Inland Port VII at Logistics Park Kansas City
1,115,196 SF Modern Warehouse / Distribution Space Available Directly Adjacent to the BNSF Intermodal Facility Inland Port VII
NorthPoint Development proposes a 1,115,196 square foot state-of-the-art distribution center at Logistics Park Kansas City (LPKC). Located in Edgerton, Kansas, a suburb southwest of Kansas City, LPKC is a 1,700-acre master- planned development served by BNSF Railway’s newest intermodal facility.
Inland Port VII, located at the southwest corner of 185th and Waverly Road, can accommodate manufacturing, warehouse and distribution tenants of varying size. Inland Port VII will be located near the entrance of BNSF’s intermodal facility, which offers access to international and domestic container service along with heavy haul corridor access.
LPKC Progress Photo 05/2016 (Southeast Quadrant - 191st/Waverly Road)
LPKC Progress Photo 05/2016 (Northwest Quadrant - 191st/Waverly Road)
LPKC Progress Photo 10/2016 (Northwest Quadrant - 196th/Waverly Road) EAST
27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 48'-2" 5015 NW Canal Street | Suite 200 | Riverside, MO 64150 816 | 888 | 7380 NorthPoint Development, LLC Logistics Park Kansas City Kansas Certificate of Authorization No. A-1099
CIVIL RENAISSANCE INFRASTRUCTURE OVERALL EAST ELEVATION CONSULTING 1 Scale: 1:50 LANDSCAPE RENAISSANCE INFRASTRUCTURE CONSULTING Inland VII FOUNDATIONS STRUCTURAL
PLUMBING
MECHANICAL 1,115,196 ELECTRICAL FIRE PROTECTION
CONTRACTOR
Specifications
Building Size ± 1,115,196 SF Future Trailer Storage 254 Stalls
Availability / Divisibility ± 1,115,196 SF / 350,000 SF Electric Service 3,000 Amps @ 480V 3P
xes Estimated $0.62 / SF (fixed) Lighting T-5 HO
Insurance Estimated $0.05 / SF Heat High E Gas Fired MAU's Inland Port VIII
30900 W 185th St · Edgerton, KS
Parking 449 Stalls Project No. 2016-32 CAM Estimated $0.20 / SF Date: 09.30.16 Issued For: Final Development Plan Revisions: DateNo. Description Dimensions ± 520’ x 2,152' Zoning Logistics Park
Office Space Build-to-Suit Year Built 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27
Construction 48'-2" Concrete Tilt-up Water JC WD 7
Robert H. Waters III - Architect OVERALL WEST ELEVATION Kansas License No. 4297 3 Scale: 1:50 A1.08 Clear Height 36’ + Outside Speed Bay Sewer Edgerton - New Treatment FacilityOVERALL FLOOR PLAN
Floor 7” Concrete Slab Electricity KCP&L
Bay Spacing 52’ x 50’ (Typical), 52' x 60' (Loading Bay) Gas Kansas Gas Energy
Fire Protection ESFR Fire Protection JC-1
Loading 120 Dock-high (expandable); 4 Drive-in Intermodal Access 1.5 Miles to BNSF Gate
Truck Court 60’ Concrete Aprons, 8” Concrete I-35 1.5 Miles
OVERALL FLOOR PLAN FLOOR OVERALL
A1.08
Scale: 1:50 Scale: 3
OVERALL WEST ELEVATION WEST OVERALL
Kansas License No. 4297 No. License Kansas Robert H. Waters III - Architect - III Waters H. Robert
48'-2"
4 1 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 3 2
Description DateNo.
Revisions:
Issued For: Final Development Plan Development Final For: Issued
ae 09.30.16 Date:
rjc o 2016-32 No. Project
Edgerton, KS Edgerton, St 185th W 30900 ·
Inland Port VIII Port Inland
CONTRACTOR
FIRE PROTECTION FIRE
ELECTRICAL
MECHANICAL
PLUMBING
STRUCTURAL
FOUNDATIONS
CONSULTING
LANDSCAPE RENAISSANCE INFRASTRUCTURE RENAISSANCE
Scale: 1:50 Scale:
1
CONSULTING
OVERALL EAST ELEVATION EAST OVERALL
CIVIL RENAISSANCE INFRASTRUCTURE RENAISSANCE
Kansas Certificate of Authorization No. A-1099 No. Authorization of Certificate Kansas
NorthPoint Development, LLC Development, NorthPoint
816 | 888 | 7380 | 888 | 816 5015 NW Canal Street | Suite 200 | Riverside, MO 64150 MO Riverside, | 200 Suite | Street Canal NW 5015
48'-2"
10 14 1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24 25 26 27 EAST Plan Floor VII Inland
OVERALL FLOOR PLAN FLOOR OVERALL
A1.08
Scale: 1:50 Scale: 3
OVERALL WEST ELEVATION WEST OVERALL
Kansas License No. 4297 No. License Kansas Robert H. Waters III - Architect - III Waters H. Robert
48'-2"
4 1 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 3 2
Description DateNo.
Revisions:
Issued For: Final Development Plan Development Final For: Issued
ae 09.30.16 Date:
rjc o 2016-32 No. Project
Edgerton, KS Edgerton, St 185th W 30900 ·
Inland Port VIII Port Inland
CONTRACTOR
FIRE PROTECTION FIRE
ELECTRICAL
MECHANICAL
PLUMBING
STRUCTURAL
FOUNDATIONS
CONSULTING
LANDSCAPE RENAISSANCE INFRASTRUCTURE RENAISSANCE
Scale: 1:50 Scale:
1
CONSULTING
OVERALL EAST ELEVATION EAST OVERALL
CIVIL RENAISSANCE INFRASTRUCTURE RENAISSANCE
Kansas Certificate of Authorization No. A-1099 No. Authorization of Certificate Kansas
NorthPoint Development, LLC Development, NorthPoint
816 | 888 | 7380 | 888 | 816 5015 NW Canal Street | Suite 200 | Riverside, MO 64150 MO Riverside, | 200 Suite | Street Canal NW 5015
48'-2"
10 14 1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24 25 26 27
Plan Site EAST VII Inland Project Advantages • Strategically and centrally located • Optimize your supply chain • Master-planned distribution and • 1,700 acres of developable space warehouse development • 17 million square feet of building capacity • Efficient movement of global goods • Access to heavy-haul corridor • Reduced transportation costs
LPKC is a cost-efficient solution for logistics-oriented companies focused on development. Benefits include: • Competitive lease rates • Low net expenses • Affordable utilities • Immediate access to BNSF Railway’s Intermodal Facility • Financial incentives • Significant savings on dayage rates • A strong, available workforce • Convenient interstate highway access • Benefits of Foreign Trade Zone
For more information about the benefits of co-locating a facility at LPKC, visit logisticsparkkc.com.
Contact For leasing opportunities at Inland Port VII or LPKC, contact the exclusive commercial real estate agents Phil Algrim and Kevin Wilkerson at JLL, 913.469.4600. www.jll.com/kansas-city.
Edgerton, KS • logisticsparkkc.com