Pre-Monsoon work Details Alappuzha Pathanamthitta kottaym Idukki Muvattupuzha Kozhikkode Wayanad Vadakara(Churam) Kannoor Kasaragod Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Patch Work-Udiyankulangara Kulathoor Thiruvananthapuram Chavady road bet km. 2/500 & 4/00. 2 Patch Work-Peringamala Kakkamoola road Thiruvananthapuram bet. km. 1/00 & 1/750. 3 Thiruvananthapuram Patch Work- Road. 2 Patch Work-N S Road bet. Km. 24/800 & Thiruvananthapuram 26/300. 2 Patch Work-Arayoor temple CVR puram road Thiruvananthapuram bet. km. 0/00 & 2/200. 2.5 Patch Work-Peringamala Kakkamoola road Thiruvananthapuram bet. km. 1/750 & 3/270. 3 Thiruvananthapuram Patch Work- 2.5 Patch Work-Chempoor road bet. km. 6/00 & Thiruvananthapuram 7/500. 2.5 Patch Work-Amaravila Karakonam road bet. Thiruvananthapuram km. 0/900 & 3/500. 1.8 Patch Work-Arumanoor Pulluvila road bet. km. Thiruvananthapuram 0/00 & 1/200. 2 Patch Work-Mookunnimala road bet, km. 0/00 Thiruvananthapuram & 1/200. 2.5

Thiruvananthapuram Patch Work-N S Road bet. Km. 29/00 & 30/00. 3 Thiruvananthapuram Patch Work-N S road bet.km. 30/00 & 31/00. 3 Patch Work-Arattukuzhy Amboori Neyyardam Thiruvananthapuram road bet. km. 14/00 & 14/970. 2.5 Patch Work-Urgent patch works to NS road Thiruvananthapuram bet. Km. 22/00 & 23/00. 2.5 Patch Work-Urgent patch works to Vellarada Thiruvananthapuram Neyyardam road bet. Km. 0/00 & 2/00. 2 Drain Work-Various roads undder Roads Thiruvananthapuram Section Parassala . 1.2 Drain Work-Balaramapuram Vizhinjam road Thiruvananthapuram bet. km. 0/00 & 1/00. 2

Page 1 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Drain Work-Drain work near Ammancovil and KSRTC Bus stand at Neyyattinkara in Thiruvananthapuram Neyyattinkara Poovar road 2

Thiruvananthapuram Drain Work-N S road km. bet. 21/700 & 23/00. 1.5 Drain Work- lake road bet. km. 0/00 & Thiruvananthapuram 1/00. 1.5 Drain Work-Neyyattinkara Kattakkada road Thiruvananthapuram bet.km. 0/00 & 2/00. 2 Drain Work-Chempoor road bet. km. 2/00 & Thiruvananthapuram 3/500. 1.5 Drain Work-Various Stretches in Neyyattinkara Thiruvananthapuram Poovar road. 3 Drain Work-Perumkadavila Kunnathukal road Thiruvananthapuram km. 1/300 to 2/800. 1 Drain Work-Eruthavoor Mukkumpalamoodu Thiruvananthapuram Naruvammoodu road. 2.5 Thiruvananthapuram Drain Work-N S road km. 24/400 to 26/200. 1.5 Drain Work-Balaramapuram Kattakkada road Thiruvananthapuram km. 0/00 to 2/200. 2

Thiruvananthapuram Drain Work-Chempoor road km. 6/00 to 7/500. 1.5 Drain Work-Pappanamkode Kulathoor road Thiruvananthapuram km. 0/00 to 3/200. 2.5 Drain Work-Perumkadavila Kunnathukal road Thiruvananthapuram km. 7/00 to 8/700. 1 Thiruvananthapuram Drain Work-N. S road km. 27/00 to 28/500. 1.5 Thiruvananthapuram Drain Work-Chempoor road 7/500 to 9/00 1.5 Drain Work-Parassala Panachamoodu road Thiruvananthapuram km. 11/00 to 12/700. 0.8 Drain Work-Arattukuzhy Amboori Neyyardam Thiruvananthapuram road km. 11/00 to 12/500. 1.5 Drain Work-Chempoor road km. 9/00 to Thiruvananthapuram 10/400. 1.5 Drain Work-Parassala Panachamoodu road Thiruvananthapuram km. 5/050 to 6/800. 0.8 Thiruvananthapuram Drain Work-N S road km. 13/00 to 14/00 1.5

Page 2 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Drain Work-Chulliyoor Chadachimarthandam Thiruvananthapuram road km. 3/00 to 4/500 1.5 Thiruvananthapuram Drain Work-N S road km. 31/500 to 33/500. 0.8 Drain Work-Vellarada Neyyardam road km. Thiruvananthapuram 0/00 to 1/500. 1.5 Drain Work-Chulliyoor Chadachimarthandam Thiruvananthapuram road km. 5/00 to 6/500. 1.5 Thiruvananthapuram Drain Work-N S road km. 35/00 to 37/500. 0.8 Drain Work-Vazhichal Amboori road km. 1/800 Thiruvananthapuram to 3/200. 1.5 Drain Work-Mandapathinkadavu Vazhichal Thiruvananthapuram road km.0/00 to 1/500. 0.8 Drain Work-Mandapathinkadavu Vazhichal Thiruvananthapuram road km.1/500 to 3/00. 0.8 Drain Work-Mandapathinkadavu Vazhichal Thiruvananthapuram road km.3/00 to 4/400. 0.8 Drain Work-Chulliyoor Chadachimarthandam Thiruvananthapuram road km. 0/00 to 1/800. 0.8 Drain Work-Chulliyoor Chadachimarthandam Thiruvananthapuram road km. 2/500 to 4/500. 0.8 Drain Work-Aruvippuram Marayamuttom Thiruvananthapuram Dhanuvachapuram road km. 4/400 to 6/300. 0.8 Urgent pot hole filling, drain clearing and jungle clearance to - Kallambalam road. Ch. Thiruvananthapuram 0/00 to 4/00. 2.5 Urgent drain clearing jungle clearance etc to Varkala - Kallambalam road. Ch. 4/00 to Thiruvananthapuram 11/400. 0.8 Urgent pot hole filling, drain clearing and jungle clearance to Varkala - Parippally road. Ch. Thiruvananthapuram 0/00 to 2/00. 2.5 Urgent pot hole filling, drain clearing and jungle clearance to Varkala - Parippally road. Ch. Thiruvananthapuram 2/00 to 11/600. 2.5 Urgent drain clearing jungle clearance etc to Manamboor- Kavalayoor Kulamattom road. Thiruvananthapuram Ch. 0/00 to 7/200. 1.2

Page 3 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent pothole filling, drain clearing and jungle clearance to - Delavapuram road. Ch. Thiruvananthapuram 2/800 to 8/600. 2.5 Urgent pothole filling, drain clearing and jungle clearance to Njekkad Chavarcode road. Ch. Thiruvananthapuram 0/00 to 2/00. 1.75 Urgent pothole fillking, drain clearing and jungle clearance to Njekkad Chavarcode road. Thiruvananthapuram Ch. 2/00 to 4/640. 2.5 Urgent drain clearing jungle clearance etc to Thiruvananthapuram Bhajanamadam road. Ch. 0/00 to. 1/00. 0.4 Urgent drain clearing jungle clearance etc to Cherunniyoor Kadavu - Nadayara road. Ch. Thiruvananthapuram 1/200 to. 7/200. 1.5 Urgent drain clearing jungle clearance etc to Ayroor Reghunathapuram road. Ch. 0/00 to. Thiruvananthapuram 4/520. 1.2

Urgent drain clearing jungle clearance etc to Thiruvananthapuram Ayroor Hariharapuram road. Ch. 0/00 to. 5/00. 1.3 Urgent drain clearing jungle clearance etc to Vadaserikonam Palamkonam road. Ch. 0/00 Thiruvananthapuram to. 5/890. 1.4 Urgent drain clearing jungle clearance etc to Thiruvananthapuram Sivagiri- Sivagiri HS road. Ch. 0/00 to. 2/00. 1 Urgent drain clearing jungle clearance etc to Thiruvananthapuram Velliyazhichakavu road. Ch. 0/00 to. 0/800. 0.35 Urgent drain clearing jungle clearance etc to Oonninmoodu - Kadampattukonam road. Ch. Thiruvananthapuram 2/500 to. 7/130. 1.6 Urgent drain clearing jungle clearance etc to Thiruvananthapuram Elakamon Paripally road. Ch. 0/00 to. 2/440. 1.2 Urgent drain clearing jungle clearance etc to Thiruvananthapuram Varkala Vettoor road. Ch. 0/00 to. 2/800. 1.4

Urgent drain clearing jungle clearance etc to Thiruvananthapuram Vettoor Nedumkanda road. Ch. 0/00 to. 1/500. 1.3

Page 4 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status

Urgent drain clearing jungle clearance etc to Thiruvananthapuram Varkala Ariyittakunnu road. Ch. 0/00 to. 2/600. 2.5 Urgent drain clearing jungle clearance etc to Varkala Ariyittakunnu road. Ch. 1/500 to. Thiruvananthapuram 4/400. 2 Urgent drain clearing jungle clearance etc to Thiruvananthapuram Edava Airoor road. Ch. 0/00 to. 3/800. 2.5 Urgent drain clearing jungle clearance etc to Narikkal - Vattaplamoodu road. Ch. 0/00 to. Thiruvananthapuram 1/200. 1.75 Urgent drain clearing jungle clearance etc to Puthenchantha Chilakkoor road. Ch. 0/00 to. Thiruvananthapuram 1/200. 2

Urgent drain clearing jungle clearance etc to Thiruvananthapuram Plavazhikom Anjengo road. Ch. 0/00 to. 2/252. 0.5 Urgent drain clearing jungle clearance etc to Thiruvananthapuram Varkala Edava road. Ch. 0/00 to. 5/00. 2.5 Urgent drain clearing jungle clearance etc to Thiruvananthapuram Edava Kappil road. Ch. 0/00 to. 2/00. 0.4 Urgent drain clearing jungle clearance etc to Thiruvananthapuram Papanasom road. Ch. 0/00 to. 0/600. 0.35 Urgent drain clearing jungle clearance etc to Thiruvananthapuram Venkulam Kappil road. Ch. 0/00 to. 3/500. 0.7 Thiruvananthapuram Nagaroor Karette road ch. 3/00 to 6/00. 1 Kilimanoor Kadakkal (via) Adayamon ch. 0/00 Thiruvananthapuram to 4/600. 1 Thiruvananthapuram Navaikulam -Pallickal ch. 3/00 to 5/400. 1 Thiruvananthapuram Pappala - Pangalthadam ch. 0/00 to 3/00 1.5 Thiruvananthapuram Kilimanoor Madavoor ch. 6/00 to 10/00. 1 Nagaroor Kallambalam road ch. 8/00 to Thiruvananthapuram 10/00. 1 Thiruvananthapuram Parippally Madathara ch. 1/600 to 11/270. 2.5 Thiruvananthapuram Old Paripally road ch. 0/00 to 2/00. 1 Thiruvananthapuram Navaikulam -Thumbode ch. 3/00 to 6/100. 1

Page 5 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Chadayamangalom Pallickal ch. 6/400 to Thiruvananthapuram 9/800. 1 Thiruvananthapuram Pallickal - Velinelloor ch. 0/00 to 6/00. 1 Clearing of side drain and culvert in Thiruvananthapuram Venjaramoodu Attingal road. Ch. 0/00 to 6/00. 1.5 Clearing of side drain and culvert in Venjaramoodu Attingal road. Ch. 6/00 to Thiruvananthapuram 10/460. 1.5

Clearing of side drain and culvert in Chirayinkil Thiruvananthapuram Kaniyapuram road. Ch. 2/00 to 5/00. 3 Pot hole filling and clearing of side drain in Attingal - Delavapouram road. Ch. 0/00 to Thiruvananthapuram 2/800. 3 Clearing of side drain and culvert in Alamcode Thiruvananthapuram Meerankadavu road. Ch. 4/00 to 9/00. 1.5 Clearing of side drain and culvert in Alamcode Thiruvananthapuram Meerankadavu road. Ch. 0/00 to 4/00. 1.5 Clearing of side drain and culvert in Thiruvananthapuram Nelakkamukku Kaikkara road ch. 0/00 to 3/00. 1.5 Clearing existing side drain , removing elevated berms etc in Sreekariyam Thiruvananthapuram Pothencode road 0/00 to 4/200. 1.5 Thiruvananthapuram Ambalam Vengode road km. 0/00 to 3/500. 1 Thiruvananthapuram Kariyam Pothencode road km. 0/100 to 4/900. 1.5 Sreekariyam Kulathur Kazhakuttam road km. Thiruvananthapuram 0/800 to 5/500. 1.5 Vembayam Pallipuram road km. 6/500 to Thiruvananthapuram 12/500. 1.5 Pothencode Murukkumpurzha road km. 6/500 Thiruvananthapuram to 9/500. 1.5 Thiruvananthapuram Ambalam Paichira road km. 0/00 to 3/500. 1 Thiruvananthapuram Kaniyapuram landing road km. 0/00 to 1/500. 1 Padinjattumukku Puthukurichy road km. 0/00 Thiruvananthapuram to 4/500. 1 Thiruvananthapuram Kaniyapuram Chirayinkil road 0/00 to 6/00. 1.5

Page 6 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Sreekariyam Pothencode road km. 4/500 to Thiruvananthapuram 7/500. 1 Thiruvananthapuram Kariyam Pothencode road km. 5/300 to 9/500. 1.5 Narikkal Pullannivila Gandhipuram Thiruvananthapuram Chavadimukku road km. 0/00 to 6/400. 1.5 Thiruvananthapuram Azhoor Perumathura road 0/00 to 2/500. 1 Urgent patch works to Arattuvazhi road bet. Thiruvananthapuram km. 0/00 to 1/100. 3 Urgent patch works to Kaniyapuram Thiruvananthapuram Chirayinkil road bet. Km. 0/00 to 2/00. 2.5 Urgent patch works to Vembayam Pallipuram Thiruvananthapuram road bet. km. 7/600 to 10/00. 2 Urgent patch works to Kariyam Pothencode Thiruvananthapuram road. Bet. Km. 0/250 to 0/800. 2.5 Urgent patch works to Sreekariyam (Via) Kulathoor Kazhakuttam road. Bet Km. 2/200 Thiruvananthapuram to 3/300. 2.5 Urgent patch works to Vembayam Pallipuram Thiruvananthapuram road bet. km. 10/600 to 12/600. 2 Urgent patch works to Ambalam Vengode Thiruvananthapuram road bet. km. 1/200 to 3/600. 3 Urgent patch works to Kaniyapuram Thiruvananthapuram Chirayinkil Road. Bet. Km. 3/500 to 6/00. 3 Urgent patch works to Padinjattumukku Thiruvananthapuram Stationkadavu road.bet. Km. 3/600 to 5/600. 2.5 Urgent side drain clearing Malayinkil Thiruvananthapuram Pappanamcode road ch. 0/00 to 1/500. 0.7 Urgent side drain clearing Malayinkil Thiruvananthapuram Pappanamcode road ch. 2/500 to 3/500. 0.7

Urgent side drain clearing Thiruvananthapuram Thiruvananthapuram Neyyardam road km. 7/800 to 8/700. 1 Urgent side drain clearing Thachottukavu Thiruvananthapuram Mangattukadavu road ch.2/500 to 3/050. 0.7 Urgent side drain clearing Malayinkil - Thiruvananthapuram Ooruttambalam road ch. 0/00 to 1/500. 0.7

Page 7 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent side drain clearing Balaramapuram Thiruvananthapuram Kattakkada road 1

Urgent side drain clearing Thiruvananthapuram Thiruvananthapuram Neyyardam road km. 9/700 to 11/00. 1.5 Urgent side drain clearing Anthiyoorkonam - Thiruvananthapuram Thachottukavu road ch. 2/00 to 3/500 0.7 Urgent side drain clearing Anthiyoorkonam - Thiruvananthapuram Thachottukavu road ch. 3/500 to 4/500 0.7 Urgent side drain clearing Pravachambalam Thiruvananthapuram Ooruttambalam road ch. 3/200 to 4/500. 0.7 Urgent side drain clearing Pravachambalam Thiruvananthapuram Ooruttambalam road ch. 4/500 to 5/500. 0.7 Urgent side drain clearing Ooruttambalam Jn. Thiruvananthapuram Approaches. 0.7

Urgent side drain clearing Thiruvananthapuram Thiruvananthapuram Neyyardam road ch. 11/500 to 12/900. 1 Urgent side drain clearing Malayinkil Thiruvananthapuram Ooruttambalam road ch. 2/800 to 3/500 0.7

Urgent side drain clearing Thiruvananthapuram Thiruvananthapuram - Neyyardam road ch. 16/00 to 17/800. 1

Urgent side drain clearing Thiruvananthapuram Thiruvananthapuram - Neyyardam road ch. 15/500 to 17/800. 1.5

Thiruvananthapuram Urgent side drain clearing Anthiyoorkonam Jn. 1 Urgent pot hole filling in Thiruvananthapuram Thiruvananthapuram Neyyardam road. 1 Urgent pot hole filling in Thachottukavu Thiruvananthapuram Mangattukadavu road. 1 Clearing side drain chocked control in Chalakuzhi Medicalkuzhi Medical college road Thiruvananthapuram from ch. 0/00 to 1/200. 1

Page 8 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing side drain chocked control in Law college Thampuranmukku Mulavana road from Thiruvananthapuram ch. 0/00 to 0/500. 0.7 Clearing side drain chocked control in Thiruvananthapuram Kumarapuram Medical college road . 0.75 Clearing side drain chocked control in Nalumukku Kannamoola road from ch. 0/00 to Thiruvananthapuram 2/500. 0.5

Clearing side drain chocked control in General Thiruvananthapuram Hospital Thampuranmukku road 0/00 to 0/480. 0.5 Clearing side drain chocked control in Mannanthala Powdikonam road ch. 0/00 to Thiruvananthapuram 0/500. 0.5 Clearing side drain chocked control in Mannanthala Powdikonam road ch. 0/500 to Thiruvananthapuram 1/500. 0.5 Urgent patch repairs to Chalakuzhi Medical Thiruvananthapuram College road from ch. 0/00 to 1/200. 1.5 Urgent patch repairs to PMG Thekkummoodu road from ch. 0/00 to 0/540 and Thekkumoodu Thiruvananthapuram Pottakkuzhi road. . 3 Urgent patch repairs to Mulavana Thiruvananthapuram Gourishapattam Kannamoola road. 1.75 Urgent patch repairs to Mannanthala Thiruvananthapuram Powdikonam road from ch. 0/00 to 1/500. 1.5 Urgent patch repairs to Mannanthala Thiruvananthapuram Powdikonam road from ch. 1/500 to 3/00. 1.4 Urgent patch repairs toKims Hospital to Thiruvananthapuram Vayoovihar road from ch. 0/00 to 0/800. 1 Urgent patch repairs to Karalkada to Subhash Nagar road and Enchakkal to Poonthura 0/500 Thiruvananthapuram to 1/500 & 2/700 to 5/200. 2 Urgent patch repairs to Valiyathura - Shanghumugham 0/00 to 0/700 & 2/300 to Thiruvananthapuram 3/00. 2 Urgent patch repairs to Roads I nside Fort. Thiruvananthapuram 0/00 to 2/937. 2

Page 9 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent patch repairs to Eanchakkal to Thiruvananthapuram Kanjiravilakom 0/00 to 1/200. 2 Urgent patch repairs to flyover to Thiruvananthapuram Vellayambalam 2/00 to 3/700. 2 Urgent patch repairs to Cottonhill to Thiruvananthapuram Kundamankadavu 2/00 tp 3/700. 2 Urgent patch repairs to Thaliyal Kaladi Kulathara Maruthoorkadavu road 0/00 to Thiruvananthapuram 1/600. 2 Urgent patch repairs to Karamana to Thiruvananthapuram Poojappura road 0/00 to 1/500. 2 Urgent patch repairs to CIT Road 0/00 to Thiruvananthapuram 1/500. 3 Urgent patch repairs to Chiramukku Thiruvananthapuram Kalladimugham road 0/00 to 2/700. 2 Urgent patch repairs to Kochar road Thiruvananthapuram Edappazhinji to Killippalam 0/00 to 1/100. 3 Urgent patch repairs to Thirumala to Thiruvananthapuram Thrikannapuram road 1/800 to 3/300. 2 Urgent patch repairs to Thirumala Thiruvananthapuram Mangattukadavu road0/00 to 1/500. 2 Urgent patch repairs to Vazhuthacadu to Thiruvananthapuram Thirumala road 0/00 to 1/500. 2 Urgent patch repairs to NCC road 0/050 to Thiruvananthapuram 1/550. 2 Urgent patch repairs to Jawahar Nagar road Thiruvananthapuram 0/00 to 2/500. 1.5 Urgent patch repairs to Jawahar Nagar road Thiruvananthapuram 2/500 to 5/00. 1.5 Urgent patch repairs to Peroorkada Sasthamangalam road (Peroorkkada Thiruvananthapuram Oolampara 0/00 to 1/500. 2 Urgent patch repairs to Peroorkada Sasthamangalam road (Peroorkkada Thiruvananthapuram Oolampara 1/500 to 3/200. 2

Page 10 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent patch repairs to Vattiyoorkavu Vellaikadavu road (Vattiyoorkavu Thiruvananthapuram Moonamoodu road)0/00 to 1/500. 2 Urgent patch repairs to Vattiyoorkavu Vellaikadavu road ( Moonamoodu Vellaikadavu Thiruvananthapuram road) 1/500 to 3/200. 2 Urgent patch repairs to Maruthankuzhy to Thiruvananthapuram Kachani road 0/00 to 0/800. 1.5 Urgent patch repairs to Maruthankuzhy to Thiruvananthapuram Kachani road 0/800 to 1/600. 1.5 Urgent patch repairs to Maruthankuzhy to Thiruvananthapuram Kachani road 1/600 to 2/500. 1.5 Urgent patch repairs to Peroorkada Thiruvananthapuram Mannanthala road 0/00 to 1/00. 2

Thiruvananthapuram Urgent patch repairs to PMG TTC 0/00 to 1/00. 2 Urgent patch repairs to Kochar road Maruthankuzhy to Edappazhinji (Omkar Jn. To Thiruvananthapuram Edappazhinji) 0/500 to 1/200. 2 Urgent patch repairs to Nettayam Manalayam - Moonnamoodu (MLA Road) (Nettayam Thiruvananthapuram Malamughal)0/00 to 1/500. 1.5 Urgent patch repairs to Nettayam Manalayam - Moonnamoodu (MLA Road) (Malamughal to Thiruvananthapuram Moonnamoodu ) 1/500 to 3/00. 1.5 Urgent patch repairs to Moolathalakkal - Thiruvananthapuram Madathilnada road (MLA road) 0/00 to 1/350. 2 Urgent patch repairs to Vattiyoorkavu Thiruvananthapuram Kulasekharam road. 0/300 to 3/00. 2 Urgent patch repairs to Kundamonkadavu to Thiruvananthapuram Vattiyoorkavu (Balance Reach)0/500 to 2/00. 2 Urgent patch repairs to Vazhayila - Thiruvananthapuram Kizhakkemukkola road 0/00 to 2/00. 2 Urgent patch repairs to Plamoodu Marappalam Thiruvananthapuram Loop Road 0/00 to 0/400. 2 Urgent patch repairs to Vettamukku Pallimukku Thiruvananthapuram 0/00 to 0/900. 3

Page 11 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent patch repairs to Maruthankuzhy PTP Thiruvananthapuram road (Pipe line road)0/200 to 1/100. 1.5 Urgent patch repairs to Kodunganoor Plavodu Thiruvananthapuram road. 2 Urgent patch repairs to Kulasekharam - Thiruvananthapuram Vellaikkadavu 0/00 to 1/300. 2 Urgent patch repairs to Peroorkada Manikanteswhwaram Nettayam Thiruvananthapuram (Manikandeswaram Nettayam) 1/500 to 3/300. 2.5 Clearing side drain in Karalkada to Subhash Nagar road and Eanchakkal to Poonthura 0/00 Thiruvananthapuram to 5/200. 1 Clearing side drain West ort to Kanjiravilakom Thiruvananthapuram 0/00 to 1/850. 1.2 Clearing side drain Roas inside Fort 0/00 to Thiruvananthapuram 2/937. 2 Clearing side drain Pazhavangadi to West Fort Thiruvananthapuram 0/00 to 0/500 3 Clearing side drain Kunnumpuram Road.0/00 Thiruvananthapuram to 0/500. 0.7 Clearing side drain Poonthura Cheriyamuttom Thiruvananthapuram 0/00 to 1/00. 1 Clearing side drain Enchakkal Kanjiravilakom Thiruvananthapuram 0/00 to 1/200. 1 Clearing side drain Statue to Chirakulam Thiruvananthapuram Uppidammoodu 0/00 to 1/00. 0.7 Clearing side drain Thampanoor Flyover to Thiruvananthapuram Vellayambalam 0/00 to 4/00. 2 Clearing side drain Cottonhill to Thiruvananthapuram Kundamankadavu 0/500 to 5/00. 1.5 Clearing side drain Pulimoodu to Residency Thiruvananthapuram 0/00 to 1/100. 1 Clearing side drain Forest office Jn. to Bakery Thiruvananthapuram Jn. 0/00 to 2/00. 0.7 Clearing side drain Spencer Jn. To Thiruvananthapuram Vazhuthacaud 0/00 to 1/200. 0.7

Page 12 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing side drain Around residency 0/00 to Thiruvananthapuram 1/100. 0.7 Clearing side drain Thycaud house to Keezhe Thiruvananthapuram Thampanoor 0/00 to 1/00. 1 Clearing side drain Manjalikulam road 0/00 to Thiruvananthapuram 0/750. 1.5 Clearing side drain Sreekumar Jn to Nandavanam and Museum (RMS to Oottukuzhi and Gorky Bhavan to Bakery Thiruvananthapuram Flyovder 0/00 to 1/400. 1.5 Clearing side drain Karamana Thaliyal road Thiruvananthapuram 0/00 to 1/600. 1 Clearing side drain Aryasala road 0/00 to Thiruvananthapuram 0/350. 1 Clearing side drain Service road (New Theatre Thiruvananthapuram road) 0/00 to 0/525. 1.5 Thiruvananthapuram Clearing side drain CIT Road 0/00 to 1/240. 1.5 Clearing side drain Karamana Kalady (via) Thiruvananthapuram Soman nagar 0/00 to 1/780. 1.5 Clearing side drain Kalayan Hospital Therakom Thiruvananthapuram road 0/00 to 1/150. 1 Clearing side drain Attakulangara to Killippalam road berm removal right side 0/00 Thiruvananthapuram to 1/150. 1.6 Clearing side drain Attakulangara Killippalam Thiruvananthapuram road 0/00 to 1/00. 1.5 Clearing side drain Thirumala to Thiruvananthapuram Thrikkannapuram road 0/00 to 3/300. 1.5 Clearing side drain Thirumala to Thiruvananthapuram Mangattukadavu road 0/200 to 1/500. 1.5 Clearing side drain Mudavanmughal road 0/00 Thiruvananthapuram to 2/00. 1.5 Clearing side drain Vazhuthacaud to Thirumala Thiruvananthapuram road 0/00 to 4/150. 1.5 Clearing side drain Road from Nanthancodu Jn. To South Approach road to Cliff House Thiruvananthapuram 0/00 to 0/500. 0.7

Page 13 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing side drain Cliff House road 0/00 to Thiruvananthapuram 1/00. 1 Clearing side drain Upper Meridian road 0/00 Thiruvananthapuram to 1/250. 1.2 Clearing side drain Loop road in Pattom Kowdiar road Kuravankonam Loop road 0/00 Thiruvananthapuram to 0/400. 0.7 Clearing side drain Kuravankonam Maruthoor Thiruvananthapuram road 0/00 to 1/500. 1 Thiruvananthapuram Clearing side drain NCC road 0/00 to 1/550. 1 Clearing side drain Peroorkada Thiruvananthapuram Sasthamangalam road 0/300 to 3/200. 1 Clearing side drain Golf links road 0/00 to Thiruvananthapuram 1/400. 0.7 Clearing side drain Vattiyoorkavu Vellaikadavu Thiruvananthapuram road 0/00 to 3/200. 1.5

Clearing side drain Peroorkada - Vattiyoorkavu Thiruvananthapuram road upto Mannarakonam 0/00 to .3/00. 1.2 Clearing side drain Maruthankuzhy to Katchani Thiruvananthapuram 0/00 to 1/200. 2 Clearing side drain Maruthankuzhy to Katchani Thiruvananthapuram 1/200 to 2/500. 2 Clearing side drain Peroorkada to Thiruvananthapuram Mannanthala road 0/00 to 1/00. 0.7 Clearing side drain Peroorkada to Thiruvananthapuram Mannanthala road 1/00 to 2/500. 1.5 Clearing side drain Kishna Nagar road 0/00 to Thiruvananthapuram 2/210. 0.7 Thiruvananthapuram Clearing side drain PMG TTC 0/00 to 0/800. 1 Thiruvananthapuram Clearing side drain PMG TTC 0/800 to 1/800. 1 Clearing side drain Kochar road Thiruvananthapuram Maruthankuzhy to edapazhiji 0/500 to 1/200. 1 Clearing side drain TK Divakaran road 0/00 to Thiruvananthapuram 1/00. 2

Page 14 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing side drain Road from YMR to Kuravankonam (Nagarukavu road) 0/00 to Thiruvananthapuram 0/500. 0.7 Clearing side drain Road from Museum to Thiruvananthapuram Nanthancode 0/00 to 0/500. 1 Clearing side drain Nettayam Manalayam Thiruvananthapuram Moonnamoodu (MLA road) 0/00 to 3/00 1 Clearing side drain Moolathalakkal - Thiruvananthapuram Madathilnada road (MLA road) 0/00 to 1/350. 1 Clearing side drain Pangodu Maruthankuzhy Thiruvananthapuram road 0/00 to 1/280. 0.7 Clearing side drain Vattiyoorkavu Thiruvananthapuram Kulasekharam road 0/300 to 3/00. 1 Clearing side drain Kundamankadavu road Thiruvananthapuram Vattiyoorkavu 0/00 to 2/00. 1.5 Clearing side drain Vazhayila Thiruvananthapuram Kizhakkemukkola road 0/00 to 2/00. 1 Clearing side drain Plamoodu - Marappalam Thiruvananthapuram Loop road 0/00 to 0/400. 1.5 Clearing side drain Plamoodu Charachira YMR Thiruvananthapuram road 0/00 to 1/200. 1.5 Clearing side drain Peroorkada Thiruvananthapuram Manikanteshwaram Nettayam 0/00 to 3/300. 1 Clearing the side drain in the radial roads of Sasthamangalom Jn. towards Pipinmoodu, Thiruvananthapuram Maruthumkuzhy and Sankar Road. 3 Clearing side drain and chocked up culvert in Shorlacode road km. 0/00 to Thiruvananthapuram 2/00. 1.5 Clearing side drain and chocked up culvert in Nedumangad Shorlacode road km. 2/00 to Thiruvananthapuram 3/800. 1.3 Clearing side drain and chocked up culvert in Nedumangad Shorlacode road km. 6/400 to Thiruvananthapuram 8/00. 1.5

Page 15 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing side drain and chocked up culvert in Nedumangad Shorlacode road km. 9/00 to Thiruvananthapuram 10/00. 1.4 Clearing side drain and chocked up culvert in Nedumangad Shorlacode road km. 11/00 to Thiruvananthapuram 14/00. 1.5 Clearing side drain and chocked up culvert in Thiruvananthapuram Nedumangad Shorlacode road Kuttichal Jn. 1.5 Clearing side drain and chocked up culvert in Thiruvananthapuram Neyyardam road km. Thiruvananthapuram 16/800 to 19/00. 2 Clearing side drain and chocked up culvert in Thiruvananthapuram Neyyardam road km. Thiruvananthapuram 19/00 to 22/00. 2 Clearing side drain and chocked up culvert in Thiruvananthapuram Neyyardam road km. Thiruvananthapuram 23/00 to 26/00. 2 Clearing side drain and chocked up culvert in Muthiyavila Ottasekharamangalam road km. Thiruvananthapuram 0/00 to 2/500. 2 Clearing side drain and chocked up culvert in Muthiyavila Ottasekharamangalam road km. Thiruvananthapuram 2/500 to 5/200. 2 Clearing side drain and chocked up culvert in Thiruvananthapuram Kattakkada Kottoor road km. 1/00 to 3/00. 2 Clearing side drain and chocked up culvert in Thiruvananthapuram Kattakkada Kottoor road km. 3/00 to 5/00. 1.8 Clearing side drain and chocked up culvert in Thiruvananthapuram Kattakkada Kottoor road km. 5/00 to 7/00. 2 Clearing side drain and chocked up culvert in Thiruvananthapuram Kattakkada Kottoor road km. 8/00 to 10/00. 2 Clearing side drain and chocked up culvert in Thiruvananthapuram Aryanad Palode road.km. 0/00 to 3/00. 2.2 Clearing side drain and chocked up culvert in Thiruvananthapuram Aryanad Palode road.km. 3/00 to 5/550. 1.8 Clearing side drain and chocked up culvert in Thiruvananthapuram Vellanad Aryanad roadkm. 1/00 to 4/200. 2.5

Page 16 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing side drain and chocked up culvert in Charumoodu Nellikuzhy Paruthikuzhy road km. Thiruvananthapuram 0/00 to 4/00. 2.2 Clearing side drain and chocked up culvert in Thiruvananthapuram Aryanad Pezhumoodu road km. 0/00 to 3/00. 2 Clearing side drain and chocked up culvert in Thiruvananthapuram Aryanad Jn. 1 Clearing side drain and chocked up culvert in and removal of slipped up earth in Vembayam Thalayil Thembamoodu road from km. 0/00 to Thiruvananthapuram 5/00. 1.8

Clearing side drain and chocked up culvert in and removal of slipped up earth Vamanapuram Thiruvananthapuram Kalamachal road from km. 0/00 to 3/600. 1.6 Clearing side drain and chocked up culvert in and removal of slipped up earth MC Road from Thiruvananthapuram km. 21/00 to 25/00. 1.8 Clearing side drain and chocked up culvert in and removal of slipped up earth Thekkada Thiruvananthapuram Seemavila road from km. 0/00 to 5/800. 1.5 Clearing side drain and chocked up culvert in and removal of slipped up earth Muthuvila Thiruvananthapuram Aruvippuram chullalam road. 1.5 Clearing side drain and chocked up culvert in and removal of slipped up earth Thannimoodu Silk Farm Valiyarappankadu from km. 0/00 to Thiruvananthapuram 5/00. 1.5 Clearing side drain and chocked up culvert in and removal of slipped up earth Muthuvila Thiruvananthapuram Parappil road from km. 0/00 to 2/200. 1.3 Clearing side drain and chocked up culvert in Thiruvananthapuram Shencota road rom km. Thiruvananthapuram 10/00 to 12/700. 1.5 Clearing side drain and chocked up culvert in Thiruvananthapuram Shencota road rom km. Thiruvananthapuram 12/700 to 14/00. 1

Page 17 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing side drain and chocked up culvert in Thiruvananthapuram Shencota road rom km. Thiruvananthapuram 18/00 to 19/00. 1.5 Clearing side drain and chocked up culvert in Thiruvananthapuram Shencota road rom km. Thiruvananthapuram 19/00 to 21/00. 1 Clearing side drain and chocked up culvert in Thiruvananthapuram Bonacaud road rom km. 0/00 to 3/00. 1.5 Clearing side drain and chocked up culvert in Thiruvananthapuram Vithura Bonacaud road rom km. 4/00 to 7/00. 1.5 Clearing side drain and chocked up culvert Thiruvananthapuram Aruvikkara Jn. 1 Clearing side drain and chocked up culvert Thiruvananthapuram Nedumangad Town Branch road. 1 Urgent rectification works to 9th mile TS road Thiruvananthapuram to Aruvikkara rom km. 2/500 to 3/400. 1.5

Urgent rectification works to Tholicode Thuruthi Thiruvananthapuram Bhadranvachapra from km. 4/850 to 5/350. 3

Urgent rectification works to Tholicode Thuruthi Thiruvananthapuram Bhadranvachapra from km. 5/350 to 5/750. 3

Urgent rectification works to Tholicode Thuruthi Thiruvananthapuram Bhadranvachapra from km. 5/750 to 6/100. 3 Various Roads works to Vamanapuram Chittar Thiruvananthapuram Road Km. 0/00 to 12/00. 1.85 Clearing side drain and chocked up culvert in Thiruvananthapuram Bus stand Jn. In Vamanapuram Chittar road . 0.8 Clearing side drain and chocked up culvert in High School Jn. In Vamanapuram Chittar Thiruvananthapuram road . 0.7 Clearing side drain and chocked up culvert in Aryanad Palode road rom km. 13/500 to Thiruvananthapuram 14/500. 0.75

Clearing side drain and chocked up culvert in Thiruvananthapuram Aryanad Palode road rom km. 14/500 to 16/00. 0.7

Page 18 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing side drain and chocked up culvert in Thiruvananthapuram Palode Brimore road from km. 1/00 tof 2/500. 0.75 Clearing side drain and chocked up culvert in Thiruvananthapuram Palode Brimore road from km. 2/500 to 4/00. 0.8 Clearing side drain and chocked up culvert in Thiruvananthapuram Anad Branch road from km. 1/00 to 4/00. 0.9 Clearing side drain and chocked up culvert in Chullimanoor Panayamuttofm road from km. Thiruvananthapuram 0/00 to 2/500. 0.8 Clearing side drain and chocked up culvert in Chullimanoor Panayamuttom road from km. Thiruvananthapuram 2/500 to 5/00. 0.75 Clearing side drain and chocked up culvert in Palode Kizhakkumbhagom road from km. 0/00 Thiruvananthapuram to 3/500. 0.9 Clearing side drain and chocked up culvert in Thiruvananthapuram Vithura Branch road from km. 0/400 to 1/300. 0.7 Urgent patch repairs to T S Road Km. 9/500 to Thiruvananthapuram 11/00. 2 Urgent patch repairs to T S Road Km. 11/500 Thiruvananthapuram to 13/00. 2.2 Urgent patch repairs to T S Road Km. 13/600 Thiruvananthapuram to 15/00. 2 Urgent patch repairs to T S Road Km. 15/500 Thiruvananthapuram to 17/100. 2.2 Urgent patch repairs to T S Road Km. 17/600 Thiruvananthapuram to 19/00. 2 Urgent patch repairs to N S Road Km. 0/00 to Thiruvananthapuram 0/700. 2 Urgent patch repairs to Vellanad Road Km. Thiruvananthapuram 4/650 to 5/100. 2 Urgent patch repairs to Enikkara Kallayam Thiruvananthapuram Road Km. 2/00 to 4/00. 2.2 Urgent rectification of Pot Holes Under City Thiruvananthapuram Road Section - I.using PotHole filling machine 3 Urgent rectification of Pot Holes Under City Thiruvananthapuram Road Section - II.using PotHole filling machine 3

Page 19 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status

Urgent rectification of Pot Holes Under City Thiruvananthapuram Road Section - III.using PotHole filling machine 3 Urgent rectification of Pot Holes under Contonment Section.using PotHole filling Thiruvananthapuram machine 1.5 Urgent rectification of Pot Holes under Kazhakuttom Section.using PotHole filling Thiruvananthapuram machine 1.5 Urgent rectification of Pot Holes under Malayinkeezh Section.using PotHole filling Thiruvananthapuram machine 1.5 Urgent rectification of Pot Holes under Attingal Thiruvananthapuram Sectionusing PotHole filling machine 1.5 Urgent rectification of Pot Holes under Kilimanoor Sectionusing PotHole filling Thiruvananthapuram machine 1.5 Urgent rectification of Pot Holes under Thiruvananthapuram Varkala sectionusing PotHole filling machine 1.5 Urgent rectification of Pot Holesunder Nedumangad Sectionusing PotHole filling Thiruvananthapuram machine 1.5 Urgent rectification of Pot Holes under Thiruvananthapuram Aryanad Section using PotHole filling machine 1.5 Urgent rectification of Pot Holes under Palode Thiruvananthapuram Section using PotHole filling machine 1.5 Urgent rectification of Pot Holes under Venjaramoodu Section using PotHole filling Thiruvananthapuram machine 1.5 Urgent rectification of Pot Holes under Neyyatinkara Section using PotHole filling Thiruvananthapuram machine 1.5 Urgent rectification of Pot Holes under Kanjiramkulam Section using PotHole filling Thiruvananthapuram machine 1.5 Urgent rectification of Pot Holes under Kunnathukal Sectionusing PotHole filling Thiruvananthapuram machine 1.5

Page 20 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status

Urgent rectification of Pot Holes under Thiruvananthapuram Parassala Sectionusing PotHole filling machine 1.5 Thiruvananthapuram Purchase of Shellmac PR (15X2) 30

Page 21 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Pre-Monsoon 2011-12 Clearing the chocked up culverts and side drain cutting earthern drain and removal of raised berm to Chittumala Idiyakadavu road and Kundara Chittumala Kollam road 3 Pre-Monsoon 2011-12 Clearing the chocked up culverts and side drain cutting earthern drain and removal of raised berm to Kallumthazham - Kureeppally road, CP road, Kollam Karikkara road and Kottiyam Kundara road 3 Pre-Monsoon 2011-12 Clearing the chocked up culverts and side drain cutting earthern drain and removal of raised berm to Palamukku - Nallila road, Kallada - Puthur road, Elampalloor - Adoor road and Kollam Keralapuram - Ayoor road 3 Pre-Monsoon 2011-12 Removing chocked up side drain and culvert, cutting of earthern drain to remove water stagnation for the BT surface of the road Chathannoor Paravoor road, Parippally Bhoothakkulam (via) South Chamavila, Paravoor Nelletil, Parippally Elakamon, Bus stand road, Paravoor Kollam Parippally, Karamcodu Uliyanadu road 3

Pre-Monsoon 2011-12 Removing chocked up side drain and culvert, cutting of earthern drain to remove water stagnation for the BT surface of the road Parippally Kalluvathukkal (via) Meenambalam, Chamavila Kochalummoodu Adichanalloor Kundumonkulam, Chathannoor Kurungavayal, Edanadu Temple road, Seemattimukku Marakkulam, Pulikuzhithadam Kollam road, Ayoor Ithikkara road 3

Page 22 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status

Pre-Monsoon 2011-12 Removing chocked up side drain and culvert, cutting of earthern drain to remove water stagnation for the BT surface of the road Panthrandrumuri Valathungal Eravipuram Koottikkada Koottikkada Sathamkadavu Mayyanad Sasthamkadavu Mayyanadu landing, Umayanalloor Pulichira, Kottiyam Mayyanadu Kottiyam Kollam Ottappilamoodu, Mylakkadu Thazhuthala road 3 Premonsoon 2011-12 Providing sign board Kollam and signals in Kollam town 3 Premonsoon 2011-12 Clearing the chocked up culvert and side drain in Kollam - Ayoor road, Vadayattukotta road, Nellimukku road, road, Vaddy road, Pallimukku Ayathil road. Thomas Stephen's Company road, Thevally road, Chinnakkada Kollam Vellayittambalam road 3 Premonsoon 2011-12 Clearing the chocked up culvert and side drain in Kollam - Elampalloor road, Anchalummodu Prakulam road Anchalummoodu Kureepuzha, Neeravil road, Muttathumoola road, Perumon road, Kollam Ashtamudi road Prakulam Sampranikody road 3 Premonsoon 2011-12 Clearing the chocked up culvert and cc drain, cutting catch drain, removal ofraised berm and earth deposited on BT surface to K.S road 8/400 to 12/400, Killoor - Anayam road 0/00 to 2/600 Cheerankavu Puthoor road 0/00 to 8/400, Cheerankavu Puthoor via Maranadu 0/00 to 7/100, Neduvathoor Puthoor road 0/00 to 6/450, Moorthicavu Manakaracavu road from ch.0/00 Kollam to 5/200 3

Page 23 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon 2011-12 Clearing the chocked up culvert and cc drain, cutting catch drain, removal of raised berm and earth deposited on BT surface to Arumurikkada Thrippilazhikom road from ch.0/00 to 3/930, Kundara Nedumoncavu road 0/00 to 6/920 Ezhukone Nedumoncavu road 0/00 to 8/100 Kattaketty Pinattinmoodu 1/100 to 4/400, Mukkandom Ambalathumkala road 0/00 to 1/400 Old Q.S road Ezhukone junction0/00 to 0/500 Ambalathumkala Irumbanangadu road 0/00 to Kollam 3/400 3 Premonsoon 2011-12 Clearing the chocked up culvert and cc drain, cutting catch drain, removal of raised berm and earth deposited on BT surface to Keralapuram Ayoor road 8/240 to 17/620 Nedumoncavu Meeyannoor road 0/00 to 6/400, Neeleswaram Vakkanadu road 0/00 to 6/830 Odanavattom Nedumoncavu Kollam road 0/00 to 5/600 3 Premonsoon 2011-12 Clearing the chocked up culvert and cc drain, cutting catch drain, removal of raised berm and earth deposited on BT surface to Ayoor Ithikkara road 8/00 to 17/500 Maruthamonpally Ambalamkunnu road 0/00 to 5/850, Kollam Ayoor road 15/187 to 20/600 Velinalloor Temple road 0/00 to 1/600 Karingannoor Attoorkonam Pallickal Puzhakadavu road 0/00 to 3/200 Oyoor Kollam Poriyakkodu junction road 0/00 to 2/600 3

Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Alencherry Kollam Onthupacha road from ch.0/00 to 18/620 3

Page 24 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Ayoor Anchal Kollam road from ch.0/00 to 7/200 1 Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to T.S road from Kollam ch.52/00 to 65/00 3

Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Edamulakkal Kollam Thadicadu road from ch.0/00 to 4/160 1

Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Madurappa Kollam Vayakkal road from ch.0/00 to 4/935 1.5

Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Kuruvikonam Kollam Bharatheepuram road from ch.0/00 to 9/105 2

Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Agasthiacodu Kollam Alencherry road from ch.0/00 to 2/00 0.5 Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Mekkara Kollam Achencoil road from ch.8/300 to 21/300 3 Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to T.S road from Kollam ch.65/00 to 73/296 2.5

Page 25 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm toPunalur Kollam Schaliyakkara oad from ch.1/00 to 8/700 2 Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Papermill Kollam Panmapatta road from ch.0/00 to 2/600 2 Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to P.M road from Kollam ch.0/00 to 2/600 1

Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Chemmanthoor Kollam Thadicadu road from ch.0/00 to 6/500 1.5 Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Elampal Kollam Thadicadu road from ch.0/00 to 7/00 1.5 Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to P.M road from Kollam ch.2/600 to 13/500 3 Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Kollam road from ch.0/00 to 12/00 2.5

Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Pathanapuram Kollam Schaliyakkara road from ch.3/00 to 13/800 2

Page 26 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status

Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Pandithitta Kollam Panampatta road from ch.0/00 to 3/700 0.75 Premonsoon 2011-12 Clearing the chocked up culvert and side drain cutting earthern drain and removal of raised berm to Kizhakketheruvu Pathanapuram road from Kollam ch.3/00 to 10/750 2

Premonsoon 2011-12 Ellimination of water stagnation by removing raised berm and filling the erroded berm, cutting side drain, clearing blocked culvert and drain etc.ofEravipuram Ayoor road from ch.20/600 to 29/460,Elamadu Thevannoor road from ch.0/00 to 6/905,Ayoor Kollam Ithikkara road from ch.0/00 to 8/000 3 Premonsoon 2011-12 Ellimination of water stagnation by removing raised berm and filling the erroded berm, cutting side drain, clearing blocked culvert and drain etc.ofChadayamangalam - Pallickal road from ch.0/00 to 6/452,Ayoor Chunda road from ch.0/00 to 7/895,Chengamanadu Kadakkal Kollam road from ch.16/693 to 24/00 3 Premonsoon 2011-12 Ellimination of water stagnation by removing raised berm and filling the erroded berm, cutting side drain, clearing blocked culvert and drain etc.ofParippally Madathara road from ch.11/200 to 16/400,Chingoli Chadayamangalam road from ch.6/960 to 9/360,Ayirakuzhy Anchal road from ch.0/00 to 2/500,Vayala Kuttikadu road from Kollam ch.0/00 to 4/250 3

Page 27 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon 2011-12 Ellimination of water stagnation by removing raised berm and filling the erroded berm, cutting side drain, clearing blocked culvert and drain etc.ofChithara Pangodu road from ch.0/000 to 5/307,Pangodu Kadakkal road from ch.3/200 to 9/690,Mullikkadu Koillayil road from ch.0/00 to 4/260,Paramukalil vilayil road from ch.0/00 to Kollam 1/830 3

Premonsoon 2011-12 Ellimination of water stagnation by removing raised berm and filling the erroded berm, cutting side drain, clearing blocked culvert and drain etc.ofT.S road from ch.43/00 to 52/00,Pangodu Kizhakkumbhagom road from ch.1/609 to 6/796,Adayamon - Kollam Tholikuzhy road from ch.4/440 to 6/460 3 Premonsoon 2011-12 Ellimination of water stagnation by removing raised berm and filling the erroded berm, cutting side drain, clearing blocked culvert and drain etc.ofEnathu Puthoor road from ch.0/00 to 3/00,Inchakkadu Perumkulam road from ch.0/00 to 2/260,Perumkulam Kalayapuram road from ch.0/00 to 7/900,Kalayapuram Thamarakudy Kollam road from ch.0/00 to 3/335 3 Premonsoon 2011-12 Ellimination of water stagnation by removing raised berm and filling the erroded berm, cutting side drain, clearing blocked culvert and drain etc.ofMylom - road from ch.0/00 to 4/800,K.S road from ch.0/00 to 8/400,Kottathala Perumkulam Kollam road from ch.0/00 to 2/750 3

Page 28 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon 2011-12 Ellimination of water stagnation by removing raised berm and filling the erroded berm, cutting side drain, clearing blocked culvert and drain etc.ofKattaketty Pinattinmoodu road from ch.0/00 to 1/100,Neeleswaram Ambalappuram Nellikkunnam road from ch.0/00 to 4/885,Nellikkunnam Chepra road from ch.0/00 to 5/400,Odanavattom Valakom road from Kollam ch.4/00 to 10/800 3 Premonsoon 2011-12 Ellimination of water stagnation by removing raised berm and filling the erroded berm, cutting side drain, clearing blocked culvert and drain etc.ofVayakkal Ummannoor road from ch.0/00 to 4/660,Ummannoor Sadanandapuram road from ch.0/00 to 5/960,Valakom Mulliyil Kollam Panaveli road from ch.0/00 to 4/460 3 Premonsoon 2011-12 Ellimination of water stagnation by removing raised berm and filling the erroded berm, cutting side drain, clearing blocked culvert and drain etc.of32nd mile M.C road chengamanadu Kadakkal road from ch.0/00 to 0/750,chengamanadu Kadakkal road from ch.0/00 to 8/00,Thalachira Venchembu road from ch.0/00 to 5/500,Vettikkavala Sadanandapuram road Kollam from ch.0/00 to 3/200 3

Page 29 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division PremonsoonName of work 2011-12 Ellimination of water Lakh) Tender date contractor date Amount the work Work status stagnation by removing raised berm and filling the erroded berm, cutting side drain, clearing blocked culvert and drain etc.ofVettikkavala Chakkuvarakkal road from ch.0/00 to 4/00,Chirattakonam Panaveli road from ch.0/00 to 1/650,Andoor Thevannoor road from ch.0/00 to 1/670, Railway station temple road from ch.0/00 to 1/338,Kizhakketheruvu Pallimukku Vettikkavala road from ch.0/00 to 2/680,Kottathala Perumkulam road from ch.0/00 to 2/750,Puthoor Iverkala road from ch.0/00 to 1/900,Railway station to MES block from ch.0/00 to 2/00,71/800 of M.C road 0/600 K.V road from ch.0/00 to 1/100,1st mile K.V road Agricultural farm road from ch.0/00 to Kollam 1/025 3 Pre-monsoon-2011-2012-Urgent pot hol filling and patch reparis to 2/6/P.S. road to Kollam Champakadavu road ch. 1/500 5o 2/500 km. 3 Pre-monsoon-2011-2012-Urgent pot hol filling and patch reparis to Karunagapally- Kollam alumkadavu road ch. 0/0-0 to 2/200 km. 2 Pre-monsoon-2011-12-clearing the side drain, clearing the choked up culvert and cutting the raised berm to padanairkulangara- Kollam Sasthamcotta road ch. 0/00 to 4/200km. 1.5 Pre-monsoon-2011-12-clearing the side drain, clearing the choked up culvert to (1) Padanairkulangara - Karoorkadavu road ch. 0/00 to 4/350 (2) Block Head quarters road ch. 0/00 to 1/600 km.(3) 2/6/P.S. road to AVHS Kollam road ch. 0/00 to 3/675km. 1

Page 30 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Pre-monsoon-2009-2010-Clearing side drain, chocked culvert,repairing damaged drain and cutting raised berm to (1) Kuttivattom - Arinalloor road ch. 0/00 to 5/650 km (2) Kuttippuram- Maratithottam road ch. 0/00 to 4/500km (3) Kuttippuram- Malumel road ch. Kollam 0/00 to 3/045 km. 1.6 Pre-monsoon-2011-12-clearing the side drain, clearing the choked up culvert and cutting the raised berm to (1) Public Office -Kallummoottil Kadavu road. (2) Lalaji -R.S. Kollam Canal road. 2 Pre-monsoon-2011-12-clearing the side drain, clearing the choked up culvert and cutting the raised berm to (1) S.V Market road ch. 0/00 to 2/910 km (2)SRV Market road ch. 0/00 to Kollam 1/00km. Clearing the side drain, clearing the chocked up culvert and cutting the raised berm to Chavara-Pattakadavu road between ch. 0/00 Kollam to 9/00km. 1.5 Pre-monsoon-2011-2012 -Urgent Pot hole filling and cutting the raised berm to Kottapuzhakkal-Thazhava road ch. 9/600 to Kollam 11/600 km. 2.8 Pre-monsoon-2011-2012 -Urgent Pot hole filling and cutting the raised berm to Kottapuzhakkal-Thazhava road ch.11/600 to Kollam 13/250 km. 2.8 Pre-monsoon-2011-2012 -Urgent Pot hole filling and cutting the raised berm toPallimukku-Manjadimukku road ch. 0/00 to Kollam 1/6600 km 2.5

Page 31 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Pre-monsoon-2011-2012-Cutting and removing raised berm and clearing side drain cutting eath drain in Oachira- Thamarakulam road ch. 0/00 to 3/287, Vavvakkavu - Kollam Thazhava road ch. 0/00 to 3/500 km. 1 Pre-monsoon2011-12-Changankulangara - Vallikunnam road ch.0/00 to 4/00, Oachira- Kollam Ayiramthengu road ch. 0/00 to 4/995 km. 1 Pre-monsoon-2011-12- Puthentheruvu- Thurayilkadavu road ch. 0/00 to 3/900,Panatemukku- Thodiyoor road ch.0/00 to 5/00km and Oachira Railway station road Kollam ch. 0/00 to 1/710km 1 Pre-monsoon-2011-12 -clearing side drain, choked up culvert, cutting earthen drain and raised berm of changankulangara- Vallikavu Kollam road and Vallikkavu- Alumkadavu road 0.75 Pre-monsoon-2011-12-Urgent Pot hole filling and patch repairs to Adoor-Sasthamcotta road Kollam ch.17/250 to 18/250 km. 2 Pre-monsoon-2011-12-Urgent Pot hole filling and patch repairs to Sasthamcotta- Kollam Pattakadavu road 0/00 to 4/00km 2 Pre-monsoon-2011-12- cutting and removing raised berm, clearing side drain, choked up culvert, cutting earthen drain etc. of Adoor- Sasthamcotta road and Kottakara Kollam -Sasthamcotta road 1 Pre-monsoon-2011-12-Cutting and removing raised berm, clearing side drain, choked up culvert, cutting earthen drain etc. of Padanairkulangara-Sasthamcotta road ch. 4/200 to 9/600 and Sasthamcotta- Kollam Pattakadavu road. 1

Page 32 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Pre-monsoon-2011-12-cutting and removing raised berm, clearing side drain, choked up culvert, cutting earthen drain etc. of kallukadavu- thoppilomukku road and Kollam Mynagapally-Thevelakkara road. 0.95 Pre-monsoon-2011-12 cutting and removing raised berm, clearing side drain, choked up culvert, cutting earthen drain etc . Of Karalimukku-Kadapuzha road,Kadapuzha- Valanjavarambu road and Bharanikavu- Kollam Kadapuzha road. 1.1 Pre-monsoon-2011-12 Cutting and removing raised berm, clearing side drain, choked up culvert, cutting earthen drain etc . Of 7th Mile- Palathinkadavu road, 7th Mile-Cheekkalkadavu Kollam road, Nediyavila- Vembanattazhikathu road 1 1.1 Pre-monsoon-2011-12- cutting and removing raised berm, clearing side drain, choked up culvert, cutting earthen drain etc. of thodiyoour- Patharam road, Pazhakulam- Anayadi road, Pallimukku- Kumaranchira road, Poikayilmukku- Bharanikkavu road and Kollam Chakkuvally-Malanada-Kallukuzhi road. 1.5

Page 33 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon works 2011-12 - Clearing blocked up side drain and culverts and removal of minor slips in various roads under Roads Idukki section 1.5 Premonsoon works 2010-11 - Clearing blocked up side drain and culverts in various roads Idukki under Roads section Marayoor 1 do. Clearing blocked up side drain and culverts in various roads under Roads section Idukki Pallivasal 1.5 do.Clearing blocked up side drain and culverts in various roads under Roads section Idukki Nedumkandom 1 do. Clearing blocked up side drain and culverts in various roads under Roads section Idukki Santhanpara 1.5 do. Clearing blocked up side drain and culverts in various roads under Roads section Idukki Vandanmedu 1 do. Clearing blocked up side drain and culverts in various roads under Roads section No.I. Idukki Idukki 2 do. Clearing blocked up side drain and culverts in various roads under Roads section No.II. Idukki Idukki 2 do. Clearing blocked up side drain and culverts in various roads under Roads section Idukki Kattappana 2 do. Clearing blocked up side drain and culverts in various roads under Roads Idukki sectionPeermade 2

do. Clearing blocked up side drain and culverts Idukki in various roads under Roads section Kumily 1 do. Clearing blocked up side drain and culverts in various roads under Roads section Idukki Thodupuzha 1.5

Page 34 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status

do. Clearing blocked up side drain and culverts Idukki in various roads under Roads section Muttom 1.5 do. Clearing blocked up side drain and culverts in various roads under Roads section Idukki Karimannoor 1 Providing urgent Emulsion patch works in Idukki various roads under Roads section Munnar 1 Providing urgent Emulsion patch works in Idukki various roads under Roads section Marayoor 1 Providing urgent Emulsion patch works in Idukki various roads under Roads section Pallivasal 1.5 Providing urgent Emulsion patch works in various roads under Roads section Idukki Nedumkandom 1.5 Providing urgent Emulsion patch works in various roads under Roads section Idukki Santhanpara 1.5 Providing urgent Emulsion patch works in various roads under Roads section Vandanmedu (except Kattappana - Kumily Idukki road) 1 Providing urgent Emulsion patch works in Idukki various roads under Roads section Peermade 1.5 Providing urgent Emulsion patch works in Idukki various roads under Roads section Kumily 1

Providing urgent Emulsion patch works in Idukki various roads under Roads section No.I. Idukki 2 Providing urgent Emulsion patch works in various roads under Roads section No.II. Idukki Idukki 2

Providing urgent Emulsion patch works in Idukki various roads under Roads section Kattappana 2 Providing urgent Emulsion patch works in various roads under Roads section Idukki Thodupuzha 2

Page 35 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Providing urgent Emulsion patch works in Idukki various roads under Roads section Muttom 1 Providing urgent Emulsion patch works in various roads under Roads section Idukki Karimannoor 1 Urgent rectification works to damaged retaining wall at Km. 0/350 of Thodupuzha - Idukki Vaniyappally road 2.8 Urgent surface rectification works to Murikkassery - Melechinnar road Km. 12/800 Idukki to 14/500 3 Urgent surface rectification works to Vettikkamattom - Ettithoppe - Melechinnar road Idukki Km. 6/000 to 8/000 3 Urgent rectiifcation of erroded edge of various StateHighway and MDR's in Roads Section Idukki Pallivasal 1.5 Urgent rectiifcation of erroded edge of Northern Outlet road and Kanthalloor - Idukki Marayoor road in Roads Section Marayoor 1 Urgent rectiifcation of erroded edge of various StateHighway and MDR's in Roads Section Idukki Munnar 1 Urgent rectiifcation of erroded edge of various StateHighway and MDR's in Roads Section Idukki Santhanpara 2.5 Urgent rectiifcation of erroded edge of various StateHighway and MDR's in Roads Section Idukki Nedumkandom 1.5 Urgent rectiifcation of erroded edge of various StateHighway and MDR's in Roads Section Idukki Vandanmedu 1 Urgent rectiifcation of erroded edge of various Idukki StateHighway and MDR's in Roads Section

Urgent rectiifcation of erroded edge of various StateHighway and MDR's in Roads Section Idukki Kumily 1

Page 36 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent rectiifcation of erroded edge of various StateHighway and MDR's in Roads Section Idukki Muttom 1.5 Urgent rectiifcation of erroded edge of various StateHighway and MDR's in Roads Section Idukki Thodupuzha 1 Urgent rectiifcation of erroded edge of various Idukki StateHighway and MDR's in Roads Section

Urgent rectiifcation of erroded edge of Cheenikuzhi - Paramada road, Thodupuzha - Puliyanmala road and Idukki - Neriyamangalam road under Roads Section Idukki No.I. Idukki 2 Urgent rectiifcation of erroded edge of Karimban Murikkassery road and Idukki - Neriyamangalam road under Roads Section Idukki No.II. Idukki 2 Urgent rectiifcation of erroded edge of Kambilikandom - Chinnar road, Kallarkutty - Perinjankutty road and Panickankudy - Perinjankutty road under Roads Section No.II. Idukki Idukki 2.5 Urgent rectiifcation of erroded edge of various Idukki StateHighway and MDR's in Roads Section

Page 37 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status OR 2011-12 - Premonsoon Works - Clearing blockage of drain and urgent repairs to Kanjiramattom road, Kanjiramattom - Ernakulam Poothotta road, & Poothotta - Piravom road 2.5 OR 2011-12 - Premonsoon Works -Clearing blockage of drain & urgrnt repairs to Aarakunnam - Amballoor road, Arakkunnam - Ernakulam Oilpuram road &Thirumarayoor road. 2 OR 2011-12 - Premonsoon Works - Clearing blockage of drain & Urgent repairs to Vettickal road,Paingarappally Pulickamali Ernakulam Thuppummpady road 2 OR 2011-12 - Premonsoon Works- Clearing blockage of drain & Urgent repairs to Peppathippara road, Nadakkavu Mulamthuruthy road, Injimala Palance square Ernakulam Eruveli Vattakunnu road, 2.5 OR 2011-12 - Premonsoon Works - Clearing blockage of drain and urgent repairs to EE Ernakulam road 38/600 to 55/200. 5.5 OR 2011-12 - Premonsoon Works - Clearing blockage of drain and urgent repairs to NH deviation road and Palarivattom Kumarapuram Ernakulam road 0/000 to 3/700. 2.5 OR 2011-12 - Premonsoon Works- Clearing blockage of drain and urgent repairs to various Major District roads under Roads Ernakulam Section,Tripunithura 4.5 OR 2011-12 - Premonsoon Works -Clearing blockage of drain and urgent repairs to various State Highways under Roads Section, Ernakulam Mattanchery 6 OR 2011-12 - Premonsoon Works -Clearing blockage of drain and urgent repairs to various Major District roads under Roads Ernakulam Section,Mattanchery 6.5

Page 38 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status OR 2011-12 - Premonsoon Works -Clearing blockage of drain and urgent repairs to Edapally Muvattupuzha road, Kangarapady Thengode road,Kangarapady Kalamassery road ,Thrikkakkara Temple road, Pattupurakal Ernakulam Thrikkakkara road 5 OR 2011-12 - Premonsoon Works -Clearing blockage of drain and urgent repairs to Old NH 47 ( NH 47 at North of HMT Jn to Municipal office Kalamassery), North Kalamassery Glass factory road,South Kalamassery Glass factory Ernakulam road, 4 OR 2011-12 - Premonsoon Works -Clearing blockage of drain and urgent repairs to Broadway road, Foreshore road, Highcourt road,Road behind Guest House, Parallel Ernakulam Shanmugham road & M.G road 4 OR 2011-12 - Premonsoon Works -Clearing blockage of drain and urgent repairs to Edachira Vayanasal road,HMT road, Kunnumpuram Civil station road , Road around Civil Station, Road around University, & Ernakulam Edapally Methanam road 4 OR 2011-12 - Premonsoon Works -Clearing blockage of drain and urgent repairs toKaloor deviation road,Kaloor Perandoor road, Perandoor landing road,Devankulangara Kacheripady road, Old NH Edapally, Chitoor Ernakulam Moolampilly road 5 OR 2011-12 - Premonsoon Works -Clearing blockage of drain and urgent repairs to Padamughal Palachuvadu road, Palachuvadu Nilampathiji road, Seaport Airport Thuthiyoor Ernakulam road, Mapranam Civil station road 2

Page 39 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status OR 2011-12 - Premonsoon Works - Urgent repairs to Manjummel Arattukadavu Road, FACT Manjummel road, FACT Kalamassery road, FACT Onthithodu and FACT Methanam Ernakulam Road 2 OR 2011-12 - Premonsoon Works - Urgent repairs to Perumbavoor road, Aluva Alangad road, Aluva Varapuzha road and Ernakulam Town limit roads. 2 OR 2011-12 - Premonsoon Works - Urgent repairs to Edappally Muvattupuzha road, 3rd Mile A.V. road to Kizhakkambalam road, Ernakulam Pukkattupady loop road and NAD HMT Road. 2 OR 2011-12 - Premonsoon Works - Urgent repairs to Thottumugham - Thadiyittaparambu road, Thottumugham Erumathala road, Edathala Pengattussery road, Edathala Thaikkattukara road and Kuttamassery Ernakulam Chalackal Thadiyittaparambu road 2 OR 2011-12 - Premonsoon Works - Urgent repairs to U.C. College Edayar road, 2nd mile A.P. Road to Thadikkadavu road, Chowara Mangalappuzha road, Mangalapuzha Panaithodu road and Mangalapuzha Seminari Ernakulam Road. 2 OR 2011-12 - Premonsoon works - urgent repairs to Manjapra - Ayyampuzha road Ch. 0/000 to 7/000, -Manjapra road Ch. 0/000 to 7/800, Kalady-manjapra road Ch. 0/000 to 5/000, Bethleham-Kidangoor road ch. Ernakulam 0/000 to 6/600 2 OR 2011-12 - Premonsoon works - urgent repairs to Manjapra- Malayattoor-FIT- Kannimangalam Road Ch. 0/000 to 11/000, Ernakulam Cheranalloore Trace road Ch. 0/000 to 2/260 2

Page 40 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status

OR 2011-12 - Premonsoon works - urgent repairs to 4th Mile AA Road Ch. 0/000 to 2/760, MC Road Ch.233/000 to 240/300, Ernakulam Kalady - Malayattoor Road Ch. 0/000 to 11/220 2 OR 2011-12 - Premonsoon works - urgent repairs to Angamaly - Manjaly Road ch. 0/000 to 3/220, Angamaly-Paravoor road ch. 0/000 to 5/400, NH Link road, Ch. 0/000 to 0/800, Angamaly Market Landing road Ch. 0/000 to Ernakulam 0/800, Campshed road Ch. 0/000 to 1/000 2 OR 2011-12 - Premonsoon works - urgent repairs to Vengoor - Nayathodu Road Ch. 0/000 to 3/500, -Mattoor road ch. 0/000 to 6/900, Chengal-Chowara road Ch. 0/000 to Ernakulam 10/000 2 OR 2011-12 - Premonsoon works - urgent repairs to Karukutty - Ezhattumugham Road Ch. 0/000 to 7/000, Karukutty-Palissery road Ch. 0/000 to 3/600, Karukutty-Azhakom road Ch. 0/000 to 5/000, Karukutty-Mookkannoor road Ch. 0/000 to 5/000, Puliyanam-Mambra- Ernakulam Karukutty roa ch. 0/000 to 5/500 2 OR 2011-12 - Premonsoon works - urgent repairs to Karukutty - Elavoor Road Ch. 0/000 to 5/000, Karukutty-Moozhikulam road Ch. 0/000 to 4/000, Angamaly-Kodussery road Ch. 0/000 to 3/200, Mookkannoor-Ezhattumugham Ernakulam road ch. 0/000 to 14/400 3

Page 41 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status O/R 2011-12 pre-Monsoon works in Annamanada- road, manakkapady-Mathanangal-Puliyanam road, thattampady-Purappillikkav-karumalloor Hospital road, Shappupady-Purappillikkav Road, Ikyakeralam- Mattupuram road, Mannam-Peruvaram road, Vazhikulanmgara- Athani-Kshemodayam road, Chengamanad- Ernakulam Elavoor road ch.0/000 to 1/800. 3 O/R 2011-12 pre-Monsoon works in Paravur- Chendamangalam road,AI Jaleel road, Arankav-Karimpadam road, Gothuruth East Church road, Paravur-Chakkarakkadav road, and road,NH Byepass road Ernakulam Thonniyakav -Thrikkapuram road. 2.5 O/R 2011-12 pre-Monsoon works in Kottapuram-Koonammav road, Edayar- Panaikulam road, Edayar-Muppathadam road, Paravur-Varapuzha Road, Neericode- Thattampady road, UC College- Thadikkalkadav road (Via) Parana, Anachal- Vazhikulangara road, Banglavupady- Kesavathuruth-Vaniyakkad road, Kochal- Karinganthuruth road and varapuzha Ferry Ernakulam road. 3 O/R 2011-12 pre-Monsoon works in V-P road, Paravur-Kuruinthottiparamb road, Old NH Moothakunnam road, kadavath road and Kadakkara road, Kaitharam Bypass, Ernakulam Cheriappilly Koonammavu Road, 2.5 O/R 2011-12 pre-Monsoon works in Ankamali- manjali road,Ayiroor-Thuruthipuram 0/000 to 7/000, Pattom-Manjali road, Thiruvalloor- Kunnelppally road, Kongorppilly-Olanad road, Njarakkat road and Kadungalloor-kongorppilly Ernakulam road and mala-Elanthikkara road. 3

Page 42 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status O/R 2011-12 pre-Monsoon works in Moothakunnam-Munambam road, Andippillikkav-Vadakkumpuram,Paravur- Ernakulam Chathanad road, and Paravur-Cherai road, 2.5 OR 2011-12 - Premonsoon works to Ernakulam Pallathankulangara beach road 1 OR 2011-12 - Premonsoon works to Kizhake Arattuvazhi Karthedam road & NH 17 - Ernakulam Byepass road 1.5

Page 43 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing Jungles, drain & culverts of Vadakkenchery Bazar road Km 0/0 to 2/600, Vadakkenchery - Kizhakkenchery road, Kunnamkad-Konnackal Kadavu road 0/00 to Palakkad 10/00 & Kundukad - Moolancode road 1.5 Clearing Jungles, drain & culverts of Kanimangalam-Cherukunnam road Km 0/00 to 5/500, Anakkapara- Mudappallur road Km 0/0 to 4/00 & Mudappallur-Chankathara-Challuvady road e Palakkad road 1.5

clearing of jungles, drain & culverts of Kazhani Pazhambalacode road Km 0/00 to 8/718, Vadakkenchery-Padoor road Km 0/0 to 3/500, Bazar road, Thrippalur-Chittilanchery Palakkad road Km 0/0 to 4/00 & Athipotta -Tholanur road 1.5 Clearing Jungles, drain & culverts of Vazhakode-Alathur road Km 22/648 to 32/890, Mudappallur-Mangalam dam road Km 0/0 to 9/432 & Kundukad-Chittady road Km 0/0 to Palakkad 5/00 1 Clearing jungles, drain & culverts of Manappadam- road Km 0/0 to 5/650, Erattakulam old NH, Thachanady- Plazhy road, Mangalam old NH & Erattakulam- Palakkad Vaniyampara road Km 0/0 to 11/655 1 Premonsoon works to Melamuri-Pudur- rod Km 6/00 to 11/520, Kannanur- road Km 0/0 to 5/200 & Ambad-Anikkode road Km Palakkad 0/0 to 5/200 1.5 Premonsoon works to -Pannicode road Km 0/0 to 10/00, Koduvayur-Thrippalur road 3/00 to 13/800, Kunissery Byepass road Km 0/0 to 2/300, Kulavanmukku-Kalapetty- Palakkad Mahalikudam road Km 0/0 to 4/600 2

Page 44 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon works to Kulavanmukku-Kuthanur road Km 0/0 to 6/800, Kuthanur-Tholanur road Km 0/0 to 6/200, Kuzhalmannam Bazar road Km 0/0 to 3/400 & -Bye pass road Km Palakkad 0/0 to 0/800 1 Premonsoon works to Kuzhalmannam- Mankara road Km 0/0 to 12/800, Parali Causeway road Km 2/400 to 4/850 & Palakkad Perukunnam road Km 0/00 to 4/600 1.25 Premonsoon works to Kottayi-Peringottukurissi rod Km 0/0 to 6/800, Pambadi- Peringottukurissi road Km 4/365 to 7/285 & Thiruvilamala-Peringottukurissi road Km 5/750 Palakkad to 7/350 0.75 Premansoon works to Kuzhalmannam- Koduvayur road Km 0/0 to 5/600, Kunissery- Vallenghy road Km 0/0 to 7/460 & Vemballur- Palakkad Muringamala road Km 0/0 to 3/140 1.5 Nattukal -Velanthavalam road Km 0/00 to Palakkad 11/664 0.5 - Velanthavalam road Km 0/00 to 9/040 and Velanthavalam - Palakkad Kuppandakoudanur road km 0/00 to 8/165 0.5 Pre-Monsoon work 2011-12 to - Palakkad Perinthalmanna road Km 16/200-27/600 0.8 Pre-Monsoon work 2011-12 to Valanchary- Palakkad Koppam road Km 5/035-13/525 0.8 Pre-Monsoon work 2011-12 to Vaniyamkulam- Palakkad Vallapuzha road Km 0/00-11/400 0.8 Pre-Monsoon work 2011-12 to Koppam- Palakkad Panagattiri road Km 0/00-10/360 0.8 Pre-Monsoon work 2011-12 to Vilayur- Palakkad Kaipuram road Km 0/00-10/600 0.8 Pre-Monsoon work 2011-12 to Nellaya- Mavundirikadavu road Km 0/00-5/300 & Palakkad Shoranur-Kavalappara road Km 0/00-4/760 0.8

Page 45 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Pre-Monsoon work 2011-12 to Vetenary Hospital - road Km 0/00- Palakkad 8/00. 0.6 Pre-Monsoon work 2011-12 to Karalmanna- road Km 0/00-1/650 & Palakkad-Perinthalmanna road Km 43/880- Palakkad 48/880. 0.9 Pre-Monsoon work 2011-12 to Ottappalam- Palakkad road Km 0/00-16/900. 0.9 Pre-Monsoon work 2011-12 to - Mannur road Km 0/00-10/725 & Nagarippuram- -Peradikunnu road Palakkad Km 0/00-5/100. 1 Pre-Monsoon work 2011-12 to Varode- Chunangad road 0/00-3/00 Ambalappara- Melur-Kizhur road Km 0/00-9/250 & Kothakurissi-Cherampatta Kavu-Chalavara Palakkad road Km 0/00-5/120. 1 Pre-Monsoon work 2011-12 to Vaniyamkulam- Kothakurissi road Km 0/00-6/160, Vaniyamkulam - Mannanur Railway station road Km 0/00-4/50, Lakkidi Rly station road Km 0/00-3/600 & Mangalam-Murukumpatta Palakkad road 0/00-4/600. 1 Restoration of blocked culvert and drains to Palakkad Perumbilavu- road Km 3/347-18/500 1 Restoration of blocked culvert and drains to Palakkad Palakkad- road Km 66/300-76/500. 0.8 Restoration of blocked culvert and drains to Palakkad Pattambi-Amayur road Km 0/00-11/316. 1 Restoration of blocked culvert and drains to Cheruthututhy-Perimbilavu road Km 9/600- Palakkad 15/475. 0.5 Restoration of blocked culvert and drains to Palakkad -Kumbidi road 0/00-14/00. 1 Restoration of blocked culvert and drains to Palakkad Koottanad-Thrithala road Km 0/00-5/025. 0.5

Page 46 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Restoration of blocked culvert and drains to Palakkad Thrithala-Perinthalmanna road Km 0/00-6/00. 0.5 Restoration of blocked culvert and drains to V.K Kadavu-Pattambi Causeway road Km Palakkad 0/00-4/200. 0.5 -Pudur Road between Km 0/00 - Palakkad 9/780 0.7 Mannarkkad-Chinnathadakam road between Palakkad Km 22/00-52/692 1.5 Karayur-Vannamthara road between Km 0/00 Palakkad -3/200 0.3 Palakkad -Jellippara road between km 0/00 - 7/800 0.5 Anakkatty- road between Km 0/000- Palakkad 12/700 0.85 Thavalam-Mully road between Km 0/00-4/00 & Palakkad 12/500 - 26/700 1 Goolikadavu-Karara road between Km 0/00 - Palakkad 5/00 0.5 -Mannarkkad-Tippusulthan road Palakkad between Km 6/340-10/00 0.7 Kongad-Mannarkkad-Tippusulthan road Palakkad between Km 10/00-13/00 0.8 Kongad-Mannarkkad-Tippusulthan road Palakkad between Km 13/00-16/990 0.7 Mannarkkad Bypass rad between Km 0/00- 3/00 and Km 0/00-1/200 of Old MC Roads, TB Palakkad Road and Mannarkkad-Cherumkulam road 0.6 Edaikkal-Koottilakadavu road between Km Palakkad 0/00 -12/710 0.8 Kakkupady-Anakkatty road between 0/00- Palakkad 8/850 0.7

Palakkad MES College road Km 0/00 -8/00 0.7 Kalladikkode-Sreekrishnapuram roasd Palakkad between Km 0/00-3/00 0.3 -Jellipara road between Km 0/00- Palakkad 3/00 0.4

Page 47 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Pre-Monsoon works between Km 27/00 to 35/00 and Km 35/00 to 43/079 of Palakkad- Palakkad Perinthalmanna road 1 Pre-Monsoon works between Km 18/600 to Palakkad 31/340 Ottappalam-Mannarkkad road 0.75 Pre-Monsoon works between Km 0/00 to 6/462 of Thiruvizhamkunnu farm road.Pre-Monsoon works between Km 0/00 to 16/000 Kumaramputhut-Olipuzha road and Pre- Monsoon works between Km 8/627 to 11/750 Palakkad of Kariavattam- road 1.25 Pre-Monsoon works between Km 0/00-7/00 and Km 8/000 to 12/000 of Sreekrishnapuram- Palakkad Muriyankanni road 0.5

Pre-Monsoon works between Km 0/00 to 5/600 of Adakkaputhur-Kalluvazhi road and Pre- Monsoon works between Km 10/400 to 15/080 Palakkad of Kalladikkode-Sreekrishnapuram road 0.5 Pre-Monsoon works between Km 0/00 to 8/200 Palakkad of Vattambalam-Kottapuram road 0.75 Pre-Monsoon works between Km 0/00 to 5/000 of Thiruvizhamkunnu-Ambalappara road.Pre- Monsoon works between Km 0/00 to 10/300 of Unnial-Edathanattukara road and Pre- Monsoon works between Km 0/00 to 3/000 of Palakkad Nattukal-Bheemanad road 1 Thattamangalam- Nattukal road km 6/00 Cutting shoulder to14/200 and - Erattakulam road abdul drain and leading Palakkad Km 0/00 to 3/904 0.6 azeez.A 45358 drain completed Chittur - Vannamada road Km 1/228 to 12/084 and Nalleppilly Anchammile road Km 0/00 to Palakkad 5/830 0.75 V.Sundaran 40406 Menonpara - road km 0/00 to Cutting shoulder 9/040 and menonpara -Chullimada road km A.Sreenivas drain and leading Palakkad 0/00 to 1/00 0.5 an 44685 drain completed

Page 48 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Pot hole filling completed Cutting Nattukal -Naduppunny road km 0/00 to 8/552 shoulder drain and approach road to ISD Farm km 0/00 to V.Ramacha leading drain in Palakkad 2/600 0.75 ndran 65969 progress Eruthampathy -Pothikkal pudur Km 0/00 to 7/070 and Gopalapuram - Meenkshipuram Abdul Palakkad road 0/00 to 7/500 0.75 azeez.A 56678 - Nelliampathy road km 0/00 to V.Thankapp Palakkad 15/00 1 an 56324 Nemmara - Nelliampathy road km15/00 to G.Ramacha Palakkad 30/714 1 ndran 56324 Karappara road km 0/00 to 8/616, and kaikatty K.Jayapraka Palakkad - Pulayampara Km 0/00 to 3/616 0.6 sh 36531 Palakkad-Perinthalmanna road Km 19/00- P.K.Veluswa Palakkad 27/00 2.5 my 150297 not started A.Sivaramak Palakkad Nemmara- Olippara km 0/00 to 11/833 0.5 rishnan 27361 Palakkad-Perinthalmanna road Km 12/00- Veluswamy. Palakkad 19/00 1.5 P.K 89284 not started Nemmara - Kiliyal cheramangalam road km 0/00 to 2/200 and Kaippenchery ayilur road km 0/00 to 1/480, Thalavettampara road km 0/00 Palakkad to 1/430 0.4 P.Bharathan 22764 Kollengode Pyloor - Panagatri Elevanchery Palakkad road km 0/00 to 8/800 0.5 V.Sundaran 49564 Nenmeni - Setharkundu road km 0/00 to 6/208 and Koduvayur - Pallavoor - Vithinasery road Palakkad km 10/00 to 11/754 0.5 P.Bharathan 30985 Muthalamada - Chammanampathy road km 0/00 to 11/200 &Chulliardam Vellaramkadavu Palakkad road km0/00-3/500 0.75 K.Gopalan 43857

Page 49 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Pathiripala-Kongad road km 0/00 -10/960, Peingod-Pulapetta road km 0/00-4/270, N.Suma, Kalladikkode-Sreekrishnapuram road Km 3/00- W/O 10/400, Kongad-Mannarkkad-Tippusulthan Udayapraka road Km 0/00-6/250, Kongad-Kanjikulam road sh, km 0/00-5/280, Ezhakkad-Velikkad road km Kuzhalmann Palakkad 0/00-3/770 1.9 am 136646 Started Thenari-Kochin frontier road Km 0/00- 6/300, Olavakkode-Dhoni road Km 0/00-7/00, Muttikulangara-Kallamparambu-dhoni road Km V.Sundaran, 0/00-3/660, NSS Engg.College road Km 0/00- Kulappura, Palakkad 1/300 0.85 Ethanur 49883 Started Palakkad- road Km 4/130-6/850, R.Sreejith, Olavakkode-Malampuzha road Km 0/00-5/00, Pudupariyar GVC- Kalpathi road Km 0/00-2/030, & GVC am,Vennakk Palakkad Ramanathapuram-Manali road Km 0/00-6/673 0.6 ara 41429 not started Govindapuram - Chemmanampathy road km 0/00 5/200& Chemmanampathy K.Jayapraka Palakkad Malayadivaram road km 0/00-1/200 0.6 sh 35520 Koppam-Mukkai road Km 0/00-3/00, V.Sundaran, Kalleppully-Venoli-Chungam road km 0/00- Kulappura, Palakkad 5/600, and Old NH road Km 204/600-215/00 1.3 Ethanur 72328 Started Palakkad-Chittur road Km 0/00-5/00, Kodumbu causeway road Km 0/00-0/500, Kodumbu- Olasseri road Km 0/00-3/700 and V.Sundaran, Pattathalachi-Edappukulam road Km 0/00- Kulappura, Palakkad 3/600 1.1 Ethanur 54979 Started K.Jayapraka sh, Kannadi-Kinasseri road Km 0/00-1/800, Thekancher Thenkurisi-Peruvembu road km 0/00-6/086 ykalam, and Pudunagaram-Kinasseri road Km 0/00- Kuzhalmann Palakkad 7/791 1.2 am 67397 Started Muthalamada railway station road km 0/00- 2/300 and pallimukku kalyanapetta alankadavu P.Radhakris Palakkad road km 0/00-5/800 0.6 hnan 50099 Work just started

Page 50 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status K.Jayapraka sh, Thekancher Mankara-Vella road-Keralasseri rod Km 0/00- ykalam, 4/300 and Mankurissi-Kallur road Km 0/00- Kuzhalmann Palakkad 4/700 1 am 65058 Started N.Suma, W/O Kanjikode-Bazhar road Km 193/275-195-850, Udayapraka Menonpara-Chullimad road Km 1/00-3/500 sh, and Kanjikkode para-Kunnachi-Kallukoottiyal Kuzhalmann Palakkad road Km 0/00-10/200 1.5 am 98909 Started Melamuri-Pudur-Kottayi road Km 0/00-6/00, athazllur-anchamile road Km 0/00-2/080, Mankarra Rly station road Km 0/00-1/190, Kuzhalmannam-Mankara road Km 12/800- V.Sundaran, 15/180 and Muttikulangara-Kallamparamba- Kulappura, Palakkad Dhoni road Km 0/00-5/305 and 0/00-2/550 1.9 Ethanur 120754 Started Palakkad Chittur - road Km0/00 to 6/760 0.5 V.Sundaran 32947 Work started Vilayodi -Vembra- pattikula road km 0/00 to 6/925, Pattenchery road km 0/00 to 1/700, Palakkad Mangode road km 0/00 to 1/800 0.6 V.Sundaran 40637 Work started Chittur -Vannamada road km 0/00 to 1/228, V.Dinesh Palakkad and palakkad - Chittur road km 5/00 to 13/620 0.75 Bhaskaran 62413 Work started T.B road Thattamangalam road km 0/00 to 0/600and thattamangalam - Nattukal road 0/00 Palakkad to 6/00 0.6 V.Sundaran 40637 work started Anamari- Kuttipadam road km 0/00 to 9/100 and Kuzhalmannam - Koduvayur road km K.Jayapraka Palakkad 5/600 to 7/904 0.6 sh 40637 Work started Koduvayur - Pallavoor -Vithinasserry road km 0/00 to 10/00,Kakkayur-Pallassanaroad Km A.Sivaramak Palakkad 0/0-4/700 0.6 rishnan 40637 Work started Palakkad Koduvayur -Thrippalur road km 0/00 to 3/00 0.3 V.Sundaran 19834 Work started Pudunagaram Kollengode road km 0/00 to 8/416& Kollengode kunisseryroad km 0/00- Palakkad 2/400 0.5 V.Sundaran 32809 Work started

Page 51 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Karippode - Pallassena road km 0/00 to 6/400&Ozhuvupara-Panthampully road Palakkad km0/00-1/400 0.6 V.Sundaran Work started

Page 52 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status

Clearing side drains and chocked culverts in all Malappuram the roads under PWD roads section Wandoor. 3 Clearing side drains and chocked culverts in Perimpilavu-Nilambur road KM 30/000 to Malappuram 42/800 and Cherukara-Muthukurussi road. 2 Clearing side drains and chocked culverts in Angadipuram-Cherukulamba road Malappuram Panangagara-Puthanangadi road. 2.5 Clearing side drains and chocked culverts in Angadipuram-Valancheri road KM 0/000 to 13660 and Vettichira-Kadampuzha- Malappuram koottilangadi road KM 6/800 to 17/400. 2.5

Clearing side drains and chocked culverts in all Malappuram the roads under PWD roads section Melattoor. 2.5 Clearing side drains and chocked culverts in all the roads (4 MDR)under PWD roads section Malappuram Malappuram. 3 Clearing side drains and chocked culverts in all the roads (S.H)under PWD roads section Malappuram Malappuram. 1.5 Clearing side drains and chocked culverts in Malappuram KNG road KM 38/200 to 64/000. 1.5 Urgent premonsoon patch works to various Malappuram roads under Manjeri section. 3 Urgent premonsoon works to various MDR Malappuram roads under Manjeri section. 3 Urgent premonsoon works to various SH roads Malappuram under Manjeri section. 3 Urgent Patch and stripped B.T works to worst portion in manjeri NSS college road KM 0/000 Malappuram to 1/500 2 Urgent Patch and stripped B.T works to worst portion in Kuttippara-Cherukode road KM Malappuram 0/000 to 11/500 3 Premonsoon works-KNG road (SH) between Malappuram Km 64/000 to 103/600. 3

Page 53 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon works-PPN road (SH) between Malappuram Km 86/112 to 107/112. 2 Premonsoon works-Nilambur-Karulai road between Km 0/000 to 9/200 and Pookkottumpadam-Karulai road KM 0/000 to Malappuram 6/000. 2 Premonsoon works-Edakkara-Amarambalam- Vaniyambalam road between Km 0/000 to Malappuram 21/800. 3 Premonsoon works-Maramvettichal- karappuram-Munda road between Km 0/000 Malappuram to 12/060. 2 Premonsoon works-vazhikadavu- Chakkapadam road between Km 0/000 to 5/340 and palad-Mamamkara road between Malappuram Km 0/000 to 6/100. 3 Premonsoon works-Edakkara-marutha road between Km 0/000 to 12/800 and Narokavu- Malappuram Thannikadavu road Km 0/000 to 3/960. 2.5 Premonsoon works-Palunda-Munderi road between Km 0/000 to 19/500 and Chungathara-kuttimunda road Km 0/000 to Malappuram 6/250. 2.5 Premonsoon works-Nilambur-Valanthode road between Km 0/000 to 6/800 and Akampadam- Malappuram Padar road Km 0/000 to 15/030. 3 Premonsoon works-Nilambur-Naduvath road between Km 0/000 to 2/600 and Mampad fewrry road to Thrikkaikuth ferry road Km Malappuram 0/000 to 3/300. 1 Premonsoon works-Chulliyode-Pattakarimba Malappuram road between Km 0/000 to 6/530. 0.5 B.T.patch works Nilambur-Valanthode road Malappuram between KM 6/800 to 10/750. 3 B.T.patch works Palunda-Munderi road Malappuram between KM 8/000 to 9/000. 2

Page 54 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status

Stripped B.T and patch works KNG road Malappuram between KM 92/000 to 100/000 (Ghat section). 3 Stripped B.T and works Edakkara-Marutha Malappuram road between KM 10/000 to 12/000. 3 Premonsoon works 2011-12-Clearing side drain and blocked ventway of culvert in Angadipuram-Valncheri and Valancheri- Malappuram Thiruvegapura road. 1 Premonsoon works 2011-12-Clearing side drain and blocked ventway of culvert in PWD rest house, Kolamangalam-Karekkad road and Malappuram Link Pookkattiri-Railway station road. 1 Premonsoon works 2011-12-Clearing side drain and blocked ventway of culvert in Pookkattiri-Edayoor and Vettichira- Malappuram Kadampuzha road. 0.5 Premonsoon works 2011-12-Clearing side drain and blocked ventway of culvert in Old NH kuttippuram and PH centre Mukkilapeedika Malappuram road. 0.5 Premonsoon works 2011-12-Clearing side drain and blocked ventway of culvert in Kanhippura-Pattarnadakavu and Thirunavaya Malappuram -Kalpakanchery road. 0.5 Premonsoon works 2011-12-Clearing side drain and blocked ventway of culvert in Malappuram Chungam-Pazhoor road. 0.5 Premonsoon work-Clearing the side drain and vent way of culverts of various roads under the Malappuram roads section Ponnani. 3 Premonsoon work-Urgent stripped B.T.works to palakkad-Ponnani road from Km 85/850 to Malappuram 85/980. 3 Premonsoon work-Urgent stripped B.T.works to palakkad-Ponnani road from Km 86/000 to Malappuram 86/130. 3

Page 55 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon work-Urgent stripped B.T.works to palakkad-Ponnani road from Km 86/700 to Malappuram 86/820. 3 Premonsoon work-Urgent stripped B.T.works to palakkad-Ponnani road from Km 86/850 to Malappuram 87/000. 3 Premonsoon work-Urgent stripped B.T.works to -Thavanoor road from Km 0/350 to Malappuram 0/540. 3 Premonsoon work-Urgent stripped B.T.works to Edappal-Thavanoor road from Km 2/450 to Malappuram 2/640. 3 Construction of C.C drain from Kacheripadi Junction to Kovilakam road Jn of malappuram- Malappuram Manjeri road from Km 11/100 to 11/250. 5 Urgent patch repairs to various roads under Malappuram roads section Parappanangadi. 2 Urgent patch repairs to various roads under Malappuram roads section . 2 Clearing chocked culverts, drains and berm clearance etc. on various roads under roads Malappuram section Kondotty. 3 Clearing chocked culverts, drains and berm clearance etc. on various roads under roads Malappuram section Tirur. 3 Clearing chocked culverts, drains and berm clearance etc. on various roads under roads Malappuram section Parappanangadi.. 3 Urgent rectification of damaged drain and berm between KM 19/700 to 20/200 of T.S Malappuram road. 3 Urgent rectification of damaged drain and berm between KM 0/100 to 0/500 of Tirur- Malappuram Chamravattom road. 3

Urgent repairs to the damaged retainingwall at Malappuram KM 28/400 of Parappanangadi-Areacode road. 3

Page 56 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Rectification of berm and deep edges between Km 0/600 to 1/500 of Thotasseriyara- Malappuram road. 3 Malappuram Repairs to the ring road Junction Tirur Town. 3 Rectification of erroded berm between Km 0/600 to 0/750 of (ROB approach) Tirur- Malappuram Malappuram road. 3 Rectification of erroded berm between KM 2/200 to 2/500 of Parasppanangadi-Areacode Malappuram road. 3

Rectification of B.T surface between KM 5/800 Malappuram to 6/200 of Chelari-Olakara-Peruvalloor road. 3

Urgent rectification works at B.P.Angadi Malappuram Byepass Junction of Tirur-Chamravattom road. 3 Urgent rectification of damaged retaining wall Malappuram between KM 5/400 to 6/000 of T.S road. 3 Repairs to the drain and construction of cross drainage at kadungathukundu-Edarikode road Malappuram junction of Tirur-Malappuram road 3 Improvements to approach road of Ummathoor-anakadavu Bridge at Malappuram Malappuram side KM 0/000 to 0/070. 15 Rectification and Improvements to the leading drain at the available out let between KM 6/200 Malappuram to 6/400 of Manjeri-Pookottoor road. 3 Urgent regrading and providing accessibility to approach road at KM 3/650 of University Malappuram parambilpeedika road. 0.5

Providing sight distance by cutting the elevated berm at sharp curve between Km 4/500 to Malappuram 5/200 of Angadipuram-Valancheri road. 3 Urgent stripped B.T between KM 4/500 to Malappuram 5/000 of Angadipuram-Valancheri road. 3

Page 57 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Repair and Improvement works of existing drain and slab between KM 71/000 to 75/000 Malappuram of KNG road. 15 Providing drainage facilities in between KM Malappuram 91/400 to 91/900 of KNG road. 15 Providing drainage facilities in between KM Malappuram 96/500 to 98/500 of PPN road. 15 Providing drainage facilities between KM 0/000 Malappuram to 0/200 of Manjeri-Kizhisseri road 5 Urgent rectification of water stagnated portion between KM 3/500 to 4/500 of Pathanapuram- Malappuram Moorkkanad- road. 15 Urgent stripped B.T and patch works to Perimpilavu-nilambur road KM 30/000 to Malappuram 39/000. 3

Page 58 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Providing Strip BT beteen Km. 2/00 to 3/200 & 4/00 to 5/500 of Kanhirode road 3 Providing BT patches and strip BT between Kannur Km. 9/500 to 10/500 of Mayyil Kanhirode road 1.5

Providing BT patches and strip BT between KM.0/00 to 2/235 of old NH Baliyapattam road Kannur and 0/00 to 0/235 of passenger approach road 3 Providing BT patches and strip BT between KM. 2/550 to 3/000 of Poothapara Myladathadam Baliyapattam Keeriyad Kannur Kattampally road 2 Providing BT patches and strip BT Km. 14/800 Kannur to 15/300 of C.K.M.K road (Mayyil Town) 2 .Providing BT patches and strip BT Kannur road Km.24/00 to 26/00 1.5 Pre monsoon patches to Chovva Anjarakandy Kannur Mattannur road Km. 0/00 to 0/600 3 Pre monsoon patches to Chovva Anjarakandy Kannur Keezhallur MattannurKm. 0/700 to 3/500 3 Pre monsoon patches to Chovva Anjarakandy Kannur Keezhallur Mattannur Km. 13/400 to 14/000 2 Pre monsoon patches to Chovva Anjarakandy Kannur Keezhallur Mattannur Km.15/900 to 16/100 1.5 Pre monsoon patches toChovva Mambaram Kannur road 0/00 to 1/350 (Old portion) 2 Pre monsoon patches to Mattool road Kannur Km.5/00 to 8/500 3 Pre monsoon patches toMadayi TB Muttam Kannur Palacode road Km. 3/600 to 4/570 3 .Pre monsoon patches to Ettikulam HS Kannur Palacode Road Km.0/00 to 1/00 3 Pre monsoon patches to Ettikulam HS Kannur Palacode Road Km 1/00 to 2/500 3 Pre monsoon patches to Ettikulam HS Kannur Palacode Road KM.2/500 to 3/500 3

Page 59 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Pre monsoon patches to Ettikulam HS Kannur Palacode Road KM 3/500 to 4/530 3 .Pre monsoon patches to Baliyapattam Kannur Road Km. 11/00 to 12/00 3 Pre monsoon patches to Baliyapattam Kannur Cheruthazham Road Km. 12/00 to 13/700 3 Urgent Strip BT and BT patches to Kannur Thalassery - Coorg road Ch.3/00 to 4/00 3 Urgent Strip BT and BT patches to Kannur Thalassery - Coorg road Ch. 4/00 to 5/00 3 Urgent Strip BT and BT patches to Kannur Thalassery - Coorg road Ch. 5/00 to 6/00 3 Urgent Strip BT and BT patches to Thalassery - Road (SH38) Km. Kannur 9/500 to 10/323 ( including Perigathur Town) 3 Approach road of Parapram bridge Km 0/00 to Kannur 2/005 2 Urgent strip BT and BT Patches to Kolassery Kannur Kayalode road 1/500 to 2/500 2.5 .Urgent strip BT and BT Patches to Kolassery Kannur Kayalode road Km. 4/00 to 5/00 2.5 .Urgent strip BT and BT Patches to Kolassery Kannur Kayalode road Km. 6/00 to 7/495 3 Urgent strip BT and BT Patches to Kuyyali - Kannur Kolasseri road 0/500 to 1/900 2.5 Urgent strip BT and BT Patches to Thalassery Kannur Coorg Road Km. 28/00 to 29/00 3 Urgent strip BT and BT Patches to Thalassery Kannur Coorg Road Km. 29/000 to 30/000 3 Urgent strip BT and BT Patches to Thalassery Kannur Coorg Road Km. 30/000 to 31/000. 3 Urgent strip BT and BT Patches to Thalassery Kannur Coorg Road Road Km. 31/000 to 32/000 3 Urgent strip BT and BT Patches to Thalassery Kannur Coorg Road Km. 38/000 to 39/000 3 Urgent strip BT and BT Patches to Kannur road Km. 0/00 to 4/00 3

Page 60 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent strip BT and BT Patches to Peravoor Kannur Kottiyoor road Km. 4/000 to 8/00 3 Urgent strip BT and BT Patches to Peravoor Kannur Kottiyoor road Km. 8/000 to 12/000 3 Urgent BT Patches to of SH 38 Menapram - Kannur Pookkod road KM 0/00 to 5/00 3 Urgent BT Patches to of SH 38 Menapram - Kannur Pookkod road KM 5/00 to 7/00 3 Urgent BT Patches to of SH 38 Menapram - Kannur Pookkod road KM to 7/00 to 9/00 3 Urgent BT Patches to of SH 38 Menapram - Kannur Pookkod road KM to 9/00 to 13/164 2 BT Patches to Kezhmadam Kallikkandy road Kannur Km 0/00 to 4/00 2 BT Patches to Mutharipeedika - Kannur road Km. 0/00 to 3/00 3 BT Patches to Mutharipeedika - Kannur Cheruvanchery road Km 3/00 to 6/125 3 BT Patches to kalluvalappu Kannur road Km 2/00 to 5/150 3 BT Patches to Nadapuram road Km Kannur 0/00 to 7/00 2 BT Patches to Kadirur Nadapuram road Km Kannur 7/00 to 12/500 & 13/500 to 15/240 3 BT Patches to Pookkom madapeedika road Kannur Km 0/00 to 5/00 1.5 BT Patches to Thalassery Coorg road Kannur Km.20/00 to 22/000 3 BT Patches to Thalassery Coorg road Kannur Km22/00 to 25/000 3 BT Patches to Thalassery Coorg road Km Kannur Km. 25/00 to 27/370 3 .BT Patches to Thalassery Coorg road Km Kannur Km. 16/500 to 16/700 1 .BT Patches to Thalassery Coorg road Km. Kannur 17/700 to 17/900 1

Page 61 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status .BT Patches to Thalassery Coorg road Km. Kannur 18/500 to 18/700 1 BT Patches to Thalassery Coorg road Km. Kannur 18/800 to 18/900 0.75 Kannur Strip BT to Kottayam Bazar km. 0/00 to 2/650 3 Providing premansoon patches to Coorg Boarder Road Km.20/00 to Kannur 21/00 2 Providing premansoon patches to Taliparamba Coorg Boarder Road Km 21/000 Kannur to 22/000 2 Providing premansoon patches to Taliparamba Coorg Boarder Road Km 22/00 Kannur to 25/00 3 Providing premansoon patches to Taliparamba Coorg Boarder Road Km Oduvallithattu Naduvil Kudiyanmala Road Km. Kannur 1/500 to 2/500 2 Providing premansoon patches to Taliparamba Coorg Boarder Road Km Kannur Km.2/500 to 5/300 2.5 Providing premansoon patches to Taliparamba Coorg Boarder Road Km Km Kannur 14/00 to 16/00 2 Providing premansoon patches to Aragome Kannur Rayrome Therthally Road Km. 0/00 to 2/00 3 Providing premansoon patches to Aragome Kannur Rayrome Therthally Road Km.5/500 to 7/00 2 Providing premansoon patches to Methurumba Kuttoor road Kannur Ch: 1/00 to 2/500 2 Providing premansoon patches to Ozhakrom Kannur vellikeel road Km. 1/500 to 2/800 1.5 Providing premansoon patches to Methurumba Chapparapadavu Kuttoor road Kannur 9/00 to 10/285 2

Page 62 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Providing premansoon patches to Kanaran vayal road Km. 3/00 to Kannur 5/500 3 Providing premansoon patches to Panapuzha Kanaran vayal road Km..10/00 to Kannur 12/800 3 Chapparapadavu Therthally via Vimalassery Kannur eruvatti chirakkal padi road km. 3/500 to 6/00 3 Providing premansoon patches to Panapuzha Kanaran vayal road Km..7/500 to Kannur 12/150 3 Taliparamba Bazar portion Road Km. 0/00 to Kannur 0/860 1.5 E.T.C. Poomangalam Mazhoor Kannur kalikadavu road Km. 2/00 to 5/00 3 E.T.C. Poomangalam Mazhoor Panniyoor Kannur kalikadavu road Km.5/500 to 8/500 3 E.T.C. Poomangalam Mazhoor Panniyoor Kannur kalikadavu road Km..9/00 to 13/575 3 Providing premansoon patches to Chapparapadavu Mangara Chanakund road Kannur Km. 2/500 to 5/500 1.5 Providing premansoon patches to Chapparapadavu Mangara Chanakund road Kannur Km. . 5/500 to 8/00 1.5 Premonsoon patches to Vellur Padiottumchal Kannur road between Km 21/00 to 23/00 3 Premonsoon patches to Cheruthayam Kuttoor - Perigome Road between Km. 15/00 Kannur to 17/00 3 Premonsoon patches to Vellur Padiottumchal Kannur Pulingome road between Km 23/00 to 25/00 3 Premonsoon patches to Cheruthayam Kuttoor - Perigome Road between Km. 17/00 Kannur to 19/00 3 Premonsoon patches to Vellur Padiottumchal Kannur Pulingome road between Km 7/300 to 8/500 2

Page 63 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon patches Kannangattu- odamuttu Kannur road Km.0/00 to 3/00 3 Premonsoon patches to Cheruthayam Kuttoor - Perigome Road between Km. 1/500 Kannur to 3/00 2.5 Premonsoon patches to Vellur Padiottuchal Kannur Pulingome road between Km 10/500 to 12/00 2 Premonsoon patches to Methurumba - Chapparapadavu -kuttur road between Kannur Km.21/00 to 23/375 3 Premonsoon patches to Punnakkadavu- Kunnaru- Palakkod - Road between km.2/500 Kannur to 4/500 3 Vellur Padiottumchal Pulingome road between Kannur Km 12/00 to 13/500 3 Premonsoon patches Methurumba - Chapparapadavu -kuttur road between Kannur Km.15/00 to 16/00 2 Premonsoon patches Punnakkadavu- Kunnaru- Palakkod - Road between km.4/500 Kannur to 7/00 2 Premonsoon patches to Aravanchal - Purakunnu- Road between Kannur Km7/500 to 9/00 2 Premonsoon patches to Vellur Padiottumchal Kannur Pulingome road between Km 19/00 to 21/00 3 Premonsoon patches to Vellara Kakkara- Kadukkaram mukku road between Km. 0/00 to Kannur 3/00 2 Premonsoon patches to Approach road to Payyannur Railway station road Km. 0/00 to Kannur 4/00 2 Premonsoon patches to Vellur Padiottumchal Kannur Pulingome road between Km 15/00 to 18/00 2 Premonsoon patches to Methurumba - Chapparapadavu -kuttur road between Kannur Km.10/285 to 12/00 2

Page 64 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Strip BT to Koottumugham Kannur road Km. 0/00 to 2/00 3 Strip BT to Sreekandapuram Koottumugham Kannur Payyavoor road Km. 7/000 to 9/800 3 Strip BT to Payyavoor Chandanakkampara vanchiyam road Km. Kannur 1/500 to 5/00 2 .Strip BT to Payyavoor Paisakari Chandanakkampara vanchiyam road Km.. 5/00 Kannur to 8/500 2 Strip BT to Payyavoor Paisakari Chandanakkampara vanchiyam road Km.. Kannur 8/500 to 10/500 2 Strip BT to Hill Highway - Puranjan chemberi Kannur Payyavoor road Km. 0/00 to 3/00 3 Strip BT to Hill Highway - Puranjan chemberi Kannur Payyavoor road Km 3/00 to 7/00 3 Strip BT to Hill Highway - Payyavoor to Kannur Chamathachal Road Km. 45/00 to 50/250 2 Strip BT to State Highway Taliparamba Kannur road Km. 16/500 to 18/690 2 .Strip BT to State Highway Taliparamba Iritty Kannur road Km.. 28/040 to 28/340 1 Strip BT to Sreekandapuram Chembanthotty Kannur Naduvil Road Km. 0/00 to 1/00 2 Strip BT to Vattiyamthodu Manikadavu road Kannur Km 0/00 to 2/00 2 Strip BT to Arabi Kolithattu peratta road Kannur Km 1/500 to 3/00 2 Clearing Side drain and Choked out culvert & removal of traffic block during monsoon in Kannur various road under road Section 2 Clearing Side drain and Choked out culvert & removal of traffic block during monsoon in Kannur various road under road Section Kannur 2

Page 65 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing Side drain and Choked out culvert & removal of traffic block during monsoon in Kannur various road under road Section Madai 2 Clearing Side drain and Choked out culvert & removal of traffic block during monsoon in Kannur various road under road Section Thalassery 1.5 Clearing Side drain and Choked out culvert & removal of traffic block during monsoon in various road under road Section Kannur Koothuparamba 2 Clearing Side drain and Choked out culvert & removal of traffic block during monsoon in Kannur various road under road Section Panoor 1.5 Clearing Side drain and Choked out culvert & removal of traffic block during monsoon in Kannur various road under road Section Iritty 2 Clearing Side drain and Choked out culvert & removal of traffic block during monsoon in Kannur various road under road Section Payyannur 3 Clearing Side drain and Choked out culvert & removal of traffic block during monsoon in Kannur various road under road Section Thaliparamba 3 Clearing Side drain and Choked out culvert & removal of traffic block during monsoon in Kannur various road under road Section Irikoor 2.5

Page 66 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon work 2011-12 - Urgent patch repairs and clearing drainage and culvert etc for S.H. ways in PWD Roads Section, Pathanamthitta Pathanamthitta 3 Premonsoon work 2011-12 - Urgent patch works and clearing drainage and culvert etc for MDRs in PWD Roads Section, Pathanamthitta Pathanamthitta . 3 Premonsoon work 2011-12 - Urgent patch repairs and clearing drainage and culvert etc for S.H. ways in PWD Roads Section, Pathanamthitta Kozhencherry 3 Premonsoon work 2011-12 - Urgent patch works and clearing drainage and culvert etc for MDRs in PWD Roads Section, Pathanamthitta Kozhencherry 3 Premonsoon work 2011-12 - Urgent patch repairs and clearing drainage and culvert etc Pathanamthitta for S.H. ways in PWD Roads Section, Konni 3 Premonsoon work 2011-12 - Urgent patch works and clearing drainage and culvert etc Pathanamthitta for MDRs in PWD Roads Section, Konni 3 Premonsoon work 2011-12 - Urgent patch repairs and clearing drainage and culvert etc Pathanamthitta for S.H. ways in PWD Roads Section, Ranny 3 Premonsoon work 2011-12 - Urgent patch works and clearing drainage and culvert etc Pathanamthitta for MDRs in PWD Roads Section, Ranny 3 Premonsoon work 2011-12 - Urgent patch repairs and clearing drainage and culvert etc Pathanamthitta for S.H. ways in PWD Roads Section, Laha 3 Premonsoon work 2011-12 - Urgent patch works and clearing drainage and culvert etc Pathanamthitta for MDRs in PWD Roads Section, Laha 3

Page 67 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon work 2011-12 - Urgent patch repairs and clearing drainage and culvert etc for S.H. ways in PWD Roads Section, Pathanamthitta Thiruvalla 3 Premonsoon work 2011-12 - Urgent patch works and clearing drainage and culvert etc Pathanamthitta for MDRs in PWD Roads Section, Thiruvalla 3 Premonsoon work 2011-12 - Urgent patch repairs and clearing drainage and culvert etc for S.H. ways in PWD Roads Section, Pathanamthitta Eraviperoor 3 Premonsoon work 2011-12 - Urgent patch works and clearing drainage and culvert etc Pathanamthitta for MDRs in PWD Roads Section, Eraviperoor 3 Premonsoon work 2011-12 - Urgent patch repairs and clearing drainage and culvert etc for S.H. ways in PWD Roads Section, Pathanamthitta Mallappally 3 Premonsoon work 2011-12 - Urgent patch works and clearing drainage and culvert etc Pathanamthitta for MDRs in PWD Roads Section, Mallappally 3 Premonsoon work 2011-12 - Urgent patch repairs and clearing drainage and culvert etc for S.H. ways in PWD Roads Section, Pathanamthitta Vennikkulam 3 Premonsoon work 2011-12 - Urgent patch works and clearing drainage and culvert etc for MDRs in PWD Roads Section, Pathanamthitta Vennikkulam 3 Premonsoon work 2011-12 - Urgent patch repairs and clearing drainage and culvert etc for S.H. ways in PWD Roads Section, Pathanamthitta Pandalam 3 Premonsoon work 2011-12 - Urgent patch works and clearing drainage and culvert etc Pathanamthitta for MDRs in PWD Roads Section,Pandalam 3

Page 68 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon work 2011-12 - S.H-ways - Clearing chocked up culvert and drain, removal of raised berm/silted up earth, cutting new side drain etc to M.C. road ch: 90/400 to 93/300 and Adoor - Sasthamcotta road ch: 0/00 to Pathanamthitta 4/800. 3

Premonsoon work 2011-12 - S.H-ways - Clearing chocked up culvert and drain, removal of raised berm/silted up earth, cutting new side Pathanamthitta drain etc to P.M. road km 13/796 to 23/476. 3 Premonsoon work 2011-12 - S.H-ways - Clearing chocked up culvert and drain, removal of raised berm/silted up earth, cutting new side Pathanamthitta drain etc to K.P road 27/00 to 35/00 3

Premonsoon work 2011-12 - S.H-ways - Clearing chocked up culvert and drain, removal of raised berm/silted up earth, cutting new side Pathanamthitta drain etc to K.P road 35/00 to 42/500 3

Premonsoon work 2011-12 - MDRs - Clearing chocked up culvert and drain, removal of raised berm//silted up earth, cutting new side Pathanamthitta drain etc to Koodal Rajagiri road 0/00 to 8/016. 1.5 Premonsoon work 2011-12 - MDRs - Clearing chocked up culvert and drain, removal of raised berm/silted up earth, cutting new side drain etc to Elamannoor Kalanjoor via Pathanamthitta Bhoothamkara road 0/00 to 3/200 1 Premonsoon work 2011-12 - MDRs - Clearing chocked up culvert and drain, removal of raised berm//silted up earth, cutting new side drain etc to Ezhamkulam - Kaipattoor road km Pathanamthitta 0/00 to 10/500 3

Page 69 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon work 2011-12 - MDRs - Clearing chocked up culvert and drain, removal of raised berm//silted up earth, cutting new side drain etc to Adoor - Pattazhy road km 1/500 to Pathanamthitta 6/150 1 Premonsoon work 2011-12 - MDRs - Clearing chocked up culvert and drain, removal of raised berm//silted up earth, cutting new side drain etc to Adoor - Thumpamon road km 0/00 Pathanamthitta to 3/200 0.75 Premonsoon work 2011-12 - MDRs - Clearing chocked up culvert and drain, removal of raised berm//silted up earth, cutting new side drain etc various other MDRs under Roads Pathanamthitta Section Adoor. 3 Purchase of Shelmac PR to PWD Roads Pathanamthitta Division, Pathanamthitta 10

Page 70 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Supplying Shelmac for various roads under Muvattupuzha Muvattupuzha Sub Division 3 Emulsion and Shelmac Patch works to various Muvattupuzha roads under Piravom Section 3

Clearing blocked up culverts and drain in State Muvattupuzha Highways and M.D.Rs in Piravom Section 2.5 Clearing blocked up culverts and drain in Muvattupuzha M.D.Rs and other roads in Piravom Section 1.5 Emulsion and Shelmac Patch works to various Muvattupuzha roads under Koothattukulam Section 3 Clearing blocked up culverts and drain in State Highways and M.D.Rs in Kothattukulam Muvattupuzha Section 2.5 Clearing blocked up culverts and drain in Muvattupuzha M.D.Rs and other roads in Piravom Section 1.5 Urgent emulsion and Shelmac repairs to Muvattupuzha various roads under Muvattupuzha Section 3 Clearing blocked up culvert and drain in M.C. road, P.M. road and Ernakulam - Thekkady Muvattupuzha under Muvattupuzha Section 3 Clearing blocked up culvert and drain in Muvattupuzha - Anchelpetty road, Marady - peruvamoozhy road, Kakkadassery - Kaliyar Muvattupuzha road etc. 3 Clearing blocked up culvert and drain in State Muvattupuzha Highways and M.D.Rs in Kalloorkkad Section 2 Clearing blocked up culvert and drain in M.D.Rs and other connected roads in Muvattupuzha Kalloorkkad Section 2 Emulsion and Shelmac patch works to various Muvattupuzha roads under Kalloorkkad Section 2 Clearing choked up culverts, drain and metal patch and removing water stagnation in Mamala - Piravom road 0/000 to 8/000 , Muvattupuzha Kolenchery - Ramamangalam and alllied roads 2

Page 71 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing choked up culverts, drain and metal patch and removing water stagnation in Chithrapuzha - Ponjasserry road Km. 10/000 to Muvattupuzha 20/00 and allied roads 2 Clearing choked up culverts, drain and metal patch and removing water stagnation in Ernakulam Thekkady S.H. Km.10/800 to Muvattupuzha 33/250 and allied roads 2

Clearing choked up culverts, drain and metal patch and removing water stagnation in Manoor - Ponjasserry road , Mannoor Valakom Muvattupuzha road and Pulluvazhy-Thattamughal road . 2 Clearing choked up culverts, drain and metal patch and removing water stagnation in MC Road215/400-224/000 , Pulluvazhy Kallili, Muvattupuzha Perumbavoor Raymangalam and allied roads 2 Clearing choked up culverts, drain and metal patch and removing water stagnation in Aluva - Munnar road Km. 20/000 to 28/000 , Kuruppumpady -Koottickal road,Pralaykkad - Kodanad road,Keezhillam - Kurichilakkoduroad and Rayamangalam - Vaikkara road and allied Muvattupuzha roads 2 Clearing choked up culverts, drain and metal patch and removing water stagnation in MC Road 224/00 -232/500,Perumbavoor Rayamangalam 0/00-1/200 ,Perumbavoor Koovapady 0/00-4/00,Chitrapuyzha Ponjassery Muvattupuzha 0/00-8/00,AM road 7/600-20/00 2

Page 72 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status

Clearing choked up culverts, drain and metal patch and removing water stagnation in Arackappady - Mangalathunada road Km. 0/000 to 8/750, Marampilly - SouthVazhakulam Road Km. 0/00-3/200, Allpara - Valamboor road 0/00-11/00 ,Perumbavoor -Puthencruz Road 8/000-9/650,Onamkulam - Ottimattom road0/00- 4/150- and including Perumbavoor Muvattupuzha town road 0/000-2/000 2 Clearing choked up culverts, drain and metal patch and removing water stagnation in Perumbavoor - Aluva road 0/000-6/800 , Vallam - Panmkuzhy road 0/000-10/000 ,Kodanad - Thottuva 0/00-1/400,Koovappady - Muvattupuzha Kayuthiyal -Pappanpaddy road 0/000-6/000 . 2 O/R-Clearing blocked up culvert and drains, removing water stagnation and urgenct rectification works during rainy season in Erumalappady - Kottappady road Km. 0/000 to 6/200, Kothamangalam - Perumbankuthu road Km. 0/000 to 11/000, Thrikkariyoor - Vettilappara road Km. 7/000 to 7/700, Nadodipalam - Malippara - Vadakkumbhagom Muvattupuzha road Km. 0/000 to 8/000 2 O/R-Clearing blocked up culvert and drains, removing water stagnation and urgenct rectification works during rainy season in Kottappady - Plamudy road Km. 0/000 to 4/200, Chathamattom - Ooramkuzhy road Km. 17/000 to 22/500, Alumavu - Kuroor road Km. Muvattupuzha 2/000 to 4/000 2 Urgent emulsion patch works and Shelmac patch work in various roads under Muvattupuzha Kothamangalam Section 2

Page 73 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status O/R-Clearing blocked up culvert and drains, removing water stagnation and urgenct rectification works during rainy season in Vengalloor - Oonnukal road Km. 9/750 to 20/050, Pothanicad - Chathamattam road Km. 0/000 to 7/000 and Kavalangad - Pareekkanni Muvattupuzha road Km. 0/000 to 3/950 2 O/R-Clearing blocked up culvert and drains, removing water stagnation and urgenct rectification works during rainy season in Vazhakulam - Kothamangalam road Km. 9/000 to 17/900, Puthuppady - Pothanicad road Km. 0/000 to 11/000, Adivadu - Pallarimangalam Muvattupuzha road Km. 0/000 to 5/890 2 Urgent emulsion patch works and Shelmac patch work in various roads under Pothanicadu Muvattupuzha Section 2

Page 74 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon drain clearance work on various Kozhikkode roads under Section 1 Urgent rectification of pot holes providing BT patch work from km.30/300 to 31/700 of Kozhikkode Ekarool-Kakkayam dam site road 3

Rectification of pot holes - WBM patch work on Kozhikkode various roads under Roads Section, Balussery 3 Providing urgent strip BT on approaches of culvert at km.2/700 of Balussery-Koorachundu Kozhikkode road 1 Premonsoon drain clearance work on various Kozhikkode roads under Roads Section, 1

Rectification of pot holes - WBM patch work on Kozhikkode various roads under Roads Section, Koyilandy 3 Premonsoon drain clearance work on various Kozhikkode roads under Roads Section, 1

Rectification of pot holes - WBM patch work on Kozhikkode various roads under Roads Section, Perambra 3 Premonsoon works - Urgent BT patch works to --Chelakkad road km.0/000 Kozhikkode to 7/500 3 Premonsoon works - Urgent BT patch works to Vatakara-Thiruvalloor-Perambra road Kozhikkode km.0/000 to 4/000 3 Premonsoon works - Urgent clearance of drain, culverts, etc., on various roads under Kozhikkode Roads Section, Thodannur 1 Premonsoon works - Rectification of pot holes and road patches on various roads under Roads Section, Thodannur (Anticipated for Kozhikkode rainy season) 3 Clearing side drain and chocked culverts on Kozhikkode various roads under Roads Section, 1 Pot hole filling works on various roads under Kozhikkode Roads Section, Kuttiady 3

Page 75 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent clearance of drain, culverts, etc., on Kozhikkode various roads under Roads Section, Vatakara 1 Rectification of pot holes and road patches on various roads under Roads Section, Vatakara Kozhikkode (Anticipated for rainy season) 3 Premonsoon works - clearing side drains and chocked culverts on various roads under Kozhikkode Roads Section, Narikkuni 1 Premonsoon works - cutting and clearing side drains on Kummangottuthazham- Kozhikkode Pandarapparambu road 0.7 Premonsoon works - Patch works using cationic emulsion and WBM patch works on Kozhikkode various roads under Roads Section, Narikkuni 3 Premonsoon works - clearing side drains and chocked culverts on various roads under Kozhikkode Roads Section, 1 Premonsoon works - Patch works using cationic emulsion and WBM patch repairs on Kozhikkode various roads under Roads Section, Koduvally 3 Premonsoon works - clearing drains and chocked culverts on various roads under Kozhikkode Roads Section, 1 Premonsoon works - BT patch repair to -Kolikkal- road km.0/000 to Kozhikkode 4/000 3 Premonsoon works - WBM, BT patch repairs to various roads under Roads Section, Kozhikkode Thamarassery 3 Premonsoon works - Urgent BT patch repairs Kozhikkode to TKKT road km.12/000 to 12/500 2 Premonsoon works - Urgent BT patch repairs Kozhikkode to TKKT road km.14/000 to 15/500 3 Premonsoon works - Urgent BT patch repairs Kozhikkode to PPK road km.5/200 to 7/100 3 Premonsoon works - Clearing blocked drainages and culverts on various roads under Kozhikkode Roads Section, 1

Page 76 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon works - BT and WBM patch repairs to various roads under Roads Section, Kozhikkode Thiruvambady 3 Premonsoon works - Drain & culvert clearance of various roads under Roads Section (South), Kozhikkode 1 Premonsoon works - Drain & culvert clearance of various roads under Roads Section (North), Kozhikkode Kozhikode 1 Premonsoon works - Drain & culvert clearance of various roads under Roads Section, Kozhikkode 1 Premonsoon works - Urgent rectification of pot holes on various roads under Roads Section Kozhikkode (South) Kozhikode 3 Premonsoon works - Urgent rectification of pot holes on various roads under Roads Section Kozhikkode (North) Kozhikode 3 Premonsoon works - Urgent rectification of pot holes on various roads under Roads Section, Kozhikkode Kunnamangalam 3 Premonsoon works - BT patch works from Kozhikkode km.1/200 to 7/500 of Kozhikode- road 1 Premonsoon works - BT patch works from km.0/000 to 2/000 of Karapparamba- Kozhikkode Malapparamb road 2 Premonsoon works - BT patch works from km.37/500 to 42/500 and from km.44/000 to Kozhikkode 52/200 of KTMAE road (SH-34) 1 Premonsoon works - BT patch works from km.0/000 to 0/800 of Francis Road to Kozhikkode Konthanari road 0.7 Premonsoon patches - Providing strip BT on Karikkamkulam-Mankavu MLA road km.4/500 Kozhikkode to 7/200 2.6 Premonsoon patches - Providing strip BT on Nanminda-Cheekilode road km.9/000 to Kozhikkode 11/120 2.8

Page 77 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon patches - Providing strip BT from Kozhikkode km.4/000 to 6/000 on KEKE road 1.5

Page 78 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent repairs to M.C. road ch:154/500 to 165/00 (except ch:162/00 to 163/00km) Clearing blockedculverts and drains, clearing light jungle, earth workfor cutting and removing the raised berms cutting earthern drain and Kottayam filling up potholes. 3 Urgent repairs to Arumanoor road ch:0/00 to 7/00(except 3/00 to 4/00 and 5/00 to 6/00) andThiruvanchoor road ch:0/00 to 9/00. Clearing blockedculverts and drains, clearing light jungle, earth workfor cutting and removing the raised berms cutting earthern drain and Kottayam filling up potholes. 3 Urgent repairs to Carithas - Ammencherry road 0/00 to1/680, Arpookara - Ammencherry road ch:0/00 to Adichira - Mannanam road ch:1/600 to 5/00. Clearing blockedculverts and drains, clearing light jungle, earth workfor cutting and removing the raised berms cutting earthern Kottayam drain and filling up potholes. 3 Urgent repairs to Oravackal - Koorali road ch:0/00 to4/00km Nedumkuzhy - Kothala road ch:0/00 to 6/200kmAreeparambu - pampady road ch:3/400 to 5/700 andOravackal - Kannankunnu road ch:1/800 to 4/00km. Clearing blockedculverts and drains, clearing light jungle, earth workfor cutting and removing the raised berms cutting earthern drain and Kottayam filling up potholes. 3

Page 79 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Pampady - Nedumkunnam road ch:0/00 to 1/00 and 2/00 to3/00km Kuttickal - Thottakad road ch:3/00 to 5/915, KuttickalKangazha road ch:1/700 to 2/400 and Vennimala - Meenadom road ch:0/00 to 1/500km. Clearing blockedculverts and drains, clearing light jungle, earth workfor cutting and removing the raised berms cutting earthern drain and filling Kottayam up potholes. 3 Thiruvanchoor - Chengalam road ch:0/00 to 3/00kmMannoopally - Poovathilapu road ch:0/00 to 1/00 and 3/750 to 4/750km, Chuvanaplavu - Kozhuvanal road ch:0/00 to 2/500km and Mattakara - Kummannoor road ch:0/00 to 4/00km. Clearing blockedfor cutting and removing the raised berms cutting Kottayam earthern drain and filling up potholes. 3 M.C. road 142/000 to 154/000 (except portion from144/000 to 145/150km and 148/800 to 150/100. Clearing blockedfor cutting and removing the raised berms cutting earthern Kottayam drain and filling up potholes. 3 Pallom - Puthupally road ikm 0/000 to 6/00km (except portionfrom 0/000 to 3/250km), Pallom - Thottakad road 0/000 to6/000km, Pakkil Loop roa 0/00 to 2/410km, Pallom Loop road1/500 to 4/490km, Lakshmipuram Landing PanachikkaduTemple road 0/000 to 4/420km. Clearing blockedfor cutting and removing the raised berms cutting earthern drain and filling Kottayam up potholes. 3

Page 80 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Chungom - Seminary road 0/000 to 1/910km, KottayamKarappuzha road 0/000 to 1/895km, Market LandingMuttambalam road 0/00 to 2/00km, Vadavathoor road0/000 to 1/800km, Kottayam - Parippu road 0/000 to7/000km (Except portion from 1.500 to 3.000km). Clearing blockedfor cutting and removing the raised berms cutting earthern drain and filling Kottayam up potholes. 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to -do - Koothattukulam Ramapuram road 3/600 to 11/056 km,Kurianadu Veliyannoor road ch: 0/00 to 7/079 km and Cherpunkal Kottayam Marangattupally road 0/00 to 11/066 km 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to -do- Kadaplamattom Vempally road ch: 0/00 to Kottayam 6/900 kmand Koodalloor road 1/00 to 5/00 km 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to -do- Prayar Kadaplamattom road 0/00 to 3/400 km andVempally Kadapoor road ch: 0/00 to 3/900 Kottayam km 3

Urgent patch work repars, clearing side drain and clearing blocked culvert to -do- M.C. Road ch: 165/00 to 170/00 km,Kanakkary Vempally road ch: 0/00 to 2/232 km and Kaduthuruthy Kottayam Neezhoor road 1/00 to 4/400 km 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to -do- Piravom Kaduthuruthy road ch: 10/00 to 14/200 km,Anamala Kurumulloor road ch: 0/00 to 3/700 km and Omalloor Elackadu road ch: Kottayam 0/00 to 5/400 km, 3

Page 81 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent patch work repars, clearing side drain and clearing blocked culvert to -do-7/2 EE Raod to Ayamkudy Kalambukadu road ch: 0/00 to 3/020 km and Malliyoor Bye Pass road Kottayam ch: 0/00 to 1/500 km 3 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Ponkunnam Azheeckal road Kottayam 0/00-4/700 and P.M. Road 80/00-85/00 kms. 3 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Mundakkayam Koottickal Road 0/00-8/650 and Thenpuzha Elamkadu Road Kottayam 0/00-5/800 kms. 2.5 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Kanjirappally Elikkulam 0/00- 12/300 and Kanjirapally Manimala road 0/00- Kottayam 7/100 1.5 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Mundakkayam Parathanam road 3/750-5/200 and Anakkuzhy Parathanam Kottayam 0/00-5/800 kms. 1.5 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Kanjirappally Erumely Road 0/00-5/00 kms. and Kanjirapally Edakkunnam Road 0/00-3/600 km.and Kottayam Edakkunnam Vattakkavu road 0/00-4/00 km 3 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc toOravackal Koorali Road 13/577- 16/413 and Thiruvanchoor Chengalam Road Kottayam 20/350-23/00 kms. 2

Page 82 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Paika Chengalam Road 1/750- 5/200 and Elamkulam Naiplavu road 0/00- Kottayam 3/00 km. 2 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to 17 th Mile K.K.road Chengalam Road 0/00-2/800 and 17 th Mile K.K.road Kottayam Puthenpurackal Road 2/300- 4/625 kms. 2 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc toPunaloor Moovattupuzha Road Kottayam 87/150 96/00 kms. 1 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Karuckachal Manimala Road 5/00-14/00 km and Kodungoor Manimala Kottayam Road 4/500-7/250 kms. 2 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Kanam Pathanadu Road 0/00- 4/650 and Plackalpady Vellavoor rod 1/750- 6/00 and Pathanadu Kulathor road 5/00- 6/430 and Nedumon Kulathor road 0/00- Kottayam 7/400 km. 3 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Poovam Cheruvally Ullayam Kanam road 5/800-9/800 kms. and Chammampathal Thekkethukavala road 0/00- Kottayam 3/00 km. 1.5 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and Kottayam drains ,etc to P.M. Road 61/800-80/00 kms. 3

Page 83 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Mundakkayam Koruthodu Mookkenpetty Pampavally Road 0/00-21/250 Kottayam kms. 2 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Kanjirapally Erumely 5/00- 11/815 km. and Karimkallumoozhy Mukkoottuthara Pampavally Road 0/00-13/370 Kottayam kms. 3 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Erumely Mukkada Road and Kottayam Plachery Mukkada Road 2.5 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Mukkoottuthrara Edakadathy Kottayam Pampavally Road 0/00-8/00 kms. 2 Urgent pre- Monsoon bitumen patch work repairs and Clearing blocked up culverts and drains ,etc to Karuckachal Manimala Road 14/00-16/290 and Theeradesom Road 0/00 Kottayam -10/00 kms. 2.5 Avoding water stagnation and pot hole filling works to Ettumanoor -Poonjar road 19/000 to 34/400km, Erattupetta - Muttom S.H. Way 0/000 to 6/705km, Plassinal - Pravithanam road 0/000 to 7/270km, Bharanaganam - Pravithanam road ch. 0/000 to 6/705km and Ambara - Mankombu road ch. 0/000 to Kottayam 5/000km. 3

Page 84 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Avoding water stagnation and pot hole filling works to Kanjirapally - Erattupetta SH Way 7/000 to 16/300km, Edamattom - Thidanadu road ch. 0/000 to 7/000, Vazhamattom - Pinnakkanadu road ch. 0/000 to 6/950km. Pinnakkanadu - Pazhuthadam road ch. 0/000 to 5/650km and Avurithara - Poovathodu ch. Kottayam 0/000 to 5/400km 3

Avoding water stagnation and pot hole filling works to Erattupetta - Peermedu road SH Way ch. 0/000 to 24/300km, Teekoy - Thalanadu - Munnilavu road ch. 0/000 to 5/000km and Kottayam Teekoy - Adukkam road ch. 0/000 to 4/560km 3

Avoding water stagnation and pot hole filling works to Poonjar - Kaipally - Yenthayar road ch. 0/000 to 13/980km, Poonjar - Kunnonny - Alumthara road ch. 0/000 to 5/465km, Poonjar - Koottickal road ch. 0/000 to 9/850km, Teekoy - Cheruppadu Ayyampara - Thalanadu road ch. 0/000 to 5/900km and Chamappara - Kottayam Vellani road ch. 0/000 to 5/500km 3 Clearing blocked up culvert drain and patch work repairs P.M. Road ch. 112/000 to 122/650km, Anthinadu - Melukavu road ch. 0/000 to 11/295km and Neeloor road ch. Kottayam 1/830 to 5/6746km 3 Clearing blocked up culvert drain and patch work repairs Erattupetta muttom road ch. 5/000 to 17/300km, Paikadapeedika - Kurumannoor road ch. 0/000 to 4/650km and Valiyathu- Kottayam Neeloor road ch. 0/000 to 5/100km 3

Page 85 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing blocked up culvert drain and patch work repairs Ramapuram - Pizhaku road ch. 0/000 to 4/182km, Ramapuram - Kurinji road ch. 0/000 to 3/385km, Ramapuram - Iycombu road ch. 0/000 to 5/190km and Kadandu road Kottayam ch. 0/000 to 4/257km 3 Clearing blocked up culvert drain and patch work repairs Kanjiramkavala - Mechal - Narimattom road ch. 0/00m to 16/000km, Ambara - Mankombu road ch. 5/600 to 11/210km and Teekoy - Thalanadu - Kottayam Munnilavu road ch. 5/000 to 9/570km 3 Re-construction of damaged culvert at ch. Kottayam 1/900 of Neeloor road 2.5 Clearing blocked up culvert drain and patch work repairs P.M. Road ch. 96/000 to Kottayam 105/000km 3 Clearing blocked up culvert drain and patch work repairs P.M. Road ch. 105/000 to Kottayam 112/000km 3 Clearing blocked up culvert drain and patch work repairs Pala - Uzhavoor road ch. 0/0000 Kottayam to 10/419km 3 Clearing blocked up culvert drain and patch work repairs Vazhoor - Puliyannoor road ch. Kottayam 12/000 to 19/588km 3 Premonsoon work: Clearing culverts, side drains and urgent patch works to Vaikom to Vechoor road ch. 9/000 to 12.250km and thaneermukkom Bund road ch. 0/000 to Kottayam 1/780km 3 Premonsoon work: Clearing culverts, side drains and urgent patch works to V.T. Road ch. 0/000 to 7/900km(Except 5/000 to 6/000km and 6/500 to 6/900km) and Moothedathukavu Kottayam road ch. 0/000 to 4/100km 3

Page 86 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Premonsoon work: Clearing culverts, side drains and culvert to Pallipuram - Kaduthuruthy road ch. 0/000 to 2/660km and Vikom - Town road (L.P. Road, E.V. Road and Thekkenada road) Chalapparambu road ch. 0./00 to Kottayam 1/090km 3 Providing bitumen patch works and clearing culverts and drain to Thalayolapparambu - Kottayam Koothattukulam road ch. 0/000 to 11/200km 3 Providing bitumen patch works and clearing culverts and drain for Keezhoor - Njizhoor road ch. 0/000 to 5/600km and Piravom - Kottayam Kaduthuruthy road ch. 3/800 to 10/000km 3 Providing bitumen patch works and clearing culverts and drain for Thalappara - Neerpara road ch. 0/000 to 6/00km and Thalayolapparambu Market road ch. 0/00 to Kottayam 0/800km 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to M.C. Road Kottayam from ch. 131/330 to 142/00km 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to 82nd mile M.C. Road - 5th mile C.W. Road from ch. 1/000 to 8/776km and Manarcadu - Thenganal Kottayam road ch. 5/000 to 10/000 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to Changanassery - Kaviyoor orad ch. 0/000 to 6/000km and Chnganassery Bye Pass ch. 0/800 to 4/400km and CW Road from ch. Kottayam 0/000 to 10/000 3

Page 87 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent patch work repars, clearing side drain and clearing blocked culvert to Paippadu - Mammoodu road ch. 2/00 to 5/000, Thalakulam - Venkotta road ch. 0/000 to 2/850km and Nadakkappadam - Venkotta Kottayam road ch. 0/000 to 2/450km 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to Kunnamkary - Kumaramkery - Paral - Changanassery road ch 7/000 to 8/310km and Chathavattom - Kottayam Madhumola road ch. 1/500 to 3/000km 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to Povathummoodu - Chang\jodi road ch. 0/000 Kottayam to 4/250km 2 Urgent patch work repars, clearing side drain and clearing blocked culvert to Kottayam - Kozhencherry road ch. 4/000 to 22/065km(Except ch. 6/500 to 7/500 and Kottayam 12/500 to 13/500km) 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to Karukcahl- Manimala road ch. 0/000 to 3/850km, Perumpanachy - Thottakkadu road ch. 0/000 to 6/240km , Pallom - Thottakkadu road ch. 9/000 to 12/000km and Cherumakkal road ch. Kottayam 0/000 to 1/800km 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to Manarcadu - Thenganal road ch. 0/000 to 3/500km and Puthupally - Vennimala road ch. 0/000 to Kottayam 5/000km 2

Page 88 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Urgent patch work repars, clearing side drain and clearing blocked culvert to To Puhtupally - Thottakkadu road ch. 0/000 to 9/129km(Except 4/500 to 5/500km), Thottakdu - Kuttickal road ch. 0/000 to 3/00km, Vettathukkavala - Meenadom road ch. 0/000 to 2/000km and Vettathukkavala - Govt. U.P.S. - Narakathodu - Kavlichira road ch. 0/000 to Kottayam 2/227km 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to 7th Mile C.W. Road - Mallpally road ch. 0/000 to 2/000km, Vattoly - Karukachal road 0/000 to 1/700km and Vakathanam - Karukachal road ch. 3/000 Kottayam to 5/000km 3 Urgent patch work repars, clearing side drain and clearing blocked culvert to Nedumkunnam - Punnavely road ch. 0/000 to 1/500km and Kangazha - Marthoorpady road Kottayam ch. 0/000 to 3/800km 2

Page 89 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing light jungle providing earthen drain clearing chocked culverts removeing slipped earth and high berms etc in bet Km 0/000 to 9/800 to of Kaniyambetta- Meenangadi Road Km 19/500 to 30/800 of rod and in bet km 0/000 to 9/600 of Wayanad kalpetta Varambetta road. 2.6 OR-Cutting and removal of falling tress and Maintenance of Various roads under roads Wayanad section Mananthavady for 2011-12 3 OR-2011-12. Premonsoom works-Clearing light jungle, blocked culvers side drains and cutting shoulder drainsand cutting shoulder drains along Beenachi Panamaram road B/w Km 0/000 to 10/000,S Bathery Malavyal Ambukuthy Ambalavayal road B/w Km 0/000 to 9/687,S bathery Cherambady road b/w Km 0/000 to 3/000, S Bathery Kuppady Vadakkanad road b/w Km 0/000 to 1/800, Kaniyambetta Meenangady road b/w KM 9/800 Wayanad to 12/800 1.79 Wayanad OR-Pre monsoon work-Protection from scoring of foundation for Valad Bridge under Roads Wayanad Division Wayanad 3 Clearing light jungle providing earthen drain clearing chocked culverts removeing slipped earth and high berms etc in bet Km 67/000 to Wayanad 82/000 of CVG Road 1.5 OR- Providing strip BT et km 0/00 to 0/145 of Wayanad Mananthavady- Kaithakkal road 3 OR-2011-12. Premonsoom works-Clearing light jungle, blocked culvers side drains and cutting shoulder drainsand cutting shoulder drains along Beenachi Panamaram road B/w Km1 0/000 to 19/200,S Bathery Pulpally Wayanad Perikallur road b/w Km 20/000 to 34/200 2.3

Page 90 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status OR-Pre monsoon work-Protection from scoring of foundation for Varummelkkadavu Bridge Wayanad Under Roads Division Wayanad 2 Clearing light jungle providing earthen drain clearing chocked culverts removeing slipped earth and high berms etc in bet Km 10/240 to 22/000 of Mananthavady- Pakramthalam road in bet. Km 22/000 to 32/000 of Mananthavady- Pakramthalam road and in bet Km 9/600 to Wayanad 17/725 of Kalpetta-Varambetta road. 2.15 OR-Clearing light jungle, drainge along Thalassery Bavali Road fromt km 50/400 to Wayanad 68/200 2 OR-2011-12. Premonsoom works-Clearing light jungle, blocked culvers side drains and cutting shoulder drainsand cutting shoulder drains along Vaduvanchal Kolagappara road b/w Km 0/000 to 14/313 Narikunda Thomatuchal road b/w Km2/900 to 9/900, S Bathery Cherambady road b/w Km 3/000 to 11/200 Ambalavayal Chulliodu road b/w Wayanad Kmv0/000 to 6/600 1.7 Wayanad OR- Per monsoon work -protection from scoring of foundation Bridge Wayanad under Roads Division Wayanad 1 Clearing light jungle providing earthen drain clearing chocked culverts removeing slipped earth and high berms etc in bet Km 0/000 to Wayanad 7/000 of Kalpetta- Meppadi road. 0.8 OR- Cutting and removal of falling trees and Maintance of Various roads under roads Wayanad section Panamaram road for 201-12 3

Page 91 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status OR-2011-12. Premonsoom works-Clearing light jungle, blocked culvers side drains and cutting shoulder drains along Moolankavu Thelambetta Mathamangalam road b/w KM 0/000 to 6/400, S Bethery Pulpally Perikallu road b/w KM 0/000 to 4/000, S Bathery Kattayad Pazhuppathur Chapakolli vakerey Wayanad Irulam road b/w Km 0/000 to 14/100 1.45 OR-Pre Monsoon work - Protection from scoring of foundation for Anappara Bridge Wayanad under Roads Division Wayanad 1.5 Clearing light jungle providing earthen drain clearing chocked culverts removeing slipped earth and high berms etc in bet Km 82/000 to Wayanad 97/00 of CVGRoad 1.5

OR-Clearing light jungle, drainge and providing earthern drain along Thavinjal - Valad- Wayanad Kunhome Road from KM 0/00 to 16/100 2.5 OR-2011-12. Premonsoom works-Clearing light jungle, blocked culvers side drains and cutting shoulder drains along Kappiset Pulpally Packom Dasankkara road b/w KM 0/000 to 16/730, Cheyambam -56 Kappiset road n/w KM 0/000 to 8/600, Cheyambam Wayanad Shed Mullankolly road B/w KM 0/000 to 6/250 1.85 Clearing light jungle providing earthen drain clearing chocked culverts removeing slipped earth and high berms etc in bet Km0/000 to 2/700 of Puthusserrikadavu- Bankkunnu road in bet Km 7/000 to 20/000 of Vythiri-Tharuvana road and in bet. Km 20/000 to 30/150 of vythiri- Wayanad Tharuvana road. 1.9 OR-Urgent side protection bet KM 4/400 to Wayanad 4/500 of Thavinjal- Valad-Kunhome road 3

Page 92 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status OR-2011-12. Premonsoom works-Clearing light jungle, blocked culvers side drains and cutting shoulder drains along Irulam Moonanakuzhi Meenanagady road b/w KM 7/900 to 13/250, pazhoor cheeral road b/w KM 0/000 to 6/400 Meenanagady Kumblery Wayanad Ambalavayal road b/w KM 0/000 to 6/375. 1 Providing BT patch work in bet KM 0/400 to 1/400 of Kalpetta- Varambetta road and in bet Km 2/950 to 3/500 of Kaniyambetta- Wayanad Meenangadi road. 1.4 Maintenance of Various roads under roads section Thirunelly for the year 2011-12 Wayanad Purchase of Shellmac 3 OR-2011-12. Premonsoom works-Clearing light jungle, blocked culvers side drains and cutting shoulder drains along Padichira Seethamount Kolavally road b/w KM 0/000 to 6/000 Mullankolly Padichira Kabanigiri Marakkadavu Perikiallur road b/w KM 0/000 to 13/460 , Irulam Moonnanakuzhi road b/w Km Wayanad 0/000 to 7/900 1.55 Clearing light jungle providing earthen drain clearing chocked culverts removeing slipped earth and high berms etc in bet Km 0/000 to 6/000 of Meppadi-Chooralmala road and in bet Km 6/000 to 12/800 of Meppadi- Chooralmala Wayanad road. 1.5 OR-Clearing linght jungle drainage along Thalassery Bavali Road from KM 68/200 to Wayanad 83/00 2 Providing BT patch work in bet KM 11/000 to Wayanad 12/000 of Kalpetta- Varambetta road 1 OR- Planting new and missed Km stone Painting and lettering km stone and central line marking of roads under various roads of Wayanad Mananthavady section 3

Page 93 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status OR- Clearing light jungleand drainage along Mananthavady- Kalpetta road bet KM 8/00 to 19/500 Panamaram - Nelliyambam road at KM 0/000 to 2/190 Beenachi-Panamaram road bet km 19/200 to 22/200 , periya- Korom road bet Wayanad km 9/750 to 15/270 1.4 OR-Clearing linght jungle drainage along Kartikulam-Tholpetty road bet km 0/00 to 15/300 and Thalassery - Bavali road bet km Wayanad 83/00 to 97/600 1.6 OR-Clearing light jungle and drainage along Mananthavady-Kaithakkal road bet Km.3/00 to 10/415, Mannanthavady -Kalpetta road at KM 0/000 to 8/000 Mananthavady Kaithakkal road at KM 0/000 to 3/000 Mananthavady -Kandothvayalroad from km 0/000 to 4/000 and approach road ro pandikkadavu bridge and Thonichal - pallikkal road from km 0/000 to Wayanad 3/200 2.7 OR-Clearing light jungle, drainage along pallikunnu-Anjukunnu road bet km 5/00 to 10/230, Mananthavady- Kandothuvayal road bet km 4/00 to 14/110 Mananthavady- Kandothuvayal road bet km.4/00 to 14/110 Mananthavady- Pakramthalam Bet km 6/470 to 10/240 kellur- Cheriyamkolly road bet km 0/00 Wayanad to 14/300 1.75 OR-Urgent patch repair bet km 0/00 to 2/00 of Wayanad Thavijal -Valad_ Kunhome Road 3 OR- Urgent patch repair bet.km 3/00 to 5/00 of Wayanad Thavijal -Valad -Kunhome Road 3

Page 94 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing light jungle providing earthen drain clearing chocked culverts removeing slipped earth and high berms etc in bet Km 0/000 to 9/800 to of Kaniyambetta- Meenangadi Road Km 19/500 to 30/800 of Mananthavady Kalpetta rod and in bet km 0/000 to 9/600 of Wayanad kalpetta Varambetta road. 3 OR-Cutting and removal of falling tress and Maintenance of Various roads under roads Wayanad section Mananthavady for 2011-12 3 OR-2011-12. Premonsoom works-Clearing light jungle, blocked culvers side drains and cutting shoulder drainsand cutting shoulder drains along Beenachi Panamaram road B/w Km 0/000 to 10/000,S Bathery Malavyal Ambukuthy Ambalavayal road B/w Km 0/000 to 9/687,S bathery Cherambady road b/w Km 0/000 to 3/000, S Bathery Kuppady Vadakkanad road b/w Km 0/000 to 1/800, Kaniyambetta Meenangady road b/w KM 9/800 Wayanad to 12/800 3 OR-Pre monsoon work-Protection from scoring of foundation for Valad Bridge under Roads Wayanad Division Wayanad 3 Clearing light jungle providing earthen drain clearing chocked culverts removeing slipped earth and high berms etc in bet Km 67/000 to Wayanad 82/000 of CVG Road 3 OR- Providing strip BT et km 0/00 to 0/145 of Wayanad Mananthavady- Kaithakkal road 3 OR-2011-12. Premonsoom works-Clearing light jungle, blocked culvers side drains and cutting shoulder drainsand cutting shoulder drains along Beenachi Panamaram road B/w Km1 0/000 to 19/200,S Bathery Pulpally Wayanad Perikallur road b/w Km 20/000 to 34/200 3

Page 95 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status OR- Cutting and removing his raised berms of Mananthavady Kalpetta road from 0/000 to Wayanad 19/500 13

Page 96 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Temporary Restoration Works 2011-12 to Thrissur Thrissur - Thalore Road 1.25 Temporary Restoration Works 2011-12 to Thrissur Edakkunny Road 1 Temporary Restoration Works 2011-12 to Thrissur Thrikkur Road. 0.75 Temporary Restoration Works 2011-12 to Thrissur Thrissur - Kuttippuram Road 1 Temporary Restoration Works 2011-12 to Thrissur - Mannamangalam Road and Bishop Thrissur Palace Road. 1 Temporary Restoration Works 2011-12 to Puthur - Ponnukkara and Ponnukkara - Thrissur Chembamkandam 1 Temporary Restoration Works 2011-12 to Thrissur Thrissur - Mannuthy Road 1 Temporary Restoration Works 2011-12 to Thrissur Veembu Road 1 Temporary Restoration Works 2011-12 to Thrissur Kannara - Moorkanikkara Road 1 Temporary Restoration Works 2011-12 to - Shornur Road and Thrissur - Thrissur Kandassamkadavu Road and Ayyanthole. 1.5 Temporary Restoration Works 2011-12 to Toll gate Chettupuzha, Olari, Elthuruthu, Amala - Pavaratty, Amala - Choorakkattukara - Thrissur Adat Road and Attoor Road., 2 Temporary Restoration Works 2011-12 to Thrissur Thrissur - Kuttippuram Road 2 Temporary Restoration Works 2011-12 to Mundur road. Kaipparambu - Parapur Road Thrissur and Avanur - Thangallur Road 1 Temporary Restoration Works 2011-12 to Chirakkekode - Pullanikadu Road, Kundukad - Kattilapoovam - Pandiparambu Road and Thrissur Cheroor Road. 1

Page 97 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Temporary Restoration Works 2011-12 to K.N.R. Road, Kuttimukku Road and Thrissur Thanikudam Road. 1.5 Temporary Restoration Works 2011-12 to Edakunni Road, Thaikkattussery Road and Thrissur Cherussery - Thaikkattussery Road 1.5 Temporary Restoration Works 2011-12 to Palakkadavu Road , Pallissery Church Road Thrissur and Poochunnipadam - Chathakudam 1.35 Temporary Restoration Works 2011-12 to Thevar Road , Arattupuzha Temple Road and Thrissur Mulangu Road 1.45 Temporary Restoration Works 2011-12 to Anakkallu - Ammadam - Peringottukara Road Thrissur and Kodannur - Kundolikadavu Road 1.7 Temporary Restoration Works 2011-12 to Jayanthi Bund Road, Karanchira Bund Road , Thrissur Vennakkal - Kuzhikkal road and A.T.C. Road 1.5 Temporary Restoration Works 2011-12 to Ollur Town Road, Chiyyaram Convent Road , Pazhamukku Road and Kanimangalam - Thrissur Nedupuzha Road 1.5 Temporary Restoration Works 2011-12 to Thrissur Potta - Moonnupeedika Road 1 Temporary Restoration Works 2011-12 to Thrissur Mapranam - Nandikkara Road 1 Temporary Restoration Works 2011-12 to - Kattoor Road and Kizhuthani - Thrissur Karalam Road 1 Temporary Restoration Works 2011-12 to Thrissur Edathirinji - Kattoor Road 1 Temporary Restoration Works 2011-12 to Thanissery - Karanchira Road and Thrissur Chemmanda - Karalam Road 1 Temporary Restoration Works 2011-12 to Thrissur Chathan Master Road 1 Temporary Restoration Works 2011-12 to Thrissur Anandapuram - Nellayi Road 1

Page 98 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Temporary Restoration Works 2011-12 to Karuvannur - Kattoor Road and Kodungallur - Thrissur Shornur Road 1 Temporary Restoration Works 2011-12 to Thrissur - Vellikulangara Road 1.2 Temporary Restoration Works 2011-12 to Thrissur Old NH Koratty - Pulikkadavu Road 1 Temporary Restoration Works 2011-12 to Thrissur Chalakudy - Anamala Road 1.1 Temporary Restoration Works 2011-12 to Ezhunnallethupatha Road, Thuruthiparambu Thrissur Road 0.9 Temporary Restoration Works 2011-12 to Mothirakanny Panchayath Road and Thrissur Jeevadhara Hospital Road 1 Temporary Restoration Works 2011-12 to Thrissur Mambra - Koottalapadam Road and JTS Road 1 Temporary Restoration Works 2011-12 to Church Road, Chalakudy Hospital Thrissur Road 0.9 Temporary Restoration Works 2011-12 to Thrissur Muringoor - Ezhattumugham Road 1 Temporary Restoration Works 2011-12 to Thrissur Muringoor - Kadukutty Road 1 Temporary Restoration Works 2011-12 to Thrissur Chalakudy - Anamala Road 1 Temporary Restoration Works 2011-12 to Erayamkudy Road and Chalakudy Market Thrissur Road 0.9 Temporary Restoration Works 2011-12 to Koratty - Nalukettu Road and Independent Thrissur Road 1 Temporary Restoration Works 2011-12 to Thrissur Amballur - Kallur Road 1 Temporary Restoration Works 2011-12 to Pudukad - Mupliyam road and Chengallur - Thrissur Mannampetta - Mavinchuvadu Road 1

Page 99 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Temporary Restoration Works 2011-12 to Chengallur - Mattimala Road and Palappilly - Thrissur Echippara Road 1 Temporary Restoration Works 2011-12 to Thrikkur - Kallur Road , Thrikkur - Manali road Thrissur and Puthur - Ponnukara Road 1 Temporary Restoration Works 2011-12 to Bazar Road, Kodakara - Kodungallur Thrissur road and Chathan Master Road 1 Temporary Restoration Works 2011-12 to Mannamangalam - Marottichal, Vellur - Chimmini Dam Road and Amballur - Palappilly Thrissur Road (Worst Reaches) 1 Temporary Restoration Works 2011-12 to Pudukad Bazar Road, Pudukad - Cheruval Road and Palakkadavu Road and Pudukad - Thrissur Mannampetta Road 1 Temporary Restoration Works 2011-12 to Thrissur Kodakara - Vellikulangara Road. 1 Temporary Restoration Works 2011-12 to Lakkidi Road, Pampady Road, Kuthampully Road, Pazhampalakode Road and Thrissur Malesamangalam Road 3 Temporary Restoration Works 2011-12 to Cheruthuruthy - Killimangalam Road, Thrissur - Shornur Road, Karukakadavu - Muthirode Road , Chelakkara - Karukakkadavu Road, Manalady - Panjal - Vettikkattiri Road (Panchayat Road) and - Thrissur Elanadu Road. 3 Temporary Restoration Works 2011-12 to Chelakkara - Elanadu Road and Kondazhy - Thrissur Mayannur Road 2 Temporary Restoration Works 2011-12 to Kondayur Road, Mullurkara - Varavoor Road Thrissur and Cheruthuruthy - Ponnani Road. 2.5

Page 100 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Temporary Restoration Works 2011-12 to Parlikkadu - Kumblangadu Road, Nelluvai - Thichoor - Ittonam Road, Kuranchery - Veloor Road, and - Wadakkanchery Thrissur Road. 3 Temporary Restoration Works 2011-12 to Varavoor - Pilakkad - Thali Road, KM and Chittanda - Thalassery Road, Thrissur - Thrissur Shornur Road. 2.5 Temporary Restoration Works 2011-12 to Kattakampal - Cheruvallikadavu, Cheruvathani Road, Vettikkadavu, , Pazhanji Link Thrissur Road. 2.6

Temporary Restoration Works 2011-12 to Thrissur - Kuttippuram, Perumbilavu - Nilambur - Link Road, Perumbilavu - Nilambur Road, Pazhanji - Road, New Kadavallur, Boundary Road, Kechery - Akkikavu Road, Thrissur Chavakkad - Wadakkanchery Road. 2.6 Temporary Restoration Works 2011-12 to Thrissur - Kuttippuram, Chavakkad - Wadakkanchery Road to Boundary, Patharamangalam, Velur Road, Kechery - Thrissur Mattom, Iringappuram - Kanippayyur Road. 2.8 Temporary Restoration Works 2011-12 to Thrissur Triprayar - Kanjany - Chavakkad Road 1.5 Temporary Restoration Works 2011-12 to East Tippu Sulthan Road and Thrissur - Thrissur Vadanappilly Road 1 Temporary Restoration Works 2011-12 to Amalanagar - Pavaratty Road and Thrissur Anchamkallu - Mullassery Road 1 Temporary Restoration Works 2011-12 to Thrissur West Tippu Sulthan Road 1.5

Page 101 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Temporary Restoration Works 2011-12 Triprayar Approach Road, Kandassankadavu - Thrissur Triprayar Road and Muttichurkadavu Road 1 Temporary Restoration Works 2011-12 to Edamuttom - Edathiruthy Road, Valapad Thrissur Beach Road and Kuzhikkal Ferry Road 1 Temporary Restoration Works 2011-12 to Kandassnakadavu - Mampilly, Karamukku - Thrissur Enamavu and Karamukku - Palazhy Road 1 Temporary Restoration Works 2011-12 to Thrissur - Althara - Ponnani Road 1 Temporary Restoration Works 2011-12 to Thrissur Chavakkad - Wadakkanchery Road 1 Temporary Restoration Works 2011-12 to Thrissur Thamarappilly - Chowallurpady Road 1 Temporary Restoration Works 2011-12 to Thrissur Chittattukara - Kundukadavu Road 1 Temporary Restoration Works 2011-12 to Thrissur Kottapadi - Mallad - Ovungalpally Road 0.75 Temporary Restoration Works 2011-12 to Thrissur Triprayar - Chavakkad Road 1 Temporary Restoration Works 2011-12 to Thrissur Paluvai - Pavaratty Road 0.75 Temporary Restoration Works 2011-12 to Thrissur Vaduthala - Attupuram Road 0.75 Temporary Restoration Works 2011-12 to Thrissur Kochannur - Mannalamkunnu Road 0.75 Temporary Restoration Works 2011-12 to Arakulam - Azhikode Road, Padakulam - Azhikode Road, Park Road, Hospital Road and Thrissur Keetholy - Chalakulam Road. 2.5 Temporary Restoration Works 2011-12 to Kakathuruthy - Mathilakam Road, Cheloor - Areepalam Road, Vellangallur - Mathilakam Thrissur Road, Kettuchira Branch Canal Road. 2.5

Page 102 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Temporary Restoration Works 2011-12 to S.N. Puram - P. Vemballore Road, V.K. Gopalan Road, Kodungallur - Eriyad Road, Eriyad Fishing Centre Road and Mathilakam - Thrissur Koolimuttom Road. 2.4 Temporary Restoration Works 2011-12 to Kombodinjamakkal Road, Kombathukadavu Road, Avittathur Road, Ongichira Road - List A Thrissur Roads. 2.9 Temporary Restoration Works 2011-12 to Chalakudy - Mala Road, Chalakudy - Karoor Road, Ashtamichira - Annamanada Road, AKK Road, Mala - Annamanada Road Kallur - Thrissur Alathur - Kottamuri Road - List C Roads. 2.7 Temporary Restoration Works 2011-12 to Valiyaparambu - Road, Eravathur - Kochukadavu Road, Indiragandhi Road, Mala - Elanthikkara Road, Chettiparambu Road etc. Thrissur List B Roads. 3 O.R. Works 2010-11 to Thrissur - Celebration in May 2011. Providing barricade for safety around the display area of fire works Thrissur and errection of watch tower. 2.5 O.R. Works 2010-11 - Construction of cross culvert at Ch. 1/600 Km. of Kuriachira - Thrissur Anchery Road. 0.8

Page 103 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Clearing jungles ,blocked culverts and side Sri K drain between Km 38/000 to 50/400 of TB Raveendran Churam Vatakara Road 149464 Peravoor 149464 nil on going Clearing jungles ,blocked culverts and side Sri Shibu M Churam Vatakara drain between Km 0/000-6/270 of KBT Road 89911 George 89911 Nil on going Clearing jungles ,blocked culverts and side drain between Km 0/000- 9/400 of Sri B U Peruvannamuzhy - Poozhithode Road and Abdurahima 0/000 to 2/2000 of Poozhithode - n Haji Churam Vatakara Padinjarathara Road 142922 Kasaragode 142922 Nil on going Sri B U Abdurahima Clearing jungles ,blocked culverts and side n Haji Churam Vatakara drain between Km 0/000- 7/000 of KP Road 99924 Kasaragode 99924 Nil on going Clearing jungles ,blocked culverts and side drain between Km 21/000 to 24/000 and 25/225 to 27/225 of Poozhithode - Sri Shibu M Churam Vatakara Padinjarathara Road 79527 George 79527 Nil on going Sri P K Clearing jungles ,blocked culverts and side Rengith drain between Km 30/000 to 41/370 of MP Babu , Churam Vatakara Road 149736 Vatakara 149736 Nil on going Reconstruction of damaged side drain at Km Churam Vatakara 38/900 of MP Road 249400 Sri Jayaraj K 225648 Nil Painting parapets and providing reflectors bet Sri Shibu M Churam Vatakara Km 0/00 to 6/270 of KBT ROAD 99960 George 99960 Not applicable on going

Page 104 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status Conveyance of bitumen (bulk and sealed) required for various Sub Divisions under Roads Division, Alappuzha, Alapuzha for the year 2011-12 from Cochin Oil Refinery, Ambalamughal to various work sites and Alappuzha District Division, Store, Alappuzha 25 O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Kattanam 1 O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Kayamkulam 1 O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Mavelikara 1 O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Chengannur 1

Page 105 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Mannar 1 O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Alappuzha 1.5 O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Haripad 1 O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Ambalapuzha 1 O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Edathua 1

Page 106 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Pulincunnu 1 O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Ramankary 1 O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Cherthala 1.25 O.R. 2011-12 Pre-monsoon works - Clearing of side drain, chocked culverts, cutting new earthern drain, removing raised berms, slipped earth etc. for avoiding water stagnation, cutting branches of trees found to be in dangerous condition in various roads under Roads Alappuzha Section, Pattanakkad 1.25 O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Kattanam 2 O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Kayamkulam 2 O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Mavelikara 2 O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Chengannur 2

Page 107 Pre-Monsoon work Details Back to first page Whether Estimate material PAC(in Name of the Work award Contract collected for Division Name of work Lakh) Tender date contractor date Amount the work Work status O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Mannar 2 O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Alappuzha 2.5 O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Haripad 2.5 O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Ambalapuzha 1.5 O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Pulincunnu 2 O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Ramankary 3 O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Edathua 3 O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Cherthala 2 O.R. 2011-12 Stray pot holes filling in various Alappuzha roads under Roads Section, Pattanakkad 2 Providing patch repairs to Thiruvanvandoor- Alappuzha Eramallikkara road ch.0/000 to 4/400 3 Providing patch repairs to Pandanadu- Alappuzha Budhanoor road ch.0/000 to 7./800 3 Providing patch repairs to Kollakadavu- Alappuzha Kulanada road ch.0/000 to 7/800 3 OR 2011-12 Urgent patch repairs to Thottappally -Thrikkunnappuzha road ch 0/000 Alappuzha to 4/300 3

Page 108