Inland VII at Logistics Kansas

1,115,196 SF Modern Warehouse / Distribution Space Available Directly Adjacent to the BNSF Intermodal Facility VII

NorthPoint Development proposes a 1,115,196 square foot state-of-the-art distribution center at Logistics Park Kansas City (LPKC). Located in Edgerton, Kansas, a suburb southwest of Kansas City, LPKC is a 1,700-acre master- planned development served by BNSF Railway’s newest intermodal facility.

Inland Port VII, located at the southwest corner of 185th and Waverly , can accommodate manufacturing, warehouse and distribution tenants of varying size. Inland Port VII will be located near the entrance of BNSF’s intermodal facility, which offers access to international and domestic container service along with heavy haul corridor access.

LPKC Progress Photo 05/2016 (Southeast Quadrant - 191st/Waverly Road)

LPKC Progress Photo 05/2016 (Northwest Quadrant - 191st/Waverly Road)

LPKC Progress Photo 10/2016 (Northwest Quadrant - 196th/Waverly Road) EAST

27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1 48'-2" 5015 NW Street | Suite 200 | Riverside, MO 64150 816 | 888 | 7380 NorthPoint Development, LLC Logistics Park Kansas City Kansas Certificate of Authorization No. A-1099

CIVIL RENAISSANCE OVERALL EAST ELEVATION CONSULTING 1 Scale: 1:50 RENAISSANCE INFRASTRUCTURE CONSULTING Inland VII FOUNDATIONS STRUCTURAL

PLUMBING

MECHANICAL 1,115,196 ELECTRICAL FIRE PROTECTION

CONTRACTOR

Specifications

Building Size ± 1,115,196 SF Future Trailer Storage 254 Stalls

Availability / Divisibility ± 1,115,196 SF / 350,000 SF Electric Service 3,000 Amps @ 480V 3P

xes Estimated $0.62 / SF (fixed) Lighting T-5 HO

Insurance Estimated $0.05 / SF Heat High E Gas Fired MAU's Inland Port VIII

30900 W 185th St · Edgerton, KS

Parking 449 Stalls Project No. 2016-32 CAM Estimated $0.20 / SF Date: 09.30.16 Issued For: Final Development Plan Revisions: DateNo. Description Dimensions ± 520’ x 2,152' Logistics Park

Office Space Build-to-Suit Year Built 2018 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27

Construction 48'-2" Concrete Tilt-up Water JC WD 7

Robert H. Waters III - Architect OVERALL WEST ELEVATION Kansas License No. 4297 3 Scale: 1:50 A1.08 Clear Height 36’ + Outside Speed Bay Sewer Edgerton - New Treatment FacilityOVERALL FLOOR PLAN

Floor 7” Concrete Slab Electricity KCP&L

Bay Spacing 52’ x 50’ (Typical), 52' x 60' (Loading Bay) Gas Kansas Gas Energy

Fire Protection ESFR Fire Protection JC-1

Loading 120 Dock-high (expandable); 4 Drive-in Intermodal Access 1.5 Miles to BNSF Gate

Truck Court 60’ Concrete Aprons, 8” Concrete I-35 1.5 Miles

OVERALL FLOOR PLAN FLOOR OVERALL

A1.08

Scale: 1:50 Scale: 3

OVERALL WEST ELEVATION WEST OVERALL

Kansas License No. 4297 No. License Kansas Robert H. Waters III - Architect - III Waters H. Robert

48'-2"

4 1 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 3 2

Description DateNo.

Revisions:

Issued For: Final Development Plan Development Final For: Issued

ae 09.30.16 Date:

rjc o 2016-32 No. Project

Edgerton, KS Edgerton, St 185th W 30900 ·

Inland Port VIII Port Inland

CONTRACTOR

FIRE PROTECTION FIRE

ELECTRICAL

MECHANICAL

PLUMBING

STRUCTURAL

FOUNDATIONS

CONSULTING

LANDSCAPE RENAISSANCE INFRASTRUCTURE RENAISSANCE

Scale: 1:50 Scale:

1

CONSULTING

OVERALL EAST ELEVATION EAST OVERALL

CIVIL RENAISSANCE INFRASTRUCTURE RENAISSANCE

Kansas Certificate of Authorization No. A-1099 No. Authorization of Certificate Kansas

NorthPoint Development, LLC Development, NorthPoint

816 | 888 | 7380 | 888 | 816 5015 NW Canal Street | Suite 200 | Riverside, MO 64150 MO Riverside, | 200 Suite | Street Canal NW 5015

48'-2"

10 14 1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24 25 26 27 EAST Plan Floor VII Inland

OVERALL FLOOR PLAN FLOOR OVERALL

A1.08

Scale: 1:50 Scale: 3

OVERALL WEST ELEVATION WEST OVERALL

Kansas License No. 4297 No. License Kansas Robert H. Waters III - Architect - III Waters H. Robert

48'-2"

4 1 27 26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 3 2

Description DateNo.

Revisions:

Issued For: Final Development Plan Development Final For: Issued

ae 09.30.16 Date:

rjc o 2016-32 No. Project

Edgerton, KS Edgerton, St 185th W 30900 ·

Inland Port VIII Port Inland

CONTRACTOR

FIRE PROTECTION FIRE

ELECTRICAL

MECHANICAL

PLUMBING

STRUCTURAL

FOUNDATIONS

CONSULTING

LANDSCAPE RENAISSANCE INFRASTRUCTURE RENAISSANCE

Scale: 1:50 Scale:

1

CONSULTING

OVERALL EAST ELEVATION EAST OVERALL

CIVIL RENAISSANCE INFRASTRUCTURE RENAISSANCE

Kansas Certificate of Authorization No. A-1099 No. Authorization of Certificate Kansas

NorthPoint Development, LLC Development, NorthPoint

816 | 888 | 7380 | 888 | 816 5015 NW Canal Street | Suite 200 | Riverside, MO 64150 MO Riverside, | 200 Suite | Street Canal NW 5015

48'-2"

10 14 1 2 3 4 5 6 7 8 9 11 12 13 15 16 17 18 19 20 21 22 23 24 25 26 27

Plan Site EAST VII Inland Project Advantages • Strategically and centrally located • Optimize your supply chain • Master-planned distribution and • 1,700 acres of developable space warehouse development • 17 million square feet of capacity • Efficient movement of global goods • Access to heavy-haul corridor • Reduced transportation costs

LPKC is a cost-efficient solution for logistics-oriented companies focused on development. Benefits include: • Competitive lease rates • Low net expenses • Affordable utilities • Immediate access to BNSF Railway’s Intermodal Facility • Financial incentives • Significant savings on dayage rates • A strong, available workforce • Convenient interstate highway access • Benefits of Foreign Trade Zone

For more information about the benefits of co-locating a facility at LPKC, visit logisticsparkkc.com.

Contact For leasing opportunities at Inland Port VII or LPKC, contact the exclusive commercial real estate agents Phil Algrim and Kevin Wilkerson at JLL, 913.469.4600. www.jll.com/kansas-city.

Edgerton, KS • logisticsparkkc.com