Energy Situation in

• Presented by/ • Santino Fardol Watod • Deputy Head of Mission • Embassy of South Sudan-Berlin 1. Centr al Equat oria

2. Easte rn Equat oria

3. Jongl ei

4. Lakes

5. Facts about South Sudan North States q Full name: Republic of South Sudan ern q National Day: 9 July q Population: 8,260,490 q Capital: q Bahr Area: 644,329 square kilometers q Major languages: English (official) Arabic, Juba Arabic, Dinka, others el Ghaza l

6. Unity

7. Upper Nile

8. Warra p

9. Weste rn Bahr el Ghaza l

10. Weste rn Equat oria Political Legal

§ Stable democratic system-election every five years. § Robust commercial legal enviroment § Legislative system-(upper and lower § Land Act in place to promote private house) sector investment § Independence jurdiciary system § Established regulatory enviroment § Directed by rule and law

Excellent Economic Enviroment Security

§ One of the fastest growing economies in Africa-with a priority to shift away from oil § Peaceful transition to indepedence § Subsistence farming and cattle- § Continuing efforts to improve herding in rural areas security § Artisanal gold mining throughout the country Energy Projects in South Sudan

Committed Generation Projects (1)

Expected Capacity Funding N° Project Name Location Type Implementation Status Commissioni Objective (MW) Status ng - Aweil - Bentiu Electrification of 1 - Juba Thermal 60 - Contractor selected Work started 2014 Provide power States Capitals - - Warrap - PPP & GRSS 25% GRSS has to Improve 2 Fula Rapids Hydro 40 2017 - Norway 75% pay 25% power in Juba Provide cheap -Contractor selected China Exim- reliable power 3 Beden CE Hydro 540 China Genzhouba Bank yet to 2020 while Group Limited (CGGC) approve loan exporting to East-Africa

Ø CE = Central Equatoria Ø PPP = Public Private Partnership Ø GRSS = Government of the Republic of South Sudan Energy Projects in South Sudan

Committed Generation Projects (2) Expected Project Capacity Implementation N° Location Type Funding Status Commissionin Objective Name (MW) Status g - Contractor Currently - Cheap power Grand selected funding is - Reliable 4 ECE Hydro 890 2019 Fula AAE-America being - Export to Company moblised East- Africa - Cheap power - Unity China Exim- 5 Tharjath Themarl 240 - Not yet 2017 Complementar State Bank y to hydro dams

Mini- - Sino Hydo China Exim- - Power supply 6 ECE 2 2015 Hydro Corperation Bank to Torit Town

Ø ECE = Eastern Central Equatoria Energy Projects in South Sudan

Committed Transmission Line Projects

Capacity Implementation Expected N° Name Description Funding Status Objective (MW) Status Commissioning

- 157km- 132kv single Evaluation - GRSS-GNorway - Evacute power Fula-Juba 1 circuit 40 process to - Norwegian private 2016 from the project Line line select Tenders sector site to Juba - 132km- 33kv, - 440km- - Interconnection Ethiopia- China Exim-Bank yet to 220kv line- grid and import of 2 South Sudan 100 CHMC release funds for 2016 Jekou and power from Line construction Malakal Ethiopia

320km- - China Exim-Bank - Interconnection Renk-Malakal Contractor 3 220kv- 130 requested to provide 2016 grid and import of Line (CMEC) Melut funding power from Sudan

Ø China Heavy Machniery Corporation Ø GRSS/GNorway = Government of South Sudan/Norway Ø CMEC = China Machinery Engineering Corporation Energy Projects in South Sudan

Non-Committed Generation Projects

Project Capacity Implementation Funding Expected N° Location Type Objective Name (MW) Status Status Commissioning

Upper Niles Investors yet be Not yet 1 Palouge Thermal 250 2017 To support refinery State secured selected

Western To provide cheap Mini- Investors yet to GRSS has to 2 Sue Bahr el 12 2017 energy for Wau town and Hydro be secured pay 25% Ghazal State Warrap State

Ø GRSS = Government of the Republic of South Sudan Energy Projects in South Sudan

Non-Committed Transmission Projects (1)

Expected Description Capacity N° Name Implementation Status Funding Status Commissionin Objective Location (MW) g Tharjath- There are ongoing No investor yet To provide power to Western 1 Rumbek 180km-400kv 650 negotiations to indentify 2017 idenified and Southern States of SS Line contractor There are ongoing No investor yet Rumbek- To provide power to 2 240km-400kv 650 negotiations to indentify idenified 2017 Wau Line Western States of SS contractor

There are ongoing Interconnection with Rumbek- No investor yet negotiations to indentify hydropower plants located in 3 Ramchiel- 480km-400kv 650 idenified 2018 contractor Central and Eastern Juba Line Equatoria

Ø SS = South Sudan Energy Projects in South Sudan

Non-Committed Transmission Projects (2)

Description Capacit Implementation Funding Expected N° Name Objective Location y (MW) Status Status Commissioning There are ongoing Interconnection with Sudan, Malakal-Bor- 500km- negotiations to No investor Ethiopia and hydropower 1 650 2019 Juba Line 400kv indentify yet idenified plants in Eastern and Central contractor Equatoria States There are ongoing No investor Juba-Torit- 480km- negotiations to To provide power to Torit, 2 130 yet idenified 2019 Line 400kv indentify Kapoeta and cement factory contractor

There are ongoing negotiations to No investor Juba-Nimule- 240km- Interconnection with with East 3 650 indentify yet idenified 2019 Line 400kv Africa power pool contractor Smmary

Committed Non-Committed Committed Non-Committed Trasmission Line Trasmission Line Generation Projects Generation Projects Projects Projects

1. Fula-Juba 1. Tharjath- 1. Electrification Line Rumbek Line of state 1. Palouge 2. Ethiopia- 2. Rumbek-Wau capitals 2. Sue South Sudan Line 2. Fula Rapids Line 3. Rumbek- 3. Beden 3. Renk-Malakal Ramchiel- 4. Grand Fula Line Juba Line 5. Tharjath 4. Malakal-Bor- 6. Kinyeti Juba Line

5. Juba-Torit- Kapoeta Line

6. Juba-Nimule- Uganda Line = No Investors selectedfor this projects Excellent business 10 projects enviroment = Contact: [email protected]