REFERENCE DATA SERIES No. 2 2014 Edition

Nuclear Power Reactors in the World

INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA ISBN 978–92–0–104914–8 ISSN 1011–2642 @

14-17621_PUB-RDS-2-34_cover.indd All Pages 2014-05-15 10:55:11 REFERENCE DATA SERIES No. 2

NUCLEAR POWER REACTORS IN THE WORLD

2014 Edition

INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA, 2014 NUCLEAR POWER REACTORS IN THE WORLD IAEA, VIENNA, 2014 IAEA-RDS-2/34 ISBN 978–92–0–104914–8 ISSN 1011–2642

Printed by the IAEA in Austria May 2014 CONTENTS

Introduction ...... 5 Definitions ...... 7

Table 1. Reactors in operation, in long term shutdown and under construction, 31 Dec. 2013 ...... 10 Table 2. Type and net electrical power of reactors connected to the grid, 31 Dec. 2013 . . . 12 Table 3. Type and net electrical power of reactors under construction, 31 Dec. 2013 . . . . 13 Table 4. Reactor years of experience, up to 31 Dec. 2013 ...... 14 Table 5. Operating reactors and net electrical power, from 1985 to 2013 ...... 16 Table 6. Nuclear electricity production and share, from 1985 to 2013 ...... 18 Table 7. Annual construction starts and connections to the grid, 1954 to 2013 . . 20 Table 8. Number of new reactors connected to the grid and median construction time in months ...... 21 Table 9. Construction starts during 2013 . . . . . 22 Table 10. Connections to the grid during 2013 . . . 23 Table 11. Scheduled connections to the grid during 2014 ...... 23 Table 12. Reactors planned for construction as known on 31 Dec. 2013 ...... 24 Table 13. Reactors under construction, 31 Dec. 2013 ...... 28 Table 14. Reactors in operation, 31 Dec. 2013 . . . 31 Table 15. Reactors in long term shutdown, 31 Dec. 2013 ...... 46 Table 16. Reactors permanently shutdown, 31 Dec. 2013 ...... 47 Table 17. Reactors in decommissioning process or decommissioned, 31 Dec. 2013 . . . . . 53 Table 18. Performance factors by reactor category, 2011 to 2013 ...... 58 Table 19. Full outage statistics during 2013 . . . . 59 Table 20. Direct causes of full outages during 2013 ...... 60 Table 21. Direct causes of full outages, 2009 to 2013 ...... 61 Table 22. Countries: abbreviations and summary . . 62 Table 23. Reactor types: abbreviations and summary ...... 63 Table 24. Operators: abbreviations and summary . . 64 Table 25. NSSS suppliers: abbreviations and summary ...... 70 Figure 1. Number of operational reactors by type and net electrical power (as of 31 Dec. 2013) ...... 74 Figure 2. Reactors under construction by type and net electrical power (as of 31 Dec. 2013) ...... 75 Figure 3. Nuclear share of electricity generation (as of 31 Dec. 2013) ...... 76 Figure 4. Worldwide median construction time in months (as of 31 Dec. 2013) ...... 77 Figure 5. Number of reactors in operation by age (as of 31 Dec. 2013) ...... 78 Figure 6. Annual construction starts and connections to the grid, 1954 to 2013 . . 79 INTRODUCTION

Nuclear Power Reactors in the World is an annual publication that presents the most recent data pertaining to nuclear power reactors in IAEA Member States.

This thirty-fourth edition of Reference Data Series No. 2 provides a detailed comparison of various statistics up to and including 31 December 2013. The tables and figures contain the following information:

— General statistics on nuclear reactors in IAEA Member States; — Technical data on specific reactors that are either planned, under construction or operational, or that have been shut down or decommissioned; — Performance data on reactors operating in IAEA Member States, as reported to the IAEA.

The data compiled in this publication is a product of the IAEA’s Power Reactor Information System (PRIS). The PRIS database is a comprehensive source of data on all nuclear power reactors in the world. It includes specification and performance history data on operational reactors as well as on reactors under construction or in the decommissioning process. The IAEA collects this data through designated national correspondents in Member States.

PRIS outputs are available in the IAEA’s annual publications and on the PRIS web page (http://www.iaea.org/pris). Detailed outputs are accessible to registered users through on-line applications. Enquiries should be addressed to:

Director Division of Nuclear Power International Atomic Energy Agency Vienna International Centre PO Box 100 1400 Vienna, Austria Email: [email protected]

5

DEFINITIONS

Performance factors

(REG – PEL – UEL – XEL) EAF (%) = × 100 REG

(REG – PEL – UEL) UCF (%) = × 100 REG

UEL UCL (%) = × 100 REG

PEL PCL (%) = × 100 REG

EG LF (%) = × 100 REG

On-line Hours OF (%) = × 100 Total Hours where

EAF is the energy availability factor, expressed in per cent. UCF is the unit capability factor, expressed in per cent. UCL is the unplanned capability loss factor, expressed in per cent. PCL is the planned capability loss factor, expressed in per cent. LF is the load factor, expressed in per cent. OF is the operating factor, expressed in per cent.

REG Reference energy generation: The net electrical energy (MW·h), supplied by a unit continuously operated at the reference unit power during the entire reference period.

7 PEL Planned energy loss: The energy (MW·h) that was not supplied during the period because of planned shutdowns or load reductions due to causes under plant management control. Energy losses are con- sidered to be planned if they are scheduled at least four weeks in advance.

UEL Unplanned energy loss: The energy (MW·h) that was not supplied during the period because of unplanned shutdowns, outage extensions or load reductions due to causes under plant management control. Energy losses are considered to be unplanned if they are not scheduled at least four weeks in advance.

XEL External energy loss: The energy (MW·h) that was not supplied owing to constraints beyond plant man- agement control that reduced plant availability.

EG The net electrical energy supplied during the refer- ence period as measured at the unit outlet terminals after deducting the electrical energy taken by unit auxiliaries and the losses in transformers that are considered to be integral parts of the unit.

Planned Reactors The IAEA considers a reactor as planned from the date when a construction license application has been submitted to the relevant national regulatory authorities until the construction start date.

Construction Start Date when first major placing of concrete, usually for the base mat of the reactor building, takes place.

First Criticality Date when the reactor is made critical for the first time.

Grid Connection Date when the plant is first connected to the electrical grid for the supply of power. After this date, the plant is considered to be in operation.

Commercial Operation Date when the plant is handed over by the contractors to the owner and declared officially in commercial operation.

8 Permanent Shutdown Date when the plant is officially declared to be shut down by the owner and taken out of operation permanently.

Long Term Shutdown A unit is considered to be long term shutdown if it has been shut down for an extended period (usually several years) without any firm recovery schedule initially, but with the intention to restart the unit eventually.

Units and Energy Conversion 1 terawatt-hour (TW∙h) = 106 megawatt-hours (MW∙h)

For an average power plant,

1 TW∙h = 0.39 megatonnes of coal equivalent (input), = 0.23 megatonnes of oil equivalent (input)

9 A f 4.4 4.4 2.8 5.7 1.5 1.7 2.8 N 2.1 4.6 3.5 19.7 42.7 36.4 19.8 52.1 35.9 15.4 51.7 33.6 16.0 29.2 33.3 73.3 17.5 27.6 30.7 50.7 total % o A h ∙ supplied in 2013 4.4 5.7 N 5.0 3.9 2.7 2.2 Nuclear electricity 63.7 25.0 10.7 13.8 54.3 29.0 92.1 13.6 13.9 40.6 22.7 14.6 94.3 11.4 13.3 14.5 30.0 405.9 161.7 104.8 132.5 TW(e) ) e ( 630 692 880 1245 1325 1109 1600 1630 8382 6370 3907 28774 Total MW f 2 1 1 2 1 1 1 2 5 6 29 10 units No. o Reactors under construction ) e ( 446 246 Total MW f 1 1 units No. o Reactors in long term shutdown ) e ( 690 935 688 915 375 482 9474 3308 1300 1884 1860 7121 3884 5927 2752 1815 1330 1906 1889 5308 12068 42388 20721 63130 13500 15977 23643 Total MW f 5 2 2 2 7 6 3 2 7 4 9 4 1 1 2 1 2 4 1 10 48 23 58 19 20 33 21 Reactors in operation units No. o A Y A REP. OF , A A ISL. REP. A , Country TABLE 1. REACTORS IN OPERATION, LONG TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2013 ARMENI SWEDEN SWITZERLAND ROMANIA RUSSI BRAZIL BULGARI FINLAND HUNGAR SOUTH AFRICA SPAIN CZECH REP. CHIN JAPAN KOREA PAKISTAN BELARUS ARGENTINA BELGIUM FRANCE GERMANY SLOVAKIA SLOVENIA MEXICO NETHERLANDS CANAD INDIA

10 A f N NA 43.6 18.3 19.4 total % o A h ∙ supplied in 2013 N Nuclear electricity 64.1 78.2 790.2 2358.9 TW(e) ) e ( 1900 2690 5633 69367 Total MW f 2 2 5 72 units No. o Reactors under construction ) e ( 692 Total MW f 2 units No. o Reactors in long term shutdown ) e ( 9243 99081 13107 Total 371733 MW f 15 16 100 434 Reactors in operation units No. o h of nuclear electricity generation, representing 19.1% the total generated there. ∙ Country A TABLE 1. REACTORS IN OPERATION, LONG TERM SHUTDOWN AND UNDER CONSTRUCTION, 31 DEC. 2013 — continued US UKRAINE UAE UK Total Note: The total includes the following data from Taiwan, China: — 6 units, 5032 MW in operation; 2 2600 under construction; — 39.8 TW(e)

11 ) e ( Total 1 375 7 5927 2 1884 2 1906 4 1889 2 1330 1 482 6 3884 4 2752 9 12068 1 915 4 1815 1 688 2 1860 7 7121 5 3308 3 690 2 1300 2 935 58 63130 48 42388 10 9474 16 9243 15 13107 23 20721 19 13500 21 5308 No. MW 100 99081 ) e ( FBR 1 20 15977 20 No. MW ) e ( LWGR 15 10219 1 15 10219 33 23643 560 No. MW ) e ( PHWR 4 2684 1 90 2 1300 2 935 2 1300 19 13500 18 4091 No. MW ) e ( GCR 15 8045 No. MW ) e ( BWR 2 1330 No. MW ) e ( PWR 1 915 6 3884 1 375 1906 2 1889 4 7 2 5927 1884 2 1 300 917 2 600 4 1815 2 2572 2 9496 7 992 2 1760 1 2 1064 1 6057 6 6663 7 2811 3 1593 2 1715 3 688 1860 1 1198 1 482 19 18037 17 14657 17 12864 35 34394 65 64687 58 63130 24 23104 24 19284 15 13107 No. MW 273 253031 81 75958 15 8045 48 23900 15 10219 2 580 434 371733 434 2 15 10219 48 23900 580 15 8045 81 75958 253031 273 A Y A REP. OF Country , A A ISL. REP. A , TABLE 2. TYPE AND NET ELECTRICAL POWER OF REACTORS CONNECTED TO THE GRID, 31 DEC. 2013 A MEXICO CZECH REP. BELGIUM BRAZIL BULGARI CANAD INDIA ROMANIA RUSSI PAKISTAN NETHERLANDS SLOVAKIA TOTAL Notes: 1. The totals include 6 units, 5032 MW in Taiwan, China. 2. During 2013, 4 reactors, 3941 MW were newly connected to the grid. GERMANY FINLAND FRANCE JAPAN HUNGAR KOREA SPAIN SWEDEN SLOVENIA SWITZERLAND SOUTH AFRICA UK UKRAINE US ARGENTINA ARMENI CHIN IRAN

12 ) e ( Total 5 6370 2 630 1 1600 1 1630 2 1325 2 880 2 2690 2 1900 5 5633 1 1109 1 1245 1 692 6 3907 10 8382 No. MW ) e ( 1 29 200 28774 No. MW HTGR ) e ( 1 789 No. MW FBR ) e ( PHWR 1 692 4 2520 1 470 4 2520 No. MW ) e ( 3925 5 3925 2 3212 1 1259 72 200 69367 1325 BWR 2 No. MW ) e ( 630 630 6370 1245 1630 2690 1900 1109 1600 PWR 5 1 1 917 9 7593 2 880 5 5633 1 2 2 1 1 2 2 60 60771 (*) 4 (*) 60 60771 28 28574 No. MW Country A A REP. OF , A A A TABLE 3. TYPE AND NET ELECTRICAL POWER NET ELECTRICAL UNDER 3. CONSTRUCTION, TYPE AND OF 31 DEC. REACTORS TABLE 2013 A PAKISTAN RUSSI ARGENTIN FRANCE INDI KOREA TOTAL UAE UKRAINE US FINLAND BRAZIL CHIN JAPAN SLOVAKI BELARUS Notes: 1. The totals include 2 units (2 x BWR), 2600 MW in Taiwan, China. 2. During 2013, construction started on 10 reactors, 11252 MW.

13 7 8 7 3 3 7 4 3 1 2 6 4 8 4 1 6 8 2 7 3 3 1 10 10 11 11 Months 2 70 39 45 80 25 43 43 69 58 23 32 58 261 155 655 160 134 139 799 114 397 427 148 301 1932 1646 1124 Years Operating experience 52 935 751 915 537 690 688 5937 1884 3538 3884 2752 1889 5308 1423 2370 1330 1300 2724 1860 8188 15643 15977 66919 26369 48798 20721 24429 and shut down Total, operating MW(e) Net capacity 2 2 8 2 6 6 4 4 1 4 1 2 2 2 3 2 7 1 2 25 20 70 36 21 60 23 38 10 No. 10 52 55 376 786 909 621 1632 2143 3789 1423 6164 2370 14301 MW(e) Net capacity reactors 1 1 4 6 4 1 2 1 5 3 2 12 27 11 Permanently shut down No. 246 446 MW(e) Net capacity shutdown 1 1 Reactors in long term No. 935 375 915 482 690 688 5927 1884 1906 3884 2752 1889 5308 1330 1300 1815 1860 7121 13500 15977 63130 12068 42388 20721 23643 MW(e) Net capacity reactors Operating 2 1 7 2 2 6 4 9 4 1 2 1 3 2 4 1 2 7 19 20 58 21 48 23 33 No. Country TABLE 4. REACTOR YEARS OF EXPERIENCE, UP TO 31 DEC. 2013 ARGENTINA ARMENIA BELGIUM BRAZIL CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. ITALY JAPAN KAZAKHSTAN KOREA, REP. OF LITHUANIA MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN

14 6 7 6 4 7 11 Months 412 194 428 1527 3912 Years Operating experience 3314 10684 13468 16622 112421 429352 15660 and shut down Total, operating MW(e) Net capacity 6 13 45 19 132 No. 6 1210 4225 3515 13340 56927 585 MW(e) Net capacity reactors 3 1 4 29 32 Permanently shut down No. 692 149 MW(e) Net capacity shutdown 2 Reactors in long term No. 9474 3308 9243 13107 99081 371733 MW(e) Net capacity reactors Operating 5 10 16 15 100 434 No. Country TABLE 4. REACTOR YEARS OF EXPERIENCE, UP TO 31 DEC. 2013 — continued SWEDEN SWITZERLAND UK UKRAINE USA Total Notes: 1. The total includes the following data from Taiwan, China: — Reactors connected to the grid: 6 units, 5032 MW — Experience: 194 years, 1 month. 2. Operating experience is counted from the grid connection excluding any long term shutdown period.

15 935 375 915 482 690 688 5927 1884 1906 3884 2752 1889 5308 1330 1300 1815 1860 7121 9474 13500 15977 63130 12068 42388 20721 23643 MW(e) 2013 2 1 7 2 2 6 4 9 4 1 2 1 3 2 4 1 2 7 19 20 58 21 48 23 33 10 No. 935 375 915 482 725 688 5927 1884 1906 3804 2752 1889 4391 1530 1300 1816 1860 7560 9395 13500 12860 63130 12068 44215 20739 23643 MW(e) 2012 2 1 7 2 2 6 4 9 4 1 2 1 3 2 4 1 2 8 19 17 58 20 50 23 33 10 No. 935 375 482 425 666 5926 1884 1906 3675 2716 1889 4189 1300 1300 1816 1800 7514 9303 12604 10065 63130 20490 46821 18698 22693 MW(e) 2010 2 1 7 2 2 6 4 4 2 1 2 2 4 1 2 8 18 13 58 17 19 54 21 32 10 No. 935 376 450 425 655 656 5801 1901 2722 6587 3373 2676 1755 2993 1185 1360 2442 1800 7591 8905 12584 63260 20339 47593 16810 21743 MW(e) 2005 2 1 7 2 4 9 6 4 4 1 2 1 2 1 6 1 2 9 18 59 17 15 55 20 31 10 No. 978 376 449 425 655 676 5712 1976 3760 9998 2188 2611 2656 1729 2508 2370 1290 2440 1840 7468 9412 63080 21283 43245 12990 19848 MW(e) 2000 2 1 7 2 6 3 5 4 4 2 2 1 2 1 6 1 2 9 14 59 19 14 52 16 30 11 No. 50 935 376 626 510 125 620 5631 3538 2188 1782 2310 1729 1746 9115 2370 1256 1632 1840 7097 14902 58573 20972 39625 19848 10043 MW(e) 1995 2 1 7 1 6 3 4 4 4 1 2 2 2 1 4 1 2 9 21 56 19 10 50 11 30 12 No. Number of units and net capacity (MW(e)) connected to the grid at 31 Dec. given year 935 626 135 640 539 125 620 5501 2585 1632 2310 1710 1324 7220 2760 1632 1840 7099 9826 13993 55808 21250 30867 18898 MW(e) 1990 2 7 1 5 4 4 4 7 1 9 2 1 2 1 4 1 2 9 20 56 21 41 29 12 No. 935 816 626 391 825 135 508 137 632 5464 1632 9741 2300 1143 1273 3692 1380 1632 1840 5608 9455 37478 18110 23612 15841 MW(e) 1985 2 2 8 1 4 1 4 2 6 3 1 5 1 2 1 4 1 2 8 16 43 24 33 28 12 No. Country TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER, FROM 1985 TO 2013 ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. ITALY JAPAN KAZAKHSTAN KOREA, REP. OF LITHUANIA MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN SWEDEN

16 3308 9243 13107 99081 MW(e) 2013 5 16 15 No. 100 3278 9231 13107 MW(e) 102330 2012 5 16 15 No. 104 3238 10137 13107 MW(e) 101211 2010 5 19 15 No. 104 3220 11852 13107 98145 MW(e) 2005 5 23 15 No. 103 3170 12490 11195 96297 MW(e) 2000 5 33 13 No. 103 3056 12910 13045 98068 MW(e) 1995 5 35 15 No. 108 Number of units and net capacity (MW(e)) connected to the grid at 31 Dec. given year 2942 11360 13020 96228 MW(e) 1990 5 37 15 No. 108 2881 8324 10077 74401 MW(e) 1985 5 38 10 90 No. 363 245779 416 318253 434 341402 435 349999 441 368125 441 375277 437 373263 434 371733 437 373263 441 375277 441 368125 435 349999 434 341402 416 318253 363 245779 Country TABLE 5. OPERATING REACTORS AND NET ELECTRICAL POWER, FROM 1985 TO 2013 — continued SWITZERLAND UK WORLD UKRAINE USA Note: The world total includes the following data in Taiwan, China: 1985: 6 units, 4890 MW; 1990: 4828 1995: 4884 2000: 2005: 2010: units, 4982 MW; 2012: 6 5028 2013: 5032 MW.

17 4.4 2.8 2.1 3.5 1.5 1.7 4.6 2.8 4.4 5.7 29.2 52.1 30.7 16.0 35.9 33.3 73.3 15.5 50.7 27.6 19.8 17.5 51.7 33.6 19.7 42.7 % of total 2013 h ∙ 5.74 2.17 3.89 2.74 4.37 5.04 40.63 13.78 13.32 94.29 29.01 22.67 92.14 14.54 30.01 13.95 11.38 10.70 14.62 13.64 54.31 63.72 104.84 405.90 132.47 161.72 TW(e) 4.7 3.1 2.0 3.6 0.6 2.1 4.7 4.4 5.3 5.1 26.6 51.0 31.7 15.3 35.3 32.6 74.8 16.1 45.9 30.4 19.4 17.8 53.8 36.0 20.5 38.1 % of total 2012 h ∙ 5.90 2.12 1.33 8.41 3.71 5.27 5.24 38.46 15.17 14.86 89.06 92.65 28.60 22.06 94.10 14.76 29.66 17.23 10.56 14.41 12.40 58.70 61.47 407.44 143.55 166.29 TW(e) 5.9 3.1 1.8 2.9 3.6 3.4 2.6 5.2 39.4 51.2 33.1 15.1 33.3 28.4 74.1 22.6 42.1 29.2 32.2 19.5 17.1 51.8 37.3 20.1 38.1 % of total 2010 h ∙ 6.69 2.29 5.59 3.75 2.56 5.38 45.73 13.77 14.24 85.50 70.96 26.44 21.89 14.66 20.48 10.70 13.54 12.90 59.26 55.73 410.09 133.01 280.25 141.89 159.41 TW(e) 6.9 2.5 2.0 2.8 5.0 3.9 2.8 8.6 5.5 42.7 55.6 44.1 14.5 30.5 32.9 78.5 26.6 37.2 29.3 44.7 70.3 15.8 56.1 42.4 19.6 44.9 % of total 2005 h ∙ 6.37 2.50 9.20 9.54 3.77 2.41 5.11 5.61 45.34 17.38 86.83 50.33 23.25 22.36 13.02 15.73 10.32 16.34 12.24 54.99 69.58 431.18 154.61 280.50 137.59 137.64 TW(e) 7.3 1.9 1.2 3.1 3.9 4.3 1.7 6.6 33.0 56.8 45.0 11.8 18.7 32.2 76.4 30.6 40.6 33.8 40.7 73.9 10.9 15.0 53.4 37.4 27.6 39.0 % of total 2000 h ∙ 5.74 1.84 5.59 7.42 7.92 3.70 0.90 5.05 4.55 h) of reactors connected to the grid at 31 Dec. given year 45.81 16.79 69.12 16.02 12.71 21.58 13.35 14.23 15.17 13.00 59.49 51.88 ∙ 395.39 160.66 306.24 103.54 120.10 TW(e) 1.0 1.2 1.9 0.1 6.0 4.9 0.9 6.5 11.8 55.5 46.4 17.3 20.0 29.9 76.1 29.6 42.3 33.4 36.1 86.1 11.8 44.1 39.5 34.1 46.6 % of total 1995 h ∙ 6.57 2.33 6.99 0.08 7.53 3.78 0.46 4.57 39.30 16.22 93.98 12.13 12.23 18.13 13.20 60.21 10.64 91.59 11.35 11.29 53.49 67.17 358.71 146.13 275.51 Nuclear capacity (TWE TW(e) NA NA NA NA NA 1.0 2.2 2.6 4.9 1.1 5.6 19.8 60.1 35.7 14.8 35.1 74.5 33.1 51.4 27.1 49.1 35.9 45.9 % of total 1990 h ∙ 6.72 2.06 5.29 2.78 3.29 0.38 4.39 8.47 40.59 13.51 69.87 11.77 18.13 12.89 50.26 15.70 11.16 51.98 65.27 297.61 139.37 187.19 109.62 TW(e) NA NA NA NA NA 1.7 2.2 3.8 6.1 1.0 4.2 11.7 59.8 31.6 12.7 38.2 64.8 31.2 23.6 22.7 23.2 24.0 42.3 % of total 1985 h ∙ 5.25 3.17 1.99 6.10 3.87 6.46 8.75 3.69 0.26 8.70 3.85 5.39 29.25 12.17 59.47 17.98 12.36 88.26 26.83 55.89 213.28 119.59 145.37 TW(e) Country TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE, FROM 1985 TO 2013 ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REP. FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. ITALY JAPAN KAZAKHSTAN KOREA, REP. OF LITHUANIA MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN SWEDEN

18 36.4 18.3 43.6 19.4 % of total 2013 h ∙ 24.99 64.13 78.17 790.19 TW(e) 35.9 18.7 46.2 19.0 % of total 2012 h ∙ 24.45 63.96 84.89 770.72 TW(e) 38.0 15.5 48.1 19.6 % of total 2010 h ∙ 25.34 56.85 83.95 807.08 TW(e) 38.0 20.0 48.5 19.3 % of total 2005 h ∙ 22.11 75.34 83.40 783.35 TW(e) 38.2 21.9 47.3 19.8 % of total 2000 h ∙ h) of reactors connected to the grid at 31 Dec. given year 25.05 72.99 72.56 ∙ 755.55 TW(e) 39.9 25.4 37.8 22.5 % of total 1995 h ∙ 23.58 70.64 65.78 673.52 Nuclear capacity (TWE TW(e) NA 42.6 19.7 20.6 % of total 1990 h ∙ 22.40 58.77 71.26 578.08 TW(e) NA 39.8 19.6 15.5 % of total 1985 h ∙ 21.28 53.73 35.81 378.90 1327.63 1890.35 2190.94 2440.92 2626.34 2629.82 2346.19 2358.86 NA 1327.63 1890.35 2190.94 2440.92 2626.34 2629.82 2346.19 2358.86 TW(e) ∙ h of nuclear electricity generation, representing 38.3% the total generated there; ∙ h of nuclear electricity generation, representing 28.8% the total generated there; ∙ h of nuclear electricity generation, representing 21.2% the total generated there; ∙ h of nuclear electricity generation, representing 17.9% the total generated there; ∙ h of nuclear electricity generation, representing 19.3% the total generated there; ∙ h of nuclear electricity generation, representing 18.4% the total generated there; ∙ h of nuclear electricity generation, representing 19.1% the total generated there. Country TABLE 6. NUCLEAR ELECTRICITY PRODUCTION AND SHARE, FROM 1985 TO 2013 — continued WORLD SWITZERLAND UK UKRAINE USA Note: The world total includes the following data from Taiwan, China: 1990: 31.54 TW(e) 1995: 33.80 TW(e) 2000: 37.00 TW(e) 2005: 38.40 TW(e) 2010: 39.89 TW(e) 2012: 38.73 TW(e) 2013: 39.82 TW(e)

19 TABLE 7. ANNUAL CONSTRUCTION STARTS AND CONNECTIONS TO THE GRID, 1954 TO 2013 Construction Connections Reactors starts to the grid in operation Year Design Design Updated Number Number Number capacity capacity capacity of units of units of units (MW(e)) (MW(e)) (MW(e)) 1954 1 60 1 5 1 5 1955 8 260 1 5

1956 5 577 1 35 2 65 1957 13 1836 3 119 5 209 1958 6 476 1 35 6 269 1959 7 976 5 176 11 548 1960 11 1010 4 438 15 1087

1961 7 1529 1 15 16 1104 1962 8 1379 9 955 25 2223 1963 5 1722 9 500 33 2677 1964 9 2932 8 1022 40 3686 1965 9 3291 8 1879 48 5910

1966 15 7052 8 1528 55 7539 1967 25 16287 11 2165 64 9595 1968 37 26859 7 1086 69 10648 1969 13 9277 10 3670 78 14121 1970 37 25453 6 3410 84 17656

1971 18 12623 16 7711 99 24320 1972 29 22328 16 8880 113 32797 1973 29 23492 20 12727 132 43761 1974 38 35222 26 17149 154 61021 1975 38 36437 15 10236 169 70414

1976 43 41774 19 14196 186 83992 1977 23 21895 18 13199 199 96202 1978 23 21735 20 15782 218 111740 1979 27 22909 8 6909 225 117814 1980 20 19084 21 15088 245 133037

1981 17 16029 23 20355 267 153832 1982 19 19765 19 15332 284 168317 1983 16 12124 23 19266 306 187756 1984 11 10478 33 30992 336 218452 1985 19 15346 33 30963 363 245779

1986 8 7201 27 27134 389 272074 1987 13 11117 22 22191 407 295812 1988 7 7722 14 13574 416 305212 1989 6 4018 12 10566 420 311942 1990 5 3267 10 10543 416 318253

1991 2 2246 4 3678 415 321924 1992 3 3107 6 4809 418 325261 1993 4 3515 9 9012 427 333914 1994 2 1330 5 4332 429 336934 1995 5 3536 434 341402

1996 1 610 6 7080 438 347296 1997 5 4410 3 3570 434 347895 1998 3 2096 4 2952 430 344915 1999 4 4540 4 2704 432 347368 2000 7 5356 6 3063 435 349999

2001 1 1304 3 2696 438 352730 2002 6 3440 6 5022 439 357496 2003 1 202 2 1600 437 359842 2004 2 1336 5 4785 438 364688 2005 3 2907 4 3823 441 368125

2006 4 3356 2 1492 435 369581 2007 8 6553 3 1842 439 371645 2008 10 10630 438 371495 2009 12 13125 2 1068 437 370702 2010 16 14517 5 3719 441 375277

2011 4 1890 7 4004 435 368921 2012 7 6984 3 2918 437 373263 2013 10 11252 4 3986 434 371733

20 67 140 Months

3 1 2013 No. 60 54 64 105 222 108 Months to

4 1 1 2 1 1 2011 2012 No. 68 81 53 51 161 323 Months to

4 4 1 1 1 1 2006 2010 No. 59 64 47 54 191 233 227 Months to

6 1 1 4 4 2 2 2001 2005 No. 42 59 83 176 167 124 122 169 150 Months to

1 1 4 4 3 5 1 1 2 1996 2000 No. 97 73 93 46 61 80 113 120 210 109 113 Months to

1 2 3 3 3 2 1 1 1 1 1991 1995 10 No. 89 93 86 90 49 62 72 96 98 58 101 103 152 116 151 Months to

1 5 3 6 2 1 8 4 1 1 4 2 4 6 1986 1990 15 No. 80 98 74 68 46 65 80 73 99 80 74 57 109 132 104 100 112 154 102 112 125 186 Months to

1 4 1 1 7 1 7 2 2 4 1 9 2 1 2 5 4 1 6 7 1981 1985 24 10 No. Country TABLE 8. NUMBER OF NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME IN MONTHS ARGENTINA BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REP. FRANCE GERMANY HUNGARY INDIA IRAN, ISL. REP. JAPAN KOREA, REP. OF LITHUANIA MEXICO PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN SWEDEN SWITZERLAND UK UKRAINE

21 Months Months

2013 2013 No. No. Commercial operation — — — — 2017-6 — — — — — Months Months to to

2011 2011 2012 2012 No. No. Grid connection — — — — — 2017-11 — — — — Months Months to to

Construction start 2013-11 2013-9 2013-9 2013-12 2013-6 2013-5 2013-3 2013-11 2013-3 2013-11 2006 2006 2010 2010 No. No. NSSS supplier ASE IZ CFHI CFHI DHICKOPC KEPCO WH WH WH WH Months Months to to

2001 2001 2005 2005 No. No. Operator DSAE JNPC YJNPC YJNPC KHNP ENEC SCE&G SCE&G SOUTHERN SOUTHERN 990 Net 1109 1000 1000 1340 1345 1117 1117 1117 1117 278 278 1194 1060 1087 1087 1400 1400 1250 1250 1250 1250 Months Months Gross to to 1 1 1996 1996 2000 2000 No. No. Capacity (MW) 3200 3000 2905 2905 3983 3983 3400 3400 3400 3400 Thermal 221 221 Months Months to to Model 1 1 1991 1991 1995 1995 No. No. VVER V-491 VVER V-428M ACPR-1000 ACPR-1000 APR-1400 APR-1400 AP-1000 AP-1000 AP-1000 AP-1000 PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type 146 146 Months Months to to 1986 1986 1990 1990 22 22 No. No. 126 126 Reactor Months Months Name BELARUSIAN-1 TIANWAN-4 YANGJIANG-5 YANGJIANG-6 SHIN-HANUL-2 BARAKAH-2 SUMMER-2 SUMMER-3 VOGTLE-3 VOGTLE-4 to to 1981 1981 1985 1985 25 25 No. No. 131 131 84 84 85 85 93 93 29 29 82 82 23 23 121 121 20 20 59 59 12 12 77 77 10 10 62 62 4 4 68 68 Code BY -1 CN -73 CN -46 CN -69 KR -28 AE -02 US -5027 US -5028 US -5025 US -5026 Country Country Country TABLE 8. NUMBER OF NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME IN MONTHS — continued TABLE 8. NUMBER OF NEW REACTORS CONNECTED TO THE GRID AND MEDIAN CONSTRUCTION TIME IN MONTHS — continued TABLE 9. CONSTRUCTION STARTS DURING 2013 USA USA TOTAL TOTAL Notes: Notes: 1. Construction time is measured from the first pouring of concrete to connection unit grid. 1. Construction time is measured from the first pouring of concrete to connection unit grid. 2. The totals include the following data from Taiwan, China: 2. The totals include the following data from Taiwan, China: — 1981 to 1985: 4 units, 72 months. — 1981 to 1985: 4 units, 72 months. BELARUS CHINA KOREA, REP. OF UAE USA Note: During 2013, construction started on 10 reactors (11252 MW).

22 Grid date 2014-1 — 2014-10 Grid connection 2013-2 2013-11 2013-12 2013-10 First criticality First criticality 2013-1 2013-10 2013-12 2013-7 2013-12 — 2014-10 Construction start 2007-8 2008-3 2008-12 2002-3 Construction start 2008-11 2002-7 1987-1 NSSS supplier DEC DEC CFHI MAEP NSSS supplier SHE MAEP SKODA Operator LHNPC LHNPC YJNPC NPCIL Operator NDNP NPCIL SE,plc 917 Net 1024 1024 1021 917 440 Net 1018 1119 1119 1086 1000 Gross 471 1080 1000 Gross Capacity (MW) 2905 2905 2905 3000 Capacity (MW) Thermal 2905 3000 1375 Thermal PWR PWR PWR Type CPR-1000 CPR-1000 CPR-1000 VVER V-412 Type Model PWR PWR PWR PWR Reactor Reactor Name NINGDE-2 KUDANKULAM-2 MOCHOVCE-3 Name HONGYANHE-1 HONGYANHE-2 YANGJIANG-1 KUDANKULAM-1 Code CN -19 IN -26 SK -10 Code CN -16 CN -17 CN -22 IN -25 Country TABLE 11. SCHEDULED CONNECTIONS TO THE GRID DURING 2014 Country TABLE 10. CONNECTIONS TO THE GRID DURING 2013 CHINA INDIA SLOVAKIA Note: During 2014, 3 reactors (2375 MW) are expected to achieve connection grid. CHINA INDIA Note: During 2013, 4 reactors (3986 MW) were newly connected to the grid.

23 Expected construction Expected start 2014-2 — — — — — — — — 2014-10 — — — — — — — — — — — — — — — — — — NSSS supplier CNEA NPIC NPIC WH WH DEC DEC DEC WH/MHI WH/MHI Operator CNEA FQNP FQNP SDNPC SDNPC HONGYANH LHNPC LHNPC SMNPC SMNPC FSNPC FSNPC 0 0 25 900 610 610 800 800 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1250 1250 1250 1250 1000 1000 29 650 650 860 860 1080 1087 1087 1253 1253 1080 1080 1250 1250 Capacity (MW) 100 2905 1930 1930 2905 2905 3415 3415 2905 2905 3400 3400 2100 2100 Thermal Gross Net CAREM Prototyp CAREM CPR-1000 ACP-1000 ACP-1000 AP-1000 AP-1000 CPR-1000 CPR-1000 AP-1000 AP-1000 BN-800 BN-800 FBR FBR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model Reactor CAREM25 BAMAOSHAN CHANGJIANG-3 CHANGJIANG-4 FANGCHENGGANG-3 FANGCHENGGANG-4 FANGCHENGGANG-5 FANGCHENGGANG-6 FUQING-5 FUQING-6 HAIYANG-3 HAIYANG-4 HONGSHIDING-1 HONGSHIDING-2 HONGYANHE-5 HONGYANHE-6 JIYANG-1 JIYANG-2 JIYANG-3 JIYANG-4 PENGZE-1 PENGZE-2 PENGZE-3 PENGZE-4 SANMEN-3 SANMEN-4 SANMING-1 SANMING-2 Code Name AR -4 AR -72 CN -53 CN -54 CN -57 CN -58 CN -59 CN -60 CN -49 CN -50 CN -76 CN -77 CN -51 CN -52 CN -80 CN -81 CN -65 CN -66 CN -67 CN -68 CN -61 CN -62 CN -63 CN -64 CN -78 CN -79 CN -70 CN -71 CN Country TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN ON 31 DEC. 2013 2013 DEC. 31 ON KNOWN AS CONSTRUCTION FOR PLANNED REACTORS 12. TABLE ARGENTINA CHINA

24 Expected construction Expected start — — — — — — — — — — — — — — — — — — — — — — — — — — NSSS supplier DEC DEC DEC DEC TBD ASE H/G MHI MHI ROSATOM ROSATOM ROSATOM Operator JNPC JNPC LNPC LNPC NPCIL NPCIL NPPDCO NPPDCO NPPDCO CHUBU TEPCO TEPCO TOHOKU CHUGOKU CHUGOKU KYUSHU JAPCO JAPCO REA REA REA REA 0 0 0 0 0 917 917 915 915 330 Net 1000 1000 1000 1000 1350 1343 1343 1067 1325 1325 1590 1538 1538 1109 1115 1115 360 1080 1080 1080 1080 1000 1000 1000 1000 1400 1385 1385 1373 1373 1590 1538 1538 1194 1255 1255 1220 Gross Capacity (MW) 2905 2905 2905 2905 3000 3000 3000 3000 1113 3926 3926 3926 3926 3926 4466 4466 4466 3200 3300 3300 3000 Thermal CNP-1000 CNP-1000 CPR-1000 CPR-1000 V-412 VVER V-412 VVER V-446 VVER - IR-360 ABWR ABWR ABWR ABWR ABWR ABWR APWR APWR APWR V-491 VVER V-510 VVER V-510 VVER BN-1200 FBR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR BWR BWR BWR BWR PWR PWR PWR PWR PWR PWR Type Model Reactor Name TAOHUAJIANG-1 TAOHUAJIANG-2 TIANWAN-5 TIANWAN-6 XIANNING-1 XIANNING-2 XUDABU-1 XUDABU-2 KUDANKULAM-3 KUDANKULAM-4 BUSHEHR-2 BUSHEHR-3 DARKHOVAIN HAMAOKA-6 (TEPCO) DORI-1 HIGASHI (TEPCO) DORI-2 HIGASHI (TOHOKU) DORI-2 HIGASHI KAMINOSEKI-1 KAMINOSEKI-2 SENDAI-3 TSURUGA-3 TSURUGA-4 BALTIC-2 BASHKIR-1 BASHKIR-2 BELOYARSK-5 Code CN -55 CN -56 CN -74 CN -75 CN -47 CN -48 CN -82 CN -83 CN IN -35 IN -36 -2 IR -5 IR -9 IR -76 JP -69 JP -74 JP -72 JP -62 JP -63 JP -75 JP -67 JP -68 JP -171 RU -202 RU -203 RU -207 RU Country TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN ON 31 DEC. 2013 — continued — 2013 DEC. 31 ON KNOWN AS CONSTRUCTION FOR PLANNED REACTORS 12. TABLE INDIA REP. ISL. IRAN, JAPAN RUSSIA

25 Expected construction Expected start — — — — — — — — — — — — — — — — — — 2014-6 2015-6 — — — — — — — — NSSS supplier ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM KEPCO KEPCO AREVA WH Operator REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA ENEC ENEC PROGRESS Net 1115 1115 1100 1100 1115 1115 1115 1115 1085 1085 1115 1115 1115 1115 1115 1115 1115 1115 1345 1345 1600 1600 1700 1700 1520 1117 1117 1117 1255 1255 1200 1200 1255 1255 1255 1255 1170 1170 1255 1255 1255 1255 1255 1255 1220 1220 1400 1400 1720 1720 1600 1250 1250 1250 Gross Capacity (MW) 3300 3300 3200 3200 3300 3300 3300 3300 3200 3200 3300 3300 3300 3300 3300 3200 3000 3000 3983 3983 4300 4300 4500 3750 3750 3750 Thermal VVER V-510 VVER V-510 VVER - - V-510 VVER V-510 VVER V-510 VVER V-510 VVER V-491 VVER V-491 VVER V-510 VVER V-510 VVER V-510 VVER V-510 VVER BN-1200 BN-1200 APR-1400 APR-1400 EPR US-EPR US-APWR US-APWR ESBWR AP-1000 AP-1000 AP-1000 FBR FBR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR PWR PWR PWR Type Model Reactor Name CENTRAL-1 CENTRAL-2 2-1 KOLA 2-2 KOLA 2-1 KURSK 2-2 KURSK 2-3 KURSK 2-4 KURSK 2-3 LENINGRAD 2-4 LENINGRAD NIZHEGORODSK-1 NIZHEGORODSK-2 SEVERSK-1 SEVERSK-2 2-1 SMOLENSK 2-2 SMOLENSK URALS-1 SOUTH URALS-2 SOUTH BARAKAH-3 BARAKAH-4 BEND BELL CLIFFS-3 CALVERT PEAK-3 COMANCHE PEAK-4 COMANCHE FERMI-3 HARRIS-2 HARRIS-3 COUNTY-1 LEVY Code RU -177 RU -178 RU -175 RU -176 RU -166 RU -189 RU -190 RU -191 RU -165 RU -167 RU -181 RU -182 RU -187 RU -188 RU -198 RU -199 RU -204 RU -205 RU -03 AE -04 AE -5039 US -5016 US -5034 US -5035 US -5033 US -5022 US -5023 US -5029 US Country TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN ON 31 DEC. 2013 — continued — 2013 DEC. 31 ON KNOWN AS CONSTRUCTION FOR PLANNED REACTORS 12. TABLE UAE USA

26 Expected construction Expected start — — — — — — — — — — NSSS supplier WH ROSATOM ROSATOM Operator EVN EVN Net 1117 1500 1350 1350 1117 1117 1117 1117 1000 1000 1250 1400 1400 1250 1250 1250 1250 Gross Capacity (MW) 3750 3926 3926 3750 3750 3750 3750 Thermal AP-1000 US-APWR ABWR ABWR AP-1000 AP-1000 AP-1000 AP-1000 PWR PWR BWR BWR PWR PWR PWR PWR PWR PWR Type Model Reactor Name LEVY COUNTY-2 LEVY ANNA-3 NORTH TEXAS-3 SOUTH TEXAS-4 SOUTH POINT-6 POINT-7 TURKEY III-1 LEE STATES WILLIAM III-2 LEE STATES WILLIAM 1 DINH PHUOC 2 DINH PHUOC Code US -5030 US -5017 US -5012 US -5013 US -5040 US -5041 US -5018 US -5019 US -1 VN -2 VN Country TABLE 12. REACTORS PLANNED FOR CONSTRUCTION AS KNOWN ON 31 DEC. 2013 — continued — 2013 DEC. 31 ON KNOWN AS CONSTRUCTION FOR PLANNED REACTORS 12. TABLE VIET NAM VIET planned. as known were MW) (94423 reactors 92 2013, December 31 of as Status Note:

27 Commercial operation — — 2016-1 — 2015-12 — — — — — — 2015-7 — — — — — — — — — — — — — — Grid connection — — — — — — — — — — — — — — — — — 2014-1 — — — — — — — — First criticality 2014-5 — — — — — — — — — — — — — — — — 2013-12 — — — — — — — — Construction start 1981-7 2013-11 2010-6 2010-4 2010-11 2010-7 2010-12 2008-12 2009-7 2008-11 2009-6 2010-12 2012-11 2009-9 2010-6 2009-3 2009-8 2008-11 2010-1 2010-9 2009-4 2009-12 2012-12 2009-11 2010-4 2012-12 NSSS supplier SIEMENS ASE KWU DEC DEC DEC DEC NPIC NPIC NPIC NPIC NPIC NPIC WH WH DEC DEC SHE CFHI CFHI WH/MHI WH/MHI Tsinghua AREVA AREVA IZ Operator NASA DSAE ELETRONU HNPC HNPC GFNPC GFNPC QNPC QNPC FQNP FQNP FQNP FQNP SDNPC SDNPC LHNPC LHNPC NDNP NDNP NDNP SMNPC SMNPC HSNPC TNPC TNPC JNPC 692 610 610 200 990 Net 1109 1245 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1018 1018 1018 1000 1000 1660 1660 745 650 650 211 1194 1350 1080 1080 1080 1080 1080 1080 1080 1080 1250 1250 1080 1080 1080 1080 1080 1250 1250 1750 1750 1060 Gross Capacity (MW) 500 2160 3200 3765 1930 1930 2905 2905 2905 2905 2905 2905 2905 2905 3451 3415 2905 2905 2905 2905 2905 3400 3400 4590 4590 3000 Thermal PHWR KWU VVER V-491 PRE KONVOI CNP-600 CNP-600 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 AP-1000 AP-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 CPR-1000 AP-1000 AP-1000 HTR-PM EPR-1750 EPR-1750 VVER V-428M PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model HTGR PHWR Reactor Name ATUCHA-2 BELARUSIAN-1 ANGRA-3 CHANGJIANG-1 CHANGJIANG-2 FANGCHENGGANG-1 FANGCHENGGANG-2 FANGJIASHAN-1 FANGJIASHAN-2 FUQING-1 FUQING-2 FUQING-3 FUQING-4 HAIYANG-1 HAIYANG-2 HONGYANHE-3 HONGYANHE-4 NINGDE-2 NINGDE-3 NINGDE-4 SANMEN-1 SANMEN-2 SHIDAO BAY-1 TAISHAN-1 TAISHAN-2 TIANWAN-3 Code AR -3 BY -1 BR -3 CN -36 CN -37 CN -38 CN -39 CN -24 CN -25 CN -20 CN -21 CN -42 CN -43 CN -30 CN -31 CN -26 CN -27 CN -19 CN -34 CN -35 CN -28 CN -29 CN -44 CN -32 CN -33 CN -45 Country TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2013 ARGENTINA BELARUS BRAZIL CHINA

28 Commercial operation — — — — — — 2016-1 — 2015-6 2015-12 2014-12 — 2016-6 2016-12 — — 2016-6 2017-6 — — — 2016-12 2017-10 2019-12 Grid connection — — — — — — — 2016-12 2015-3 2015-9 — — 2016-3 2016-9 — — — — — — — 2016-9 2017-7 — First criticality — — — — — — — 2016-12 2014-12 2015-6 — — 2015-12 2016-6 — — — — — — — 2016-8 2017-6 — Construction start 2013-9 2009-6 2010-11 2012-11 2013-9 2013-12 2005-8 2007-12 2010-11 2010-11 2002-7 2004-10 2011-7 2011-9 2010-5 2007-10 2012-7 2013-6 2008-10 2009-8 2008-9 2011-5 2011-12 2007-4 NSSS supplier IZ CFHI CFHI CFHI CFHI CFHI AREVA AREVA NPCIL NPCIL MAEP NPCIL NPCIL H/G HITACHI DHICKOPC DHICKOPC DHICKOPC DHICKOPC DHICKOPC CNNC CNNC ROSATOM Operator JNPC YJNPC YJNPC YJNPC YJNPC YJNPC TVO EDF NPCIL NPCIL NPCIL BHAVINI NPCIL NPCIL EPDC CHUGOKU KHNP KHNP KHNP KHNP KHNP PAEC PAEC REA 0 32 990 630 630 917 470 630 630 950 315 315 Net 1000 1000 1000 1000 1000 1600 1630 1325 1340 1340 1400 1340 35 700 700 500 700 700 340 340 1060 1080 1080 1080 1087 1087 1720 1650 1000 1383 1373 1400 1400 1400 1400 1000 Gross Capacity (MW) 999 999 150 3000 2905 2905 2905 2905 2905 4300 4300 2166 2166 3000 1253 2177 2177 3926 3926 3938 3983 3983 3938 2825 Thermal VVER V-428M CPR-1000 CPR-1000 CPR-1000 ACPR-1000 ACPR-1000 EPR EPR PHWR-700 PHWR-700 VVER V-412 Prototype Horizontal Pre Horizontal Pre ABWR ABWR APR-1400 APR-1400 APR-1400 APR-1400 OPR-1000 CNP-300 CNP-300 KLT-40S 'Float FBR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model PHWR PHWR PHWR PHWR Reactor Name TIANWAN-4 YANGJIANG-2 YANGJIANG-3 YANGJIANG-4 YANGJIANG-5 YANGJIANG-6 OLKILUOTO-3 FLAMANVILLE-3 KAKRAPAR-3 KAKRAPAR-4 KUDANKULAM-2 PFBR RAJASTHAN-7 RAJASTHAN-8 OHMA SHIMANE-3 SHIN-HANUL-1 SHIN-HANUL-2 SHIN-KORI-3 SHIN-KORI-4 SHIN-WOLSONG-2 CHASNUPP-3 CHASNUPP-4 -1 Code CN -73 CN -23 CN -40 CN -41 CN -46 CN -69 FI -5 FR -74 IN -30 IN -31 IN -26 IN -29 IN -21 IN -22 JP -66 JP -65 KR -27 KR -28 KR -25 KR -26 KR -24 PK -4 PK -5 RU -151 Country TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2013 — continued FINLAND FRANCE INDIA JAPAN KOREA, REP. OF PAKISTAN RUSSIA

29 Commercial operation 2019-12 2019-12 2015-12 2016-12 2018-12 2015-12 2017-12 2015-12 2018-12 2014-12 2015-12 2017-6 — — — — — — — — — — Grid connection — 2018-12 — — — — — — — 2014-10 2015-10 2016-11 2017-11 2015-1 2016-1 — — — — 2015-8 — — First criticality — — — — — — — — — 2014-10 2015-10 2016-10 2017-10 — — — — — — — — — Construction start 2007-4 2012-2 2006-7 2008-10 2010-4 2008-6 2009-7 2009-9 2010-6 1987-1 1987-1 2012-7 2013-5 1986-3 1987-2 2013-3 2013-11 2013-3 2013-11 1972-12 1999-3 1999-8 NSSS supplier ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM SKODA SKODA KEPCO KEPCO ASE ASE WH WH WH WH WH GE GE Operator REA REA REA REA REA REA REA REA REA SE,plc SE,plc ENEC ENEC NNEGC NNEGC SCE&G SCE&G SOUTHERN SOUTHERN TVA TPC TPC 32 789 440 440 950 950 Net 1109 1085 1085 1114 1114 1011 1011 1345 1345 1117 1117 1117 1117 1165 1300 1300 35 864 471 471 1194 1170 1170 1199 1199 1100 1100 1400 1400 1000 1000 1250 1250 1250 1250 1218 1350 1350 Gross Capacity (MW) 150 3200 2100 3200 3200 3200 3200 3000 3000 1375 1375 3983 3983 3200 3200 3400 3400 3400 3400 3425 3926 3926 Thermal KLT-40S 'Float VVER V-491 BN-800 VVER V-491 VVER V-491 VVER V-392M VVER V-392M VVER V-320 VVER V-320 VVER V-213 VVER V-213 APR-1400 APR-1400 VVER V-392B VVER V-392B AP-1000 AP-1000 AP-1000 AP-1000 W (4-loop) (IC ABWR ABWR FBR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR Type Model Reactor Name AKADEMIK LOMONOSOV-2 BALTIC-1 BELOYARSK-4 LENINGRAD 2-1 LENINGRAD 2-2 NOVOVORONEZH 2-1 NOVOVORONEZH 2-2 ROSTOV-3 ROSTOV-4 MOCHOVCE-3 MOCHOVCE-4 BARAKAH-1 BARAKAH-2 KHMELNITSKI-3 KHMELNITSKI-4 SUMMER-2 SUMMER-3 VOGTLE-3 VOGTLE-4 WATTS BAR-2 LUNGMEN 1 LUNGMEN 2 Code RU -152 RU -170 RU -116 RU -163 RU -164 RU -161 RU -162 RU -63 RU -64 SK -10 SK -11 AE -01 AE -02 UA -51 UA -52 US -5027 US -5028 US -5025 US -5026 US -391 TW -7 TW -8 Country TABLE 13. REACTORS UNDER CONSTRUCTION, 31 DEC. 2013 — continued SLOVAKIA UAE UKRAINE USA Note: Status as of 31 December 2013, 72 reactors (69367 MW) were under construction, including 2 units (2600 in Taiwan, China. TAIWAN, CN TAIWAN, CN

30 ------DH DH Non- applics electrical 85.1 75.2 70.7 89.7 90.5 73.7 85.8 86.5 77.5 88.8 78.4 91.8 88.0 87.6 77.4 87.9 75.1 78.6 93.9 88.6 94.4 87.4 92.6 86.2 2013 2009- UCF % 84.8 75.1 68.8 89.5 90.4 73.4 85.8 85.0 77.2 88.1 78.4 91.5 87.5 87.0 77.3 87.8 74.8 78.3 93.8 88.5 94.3 87.3 91.5 85.3 2013 2009- EAF % Commercial operation 1974-6 1984-1 1980-5 1975-2 1975-12 1982-10 1985-7 1975-10 1983-6 1985-9 1985-1 2001-2 1988-12 1993-12 1977-9 1977-9 1978-2 1979-1 1985-3 1984-9 1986-4 1987-5 1992-11 1990-10 Grid connection 1974-3 1983-4 1980-1 1974-8 1975-8 1982-6 1985-4 1975-3 1982-10 1985-6 1982-4 2000-7 1987-11 1991-8 1977-1 1976-9 1977-12 1978-12 1984-12 1984-6 1986-2 1987-3 1990-12 1990-1 Construction start 1968-6 1974-4 1975-7 1969-7 1971-9 1975-1 1978-12 1970-6 1976-4 1978-11 1971-5 1976-1 1980-7 1982-4 1971-6 1970-12 1972-7 1972-9 1978-6 1978-1 1979-5 1979-8 1982-4 1981-9 NSSS supplier SIEMENS AECL FAEA ACECOWEN ACECOWEN FRAMACEC ACECOWEN ACLF FRAMACEC ACECOWEN WH KWU AEE AEE OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL Operator NASA NASA ANPPCJSC ELECTRAB ELECTRAB ELECTRAB ELECTRAB ELECTRAB ELECTRAB ELECTRAB ELETRONU ELETRONU KOZNPP KOZNPP BRUCEPOW BRUCEPOW BRUCEPOW BRUCEPOW BRUCEPOW BRUCEPOW BRUCEPOW BRUCEPOW OPG OPG 335 600 375 433 433 962 609 953 953 772 734 730 730 817 817 817 817 878 878 Net 1006 1039 1008 1046 1275 357 648 408 454 454 640 824 786 805 805 872 891 872 845 934 934 1056 1090 1009 1055 1094 1350 1000 1000 Gross 1179 2015 1375 1311 1311 3054 2988 2873 3064 3000 1882 3764 3000 3000 2575 2456 2832 2832 2832 2690 2832 2690 2776 2776 Capacity (MW) Thermal PHWR KWU CANDU 6 VVER V-270 WE (2 loops) WE (2 loops) WE 3-loops WE 3-loops Framatome 3 lo WE 3-loops WE 3-loops 2-loop WE PRE KONVOI VVER V-320 VVER V-320 CANDU 791 CANDU 791 CANDU 750A CANDU 750A CANDU 750B CANDU 750B CANDU 750B CANDU 750B CANDU 850 CANDU 850 PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR Reactor Name ATUCHA-1 EMBALSE ARMENIAN-2 DOEL-1 DOEL-2 DOEL-3 DOEL-4 TIHANGE-1 TIHANGE-2 TIHANGE-3 ANGRA-1 ANGRA-2 KOZLODUY-5 KOZLODUY-6 BRUCE-1 BRUCE-2 BRUCE-3 BRUCE-4 BRUCE-5 BRUCE-6 BRUCE-7 BRUCE-8 DARLINGTON-1 DARLINGTON-2 Code AR -1 AR -2 AM -19 BE -2 BE -4 BE -5 BE -7 BE -3 BE -6 BE -8 BR -1 BR -2 BG -5 BG -6 CA -8 CA -9 CA -10 CA -11 CA -18 CA -19 CA -20 CA -21 CA -22 CA -23 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 ARGENTINA ARMENIA BELGIUM BRAZIL BULGARIA CANADA Note: The column "Non-electrical applications" indicates the use of facility to provide: DH district heating.

31 ------Non- applics electrical 90.5 86.2 67.5 64.3 71.2 80.0 83.5 80.5 16.1 90.1 92.9 99.5 90.3 91.0 82.7 87.3 99.9 83.8 86.8 88.9 90.0 92.1 93.7 88.0 85.1 85.5 2013 2009- UCF % 89.6 85.4 67.2 64.0 70.3 79.4 82.9 79.9 16.1 89.9 92.8 97.6 90.2 90.9 82.5 86.9 99.9 83.8 86.8 88.8 90.0 92.1 93.6 87.8 85.1 85.5 2013 2009- EAF % Commercial operation 1993-2 1993-6 1971-7 1973-6 1983-5 1984-2 1985-1 1986-2 1983-2 — 1994-2 1994-5 2013-6 — 2002-5 2003-1 2010-9 2011-8 2013-4 2002-4 2004-5 2010-10 2011-12 2002-12 2003-7 1994-4 2007-5 2007-8 — Grid connection 1992-12 1993-4 1971-4 1973-5 1982-12 1983-11 1984-11 1986-1 1982-9 2011-7 1993-8 1994-2 2013-2 2013-11 2002-2 2002-9 2010-7 2011-5 2012-12 2002-2 2004-3 2010-8 2011-11 2002-11 2003-6 1991-12 2006-5 2007-5 2013-12 Construction start 1984-9 1985-7 1966-6 1968-5 1974-11 1975-10 1976-3 1976-9 1975-5 2000-5 1987-8 1988-4 2007-8 2008-3 1997-5 1997-11 2005-12 2006-6 2008-2 1996-6 1997-4 2006-4 2007-1 1998-6 1998-9 1985-3 1999-10 2000-9 2008-12 NSSS supplier OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL OH/AECL AECL IZ FRAM FRAM DEC DEC FRAM FRAM DEC DEC DEC CNNC CNNC CNNC CNNC AECL AECL CNNC IZ IZ CFHI Operator OPG OPG OPG OPG OPG OPG OPG OPG NBEPC CIAE DNMC DNMC LHNPC LHNPC DNMC DNMC DNMC DNMC NDNP NPQJVC NPQJVC NPQJVC NPQJVC TQNPC TQNPC CNNO JNPC JNPC YJNPC 20 878 878 515 515 516 516 516 516 660 944 944 950 950 610 610 610 610 650 650 298 990 990 Net 1024 1024 1007 1007 1018 1000 25 934 934 542 542 540 540 540 540 705 984 984 990 990 650 650 650 650 700 700 310 1119 1119 1080 1080 1080 1060 1060 1086 Gross 65 966 2776 2776 1744 1744 1744 1744 1744 1744 2180 2905 2905 2905 2905 2905 2905 2905 2905 2905 1930 1930 1930 1930 2064 2064 3000 3000 2905 Capacity (MW) Thermal CANDU 850 CANDU 850 CANDU 500A CANDU 500A CANDU 500B CANDU 500B CANDU 500B CANDU 500B CANDU 6 BN-20 M310 M310 CPR-1000 CPR-1000 M310 M310 CPR-1000 CPR-1000 CPR-1000 CNP-600 CNP-600 CNP-600 CNP 600 CANDU 6 CANDU 6 CNP-300 VVER V-428 VVER V-428 CPR-1000 FBR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR Reactor Name DARLINGTON-3 DARLINGTON-4 PICKERING-1 PICKERING-4 PICKERING-5 PICKERING-6 PICKERING-7 PICKERING-8 POINT LEPREAU CEFR DAYA BAY-1 DAYA BAY-2 HONGYANHE-1 HONGYANHE-2 LING AO-1 LING AO-2 LING AO-3 LING AO-4 NINGDE-1 QINSHAN 2-1 QINSHAN 2-2 QINSHAN 2-3 QINSHAN 2-4 QINSHAN 3-1 QINSHAN 3-2 QINSHAN-1 TIANWAN-1 TIANWAN-2 YANGJIANG-1 Code CA -24 CA -25 CA -4 CA -7 CA -13 CA -14 CA -15 CA -16 CA -17 CN -84 CN -2 CN -3 CN -16 CN -17 CN -6 CN -7 CN -12 CN -13 CN -18 CN -4 CN -5 CN -14 CN -15 CN -8 CN -9 CN -1 CN -10 CN -11 CN -22 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued CHINA

32 ------DH DH Non- applics electrical 89.6 88.4 84.9 86.1 79.6 80.9 91.8 92.7 94.6 94.3 81.1 78.1 76.4 78.7 85.7 77.9 74.7 53.9 83.4 78.3 76.7 81.3 72.9 78.2 69.0 79.9 75.4 78.2 2013 2009- UCF % 89.1 87.7 83.9 85.3 79.4 80.5 91.3 91.9 93.9 93.4 79.8 74.6 73.0 75.5 82.4 74.3 72.5 48.8 80.7 75.1 74.4 78.2 71.4 76.5 64.1 77.7 72.9 74.1 2013 2009- EAF % Commercial operation 1985-5 1986-3 1986-12 1987-7 2002-6 2003-4 1977-5 1981-1 1979-10 1982-7 1988-6 1989-1 1981-12 1983-2 1983-11 1983-10 1979-3 1979-3 1979-7 1980-1 1987-4 1988-2 1991-2 1992-1 1984-2 1984-8 1987-3 1988-4 Grid connection 1985-2 1986-1 1986-11 1987-6 2000-12 2002-12 1977-2 1980-11 1978-9 1980-2 1987-10 1988-7 1981-6 1982-7 1983-8 1983-5 1978-5 1978-9 1979-3 1979-7 1986-11 1987-9 1990-7 1991-5 1982-11 1983-11 1986-10 1987-11 Construction start 1979-1 1979-1 1979-3 1979-3 1987-2 1987-2 1971-5 1972-8 1974-2 1975-11 1980-5 1980-8 1977-1 1977-1 1978-4 1978-4 1972-11 1973-9 1974-6 1974-7 1979-10 1980-7 1982-6 1983-9 1977-3 1977-3 1980-10 1981-2 NSSS supplier SKODA SKODA SKODA SKODA SKODA SKODA AEE AEE ASEASTAL ASEASTAL FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM Operator CEZ CEZ CEZ CEZ CEZ CEZ FORTUMPH FORTUMPH TVO TVO EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF 468 471 468 471 496 496 880 880 910 910 910 910 910 910 880 880 905 905 905 905 Net 1003 1003 1310 1310 1300 1300 1300 1300 500 500 500 500 520 520 910 910 951 951 951 951 945 945 917 917 954 954 954 954 1056 1056 1363 1363 1362 1362 1362 1362 Gross 1444 1444 1444 1444 3120 3120 1500 1500 2500 2500 3817 3817 2785 2785 2785 2785 2785 2785 2785 2785 3817 3817 3817 3817 2785 2785 2785 2785 Capacity (MW) Thermal VVER V-213 VVER V-213 VVER V-213 VVER V-213 VVER V-320 VVER V-320 VVER V-213 VVER V-213 BWR-2500 BWR-2500 P4 REP 1300 P4 REP 1300 CP1 CP1 CP1 CP1 CP0 CP0 CP0 CP0 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 CP2 CP2 CP2 CP2 PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model Reactor Name DUKOVANY-1 DUKOVANY-2 DUKOVANY-3 DUKOVANY-4 TEMELIN-1 TEMELIN-2 LOVIISA-1 LOVIISA-2 OLKILUOTO-1 OLKILUOTO-2 BELLEVILLE-1 BELLEVILLE-2 BLAYAIS-1 BLAYAIS-2 BLAYAIS-3 BLAYAIS-4 BUGEY-2 BUGEY-3 BUGEY-4 BUGEY-5 CATTENOM-1 CATTENOM-2 CATTENOM-3 CATTENOM-4 CHINON B-1 CHINON B-2 CHINON B-3 CHINON B-4 Code CZ -4 CZ -5 CZ -8 CZ -9 CZ -23 CZ -24 FI -1 FI -2 FI -3 FI -4 FR -54 FR -55 FR -32 FR -33 FR -34 FR -35 FR -13 FR -14 FR -15 FR -16 FR -50 FR -53 FR -60 FR -65 FR -40 FR -41 FR -56 FR -57 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued CZECH REP. FINLAND FRANCE Note: The column "Non-electrical applications" indicates the use of facility to provide: DH district heating.

33 ------Non- applics electrical 78.4 81.1 78.5 83.2 79.6 77.9 84.5 78.3 77.2 81.7 78.6 85.2 72.1 62.0 79.6 84.1 85.3 88.8 69.4 73.7 69.9 84.3 81.3 84.2 83.4 80.7 82.3 86.2 67.6 82.6 2013 2009- UCF % 77.6 72.7 75.5 74.1 74.4 74.2 79.2 74.3 74.4 80.2 76.2 79.8 71.3 58.6 76.9 81.3 83.9 87.5 67.3 72.1 68.2 82.6 79.9 83.8 79.3 79.8 77.0 84.1 65.7 81.1 2013 2009- EAF % Commercial operation 2000-5 2000-9 2002-1 2002-4 1984-4 1985-4 1984-9 1985-2 1980-9 1981-2 1981-5 1981-11 1978-1 1978-4 1986-12 1987-3 1991-2 1994-3 1980-11 1980-12 1981-6 1981-10 1985-1 1985-10 1988-2 1989-5 1985-12 1985-12 1986-2 1986-6 Grid connection 1996-8 1997-4 1997-12 1999-12 1983-4 1984-9 1984-5 1984-10 1980-3 1980-12 1981-1 1981-8 1977-4 1977-10 1985-12 1986-7 1990-6 1993-6 1980-3 1980-8 1980-12 1981-6 1984-8 1985-8 1987-10 1988-12 1984-6 1984-9 1985-9 1986-4 Construction start 1984-1 1985-12 1988-10 1991-4 1978-8 1978-11 1979-4 1979-10 1975-2 1975-4 1975-9 1975-12 1971-9 1972-2 1979-12 1980-5 1982-11 1984-10 1975-2 1975-3 1975-12 1976-4 1979-10 1979-10 1981-5 1982-1 1977-8 1978-1 1979-2 1980-2 NSSS supplier FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM Operator EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF 915 915 915 915 890 890 890 890 880 880 910 910 910 910 910 910 Net 1500 1500 1495 1495 1330 1330 1310 1310 1310 1310 1330 1330 1330 1330 956 956 956 956 937 937 937 937 920 920 951 951 951 951 951 951 1560 1560 1561 1561 1382 1382 1363 1363 1363 1363 1382 1382 1382 1382 Gross 4270 4270 4270 4270 2785 2785 2785 2785 2785 2785 2785 2785 2785 2785 3817 3817 3817 3817 2785 2785 2785 2785 2785 2785 3817 3817 3817 3817 3817 3817 Capacity (MW) Thermal N4 REP 1450 N4 REP 1450 N4 REP 1450 N4 REP 1450 CP2 CP2 CP2 CP2 CP1 CP1 CP1 CP1 CP0 CP0 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 CP1 CP1 CP1 CP1 CP1 CP1 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model Reactor Name CHOOZ B-1 CHOOZ B-2 CIVAUX-1 CIVAUX-2 CRUAS-1 CRUAS-2 CRUAS-3 CRUAS-4 DAMPIERRE-1 DAMPIERRE-2 DAMPIERRE-3 DAMPIERRE-4 FESSENHEIM-1 FESSENHEIM-2 FLAMANVILLE-1 FLAMANVILLE-2 GOLFECH-1 GOLFECH-2 GRAVELINES-1 GRAVELINES-2 GRAVELINES-3 GRAVELINES-4 GRAVELINES-5 GRAVELINES-6 NOGENT-1 NOGENT-2 PALUEL-1 PALUEL-2 PALUEL-3 PALUEL-4 Code FR -62 FR -70 FR -72 FR -73 FR -42 FR -43 FR -44 FR -45 FR -22 FR -29 FR -30 FR -31 FR -11 FR -12 FR -46 FR -47 FR -61 FR -68 FR -20 FR -21 FR -27 FR -28 FR -51 FR -52 FR -58 FR -59 FR -36 FR -37 FR -38 FR -39 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued

34 ------DH DH DH Non- applics electrical 79.1 86.8 81.7 79.7 81.1 73.5 77.6 78.2 75.8 84.9 88.5 94.4 84.0 91.3 87.9 89.5 94.3 92.2 86.7 89.2 89.4 85.6 88.7 91.7 93.3 89.0 89.2 2013 2009- UCF % 78.2 84.4 80.3 77.9 76.4 70.2 75.5 76.0 74.9 82.3 88.4 94.4 83.9 90.0 87.9 89.4 94.3 92.0 86.3 89.1 89.3 85.5 88.6 65.4 65.0 66.0 68.9 2013 2009- EAF % Commercial operation 1990-12 1992-11 1986-5 1987-3 1983-8 1983-8 1980-12 1980-12 1981-5 1981-11 1986-12 1988-6 1982-6 1985-2 1984-7 1985-1 1988-4 1989-4 1985-4 1983-8 1984-11 1986-12 1987-11 2000-11 2000-3 2007-5 2011-1 Grid connection 1990-5 1992-2 1985-8 1986-7 1981-1 1981-6 1980-5 1980-8 1981-2 1981-6 1986-10 1988-4 1981-12 1984-9 1984-3 1984-11 1988-1 1989-1 1984-12 1982-12 1984-9 1986-9 1987-8 2000-10 1999-12 2007-4 2011-1 Construction start 1982-9 1984-8 1979-1 1979-7 1976-5 1976-7 1974-11 1974-12 1975-4 1975-5 1976-1 1982-8 1975-1 1976-6 1976-7 1976-7 1982-9 1982-11 1977-7 1974-8 1974-8 1979-10 1979-10 1989-9 1989-12 2002-3 2002-5 NSSS supplier FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM FRAM KWU KWU KWU KWU KWU KWU KWU KWU KWU AEE AEE AEE AEE NPCIL NPCIL NPCIL NPCIL Operator EDF EDF EDF EDF EDF EDF EDF EDF EDF EDF E.ON KLE E.ON KWG KGG KGG E.ON EnKK EnKK PAKS Zrt PAKS Zrt PAKS Zrt PAKS Zrt NPCIL NPCIL NPCIL NPCIL 915 915 915 915 915 915 470 473 473 473 202 202 202 202 Net 1330 1330 1335 1335 1410 1329 1275 1360 1284 1288 1410 1310 1402 956 956 955 955 955 955 500 500 500 500 220 220 220 220 1382 1382 1381 1381 1480 1400 1345 1430 1344 1344 1485 1400 1468 Gross 801 801 800 800 3817 3817 3817 3817 2785 2785 2785 2785 2785 2785 3900 3850 3765 3900 3840 3840 3950 3850 3950 1485 1485 1485 1485 Capacity (MW) Thermal P4 REP 1300 P4 REP 1300 P4 REP 1300 P4 REP 1300 CP2 CP2 CP1 CP1 CP1 CP1 PWR Konvoi PWR PWR BWR-72 BWR-72 Konvoi Konvoi PWR VVER V-213 VVER V-213 VVER V-213 VVER V-213 Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR PWR PWR PWR PWR PWR PWR PWR Type Model PHWR PHWR PHWR PHWR Reactor Name PENLY-1 PENLY-2 ST. ALBAN-1 ST. ALBAN-2 ST. LAURENT B-1 ST. LAURENT B-2 TRICASTIN-1 TRICASTIN-2 TRICASTIN-3 TRICASTIN-4 BROKDORF EMSLAND GRAFENRHEINFELD GROHNDE GUNDREMMINGEN-B GUNDREMMINGEN-C ISAR-2 NECKARWESTHEIM-2 PHILIPPSBURG-2 PAKS-1 PAKS-2 PAKS-3 PAKS-4 KAIGA-1 KAIGA-2 KAIGA-3 KAIGA-4 Code FR -63 FR -64 FR -48 FR -49 FR -17 FR -23 FR -18 FR -19 FR -25 FR -26 DE -32 DE -33 DE -23 DE -27 DE -26 DE -28 DE -31 DE -44 DE -24 HU -1 HU -2 HU -3 HU -4 IN -13 IN -14 IN -15 IN -16 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued GERMANY HUNGARY INDIA Note: The column "Non-electrical applications" indicates the use of facility to provide: DH district heating.

35 ------DS DS PH PH PH PH DS DS Non- applics electrical 0.0 57.2 92.4 90.0 83.2 88.2 61.2 80.1 93.5 91.4 92.6 79.0 79.3 81.1 91.0 87.9 95.1 35.3 39.3 41.2 34.7 50.0 36.6 34.8 51.3 32.0 65.8 2013 2009- UCF % 0.0 57.2 74.9 60.5 51.6 56.2 38.5 78.6 84.6 83.1 92.2 78.4 79.0 80.4 77.8 68.0 95.1 34.2 38.2 40.0 33.6 50.0 36.6 34.8 51.3 32.0 63.7 2013 2009- EAF % Commercial operation 1993-5 1995-9 2014-4 1984-1 1986-3 1991-1 1992-7 1973-12 1981-4 2000-6 2000-12 2010-2 2010-3 1969-10 1969-10 2006-8 2005-9 2013-9 1982-4 1984-2 1985-6 1987-8 1975-10 1981-3 1994-3 1997-7 1987-8 1993-9 Grid connection 1992-11 1995-3 2013-10 1983-7 1985-9 1989-7 1992-1 1972-11 1980-11 2000-3 2000-11 2009-12 2010-3 1969-4 1969-5 2006-6 2005-6 2011-9 1981-7 1983-6 1984-12 1986-12 1975-2 1980-6 1993-6 1996-11 1987-1 1993-1 Construction start 1984-12 1985-4 2002-3 1971-1 1972-10 1976-12 1977-11 1965-8 1968-4 1990-2 1990-10 2002-9 2003-1 1964-10 1964-10 2000-5 2000-3 1975-5 1976-3 1979-5 1981-3 1981-5 1971-9 1977-2 1988-6 1992-7 1983-4 1989-10 NSSS supplier NPCIL NPCIL MAEP NPCIL NPCIL NPCIL NPCIL AECL AECL/DAE NPCIL NPCIL NPCIL NPCIL GE GE NPCIL NPCIL ASE TOSHIBA HITACHI TOSHIBA HITACHI MHI MHI MHI MHI TOSHIBA TOSHIBA Operator NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPCIL NPPDCO TEPCO TEPCO TEPCO TEPCO KYUSHU KYUSHU KYUSHU KYUSHU CHUBU CHUBU 90 202 202 917 205 205 202 202 187 202 202 202 202 150 150 490 490 915 529 529 Net 1067 1067 1067 1067 1127 1127 1056 1092 220 220 220 220 220 220 100 200 220 220 220 220 160 160 540 540 559 559 1000 1000 1100 1100 1100 1100 1180 1180 1100 1137 Gross 801 801 801 801 801 801 346 693 801 801 801 801 530 530 3000 1730 1730 3000 3293 3293 3293 3293 1650 1650 3423 3423 3293 3293 Capacity (MW) Thermal Horizontal Pre Horizontal Pre VVER V-412 Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre Horizontal Pre BWR-1, Mark 2 BWR-1, Mark 2 Horizontal Pre Horizontal Pre VVER V-446 BWR-5 BWR-5 BWR-5 BWR-5 M (2-loop) M (2-loop) M (4-loop) M (4-loop) BWR-5 BWR-5 PWR BWR BWR PWR BWR BWR BWR BWR PWR PWR PWR PWR BWR BWR Type Model PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR PHWR Reactor Name KAKRAPAR-1 KAKRAPAR-2 KUDANKULAM-1 MADRAS-1 MADRAS-2 NARORA-1 NARORA-2 RAJASTHAN-1 RAJASTHAN-2 RAJASTHAN-3 RAJASTHAN-4 RAJASTHAN-5 RAJASTHAN-6 TARAPUR-1 TARAPUR-2 TARAPUR-3 TARAPUR-4 BUSHEHR-1 FUKUSHIMA-DAINI-1 FUKUSHIMA-DAINI-2 FUKUSHIMA-DAINI-3 FUKUSHIMA-DAINI-4 GENKAI-1 GENKAI-2 GENKAI-3 GENKAI-4 HAMAOKA-3 HAMAOKA-4 Code IN -9 IN -10 IN -25 IN -5 IN -6 IN -7 IN -8 IN -3 IN -4 IN -11 IN -12 IN -19 IN -20 IN -1 IN -2 IN -23 IN -24 IR -1 JP -25 JP -26 JP -35 JP -38 JP -12 JP -27 JP -45 JP -46 JP -36 JP -49 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued IRAN, ISL. REP. JAPAN Note: The column "Non-electrical applications" indicates the use of facility to provide: DS desalination, PH process heating.

36 ------DS DS DS DS DS Non- applics electrical 0.0 0.0 0.0 53.4 37.2 43.2 49.4 43.4 23.1 23.0 45.5 37.2 32.3 45.1 41.7 33.7 41.8 60.5 68.0 40.1 36.1 38.0 39.6 44.9 31.9 32.3 17.8 42.4 36.8 47.5 2013 2009- UCF % 0.0 0.0 0.0 42.2 37.1 43.1 49.4 43.4 23.1 23.0 45.5 37.2 32.1 44.9 41.7 33.7 41.8 60.4 68.0 30.1 26.7 28.0 39.6 44.9 31.9 32.3 17.8 42.4 36.8 47.5 2013 2009- EAF % Commercial operation 2005-1 2005-12 1977-9 1982-3 1994-12 1985-9 1990-9 1993-8 1994-8 1990-4 1996-11 1997-7 1970-11 1972-7 1976-12 1979-3 1979-12 1991-12 1993-2 1984-6 1995-7 2002-1 1984-7 1985-11 1993-7 2006-3 1974-3 1989-2 1974-11 1975-11 Grid connection 2004-4 2005-3 1977-2 1981-8 1994-3 1985-2 1990-2 1992-12 1993-12 1989-9 1996-1 1996-12 1970-8 1972-4 1976-2 1977-12 1978-10 1991-6 1992-6 1983-11 1994-12 2001-5 1983-9 1985-4 1993-1 2005-7 1973-12 1988-7 1974-3 1975-1 Construction start 2000-7 2000-11 1973-9 1978-8 1990-10 1980-6 1985-11 1989-3 1990-3 1985-6 1992-11 1993-7 1967-2 1968-5 1972-8 1972-10 1972-12 1987-10 1988-6 1980-7 1991-4 1998-1 1979-12 1981-10 1989-7 2001-8 1970-7 1985-2 1970-4 1971-3 NSSS supplier TOSHIBA TOSHIBA MHI MHI MHI TOSHIBA TOSHIBA TOSHIBA HITACHI HITACHI TOSHIBA HITACHI WH MHI MHI WH WH MHI MHI TOSHIBA TOSHIBA TOSHIBA MHI MHI HITACHI HITACHI HITACHI HITACHI WH/MHI MHI Operator CHUBU TOHOKU SHIKOKU SHIKOKU SHIKOKU TEPCO TEPCO TEPCO TEPCO TEPCO TEPCO TEPCO KEPCO KEPCO KEPCO KEPCO KEPCO KEPCO KEPCO TOHOKU TOHOKU TOHOKU KYUSHU KYUSHU HOKURIKU HOKURIKU CHUGOKU CHUGOKU KEPCO KEPCO 538 538 846 320 470 780 498 796 796 846 846 505 439 789 780 780 Net 1325 1067 1067 1067 1067 1067 1067 1315 1315 1120 1120 1127 1127 1108 566 566 890 340 500 826 524 825 825 890 890 530 460 820 826 826 1380 1100 1100 1100 1100 1100 1100 1356 1356 1175 1175 1180 1180 1150 Gross 3926 3293 1650 1650 2660 3293 3293 3293 3293 3293 3926 3926 1031 1456 2440 3423 3423 3423 3423 1593 2436 2436 2660 2660 1593 3926 1380 2436 2440 2440 Capacity (MW) Thermal ABWR BWR-5 M (2-loop) M (2-loop) M (3-loop) BWR-5 BWR-5 BWR-5 BWR-5 BWR-5 ABWR ABWR W (2-loop) M (2-loop) M (3-loop) W (4-loop) W (4-loop) M (4-loop) M (4-loop) BWR-4 BWR-5 BWR-5 M (3-loop) M (3-loop) BWR-5 ABWR BWR-3 BWR-5 M (3-loop) M (3-loop) BWR BWR PWR PWR PWR BWR BWR BWR BWR BWR BWR BWR PWR PWR PWR PWR PWR PWR PWR BWR BWR BWR PWR PWR BWR BWR BWR BWR PWR PWR Type Model Reactor Name HAMAOKA-5 HIGASHI DORI-1 (TOHOKU) IKATA-1 IKATA-2 IKATA-3 KASHIWAZAKI KARIWA-1 KASHIWAZAKI KARIWA-2 KASHIWAZAKI KARIWA-3 KASHIWAZAKI KARIWA-4 KASHIWAZAKI KARIWA-5 KASHIWAZAKI KARIWA-6 KASHIWAZAKI KARIWA-7 MIHAMA-1 MIHAMA-2 MIHAMA-3 OHI-1 OHI-2 OHI-3 OHI-4 ONAGAWA-1 ONAGAWA-2 ONAGAWA-3 SENDAI-1 SENDAI-2 SHIKA-1 SHIKA-2 SHIMANE-1 SHIMANE-2 TAKAHAMA-1 TAKAHAMA-2 Code JP -60 JP -58 JP -23 JP -32 JP -47 JP -33 JP -39 JP -52 JP -53 JP -40 JP -55 JP -56 JP -4 JP -6 JP -14 JP -15 JP -19 JP -50 JP -51 JP -22 JP -54 JP -57 JP -28 JP -37 JP -48 JP -59 JP -7 JP -41 JP -8 JP -13 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued Note: The column "Non-electrical applications" indicates the use of facility to provide: DS desalination.

37 ------DS DS Non- applics electrical 53.5 44.9 30.2 42.3 43.3 54.3 19.8 36.7 91.0 90.6 83.1 90.7 89.5 92.7 89.0 91.3 90.5 57.9 92.4 94.3 76.2 88.9 91.4 90.2 67.4 58.1 55.0 52.3 92.2 2013 2009- UCF % 53.5 44.9 26.3 42.3 43.3 54.3 19.7 36.7 90.6 90.4 82.8 90.5 89.3 92.4 88.8 91.3 90.4 57.9 92.3 94.2 76.1 88.9 91.4 90.1 67.2 58.0 54.8 52.3 92.1 2013 2009- EAF % Commercial operation 1985-1 1985-6 1978-11 1989-6 1991-4 2009-12 1970-3 1987-2 1986-8 1987-6 1995-3 1996-1 2002-5 2002-12 1988-9 1989-9 1998-8 1999-12 2004-7 2005-4 1978-4 1983-7 1985-9 1986-4 2011-2 2012-7 2012-7 1983-4 1997-7 Grid connection 1984-5 1984-11 1978-3 1988-12 1990-8 2009-3 1969-11 1986-6 1986-3 1986-11 1994-10 1995-7 2001-12 2002-9 1988-4 1989-4 1998-1 1998-12 2003-12 2005-1 1977-6 1983-4 1985-1 1985-11 2010-8 2012-1 2012-1 1982-12 1997-4 Construction start 1980-12 1981-3 1973-10 1985-4 1985-6 2004-11 1966-11 1982-11 1981-6 1981-12 1989-12 1990-5 1997-6 1997-11 1983-1 1983-7 1993-7 1993-11 1999-10 2000-9 1972-4 1977-12 1979-10 1980-4 2006-6 2007-6 2007-11 1977-10 1992-6 NSSS supplier MHI MHI GE MHI MHI MHI GE MHI WH WH DHICKAEC DHICKAEC DHICKOPC DHICKOPC FRAM FRAM DHICKOPC DHICKOPC DHICKOPC DHICKOPC WH WH WH WH DHICKOPC DHICKOPC DHICKOPC AECL AECL/DHI Operator KEPCO KEPCO JAPCO HEPCO HEPCO HEPCO JAPCO JAPCO KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP KHNP 830 830 550 550 866 340 960 958 997 997 997 995 960 962 994 998 996 996 576 639 991 657 655 Net 1060 1108 1011 1010 1000 1000 870 870 579 579 912 357 996 993 608 676 687 678 1100 1160 1050 1049 1053 1052 1003 1008 1050 1053 1051 1051 1042 1041 1048 1045 1043 Gross 2660 2660 3293 1650 1650 2660 1070 3411 2787 2787 2825 2825 2825 2825 2785 2775 2825 2825 2815 2825 1729 1882 2912 2912 2825 2825 2825 2061 2061 Capacity (MW) Thermal M (3-loop) M (3-loop) BWR-5 M (2-loop) M (2-loop) M (3-loop) BWR-2 M (4-loop) WH F WH F OPR-1000 OPR-1000 OPR-1000 OPR-1000 France CPI France CPI OPR-1000 OPR-1000 OPR-1000 OPR-1000 WH △60 WH F WH F WH F OPR-1000 OPR-1000 OPR-1000 CANDU 6 CANDU 6 PWR PWR BWR PWR PWR PWR BWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model PHWR PHWR Reactor Name TAKAHAMA-3 TAKAHAMA-4 TOKAI-2 TOMARI-1 TOMARI-2 TOMARI-3 TSURUGA-1 TSURUGA-2 HANBIT-1 HANBIT-2 HANBIT-3 HANBIT-4 HANBIT-5 HANBIT-6 HANUL-1 HANUL-2 HANUL-3 HANUL-4 HANUL-5 HANUL-6 KORI-1 KORI-2 KORI-3 KORI-4 SHIN-KORI-1 SHIN-KORI-2 SHIN-WOLSONG-1 WOLSONG-1 WOLSONG-2 Code JP -29 JP -30 JP -21 JP -43 JP -44 JP -64 JP -3 JP -34 KR -7 KR -8 KR -11 KR -12 KR -17 KR -18 KR -9 KR -10 KR -13 KR -14 KR -19 KR -20 KR -1 KR -2 KR -5 KR -6 KR -21 KR -22 KR -23 KR -3 KR -4 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued KOREA, REP. OF Note: The column "Non-electrical applications" indicates the use of facility to provide: DS desalination.

38 ------DS PH DH DH DH DH DH DH Non- DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH applics electrical 93.3 93.5 74.2 79.4 85.9 84.3 77.4 46.6 94.9 93.6 87.8 92.0 88.6 88.5 77.0 54.8 83.4 85.8 85.3 82.8 87.9 84.2 75.7 83.9 83.8 2013 2009- UCF % 93.3 93.3 73.4 78.8 85.3 84.3 77.4 46.6 94.6 93.0 87.7 91.6 88.4 88.5 76.9 54.8 83.4 85.8 85.3 82.8 87.9 84.2 75.7 83.8 83.5 2013 2009- EAF % Commercial operation 1998-7 1999-10 1990-7 1995-4 1973-10 2000-9 2011-5 1972-12 1996-12 2007-10 1986-5 1988-1 1989-4 1993-12 1981-11 1974-4 1975-2 1976-2 1977-1 1985-6 1987-3 2005-11 2012-12 1973-12 1975-2 Grid connection 1998-3 1999-5 1989-4 1994-11 1973-7 2000-6 2011-3 1971-10 1996-7 2007-8 1985-12 1987-10 1988-12 1993-4 1980-4 1974-1 1974-12 1975-12 1976-12 1984-5 1986-12 2004-12 2011-11 1973-6 1974-12 Construction start 1994-3 1994-7 1976-10 1977-6 1969-7 1993-8 2005-12 1966-8 1982-7 1983-7 1980-12 1981-8 1982-11 1984-4 1969-1 1970-1 1970-1 1970-1 1970-1 1977-2 1982-2 1985-10 1986-8 1970-5 1970-5 NSSS supplier AECL/DHI AECL/DHI GE GE S/KWU CNNC CNNC CGE AECL AECL ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM Operator KHNP KHNP CFE CFE EPZ PAEC PAEC PAEC SNN SNN REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA 90 11 11 11 11 684 688 665 665 482 300 300 650 650 950 950 950 950 560 950 950 950 950 411 411 Net 12 12 12 12 698 703 700 700 515 325 325 100 706 705 600 440 440 1000 1000 1000 1000 1000 1000 1000 1000 Gross 62 62 62 62 999 999 337 2061 2061 2027 2027 1366 2180 2180 3000 3000 3000 3200 1470 3000 3000 3200 3200 1375 1375 Capacity (MW) Thermal CANDU 6 CANDU 6 BWR-5 BWR-5 LWR - PWR CNP-300 CNP-300 CANDU-137 MW CANDU 6 CANDU 6 VVER V-320 VVER V-320 VVER V-320 VVER V-320 BN-600 EGP-6 EGP-6 EGP-6 EGP-6 VVER V-338 VVER V-338 VVER V-320 VVER V-320 VVER V-230 VVER V-230 FBR BWR BWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model LWGR LWGR LWGR LWGR PHWR PHWR PHWR PHWR PHWR Reactor Name WOLSONG-3 WOLSONG-4 LAGUNA VERDE-1 LAGUNA VERDE-2 BORSSELE CHASNUPP-1 CHASNUPP-2 KANUPP CERNAVODA-1 CERNAVODA-2 BALAKOVO-1 BALAKOVO-2 BALAKOVO-3 BALAKOVO-4 BELOYARSK-3 BILIBINO-1 BILIBINO-2 BILIBINO-3 BILIBINO-4 KALININ-1 KALININ-2 KALININ-3 KALININ-4 KOLA-1 KOLA-2 Code KR -15 KR -16 MX -1 MX -2 NL -2 PK -2 PK -3 PK -1 RO -1 RO -2 RU -96 RU -97 RU -98 RU -99 RU -21 RU -141 RU -142 RU -143 RU -144 RU -30 RU -31 RU -36 RU -37 RU -12 RU -13 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA Note: The column "Non-electrical applications" indicates the use of facility to provide: DS desalination, DH district heating, PH process heating.

39 ------Non- DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH DH, PH applics electrical 75.8 83.2 80.8 69.3 83.8 74.6 53.9 75.2 84.6 75.4 75.5 86.8 68.4 90.4 90.5 75.1 77.1 81.6 91.1 91.5 90.6 91.1 89.9 76.2 84.9 87.1 2013 2009- UCF % 75.6 83.1 80.5 69.2 83.5 74.3 53.1 74.9 84.4 75.2 74.8 85.6 67.9 90.3 90.2 74.7 76.8 81.5 88.3 89.1 90.1 90.1 89.6 75.8 84.1 85.9 2013 2009- EAF % Commercial operation 1982-12 1984-12 1977-10 1979-8 1984-3 1986-2 1974-11 1976-2 1980-6 1981-8 1972-6 1973-3 1981-2 2001-12 2010-12 1983-9 1985-7 1990-10 1985-2 1985-12 1998-10 2000-4 1983-1 1984-7 1985-11 1983-9 Grid connection 1981-3 1984-10 1976-12 1979-1 1983-10 1985-12 1973-12 1975-7 1979-12 1981-2 1971-12 1972-12 1980-5 2001-3 2010-3 1982-12 1985-5 1990-1 1984-8 1985-8 1998-7 1999-12 1981-10 1984-4 1985-7 1981-5 Construction start 1977-4 1976-8 1972-6 1973-1 1978-4 1981-5 1970-3 1970-6 1973-12 1975-2 1967-7 1967-7 1974-3 1981-9 1983-5 1975-10 1976-6 1984-5 1976-12 1976-12 1983-10 1983-10 1975-3 1976-7 1976-7 1973-7 NSSS supplier ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM ROSATOM SKODA SKODA SKODA SKODA WH FRAM FRAM WH Operator REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA REA SE,plc SE,plc SE,plc SE,plc NEK ESKOM ESKOM CNAT 411 411 925 925 925 925 925 925 925 925 385 385 950 950 950 925 925 925 472 471 436 436 688 930 930 Net 1011 440 440 417 417 505 505 470 470 727 970 970 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1049 Gross 1375 1375 3200 3200 3200 3200 3200 3200 3200 3200 1375 1375 3000 3200 3200 3200 3200 3200 1471 1471 1471 1471 1994 2775 2775 2947 Capacity (MW) Thermal VVER V-213 VVER V-213 RBMK-1000 RBMK-1000 RBMK-1000 RBMK-1000 RBMK-1000 RBMK-1000 RBMK-1000 RBMK-1000 VVER V-179 VVER V-179 VVER V-187 VVER V-320I VVER V-320I RBMK-1000 RBMK-1000 RBMK-1000 VVER V-213 VVER V-213 VVER V-213 VVER V-213 Westinghouse 2 CP1 CP1 WE 3-loops PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model LWGR LWGR LWGR LWGR LWGR LWGR LWGR LWGR LWGR LWGR LWGR Reactor Name KOLA-3 KOLA-4 KURSK-1 KURSK-2 KURSK-3 KURSK-4 LENINGRAD-1 LENINGRAD-2 LENINGRAD-3 LENINGRAD-4 NOVOVORONEZH-3 NOVOVORONEZH-4 NOVOVORONEZH-5 ROSTOV-1 ROSTOV-2 SMOLENSK-1 SMOLENSK-2 SMOLENSK-3 BOHUNICE-3 BOHUNICE-4 MOCHOVCE-1 MOCHOVCE-2 KRSKO KOEBERG-1 KOEBERG-2 ALMARAZ-1 Code RU -32 RU -33 RU -17 RU -22 RU -38 RU -39 RU -15 RU -16 RU -34 RU -35 RU -9 RU -11 RU -20 RU -59 RU -62 RU -23 RU -24 RU -67 SK -13 SK -14 SK -6 SK -7 SI -1 ZA -1 ZA -2 ES -6 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN Note: The column "Non-electrical applications" indicates the use of facility to provide: DH district heating, PH process heating.

40 ------PH DH DH Non- applics electrical 86.2 84.2 87.7 90.8 87.9 80.2 87.4 75.2 86.9 47.5 70.4 55.0 60.3 56.3 84.6 81.9 91.6 88.2 89.2 87.8 87.7 37.4 44.2 75.9 71.3 68.8 64.6 2013 2009- UCF % 85.1 83.1 85.5 89.3 87.0 79.1 86.8 74.6 86.0 46.9 69.4 54.2 59.3 55.1 82.3 80.0 91.6 88.1 89.1 86.6 87.6 37.4 44.2 75.9 71.3 68.8 64.6 2013 2009- EAF % Commercial operation 1984-7 1984-12 1986-3 1985-3 1988-8 1988-3 1980-12 1981-7 1985-8 1972-2 1975-1 1985-8 1976-1 1975-5 1981-9 1983-11 1969-9 1971-12 1979-11 1984-12 1972-11 1985-4 1989-4 1989-4 1989-4 1989-4 1989-4 Grid connection 1983-10 1983-8 1985-10 1984-10 1988-5 1987-12 1980-6 1981-1 1985-3 1971-8 1974-10 1985-3 1974-10 1974-8 1980-9 1982-6 1969-7 1971-10 1979-2 1984-5 1971-7 1983-4 1985-12 1983-8 1984-10 1983-7 1984-10 Construction start 1973-7 1974-5 1975-3 1975-9 1979-8 1980-12 1973-6 1975-1 1979-1 1966-8 1969-9 1980-5 1969-2 1970-10 1972-9 1973-11 1965-9 1968-1 1973-12 1974-1 1967-3 1965-10 1965-10 1968-10 1968-10 1970-12 1970-12 NSSS supplier WH WH WH GE KWU WH ABBATOM ABBATOM ABBATOM ABBATOM ABBATOM ABBATOM ABBATOM WH WH WH WH WH KWU GETSCO GETSCO APC APC NPC NPC NPC NPC Operator CNAT ANAV ANAV ID CNAT ANAV FKA FKA FKA OKG OKG OKG RAB RAB RAB RAB Axpo AG Axpo AG KKG KKL BKW EDF UK EDF UK EDF UK EDF UK EDF UK EDF UK 995 997 984 473 638 878 807 940 365 365 985 373 520 520 595 585 585 575 Net 1006 1064 1003 1045 1120 1170 1400 1064 1220 492 661 910 847 990 380 380 390 615 615 655 655 625 625 1044 1033 1035 1102 1066 1087 1022 1158 1212 1450 1117 1035 1275 Gross 2947 2954 2941 3237 3010 2941 2928 3253 3300 1375 1800 3900 2540 2500 3135 2775 1130 1130 3002 3600 1097 1500 1500 1500 1500 1500 1500 Capacity (MW) Thermal WE 3-loops WE 3-loops WE 3-loops BWR-6 PWR 3 loops WE 3-loops BWR-75 BWR-75 BWR-3000 ABB BWR ABB BWR BWR-75 BWR WE (3 loops) WE (3 loops) WE (3 loops) WH - 2 loops WH - 2 loops PWR 3 Loop BWR-6 BWR-4 AGR AGR AGR AGR AGR AGR GCR GCR GCR GCR GCR GCR PWR PWR PWR BWR PWR PWR BWR BWR BWR BWR BWR BWR BWR PWR PWR PWR PWR PWR PWR BWR BWR Type Model Reactor Name ALMARAZ-2 ASCO-1 ASCO-2 COFRENTES TRILLO-1 VANDELLOS-2 FORSMARK-1 FORSMARK-2 FORSMARK-3 OSKARSHAMN-1 OSKARSHAMN-2 OSKARSHAMN-3 RINGHALS-1 RINGHALS-2 RINGHALS-3 RINGHALS-4 BEZNAU-1 BEZNAU-2 GOESGEN LEIBSTADT MUEHLEBERG DUNGENESS B-1 DUNGENESS B-2 HARTLEPOOL A-1 HARTLEPOOL A-2 HEYSHAM A-1 HEYSHAM A-2 Code ES -7 ES -8 ES -9 ES -10 ES -11 ES -16 SE -9 SE -11 SE -14 SE -2 SE -3 SE -12 SE -4 SE -5 SE -7 SE -10 CH -1 CH -3 CH -4 CH -5 CH -2 GB -18A GB -18B GB -19A GB -19B GB -20A GB -20B Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued SWEDEN SWITZERLAND UK Note: The column "Non-electrical applications" indicates the use of facility to provide: DH district heating, PH process heating.

41 ------DH DH DH DH DH DH DH DH DH DH DH DH DH DH DH Non- applics electrical 84.1 71.9 78.6 83.5 84.8 85.7 77.6 83.7 82.9 66.9 83.1 76.7 63.7 76.2 70.6 79.4 67.9 77.6 71.1 78.0 83.6 84.5 82.1 82.2 81.7 88.0 91.4 92.4 2013 2009- UCF % 83.8 71.3 78.2 83.5 84.8 85.5 77.6 82.7 81.7 66.7 82.2 75.3 63.3 75.7 68.6 76.9 62.8 75.1 64.8 76.5 81.7 81.5 80.8 80.2 80.8 88.0 91.4 92.4 2013 2009- EAF % Commercial operation 1989-4 1989-4 1978-10 1976-9 1976-2 1977-3 1995-9 1988-5 1989-2 1971-11 1988-8 2005-12 1981-9 1982-7 1987-5 2006-4 1983-12 1985-4 1989-12 1985-12 1986-2 1987-3 1988-4 1989-10 1996-9 1974-12 1980-3 1976-10 Grid connection 1988-7 1988-11 1976-10 1976-2 1976-2 1977-3 1995-2 1988-5 1989-2 1971-1 1987-12 2004-8 1980-12 1981-12 1986-12 2004-10 1982-12 1985-1 1989-9 1984-12 1985-7 1986-12 1987-12 1989-8 1995-10 1974-8 1978-12 1976-6 Construction start 1980-8 1980-8 1967-9 1967-9 1967-11 1967-11 1988-7 1980-8 1980-8 1963-9 1981-11 1985-2 1973-8 1973-10 1980-2 1986-8 1976-8 1981-7 1984-11 1980-4 1981-1 1982-4 1983-4 1985-11 1986-6 1968-10 1968-12 1970-6 NSSS supplier NPC NPC TNPG TNPG TNPG TNPG PPC NNC NNC EE/B&W/T PAIP PAIP PAIP PAIP PAIP PAA PAA PAA PAA PAIP PAIP PAIP PAIP PAIP PAIP B&W CE WH Operator EDF UK EDF UK EDF UK EDF UK EDF UK EDF UK EDF UK EDF UK EDF UK ML NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC NNEGC ENTERGY ENTERGY FENOC 610 610 440 440 460 430 590 595 490 950 950 381 376 950 950 950 950 950 950 950 950 950 950 950 836 992 921 Net 1198 680 680 655 655 644 644 682 682 540 420 415 903 959 1250 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1065 Gross 1550 1550 1494 1494 1496 1496 3425 1623 1623 1920 3000 3000 1375 1375 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 2568 3026 2900 Capacity (MW) Thermal AGR AGR AGR AGR AGR AGR SNUPPS AGR AGR MAGNOX VVER V-320 VVER V-320 VVER V-213 VVER V-213 VVER V-320 VVER V-320 VVER V-302 VVER V-338 VVER V-320 VVER V-320 VVER V-320 VVER V-320 VVER V-320 VVER V-320 VVER V-320 B&W (L-loop) D CE (2-loop) DR W (3-loop) GCR GCR GCR GCR GCR GCR GCR GCR GCR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR Type Model Reactor Name HEYSHAM B-1 HEYSHAM B-2 HINKLEY POINT B-1 HINKLEY POINT B-2 HUNTERSTON B-1 HUNTERSTON B-2 SIZEWELL B TORNESS-1 TORNESS-2 WYLFA-1 KHMELNITSKI-1 KHMELNITSKI-2 ROVNO-1 ROVNO-2 ROVNO-3 ROVNO-4 SOUTH UKRAINE-1 SOUTH UKRAINE-2 SOUTH UKRAINE-3 ZAPOROZHYE-1 ZAPOROZHYE-2 ZAPOROZHYE-3 ZAPOROZHYE-4 ZAPOROZHYE-5 ZAPOROZHYE-6 ANO-1 ANO-2 BEAVER VALLEY-1 Code GB -22A GB -22B GB -16A GB -16B GB -17A GB -17B GB -24 GB -23A GB -23B GB -13A UA -40 UA -41 UA -27 UA -28 UA -29 UA -69 UA -44 UA -45 UA -48 UA -54 UA -56 UA -78 UA -79 UA -126 UA -127 US -313 US -368 US -334 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued UKRAINE USA Note: The column "Non-electrical applications" indicates the use of facility to provide: DH district heating.

42 ------Non- applics electrical 92.6 93.6 95.1 93.5 90.5 92.4 90.5 87.7 94.5 95.6 89.9 93.4 94.0 92.5 91.7 94.3 81.9 95.0 95.3 73.5 89.1 91.4 85.7 91.0 92.0 95.5 96.3 91.7 92.4 93.3 2013 2009- UCF % 92.6 93.6 95.1 92.2 89.0 90.5 90.5 87.7 94.5 95.6 89.9 93.2 94.0 92.5 91.7 94.3 81.7 95.0 95.3 73.5 89.1 91.4 85.7 91.0 91.8 95.5 96.3 91.7 92.4 93.3 2013 2009- EAF % Commercial operation 1987-11 1988-7 1988-10 1974-8 1975-3 1977-3 1977-3 1975-11 1985-9 1987-8 1984-12 1975-5 1977-4 1985-6 1986-8 1987-11 1984-12 1990-8 1993-8 1975-8 1978-7 1974-7 1978-7 1985-5 1986-3 1970-6 1971-11 1975-2 1977-12 1981-7 Grid connection 1987-8 1987-7 1988-5 1973-10 1974-8 1976-9 1976-12 1975-4 1985-3 1987-2 1984-10 1975-1 1976-12 1985-1 1986-5 1987-4 1984-5 1990-4 1993-4 1975-2 1978-3 1974-5 1977-8 1984-11 1985-10 1970-4 1971-7 1974-5 1977-8 1981-5 Construction start 1974-5 1975-8 1975-8 1967-5 1967-5 1968-7 1970-2 1970-2 1975-4 1975-4 1975-9 1968-6 1968-6 1974-5 1974-5 1975-10 1972-8 1974-12 1974-12 1969-3 1969-3 1968-6 1970-9 1968-4 1970-12 1966-1 1966-10 1970-6 1970-10 1970-10 NSSS supplier WH WH WH GE GE GE GE GE WH WH WH CE CE WH WH GE GE WH WH WH WH GE B&W WH WH GE GE GE WH WH Operator FENOC EXELON EXELON TVA TVA TVA PROGRESS PROGRESS EXELON EXELON AmerenUE EXELON EXELON DUKEENER DUKEENER EXELON ENERGYNW LUMINANT LUMINANT AEP AEP ENTERGY FENOC PG&E PG&E EXELON EXELON NEXTERA SOUTHERN SOUTHERN 885 938 920 866 850 766 894 883 867 601 874 883 Net 1178 1152 1101 1104 1105 1164 1136 1215 1146 1146 1065 1107 1205 1195 1030 1077 1122 1118 958 990 960 918 911 801 925 926 890 624 918 928 1242 1210 1155 1155 1155 1242 1210 1275 1188 1188 1098 1173 1259 1250 1100 1151 1197 1197 Gross 2900 3587 3587 3458 3458 3458 2923 2923 3587 3587 3565 2737 2737 3411 3411 3473 3486 3612 3612 3304 3468 2419 2817 3411 3411 2957 2957 1912 2775 2775 Capacity (MW) Thermal W (3-loop) W (4-loop) W (4-loop) DRY BWR-4 (Mark 1) BWR-4 (Mark 1) BWR-4 (Mark 1) BWR-4 (Mark 1) BWR-4 (Mark 1) W (4-loop) (DR W (4-Loop) (DR W (4-loop) DRY CE (2-loop) (D CE (2-loop) (D W (4-loop) (IC W (4-loop) (IC BWR-6 (Mark 3) BWR-5 (Mark 2) W (4-loop) DRY W (4-loop) DRY W (4-loop) ICE W (4-loop) ICE BWR-4 (Mark 1) B&W (R-loop) W (4-loop) W (4-loop) BWR-3 (Mark 1) BWR-3 (Mark 1) BWR-4 (Mark 1) W (3-loop) W (3-loop) DRY PWR PWR PWR BWR BWR BWR BWR BWR PWR PWR PWR PWR PWR PWR PWR BWR BWR PWR PWR PWR PWR BWR PWR PWR PWR BWR BWR BWR PWR PWR Type Model Reactor Name BEAVER VALLEY-2 BRAIDWOOD-1 BRAIDWOOD-2 BROWNS FERRY-1 BROWNS FERRY-2 BROWNS FERRY-3 BRUNSWICK-1 BRUNSWICK-2 BYRON-1 BYRON-2 CALLAWAY-1 CALVERT CLIFFS-1 CALVERT CLIFFS-2 CATAWBA-1 CATAWBA-2 CLINTON-1 COLUMBIA COMANCHE PEAK-1 COMANCHE PEAK-2 COOK-1 COOK-2 COOPER DAVIS BESSE-1 DIABLO CANYON-1 DIABLO CANYON-2 DRESDEN-2 DRESDEN-3 DUANE ARNOLD-1 FARLEY-1 FARLEY-2 Code US -412 US -456 US -457 US -259 US -260 US -296 US -325 US -324 US -454 US -455 US -483 US -317 US -318 US -413 US -414 US -461 US -397 US -445 US -446 US -315 US -316 US -298 US -346 US -275 US -323 US -237 US -249 US -331 US -348 US -364 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued

43 ------Non- applics electrical 83.2 94.8 43.0 94.1 89.5 90.4 93.3 87.5 92.9 93.8 93.7 96.3 95.8 95.2 94.5 93.7 91.5 90.2 92.2 82.0 92.3 93.5 90.7 92.9 89.4 93.3 93.2 92.8 87.4 91.6 2013 2009- UCF % 83.2 94.8 43.0 94.1 89.5 90.4 93.3 87.5 92.9 93.8 93.5 96.3 95.8 95.2 94.5 93.7 91.5 90.0 92.2 82.0 92.3 93.5 86.2 87.8 89.4 93.3 93.2 92.7 87.4 91.6 2013 2009- EAF % Commercial operation 1988-1 1975-7 1973-9 1970-7 1985-7 1987-5 1975-12 1979-9 1986-12 1974-8 1976-8 1984-1 1984-10 1986-2 1990-1 1981-12 1984-3 1975-12 1986-4 1971-6 1969-12 1988-3 1978-6 1980-12 1973-7 1974-9 1974-12 1969-12 1971-12 1986-1 Grid connection 1986-9 1975-2 1973-8 1969-12 1984-10 1987-1 1974-11 1978-9 1986-8 1973-6 1976-4 1982-9 1984-4 1985-4 1989-9 1981-9 1983-5 1975-11 1986-2 1971-3 1969-11 1987-8 1978-4 1980-8 1973-5 1973-12 1974-9 1969-9 1971-12 1985-6 Construction start 1972-9 1968-9 1968-6 1966-4 1974-5 1978-1 1968-9 1972-2 1976-3 1966-10 1968-11 1973-9 1973-9 1974-6 1974-6 1971-4 1971-4 1969-11 1974-8 1967-6 1965-4 1975-8 1971-2 1971-2 1967-11 1967-11 1967-11 1964-12 1967-3 1976-5 NSSS supplier GE GE CE WH GE WH GE GE GE WH WH GE GE GE GE WH WH CE WH GE GE GE WH WH B&W B&W B&W GE CE CE Operator DTEDISON ENTERGY OPPD EXELON ENTERGY PROGRESS SOUTHERN SOUTHERN PSEG ENTERGY ENTERGY EXELON EXELON EXELON EXELON DUKEENER DUKEENER DOMINION DOMINION NSP EXELON EXELON DOMINION DOMINION DUKEENER DUKEENER DUKEENER EXELON ENTERGY APS 813 482 581 928 876 883 869 578 621 943 943 846 846 846 619 793 Net 1037 1419 1172 1020 1041 1137 1140 1130 1134 1158 1158 1210 1277 1311 849 512 608 960 911 921 918 613 642 990 891 891 891 652 845 1100 1500 1240 1067 1085 1207 1207 1194 1194 1215 1215 1280 1320 1011 1414 Gross 3430 2536 1500 1775 4408 2900 2804 2804 3840 3216 3216 3546 3546 3515 3515 3411 3411 2700 3650 1775 1850 3988 2940 2940 2568 2568 2568 1930 2565 3990 Capacity (MW) Thermal BWR-4 (Mark 1) BWR-4 (Mark 1) CE (2-loop) W (2-loop) BWR-6 (Mark 3) W (3-loop) DRY BWR-4 (Mark 1) BWR-4 (Mark 1) BWR-4 (Mark 1) W (4-loop) DRY W (4-loop) DRY BWR-5 (Mark 2) BWR-5 (Mark 2) BWR-4 (Mark 2) BWR-4 (Mark 2) W (4-loop) ICE W (4-loop) (IC COMB CE DRYAMB W (4-loop) DRY BWR-3 BWR-2 (Mark 1) BWR-5 (Mark 2) W (3-loop) W (3-loop) B&W (L-loop) B&W (L-loop) B&W (L-loop) BWR-2 (Mark 1) CE (2-loop) DR CE (2-loop) DR BWR BWR PWR PWR BWR PWR BWR BWR BWR PWR PWR BWR BWR BWR BWR PWR PWR PWR PWR BWR BWR BWR PWR PWR PWR PWR PWR BWR PWR PWR Type Model Reactor Name FERMI-2 FITZPATRICK FORT CALHOUN-1 GINNA GRAND GULF-1 HARRIS-1 HATCH-1 HATCH-2 HOPE CREEK-1 INDIAN POINT-2 INDIAN POINT-3 LASALLE-1 LASALLE-2 LIMERICK-1 LIMERICK-2 MCGUIRE-1 MCGUIRE-2 MILLSTONE-2 MILLSTONE-3 MONTICELLO NINE MILE POINT-1 NINE MILE POINT-2 NORTH ANNA-1 NORTH ANNA-2 OCONEE-1 OCONEE-2 OCONEE-3 OYSTER CREEK PALISADES PALO VERDE-1 Code US -341 US -333 US -285 US -244 US -416 US -400 US -321 US -366 US -354 US -247 US -286 US -373 US -374 US -352 US -353 US -369 US -370 US -336 US -423 US -263 US -220 US -410 US -338 US -339 US -269 US -270 US -287 US -219 US -255 US -528 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued

44 ------Non- applics electrical 92.1 89.2 96.4 93.4 85.8 92.0 92.2 89.1 89.1 86.2 94.4 96.1 93.1 84.3 92.5 93.9 90.1 90.7 90.9 91.8 79.2 82.9 82.2 89.9 92.9 91.9 85.7 86.6 90.7 81.3 2013 2009- UCF % 92.1 89.2 96.4 93.4 85.8 92.0 92.2 89.1 89.1 86.2 94.4 96.1 93.1 84.3 92.2 93.9 90.1 90.7 90.9 91.8 79.2 82.9 82.0 89.9 92.5 91.9 85.7 86.6 90.7 81.3 2013 2009- EAF % Commercial operation 1986-9 1988-1 1974-7 1974-12 1987-11 1972-12 1970-12 1972-10 1973-12 1974-12 1973-2 1973-3 1986-6 1971-3 1977-6 1981-10 1990-8 1981-7 1982-6 1988-8 1989-6 1976-12 1983-8 1984-1 1972-12 1973-5 1983-6 1985-2 1974-9 1972-12 Grid connection 1986-5 1987-11 1974-2 1974-9 1986-12 1972-7 1970-11 1972-8 1973-12 1974-12 1972-4 1972-5 1985-12 1970-9 1976-12 1981-6 1990-5 1980-7 1981-12 1988-3 1989-4 1976-5 1983-6 1982-11 1972-7 1973-3 1982-11 1984-7 1974-6 1972-11 Construction start 1976-6 1976-6 1968-1 1968-1 1974-10 1968-8 1967-7 1968-7 1968-6 1969-6 1967-2 1967-2 1977-3 1967-4 1968-9 1968-9 1976-7 1970-5 1970-5 1975-12 1975-12 1970-7 1977-6 1973-3 1968-6 1968-6 1973-11 1973-11 1968-5 1967-4 NSSS supplier CE CE GE GE GE GE WH WH WH WH GE GE GE WH WH WH WH WH WH WH WH CE CE WH WH WH GE GE B&W WH Operator APS APS EXELON EXELON FENOC ENTERGY NEXTERA NEXTERA NSP NSP EXELON EXELON ENTERGY PROGRESS PSEG PSEG NEXTERA TVA TVA STP STP FPL FPL SCE&G DOMINION DOMINION PPL SUSQ PPL SUSQ EXELON FPL 677 591 591 522 519 908 911 967 741 982 987 971 838 838 819 802 Net 1314 1312 1125 1138 1256 1168 1158 1246 1152 1126 1280 1280 1257 1257 711 640 640 566 560 940 940 780 890 890 880 829 1414 1414 1182 1182 1303 1016 1254 1200 1296 1221 1200 1354 1354 1045 1050 1006 1330 1330 Gross 3990 3990 3514 3514 3758 2028 1800 1800 1677 1677 2957 2957 3091 2339 3459 3459 3648 3455 3455 3853 3853 3020 3020 2900 2857 2857 3952 3952 2568 2644 Capacity (MW) Thermal COMB CE80 DRYA COMB CE80 DRYA BWR-4 (Mark 1) BWR-4 (Mark 1) BWR-6 (Mark 3) BWR-3 (Mark 1) W (2-loop) DRY W (2-loop) DRY W (2-loop) DRY W (2-loop) DRY BWR-3 (Mark 1) BWR-3 (Mark 1) BWR-6 (Mark 3) W (3-loop) DRY W (4-loop) DRY W (4-loop) DRY W (4-loop) DRY W (4-loop) ICE W (4-loop) (IC W (4-loop) W (4-loop) DRY COMB CE DRYAMB COMB CE DRYAMB W (3-loop) DRY W (3-loop) DRY W (3-loop) DRY BWR-4 (Mark 2) BWR-4 (Mark 2) B&W (L-loop) W (3-loop) DRY PWR PWR BWR BWR BWR BWR PWR PWR PWR PWR BWR BWR BWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR PWR BWR BWR PWR PWR Type Model Reactor Name PALO VERDE-2 PALO VERDE-3 PEACH BOTTOM-2 PEACH BOTTOM-3 PERRY-1 PILGRIM-1 POINT BEACH-1 POINT BEACH-2 PRAIRIE ISLAND-1 PRAIRIE ISLAND-2 QUAD CITIES-1 QUAD CITIES-2 RIVER BEND-1 ROBINSON-2 SALEM-1 SALEM-2 SEABROOK-1 SEQUOYAH-1 SEQUOYAH-2 SOUTH TEXAS-1 SOUTH TEXAS-2 ST. LUCIE-1 ST. LUCIE-2 SUMMER-1 SURRY-1 SURRY-2 SUSQUEHANNA-1 SUSQUEHANNA-2 THREE MILE ISLAND-1 TURKEY POINT-3 Code US -529 US -530 US -277 US -278 US -440 US -293 US -266 US -301 US -282 US -306 US -254 US -265 US -458 US -261 US -272 US -311 US -443 US -327 US -328 US -498 US -499 US -335 US -389 US -395 US -280 US -281 US -387 US -388 US -289 US -250 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued

45 ------Non- applics electrical Long term shutdown date 1995-12 2013-7 84.8 95.3 94.3 94.5 90.0 92.0 80.5 88.3 91.6 88.9 93.0 90.8 93.2 2013 2009- UCF % 84.8 95.3 94.3 94.5 89.7 91.9 80.5 88.2 91.5 88.2 91.8 90.6 93.0 2013 2009- EAF % Commercial operation — 1971-5 Commercial operation 1973-9 1972-11 1987-6 1989-5 1985-9 1996-5 1985-9 1978-12 1979-7 1981-12 1983-3 1984-7 1985-5 Grid connection 1995-8 1971-3 Grid connection 1973-6 1972-9 1987-3 1989-4 1985-3 1996-2 1985-6 1977-11 1978-12 1981-5 1982-6 1984-5 1985-2 Construction start 1986-5 1966-9 Construction start 1967-4 1967-12 1976-8 1976-8 1974-11 1973-1 1977-5 1972-6 1973-12 1975-11 1976-3 1978-8 1979-2 NSSS supplier T/H/F/M GE NSSS supplier WH GE WH WH CE WH WH GE GE GE GE WH WH Operator JAEA NUCLENOR 246 446 Operator FPL ENTERGY SOUTHERN SOUTHERN ENTERGY TVA WCNOC TPC TPC TPC TPC TPC TPC 802 605 604 604 985 985 926 928 Net 1150 1152 1168 1123 1195 280 466 829 635 636 636 951 951 1229 1229 1250 1210 1280 1020 1020 Gross Capacity (MW) 714 1381 2644 1912 3626 3626 3716 3459 3565 1840 1840 2943 2943 2822 2822 Capacity (MW) Thermal Gross Net Thermal - BWR-3 FBR BWR Type Model W (3-loop) DRY BWR-4 (Mark 1) W (4-loop) DRY W (4-loop) DRY CE (2-loop) W (4-loop) (IC W (4-loop) BWR-4 BWR-4 BWR-6 BWR-6 WE 312 (3 loop WE 312 (3 loop PWR BWR PWR PWR PWR PWR PWR BWR BWR BWR BWR PWR PWR Type Model Reactor Reactor Name TURKEY POINT-4 VERMONT YANKEE VOGTLE-1 VOGTLE-2 WATERFORD-3 WATTS BAR-1 WOLF CREEK CHINSHAN-1 CHINSHAN-2 KUOSHENG-1 KUOSHENG-2 MAANSHAN-1 MAANSHAN-2 MONJU SANTA MARIA DE GARONA Code US -251 US -271 US -424 US -425 US -382 US -390 US -482 TW -1 TW -2 TW -3 TW -4 TW -5 TW -6 Code Name JP -31 ES -2 Country TABLE 14. REACTORS IN OPERATION, 31 DEC. 2013 — continued Country TABLE 15. REACTORS IN LONG TERM SHUTDOWN , 31 DEC. 2013 Note: Status as of 31 December 2013, 434 reactors (371733 MW) were connected to the grid, including 6 units (5032 in Taiwan, China. TAIWAN, CN TAIWAN, CN TAIWAN, CN TAIWAN, CN TAIWAN, CN TAIWAN, CN JAPAN SPAIN Note: Status as of 31 December 2013, 2 reactors (692 MW) were in long term shutdown.

46 Shut down 1989-2 1987-6 2002-12 2002-12 2006-12 2006-12 1984-5 1977-6 2012-12 2007-5 2008-10 1987-8 1994-5 1973-4 1985-6 1990-6 1991-10 1985-7 1980-2 1984-6 2010-2 1990-4 1992-5 1998-12 1988-12 2011-8 Commercial operation 1977-10 1962-10 1974-10 1975-11 1981-1 1982-6 1968-9 1972-5 1983-10 1971-12 1972-6 1962-10 1972-7 1964-2 1965-2 1966-8 1967-4 1968-6 1959-4 1960-4 1974-7 1969-6 1971-11 1986-12 1969-5 1975-2 Grid connection 1976-12 1962-10 1974-7 1975-8 1980-12 1982-5 1967-1 1971-4 1982-12 1971-10 1972-5 1962-6 1972-4 1963-6 1965-2 1966-8 1967-4 1967-7 1959-4 1960-4 1973-12 1969-3 1971-8 1986-1 1967-12 1974-8 Construction start 1969-7 1957-11 1970-4 1970-4 1973-10 1973-10 1960-2 1966-9 1974-4 1966-9 1967-12 1958-1 1965-12 1957-2 1959-8 1961-3 1962-1 1962-7 1955-3 1956-3 1968-11 1963-10 1966-1 1976-12 1961-8 1970-1 NSSS supplier FAEA WH AEE AEE AEE AEE AECL AECL AECL OH/AECL OH/AECL CGE FRAM LEVIVIER LEVIVIER GTM A/F/W GAAA SACM SACM CNCLNEY FRAM FRAM ASPALDO BBK KWU Operator ANPPCJSC CEN/SCK KOZNPP KOZNPP KOZNPP KOZNPP OH HQ HQ OPG OPG OH EDF EDF EDF EDF SENA EDF COGEMA COGEMA CEA/EDF EDF EDF EDF AVR RWE 10 22 70 70 39 40 13 376 408 408 408 408 206 250 635 515 515 540 180 360 305 130 390 465 Net 1200 1167 12 25 80 75 43 43 15 408 440 440 440 440 218 266 675 542 542 555 230 480 320 142 500 530 1242 1225 Gross Capacity (MW) 41 92 46 704 792 300 800 250 260 260 345 1375 1375 1375 1375 1375 2156 1744 1744 1954 1170 1040 1650 1475 3000 3517 Thermal FBR FBR GCR GCR GCR GCR GCR GCR GCR GCR PWR PWR PWR PWR PWR PWR PWR PWR Type HTGR PHWR PHWR PHWR PHWR PHWR HWLWR HWGCR Reactor Name ARMENIAN-1 BR-3 KOZLODUY-1 KOZLODUY-2 KOZLODUY-3 KOZLODUY-4 DOUGLAS POINT GENTILLY-1 GENTILLY-2 PICKERING-2 PICKERING-3 ROLPHTON NPD BUGEY-1 CHINON A-1 CHINON A-2 CHINON A-3 CHOOZ-A (ARDENNES) EL-4 (MONTS D'ARREE) G-2 (MARCOULE) G-3 (MARCOULE) PHENIX ST. LAURENT A-1 ST. LAURENT A-2 SUPER-PHENIX AVR JUELICH BIBLIS-A Code AM -18 BE -1 BG -1 BG -2 BG -3 BG -4 CA -2 CA -3 CA -12 CA -5 CA -6 CA -1 FR -9 FR -2 FR -3 FR -4 FR -5 FR -6 FR -1B FR -1 FR -10 FR -7 FR -8 FR -24 DE -4 DE -12 Country TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2013 ARMENIA BELGIUM BULGARIA CANADA FRANCE GERMANY

47 Shut down 2011-8 2011-8 1990-2 1990-2 1990-2 1990-7 1989-11 1977-1 1971-4 2011-8 1991-8 2011-8 1977-1 1988-9 1984-5 2011-8 1974-7 2005-5 2011-8 1990-6 2003-11 1988-9 2011-8 1985-11 1994-8 1990-7 1990-7 1982-3 1987-12 2003-3 Commercial operation 1977-1 1977-2 1974-7 1975-4 1978-5 1979-11 1989-11 1967-4 1970-8 1979-3 1979-3 1984-3 1968-10 1987-8 1966-12 1976-12 1973-1 1969-3 1980-3 1966-10 1972-5 1987-6 1979-9 1962-2 1975-11 1981-12 1965-1 1964-6 1964-1 1979-3 Grid connection 1976-4 1976-7 1973-12 1974-12 1977-10 1979-9 1989-4 1966-12 1969-10 1977-12 1978-4 1983-9 1968-7 1986-3 1966-3 1976-6 1973-1 1968-10 1979-5 1966-5 1972-1 1985-11 1978-9 1961-6 1971-12 1978-5 1964-10 1964-1 1963-5 1978-7 Construction start 1972-2 1970-4 1970-3 1970-3 1972-4 1972-4 1976-12 1962-12 1965-1 1972-5 1974-9 1974-4 1964-10 1975-1 1961-12 1972-2 1966-6 1965-3 1970-10 1960-1 1967-12 1971-5 1972-7 1958-7 1968-1 1970-1 1961-7 1959-11 1958-11 1972-5 NSSS supplier KWU KWU AtEE AtEE AtEE AtEE AtEE AEG,GE AEG,KWU KWU IA KWU AEG BBR SIEMENS KWU SIEM,KWU SIEM,KWU KWU AtEE KWU HRB KWU GE,AEG AEG,KWU AMN/GETS EL/WEST GE TNPG HITACHI Operator RWE KKB EWN EWN EWN EWN EWN KGB HDR E.ON KBG KKK KWL KGG KBG EnKK KKN EnBW EnKK EWN E.ON HKG E.ON VAK PE SOGIN SOGIN SOGIN SOGIN JAEA 25 17 52 62 15 771 408 408 408 408 408 237 878 183 785 100 340 890 640 296 640 860 260 150 153 148 Net 1240 1346 1219 1345 27 21 57 70 16 806 440 440 440 440 440 250 912 268 840 106 357 926 672 308 670 882 270 160 160 165 1300 1402 1302 1410 Gross Capacity (MW) 58 60 801 100 520 200 321 265 760 870 506 660 557 3733 2292 1375 1375 1375 1375 1375 2575 3690 3760 2497 1050 2575 1900 3900 1912 2651 Thermal FBR GCR PWR BWR PWR PWR PWR PWR PWR BWR BWR BWR BWR BWR PWR PWR PWR BWR PWR PWR PWR BWR BWR BWR PWR BWR Type HTGR PHWR HWGCR HWLWR Reactor Name BIBLIS-B BRUNSBUETTEL GREIFSWALD-1 GREIFSWALD-2 GREIFSWALD-3 GREIFSWALD-4 GREIFSWALD-5 GUNDREMMINGEN-A HDR GROSSWELZHEIM ISAR-1 KNK II KRUEMMEL LINGEN MUELHEIM-KAERLICH MZFR NECKARWESTHEIM-1 NIEDERAICHBACH OBRIGHEIM PHILIPPSBURG-1 RHEINSBERG STADE THTR-300 UNTERWESER VAK KAHL WUERGASSEN CAORSO ENRICO FERMI GARIGLIANO LATINA FUGEN ATR Code DE -18 DE -13 DE -502 DE -503 DE -504 DE -505 DE -506 DE -3 DE -7 DE -16 DE -8 DE -20 DE -6 DE -22 DE -2 DE -15 DE -11 DE -5 DE -14 DE -501 DE -10 DE -19 DE -17 DE -1 DE -9 IT -4 IT -3 IT -2 IT -1 JP -20 Country TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2013 — continued GERMANY ITALY JAPAN

48 Shut down 2011-5 2011-5 2011-5 2011-5 2013-12 2013-12 2009-1 2009-1 1976-3 1998-3 1999-4 2004-12 2009-12 1997-3 2002-4 1983-1 1990-1 1988-2 1990-8 1977-2 2006-12 2008-12 2006-4 1990-7 1974-6 Commercial operation 1971-3 1974-7 1976-3 1978-10 1978-4 1979-10 1976-3 1978-11 1965-3 1966-7 1973-7 1985-5 1987-12 1969-3 1954-12 1964-4 1969-12 1964-12 1970-4 1972-12 1980-4 1981-1 1969-8 1972-8 1964-5 Grid connection 1970-11 1973-12 1974-10 1978-2 1977-9 1979-5 1974-8 1978-5 1963-10 1965-11 1973-7 1983-12 1987-8 1968-10 1954-6 1964-4 1967-12 1964-9 1969-12 1972-12 1978-12 1980-3 1968-7 1972-5 1964-5 Construction start 1967-7 1969-6 1970-12 1973-2 1972-5 1973-10 1971-6 1974-6 1960-12 1961-3 1964-10 1977-5 1978-1 1965-5 1951-1 1958-6 1962-1 1957-7 1964-6 1958-8 1972-4 1972-4 1964-6 1968-6 1957-12 NSSS supplier GE/GETSC GE/T TOSHIBA HITACHI TOSHIBA GE/T TOSHIBA TOSHIBA GE GEC MAEC-KAZ MAEP MAEP RDM MSM MSM MSM MSM MSM SKODA AEE AEE WH CEA ABBATOM Operator TEPCO TEPCO TEPCO TEPCO TEPCO TEPCO CHUBU CHUBU JAEA JAPCO MAEC-KAZ INPP INPP BV GKN MSM REA REA REA REA JAVYS JAVYS JAVYS UFG HIFRENSA BKAB 5 12 52 55 93 10 439 760 760 760 760 515 806 137 102 146 197 336 408 408 141 480 Net 1067 1185 1185 6 13 90 60 12 460 784 784 784 784 540 840 166 108 160 210 365 143 440 440 150 500 1100 1300 1300 Gross Capacity (MW) 90 30 80 587 183 286 530 760 560 510 1380 2381 2381 2381 2381 3293 1593 2436 1000 4800 4800 1320 1375 1375 1670 Thermal FBR GCR GCR BWR BWR BWR BWR BWR BWR BWR BWR BWR BWR PWR PWR PWR PWR PWR Type LWGR LWGR LWGR LWGR LWGR PHWR HWGCR Reactor Name FUKUSHIMA-DAIICHI-1 FUKUSHIMA-DAIICHI-2 FUKUSHIMA-DAIICHI-3 FUKUSHIMA-DAIICHI-4 FUKUSHIMA-DAIICHI-5 FUKUSHIMA-DAIICHI-6 HAMAOKA-1 HAMAOKA-2 JPDR TOKAI-1 AKTAU IGNALINA-1 IGNALINA-2 DODEWAARD APS-1 OBNINSK BELOYARSK-1 BELOYARSK-2 NOVOVORONEZH-1 NOVOVORONEZH-2 BOHUNICE A1 BOHUNICE-1 BOHUNICE-2 JOSE CABRERA-1 VANDELLOS-1 AGESTA Code JP -5 JP -9 JP -10 JP -16 JP -17 JP -18 JP -11 JP -24 JP -1 JP -2 KZ -10 LT -46 LT -47 NL -1 RU -1 RU -3 RU -6 RU -4 RU -8 SK -1 SK -2 SK -3 ES -1 ES -3 SE -1 Country TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2013 — continued JAPAN KAZAKHSTAN LITHUANIA NETHERLANDS RUSSIA SLOVAKIA SPAIN SWEDEN

49 Shut down 1999-11 2005-5 1969-1 1989-3 1988-10 2002-3 2002-3 2003-3 2003-3 2003-3 2003-3 2004-6 2004-6 2004-6 2004-6 1977-3 1994-3 2006-12 2006-12 2000-5 2000-5 1990-3 1989-12 2012-2 2011-6 2006-12 2006-12 1991-2 1991-2 1981-4 Commercial operation 1975-7 1977-7 NA 1962-6 1962-10 1962-7 1962-11 1956-10 1957-2 1958-5 1959-4 1959-3 1959-8 1959-12 1960-3 1962-10 1976-7 1965-10 1965-12 1965-3 1965-5 1964-2 1964-7 1967-12 1968-9 1966-3 1966-9 1965-3 1965-3 1963-3 Grid connection 1975-5 1977-3 1968-1 1962-6 1962-6 1962-7 1962-7 1956-8 1957-2 1958-3 1959-4 1959-2 1959-7 1959-11 1960-1 1962-10 1975-1 1965-9 1965-11 1965-2 1965-3 1964-2 1964-6 1967-11 1968-4 1966-1 1966-4 1965-1 1965-2 1963-2 Construction start 1971-2 1973-1 1962-4 1957-1 1957-1 1957-1 1957-1 1953-8 1953-8 1955-8 1955-8 1955-10 1955-10 1955-10 1955-10 1955-3 1966-1 1960-7 1960-7 1957-11 1957-11 1957-10 1957-10 1962-5 1962-5 1961-4 1961-4 1959-7 1959-7 1958-11 NSSS supplier ASEASTAL ABBATOM NGA TNPG TNPG TNPG TNPG UKAEA UKAEA UKAEA UKAEA UKAEA UKAEA UKAEA UKAEA UKAEA TNPG TNPG TNPG EE/B&W/T EE/B&W/T GEC GEC TNPG TNPG EE/B&W/T EE/B&W/T APC APC UKAEA Operator BKAB BKAB EOS ML ML ML ML SL SL SL SL ML ML ML ML UKAEA UKAEA ML ML ML ML ML ML ML ML ML ML ML ML UKAEA 6 49 49 49 49 48 48 48 48 11 24 600 600 138 138 123 123 234 225 225 235 235 150 150 217 217 210 210 195 195 Net 7 60 60 60 60 60 60 60 60 15 36 615 615 166 166 146 146 250 230 230 267 267 173 173 230 230 245 245 235 235 Gross Capacity (MW) 28 60 620 620 481 481 268 268 268 268 260 260 260 260 600 840 840 900 900 595 595 730 660 850 850 120 1800 1800 1010 1010 Thermal FBR FBR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR GCR BWR BWR Type HWGCR Reactor Name BARSEBACK-1 BARSEBACK-2 LUCENS BERKELEY-1 BERKELEY-2 BRADWELL-1 BRADWELL-2 CALDER HALL-1 CALDER HALL-2 CALDER HALL-3 CALDER HALL-4 CHAPELCROSS-1 CHAPELCROSS-2 CHAPELCROSS-3 CHAPELCROSS-4 DOUNREAY DFR DOUNREAY PFR DUNGENESS A-1 DUNGENESS A-2 HINKLEY POINT A-1 HINKLEY POINT A-2 HUNTERSTON A-1 HUNTERSTON A-2 OLDBURY A-1 OLDBURY A-2 SIZEWELL A-1 SIZEWELL A-2 TRAWSFYNYDD-1 TRAWSFYNYDD-2 WINDSCALE AGR Code SE -6 SE -8 CH -8 GB -3A GB -3B GB -4A GB -4B GB -1A GB -1B GB -1C GB -1D GB -2A GB -2B GB -2C GB -2D GB -14 GB -15 GB -9A GB -9B GB -7A GB -7B GB -6A GB -6B GB -11A GB -11B GB -10A GB -10B GB -8A GB -8B GB -5 Country TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2013 — continued SWEDEN SWITZERLAND UK

50 Shut down 1990-9 2012-4 1996-11 1991-10 2000-12 1986-4 1997-8 1968-6 2013-2 1967-1 1978-10 1968-2 1972-11 1989-8 1963-12 1996-12 1964-9 1976-7 1974-10 2013-5 1987-4 1997-8 1998-7 1967-10 1974-11 1966-1 1989-6 1992-11 2013-6 2013-6 Commercial operation 1968-1 1972-1 1978-5 1979-5 1982-6 1984-3 1963-3 1965-9 1977-3 NA 1960-7 1964-7 NA 1979-7 1957-10 1968-1 1963-11 1963-8 1962-10 1974-6 1969-11 1972-12 1971-3 NA 1967-6 1963-11 1975-4 1968-1 1983-8 1984-4 Grid connection 1967-12 1971-7 1977-9 1978-12 1981-12 1983-12 1962-12 1964-8 1977-1 1963-12 1960-4 1963-8 1966-8 1976-12 1957-10 1967-8 1963-9 1963-4 1962-9 1974-4 1968-4 1972-11 1970-11 1966-7 1967-1 1963-7 1974-10 1967-7 1982-9 1983-9 Construction start 1963-5 1963-9 1970-3 1973-2 1976-3 1979-4 1960-5 1960-1 1968-9 1960-1 1956-5 1959-1 1956-12 1968-9 1956-1 1964-5 1959-1 1960-11 1956-5 1968-8 1963-3 1968-10 1966-5 1959-1 1962-2 1960-1 1969-4 1964-5 1974-3 1974-3 NSSS supplier ICL/FE EE/B&W/T FAEA FAEA FAEA FAEA GE GNEPRWRA B&W WH GE AC UEC GA GE WH GE GE B&W WH AC CE GE AC GA GE B&W WH CE CE Operator UKAEA ML MTE MTE MTE MTE CPC DOE/PRWR PROGRESS CVPA EXELON RCPA DTEDISON PSCC GE CYAPC AEC/NPPD PG&E ENTERGY DOMINION DPC MYAPC DOMINION NMC EXELON CofPiqua SMUD SCE SCE SCE 92 67 17 17 22 61 24 75 63 48 59 40 12 490 740 925 925 925 860 197 330 560 257 566 860 641 873 436 Net 1070 1080 71 18 19 24 65 24 84 65 55 63 42 12 100 540 800 890 207 342 603 277 595 900 684 917 456 1000 1000 1000 1127 1127 Gross Capacity (MW) 50 65 58 50 46 318 240 700 200 842 256 220 615 165 220 115 1920 3200 3200 3200 3200 2568 1825 1772 2630 2011 2772 1347 3438 3438 Thermal X X FBR GCR BWR BWR PWR BWR BWR BWR PWR BWR PWR PWR BWR PWR BWR BWR PWR PWR PWR PWR Type HTGR HTGR LWGR LWGR LWGR LWGR PHWR SGHWR Reactor Name WINFRITH SGHWR WYLFA-2 CHERNOBYL-1 CHERNOBYL-2 CHERNOBYL-3 CHERNOBYL-4 BIG ROCK POINT BONUS CRYSTAL RIVER-3 CVTR DRESDEN-1 ELK RIVER FERMI-1 FORT ST. VRAIN GE VALLECITOS HADDAM NECK HALLAM HUMBOLDT BAY INDIAN POINT-1 KEWAUNEE LACROSSE MAINE YANKEE MILLSTONE-1 PATHFINDER PEACH BOTTOM-1 PIQUA RANCHO SECO-1 SAN ONOFRE-1 SAN ONOFRE-2 SAN ONOFRE-3 Code GB -12 GB -13B UA -25 UA -26 UA -42 UA -43 US -155 US -014 US -302 US -144 US -10 US -011 US -16 US -267 US -018 US -213 US -077 US -133 US -013 US -305 US -409 US -309 US -245 US -130 US -171 US -012 US -312 US -206 US -361 US -362 Country TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2013 — continued UK UKRAINE USA

51 Shut down 1972-5 1982-10 1989-5 1979-3 1992-11 1991-10 1998-2 1998-2 Commercial operation 1967-3 1958-5 NA 1978-12 1976-5 1961-7 1973-12 1974-9 Grid connection 1967-3 1957-12 1986-8 1978-4 1975-12 1960-11 1973-6 1973-12 Construction start 1960-1 1954-1 1972-11 1969-11 1970-2 1957-11 1968-12 1968-12 NSSS supplier GE WH GE B&W WH WH WH WH Operator SNEC DOE DUQU LIPA GPU PORTGE YAEC EXELON EXELON 3 60 820 880 167 Net 1095 1040 1040 3 68 849 959 180 1155 1085 1085 Gross Capacity (MW) 24 236 600 2436 2772 3411 3250 3250 Thermal PWR PWR BWR PWR PWR PWR PWR PWR Type Reactor Name SAXTON SHIPPINGPORT SHOREHAM THREE MILE ISLAND-2 TROJAN YANKEE NPS ZION-1 ZION-2 Code US -146 US -001 US -322 US -320 US -344 US -29 US -295 US -304 Country TABLE 16. REACTORS PERMANENTLY SHUTDOWN, 31 DEC. 2013 — continued USA Note: Status as of 31 December 2013, 149 reactors (56927 MW) have been permanently shut down.

52 2014 2019 2025 2015 2027 2025 2020 2036 2036 2036 2036 License terminated K A A Decom. licensee E.ON xxxx SEN EDF EDF EDF EDF EDF EDF EDF KGG HKG WAK - KIT E.ON ANPPCJSC VAK RWE AECL 7777 E-03492 E-03493 E-00174 E-0008 6 NERS 777 G 01 KKR G 01 KGR G 01 KGR , , , , , , , , 4 CEN/SC 77 AECL AECL/HQ 3 3 3 3 4 3 phase managemt Current fuel 6 9 , , 9 9 93 93 , , , , 4 4 6 9 9 7 7 7 7 9 9 8 8 8 , , 4 3 3 4 3 3 phase Current decom. Decom. strategy ID ID ID ID ID ID ID ID ID Other ID ID ID Dd+PD+SE Dd+PD+SE Other Dd+SE 777 ID ID ID , , , 6 6 6 5 2 2 2 2 2 2 2 8 , , , , , , , , , , , , 6 7 7 2 2 2 7 2 3 3 3 2 1 1 1 6 1 1 1 1 , , , OthersOthersOthersOthers Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Others Other , , , , , Others Other OthersOthers ID Others ID ID Others Other Others Other 1 1 1 6 7 7 7 7 Shut down Shutdown reason 1987-6 2002-12 1985-6 1984-5 2002-12 2006-12 2006-12 1973-4 2010-2 1998-12 1991-10 1985-7 1977-1 1974-7 2011-8 1988-9 1990-6 1989-2 1988-12 1990-6 1990-4 1992-5 1994-5 1985-11 2003-11 1987-8 1988-9 1990-2 1990-2 1984-5 1977-6 ) ) A X Reactor ARDENNES ( X MONTS D'ARREE ( RMENIAN-1 VR JUELICH A A Code Name DE -11 DE -17 NIEDERAICHBACH DE -19 UNTERWESER THTR-300 DE -501 RHEINSBERG BE -1 BR-3 FR -24 SUPER-PHENI FR -5 CHOOZ-A DE -4 AM -18 BG -1 KOZLODUY-1 CA -1 ROLPHTON NPD FR -3 CHINON A-2 DE -2 DE -22 MZFR MUELHEIM-KAERLICH BG -2 BG -3 BG -4 KOZLODUY-2 KOZLODUY-3 KOZLODUY-4 DE -502 DE -503 GREIFSWALD-1 GREIFSWALD-2 FR -2 CHINON A-1 FR -6 EL-4 FR -4 CHINON A-3 FR -7 FR -8 FR -9 ST. LAURENT A-1 ST. LAURENT A-2 DE -10 BUGEY-1 STADE FR -10 PHENI DE -3 GUNDREMMINGEN- CA -3 GENTILLY-1 CA -2 DOUGLAS POINT A A A Country TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2013 ARMENI BULGARI BELGIUM GERMANY DE -1 VAK KAHL CANAD FRANCE

53 2014 2021 2040 2026 2024 2055 2034 2015 2032 2029 2030 2027 2027 2025 2002 License terminated A Decom. licensee E.ON SOGIN JAVYS JAVYS INPP SOGIN SOGIN JAVYS BKAB JAPCO BV GKN RWE AG KIT EA EA JAERI WAK EA EA ENRES 6 SOGIN , 777 G 01 KGR G 01 KGR G 01 KGR 57 JAEA MAEC-KAZ 7 UFG , , , , , , 5 22 CHUBU DL CHUBU DL 2037 2037 1 INPP 44 BKAB BKAB , 3 3 phase managemt Current fuel 9 , 10 7 93 6 9 7 7 64 9 9 93 , , , , , , , , , , , 93 9 9 52 3 6 9 10 , , , , , , 6 3 4 4 6 6 5 4 4 4 7 7 3 8 3 8 , , , , , , , , , , , , 3 4 2 3 1 4 3 4 1 3 3 1 3 3 3 1 , , phase 3 Current decom. Decom. strategy Dd+PD+SE 1 Dd+SE Dd+SE Dd+PD+SE 3 Other ID Other ID Dd+SE Dd+PD+SE 3 Dd+PD+SE Dd+SE ID 777 ID ID ID , , , 6 Dd+PD+SE , 6 6 6 5 3 , , , , , 5 6 2 5 7 5 7 2 4 4 6 2 , Others ID 3 3 3 2 2 , , , , OthersOthersOthers ID ID ID OthersOthersOthers ID ID Dd+SE 2 , , , , , , 4 Others ID OthersOthers Other Other Others ID OthersOthers Other Other Others Other Others Other 1 1 1 , 7 7 7 7 7 2 3 Shut down Shutdown reason 1982-3 1990-7 1998-3 2006-4 1999-4 1974-6 1999-11 2005-5 1990-7 2004-12 1977-1 2009-1 1987-12 1976-3 2008-12 1971-4 1991-8 2009-12 1990-2 2006-12 2003-3 1977-2 1983-1 1988-2 1990-7 1989-11 1990-7 2009-1 1994-8 1997-3 1990-8 1990-1 Reactor A R KTAU GESTA A A Code Name IT -1 LATIN IT -3 ENRICO FERMI JP -2 TOKAI-1 SK -3 ES -1 BOHUNICE-2 JOSE CABRERA-1 SE -1 SK -2 BOHUNICE-1 IT -2 GARIGLIANO JP -1 JPD SE -6 BARSEBACK-1 SE -8 BARSEBACK-2 IT -4 CAORSO LT -46 IGNALINA-1 RU -3 BELOYARSK-1 RU -4 NOVOVORONEZH-1 DE -505 DE -506 GREIFSWALD-4 DE -6 GREIFSWALD-5 LINGEN JP -24 HAMAOKA-2 ES -3 VANDELLOS-1 DE -7 DE -8 HDR GROSSWELZHEIM KNK II LT -47 IGNALINA-2 JP -20 FUGEN ATR RU -8 NOVOVORONEZH-2 RU -6 BELOYARSK-2 JP -11 HAMAOKA-1 DE -9 WUERGASSEN A A Country TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2013 — continued ITALY RUSSI KAZAKHSTAN KZ -10 SPAIN SWEDEN GERMANY DE -504 GREIFSWALD-3 NETHERLANDS NL -1 DODEWAARD JAPAN LITHUANI SLOVAKIA SK -1 BOHUNICE A1

54 2019 1974 2110 2110 2333 2128 2128 2128 2128 2083 2083 2104 2104 2090 2090 2104 2104 2098 2098 2111 2111 2065 2004 2117 2117 2117 2117 2333 License terminated ua A q A nox S nox S nox N nox N nox N nox N nox N nox S nox S nox S nox S nox N nox N nox S nox S nox N nox N nox S nox S g g g g g g g g g g g g g g g g g g g Decom. licensee Ma Ma Ma Ma Ma Ma Ma Ma Ma Ma Ma Ma Ma Ma Ma Ma CofPi DOE/PRWR 1970 UKAE SL RCP SL SL SL SL Ma Ma DOE DUQU 1989 ENTERGY DSR Ma EOS phase managemt Current fuel 6 10 , 6 6 6 6 6 6 6 6 6 6 6 6 6 6 , , , , , , , , , , , , , , , 5 8 8 9 , , , 5 5 5 5 5 5 5 5 5 5 5 5 5 5 8 8 8 8 8 8 5 5 1 , , , , , , , , , , , , , , , 11 3 3 3 4 , 3 3 3 3 , phase 3 Current decom. Decom. strategy Dd+SE Dd+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SE Dd+PD+SEDd+PD+SEDd+PD+SEDd+PD+SE 3 Dd+SE 3 Dd+SE 3 Dd+SE 3 Dd+SE Dd+PD+SEDd+PD+SEDd+PD+SEDd+PD+SE 3 Dd+PD+SE 3 Dd+PD+SE 3 Dd+PD+SE 3 Dd+PD+SE 3 ISD 3 ISD ID Dd+PD+SE Dd+SE 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 8 5 6 , , , , , , , , , , , , , , , , , , , , , , , , 3 5 4 2 2 2 2 2 2 2 2 2 4 2 2 2 2 2 2 2 2 2 2 5 2 2 2 Others ID , OthersOthers Dd+PD+SE Dd+PD+SE Others ID Others Dd+PD+SE 2 1 Shut down Shutdown reason 1989-3 1989-12 2000-5 1991-2 2006-12 2006-12 1982-10 1974-10 1977-3 1994-3 2003-3 2003-3 2003-3 1966-1 2006-12 1990-9 2003-3 2004-6 2004-6 2004-6 1988-10 1981-4 2000-5 1991-2 2006-12 1969-1 1990-3 1968-6 2002-3 2002-3 2004-6 1968-2 R R 2 3 4 Reactor Code Name GB -1A CALDER HALL-1 GB -2B GB -2C CHAPELCROSS-2 GB -2D CHAPELCROSS-3 GB -3A CHAPELCROSS-4 BERKELEY-1 GB -6B GB -7A HUNTERSTON A-2 HINKLEY POINT A-1 GB -8B GB -9A TRAWSFYNYDD-2 DUNGENESS A-1 GB -10A SIZEWELL A-1 US -001 SHIPPINGPORT US -013 US -014 INDIAN POINT-1 BONUS GB -15 DOUNREAY PF GB -14 DOUNREAY DF US -012 PIQUA GB -10B GB -12 SIZEWELL A-2 WINFRITH SGHWR GB -3B GB -4A BERKELEY-2 GB -4B BRADWELL-1 GB -5 BRADWELL-2 WINDSCALE AGR GB -7B GB -8A HINKLEY POINT A-2 TRAWSFYNYDD-1 GB -9B DUNGENESS A-2 GB -1B GB -1C CALDER HALL- GB -1D CALDER HALL- GB -2A CALDER HALL- CHAPELCROSS-1 GB -6A HUNTERSTON A-1 US -011 ELK RIVER Country TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2013 — continued A US UK SWITZERLAND CH -8 LUCENS

55 2013 2007 2009 2007 2005 2009 1996 1995 2005 2005 2008 2005 License terminated A Decom. licensee PG&E DTEDISON 2025 CYAPC YAEC DOMINRES SMUD CVP PSCC LIPA GPUNC EXELON DOMINRES CommonEd COMMED GE&PGEC AEC&NPPD 1971 SCE NMC PORTGE 7 CPC 4 GPU 7 MYAPC 7 EXELON 7 DPC phase managemt Current fuel 11 , 9 6 6 , 11 , , 1 4 1 1 4 , 6 11 11 11 4 4 , 9 4 phase , Current decom. Decom. strategy Dd+SE ID Dd+PD+SE Dd+PD+SE Dd+SE Dd+PD+SE Other Dd+SE Dd+PD+SE ID Dd+SE Dd+SE Dd+PD+SE 3 ID Dd+SE Dd+SE Dd+PD+SE Dd+PD+SE 5 7 6 6 6 6 5 , , , , , , , 1 6 6 1 5 5 6 6 5 6 2 4 5 5 5 5 4 2 OthersOthers Dd+SE ID Others ID Others ID , , , , Others ID Others Dd+PD+SE 1 2 7 7 Shut down Shutdown reason 1972-11 1974-11 1989-8 1997-8 1963-12 1991-10 1976-7 1996-12 1972-5 1997-8 1967-1 1992-11 1998-7 1998-2 1998-2 1989-6 1979-3 1989-5 1964-9 1978-10 1967-10 2013-5 1992-11 1987-4 Y K Reactor Code Name US -16 FERMI-1 US -144 CVTR US -171 US -206 PEACH BOTTOM-1 SAN ONOFRE-1 US -245 US -267 MILLSTONE-1 FORT ST. VRAIN US -309 US -312 MAINE YANKEE RANCHO SECO-1 US -320 US -322 THREE MILE ISLAND-2 SHOREHAM US -077 US -10 HALLAM DRESDEN-1 US -018 GE VALLECITOS US -130 PATHFINDER US -29 YANKEE NPS US -146 US -155 SAXTON BIG ROCK POINT US -213 HADDAM NEC US -295 ZION-1 US -304 US -305 ZION-2 KEWAUNEE US -133 HUMBOLDT BA US -344 TROJAN US -409 LACROSSE Country TABLE 17. REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED, 31 Dec. 2013 — continued A US

56

Description Immediate dismantling and removal of all radioactive materials Deferred dismantling, placing all radiological areas into safe enclosure Deferred dismantling, including partial dismantling and placing remaining radiological areas into safe enclosure In situ disposal, involving encapsulation of radioactive materials and subsequent restriction of access None of the above Drawing up the Final Decommissioning Plan Reactor core defuelling Waste conditioning on-site - only for decommissioning waste Waste shipment off-site - only for decommissioning waste Safe enclosure preparation Partial dismantling Active safe enclosure period Passive safe enclosure period Final dismantling Final survey Licence terminated (legal act at the end of decommissioning process) Decommissioning strategy ID Dd+SE Dd+PD+SE 1 4 7 ISD Other Current decommissioning phase Description 2 3 5 6 8 9 10 11 Description The technology or process being used became obsolete After major component failure or deterioration None of the above Transfer to a reactor facility Transfer away from a reactor facility Storage in an on-site facility Storage in an off-site facility Shipment to a reprocessing plant Underwater storage period The process was no longer profitable Changes in licensing requirements After an operating incident Other technological reasons Other economical reasons Public acceptance or political reasons Description Dry storage period Encapsulation TABLE 17. DEFINITIONS FOR REACTORS IN DECOMMISSIONING PROCESS OR DECOMMISSIONED Shutdown reason 1 2 3 4 5 6 7 8 Other Fuel Management 1 2 3 4 5 6 7 8

57 77.3 77.3 70.2 77.9 77.9 62.1 37.6 37.6 74.4 74.4 63.4 63.4 80.2 80.2 75.4 82.5 74.1 80.0 74.0 74.0 74.1 35.7 35.7 (%) Load factor 73.4 73.4 78.3 78.3 62.8 62.8 79.3 79.3 43.2 43.2 80.5 80.5 83.6 83.6 83.1 82.8 65.4 65.4 84.2 84.2 75.6 75.6 74.6 74.6 75.8 71.7 71.7 (%) factor 1.5 1.5 2.3 2.3 3.5 3.5 2.4 2.4 3.9 3.9 6.5 3.3 3.0 3.0 2.6 2.6 2.8 2.9 2.9 2.9 0.2 0.2 17.4 17.4 10.6 10.6 loss Operating (%) rate 72.2 72.2 79.2 79.2 65.5 65.5 40.8 40.8 79.9 79.9 84.1 84.1 82.3 74.5 78.6 73.1 73.1 76.3 66.8 66.8 85.0 85.0 84.0 73.0 73.0 (%) factor 24.9 24.9 16.7 16.7 30.5 30.5 48.7 48.7 16.0 16.0 11.2 11.2 10.2 18.3 11.2 11.2 24.5 24.5 19.4 29.5 29.5 15.9 11.7 11.7 24.6 24.6 Reactors reporting to IAEA PRIS (see note) (%) Planned Capability Forced unavailability factor 71.8 71.8 78.3 78.3 64.3 64.3 37.9 37.9 81.7 81.7 75.8 78.5 78.9 78.9 74.3 74.3 72.8 72.8 75.3 84.0 84.0 65.7 65.7 84.5 84.5 72.7 72.7 (%) factor Availability 1 1 4 4 47 47 92 92 11 11 49 49 26 15 15 18 18 81 81 23 23 11 11 278 278 231 231 453 453 of units Number Reactor category 600 MWe 600 600 MWe 600 ≥ 600 MWe 600 600 MWe 600 ≥ ≥ TABLE 18. PERFORMANCE FACTORS BY REACTOR CATEGORY, 2011 to 2013 2013 to 2011 CATEGORY, REACTOR BY FACTORS PERFORMANCE 18. TABLE PWR considered. are units) (23 2013 to 2011 during down shut Reactors Note: PWR < 600 MWe 600 < PWR BWR PWR BWR < 600 MWe 600 < BWR PHWR FBR PHWR < 600 MWe 600 < PHWR LWGR GCR TOTAL BWR PHWR LWGR ≥ LWGR < 600 MWe 600 < LWGR

58 5.7 0.0 2.8 0.3 0.0 0.4 1.2 3.0 0.0 2.5 4.3 1.9 17.2 14.9 32.8 (%) outages External 0.5 0.0 3.3 3.9 7.9 7.0 34.5 48.1 15.8 23.5 11.6 42.9 17.2 18.9 11.4 (%) outages Unplanned 50.6 55.9 82.3 46.2 81.4 43.7 93.7 96.1 88.4 92.6 91.8 80.3 79.2 84.3 100.0 (%) outages Planned 1362 1505 1573 1724 1425 2239 1425 2577 2887 5760 3167 3475 2018 1888 2648 reactor per operating Full outage hours 1 4 48 26 15 15 11 22 10 74 84 47 437 274 227 reactors Number of comm. operating Reactor type ≥ 600 MWe ≥ 600 MWe ≥ 600 MWe ≥ 600 MWe TABLE 19. FULL OUTAGE STATISTICS DURING 2013 Notes: 1. Only reactors in commercial operation are considered. 2. Reactors shut down during 2013 (7 units) are considered. PHWR PHWR < 600 MWe GCR FBR ALL REACTORS LWGR LWGR BWR < 600 MWe BWR PHWR LWGR < 600 MWe BWR PWR < 600 MWe PWR PWR

59 % Time lost Hours Unplanned full outages % h ∙ 566 0.99 783 1.06 284 0.50 488 0.66 Energy lost 53884 93.95 69385 93.85 53884 93.95 GW(e) % Time lost Hours Planned full outages % h ∙ 178 0.02 892 0.10 1045 1.82 1074 1.45 1074 1.82 1045 0.02 178 0.10 892 2.07 1528 0.99 8760 1.36 779 0.10 788 1760 0.23 3262 0.37 1760 0.23 88 0.15 131 0.18 1900 0.25 4259 0.48 707 1.23 544 0.74 Energy lost 35143 4.65 33712 3.83 35143 4.65 59892 6.80 40856 5.41 37656 4.99 51645 5.87 297172 39.35 333231 37.85 333231 39.35 297172 755165 100.00 880421 100.00 57353 100.00 755165 100.00 73933 100.00 339712 44.99 384768 43.70 GW(e) Direct cause TABLE 20. DIRECT CAUSES OF FULL OUTAGES DURING 2013 Plant equipment problem/failure Inspection, maintenance or repair combined with refuelling Inspection, maintenance or repair without refuelling Testing of plant systems or components Major back-fitting, refurbishment or upgrading activities without refuelling Nuclear regulatory requirements Other Refuellling without maintenance Major back-fitting, refurbishment or upgrading activities with refuelling Human factor related Fire Fuel management limitation (including high flux tilt, stretch out or coast-down operation) TOTAL Note: Only reactors which have achieved full commercial operation in or before 2013 are counted.

60 % Time lost Hours Unplanned full outages % h ∙ 4620 1.25 7080 1.60 4620 1.25 4402 1.00 2640 0.72 Energy lost 332861 90.42 391188 88.61 391188 90.42 332861 GW(e) % Time lost Hours Planned full outages % h ∙ 182 0.01 920 0.03 23679 6.43 32047 7.26 23679 6.43 182 0.01 920 0.03 382 0.01 1909 0.05 1909 0.01 382 8943 0.30 18961 0.53 831 0.23 1513 0.34 18961 0.53 831 0.23 8943 0.30 0.81 3579 0.43 1597 0.97 35066 0.10 3158 2431 0.08 5592 0.15 1911 0.52 1677 0.38 Energy lost 139801 4.61 149053 4.13 139801 4.61 257704 7.14 159134 5.25 214386 7.07 298148 8.26 876408 28.91 990678 27.44 3030997 100.00 3610611 100.00 368139 100.00 441486 100.00 368139 100.00 3610611 100.00 3030997 100.00 1626173 53.65 1852580 51.31 1626173 53.65 GW(e) Direct cause TABLE 21. DIRECT CAUSES OF FULL OUTAGES, 2009 TO 2013 Plant equipment problem/failure Refuellling without maintenance Inspection, maintenance or repair combined with refuelling Inspection, maintenance or repair without refuelling Testing of plant systems or components Major back-fitting, refurbishment or upgrading activities with refuelling Major back-fitting, refurbishment or upgrading activities without refuelling Nuclear regulatory requirements Human factor related Fire External restrictions on supply and services Fuel management limitation (including high flux tilt, stretch out or coast-down operation) Other TOTAL Note: Only reactors which have achieved full commercial operation in or before 2013 are counted.

61 1 2 3 9 35 22 Planned 1 1 4 6 4 1 2 1 5 3 2 3 12 27 11 Shut down 1 1 LT shut down 1 1 1 1 1 6 2 5 2 2 29 10 Number of reactors, as 31 Dec. 2013 Construction 2 1 7 2 2 6 4 9 4 1 2 1 3 2 4 1 2 7 19 20 58 21 48 23 33 10 Operational Full name ARGENTINA ARMENIA BELARUS BELGIUM BRAZIL BULGARIA CANADA CHINA CZECH REPUBLIC FINLAND FRANCE GERMANY HUNGARY INDIA IRAN, ISLAMIC REPUBLIC OF ITALY JAPAN KAZAKHSTAN KOREA, REPUBLIC OF LITHUANIA MEXICO NETHERLANDS PAKISTAN ROMANIA RUSSIA SLOVAKIA SLOVENIA SOUTH AFRICA SPAIN SWEDEN FI IT SI IN IR JP LT KZ ZA NL BY BE CZ FR PK SK ES SE AR BR CA DE KR BG CN HU RU AM MX RO TABLE 22. COUNTRIES: ABBREVIATIONS AND SUMMARY code Country

62 2 2 9 5 92 16 92 78 Planned Planned 1 4 7 4 4 2 9 8 1 2 29 32 33 37 42 149 149 Shut down Shut down 2 2 1 1 LT shut down LT shut down 2 2 5 4 2 1 5 72 72 60 Number of reactors, as 31 Dec. 2013 Number of reactors, as 31 Dec. 2013 Construction Construction 5 2 15 16 81 15 15 48 434 100 434 273 Operational Operational Full name Full name SWITZERLAND UKRAINE UNITED ARAB EMIRATES UNITED STATES OF AMERICA VIET NAM Boiling Light-Water-Cooled and Moderated Reactor Fast Breeder Reactor Gas-Cooled, Graphite-Moderated Reactor High-Temperature Gas-Cooled Reactor Heavy-Water-Moderated, Gas-Cooled Reactor Heavy-Water-Moderated, Boiling Light-Water-Cooled Reactor Light-Water-Cooled, Graphite-Moderated Reactor Pressurized Heavy-Water-Moderated and Cooled Reactor Pressurized Light-Water-Moderated and Cooled Reactor Steam-Generating Heavy-Water Reactor Other AE UA US VN GB CH TABLE 22. COUNTRIES: ABBREVIATIONS AND SUMMARY — continued code TABLE 23. REACTOR TYPES: ABBREVIATIONS AND SUMMARY code Type TOTAL Country Note: The total includes the following data from Taiwan, China: — 6 units in operation; 2 under construction. BWR FBR GCR HTGR HWGCR HWLWR LWGR PHWR PWR SGHWR X TOTAL

63 1 2 1 Planned 1 1 1 3 1 1 1 2 1 2 1 1 1 Shut down LT shut down 1 1 Number of reactors, as 31 Dec. 2013 Construction 2 1 3 1 3 2 1 8 6 2 3 2 1 3 1 6 Operational Full name ATOMIC ENERGY COMMISSION AND NEBRASKA PUBLIC POWER DISTRICT AMERICAN ELECTRIC POWER COMPANY, INC. AMEREN UE, UNION ELECTRIC COMPANY ASOCIACION NUCLEAR ASCO-VANDELLOS A.I.E. (ENDESA / ID) CLOSED JOINT STOCK COMPANY ARMENIAN NPP ARIZONA PUBLIC SERVICE CO. ARBEITSGEMEINSCHAFT VERSUCHSREAKTOR GMBH KERNKRAFTWERK BEZNAU CH-5312 DÖTTINGEN BHARATIYA NABHIKIYA VIDYUT NIGAM LIMITED BARSEBÄCK KRAFT AB BKW ENERGIE AG BRUCE POWER BV GEMEENSCHAPPELIJKE KERNENERGIECENTRALE NEDERLAND (BV GKN) COMMISSARIAT À L'ENERGIE ATOMIQUE (80%) / ELECTRICITÉ DE FRANCE (20%) CENTRE D'ETUDE DE L'ENERGIE NUCLEAIRE / STUDIECENTRUM VOOR KERNENERGIE CZECH POWER COMPANY, CEZ A.S. COMISION FEDERAL DE ELECTRICIDAD CHUBU ELECTRIC POWER CO., INC THE CHUGOKU ELECTRIC POWER CO., INC. CHINA INSTITUTE OF ATOMIC ENERGY CENTRALES NUCLEARES ALMARAZ-TRILLO (ID / UFG ENDESA HC NUCLENOR) COMISION NACIONAL DE ENERGIA ATOMICA CNNC NUCLEAR OPERARION MANAGEMENT COMPANY LIMITED CITY OF PIQUA GOVERNMENT COMPAGNIE GENERALE DES MATIERES NUCLEAIRES CONSUMERS POWER CO. CAROLINAS-VIRGINIA NUCLEAR POWER ASSOC. CONNECTICUT YANKEE ATOMIC POWER CO. DAYA BAY NUCLEAR POWER OPERATIONS AND MANAGEMENT CO, LTD. code TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY Operator AEC/NPPD AEP AmerenUE ANAV ANPPCJSC APS AVR Axpo AG BHAVINI BKAB BKW BRUCEPOW BV GKN CEA/EDF CEN·SCK CEZ CFE CHUBU CHUGOKU CIAE CNAT CNEA CNNO CofPiqua COGEMA CPC CVPA CYAPC DNMC

64 2 2 2 2 Planned 1 1 2 1 1 3 8 1 2 1 1 6 4 1 Shut down LT shut down 1 1 1 2 1 4 Number of reactors, as 31 Dec. 2013 Construction 6 1 7 3 7 2 1 2 1 2 4 3 2 4 58 15 12 22 Operational Full name DEPARTMENT OF ENERGY AND DUQUESNE LIGHT CO. DOE & PUERTO RICO WATER RESOURCES DOMINION GENERATION DAIRYLAND POWER COOPERATIVE STATE INSTITUTION DIRECTORATE FOR CONSTRUCTION DETROIT EDISON CO. DUKE ENERGY CORP. E.ON KERNKRAFT GMBH ELECTRICITE DE FRANCE EDF ENERGY ELECTRABEL M. V. NUCLEAIRE PRODUKTIE ELETROBRAS ELETRONUCLEAR S.A. ENBW KRAFTWERKE AG EMIRATES NUCLEAR ENERGY CORPORATION ENERGY NORTHWEST ENBW KERNKRAFT GMBH (SITZ IN OBRIGHEIM) ENTERGY NUCLEAR OPERATIONS, INC. ENERGIE DE L'OUEST SUISSE ELECTRIC POWER DEVELOPMENT CO., LTD. N.V. ELEKTRICITEITS-PRODUKTIEMAATSCHAPPIJ ZUID-NEDERLAND ESKOM VIETNAM ELECTRICITY ENERGIEWERKE NORD GMBH EXELON GENERATION CO., LLC FIRST ENERGY NUCLEAR OPERATING CO. FORSMARK KRAFTGRUPP AB FORTUM POWER AND HEAT OY (FORMER IVO) FLORIDA POWER & LIGHT CO. CNNC FUJIAN FUQING NUCLEAR POWER CO., LTD FUJIAN SANMING NUCLEAR POWER CO., LTD. GENERAL ELECTRIC code TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY — continued Operator DOE DUQU DOE/PRWR DOMINION DPC DSAE DTEDISON DUKEENER E.ON EDF EDF UK ELECTRAB ELETRONU EnBW ENEC ENERGYNW EnKK ENTERGY EOS EPDC EPZ ESKOM EVN EWN EXELON FENOC FKA FORTUMPH FPL FQNP FSNPC GE

65 1 2 2 Planned 1 1 1 1 2 2 2 1 3 2 1 1 1 1 1 4 1 Shut down 1 LT shut down 2 2 1 2 5 Number of reactors, as 31 Dec. 2013 Construction 3 2 1 3 2 2 1 1 1 2 1 11 23 Operational Full name GUANGXI FANGCHENGGANG NUCLEAR POWER COMPANY LTD GENERAL PUBLIC UTILITIES(OWNED BY FIRSTENERGY CORP. HEISSDAMPFREAKTOR-BETRIEBSGESELLSCHAFT MBH. HOKKAIDO ELECTRIC POWER CO., INC. HISPANO-FRANCESA DE ENERGIA NUCLEAR, S.A. HOCHTEMPERATUR-KERNKRAFTWERK GMBH HAINAN NUCLEAR POWER COMPANY HOKURIKU ELECTRIC POWER CO. HONGYANHE NUCLEAR POWER COMPANY HYDRO QUEBEC HUANENG SHANDONG SHIDAO BAY NUCLEAR POWER COMPANY, LTD. IBERDROLA, S.A. IGNALINA NUCLEAR POWER PLANT JAPAN ATOMIC ENERGY AGENCY JAPAN ATOMIC POWER CO. JADROVA A VYRADOVACIA SPOLOCNOST / NUCLEAR AND DECOMMISSIONING COMPANY, PLC. JIANGSU NUCLEAR POWER CORPORATION KERNKRAFTWERK-BETRIEBSGESELLSCHAFT MBH KANSAI ELECTRIC POWER CO. KERNKRAFTWERKE GUNDREMMINGEN BETRIEBSGESELLSCHAFT MBH KERNKRAFTWERK GUNDREMMINGEN GMBH KOREA HYDRO AND NUCLEAR POWER CO. KERNKRAFTWERK BRUNSBÜTTEL GMBH KERNKRAFTWERK GOESGEN-DAENIKEN AG KERNKRAFTWERK KRÜMMEL GMBH & CO. OHG KERNKRAFTWERK LEIBSTADT KERNKRAFTWERK NIEDERAICHBACH GMBH KERNKRAFTWERKE LIPPE-EMS GMBH KOZLODUY NPP-PLC GEMEINSCHAFTSKERNKRAFTWERK GROHNDE GMBH & CO. OHG KERNKRAFTWERK LINGEN GMBH code TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY — continued Operator GFNPC GPU HDR HEPCO HIFRENSA HKG HNPC HOKURIKU HONGYANH HQ HSNPC ID INPP JAEA JAPCO JAVYS JNPC KBG KEPCO KGB KGG KHNP KKB KKG KKK KKL KKN KLE KOZNPP KWG KWL

66 1 2 2 2 3 Planned 1 1 1 4 1 1 2 2 1 1 1 21 Shut down 1 LT shut down 2 1 3 2 5 2 Number of reactors, as 31 Dec. 2013 Construction 6 2 2 1 2 1 1 1 4 1 4 3 3 1 3 4 2 15 21 10 Operational Full name KYUSHU ELECTRIC POWER CO., INC. LIAONING HONGYANHE NUCLEAR POWER CO. LTD. (LHNPC) LONG ISLAND POWER AUTHORITY LIAONIN NUCLEAR POWER COMPANY, LMT. LUMINANT GENERATION COMPANY LLC MANGISHLAK ATOMIC ENERGY COMPLEX-KAZATOMPROM, LIMITED LIABILITY COMPANY MAGNOX LIMITED MINISTRY OF MEDIUM MACHINE BUILDING THE USSR (MINSREDMASH) MINTOPENERGO OF UKRAINE - MINISTRY FUEL AND ENERGY MAINE YANKEE ATOMIC POWER CO. NUCLEOELECTRICA ARGENTINA S.A. NEW BRUNSWICK ELECTRIC POWER COMMISSION FUJIAN NINGDE NUCLEAR POWER COMPANY LTD. NUKLERANA ELEKTRARNA KRŠKO NEXTERA ENERGY RESOURCES, LLC NUCLEAR MANAGEMENT CO. NATIONAL NUCLEAR ENERGY GENERATING COMPANY NUCLEAR POWER CORPORATION OF INDIA LTD. NUCLEAR POWER PRODUCTION & DEVELOPEMENT CO. OF IRAN NUCLEAR POWER PLANT QINSHAN JOINT VENTURE COMPANY LTD. NORTHERN STATES POWER CO. (SUBSIDIARY OF XCEL ENERGY) NUCLENOR, S.A. ONTARIO HYDRO OKG AKTIEBOLAG ONTARIO POWER GENERATION OMAHA PUBLIC POWER DISTRICT PAKISTAN ATOMIC ENERGY COMMISSION PAKS NUCLEAR POWER PLANT LTD PREUSSENELEKTRA KERNKRAFT GMBH&CO KG PACIFIC GAS AND ELECTRIC COMPANY PORTLAND GENERAL ELECTRIC CO. code TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY — continued Operator KYUSHU LHNPC LIPA LNPC LUMINANT MAEC-KAZ ML MSM MTE MYAPC NASA NBEPC NDNP NEK NEXTERA NMC NNEGC NPCIL NPPDCO NPQJVC NSP NUCLENOR OH OKG OPG OPPD PAEC PAKS Zrt PE PG&E PORTGE

67 1 2 2 2 1 22 Planned 1 1 1 4 2 3 1 4 1 1 4 6 1 Shut down LT shut down 2 2 2 2 2 2 2 2 1 1 10 Number of reactors, as 31 Dec. 2013 Construction 2 4 3 4 1 4 3 2 6 2 4 6 2 6 2 33 11 Operational Full name PPL SUSQUEHANNA, LLC PROGRESS ENERGY PUBLIC SERVICE CO. OF COLORADO PSEG NUCLEAR LLCPUBLIC SERVICE ELECTRIC & GAS CO. QINSHAN NUCLEAR POWER COMPANY RINGHALS AB RURAL COOPERATIVE POWER ASSOC. JOINT STOCK COMPANY CONCERN RWE POWER AG SOUTHERN CALIFORNIA EDISON CO. SOUTH CAROLINA ELECTRIC & GAS CO. SHANDONG NUCLEAR POWER COMPANY LTD SLOVENSKÉ ELEKTRÁRNE, A.S. SOCIETE D'ENERGIE NUCLEAIRE FRANCO-BELGE DES ARDENNES SHIKOKU ELECTRIC POWER CO., INC. SELLAFIELD LIMITED SANMEN NUCLEAR POWER CO., LTD. SACRAMENTO MUNICIPAL UTILITY DISTRICT SAXTON NUCLEAR EXPIRAMENTAL REACTOR CORPORATION SOCIETATEA NATIONALA NUCLEARELECTRICA S.A. SOCIETA GESTIONE IMPANTI NUCLEARI S.P.A. SOUTHERN NUCLEAR OPERATING COMPANY, INC. STP NUCLEAR OPERATING CO. TOKYO ELECTRIC POWER CO., INC. GUANGDONG TAISHAN NUCLEAR POWER JOINT VENTURE COMPANY LIMITED (TNPC) TOHOKU ELECTRIC POWER CO., INC. TAIWAN POWER CO. THE THIRD QINSHAN JOINTED VENTURE COMPANY LTDA. TENNESSEE VALLEY AUTHORITY TEOLLISUUDEN VOIMA OYJ UNION FENOSA GENERATION S.A. code TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY — continued Operator PPL SUSQ PROGRESS PSCC PSEG QNPC RAB RCPA REA RWE SCE SCE&G SDNPC SE,plc SENA SHIKOKU SL SMNPC SMUD SNEC SNN SOGIN SOUTHERN STP TEPCO TNPC TOHOKU TPC TQNPC TVA TVO UFG

68 92 35 Planned 4 1 1 149 Shut down 2 LT shut down 5 72 Number of reactors, as 31 Dec. 2013 Construction 1 1 434 Operational Full name UNITED KINGDOM ATOMIC ENERGY AUTHORITY VERSUCHSATOMKRAFTWERK KAHL GMBH WOLF CREEK NUCLEAR OPERATION CORP. YANKEE ATOMIC ELECTRIC CO. YANGJIANG NUCLEAR POWER COMPANY code TABLE 24. OPERATORS: ABBREVIATIONS AND SUMMARY — continued Operator UKAEA VAK WCNOC YAEC YJNPC not specified TOTAL

69 1 1 1 7 Planned 1 2 3 3 6 1 1 2 1 2 1 1 6 4 1 1 3 1 1 1 Shut down LT shut down 4 3 7 2 6 Number of reactors, as 31 Dec. 2013 Construction 7 4 1 8 1 3 8 2 1 2 6 1 1 7 5 12 Operational Full name ASSOCIATION ACEC, FRAMATOME ET WESTINGHOUSE ABBATOM (FORMERLY ASEA-ATOM) ALLIS CHALMERS ACECOWEN (ACEC-COCKERILL-WESTINGHOUSE ) ACECOWEN - CREUSOT LOIRE FRAMATOME ATOMIC ENERGY OF CANADA LTD. ATOMIC ENERGY OF CANADA LTDA AND DEPARTMENT (INDIA) ATOMIC ENERGY OF CANADA LTD. / DOOSAN HEAVY INDUSTRY & CONSTRUCTION ATOMENERGOEXPORT ALLGEMEINE ELEKTRICITAETS-GESELLSCHAFT ALLGEMEINE ELECTRICITAETS-GESELLSCHAFT, GENERAL ELECTRIC COMPANY (US) ALLGEMEINE ELEKTRICITAETS GESELLSCHAFT, KRAFTWERK UNION AG ANSALDO MECCANICO NUCLEARE SPA / GENERAL ELECTRIC TECHNICAL SERVICES CO ATOMIC POWER CONSTRUCTION LTD. AREVA, 27-29, RUE LE PELETIER, 75433 PARIS CEDEX 09URL: WWW.AREVA.COM JOINT-STOCK COMPANY ASEA-ATOM / STAL-LAVAL ASPALDO ATOMENERGOEXPORT BABCOCK & WILCOX CO. BROWN BOVERI-KRUPP REAKTORBAU GMBH BROWN BOVERI REAKTOR GMBH COMBUSTION ENGINEERING CO. COMMISSARIAT A L'ENERGIE ATOMIQUE CHINA FIRST HEAVY INDUSTRIES CANADIAN GENERAL ELECTRIC CNIM-CONSTRUCTIONS NAVALES ET INDUSTRIELLES DE MEDITERRANEE CL - CREUSOT LOI COMISIÓN NACIONAL DE ENERGÍA ATÓMICA CHINA NATIONAL NUCLEAR CORPORATION DONGFANG ELECTRIC CORPORATIONDEC-NPIC-FANP code TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY NSSS supplier A/F/W ABBATOM AC ACECOWEN ACLF AECL AECL/DAE AECL/DHI AEE AEG AEG,GE AEG,KWU AMN/GETS APC AREVA ASE ASEASTAL ASPALDO AtEE B&W BBK BBR CE CEA CFHI CGE CNCLNEY CNEA CNNC DEC

70 1 2 2 Planned 5 1 5 3 2 1 1 1 2 3 1 1 2 1 1 1 9 2 1 2 5 1 11 Shut down 1 LT shut down 5 2 1 1 2 2 1 1 Number of reactors, as 31 Dec. 2013 Construction 2 9 1 1 2 2 9 3 1 66 46 12 20 Operational Full name DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO. LTD. / KOREA ATOMIC ENERGY RESEARCH I DOOSAN HEAVY INDUSTRIES & CONSTRUCTION CO. LTD. / KOREA POWER ENGINEERING COMPA THE ENGLISH ELECTRIC CO. LTD / BABCOCK & WILCOX TAYLOR WOODROW CONSTR. ELETTRONUCLEARE ITALIANA / WESTINGHOUSE ELECTRIC CORP. FEDERAL ATOMIC ENERGY AGENCY FRAMATOME FRAMACECO (FRAMATOME-ACEC-COCKERILL) GENERAL ATOMIC CORP. GROUPEMENT ATOMIQUE ALSACIENNE ATLANTIQUE GENERAL ELECTRIC CO. GENERAL ELECTRIC COMPANY (US), ALLGEMEINE ELEKTRICITAETS- GESELLSCHAFT GENERAL ELECTRIC CO. / TECHNICAL SERVICES GENERAL ELECTRIC CO. / TOSHIBA CORPORATION GENERAL ELECTRIC COMPANY (UK) GENERAL ELECTRIC TECHNICAL SERVICES CO. GENERAL & PUERTO RICO WATER RESOURCES AUTHORITY (US) GRANDS TRAVAUX DE MARSEILLE HITACHI GE NUCLEAR ENERGY, LTD. HITACHI LTD. HOCHTEMPERATUR-REAKTORBAU GMBH INTERATOM INTERNATIONALE ATOMREAKTORBAU GMBH INTERNATIONAL COMBUSTION LTD. / FAIREY ENGINEERING IZHORSKIYE ZAVODY KOREA ELECTRIC POWER CORPORATION SIEMENS KRAFTWERK UNION AG LEVIVIER MAEC-KAZATOMPROMMANGISHLAK ATOMIC ENERGY COMPLEX-KAZATOMPROM, LLC MINATOMENERGOPROM, MINISTRY OF NUCLEAR POWER AND INDUSTRY MITSUBISHI HEAVY INDUSTRIES LTD. MINISTRY OF MEDIUM MACHINE BUILDING THE USSR (MINSREDMASH) NATIONALE GESELLSCHAFT ZUR FÖRDERUNG DER INDUSTRIELLEN ATOMTECHNIK code TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY — continued NSSS supplier DHICKAEC DHICKOPC EE/B&W/T EL/WEST FAEA FRAM FRAMACEC GA GAAA GE GE,AEG GE/GETSC GE/T GEC GETSCO GNEPRWRA GTM H/G HITACHI HRB IA ICL/FE IZ KEPCO KWU LEVIVIER MAEC-KAZ MAEP MHI MSM NGA

71 2 1 4 2 92 24 44 Planned 2 1 2 2 1 1 4 1 10 10 11 149 Shut down 2 1 LT shut down 4 6 1 1 2 1 7 2 1 72 10 Number of reactors, as 31 Dec. 2013 Construction 2 6 4 1 1 1 4 1 16 18 11 33 10 13 70 434 Operational Full name NATIONAL NUCLEAR CORPORATION NUCLEAR POWER CO. LTD. NUCLEAR POWER CORPORATION OF INDIA LTD. VIKRAM SARABHAI BHAVAN, ANUSHAKTI NAG NUCLEAR POWER INSTITUTE OF CHINA ONTARIO HYDRO / ATOMIC ENERGY OF CANADA LTD. PRODUCTION AMALGAMATION 'ATOMMASH', PRODUCTION AMALGAMATION IZHORSKY PLANT ATOMMASH,VOLGODONSK,RUSSIA PWR POWER PROJECTS LTD ROTTERDAMSE DROOGDOK MAATSCHAPPIJ (RDM) IN ROTTERDAM (NL) STATE ATOMIC ENERGY CORPORATION ROSATOM SIEMENS / KRAFTWERK UNION AG SOCIETE ALSACIENNE DE CONSTRUCTIONS MECANIQUES SHANGHAI ELECTRIC SIEMENS AG, KRAFTWERK UNION AG SIEMENS AG, POWER GENERATION - FRG SKODA CONCERN NUCLEAR POWER PLANT WORKS TOSHIBA / HITACHI FUJI ELECTRIC HOLDINGS MITSUBISHI HEAVY INDUSTRIES TBD THE NUCLEAR POWER GROUP LTD. TOSHIBA CORPORATION TSINGHUA UNIVERSITY UNITED ENGINEERS AND CONTRACTORS UNITED KINGDOM ATOMIC ENERGY AUTHORITY WESTINGHOUSE ELECTRIC CORPORATION WESTINGHOUSE ELECTRIC CORPORATION / MITSUBISHI HEAVY INDUSTRIES LTD. code TABLE 25. NSSS SUPPLIERS: ABBREVIATIONS AND SUMMARY — continued NSSS supplier NNC NPC NPCIL NPIC OH/AECL PAA PAIP PPC RDM ROSATOM S/KWU SACM SHE SIEM,KWU SIEMENS SKODA T/H/F/M TBD TNPG TOSHIBA Tsinghua UEC UKAEA WH WH/MHI not specified TOTAL

72 This page is intentionally left blank 300

Number of reactors Net electrical power (GW(e)) 273 253.0

250

200

150 Number of reactors/ net electrical power (GW(e)) 100 81 76.0 48 50 23.9 15 15 10.2 8.1 2 0.6 0 PWR BWR GCR PHWR LWGR FBR

Reactor type

Figure 1. Number of operational reactors by type and net electrical power (as of 31 Dec. 2013).

74 70

Number of reactors Net electrical power (GW(e)) 60.8 60 60

50

40

30 Number of reactors / net electrical power (GW(e)) Number of reactors

20

10 5 4 3.9 3.2 2 1.3 1 0.2 0 PWR BWR PHWR FBR HTGR

Reactor type

Figure 2. Reactors under construction by type and net electrical power (as of 31 Dec. 2013).

75 80% 73.3% 70% 60% 52.1% 51.7% 50.7% 50% 43.6% 42.7% 40% 36.4% 35.9% 33.6% 33.3% 30.7% Nuclear Share Nuclear 29.2% 30% 27.6% 19.8% 19.7% 19.4% 18.3% 20% 17.5% 16.0% 15.4% 10% 5.7% 4.6% 4.4% 4.4% 3.5% 2.8% 2.8% 2.1% 1.7% 1.5% 0% UK USA INDIA SPAIN CHINA JAPAN BRAZIL RUSSIA MEXICO FRANCE CANADA FINLAND SWEDEN UKRAINE BELGIUM ARMENIA ROMANIA PAKISTAN SLOVAKIA Figure 3. Nuclear share of electricity generation (as of 31 Dec. 2013). Dec. 31 of (as generation electricity of share Nuclear 3. Figure HUNGARY SLOVENIA Note: The nuclear share of electricity supplied in Taiwan, China was 19.1% the total. GERMANY BULGARIA ARGENTINA CZECH REP. IRAN,ISL.REP SWITZERLAND SOUTH AFRICA NETHERLANDS KOREA REP.OF

76 140 131 121

120

100 93 85 84 82

80 77 68 62 59 60 Number of reactors / construction time (in months)

40 29 23 20 20 12 10 4

0 2013 1981-1985 1986-1990 1991-1995 1996-2000 2001-2005 2006-2010 2011-2012

Number of reactors Construction time

Figure 4. Worldwide median construction time in months (as of 31 Dec. 2013).

77 7 4 10 10 13 19 11 14 12 11 5 19 22 16 19 33 32 24 21 14 11 10 4 6 9 5 4 Reactor age (in years) s of 31 Dec. 2013). 6 3 44 6 3 6 2 5 4 2 3 0 2 5 7 3 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 4 Figure 5. Number of reactors in operation by age (a age by operation in reactors of Number 5. Figure

5 0

35 30 25 20 15 10 Number of reactors of Number

78

4

2013

10

3

2012

7

7 2011

4

5

2010

16

2

2009

12

0

2008

10

3

2007

8

2

2006

4

4 2005

3

5

Grid connections 2004

2

2 2003

1

6 2002

6

3 2001

1

6 2000

7

4 1999

4

4 1998

3

3

1997

5

6 1996

1

5 1995

0

5

Construction starts 1994

2

9 1993

4

6 1992

3

4 1991

2

1990 10

5

1989 12

6

14 1988

7

1987 22

13

1986 27

8

1985 33

19

1984 33

11

23 1983

16

19

1982

19

1981 23

17

1980 21

20

8

1979

27

20

1978

23

18

1977

23

19

1976

43

15

1975

38

26

1974

38

20

1973

29

16

1972

29

16

1971

18

6

1970

37

10

1969

13

7

1968

37

11

1967

25

8

1966

15

8

1965

9

8 1964

9

1963 9

5

1962 9

8

1961 1

7

4

1960

11

5

1959

7

1

1958

6

3

1957

13

1

1956

5

0 1955

8

1954 1 1 Figure 6. Annual construction starts and connections to the grid (1954 2013).

0

50 40 30 20 10 Number of reactors of Number

79

@ No. 23

ORDERING LOCALLY In the following countries, IAEA priced publications may be purchased from the sources listed below or from major local booksellers. Orders for unpriced publications should be made directly to the IAEA. The contact details are given at the end of this list. AUSTRALIA DA Information Services 648 Whitehorse Road, Mitcham, VIC 3132, AUSTRALIA Telephone: +61 3 9210 7777  Fax: +61 3 9210 7788 Email: [email protected]  Web site: http://www.dadirect.com.au BELGIUM Jean de Lannoy Avenue du Roi 202, 1190 Brussels, BELGIUM Telephone: +32 2 5384 308  Fax: +32 2 5380 841 Email: [email protected]  Web site: http://www.jean-de-lannoy.be CANADA Renouf Publishing Co. Ltd. 5369 Canotek Road, Ottawa, ON K1J 9J3, CANADA Telephone: +1 613 745 2665  Fax: +1 643 745 7660 Email: [email protected]  Web site: http://www.renoufbooks.com Bernan Associates 4501 Forbes Blvd., Suite 200, Lanham, MD 20706-4391, USA Telephone: +1 800 865 3457  Fax: +1 800 865 3450 Email: [email protected]  Web site: http://www.bernan.com CZECH REPUBLIC Suweco CZ, spol. S.r.o. Klecakova 347, 180 21 Prague 9, CZECH REPUBLIC Telephone: +420 242 459 202  Fax: +420 242 459 203 Email: [email protected]  Web site: http://www.suweco.cz FINLAND Akateeminen Kirjakauppa PO Box 128 (Keskuskatu 1), 00101 Helsinki, FINLAND Telephone: +358 9 121 41  Fax: +358 9 121 4450 Email: [email protected]  Web site: http://www.akateeminen.com FRANCE Form-Edit 5 rue Janssen, PO Box 25, 75921 Paris CEDEX, FRANCE Telephone: +33 1 42 01 49 49  Fax: +33 1 42 01 90 90 Email: [email protected]  Web site: http://www.formedit.fr Lavoisier SAS 14 rue de Provigny, 94236 Cachan CEDEX, FRANCE Telephone: +33 1 47 40 67 00  Fax: +33 1 47 40 67 02 Email: [email protected]  Web site: http://www.lavoisier.fr L’Appel du livre 99 rue de Charonne, 75011 Paris, FRANCE Telephone: +33 1 43 07 50 80  Fax: +33 1 43 07 50 80 Email: [email protected]  Web site: http://www.appeldulivre.fr GERMANY Goethe Buchhandlung Teubig GmbH Schweitzer Fachinformationen Willstätterstrasse 15, 40549 Düsseldorf, GERMANY Telephone: +49 (0) 211 49 8740  Fax: +49 (0) 211 49 87428 Email: [email protected]  Web site: http://www.goethebuch.de HUNGARY Librotade Ltd., Book Import PF 126, 1656 Budapest, HUNGARY Telephone: +36 1 257 7777  Fax: +36 1 257 7472 Email: [email protected]  Web site: http://www.librotade.hu INDIA Allied Publishers 1st Floor, Dubash House, 15, J.N. Heredi Marg, Ballard Estate, Mumbai 400001, INDIA Telephone: +91 22 2261 7926/27  Fax: +91 22 2261 7928 Email: [email protected]  Web site: http://www.alliedpublishers.com Bookwell 3/79 Nirankari, Delhi 110009, INDIA Telephone: +91 11 2760 1283/4536 Email: [email protected]  Web site: http://www.bookwellindia.com ITALY Libreria Scientifica “AEIOU” Via Vincenzo Maria Coronelli 6, 20146 Milan, ITALY Telephone: +39 02 48 95 45 52  Fax: +39 02 48 95 45 48 Email: [email protected]  Web site: http://www.libreriaaeiou.eu JAPAN Maruzen Co., Ltd. 1-9-18 Kaigan, Minato-ku, Tokyo 105-0022, JAPAN Telephone: +81 3 6367 6047  Fax: +81 3 6367 6160 Email: [email protected]  Web site: http://maruzen.co.jp NETHERLANDS Martinus Nijhoff International Koraalrood 50, Postbus 1853, 2700 CZ Zoetermeer, NETHERLANDS Telephone: +31 793 684 400  Fax: +31 793 615 698 Email: [email protected]  Web site: http://www.nijhoff.nl Swets Information Services Ltd. PO Box 26, 2300 AA Leiden Dellaertweg 9b, 2316 WZ Leiden, NETHERLANDS Telephone: +31 88 4679 387  Fax: +31 88 4679 388 Email: [email protected]  Web site: http://www.swets.com SLOVENIA Cankarjeva Zalozba dd Kopitarjeva 2, 1515 Ljubljana, SLOVENIA Telephone: +386 1 432 31 44  Fax: +386 1 230 14 35 Email: [email protected]  Web site: http://www.mladinska.com/cankarjeva_zalozba SPAIN Diaz de Santos, S.A. Librerias Bookshop  Departamento de pedidos Calle Albasanz 2, esquina Hermanos Garcia Noblejas 21, 28037 Madrid, SPAIN Telephone: +34 917 43 48 90  Fax: +34 917 43 4023 Email: [email protected]  Web site: http://www.diazdesantos.es UNITED KINGDOM The Stationery Office Ltd. (TSO) PO Box 29, Norwich, Norfolk, NR3 1PD, UNITED KINGDOM Telephone: +44 870 600 5552 Email (orders): [email protected]  (enquiries): [email protected]  Web site: http://www.tso.co.uk UNITED STATES OF AMERICA Bernan Associates 4501 Forbes Blvd., Suite 200, Lanham, MD 20706-4391, USA Telephone: +1 800 865 3457  Fax: +1 800 865 3450 Email: [email protected]  Web site: http://www.bernan.com Renouf Publishing Co. Ltd. 812 Proctor Avenue, Ogdensburg, NY 13669, USA Telephone: +1 888 551 7470  Fax: +1 888 551 7471 Email: [email protected]  Web site: http://www.renoufbooks.com United Nations 300 East 42nd Street, IN-919J, New York, NY 1001, USA Telephone: +1 212 963 8302  Fax: 1 212 963 3489 Email: [email protected]  Web site: http://www.unp.un.org Orders for both priced and unpriced publications may be addressed directly to: IAEA Publishing Section, Marketing and Sales Unit, International Atomic Energy Agency Vienna International Centre, PO Box 100, 1400 Vienna, Austria Telephone: +43 1 2600 22529 or 22488 • Fax: +43 1 2600 29302 Email: [email protected] • Web site: http://www.iaea.org/books

14-17621 REFERENCE DATA SERIES No. 2 2014 Edition

Nuclear Power Reactors in the World

INTERNATIONAL ATOMIC ENERGY AGENCY VIENNA ISBN 978–92–0–104914–8 ISSN 1011–2642 @

14-17621_PUB-RDS-2-34_cover.indd All Pages 2014-05-15 10:55:11