5.1 BACKGROUND/OVERVIEW In 1992, NHA and BMA were in accord to improve and renew Din Daeng Community Area lands mainly occupied by these two agencies as a redevelopment “Super Block”. During 1996 to 1997, NHA and BMA jointly studied the Super Block concept for the urban renewal of Din Daeng Community Area. The executive officer of BMA (the Deputy Governor) approved the cooperation approach of NHA and BMA, and a Working Committee was established accordingly by both agencies. In 1999, NHA worked out a preliminary master plan focusing on the renewal of Din Daeng Housing Complex, which is totally used as apartment housing for low to medium income households. In order to realize the master plan, NHA held several meetings with other agencies constituting the Working Committee including OCMLT, SRT, etc. The study called for a minimum budget of 20,000 million baht, and therefore, the participation of private investors was found to be necessary for minimizing public investment. Consequently, a reliable feasibility study by creditable consultants was required to comply with the Royal Act on Private Participation in State Affairs (B.E. 2535).The Act prescribes that if the project owner desires participation of private sector with assets exceeding five billion baht, the owner should hire a consultant to carry out a separate study following the requirements established by NESDB. After several meetings, the Working Committee decided to entrust a consultant team (Creative Development Co., A-7 Corporation, SJA. 3D Co.) to formulate a master plan to be submitted to the relevant authorities for approval. At a cabinet meeting held on 7th November 2000, the masterplan was approved with several conditions to be secured. The contents of the decision made at the cabinet meeting are presented in the box below. In essence, the cabinet approved the concept of the project, but requested further study as a condition for approval of implementation. NHA has been making efforts to comply with this requirement by

5-1 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

holding several workshops, consulting the existing residents who would be affected by the project, and requesting technical assistance from the Government of Japan, the result of which being that the JICA Study Team joined the study.

Cabinet Meeting Decision

1. Approval of the Master Plan for Land Development and Urban Renewal in Din Daeng Community as proposed by the Ministry of Interior.

2. Approval of the supporting fund for expenses needed for preparation for not over 793 Million baht within the period of 10 years. The 250 Million baht for initial stage shall be allocated from the budget of the fiscal year 2002 and 2003.

3. MOF, MOSTE, NESDB and the Budget Bureau were assigned to study further details, and find out the appropriate plan that conform with the related laws for investment planning, investment method, and joint-venture with the private sector including the support for construction of residential building, in order to compensate the right of old residents, removal fees during construction period, and environmental impact.

4. Study to improve the National Housing Act so that NHA can be more efficient in developing and managing the large scale communities, including the adjustment of NHA’s duty in the operation and management of residential buildings and improving environment of the congested and deteriorated communities of the low-income people. Giving NHA a full authority to operate and manage the cleaning system of each community and assigned the Ministry of Interior and NHA, to proceed the improvement of the National Housing Act as soon as possible.

5. NHA shall determine the criteria and complete the following procedures before initiating the project implementation:

5.1 Prepare a clear plan for removal, construction of building and temporary residence by considering the impact on households, schools and income sources of old residents. 5.2 Study and confirm the number of residents by making the name list and announce at each community for them to check for the correctness. 5.3 Determine the compensation for rental privilege and temporary removal fee for old residents during the project operation with fairness according to economic situation. 5.4 Determine the privilege of old residents to return to the project as first priority with rental fee lower than normal fee that will charge from new resident. The Special rental fee will consider from the average income of old residents. 5.5 Determine the area for pubic center i.e. library, community center, old age health center, nursery, sport and recreation center with appropriate ratio compared with total residents. 5.6 Determine the suitable and appropriate area for community shops in each residential building and specific area by giving the privilege to the residents in making more income with special rental fee and without liquidation. 5.7 Allocate the area in the commercial area with number of building by giving the privilege to the residents with special rental fee and without liquidation. 5.8 Study for possibility of joint venture by private sector for land development for commercial use by giving the opportunity to old residents to purchase the shares of private sector. 5.9 NHA should explain, making the understanding and conduct a-public hearing among the old residents to be used as guideline for operation according to 5.1 - 5.8 and proceed according to the comments from MOSTE, NESDB and Budget Bureau before project implement.

5-2 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

5.2 OUTLINE OF EXISTING MASTER PLAN

5.2.1 Objectives/Target of Planning The consultant team carried out their study to meet the following requirements set by NHA.

(1) Objectives of the Project The objectives of the project are: • To set up a pilot project using the concept of urban renewal in cooperation with local government and other relevant agencies; • To bring component facilities up to current required standards; • To build new housing for existing residents with improved infrastructure and environment to provide quality of urban lives; • To provide new housing to accommodate other residents as a means to alleviate housing shortages within BMA; • To provide employment opportunities for community residents through reduced commuting time and to ease local traffic problems; and • To utilize the land development potential at the local level and to develop effective communication networks.

(2) Direction of Development The development of the Din Daeng Community Area was approached from three levels: 1) the district level (larger area comprising surrounding the super block); 2) the super block level (large block of area comprised of component projects); and, 3) the project level (component projects of the super block). At the district level, a traffic plan was developed to accommodate new and anticipated increased traffic loads. As Din Daeng district will have a main station in the underground rapid rail mass transit system (the ), with a park and ride facility for private cars, more traffic is expected. The local road network should be well connected to the city level system with access to the underground station. More parks, open spaces, and green areas are required to enhance the living environment.

5-3 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

At the super block level, the project should be well coordinated with SRT’s Makkasan Development Project. These two sites would cover 1,500 rai (240 ha), and successful cooperation between the two projects would enhance the urban renewal concept, and lead to significant improvement of infrastructure and the urban environment.

5.2.2 Spatial Development Plan

(1) Land Use Plan The land use plan was formulated to achieve the following items. • Land for mixed use to match the advantageous location; • Effective network of infrastructure; • More parks, open spaces and green areas to enhance the community environment; • Careful approach to minimize impact on the existing residents; and • Provision of other necessary items to facilitate BMA’s new City Hall and other Government works and services. Figure 5.1 shows the master plan of Din Daeng Community Development.

(2) Zoning Plan The land use consists of seven spatial zones: Zone 1 Din Daeng − Makkasan Zone 2 Din Daeng − Pracha Songkhro Zone 3 Din Daeng − Mit Mai tri Zone 4 Din Daeng − Vibhavadi Rangsit Zone 5 Community Institution Zone 6 Sports and Recreation Park Zone 7 BMA Civic Center Figure 5-2 shows the zoning plan employed in the master plan and detailed development policy for each zone is presented in Table 5.1.

5-4 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Figure 5.1: Master Plan of Din Daeng Community Development by NHA

Figure 5.2: Zoning Plan of Din Daeng Community Development by NHA

5-5 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Table 5.1: Spatial Development Policy by Zone Zone Development Policies Is connected with Makkasan marshalling yard of SRT. This Zone 1: South (Din-Daeng - Makkasan) zone can be divided into number of minor areas. Zone 1.1 Site D (Old Din-Daeng) : Will be developed as compensation housing. Will be developed for compensation housing project while the Zone 1.2 Site E (Old Din-Daeng) : remaining will be green area. An open area is suggested in front of the building to be Zone 1.3 Site DD3 (Old Din-Daeng3) : developed for parking where roof top will function as green area for existing NHA. hire purchased housing. Zone 2: East (Din-Daeng Pracha Songkhro) Comprises 7 minor areas: Will be developed for commercial purposes to generate cross subsidy for existing residents. Development elements include Zone 2.1 Site B1 B4 (Old Din Daeng) : good housing for medium income in nice environment with lagoon, fountain at center point and people bazaar for lively activities. Will be developed for compensation housing project with Zone 2.2 Site F: some public services. Will be designed for people walking street alignment and Zone 2.3 Site DD4: (New Din Daeng 4) : equipped with shopping activities with some elements of Thai architecture. A pair of 12 storey buildings will function as connection of zone Zone2.4 Site DD (New Din Daeng) : 2.1 and zone 2.2 through some units of housing. Some shop houses are suggested to be converted for connection with pedestrian route system with open space and Zone 2.5 Site G (New Din Daeng) : some shopping activities. Expansion of Pracha-Songkhro Road will be monitored on real situation. Zone 2.6 Samakee bamrung vittaya school Is suggested to be combined with public service function. area: Zone 2.7 Temporary Residence for traveler Should be combined with zone 2.5 area: Zone 3: North (Din Daeng Mit Mai Tri) Comprises 6 minor areas: Will be designated to compensation housing with more open Zone 3.1 Site H (New Din Daeng) : space and some shopping function and public services. Zone 3.2 Site DD5 (Hired Purchase) : Housing will be incorporated in the plan. Suggested to be developed for housing program for BMA Zone 3.3 Petrol station officials. Zone 3.4 Road Construction and Maintenance Suggested to function as zone 3.3 and exchanged with zone Center 2.2 Should be refurbished for better visual and open space Zone 3.5 Waste Water Treatment Plant function on roof top. Zone 3.6 Din Daeng Police Station Will retain its function with more security checkpoints.

5-6 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Table 5.1: Spatial Development Policy by Zone (Continued) Zone Development Policies Zone 4: West (Din Daeng Vibhavadi Comprise 4 minor areas: Rangsit) Will be reserved for greeting land mark with elevated Zone 4.1 Site A (Old Din Daeng) : connection with zone 1.2 to the north direction. Are most attractive location for business purpose. The area is suggested for main commercial function such as hotel, Zone 4.2 Site C (Old Din Daeng) : convention hall and shopping center. It is expected that income from this area will generate a great amount of cross subsidy for compensation housing investment. Zone 4.3 Muslim Musyid Will be retained as religious area with better environment. Zone 4.4 Department of City Planning and Is suggested to combine with zone 4.2 or transitional point for Department of Traffic and park andride facilities for underground station of Orange line Transportation of Mass Transit. Zone 5: Community institutions Comprise 5 minor areas: Is suggested to have intensified function to absorb more students. Zone 5.1 Piboolprachasan school Land along Asok-Din Daeng road is recommended for green space for the approach to Victory Monument. Is suggested for rearrangement of building for more effective future Zone 5.2 Rajanukul Hospital for the Retarded functions. Some parts are recommended for commercial development to generate income for new buildings. Zone 5.3 Research and Analysis Division of BMA Should be exchanged with other area.

Zone 5.4 Ministry of Labour and Social Welfare

Zone 5.5 Day Care & YMCA These functions should be included in housing complex.

Zone 6: Sport and Recreation Park

Zone 6.1 Site B5 (New Din Daeng) Nice housing in good environment is planned. Will be designated as multi-purpose function serving as main Zone 6.2 Site B6 (New Din Daeng) employment for local residents in Thai culture. It is recommended that sports center is easily accessible by local Zone 6.3 Sports Center residents. Zone 6.4 Sports Hall Redevelopment of its function should be planned.

Zone 7: BMA Civic Center Comprise 8 minor areas:

Zone 7.1: New BMA head office With city Hall Plaza, Citizen’s plaza and people walking street.

Zone 7.2: Mechanical Workshop Division Is recommend for green area with shopping activities underground.

Zone 7.3: Mechanical Division Same as Zone 7.2. This area is planned for amphitheater, public services and people Zone 7.4: Vichakorn School bazaar. Zone 7.5: Wichutit School All schools should be relocated in single area.

Zone 7.6: Vocational school Same as 7.5

Zone 7.7: Waste Water Treatment Plant Landscaping for this area is recommended.

Zone 7.8: Health service This area should be combined with NHA area.

5-7 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

(3) Housing Development The plan proposed high-rise buildings for housing purpose to create more housing units and open space as summarized below.

Table 5.2: Proposed Housing Scheme in NHA Type No. of Housing Unit Remarks Type A1 (33m2) 3,019 units Housing for compensation to existing residents Type A2 (41.25m2) 4,193 units Sub-total 7,212 units Type B (41.25m2) 6,330 units Housing for new residents Total 13,542 units

At the full development, total floor area for housing would reach 1,434,080m2, or 574% in the floor area ratio against 24.81 ha (NHA portion). The area would be divided into 1) housing for existing residents (Housing A-1 and A-2) covering 51 rai (8.16 ha), and 2) housing for new dwellers (Housing B) mixed with commercial development covering the remaining 104 rai (16.64 ha). It should be noted that in the master plan, several blocks were excluded from the redevelopment scheme, as the owner/occupiers of shophouses in those blocks would have difficulty accepting to any new proposals and due to the complicated rights held by them. These blocks include Nos. 1,10, 12, 13, and 14.

5.2.3 Construction and Financial Plan

(1) Construction Phasing Plan The master plan proposed construction phasing plan is as shown in the following figure. The NHA responsibility is to be phased out into four sections and is scheduled to be executed within 10 years.

5-8 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Figure 5.3: Construction Phasing Plan

(2) Financial Plan

1) Cost Estimate The expenses for the 10-year NHA development were estimated at 26,433 million baht, with an initial investment of 2,556 million baht needed for the first phase.

Table 5.3: Construction Cost by Phase (million baht) Type Total Phase 1 Phase 2 Phase 3 Phase 4 Housing A-1 (m2) 99,627 57,717 41,910 0 0 Housing A-2(m2) 172,961 31,928 84,191 56,843 0 Housing B(m2) 261,113 0 62,618 151,058 47,438 Commercial(m2) 221,072 7,120 45,454 78,854 89,644 Public Service(m2) 38,213 4,600 9,200 12,700 11,713 Parking(m2) 215,112 26,044 64,480 80,914 43,675 Circulation(m2) 425,983 46,216 122,012 159,060 98,695 Total Built-Up Area(m2) 1,434,080 173,624 429,864 539,428 291,695 Project Cost (mil. baht) 26,433 2,556 7,246 10,357 6,274

2) Financial Plan NHA has identified the following three alternative financing arrangements:

5-9 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

1) NHA or the government as a sole investor, 2) private sector as a sole investor, or 3) co-investment by NHA and the private sector. Condition and results of the financial study are as follows:

Table 5.4: Assumptions for Financial Planning Categories Criteria Rent and Leasing of Housing Units 1) Rental payment set at 1,500 baht/month plus 3% inflation for Housing A1 (33m2) and 2,000 baht/month for Housing A2 (41m2), both of which are for compensation of existing residents, 2) Rental payment set at 5,000 baht/month plus 3% inflation for Housing B (41m2), for new residents, 3) Leasing payment for Housing B set at not less than 300,000 baht, Rent of Commercial Area Rental payment for commercial floor set at 35 baht/m2/month, Compensation for Existing 1) Leasing payment for compensation set at not less than 50,000 Residents baht/m2/month, 2) Land rent fee for compensation set at not more than 1 baht/wah, 3) Land rent fee for commercial are not more than 200 baht/wah 4) Those who prefer to move out from the area will get new units in other NHA project with cost-reduction scheme. 5) Temporary shelter will be prepared for the first group who has to be relocated. 6) Payment for move will be offered at 5,000 – 10,000 baht./household. 7) Other necessary options will be considered case by cases. Others 1) Inflation for income 3%/year, for expenditure 4%/year, 2) Subsidy for the study 3%, 3) Interest rate for NHA bond about 7.5% yield 10years, and 4) Interest rate for private bank loan about 8% up.

Table 5.5: Results of Financial Study in NHA Sections (FIRR: %) Phase 1-4 Phase 1 Phase 2 Phase 3 Phase 4 Capital Investment 16,226 2,603 5,732 10,594 6,424 Case 1: 9.2 4.5 8.6 9.4 14.0 Case 2: 9.2 4.5 8.6 9.4 14.0 Case 3: NHA-Cash 5.4 3.7 4.5 12.8 - Private - Cash 12.0 - 12.2 10.3 12.5

Based on the results shown above, the master plan recommended that the project should be separated into two parts, i.e., the low cost housing part to be invested by NHA, and the new housing and commercial development to be invested by the private sector.

5-10 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

5.2.4 Community Participation on Existing Master Plan When NHA selected the Din Daeng Community Project as a pilot project of urban redevelopment, it considered that the understanding and active participation of the residents at the beginning of the projects was essential as the project would affect a large number of residents in various ways. During and after the development of the master plan, NHA conducted three seminars in order to explain the concepts of the project, and to receive comments and opinions from stakeholders.

(1) Workshops during Master Planning The seminars were held on 8 May 1999, 26 January 2000, and 29 January 2000. The topic of the first and the third seminar was “Urban Community Redevelopment”, targeting different groups: 95 community leaders of Din Daeng 2 attended the first seminar, while 86 leaders of Din Daeng 1 participated in the third seminar. The second was a brainstorming seminar to discuss “Preparation of Projects to Develop Din Daeng Community Area”, for which the participants were composed of 200 delegates from relevant local and central government organizations. The result of the community leader seminars showed that most participants seemed to agree with the project. They pointed out that the buildings were old and might collapse. Building equipment had been in bad condition, and the living environment had become worse.

(2) Workshops after Finalization of Master Plan NHA held two more seminars attended by community leaders in late February and early March 2001 in Pattaya city. These seminars aimed to give correct information about the project because of confusion and misunderstanding that had spread during the election campaign period.

1) Provision of Up-dated Information In the seminars, community leaders expressed requests for participation in certain levels at critical points in the project implementation. The participants requested NHA to provide up-dated information on the project. Some leaders and local politicians suggested that NHA should conduct public

5-11 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report campaigns through various means. The suggestions of these groups on the methods of the public relation campaigns included: • distributing leaflets to all flat households; • holding a seminar with more attendants (10% of residents in each flat); • arranging public meetings for each flat, in which all residents can participate and can directly ask about details of the project from NHA staff; and • setting up an information center in the project area.

2) Positive Cooperation with Community Leaders Attending community leaders expressed their willingness to assist NHA to distribute information to the residents. For example, if NHA holds a public meeting, they would participate and help explain and answer questions raised by the residents.

3) Contribution to Planning They wanted to share and provide ideas to the master plan. To this end, they suggested that NHA set up a committee, sub-committee, or working group in which representatives of the residents would be fully involved.

4) Closer Coordination on Relocation and Compensation Planning They requested a closer relationship with NHA for making decisions on relocation and compensation policies. To this end, they suggested that NHA appoint community representatives as members of a relocation committee.

5) Closer Discussion on Setting of New Rent They requested close discussion for making a decision on the new rental fee. They suggested that NHA should propose several alternatives and let the representatives of the residents consider the alternatives that might be acceptable to residents and feasible for implementing the project.

5-12 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

CHAPTER SIX:

EXISTING CONDITION OF

DIN DAENG COMMUNITY AREA

6.1 SOCIO-ECONOMIC CHARACTERISTICS

(1) General As accommodating government activities and welfare housing, the Din Daeng Community Area (DC Area) has a large day time and night time population. Based on the social survey results, there are 30,011 residents in DC Area. All of them reside in NHA’s Din Daeng Housing Complex. On the other hand, the daytime population amounted to 32,279 persons, according to the interview survey by NHA. The daytime population includes 25,325 employees and 6,954 students as tabulated in Table 6.1. Regarding employment, BMA has the largest share of 82% among the seven government organizations. The population density is estimated to be 695.5 persons/ha in the entire area, while it is 927.7 persons/ha if focusing on the housing section. In addition to residents and employees, the Thai-Japan Youth Center records 1,690,309 visitors, annually.

6-1 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Table 6.1: Population in DC Area Categories Organization Population Block No. 1. Residents NHA Housings*1 30,011 persons 1.2~14 2. Daytime Population 2.1 Employees (25,325 employees) (NHA, 748 employees) Office 58 employees 1.1 Shophouses in NHA housing area*2 690 persons 1.10, 13&14 (BMA, 20,656 employees) City Hall & District Office 14,804 employees 2.1 Mechanical Workshop Division 370 employees 2.2 Thai Youth Center 106 employees 2.5 Sports Complex 108 employees 2.4 Vichakorn School 154 employees 2.3 Mechanical Division 1,042 employees 2.6 Rabies Division 130 employees 2.7 Park 9 employees 2.8 Gas Station 743 employees 2.9 Road Construction and 1,474 employees 2.10 Maintenance Center Sewage Treatment Plant 112 employees 2.11&12 Health Source Center 60 employees 2.13 Witchutit 153 employees 2.15 Analysis & Research 74 employees 2.16 Office*3 1,317 employees 4.1 (MOL, 3,013 employees)*4 Office 2,256 employees 3.1, 3 & 4 Care Center 650 employees 3.2 Day Care Center 107 employees 3.5 (MOE) Piboonprachasan School 163 employees 5.1 (MOPH) Rajanukul Hospital 511 employees 6.1 (OPM) Police Station 224 employees 7.1 (Other)*5 Mosque 10 employees 8.1 2.2 Students (6,954 students) (BMA) Vichakorn School 1,206 students 2.3 Vocational Center 1,643 employees 2.14 Wichutit School 1,659 students 2.15 (MOE) Piboonprachasan School 2,191 students 5.1 Samakeebumrungvittaya School 255 students 5.2 Total of Daytime Population 32,279 persons 3. Visitors (Thai Youth Center) 4,631 persons (daily average) 2.3 & 4 Source: Interview survey by NHA Note: *1 The number of residents is estimated from the social survey by the Study as presented in 6.1 (2). *2 The number of employees of shophouses is estimated as 230 shophouses (actual)×3 staffs/shophouse (assumption) *3 The number of employees at block 4.1 is assumption, based on 5.0 m2/employee similar to the BMA City Hall at Block 2.1. *4 The number of employees at each Block of MOL is assumed to distribute 3,013 employees of total by proportion of floor areas at each Block. *5 The number of employees at mosque is assumption.

6-2 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

(2) NHA Housing Area As there is no data on population readily available for Din Daeng Housing Complex, several assumptions were made based on the social survey conducted by the Study. According to the survey results, the average family size was estimated at 3.6 persons with the vacancy rate of 7.5%. the population in entire Din Daeng Housing Complex is estimated at 30,011 residents as tabulated below.

Table 6.2: Estimated Population in NHA Housing Area Block No. No. of Units Population Block No. No. of Units Population (units) (residents) (units) (residents) 1,2 1,776 5,914 1,9 352 1,172 1,3 672 2,238 1,10 664 2,211 1,4 672 2,238 1,11 972 3,237 1,5 640 2,131 1,12 308 1,026 1,6 384 1,279 1,13 952 3,170 1,7 900 2,997 1,14 270 899 1,8 450 1,499 Total 9,012 30,011 Note: Population is estimated by the assumptions: 1) average family member is 3.6 persons and 2) vacancy rate is 7.5%, according to the social survey.

Regarding the age structure, the economically active group (15-59 years old) makes up 72.5% as shown in the following table. The elder group (60 years old or more) is 12.9%, which is higher than that of BMA on the whole (9%). Dividing the age structure into 5-year groups, the 20-24 and 30-34 groups are the largest (both 11.9%).

6-3 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Table 6.3: Estimated Age Structure in Din Daeng Housing Complex Age Estimated Population Male Female Total Ratio Age Group 0-4 500 700 1,200 4,1% 14,6% 5-9 800 900 1,700 5,8% (infant group) 10-14 700 700 1,400 4,8% 15-19 900 600 1,500 5,1% 72.5% 20-24 1,600 1,900 3,500 11,9% (economically 25-29 1,200 1,400 2,600 8,8% active group) 30-34 1,700 1,800 3,500 11,9% 45-39 1,100 1,500 2,600 8,8% 40-44 1,400 1,400 2,800 9,5% 45-49 700 1,000 1,700 5,8% 50-54 700 1,200 1,900 6,5% 55-59 300 900 1,200 4,1% 60-64 600 800 1,400 4,8% 12,9% 65-69 400 600 1,000 3,4% (elderly group) 70~ 600 800 1,400 4,8% Total 13,200 16,200 29,400 100.0% 100.0% (44.9%) (55.1%) (100.0%) Note: Component ratio by ages is estimated according to the social survey by the Study.

Apart from the residents, there are 230 shophouses located in Blocks 1.10, 1.13, and 1.14. Assuming the average number of employees at 3 staffs/shophouse, the total number of employees is estimated at 690.

6.2 LAND USE AND TENURE

6.2.1 Land Use

(1) Designated Land Use in the Second Bangkok General Plan According to the Second Bangkok General Plan, the DC Area is designated to fall into four kinds of land uses as tabulated below. Among them, i) high density residential, and ii) government offices, cover a large area of 796,672m2 (78.4%), if combined.

Table 6.4: Designated Land Use by the Second Bangkok General Plan Land Use Land Area (m2) (%) High density residential zone 345,456 34.0% Open space, recreation area, and environmental conservation area 158,928 15.6% Educational institutes 60,400 5.9% Government offices, infrastructure, and others 451,216 44.4% Total 1,016,000 100.0% Source: NHA

6-4 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

(2) Current Land Use Currently, there are eight kinds of land use dispersed on 100 ha of DC Area. Major land uses are residential (31.5%) and office (24.4%) sharing 55.9% in total. As shown in the following table, the land used for roads is limited to 80,509 m2 or 7.8%, reflecting unclear hierarchy of the existing road network. The floor area ratio (FAR) in the whole area is 82.8% in gross and 92.0% in net. Regarding the residential section, the FAR ranges middle to high, as 151.2% in residential areas, and 289.8% in mixed use area of commercial and residential.

Table 6.5: Land Use in DC Area Use Land Area Building Floor Area Building Floor Area Area Coverage Ratio Ratio m2 % m2 m2 % % Building Site 929,557 90.4 262,967 823,137 29.4 92.0 Residential 275,483 26.8 96,689 416,449 35.1 151.2 Office 251,058 24.4 54,552 126,906 21.8 50.7 Commercial & 48,015 4.7 19,575 139,164 40.8 289.8 Residential Sport Facilities 131,263 12.8 57,381 66,846 43.7 50.9 Public Service 10,619 1.0 2,838 4,786 26.7 45.1 School 118,722 11.5 20,359 46,347 17.1 39.0 Hospital 52,385 5.1 10,295 21,054 19.7 40.2 Religious Facilities 3,377 0.3 563 870 16.7 25.8 Others 38,635 3.8 715 715 14.7 14.7 Public Space 99,160 9.6 102 102 - - Park 18,651 1.8 102 102 - - Road 80,509 7.8 - - - - Total 1,028,717 100.0 263,069 823,239 26.4% 82.8% Source: JICA Study Team Note: 1) Building and floor areas of Block 3.4 in “Office” and 2.11, 2.12 and 7.1 in “Other” are not available. Therefore BCR and FAR are estimated excluding land areas of those blocks. Block 3.4 has a land area of 628m2 and 2.11, 2.12, and 7.1 have totally 3,377m2. 2) “Others” includes waste water treatment plant (2.11 & 12), gas station (2.9), and police station (7.1).

Table 6.6 shows details of land use, building area, and building floor area.

6-5 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Figure 6.1: Existing Land Use in the DC Area

6-6 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Table 6.6: Land Use, Building Coverage Ratio, and Floor Area Ratio in the DC Area No. Land Use Land Area Building Area Floor Area Remarks (m2) (m2) (%) (m2) (%) 1.1 Office 3,996 876 22 1,666 42 NHA office/ BMA’s Pawnshop/ Branch of the Government Saving Bank 1.2 Residential 86,004 35,291 41 111,354 129 NHA Housings 1.3 Residential 32,597 9,963 31 43,776 134 NHA Housings 1.4 Residential 29,381 9,184 31 43,776 149 NHA Housings 1.5 Residential 20,522 9,022 44 45,000 219 NHA Housings 1.6 Residential 23,365 5,763 25 23,336 100 NHA Housings 1.7 Residential 23,579 9,286 39 45,280 192 NHA Housings 1.8 Residential 11,207 4,478 40 22,640 202 NHA Housings 1.9 Residential 9,427 2,067 22 15,000 159 NHA Housings 1.10 Residential & Commercial 17,395 6,273 36 18,790 108 including shophouse 1.11 Residential 31,446 9,733 31 38,800 123 NHA Housings 1.12 Residential 7,955 1,902 24 27,487 346 NHA Housings 1.13 Residential & Commercial 28,396 11,078 39 89,244 314 including shophouse 1.14 Residential & Commercial 2,224 2,224 100 31,130 1,400 including shophouse Sub-total 327,494 117,140 36 557,279 170 2.1 Office 147,674 19,461 13 73,754 50 BMA City Hall and District office 2.2 Office 20,282 14,856 73 15,626 77 Mechanical Workshop Div., BMA 2.3 School 21,541 2,439 11 6,878 32 Vichakorn Elementary School, BMA 2.4 Sport Facilities 11,656 4,168 36 4,168 36 Indoor stadium, BMA 2.5 Sport Facilities 119,607 53,213 44 62,678 52 Thai-Japan Youth Center, BMA 2.6 Office 11,111 3,144 28 6,351 57 Mechanical Div., BMA 2.7 Office 1,697 976 58 1,206 71 Rabies Div., BMA 2.9 Other 4,863 715 15 715 15 Gas Station 2.10 Office 15,537 4,872 31 4,319 28 Construction center, BMA 2.11 Other 19,603 N/A 0 N/A 100 Central WWTP 2.12 Other 12,809 N/A 0 N/A 100 Central WWTP 2.13 Office 1,825 674 37 2,021 111 Health source center, BMA 2.14 School 14,520 1,665 11 5,582 38 Vocational Center, BMA 2.15 School 15,599 5,194 33 13,966 90 Wichutit School, BMA 2.16 Office 4,480 1,354 30 1,757 39 Analysis & Research Center, BMA Sub-total 422,804 112,731 27 199,123 47 3.1 Office 33,074 4,595 14 12,187 37 Office, MOL 3.2 Public Service 8,832 2,162 24 4,110 47 Children and elderly care center, MOL 3.3 Office 2,824 730 26 1,460 52 Office, MOL 3.4 Office 628 N/A 0 N/A 0 Office, MOL 3.5 Public Service 1,787 676 38 676 38 Day care center, MOL Sub-total 47,145 8,163 17 18,433 39 4.1 Office 7,930 3,014 38 6,559 83 Dept. of City Planning, Dept. of Traffic and Transportation, BMA Sub-total 7,930 3,014 38 6,559 83 5.1 School 63,670 10,183 16 18,854 30 Piboonprachasan school, MOE

6-7 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

No. Land Use Land Area Building Area Floor Area Remarks (m2) (m2) (%) (m2) (%) 5.2 School 3,392 878 26 1,067 31 Samakeebumrungvittaya school, MOE Sub-total 67,062 11,061 16 19,921 30 6.1 Hospital 52,385 10,295 20 21,054 40 Rajanukul Hispital Sub-total 52,385 10,295 20 21,054 40 7.1 Others 1,360 N/A 0 N/A 100 Police Station 8.1 Religious 3,377 563 17 870 26 Mosque Total Building Site 929,557 262,967 29 823.137 92 Park (2.8) 18,651 102 1 102 1 Garden, BMA Road 80,509 - - - - Grand total 1,028,717 263,069 26 823,239 83 Source: NHA

6.2.2 Land Tenure The land of the entire DC Area belongs to the government. Upon this condition, most part of the area is used by the government institutions (64.4%). Remaining part, equivalent to 35.6%, is used by non-government organizations, including NHA. It should be noted that the land owned by the government but used by non-government organizations is classified as Ratchaphasadu on which several conditions are imposed for use of the land. BMA, four central governments, and NHA are the main land users as shown in Table 6.7. Among them, BMA shares the largest area (51.5%), followed by NHA (31.8%). Distribution of the land users is shown in Figure 6-2. The land used by BMA is located at the southern part of Mit Maitri Road, while those of central governments are located in the northern part of Asok-Din Daeng Road. The NHA lands are widely scattered.

6-8 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Table 6.7: Land Users in DC Area User Land Use Land Area (m2) (%) Building Site NHA Residential 275,483 26.8% Residential & Commercial 48,015 4.7% Office 3,996 0.4% Total 327,494 31.8% BMA Office 225,056 21.9% Sport Facilities 131,263 12.8% School 37,140 3.6% WWTP 32,412 3.2% Gas Station 4,863 0.5% Total 430,734 41.9% Ministry of Labor Office 36,526 3.6% Public Service 10,619 1.0% Total 47,145 4.6% Ministry of Education School 67,062 6.5% Ministry of Public Health Hospital 52,385 5.1% Office of Prime Minister Police Station 1,360 0.1% Others Mosque 3,377 0.3% Total 929,557 90.4% Public Space BMA Park 18,651 1.8% Road 80,509 7.8% Total 99,160 9.6% Total 1,028,717 100.0% Source: JICA Study Team

6-9 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Figure 6.2: Land User Distribution in the DC Area

6-10 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

6.3 BUILDINGS/FACILITIES

6.3.1 NHA Housing Complex The first housing facility in Din Daeng Housing Complex was built in 1963 and has been expanded until 1999. Currently, the total number of facilities comprises 94 buildings (excluding 5 buildings for offices of the NHA, and the prawn shop of BMA in Block 1.1). These buildings are mostly old and deteriorated as ninety one buildings (97%) were built more than 20 years ago. Fifty six buildings (60%) are more than 30 years after construction. Focusing on housing units, those old comprise 8,390 (93%) for 20 years and over, and 3,736 (41%) for 30 years and over. As mentioned earlier, buildings in Blocks 1.10, 1.12, 1.13, and 1.14 have 230 shophouses in total. All the facilities are built of reinforced concrete structure (RC) and most of them are five stories with some exceptions, including the highest of 14 stories, built during 1997 – 1999. Typical floor plan of the buildings constructed before 1977 is the single corridor type and that of later buildings is twin corridor type. The following table shows an outline of the housing facilities:

6-11 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Table 6.8: Outline of Existing Housing Facilities in Din Daeng Housing Complex Building Site Area Floor Area Operatio Use of No of Type of No. of Type of No. of Built Year Block Area n No. Building Building Structure Stories Corridor Units (m2) (m2) (m2) 1963 1.1 (3,996) (876) (1,666) - (O,PS) (3) (RC) - - - 1963 1.5 20,522 9,022 45,000 R 8 RC 5 SC 640 1964 1.4 29,381 9,184 43,776 1 R 12 RC 5 SC 672 1967 1.3 32,597 9,963 43,776 R 12 RC 5 SC 672 1968 1.2 86,004 35,291 111,354 R 24 RC 5 SC 1,776 1974 1.6 23,365 5,763 23,336 2 R 8 RC 5 SC 384 1975 1.10 17,395 6,273 18,790 R & S 10 RC 5 SC 664 1975 1.12 7,955 1,902 27,487 - R 2 RC 12 SC 308 1977 1.13 28,396 11,078 89,244 3 R & S 4 RC 8 TC 952 1978 1.7 23,579 9,286 45,280 2-3 & R 4 RC 5 TC 900 1980 1.8 11,207 4,478 22,640 4-2 R 2 RC 5 TC 450 1980 1.11 31,446 9,733 38,800 4-1 R 5 RC 5 TC 972 1984 1.9 9,427 2,067 15,000 4 R 2 RC 5 DC 352 1999 1.14 2,224 2,224 31,130 5 R & S 1 RC 14 DC 270 More than 30 years 168,504 63,460 243,906 56 3,736 - - - - - old (52%) (55%) (44%) (60%) (41%) More than 20 years 311,847 111,973 509,483 91 8,390 - - - - - old (96%) (96%) (92%) (97%) (93%) 323,498 116,264 555,613 94 9,012 Total - - - - - (100%) (100%) (100%) (100%) (100%) Note: 1) Type of Corridor - SC: Single Corridor type, TC: Twin Corridor type, and DC: Double-loaded Corridor type 2) Use of building - O: Office, PS: Pawn shop, R: Residential, and S: Shophouse. 3) Operation Number is designated by NHA for operation and maintenance purpose, according to construction phase and maintenance area. 4) Buildings in Block 1.1 is excluded from the total, as those consist of offices and prawn shops without housing units.

Regarding the housing units, the majority are used as rental flats, excluding Block 1.13 which is hire-purchased. Floor area of these units range from 31m2 to 54m2 with the average of 40.54m2. The floor area per unit is related to the year of construction as follows. Units before 1975 : floor area - around 40m2

Units after 1975 : floor area - around 35m2 and more than 50m2 (Block 1.13 and 1.14) Most of the units are single room type except those having three bedrooms located in Blocks 1.12 and 1.13. A single room type has an open room (or a large balcony), which serves for various purposes including cooking and dinning. Each of these units originally had a toilet and a shower room, but no kitchen. Composition of unit plan types in Din Daeng Housing Complex is summarized in the following figures and tables.

6-12 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Table 6.9: Outline of Unit Plan in Din Daeng Housing Complex No. of Floor Area (m2) Unit Plan No. of Built Year Block Buildings Flat Balcony No. of Bedroom Balcony Units 1963 1.5 8 40.6 6.60 0 ○ 640 1964 1.4 12 40.6 6.60 0 ○ 672 1967 1.3 12 40.6 6.60 0 ○ 672 6 40.6 6.60 0 ○ 337 1968 1.2 18 40.6 6.60 0 ○ 1,439 1974 1.6 8 40.6 6.60 0 ○ 384 1975 1.10 10 34.8 7.15 0 ○ 664 1975 1.12 2 44.1 0.00 3 × 308 1977 1.13 4 54.0 7.00 3 ○ 952 1978 1.7 4 36.9 4.50 0 ○ 900 1980 1.8 2 36.9 4.50 0 ○ 450 1980 1.11 5 36.9 4.50 0 ○ 972 1984 1.9 2 31.0 4.50 0 ○ 352 37.4 8.35 0 ○ 126 1999 1.14 1 50.9 8.35 0 ○ 144 Total - 94 40.54 (avg.) 5.89 (avg.) - - 9,012 Note: “○” means the unit has balcony and “×” means no balcony.

6-13 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Figure 6.3: Floor Plan and Unit Plan in Din Daeng Housing Complex (1/3)

Block No. 1.2 – 1.6

Outline: Side corridor type, 5 stories, 64 buildings, Constructed in 1963 – 1975 40.6 m2/unit (incl. 6.6 m2 of balcony and alcove), 4,152 units 1,600 3,000

50,000

4,000 3,500*12=42,000 4,000 11,600 7,000 1,600 13,600 Block No. 1.6: 8 buildings, 384 units (‘74-‘75)

2,000 10,000 57,000 4,000 3,500*14=49,000 4,000 Block No. 1.2: 6 of 24 buildings in 1.2, 337 units (‘68-’74) (Building No. 45, 47, 49, 51, 53 and 55) 1,600 Block No. 1.3: 12 buildings (’67), 672 units Block No. 1.4: 12 buildings (‘64-’65), 672 units 13,600 10,000 Total : 30 buildings, 1,681 units

2,000 78,000 4,000 3,500*20=70,000 4,000

1,600 Block No. 1.2: 18 of 24 buildings in 1.2 (‘68-’74), 1,439 units 13,600 10,000 Block No. 1.5: 8 buildings (’63), 640 units Total : 26 buildings, 2,079 units

6-14 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Figure 6.3: Floor Plan and Unit Plan in Din Daeng Housing Complex (2/3) Block No. 1.7, 1.8 and 1.11

Outline: Twin corridor type, 5 stories, 11 buildings, Constructed in 1978 – 1999 36.9 m2/unit (incl. 4.5m2 of balcony), 2,322units Block 1.7: 900 units (‘78 – ‘80) Block 1.8: 450 units (‘80), Block 1.11: 972 units (’96 – ’99)

3,600*29=104,400 3,600*25=90,000 14,400 1,250 1,450 8,600 1,450 10,250 9,000 8,000 31,000 1,450 8,600

Block No. 1.9

Outline: Double-loaded corridor type, 5 stories, 2 buildings, Constructed in 1984 4,000 31 m2/unit (incl. 4.5 m2 of balcony), 352 units

2,400 4,000*24=96,000 2,400 2,000 2,000 5,750 5,750 17,500 5,750 2,000 2,000

Block No. 1.10

Outline: Side corridor type, 5 stories, 10 buildings, Constructed in 1975 - 1977 34.8 m2/unit (incl. 7.15m2 of balcony), 664 units

63,000 5,400 4,350*12=52.2,000 5,400 4,350 2,600 9,300 5,400 (4 buildings) 2,400 1,300 71,700 5,400 4,350*14=60,900 5,400 8,000 5,400 2,600 9,300 5,400 (4 buildings) 1,300 89,100 5,400 4,350*18=78,300 5,400 2,600

9,300 (2 buildings) 5,400 1,300

6-15 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Figure 6.3: Floor Plan and Unit Plan in Din Daeng Housing Complex (3/3)

Block No. 1.12 6,300 Outline: Side corridor type, 12 stories, 2 buildings, Constructed in 1975 3,150 3,150 44.1 m2/unit, 308 units

85,050 2,600 6,300*6=37,800 4,250 6,300*6=37,800 2,600 3,000 7,000 7,000 4,000 13,900 1,500 5,400

Block No. 1.13

Outline: Twin corridor type, 8 stories, 4 buildings, Constructed in 1977 54 m2/unit (incl. 7 m2 of alcove and balcony), 952 units 134,200 2,600 6,000*10=60,000 9,000 6,000*10=60,000 2,600 9,000 6,660 24,600 9,000

6,000 3,000 3,000 2,000

Block No. 1.14 3,500 Outline: Double-loaded corridor type, 14 stories, 1 building, Constructed in 1977 – 1999 9,000 ①37.35 m2/unit (incl. 8.35m2 of balcony), 126 units 2 2 ②50.85 m /units (incl. 8.35 m of balcony), 144 units 3,500

4,500 55,400 2,200 9,000 4,125*8=33,000 9,000 2,200 4,500 1,800 2,200 7,000 1,800 2,000 11,300 9,500 40,200 8,300 6,500 4,500*5=22,500 4,500

2,000 1,800 9,000 2,0006,2501,800 Plan-① Plan-②

6-16 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

6.3.2 Government Office Buildings There are 72 government office buildings situated in 11 blocks in DC area with a total floor area amounting to 192,758m2 as tabulated in Table 6.10. The land area amounts to 247,062m2 in total. The largest government office in the area is the branch city hall of BMA, which has a total floor area of 28,213m2. There is a de-facto development project to construct a new city hall of BMA with a total floor area of approximately 500,000m2, as one of the major components of Din Daeng Community Redevelopment. The Ministry of Labor (MOL) has 16 office buildings with a total floor area of 36,526m2. As a whole of the offices, the building coverage ratio (BCR) and floor area ratio (FAR) are 21.8% and 78.2%. There is no block with the FAR above 100%.

Table 6.10: Government Offices in the DC Area Building Use Land Building Area Floor Area No. of Area Buildings m2 m2 % m2 % (buildings) BMA 2.1 BMA City Hall and District office 147,674 19,461 13 128,213 87 17 2.2 Mechanical Workshop Div., BMA 20,282 14,856 73 5,426 27 16 2.6 Mechanical Div., BMA 11,111 3,144 28 7,967 72 7 2.7 Rabies Div., BMA 1,697 976 57 721 43 3 2.9 Gas station 4,863 715 15 715 15 6 2.10 Construction center, BMA 15,537 4,872 31 4,319 28 1 Health Source Center 1,825 674 37 1,151 63 1 2.16 Analysis & research center, BMA 4,480 1,354 30 1,757 39 1 4.1 Dept. of City Planning, and Dept. of 7,930 3,014 38 6,559 83 4 Traffic and Transportation, BMA MOL 3.1 Office 33,074 4,595 14 12,187 37 12 3.3 Office 2,824 730 26 1,460 52 2 3.4 Office 628 - - - - 2 Total 247,062 53,676 22 192,758 78 72 Source: NHA Note: BCR and FAR in total excludes offices in Block 3.4.

6.3.3 Public Facilities Public facilities located in DC Area include educational, recreational, health, and religious facilities as tabulated in Table 6.11.

6-17 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Table 6.11: Public Facilities in the DC Area Building Use Land Area Building Area Floor Area (m2) (m2) (%) (m2) (%) Educational 2.3 Vichakorn Elementary School, BMA 21,541 2,439 11% 6,878 32% 2.15 Wichutit School, BMA 15,599 5,194 33% 13,966 90% 2.14 Vocational Center, BMA 14,520 1,665 11% 5,582 38% 5.1 Piboonprachasan school, MOE 63,670 10,183 16% 18,854 30% 5.2 Samakeebumrungvittaya school, 3,392 878 26% 1,067 31% MOE Recreational 2.4 Indoor stadium, BMA 11,656 4,168 36% 4,168 36% 2.5 Thai-Japan Youth Center, BMA 119,607 53,213 44% 62,678 52% 2.8 Garden, BMA 18,651 102 1% 102 1% Health and Public Service 3.2 Children and elderly care center, MOL 8,832 2,162 24% 4,110 47% 3.5 Day care center, MOL 1,787 676 38% 676 38% 6.1 Rajanukul Hospital 52,385 10,295 20% 21,054 40% Religious 8.1 Mosque 3,377 563 17% 870 26% Source: NHA As for educational facilities, there are four schools accommodating pupils for compulsory educational demand consisting of two public schools (Vichakorn public school, and Wichutit). As a whole, the capacity of schools under BMA is sufficient as these two public schools can accommodate a total of 3,010 pupils, only 2,865 pupils have been enrolled as of July 2001. In addition to these schools, there is one public school (Piboonprachasan) for disabled pupils under BMA which has a capacity of 2,730 pupil for 2,191 enrolled pupils.

On the other hand, Piboonprachasan private school insufficiently accommodates 240 pupils, as the number of enrolled pupils is 255.

6-18 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Table 6.12: Capacity of School in the DC Area School Kindergarten Elementary Secondary Total Lower Upper Vichakorn Public Capacity (pupils) 250 1,040 0 0 1,290 School No. of pupils 324 882 0 0 1,206 (BMA) No. of Classroom 10 26 0 0 36 No. of Staffs - - - - 65 Wichutit Public Capacity (pupils) 200 1,200 320 0 1,720 School No. of pupils 242 1,120 297 0 1,659 (BMA) No. of Classroom 8 30 8 0 46 No. of Staffs - - - - 94 Piboonprachasan Capacity (pupils) 250 1,400 720 360 2,730 Public School for No. of pupils 288 1,123 636 144 2,191 Disabled Pupils No. of Classroom 10 35 18 9 72 (MOE) No. of Staffs - - - - 152 Samakeebumrun Capacity (pupils) 0 240 0 0 240 gvittaya Private No. of pupils 0 255 0 0 255 School No. of Classroom 0 6 0 0 6 (Situated on the No. of Staffs - - - - 13 MOL land) Total Capacity (pupils) 700 3,880 1,040 360 5,980 No. of pupils 854 3.380 933 144 5.311 No. of Classroom 28 97 26 9 160 No. of Staffs - - - - 324 Source: NHA Note: Capacity of kindergarten classrooms: 25 pupils/classroom Capacity of elementary classrooms: 40 pupils/classroom Capacity of secondary classrooms: 40 pupils/classroom

The Thai-Japan Youth Center consists of an outdoor stadium, indoor stadium, swimming pool, meeting room, and outdoor stage. The total capacity of those facilities is for 16,914 visitors. According to the recent record, the annual number of visitors is 1,690,309 persons, which can be converted to 4,631 visitors per day as described earlier.

Table 6.13: Capacity of Thai-Japan Youth Center Number of Visitors Annual Number Daily Average Note Visitors for sport 1,073,306 visitors 2,941 visitors/day Record in 1999 Visitors for others 262,282 visitors 719 visitors/day Record in 1999 Audience 354,721 visitors 972 visitors/day Record in 2000 Total 1,690,309 visitors 4,631 visitors/day Capacity of Facility Capacity(person) Note Stadium (Outdoor) 6.400 visitors 1) Daily Water Demand: 350 m3/day Stadium (Indoor) 9.000 visitors 2) Wastewater is treated by septic tank of Thai and Swimming pool 800 visitors aeration type. Meeting room 214 visitors 3) Max Storm Discharge: 11,000 m3/day (rainy Outdoor stage 500 visitors season) Total 16,914 visitors 4) Capacity of electricity transformer: 1,600kVA, receiving from 12 kV power line of MEA. 5) No. of telephone: External - 5 lines, Internal - 40 lines. Source: Thai-Japan Youth Center

6-19 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

6.3.4 Infrastructure

(1) Transport System The main roads in the DC area, such as Pracha Songkhro Road, and Mit Maitri Road, connect to Asok-Din Daeng Road, and . These main roads have two lanes and pedestrian ways. Regarding the pedestrian movement, the foot bridge at the intersection of Asok-Din Daeng Road and Pracha Songkhro Road, connects the northern and southern parts of Asok-Din Daeng Road. Cross sections of these main roads are shown in Figure 6.4. There are several other roads situated within the DC Area serving as collector and access roads. These roads have one lane in each direction, and sometimes are over-crowded by passing through traffic.

6-20 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

Figure 6.4: Road Cross-section in DC Area Asok-Din Daeng Road

Pracha Songkhro Road

Mit Maitri Road

King’s Road in front of Block A

6-21 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

(2) Water Supply System Figure 6.5 shows layout of existing water distribution pipelines. Drinking water is supplied from trunk distribution pipelines with a diameter of 300 mm. Enclosing the northern part of Asok-Din Daeng Road, these pipelines are connected with transmission pipelines of 600 mm and 1,200 mm at three points. Distribution for inner parts from 300 mm pipelines is taken by pipes with a diameter between 150 mm and 200 mm. Apart from those mentioned above, drinking water for Block E and Block A in the southern part of Asok-Din Daeng Road is directly supplied by 200 mm and 300 mm distribution pipelines.

(3) Sewage Treatment System There is no central waste water treatment plant under operation to cover the DC Area. All building facilities therefore are equipped with individual treatment systems in accordance with regulations. Regarding the housing section, each building has a septic tank (community plant) with a capacity of 1,000 m3/day operated by NHA. The Department of Drainage and Sewerage (DDS), BMA is constructing Din Daeng central sewage treatment plant, which is designed to process 341,000 m3/day for 697,000 population in Phase 1 and 463,000 m3/day for 1,080,000 population in Phase 2. The plant will cover the entire DC Area by the combined system as presented in Part II of this report. The plant is scheduled to start operation in a few years.

(4) Rainfall Drainage System DC Area is divided into two catchment basins: the eastern part and western part of Pracha Songkhro Road. Storm water in the western part is pumped out by pumps with capacity of 6 m3/s at Block 2.8 after collecting through drainage pipes of 800 mm diameter. The western part is drained by culvert of 1,500mm along Asok-Din Daeng Road, as shown in Figure 6-6.According to DDS, the inundation areas in DC Area are pointed out at Pracha Songkhro Road and Block B.

6-22 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

(5) Electric Power System Electric power for the DC Area is supplied from the Saen Saep substation (3×40 MVA) through 12 kV lines along Asok-Din Daeng Road, Pracha Songkhro Road, and Mit Maitri Road. Those distribution lines will be upgraded by MEA from 12 kV to 24 kV in 2002.

(6) Telecommunication System The DC area is in the service area of Asok-Din Daeng (DD) switching station, which has a capacity of 40,000 lines. The switching station is connected to 93 distribution cabinets through 24 primary cable lines with total capacity of 72,000 lines. There are 28 distribution cabinets with capacity of 900 lines/cabinet in the DC area. According to the Telecommunication Organization of Thailand (TOT), 4,953 lines were in use in 1999. It forecasts that the demand will increase to 8,641 lines in 2011. Besides, there is a SDF for the branch city hall of BMA connected by special lines. There were 400 lines in use in 1999 and the demand in 2011 is assumed to be 800 lines. The DC Area also has optical fiber lines along Asok-Din Daeng Road and a road in front of the Japan Youth Center, connecting to the DD switching station. Another optical fiber line is laid along Pracha Songkhro Road, and this is connected to Inthamara switching station.

(7) Solid Waste Disposal System The Din Daeng district office of BMA is in charge of solid waste collection in the DC Area, and operate on the following basis.

1) Separation of Solid Waste Solid waste is separated into four types as follows: • Green for general; • Yellow for recyclable waste; • Grey with red lids for hazardous waste; and • Blue for ordinary garbage.

6-23 The Study for Urban Redevelopment Plan and Case Study in the Bangkok Metropolitan Area in the Kingdom of Thailand

Final Report

2) Frequency of Collection • Major road : three times a day • Soi road : once in two days • Housing : two or three times a week • School and market : once a day by 4 m3 containers