GOVERNMENT OF

WATER RESOURCES DEPARTMENT (MAJOR & MEDIUM IRRIGATION)

ANNUAL REPORT

2006-07 2

SL. PAGE CONTENTS NO. NO.

1 INTRODUCTION 1

2 ORGANISATIONAL STRUCTURE 2

3 ACHIEVEMENTS OF WATER RESOURCES DEPARTMENT DURING 2006-07 34

4 ACCELERATED IRRIGATION BENEFIT PROGRAMME 510

5 SPECIAL REHABILITATION PACKAGE 11

6 WATER RESOURCE DEVELOPMENT ORGANISATION 1218

7 CENTRAL MECHANICAL ORGANISATION 1922

8 KARNATAKA ENGINEERING RESEARCH STATION 2225

9 WATER AND LAND MANAGEMENT INSTITUTE (WALMI) 2627

NIGAMS

10 KRISHNA BHAGYA JALA NIGAM LIMITED 31

10.1 UPPERKRISHNAPROJECT 3140

10.2 BAGALKOTTOWNDEVELOPMENTAUTHORITY,BAGALKOT 4145

11 KARNATAKA NEERAVARI NIGAM LIMITED 49

AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER,IRRIGATION 11.1 49 (NORTH), BELGAUM

11.1.1 MALAPRABHA PROJECT 50

11.1.2 GHATAPRABHA PROJECT 51

11.1.3 HIPPARAGI IRRIGATION PROJECT 52

11.1.4 HARINALA IRRIGATION PROJECT 52

11.1.5 MARKANDEYA RESERVOIR PROJECT 53

11.1.6 DUDHGANGA IRRIGATION PROJECT 53

11.1.7 KALASA NALA AND BANDHUR NALA PROJECT 54

11.1.8 LIFTING OF HIRANYAKESHI WATERS INTO G.R. 55 3

SL. PAGE CONTENTS NO. NO.

11.1.9 BELLARYNALA PROJECT 56

11.1.10 SRI RAMESHWARA L.I.SCHEME 57

11.1.11 JAVALUHALLA L.I.SCHEME 58

11.1.12 BENNIHALLA L.I.SCHEME (5 NOS.) 58

11.1.13 KOLACHI L.I.SCHEME 59

11.1.14 KONNUR L.I.SCHEME 59

AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 11.2 60 CENTRAL ZONE, MUNIRABAD

11.2.1 SINGATALUR LIFT IRRIGATION SCHEME [SLIS] 6061

AN OVERVIEW OF PROJECTS UNDER THE ENGINEER-IN-CHIEF, UPPER TUNGA 11.3 61 PROJECT ZONE, SHIMOGA

11.3.1 UPPER TUNGA PROJECT 6162 11.3.2 TUNGA LIFT IRRIGATION SCHEME 62 11.3.3 BASAPUR LIFT IRRIGATION SCHEME 6263

11.3.4 ITAGI-SASALWAD LIS 63

11.3.5 GUDDADA MALLAPURA LIS 6364 11.3.6 UPPER BHADRA PROJECT [STAGE 1 &2] 64 11.3.7 UBRANI-AMRUTHAPURA MULTIPURPOSE LIS 64 11.3.8 SANYASIKOPPA LIS 64

AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, VARAHI PROJECT 11.4 65 ZONE, SIDDAPURA

11.4.1 VARAHI IRRIGATION PROJECT 6566

AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 11.5. 67 PROJECTS ZONE, GULBARGA

11.5.1 BENNITHORA PROJECT 67

11.5.2 BHIMA LIFT IRRIGATION SCHEME 67 4

SL. PAGE CONTENTS NO. NO.

11.5.3 GANDORINALA PROJECT 68 11.5.4 LOWER MULLAMARI PROJECT 69 11.5.5 AMARJA PROJECT 6970

12 CAUVERY NEERAVARI NIGAMA LIMITED 73

AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION(S) 12.1 74 ZONE, MYSORE

12.1.1 D.DEVARAJAURSCANAL 74

12.1.2 KABINIRESERVOIRPROJECT 7475

12.1.3 HARANGIPROJECT 75 12.1.4 TARAKAPROJECT 76 12.1.5 ARKAVATHYPROJECT 7677

12.1.6 CHIKLIHOLEPROJECT 7778

12.1.7 UDUTHOREHALLAPROJECT 78 12.1.8 IGGALURBARRAGEPROJECT 7879 12.1.9 MANCHANABELEPROJECT 7980

12.1.10 MODERNISATIONOFKRISHNARAJASAGAR 8081

12.1.11 NANJAPURALIFTIRRIGATIONSCHEME 8182

12.1.12 BANAHALLIHUNDILIS 82

AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, HEMAVATHY CANAL 12.2 82 ZONE, TUMKUR

AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, HEMAVATHY 12.3 85 RESERVOIR, GORUR

12.3.1 HEMAVATHYPROJECT 8586

12.3.2 YAGACHIPROJECT 8687 12.3.3 HUCHANAKOPPALULIS 8788 5

SL. PAGE CONTENTS NO. NO.

12.3.4 KAMASAMUDRALIS 88 12.3.5 KACHENAHALLILIS 89 12.3.6 VOTEHOLEPROJECT 90

ZONES

AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 13 93 PROJECT ZONE, GULBARGA

13.1 KARANJAPROJECT 93

AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION 14 94 CENTRAL ZONE, MUNIRABAD

14.1 TUNGABHADRAPROJECT 9496

14.2 HIREHALLAPROJECT 9798

14.3 MASKINALAPROJECT 99100 14.4 OTHERWORKS[NEW] 101103

AN OVERVIEW OF PROJECTS UNDER THE ENGINEER-IN-CHIEF, UPPER TUNGA 15 104 PROJECT ZONE, SHIMOGA

15.1 BHADRAPROJECT 104105

15.2 MODERNISATIONOFCANALSYSTEMOFTUNGAANICUT 106

15.3 HODIRAYANAHALLADIVERSIONSCHEME 106

15.4 MODERNISATIONOFCANALSYSTEMOFAMBALIGOLARESERVOIR 106

15.5 MADAGAMASURTANK 107

15.6 ERMOFBHEEMASAMUDRATANK 107

15.7 MODERNISATIONOFCANALSYSTEMOFGONDIANICUT[BHADRA] 107

15.8 KADUVINABYLULIFTIRRIGATIONSCHEME 107

15.9 THIMMAPURALIFTIRRIGATIONSCHEME 107

15.10 ANJANAPURARESERVOIRPROJECT 108 6

SL. PAGE CONTENTS NO. NO.

16 COMMAND AREA DEVELOPMENT PROGRAMME 108-112

1. INTRODUCTION The Annual Report is a document giving details of the annual Programme, Progress and importanteventsthathavetakenplaceduringtheyear,intheWaterResourcesDepartment.

GEOGRAPHICAL AREA The geographical area of Karnataka is 1,91,791 Sq. Km., accounting for 5.83% of thetotal areaofthecountry. TheculturablecommandareaoftheStateis1,40,598sq.Km.Thenetsownareais1,07,000 sq. Km and the ultimate Irrigation Potential from Major and Medium Irrigation Projects has been estimatedas35,000sq.Kmor35.00LakhHa

PROGRESS IN BRIEF Presently,theIrrigationDepartmentisknownastheWaterResourcesDepartment. Thereare116MajorandMediumIrrigationProjectsintheState,outofwhich42projects arecompleted,55areongoingand19arenewschemes. The Water Resources Department has established three special purpose vehicles, namely, Krishna Bhagya Jala Nigama Limited (KBJNL), Karnataka Neeravari Nigama Limited (KNNL) and Cauvery Neeravari Nigam Limited (CNNL), under the companies Act of 1956, to mobilize financial resourcesforspeedycompletionofmajorandmediumirrigationprojectswithinthetargetedperiod.

KRISHNA BHAGYA JALA NIGAM LIMITED (KBJNL): “KrishnaBhagyaJalaNigamLimited”wasformedvideG.O.No.ID/25/WBM/95,dated:65 94, to expedite the works of Upper Krishna Project (UKP). This Nigam is functioning since 19th August1994.

KARNATAKA NEERAVARI NIGAMLIMITED (KNNL): ”KarnatakaNeeravariNigamLimited”wasformedvideG.O.No.ID:201:KBN:98,dated:26 1198, to expedite the works in Krishna Basin, except UKP. This Nigam is functioning since 9th December1998. 7

CAUVERY NEERAVARI NIGAM LIMITED (CNNL): ”CauveryNeeravariNigamLimited”wasformedvideG.O.No.WRD:32:KBN:2003,Dated: 12.05.2003,toexpeditetheworksinCauveryBasin.ThisNigamisfunctioningsince3 rd June2003. 8

2. ORGANISATIONAL STRUCTURE WATER RESOURCES DEPARTMENT HON'BLE MINISTER FOR WATER RESOURCES

PRINCIPAL SECRETARY

SECRETARY EIC DIRECT FIELD CADA'S KBJNL BOARD KNNL BOARD CNNL BOARD WRDO OFFICES OF DIRECTORS OF DIRECTORS OF DIRECTORS CE, CE, Administrator, Registered Registered Registered HYDROLOGY Irrigation Central Malaprabha & Corporate Office Corporate Office Corporate Office & CMO Zone Ghataprabha Bangalore. Munirabad Belgaum CE, Administrator, Field offices Field offices Field offices Irrigation project Tungabhadra Zone Project Gulbarga Munirabad EIC, Administrator, Upper Tunga Bhadra C.E., EIC, C.E., Project Shimoga O & M Zone Upper Tunga Irrigation UKP Project (South) Shimoga Narayanapura Shimoga Mysore Director, Administrator, Walmi Cauvery Basin C.E., C.E., C.E., Mysore UKP, Dam Zone Varahi Zone H.P.Z Alamtti Siddapura Gorur

Director Administrator, K.E.R.S. Upper Krishna C.E.UKP, Canal, C.E., C.E., Zone-1 Irrigation Project H.C.Z. Project Bheemarayanagudi Bheemarayanagudi Zone Tumkur Gulburga Administrator, Irrigation Project C.E.UKP, Canal, C.E., Zone-II Irrigation Zone Gulburga Kembhavi (North) Belgaum 9

3. ACHIEVEMENTS OF WATER RESOURCES DEPARTMENT DURING 2006  Itisprogrammedtocomplete39Major&mediumirrigationprojectsduring200607.Ofthese,35 projectsinclusiveofBennithora,Rampura,HuchhanakoppaluandModernisationofcanalworksof Tungabhadra&Bhadraprojectshavealreadybeencompleted.

 Theultimateirrigationpotentialis35lakhHafromMajor&mediumirrigationprojects.Uptoend ofMarch2007,cumulativeirrigationpotentialof23.20lakhHahasbeencreated.

 Outofthetargettedirrigationpotentialof6.22LakhHaunderUpperKrishnaProject,anirrigation potentialof5.75lakhHahasbeencreatedsofor.ThebalanceworksofJewargiBranchCanal, Narayanapur Right Bank Canal, Mulwad Lift Irrigation Scheme, Almatti Right Bank Canal and AlmattiLeftBankCanalofUpperKrishnaProjectarenearingcompletion.

 To utilize Krishna waters under Upper Krishna Project, Ramthal (Marol) Lift Irrigation Scheme, TeggiSiddapuraLiftIrrigationScheme,ThimmapuraLiftIrrigationScheme,SonnaLiftIrrigation Scheme and RolliMannikeri Lift Irrigation Scheme are taken up in the backwaters of Almatti Reservoir

 During200607,CentralAssistanceunderA.I.B.P.tothetuneofRs.334.0022Croresfor5Major &mediumirrigationprojectshasbeenavailedandanexpenditureofRs.457.15Croreshasbeen incurred.

 The Hon’ble President of , Sri A.P.J.Kalam, dedicated “SHRI LAL BAHADUR SHASTRI SAGAR” (Almattidam)tothenationon21.8.2006.

 During200607,undertheHon’blePrimeMinister’sspecialrehabilitationpackage,anallocation ofRs.1208.71CroreshasbeenmadetowardsmajorandmediumIrrigationsectorunderassured irrigation, so as to complete the 17 major and medium irrigation projects coming under the 6 identifieddroughtpronedistrictsoftheState,bytheendof200809.Proposalsofthesamehave beensubmittedtotheCentralgovernment.

 ToutilizeitsshareofGodavariwatersresourcefully,theStatehastakenuptheconstructionof seriesofBarrageslikeJigrihal,Manikeshwar,HalahalliandChandapurbarrages.Thesebarrages arebeingimplementedbyKrishnaBhagyaJalaNigamLimited.

 CauveryNeeravariNigamLimitedhasactivatedthepotentialorientedworksunderCauveryBasin. InordertominimisetheadvertconsequencesoftheCauverywaterdisputetribunal’saward,it has been programmed to develop 1252 minor irrigation tanks coming under the jurisdiction of CNNL.

 During200607,KarnatakaNeeravariNigamLimitedhasincurredanexpenditureofRs.791.16 Croresforimplementing37majorandmediumirrigationprojectsagainstanannualprogramme ofRs.1020.00Crores.

 During the current year, Karnataka Neeravari Nigam Limited has taken up Sanyasikoppa Lift IrrigationSchemeandKalluvadduhallaprojectinShikaripurtaluk,ShimogadistrictandKeneya tank project in Belgaum district at an estimated cost of Rs.10.00 Crores, Rs.20.42 Crores and Rs.9.31Crores,respectively. 10

 TheTechnicalCommitteehasgivenitsreportinrespectofUpperBhadraprojectStageI,tofillup Irrigationtanks&toprovideDrinkingWaterfacilitiestoDroughtpronedistrictsbyutilising21.50 TMCofBhadrawater.Tendersareinvitedfor3packagesofUpperBhadraProjectamountingto Rs.825.00Crores.

 ForefficientWatermanagement12packagetendersamountingtoRs.702.00Croresareinvited forModernisationoftheMaincanaland5BranchcanalsofBhadraCanalNetwork.

 For efficient management of water under the Command Areas of Major & medium irrigation projects,WaterResourcesDepartmenthasestablished2,392WaterUsersCooperativeSocieties.

 KarnatakaNeeravariNigamLimitedincollaborationwithFAOhadorganizedaworkshop,about RAP&MASOTdevelopedbyFAO’slandandwatersector,from916October2006inMalyasia. Thetrainingprogrammehasgivenaninsightintothepracticalsolutiontotheirrigationsystem anditsadvancedmaintenanceandexecutionpattern.Thetrainingprogrammehasenabledthe Nigam to speed up the completion of the projects, modernization and efficiency in irrigation system.

 TheworksofKalasanaladiversionschemeinnonforestregionshavebeentakenupduringthe currentyear.

The details of the targets and achievements in respect of the Major and Medium irrigation Projectsfortheyear200607uptoendofMarch2007areashereunder.

Sl. Financial (Rs. In Crores) Physical (in Hectares) Project No Program Progress Program Progress 1 KrishnaBhagyaJalaNigam 1,538.97 2,303.55 50,000 40,037 2 KarnatakaNeeravariNigama 1,462.34 1,226.79 79,500 43,795 3 CauveryNeeravariNigama 477.00 538.26 41,049 32,538 4 WaterResourcesDepartment 252.48 204.79 11,951 4,018 Total 3,730.79 4,273.39 1,82,500 1,20,388

11

4. ACCELERATED IRRIGATION BENEFIT PROGRAMME Fortheearlycompletionofsomeoftheongoingirrigationprojects,whichwerelingeringdue to shortageoffundsformanyyears,theGovernmentofIndialaunchedtheAcceleratedIrrigation benefitprogramme,during199697.Sincethen,eightprojectsintheState,namely,UpperKrishna project(UKP)StageI,PhaseIII,Malaprabha,Hirehalla,Ghataprabha,Karanja,UpperKrishnaproject (UKP) StageII, Maskinala, and Gandhorinala have received Central Loan Assistance (CLA) under AcceleratedIrrigationbenefitprogramme(AIBP).  During 199697, at the end of 8 th Five Year Plan, the Government of India launched the Accelerated Irrigation Benefit Programme (A.I.B.P.) with the intention of completing those projectslingeringduetoshortageoffunds.From199697to200203,thesharingbetweenthe centre and the state was in the ratio of 50:50. Since200203,thesharingisintheratioof 2/3:1/3.  Intheirrigationsector8major&mediumirrigationprojectshavebeenreceivingCentralLoan Assistance(C.L.A.)underA.I.B.P.  UKPStageIPhaseIII,UKPStageII,Malaprabha,Ghataparbha,Hirehalla,Karanja,Maskinala andGandhorinalaaretheeightprojectsthathavereceived/arereceivingC.L.A.underA.I.B.P.  The cumulative C.L.A. (including grants) released upto end of March 2007 is Rs. 3,029.16 Crores.  The cumulative expenditure incurred on these projects upto the end of March/2007 is Rs. 4,413.42Crores.  During200405,loansalongwithgrantswerereleasedtotheprojectsintheratioof70:30.  Aspertherevisedguidelinesof2005,andaccordingtothe11 th FinanceCommissionreport,the Loan portion is to be raised entirely by the concerned State Governments. The Central governmentwillreleaseonlythegrantportion.  Fortheyear200607,Proposalsofsixprojects,namely,UKPStageIPhaseIII,UKPStageII, Malaprabha, Ghataprabha, Gandhorinala and Varahi, to the tune of Rs. 466.33 Crores was posed for C.L.A. under A.I.B.P. Later as per the Revised A.I.B.P. guidelines, effective from December 2006, UKP Stage I Phase III, UKP Stage II, Malaprabha, Ghataprabha and Gandhorinala projects have been considered as benefiting the drought prone districts of Belgaum, Bijapur, Bagalkot, Gulbarga & Raichur and revised proposals claiming 90% of the balance cost amounting to Rs.568.91 Crores, were prepared and submitted to the Central WaterCommission.TheCentralAssistancesanctionedtothese6projectsisRs.494.97Crores.  TheCentralAssistancereleased,during200607,to5projectsnamelyUKPStageIPhaseIII, UKPStageII,Malaprabha,GhataprabhaandGandhorinalaisRs.334.00Crores,  Theexpenditureincurredonthese6projectsduring200607uptoendofMarch2007isRs. 457.15Crores. STATEMENT SHOWING DETAILS OF C.L.A. UNDER A.I.B.P RELEASED TO MAJOR AND MEDIUM IRRIGATION PROJECTS (SINCE 1996-97) (Rs.inCrores) PERIOD NO.OFPROJECTS CLAPROPOSED CLARELEASED EXPENDITURE 12

/SANCTIONED 199697 5 122.50 61.25 172.21 199798 5 175.00 90.50 160.49 199899 5 167.00 94.50 171.05 199900 5 190.64 157.14 190.61 200001 4 171.00 171.00 268.26 200102 7 545.00 492.50 911.38 200203 8 611.97 620.85 693.00 200304 8 266.48 266.48 440.57 200405 5 463.05 449.71 475.46 200506 5 336.70 291.23 473.24 200607 6 568.91 334.00 457.15 TOTAL UPTO MARCH 2007 3618.25 3029.16 4413.42

Details of Central Assistance (CA) under AIBP during 2006-07

(Rs. in Crores)

EXPENDITURE CA CLA Sl.No. PROJECTS CLA RELEASED incurred PROPOSED SANCTIONED during 06-07

UKPStageI 1 94.58 74.87 71.64 46.19 PhaseIII

2 UKPStageII 212.25 168.77 172.53 234.58

3 Ghataprabha 127.72 123.21 30.80 77.29

4 Malaprabha 58.50 54.00 13.50 31.28

5 Gandhorinala 57.61 55.87 45.53 34.96

6 Varahi 18.25 18.25 32.85

Total 568.91 494.97 334.00 457.15 13

CUMULATIVE STATEMENT

(Rs. in Crores) CLA Released

Sl. Project 1996- 1997- 1998- 1999- 2000- 2001- 2002- 2003- 2004- 2005- 2006- CUMULATIVE 97 98 99 2000 2001 02 03 04 05 06 07 No UKP Stage-I Phase- 1 57.00 50.00 50.00 100.00 100.00 200.00 181.00 115.85 71.638 925.49 III

2 UKP Stage-II 250.00 275.05 163.48 240.72 197.76 172.53 1,299.54

3 Malaprabha 1.50 12.00 10.00 13.50 10.00 25.56 12.00 20.00 13.5 118.06

4 Hirehalla 2.75 6.00 6.00 8.00 8.00 10.00 8.78 14.71 64.24

5 Ghataprabha 15.00 12.50 20.00 45.00 5.00 75.00 13.02 62.09 65.00 30.805 343.41

6 Karanja 7.50 16.00 15.64 18.00 10.00 34.37 75.27 176.78

7 Gandhorinala 7.50 17.87 19.05 8.47 45.53 98.42

8 Maskinala 3.22 3.22

TOTAL 61.25 90.50 94.50 157.14 171.00 492.50 620.85 266.48 449.71 291.23 334.00 3,029.16 14

Expenditure

Sl. Project 1996- 1997- 1998- 1999- 2000- 2001- 2002- 2003- 2004- 2005- 2006- CUMULATIVE No 97 98 99 2000 2001 02 03 04 05 06 07 UKP Stage-I Phase- 1 155.74 92.30 77.58 116.40 187.80 235.33 214.69 94.19 92.18 61.13 46.19 1,373.53 III

2 UKP Stage-II 534.10 352.29 236.48 268.17 272.29 234.58 1,897.91

3 Malaprabha 5.12 14.92 22.64 9.87 5.15 15.87 14.45 14.42 19.64 19.62 31.28 172.98

4 Hirehalla 11.35 17.12 12.06 15.82 22.68 11.41 11.69 9.94 18.45 130.52

5 Ghataprabha 20.47 28.82 20.04 26.96 72.77 57.57 55.45 64.68 92.47 77.29 516.52

6 Karanja 15.68 29.95 28.48 25.67 26.55 23.62 18.64 168.59

7 Gandhorinala 15.35 16.82 10.09 12.34 27.73 34.96 117.29

8 Maskinala 1.87 1.36 3.23

9 Varahi 32.85 32.85

TOTAL 172.21 160.49 171.05 190.61 268.26 911.38 693.00 440.57 475.46 473.24 457.15 4,413.42 15

DETAILS OF PROJECTS ASSISTED UNDER AIBP PROGRAMME (YEARLY)

(As on 31-3-2007)

(Rs. in Crores)

1996-97 1997-98 1998-99 1999-2000 2000-01 2001-02

Sl. CLA CLA CLA CLA CLA CLA Project CLA Expendit CLA Expendi CLA Expendi CLA Expendi CLA Expendi CLA Expendi No Sanctio Sanctio Sanctio Sanctio Sanctio Sanctio Released ure Released ture Released ture Released ture Released ture Released ture ned ned ned ned ned ned

UKP Stage- 1 114.00 57.00 155.74 100.00 50.00 92.30 100.00 50.00 77.58 100.00 100.00 116.40 100.00 100.00 187.80 200.00 200.00 235.33 I Phase-III

2 UKP Stage-II 250.00 250.00 534.10

3 Malaprabha 3.00 1.50 5.12 24.00 12.00 14.92 20.00 10.00 22.64 27.00 13.50 9.87 5.15 20.00 10.00 15.87

4 Hirehalla 5.50 2.75 11.35 6.00 6.00 17.12 6.00 6.00 12.06 8.00 8.00 15.82 8.00 8.00 22.68 10.00 10.00 11.41

5 Ghataprabha 30.00 15.00 20.47 25.00 12.50 28.82 40.00 20.00 20.04 45.00 45.00 26.96 30.00 5.00 72.77

6 Karanja 15.00 7.50 15.68 16.00 16.00 29.95 15.64 15.64 28.48 18.00 18.00 25.67 20.00 10.00 26.55

7 Gandhorinala 15.00 7.50 15.35

8 Maskinala

Total 122.50 61.25 172.21 175.00 90.50 160.49 167.00 94.50 171.05 190.64 157.14 190.61 171.00 171.00 268.26 545.00 492.50 911.38

16

2002-03 2003-04 2004-05 2005-06 2006-07 CUMULATIVE Sl. CLA CLA CLA CLA CLA Project CLA Expendi CLA Expendi CLA Expendi CLA Expendi CLA Expendit CLA Expendi No Sanctio Sanctio Sanctio Sanctio Sanctio Released ture Released ture Released ture Released ture Released ure Released ture ned ned ned ned ned

UKP Stage-I 1 181.00 181.00 214.69 94.19 115.85 115.85 92.18 39.01 61.13 74.87 71.64 46.19 925.49 1,373.53 Phase-III

2 UKP Stage-II 275.05 275.05 352.29 163.48 163.48 236.48 241.22 240.72 268.17 204.22 197.76 272.29 168.77 172.53 234.58 1299.54 1,897.91

3 Malaprabha 25.56 25.56 14.45 14.42 12.00 12.00 19.64 20.00 20.00 19.62 54.00 13.50 31.28 118.06 172.98

4 Hirehalla 9.90 8.78 11.69 14.71 14.71 9.94 12.84 18.45 64.24 130.52

5 Ghataprabha 75.00 75.00 57.57 13.02 13.02 55.45 62.09 62.09 64.68 65.00 65.00 92.47 123.21 30.81 77.29 343.42 516.52

6 Karanja 34.37 34.37 23.62 75.27 75.27 18.64 167.78 168.59

7 Gandhorinala 17.87 17.87 16.82 10.09 19.05 19.05 12.34 8.47 8.47 27.73 55.87 45.53 34.96 98.42 117.29

8 Maskinala 3.22 3.22 1.87 1.36 3.22 3.23

9 Varahi 18.25 32.85 0.00 32.85

Total 611.97 620.85 693.00 266.48 266.48 440.57 463.05 449.71 475.46 336.70 291.23 473.24 494.97 334.00 457.15 3,029.16 4,413.42 91 5. SPECIAL REHABILITATION PACKAGE

During200607,theSpecialRehabilitationPackagewaslaunchedbytheGovernmentofIndia tomitigatethedistressoffarmersinselected31districtsoftheCountryfromwherelargenumbers ofSuicidecasesbythefarmerswerereported. In Karnataka, the 6 districts viz Belgaum, Bijapur, Shimoga, Chikkamagalur, Chitradurga, Hassan and Kodagu were identified as drought prone districts and 17 projects benefiting these 6 districtswereidentifiedandproposalsofthesamehavebeensubmitted. An allocation of Rs. 1208.71 Crores has been made towards major and medium Irrigation sectorunderassuredirrigation.OutofthisthegrantportionofRs.725.24Croreswillbebornebythe centerandtheloanportionofRs.483.47Croreswillbemetoutofstatefunds.Thefundingproposed isasperrevisedAIBPnorms. Thedetailsofthe17projectsareasfollows: (Rs. In Crores) BALANCE COST OF THE SL.NO. NAME OF THE PROJECT PROJECT MAJOR 1 Malaprabha 120.98 2 GhataprabhaIII 159.68 3 Hipparagi 934.92 4 Markandeya 56.41 5 ERMofBhadraReservoirproject 400.00 6 Harangi 12.57 7 Hemavathy 64.54 8 Yagachi 127.78 9 Dudhganga 37.79 MEDIUM 10 KamasamudraLIS 18.42 11 HuchanakoppaluLIS 14.00 12 Votehole 1.50 13 KachenahalliLIS 79.88 14 Chiklihole 1.50 15 ERMofBheemasamudratank 4.00 16 SrirameshwaraLIS 212.38 17 BellarynalaLIS 131.36 TOTAL 2530.05

92

6. WATER RESOURCES DEVELOPMENT ORGANISATION

This Organisation is headed by EngineerinChief and supported by 2 Chief Engineer, 6 Superintending Engineers, 12 Executive Engineers and 51 Assistant Executive Engineers with supportingstaffareworkinginthisOrganisation.

ACTIVITIES: - This Organisation is incharge of Planning and Investigation of all Major and Medium IrrigationProjectsintheStateandprovidesalltheinformationtotheGovernmentinrespectofInter StateWaterDisputeslikeCauvery,Krishna,GodavariandMahadayi.ThisOrganisationactsasadata BankforallHydrologicaldetailsofRiversandstreamsintheStatebycollectingandprocessingthe raingaugeandRivergaugedatainasystematicmanner.Inaddition,theestablishmentmatterof Irrigationzonesregardingpostings,transferofstaffandRegularisationofDailyWagesandMonthly RatedStaffasperSupremeCourtorderisalsoattendedtobythisOrganisation.  PLANNING AND INVESTIGATION UNIT  This Unit is attending to the work of Technical Scrutiny of New Major and Medium Irrigation Projects, Replies toC.W.C.commentsandarrangingforclearanceofprojectsandcorrespondence betweenStateandCentralGovernmentsregardingIrrigationProjects.  During200607,19ProjectsunderKrishnaBasinand5ProjectsunderWestflowingRiverbasins, totally24MajorandMediumIrrigationProjectsareunderdifferentstagesofinvestigation.  Inadditiontotheaboveinvestigationworks,thefollowingworksarealsodealtwithinthisunit. 1. e– Governance in Water Resources Department : PlanningandInvestigationUnit,WaterResourcesDevelopmentOrganisationismonitoringthee GovernanceactivitiesofentireWaterResourcesDepartmentinKarnataka.Shorttermcoursestouse Computers for the Technical and NonTechnical staff are being conducting regularly. This Unit managestheWebsiteofWaterResourcesDepartment “http://waterresources.kar.nic.in”. 2. Right to Information Act-2006: Details of Water Resources Department including Nigams were hosted in the Website “http://waterresources.kar.nic.in”. 3. Government Officials Committee: The Government Officials Committee constituted under the Chairmanship of EngineerinChief, W.R.D.O.,videG.O.No. WRD205WBP03Bangalore,dated23.8.2004tostudyWestflowingRivers hassubmitteditsfinalreporttotheGovernmenton2952006. 4. Experts Committee regarding "Soubhagya Sanjeevini" project: TheGovernmenthasconstitutedanExpertsCommitteevideG.O.WRD205WBP03,Bangalore, dated: 17112006 under the Chairmanship of Sri. K.C.Reddy, Advisor, Public Works & Energy Department,toStudyindetail"SoubhagyaSanjeevini"projectproposedbySri.A.G.Koodgi,former MLC,andtosubmitfeasibilityreport.Thecommitteehasplannedtosubmititsinterimreport. 93 5. Experts Committee for diversion projects and regarding availability of water in various River basins: TostudytheavailabilityofwaterinvariousWestFlowingRiverbasinsandalsotoconductstudies regardingtheprojects,anExpertCommitteeundertheChairmanshipofSri.K.C.Reddy,Consultant, PublicWorks&EnergyDepartmenthasbeenreconstitutedvideGovernmentOrderNo.WRD65WBP 05(P1)Bangaloredated161206. 6. Upper Bhadra Committee: ACommitteeofTechnical&EnvironmentalExpertshasbeenconstitutedvideG.O.No.WRD152 WBP04(P1)Bangalore,dated241005undertheChairmanshipofSri.K.C.Reddy,Advisor,PW& EnergytostudytheavailabilityofwaterforUpperBhadraProjectandtheenvironmentalimpactof the Project.The Committee has submitted its final report to the Government. KarnatakaNeeravari NigamaLimitedhastakenupnecessarystepsforpreparationofDetailedProjectReport. 7. Irrigation Information System using GIS: WaterResourcesDepartment,GovernmentofKarnatakahasearmarkedgrantsofRs.100lakhsfor thedevelopmentofIrrigationInformationSystemusingGIStechnology.TheDepartmentislooking forward for the integration of M.I.S. and G.I.S., which aims at preparation of Decision Support System (D.S.S.). In this regard Water Resources Development Organisation has identified three private consultants having vast experience in the field of technology and has entrusted projects namelyKanvaReservoirProject,KaranjaIrrigationProject&GhataprabhaIrrigationProjectforthe development of Irrigation Information System. Water Resources Development Organisation has purchasednecessarydigitaltoposheet/maps. 8. Technical Experts Committee regarding sea erosion preventive works : Acommitteeof16memberswasconstitutedvideG.O.No.‾ÉÆÃE80¦J¸ï¦2001,dated:187 2001toanalyseseaerosionpreventiveworksofcoastalregionoftheStateandtoprovidedesign, guidance&suggestionsinthisregard. 9. Other activities: ThisUnitcorrespondswithState&NationallevelOrganisationslikeCentralWaterCommission, Bureau of Indian Standards, Indian National Committee for Irrigation & Drainage, Water&Power ConsultancyServicesandCentralBoardofIrrigationandPower.ThisUnitattendstotheCommittee meetingsconductedbytheseOrganisationsandprovidesinformationrequestedbythem.ThisUnit provides information for attending the meetings of Subject Committee, Assurance Committee, EstimateCommitteeandPetitioncommittee.  KRISHNA-GODAVARI UNIT TheKrishnaGodavariUnit,underthejurisdictionoftheWaterResourcesDevelopmentOrganisation, isworkingonthefollowingInterStateWaterDisputes: A. KrishnaWaterDispute B. MahadayiDiversionScheme C. PalarandPennarBasin 94 D. InterlinkingofRivers A. Krishna Water Dispute: a) KarnatakafiledanI.A.1/2001inO.S.1/97beforetheSupremeCourtrequestingtoissueordersto stoptheprojectsillegallytakenupbyAndhraPradeshinspiteofclearordersofSupremeCourt. In view of submitting a request to the Central Government to constitute a Tribunal, this InterlocutoryApplication(I.A.)waswithdrawn. b) KrishnaWaterDisputeTribunalcameintoexistenceon02.04.2004.On19.05.2006,theTribunal commenced the sitting and the same was not continued, as the Central Government did not provide the required Court Hall, Residences totheTribunalChairmanandMembersandother facilitiesintime. c) Tribunalsittingstartedon09.01.2006,aftertheStatefiledawritpetitionbeforetheSupreme Court on 13.12.2005, to direct the Central Government to provide infrastructure for early commencementoftheTribunalwork.By09.01.2006,theStatefiledreplies/rejoinderstothe complaint/repliesofotherpartyStatesalongwithotherdocumentsbeforetheTribunal. d) Inthemeantime,KarnatakafiledoneI.A.,MaharashtrafiledfiveI.A.sandAndhraPradeshfiled fourI.A.sbeforetheTribunal.TheTribunaltookuptheseI.A.sforargumentsandordershave been issued on 09.06.2006. These orders are in favour of Karnataka State. Necessary documentsrequiredforarguingonbehalfoftheStatehavebeenfiledintheTribunal.  CAUVERY UNIT Introduction: TheCauveryunitofWaterResourcesDevelopmentOrganisation,Bangaloredealswiththematters concerningsharingofwatersoftheRiverCauverywiththeotherriparianStatesviz.,TamilNadu, KeralaandUnionTerritoryofPondicherry. 1. Organisation: TheCauveryUnitwasformedduring1990withstaffofW.R.D.O.Itwasfunctioningunderthethen ChiefEngineer,W.R.D.O.,Bangalore. 2. Activities:  The Cauvery Water Disputes Tribunal was set up by the Ministry of Water Resources, GovernmentofIndia,videitsorderNo.21.1.90WDdated;2.6.1990withHeadquartersatNew DelhiforadjudicationoftheCauveryWaterDispute.  TosafeguardtheinterestsofKarnatakaandtosubstantiatethestandoftheGovernmentbefore the Supreme Court / Cauvery Water Disputes Tribunal, a team of Advocates along with the AdvocateGeneralofKarnatakaisappointedandtheirservicesarebeingutilised. The current team of Advocates appointed by the Government to represent Cauvery Water Disputesisasunder: 1.AdvocateGeneralofKarnataka 2.Sri.F.S.Nariman SeniorAdvocate 95 3.Sri.AnilB.Divan SeniorAdvocate 4.Sri.S.S.Javali SeniorAdvocate 5.Sri.MohanVKatarki Advocate 6.Sri.ShambhuPrasadSingh Advocate 7.Sri.SanjayR.Hegde Advocate 8.Sri.S.C.Sharma Advocate 9.Sri.RanvirSingh Advocate 10.Sri.BrijeshKalappa Advocate  TogettechnicaladviseinCauveryWaterDisputesmattertwoTechnicalAdvisorswereappointed bytheGovernmentandtheirservicesarebeingcontinued.  ForeffectiveparticipationandpleadingthecaseofKarnatakabeforetheCauveryWaterDispute Tribunal, Cauvery Water Cell established in 1990 isnowfunctioninginKarnatakaBhavan–III (Bheema),HudcoPlace,AndrewsGanj,NewDelhi.TheCauveryWaterDisputesTribunalheld8 Sittingsduringtheyear200607fromApril2006toFebruary2007.  ThisunitrenderstechnicalassistancetotheAdvocatesengagedbythestatetoappearbeforethe Cauvery Water Dispute Tribunal and Supreme Court. This unit also prepares documents and other required materials for the Technical Committee, All Party Meetings and other related meetings.  Inaddition,thisunitalsocarriesoutthefollowingworks.  Collection and analysing data regarding Reservoir levels, inflow, outflow, etc., of the CauveryBasinProjectsintheState.  Preparationofbriefanddraftrepliesinconnectionwiththereactionsfromthepublicand otherStateGovernments,whichappearinpress.  CollectionandupdatingofmaterialsthatarerelevanttotheCauverywaterDisputesetc.,  This unit also renders its views on the matters connected with the West Flowing River Development,National&StateWaterPolicy,NationalWaterBoardandNWDAstudiesregarding WaterBalancewheneversuchfilesarereferredto.

3. Physical and Financial Targets and Achievements ThesignificantdevelopmentsbeforetheCauveryWaterDisputeTribunalandCauveryRiverAuthority concerningtheCauveryWaterDisputeduringtheyear200607areasfollows; (a)Before the Cauvery Water Dispute Tribunal The final arguments and counter arguments before the Tribunal regarding all issues have been completedbyallthepartyStates.TheCauveryWaterDisputesTribunalannounceditsfinalverdict along with report on 05.02.2007. As per the judgement the allocation of 740 tmc (available in Cauverybasinat50%dependability)tothepartyStatesisasunder: 1. Kerala 30tmc 2. Karnataka 270tmc 3. TamilNadu 419tmc 4. UnionTerritoryofPondicherry 7tmc 5. Environmentalprotection 10tmc 6. Inevitableescapagesintosea 4tmc 96 Total 740tmc FurtheritisorderedinthejudgementthatKarnatakashouldensure192tmcatBiligundlu(gauging stationmaintainedbyCWC)asunder: Month TMC Month TMC June 10 December 8 July 34 January 3 August 50 February 2.5 September 40 March 2.5 October 22 April 2.5 November 15 May 2.5 Total - 192 tmc SinceKarnatakaStatecouldnotgetfulljusticefromtheTribunalKarnatakaGovernmentistaking actiontofirstfileaoriginalSuitunderarticle131andSpecialLeavePetitionunderarticle136ofthe constitutionbeforetheSupremeCourtofIndiaandthenfileaReviewPetitionundersection5(3)of InterStateWaterDisputesActbeforetheCWDTbringingforththeanomaliestobesetright. (b) Technical Committee on Cauvery Water Dispute ThisCommitteehasmettwiceduringtheyear2006.TheTechnicalCommitteeofCauveryWater Dispute has constituted several working Group, which would be meeting frequently to prepare reports on various subjects. The Technical Committee of Cauvery Water Dispute will ultimately discussthesereports.  HYDROLOGY UNIT: ToassesswaterresourcesoftheStateinascientificmanner,theobservationsofflowdataat variouspointsindifferentRiverbasinsismostessential.Assuch,theGovernmentofKarnatakahas establishedaseparateHydrologyUnit,undertheWaterResourcesDevelopmentOrganisation,with the responsibility of establishing gauging stations, for collection, analysis of Hydrometric and Hydrometeorologicaldata. TheworkofthegaugingsubdivisionistoestablishobservationsitesforRiversandstreamsat selectedpointsandtomaintainthemsystematically.Inadditiontothe,Hydrometricobservations, theyarealsoentrustedwiththeworksofinstallationandmaintenanceofraingauges(bothARG& SRG)andestablishingofHMstationsintheentireState. Duringtheyear200607,thedatafromthefollowingstationswerecollected:  Hydrological Stations: 1. CurrentMeterGaugingStations 41 2. StageDischargeStations 12 3. RiverGaugingStations 01 4. Automatic/DigitalWaterLevelRecordingStations 42 5. SiltandSedimentobservationStations 35  Hydrometeorological Stations 97 1. FullClimaticStations 86 2. AutographicraingaugeStations 165 3. StandardraingaugeStations 767 The Hydrological & Hydrometeorological data is scrutinized,analysed,processed,computerized andstoredindatacentre.Therainfalldataoftheraingaugestationsmaintainedbythisorganization is collected and data are being forwarded to the statistical department. Daily rainfall data is maintainedintheraingaugeregistersofallthestationscomingunderthisorganization.Alsothedaily inflowandoutflowdataofthemajor&mediumreservoirs,weirsandanicutsarecollectedfromthe respectiveirrigationzonesandrecorded. The Hydrology Unit also reviews the water balance study reports prepared by National Water Development Agency for different Rivers in southern states and in particular Karnataka and suggestionsarefurnishedtoNationalWaterDevelopmentAgency. Hydrology Project Aid: Government of India took up the Hydrology Project – I under the World Bank and which envisaged thesettingupofreliableandwelldesignednetworkinthecountryforthecollectionof HydrologicalandHydrometeorologicaldatas,bothforSurfaceaswellasGroundWaterforquantity andquality. Theprojectstartedon10.12.1996andclosedon31.12.2003. During the current financial year of 200607, a budget grants of Rs. 3.50 Crores has been allocated for maintenanceofStations,Laboratory,Vehicles,Computersetc.,establishedunderthe World BankassistedHydrologyProject–IandforpaymentofsalariesofStaffcreatedunderthis project.AtotalofRs.2.69Croresexpenditureisduring200607. 98 National Hydrology Project – II TheGovernmentofIndiahasincludedtheStateofKarnatakaforparticipatingintheHydrology ProjectPhase–IIandhasmadeaprovisionofRs.29.19Croresforthesame.Thecomponentsare: SurfaceWaterComponent Rs.11.54Crores GroundWaterComponent Rs.17.65Crores TOTAL Rs. 29.19 Crores A review of the various activities, which are to be taken up under Hydrology Project – II indicatesthatamajorityoftheexpenditureisconcentratedfordevelopmentofsoftwarepackagesfor betterutilizationofWaterResourcesintheState.HydrologyProject–IIisafollowupactionproject of World Bank Aided Hydrology Project – I where in infrastructure for collection of data was established.ThedatasocollectedisnowproposedforutilizationinthenewHydrologyProject–II. UnderHydrologyProject–IIoutoftheproposedcostofRs.29.19Crores,Rs.24.44Croresis earmarkedforreimbursementfromWorldBankandthebalanceofRs.4.749Croreswillbeborneby the State Government. The loan agreement of this project with the World Bank authorities was signedon19.01.2006atDelhi.ThisprojecthasbecomeeffectivewithWorldBankassistancefrom5 42006.Theprojectisnowunderprogress.

GEOMATIC CENTRE:

TheaimofGeomaticsCentre,WaterResourcesDevelopmentOrganisation,Bangaloreis  Planning & Investigation of different Water Resources Projects using latest technologies like RemoteSensing,GlobalpositioningSystem,GeographicalSystem,ALTM,DigitalCartographyetc.,

 Carrying out a pilot study to formulate a model system for establishing Water Resources Data CentreforimplementationofStateWaterPolicy.

 TheworkofCarryingoutadetailedinvestigationfordiversionofthewatersofRiverNethravathi todroughtaffectedeasternpartsofKarnatakaStatehasbeenentrustedtoNRSA,Hyderabadand theworkisunderprogress.

99 7. CENTRAL MECHANICAL ORGANISATION CentralMechanicalorganization(CMO)hasonecircleoffice,threedivisions,14subdivisions and36Sections/Workshopsunderitsjurisdiction. I. The main duties and functions of the organization are briefly as follows: a) OptimumutilizationofMachinery/Equipmentavailableinthedepartment. b) StreamliningthepurchaseofsparepartsofMachinery/Equipments. c) CentralizationandStreamliningofpurchaseofnewMachinery/Equipments. d) Reductionintheinventoryofthesparepartsheldinstockofvariousdivisions. e) Pluggingtheleakagesofrevenue. f) Disposalofsurplusandunserviceablemachinery. g) Inspection of sick machinery in the Public Works and Water Resources Department and scrutiny/sanctionofrepairestimates. h) ReviewofefficiencyandperformanceofMachinery/Equipments. i) Calculationofhirechargesofmachinery/equipmentandrecommendationtotheGovernmentfor theadoptionofhirechargesfromtimetotime. j) RehabilitationofsurplusVehicles/Machinery/Equipments.

 PROGRESS ACHIEVED BY C.M.O DURING 2006-07 In order to ensure optimum utilization of Machinery/Equipments, available in Public works and WaterResourcesDepartment,themonthlyreturnsofmachineryofdivisionsarebeingobtainedand reviewedregularlyforitsvariousperformanceaspectssuchas 1) Fuelusage 2) Oilusage 3) Kmrunwithreferencetostandardsfixed. 4) Idleness,surplusnessandrehabilitation. 5) Sickvehicles/equipmentsidentificationanditsspeedyrepairs 6) Disposalofunserviceablemachineryisreviewedandfollowupactionensureduntiltheir disposal. Purchase of spare parts required for repairs to machinery is being streamlined and only such spares, which are absolutely required and not available in the stock, are procured. The Chief Engineer,CMOistheMemberSecretaryofthePurchaseCommittee.Anynewpurchaseofmachinery isbeingscreenedthoroughlyandrecommendedtoGovernmentforapproval. CMO is makingeffortsinutilisationoftheavailablesparepartsinstockofseveralDivisionsof PWDandWRDtherebycausingreductionintheinventory. EveryeffortisbeingmadebytheCMOtocheckandplugthelossofrevenuetotheGovernment bytheutilisationandhiringofmachinerytocontractors,thusbringingrevenuetoGovernment. Central Mechanical Organisation is also inspecting vehicles / equipment pertaining to Board, CorporationsandCentralGovernmentafterlevyinginspectionfeesandremittingtothesametothe GovernmentTreasury. 100 DISPOSAL OF SURPLUS AND UNSERVICEABLE MACHINERY

No.of No.ofvehicle/ Amountofrevenue Balance Sl. Vehicle/equipment Equipment/ throughdisposal equipment/ No. declaredunserviceable Machinerydisposedoff (Rs.InLakhs) machinery (a)WaterResourcesDepartment 72 (Disposalis 1 245 173 6.61 undervarious stages) (b)PublicworkDepartment 156 (Disposalis 1 964 808 57.39 undervarious stages)

SURPLUS MACHINERY DECLARED AND THEIR REHABILITATION (04/2006 TO 12/2006)

Sl. No Nigams/Zones Numbers Remarks 1 KrishnaBhagyaJalaNigam 20 Includes 2 IrrigationalCentralZone 07 16Jeeps 3 HemavathyCanalZone 04 11Cars 4 PublicWorkingDepartment 06 5 OtherDepartments 10 6 N.H.P.C.L 03 Rejected 7 R.S.D. 02 Total 52

DISPOSAL OF UNSERVICEABLE MACHINERY IN WATER RESOURCES & PUBLIC WORKS DEPARTMENT, WHICH HAVE BEEN RECOMMENDED, FOR SCRAP DURING ROUTINE COURSE OF INSPECTION

Sl.No Description Numbers Remarks Machinery/Equipmentsidentifiedfor 1 113 Totalrevenuerealisedfromthetransaction disposalduring200607 ofMachineries/Equipmentsis Machineries/EquipmentsDisposedduring 2 79 Rs.42,93,600.00 200607

ACHIEVEMENT OF CENTRAL MECHANICAL ORGANISATION DURING 2006-07 Sl. Achievements Subject No (Numbers) 101 1 RepairofMachinary/Equipents(MajorandMinor)

a)OpeningBalance(01.04.2006) 206

b)Receipts 2240

c)Total 2446

d)Getrepaired95(Major/Medium) 2192

e)Remaining 254

2 Inspection

a)TotalGeneralInspection 218

b)Recommendedforrepair 105

c)Recommendedfordiscard 113

3 InspectionofEstimate

a)InitialEstimates

b)EstimatesInspectedandgranted 105

c)AmountofInspectedestimates Rs.84.35lakhs

d)Numberofreportsgivenbyinspectingtheestimates 22

e)Totalamountofestimatesafterinspectingthereports Rs.15.49lakhs

f)AmountofGrantedEstimates 83

g)Grantedamountofestimates Rs.68.86lakhs

4 Sparepartsutilization

a)CostofIdentifiedSpareparts Rs.415.86lakhs

b)Costofsparepartsutilizedonworks Rs.246.16lakhs c)Balance Rs.169.70lakhs

d)Sparepartsusedduringtheyear200607 Rs.9.32lakhs

102 FINANCIAL TARGET AND ACHIEVEMENT FOR THE YEAR 2006-2007 ( Rs. In lakhs) Sl. Nameofthe Grantfor Expenditurefor20062007 No. Project 2006 2007 (toendof12/2006) 1. 315Bhadra 29.66 27.88 2. 317TBPLBC 98.55 107.61 3. 359Bennithora 43.58 63.81 4. 401Karanja 59.81 60.92 5 207HamavathiDam 138.95 130.53 6. 208HemavathiCanal 29.21 27.99 7. 470180800(Plan) 150.00 137.08 8. 470180800(N.P) 200.00 171.49 9. 2702MinorIrrigation(Plan) 46.69 41.93 10. 2702MinorIrrigation(NP) 56.57 53.47 11 2059P.W(NP) 50.00 118.47 12. 3054NH(NP) 35.00 29.90 13. 2701D&A(NP) 252.38 235.00 14. 2701W.R.D.O.(NP)–80800 25.00 31.21 TOTAL 1215.40 1237.29 103

104

8. KARNATAKA ENGINEERING RESEARCH STATION

KarnatakaEngineeringResearchStationwasstartedduring1944asasmallResearchUnit. The Research Station, which forms a wing of the State Water Resources Department, had a phenomenal growth and today it is one of the oldest Research Organisations of its kind in the country. The main objectives of the Research Station are to find solutions to various problems encounteredbythefieldEngineersinCivilengineeringdiscipline.TheResearchStationhassolved many intricate problems posed by Public Works Department, Water Resources Department, other Civil Engineering Departments, other agencies etc. The Research Station has well equipped laboratoriessupportedwithgoodComputerfacilitiesandLibrary.

TheDirectoroftherankofChiefEngineerheadstheResearchStation.Heisassistedbythe JointDirector,whoisalsothePrincipalofEngineeringStaffCollege,whichisawingofK.E.R.S.

TheactivitiesoftheResearchStationaregroupedunder4divisionsasunder.

 HydraulicsDivision

 TechnicalServicesDivision

 SoilMechanics&FoundationEngineeringDivision

 CoastalEngineeringDivision

Chief Research Officer of the rank of Executive Engineer heads each Division. Thereare4 ChiefResearchOfficers(ExecutiveEngineer),19ResearchOfficers(AssistantExecutiveEngineer),62 AssistantResearchOfficers(AssistantEngineer),and19JuniorResearchOfficers(JuniorEngineer). Ofthesesanctionedposts,04ChiefResearchOfficers,17ResearchOfficers,45AssistantResearch Officersand12JuniorResearchOfficersareworkingatpresent.

 HYDRAULICS DIVISION

Model studies of various components of Irrigation & Power Projects like spillway and energy dissipating arrangements, Assessment of carrying capacity of canal system by backwater computation, Gauging ofcanals,calibrationofcurrentmeters,CapacityEvaluationofReservoirby conventionalHydrographicsurveyaswellasremotesensingtechniquesarethestudiesentrustedto thisdivision.

 TECHNICAL SERVICES DIVISION

Thisdivisionisentrustedwiththeworkofconducting,nondestructivetestsoncement,concrete, Mixdesign,steel,sandcoarseaggregateetc.Testsonwatersamples,cementmortarandcement concrete samples for chemical analysis, collection of daily Rainfall and Hydrometerological data, maintenanceofbuildingsandquartersofKERS,maintenanceoflibraryareotherworksentrustedto thisdivision.

 SOIL MECHANICS & FOUNDATION DIVISION

This division deals with problems related to foundations, suitability of soils to embankments, foundations of bridges and buildings and that related to MI tanks. This division also deals with problemsrelatedtorocks&itsproperties,roadsetc.

 COASTAL ENGINEERING DIVISION 105 Themainobjectiveofthisdivisionistoinvestigatethecausesofcoastalerosionalongcoastalline ofKarnataka,tocollectfielddata,tosuggestremedialmeasurestocontaincoastalerosionandto conductmodelstudiesifnecessary.AlsopremonsoonandPostmonsoonmonitoringofSeaWalls, monthly monitoring of Sea Walls being constructed by port authorities are being done by this Division.Inaddition,thisdivisionisalsoconductingsiltandsedimentationsurveyofKabinireservoir.

ThroughtheaboveDivisions,theResearchStationhasbeenplayingakeyroleinsolvingmany Engineering problems in the field of Hydraulics, Concrete, Testing of building materials concrete, Soils,Rock,problemsconnectedwithroads,SeaErosionetc.

DAM SAFETY CELL

A Dam Safety Cell isworkingintheResearchStationunderthedirectcontroloftheDirector, K.E.R.S.TheCellisheadedbyAssistantExecutiveEngineersupportedbytechnicalstaffanddeals withthesafetyaspectsofDamsaspertheguidelinesofCentralWaterCommission.

AproposalforcreationofDamSafetyOrganisation(DSO)headedbyaSuperintendingEngineer hasbeensubmittedtoGovernment,whichisunderconsiderationbytheGovernment.

PROGRESS ACHIEVED BY KERS DURING 2006-07

Duringtheyear200607,uptoendofMarch2007,91Nos.ofstudiescoveringHydraulic,Rating of current meters (24 Nos), Gauging, Testing of Building Materials, Soils, Water quality testing, MonitoringofSeaWallsetc.,referredbydifferentagencieshavebeencompletedandreportshave beensenttoconcernedauthoritiesand43studiesareunderprogress.

IMPORTANT EVENTS DURING THE YEAR

1) The MOU between KERS & Mysore Urban Development Authority (MUDA) on Quality tests on materials used for development works undertaken by MUDA.

The Karnataka Engineering Research station has taken up major work of conducting quality controltestsonthematerialsusedfordevelopmentworksofMysoreUrbanDevelopmentAuthority (MUDA)agencies.TheMOUsignedbetweentheResearchStationandMUDAinthisregardforthe year200506hasbeencontinuedto200607also.Accordingly,during200607,54Nos.ofstudies havebeencompleteduptoendofMarch2007andreportshavebeensenttoconcernedauthorities and15studiesarestillunderprogress.

2) Activities of KERS on the Hydrology Project

Under the Hydrology project taken up by Government of Karnataka with World Bank Assistance,twoWaterQualityLaboratoryhavebeenestablishedatK.R.SagaraandMunirabad.

Further, using the Hitech IBS integrated FRP Boat with other auxiliary Equipments procured underHydrologyProject,anactionPlanforconductingSiltSurveyofmajorReservoirsofKarnataka was prepared and submitted to Government.AsperthisActionPlan,theHydrographicsurveyof Tungabhadra Reservoir wasconductedinassociationwithAndhraPradeshEngineeringResearch Laboratory(APERL)duringNovemberDecember2004andcompleted.Duringthecurrentyeari.e., 200607, Hydrographic Survey of Bhadra Reservoir has been completed. Analysis of the survey resultsandpreparationofreportareunderprogress.

TheobjectiveofK.E.R.S.istofindsolutiontovariousincidentalCivilEngineeringproblems referredbyGovernment,QuasiGovernment,otheragenciesetc.,andaccordingly,thesameisbeing 106 attendedtoasandwhenreferredbythesaidDepartments/agenciesandwillalsobecontinuedin future.

ENGINEERING STAFF COLLEGE: -

TheEngineeringStaffCollegewasestablishedintheyear1971,asacommemorationofthe SilverJubileeoftheKarnatakaEngineeringResearchStation.ThisInstitutionhasbeenestablished withtheaimoftrainingtheinserviceEngineersaswellasnewlyappointedAssistantEngineersand JuniorEngineersofPublicWorksandWaterResourcesDepartment.

The Engineering Staff College is working as an independent unit under the administrative controloftheDirector,KarnatakaEngineeringResearchStation,Krishnarajasagara,witheffectfrom 010488.

The Principal & Joint Director, of the rank of Superintending Engineer, heads the college. Two Professors (Executive Engineers), 06 Assistant Professors (Assistant ExecutiveEngineers),03 Lecturers(AssistantEngineers)andTwoJuniorEngineersassisthim.Atpresent,ofthesesanctioned posts,02Professors,06AssistantProfessors,03AssistantEngineersandTwoJuniorEngineersare workingintheCollege.

ACTIVITIES

TheEngineeringStaffCollegeconductsmainlythreetypesoftrainingCourses.

1) OrientationcoursefornewlyappointedAssistantExecutiveEngineers/AssistantEngineers/Junior Engineers (Duration 6 weeks for Assistant Executive Engineers and 4 weeks for Assistant EngineersandJuniorEngineers)

2) RefreshercoursesforinserviceEngineersandothersindifferentsubjects(Duration–5to6 days)

3) Short term courses under Continuing Education Programme (C.E.P) (Duration 5 days) since 1989.

TheseCEPCoursesareconductedatseveralrenownedTechnicalInstitutionsintheStatewith the object of imparting training to the technical personnel working in the Department. They are conducted at 8 centers in the state namely Mysore, Hassan, Surathkal, Dharwad, Davangere, Belgaum,BagalkotandShimoga.

Besides,theCollegeisalsoconductingBasicComputerCourseof12daysdurationforthebenefit ofEngineers&otherstaffworkingintheDepartment.

PROGRESS ACHIEVED BY ENGINEERING STAFF COLLEGE DURING 2006-07

During200607,itwasprogrammedtoconduct23Nos.ofInstitutionalTrainingcoursesand 32Nos.ofC.E.P.trainingprogrammes.ThedetailsoftrainingProgrammesconducteduptoendof March2007aregivenbelow.

No. of courses Sl. Category of training No. of courses No. of persons conducted upto end No. programme proposed trained. of March 2007 1 InstitutionalCourses 23 17 401 107 2 C.E.PCourses 32 23 321 3 SpecialCourses 11 08 320 Total 66 48 1042

During 200607, upto end of March 2007, 48 different training Programmes have been conductedand1042officer/Staffhasbeentrained.

SinceinceptionoftheStaffCollegeanduptoendofMarch2007,thecollegehassuccessfully conducted 1074 training programmes and have trained 21,637 Officers/Staff of the various GovernmentDepartments.

TheGrantallottedfor200607isRs.17.61Lakhsandtheexpenditureincurreduptoendof March2007isRs.26.60Lakhs.

9. WATER AND LAND MANAGEMENT INSTITUTE (WALMI)

INTRODUCTION

To maximize returns from investments made in irrigation projects in the State, it is necessary to manage water and land in a systematic and scientific way. This requires capacity buildingofGovernmentStaffaswellWaterUsers.Tomeetthesecapacitybuildingneeds,Waterand Land Management Institute (WALMI) started functioning at Dharwad on 1251986 and was later registeredasaSocietyundertheKarnatakaSocietiesRegistrationAct,1960on16.06.1986.WALMI: imparts training; renders technical assistance, advises Government on legal, policy, organisational and procedural changes; organizes demonstrations in collaboration with other organizations; conductsspecialstudiesandbringsoutpublications.

WALMI CAMPUS AND ITS ACTIVITIES

WALMIisfunctioningfromitsown55hectarecampuslocatedinDharwadBelurIndustrial Area located 12 Km away from Dharwad on Belgaum Road. The Administrative Building, Faculty Block,andResidentialBuildingshavebeenconstructed.TheInstituteisequippedwiththefacilities necessaryforimpartingtrainingforStaffandFarmers.ALibraryandDemonstrationFarmwithMinor IrrigationTankandborewellsarealsoavailable.

PROGRESS DURING 2006-07

TRAINING

WALMI's training activities focused on the training required for implementation of the State WaterPolicyandtheIrrigationSectorReforms.SpecialemphasiswaslaidontrainingonParticipatory Irrigation Management, Water Management and Land Development. Staff of the Water Resources Department,KrishnaBhagyaJalaNigam,KarnatakaNeeravariNigam,CauveryNeeravariNigamand theSixCommandAreaDevelopmentAuthoritieswastrainedbyWALMI.TheOfficebearersofWater UsersCooperativeProjectLevelFederationsofMalaprabhaandGhataprabha,OfficebearersofWater Users Cooperative Societies throughout the State as well as some farmers were also trained by WALMI.DuringtheyearduetononavailabilityofTraineesHostelasthesamewasdemolishedfor construction of Circuit Bench of the High Court of Karnataka training programmes could not be organisedbetweenmidJulytomidNovember2006andonly768personsweretrainedascompared 108 toannualtargetof1080persons.ThecumulativetrainingprogresssinceinceptionuptoendofMarch 2007is29771persons.

TECHNICAL ASSISTANCE

WALMI renders technical assistance to the Water Resources Department, Krishna Bhagya Jala Nigam, Karnataka Neeravari Nigam, Cauvery Neeravari Nigam and Six Command Area Development in the delineation of the area of operation of water users societies, entrusting rehabilitation prior to handing over of canal network to Water Users Societies, implementation of State Water Policy and Irrigation Sector Reforms. Malaprabha, Ghataprabha, Harangi and Kabini Water Users Cooperative Project Level Federations and the Water Users Cooperative Societies in: Malaprabha,Ghataprabha,UpperKrishna,Chandrampalli,Tungabhadra,Bhadra,Krishnarajasagara, Hemavathy,HarangiandKabiniwerealsogiventechnicalassistanceforPIMimplementation.

DEMONSTRATIONS IN COLLABORATION WITH THE UNIVERSITY OF AGRICULTURAL SCIENCES, DHARWAD

DemonstrationspertainingtoirrigationmethodsfordifferentcropsCotton,Soyabean,Maize, Groundnut,Chilli,Sunflower,Wheat,Bengalgram,Guava,vegetablesandMangowerelaid.Water saving technologies like drip, sprinkler and Raingun were demonstrated in the WALMI Farm to supporttrainingactivities.

FINANCIAL PROGRESS

During 200607, against a sum of Rs. 100.00 Lakhs allocated for Command area development,anexpenditureofRs.77.04lakhshasbeenincurred.

ADMINISTRATION

DuringtheyearOutofthe47sanctionedposts,21postswerefilledup.Theremainingposts werekeptvacantbecausegrantinaidofRs.100.00lakhswasprovidedinthebudgetasagainstthe requirement of Rs. 200 lakhs and Rs. 66.68 lakhs were released. Thetrainingcoursesarebeing managedwiththehelpofguestlecturers.Forrenderingtechnicalassistanceseniorlevelconsultants arebeinghiredonshorttermbasis.

109 110

PROJECTS UNDER

KRISHNA BHAGYA JALA NIGAM LIMITED

111 112 10. KRISHNA BHAGYA JALA NIGAM LIMITED 10.1 UPPER KRISHNA PROJECT

A). BRIEF DESCRIPTION In order to speed up the implementation of the Upper Krishna Project (UKP) in the State of Karnataka,bymobilisingresourcesfromthecapitalmarkets,KBJNLwasincorporatedon19 th August 1994undertheCompaniesAct,1956asaCompany,whollyownedbytheGovernmentofKarnataka forplanning,investigation,estimation,execution,operationandmaintenanceofallirrigationprojects coming under the UKP. The Company is funding the rehabilitationandresettlementofthepeople affected by the Project. The company is authorised to letout water and recover revenues from individuals,groupsoffarmersincludingWaterUsersCooperativeSocieties,towns,citymunicipalities andindustries.

B). ADMINISTRATIVELY APPROVED COST AND THE YEAR OF APPROVAL ALONG WITH REVISED COST DETAILS a)Stage1workhasbeenapprovedbyPlanningcommissionvideletterno:2(10)/88I&CAD/dated 24.09.90forRs.1214.97Crores.TherevisedprojectcostapprovedbytheNigam’sBoardis Rs.6003.19Croresason30 th September2005. b)StageIIworkhasbeenapprovedbyPlanningcommissionvideletterno:2(10)/99WR/dated 13.12.2006forRs.2358.86Crores.TherevisedprojectcostapprovedbytheNigam’sBoardis Rs.3476.40Croresason30 th September2005.

C). EXPENDITURE INCURRED ON THE PROJECT FOR THE YEAR 2006-07 UPTO END OF MARCH 2007 AsumofRs.9368.20CroreshasbeenspentontheprojectuptoMarch2007,andanamountof Rs.4,553.57Croresisspenttowardspaymentofinterest.

D). BARRAGES ACROSS RIVER BHIMA KrishnaBhagyaJalaNigamLimitedisimplementingthefollowingbarragesacrosstheRiver Bhima. 1. Kallur Bbarrage. Completed. 2. Sonnathi. Workisunderprogress 3. JoladadagiGudur Completed. 4. Yadgir Completed 5. Ghattargi Completed

ThesebarragesarebeingimplementedatanestimatedcostofRs.277.45Crores.

Amongthese,thesonnathibarrageisunderprogress.FurtherinadditiontotheabovetheNigam isentrustedwithconstructionof4barragesacrossRiverManjraGodavaribasininBidardistrict. Theprobableestimatecostof4barragesisRs.200.00Crores.Thetenderforcivilcomponentshave beenreceived.

About 4.25 Lakhs Ha (10.90 Lakh Acres) area of Bijapur, Gulbrga and Raichur District will be irrigatedunderStageIofUpperKrishnaProject.About1.92LakhsHawillbeirrigatedunderStage 113 II.TheStageIworksaredividedintothreephases.WorksunderPhase–I&IIarecompletedand thatunderPhase–IIIarenearingcompletion.

 UPPER KRISHNA PROJECT DAM ZONE, ALMATTI. This zone was established on 30.01.1977. One Circle Office, Six Division Offices with 20 Sub divisions,OneSeniorHealthOfficer(ClassI)withhis4AntiMalariaUnitsandDeputyConservationof Forestwithits3subdivisionsareworkingunderthiszone.

TheworksofRaisingofAlmattiDam,D/SgardenandLiftIrrigationSchemessuchasALBC,ARBC, MLIS,MarolLIS,ThimmapuraLISandTeggiSiddapuraLIScomesunderthiszone.

About4.25LakhHa(10.90LakhAcres)areaofBijapur,GulbargaandRaichurDistrictwillbeirrigated underStageIofUpperKrishnaProject.About1.92LakhsHaareawillbeirrigatedunderStageII. TheStageIworksaredividedinthreephasesandPhaseIworksarecompleted.Theprogressof PhaseII,PhaseIIIandStageIIworksareasfollows:

1) Almatti Dam TheworkisalreadycompletedandGatesarealsoerected.ThewaterisbeingstoreduptoRL518.60 andbeingutilizedforirrigation.

2) Landscape garden at down stream of Almatti Reservoir Landscape Development of Almatti Dam environs has been taken upto create the avenues for economic development of project area by attracting the tourist. M/s Nefertiti, Bangalore, was appointed as Consultants for preparation of plans, designs and estimates of Landscaping. A CommitteeisformedundertheChairmanshipoftheCommissioner,R&R,Bagalkot,tosupervisethe work.

Theprojecthasbeenphasedoutinmultiplestagesandpresentlyonly77acresoflandalongtheleft bank downstream abutting Dam masonry wall is taken up under PhaseI. The Present phase concentratesmainlyonfuturegarden.Thelaterphasesconcentratesmainlyonwaterthemeparks, waterthemecourtsetc.,inabout220acres.

3) Almatti Left Bank Canal L.I.S. Headworks,ErectionPumpsandestablishmentofsubstationarecompleted.Anareaof17,891 HahasbeensuccessfullyirrigatedduringRabi200607. The total length of canalis92.11Km.Outofwhich,67Kmisnearingcompletion.Theworksfor Km.67.00to85.00areunderprogress.TheDistributaries1to2arenearingcompletion.Theworks ofDistributariesNo.28to40areunderprogress.

4) Almatti Right Bank Canal L.I.S The head works are completed and pumps are erected. The cabling works of taking power connectionisalsocompeted.Thetotallengthofthecanalis67.50Km.andtheareairrigatedwillbe about9,900Ha.Theworksofmaincanalarenearingcompletion. TheDistributaryfrom1to15iscompleted.Theworksofotherdistributariesareunderprogress.An areaof4921HaisnotifiedforRabi200607.

About6,200HabeyondRiverMalaprabha,underARBC,isincludedinMarolLiftIrrigationScheme. 5) Thimmapur Lift Irrigation Scheme 114 Thisschemeprovidesanirrigationfacilitytoanareaof20100HaofBagalkottaluk.Theworkfor takingupofJackwell,Pumps,raisingmainanddeliverychamberisentrustedtoagencyonturnkey basis.Workisunderprogress.Thedetailedsurveyoftheschemeisentrustedtoagency.Workis underprogress. 6) Ramthal (Marol) Lift Irrigation Scheme About26,200HaareaofHunagundTalukofBagalkotDistrictwillbeirrigatedunderthisproject. TheestimatedcostofthisprojectisRs.218.00Crores.TheGovernmenthasaccordedadministrative approvalwithcertainconditions.Thesurveyworkisnearingcompletion.Theworkof1 st jackwell anditsalliedworkisentrustedtoM/sL&Tandtheworkisunderprogress.TSChascleared estimatesofthemaincanalworks.Tenderswillbecalledshortly. 7) Mulwad Lift Irrigation Scheme The water will be lifted in two stages under this scheme. The head works of 1 st stage and constructionof2 nd jackwellworksarecompleted.Anareaof5543HaisnotifiedforRabi200607.

Theleadoffcanal,whichleadswaterfrom1stJackwellto2ndjackwelli.e,fromKm0.00to5.00, isalreadycompleted.ThelengthofEastcanalfromthe2 nd deliverychamberis17.40Km.andthe lengthofWestCanalisabout83Km.About30,850Haareawillbeirrigatedunderthisscheme.

Theleadoffcanalworkiscompleted.TheeastcanalfromKm0.00to17.40andtheWestcanal fromKm0to78.00arenearingcompletion.Outof6distributariesofEastCanal,worksinrespectof 5distributariesarenearingcompletionandworksofthe6thdistributaryisunderprogress.Outof43 distributariesofWestCanal,24arenearingcompletionandworksoftheremainingdistributariesare underprogress.

8) Teggi-Siddapur Lift Irrigation Scheme TeggiSiddapur Lift Irrigation Scheme is a lift irrigation scheme proposed on the foreshore of Almatti Reservoir, near Teggi, to provide irrigation benefits to about 3000 Ha in Bilgi Taluk. The survey work is nearing completion. The alignment of canal is approved and thetenderprocessis completed.Workwillbestartedshortly.TheJackwellworkisunderprogress. 9) Sonna-Rolli-Mannikeri Lift Irrigation Scheme SonnaRolliMannikeriLISwillprovideirrigationbenefitstoabout3000HaareainBilgiTaluk.The surveyworkisnearingcompletion.ThetenderprocessfortheSonnaJackwelliscompleted.Workwill becommencedshortly.ThetenderprocessfortheRolliManikeriisnearingcompletion

NAME OF PROJECT: UPPER KRISHNA PROJECT DETAILS OF IRRIGATION POTENTIAL, (in Ha) Sl. Onfull Createdby] Programfor Progressduring NameofDistrict No development March2006 200607 200607 AlmattiLeftBankCanal(from 1 20,235 17,648 3,300 529 Km0to103) 115 AlmattiRightBankCanal(from 2 9,900 6,643 1,500 1,693 Km0to67) MulwadWestCanal(FromKm 3 30,850 9,638 13,400 5,708 0to85) TOTAL 60,985 33,929 18,200 7,930

DETAILS OF FINANCIAL ESTIMATE (Rs.in lakhs.) Actuals Sl. Revised Estimate Budget Estimate Classification 2005-06 No. 2006-07 2006-07 (KBJNL) 1 Reservoir 1,475.16 1,191.39 901.65 2 Dam&Appurtenantworks 4,746.50 1,611.33 7,203.83 3 Canal&Branches 4,409.00 3,657.74 1,313.85 4 Distributaries&Laterals 5,628.50 3,484.22 1,357.57 5 Watercourses 6 Roads 337.00 811.60 162.20 7 Buildings 460.00 173.20 262.91 8 Othercharges 120.00 9 Establishment&others 1,443.84 1,467.03 783.24

 UPPER KRISHNA PROJECT OPERATION & MAINTENANCE ZONE, NARAYANPUR. Consideringthevastareathatisalreadynotifiedandthephaseofdevelopmentofirrigationinthe subsequentphases,theGovernmenthasaccordedthesanctionforcreationofseparateZonetolook afterOperationandMaintenanceactivitiesofUpperKrishnaProjectvideGovernmentOrderNo.ID 115WBM91dated14101991.OwingtotheGovernmentOrder,theOfficeoftheChiefEngineer,O & M Zone, Narayanpur came into existence on 0311992. This Zone is working under Krishna BhagyaJalaNigamLimitedwitheffectfrom15111995.

OneCircle,ThreeDivisionandNineSubDivisionareworkingunderthecontrolofthiszone.

ThisZonehastheresponsibilitytomonitorthewatermanagementforanirrigatedareaof4.25 lakhHaunderStageIofUpperKrishnaProject.Astheprojectworkisunderprogress,theirrigable areaunderthiszoneisincreasingyearbyyearDuring20062007,thetotalareanotifiedforirrigation underNarayanpurLeftBankCanal,HunsagiBranchCanal&ShahpurBranchCanalwas 58241 Ha forKhariffand 64421 HaforRabi,respectively.Thecanalwisedetailsofnotifiedareaisasunder. Sl. Kharif Rabi Canals No. 2006-2007 2006-2007 1. NarayanpurLeftBankCanal 27,961 27,961 2. HunsagiBranchCanal 22,172 22,172 3. RampurLiftIrrigationSchemes 8,108 14,288 TOTAL 58241 64421

ThemaintenanceofNarayanpur,Kodekal,Rajankollur,Hunsagi,Kakkera,Devapur,Devathakkal andMudanurirrigationcoloniesundertheprojectcomeswithinthepurviewofthiszone. 116 Maintenanceof108Kmlengthofmajordistrictroad,247.32Kmofotherroads,16VHFwireless stations,Canalphonesetc.,aretheotheritems,whicharebeinglookedintobythiszone. ApartfromOperation&MaintenanceofcanalworkunderNarayanpurLeftBankCanalfromKm. 0.00to78.00thiszoneisalsolookingafterRampurLiftIrrigationSchemeworksandimplementation ofRajakollurLiftIrrigationSchemes.

 UPPER KRISHNA PROJECT CANAL, ZONE NO.1 BHEEMARAYANAGUDI 1. Contemplated Irrigation potential: TheIrrigablecommandareascontemplatedundervariouscanalsofthiszoneareasunder Name of the canal I.C.A. envisaged (In. Ha ) i) ShahapurBranchCanal 1,22,120 ii) MudbalBranchCanal 51,000. iii)JewargiBranchCanal 57,100 iv)NarayanapurRightBankCanal 84,000 TOTAL 3,14,220 The command areaslieintheShorapur,ShahapurandJewargiTaluksofGulbargadistrictand Lingasugur&DeodurgaTaluksofRaichurdistrict.

2. Present Status of Works upto end of March 2007: ShahapurBranchCanalandMudbalBranchCanalworksarecompletedandareintheOperation& Maintenancestage.

 JEWARGI BRANCH CANAL WORKS TheworksofthisCanalcomesunderUKPstageI,PhaseIII.TheearthworkofJewargiBranch Canalfrom0.00to13.00Kmwasfirststartedduring199293,underfamineworksprogramme.But brisk activities on the works of this canal started during the year 199596 with the formation of KBJNL. All the works of main canal (0.00 to 86.36 Km) and Distributary 1 to 17, including lining, is completed.WorksonlyinKm2ofBD2ofDistributary18andonelateralofDistributary16areunder progressandthesamearealmostcompleted.

The irrigation potential created under the canal since inception upto the end of March2006is 55,705Ha,asagainstthecontemplatedpotentialof57,100Ha.Ithasbeenprogrammedtocreate anirrigationpotentialof2,400HabyutilisingagrantofRs.16.23Croresduring20062007.During 200607, upto end of March 2007, an irrigation potential of 1,928 Ha has been created, and an amountofRs.10.75Croreshasbeenspent.Outofthetotalcreatedcommandareaof57,633Ha uptotheendofMarch2007,52,140Haareaisalreadyunderoperationandmaintenancestage,and waterisalsoletoutontrailbasisinthebalancearea,whereverthebasicinfrastructureforirrigation potentialhasbeencreated.

Thecumulativefinancialprogressachievedontheworks,sinceinceptionuptotheendofMarch 2007isRs.477.81Crores.

Allthebalanceworks,includingFICswillbecompletedattheearliest.

117  NARAYANAPUR RIGHT BANK CANAL WORKS TheworksofthisCanalweretakenupunderUKPstageII,withtheNigamfunds,duringtheyear 199596.

AlltheworksofmaincanalKm0.00to95.00(exceptonecrossregulatoratkm72.015whichis nearing completion) and the main Distributary 1 to 18 are completed. Works of some lateral on Distributary15,16and18arecompleted.

TheirrigationpotentialcreatedunderthecanalsinceinceptionuptoendofMarch2006is78,721 Haasagainstthecontemplatedpotentialof84,000Ha. During 200607, upto end of March 2007, an irrigation potential of 5,279 Ha has been created againsttheprogrammeof5,800Ha.AnamountofRs.50.34Croreshasbeenspentagainstagrantof Rs.76.59Crores.

Outofthetotalcreatedcommandareaof84,000HauptotheendofMarch2007,55,841Hais alreadyunderoperationandmaintenancestage,andwaterisalsoletoutontrailbasisinthebalance areawhereverthebasicinfrastructureforirrigationpotentialhasbeencreated.

Thecumulativefinancialprogressachievedontheworksofthiscanal,sinceinceptionuptothe endofMarch2007isRs.1,011.00CroresincludingFICexpenditure.

Allthebalanceworks,includingFICswillbecompletedduring200708. 3. BARRAGES TheworksofconstructionofoneBarragecumBridgeacrossRiverKrishna,threeBarragesacross RiverBheema,andfourBarragesacrossRiverManjracomeunderthisZone.

The works of construction of Two Barrage cum Bridge across River Bheema (one near village JoldadgiandanothernearYadgir)arecompleted.TheworksofthethirdonenearvillageSonnati, SonnatiBarragecumBridge,isunderprogress.

TheworkofconstructionofBarragecumBridgenearvillageGugalonRiverKrishnaisalsounder progress.

TheworksoffourBarragesacrossRiverManjrahavebeenrecentlystartedandthesameisunder progress.

Totalexpenditureincurredduring200607onalltheBarragescomingunderthiszone,uptothe end of March 2007 is Rs. 2,914.13 lakhs as against the annual target of Rs.1,750.17 Lakhs. The Barrageworksarelikelytobecompletedinallrespectsduring200708.

4. PROGRAMME AND PROGRESS DURING 2006-07: Theannualfinancialprogrammeofthiszonefortheyear200607isRs.237.98Croresandthe programme of creation of irrigation potential was 8,400 Ha Against this, 8,017 Ha of irrigation potential has been created upto end of March 2007 with the financial achievement of Rs. 136.95 Crores.  UPPER KRISHNA PROJECT CANAL ZONE-2, KEMBHAVI 118 TheUpperKrishnaProjectCanalZoneNo.2,Kembhavi,isfunctioningwitheffectfrom1.10.1986 videGovernmentOrderNo.PWD60PCO86,Dated:2991986,fortheconstructionofIndiBranch CanalandMudbalBranchCanal.SubsequentlytheMudbalBranchCanalworksweretransferredto thechargeofChiefEngineer,ID,UKPCanalZoneNo.1,BheemarayanagudiandAyacutRoadworks wastransferredtothiszonevideGovernmentOrderNo.PWD60PCO86dated1561987.

AtpresentthisofficeisinchargeoftheworksofIndiBranchCanalfromKm1to172including distributories1to46,IndiLiftCanalworksfromKm1to147andAyacutRoadwithintheAyacutof IndiBranchCanal.TheworksofIBCfromKm1to64anddistributories1to13includinglaterals andFICsarealreadycompletedtherebycreatinganirrigationpotentialof60,721Haandtheseworks arenowunderoperationandmaintenance.TheworksofIBCfromKm65to172anddistributaries 14 to 46 are completed and irrigation potential of 70,574 ha is created. Laterals and FICs are completed. The works of Head Regulator and intake canal of Indi Lift Scheme and Canal works from Km 0.225 to 40.00 are completed. The works of Indi Lift Canal from Km 10.00 to 97.30 is nearing completion.Workofsurvey,preparationofestimatesincludingdesignanddrawingfromKm97.30to 147.00isentrustedontenderbasisandisunderprogress.

1. ORGANISATION ThiszoneisfunctioningwithtwocirclesnamelyIBCCircleNo.2,Almelcamp,RampurandO&M CircleNo.2,Rampur.Thedetailsofworkstakenupunderthiszoneareasunder.  INDI BRANCH CANAL TheIndiBranchCanaltakesoffatKm77.52ofNarayanpurLeftBankCanal,whichissituated about1kmawayfromKembhavivillageofShorapurtalukinGulbargaDistrictandtraverseswitha head discharge of 2943 cusecs (83.49 cumecs) through the districts of Gulbarga and Bijapur irrigatinganareaof30,831Haand1,00,464Harespectively(Total1,31,295Ha)

TheworksofconstructionofIndiBranchCanalfromKm1to64arecompletedunderStageI, PhaseII of UKP, creating an irrigation potential of 60,721 Ha. The works of construction of Indi BranchCanalfromKm65to172aretackledunderStageI,PhaseIIItocreatethebalanceirrigation potentialof70,574Ha.

Theexpenditureincurredtoendof3/2007fortheseworksisasfollows (Rs. In lakhs) SL. EXPENDITURE WORK PACKAGE NO. UPTO END OF 3/2007 1. IBCKm1to10(SliceI) PackageIB01/01 1552.63 2. IBCKm11to20(SliceII) PackageIB01/02 2147.65 3. IBCKm21to30(SliceIII) PackageIB01/03 2076.20 4. IBCKm31to64 PackageIB02/01 9341.35 5. StructuresonIBCKm31to64 PackageIB0202 1890.99 6. IBCDistributories11and13 PackageIB0301 23140.87 7. IBCDistributories6,6A,6B&7 PackageIB0302 752.56 8. IBCDistributories8and9 PackageIB0303 3131.91 9. IBCDistributories10,12,12A&12B PackageIB0304 2808.07 119 TOTAL 46,842.23 TheworksofIndiBranchCanalfromKm.65toKm172andDistributories14to46havebeen takenupontenderaswellasentrustmentbasis.Theworksarecompleted.TheworksofIndiLift CanalfromKm1to97.3,Distributories1to40BandLateralscomingthereunderaretakenupon tenderbasis.AnamountofRs.1,009.92Croreshasbeenspenttoendof3/2007fortheaboveworks includingtheworksofIndiLiftIrrigationSchemeandFIC.Thedetailsofworksareasunder: I. TheworksofIBCfromKm65to80,89,101to113,120,122to125and151to172aretakenup ontenderbasisandtheworksarecompleted.

II. TheworksofIBCfromKm81to88,90to100,114to119,121,and126to150aretakenupon directentrustmentbasisandtheworksarecompleted. III.Theworksofdistributories14to24andlateralscomingunderIBCfromKm65to120arealso takenupondirectentrustmentbasisandtheworksarecompleted. IV.The works of distributories 25, 26 to 34, 35 to 37, 38 to 45A & 46, which were divided into packagesandtakenupontenderbasis,arecompleted. V. TheworksofprovidingC.C.liningtoIBCfromKm65to172havebeendividedintopackagesand theseworksweretakenupontenderbasis.Theworksarecompleted. VI.TheworksofIndiLiftIrrigationSchemeviz.,HeadRegulatorandIntakeCanalwithstructureon intakecanalaretakenupontenderbasisandtheworksarecompleted.WorksofIndiliftcanal fromKm0.225to40.00arealsocompleted.WorksofIndiliftcanalfromKm40.00to97.30are takenupontenderbasisandtheworksarenearingcompletion.WorksofDistributories1to40B on I.L.C. are also takenupontenderbasis,whichareundervariousstagesofprogress.For lateralsunderdistributories1to40B,tendershavebeencalledfor. VII.Theworksofpumpset,transmissionline,substationandE.O.T.craneofILC,whichweretaken upontenderbasisandentrustedtotheagencies,areunderprogress.  AYACUT ROADS STAGE-I, PHASE-I TheworkofConstructionof611KmlongAyacutRoadsunderUKPStageIPhaseIiscompleted. STAGE-I, PHASE-II ItwasproposedtoConstruct942KmlongAyacutRoadsunderUKPStageIPhaseII.Outofthetotal 942Km,constructionof307KmofAyacutRoadswerehandedovertoCADAaspertheordersof GovernmentofKarnatakavideGovernmentOrderNo.ID95Dated:15111995.Hence,635Kmof AyacutRoadscomeunderthejurisdictionofthiszone.Theseworksarecompletedexcepttheworks ofAR04Package.ThecontractorofAR04packagehasstoppedtheworksfornonfinalisationof workable rates. The roads coming under this package are included in the rehabilitation of Ayacut Raodspackage. TheamountspentonAyacutRoadworksuptotheendof3/2007isRs.2128.67lakhsincluding maintenance.(ExcludingWorldBankworkswhicharecompleted) Alltheremaningroadscomingunderthejurisdictionofthiszoneareincludedinonepackageandfor theseroadsfreshtenderhavebeencalledfor. 120  BUILDINGS Thebuildingswereconstructedinvariouscoloniesofthiszoneforaccommodationofstaffand office.Rs.128.10lakhsexpenditureisincurredtowardstheseworkstoendofMarch2007.Two buildingpackages,oneatRampurwithbidcostofRs.296.51lakhsandanotheratAlmelwithbid costofRs.140.48lakhs,arecompleted.TheexpenditureincurreduptoendofMarch2007onthe aboveworksisasunder,

01. BuildingatRampur PackageB201 Rs.370.07lakhs. 02. BuildingatAlmel PackageB202 Rs.182.76lakhs The Grant allotted since 19861987 upto the end of 3/2007 is Rs. 192329.33 lakhs and a cumulativeExpenditureofRs.155775.69lakhshasbeenincurreduptotheendof3/2007.TheGrant allottedduring20062007isRs.12268.51lakhsandanExpenditureofRs.9361.89lakhsisincurred uptoendofMarch2007.

DETAILS OF IRRIGATION POTENTIAL IN HECTARES Name of work in Potential Programme Anticipated Bijapur and Total ICA created to end during the progress upto Gulbarga District of 3/06 year 2007 March-2006 IBC 1,31,261 131,295 ILIS 41,900 16,294 20,300 21,140 (44,076revised)

DETAILS OF FINANCIAL ACTIVITIES AND CLASSIFICATION (RS.IN LAKHS) EXPENDITURE ACTUAL FOR SL.NO ACTIVITY/CLASSIFICATION FOR 2006-07 2006-07 A. ACTIVITY 1 CanalsandBranches 3,437.79 2,816.46 2 Distributaries 5,869.46 5,144.93 3 Roads 37.14 0.41 4 Buildings 248.18 128.10 5 Barrages 961.50 912.14 Total for – A 10,554.02 9,002.04 B. CLASSIFICATION 1 Pay 935.41 613.94 2 TravelExpenses 189.39 64.28 3 OfficeExpenses 62.26 23.33 4 Pensionarycharges 2.30 5 MachineryandEquipments 82.85 75.21 6 SuspenseDebit 148.07 TOTAL FOR – B 1,272.21 924.83 121 C. DEDUCTION 1 SuspenseCredit 265.32 2 DeductreceiptandrecoveriesonCapital 308.82 account TOTAL OF – C 574.14 GRAND TOTAL OF A+B+C 11,826.23 9,352.73

122 10.2 BAGALKOT TOWN DEVELOPMENT AUTHORITY, BAGALKOT

1. SALIENT FEATURES OF BAGALKOT TOWN

BagalkotTownishistoricallyfamousforitsglory&oneofthelargesttownsinthenorthern partsofKarnataka,issituatedontherightbankofRiverGhataprabhaat16˚11’longitude&71˚12’ latitude.

BagalkotTownisgettingsubmergedunderthebackwatersofAlmattireservoir.WhentheDam heightreachesRL524.256mtrs,theresultingsubmersionis3/4 th ofthetown.Thisyearwhenwater wasstoredupto519.16mtrs,itsbackwaterstoodatBagalkotupto520.10mtrs.Thefollowingare thesubmergencedetailsatdifferentelevations.

No. of Present acquisition of Structures SL. Height or RL Structure Authorize Un- Population No in Mtrs Total Difference s d authorised 1 2 3 4 5 6 7 8 1. 517.00 615 781 206 987 373 3,760 2. 521.00 2,337 2,524 1,208 3,732 1,317 18,860 Total 2,952 3,305 1,414 4,719 1,690 22,620 3. 521to525 4,225 2,525 498 6,772 28,376 4. 525to526 1,872 1,872 7,021 5. 526to527 1,482 1,482 4,238 Total 10,531 2,525 498 14,845 62,255 6. Above527 7,155 29,341 Total 1 to 6 22,000 91,596

Note:ThefiguresinSL.No.1&2areasper6(1)notification.ThefiguresindicatedatSL.No.3,4,5 areaspersurveyconductedin1986.

Resettlementplanconsistsofacquiring4500acresoflandsforlocatingthenewBagalkottown andmakingallarrangementstoprovidebasicinfrastructureinthenewtown.Forthispurposethe state Government has enacted a special legislation called “BAGALKOT TOWN DEVELPOMENT ACT 1983”.

2. ORGAINSATION STRUCTURE : BTDAisformedwith1ChiefEngineerOffice,2Divisions,8SubDivisionalOffices,oneSpecial LandAcquisitionOfficeandoneRehabilitationOffice.1OfficeoftheGeneralManagerisfunctioning forspeedyexecutionofthework.

Sincemostofthemajorworksarecompleted,exceptmaintenancework,theGovernmentinits orderRDNo.145/REH/Bangalore/2005Dated24/10/2005hastemporarilyclosedOneDivisionaland4 SubDivisionalofficesalongwithstaff,witheffectfrom31/10/2005.

123 3. AIBP PROGRAMME ESTIMATED COST OF REHABILITATION AND RESETTLEMENT OF BAGALKOT TOWN Sl. No. Details of Component Rs. in lakh 1. StructuralcompensationinoldBagalkottown 39,539.06 2. LandAcquisitionfornewtownshipandothersetc., 2,952.50 3. R&RPackages 3,000.00 4. ConstructionofRoadsandparksetc., 6,231.50 5 ProvidingWaterSupply 4,445.00 6. ProvidingU.G.D 2,200.00 7. ProvidingElectrification 2,000.00 8. ConstructionofPublicBuilding 2,200.00 9. Telecomfacilities 400.00 10. ConstructionofRailway 1,000.00 11. MaintenanceofBTDAColonyandNavanagar 800.00 12. NewSupplyMachineryandMaintenance 250.00 13. Consultancyandtrainingcharges 90.00 14. Establishment 2,591.94 TOTAL 67,700.00 It has been estimated that Rs. 677.00 Crores at 9596 price levels is required for Bagalkot RehabilitationandResettlementworks.Rs.36.32Croreshasbeenearmarkedforthisprojectunder U.K.PStage1PhaseIIandPhaseIII. 4. SPECIAL PACKAGE SCHEME Considering the problems due to backwater effect, Government has announced a special packageofRs.638.00Crores(Rs.500.00CroresforBagalkottown+Rs.138.00CroresforR&R) VideG.O.No.RD1/124/REH/2002Bangalore,Dated16.11.2002,toimprovetheexistingconditionsof BagalkotTown.

The details of special package are as under. Sl. Rs. in Details of components No Crores 1 Structural components RL521.00 to 523.00, Office of the Chief Engineer and 414.00 Development of 35 sectors of unit 2 of Navanagar with all infrastructures facilitieslikeroadsetc., 2 ProvidingUGDforNonsubmergenceofBagalkotTown 29.12 3 ProvidingWaterSupplyfornonsubmergenceofBagalkotTown 11.70 4 Constructionoflinkroads 20.00 5 Developmentofparksinoldtown 12.00 6 ConstructionofbuildingunderAshrayaSchemeforslumdwellers 5.00 7 Constructionof50beddedbuildingforsitelessandbelowpovertylinepeople 2.00 8 Constructionof50beddedhospitalinoldtown 2.00 9 Incomeandemploymentgeneratingscheme 4.18 TOTAL 500.00 a)ThestructuresbetweenRL.521.00mtrsto523.00mtrsneedstobeacquired. 124 b)Fixingofboundarystonesanddemarcationofplotsofvarioussizesin35sectorsofunit2are completed. c) Theestimateforinfrastructurefacilitieslike,mainperipheralroads,UGD,Watersupplyetc.for UnitIIofNavanagaretc.areprepared.

1. The U.G.D. Network in old Town of Nonsubmersible portion of Bagalkot is nearing completion.

2. Theworkofprovidingwatersupplysystemincludingrevampingofexistingpipelinefornon submersibleportionofBagalkottownisnearingcompletion.

3. Theworksfor3linkroads,5mainroads,7internalroadsinslumareaofBaglkotTownwere taken up on tender basis. Out of these works, 3 link road works have already been completed and 3 main road works are also completed. Remaining works are nearing completion.

4. Developmentof3parksinoldBagalkottownistakenup,outofwhichworkofonegardenis completed.

5. Estimate and DTPs for construction of 50bedded hospital in old Bagalkot Town is under scrutiny.

5) FINANCIAL PROGRESS ACHIEVED TO END OF MARCH 2007, SINCE

INCEPTION

TheCumulativeExpenditureincurredsinceinception(198384)uptoMarch2007isRs.419.694 Crores.TheExpenditureincurredduring200607uptoendofMarch2007isRs.25.27Crores.

6) FINANCIAL PROGRESS ACHIEVED UPTO 31-12-2006 SINCE 1996-97 FOR A.I.B.P WORKS.

The Cumulative Expenditure incurred on AIBP works, since 199697 upto March 2006 is Rs. 13,162.88 Lakhs. TheExpenditureincurredduring200607uptoendofMarch2007isRs.821.00 Lakhs.

7) DETAILS OF BUDGETARY PROVISIONS FOR 2006-2007 (Rs. In Lakhs)

Budgetary Special Sl. Details Provision Package No for 06-07 2006-07 1 Establishment 315.00 2. NewSuppliesandmaintenanceofVehiclesetc., 261.90 StructuralcompensationR&Rpackageandcivil 3. 1,518.90 2,201.15 works 4. BTDAcolony&Navanagarmaintenance 36.60 TOTAL 2,132.00 2,201.15

8. THE DETAILS OF BUDGETARY PROVISIONS FOR 2006-2007 (Rs. In Lakhs) 125 Under Special Sl. No. Details of Component Under AIBP package 1. LandAcquisition 21.41 2. Structuralcompensation 57.14 3. R&Rpackages 25.00 4 ConstructionofRoadsetc., 1,148.41 959.41 5. ProvidingwatersupplyandUGD 1,69.44 1,160.49 6. Electrification 29.77 43.50 7. ConstructionofBuildings 67.73 37.75 8. BTDAcolony&Navanagarmaintenance 36.60 9. Establishment&consultancy 315.00 10. Vehiclemaintenance&newsupplies 261.90 Total 2,132.40 2,201.15

9. DETAILS OF PROGRESS ACHIEVED DURING 2006-07, UPTO MARCH-2007

1. AnamountofRs.40.70lakhspaidascompensationforaffectedstructuresuptoRL.521mtrs,and alsoenhancedcompensationofRs.267.42lakhsispaidaspercourtawards.

2. Payment is made towards compensation for unauthorized structures. Rs.4.98lakhshavebeen paidtowardsacquisitionoflandsetc.thatincludesenhancedcompensationaspercourtawards.

3. Totally56sectorsforPDF’sand8sectorsforNonPDF’saredevelopedinunit1atNavanagar. Duringthisyear25plotsareallottedtoPDF’s.For86PDFsand19NonPDFspermissionhave beengiventoconstructtheirhouses.

4. Rs.2.20lakhshavebeenpaidashousegrantsintheformofexgratiafor22PDFscomingbelow Povertyline.

10. Financial Progress.

Financial programme for the year 200607 is Rs.43.33 Crores out of which an expenditure of Rs.25.27CroreshasbeenincurreduptoendofMarch2007.

The Details are as under:

(Rs.inCrores) Sl.No. Programme Progress 1. ForA.I.B.P.Works 15.18 8.21 2. ForSpl.Package. 22.01 10.37 3. ForKBJNLWorks 6.13 6.69 Total 43.33 25.27

AN OVERVIEW:

NAMEOFTHEPROJECT B.T.D.A 126 Location Bagalkot.

Yearofinception 1984

Yearofcompletion(incaseofcompletedprojects) Ongoing OriginalandLatestestimatedcost(Rs.InCrores),including Rs.677.00Crores+Rs.360.49Crores= administrative /Technical sanction approval number and Rs.1,037.49Crores date.

Lengthofayacutroads/I.T.roads 48.00k.m.Peripheralroads.

Programmeduring200607 Rs.43.33Crores

Progressachievedduring200607 Rs.25.27Crores

FinancialProgrammefor200708 Rs.40.00Crores

127 128

PROJECTS UNDER

KARNATAKA NEERAVARI NIGAM LIMITED

129 10. KARNATAKA NEERAVARI NIGAMA LIMITED

11.1 AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION (NORTH), BELGAUM

Irrigation (North) Zone was formed on 10.8.67 in pursuance of the Government order No.PWD.114.PCO.67,dated:24.7.1967withaviewtoincreasethetempoofconstructionworkinthe IrrigationProjectsasaresultofincreasedprovisionoftheplanallocationinthestate. Irrigation(North)Zoneisinchargeofthefollowingprojects. On-going Schemes New Schemes 1 MalaprabhaProject 8 BellaryNalaProject 2 GhataprabhaProject 9 SriRameshwaraL.I.S 3 HipparagiIrrigationProject 10 JavaluhallaL.I.S.* 4 MarkandeyaReservoirProject 11 BennihallaL.I.S.* 5 HarinalaIrrigationProject 12 KonnurL.I.S.* 6 DudhagangaIrrigationProject 13 KolachiL.I.S.* 7 Kalasa Nala & Bandhur Nala Diversion 14 Lifting of Hiranyakeshi waters into GRB Schemes. Canal. (*) To irrigate suffering atchkat of tail end distributaries of MRBC / NBC, under Malaprabha Project Sofar,anirrigationpotentialof5,13,454Ha,hasbeencreatedundertheaboveprojects.An expenditureofRs.2642.64Croreshasbeenincurredundertheaboveschemestoendof3/2007. Harinala Project and Markandeya Project are to be dedicated to the Nation during Suvarna Karnataka200607. Theremainingschemesareunderdifferentstagesofprogress. 130 11.1.1 MALAPRABHA PROJECT

NAME OF THE PROJECT MALAPRABHA PROJECT

Location Naviluteertha

YearofInception 1960

OriginalEstimatedcostRs.20.00Crores OriginalandLatestestimatedcost LatestEstimatedcostRs.994.00Crores (Rs.inCrores),includingadministrative/ Administrativeapproval:GONo.PWD.59.GMP.77, B’loreDated:4.2.1980Rs.162.09Crores Technicalsanctionapprovalnumber&Date. TechnicalsanctionNo.:CE,I(N),BGM Reg.No.CIN.7.forJune1980Rs.162.09Crores

LengthofCanal M.L.B.C. M.R.B.C

a) MainCanal, 150Km. 142Km.

b) BranchCanal 26Km. 42Km.

c) Distributories 280Km 677Km.

Lengthofayacutroads/I.T.roads 282.62Km

Districtsbenefited Belgaum,Dharwad,Gadag,Bagalkot

NumberofvillagesandTaluks Bailhongal,Ramadurg,Saundatti,Badami, Benefitted Navalgund,Hubli,Naragund,Ron,Gadagtaluks.

NumberofW.U.C.S:

a) Formed 231

b) Registered 231

c) Handedover 191

Physical Financial

Programmeduring200607 15000Ha Rs.105.17Crores.

ProgressachieveduptoEndofMarch2007 9075Ha Rs.72.490Crores.

Programmefor200708(Physical&Financial). 8631Ha Rs.60.00Crores.

CumulativeprogressuptoEndofMarch2007 205075Ha Rs.886.278Crores.

131 11.1.2 GHATAPRABHA PROJECT NAMEOFTHEPROJECT GHATAPRABHA PROJECT

Location Hidkal

YearofInception 1972

OriginalEstimatedcostRs.90.54Crores LatestEstimatedcostRs.1244.00Crores OriginalandLatestestimatedcost Administrativeapproval:GONo.PWD.147.MGP. (Rs.inCrores),includingadministrative/ B’loreDated:16.12.76Rs.90.54Crores Technicalsanctionapprovalnumber&Date. TechnicalsanctionNo.:CE,I(N),BGM Reg.No.CIN.196.forMarch1977Rs.90.54Crores

LengthofCanal G.R.B.C. G.L.B.C

a) MainCanal, 199Km. 109Km.

b) BranchCanal 88Km 197Km

c) Distributories 994Km 494Km

Lengthofayacutroads/I.T.roads 600.35km

Districtsbenefited Belgaum,Bagalkot

Athani,Chikodi,Gokak,Hukkeri,Raibag,Ramadurg, NumberofvillagesandTaluksBenefitted Saundatti,Badami,Bagalkot,Bilagi,Hungund, Jamakhandi,Mudholtaluks.

NumberofW.U.C.S:

a) Formed 302

b) Registered 302

c) Handedover 285

Physical Financial

Programmeduring200607 35000Ha Rs.162.24Crores.

ProgressachieveduptoEndofMarch2007 31620Ha Rs.115.515crores

Programmefor200708(Physical&Financial). 5837ha Rs.90.00Crores.

296642Ha(includingStage CumulativeprogressuptoEndofMarch2007 Rs.1054.923crores. I,II&III)

132

11.1.3 HIPPARAGI IRRIGATION PROJECT

NAME OF THE PROJECT HIPPARAGI IRRIGATION PROJECT Location Hippargivillage YearofInception 1973 OriginalEstimatedcostRs.186.70Crores OriginalandLatestestimatedcost LatestEstimatedcostRs.1113.00Crores (Rs.inCrores),includingadministrative/ Administrativeapproval:NeeE17HiAaYo2000, Technicalsanctionapprovalnumber&Date. B’loredated:16.6.01,(Rs.901.00Crores) Technicalsanction. :CE,I(N),BGMReg.No.CIN.10.for June2001(Rs.901.00Crores) LengthofCanal a)MainCanal 306Km Districtsbenefited Belgaum,Bagalkot NumberofvillagesandTaluksBenefitted Athani,Chikodi,Jamakhanditaluks. Physical Financial Programmeduring200607 Rs.50.00Crores. ProgressachieveduptoEndofMarch2007 Rs.39.307Crores. Programmefor200708(Physical&Financial). Rs.100.00Crores. CumulativeprogressuptoEndofMarch2007 Rs.220.528Crores.

133 11.1.4 HARINALA IRRIGATION PROJECT NAMEOFTHEPROJECT HARINALA IRRIGATION PROJECT Location TigadiVillage YearofInception 1998 OriginalEstimatedcostRs.0.83Crores OriginalandLatestestimatedcost LatestEstimatedcostRs.68.93Crores (Rs.inCrores),includingadministrative/ AdministrativeApprovalNo:CE:114:MPS:92 Technicalsanctionapprovalnumber&Date. Dated.11/14/9/98(Rs.26.95Crores). Technicalsanction:CEI(N):BGM:Reg.No.CIN–17for May1999(Rs.26.95Crores). LengthofCanal LeftBank RightBank a)MainCanal 9.00Km 10.72Km Districtsbenefited Belgaum. NumberofvillagesandTaluksBenefitted Bailhongaltaluk. Physical Financial Programmeduring200607 Rs.1.00Crore ProgressachieveduptoEndofMarch2007 3480Ha Rs.1.909Crores Programmefor200708(Physical&Financial). CumulativeprogressuptoEndofMarch2007 3480Ha Rs.67.100Crores

134 11.1.5 MARKANDEYA RESERVOIR PROJECT

NAMEOFTHEPROJECT MARKANDEYA RESERVOIR PROJECT Location Shirurvillage YearofInception 1998 OriginalEstimatedcostRs.120.00Crores OriginalandLatestestimatedcost LatestestimatedcostRs.341.720Crores (Rs.inCrores),includingadministrative/ AdministrativeapprovalNo.ID:MMM:87:Bangalore Technicalsanctionapprovalnumber&Date. Dated.18.12.96(ForRs.120.00Crores). TechnicalsanctionNo.CEI(N):BGM:Reg:No.CIN.46 forOct.1997(Rs.120.00Crores). LengthofCanal R.B.C. L.B.C. a)MainCanal 71Km 15Km b) Distributories 183Km Districtsbenefited Belgaum NumberofvillagesandTaluksBenefitted Belgam,Hukkeri,Gokak,Saundattitaluks. Physical Financial Programmeduring200607 720Ha Rs.34.45Crores. ProgressachieveduptoEndofMarch2007 700Ha Rs.10.285Crores. Programmefor200708(Physical&Financial). 20Ha Rs.10.00Crores CumulativeprogressuptoEndofMarch2007 14364.64Ha Rs.298.472Crores

135 11.1.6 DUDHGANGA IRRIGATION PROJECT NAMEOFTHEPROJECT DUDHGANGA IRRIGATION PROJECT Location Asangaonvillage(MaharashtraState) YearofInception 1992(CanalinKarnatakaState) OriginalEstimatedcostRs.124.00Crores OriginalandLatestestimatedcost LatestEstimatedcost–Rs.124.00Crores (Rs.inCrores),includingadministrative/ Administrativeapproval.Ja.SAM:E1:(VI.DN:GAM:2000(P Technicalsanctionapprovalnumber&Date. 2)Dated.17/42002(ForRs.124.00Crores) Technicalsanction.:(YettobeaccordedforKarnataka works). NidhoriBranch BidriBranch DattawadBranch LengthofCanal Canal canal Canal a)BranchCanal 21.57Km 25.155Km 30.00Km Districtsbenefited Belgaum NumberofvillagesandTaluksBenefitted Chikkoditaluk. Physical Financial Programmeduring200607 1280Ha Rs.15.00Crores ProgressachieveduptoEndofMarch2007 Rs.12.987Crores. Programmefor200708 500Ha Rs.10.00Crores. Rs.63.36Crores.(Karnataka’s CumulativeprogressuptoEndofMarch2007 3800Ha. share)

136 11.1.7 KALASA NALA AND BANDHUR NALA PROJECT NAMEOFTHEPROJECT KALASA NALA AND BANDHUR NALA PROJECT

Location Kanakumbi–KalasaNalaProject NersevillageBhandurNalaProject

YearofInception 2006

Yearofcompletion(incaseofCompleted Underprogress(Kalasaonly) Projects)

OriginalEstimatedCost KalasaNalaRs.44.78Crores BhandurNalaRs.49.20Crores OriginalandLatestestimatedcost AdministrativeapprovalNo. (Rs.inCrores),includingadministrative/ a)Kalasanala:ID.37.WBT.2000:Dated.22.8.2000 Technicalsanctionapprovalnumber&Date. b)Bhandurnala:.ID4.WBT:2000:Dated.22.8.2000. TechnicalsanctionNo: a)KalasanalaCIN.Reg.No.270,March2002 b)BhandurnalaCIN.Reg.No.269,March2002.

DistrictsBenefited Belgaum

NumberofvillagesandTaluks HubliDharwad&othervillages(Drinkingwatersupply) Benefited

Physical Financial

Rs.0.50CroresforKalasaNala Programmeduring200607 Rs.0.50CroresforBhandurNala)

Rs.0.389CroresforKalasaNala ProgressachieveduptoEndofMarch2007 Rs.0.031CroresforBhandurNala

Programmefor200708(Physical&Financial). Rs.25.00Crores

Rs.1.513CroresunderKalasaNala& CumulativeprogressuptoEndofMarch2007 Rs.0.256CroresunderBhandurNala

137 11.1.8 LIFTING OF HIRANYAKESHI WATERS INTO G.R.B. CANAL LIFTING OF HIRANYAKESHI WATERS INTO NAME OF THE PROJECT G.R.B. CANAL.

Location Ghodagerivillage

YearofInception 2005

Yearofcompletion(incaseof Underprogress. CompletedProjects)

OriginalandLatestestimatedcost EstimatedcostRs.30.00Crores. (Rs.inCrores),includingadministrative/ AdministratriveapprovalWRD:03:NIN:1995: Technicalsanctionapprovalnumber&Date. Bangaloredated23.8.2003 TechnicalsanctionCIN.109.ForJune2005.

LengthofCanal

a)MainCanal

b)BranchCanal Detailedsurveyistakenup. c)Distributories

d)F.I.C.

Districtsbenefited Belgaum

NumberofvillagesandTaluksBenefitted Hukkeri

Physical Financial

Programmeduring200607 Rs.8.00Crores

ProgressachieveduptoEndofMarch2007 Rs.6.088Crores

Programmefor200708(Physical&Financial). Rs.10.00Crores.

CumulativeprogressuptoEndofMarch2007 Rs.6.981Crores.

138 11.1.9 BELLARYNALA PROJECT

NAME OF THE PROJECT BELLARYNALA PROJECT

Location Kardikollavillage

YearofInception 2005

Yearofcompletion(incaseofCompleted Underprogress Projects)

OriginalandLatestestimatedcost Estimatedcost:Rs.138.28Crores (Rs.inCrores),includingadministrative/ Administrativeapproval:Ja:SamE:171:ViByaE: 2003dated23.8.2003 Technicalsanctionapprovalnumber&Date. Technicalsanction:CEI(N):Reg.No.164for August2005

LengthofCanal

a. MainCanal

b. BranchCanal Detailedsurveyistakenup c. Distributories

d. F.I.C.

Districtsbenefited Belgaum

NumberofvillagesandTaluksBenefitted Gokak,Saundatti.

Physical Financial

Programmeduring200607 Rs.20.00Crores

ProgressachieveduptoEndofMarch2007 Rs.63.818Crores

Programmefor200708(Physical&Financial). Rs.25.00Crores

CumulativeprogressuptoEndofMarch2007 Rs.70.734Crores

11.1.10 SRI RAMESHWAR L.I. SCHEME 139

NAME OF THE PROJECT SRI RAMESHWAR L.I. SCHEME

Location Dhavaleshwarvillage

YearofInception 2005

Yearofcompletion(incaseofCompletedProjects) Underprogress

OriginalandLatestestimatedcost Originalcost:Rs.218.42Crores (Rs.inCrores),includingadministrative/ AdministrativeapprovalNo:JaSamE:14:NIN: 2001:Bangalore:Dated.23.8.2003. Technicalsanctionapprovalnumber&Date. Technicalsanction:CEI(N)Reg.No.110for June2005

LengthofCanal

a) MainCanal

b) BranchCanal DetailedSurveyistakenup. c) Distributories

d) F.I.C.

Districtsbenefited Belgaum

NumberofvillagesandTaluksBenefitted Gokak

Physical Financial

Programmeduring200607 Rs.10.00Crores

ProgressachieveduptoEndofMarch2007 Rs.24.514Crores

Programmefor200708(Physical&Financial). Rs.25.00Crores

CumulativeprogressuptoEndofMarch2007 Rs.30.553Crores

140 11.1.11 JAVALUHALLA L.I. SCHEME NAME OF THE PROJECT JAVALUHALLA L.I. SCHEME Location: Kitturvillage YearofInception: 2005 Yearofcompletion(incaseofCompletedProjects) Underprogress OriginalEstimated :cost.Rs.3.33Crores OriginalandLatestestimatedcost Administrativeapproval:WRD:03:NIN:95 dated: (Rs.inCrores),includingadministrative/ 23.08.03 Technicalsanctionapprovalnumber&Date. Technicalsanction:CE,I(N),BGM Reg.No.CIN.10.forApril–2003 LengthofCanal: a)MainCanal b)BranchCanal c)Distributories Detailedsurveyistakenup. d)F.I.C. Districtsbenefited Belgaum NumberofvillagesandTaluksBenefitted Ramdurg Physical Financial Programmeduring200607 Rs.3.00Crores ProgressachieveduptoEndofMarch2007 Rs.1.645Crores Programmefor200708(Physical&Financial). Rs.1.00Crores. CumulativeprogressuptoEndofMarch2007 Rs.3.019Crores.

11.1.12 BENNIHALLA L.I. SCHEME (5 NOS.) 141 NAME OF THE PROJECT BENNIHALLA L.I. SCHEME (5 NOS.) Location Banahatti,Kurlageri,Surkod,Khanapur,ReddarNaganur YearofInception 2005 OriginalEstimatedcost: Rs.17.33Crores OriginalandLatestestimatedcost Administrativeapproval:WRD/58/MPS/1999(P),B’lore (Rs.inCrores),includingadministrative/ dated:23.08.03 Technicalsanctionapprovalnumber&Date. TechnicalSanction : CEI(N)Reg.No.163forAugust 2005. LengthofCanal a)MainCanal b)BranchCanal Detailedsurveyistakenup. c)Distributories d)F.I.C. Districtsbenefited Gadag NumberofvillagesandTaluksBenefitted Nargund

11.1.13 KOLACHI L.I. SCHEME 142 NameoftheProject KOLACHI L.I. SCHEME Location: Asootivillage YearofInception: 2005 Yearofcompletion(incaseofCompleted Underprogress Projects) OriginalEstimatedcost:Rs.2.25Crores OriginalandLatestestimatedcost Administrativeapproval :WRD.58.MPS.1999(P)(K), (Rs.inCrores),includingadministrative/ Bangaloredated:23.08.03. Technicalsanctionapprovalnumber&Date. TechnicalSanction:CEI(N).Reg.No.162forAugust 2005. LengthofCanal a)MainCanal b)BranchCanal c)Distributories Detailedsurveyistakenup. d)F.I.C. Districtsbenefited Gadag NumberofvillagesandTaluksBenefitted Ron

11.1.14 KONNUR L.I. SCHEME

143 NAMEOFTHEPROJECT: KONNUR L.I. SCHEME Location: Konnurvillage YearofInception: 2005 Yearofcompletion(incaseofCompleted Underprogress. Projects) OriginalEstimatedcost:Rs.6.15Crores OriginalandLatestestimatedcost Administrativeapproval:WRD.58.MPS.1999(P), (Rs.inCrores),includingadministrative/ B’loredated:23.08.03 Technicalsanctionapprovalnumber&Date. TechnicalsanctionNo:CEI(N)Reg.No.161for August2005. LengthofCanal: a)MainCanal b)BranchCanal Detailedsurveyistakenup c)Distributories d)F.I.C. Districtsbenefited Gadag NumberofvillagesandTaluksBenefitted Nargund FOR BENNIHALLA, KONNUR L.I.S & KOLCHI LIS Financial Physical Programmeduring200607 Rs.10.00Crores ProgressachieveduptoEndofMarch2007 Rs.6.389Crores Programmefor200708(Physical&Financial). Rs.10.00Crores CumulativeprogressuptoEndofMarch2007 Rs.6.389Crores 144 11.2. AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, MUNIRABAD 11.2.1 SINGATALUR LIFT IRRIGATION SCHEME (SLIS)

TheprojectcomprisesofconstructionofbarrageacrossRiverTungabhadranearHammigevillage of Mundargi taluk in Gadag District to provide irrigation facility to an extent of 1,20,236Acres (1,40,677Acresofcroppedarea),withanirrigationintensityof117%using12.03TMCofwater.

StageIcomprisesofutilising7.64TMCtoirrigate76181acresandstageIIofutilising4.39TMCto irrigate 44055acres. Government has accorded administrative approval to implement this scheme withtheutilizationof12.03TMCofwatervideG.O.No.WRD115WBP2003Dt.2962006.

♦BARRAGE: .Outof26blocksconcretinginalltheblockshasreacheduptocrestlevelexceptin blockno.6and7.Fabricationof26nosofgatesiscompleted.Erectionworkaretobetakenup. TheBarrageandalliedworksareunderprogress.Outof25Nosofpiers14Nosofpiershavebeen concreteduptothebearinglevelofSpillwayBridge.CastingofRCCprecastbeamsandpiersare underprogress.

♦CANALWORKSONLEFTSIDE: • Intakecanal:Earthworkexcavationofintakecanalfrom0to6.71Kmisunderprogress. • ThetendersareinvitedtotakeuptheworksofMundwada&HammigeLiftandoftheLeftside1 st Lift,onturnkeybasis.ThepreparationofestimatesandDTPareunderprogressforobtaining technicalsanction. • Landacquisitionworksonleftsideareunderprogress.

ThecumulativeexpenditureincurredontheprojectsinceinceptionuptoendofMarch2007isRs. 131.07 Crores. During 200607 an expenditure of Rs. 49.16 crores has been incurred against a BudgetallocationofRs.40.00Crores.

11.2.1 AN OVER VIEW OF THE SINGATALUR LIFT IRRIGATION SCHEME :

145 1 NAME OF PROJECT SINGATALUR LIFT IRRIGATION SCHEME AcrossRiverTungabhadranearHammigevillage MundaragiTaluk,GadagDistrict. 2 Location Longitude:70 0 50’E Lattitude:15 002’N 3 Yearofinception March1998 OriginalestimateRs.595CroresvideG.O.No.ID/90/ Originalandlatestestimatedcostin MTP/98and29122000. CroresIncludingadministrativeapproval 5 TechnicallysanctionedbyChiefEngineerVideCER no.anddate No.28/200102 Latestcost Rs.657.00Crores. Lengthofcanal 6 a)MaincanalLBC 207.34km b)Branchcanal 31.70Km 8 Districtbenefited Bellary,GadagandKoppal 70villagesofMundargiandGadagTq. 9 NumberofvillageandTqbenefited 09villagesofKoppalTaluk. 20villagesofHuvinaHadagaliTaluk 11 Programmeduring200607 Rs.4000Lakhs 12 ProgressachieveduptoMarch2007. Rs.4916.00Lakhs

146 11.3. AN OVERVIEW OF PROJECTS UNDER THE ENGINEER-IN-CHIEF, UPPER TUNGA PROJECT ZONE, SHIMOGA

The following are the projects under the jurisdiction and control of Upper Tunga Project circle,Shimoga.

1) TheUpperTungaProject

2) TheTungaLiftIrrigationScheme

3) BasapurLiftIrrigationScheme

4) ItagiSasalwadLiftIrrigationScheme

5) GuddadaMallapuraLiftIrrigationScheme

6) UpperBhadraProject

7) UbraniAmrutapuraLiftIrrigationScheme

8) SanyasikoppaLiftIrrigationScheme

11.3.1 UPPER TUNGA PROJECT

It is envisaged to create an Irrigationpotentialof80,494hectaresinShimoga,Davanagere andHaveriDistrictsbyutilising12.24TMCofwaterfromRiverTunga.ToservethepurposeaNew Damhasbeenconstructed100mDownstreamofexistingTungaAnicut.

The Government of Karnataka has accorded administrative approval for this project vide No.ID:25:MMM:91:Bangaloredated:3101991forRs.271.41CroresandvideNo.WRD:38:WBP: 2005(P):Bangaloredated:21.11.2006forRs.1,052.33CroresandtheRevisedCostoftheprojectis Rs.1,644.11Crores.

TheUpperTungaProjectcomesunderthecontrolofKarnatakaNeeravariNigamaLtd.,with effectfrom1461999,VideG.O.No.ID/90/SPG/99dated:29.5.1999.

ThisprojectconsistsofconstructionofMainCanalforlengthof329.50Kmincluding5.50Km lengthofTunnelwithconstructionofDistributaryNetworkforwaterdistributionsystem.

DAM AND ALLIED WORKS: -TheGovernmentinitsG.O.No.ID:55:MMM:97:Bangaloredated: 27299hasaccordedadministrativeapprovalofRs.92.00CrorestowardsconstructionofNewDam, whichwasentrustedtoM/sMysoreConstructionCompany,Bangaloreon131099andtheworkis nowcompleted.TheErectionofcrestgateswasentrustedtoM/sKeralaElectricalsLtd.,ontender basison26122002andErectionworkinnowcompleted.

CANAL AND DISTRIBUTARY NETWORK: -UpperTungaProjectincludesconstructionof329.50 KmlengthsofMainCanalincludingCDworks,liningandDistributaryNetwork.AtpresentMainCanal alignmentisapprovedupto244Km.Canalworkfromkm192includingTunnelworkfromkm165.50 to 174.00is under different stages of progress. Estimates of Km 192 to Km 244 are under preparation. Works of Distributary 1 and 2 of UTP Main Canals (including its minors) are under differentstagesofprogress. 147 Duringtheyear200607thegrantallotedisRs.144.00Croresandtheexpenditureincurredis Rs. 129.29 Crores. Since inception of project, cumulative expenditure to the tune of Rs. 728.39 Croreshasbeenincurred.FortakingupFICworkduringthecurrentyearanallocationofRs.3.00 Croresisbeingmadeseparately.Theexpenditureincurredisnil,sinceestimatesforFICworksare underpreparation.

11.3.2 TUNGA LIFT IRRIGATION SCHEME

This project envisages lifting of water from the backwater of UTP Reservoir to feed the sufferingatchkatof5162AcresofAihole,BarehallaandGowdanakereTanksofShimogaTaluk.Itis proposed to utilise 1.428 TMC of water from Tunga Reservoir. For this project Government has accordedadministrationapprovalvideNo.ID68:MMM:95:Bangaloredated27299forRs.24.12 CroresandTechnicalsanctionwasaccordedforthesameamounton30399.

The Main Canal of the project runs in Sakrebylu wild life forest. Necessary proposal for DiversionofforestLandhasbeenmadewithforestauthoritiesandthisprojectwillbeimplemented soonafterobtainingnecessaryclearancefromtheGovernment.

Duringtheyear200607thegrantallotedisRs.50.00Lakhs.Theprojectnotyetstarted.To avoidacquisitionofforestland,surveyofsuitablelandisundertaken.

11.3.3 BASAPURA LIFT IRRIGATION SCHEME

ThisprojectenvisagesliftingofwaterfromRiverVaradanearBasapuravillagein2stagesto irrigate5600AcresofLand,pertainingto13villagesofHangalTaluk,HaveriDistrict.Anallocationof 0.60 TMC of water for utilisation in provided for this project by the Krishna Water Tribunal. AdministrativeapprovalhasbeenaccordedforthisprojectvidesG.O.No.ID20/MMM/9697dated.9 496forRs.936.00Lakhs.CE,UTPZone,ShimogahasaccordedtechnicalsanctionforRs.936.00 Lakhson3161996.

The project is transferred to KNNL during August03. Presently, Stage I work of Electro Mechanical Components & otherheadworkshavebeenentrustedonturnkeybasisandareunder differentstagesofprogress.MainCanalworkofStageI,inthereachKm0.00to0.198&Aqueduct in Ch.0.56 to 1.87 Km is completed. Balance canal works are under different stages of progress. Distributaryworksarealsoentrustedontenderbasis,whichareunderdifferentstagesofprogress. The estimates of Stage II are prepared and Tenders are being invited to take up the work on Turnkeybasis.

Duringtheyear200607thegrantallotedisRs.1247.00Lakhsandtheexpenditureincurredis Rs. 180.40 Lakhs. Since inception upto end of March 2007, cumulative expenditure ofRs.658.96 Lakhshasbeenincurredontheproject.

SeperateallocationofRs.200.00Lakhshasbeenmadeduring200607totakeupFICworks. Sincesurveyworksareunderprogress,theexpenditureincurredisnil.

148 11.3.4 ITAGI-SASALWAD LIS

This project envisage lifting of water from River Tungabhadra near Itagi village, Shirahatti Taluk,GadagDistrist,inonestagetocatertheirrigationrequirementsofKhariff&semidrycropsto an extent of 490 Acres belonging to Shirahatti, Mundargi and Haveri Taluk. The Government accorded Administration approval for Rs. 427.00 Lakhs on 21091992 and subsequently Revised administrative approval was accorded for Rs. 800 lakhs on 24496. Chief Engineer, UTP Zone, ShimogaaccordedtechnicalsanctionforRs.800LakhstotheProject,on5696.Anallocationof 0.55TMCofwaterforutilizationisprovidedforthisprojectbytheKrishnawaterTribunal.

TheprojectwastransferredtoKNNLduringAugust2003.PresentlytheHeadworklikeJack well, Intake arrangements, Raising Main, Pump house, pumping Machineries etc., has been entrusted on Turnkey basis and the works are under progress.TheworksofRightBankCanalto lengthof25.52Km&LeftBankCanaltoalengthof10.90KmanditsdistributaryNetworkhasbeen entrustedtodifferentagenciesandareunderprogress.

Duringtheyear200607thegrantallotedis1032.00LakhandtheexpenditureincurredisRs. 653.10 Lakhs. Since inception of the project an amount of Rs. 1207.62 Lakhs has been spent. SeparategrantofRs.200.00LakhshasbeenallocatedfortakingupFICworksduringthecurrent yearandsurveyworksareunderprogress.

11.3.5 GUDDADA MALLAPURA LIS

This Project envisages creation of Irrigation potential of 5261 Ha of Byadagi Taluk with an ultimateutilizationof1.00TMCofwaterfromRiverVarada.TheEstimatedcostofthisprojectisRs. 60.00Crores.

TechnicalsanctionisaccordedforRs.56.16Croresandworkistakenuponturnkeybasis.The worksareunderdifferentstagesofprogress.

Duringtheyear200607thegrantallotedisRs.1000.00Lakhsandtheexpenditureincurredis Rs.744.72.Sinceinception,cumulativeexpenditureofRs.1687.69Lakhshasbeenincurredforthis project.

11.3.6 UPPER BHADRA PROJECT (STAGE 1 & 2)

This project envisages to create an Irrigation potential of 2,62,325 Ha of Chitradurga, Chikkamagalur and Tumkur districts with a utilization of 42 TMC of water from River Bhadra. Governmenthasaccordedadministrtiveapprovalforstage1foranamountofRs.2813Crores&the projectwasrecentlyhandedovertoKNNLforexecution.

A subcommittee tostudytheEnvironmentaspectsandutilizationofwaterhassubmitteda reporttotheGovernment.Onthebasisofthereport,tenderhasbeencalledandonedivisionoffice atChitradurgaisproposedtoexecutivetheworksofUpperBadraProject.

Duringtheyear200607thegrantallotedisRs.50.00Lakhsandtheexpenditureincurredis Rs.0.20Lakhs. 149 11.3.7 UBRANI-AMRUTHAPURA MULTIPURPOSE LIS

This scheme was a part of Upper Bhadra Project Stage1, which was separated as per Government order. The Main aim of this project is (a) drinking water purpose and (b) Filling of TanksofUbraniandKasabahobliofTarikereTaluk.

Thisprojectconsistsof3stagescostingRs.92.40Crores.StageIistechnicallysanctionedfor Rs. 36.00 Crores and work is taken up on turnkey basis. The work is under different stages of progress.

During the year 200607 the grant alloted is 1500.00 Lakh and the expenditure incurred is Rs.1497.74lakhs.SinceinceptionuptoendofMarch2007,cumulativeexpenditureofRs.1518.37 Lakhshasbeenincurredforthisproject.

Estimates of StageII and III are cleared from TSC and are to be placed before the KNNL Boardforclearance.

11.3.8 SANYASIKOPPA LIS

ThisschemeenvisagescreatingIrrigationpotentialforShikaripuraTaluk,ShimogaDistrictwith construction of dam across the River Kumudvathi. The Government has accorded administrative approval Vide G.O.No.ID/ 161/MMI/2003 dated: 2532006 for Rs.10. 00 Crores for this Project. TechnicalsanctionisaccordedforRs.9.97Crores.

During the year 200607 the grant alloted is Rs. 100 lakh and the expenditure incurred is Rs.0.40Lakhs.

150 11.4. AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, VARAHI PROJECT ZONE, SIDDAPURA. 11.4.1 VARAHI IRRIGATION PROJECT BREIF DESCRIPTION

The Varahi Irrigation Project envisages Construction of Diversion Weir across Varahi River at HorriabbenearSiddapuraVillage,UdupiDistricttocreateirrigationpotentialtoanextentof15,702 Ha.(38,800acres)inKundapuraandUdupitaluksofUdupiDistrict,byutilizingthedailyreleaseof 1100 Cusecs of tail race water from Varahi underground hydro electric project situated in the upstreamoftheriver. TheVarahiIrrigationProjectisadministrativelyapprovedbytheGovernmentofKarnatakavide G.O.No.PWD71GIP76,Bangaloredated2731979forRs.943lakhs.Lateradministrativeapproval wasaccordedtothererevisedestimatecostofRs.569.00crores. Forspeedyimplementation,theProjectwastransferredtoKarnatakaNeeravariNigamLtd.Vide G.O.No.WRD1MMM2003,Bangaloredated6112003. Varahi Diversion weir:

A concrete diversion weir 145 meters long and 17.50 meters high above the deepest foundation level is proposed to be constructed at Horriabbe site near Siddapura Village, Udupi District. Administrative approvalfortheConstructionofDiversionWeirhasbeenaccordedbythe GovernmentofKarnatakavideG.O.No.WRD30MMM2001dated322003forRs.2900.00lakhs andtechnicalsanctionhasbeenaccordedon2722003. DuetoConstructionofDiversionWeir,121.58Ha.oflandwillsubmergeandtwovillageswillbe submergedpartially.

Canals:

VarahiRightBankCanaltakesofffromtheDamandrunsforalengthof42.8Km.Abranchcanal takesofffromRightBankCanalatKm19 andcrossestheRiverVarahithroughanaqueduct.TheLeft BankCanaltakesofffromthisaqueductandrunsforalengthof44.35Km.TheLiftCanaltakesoff fromtheLeftBankCanalatKm7andrunsforalengthof33Km. TheproposedatchkattobecoveredinUdupiDistrictisasdetailedbelow:

MAIN FEATURES OF THE PROJECT IS AS FOLLOWS : Irrigable Sl.No Canal details Length, Km area, Ha 1 VarahiRightBankCanal 42.80 1992 Varahileftbankcanal 2. 44.350 10987 (Fromofftakeat20 th KmofRightBankCanal) 3 Liftcanal(Fromofftakeat7 th KmofLeftBankCanal) 33.00 2723 Total 15702 Villages benefited: 1 KundapuraTaluk 33villages 8324 2 UdupiTaluk 35villages 7378 Total 68 villages 15702

FortheLiftIrrigationSchemeadministrativeapprovalisaccordedforRs.14.55Croresvide G.O.No.ID102NHPDated22101992whichprovidesirrigationfacilitiestoanextentof2723Haof Land.Theworkisunderprogress. 151

PROGRESS DURING 2006-07

ThetotalestimatedcostoftheprojectisRs.569.53Crores.Cumulativeexpenditureincurredon theprojectisRs.82.73Crores.

During200607,againsttheprogrammeofRs.7500.00lakhs,expenditureofRs.3358.76lakhs hasbeenincurred.

TheworkofVarahiLeftBankCanalfromKm.0to21andHeadworksofLiftIrrigationareunder progress.

SurveyworksofVarahiRightBankCanalandVarahiLeftBankCanalfromKm.21totailendis completed.WorksofRightBankCanalfromKm.0to19aretobetakenup.SurveyworkofLiftCanal from Km. 0 to 33 is under progress. Construction of Aqueducts in Varahi Left BankCanal,Varahi AqueductandworksofDiversionWeirareunderprogress.

TheProjectisproposedtobecompletedbytheendof2009.

152 11.5. AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION PROJECTS ZONE, GULBARGA 11.5.1 BENNITHORA PROJECT Bennithoraprojectisamajorirrigationproject,whichcomprisesofconstructionofdamacross RiverBennithoranearHeroorvillage,ChittapurTq.,GulbargaDistrict.Therearetwocanalscovering anIrrigableareaof20,234HainGulbargaDistrict.Theutilisationfortheprojectis5.75TMC. TheworksofdamembankmentandspillwayarecompletedandthebalanceworksofCanal arenearingcompletion.Theprojectwasinauguratedon17.6.2007. Therevisedestimatecostofthisprojectis346.93Crores.Cumulativeexpenditureuptoendof March2007isRs.296.40Crores.Adrypotentialof18807Hahasbeencreatedand15537hectares achakatisprovidedwithFICtoendof3/2007. Thedetailsoftargetandachievementoftheprojectfor200506and200607areasfollows: Sl. Financial (Rs. in Crores) Physical (In hectares) Year No. Target Achievement Target Achievement 18,234 1 200506 27.50 22.63 10,000 9,863(FICprovided) 573 2 200607 48.29 23.06 2,000 5,158(FICprovided)

11.5.2 BHIMA LIFT IRRIGATION SCHEME BhimaLiftIrrigationSchemeenvisagesconstructionofabarragenearSonnavillage,Afzalpur taluk of Gulbarga district to provide irrigation to an area of 24,292 Ha. The utilisation under this projectis6TMC. Preliminaryworksoftheprojectiscompleted.TheearthenembankmentonL/SandR/Sare completed. Central spillway, lift point works are under progress. The canal work is started and FRL/MWLsurveyworksiscompleted.Allbalanceworksareprogrammedtobecomletedduring2008 09. The revised estimate cost of project is Rs. 275.53 Crores and expenditure upto the end of 3/2007isRs.65.80Crores. Thebudgetallocationfor200607isRs.50.00Crores,outofwhichanexpenditureofRs.36.63 CroreshasbeenincurreduptoendofMarch2007. Thedetailsoftargetandachievementoftheprojectfor200506and200607areasfollows: Sl. Financial (Rs. in Crores) Physical (In hectares) Year No. Target Achievement Target Achievement 1. 200506 34.00 37.50 2. 200607 50.00 36.63

11.5.3. GANDORINALA PROJECT. 153 GandorinalaprojectismediumirrigationprojectinGulbargaDistrict.Thisprojectisconstructed acrossRiverGandorinala,atributarytoRiverBennithora,whichinturnjoinsRiverBhimaofKrishna Basin.Theutilisationunderthisprojectis1.97TMC.Theareacoveredforirrigationunderthisproject is8094Ha. DAM: Earthen dam, embankment and spillway works are completed, and water is stored in the Reservoir. CANAL: Main Canal RBCTotallengthofCanalis7km.,whichiscompleted. LBC Total length of canal is 90 km. out of which works in km.0.00 to 24.00 are completed, in Km.24.00to60.00areundercompletionstageandinKm.60.00to90.00worksareunderprogress. Distributary RBC–Worksofall3Distributaryarecompleted. LBCOfthe40Distributaries,worksof18arecompleted,15areunderprogressand7areunder startingstage. FIC: RBC:WorksinKm.0.00to7.00arecompleted. LBC:WorksinKm.0.00to20.00areunderprogressandnearingcompletion. Km.20.00to60.00tendercalled. Km.60.00to90.00Surveyworksunderprocess. TherevisedestimateoftheprojectamountstoRs.212.33CroresandexpenditureuptoMarch 2006isRs.142.10Crores.Thedryirrigationpotentialof4676Haandwetirrigationpotential977Ha hasbeencreateduptoMarch2007. Drypotentialcreatedduring200607toendofMarch2007is1587Ha CumulativeDrypotentialcreatedtoendofMarch2007is6263Ha Thedetailsoftargetandachievementoftheprojectfor200506and200607areasfollows Sl. Financial ((Rs.in Crores) Physical (in hectares) Year No. Target Achievement Target Achievement

2312(Dry) 1) 200506 30.00 28.81 3000 977(wet)

2000(dry) 1587(Dry) 2) 200607 52.00 35.04 2233(wet)(FIC 2000(wet) provided)

11.5.4. LOWER MULLAMARI PROJECT.

LowerMullamariProjectisamediumIrrigationprojectacrossRiverMullamariatributaryto River Kagina in Krishna basin. The project is located near Nagaral village in Chincholi Taluk of 154 GulbargaDistrict.Theutilisationunderthisprojectis1.741TMCandtheareacoveredforirrigationis 8100Ha.

DAM: EarthendamincludingspillwayiscompletedandwaterisbeingstoredsinceAugust2001.

CANAL:

RBC:TotallengthofCanalis80mtrs,andiscompleted.

The latest estimated cost of theprojectisRs.178.52CroresandexpendituretoendofMarch 2007 is Rs.159.55 Crores. The irrigation potential of 7666 Ha has been created upto 3/07 and potentialcreatedduring200607toendofMarch2007is170Ha,totallingto7836Ha.

Thedetailsoftargetandachievementduring200506andtargetduring200607isasunder: Sl. Financial (Rs.in Crores) Physical (in hectares) Year No. Target Achievement Target Achievement 1) 200506 7.00 8.48 434 Nil 170 2) 200607 16.00 7.96 434 1420(FIC)

11.5.5. AMARJA PROJECT.

Amarja,amediumirrigationprojectacrossRiverAmarja,atributarytoRiverBhimainKrishna Basin, is being constructed near Sangolgi village in Aland Taluk of Gulbarga District in Karnataka State.Theutilisationunderthisprojectis1046TMC.

DAM: Dam,embankmentandspillwayworksarecompletedinallrespects.

CANALS:

Maincanal:ThetotallengthofRBCis45KmandthatofLBCis55Km.

Distributary:RBC4248km

LBC55Km

Due to variation in the CBL of the canal, the rectification of the existing canals and the Distributarysystemwasproposed.Thesurveyworkforboththecanalsystemincludingdistributaries andFIC(includingstructures)isnearingcompletionandthetenderfortheworkofrectificationof existingcanalsystem,DistributarysystemincludingFICandstructuresforRBCfromKm.0to20is allottedtoKLACandtheworkisunderprogressandinthereachofRBCfromkm.21to42.48andof LBCfromkm.0to30.00,thetenderprocessisunderprogress.

ThepresentcostoftheprojectisRs.213.66CroresandtheexpenditureincurreduptoMarch 2007isRs.128.81Crores.

Duetorectificationofcanalsystemsthepotentialisyettobecreated.

Thedetailsofthetargetandachievementoftheprojectfor200506and200607isasfollows:

155 Sl. Financial (Rs.in Crores) Year No. Target Achievement

Rs.1.31Crores(KNNL) 1) 200506 Rs.11.57Crores Rs.6.98Crores(KNNL)

Rs.25.00Crores(KNNL) Rs.15.69Crores(KNNL) 2) 200607 Rs.0.93Crores(State) Rs.0.90Crores(KNNL)

PROJECTS UNDER

CAUVERY NEERAVARI NIGAM LIMITED

156

12. CAUVERY NEERAVARI NIGAMA LIMITED There are 14 major ongoing projects under CNNL. Which includes 19 sub projects in different stages. Out of which 11projectsareproposedforcompletionduring200607forwhich grantofRs.168.00Croresisallocated.Totallyalltheprojectsareprogrammedtocompletebefore 2011.Zonewisedetailsareasfollows. Sl.No. Zone / Name of the Project

(I) Irrigation(S)Zone,Mysore.

1 D.D.UrsCanal

2 KabiniProject

3 HarangiProject

4 TarakaProject

5 Arkavathy

6 ChikliholeProject

7 UduthorehallaProject

8 IggalurProject

9 ManchanabeleProject

10 K.R.S.Modernisation

11 NanjapuraLIS

12 BannahallyhundiLIS

(II) HemvathyCanalZone,Tumkur.

13 HemavathyCanalProject 157

(III) HemavathyProjectZone,Gorur

14 HemavathyProject

15 YagachiProject

16 HuchanakoppaluLIS 17 KamasamudraLIS 18 KachenahallyLIS

19 VoteholeProject 12.1. AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION (S) ZONE, MYSORE 12.1.1. D. DEVARAJA URS CANAL

D. Devaraja Urs Canal project envisages constructionof126kmlongrightbankcanalfrom Krishnarajasagarreservoir.10.5TMCofwaterisutilisedtoirrigate32,375haoflandinNanjangud, T.Narasipur&H.D.KotetaluksofMysoredistrictandSrirangapatnatalukofMandyadistrict. This project was started in the year 1979 at an estimated cost of Rs. 18.50 Crores. AdministrativeapprovalwasaccordedtotherevisedestimatecostofRs.51.80Croresduring1988. ThelatestestimatedcostisRs.410.00Crores. The main canal work has been completed upto 126 km and the work ofduistributoriesare nearing completion. Lining of Canlas in distributories are under progress. The water has been alloweduptotailendontrialbasis. During200607,potentialof869Hahasbeencreatedagainsttargetedpotentialof1599Ha. ThecumulativepotentialcreateduptoendofMarch2007is31645Ha. During 200607, a grant of Rs. 20.00 Crores has been allocated. Upto end of 3/2007, an expenditureofRs.45.18Croresisincurred.Thecumulativeexpenditureincurredsinceinceptionupto endof3/2007isRs.406.03Crores. It was programmed to complete the project during 200607 and a balance work to create potential of 90 ha is to be taken up (Aqueduct) it is programmed to be complete the back log potentialbySeptember2007withthistheprojectisgoingtobecompletedinallrespects. 12.1.2. KABINI RESERVOIR PROJECT

TheKabinireservoirisconstructedacrossRiverKabininearBeechanahallyvillageinH.D.Kote taluk, Mysore district. This project was started in the year 1959 at an estimated costofRs.3.20 Crores. The Government has given approval for the Revised estimate amounting to Rs. 390.00 Crores during 198586. The rerevised estimate cost is Rs.1233.00Crores. DamandalliedWorksofthe26kmlongleftbankcanaliscompleted.Worksof202kmlong RightBankCanal(excludinglining&TellanurBranchCanal)isalsocompleted.TellanurBranchCanal workisunderprogress.SurveyworksofKabiniliftirrigationschemehasbeencompleted. 158 Thisprojectincludesbothflowandliftirrigationschemes.Underflowirrigationitisproposed tocreateatchkatof44516ha. During200607,potentialof1414Hahasbeencreatedagainstatargetedpotentialof3292 Ha.ThecumulativepotentialcreateduptoendofMarch2007is42638Ha. During 200607, a grant of Rs. 75.00 Crores has been allocated. Upto end of 3/2007, an expenditureofRs.48.56Croresisincurred.Thecumulativeexpenditureincurredsinceinceptionupto endof3/2007isRs.518.89Crores. The flow scheme was programmed to be completed during 200607. The balance works of Tallanur Branch Canal which are bottle necks for creation potentialwillbecompletedduringJune 2007. The survey and investigation works of LIS are completed, Design and estimates are under preparation. 12.1.3. HARANGI PROJECT

HarangiReservoirisconstructedacrossRiverHarangi,atributaryofCauvery,atHulugunda village,Somwarpettaluk,Kodagudistrict.Underthisproject,worksof153kmlongleftbankcanal, 138longRightBankCanaland87kmlongdistributoriesarecompleted. The Project was started during the year 1964 at an estimated cost of Rs. 11.00 Crores. Administrative approval was accorded to the revised estimate for Rs. 230.00 Crores. The latest estimatedcostoftheprojectisRs.429.00Crores. Thetotalirrigableareunder2canals(LBC&RBC)is40790Ha. Itisproposedtocreateirrigationpotentialof12141haunderPeriyapatnaLIS,607haunder Somwarpet lift irrigation scheme and 1,053 ha under Minor Irrigation. After completion of these schemes,atotalof54,591haofAgriculturallandwillbeirrigated. Thedam&alliedworkshavebeencompleted.Worksof153kmlongLBCand.Of138km longRBC,havebeencompleted. SomwarpetLIS:Theheadworkincluding10kmlongcanalworkhavebeencompleted. Periyapatna LIS: The intake canal, pump house, sumpwell, raising main works been completed. Out of 50 th Km long total length of canal 24 km including distributaries works have completed. During200607,potentialof3926Hahasbeencreatedagainstatargetedpotentialof4000 Ha.ThecumulativepotentialcreateduptoendofMarch2007is48165Ha. During 200607, a grant of Rs. 20.00 Crores has been allocated. Upto end of 3/2007, an expenditure of Rs. 44.75 Crores is incurred. The cumulative expenditure incurred since inception uptoendof3/2007isRs.443.72Crores. ThebalancepotentialtobecreatedisunderPLI5846ha.Itisprogrammetocompletethis projectduring200708asexpected. 159 12.1.4. TARAKA PROJECT

Taraka project is built across River Taraka, a tributary of River Kabini, near Penjahally, Heggadadevanakotetaluk,Mysoredistrict.Ultimateirrigationpotentialunderthisprojectis7040ha. The Project was started during the year 1970 at an estimated cost of Rs. 1.70 Crores. Administrative approval was accorded to the revised estimate for Rs. 51.00 Crores. The latest estimatedcostoftheprojectisRs.55.00Crores. It is proposed to provide irrigation to 3610Ha of suffering atchkat under Taraka Project by lifting230cusecsofwaterfromKabinireservoirandincreasingthestorageofTarakareservoir. Damandalliedworksarecompletedflowcanalworksofthe50kmlongleftbankcanaland 38.50kmlongRightBankCanalarecompleted Underliftirrigationscheme,approachcanal,RoadBridge,deliverychamberandsumpwellcum pumphouse work have been completed. Raising main work is nearing completion. Pumping machineryandelectricsubcenterworkisalsonearingcompletion. CumulativepotentialcreateduptoendofMarch2007is7040Ha.Fullycreatedasperultimate potentialcontemplatedundertheproject. During 200607, a grant of Rs. 8.00 Crores has been allocated. Upto end of 3/2007, an expenditureofRs.7.87Croresisincurred.Thecumulativeexpenditureincurredsinceinceptionupto endof3/2007isRs.52.25Crores. ItisprogrammedtocompletetheTarakaLISprojectduring200708. 12.1.5. ARKAVATHY PROJECT

BRIEF DESCRIPTION TheArkavathyreservoirisconstructedacrosstheRiverArkavathy,atributarytoRiver Cauvery.ThedamislocatednearArobelevillageinKanakapuratalukofBangaloreDistrict. Itisproposedtoprovideirrigationthroughleftbankcanal,rightbankcanalandtwoLift Schemesontheforeshorecovering6232Hectaresin Kanakapura Taluk. The utilisation proposedis88.83M.Cum(3.14TMC). ESTIMATED COST AdministrativeApprovalhasbeenaccordedtotheProjectEstimateforRs.22.25Crores videGovernmentOrderNo.PWD/126/MMK/83,Dated:27061984.Thepresentcostof theProjectisRs.110Crores,whichisalreadyclearedbyTechnicalAdvisoryCommitteeand M.I.P.C.BoardandAdministrativeapprovalisawaitedfromtheGovernment. DAM & CANAL DAM: Thelengthofthecompositedamis716.28Mtr.andheightis26.68Mtr.Thestorage capacityofthedamis44.90M.Cum.(1.587TMC).TheDamsubmergesanextentof665 Hectaresaffecting950personsof4villages. CANALS: LBCrunstoalengthof23.00kmandRBCrunstoalengthof22.00km.and providesirrigationto1821Haand1214Ha,respectively.Inadditiontwoliftschemeswitha canallengthof21Kmfromleftbankand34KmfromRightBankwillprovidewaterfor Irrigationto1457Haand1740Ha,respectively. 160 STAGE OF WORK The Dam & appurtanant worksunderStage–IofthisProject have been completed. The Stage–IIofthisProject,whichcomprisesSpillway,BridgeovertheSpillwayandEarthen EmbankmentingorgeportionfromCh.470mto670m,arecompleted,exceptfinishing worksofspillwaygates. LeftBankCanalworksiscompletedupto15KmandRightBankCanalworksiscompleted upto15Km.Cplanforboththecanalsisapproved.Canalworksfrom15Kmofbothcanals areunderprogress. Lift Irrigation Scheme: (a) Left Bank Lift Irrigation Scheme :HeadWorks(SumpwellandPumpHouse)are completed.Approachchannelistobestarted.CanalworksinKm1andKm3to17 areunderprogress. (b) Right Bank Lift Irrigation Scheme :Headworks(SumpwellandPumpHouse)are completed.CanalworksinKm1andKm2arecompleted.C.Dworksareunder progress. Estimate for supply, erection and commisioning of deepwell, vertical turbine,pumpsetswithalliedmechanicalworks,electricalaccessoriesetc,including raisingmainisapprovedforRs.312lakhsandtendersaretobeinvited. During200607,potentialof2302Hahasbeencreatedagainstatargetedpotentialof2306 Ha.ThecumulativepotentialcreateduptoendofMarch2007is3035Ha. During 200607, a grant of Rs. 28.00 Crores has been allocated. Upto end of 3/2007, an expenditure of Rs. 18.80 Crores is incurred. The cumulative expenditure incurred since inception uptoendof3/2007isRs.116.21Crores. PROGRAMME FOR COMPLETION The Arkavathy Flow Irrigation was programmed to be completed during 200607 and accordinglytheprojectiscompleted.TheliftIrrigationSchemeisprogrammedtocompleteduring 200708. 12.1.6. CHIKLIHOLE PROJECT

ChikliholeReservoirisconstructedacrossRiverChiklihole,atributaryofRiverCauvery,near RangasamudravillageofSomawarpettaluk.Thisprojectwasstartedduring1978withaninitialcost of Rs.3.40 Crores. The Government accorded approval to the G.O. No. ¸ÀPÁðj DzÉñÀ ¸ÀASÉå. ¦.qÀ§Æèöå.r./25/fL¦/71,¢:26877. Dam&alliedworkiscompleted.Worksof29.00kmlongleftbankcanaliscompleted. ThecumulativepotentialcreateduptoendofMarch2007is865Ha. During 200607, a grant of Rs. 1.00 Crores has been allocated. Upto end of 3/2007, an expenditureofRs.1.00Croresisincurred.Thecumulativeexpenditureincurredsinceinceptionupto endof3/2007isRs.19.20Crores. Theprojectwasprogrammedtocompleteduring200607. 161

12.1.7. UDUTHOREHALLA PROJECT

TheUduthorehallareservoirisconstuructedacrossRiverUduthorehallanearvillage, talukofChamarajanagaradistrict.Itisproposedtocreateanultimateirrigationpotentialof 6602hainKollegaltalukbyutilising1.23TMCwater. The project was originally sanctioned for Rs. 7.55 Crores as per 1978 SR. Government accordedadministrationapprovedvideG.O.No.PWD/60/GIP/71,Dtd:30.11.1978.During1989,the Government has accordedadministrativeapprovaltotherevisedestimateamountingtoRs.32.30 Crores.ThelatestestimatedcostisRs.235.00Croresat200607rates. Thedamworksarecompleted.Thespillwaygatearebeenfixed. Ofthe10.2kmlongleftbankcanal,workupto6kmhasbeencompleted. Ofthe30.30kmlongRightBankCanal,workupto9.10kmiscompleted.Aqueductworksat km8&9areunderprogress.Atch.Km.9.10of Right Bank Canal,itsbranchesinto2canals namely left bank canal 11.20 and right bank canal 10.00 km. works are completed. Right branch canalworksaretobeunderprogress. During200607,potentialof3091Hahasbeencreatedagainstatargetedpotentialof3852 Ha.ThecumulativepotentialcreateduptoendofMarch2007is5841Ha. During 200607, a grant of Rs. 30.00 Crores has been allocated. Upto end of 3/2007, an expenditureofRs.19.65Croresisincurred.Thecumulativeexpenditureincurredsinceinceptionupto endof3/2007isRs.191.77Crores. Itwasprogrammedtocompletetheprojectduring200607.Thebalanceworktocompleted bytheendofJuly2007. 12.1.8. IGGALUR BARRAGE PROJECT BRIEF DESCRIPTION The Iggalur Barrage is constructed across the River Shimsha, a tributary to River Cauvery.TheBarrageislocatednearIggalurvillageinChannapattanaTalukofBangalore Rural District. Four Lift Irrigation Schemes and flow canal under the project provides irrigationtoanextentof4047HectaresinChannapattana,MaddurandMalavallyTaluks.The utilisation proposed is 5.10 M.Cum. The original cost of the project is Rs. 3.42Crores. AdministrativelyapprovedvideGo.No.PWD/GIP/71/Dtd:06.12.77andtherevisedcost oftheprojectisRs.10.75Crores&AdministrativeApprovalhasbeenaccordedduring1986 vide Government order No. PWD/33/MMH/86, Dated: 23rd December 1986. The Project costingisRs.69.65Croresat9697rateincludesadditionaltwoLiftIrrigationSchemesapart from“B”liftpointviz.,LiftIrrigationSchemetofeedNitturTankandGarkhallyLiftIrrigation Scheme. TAC and MIPC Board have cleared the proposal and approval to the revised estimateisawaitedfromtheGovernment. 162 DAM & CANAL

DAM: The1234Mtr.longand11.27Mtr.highBarragehassubmergedanextentof171 Hectares. CANALS: The35.00K.M.longLeftBankCanalwillprovideirrigationtoanextentof2242 Hectaresinclusiveof765Hectaresunder“D”LiftpointtakingofffromCanal.Inaddition, thereare3liftpointsontheforeshoreoftheLeftBank(“A”,“C”and“CII”)toprovidean irrigationpotentialof346Hectares,508Hectaresand405Hectares,respectively.Further,in therevisedestimatethreeadditionalLiftIrrigationSchemessuchasBpointwithanatchkat of546Ha,NitturLISwithanatchkatof81Ha,andGarkallyL.I.Swithanatchkatof753Ha areproposed. STAGE OF WORK The work of the Barrage is completed. The Lift Irrigation Scheme at “A” point, “C1”and“C2”arecompleted.LiftIrrigationSchemeat“D”pointiscommissionedandison trial run. The work of Nittur, Garkhally and Hulikere Lift Irrigation Schemes are under progress. During200607,nopotentialhasbeencreatedagainstatargetedpotentialof1029Ha.The cumulativepotentialcreateduptoendofMarch2007is3018Ha. During 200607, a grant of Rs.12.00. Crores hasbeenallocated.Uptoendof3/2007,an expenditure of Rs. 11.01 Crores is incurred. The cumulative expenditure incurred since inception uptoendof3/2007isRs.68.91Crores. It was programmed tocompletetheprojectduring200607.Thebalanceworksto createpotentialof1029hasbeencompletedbyMay2007whichcompletstheproject.

12.1.9. MANCHANABELE PROJECT

BRIEF DESCRIPTION TheManchanabeleReservoirisconstructedacrosstheRiverArkavathy,atributaryto RiverCauverynearManchanabelevillageinMagadiTalukofBangaloreRuralDistrict.The Right and Left bank canals irrigates land in Magadi and Ramanagara Taluks. The Administrative Approval was accorded to the ProjectvideG.O.No.PWD/14/MMG/76, dated:11111977.ThecostoftheProjectat198687rateswasRs.18.50Crores.The revisedestimateispreparedforRs.80.00Crores.

DAM & CANALS

DAM : The length ofcompositeDamis362.20mandheightis28.74mwithastorage capacityof34.58M.Cum.,involvingsubmersiontoanextentof365Hectaresof4villages andaffecting1350persons. CANALS: Asperapprovedprojectestimate,thecanallengthofLeftandRightbankswere 52Kmand63Kmtoirrigate1767and2078Hectares,respectively.Sincetheinflowtothe reservoirduringtheperiodofsixyearsbetween1991to1996wasnotencouraging,ithas beenproposedtoreducethelengthsofRightBankCanalto36Km.andLeftBankCanalto 163 35Km.Duetoreductioninlengths,thecontemplatedatchkathasbeenreducedto2433 Hectares. STAGE OF WORK TheDamandAppurtenantworksarecompleted.ThecanalworksofLeftBankCanalis completeduptoKm35.DistributaryworksfromKm1toKm20arecompleted.TheCanal worksonRightBankCanalisalsocompleteduptoKm34andworksofitsDistributariesare underprogress. During200607,potentialof188Hahasbeencreatedagainstatargetedpotentialof189Ha. ThecumulativepotentialcreateduptoendofMarch2007is2432Ha. During 200607, a grant of Rs. 5.00 Crores has been allocated. Upto end of 3/2007, an expenditureofRs.3.22Croresisincurred.Thecumulativeexpenditureincurredsinceinceptionupto endof3/2007isRs.78.19Crores. Itwasprogrammedtocompletetheprojectduring200607andaccordingtheproject iscompleted. 12.1.10. MODERNISATION OF KRISHNARAJA SAGAR

BRIEF DESCRIPTION

The Krishnarajasagar Reservoir is constructed across the River Cauvery near KannambaadivillageinSrirangapattanaTalukofMandyaDistrict,withCanalsonboththe flanksforprovidingirrigationtoanextentof79312HectaresinMandyaandMysoreDistrict. TheLeftBankHighLevelCanal,whichisnamedasVishweshvarayaCanalwasoriginally proposedforprovidingIrrigationtoanextentof48,564Hectares(120000Acres).However, duetovariousfactorslikeconstructionofpickupchannels,loweringoflocalmoundsinthe command area, subsequent extension of certain branch canals etc., there has been considerableincreaseinthecommandareaofVishweshvarayaCanal,whichhastoprovide irrigationtoanextentof77220Hectares(190769Acres).Thishasresultedinincreased withdrawalinvariousbranches,causingastrainonthecanalsystem.Duetothisthesupply ofwatertotheatchkatinthetailendreacheswasinadequate.Theconditionoftheexisting canaldoesnotlenditselftohigherdischargesbeingdrawn.AlsotwomajorAqueductsalong thecanalwerenotabletocarrydischargesbeyond67Cumecs(2366Cusecs).Inorderto limittheexcessutilisationofwaterintheatchkat it wasprogrammedtomodernisethe VishweshvarayaCanalandalsotocreatefreshatchkatof2125Hectares(5250Acres).The original estimate costofthemodernisationworksis Rs.55.00 Crores and the same was administratively approved by the government vide G.O No.: PWD/ 13/ MMG/ 86 Dated 6/3/87.TherevisedestimateoftheprojectispreparedforRs.350Croresanditisunder finalisation.

DAM & CANALS TheKrishnarajasagarDamanditsCanalsystemwerecompletedintheyear1931and thefullpotentialwascreatedby1940.

STAGE OF WORK: MostoftheModernisationworksincludingLinkCanalandTunnelworksarecompleted. TheLiftIrrigationSchemeworksundermodernisationareunderprogress. 164 Cumulativepotentialof2125HectareshasbeencreateduptoendofMarch2007 During 200607, a grant of Rs. 20.00 Crores has been allocated. Upto end of 3/2007, an expenditure of Rs. 34.12 Crores is incurred. The cumulative expenditure incurred since inception uptoendof3/2007isRs.387.46Crores.

12.1.11. NANJAPURA LIFT IRRIGATION SCHEME

BRIEF DESCRIPTION: NanjapuraLiftIrrigationSchemeistakenupforlifting119CusecsofwaterfromRiver CauverynearBannurTowninT.NarasipurTalukofMysoreDistrictandforfeedingTuruganur BranchCanalnearNanjapuraVillageinordertoaugmentsuppliesto10000Acresofatchkat undertailenddistributoryofTuruganurBranchExtensionCanal,HalwaraBranch,Ukkalagere BranchandB.G.PuraChannel(sufferingatchkat2000Acres+Freshatchkat8000Acres). Administrative Approval hasbeenaccordedforRs.28.00CroresbytheGovernment videGovernmentorderNo.:ID/197/MMK/96Bangalore,dated:27051997andTechnical SanctionhasbeenaccordedforRs.31.60CroresunderCERNo.119/199899. SALIENT FEATURES OF THE PROJECT: Source RiverCauvery Discharge 119Cusecs LengthofRaisingMain 8500Mtr.(tworows) Dia/typeofpipe Tworowsof1500diaPSCPipes MaximumLiftincludinglosses 81Mtrs. No.ofPumps 1300H.P(4+2) TypeofPump Deep well Turbine type with vertical solid shaft squirrelcageinductionMotor Totalcroppedarea 2000+8000=10000Acres(Suffering+Fresh) Cropperiod JunetoNovember Areabenefited MalavallyTaluk4300acre,T.Narasipura Taluk 5700 acres TotalcostoftheProject :Rs.3160Lakhs

STAGE OF WORK

Pump HousecumSump well, Delivery cistern and other components of L.I.S like RegulatorcumRoadBridge,TransitionandImprovementstoTuruganurBranchCanalhave beencompleted.Raisingmainworkisunderprogressand14580marecompletedoutof 15940m.Intakechannel,controlroom,substationworksareunderprogress. During 200607, no potential has been created against a targeted potential of 4049Ha. 165 During 200607, a grant of Rs. 7.00 Crores has been allocated. Upto end of 3/2007, an expenditure of Rs. 11.90 Crores is incurred. The cumulative expenditure incurred since inception uptoendof3/2007isRs.43.55Crores. Itwasprogrammedtocompletetheprojectinallrespectduringtheyear200607.The balanceworksitcreate4049ha.ofirrigationpotential will becompletedbytheendof October2007.

12.1.12. BANNAHALLIHUNDI LIS

BannahallihundiliftirrigationschemeislocatednearBannahallihundi,T. Narasipurataluk,Mysoredistrict.ItisproposedtoliftwaterfromKabinireservoir.Underthisproject, itisproposedtocreate1773ha(4830acres)ofirrigationpotentialfor6villagestoraisesemidry crops.Forthis,itisproposedtolift48cusecsofwater. The administrative approval to the project has been accorded from Government vide No. ID/272/MMK/97/Bangaloredated:02022001forRs.1625.00lakhs.Underthisproject,ridgecistern and secondary cistern is completed. The feeder canal excavation work from ridge cistern to secondary cistern is completed. Lining work is under progress. Land acquition process is under progress. ThecumulativepotentialcreateduptoendofMarch2007isnil During 200607, a grant of Rs. 10.00 Crores has been allocated. Upto end of 3/2007, an expenditureofRs.4.45Croresisincurred.Thecumulativeexpenditureincurredsinceinceptionupto endof3/2007isRs.4.45Crores. The project is programmed to be completed during 200708 by existing an outlet potential 1774ha(ultimate).

12.2. AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, HEMAVATHY CANAL ZONE, TUMKUR

HemavathyCanalZone,Tumkur,wasformedasperGovernmentorderNo.PWD11PCO87 Bangalore, dated 1411987, for execution of canal works in Tumkur and Mandya Districts and is functioning since 23041987.This is a part of Hemavathy project for the execution of works of Tumkur Branch canal and Nagamangala Branch Canal under Hemavathy left Bank Canal. As per GovernmentorderNo.WRD32KBN2003(P),Bangalore,dated08082003thiszoneisfunctioning underCauveryNeeravariNigamaNiyamita. Thiszonehasajurisdictionwithanareaproposedforirrigationasunder. Sl.No. Total length in Km. Atchkat in Ha a) ‘Y’Alignment. 5.50Km b) TumkurBranchCanal. 240.00Km 95,909 c) NagamangalaBranchCanal. 78.325Km 59,488 166 d) LiftIrrigationSchemeattheexitof 2,358 Bagur–NavileTunnel Total 1,57,755 Districtwiseandtalukwiseatchkatdetailsisasfollows. Lift Name of District and Tumkur Nagamangala Total atchkat Irrigation taluk Branch Canal Branch Canal in Ha Scheme Hassan District ChannarayanapatnaTaluk 47 2,265 2,312 Tumkur District TuruvekereTaluk 20,234 27,302 47,536 TipturTaluk 5,665 4,095 93 9,853 GubbiTaluk 40,064 914 40,978 TumkurTaluk 6,879 6,879 KunigalTaluk 23,067 1,659 24,726 Mandya District NagamangalaTaluk 25,471 25,471 Total in Ha 95,909 59,488 2,358 157,755 Thetotalatchkatthatwillbeirrigatedaftercompletionoftheproject,underHemavathyCanal ZoneTumkur,is1,57,755Ha(3,89,826Acres). ‘ Y ’ Alignment Totallengthof‘Y’alignmentis5.50Km.EarthworkandC.D.workscompleted.Liningworks isunderprogress.

TUMKUR BRANCH CANAL (0-240 Km)

TotallengthofTumkurbranchcanalis240Km,havinganatchkatof95,909Ha.Earthwork upto187Kmisalmostcompleted.SurveyworkfromKM188to194isunderprogress.Estimates havebeensanctionedandtenderprocessisunderprogress.Anditisprogrammedtocompletethe workduring0708. Thereare44Distributaries.Outofwhich,worksofDistributary1to27Aaretakenup.The worksofDistributary1to22isalmostcompleted.TheDistributaryworksfrom23to27Aisunder differencestagesofprogress. Since 1996, water has been allowed in the canal during Khariff season every year for land developmentactivitiesanddrinkingwatersupplytoTumkurandTipturtown,fromkm124andkm 24,respectively,tostorewaterinBugudanahalliandYeachnoortank.Furtherduringtheyearwater is allowed in the canal upto km 183. Action is also being taken as per the decision taken by the IrrigationConsultativecommittee. 54207.45 Ha. of irrigation potential has been created under Tumkur branch canal and a balanceof41701.55Ha.isyettobecreated. NAGAMANGALA BRANCH CANAL (0 TO 78.325 Km) 167 ThelengthofNagamangalabranchcanalis78.325Kmhavinganatchkatof59,488Ha.The canal alignment of the entire length is approved. The Main canal works from Km 0 to 78.325 is nearingcompletion. ThecanalworksfromKm62to67isalmostcompleted,exceptacqueductatch.Km64.616to 65.660, which is under progress. The main canal works from Km 68 to Km 78.325 are under progress.About20Km.C.C.Liningworksareunderprogressandnearingcompletion.Thebalance 40Kmliningworksistobetakenupduringthecurrentyear.Waterisallowedupto59Km. Thereare20distributories,outofwhichworksof10distributariesarecompleted.Theworks ofDistributaryNo.11to19areunderprogress. The canal works from Km 0 to 59 is completed and water has been allowed for land developmentactivitiessince1996.Furtherthetunnelworksinkm4243isnearingcompletion.Also theearthwork,embankment,andC.D.worksarecompletedupto59Kmandwaterisallowedduring theyear. 47574.15Ha.ofirrigationpotentialhasbeencreatedunderNagamangalabranchcanalanda balanceof11913.85Ha.isyettobecreated. LIFT IRRIGATION SCHEME AT THE EXIT OF BAGUR – NAVILE TUNNEL

Thisliftirrigationschemeisenvisagedtoprovideirrigationtoanextentof2358Ha.Thework ofraisingmain,distributionchamberandjackwellcumpumphouseiscompleted.Theelectrification work is under progress. RBC and LBC works are under various stages of progress. It was commissionedduringFebruary–2004. NEW PROJECT a) HEBBUR – GOOLUR LIFT IRRIGATION

Itisproposedtolift0.7TMCofwaterfromch.142.225KmofTBCtosupplydrinkingwaterto 52Villages.TheTechinicalsanctiontotheestimateisaccordedforRs.38.50Crores.Tendershave been called to entrust the work on turnkey basis. Further, tender have been submitted to GovernmentthroughCNNLforapproval.Atpresent,thetenderprocessisheldup. b) HONNAVALLI LIFT IRRIGATION

It is proposedtolift0.60TMCofwateratch.9.90KmofTBCunderthisproject,tosupply drinking water to 244 Villages and to feed water to 6 tanks under Tiptur, Arasikere, Kadur and Hosadurga taluk. The Technical sanction to estimate is accorded for Rs.20.38 Crores. Tender has been called to entrust the work on turnkey basis. Further, tender have been submitted to Government through CNNL for approval. At present, due to unavoidable circumstancesthetender processisheldup. TheprogrammeandprogressunderHemavathycanalprojectfortheyear200607uptoendof March2007isasfollows Financial (Rs.in Lakhs) Physicial (in Ha) Year Target Achievement Target Achievement 200607 16,100.00 13,960.80 12,135 11,963.86 ThegrantallocatedtoZoneduring200708isRs.19400.00Lakhs. 168 PHYSICAL PROGRESS

Duringtheyear200607potentialof1963ha.hasbeencreatedagainstatargetedpotentialof 12135ha.Totalcontemplatedatchkatis1,57,755Ha.OutofwhichuptoendofMarch2007irrigation potentialof103930.14Hahasbeendeclaredandbalanceof53824.86Haistobetackled. FINANCIAL PROGRESS During the year 200607 an expenditure of 114.97 crores has been incurred against grants fo 119.00croresuptotheendofMarch2007.Thecumulativeexpenditureincurredontheprojectupto theendofMarch2007isRs.1045.61crores. Theprojectisprogrammedtocompleteby200910inallrespects.TheLISattheexitofBNTwill becompletedduringtheyear200708.

12.3. AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, HEMAVATHY RESERVOIR PROJECT, GORUR

12.3.1. HEMAVATHY PROJECT

HemavathyProjectcontemplatesutilizationof37.10TMCofHemavathyRiverwatertoprovide irrigationfccilitiestothearidregionsofHassan,TumkurandMysoreDistricttoprovideirrigationto 2,65,075 Ha (6,55,000 acres) by flow irrigation. In addition 14 Lift Irrigation Scheme provide irrigationto18,517Haofland. HemavathyprojectconsistsofacompositedamacrossRiverHemavathy,nearGorurvillagein Hassandistrict.Thelengthofdamis4692.00mandheightis44.50m. The Government has accorded administrative approval for Rs. 588.00 Crores 198586price level. There are two zones under Hemavathy Project Viz., Hemavathy Project Zone, Gorur and Hemavathy Canal Zone, Tumkur. As per Government Order No: WRD/32/dated/ 1252003, this project was transferred to Cauvery Neeravari Nigama Limited, and since172003,itisunderthe jurisdictionoftheNigam.ThejurisdictionofHemavathyProjectzonewhichincludeHemavathyDam isasbelow: Sl. Name of the Canal Length Atchkat in Hectares No. 1 HemavathyLeftBankCanal 0to212Km. 78,916 0to91Km 2 HemavathyRightBankCanal 8,093 (Fulllength) 0to97Km 3 HemavathyRightBankHighLevelCanal 22,662 (Fulllength) 169 Total 1,09,671 4 14LIS 16,166 TherevisedestimatecostofthisprojectisRs.3877.00Crores(200607SR). PRESENT STAGE Earthworkexcavation&C.D.worksofthe212kmlongLeftBankCanaliscompleted.Works ofalldistributoriesarecompleted.Theliningworkisunderprogress. Earthworkexcavation&C.D.worksofthe91kmlongRightBankCanaliscompleted.The liningworkisunderprogress. Works of C.D. and distributories of the 96 km long Right Bank High level Canal is completed.Liningworkof60kmbedand50kmsideiscompleted.Thebalanceliningworkof36 kmbedand46kmsideispending. Outofthe14LIS,4schemesarenearingcompletionstageandtheremaining10schemesare underdifferentstagesofimplementation. During200607,potentialof5344Hahasbeencreatedagainstatargetedpotentialof4741 Ha.ThecumulativepotentialcreateduptoendofMarch2007is120883Ha. During 200607, a grant of Rs. 60.00 Crores has been allocated. Upto end of 3/2007, an expenditureofRs.130.10Croresisincurred.Thecumulativeexpenditureincurredsinceinception uptoendof3/2007isRs.1266.45Crores. ItisprogrammedtocompleteallthebalanceworksincludingLISschemesbythendof2009 10bycreatingbalancepotentialof58779ha. 12.3.2. YAGACHI PROJECT The Yagchi project comprises of a Reservoir across the River Yagchi, Tributary of River HemavathynearChikkabyadagerevillageinBelurTalukofHassanDistrict.TheDamofcomposite typewithcentralspillwayis1280Mlongand29.15Mmaximumheight. Thestoragecapacityofthereservoiris89.54Mcum.(3.164TMCft).Theleftbankcanalis100 Kmlong.Itisproposedtoprovideirrigationfacilitiestoanextentof14973Hectares(37000Acres)in Belur,Alur,HassanandHolenarasipuraTaluksinHassanDistrict. ThecostoftheprojectwasestimatedatRs.35.38CroresbasedonS.Rof198384andhas beenadministrativelyapprovedbyGovernmentintheirorderNo.PWD91NAP83dated2761984. Therevisedcostofprojectat200607pricelevelisassessedtobeRs.440.00Crores. CANAL DETAILS

Sl No. Name of the Canal Length in Km Atchkat in Hectares. 1 LeftBankCanal 100 2 MosaleBranchCanal 10 14973 3 KamasmudraBranch 35

DAM AND APPURTENANT WORKS

170 TheDamworkiscompleted.

CANAL WORKS The earth work excavation andembankmentofcanal(YLBC)hasbeencompletedupto83 rd Km.CDworksuptoin76 th kmarecompletedtoalargeextent.andCDstructuresfromKm76toKm 83areunderprogress.AqueductworkfromKm60.54toKm63.16isunderprogress.Theestimate fortunnelworkatkm75.4hasbeensanctionedandthetenderforthistunnelworkhasbeeninvited. Work of Mosale Branch Canal and Kamasamudra Branch Canal at the exit of the tunnel is yet to started. During200607,potentialof241Hahasbeencreatedagainstatargetedpotentialof2500Ha. ThecumulativepotentialcreateduptoendofMarch2007is2541Ha. During 200607, a grant of Rs. 25.00 Crores has been allocated. Upto end of 3/2007, an expenditure of Rs. 19.49 Crores is incurred. The cumulative expenditure incurred since inception uptoendof3/2007isRs.214.44Crores. Theprojectisprogrammedtocompleteduringtheyear200910.

12.3.3. HUCHANAKOPPALU LIS

HuchanakoppaluLISwasstartedintheyear198586forRs.6.90Crores.Therevisedcostis Rs. 50.00 Crores. It is proposed to create irrigation potential of 3360 ha under this project. This projectistakenupin2stagesandirrigationpotentialof1532haand1828hawillbecreatedunder stageIandstageII,respectively.ItisproposedtocompletetheworkofstageIduring200607. Itisproposedtolift0.97TMCofwaterfromHemavathyreservoirintwostagessoastoraise semidry crops and to irrigate 3360 ha in premonsoonand2228hainpostmonsoonseason.28 villageswillbebenefittedfromthisproject. UnderstageI,86cusecsofwaterisraisedtoaheightof76mthroughtworaisingmainsof length2142manddiameter1000mmbyusing4pumpsof1200HPsoastoirrigate1532Haofland. TheIststageworkhavebeencompleted. UnderstageII,70.63cusecsofwaterisraisedtoaheightof30mthroughraisingmainof length330mbyusing4pumpsof300HPsoastoirrigate1532Haofland.Theworkisnearing completion. During200607,potentialof478Hahasbeencreatedagainstatargetedpotentialof1500Ha. ThecumulativepotentialcreateduptoendofMarch2007is1533Ha. During 200607, a grant of Rs. 9.00 Crores has been allocated. Upto end of 3/2007, an expenditureofRs.8.60Croresisincurred.Thecumulativeexpenditureincurredsinceinceptionupto endof3/2007isRs.29.44Crores. 171 12.3.4. KAMASAMUDRA LIS

KamasamudraLISwasstartedintheyear1984atanestimatedcostofRs.0.99Croreswiththe approvalfromGovernment.AftertheBasicpurposeoftheprojectwaswidened,therevisedestimate amounting to Rs.6.30 Crores was approved by Government during 1986. Later, the rerevised estimateforRs.18.00CroreswasapprovedbyGovernmentduring1994.Theprojectistobetaken upin3stages.thelatestcostoftheprojectisRs.70.00Crores. Under this project, it is proposed to create irrigation potential of 5127 ha in Hassan and Holenarasiupura taluks by lifting 1.44 TMC of water from River Hemavathy near Kamasamudra village,Holenarasiupurataluk.UnderstageI,990haoflandandunderstageII,2922haoflandwill bebroughtunderIrrigation.WorksofStageI(exceptLeftBankCanal)whichisnearing.IIndstage headworkshavebeencompleted.WorksofMalaliandNagenahallysubcanalunderStageII,isunder progress.SurveyworksofStageIIIisunderprogress.Irrigationpotentialof1670.58hahasbeen createdtilldateunderStageIandStageII. StageIIisproposedtobecompletedduring200607. TECHNICAL DETAILS Sl. Detail Stage I Stage II Stage III No. Sourceof River LeftbankcanalofstageI Malalibranchcanal 1 water Hemavathy @ch:3400m @km34 2 Pumps 700HP(4+2Nos) 335HP(4+2Nos) 335HP(4+2Nos) 1000mmdia,966m 1200mmdia, 800mmdia, Raising length 330mlength 1000mlength 3 main 2line singleline singleline (MSpipe) (MSpipe) (PSCpipe) 4 Atchkat 990Ha 2922Ha 1214Ha

During200607,potentialof1666Hahasbeencreatedagainstatargetedpotentialof2000 Ha.ThecumulativepotentialcreateduptoendofMarch2007is3,094Ha. During 200607, a grant of Rs. 9.00 Crores has been allocated. Upto end of 3/2007, an expenditure of Rs. 11.84 Crores is incurred. The cumulative expenditure incurred since inception uptoendof3/2007isRs.41.43Crores. Itwasprogrammedtocompletetheprojectduring200607accordinglyitiscompletedduring 200607. 172 12.3.5. KACHENAHALLI LIS

Kachenahalli LIS is situated near Kachenahalli village, Channarayapatna taluk in Hassan district.Underthisproject,0.73TMCofregeneratedwaterinHemavathyatchkatisutilizedand135 cusecofthiswaterisliftedtoprovideirrigationto5100haofKhariffcropinHolenarasipura,Hassan, ArasikereandChannrayapatnataluksin3stages. TheGovernmentapprovedtheschemeduringDecember1991forRs.8.90Crores.Afterthe Basicpurposeoftheprojectwaswidened,theGovernmentaccordedadministrativeapprovaltothe revisedestimateamountingtoRs.68.30CroresduringDecember2002. The earthwork excavation of Samudravally main canal, Dandiganahally branch canal and Bijamaranahally branch canal,ispartiallycompleted.AsondateexpenditureofRs.5.15Croresis incurred. GrantsofRs.620.00lakhshasbeenallottedforworksofintakecanal,sumpandjackwellcum pump house related to head works of Stage I and the works have been entrusted to M/s IVRCL infrastructure & Projects Ltd., Hyderabad, on tender basis amounting to Rs. 704.33 lakhs during March 2003. Earthworkexcavationof1 st stageheadworksarenearingcompletion.Estimatefor Electromechanicalworkhasbeenapproved SurveyworksofstageI,II,andIIIrdhasbeenentrustedtoM/sSECONSurveyPvt.Ltd.,agency. Surveyworkhasbeencompleted&estimateisunderpreparation.Theultimatepotentialunderthis progressis3480ha.NopotentialiscreateduptotheendofMarch2007. During 200607, a grant of Rs. 10.00 Crores has been allocated. Upto end of 3/2007, an expenditureofRs.0.79Croresisincurred.Thecumulativeexpenditureincurredsinceinceptionupto endof3/2007isRs.5.65Crores. Theprojectisprogrammedtocompleteduring200910. 173 12.3.6. VOTEHOLE PROJECT

VoteholeprojectconsistsofreservoiracrosstheRiverVoteholenearLakkenahallyvillage, BelurtalukinHassandistrict.Thisprojectedwasstartedintheyear1971withinitialcostofRs.2.05 Crores. Thereservoirhascentralspillwayofstonemasonrywithearthenflanksonbothsides.The dam is 900 m (2953 feet) long and has a maximum height of 28 m (92 feet). The full storage capacityofthereservoiris67.64Mcum(2.39TMC).Themaximumstoragecapacityis42.73Mcum (1.51TMC).Canalsareconstructedonbothsidesofthedamtoprovideirrigationtoanextentof 7487ha(18500acres)ofAlurandBelurtalukofHassanDistrict. TherevisedcostoftheprojectisRs.59.75Croresanduptoendof3/2007theexpenditure incurredisRs.52.14Crores.Dam&alliedworkiscompleted.65familiesofLakkenahallyvillagewho wereaffectedduetosubmergencehavebeenshiftedtoHariharapuraandDevarajpurarehabilitation centers.Theworksofrehabilitationcentershavebeencompleted.4villages&5familiesaffected duetobackwatersofthereservoiraretobeshiftedtoSomanahally,ChattanahallyandDoddahally rehabilitationcenters. ThecumulativepotentialcreateduptoendofMarch2007is7487Ha. During 200607, a grant of Rs. 1.00 Crores has been allocated. Upto end of 3/2007, an expenditureofRs.1.91Croresisincurred.Thecumulativeexpenditureincurredsinceinceptionupto endof3/2007isRs.58.45Crores. Itwasprogrammedtocompletetheprojectduring200607exceptforthe2bridgesallother worksarecompleted.Thesamewillbecompletedduring200708. 174

PROJECTS UNDER

ZONES OF WATER RESOURCES

DEPARTMENT

13. AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION PROJECT ZONE, GULBARGA 13.1. KARANJA PROJECT 175 Karanja Irrigation project is a Major Irrigation project in Bidar District. This project is constructed across Karanja Tributary of River Manjra in Godavari Basin, near Byalhalli village, Bhalki TalukofBidarDistrict.Theutilisationunderthisprojectis9.27TMC.Theareacoveredfor irrigationunderthisprojectis35614Ha. ThisprojecthasavailedcentralloanassistanceunderAIBP. (1)(a)EarthenDamembankmentandspillwayworksarecompleted. (b) Works of foreshore lift irrigation Scheme, ie, raising main, intake channels, pumphouse, collectingcisternsandpumpingarrangementsarecompleted. (c)LBCforalengthof31Kmiscompleted;RBCforalength128kmiscompleted.Theworksin 3Km.ofCanalsisunderprogress. (2)TherevisedestimateoftheprojectamountstoRs.482.47Crores.Thecumulativeexpenditure incurred and potential created upto end of March 2006 is Rs. 458.33 Crores and 22793 Ha, respectively. (3)Thedetailsoftargetandachievementoftheprojectfor200506andthetarget200607areas follows: Financial(Rs.inCrores) Physical(inhectares) Sl.No Year Target Achievement Target Achievement 3938 1) 200506 48.31 22.95 11000 1693(FICprovided). 666 2) 200607 44.40 20.86 7100 2364(FICprovided). Theprojecthasbeencompletedduring200607.

176 14. AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, IRRIGATION CENTRAL ZONE, MUNIRABAD Tungabhadra Project, Hirehalla Project, Maskinala Project, Singatalur Lift Irrigation Scheme, Kanakanala Project, Narihalla Project, Hagaribommanahalli Project, Rajolibanda Diversion Scheme, Vijayanagar Canals and other LIS comes under the Irrigation Central Zone, Munirabad. Hirehalla Project, Maskinala Project, Singatalur Lift Irrigation Scheme projects are ongoing projects. The originalworksofTungabhadraProjecthavebeencompleted.Butimprovement/Modernisationworks ofLeftbankcanalaretobecompleted. 14.1. TUNGABHADRA PROJECT TheTungabhadraProjectcomprisesofreservoiracrosstheRiverTungabhadra,atributaryto RiverKrishna,nearMallapuraminHospettaluk,BellaryDistrict,withcanalsonbothbankstoprovide irrigationtoanextentof3,62,715HainBellary,KoppalandRaichurDistricts.Theutilisationis3736 M.cum(133.00TMC).Thisisaninterstatemultipurposeprojectstartedin1945asajointventure of the then Governments of Madras and Hyderabad. After reorganisation of States, the project became a joint venture of Mysore (Now Karnataka) and Andhra Pradesh. The irrigation and utilisationindicatedabovepertaintoKarnatakaonly. TheDamandCanalworksarecompleted.OriginallymostofthereachesofTungabhadraLeft Bank Canal have been constructed out of available soil in the adjoining borrow areas. For the embankmentsections,sinceZonalsectionisnotprovidedbreachesandbongaswereoccurring.In order to avoid frequent breaches and bongas in the canal. Government constituted an expert committeetoadviceregardingstrengtheningofthecanal.AspertheExpertCommitteeReportI.S. workshavebeentakenupinstagesfrom1982to2006withanexpenditureofRs.185.34Crores. In order to avoid further breaches and bongas at the vulnerable reaches in TBLBC, the Government constituted a special committee to suggest remedial measures for strengthening the canal vide G.O. No. WRD 244 MTP 2005 date: 31122004. The committee submitted the report duringJanuary2006.ThecostoftheimprovementworkwillbeRs.210.00Crores,whichistobe completedin5yearsfrom200607.During200607theGovernmentallocatedgrantsofRs.20.00 Crores.Accordinglyworkhasbeentakenupandcompleted. MODERNISATION OF DISTRIBUTARIES OF TBLBC, TBRBLLC AND TBRBHLC  SincethedistributariesofTBPareveryold,theyareindilapidatedconditionandhavelosttheir originalcanalsection.Assuchitisnotpossibletothrustthewatertotailendreaches.Inorderto restorethesectionandalsotorepairthestructure,acomprehensiveproposalforimprovingthe distributaries of TBP, amounting to Rs. 841.00 Crores, has beenprepared.During200607,worksamountingtoRs.20.80Crores havebeentakenupandcompleted.  Balancing reservoir at Mile 109 of TBLBC has been constructed and water is being stored in ordertosupplementthetailendayacutandtosupplydrinkingwatertoRaichurcity.  All the distributories of TBRBHLC have been completed including SubDistributory 16 A and HagariBridgeandrelatedworks.  FromtheTBLBC,UltimateIrrigationpotentialof2,44,199Hahasbeencreated.FromTBRBHLC, UltimateIrrigationpotentialof72,443Hahasbeencreated. 177  From the Tungabhadra project, Irrigation Potential of 3,54,615 Ha has been created upto 3/2007.  During200607,theexpenditureincurredonTBLBCisRs.345.02Lakhs;andonTBRBHLCisRs. 54.96 Lakhs. The cumulative expenditure incurred on this project upto end of 3/2007 is Rs. 27977.83Lakhs.Outofthis,expenditureonTBLBCisRs.20422.87Lakhs;onTBRBHLCisRs. 7554.96Lakhs.FromTBLBCandLBHLCIrrigationPotentialhasbeencreatedtoanextentof 2,44,668HaandfromRBHLCandRBLLCIrrigationPotentialhasbeencreatedtoanextentof 1,09,947Ha.Intotal,fromTungabhadraProject3,54,615Hahasbeenirrigated. AN OVER VIEW OF THE TUNGABHADRA PROJECT

TUNGABHADRA LEFT BANK CANAL

1. Name of Project TUNGABHADRA LEFT BANK CANAL 2. Location LeftBankofT.B.Dam 3. Yearofinception 1945 4. Yearofcompletion Completedinstagesupto1968(Originalworks) Originalcost:Rs.17.44Crores(SanctionedbyNizam Originalandlatestestimatedcostin Governmentin1951) Crores 5. RevisedCost:Rs.194.40Crores(ID122MTP92 Includingadministrativeapprovalno. Dated:05061996) anddate/TechnicalSanction. Latestcost:Rs.302.00Crores Lengthofcanal 6. a)Maincanal 226.00km b)Distributaries 707.00km 7. Lengthofayacutroads 1150Km 8. Districtbenefited RaichurandKoppal GangavathiTq,SidhnoorTq,ManviTq,Devadurga& 9. NumberofvillageandTqbenefited RaichurTaluk NoofWUCS a)Formed 585 10. b)Registered 244 c)Handedover 46 11. Programmeduring200607 Rs.1000.23lakhs 12. Progressachievedduring200607 Rs.345.22Lakhs

TUNGABHADRA RIGHT BANK HIGH LEVEL CANAL 1. NameofProject TUNGABHADRA RIGHT BANK HIGH LEVEL CANAL

2. Location RightBankofT.B.Dam

3. Yearofinception 1959 178 4. Yearofcompletion 19992000

Originalcost 1) Rs.2.20Crores(AdministrativeapprovalPWD83TBP57 Dated:14859) 2) PWD22NTP65Dated:18965ForRs.3.00Crores Originalandlatestestimatedcost (StageIandII) inCrores 3) StageITechnicalapprovedNo.CER72Dated:1611 5. Includingadministrativeapproval 1996forRs.1.80Crores

no. 4) StageIITechnicalapprovedNo.CER/10/72Dated:88 anddate/TechnicalSanction. 1972;Rs.1.20Crores RevisedCost:Rs.26.00Crores (PWD149Dated:2389) LatestCost:Rs.153.60Crores.(SubmittedtoGovernment forapproval)

Lengthofcanal

6. a)Maincanal 196.34km

b)Distributaries 171.66km

7. Lengthofayacutroads 294.55km

8. Districtbenefited Bellary

NumberofvillageandTq 9. SiruguppaandBellaryTq. benefited

NoofWUCS

a)Formed 126 10. b)Registered 81

c)Handedover 39

11. Programmeduring200607 Rs.62.10lakhs

12. Progressachievedduring200607 Rs.54.96Lakhs 179 14.2. HIREHALLA POJECT

The Hirehalla Project comprises of a reservoir across the Hirehalla, a tributary to the River Tungabhadra near Kinnal village inKoppalTalukofKoppalDistrict,withcanalsonbothbanks,to provideirrigationtoanextentof8330HainKoppalTaluk.Theproposedutilisationis64.24M.Cum (2.27TMC).AdministrativeapprovaltotheprojectamountingtoRs.6.35Croreshasbeenaccorded videG.O.No.PWD164MTP73,dated:2451979andthelatestestimatedcostoftheprojectforRs. 227.00Croresisunderpreparation.

DAM AND CANALS

DAM :Thelengthofthedamis3.6Km,withaheightof15mtrhavingastoragecapacityof47.23 M.Cum.Thesubmergenceareais1247Ha,affectingArakeravillagewithapopulationof1500.

CANALS : 24.60 Km. long Left Bank Canal and a 25.00 Km. long Right Bank Canal will provide irrigationto5000Haand3330Ha,respectively.

COST :TheprojecthadbeenoriginallyestimatedatacostofRs.635.00lakhsat197778levelsof rates.ThelatestcostofprojectisRs.227.00Crores.

STAGE OF WORK

DAM: Earthen embankment is completed. Spillway work including installation of 6 radial gatesis completed.Waterisstoredtothefullcapacity.Theprojectwasdedicatedtothenationon2612 2001bythethenHon’bleChiefMinisterofKarnataka.

CANALSANDDISTRIBUTARIES:

1) RBC: Outofatotallengthof25Km,worksinrespectof22.30Kmarecompleted.Outof37 distributaries,26Nosarecompletedandbalanceof11Nosisunderprogress.

2) LBC: Worksoftheentirecanallengthof24.60Kmarecompleted.Outof28Distributaries,27 Nosarecompletedandbalance1isunderprogress.

EXPENDITURE: Expenditureincurredduring200607isRs.1727.77Lakhs.CumulativeExpenditure upto3/2007isRs.21731.58Lakhs.

N.H. AND RAILWAY CROSSING WORKS:

NationalHighwaycrossingsarecompleted.RailwaycrossingsworksonLBCandRBCtakenup byRailwayauthoritiesontenderbasisiscompleted.

REHABILITATION WORKS:

For rehabilitation of Arakera Village, Rs. 867.00 lakhs has been spent. A balance of Rs.50.00 lakhsisrequired.

ForrehabilitationofMudlapurveerapur,SirurMuttal,anamountofRs.11.85Croreshasbeen depositedwiththeRevenueDepartment.BalanceamountrequiredisRs.23.91Crores.Sofar7,534 Hahasbeenirrigated.

AN OVER VIEW OF THE HIREHALLA PROJECT 180

1 NameofProject HirehallaProject

AcrossHirehallandVeerpurhalla4KmU/sof 2 Location Kinnalvillage.

3 Yearofinception 1979

Originalcost:Rs.6.35Crores. Originalandlatestestimatedcostin PWD164MTC73Dated2451979 Crores. 4. Revisedcost:Rs.225Crores. Includingadministrativeapprovalno. anddate (Administrativeapprovaltobeobtainedfrom Government)

Lengthofcanal

a)Maincanal LB24.60Km;RB25Km

5. b)Distributaries 63Km

c)Branchcanal 15Km

d)FIC Underprogress

6. Lengthofayacutroads 65Km

7. Districtbenefitted Koppal

8. NumberofvillageandTqbenefited Kinnal

NoofWUCS

9. a)Formed 7

b)Registered 3

10. Programmeduring200607 Rs.1922.53lakhs

ProgressachieveduptoDecember 11. Rs.1727.77Lakhs 3/2007.

Details of Irrigation Potential in Ha Sl. Nameof Onfull Programmeduring Createdduring Totalpotential No District development 200607 200607 createdupto3/2007 1. Koppal 8330 4150 3354 7534

14.3. MASKINALA PROJECT BRIEF DESCRIPTION: 181 The Maskinala Project comprises of a reservoir across the Maskinala, a tributary to River Tungabhadra, near Maraladinni Village in LingasugurtalukofRaichurDistrict,withcanalsonboth banks,toprovideirrigationtoanextentof3001HainLingasugurtaluk.Administrativeapprovalhas beenaccordedtotheProjectforRs.311.00lakhs.Revisedadministrativeapprovalhasaccordedfor Rs.2357lakhs.ThelatestrevisedcostoftheprojectisRs.4835lakhs.

DAM & CANALS DAM: Damis814mlong(spillwaylengthbeing57m)and23.74mhighabovethenalabedlevel with a gross storage capacity of 13.11 M.cum with submergence to an extent of 173 Ha without affectinganyvillage.

CANALS: Alltheworksofmaincanalsoneithersidearecompleted.Irrigationpotentialcapacityis 1940HaunderLBCand1061HaunderRBC,totalfromtheprojectbeing3001Ha COST: The project had been originally estimated to Rs. 311 lakhs at 197576 level of rate. The revisedcostoftheprojectishasbeenadministrativelyapprovedforRs.2357.00lakhsandthelatest revisedcostoftheprojectisRs.4835.00lakhs.

STAGE OF WORK: DAM&SPILLWAY: Allworkshavebeencompleted. CANALS: Allworksof11.50KmlongRBCand10KmlongLBCarecompleted. DISTRIBUTARIES: Allworkshavebeencompleted. WaterhasbeenstoredintheReservoirisalsoallowedinthecanalsforirrigation.Sofar3001Ha oflandhasbeenirrigated. EXPENDITURE: Expenditure incurred during 200607 is Rs. 239.33 Lakhs. Cumulative Expenditure upto3/2007isRs.4749.32Lakhs. Theprojectiscompleted.

AN OVER VIEW OF MASKINALA THE PROJECT

1 NameofProject MASKINALA PROJECT 2 Location NearMaraladinnivillageofLingasugurTq. 3 Yearofinception 1976 182 Originalandlatestestimatedcostin Originalcost:Rs.3.11Crores. Crores. G.O.No.PWD52GIP78Dated:22011979 4 Includingadministrativeapproval Revisedcost:Rs.48.35Crores.(Administrative no.anddate approvaltobeobtainedfromGovernment)

Lengthofcanal LBC RBC

a)Maincanal 10Km 11.50Km 5 b)Distributaries 27Km

c)FIC Underprogress

6 Lengthofayacutroads 1Km

7 Districtbenefited Raichur

8 NumberofvillageandTqbenefited 1No.Lingasugur

NoofWUCS

9 a)Formed 5

b)Registered 5

10 Programmeduring200607 Rs.199.96lakhs

11 Progressachievedupto3/2007. Rs.239.34Lakhs

Details of Irrigation Potential in Ha Sl. Nameof Onfull Programmeduring Createdduring Totalpotential No. District development 200607 200607 createdupto 3/2007 1. Raichur 3001 501 501 3001Ha Theprojecthasbeencompleted 183

14.4 OTHER WORKS (NEW) (Rs.inLakhs.) Cumulative Expenditure Likelydate Sl. Latest Grantfor Expenditure NameoftheProject during of IrrigationPotentialinHa PresentStageofProject No. Cost 200607 uptoMarch 200607 completion 2007 1 2 3 4 5 6 7 8 9 OngoingSchemesLiftIrrigationSchemes

Physicallyall Stabilizationof324Haof Itwasproposedtocompletetheprojectduring2006 1 Kolur(D13)LIS 74.00 37.12 68.37 works KolurbranchofD13of 07. completed. RBHLC

Stabilizationof410Haof8 Jackwellcompleted.Raisingmainfor630mt.Tobe 2 T.S.KadlurLIS 135.00 50.00 58.58 113.40 Jun07 TEofT.S.distributoryof done,Pipesprocured.Itwasproposedtocomplete RBHLC theprojectduring200607.

Physicallyall Stabiilizationof210Haof Itwasproposedtocompletetheprojectduring2006 3 RaraviLIS 67.00 25.00 9.00 50.07 works 7TE1ofKotehalldistri.of 07. completed RBHLC

Stabilizationof1518Haof IntakewellandJackwellcompleted,350mraising 4 Kolur(D7)LIS 394.00 200.00 136.76 165.73 Jun07 tailendofdistryNo.7of maincompleted.Electricalworksunderprogress. RBHLC Stabilizationof1214Haof HagariD/S(D16) Jackwellisunderprogress.Itwasproposedto 5 90.00 50.00 50.31 50.31 Jun07 tailendofHagariAqueduct LIS completetheprojectduring200607. D/SofD16A Stabilizationof182HaSub Jackwellisunderprogress.Theworkisbeing 6 KatharakiLIS 58.00 75.00 2.09 2.16 Jun07 distributory89/8/1&2of executedbyKLAC. TLBC Jackwell,Intakewell,Raisingmain&Pumphouse Stabilizationof479HaSub 7 BoylmerchedLIS 73.00 50.00 27.92 28.15 Jun07 areunderprogress.Theworkisbeingexecutedby distri.89/7ofTLBC KLAC. 184

Cumulative Expenditure Likelydate Sl. Latest Grantfor Expenditure NameoftheProject during of IrrigationPotentialinHa PresentStageofProject No. Cost 200607 uptoMarch 200607 completion 2007 Jackwell,transitioncompleted.Pumphouseflooring completed.AlltheworksentrustedtoM/sR.S.Sheety 8 YKaggalLIS 2200.00 500.00 138.13 229.55 200708 2,568Ha &Co.,hadcomeswithdrawnasperTACdirections andestimateforbalanceworksunderprepration.

9 Modernisationof i) TLBC 21000.00 2000.00 2400.79 2400.79 2011 Workscompletedduring2006closureperiod. Distributoriesof Tungabhadra ii) Project. 84100.00 2080.00 2272.74 2272.74 2011 Workscompletedduring2006closureperiod. (LeftBank+ RightBank) Vijayanagar iii) 10000.00 1090.00 1165.60 1165.60 2011 Workscompletedduring2006closureperiod. Canals NewSchemes

Kenchanagudda stabiilizationof1376Ha Administrativeapprovalunderconsiderationof 1 495.00 300.00 LIS tailend. Government.

Administrativeapprovalunderconsiderationof 2 WalaBellaryLIS 594.00 300.00 2541Ha Government.

Stabilizationof645Hatail Administrativeapprovalunderconsiderationof 3 ChaganurLIS 242.50 50.00 endayacutofChaganur Government. branchcanalofRBHLC 185

Cumulative Expenditure Likelydate Sl. Latest Grantfor Expenditure NameoftheProject during of IrrigationPotentialinHa PresentStageofProject No. Cost 200607 uptoMarch 200607 completion 2007 Stabilisationof123Haof JalibenchiLI Administrativeapprovalisobtainedfrom 4 245.00 100.00 tailendofDP36of Scheme Government.Technicalsanctionistobegiven. RBHLC Administrativeapprovalund erconsiderationof 5 VeerapurLIS 414.00 50.00 247Ha Government. Administrativeapprovalunderconsiderationof 6 MuttalLIS 317.00 50.00 335Ha Government. Administrativeapprovalunderconsiderationof 7 ShirurLIS 487.00 50.00 592Ha Government. Administrativeapprovalunderconsiderationof 8KinnalLIS 275.00 100.00 307Ha Government.

clxxxvi

15. AN OVERVIEW OF PROJECTS UNDER THE CHIEF ENGINEER, UPPER TUNGA PROJECT ZONE, SHIMOGA 15.1. BHADRA PROJECT CIRCLE BhadraProjectCircleisfunctioningatB.R.ProjectinBhadravathitaluk,since07.11.1969.ThisCircleis underthecontroloftheEngineerinChief,KNNL,UpperTungaProjectZone,Shimoga ThreeDivisions,namelyExecutiveEngineer,No.3,CanalDivisionMalebennur;No.4BRLBCDivision, Bhadravathi&No.5CanalDivision,DavanagereandfifteenSubDivisionscomesundertheJurisdictionofthis Circle. ThefollowingProjectscomeundertheJurisdictionofthisCircle. I. Major Irrigation Project 1) BhadraReservoirProject 2) VanivilasSagarProject II. Medium Irrigation Project 1) GondiAnicutProject{BhadraAnicut} 2) JambadahallaReservoirProject 3) FeederCanaltoRanikereTankProject 4) GayathriReservoirProject 5) AmbligolaReservoirProject 6) ThimmapuraLiftIrrigationScheme 7) AnjanapuraProject 8) DharmaProject 9) TungaAnicutProject 10)KaduvinabyluProject 11)D.B.KerePickup III. TANKS 1) Sulekeretank(ShantiSagar). 2) Bheemasamudratank 3) Asunditank 4) MadagaMasurtank

clxxxvii

BHADRA RESERVOIR PROJECT BhadraDamisconstructedacrossRiverBhadranearLakkavallivillage,TarikereTaluk,Chikamagalur District.ThisprojectisaMultipurposeProjectprovidingIrrigationfacilitytoanextentof1,05,570Haanda powergenerationcapacityof39.20M.W.Thedetailsofcanalscomingunderthisprojectisasfollows. Sl.No. Canal Length in Km Atchkat in Ha 1. BhadraRightBankCanal 103.00 17109 2. BhadraLeftBankCanal 77.00 8270 3. AnveriBranchCanal 67.00 6514 4. MalebennurBranchCanal 48.00 23774 5. DavanagereBranchCanal 90.00 30286 6. HariharaBranchCanal 20.40 15337 7. DevarabelakerePickupCanal 59.20 4280 Total: 464.60 1,05,570

BhadraProjectisallocated61.70TMCofwaterasperKWDT.UndertheProject,Irrigationpotentialof 1,05,570Hahasbeenachievedin1989.Therevisedcostoftheprojectwas33.53CroresandRerevised costofestimateisRs.170.00Crores.

TheExpenditureincurredupto3/2006isRs.19,330.12Lakhs.

The Major works under the Bhadra Reservoir projectarecompleted.Thewaterisallowedthrough both the canals, since 1965 and Irrigation facility to the total extent of 1,05,570 Ha has already been achieved.

TheGovernmenthasallottedagrantofRs.803.52Lakhsduringtheyear200607.OutofthisRs. 440.01LakhsisallocatedforworksandRs.363.57LakhsforEstablishment.TheExpenditureincurredfor establishmentisRs.301.66LakhsandforworksisRs.1,394.52Lakhs.Thetotalexpenditureincurredupto 3/2007isRs.1767.38Lakhs.

Modernisation of Bhadra Reservoir Project Canals: -

For the modernization of Bhadra Canal System, an estimate amounting to Rs.365.50 Crores was prepared.GovernmenthasallottedagrantofRs.10.00Crorestotakeupthemodernizationworksforthe year200506andtheworksforRs.15.48Croreshavebeenapproved.AgainstthegrantsofRs.10.00Crores, anexpenditureofRs.338.51lakhshasbeenincurreduptotheendofMarch2006.

For Modernisation of Canals of Bhadra Reservoir Project a Grant of Rs.4515.00 Lakhs has been providedduring200607under4701Modernisation.DuringMayJune2006closureperiodRs.2737.00Lakhs of works are taken up and completed on tender basis. The expenditure incurred during December 2006 closureperiodisRs.1506.42Lakhs.WorkstoatuneofRs.5554.00Lakhshasbeentakenupandareunder progress.TheexpenditureincurreduptoendofMarch2007isRs.6527.91Lakhs.

15.2. MODERNISATION OF CANAL SYSTEM OF TUNGA ANICUT clxxxviii

GrantallottedforModernisationofCanalsystemofTungaandGondiAnicutProjectduringtheyear 200607isRs.600.00Lakhs.Outofthis,agrantofRs.390.00LakhswasreallottedforTungaProject. TheseworkshavebeentakenupduringtheJune2006ClosureperiodandMarch2007Closureperiod.The ExpenditureincurreduptoendofMarch2007isRs.357.40Lakhs.

TheGrantallottedunder2701during200607isRs.57.08Lakhs(Rs.17.09LakhsforEstablishment andRs.39.99Lakhsforworks).Theexpenditureincurreduptotheendof3/2007isRs.290.72Lakhs(Rs. 18.57LakhsforestablishmentandRs.272.15Lakhsforworks).

15.3. HODIRAYANAHALLA DIVERSION SCHEME

JambadahallaReservoirislocatednearDuglapuravillage,TarikereTaluk,Chikkamagaloredistrict.This projectwascontemplatedtoprovideirrigationto2428Ha.

Butduetolessflowonly1133Haoflandunderrightbankisbeingirrigated.Remaining1295Haof land is to be irrigated by diverting supplement water from Hodirayanahalla, an adjacent valley to Jambadahalla. Addition to this, 243 Ha Land will also be benefited by this scheme. The above said HodirayanahalladiversionSchemehasgotadministrativeapprovalbytheGovernmentdated:10.08.1987for Rs.248.00lakhs.About16.07Haoflandcomesunderthejurisdictionofforestland.Clearancehasnotbeen obtainedbyCentralForest&EnvironmentMinistry.Henceprojecthasnotyetcommenced.

So an alternative alignment survey has been conducted and modified such that it comes under jurisdictionofstateforestdepartmentandrequisitionissubmittedforapprovalbytheForestDepartmentfor required12.98Haofforestland.Hencetheprojectwillbecommencedaftergettingclearancefromforest department.

During200607,agrantofRs.1500.00Lakhsisallocated.Theexpenditureincurreduptotheendof 3/2007isRs.113.73Lakhs.

15.4. MODERNISATION OF CANAL SYSTEM OF AMBLIGOLA RESERVOIR

During 200506 Governemt has allotted Rs.100.00 Lakhs grants for this project for improvements of canalsystem.Worksarecompleted.

AnadditionalgrantofRs.200.00Lakhshasbeenreleasedduring200506.Andtheseworksaretaken up during 200607. A grant of Rs.500.00 Lakhs has been allotted during 200607 under 4701. The expenditure incurred upto the end of 3/2007 is Rs. 547.97 Lakhs. Government has granted an additional grantofRs.10.00Crores.Tenderprocessfortheseworksisunderprogress.

AgrantofRs.135.00Lakhshasbeenallottedduring200607under4701forimprovementsof7tanks comingunderthisproject.Theprogrammeisgotapprovedandworksaretakenupontenderbasis.The expenditureincurreduptoendofMarch2007isRs.85.79Lakhs.

15.5. MADAGA –MASUR TANK

Madaga Masur Tank is a very old tank located in Haveri District in Hirekerur Taluk, across River Kumudvathi.2855HaofLandisirrigatedunderthistank.LBCofthistankis14.00KmlongandRBCis37.00 KmofLong.Improvementsandrepairstoembankment,canalworks,andremovalofsilthavetobetaken up.Rs.106.00Lakhsisallottedinthebudgetduring200607under4701forimprovementsofthistank.The expenditureincurreduptotheendof3/2007isRs.104.77Lakhs. clxxxix

15.6. ERM OF BHEEMASAMUDRA TANK

Bheemasamudra tank has been constructed 500 years ago in Bheemasamudra village, Chitradurga Taluk,Chitradurgadistrict.Thestoragecapacityofthetankis0.905TMC.TheIrrigationpotentialcreated underthistankis1235Ha(3050Acres).ThetankhasleftBankcanalandrightBankcanalanddistributary system.Thetotallengthofcanalis68Km.

AtpresenttheBheemasamudratankisfilledupwithsiltsincethetankis500yearold.Duetothis, thestoragecapacityoftankisreducedto0.18TMC.Thecatchmentareaoftankhasscantyrainfall.

In order to augument the inflow in to the tank it is proposed to construct feeder canal from BettadanagenahalliandJogerahalladamsbyconstructingpickup.Thegrantallottedfortheyear200506for thisprojectwasRs.150.00Lakhs.Theexpenditureincurredtoendof3/2006isRs.79.54Lakhs.

15.7. MODERNISATION OF CANAL SYSTEM OF GONDI ANICUT (BHADRA)

GrantallottedforModernizationofcanalsystemofTungaandGondiAnicutProjectduring200607 isRs,600.00Lakhs.ThegrantreallocatedforGondianicutisRs.210.00.Workshavebeentakenduring June 2006 Closure period and December 2006 closure period. The expenditure incurred upto the end of 3/2007isRs.280.87Lakhs.

15.8. KADUVINABYLU LIFT IRRIGATION SCHEME

KaduvinabyluLiftirrigationSchemeislocatedinN.R.Purataluk,ChikkamagaloreDistrict.TheProject hasbeenadministrativelyapprovedbytheStateGovernmentvideG.O.No.WRD223MMB2004Bangalore dated10.5.2005forRs.690.00Lakhs.TheMasterplancommitteehasallocated0.21TMCofwatertothis project under Krishna scheme A. The Chief Engineer, KNNL, Upper Tunga Project Zone Shimoga, technically sanctioned the estimate amounting to Rs.690.00 Lakhs, Vide CER No.83/200506 dated. 29.9.2005.

Rs.350.00Lakhshasbeenallottedduring200607under4701.Theexpenditureincurreduptotheend of3/2007isRs.19.01Lakhs.

15.9. THIMMAPURA LIFT IRRIGATION SCHEME

Theschemeenvisagesprovidingirrigationfacilitytoanextentof4176Acres(1691Ha)ofland coming under the villages of Kanavelli, Bharadi, Kurugunda and Basapura of Haveri taluk (this includes 159.00AcresofsufferingatchkatunderKannavallitank).TherevisedestimatedcostisRs.2313.00Lakhs. GrantofRs.400.00Lakhswasallottedintheyear200506andtheexpenditureincurreduptoMarch2006is Rs.4.82Lakhs.Rs.200.00Lakhsisallottedinthe budget during 200607. NABARD assistance to this projecthasbeenrejected.

15.10. ANJANAPURA RESERVOIR PROJECT

AnjanapuraReservoirprojectissituatedinShikarepurataluk,ShimogaDistrict.Theareairrigatedis 6736Ha.TheoriginalestimatedcostoftheprojectwasRs.272.00Lakhs.Therightbankcanalrunsfora cxc lengthof45.00Km.andhasanirrigationpotentaialof5919HaTheLeftbankcanalrunsforalengthof 15.00Km.andhasanirrigationpotentialof817Ha

Improvements to canal system:

Grant of Rs. 905.00 Lakhs is allotted during 200607. Works are taken up on tender basis. The expenditure incurred upto end of 3/07 is Rs.829.06 Lakhs. Additional grant allotted is Rs.10.00 crores. Tenderprocessisunderprogress.

GrantofRs.284.00Lakhsisallottedduring200607forimprovementof13tankscomingunderthis Project.WorksaretakenuponTenderbasis.Theexpenditureincurreduptotheendof3/2007isRs.211.26 Lakhs.

16. COMMAND AREA DEVELOPMENT PROGRAMME

AgricultureisthebackboneofIndianEconomyanditisthepillaroftheEconomicdevelopment.Atthe commencementoftheFifthFiveYearPlan(197480),inpursuanceofthepolicyoftheGovernmentofIndia, theCommandAreaDevelopmentProgrammewaslaunchedintheStateforintegratedandcomprehensive developmentoftheCommandAreasofMajorandMediumIrrigationProjects.Aspertheobjectiveslaiddown bytheNationalCommissiononIrrigation,1971andtheNationalCommissiononAgriculture,1976,theCADP ensures rapid and optimum utilization of Irrigation Potential created under Major and Medium Irrigation Projectstherebyincreasingtheagricultureproductionasalsoreducingthegapbetweenthepotentialarea createdandtheactualareautilised.

THE OBJECTIVES

Irrigation Management is a multidisciplinary activity involving major department like Irrigation, Agriculture, Cooperation and other organization engaged in training and research activities. Against this perspective,CADAwasconstitutedintheyear1970toworkasacatalystbetweenthevariousorganizations toreducethegapbetweenirrigationpotentialcreatedandutilized,toincreaseproductionperunitofwater andland,toreducethelossofirrigationwaterintheconveyancesystem,toimproveitsefficiencyatthefarm levelandtoensureequitabledistributionofwater.TheobjectivesoftheCADA,asenvisagedundersection 10oftheKarnatakaCommandAreasDevelopment(K.C.A.D.)Act1980,arelistedbelow:

ToformulateandimplementschemesfortheComprehensiveDevelopmentoftheCommandArea;

Topreventlanderosionandwaterlogging;

Toimprovesoilfertilityandregulationofcroppingpattern;

ToensuretheefficientmaintenanceofFieldchannelsandFieldDrainsbytheFarmerswithinthe CommandArea;

Localisationanddelocalisationoflandsforvariouscrops;

Ensuringsupplyofallinputsandservices;

PromotionandsettingupofruralgrowthcentresforintegrateddevelopmentoftheCommandArea;

Developmentofmarketing,processingandstoragefacilitiesandadequatecommunicationsystem;

Arrangingforcreditfacilitiestothefarmersandartisans; cxci

OrganizingagriculturalCooperativesandAssociations;

ConstructionofFieldchannelsandconnecteddrains;

Toborrowandlendmoneynecessaryfortheduedischargeofitsfunctions;

Conjunctiveuseofsurfaceandgroundwater;

Todeterminethepaymentofcompensationasprovidedinsubsection[4]ofsection12ofKCADAct 1980;

Tosetupagriculturaldemonstrationsfarmsandpromoteextensionactivities;and

Toexecutesuchotheracts,consistentwiththeprovisionsofthisAct.

The Six CADA’S that are established in Karnataka are:

 MalaprabhaandGhataprabhaProjects,Belgaum

 Tungabhadraproject,Munirabad

 UpperKrishnaprojects,Bheemarayanagudi

 Cauverybasinprojects,Mysore

 Bhadraproject,Shimoga

 IrrigationProjectZone,Gulbarga

BRIEF DETAILS OF CADA

Sl. Name of CADA with Year of Irrigation Districts covered No. headquarters Starting Projects 1 Malaprabhaand 1974 Malaprabha& Belgaum,Dharwad, GhataprabhaProjects, Ghataprabha Bagalkot,Gadag Belgaum TungabhadraProject, 1974 Tungabhadra,Hirehalla, Bellary,Raichur& 2 Munirabad 12.11.1979 Maskinala Koppal. UpperKrishnaProjects, 1977 UpperKrishna Gulbarga,Bijapur, 3 Bheemarayanagudi 11121979 Raichur&Bagalkot. cxcii

4 CauveryBasinProjects, 1974 Kabini,Harangi, Mysore,Kodagu, Mysore 1.3.1974 Hemavathy,KRS.,Nugu, Chamarajnagar, Taraka,Gundal, Hassan,Mandya, Votehole,Marconahally, Tumkur, Manchanabele,Kanva Bangalore(Rural) andByramangala. 5 BhadraReservoir 1979 Tunga,Bhadra&Gondi Shimoga, Project,Shimoga Chikkamagalore, Davangere. 6 IrrigationProjectZone, 2000 Chandrampalli,Hattiguni, Gulbarga,Bidar Gulbarga Soudagar,Upper Mullamari,Amarja, Bennethora,Bhima, Gondorinala,Kagna, Karanja

MALAPRABHA AND GHATAPRABHA PROJECTS, BELGAUM CommandAreaDevelopmentAuthority , MalaprabhaandGhataprabhaprojects,Belgaum,cameinto existenceduring197475. During200607,thebudgetallocationisRs.970.80lakhsoutofwhichanexpenditureofRs.1106.11 lakhshasbeenincurred. TUNGABHADRA PROJECT, MUNIRABAD CommandAreaDevelopmentAuthority , Tungabhadraproject,Munirabad,cameintoexistenceduring 1974. During200607,thebudgetallocationisRs.950.00lakhsoutofwhichanexpenditureofRs.817.51 lakhshasbeenincurred. UPPER KRISHNA PROJECTS, BHEEMARAYANAGUDI CommandAreaDevelopmentAuthority,UpperKrishnaprojects,Bheemarayanagudi,hascomeinto forcesince11121979. During200607,thebudgetallocationisRs.717.70lakhsoutofwhichanexpenditureofRs.541.26 lakhshasbeenincurred. Thebudgetallocationduring200607isRs.lakhsofwhichanexpenditureofRs.5018.51lakhshas beenincurreduptotheendof3/2007 CAUVERY BASIN PROJECTS, MYSORE CommandAreaDevelopmentAuthority , Cauverybasinprojects,Mysore,cameintoexistenceduring 197475. During200607,thebudgetallocationisRs.582.90lakhsoutofwhichanexpenditureofRs.509.85 lakhshasbeenincurred. BHADRA PROJECT, SHIMOGA cxciii

CommandAreaDevelopmentAuthority , Bhadraproject,Shimoga,cameintoexistenceduring1979. During200607,thebudgetallocationisRs.900.70lakhsoutofwhichanexpenditureofRs.887.78 lakhshasbeenincurred. IRRIGATION PROJECT ZONE, GULBARGA. Command Area Development Authority, Irrigation Project Zone, Gulbarga, came into existence during 200001. During200607,thebudgetallocationisRs.730.20lakhsoutofwhichanexpenditureofRs.662.75 lakhshasbeenincurred. cxciv

The details of the Physical programme & Progress and Financial Programme & progress for the year 2006-07 upto the end of 3/2007

(Physicalinhectares)(FinancialinRs.Lakhs)

Field Sl. Field Drains Warabandi Name of the cadas Irrigation channels No. Program Progress Program Progress Program Progress

P 1,628 1,633 3,250 3,250 1,628 TungabhadraProject, 1 Munirabad F 162.80 163.66 130.00 129.80 162.80

Malaprabhaand P 43,629 23,123 7,574 7,388 43,629 2 Ghataprabha Projects,Belgaum F 4,400.00 2,224.46 302.95 203.96 4,400.00

UpperKrishna P 54,070 50,594 2,125 961 8,667 54,070 3 Projects, Bheemarayanagudi F 6,759.00 5,889.59 85.00 38.43 26.00 6,759.00

P 1,250 1,250 750 CauveryBasin 4 Projects,Mysore F 10.00 10.00 3.00

P 12,580 4,310 3,500 3,750 333 12,580 BhadraReservoir 5 Project,Shimoga F 1,258.00 431.05 140.00 150.29 1.00 1,258.00

P 24,120 23,639 24,120 IrrigationProject 6 Zone,Gulbarga F 2,355.00 1,277.00 2,355.00

* * * * *