Schedule of Proposed Action (SOPA) 04/01/2021 to 06/30/2021 White River National Forest This report contains the best available information at the time of publication. Questions may be directed to the Project Contact. Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact

Projects Occurring Nationwide Gypsy Moth Management in the - Vegetation management Completed Actual: 11/28/2012 01/2013 Susan Ellsworth : A Cooperative (other than forest products) 775-355-5313 Approach [email protected]. EIS us *UPDATED* Description: The USDA Forest Service and Animal and Plant Health Inspection Service are analyzing a range of strategies for controlling gypsy moth damage to forests and trees in the United States. Web Link: http://www.na.fs.fed.us/wv/eis/ Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. Nationwide. Locatable Mining Rule - 36 CFR - Regulations, Directives, In Progress: Expected:12/2021 12/2021 Sarah Shoemaker 228, subpart A. Orders NOI in Federal Register 907-586-7886 EIS 09/13/2018 [email protected] d.us *UPDATED* Est. DEIS NOA in Federal Register 03/2021 Description: The U.S. Department of Agriculture proposes revisions to its regulations at 36 CFR 228, Subpart A governing locatable minerals operations on National Forest System lands.A draft EIS & proposed rule should be available for review/comment in late 2020 Web Link: http://www.fs.usda.gov/project/?project=57214 Location: UNIT - All Districts-level Units. STATE - All States. COUNTY - All Counties. LEGAL - Not Applicable. These regulations apply to all NFS lands open to mineral entry under the US mining laws. More Information is available at: https://www.fs.usda.gov/science-technology/geology/minerals/locatable-minerals/current-revisions.

R2 - Rocky Mountain Region, Occurring in more than one Forest (excluding Regionwide)

04/01/2021 04:03 am MT Page 1 of 11 White River National Forest Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact

R2 - Rocky Mountain Region, Occurring in more than one Forest (excluding Regionwide) Xcel Energy Transmission and - Special use management Developing Proposal Expected:03/2021 05/2021 Matthew Custer Distribution Authorization; Est. Scoping Start 12/2020 720-822-4321 Operation and Maintenance [email protected] Plan Project Description: The Forest Service proposes to reauthorize approximately 293 miles of existing electric transmission line and 196 CE miles of electric distribution line; develop and implement a standardized O&M Plan for routine maintenance and vegetation management. Location: UNIT - Conejos Peak Ranger District, Saguache Ranger District, Pawnee Ranger District, Clear Creek Ranger District, Sulphur Ranger District, South Park Ranger District, West Zone/Rifle Ranger District, East Zone/Dillon Ranger District, Boulder Ranger District, East Zone/Holy Cross Ranger District, West Zone/Sopris Ranger District, Leadville Ranger District, East Zone/Eagle Ranger District, Salida Ranger District, Pikes Peak Ranger District, Gunnison Ranger District. STATE - . COUNTY - Boulder, Chaffee, Clear Creek, Conejos, Eagle, Fremont, Garfield, Gilpin, Grand, Gunnison, Jefferson, Lake, Park, Rio Grande, Saguache, Summit, Weld. LEGAL - Not Applicable. Project located on applicable Xcel transmission and distribution lines on National Forests and Grasslands in Colorado,.

White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) R2 - Rocky Mountain Region Frisco Nordic Center Trails - - Recreation management Developing Proposal Expected:05/2021 07/2021 Marcus Dreux Phase 2 - Special use management Est. Scoping Start 04/2021 970-468-5400 CE [email protected] v *NEW LISTING* Description: Construction of 7.9 miles of winter Nordic ski trails; includes 6.7 acres of disturbance and construction of 3.4 miles summer multi-use non-motorized trails; includes 1.9 acres of disturbance within the SUP boundaries of the Frisco Nordic Center. Web Link: http://www.fs.usda.gov/project/?project=59611 Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Located within the Frisco Nordic Center special use permit operational boundaries on the Frisco Peninsula.

04/01/2021 04:03 am MT Page 2 of 11 White River National Forest Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact

White River National Forest, Forestwide (excluding Projects occurring in more than one Forest) R2 - Rocky Mountain Region Natural Resources - Special use management In Progress: Expected:02/2021 02/2021 Michael Braudis Conservation Service SNOTEL Scoping Start 07/30/2020 970-404-3153 Special Use Permit Reissuance michael.braudis@usda. CE gov *UPDATED* Description: White River National Forest (WRNF) Master Special Use Permit Reissuance to the Natural Resources Conservation Service (NRCS) for the operation and maintenance of 16 existing SNOTEL sites and 12 Snow Courses Web Link: http://www.fs.usda.gov/project/?project=58579 Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Gunnison, Pitkin, Rio Blanco, Summit. LEGAL - Multiple locations across the forest within Dillon, Eagle-Holy Cross, Blanco and Aspen-Sopris Ranger Disrricts. Multiple locations across the forest. White River Aspen Management - Wildlife, Fish, Rare plants In Progress: Expected:01/2022 06/2022 Brett Crary Project - Forest products Comment Period Public Notice 970-328-5899 EA - Vegetation management 02/19/2021 [email protected] *NEW LISTING* (other than forest products) - Fuels management Description: The WRNF is proposing to conduct vegetation management activities (mechanical and prescribed fire) within forest stands that contain aspen. Management would improve the resiliency of aspen forests to disturbance agents and improve wildlife habitat. Web Link: http://www.fs.usda.gov/project/?project=59419 Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Gunnison, Mesa, Moffat, Pitkin, Rio Blanco, Routt, Summit. LEGAL - Not Applicable. Treatments could occur in forests containing aspen that area within Forest Plan Management Areas 4.2, 4.23, 4.3, 4.32, 5.12, 5.13, 5.4, 5.41, 5.42, 5.43, 5.5, 7.1, 8.21, 8.25, and 8.32. White River Forest Health and - Wildlife, Fish, Rare plants In Progress: Expected:03/2021 03/2021 Shelby Limberis Fuels Management Project - Vegetation management Scoping Start 12/18/2018 970-827-5161 CE (other than forest products) [email protected] *UPDATED* - Fuels management Description: White River National Forest proposes to perform density reduction treatments in over-crowded regenerating stands of trees. Treatments would reduce the number of trees per acre to improve overall stand health. Web Link: http://www.fs.usda.gov/project/?project=55257 Location: UNIT - White River National Forest All Units. STATE - Colorado. COUNTY - Eagle, Garfield, Mesa, Pitkin, Rio Blanco, Routt, Summit. LEGAL - Not Applicable. Project activities include all Ranger Districts on the White River National Forest.

04/01/2021 04:03 am MT Page 3 of 11 White River National Forest Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact

White River National Forest, Occurring in more than one District (excluding Forestwide) R2 - Rocky Mountain Region Berlaimont Estates Road - Special use management In Progress: Expected:02/2021 02/2021 Leanne Veldhuis Improvement Project - Road management Objection Period Legal Notice 970-471-1796 EIS 09/25/2020 leanne.veldhuis@usda. gov *UPDATED* Description: The Proposed Action would authorize Berlaimont to improve those existing segments of NFSR 774 and 780 as they lead up to the southeastern corner of the Berlaimont property from local public roads in Edwards. Web Link: http://www.fs.usda.gov/project/?project=50041 Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - The project is within Sections 20, 29, 32, and 33 of Township 4 South, Range 82 West, 6th Principal Meridian, Eagle County, Colorado. Located north of Interstate 70 in the vicinity of Edwards, Colorado. accessed by National Forest System Roads (NFSR) 774 and 780. Camp Hale Restoration and - Watershed management On Hold N/A N/A Melvin Woody Enhancement Project 970-874-6661 EIS [email protected] v Description: The purpose of action is to improve aquatic, riparian, and wetland conditions in and along the Eagle River, maintain or improve recreation opportunities and facilities, and conserve historic values in the Camp Hale area. Web Link: http://www.fs.usda.gov/project/?project=46121 Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Township 7S, Range 80W, Sect. 3, 4, 9, 10, 14, 15, 16, 22, 23, 24, 25, 26, 27. The project area is located in the Camp Hale area, south of Red Cliff, and north of Tennessee Pass. Glenwood Canyon Weather - Recreation management In Progress: Expected:03/2021 07/2021 Sarah Strehle Shelter Scoping Start 01/06/2021 970 827 5154 CE [email protected] v *NEW LISTING* Description: The project would construct a 45'x44'x21' structure at the Hanging Lake Rest Area in Glenwood Canyon to provide shelter to visitors at the popular recreation area. Web Link: http://www.fs.usda.gov/project/?project=59272 Location: UNIT - East Zone/Holy Cross Ranger District, East Zone/Eagle Ranger District. STATE - Colorado. COUNTY - Garfield. LEGAL - Not Applicable. The proposed weather shelter is located in Glenwood Canyon at the Hanging Lake Rest Area, I-70 Exit 125, Garfield County. The site is adjacent to the Hanging Lake Area restroom facility.

White River National Forest East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) R2 - Rocky Mountain Region

04/01/2021 04:03 am MT Page 4 of 11 White River National Forest Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact

White River National Forest East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) R2 - Rocky Mountain Region Arapahoe Basin Food Service - Recreation management In Progress: Expected:03/2021 06/2021 Samuel Massman and Lenawee Replacement - Special use management Scoping Start 02/17/2021 970-262-3484 Project samuel.massman@usd CE a.gov *NEW LISTING* Description: Proposal from Arapahoe Basin Ski Area to replace the existing Lenawee Chairlift, expand existing food service facilities at Black Mountain Lodge and construct a warming hut near the Lenawee Parks ski trail. Web Link: http://www.fs.usda.gov/project/?project=59357 Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. Located within Arapahoe Basin Ski Area's special use permit area and operational boundary. Keystone Bergman Bowl - Recreation management Completed Actual: 02/18/2021 06/2021 Samuel Massman Project - Special use management 970-262-3484 EA samuel.massman@usd a.gov *UPDATED* Description: Proposal to add lift-served terrain in Bergman and Erickson Bowls at Keystone Resort. Web Link: http://www.fs.usda.gov/project/?project=58011 Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. White River NF, Dillon RD, within Keystone Resort's Ski Area Term Special Use Permit area. Loveland Pass Beacon - Special use management In Progress: Expected:03/2021 04/2021 Marcus Dreux Checkpoint Scoping Start 03/19/2021 970-468-5400 CE [email protected] v *NEW LISTING* Description: Summit County Rescue Group has requested temporary authorization to install a Backcountry Access manufactured avalanche beacon checkpoint and educational avalanche signage on the south side of Loveland Pass on National Forest Land. Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - NE1/4 Sec. 34, T. 4 S., R. 76 W., 6TH PM. South Side of Loveland Pass, near the parking area.

04/01/2021 04:03 am MT Page 5 of 11 White River National Forest Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact

White River National Forest East Zone/Dillon Ranger District (excluding Projects occurring in more than one District) R2 - Rocky Mountain Region Mountain Parks Electric, Inc - Special use management Completed Actual: 01/12/2021 06/2021 Anna Bengtson Permit Renewal 970-262-3454 CE anna.p.bengtson@usda .gov *UPDATED* Description: Re-issuance of an existing authorization for variable kV electrical distribution lines and fiber optic cable. Web Link: http://www.fs.usda.gov/project/?project=58586 Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Sec 11, 13, 14, 15, 35, 36 of T2S, R80W; Sec 34 T2S, R79W; Sec 18, 28, 29, 33 of T3S, R78W; Sec 2, 3 T3S, R79W: 6th Principal Meridian. General area of permit reauthorization is north end of Summit County. Ruby Ranch Fuels Reduction - Fuels management In Progress: Expected:09/2021 10/2021 Kathleen Gray CE Scoping Start 03/31/2021 970-401-1983 [email protected] *NEW LISTING* v Description: A proposed fuels reduction project to reduce the risks and repercussions of a wildfire escaping the and posing a threat to community safety and private and public infrastructure. Web Link: http://www.fs.usda.gov/project/?project=59751 Location: UNIT - East Zone/Dillon Ranger District. STATE - Colorado. COUNTY - Summit. LEGAL - Not Applicable. The project is located within the Eagles Nest Wilderness adjacent to the Ruby Ranch subdivision in Silverthorne, Colorado.

White River National Forest East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) R2 - Rocky Mountain Region Holy Cross Energy (HCE) - Special use management In Progress: Expected:05/2021 07/2021 Carole Huey Avon-to-Gilman Electric (115- Scoping Start 11/19/2019 970-945-3219 kV) Transmission Line Est. Comment Period Public [email protected] EA Notice 04/2021 *UPDATED* Description: Holy Cross Electric Association, Inc. proposes to construct 8.65 miles of new 115-kV transmission line between the Gilman and Avon substations along the Eagle River valley, crossing 3 miles of the White River National Forest and the Town of Minturn. Web Link: http://www.fs.usda.gov/project/?project=57224 Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Townships 5 South - 81 West and 6 South - 81 West, 6th Principal Meridian, Eagle County, Colorado. The right-of-way would run southeasterly from the substation in the Avon / Eagle-Vail area, through the town of Minturn, and terminate at the substation just above Gilman.

04/01/2021 04:03 am MT Page 6 of 11 White River National Forest Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact

White River National Forest East Zone/Holy Cross Ranger District (excluding Projects occurring in more than one District) R2 - Rocky Mountain Region McCoy Park 2020 - Special use management Cancelled N/A N/A Calen Orlowski CE 7195303953 [email protected] *UPDATED* Description: Beaver Creek Resort is proposing to add a ski patrol egress/temporary construction access road, a gray water leach field for the previously approved warming hut, and signage corbels for the McCoy Park terrain development. Web Link: http://www.fs.usda.gov/project/?project=57560 Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. Beaver Creek Ski Area. McCoy Park 2021 - Special use management Developing Proposal Expected:05/2021 07/2021 Calen Orlowski Improvements Est. Scoping Start 03/2021 970-618-4379 CE [email protected] ov *NEW LISTING* Description: Beaver Creek Resort is proposing add a ski patrol egress/temporary construction access road, a gray water leach field for the previously approved warming hut, signage corbels, and an additional toilet for lift operators. Web Link: http://www.fs.usda.gov/project/?project=59521 Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Not Applicable. Within the Beaver Creek Ski Area Special Use Permit boundary. Whitney Creek Geotechnical - Minerals and Geology Completed Actual: 03/22/2021 07/2021 Leanne Veldhuis Investigation - Special use management 970-471-1796 CE - Facility management leanne.veldhuis@usda. gov *UPDATED* - Research and Development Description: Homestake Partners (City of Aurora and Colorado Springs Utilities) is requesting an authorization to conduct a fatal-flaw geotechnical investigation within the Homestake Valley located on National Forest System Lands in southeastern Eagle County. Web Link: http://www.fs.usda.gov/project/?project=58221 Location: UNIT - East Zone/Holy Cross Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Township 7 South - Range 81 West, 6th Principal Meridian, Eagle County, Colorado. The project area is located along Homestake Creek about 6 miles southwest of Redcliff, Colorado. Sec. 13 and Sec. 23 - T7S-R81W, 6th P.M., Eagle County, Colorado.

White River National Forest West Zone/Blanco Ranger District (excluding Projects occurring in more than one District) R2 - Rocky Mountain Region

04/01/2021 04:03 am MT Page 7 of 11 White River National Forest Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact

White River National Forest West Zone/Blanco Ranger District (excluding Projects occurring in more than one District) R2 - Rocky Mountain Region Hill Creek C&H Livestock - Grazing management In Progress: Expected:02/2021 06/2021 Mary Cunningham Facility Scoping Start 11/06/2020 970-878-5015 CE mary.cunningham@usd a.gov *UPDATED* Description: This project involves the construction of a corral with loading chute and a small 'beef pasture' (7 ac) for livestock ingress and egress to the Hill Creek C&H grazing allotment. Web Link: http://www.fs.usda.gov/project/?project=59084 Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. LEGAL - Not Applicable. Project is located T 2 S, R 90 W, Section 7 Accessible by Rio Blanco County Road 10, Peltier Trailhead Parking Lot. Yellowjacket Project - Forest products In Progress: Expected:06/2021 06/2022 Christopher McDonald EA - Vegetation management Comment Period Public Notice 970-625-6856 (other than forest products) 02/20/2020 christopher.mcdonald@ - Fuels management usda.gov - Road management Description: The Blanco Ranger District is proposing approximately 2,300 acres of vegetation management activities within the Wilson Park, Sawmill Mountain and Ellison Mountain area. Web Link: http://www.fs.usda.gov/project/?project=57654 Location: UNIT - West Zone/Blanco Ranger District. STATE - Colorado. COUNTY - Rio Blanco. LEGAL - Sec. 1-3, 10- 15, 22-27, 34-36, T2N, R92W; Sec. 4-9, 17-20, 26-36, T2N, R91W; Sec. 1-3 and 12, T1N, R92W; Sec. 1-17, 20-24, 26-29, 32-34, T1N, R91W; Sec. 7, 18, 19 T1N, R90W, Rio Blanco Co. Proposed management activities would occur approximately 16 miles east-northeast of Meeker, Colorado within the vicinity of Wilson Park, Sawmill Mountain and Ellison Mountain,.

White River National Forest West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) R2 - Rocky Mountain Region

04/01/2021 04:03 am MT Page 8 of 11 White River National Forest Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact

White River National Forest West Zone/Rifle Ranger District (excluding Projects occurring in more than one District) R2 - Rocky Mountain Region Hells Gulch Communication - Special use management In Progress: Expected:02/2021 02/2021 Corbin Shipp Tower Renewal Permit Scoping Start 09/23/2020 970-625-6845 CE [email protected] *UPDATED* Description: Reissue special use permit (RIF-184) to Laramie Energy, LLC., including relocating the existing tower approx. 75ft south of current pad location and continued use of existing roads NFSR 815.1 & NFSR 815.1A to Hells Gulch Wellpad #26 Web Link: http://www.fs.usda.gov/project/?project=58843 Location: UNIT - West Zone/Rifle Ranger District. STATE - Colorado. COUNTY - Mesa. LEGAL - Not Applicable. T8S, R92W, Sections 26, 27, & 34; 6th Principal Meridian, Mesa County, Colorado.

White River National Forest West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) R2 - Rocky Mountain Region El Jebel Administrative Sites, - Land ownership management In Progress: Expected:02/2022 03/2022 Kevin Warner Upper and Lower Parcels, NOI in Federal Register 970-945-3303 Conveyance Project 12/07/2016 [email protected] EIS Est. DEIS NOA in Federal *UPDATED* Register 09/2021 Description: Proposal to sell two adjacent parcels of land (approx. 40 acres and 30 acres in size), and the associated water rights and mineral estate in El Jebel, Colo. pursuant to the Forest Service Facilities Realignment and Enhancement Act of 2015. Web Link: http://www.fs.usda.gov/project/?project=50663 Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Eagle. LEGAL - Sixth Principal Meridian T. 8 S., R. 87 W. N1/2 of Sec. 3, NE1/4 NE1/4 of Sec. 4. The Lower Parcel is approximately 40 acres and is predominantly riparian in nature and the Upper Parcel is approximately 30 acres and consists of three residences, one mobile home pad, horse pastures.

04/01/2021 04:03 am MT Page 9 of 11 White River National Forest Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact

White River National Forest West Zone/Sopris Ranger District (excluding Projects occurring in more than one District) R2 - Rocky Mountain Region Pitkin County Thomasville - Special use management In Progress: Expected:03/2021 06/2021 Michael Braudis CommSite Redevelopment Scoping Start 02/23/2021 970-262-3481 CE michael.braudis@usda. gov *NEW LISTING* Description: Construction of a new freestanding tower and installation of a communications cabinet adjacent to existing permitted facility. Removal and rehabilitation of the existing communications facility which includes the shelter and all towers/antennas. Web Link: http://www.fs.usda.gov/project/?project=59548 Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - NE1/4SE1/4, Sec. 17, T. 8 S., R 83 W., 6th PM, Pitkin County, CO White River NF. NE1/4SE1/4, Sec. 17, T. 8 S., R 83 W., 6th PM, Pitkin County,CO Site is located 1500 ft. northeast of the intersection of County Road 4 (Fryingpan Rd.) and County Road 4A.4 (Eagle-Thomasville Rd.). Redstone to McClure Pass Trail - Recreation management On Hold N/A N/A Shelly Grail EA - Special use management 970-404-3155 [email protected] *UPDATED* Description: Pitkin County has proposed a native surface trail connecting Redstone with McClure Pass. The 5 mile section of trail on NFS would lie within the CDOT right of way or along the historic wagon road. Web Link: http://www.fs.usda.gov/project/?project=56913 Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Not Applicable. Along CDOT Highway 133 right of way between Redstone and McClure or along historic wagon route. Toilet Installation at Upper Lost - Recreation management In Progress: Expected:04/2021 06/2021 Shelly Grail Man Trailhead Scoping Start 03/22/2021 970-404-3155 CE [email protected] *NEW LISTING* Description: Installation of a CXT toilet at the Upper Lost Man trailhead. Web Link: http://www.fs.usda.gov/project/?project=59483 Location: UNIT - West Zone/Sopris Ranger District. STATE - Colorado. COUNTY - Pitkin. LEGAL - Not Applicable. Upper Lost Man trailhead- Highway 82 corridor; 2 miles below Independence Pass Summit at 11,500 feet. Project coordinates: 39 07%u2019 18%u201D N, 106 34%u2019 18%u201D W.

04/01/2021 04:03 am MT Page 10 of 11 White River National Forest Expected Project Name Project Purpose Planning Status Decision Implementation Project Contact

The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD).

To file a complaint of discrimination, write USDA, Director, Office of Civil Rights, 1400 Independence Avenue, SW, Washington, DC 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.

This report contains the best available information at the time of publication. Questions may be directed to the Project Contact.

04/01/2021 04:03 am MT Page 11 of 11 White River National Forest