PROVIDING SUFFICIENT WATER DEPTH FOR KWAI TSING CONTAINER BASIN AND ITS APPROACH CHANNEL Sediment Sources Dredging Scenario 1 Area of Water Depth less than -17.5m CD where dredging will be required
Figure 3.5b A
C
PROVIDING SUFFICIENT WATER DEPTH FOR KWAI TSING CONTAINER BASIN AND ITS APPROACH CHANNEL Sediment Sources
Dredging Scenario 2 Area of Water Depth less than -17.5m E CD where dredging will be required
Figure 3.5c C
D
PROVIDING SUFFICIENT WATER DEPTH FOR KWAI TSING CONTAINER BASIN AND ITS APPROACH CHANNEL Sediment Sources
Dredging Scenario 3 Area of Water Depth less than -17.5m E CD where dredging will be required
Figure 3.5d A
B
D
PROVIDING SUFFICIENT WATER DEPTH FOR KWAI TSING CONTAINER BASIN AND ITS APPROACH CHANNEL Sediment Sources
Dredging Scenario 4 Area of Water Depth less than -17.5m CD where dredging will be required
Figure 3.5e A
B
C
PROVIDING SUFFICIENT WATER DEPTH FOR KWAI TSING CONTAINER BASIN AND ITS APPROACH CHANNEL Sediment Sources
Dredging Scenario 5 Area of Water Depth less than -17.5m CD where dredging will be required
Figure 3.5f A
C
PROVIDING SUFFICIENT WATER DEPTH FOR KWAI TSING CONTAINER Sediment Source (CSD) BASIN AND ITS APPROACH CHANNEL Sediment Sources (grab dredger) Dredging Scenario 6 Area of Water Depth less than -17.5m E CD where dredging will be required
Figure 3.5g Sediment Source ID
Project Area
T1 T2 S1 S2
B4 B5 B3 T3 B2 T4 SB1 SB2 B1 B6 T5 C SC2 L1 L2 TO1 SC1 L3 D W3 W1 W2
W4
E
PROVIDING SUFFICIENT WATER DEPTH FOR KWAI TSING CONTAINER BASIN AND ITS APPROACH CHANNEL
Dredging Scenario 7
Figure 3.5h · ‰ ¤¤ª¸F · ‰ ¤¤ª¸F · ‰ ¤¤ª¸F øªë j⁄ ⁄ Ferry Pier Central Kwai øªë j⁄ ⁄ Ferry Pier Central Kwai øªë j⁄ ⁄ Ferry Pier Central Kwai Tai Wong Ha Tai Wong Ha Tai Wong Ha TSING LENG Rambler Chung Park TSING LENG Rambler Chung Park TSING LENG Rambler Chung Park Resite Village RĽ Resite Village RĽ Resite Village RĽ Channel Channel Channel TSUI Lai Yiu TSUI Lai Yiu TSUI Lai Yiu QÆÐ¥ Typhoon QÆÐ¥ Typhoon QÆÐ¥ Typhoon Estate Estate Estate p Yim Tin Kok Shelter p Yim Tin Kok Shelter p Yim Tin Kok Shelter Resite Village fiY“ Resite Village fiY“ Resite Village fiY“ C« ‰ Grand Horizon C« ‰ Grand Horizon C« ‰ Grand Horizon ÅÂÐTsing Fai Ffl ‹ ÅÂÐTsing Fai Ffl ‹ ÅÂÐTsing Fai Ffl ‹ d¼ Lam Tin San Tsuen Chung Mei d¼ Lam Tin San Tsuen Chung Mei d¼ Lam Tin San Tsuen Chung Mei LEGEND: Liu To Resite Village Lo Uk Village t Liu To Resite Village Lo Uk Village t Liu To Resite Village Lo Uk Village t SCENARIO 1 Ser Res SCENARIO 2 Ser Res SCENARIO 3 Ser Res øªd fl” øªd fl” øªd fl” E¯º E¯º E¯º Cheung Hong Estate Cheung Hong Estate Cheung Hong Estate Highland Park Highland Park Highland Park 214 HA 214 HA 214 HA PROPOSED DREDGING AREA C« ¤¹¸ KWAI CHUNG C« ¤¹¸ KWAI CHUNG C« ¤¹¸ KWAI CHUNG Ching Wah øªC Ching Wah øªC Ching Wah øªC Terminal 5 Terminal 5 Terminal 5 Court Cheung Ching 3 5 Court Cheung Ching 3 5 Court Cheung Ching 3 5 Estate Estate Estate @¤¹¸ “fl @¤¹¸ “fl @¤¹¸ “fl t Terminal 1 Lai King t Terminal 1 Lai King t Terminal 1 Lai King SUBMARINE OUTFALL Ser Res Estate Ser Res Estate Ser Res Estate KAM CHUK KOK TSING YI Cho Yiu KAM CHUK KOK TSING YI Cho Yiu KAM CHUK KOK TSING YI Cho Yiu Chuen Chuen Chuen
3 3 3 ˆƒ ⁄B G¤¹¸ ˆƒ ⁄B G¤¹¸ ˆƒ ⁄B G¤¹¸ FAIRWAY Sewage Treatment Terminal 2 Sewage Treatment Terminal 2 Sewage Treatment Terminal 2 ‹”· Works t ‹”· Works t ‹”· Works t Mayfair Ser Res Mayfair Ser Res Mayfair Ser Res Gardens ÅÂá ª¸F¯ Gardens ÅÂá ª¸F¯ Gardens ÅÂá ª¸F¯ Rambler Kwai Chung Rambler Kwai Chung Rambler Kwai Chung C« Crest Hospital C« Crest Hospital C« Crest Hospital GRAB DREDGER T¤¹¸ T¤¹¸ T¤¹¸ SAI TSO WAN Terminal 3 SAI TSO WAN Terminal 3 SAI TSO WAN Terminal 3 TSING YI TSING YI TSING YI Princess Margaret Princess Margaret Princess Margaret oª oª oª Oil Depot Oil Depot Oil Depot CUTTER SECTION DREDGER