Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
343 Projects since 2003 6,366
Dobrzyca 2019 Poland 49.9 19 Siemens Gamesa G126 2,625 Technical Due Diligence
Gismarvik 2019 Norway 12.6 3 Enercon E-138 E2 Technical Due Diligence
Zelechowo 2019 Poland 52.8 16 Nordex N131 Energy Yield Assessment
Schönefeld 2019 Germany 12.6 3 Enercon E-141 EP4 Technical Due Diligence
Fürstkogel 2019 Austria 17.3 5 i.a. Vestas V126 HTq Evaluation of Energy Yield Assessments; Technical Due Diligence
Trebbin 2019 Germany 9.4 4 Enercon E-92 Technical Due Diligence
Schönberg 2019 Germany 18.8 8 Enercon E-92 Technical Due Diligence
Himmelwald 2019 Germany 13.8 5 General Electric 2.75-120 Energy Yield Assessment; Other Assessments
Altentreptow 2019 Germany 17.7 7 i.a. Enercon E-101 Energy Yield Assessment
Jasna 2018 Poland 132.1 39 Vestas V126 Technical Due Diligence
4 Vallées 5 2018 France 52.0 30 i.a. Gamesa G132 Evaluation of Energy Yield Assessments
Sarow III 2018 Germany 25.2 7 Nordex N131 Energy Yield Assessment
Swiecie 2018 Poland 15.9 5 Siemens swt-3.3 Energy Yield Assessment
12W 2018 Poland 2.2 1 Vestas V110 Energy Yield Assessment
Debowa Laka 2018 Poland 26.4 12 Vestas V110 Energy Yield Assessment
1 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Workerszeller Forst 2018 Germany 13.2 4 Nordex N131 Inspection; Technical Due Diligence
Kolbenstein 2018 Germany 28.8 9 Senvion 3.2M114 Data Analysis; Technical Due Diligence
Demircili 2018 Turkey 40.0 16 i.a. Nordex N100 Energy Yield Assessment; Inspection; Technical Due Diligence
Sarpincik 2018 Turkey 32.5 13 i.a. Nordex N100 Inspection; Technical Due Diligence
Aßlar 2018 Germany 16.5 6 General Electric 2.75-120 Evaluation of Energy Yield Assessments; Other Assessments
Imsweiler 2018 Germany 9.0 3 Nordex N117 Technical Due Diligence
Sien 2018 Germany 7.2 2 Vestas V136 Evaluation of Energy Yield Assessments
Spechenwald 2018 Germany 9.0 3 Nordex N131 Evaluation of Energy Yield Assessments
Buchhain 2018 Germany 4.0 2 Siemens Gamesa G114 Evaluation of Energy Yield Assessments
Bärfang 2018 Germany 16.0 8 Siemens Gamesa G114 Evaluation of Energy Yield Assessments
Parc Stormy 2018 Wales 1.5 1 Vensys Vensys 77 Data Analysis; Energy Yield Assessment
Breitendeich 2018 Germany 6.4 2 Senvion 3.2M114VG Operation Survey; Technical Due Diligence
Schimmendorf 2018 Germany 16.8 7 Nordex N117 Data Analysis; Energy Yield Assessment
Lairg 2018 Scotland 7.5 3 Nordex N80 Other Assessments
Lunestedt 2018 Germany 38.5 14 General Electric 2.75-103 Energy Yield Assessment; Technical Due Diligence
Briest 2018 Germany 3.2 1 General Electric 3.2-130 Energy Yield Assessment; Technical Due Diligence
Pölzig II 2018 Germany 3.5 1 Vestas V136 Evaluation of Energy Yield Assessments; Technical Due Diligence
2 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Sepopol 2018 Poland 40.0 20 Vestas V110 Energy Yield Assessment; Technical Planning
Reichertshüll 2018 Germany 52.8 16 Nordex N131 Inspection; Technical Due Diligence
Debstedt 2018 Germany 18.0 4 Siemens Gamesa G128 Evaluation of Energy Yield Assessments; Technical Due Diligence
Klein Winterheim II 2017 Germany 3.0 1 Enercon E-115 Technical Due Diligence
Reichweiler 2017 Germany 3.3 1 Vestas V126 Technical Due Diligence
Winterlingen 2017 Germany 13.2 4 Vestas V126 Data Analysis
Boganlea 2017 UK 2.3 1 Enercon E-70 Data Analysis; Technical Due Diligence
Düste 2017 Germany 23.5 10 Enercon E-92 Evaluation of Energy Yield Assessments
Röslau 2017 Germany 8.3 3 General Electric 2.75-120 Inspection
Winterborn II 2017 Germany 6.6 2 Vestas V126 Technical Due Diligence
Jokela 2017 Finland 36.0 12 Nordex N117 Evaluation of Energy Yield Assessments; Other Assessments
Klanxbüll 2017 Germany 6.8 2 Senvion 3.4M104 Inspection; Other Assessments
Lindenberg 2017 Germany 12.0 5 Nordex N117 Data Analysis; Inspection; Technical Due Diligence
Data Analysis; Evaluation of Energy Yield Assessments; Other Lüdersdorf II 2017 Germany 6.6 2 Vestas V112 Assessments
Nonnenholz 2017 Germany 11.1 4 General Electric 2.75-120 Technical Due Diligence
Basse Thiérache Sud 2017 France 17.1 6 General Electric 2.85-103 Evaluation of Energy Yield Assessments; Other Assessments
3 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Gilmerdingen 2017 Germany 12.0 6 Siemens Gamesa G97 Evaluation of Energy Yield Assessments
Coquelicot-Julie 2017 France 32.2 14 i.a. Enercon E-82 Evaluation of Energy Yield Assessments
Danna 2017 Germany 15.0 5 Enercon E-115 Evaluation of Energy Yield Assessments
Viehsteig 2017 Germany 36.6 12 Enercon E-101 Evaluation of Energy Yield Assessments
Wipperdorf 2017 Germany 14.4 6 Nordex N117 Technical Due Diligence
Waal 2017 Germany 3.3 1 Vestas V112 Evaluation of Energy Yield Assessments; Technical Due Diligence
Odersberg 2017 Germany 3.5 1 Vestas V126 Evaluation of Energy Yield Assessments
Dahlia 2017 France 10.0 5 Vestas V110 Evaluation of Energy Yield Assessments
Camomille 2017 France 4.7 2 Enercon E-82 E2 Evaluation of Energy Yield Assessments
Schlenzer 2017 Germany 5.6 2 General Electric 2.75-120 Evaluation of Energy Yield Assessments
Niederlehme 2017 Germany 4.0 2 Vestas V90 GS Technical Due Diligence
Teutleben 2017 Germany 15.0 5 Vestas V112 Technical Due Diligence
Evaluation of Energy Yield Assessments; Inspection; Technical Due Gohlocher Wald 2017 Germany 6.0 2 Nordex N131 Diligence
Gussenstadt 2017 Germany 14.4 4 Nordex N117 Evaluation of Energy Yield Assessments; Technical Due Diligence
Stetten 2017 Germany 3.1 1 Vestas V112 Energy Yield Assessment; Operation Survey
Hochstätten 2017 Germany 6.0 3 Vestas V90 GS Technical Due Diligence
4 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Kappel 2017 Germany 16.1 7 i.a. Enercon E-82 Data Analysis
Dischingen 2017 Germany 13.8 5 General Electric 2.75-120 Energy Yield Assessment; Operation Survey
Scharmbeck 2017 Germany 23.1 7 Nordex N131 Inspection
El Ktef 2017 Tunisia 100.0 0 not yet defined Other Assessments
Jbel Abderrahmane 2017 Tunisia 120.0 0 not yet defined Other Assessments
Sidi Daoud 2017 Tunisia 80.0 0 not yet defined Other Assessments
Retiers 2016 France 11.5 5 Enercon E-70 Energy Yield Assessment; Inspection; Technical Due Diligence
St Guen 2016 Frankreich 9.2 4 Enercon E-70 Evaluation of Energy Yield Assessments; Technical Due Diligence
Glénay 2016 France 29.7 9 Vestas V117 Technical Due Diligence
Körbeldorf 2016 Germany 6.9 2 Vestas V126 Data Analysis; Technical Due Diligence
Ahorn 2016 Germany 13.9 5 General Electric 2.75-120 Technical Due Diligence
Ahorn II 2016 Germany 3.3 1 Nordex N131 Technical Due Diligence
Amöneburg 2016 Germany 12.7 5 General Electric 2.5-120 Technical Due Diligence
Eoliennes de Clémentine 2016 France 11.5 5 Enercon E-82 Evaluation of Energy Yield Assessments
Gremersdorf 2016 Germany 6.9 3 i.a. Enercon E-82 Evaluation of Energy Yield Assessments
Hahnenberg 2016 Germany 6.3 2 Senvion 3.2M114 Technical Due Diligence
Maisontiers 2016 France 16.5 5 Vestas V117 Technical Due Diligence
5 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Energy Yield Assessment; Evaluation of Energy Yield Assessments; Marsais 1 et 2 2016 France 16.0 8 Vestas V90 Inspection; Technical Due Diligence
Mengeringhausen 2016 Germany 12.0 5 Nordex N117 Evaluation of Energy Yield Assessments
Parey 2016 Germany 18.8 8 Enercon E-92 Technical Due Diligence
Redekin II 2016 Germany 4.6 2 Enercon E-82 Evaluation of Energy Yield Assessments
Rothenborn 2016 Germany 9.9 3 Vestas V112 Evaluation of Energy Yield Assessments
Sachsenhausen 2016 Germany 3.1 1 Enercon E-101 Technical Due Diligence; Other Assessments
Schwarzbruch 2016 Germany 6.6 2 Vestas V126 Technical Due Diligence
Steigerwald 2016 Germany 7.2 3 Nordex N117 Evaluation of Energy Yield Assessments
Zagelsdorf 2016 Germany 7.6 3 General Electric 2.5-120 Evaluation of Energy Yield Assessments
Zellertal 2016 Germany 5.6 2 General Electric 2.75-120 Technical Due Diligence
Beedenbostel 2016 Germany 3.0 1 Siemens Gamesa SWT-3.0-113 Technical Due Diligence
Bartow 2016 Germany 6.9 2 Vestas V126 Evaluation of Energy Yield Assessments
Dinkelsbühl 2016 Germany 6.6 2 Vestas V126 Technical Due Diligence
Eimsheim 2016 Germany 12.2 4 Enercon E-101 Energy Yield Assessment
Fohren-Linden 2016 Germany 12.7 4 Senvion 3.2M114 Evaluation of Energy Yield Assessments
Groß-Niendorf 2016 Germany 9.9 3 Vestas V112 Evaluation of Energy Yield Assessments
6 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Heinsberg-Randerath 2016 Germany 19.2 8 Nordex N117 Evaluation of Energy Yield Assessments
Hellberge 2016 Germany 6.1 2 Enercon E-101 Energy Yield Assessment
Hohenmölsen 2016 Germany 26.4 12 i.a. ENO 92 Technical Due Diligence; Data Analysis; Inspection
Géry 2016 Frankreich 10.0 5 Siemens Gamesa G90 Operation Survey; Technical Due Diligence
Holzthaleben 2016 Germany 4.8 2 Nordex N117 Evaluation of Energy Yield Assessments
Kaifenheim 2016 Germany 9.9 3 i.a. Vestas V112 Evaluation of Energy Yield Assessments; Inspection
Köhlen 2016 Germany 21.4 7 Enercon E-101 Evaluation of Energy Yield Assessments
Linnich-Bolsar 2016 Germany 12.0 5 Nordex N117 Evaluation of Energy Yield Assessments
Baudignécourt 2016 France 12.3 6 Senvion MM92 Energy Yield Assessment; Inspection; Technical Due Diligence
Naundorf 2016 Germany 6.0 2 Vestas V112 Evaluation of Energy Yield Assessments
Badow 2016 Germany 27.6 12 Enercon E-82 Evaluation of Energy Yield Assessments
Waldfeucht 2016 Germany 9.2 3 Vestas V112 Evaluation of Energy Yield Assessments
Schmelz 2016 Germany 5.6 2 General Electric 2.75-120 Technical Due Diligence
Kaseldorf 2016 Germany 6.0 3 Vestas V90 Technical Due Diligence
Berger Wacken 2016 Germany 4.8 2 Nordex N117 Technical Due Diligence
Ger 2015 France 8.0 4 Enercon E-82 Data Analysis; Energy Yield Assessment
Dahme II 2015 Germany 76.5 51 i.a. NEG Micon NM72C Other Assessments
7 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Taza 2015 Morocco 150.0 50 i.a. Ecotecnia ECO 110 Other Assessments; Technical Due Diligence
Luedersdorf 2015 Germany 6.6 2 Vestas V112 Evaluation of Energy Yield Assessments
Sylda II 2015 Germany 9.4 4 Enercon E-92 Evaluation of Energy Yield Assessments
Appeln 2015 Germany 11.8 4 General Electric 2.75-103 Evaluation of Energy Yield Assessments
Stormon 2015 Sweden 16.0 5 Siemens SWT-3,2-113 Evaluation of Energy Yield Assessments
Tellenes 2015 Norway 160.0 50 Siemens SWT-3,2-113 Evaluation of Energy Yield Assessments
La Haie 2015 France 12.0 6 Vestas V90 Technical Due Diligence
Vogelherd 2015 Germany 19.2 8 Nordex N117 Technical Due Diligence
Herrenstein 2015 Austria 20.0 6 i.a. Vestas V112 Techincal Due Dilligence
Zagersdorf 2015 Austria 7.1 3 Enercon E-92 Technical Due Diligence
Evaluation of Energy Yield Assessments; Inspection; Other Gulf of Suez 2015 Egypt 250.0 100 not yet defined Assessments; Technical Due Diligence
Velburg 2015 Germany 12.0 5 Nordex N117 Technical Due Diligence
Bremer Bucht 2015 Germany 18.3 6 Enercon E-101 Technical Due Diligence
Carrowleagh 2015 Ireland 36.8 16 Enercon E-82 Evaluation of Energy Yield Assessments
Clamecy 2015 France 12.3 6 Senvion MM92 Technical Due Diligence; Inspection
Drosay 2015 France 15.0 6 Nordex N100 Evaluation of Energy Yield Assessments
8 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Frehne 2015 Germany 6.3 3 i.a. Enercon E-82 Other Assessments
Haukineva 2015 Finland 6.0 2 Nordex N117 Evaluation of Energy Yield Assessments
Jagdberg 2015 Germany 21.0 7 Vestas V112 Technical Due Diligence
Jeppo 2015 Finland 6.0 2 Nordex N117 Evaluation of Energy Yield Assessments
Laperrière 2015 France 19.2 8 Nordex N117 Evaluation of Energy Yield Assessments
Melgven 2015 France 6.0 3 Vestas V80 Technical Due Diligence; Inspection
Mertensdorf 2015 Germany 10.0 5 Vestas V90 GS Other Assessments
Mohon 2015 France 20.0 10 Vestas V90 Technical Due Diligence
Plouguernével 2015 France 4.0 5 Enercon E-53 Technical Due Diligence; Inspection
Ribäcken 2015 Finland 16.5 5 Vestas V126 Evaluation of Energy Yield Assessments
Sommette-Eaucourt 2015 France 21.6 9 Nordex N117 Evaluation of Energy Yield Assessments
St Gueno 2015 France 4.0 5 Enercon E-53 Technical Due Diligence; Inspection
St Martin 2015 France 10.3 5 Senvion MM92 Evaluation of Energy Yield Assessments
Haiger 2015 Germany 13.8 6 Siemens Gamesa SWT-2.3-113 Technical Due Diligence
Evaluation of Energy Yield Assessments; Other Assessments; Essaouira 2015 Morocco 201.0 61 not yet defined Technical Due Diligence
Horst 2014 Germany 12.0 6 Gamesa G97 Evaluation of Energy Yield Assessments; Technical Due Diligence
9 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Grosskrut 2014 Austria 19.0 6 Senvion 3.2M114 Evaluation of Energy Yield Assessments
Ladendorf 2014 Australia 18.0 6 Enercon E-101 Evaluation of Energy Yield Assessments
Scharndorf III 2014 Australia 9.0 3 Enercon E-101 Evaluation of Energy Yield Assessments
Zistersdorf-Ost 2014 Australia 18.0 6 Vestas V112 Evaluation of Energy Yield Assessments
Kirchhain 2014 Germany 12.0 5 Nordex N117 Other Assessments
Looft 2014 Germany 10.0 4 i.a. Vestas V112 Evaluation of Energy Yield Assessments
St. Mandré 2014 France 12.0 6 Enercon E-70 E4 Evaluation of Energy Yield Assessments
Weilrod 2014 Germany 16.8 7 Nordex N117 Evaluation of Energy Yield Assessments
Weiskirchen 2014 Germany 12.0 4 Enercon E-115 Evaluation of Energy Yield Assessments
Techincal Due Dilligence; Energy Yield Assessment; Evaluation of Banie 2014 Poland 190.0 95 i.a. Vestas V100 Energy Yield Assessments
Siebenbäumen 2014 Germany 6.2 2 Vestas V112 Technical Due Diligence; Operation Survey
Coppenbrügge 2014 Germany 18.0 6 Enercon E-101 Evaluation of Energy Yield Assessments
Calau II C+D 2014 Germany 30.0 10 Vestas V112 Techincal Due Dilligence
Pölzig 2014 Germany 6.3 2 Senvion 3.2M114 Technical Due Diligence
Gaishecke 2014 Germany 28.8 12 Nordex N117 Evaluation of Energy Yield Assessments
Roteberg 2014 Germany 12.0 5 Nordex N117 Evaluation of Energy Yield Assessments
10 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Schlitz-Berngerode 2014 Germany 30.0 12 General Electric 2.5-120 Evaluation of Energy Yield Assessments
La Ferriére 2014 France 20.0 8 Nordex N100 Evaluation of Energy Yield Assessments
St. Mandé 2014 France 12.0 6 Enercon E-70 E4 Evaluation of Energy Yield Assessments
Pongratzer Kogel 2014 Austria 9.0 4 Enercon E-70 E4 Techincal Due Dilligence
Sontra 2014 Germany 12.0 5 Nordex N117 Techincal Due Dilligence
Kemberg III 2014 Germany 12.0 4 Nordex N117 Technical Due Diligence
Pritzwalk 2014 Germany 10.0 5 Vestas V90 GS Technical Due Diligence
Sarow II 2014 Germany 8.0 4 Siemens Gamesa G90 Operation Survey; Other Assessments
Blaues Eck 2014 Germany 21.4 7 Enercon E-101 Evaluation of Energy Yield Assessments
Chransdorf 2014 Germany 57.6 24 Nordex N117 Evaluation of Energy Yield Assessments
Klettwitz 2014 Germany 89.1 27 Vestas V112 Technical Due Dilligence
Wölkisch 2014 Germany 12.3 6 Senvion MM92 Technical Due Diligence
Ballon Portfolio 2013 France 95.0 49 i.a. Enercon E-70 Evaluation of Energy Yield Assessments
Cottbuser See 2013 Germany 24.0 12 Vestas V90 Techincal Due Dilligence; Other Assessments
Lieberose 2013 Germany 52.8 22 Nordex N117 Evaluation of Energy Yield Assessments
Ruhlkirchen 2013 Germany 9.6 4 Nordex N117 Technical Due Diligence
11 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Data Analysis; Evaluation of Energy Yield Assessments; Inspection; Seine Rive Gauche Nord 2013 France 75.0 30 Nordex N100 Technical Due Diligence
Selmsdorf III 2013 Germany 9.2 4 Enercon E-82 Technical Due Diligence
Kastorf 2013 Germany 15.4 5 i.a. Vestas V112 Technical Due Diligence; Operation Survey
Kropp 2013 Germany 9.0 3 Vestas V112 Technical Due Diligence; Operation Survey
Woschkow I+II 2013 Germany 8.0 4 Vestas V90 Data Analysis; Other Assessments
Volkmarsdorf 2013 Germany 19.8 11 Enercon E-66 Data Analysis; Other Assessments
Uebigau III 2013 Germany 6.0 3 Vestas V90 Data Analysis; Other Assessments
Uebigau I+II 2013 Germany 19.5 13 NEG Micon NM82 Data Analysis; Other Assessments
Rosenthal 2013 Germany 12.0 8 NEG Micon NM82 Data Analysis; Other Assessments
Rehfeld I+II 2013 Germany 10.5 7 NEG Micon NM82 Data Analysis; Other Assessments
Möglenz I+II+III 2013 Germany 14.0 7 Vestas V90 Data Analysis; Other Assessments
Langenrieth II+III 2013 Germany 6.0 3 Vestas V80 Data Analysis; Other Assessments
Langenrieth I 2013 Germany 14.0 7 Vestas V90 Data Analysis; Other Assessments
Elsterwerda 2013 Germany 10.0 5 Vestas V90 Data Analysis; Other Assessments
Drehnow 2013 Germany 10.5 7 NEG Micon NM82 Data Analysis; Other Assessments
Danna Vogel 2013 Germany 20.0 10 Vestas V90 Data Analysis; Other Assessments
12 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Nulvi-Tergu 2013 Italy 29.8 35 Vestas V52 Technical Due Dilligence; Data Analysis
Dettelbach 2013 Germany 14.4 6 Nordex N117 Evaluation of Energy Yield Assessments
Elsdorf 2013 Germany 2.3 1 Enercon E-82 Evaluation of Energy Yield Assessments
Schleifstein 2013 Germany 6.0 3 Vestas V90 Evaluation of Energy Yield Assessments
Wrestedt 2013 Germany 3.0 1 Enercon E-101 Evaluation of Energy Yield Assessments
Kratzenburg 2013 Germany 28.8 9 Repower 3.2M114 Evaluation of Energy Yield Assessments
Rukieten 2013 Germany 18.0 6 Enercon E-101 Evaluation of Energy Yield Assessments
Vier Fichten 2013 Germany 15.0 5 Vestas V112 Evaluation of Energy Yield Assessments
Weichensdorf 2013 Germany 53.0 22 Nordex N117 Evaluation of Energy Yield Assessments; Technical Due Diligence
Sandstruth 2013 Germany 15.0 5 Vestas V112 Evaluation of Energy Yield Assessments
Zerbst 2013 Germany 6.0 3 ENO eno 82 Evaluation of Energy Yield Assessments
Müggenburg 2013 Germany 4.0 2 Vestas V90 Evaluation of Energy Yield Assessments
Zölkow 2013 Germany 8.6 4 i.a. ENO eno 92 Evaluation of Energy Yield Assessments
Panschow 2013 Germany 10.3 3 i.a. Enercon E-70 E4 Evaluation of Energy Yield Assessments
Nack 2013 Germany 12.3 4 Vestas V112 Technical Due Diligence; Operation Survey
Offenheim 2013 Germany 15.4 5 Vestas V112 Technical Due Diligence; Operation Survey
Norath 2013 Germany 9.0 3 Vestas V112 Technical Due Diligence; Operation Survey
13 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Maßbach 2013 Germany 12.0 5 Nordex N117 Evaluation of Energy Yield Assessments
Dargies 2013 France 12.0 6 Enercon E-82 Technical Due Diligence; Construction Survey; Operation Survey
Moquepanier 2013 France 16.0 8 Vestas V90 Technical Due Diligence; Construction Survey
Leddin IV 2013 Germany 10.0 2 Vestas V90 GS Technical Due Diligence; Operation Survey
Zernitz II 2013 Germany 10.0 3 Vestas V90 GS Technical Due Diligence; Operation Survey
Dieksanderkoog 2013 Germany 4.6 2 Enercon E-70 E4 Technical Due Diligence
Creglingen Klosterwald 2013 Germany 17.5 7 General Electric 2.5-120 Evaluation of Energy Yield Assessments
Neu Kosenow 2013 Germany 26.0 13 Vestas V90 Technical Due Dilligence
Sarow I 2013 Germany 16.0 8 Siemens Gamesa G90 Operation Survey; Other Assessments
Greneville 2013 France 24.0 8 Vestas V112 Evaluation of Energy Yield Assessments
Fresnoy-Brancourt 2013 France 14.0 6 Enercon E82 Technical Due Diligence
Holleben 2012 Germany 42.0 21 Vestas V90 Evaluation of Energy Yield Assessments
Waldgrehweiler 2012 Germany 6.8 2 Repower 3.4M104 Evaluation of Energy Yield Assessments
Bispingen 2012 Germany 12.0 4 Repower 3.2M114 Evaluation of Energy Yield Assessments; Technical Due Diligence
Pattensen 2012 Germany 9.2 4 Enercon E-70 E4 Evaluation of Energy Yield Assessments
Rehfeld 2012 Germany 14.0 5 i.a. Vestas V112 Technical Due Diligence
Mettlach I & II 2012 Germany 17.0 9 i.a. Enercon E-66 / 18.70 Inspection; Other Assessments
14 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Langwedel II 2012 Germany 8.0 4 Vestas V90 GS Technical Due Diligence; Operation Survey
Habscheid 2012 Germany 4.6 2 Siemens Gamesa SWT-2.3 Evaluation of Energy Yield Assessments; Technical Due Diligence
Eckolstädt 2012 Germany 26.0 13 Vestas V90 Technical Due Diligence
Nozay 2012 France 16.0 8 Vestas V90 Technical Due Diligence; Inspection; Operation Survey
Moréac 2012 France 16.0 8 Siemens Gamesa G90 Technical Due Diligence; Inspection; Operation Survey
Flomborn 2012 Germany 15.0 5 Vestas V112 Technical Due Diligence; Operation Survey
Buch 2012 Germany 9.0 3 Vestas V112 Technical Due Diligence; Operation Survey
Reich 2012 Germany 3.1 1 Vestas V112 Technical Due Diligence; Operation Survey
Quatre Vallées II 2012 France 20.0 10 Siemens Gamesa G87 Technical Due Diligence; Construction Survey; Operation Survey
Quatre Vallées I 2012 France 12.0 6 Siemens Gamesa G90 Technical Due Diligence; Inspection; Operation Survey
Souvigné 2012 France 8.0 4 Siemens Gamesa G90 Technical Due Diligence; Inspection; Operation Survey
Heppdiel 2012 Germany 12.0 5 Nordex N117 Evaluation of Energy Yield Assessments
Ellenserdamm 2012 Germany 12.5 5 Nordex N90 Operation Survey
Thransheide 2012 Germany 30.0 12 Nordex N100 Operation Survey
Wanlo 2012 Germany 9.2 4 Nordex N90 Operation Survey
Breesen-Teetzleben 2012 Germany 15.0 5 Vestas V112 Evaluation of Energy Yield Assessments
St. Bihy 2012 France 3.2 4 Enercon E-48 Technical Due Diligence
15 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Suderbruch 2011 Germany 16.0 8 Vestas V90 Evaluation of Energy Yield Assessments; Technical Due Diligence
Rageade_I 2011 France 12.0 6 Vestas V90 Technical Due Diligence
Kauxdorf 2011 Germany 12.0 6 i.a. ENO eno 82 Technical Due Diligence
Weibern 2011 Germany 5.0 2 Nordex N90 Operation Survey
Buchbrunn 2011 Germany 3.0 2 Vestas V82 Technical Due Diligence; Operation Survey
Hollige 2011 Germany 10.0 5 Vestas V90 Operation Survey
Auras II 2011 Germany 2.0 1 Vestas V90 Technical Due Diligence; Operation Survey
Ebersgrün 2011 Germany 8.0 4 Senvion MM92 Operation Survey
Data Analysis; Operation Survey; Other Assessments; Technical Due Auras I 2011 Germany 2.0 1 Vestas V80 Diligence
Thräna 2011 Germany 6.0 3 Vestas V90 Technical Due Diligence; Operation Survey
Dessow 2011 Germany 3.0 2 Repower MD77 Technical Due Diligence; Operation Survey
Klein Lobke 2011 Germany 9.2 4 Enercon E-70 E4 Technical Due Diligence
Voyennes 2011 France 16.0 8 Vestas V90 Technical Due Diligence; Inspection; Operation Survey
Seehausen 2011 Germany 8.0 4 Siemens Gamesa G80 Technical Due Diligence; Operation Survey
Coswig 2011 Germany 6.0 7 Siemens Gamesa G58 Technical Due Diligence; Operation Survey
Eschweiler 2011 Germany 4.0 2 Siemens Gamesa G80 Technical Due Diligence; Operation Survey
16 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Sonnenberg 2011 Germany 1.7 2 i.a. Siemens Gamesa G52 Technical Due Diligence; Operation Survey
Calau 2011 Germany 8.0 4 Vestas V90 Technical Due Diligence; Operation Survey
Leddin 2011 Germany 10.0 5 Vestas V90 Technical Due Diligence; Operation Survey
Langwedel 2011 Germany 20.0 10 Vestas V90 Technical Due Diligence; Operation Survey
Hiddestorf 2011 Germany 3.0 2 Nordex S70 Technical Due Diligence; Operation Survey
Kaarst II 2011 Germany 2.0 1 Vestas V80 Technical Due Diligence; Operation Survey
Kaarst I 2011 Germany 10.0 5 Vestas V80 Technical Due Diligence; Operation Survey
Bocholt-Liedern 2011 Germany 7.5 5 Nordex S70 Technical Due Diligence; Operation Survey
Wachtendonk 2011 Germany 12.0 8 Nordex S77 Technical Due Diligence; Operation Survey
Eifel 2011 Germany 36.5 23 i.a. Nordex S70 Technical Due Diligence; Operation Survey
Dabern 2010 Germany 4.0 2 Vestas V90 Data Analysis; Technical Due Diligence
Penquer 2010 France 4.0 2 Enercon E-82 Technical Due Diligence; Inspection
Pigeon Blanc 2010 France 12.0 6 Enercon E-82 Technical Due Diligence; Inspection
Maldegem 2010 Belgium 16.1 7 Enercon E-70 E4 Technical Due Diligence; Inspection
Wriezener Höhe 2010 Germany 26.0 13 i.a. Vestas V90 Data Analysis; Technical Due Diligence
Mildenberg 2010 Germany 12.0 6 Vestas V80 Data Analysis; Technical Due Diligence
Altlandsberg 2010 Germany 12.0 6 Vestas V90 Technical Due Diligence
17 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Kirf 2010 Germany 8.0 4 Repower MM92 Technical Due Diligence
Kesfeld 2010 Germany 32.5 15 i.a. Siemens Gamesa SWT-2.3 Technical Due Diligence
Genthin 2010 Germany 6.0 3 Enercon E-82 Technical Due Diligence
Campigny 2010 France 10.0 5 Enercon E-70 E4 Technical Due Diligence
Delbrück Westenholz 2010 Germany 2.0 1 Enercon E-70 E4 Technical Due Diligence; Operation Survey
Delbrück Ostenland 2010 Germany 6.0 3 Enercon E-82 Technical Due Diligence; Operation Survey
Remlingen II 2010 Germany 9.2 4 Enercon E-70 E4 Inspection; Technical Due Diligence
Domsdorf 2010 Germany 14.0 7 Enercon E-82 Technical Due Diligence
Evaluation of Energy Yield Assessments; Inspection; Technical Due Cottbus Halde 2010 Germany 28.0 14 Vestas V90 Diligence
Elsterwerda II 2010 Germany 2.0 1 Vestas V90 Evaluation of Energy Yield Assessments; Technical Due Diligence
Möglenz IV 2010 Germany 4.0 2 Vestas V90 Evaluation of Energy Yield Assessments; Technical Due Diligence
Lausitz V 2010 Germany 6.0 3 Vestas V90 Evaluation of Energy Yield Assessments; Technical Due Diligence
Lausitz III 2010 Germany 10.0 5 Vestas V90 Evaluation of Energy Yield Assessments; Technical Due Diligence
Woschkow II 2010 Germany 4.0 2 Vestas V90 Evaluation of Energy Yield Assessments; Technical Due Diligence
Vader Piet Aruba 2009 Aruba 30.0 10 Vestas V90 Technical Due Diligence
Wehrhain 2009 Germany 16.0 8 Vestas V90 Inspection; Technical Due Diligence
18 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Redekin 2009 Germany 16.0 8 Enercon E-82 Technical Due Diligence
Wawern 2009 Germany 14.0 7 i.a. Vestas V90 Technical Due Diligence
Pouillé-les-Coteaux 2009 France 9.2 4 Enercon E-70 E4 Inspection; Technical Due Diligence
Hohenseefeld 2009 Germany 8.0 4 Vestas V90 Data Analysis; Technical Due Diligence
Oresmaux 2009 France 12.0 6 Enercon E-66 / 20.70 Technical Due Diligence
Werhain 2009 Germany 16.0 8 Vestas V90 Technical Due Diligence
Gelber Berg 2009 Germany 8.0 4 Enercon E-82 Technical Due Diligence
Selmsdorf 2009 Germany 16.0 8 Enercon E-70 E4 Technical Due Dilligence; Other Assessments
Havelland 2009 Germany 145.1 70 i.a. Enercon E-70 E4 Data Analysis; Evaluation of Energy Yield Assessments
Möbisburg 2009 Germany 22.0 11 Enercon E-70 E4 Data Analysis; Evaluation of Energy Yield Assessments
St. Cyr-en-Pail 2008 France 10.0 5 Enercon E-82 Energy Yield Assessment; Inspection; Technical Due Diligence
Galgenberg 2008 Germany 6.0 3 Enercon E-82 Technical Due Diligence
Arnstedt 2008 Germany 0.8 1 Enercon E-53 Technical Due Diligence
Gerbstedt 2008 Germany 2.4 3 Enercon E-53 Technical Due Diligence
Göllnitz 2008 Germany 10.0 5 Vestas V90 Technical Due Diligence
Premslin 2008 Germany 2.0 1 Vestas V90 Technical Due Diligence
Kalsow I 2008 Germany 1.5 1 Nordex S77 Technical Due Diligence
19 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Sotterhausen 2008 Germany 6.0 3 Vestas V90 Technical Due Diligence
Lauterbach 2008 Germany 4.0 2 Vestas V90 Technical Due Diligence
Raucourt 2008 France 12.0 6 Vestas V90 Inspection; Technical Due Diligence
Lestrade II 2008 France 2.3 1 Enercon E-70 E4 Technical Due Diligence
Pröttlin II 2008 Germany 4.0 2 Repower MM82 Technical Due Diligence
Kleinpaschleben 2007 Germany 18.0 12 General Electric 1.5s Technical Due Diligence
Heede 2007 Germany 16.5 11 General Electric 1.5s Technical Due Diligence
Pobzig 2007 Germany 7.5 5 General Electric 1.5s Technical Due Diligence
Drosa 2007 Germany 6.0 4 General Electric 1.5s Technical Due Diligence
Dornbock 2007 Germany 15.0 10 General Electric 1.5s Technical Due Diligence
Dörenberg 2007 Germany 6.0 4 General Electric 1.5s Technical Due Diligence
Stavenhagen 2007 Germany 6.0 4 General Electric 1.5s Technical Due Diligence
Wiesmoor 2007 Germany 19.8 11 Enercon E-66 Technical Due Diligence
Pröttlin I 2007 Germany 20.0 10 Repower MM82 Technical Due Diligence
Quitzow 2007 Germany 24.0 12 Enercon E-82 Technical Due Diligence
Werder-Zinndorf 2007 Germany 30.0 15 Enercon E-82 Technical Due Diligence
Waltersdorf 2007 Germany 14.0 7 i.a. Enercon E-70 E4 Technical Due Diligence
20 Reference List: Wind Projects
Installed Evergy Project Country Capacity in N of Turbines Type(s) of Turbine Evergy Scope of Work Mandate MW
Vaux-Les-Mouzon 2007 France 6.9 3 Enercon E-70 E4 Technical Due Diligence
Büttel 2007 Germany 25.0 5 Repower 5M Technical Due Diligence
Schönwalde 2007 Germany 22.0 11 Vestas V90 Technical Due Diligence
Waldfischbach-Burgalben 2007 Germany 6.0 3 Enercon E-82 Inspection; Technical Due Diligence
Weselberg 2007 Germany 4.0 2 Enercon E-82 Inspection; Technical Due Diligence
Hermersberg 2007 Germany 1.6 2 Enercon E-48 Technical Due Diligence
Oberkostenz 2007 Germany 6.0 3 Vestas V90 Technical Due Diligence
Welchweiler 2006 Germany 2.8 2 i.a. Enercon E-70 E4 Technical Due Diligence
Lestrade I 2006 France 9.2 4 Enercon E-70 E4 Inspection; Technical Due Diligence
Masendorf 2006 Germany 14.0 7 Vestas V80 Technical Due Diligence
Dobberkau 2006 Germany 28.0 14 i.a. Vestas V90 Inspection; Technical Due Diligence
Hermannsburg 2006 Germany 18.0 9 i.a. Vestas V90 Technical Due Diligence
Helmstedt / Büddenstedt 2004 Germany 18.0 9 Vestas V80 Technical Due Diligence
Schnellin 2004 Germany 20.0 10 Vestas V80 Technical Due Diligence
La Muela 2003 Spain 99.0 132 NEG Micon 750/48 Data Analysis; Operation Survey; Technical Due Diligence
Evergy Engineering GmbH ©2019
21