Page 1 of 40

Minutes of the 273rd meeting of the State Level Expert Appraisal Committee held on 12/01/2016 at Committee Room, Pollution Control Board, Gandhinagar. The 273rd meeting of the State Level Expert Appraisal Committee (SEAC) was held on 12th January, 2016 at Committee Room, Gujarat Pollution Control Board, Gandhinagar. Following members attended the meeting:

1. Shri T. P. Singh, Chairman, SEAC. 2. Shri V. C. Soni, Vice Chairman, SEAC. 3. Shri R. J. Shah, Member, SEAC. 4. Dr. V. K. Jain, Member, SEAC. 5. Shri V. N. Patel, Member, SEAC. 6. Shri Hardik Shah, Secretary, SEAC.

The agenda of TOR/Scoping and appraisal cases was taken up. Eight (08) cases of TOR/Scoping and four (04) appraisal cases were taken up. The applicants made presentations on the activities to be carried out along with other details furnished in the Form-1 / Form-1A, EIA report and other reports. 1 Aaditi Enterprise Block .No.A2 Pal, Choras, Screening & Scoping  M/s: Aaditi Enterprise (herein after Project Proponent – PP) has submitted application vide their online proposal no. SIA/GJ/MIS/2521/2015. Project status: New Project / Activity Details: M/s. Aaditi Enterprise has applied for dredging at Block: A2, near Pal village Taluka: Chorasi, District: Surat, Gujarat to remove accumulated sediment on right bank of Tapi Estuary as a flood control measure. This project has been conceptualized as the disaster management programme by Collector office Surat. The objective of undertaking proposed dredging works within this particular reach of Tapti river (Right bank) is for flood alleviation purposes by increasing the river channel capacity and its ability to convey water. Widening and deepening of that portion of the river on the right bank will be carried out to increase the carrying capacity of River Tapi. The work had been allocated to M/s Aaditi Enterprise to remove the accumulated sediment an area of 8 hectors at A2 block ,along the right bank Tapti estuary near Pal village in Chorasi Taluka. Anticipated sand reserve is 348000 MT and rate of removal of sand is 30000 MT/Month. Dredging will be carried out by means of mechanical or hydraulic process. The dredged material will be loaded out and beneficially deposited at other various sites based on the quality of sediment. Sand, aggregates soil etc. Will be reused / recycle for various purpose. One DG set is proposed. Requirement of fresh water is only for drinking purpose. No domestic activity will be carried out near the project site. There will be no waste water and solid waste generation from the proposed activity. The waste oil (100 lit./Month) is expected to be generated from the hydraulic dredger and other machineries. Observations & Discussions: During the meeting, Committee noted that the proposed proposal of dredging is to remove the accumulated sediments to a depth of 3 meter. However, the proposed area is only a part of total 153.65.50 Ha area from Singanpore weir to Magdalla bridge of River Tapi, which falls under the CRZ area. Project proponent informed that the flood in Tapti River has become recurring phenomena during the monsoon period and In order to overcome this and to reduce the impact of flood, Collector office

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 1 of 40

Page 2 of 40

Surat has decided to remove the accumulated sediments to a depth of 3 meter. On asking about the master plan for the entire belt of 153.65.50 Ha, PP informed that they have not prepared the master plan as Collector, Surat will prepare the same. Project proponent could not reply satisfactorily about how the one block of 8 ha will benefit the River Tapi to control flood situation. Issues related to erosion, River morphology etc. has been discussed in detail. The committee observed that the proposed dredging will be carried out within the River stream. The committee was of the view that this project cannot be considered for ToR unless and until a study has been conducted by recognized institution to examine sand replenishment rate and other related environmental parameters. After deliberations on various aspects, It was unanimously decided to consider the project for TOR/Scoping only after submission of the following: 1. Detailed Environment impact study report by recognized institution to examine sand replenishment rate, impact of dredging on morphology, plankton, benthic flora and fauna, turbidity downstream and other related environmental aspects for proposed project considering entire stretch of 153.65.50 Ha area and its mitigation measures.

2 Krishna Developers S.N.A-1 (On Tapi River) Pal, Coryasi, Screening & Dist.: Surat Scoping

 M/s: Krishna Developers (herein after Project Proponent – PP) has submitted application vide their proposal no. SIA/GJ/MIS/2526/2015. Project status: New Project / Activity Details: M/s. Krishna Developers has applied for dredging at Block: A1, near Pal village Taluka: Chorasi, District: Surat, Gujarat to remove accumulated sediment on right bank of Tapi Estuary as a flood control measure. This project has been conceptualized as the disaster management programme by Collector office Surat. The objective of undertaking proposed dredging works within this particular reach of Tapti river (Right bank) is for flood alleviation purposes by increasing the river channel capacity and its ability to convey water. Widening and deepening of that portion of the river on the right bank will be carried out to increase the carrying capacity of River Tapi. The work had been allocated to M/s Krishna Developers to remove the accumulated sediment an area of 10 hectors at A1 block ,along the right bank Tapti estuary near Pal village in Chorasi Taluka. Anticipated sand reserve is 435000 MT and rate of removal of sand is 38000 MT/Month. Dredging will be carried out by means of mechanical or hydraulic process. The dredged material will be loaded out and beneficially deposited at other various sites based on the quality of sediment. Sand, aggregates soil etc. Will be reused / recycle for various purpose. One DG set is proposed. Requirement of fresh water is only for drinking purpose. No domestic activity will be carried out near the project site. There will be no waste water and solid waste generation from the proposed activity. The waste oil (100 lit./Month) is expected to be generated from the hydraulic dredger and other machineries. Observations & Discussions: During the meeting, Committee noted that the proposed proposal of dredging is to remove the accumulated sediments to a depth of 3 meter. However, the proposed area is only a part of total 153.65.50 Ha area from Singanpore weir to Magdalla bridge of River Tapi, which falls under the CRZ area. Project proponent informed that the flood in Tapti River has become recurring phenomena during the monsoon period and In order to overcome this and to reduce the impact of flood, Collector office Surat has decided to remove the accumulated sediments to a depth of 3 meter. On asking about the master plan for the entire belt of 153.65.50 Ha, PP informed that they have not prepared the master plan as Collector, Surat will prepare the same. Project proponent could not reply satisfactorily about how the one block of 8 ha will benefit the River Tapi to control flood situation. Issues related to erosion, River morphology etc. has been discussed in detail.

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 2 of 40

Page 3 of 40

The committee observed that the proposed dredging will be carried out within the River stream. The committee was of the view that this project cannot be considered for ToR unless and until a study has been conducted by recognized institution to examine sand replenishment rate and other related environmental parameters. After deliberations on various aspects, It was unanimously decided to consider the project for TOR/Scoping only after submission of the following: 1. Detailed Environment impact study report by recognized institution to examine sand replenishment rate, impact of dredging on morphology, plankton, benthic flora and fauna, turbidity downstream and other related environmental aspects for proposed project considering entire stretch of 153.65.50 Ha area and its mitigation measures.

3 Bio Clean BMW Plot No. 99/p, Village : Sevala, Ta.: Chansma, Screening & Management System Dist. Patan Scoping

Project / Activity No.: 7 (da)  M/s: Bio Clean BMW Management System (herein after Project Proponent – PP) has submitted application vide their online proposal vide no. SIA/GJ/MIS/3991/2015 dated 06/11/2015. Project status: New Project / Activity Details: This unit has proposed to set up a Common Bio-Medical Waste Treatment Facility (CBWTF) for collection, transportation & its management as per the Bio-Medical Waste (Management and Handling) Rules, 1998 as amended. Proposed capacity of the project is illustrated below: Facility Capacity Number Incinerator 100 Kg/hr each 2 Autoclave 250 kg/hr. 1 Shredder 100 Kg/ hr 1 Effluent Treatment Plant 10 KL/day 1

The project falls under Category B of project activity 7(da) as per the schedule of EIA Notification 2006. Total land area of 4645 sq. m will be utilized for the proposed Centralized Bio-Medical Waste Treatment Facility (CBWTF). Unit has proposed 1393.5 sq m area for the green belt development/Tree plantation. Expected project cost is Rs. 1.75 Crores. Wastes shall be collected from various Hospitals, Clinics and Health Care units (UCHs) located in District Patan and surrounding area. PP presented that the aerial distance of nearest habitat of village Sevala is @ 1.75 km from the proposed site. Total water consumption for proposed project will be 19.5 KL/day (8.5 KL for Domestic, 11 KL for Industrial) which will be sourced from ground water using bore well. Industrial waste water generation will be 9 .5 KL/day from Washing and scrubber, which will be treated in proposed ETP (Primary and Secondary treatment plant) and treated waste water will be reused for gardening (7 KL/day) and for scrubber (2.5 KL/day). Domestic waste water (1.2 KL/day) will be disposed off into soak pit system. Unit has proposed two Incinerators with capacity 100 Kg/hr each along with automatic waste loading system by conveyor belt. Cyclone separator followed by water scrubber is proposed as APCM. Diesel (500 Litre/day) will be used as fuel for incineration. The non-incinerable and infected waste will be taken for autoclaving at autoclave section. The capacity of autoclave will be 250 kg/hr. After disinfection of BMW in autoclave, it will be loaded into shredder machine for shredding process. The proposed shredder will have the capacity of 100 Kg/ hr. The shredded waste will be collected in plastic bags and then will be send to authorized recycler. Unit has proposed one DG set having capacity 50 KVA. Hazardous waste generated from the

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 3 of 40

Page 4 of 40 proposed activity will be ETP sludge (0.5 MT/Month), Incinerator ash (2 MT/Month), Disinfected and shredded plastic materials (25 MT/Month) and used oil (50 lit./Year). ETP waste & Incinerator ash will be disposed off at the nearby common TSDF. Disinfected and shredded plastic materials will be sold out to authorised recyclers. Used oil will be sold only to the registered recyclers. Discussions & Observations: Technical presentation made during the meeting by project proponent. During the meeting, guidelines published by Central Pollution Control Board (CPCB) for Common Bio-Medical Waste Treatment Facility (CBWTF) were discussed in detail. On asking about the justification regarding the site selection for proposed project of CBWTF in context of CPCB guidelines, PP could not justify for the selection of site. Committee found that there are CBWTF sites existing within the 150 km radial distance from the proposed site. Committee noted that the Hon’ble High Court of Gujarat in the matter of CBWTF association of versus State of Gujarat (special Civil application no. 8364 of 2013) has passed a judgement on 26/02/2015 mentioning dismissal of petition on the ground of alternative remedy of appeal before the appellate authority. It is further noted that the case of CBWTF association of India versus State of Gujarat is still pending before the appellate authority and Committee unanimously decided to consider the proposal for screening & scoping only after the final decision by Appellate authority.

4. Department of Fisheries, Mangrol Phase III, District,: Junagarh Screening & Government of Gujarat. Scoping

Project / Activity No.: 7 (e)  M/s. Fisheries Department, Government of Gujarat (herein after Project Proponent – PP) has submitted application vide their proposal no. SIA/GJ/MIS/4219/2015 dated 17/11/2015. Project status: New Project / Activity Details: The proposed Mangrol Fishery harbour is proposed on sea at a distance of about 1 km to the west of the existing Mangrol Fishery Harbor. The area proposed to be acquired is barren land and devoid of any vegetation and settlement. The proposed project area will be developed as a fishery harbour and necessary facilities will be provided for fishermen. The following fleet size will be considered for Phase III expansion and design the harbour. OAL No. of Average No. of Days in No. of Duration of each Vessels Landing per fishing season fishing days trip (days) Boat (Kg) Trawler (17 to 18 m) 800 3000 300 240 12 IBM-OBM-NM-(10 200 90 270 200 1 m)

The project falls in the project activity 7(e) and category B as per the schedule of EIA Notificaiton-2006. Total plot area is 237200 sq. m [106800 sq. m land side facilities & 1304000 sq. m for marine side facilities] and proposed Green belt area/Tree plantation area will be 1073 sq. m. Estimated cost of the proposed project will be 91.42 Crores. The proposal envisages developing an outer harbour as phase-III expansion on the south-eastern side of existing fishery harbour. The proposed project envisages construction of two break water viz. Eastern Break Water- 512.50 m and Western Break Water - 321.65 m. Dredging is required close to the shoreline to ensure all time berthing. Dredged material (30-40%) will be use in construction & balance will be dumped at GMB recommended dumping site. Quay requirement will be Landing quay- 805 m, Outfitting quay-560 m, Repair quay- 280 m and Berthing Quay-1379m. The berth is wharf wall type structure consisting of retaining wall and deck slab. Unit has proposed one auction hall, Fishnet Mending Shed, Fish storage and ice plants, Ice Storage facilities 273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 4 of 40

Page 5 of 40 near outfitting quay, Sanitary Facilities, CC road, Water distribution system, Administrative office, Centre Communication & Radio Station, Electric Room, Gear Shed, Workshop, Toilet Blocks, Fuel Pump Area, Boat Parking, Boat Repair Area, Canteen, Security Cabin, Dormitory, Pavement and Parking area, Boat hauling arrangements etc. Water consumption will be 169.50 KL/day (Domestic – 37.4 KL & Industrial (Washings) – 132.10 KL). Fresh water will be supplied through local municipality or tankers. Wastewater generation from washing activity will be 105.68 KL/day. Quantity of sewage will be around 29.92 KL/day. Wastewaters will be treated in Treatment Plant and treated waste water will be reused for greenbelt development. Solid waste likely to be generated from construction site and labour camps during construction phase will be collected and disposed off at designated disposal site. Fish waste (offal) will be collected from the auction hall and used for manufacturing of fish meal for animal and poultry feeds etc, during operation phase. Offal may also be used for making fertilisers for agriculture use. Community toiled with septic tanks shall be provided for the labour involved in construction phase. DG set will be provided as stand- by facility. Hazardous wastes to be generated are used oil and discarded containers. Observations/Discussions: Technical presentation by the project proponent also covered details like back ground details & need of the proposed project, proposed facilities, layout plan, proposed structures, major components of DPR, dredging, growth pattern, design data, general information, proposed Terms of Reference etc. On asking about the CRZ, representatives of the project informed that the proposed activity will be carried out within the CRZ area and they will obtain CRZ clearance from the concern authority. While discussing about the waste water management, Committee emphasized on complete reuse of treated waste water and asked to submit treated effluent management plan during monsoon season when utilization of treated effluent for gardening & plantation purpose is not feasible. Issues related to dredging, erosion, marine ecology etc. have been discussed. PP presented that there are no National parks / Sanctuaries / Wildlife reserves within a radius of 10 km from the project site. On asking about the benefits to the local people from this proposed project, PP informed that Construction of fisheries harbour will give boost to fishing activities in the area and due to increase in fishing activities, economy of the local population will improve significantly in the project area and its surrounding area. The project proponent presented that they have already started baseline environmental monitoring in the winter 2015-2016 and requested to allow them to use the same for the preparation of the EIA report which was agreed to by the committee. After detailed discussion on each and every aspect of the project, following TOR were prescribed to include them in the EIA report to be prepared for the study area covering 10 km radius from the boundary of the project site. 1. Present land use pattern within 10 km radius from the project boundary based on satellite imagery. 2. Copy of permission obtained from Revenue Department for the proposed development of fishery harbour. 3. Land ownership documents and copy of approval obtained from Gujarat Maritime Board for the proposed development of fishery harbour. 4. A map showing distance of the nearest fishing port, fishermen hutments, village, salt pans, mangrove patch, migratory corridors of birds, National Parks/Sanctuaries/Bio sphere Reserves, sand dune areas etc. from the project boundary. Give tabular chart with exact aerial distance with specific remarks (If any). 5. Distance of the Fishery harbour from the Low Tide Line. Authenticated details on High Tide height, time duration of high tide availability etc. 6. Phase wise project implementation details in terms of site development, infrastructure provision, EMS implementation etc. Phase wise project implementation schedule with bar chart including resources, manpower and time frame etc. 7. Details of the activities to be undertaken in the CRZ area and their impact on marine ecosystems

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 5 of 40

Page 6 of 40

and mitigation measures proposed in this regard. 8. Copy of CRZ map or map prepared by one of the authorized agencies authorized by the MoEF for carrying out the CRZ demarcation, on which the project boundary / facilities are superimposed and clearly indicating the proposed project location. 9. Status of application for CRZ clearance. Recommendation from the Gujarat Coastal Zone Management Authority under the CRZ Notification. 10. Analysis of Alternatives (Technology & Sites). Technologies involved for design, construction, equipment and operation. 11. Project coverage, master plan, phasing and scope. Capacity of the Harbour, types of fishing trawlers/boats proposed for handling, Fish handling equipments, ancillary operations, housing, vehicl parking details etc 12. Assessment of source of the water supply with adequacy of the same to meet with the requirements for the project. Copy of permission obtained from the concerned authority for water supply. 13. Detailed mass balance and water balance (including reuse-recycle, if any). 14. Details of the proposed ETP and stream wise analysis of the waste water likely to be generated as well as the stream wise treatment proposed with ETP adequacy and efficacy report. Details of segregation of the wastewater stream to be carried out and plans for management and disposal of w/w streams to be generated from spillage, leakages etc. A detailed treatability study for untreated effluent & treated effluent vis-à-vis adequacy of the treatment facilities proposed for the wastewater likely to be generated. The characteristic on which treatability is based shall also be stated. 15. Action plan for Complete Zero Liquid Discharge (ZLD) including treated effluent management plan during monsoon season when utilization of treated effluent for gardening & plantation purpose is not feasible. Detailed study report considering Percolation rate of the land available for gardening & plantation. Ensure that land is suitable for plantation & gardening. 16. Finalization of the exact scope of the off shore / waterfront facilities out of various options. 17. Details of the berthing facility if any to be provided along with class of fishing vessels envisaged. Fishing Vessel simulation to be done in respect of stability. Details of handling of each fishing cargo, its impact and management plan. 18. Detailed study for shore protection works. Details of proposed reclamation and / or dredging for protection of the water front and/or maintaining the channel depth. Details regarding dredging depth, dredge material characteristics as well as the dredged quantity, its disposal & and reclamation. The chances of erosion / accretion due to proposed dredging and/or reclamation and mitigation measures should be incorporated. 19. Measures to prevent further deterioration of the estuarine river water quality and coastal ecology due to the proposed project. Cumulative impact taking into consideration other project activities in the vicinity. 20. Number of creeks and creeklets fall in the area of project site as well as approach road. Impacts on hydrology pattern due to the proposed project and mitigation measures thereof. 21. Whether any blockage of creek is envisaged due to the proposed project and if so, remedial measures. Impact on the natural drainage system if any. It shall be ensured that free flow of water from the catchment area is not hampered due to the proposed project. 22. Hydro-dynamics of estuary / creek from shoreline erosion perspective. The hydro-dynamic studies shall be undertaken for assessing whether the proposed activities shall have any significant impact to the shoreline abutting the project as well as significant impact on the ecologically sensitive areas along the stretch or not. 23. Whether project activities will lead to any shoreline changes. Hydrodynamics of the coast abutting the project site from shoreline erosion perspective. The hydrodynamic studies for assessing

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 6 of 40

Page 7 of 40

whether the proposed activities shall have any significant impact on the shoreline abutting the project along the stretch or not. Details of precautions to be taken to ensure that there will be no adverse impact on the drainage of the area. 24. Comprehensive modeling study of accretion, erosion / deterioration on nearby coastline & elsewhere due to the proposed project and its mitigation measures. Submit details of stability analysis of coast. The study shall be got vetted by CWPRS. 25. Details of the sand dune areas and ecologically sensitive areas in the vicinity. 26. Anticipated environmental impacts and mitigation measures due to the fishing vessel traffic including discharges from fishing vessels/ships. 27. Details of existing sea vessel traffic management and predicted increase in vessel traffic due to the proposed project along with its impacts. 28. Details of vessel traffic management system framed for the proposed project considering the guidelines and provisions of Vessel Traffic Management System devised for the study area. Measures proposed to ensure that there will be no any hindrance to the movement of fishing vessels or fishermen. 29. Impact of project construction/operation on the noise and vibration due to construction equipment, cargo handling equipment and road traffic. Mitigation measures for the same. 30. Impact on marine life and fishing activities in the surrounding region. 31. Impacts of the proposed activities on fishing in the surrounding region as well as on livelihood of fishermen, saltpan workers, farmers, villagers etc. How it would be ensured that fishing area will not be affected due to the project activities. 32. Commitment from the management for extensive mangrove plantation as well as mangrove associated species in the area with year wise plan. Explore co-ordination with ecology commission / social forestry division for the same. 33. Details of characteristics of materials to be handled and the control measures proposed to ensure safety and avoid the human health impact. 34. Details of possibility of occupational health hazard from the proposed activities and proposed measures to prevent it. 35. Measures proposed to arrest the micronized fine particles generated during the painting process. Disposal of waste paint / paint residue. 36. Details for the use of lead free paints in the proposed project. Undertaking for use of only lead free paints in the project. 37. Submit the details of storage yard and dust suppression measures. 38. The details with respect to number of fishermen (including the pagarias) living and / or fishing within the study area along with the exact distance of their habitation from the proposed facilities. Details of fish production in the region in last five years as per the records of fisheries department. Impacts of the proposed activities on the fishery in the region. How, it would be ensured that fishing area will not be affected due to the project activities. 39. Anticipated environmental impacts due to the proposed project may be evaluated for significance and based on corresponding likely impacts VECs (Valued Environmental Components) may be identified. Baseline studies may be conducted within the study area of 10 km for all the concerned/identified VECs and likely impacts will have to be assessed for their magnitude in order to identify mitigation measures. 40. One season site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall should be incorporated. 41. Base line ambient air quality data (except monsoon) to be given along with the dates of monitoring. The parameters to be covered shall be in accordance with the revised National Ambient Air Quality Standards as well as project specific parameters. Locations of the monitoring stations should be so

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 7 of 40

Page 8 of 40

decided so as to take into consideration the pre-dominant downwind direction, population zone and sensitive receptors. There should be at least one monitoring station in the upwind direction. There should be at least one monitoring station in the pre dominant downwind direction at a location where maximum ground level concentration is likely to occur. 42. Modelling indicating the likely impact on ambient air quality due to proposed activities. The details of model used and input parameters used for modelling should be provided. The air quality contours may be shown on location map clearly indicating the location of sensitive receptors, if any, and the habitation. The wind rose showing pre-dominant wind direction should also be indicated on the map. Impact due to vehicular movement shall also be included into the prediction using suitable model. Results of Air dispersion modelling should be superimposed on google map / geographical area map. 43. Apart from terrestrial EIA study, marine EIA study should be conducted through reputed institute in order to assess impacts of the proposed activities on the marine environment as well as fishery and according to the same, mitigation measures shall be planned. 44. Baseline status of flora, fauna and marine biodiversity including that of phytoplankton and zooplankton in the study area shall be elaborated. Impact of the proposed activities on the marine biodiversity shall be elaborated. In case of any scheduled fauna, conservation plan should be provided. 45. Actual field survey shall be carried out for ascertaining base line status of coastal and marine flora, fauna, including that of phytoplankton and zooplankton. Impacts of the proposed activities on the marine flora, fauna; especially on endangered and rare species shall be elaborated. 46. Include coastal geo-morphology in the EIA study report. 47. Base line status of the noise environment, impact of noise on present environment due to the project and proposed measures for noise reduction including engineering controls. 48. Specific details of (i) Details of the utilities required (ii) Type and quantity of fuel to be used for each utility (iii) Flue gas emission rate emission from each utility (iv) Air Pollution Control Measures proposed to each of the utility along with its adequacy (v) List the sources of fugitive emission along with its quantification and proposed measures to control it. (vi) Air pollution due to the sand /grit blasting operation. 49. Details of mangrove along with its species in the project area & fabrication plant area. 50. Measures proposed to be taken for the work area ambient air quality monitoring as per Gujarat Factories Rules. 51. Detailed greenbelt development program including annual budget, types & number of trees to be planted, area under green belt development [with map]; along with commitment of the management to carry out the tree plantation activities outside the premises at appropriate places in the nearby area and elsewhere. 52. Copy of membership certificate of Common Environmental Infrastructure like TSDF, if any taken, should be incorporated. Copies of MOU / agreements done with actual consumers regarding any wastes shall also be incorporated. 53. A detailed EMP including the protection and mitigation measures for the impacts on human health and environment as well as detailed environmental monitoring plan with respect to various parameters, environmental management cell proposed for implementation & monitoring of EMP as well as person responsible for the same. The EMP should also include the concept of waste- minimisation, energy conservation, and natural resource conservation. Plan to ensure that the existing environmental condition is not deteriorated due to discharges from the fishing vessels / boats, disposal of sewage, etc. 54. Lay out showing open unobstructed peripheral margin, green belt, separate gates for entry and exit, parking area for tankers / trucks / visitors etc.

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 8 of 40

Page 9 of 40

55. Detail risk assessment report including prediction of the worst-case scenario and maximum credible accident scenario, catastrophic failure along with damage distances and preparedness plan to combat such situation and risk mitigation measures. This shall also include hazardous area classification & vulnerable zone demarcation. Detailed fire control plan for flammable substances and processes. Environment Management Plan and On-Site / Off-Site emergency plan for proposed plant. 56. Details of management of the solid waste and hazardous wastes to be generated from the project stating detail of storage area for each type of waste, its handling and its disposal. How the manual handling of the hazardous wastes shall be minimized. 57. Methodology of de-contamination and disposal of discarded containers and its record keeping. 58. Detailed odor management plan. 59. To explore the use of renewable energy to the maximum extent possible. 60. Submit checklist in the form of Do’s & Don’ts of preventive maintenance, strengthening of HSE, utility staff for safety related measures. 61. Details of existing traffic density on main road as well as secondary road in the vicinity, prediction of impact of additional traffic from the project on those roads along with carrying capacity of the said roads. 62. Details of flood data considered to avoid flooding at the proposed site & preventive measures envisaged for the same. 63. Details of monitoring / supervision cell to monitor environmental aspects during construction and operational phases. Appointment of Construction Safety Officer during the construction phase as well as a detailed environment management plan. 64. Details of dust suppression measures proposed during the construction period. Noise mitigation measures during construction activity from the proposed activity. 65. Details of the seismic design aspects to be adhered to in the project. 66. Details on use of eco-friendly building materials including fly ash bricks, fly ash paving blocks, RMC etc. 67. Details of disaster management plan / emergency management systems during operational phase of the project should also include scenario of natural catastrophe like earth quake, floods and tsunami in addition to other disasters. The plan should include the details of (i) Emergency evacuation (ii) Emergency lighting system (iii) Details of power back up system in the case of emergency (iv) Fire fighting arrangements (v) First aid arrangement (vi) Training and Mock drill (vii) Emergency announcement or public address system (viii)Signage’s including fluorescent pathways/ exit marker signs (ix)Location of emergency pathways and glow light signs. (x) Emergency response procedures. 68. Details of fire fighting system at the Harbour as well as associated area including provision for flame detectors, temperature actuated heat detectors, location of fire water tanks & capacity, separate power system for fire fighting, automatic sprinkler system, fire detection system with alarms & automatic fire extinguishers, location of fire lift and fire retardant staircases, details of qualified and trained fire personnel & their job specifications, nearest fire station & time required to reach the proposed site, etc. Submit line diagram of the fire hydrant line passing through the plant premises. Fire control plan for flammable substances and processes based on the flammable area classification. 69. Details of first aid, fire fighting system and other emergency services to be provided during operation phase including the training to be provided to the staff of the project as first aid facility providers, fire fighters etc. Tie up with emergency services like local fire station, provision of emergency van etc. to be made during the operational phase. 70. Details of the D.G. sets with location, fuel consumption & storage and details of the acoustic

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 9 of 40

Page 10 of 40

measures to abate noise pollution. 71. Details of the debris management plan along with the use/disposal of excavated soil during construction phase and top soil conservation plan. 72. The details of the basic amenities and welfare facilities to be provided to the construction workers to ensure that they do not ruin the existing environment. 73. Undertaking from the management regarding maximum employment to the local people. 74. Details of Project benefits accruing to the locality, neighbourhood, region and nation as a whole. 75. Submit a detailed plan for social corporate responsibilities, with appropriate budgetary provisions. 76. Details of registration and provisions to be made by the project proponent to follow Building and other Construction Workers Acts and Rules and undertaking for the same. 77. An action plan showing list of socio-economic upliftment activities based on socio-economic profile of the surrounding villages and need base field assessment along with the fund allocation for the five years, shall be incorporated in the EMP. 78. A tabular chart for the issues raised and addressed during public hearing/consultation and commitment of the project proponent on the same should be provided. An action plan to address the issues raised during public hearing and the necessary allocation of funds for the same should be provided. 79. (a) Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report. (b) Does the Environment Policy prescribe for standard operating process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions ? If so, it may be detailed in the EIA. 80. Point wise compliance of existing CC&A. 81. What is the hierarchical system or administrative order of the company to deal with the environmental issues and for ensuring compliance with the EC conditions. Details of this system may be given. 82. Does the company have a system of reporting of non compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism should be detailed in the EIA Report. 83. Certificate of accreditation issued by the NABET, QCI to the environmental consultant should be incorporated in the EIA Report. 84. An undertaking by the Project Proponent on the ownership of the EIA report as per the MoEF&CC OM dated 05/10/2011 and an undertaking by the Consultant regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the MoEF&CC OM dated 04/08/2009. (Compliance of OM dated 05/10/2011 & 04/08/2009). 85. A tabular chart with index for point-wise compliance of above TORs. The above mentioned project specific TORs/additional TORs and the model TORs available in the MoEF’s sector specific EIA Manual for “Ports, Harbours” shall be considered as generic TORs for preparation of the EIA report in addition to all the relevant information as per the generic structure of EIA given in Appendix III in the EIA Notification, 2006. The draft EIA report shall be submitted to the Gujarat Pollution Control Board for conducting the public consultation process as per the provisions of the EIA Notification, 2006. The project shall be appraised on receipt of the final EIA report. 5 Department of Fisheries, Navabandar, District : Junagadh Screening & Government of Gujarat Scoping

Project / Activity No.: 7 (e)  M/s. Fisheries Department, Government of Gujarat (herein after Project Proponent – PP) has submitted application vide their proposal no. SIA/GJ/MIS/4228/2015 dated 17/11/2015. Project status: New

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 10 of 40

Page 11 of 40

Project / Activity Details: The Navabandar Fishery harbour is proposed on sea adjacent to the existing Navabandar Fishery Harbor. The area proposed to be acquired is barren land and devoid of any vegetation and settlement. The proposed project area will be developed as a fishery harbour and necessary facilities will be provided for fishermen. For designing a new harbour following types and number of the boats are considered as per year 2020 scenario. At present no of trawler is zero. It is assumed that 200 number of trawler boat will operate from the new harbor. Type of Boats Number anticipated in 2020 AD Trawlers 200 Gillnetter 580 IBM/OBM 220 Total 1000

The project falls in the project activity 7(e) and category B as per the schedule of EIA Notificaiton-2006. Total plot area is 60700 sq. m and proposed Green belt area/Tree plantation area will be 1980 sq. m. Estimated cost of the proposed project will be 80.28 Crores. PP has proposed to construct marine Facilities like Breakwater protection, Landing Quay and its arrangement, Outfitting Quay and its arrangement, Berthing Quay and its arrangement, Repair Quay and its arrangement and Land side facilities like Auction Hall, Fish storage and ice plants, Sanitary and storm water drainage facilities, Water distribution system, Fishnet mending shed, Under Ground Water Tank, Infrastructure development for Administrative office, Centre Communication & Radio Station, Electric, Cable Trench, Solid waste management etc. Water consumption will be 169.50 KL/day (Domestic – 37.4 KL & Industrial (Washings) – 132.10 KL). Fresh water will be sourced through local municipality or tankers. Wastewater generation from washing activity will be 105.68 KL/day. Quantity of sewage will be around 29.92 KL/day. Wastewaters will be treated in Treatment Plant and treated sewage will be reused for greenbelt development. Solid waste likely to be generated from construction site and labour camps during construction phase will be collected and disposed off at designated disposal site. Fish waste (offal) will be collected from the auction hall and used for manufacturing of fish meal for animal and poultry feeds etc, during operation phase. Offal may also be used for making fertilisers for agriculture use. Community toilet with septic tanks will be provided for the labour involved in construction phase. DG set will be provided as stand-by facility. Hazardous wastes to be generated are used oil and discarded containers. Observations/Discussions: Technical presentation by the project proponent also covered details like back ground details & need of the proposed project, proposed facilities, layout plan, proposed structures, major components of DPR, dredging, growth pattern, design data, general information, proposed Terms of Reference etc. On asking about the CRZ, representatives of the project informed that the proposed activity will be carried out within the CRZ area and they will obtain CRZ clearance from the concern authority. While discussing about the waste water management, Committee emphasized on complete reuse of treated waste water and asked to submit treated effluent management plan during monsoon season when utilization of treated effluent for gardening & plantation purpose is not feasible. Issues related to dredging, erosion, marine ecology etc. have been discussed. PP presented that there are no National parks / Sanctuaries / Wildlife reserves within a radius of 10 km from the project site. On asking about the benefits to the local people from this proposed project, PP informed that Construction of fisheries harbour will give boost to fishing activities in the area and due to increase in fishing activities, economy of the local population will improve significantly in the project area and its surrounding area. The project proponent presented that they have already started baseline environmental monitoring in the winter 2015-2016 and requested to allow them to use the same for the preparation of the EIA report which was agreed to by the committee. 273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 11 of 40

Page 12 of 40

After detailed discussion on each and every aspect of the project, following TOR were prescribed to include them in the EIA report to be prepared for the study area covering 10 km radius from the boundary of the project site. 1. Present land use pattern within 10 km radius from the project boundary based on satellite imagery. 2. Copy of permission obtained from Revenue Department for the proposed development of fishery harbour. 3. Land ownership documents and copy of approval obtained from Gujarat Maritime Board for the proposed development of fishery harbour. 4. A map showing distance of the nearest fishing port, fishermen hutments, village, salt pans, mangrove patch, migratory corridors of birds, National Parks/Sanctuaries/Bio sphere Reserves, sand dune areas etc. from the project boundary. Give tabular chart with exact aerial distance with specific remarks (If any). 5. Distance of the Fishery harbour from the Low Tide Line. Authenticated details on High Tide height, time duration of high tide availability etc. 6. Phase wise project implementation details in terms of site development, infrastructure provision, EMS implementation etc. Phase wise project implementation schedule with bar chart including resources, manpower and time frame etc. 7. Details of the activities to be undertaken in the CRZ area and their impact on marine ecosystems and mitigation measures proposed in this regard. 8. Copy of CRZ map or map prepared by one of the authorized agencies authorized by the MoEF for carrying out the CRZ demarcation, on which the project boundary / facilities are superimposed and clearly indicating the proposed project location. 9. Status of application for CRZ clearance. Recommendation from the Gujarat Coastal Zone Management Authority under the CRZ Notification. 10. Analysis of Alternatives (Technology & Sites). Technologies involved for design, construction, equipment and operation. 11. Project coverage, master plan, phasing and scope. Capacity of the Harbour, types of fishing trawlers/boats proposed for handling, Fish handling equipments, ancillary operations, housing, vehicl parking details etc 12. Assessment of source of the water supply with adequacy of the same to meet with the requirements for the project. Copy of permission obtained from the concerned authority for water supply. 13. Detailed of water balance (including reuse-recycle, if any). 14. Details of the proposed ETP and stream wise analysis of the waste water likely to be generated as well as the stream wise treatment proposed with ETP adequacy and efficacy report. Details of segregation of the wastewater stream to be carried out and plans for management and disposal of w/w streams to be generated from spillage, leakages etc. A detailed treatability study for untreated effluent & treated effluent vis-à-vis adequacy of the treatment facilities proposed for the wastewater likely to be generated. The characteristic on which treatability is based shall also be stated. 15. Action plan for Complete Zero Liquid Discharge (ZLD) including treated effluent management plan during monsoon season when utilization of treated effluent for gardening & plantation purpose is not feasible. Detailed study report considering Percolation rate of the land available for gardening & plantation. Ensure that land is suitable for plantation & gardening. 16. Finalization of the exact scope of the off shore / waterfront facilities out of various options. 17. Details of the berthing facility if any to be provided along with class of fishing vessels envisaged. Fishing Vessels simulation to be done in respect of stability. Details of handling of each fishing Cargo, its impact and management plan. 18. Detailed study for shore protection works. Details of proposed reclamation and / or dredging for

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 12 of 40

Page 13 of 40

protection of the water front and/or maintaining the channel depth. Details regarding dredging depth, dredge material characteristics as well as the dredged quantity, its disposal & and reclamation. The chances of erosion / accretion due to proposed dredging and/or reclamation and mitigation measures should be incorporated. 19. Measures to prevent further deterioration of the estuarine river water quality and coastal ecology due to the proposed project. Cumulative impact taking into consideration other project activities in the vicinity. 20. Number of creeks and creeklets fall in the area of project site as well as approach road. Impacts on hydrology pattern due to the proposed project and mitigation measures thereof. 21. Whether any blockage of creek is envisaged due to the proposed project and if so, remedial measures. Impact on the natural drainage system if any. It shall be ensured that free flow of water from the catchment area is not hampered due to the proposed project. 22. Hydro-dynamics of estuary / creek from shoreline erosion perspective. The hydro-dynamic studies shall be undertaken for assessing whether the proposed activities shall have any significant impact to the shoreline abutting the project as well as significant impact on the ecologically sensitive areas along the stretch or not. 23. Whether project activities will lead to any shoreline changes. Hydrodynamics of the coast abutting the project site from shoreline erosion perspective. The hydrodynamic studies for assessing whether the proposed activities shall have any significant impact on the shoreline abutting the project along the stretch or not. Details of precautions to be taken to ensure that there will be no adverse impact on the drainage of the area. 24. Comprehensive modeling study of accretion, erosion / deterioration on nearby coastline & elsewhere due to the proposed project and its mitigation measures. Submit details of stability analysis of coast. The study shall be got vetted by CWPRS. 25. Details of the sand dune areas and ecologically sensitive areas in the vicinity. 26. Anticipated environmental impacts and mitigation measures due to the fishing ship/vessel traffic including discharges from fishing vessels/ships. 27. Details of existing sea vessel traffic management and predicted increase in vessel traffic due to the proposed project along with its impacts. 28. Details of vessel traffic management system framed for the proposed project considering the guidelines and provisions of Vessel Traffic Management System devised for the study area. Measures proposed to ensure that there will be no any hindrance to the movement of fishing vessels or fishermen. 29. Impact of project construction/operation on the noise and vibration due to construction equipment, cargo handling equipment and road traffic. Mitigation measures for the same. 30. Impact on marine life and fishing activities in the surrounding region. 31. Impacts of the proposed activities on fishing in the surrounding region as well as on livelihood of fishermen, saltpan workers, farmers, villagers etc. How it would be ensured that fishing area will not be affected due to the project activities. 32. Commitment from the management for extensive mangrove plantation as well as mangrove associated species in the area with year wise plan. Explore co-ordination with ecology commission / social forestry division for the same. 33. Details of characteristics of materials to be handled and the control measures proposed to ensure safety and avoid the human health impact. 34. Details of possibility of occupational health hazard from the proposed activities and proposed measures to prevent it. 35. Measures proposed to arrest the micronized fine particles generated during the painting process. Disposal of waste paint / paint residue.

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 13 of 40

Page 14 of 40

36. Details for the use of lead free paints in the proposed project. Undertaking for use of only lead free paints in the project. 37. Submit the details of storage yard and dust suppression measures. 38. The details with respect to number of fishermen (including the pagarias) living and / or fishing within the study area along with the exact distance of their habitation from the proposed facilities. Details of fish production in the region in last five years as per the records of fisheries department. Impacts of the proposed activities on the fishery in the region. How, it would be ensured that fishing area will not be affected due to the project activities. 39. Anticipated environmental impacts due to the proposed project may be evaluated for significance and based on corresponding likely impacts VECs (Valued Environmental Components) may be identified. Baseline studies may be conducted within the study area of 10 km for all the concerned/identified VECs and likely impacts will have to be assessed for their magnitude in order to identify mitigation measures. 40. Site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall should be incorporated. 41. Base line ambient air quality data (except monsoon) to be given along with the dates of monitoring. The parameters to be covered shall be in accordance with the revised National Ambient Air Quality Standards as well as project specific parameters. Locations of the monitoring stations should be so decided so as to take into consideration the pre-dominant downwind direction, population zone and sensitive receptors. There should be at least one monitoring station in the upwind direction. There should be at least one monitoring station in the pre dominant downwind direction at a location where maximum ground level concentration is likely to occur. 42. Modelling indicating the likely impact on ambient air quality due to proposed activities. The details of model used and input parameters used for modelling should be provided. The air quality contours may be shown on location map clearly indicating the location of sensitive receptors, if any, and the habitation. The wind rose showing pre-dominant wind direction should also be indicated on the map. Impact due to vehicular movement shall also be included into the prediction using suitable model. Results of Air dispersion modelling should be superimposed on google map / geographical area map. 43. Apart from terrestrial EIA study, marine EIA study should be conducted through reputed institute in order to assess impacts of the proposed activities on the marine environment as well as fishery and according to the same, mitigation measures shall be planned. 44. Baseline status of flora, fauna and marine biodiversity including that of phytoplankton and zooplankton in the study area shall be elaborated. Impact of the proposed activities on the marine biodiversity shall be elaborated. In case of any scheduled fauna, conservation plan should be provided. 45. Actual field survey shall be carried out for ascertaining base line status of coastal and marine flora, fauna, including that of phytoplankton and zooplankton. Impacts of the proposed activities on the marine flora, fauna; especially on endangered and rare species shall be elaborated. 46. Include coastal geo-morphology in the EIA study report. 47. Base line status of the noise environment, impact of noise on present environment due to the project and proposed measures for noise reduction including engineering controls. 48. Specific details of (i) Details of the utilities required (ii) Type and quantity of fuel to be used for each utility (iii) Flue gas emission rate emission from each utility (iv) Air Pollution Control Measures proposed to each of the utility along with its adequacy (v) List the sources of fugitive emission along with its quantification and proposed measures to control it. (vi) Air pollution due to the sand /grit blasting operation. 49. Details of mangrove along with its species in the project area & fabrication plant area.

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 14 of 40

Page 15 of 40

50. Measures proposed to be taken for the work area ambient air quality monitoring as per Gujarat Factories Rules. 51. Detailed greenbelt development program including annual budget, types & number of trees to be planted, area under green belt development [with map]; along with commitment of the management to carry out the tree plantation activities outside the premises at appropriate places in the nearby area and elsewhere. 52. Copy of membership certificate of Common Environmental Infrastructure like TSDF, if any taken, should be incorporated. Copies of MOU / agreements done with actual consumers regarding any wastes shall also be incorporated. 53. A detailed EMP including the protection and mitigation measures for the impacts on human health and environment as well as detailed environmental monitoring plan with respect to various parameters, environmental management cell proposed for implementation & monitoring of EMP as well as person responsible for the same. The EMP should also include the concept of waste- minimisation, energy conservation, and natural resource conservation. Plan to ensure that the existing environmental condition is not deteriorated due to discharges from the fishing vessels / boats, disposal of sewage, etc. 54. Lay out showing open unobstructed peripheral margin, green belt, separate gates for entry and exit, parking area for tankers / trucks / visitors etc. 55. Detail risk assessment report including prediction of the worst-case scenario and maximum credible accident scenario, catastrophic failure along with damage distances and preparedness plan to combat such situation and risk mitigation measures. This shall also include hazardous area classification & vulnerable zone demarcation. Detailed fire control plan for flammable substances and processes. Environment Management Plan and On-Site / Off-Site emergency plan for proposed plant. 56. Details of management of the solid waste and hazardous wastes to be generated from the project stating detail of storage area for each type of waste, its handling and its disposal. How the manual handling of the hazardous wastes shall be minimized. 57. Methodology of de-contamination and disposal of discarded containers and its record keeping. 58. Detailed odor management plan. 59. To explore the use of renewable energy to the maximum extent possible. 60. Submit checklist in the form of Do’s & Don’ts of preventive maintenance, strengthening of HSE, utility staff for safety related measures. 61. Details of existing traffic density on main road as well as secondary road in the vicinity, prediction of impact of additional traffic from the project on those roads along with carrying capacity of the said roads. 62. Details of flood data considered to avoid flooding at the proposed site & preventive measures envisaged for the same. 63. Details of monitoring / supervision cell to monitor environmental aspects during construction and operational phases. Appointment of Construction Safety Officer during the construction phase as well as a detailed environment management plan. 64. Details of dust suppression measures proposed during the construction period. Noise mitigation measures during construction activity from the proposed activity. 65. Details of the seismic design aspects to be adhered to in the project. 66. Details on use of eco-friendly building materials including fly ash bricks, fly ash paving blocks, RMC etc. 67. Details of disaster management plan / emergency management systems during operational phase of the project should also include scenario of natural catastrophe like earth quake, floods and tsunami in addition to other disasters. The plan should include the details of (i) Emergency

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 15 of 40

Page 16 of 40

evacuation (ii) Emergency lighting system (iii) Details of power back up system in the case of emergency (iv) Fire fighting arrangements (v) First aid arrangement (vi) Training and Mock drill (vii) Emergency announcement or public address system (viii)Signage’s including fluorescent pathways/ exit marker signs (ix)Location of emergency pathways and glow light signs. (x) Emergency response procedures. 68. Details of fire fighting system at the Harbour as well as associated area including provision for flame detectors, temperature actuated heat detectors, location of fire water tanks & capacity, separate power system for fire fighting, automatic sprinkler system, fire detection system with alarms & automatic fire extinguishers, location of fire lift and fire retardant staircases, details of qualified and trained fire personnel & their job specifications, nearest fire station & time required to reach the proposed site, etc. Submit line diagram of the fire hydrant line passing through the plant premises. Fire control plan for flammable substances and processes based on the flammable area classification. 69. Details of first aid, fire fighting system and other emergency services to be provided during operation phase including the training to be provided to the staff of the project as first aid facility providers, fire fighters etc. Tie up with emergency services like local fire station, provision of emergency van etc. to be made during the operational phase. 70. Details of the D.G. sets with location, fuel consumption & storage and details of the acoustic measures to abate noise pollution. 71. Details of the debris management plan along with the use/disposal of excavated soil during construction phase and top soil conservation plan. 72. The details of the basic amenities and welfare facilities to be provided to the construction workers to ensure that they do not ruin the existing environment. 73. Undertaking from the management regarding maximum employment to the local people. 74. Details of Project benefits accruing to the locality, neighbourhood, region and nation as a whole. 75. Submit a detailed plan for corporate social responsibilities, with appropriate budgetary provisions. 76. Details of registration and provisions to be made by the project proponent to follow Building and other Construction Workers Acts and Rules and undertaking for the same. 77. An action plan showing list of socio-economic upliftment activities based on socio-economic profile of the surrounding villages and need base field assessment along with the fund allocation for the five years, shall be incorporated in the EMP. 78. A tabular chart for the issues raised and addressed during public hearing/consultation and commitment of the project proponent on the same should be provided. An action plan to address the issues raised during public hearing and the necessary allocation of funds for the same should be provided. 79. (a) Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report. (b) Does the Environment Policy prescribe for standard operating process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions ? If so, it may be detailed in the EIA. 80. Copy of CC&A and Point wise compliance of existing CC&A. 81. What is the hierarchical system or administrative order of the company to deal with the environmental issues and for ensuring compliance with the EC conditions. Details of this system may be given. 82. Does the company have a system of reporting of non compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism should be detailed in the EIA Report. 83. Certificate of accreditation issued by the NABET, QCI to the environmental consultant should be incorporated in the EIA Report.

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 16 of 40

Page 17 of 40

84. An undertaking by the Project Proponent on the ownership of the EIA report as per the MoEF&CC OM dated 05/10/2011 and an undertaking by the Consultant regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the MoEF&CC OM dated 04/08/2009. (Compliance of OM dated 05/10/2011 & 04/08/2009). 85. A tabular chart with index for point-wise compliance of above TORs. The above mentioned project specific TORs/additional TORs and the model TORs available in the MoEF’s sector specific EIA Manual for “Ports, Harbours” shall be considered as generic TORs for preparation of the EIA report in addition to all the relevant information as per the generic structure of EIA given in Appendix III in the EIA Notification, 2006. The draft EIA report shall be submitted to the Gujarat Pollution Control Board for conducting the public consultation process as per the provisions of the EIA Notification, 2006. The project shall be appraised on receipt of the final EIA report.

6 Department of Fisheries, Madhwad, District :Junagadh Screening & Government of Gujarat Scoping

Project / Activity No.: 7 (e)  M/s. Fisheries Department, Government of Gujarat (herein after Project Proponent – PP) has submitted application vide their proposal no. SIA/GJ/MIS/4308/2015 dated 19/11/2015. Project status: New Project / Activity Details: The proposed Madhawad Fishery harbour is proposed on sea adjacent to the existing Madhwad Port. The area proposed to be acquired is barren land and devoid of any vegetation and settlement. The proposed project area will be developed as a fishery harbour and necessary facilities will be provided for fishermen. For designing a new harbour following types and number of the boats are considered as per year 2020 scenario. Type of Boats Number anticipated in 2020 AD Trawlers 136 Gillnetter 10 IBM/OBM 423 Total 569

The project falls in the project activity 7(e) and category B as per the schedule of EIA Notificaiton-2006. Total plot area is 120700 sq. m and proposed Green belt area/Tree plantation area will be 463 sq. m. Estimated cost of the proposed project will be 52.84 Crores. PP has proposed to construct marine Facilities like Breakwater protection, Landing Quay & its arrangement, Outfitting Quay & its arrangement, Berthing Quay & its arrangement, Repair Quay & its arrangement and Land side facilities like Auction Hall, Fish storage and ice plants, Sanitary and storm water drainage facilities, Water distribution system, Fishnet mending shed, Under Ground Water Tank, Infrastructure development for:- Administrative office, Centre Communication & Radio Station, Electric Room, Gear Shed, Workshop, Toilet Blocks, Fuel Pump Area with fuel storage facility, Boat Parking, Boat Repair Area, Tank, Canteen, Security Cabin, Fresh Water Supply System, Drainage etc. Water consumption will be 138.203 KL/day (Domestic – 35.903 KL & Industrial (Washings) – 102.3 KL). Fresh water will be sourced from tanker supply. Wastewater generation from washing activity will be 110.56 KL/day. Quantity of sewage will be around 27.64 KL/day. Wastewaters will be treated in ETP & STP and treated waste water will be reused for greenbelt development. Solid waste likely to be generated from construction site and labour camps during construction phase will be collected and disposed off at 273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 17 of 40

Page 18 of 40 designated disposal site. Fish waste (offal) will be collected from the auction hall and used for manufacturing of fish meal for animal and poultry feeds etc, during operation phase. Offal may also be used for making fertilisers for agriculture use. Community toilet with septic tanks will be provided for the labour involved in construction phase. DG set will be provided as stand-by facility. Hazardous wastes to be generated are used oil and discarded containers. Observations/Discussions: Technical presentation by the project proponent also covered details like back ground details & need of the proposed project, proposed facilities, layout plan, proposed structures, major components of DPR, dredging, growth pattern, design data, general information, proposed Terms of Reference etc. It was presented by PP that the proposed activity will be carried out within the CRZ area and they will obtain CRZ clearance from the concern authority. While discussing about the waste water management, Committee emphasized on complete reuse of treated waste water and asked to submit treated effluent management plan during monsoon season when utilization of treated effluent for gardening & plantation purpose is not feasible. Issues related to dredging, erosion, marine ecology etc. have been discussed. PP presented that there are no National parks / Sanctuaries / Wildlife reserves within a radius of 10 km from the project site. On asking about the benefits to the local people from this proposed project, PP informed that Construction of fisheries harbour will give boost to fishing activities in the area and due to increase in fishing activities, economy of the local population will improve significantly in the project area and its surrounding area. The project proponent presented that they have already started baseline environmental monitoring in the winter 2015-2016 and requested to allow them to use the same for the preparation of the EIA report which was agreed to by the committee. After detailed discussion on each and every aspect of the project, following TOR were prescribed to include them in the EIA report to be prepared for the study area covering 10 km radius from the boundary of the project site. 1. Present land use pattern within 10 km radius from the project boundary based on satellite imagery. 2. Copy of permission obtained from Revenue Department for the proposed development of fishery harbour. 3. Land ownership documents and copy of approval obtained from Gujarat Maritime Board for the proposed development of fishery harbour. 4. A map showing distance of the nearest fishing port, fishermen hutments, village, salt pans, mangrove patch, migratory corridors of birds, National Parks/Sanctuaries/Bio sphere Reserves, sand dune areas etc. from the project boundary. Give tabular chart with exact aerial distance with specific remarks (If any). 5. Distance of the Fishery harbour from the Low Tide Line. Authenticated details on High Tide height, time duration of high tide availability etc. 6. Phase wise project implementation details in terms of site development, infrastructure provision, EMS implementation etc. Phase wise project implementation schedule with bar chart including resources, manpower and time frame etc. 7. Details of the activities to be undertaken in the CRZ area and their impact on marine ecosystems and mitigation measures proposed in this regard. 8. Copy of CRZ map or map prepared by one of the authorized agencies authorized by the MoEF for carrying out the CRZ demarcation, on which the project boundary / facilities are superimposed and clearly indicating the proposed project location. 9. Status of application for CRZ clearance. Recommendation from the Gujarat Coastal Zone Management Authority under the CRZ Notification. 10. Analysis of Alternatives (Technology & Sites). Technologies involved for design, construction, equipment and operation. 11. Project coverage, master plan, phasing and scope. Capacity of the Harbour, types of fishing trawlers/boats proposed for handling, Fish handling equipments, ancillary operations, housing,

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 18 of 40

Page 19 of 40

vehicl parking details etc 12. Assessment of source of the water supply with adequacy of the same to meet with the requirements for the project. Copy of permission obtained from the concerned authority for water supply. 13. Detailed of water balance (including reuse-recycle, if any). 14. Details of the proposed ETP and stream wise analysis of the waste water likely to be generated as well as the stream wise treatment proposed with ETP adequacy and efficacy report. Details of segregation of the wastewater stream to be carried out and plans for management and disposal of w/w streams to be generated from spillage, leakages etc. A detailed treatability study for untreated effluent & treated effluent vis-à-vis adequacy of the treatment facilities proposed for the wastewater likely to be generated. The characteristic on which treatability is based shall also be stated. 15. Action plan for Complete Zero Liquid Discharge (ZLD) including treated effluent management plan during monsoon season when utilization of treated effluent for gardening & plantation purpose is not feasible. Detailed study report considering Percolation rate of the land available for gardening & plantation. Ensure that land is suitable for plantation & gardening. 16. Finalization of the exact scope of the off shore / waterfront facilities out of various options. 17. Details of the berthing facility if any to be provided along with class of vessels envisaged. Ship/Vessel simulation to be done in respect of stability. Details of handling of each cargo, its impact and management plan. 18. Detailed study for shore protection works. Details of proposed reclamation and / or dredging for protection of the water front and/or maintaining the channel depth. Details regarding dredging depth, dredge material characteristics as well as the dredged quantity, its disposal & and reclamation. The chances of erosion / accretion due to proposed dredging and/or reclamation and mitigation measures should be incorporated. 19. Measures to prevent further deterioration of the estuarine river water quality and coastal ecology due to the proposed project. Cumulative impact taking into consideration other project activities in the vicinity. 20. Number of creeks and creeklets fall in the area of project site as well as approach road. Impacts on hydrology pattern due to the proposed project and mitigation measures thereof. 21. Whether any blockage of creek is envisaged due to the proposed project and if so, remedial measures. Impact on the natural drainage system if any. It shall be ensured that free flow of water from the catchment area is not hampered due to the proposed project. 22. Hydro-dynamics of estuary / creek from shoreline erosion perspective. The hydro-dynamic studies shall be undertaken for assessing whether the proposed activities shall have any significant impact to the shoreline abutting the project as well as significant impact on the ecologically sensitive areas along the stretch or not. 23. Whether project activities will lead to any shoreline changes. Hydrodynamics of the coast abutting the project site from shoreline erosion perspective. The hydrodynamic studies for assessing whether the proposed activities shall have any significant impact on the shoreline abutting the project along the stretch or not. Details of precautions to be taken to ensure that there will be no adverse impact on the drainage of the area. 24. Comprehensive modeling study of accretion, erosion / deterioration on nearby coastline & elsewhere due to the proposed project and its mitigation measures. Submit details of stability analysis of coast. The study shall be got vetted by CWPRS. 25. Details of the sand dune areas and ecologically sensitive areas in the vicinity. 26. Anticipated environmental impacts and mitigation measures due to the fishing ship/vessel traffic including discharges from fishing vessels/ships. 27. Details of existing sea vessel traffic management and predicted increase in vessel traffic due to the

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 19 of 40

Page 20 of 40

proposed project along with its impacts. 28. Details of vessel traffic management system framed for the proposed project considering the guidelines and provisions of Vessel Traffic Management System devised for the study area. Measures proposed to ensure that there will be no any hindrance to the movement of fishing vessels or fishermen. 29. Impact of project construction/operation on the noise and vibration due to construction equipment, cargo handling equipment and road traffic. Mitigation measures for the same. 30. Impact on marine life and fishing activities in the surrounding region. 31. Impacts of the proposed activities on fishing in the surrounding region as well as on livelihood of fishermen, saltpan workers, farmers, villagers etc. How it would be ensured that fishing area will not be affected due to the project activities. 32. Commitment from the management for extensive mangrove plantation as well as mangrove associated species in the area with year wise plan. Explore co-ordination with ecology commission / social forestry division for the same. 33. Details of characteristics of materials to be handled and the control measures proposed to ensure safety and avoid the human health impact. 34. Details of possibility of occupational health hazard from the proposed activities and proposed measures to prevent it. 35. Measures proposed to arrest the micronized fine particles generated during the painting process. Disposal of waste paint / paint residue. 36. Details for the use of lead free paints in the proposed project. Undertaking for use of only lead free paints in the project. 37. Submit the details of storage yard and dust suppression measures. 38. The details with respect to number of fishermen (including the pagarias) living and / or fishing within the study area along with the exact distance of their habitation from the proposed facilities. Details of fish production in the region in last five years as per the records of fisheries department. Impacts of the proposed activities on the fishery in the region. How, it would be ensured that fishing area will not be affected due to the project activities. 39. Anticipated environmental impacts due to the proposed project may be evaluated for significance and based on corresponding likely impacts VECs (Valued Environmental Components) may be identified. Baseline studies may be conducted within the study area of 10 km for all the concerned/identified VECs and likely impacts will have to be assessed for their magnitude in order to identify mitigation measures. 40. Site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall should be incorporated. 41. Base line ambient air quality data (except monsoon) to be given along with the dates of monitoring. The parameters to be covered shall be in accordance with the revised National Ambient Air Quality Standards as well as project specific parameters. Locations of the monitoring stations should be so decided so as to take into consideration the pre-dominant downwind direction, population zone and sensitive receptors. There should be at least one monitoring station in the upwind direction. There should be at least one monitoring station in the pre dominant downwind direction at a location where maximum ground level concentration is likely to occur. 42. Modelling indicating the likely impact on ambient air quality due to proposed activities. The details of model used and input parameters used for modelling should be provided. The air quality contours may be shown on location map clearly indicating the location of sensitive receptors, if any, and the habitation. The wind rose showing pre-dominant wind direction should also be indicated on the map. Impact due to vehicular movement shall also be included into the prediction using suitable model. Results of Air dispersion modelling should be superimposed on google map / geographical

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 20 of 40

Page 21 of 40

area map. 43. Apart from terrestrial EIA study, marine EIA study should be conducted through reputed institute in order to assess impacts of the proposed activities on the marine environment as well as fishery and according to the same, mitigation measures shall be planned. 44. Baseline status of flora, fauna and marine biodiversity including that of phytoplankton and zooplankton in the study area shall be elaborated. Impact of the proposed activities on the marine biodiversity shall be elaborated. In case of any scheduled fauna, conservation plan should be provided. 45. Actual field survey shall be carried out for ascertaining base line status of coastal and marine flora, fauna, including that of phytoplankton and zooplankton. Impacts of the proposed activities on the marine flora, fauna; especially on endangered and rare species shall be elaborated. 46. Include coastal geo-morphology in the EIA study report. 47. Base line status of the noise environment, impact of noise on present environment due to the project and proposed measures for noise reduction including engineering controls. 48. Specific details of (i) Details of the utilities required (ii) Type and quantity of fuel to be used for each utility (iii) Flue gas emission rate emission from each utility (iv) Air Pollution Control Measures proposed to each of the utility along with its adequacy (v) List the sources of fugitive emission along with its quantification and proposed measures to control it. (vi) Air pollution due to the sand /grit blasting operation. 49. Details of mangrove along with its species in the project area & fabrication plant area. 50. Measures proposed to be taken for the work area ambient air quality monitoring as per Gujarat Factories Rules. 51. Detailed greenbelt development program including annual budget, types & number of trees to be planted, area under green belt development [with map]; along with commitment of the management to carry out the tree plantation activities outside the premises at appropriate places in the nearby area and elsewhere. 52. Copy of membership certificate of Common Environmental Infrastructure like TSDF, if any taken, should be incorporated. Copies of MOU / agreements done with actual consumers regarding any wastes shall also be incorporated. 53. A detailed EMP including the protection and mitigation measures for the impacts on human health and environment as well as detailed environmental monitoring plan with respect to various parameters, environmental management cell proposed for implementation & monitoring of EMP as well as person responsible for the same. The EMP should also include the concept of waste- minimisation, energy conservation, and natural resource conservation. Plan to ensure that the existing environmental condition is not deteriorated due to discharges from the fishing vessels / boats, disposal of sewage, etc. 54. Lay out showing open unobstructed peripheral margin, green belt, separate gates for entry and exit, parking area for tankers / trucks / visitors etc. 55. Detail risk assessment report including prediction of the worst-case scenario and maximum credible accident scenario, catastrophic failure along with damage distances and preparedness plan to combat such situation and risk mitigation measures. This shall also include hazardous area classification & vulnerable zone demarcation. Detailed fire control plan for flammable substances and processes. Environment Management Plan and On-Site / Off-Site emergency plan for proposed plant. 56. Details of management of the solid waste and hazardous wastes to be generated from the project stating detail of storage area for each type of waste, its handling and its disposal. How the manual handling of the hazardous wastes shall be minimized. 57. Methodology of de-contamination and disposal of discarded containers and its record keeping.

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 21 of 40

Page 22 of 40

58. Detailed odor management plan. 59. To explore the use of renewable energy to the maximum extent possible. 60. Submit checklist in the form of Do’s & Don’ts of preventive maintenance, strengthening of HSE, utility staff for safety related measures. 61. Details of existing traffic density on main road as well as secondary road in the vicinity, prediction of impact of additional traffic from the project on those roads along with carrying capacity of the said roads. 62. Details of flood data considered to avoid flooding at the proposed site & preventive measures envisaged for the same. 63. Details of monitoring / supervision cell to monitor environmental aspects during construction and operational phases. Appointment of Construction Safety Officer during the construction phase as well as a detailed environment management plan. 64. Details of dust suppression measures proposed during the construction period. Noise mitigation measures during construction activity from the proposed activity. 65. Details of the seismic design aspects to be adhered to in the project. 66. Details on use of eco-friendly building materials including fly ash bricks, fly ash paving blocks, RMC etc. 67. Details of disaster management plan / emergency management systems during operational phase of the project should also include scenario of natural catastrophe like earth quake, floods and tsunami in addition to other disasters. The plan should include the details of (i) Emergency evacuation (ii) Emergency lighting system (iii) Details of power back up system in the case of emergency (iv) Fire fighting arrangements (v) First aid arrangement (vi) Training and Mock drill (vii) Emergency announcement or public address system (viii)Signage’s including fluorescent pathways/ exit marker signs (ix)Location of emergency pathways and glow light signs. (x) Emergency response procedures. 68. Details of fire fighting system at the Harbour as well as associated area including provision for flame detectors, temperature actuated heat detectors, location of fire water tanks & capacity, separate power system for fire fighting, automatic sprinkler system, fire detection system with alarms & automatic fire extinguishers, location of fire lift and fire retardant staircases, details of qualified and trained fire personnel & their job specifications, nearest fire station & time required to reach the proposed site, etc. Submit line diagram of the fire hydrant line passing through the plant premises. Fire control plan for flammable substances and processes based on the flammable area classification. 69. Details of first aid, fire fighting system and other emergency services to be provided during operation phase including the training to be provided to the staff of the project as first aid facility providers, fire fighters etc. Tie up with emergency services like local fire station, provision of emergency van etc. to be made during the operational phase. 70. Details of the D.G. sets with location, fuel consumption & storage and details of the acoustic measures to abate noise pollution. 71. Details of the debris management plan along with the use/disposal of excavated soil during construction phase and top soil conservation plan. 72. The details of the basic amenities and welfare facilities to be provided to the construction workers to ensure that they do not ruin the existing environment. 73. Undertaking from the management regarding maximum employment to the local people. 74. Details of Project benefits accruing to the locality, neighbourhood, region and nation as a whole. 75. Submit a detailed plan for corporate social responsibilities, with appropriate budgetary provisions. 76. Details of registration and provisions to be made by the project proponent to follow Building and other Construction Workers Acts and Rules and undertaking for the same.

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 22 of 40

Page 23 of 40

77. An action plan showing list of socio-economic upliftment activities based on socio-economic profile of the surrounding villages and need base field assessment along with the fund allocation for the five years, shall be incorporated in the EMP. 78. A tabular chart for the issues raised and addressed during public hearing/consultation and commitment of the project proponent on the same should be provided. An action plan to address the issues raised during public hearing and the necessary allocation of funds for the same should be provided. 79. (a) Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report. (b) Does the Environment Policy prescribe for standard operating process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions ? If so, it may be detailed in the EIA. 80. Copy of CC&A and Point wise compliance of existing CC&A. 81. What is the hierarchical system or administrative order of the company to deal with the environmental issues and for ensuring compliance with the EC conditions. Details of this system may be given. 82. Does the company have a system of reporting of non compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism should be detailed in the EIA Report. 83. Certificate of accreditation issued by the NABET, QCI to the environmental consultant should be incorporated in the EIA Report. 84. An undertaking by the Project Proponent on the ownership of the EIA report as per the MoEF&CC OM dated 05/10/2011 and an undertaking by the Consultant regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the MoEF&CC OM dated 04/08/2009. (Compliance of OM dated 05/10/2011 & 04/08/2009). 85. A tabular chart with index for point-wise compliance of above TORs. The above mentioned project specific TORs/additional TORs and the model TORs available in the MoEF’s sector specific EIA Manual for “Ports, Harbours” shall be considered as generic TORs for preparation of the EIA report in addition to all the relevant information as per the generic structure of EIA given in Appendix III in the EIA Notification, 2006. The draft EIA report shall be submitted to the Gujarat Pollution Control Board for conducting the public consultation process as per the provisions of the EIA Notification, 2006. The project shall be appraised on receipt of the final EIA report.

7 Zydus Infrastructure Pvt S.No.467, Pharon, SEZ, Sarkhej-Bavla Road, Screening & Ltd NH-8, Vill.Matoda, Sanand, Ahmedabad. Scoping

Project / Activity No.: 7 (h)  M/s: Zydus Infrastructure Pvt Ltd (herein after Project Proponent – PP) has submitted application vide their online proposal no. SIA/GJ/MIS/5152/2015 dated 16/12/2015. Project status: Existing Project / Activity Details: M/s. Zydus Infrastructure Pvt. Ltd. (ZIPL) is having Common Effluent Treatment Plant (CETP) and is engaged in the treatment of waste water collected from the member units of Special Economic Zone (SEZ). ZIPL has proposed for expansion of existing CETP from 0.8 MLD to 3 MLD, located at Survey No. 467, “Pharmez” Special Economic Zone, Sarkhej-Bavla Road, NH-8 A, Village Matoda, Taluka Sanand, District Ahmedabad, Gujarat. Members units are only High Tech Pharmaceutical (Formulation) Manufacturing units. At present unit has obtained CCA from Gujarat Pollution Control Board for 0.8 MLD capacity. Existing total land area is 17,919.26 sq. m. including 5,936.58 sq. m of green belt/tree plantation area. No additional land is needed to acquire for the proposed expansion project. Proposed 273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 23 of 40

Page 24 of 40 expansion activity will be carried out in open area available within the premises i.e. 315.54 sq.mt. Approximate project cost is Rs. 50 Crores for expansion of CETP. Fresh water requirement will be increased from 70 KL/day to 158 KL/day. Waste water generation will be increased from 36 KL/day to 85 KL/day (Domestic 12 KL & Industrial 73 KL). At present unit has provided CETP with primary, secondary, MBR process & MEE. Unit has proposed to install additional CETP units like equalization tank, neutralization tank, clarifloculator, fine screen platform, pre air basin, MBR Basin etc. Unit has provided one steam Boiler (3 TPH) for MEE. Waste water from the member units will be collected through tankers. Raw effluent is subjected to the primary physic-chemical treatment followed by biological treatment in MBR unit. Treated waste water will be sent to RO system. RO permeate will be reused and RO reject will be sent for MEE.FO/HSD/LDO (300 Lit./hr) is used as a fuel for Boiler. Unit has proposed to install two DG sets (320 KVA X 2) in addition to existing DG set (720 KVA). No process gaseous emission is envisaged. Hazardous waste generated from the proposed CETP project will be ETP sludge (15 MT/Month), MEE/Decanter sludge (114 MT/Month) and used oil (0.2 MT /Month). Discussions/Observations: Technical presentation made during the meeting by project proponent. While discussing about the treatment and reuse of waste water, Committee emphasised on drip irrigation system for utilization of treated waste water in green belt development. The project proponent presented that they have already started baseline environmental monitoring from 1st January 2016 and requested to allow them to use the same for the preparation of the EIA report which was agreed to by the committee. After detailed discussion on each and every aspect of the project, following TOR were prescribed to include them in the EIA report to be prepared for the study area covering 5 km radius from the boundary of the project site. 1. Detailed layout of effluent conveyance pipeline within the SEZ and all technical specifications, line diagram and total capacity of the pipeline to convey effluent. Details of pumping stations, pumping capacity in each pumping station etc if any shall also be furnished. 2. Justification for selecting particular capacity of the CETP & MEE keeping in view the future effluent load from the additional member units. 3. List of the CETP members (existing & new), their production capacity, effluent generation capacity, effluent characteristics and effluent quantity booked in ZIPL, potential / booked quantity of treated effluent for reuse / recycle etc. 4. List of the CETP members/industries ready to reuse treated effluent from the CETP for various applications within their premises. 5. Whether any future projections are envisaged for finalization of the CETP capacity and conveyance pipeline. 6. CETP daily performance data for the last one year including data of GPCB & ZIPL. 7. Assessment of quantity and desirable quality of treated effluent for recycle/reuse by member units. Exact details on the scheme for recycle-reuse of the treated effluent in various applications. 8. Details of mode of effluent collection system either by tankers and/or pipeline, etc. or proposed trouble-shooting mechanism. 9. The collection network/route map of tanker movement, treated wastewater carrying pipe-line for reuse-recycle by member units. 10. Monitoring protocol in case of collection of effluent through pipeline and/or tankers. 11. Specific monitoring plan to ascertain that all the CETP member units send their effluent [contracted quantity] to the CETP and do not discharge it elsewhere / on road side. Details of measures / checks proposed to eliminate bypassing of effluent and to ensure that ghost connections in underground drainage will not come in existence. 12. Details of the monitoring plan of the member units to ensure compliance with the inlet norms of the CETP as well as to avoid shock loading / acidic effluent in the system.

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 24 of 40

Page 25 of 40

13. Undertaking stating that they shall not give membership to any industrial unit located outside the SEZ and shall not transfer the membership without permission from the GPCB. 14. Details including the proposed inlet norms of the CETP. Give details of the mandatory treatment required by the member units to achieve the inlet norms by the each unit. 15. Techno-feasibility & detailed treatability studies for treating 3 MLD effluent including shock load. Design calculations & technical parameters for individual treatment components for the proposed treatment facilities to achieve the effluent quality at the outlet suitable for various applications. 16. Explore use of Best Available Technology incorporating latest features for the proposed up- gradation instead of providing conventional treatment units. 17. Technical details of the MEE including evaporation capacity, steam / energy required for evaporation, source of steam / energy required for evaporation, system for drying of concentrated effluent / slurry from the MEE, etc. 18. Undertaking stating that a separate electric meter will be provided for the ETP & MEE. 19. Details of the pipeline maintenance program to avoid choking / overflow / leakage of the effluent conveyance pipeline and means to avoid the same in the proposed up-gradation. 20. Provision of flow meter at the outlet of ZIPL; checks & balances to ensure that discharge quantity never exceeds the consented limit. How it would be ensured that the Zero Liquid Discharge (ZLD) concept shall be maintained at any time. 21. One season Site-specific micro-meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall should be incorporated. 22. Anticipated environmental impacts due to the proposed project/production may be evaluated for significance and based on corresponding likely impacts VECs (Valued Environmental Components) may be identified. Baseline studies may be conducted within the study area of 5 km for all the concerned/identified VECs and likely impacts will have to be assessed for their magnitude in order to identify mitigation measures. 23. One complete season base line ambient air quality data (except monsoon) to be given along with the dates of monitoring. The parameters to be covered shall be in accordance with the revised National Ambient Air Quality Standards as well as project specific parameters. Locations of the monitoring stations should be so decided so as to take into consideration the pre-dominant downwind direction, population zone and sensitive receptors. There should be at least one monitoring station in the upwind direction. There should be at least one monitoring station in the pre dominant downwind direction at a location where maximum ground level concentration is likely to occur. 24. Modeling indicating the likely impact on ambient air quality due to proposed activities. The details of model used and input parameters used for modeling should be provided. The air quality contours may be shown on location map clearly indicating the location of sensitive receptors, if any, and the habitation. The wind rose showing pre-dominant wind direction should also be indicated on the map. Impact due to vehicular movement shall also be included into the prediction using suitable model. Results of Air dispersion modeling should be superimposed on satellite Image/ geographical area map. 25. Specific details of (i) utilities required (v) types and quantity of fuel to be used (vi) flue gas emission rate emission from each utility (vii) Air Pollution Control Measures proposed along with its adequacy (viii) list the sources of fugitive emission along with its quantification and proposed measures to control it. 26. Methodology of de-contamination and disposal of discarded containers and its record keeping. 27. CETP emergency management system in case of malfunction of major components; include most likely malfunction / disruption / worst case scenario for assessing the impact & mitigation measures. 28. Existing natural drainage pattern of the project site and likely impact on it due to proposed up-

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 25 of 40

Page 26 of 40

gradation. 29. Socio-economic / CSR activities of ZIPL based on the needs/requirement of the surrounding people. 30. Compliance of the CC& A from GPCB as well as any notices / legal action against ZIPL for the last three years from the environment point of view. 31. Detailed odour control plan. 32. Details of measures proposed for the noise pollution abatement and its monitoring. 33. Details of hazardous characteristics including toxicity of hazardous chemicals to be handled and the control measures proposed to ensure safety and avoid the human health impact. 34. Details of quantity of each hazardous chemical to be stored, material of construction of major hazardous chemical storage tanks, threshold storage quantity as per schedules of the Manufacture, Storage & Import of Hazardous Chemicals Rules of major hazardous chemicals. How the manual handling of the hazardous chemicals will be minimized? 35. A detailed EMP including the protection and mitigation measures for impacts on human health and environment as well as detailed monitoring plan and env. management cell proposed for implementation and monitoring of EMP. This shall include the details of antidotes also. 36. Detailed Greenbelt Development Program including annual budget, types & number of trees to be planted, area under green belt development; along with commitment of the management. 37. Detailed risk assessment report including prediction of the worst-case scenario and maximum credible accident scenario along with damage distances and preparedness plan to combat such situation and risk mitigation measures for the haz. chemicals to be used in the CETP. 38. Details of management of the hazardous wastes to be generated from the project stating detail of storage area for each type of waste, its handling and its disposal. How the manual handling of the hazardous wastes will be minimized? 39. Copy of membership certificate of common TSDF for disposal of CETP sludge and carbon waste and adequacy of the Common TSDF to accommodate the additional quality / quantity of wastes to be generated due to the proposed up-gradation. 40. Details of CETP management and maintenance of the CETP during operation phase including infrastructure, model of management, role of each stake holder, CETP effluent quality monitoring scheme etc. 41. Impact of the CETP up-gradation and treated effluent conveyance & disposal system on the environment including the local hydrology, soil condition, floral and faunal bio-diversity of the region and the mitigation measures proposed. 42. Impact assessment analysis on above environmental attributes due to project and project allied activities both during construction and operation phase. 43. Detailed Environmental Management Plan along with the post project environmental monitoring programs and eco-development activities, greenbelt development plan and the socio-economic activities proposed under the Corporate Social Responsibility. 44. Detailed site map showing green belt, common utilities and proposed CETP units. 45. Measures to prevent flooding of the CETP in the rainy season. Disaster Management Plan of the project. 46. Details of emergency storage of effluent in the CETP for the monsoon season. 47. Treated effluent management plan during monsoon season when utilization of treated effluent for gardening & plantation purpose is not feasible. Detailed study report considering Percolation rate of the land available for gardening & plantation. Ensure that land is suitable for plantation & gardening. 48. Justification of the economic viability of the project. 49. Details of measures proposed to comply with CETP guidelines issued by the CPCB. 50. Details of R&D to be initiated by the CETP management for effective and viable treatment of the

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 26 of 40

Page 27 of 40

effluent received. 51. Details of total power load required for the CETP after the proposed up-gradation as well as details of dedicated power back up / D. G. Sets provided / proposed to take care of power requirements during power supply failure, to ensure that treatment units operate uninterrupted. 52. A tabular chart for the issues raised and addressed during public hearing/consultation and commitment of the project proponent on the same should be provided. An action plan to address the issues raised during public hearing and the necessary allocation of funds for the same should be provided. 53. (a) Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report. (b). Does the Environment Policy prescribe for standard operating process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions ? If so, it may be detailed in the EIA. 54. What is the hierarchical system or administrative order of the company to deal with the environmental issues and for ensuring compliance with the EC conditions. Details of this system may be given. 55. Does the CETP have a system of reporting of non compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism should be detailed in the EIA Report. 56. Certificate of accreditation issued by the NABET, QCI to the environmental consultant should be incorporated in the EIA Report. 57. CETP management manual covering various management aspects during the effluent collection, transportation, treatment and disposal aspects for best management practices. The member units shall abide by various clauses in this regard to check problems during the collection, transportation, treatment and disposal of the effluent. 58. An undertaking by the Project Proponent on the ownership of the EIA report as per the MoEF&CC OM dated 05/10/2011 and an undertaking by the Consultant regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the MoEF&CC OM dated 04/08/2009. The name of the Consultants / Consultancy firm along with their complete details shall be incorporated in EIA report. 59. A tabular chart with index for point-wise compliance of above TORs. The above mentioned project specific TORs/additional TORs and the model TORs available in the MoEF’s sector specific EIA Manual for CETP shall be considered as generic TORs for preparation of the EIA report in addition to all the relevant information as per the generic structure of EIA given in Appendix III in the EIA Notification, 2006. The draft EIA report shall be submitted to the Gujarat Pollution Control Board for conducting the public consultation process as per the provisions of the EIA Notification, 2006. The project shall be appraised on receipt of the final EIA report.

8 Maurya Enviro Project Pvt Block/S.No.75-A Paiki Khata No.125, Screening & Ltd Block/S.No72-B Paiki Khata No.124, Vill. Scoping Jamiyatpura, Ta. Balasinor, Dist. Mahisagar Project / Activity No.: 7 (d)

 M/s: Maurya Enviro Project Pvt Ltd. (herein after Project Proponent – PP) submitted Application vide online proposal no. SIA/GJ/MIS/6010/2015 dated 31/12/2015. Project status: New Project / Activity Details:

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 27 of 40

Page 28 of 40

M/s.: Maurya Enviro Project Pvt Ltd has proposed to establish a TSDF site at Block/S.No.75-A Paiki 2 paiki Khata No.125, Block/S.No72-B Paiki Khata No.124, Vill. Jamiyatpura, Ta. Balasinor, Dist. Mahisagar. PP has acquired 113817 sq. m land for the development of Common Hazardous Waste Treatent, Storage and Disposal Facility (TSDF). The total land area of the proposed site is 113817 Sq. meter. Total greenbelt proposed is 37600 sq. meter. Total area for cell will be 53267 sq. m. and capacity of the site will be 746856 m3. Total quantity of waste to be disposed is 970912 MT. Expected waste receipt at the site will be 200 MT/day. (54000 MT/Year). Total expected life of the site will be @ 17 years. Expected project cost is Rs. 55 Cr. Water requirement will be 176 KLPD for operation phase (Laboratory: 1 KL, Wet scrubber: 10 KL, Vehicle Wash: 10 KL, Green Belt: 150 KL & Domestic 5 KL). Source of the water will be Bore well. Total waste water generation will be 64.9 KL/day (Laboratory: 0.9 KL, Wet scrubber: 10 KL, Vehicle Wash: 10 KL, Leachate: 40 KL & Domestic 4 KL). Unit has proposed primary ETP followed by Spray dryer (Capacity 1 KL/hr) to achieve zero liquid discharge. Industrial effluent will be primary treated and then it will be spray dried. Unit has proposed one Hot Air Generator (Capacity: 30 Lac KCal/hr) for spray dryer unit. Coal (9 MT/day) will be used as a fuel for HAG. Cyclone separator followed by Wet scrubber is proposed as APCM for Spray dryer. Wet scrubber is proposed as APCM for HAG. There will be no discharge of waste water within or outside premises. Hazardous waste suitable for landfill received will be weighed, sampled and then sent inside TSDF cell for unloading. Compaction and levelling will be carried out regularly. Leachate collection system will be provided. One D. G. Set (200 KVA) is proposed to be installed. Hazardous wastes to be generated from their own activities are ETP sludge (180 MT/Year) and Used oil (25 Lit/yr). Discussions/Observations: Technical presentation made during the meeting by project proponent. During meeting, Committee noted that there are discrepancies in data submitted in Form-1 & PFR and data presented during meeting. It was observed that details presented regarding water consumption, waste water generation, leachate generation etc. during meeting are not as per the online data submitted in Form-1 & PFR. Further, Committee found that the data submitted in Form-1 & Pre feasibility report are unrealistic (Water consumption – 176 KL/day, Waste water generation – 60.9 KL/day including leachate generation – 40 KL/day etc.) PP submitted that alternative sites analysis was carried out for six sites and five sites namely (i) at Lal Mandva, Kapadvanj, (ii) at Bayad, (iii) Vadasinor, (iv) Vadasinor,(v) Modasa were rejected. However, the rejection of sites and site evaluation was not carried out as per the CPCB guidelines i.e. parameters such as characteristics of land, geology, hydro-geology, ground water conditions and ecological considerations etc. are not considered. Project proponent presented that the aerial distance of nearest habitat is 2 km from the proposed site. However, it was observed from the satellite image shown during presentation that there are habitats existing within 1 km area from the proposed site. Committee also found that distance of Balasinor town and Sudarshan lake from the proposed site is not correct. Upon asking about Fossil park, PP informed that the Fossil Park of

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 28 of 40

Page 29 of 40

Balasinor is located at a distance 9 km from the proposed site. Considering the historical and archaeological significance of the fossil park, Committee desired to know about the possible environmental impacts of the proposed Common TSDF site on archaeological site of Balasinor. After detailed deliberations, It was unanimously decided to reconsider the project for screening / scoping in one of the upcoming meetings only after submission of the following: 1. Revised Form-1 & PFR with realistic data & correct details. 2. (i) Satellite image and map showing nearest residential area/habitats (aerial distance) from the outer periphery of the proposed site.(ii) Satellite image of project site with specific details such as aerial distance of the project site from the nearest (1) Aanganwadi/School/College/Institute (2) Water Body: Creek / Nallah / Lake / Pond / Reservoir / Canal (3) National Highway (4) State Highway (5) Railway line (6) Heritage site (7) National Park / Wild Life Sanctuary etc. 3. Comparative statement for selection of proposed site for common hazardous waste management facility as per Rejection or knockout criteria & site evaluation criteria prescribed in CPCB guidelines. 4. The opinion / NOC from the Archaeological Survey of India with respect to impacts of the proposed Common TSDF site on archeologically important site of Balasinor. 9 Kejriwal Integrated Textile Vill:Kareli, Plot No: 340,341,342, Screening & Park Pvt. Ltd. 328,333,357,358, Palsana, Surat Scoping

Project / Activity No.: 7(c) & 7 (h) Project status: New Chronology of EC Process:  M/s: Kejriwal Integrated Textile Park Pvt. Ltd.- KITPPL (herein after Project Proponent – PP) submitted Application vide their letter dated 18/10/2014.  The project was considered for TOR finalization in the meeting of the SEAC held on 16/12/2014.  The project was considered in the SEAC meeting held on 16/12/2014 and additional TORs were prescribed in addition to proposed Terms of Reference (TOR) to include them in the EIA study to be done covering 5 km radius from the boundary of the project site.  Public hearing for the project was conducted by the GPCB on 30/10/2015 at project site.  Final EIA Report prepared by M/s: Detox Corporation Pvt. Ltd., Surat was submitted project proponent vide their online Proposal no. SIA/GJ/IND2/6181/2014) Project / Activity Details: This is a new proposed textile park with Common Effluent Treatment Plant (CETP) which falls under the project/activity 7(c) & 7 (h) as per the schedule of the EIA Notificaiton-2006. The textile park will be set up in 212481.88 sq. m. (Buildings 130203 sq. m, Common infrastructure – 4593505 sq. m & Green space 24330 sq. m, Common facilities – 12013.38 sq. m). Total cost of the project will be 121.28 Crores. Types of units to be set up in the premises are Texturising unit, Weaving unit and Embroidery units. This unit has proposed to develop Integrated Textile Park at Survey no. 340,342,343,344, 328, 333, 357, 358 at village Kareli, Ta. Palsana, District: Surat. The proposed Park envisages setting up total 33 different textile units in the Park. Viz. Texturising – 7 units, Water jet weaving – 17 units, Embroidery – 9 units). The proposed activities in the textile park will (1) Finished Cloth – 89.40 Lac meters/Month (2) Texturised Yarn – 6720 MT/Month and (3) Embroidered Fabric – 11.1 Lac meters. At present one unit namely M/s: Kejriwal Geotech Pvt. Ltd. is already installed at Survey no. 340, 341, 343, 344 having total area 69920 sq. m for manufacturing of POY/FDY. Separate

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 29 of 40

Page 30 of 40

EC has been obtained the same vide dated 23rd August, 2012. During the construction phase fresh water requirement 21.75 KL/day will be met through the tankers or underground water. During the operation Phase, fresh water requirement for the textile park will be 315 KL/day which is proposed to be sourced from Ground water. No pre-treatment will be given by the member units. The waste water generated from member units will consist of oil and grease which shall be treated in proposed CETP. The total effluent generated by the each member units of KITPPL is collected through underground effluent conveying network and stored in the raw effluent collection sump. Total industrial effluent generation will be 2715 KL/day (2625 KL from Water Jet units & 90 KL from Domestic activities). Total industrial effluent (2500 KL/day) after humidification loss will be treated in proposed CETP. Treated water (2480 KL/day) after handling/evaporation loss will be mixed with treated sewage (90 KL/day). Total 2400 KL/day of treated waste water will be sent to member units for recycle and 80 KL/day of treated waste water will be used for gardening/plantation within premises. Unit has proposed Common Effluent Treatment Plant (CETP) and STP with capacity 2500 KL/day and 100 KL/day respectively. CETP will consists of Primary, Secondary treatment incorporating MBBR technique & Tertiary treatment units with sludge dewatering system. Unit has proposed to install closed and protected flow & pH meter instruments at the inlet as well as outlet of each line terminating into the sump to provide real-time measurement of flow and pH from each unit. Each pumping line from member industries will be fitted with an automatic control valve. There will be installation of flow meter at the recycled network line. Records will be maintained for utilization of treated effluent. Flow meter and pH meter will be installed on outlet pipe from each member, and a PLC-SCADA based system will ensure that flow and pH from each unit is within prescribed norms. An effluent quality-monitoring programme will be established by KITPPL, which includes location of monitoring, frequency of monitoring, and specification of parameters to be monitored in line with Central Pollution Control Board (CPCB) guidelines.  The inlet norms and the quality of treated effluent suitable for recycling presented before the committee are as below : Sr. Parameter Units Inlet Norms Desired treated No. effluent quality 1 pH -- 6.5 to 7.5 7.0 to 8.0 2 Oil & Grease mg/l < 150 < 1 3 Total Suspended mg/l < 150 < 5 Solids 4 TDS mg/l < 400 < 500 5 COD mg/l < 250 < 20 6 BOD mg/l < 50 < 5

Unit has proposed one DG set with capacity 125 KVA for provision of alternate power to run emergency services like street lights, STP & ETP. Diesel (25 Lit./hr) will be used as fuel for DG set. There will be no Boilers/heaters and no use of solid fuels and hence no generation of flue gas accept DG set. Hazardous waste to be generated are ETP sludge (72 MT/Year) and Used oil. ETP sludge will be sent to TSDF site, STP sludge (8.8 MT/Year) will be used as manure and used oil will be sent to authorized recyclers. Unit has applied to SEPPL, Kutch for membership for TSDF site. There will be no use of any fuel for manufacturing activities and no process gas emissions from the proposed project. Observations & Discussions: Technical presentation during the meeting included the Point wise ToR compliance. During the appraisal, issues raised during the public consultation were discussed. There will be no significant source of air pollution, except flue gas stack of DG set. The DG Set will be operated in case of emergency and power failure, hence impact of flue gas emission on ambient air quality is expected to be

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 30 of 40

Page 31 of 40 marginal. The baseline study for ambient air quality, surface, ground water quality, noise, ecology and soil quality was carried out during 1st March to 31st May 2015. Ambient air quality monitoring was carried out at four locations during the study period. The analysis results of the same indicate that the ambient air quality was conforming to the national ambient air quality standards. Average Concentration of PM10, PM2.5, SO2 & NOx was found below the limits prescribed by CPCB. While reviewing the EIA report, Committee observed that the ToR related to details of source of water supply, reuse/recycle of treated waste water, Conveyance pipeline network, justification for proposed capacity of CETP, Management of haz. Wastes etc. were not addressed properly. After deliberation on various aspects, the Committee sought following additional information for further consideration of the proposal: 1. Revised water balance diagram with exact details of fresh water requirement and waste water generation considering RO plant for fresh water treatment. Give technical justification for Humidification loss (125 KL/day) and Handling/Evaporation loss (110 KL/day). 2. Complete and specific details of TOR no. 7, 11,12, 13, 21, 39, 42 3. Justification of proposed capacity of CETP considering the number of water jet looms and waste water generation per water jet loom or per meter production of fabric etc. 4. Details about suitability of Soil for utilizing treated effluent for plantation /gardening considering its percolation rate and soil characteristics. How it will be ensured that treated effluent won't flow outside the premises linked with storm water during high rainy days. Detail management plan for treated effluent in monsoon season. 5. Status of existing unit namely M/s: Kejriwal Geotech Pvt. Ltd. at Survey no. 340, 341, 343, 344 within the proposed park, Copy of CC&A of the said unit & its point wise compliance. Ensure that the waste water generated from the existing unit will not be allowed in the proposed CETP. 10 Shanti Integrated Textile S.No.338,339,340,341,342, 343,344,345, Screening & Navi Pardi, , Surat Scoping Park Private Limited

Project / Activity No.: 7(c) & 7 (h) Project status: New Chronology of EC Process:  M/s: Shanti Integrates Textile Park Pvt. Ltd.- SITPPL (herein after Project Proponent – PP) submitted Application vide their letter dated 16/10/2014.  The project was considered for TOR finalization in the meeting of the SEAC held on 16/12/2014.  The project was considered in the SEAC meeting held on 16/12/2014 and additional TORs were prescribed in addition to proposed Terms of Reference (TOR) to include them in the EIA study to be done covering 5 km radius from the boundary of the project site.  Final EIA Report prepared by M/s: Detox Corporation Pvt. Ltd., Surat was submitted project proponent vide their online Proposal no. SIA/GJ/IND2/6181/2014) Project / Activity Details: This is a new proposed textile park with Common Effluent Treatment Plant (CETP) which falls under the project/activity 7(c) & 7 (h) as per the schedule of the EIA Notificaiton-2006. The project envisages setting up of a Textile park at Block no. 338 to 345 in village Navi Pardi , Ta.: Kamrej, Dist. Surat. The textile park will be set up in 194380.82 sq. m. (Industrial plot area 143522.09 sq. m , Common facilities 4396.03 sq. m, Green space 15194.29 sq. m & Roads 30673.41 sq. m). Aerial distance of nearest residential area of Village Navi Pardi is 1 km from the project site. It is reported that no national park/sanctuary or ecologically sensitive area is located within 10 km distance. River Tapi is @ 1.29 km from the project site. Total cost of the project will be 151.09 Crores. Estimated cost for implementation of EMP will be 30.47 Crores. The textile park will houses 45 different units of Spinning (1), Water jet weaving (39), Wrap Knitting (1), Technical textile (1), Embroidery (2) and Paper 273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 31 of 40

Page 32 of 40 cone / Cartoon box making unit (1). Basic raw materials consumed in units within the park will be POY, FDY, Embroidery threads, water etc. Capacity of the proposed CETP will be 10 MLD. Initial water requirement of the textile park will be 10 MLD which is proposed to be sourced from canal water. Fresh water make up will be 1167 KL/day. SITPPL has obtained water allocation certificate for the project from Narmada Water Resources and Water supply and Kalpsar Department for withdrawal of 2 MLD from canal. As the anticipated generation of effluent from the park will be mainly sewage along with water jet process. There will be generation of industrial wastewater only from Water jet weaving units. Total effluent (9850 KL/day) from member units will be treated in CETP. The waste water generated from the member units will consist mainly of oil and grease. No pretreatment will be given by the member units. Effluent from individual units of SITPPL will be collected into one collection sump having a closed and protected room to house PLC-SCADA panel. Common Drain will be laid for domestic and industrial effluent so there will not be any other mode of discharge. Total 150 KL/day of sewage will be sent to CETP. Main units of the proposed CETP will be Effluent collection sump, Medium and Fine bar screens (mechanical & manual), Flash mixer, Flocculator, Dissolved air flotation (DAF), Equalization tank, MBBR (Moving Bed Bio-film Reactor), Secondary Clarifier, Sludge thickener and dewatering system, Chlorine contact tank, UF system, Micron Cartridge filter (MCF). Domestic effluent (150 KL/day) will be also sent to CETP for treatment with industrial effluent. There will be provision of emergency storage tanks by the member units to store the effluent in case of any unprecedented circumstances in CETP operation. Flow meter and pH meter will be installed on outlet pipe from each member, and a PLC-SCADA based system will ensure that flow and pH from each unit is within permitted range. Monitoring of CETP by management will be in line with Central Pollution Control Board (CPCB) guidelines for management, operation and maintenance of common effluent treatment plants. Unit has proposed Pressure sand filter and Ultra filtration after CETP. UF reject stream (200 KL) will be reused for gardening, fire fighting and evaporated in single stage evaporator. Unit has proposed to recycle 8833 KL/day of treated effluent to member units within premises.  The inlet norms and the quality of treated effluent suitable for recycling presented before the committee are as below : Sr. Parameter Units Inlet Norms Desired treated No. effluent quality 1 pH -- 6.5 to 8 6.5 to 8.5 2 Oil & Grease mg/l < 150 < 1 3 Total Suspended mg/l < 150 < 5 Solids 4 TDS mg/l < 400 < 500 5 COD mg/l < 250 < 20 6 BOD mg/l < 50 < 5

Total 8833 KL/day of the treated waste water will be recycled to member units of the textile park. Unit has proposed one DG set with capacity 650 KVA for provision of alternate power to run emergency services like street lights, STP & ETP. HSD (100 Ltrs/hr) will be used as fuel for DG set. Hazardous waste to be generated are ETP sludge (0.8 MT/day), Used oil. ETP sludge will be sent to TSDF site, STP sludge will be used as manure and used oil will be sent to authorized recyclers. Unit has proposed rain water harvesting system. There will be no use of any fuel for manufacturing activities and no process gas emissions from the proposed project. Observations & Discussions: Technical presentation during the meeting included the Point wise ToR compliance. During the appraisal, issues raised during the public consultation were discussed. There will be no significant

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 32 of 40

Page 33 of 40 source of air pollution, except flue gas stack of DG set. The DG Set will be operated in case of emergency and power failure, hence impact of flue gas emission on ambient air quality is expected to be marginal. The baseline study for ambient air quality, surface, ground water quality, noise, ecology and soil quality was carried out during 15th January to 15th April 2015. Ambient air quality monitoring was carried out at four locations during the study period. The analysis results of the same indicate that the ambient air quality was conforming to the national ambient air quality standards. While reviewing the EIA report, Committee observed that the ToR related to details of techno-feasibility & adequacy for reuse/recycle, justification for proposed capacity of CETP etc. were not addressed properly. After deliberation on various aspects, the Committee sought following additional information for further consideration of the proposal: After deliberation on various aspects, the Committee sought following additional information for further consideration of the proposal: 1. Break up of 200 KL/day UF rejection stream with its disposal along with its feasibility. Land availability for gardening and plantation with its percolation rate & Soil characteristic. Detail management plan for treated effluent in monsoon season when utilization of treated effluent for gardening & plantation purpose is not feasible. 2. Technical details of Single stage evaporator. 3. Recurring cost/annum earmarked for environment pollution control measures. 4. Compliance of ToR no. 12, 13, 22

11 Mahavir Eco Projects Pvt. Plot No:2430, GIDC Estate, Sachin, Choryasi, Appraisal Ltd. Surat Project / Activity No.: 7 (h) Project status: New Chronology of EC Process:  M/s: Mahavir Eco Projects Pvt. Ltd. - MEPPL (herein after Project Proponent – PP) submitted Application vide their letter dated 16/10/2014.  The project was considered for TOR finalization in the meeting of the SEAC held on 23/12/2014.  The project was considered in the SEAC meeting held on 23/12/2014 and additional TORs were prescribed in addition to proposed Terms of Reference (TOR) to include them in the EIA study to be done covering 10 km radius from the boundary of the project site.  Final EIA Report prepared by M/s: Aqua-Air Environmental Engineers Pvt. Ltd., Surat was submitted project proponent vide their online Proposal no. SIA/GJ/IND2/4857/2014 dated 04/12/2015

Project status: Expansion Project / Activity Details: M/s. Mahavir Eco Projects Pvt. Ltd.[MEPPL] is having facility of common salt recovery plant and steam generation from waste recovery system from SYN Gas generation using non hazardous waste like Chindi waste, wood, wood briquettes, wood pallets, agro waste, bagasse, coke, RDF, etc.). PP has obtained CTE for the same. Now MEPPL proposes to set up Common Multiple Effect Evaporator (MEE Plant) at Plot no. 2430, GIDC Sachin, Dist.: Surat. Existing and proposed project activities are tabulated as below:

Sr. Name of Products Existing Proposed Total No. Capacity Capacity Capacity

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 33 of 40

Page 34 of 40

Integrated Waste Management Facility for

1. Steam (Generated from Waste 9 MT/Hr 9 MT/Hr 18 MT/Hr Heat Recovery System) from SYN (From Gas generation (Using non Community hazardous waste like Chindi Boiler) waste, wood, wood briquettes, wood pallets, agro waste, bagasse, coke, RDF, etc.)

2. Receipt, Treatment of Mother 550 -- 550 KL/Day Liquor in Common Salt recovery KL/Day Unit

3. Receipt, Treatment & Disposal of -- 550 KL/Day 550 KL/Day Waste Water in common MEE

Total incoming effluent 550 550 KL/Day 1100 KL/Day KL/Day

The expected raw material consumption/incoming effluent will be as below:

Consumption Sr. Raw Material No. Existing Proposed Total

Non Hazardous Waste -- 60 MT/Day (like Chindi Waste, Wood, Wood Brickets, Wood pallets, 60 1 Agrowaste, Bagasse, coke, RDF, MT/Day etc.) – (40 MT/Day) and Hazardous Waste – (20 MT/Day)

Waste Water (containing high 550 550 KL/Day 2 -- COD and TDS) KL/Day

550 -- 550 KL/Day 3 Waste Water for Salt recovery KL/Day

20 20 4 Lime 40 MT/Day MT/Day MT/Day

5 Caustic Soda Lye 5 MT/Day 5 MT/Day 10 MT/Day

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 34 of 40

Page 35 of 40

1250 -- 1250 6 Natural Gas SCM/Day SCM/Day

9 MT/Hr 7 Steam -- 9 MT/Hr

The proposed project falls in project activity 7(h) of the schedule of the EIA Notification, 2006. The cost of proposed expansion will be 8.5 Crores. The proposed expansion will take place within the existing premises having plot area 6196.13 m2 and no additional land will be acquired. Unit has proposed 824 m2 area for tree plantation. Presently 550 KL/day of waste water for salt recovery, 40 MT/day Non- hazardous waste & 20 MT/day Hazardous waste is accepted at the MEPPL. Now it is proposed to receive 550 KL/day of Waste Water (containing high COD and TDS) also. MEPPL has identified 26 members from GIDC Sachin & outside Sachin GIDC & received confirmation letters from them. Effluent from individual industry will be collected by tankers, analyzed for salt content, acidity and solvents and unloaded in collection tanks. Effluent will be neutralized in reactors with lime and gypsum will be filtered off. The clarified liquid will be treated with caustic soda lye in a de-calcinator. The effluent containing traces of solvent will be sent to solvent stripper for removal of low boilers. This neutral effluent will be subjected to MEE followed by ATFD-(Agitated Thin Film Dryer). The plant will have three series of MEE viz. (1) MEE for NaCL predominant stream (3 falling film calendria and 1 forced Circulation for capacity 200 KLPD), (2) MEE for Sodium Sulfate predominant stream (3 Forced Circulation calendria with capacity of 100 KLPD) & (3) MEE for mixed salts stream (3 Falling Film calendria with capacity of 250 KLPD). The condensed water will be purified using chemical and electrical oxidation process and will be recycled as process water to the industry. The gypsum will be sold to cement industry. The unusable mixed salt will be disposed in TSDF sites and concentrated low boiler stream from stripper will be disposed at common incineration facility (CHWIF). Fresh water consumption will be 408 KL/day which will be sourced from Sachin Infra Management Ltd. Industrial Waste water generation (399.75 KL/day) will be reused. Domestic waste water (15 KL/day) will be disposed off into soak pit via septic tank. Multi cyclone separator, bag filter, Ventury scrubber with demister and carbon filter will be provided with Syngas generator (60 TPD) attached with steam Boiler (10 TPH). Multi cyclone separator, bag filter & Ventury scrubber will be provided with 9 TPH steam Boiler. Coal ( 30 MT/day) will be used as fuel for Boiler. PP has proposed two DG sets (250 KVA & 340 KVA). Cyclone separator & bag filter will be provided as air pollution control system with Dryer. SYNGAS will be used in Dryer. Ventury scrubber will be provided as APCM with Ammonia Stripper (Closed vessel system). Cyclone separator and wet scrubber will be provided with two spray Dryer units (Cap. 8 m3/hr each). Hazardous waste to be generated from the proposed project are ETP sludge (151.2 MT/day), Dry salt (54 MT/ Day), MEE Salt (40 MT/day), Used oil (0.085 MT/Year) & discarded containers/liners 2.4 MT/Year). ETP sludge Dry salt & MEE salt will be sent to TSDF site. Bottom Ash generated from Syngas generator and APCM will be send to Brick/Cement manufacturer or used for captive purpose. Observations & Discussions: Technical presentation made during the meeting by project proponent. The study period considered for EIA study was March 2014 to May-2014. The baseline environmental conditions within the study area of 5 km have been determined. Ambient air quality monitoring was carried out at 8 locations including project site. The maximum concentration of PM10 (86.71 μg/m3) and PM2.5 (51.89 μg/m3) was recorded at the Project Site – Unit 2. The maximum concentration of SO2 (19.4 μg/m3) was at Village:

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 35 of 40

Page 36 of 40

Kharwas and maximum concentration of NOx (21.6 μg/m3) was at Village: Kharwas respectively. The

PM10 and PM2.5concentrations at all the AAQM locations were primarily caused by local phenomena including industrial & vehicular activities and natural dust getting air borne due to manmade activities and blowing wind. PM10 and PM2.5 concentrations were observed below stipulated standards of CPCB for Industrial, Residential, Rural and Other Area at all air quality monitoring locations during the monitoring period. Eight nos. of ground water and two nos. of surface water samples were collected from the study area. The Industrial Source Complex – Short Term Version 3 (ISCST) AERMOD model has been developed to simulate the effect of emissions from point sources on air quality. Incremental concentration due to proposed project is found within permissible National Ambient Air Quality Standards. During the meeting, the committee noted that the waste water from the entire system to be reused will be in the industries located outside instead of using it within premises. Committee was of the view that unit shall fulfill their fresh water requirement from generated RO permeate stream only and no fresh water shall be procured from outside. While reviewing the EIA report, Committee observed that the ToR related to details of effluent streams from member units, segregation of streams and transportation system, Monitoring plan, emission details, green belt development etc. were not addressed properly. After deliberation, It was unanimously decided to consider the project for further consideration only after submission of the following: 1. Revised water balance diagram including complete reuse of waste water within premises. 2. Complete and specific details of TOR no. 6, 7, 8, 10, 11, 12, 28, 48. 3. An undertaking by the Project Proponent on the ownership of the EIA report as per the MoEF&CC OM dated 05/10/2011 and an undertaking by the Consultant regarding the prescribed TORs have been complied with and the data submitted is factually correct as per the MoEF&CC OM dated 04/08/2009. 4. Latest status about the accreditation by the NABET, QCI or any other agency as may be notified by the Ministry of Environment, Forest and Climate Change from time to time. 5. Status of existing CC&A and its point wise compliance. 6. Summary & Conclusion as per the generic structure given in Appendix III A of the EIA Notification 2006. 12 Sachin Udhyognagar Block No:C-11,C-13,C-15,C-24 (Subpart 28 to Appraisal Sahakari Mandli Ltd 35),Sachin, Choryasi, Surat

Project / Activity No.: 7 (h) Project status: New Chronology of EC Process:  M/s: Sachin Udhyognagar Sahakari Mandli Ltd – SUSML (herein after Project Proponent – PP) submitted Application vide their letter dated 11/10/2014.  The project was considered for TOR finalization in the meeting of the SEAC held on 16/12/2014.  The project was considered in the SEAC meeting held on 16/12/2014 and additional TORs were prescribed in addition to proposed Terms of Reference (TOR) to include them in the EIA study to be done covering 10 km radius from the boundary of the project site.  Final EIA Report prepared by M/s: Ramans Enviro Services Pvt. Ltd., Ahmedabad was submitted project proponent vide their letter dated 21/10/2015. Project / Activity Details: M/s: Sachin Udyognagar Sahakari Mandli Limited has proposed to establish Common Effluent Treatment Plant (CETP) with 20 MLD capacity with recycling facility along with effluent collection system

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 36 of 40

Page 37 of 40 and treated waste water distribution system for water jet looms industry situated at Hojiwala Industrial estate. The proposed CETP will be situated at block no. C-11, C-13, C-15, C-24 (Subpart 28 to 35), Hojiwala Industrial Estate, Sachin, Dist- Surat, Gujarat. Total land acquired for the proposed CETP with recycling plant will be 25230 sq. mtr. Unit has proposed total 7570 sq. m area for green belt area,/Tree Plantation area . Total project cost will be Rs 50 Crores. Proposed project is exclusively for conveyance, common effluent treatment and recycling of industrial effluent being generated exclusively from the Water Jet Looms from the Hojiwala Industrial Estate; both existing looms and upcoming looms will be utilizing the CETP for their effluents and under no circumstances any dying and printing, textile process house and chemical manufacturing unit will be allowed to be the member of the CETP. There will be 18 member units with @ 1069 water jet machines at the initial stage. However, looking to the future potential in textile industries, the number of water jet looms bearing industries is going to increase rapidly within the Hojiwala Estate, either by way of expansion of the existing units or by setting up of new units. About 6000-7000 water jet looms are envisaged to be ultimately operational in the Hojiwala Industrial Estate; considering the wastewater generation quantity from each loom to be around 2.8 to 3 KLD , the CETP has been designed for 20 MLD capacity. The conveyance system for effluent and distribution network for re-cycled water including its various components has been designed for 20 MLD capacity. Total water consumption at CETP will be 50 KL/day which includes 10 KL/day of fresh water for Domestic use & 40 KL/day of recycled treated water for solution preparation of treatment chemicals. There will be a requirement of make-up fresh water of 5 MLD (max.), (including 10 KLPD of domestic requirement at CETP) to compensate for the evaporation losses at each individual member unit. Canal water will be used as make up water and a water Treatment Plant for 5 MLD is proposed along with the CETP for canal water treatment. The wastewater quantity being received through member units and the recycled water quantity to be distributed to member units will be monitored through SCADA based system. Effluent conveyance system will be based upon gravity flow. The effluent received at inlet chamber of CETP will be subjected to treatment so as to meet with norms prescribed and will be put back in to dedicated piped distribution network for reuse. The member units will have preliminary treatment consisting of screen chamber, oil & grease trap and collection sump so as to meet the quality of effluent with CETP inlet norms prior to discharge into the conveyance system. These facilities shall be within the premises of the member industry. The screen and oil & grease trap of suitable capacity will prevent choking of drainage line and will ensure continuous flow at all stages. For the individual member units, it will be mandatory to provide continuous online monitoring system for estimation of flow, TDS & pH to prevent any illegal disposal of effluent from industries other than member units. Common Effluent Treatment and Recycling Plant will consist of Equalization, Primary Treatment, Biological Treatment (based on SBR process) and Tertiary Treatment Facility. 20 MLD of treated effluent will be collected in water reservoir and recycled to member units for reuse. Alum, Poly Electrolyte (PE), Urea and Activated carbon will be used at the CETP as treatment chemicals. The entire treated effluent from CETP of SUSML will be sent back to member units for reuse through distribution network of rising mains. Treated effluent generated will be collected in water storage tank and recycled to member units for reuse after addition of fresh water as make-up. It will be mandatory for member units to provide continuous online monitoring system for estimation of flow, TDS & pH to prevent any illegal disposal of effluent from industries other than member units. Provisions of state of art centralized PLC/SCADA system will be provided for plant operation, control, monitoring, and data recording. The data of pH meter, flow meter, TDS and TOC analyzer will be made available to GPCB in real-time basis. The CETP management manual for proposed CETP will be prepared for better performance of the CETP. The full fledged laboratory facility will be provided. CETP inlet norms and anticipated quality of treated effluent will be as under:

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 37 of 40

Page 38 of 40

Unit CETP inlet CETP outlet i.e. Parameters norms Quality required for utilization for water jet. pH pH unit 7.0 – 7.5 7.0 - 8.0 BOD mg/lit. 200 < 30 COD mg/lit. 400 < 40 TSS mg/lit. 200 < 10 Oil & mg/lit. 30 < 10 Grease TDS mg/lit. <300 < 500 No process gas emission is envisaged. Unit has proposed two D.G. sets (capacity: 750 KVA each) as standby facility. Diesel @ 50 L/hr will be required as a fuel for each DG set. Hazardous wastes to be generated are ETP sludge (15 MT/day), Used Oil (200 Lit./Annum, , Discarded containers and Spent Carbon (7.5 MT/Annum). ETP waste & Spent carbon will be disposed off at the nearby common TSDF. Discarded barrels / containers / bags / liners will be either reused or returned back to suppliers or sold only to the authorized recyclers. Used oil will be sold only to the registered recyclers. Observations/Discussions: Technical presentation during the meeting included the Point wise ToR compliance and issues raised during public hearing. The baseline environmental quality has been assessed for a period from 5th Jan 2015 to 28th March 2015 in a study area of 5 km radial distance from the project site. Ambient Air

Quality Monitoring (AAQM) was carried out at 6 locations during the study period for PM10, PM2.5,

Sulphur Dioxide, and Oxides of Nitrogen. Results show that the PM10 concentration ranges between 3 56.2 - 165.6 μg/m within the study area during the period of sampling. The average PM10 concentration remains well below the stipulated standards of NAAQS [24 hr.] at waktana and kansad villages, however, at other locations the average concentrations are high due to the industrial activities. The 3 PM2.5 concentration ranges between 35.8 - 89.2 μg/m within the study area during the period of sampling. The highest concentration among the monitored locations has been found at Sachin and the lowest at Waktana. The average PM2.5 concentration remain below the stipulated standards of NAAQS [24 hr.] at three locations except at Site, Sachin and Lajpor locations due to the industrial activities. The average values of Sulphur Dioxide and Oxides of Nitrogen remains well within the stipulated value of 80 μg/m3 at all the monitoring locations. Gaseous pollutants and Particulate matter remain well within the prescribed norms. The surface water samples and ground water samples have been collected from Ponds, Rivers and different bore wells of various Gram Panchayats within the study area. Result shows that majority of the physico-chemical parameters and heavy metals from surface and ground water samples are below stipulated drinking water standards. All the ground water samples analyzed, except village kansad hand pump sample can be considered fit for drinking purpose after resorting to suitable treatment of disinfection. Committee noted that the treated waste water will be completely recycled and there will be no discharge of waste water. During the meeting, Committee emphasized on the conveyance system of the raw effluent and treated effluent and CETP performance. Project proponent assured that the wastewater quantity being received through member unit and the recycled water quantity to be distributed to member units needs to be monitored through SCADA based system. Committee asked to submit an action plan in case of Breakage in conveyance system considering worst case scenario. After detailed deliberations the Committee sought following additional information for further consideration of the proposal: 1. Status of permission from Irrigation department about withdrawal of 5 MLD canal water. 2. How will you ensure that all the member units will use recycled treated water and will not use 273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 38 of 40

Page 39 of 40

ground water from their own premises. 3. Site plan and Layout plan showing nearby Nallah and surrounding areas. How will you ensure that there will not be any waste water discharge from the proposed project. 4. The CETP management manual for proposed CETP. 5. Action plan in case of Breakage in effluent conveyance system (Worst case scenario) including response time, impact on soil and surrounding environment & mitigation measures. Following projects were also considered and discussed during meeting.

1. Bhadbhut Barrage Project (Proposed by Kalpasar Department of Government of Gujarat), Near Bhadbhut Village , Tal. Vagra, Dist. Bharuch.

The Narmada, Water Resources, Water Supply & Kalpsar Department (NWR&WS&KD), Government of Gujarat has proposed to construct a barrage across Narmada River near Bhadbhut village, Dist: Bharuch.  This office received an application for Environmental Clearance for the proposed Barrage project on 15/11/2011. Referring to the EIA Notification 2006, Barrage Project has not been included in the project specific list however, the proposed Barrage will provide irrigation to 1136 hectare of land. Accordingly, the project falls under category B of the project / activity no. 1(c) [i.e. the project having irrigation command area less than 10,000 ha] in the schedule of the EIA Notification, 2006.  Further the project was considered for screening /scoping in the meeting of the SEAC held on 05/01/2012 and additional TORs were prescribed for the EIA study.  Public hearing for the project was conducted by the GPCB on 19/07/2013 at Bhadbhut village, Dist: Bharuch.  Final EIA and Risk Assessment report of the project prepared by CSIR-NEERI, Nagpur was submitted by PP during February, 2014. The project proponent was called for appraisal in the SEAC meeting held on 31/07/2014.  During the SEAC meeting on 31/07/2014 & 10/03/2015, the project was appraised based on the information furnished in the EIA Report.  Consequently, the project proponent submitted the details/information sought during the SEAC meetings dated 31/07/2014 & 10/03/2015 vide their letters dated 29/01/2015 & 04/09/2015 respectively. Observations & Discussions: During meeting, Committee took notice of MoEF&CC Notification vide S.O. 1599 (E) dated 25.06.2014 regarding amendment to EIA Notification 2006, which states about amendment in the applicability of Irrigation Projects for culturable command area i.e. “<10000 ha, >2000 ha of Culturable Command area” falls under category B of the project / activity no. 1(c) (ii) of the EIA Notification 2006. Further, applicability of the said amendment was deliberated in detail. As the proposed Barrage project will provide irrigation to about 1136 ha of land which is less than 2000 Ha, Committee was of the view that proposed project does not fall under the ambit of EIA Notification 2006 as culturable command area does not qualify under the amended EIA Notification 2006 dated 25/06/2014. In view of this, project proponent informed that their proposal does not fall under the purview of EIA Notification 2006 and does not require to obtain Environmental Clearance. Considering an amendment of EIA Notification 2006 dated 25/06/2014 and the fact that culturable command area of the proposed project is less than 2000 Ha, Committee unanimously decided to return an application for obtaining Environmental Clearance for proposed Barrage project since it does not require environmental clearance anymore. In view of the above, it was decided to delist the proposal from the list of the applications for getting

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 39 of 40

Page 40 of 40

Environmental Clearance pending with SEAC, Gujarat and to close the file.

(2)The additional information received from the project proponent M/s Sun Light Pigment., Plot no:48/1&48/2, GIDC-Kalol, Dist.: Gandhinagar which was sought during SEAC meeting dated 19/08/2015 for further consideration of the proposal. The said submission by the project proponent was considered by the committee during the meeting. Unit has submitted as below: (1) Proposal for Zero Liquid Discharge (ZLD) system. (2) Name and quantity of each type of solvents to be used and its management. (3) Management of by products. Committee noted that the waste water will be treated in un-house ETP followed by RO system and RO reject stream will be sent to Common spray dryer at Vatva GIDC. After detailed deliberations, the Committee decided to consider the project on satisfactory submission of the following: 1. Feasibility report for actual use of By-products as a raw material at end consumers. 2. Details about transportation of waste water to the Common facility at Vatva GIDC through dedicated tankers. 3. Details about Manifests system for tanker movement and GPS System to be installed for online tracking of tanker movements. (3)The additional information received from the project proponent namely M/s. M.G. Polymer, Block no: 272, Sub Plot no.2, Village: Zak, Ta.: Dehgam, Dist.: Gandhinagar which was sought during earlier SEAC meeting dated 19/08/2015 for granting Environmental Clearance to the project. The said submission by the project proponent was considered by the committee during the meeting and as it was found satisfactory, the committee decided to recommend the proposed project for grant of environmental clearance.

Meeting ended with thanks to the Chair and the Members. ------Minutes approved by:

1. Shri T. P. Singh, Chairman, SEAC.

2. Shri V. C. Soni, Vice Chairman, SEAC.

3. Shri R. J. Shah, Member, SEAC.

4. Dr. V. K. Jain, Member, SEAC.

5. Shri V. N. Patel, Member, SEAC.

6. Shri Hardik Shah, Secretary, SEAC.

273rd meeting of SEAC-Gujarat, Dated 12.01.2016 Page 40 of 40