Transit Rail Yard Boiler Plant Upgrade Draft Public Participation Plan

Introduction New York City Transit (NYCT), an agency of the Metropolitan Transportation Authority (MTA), is proposing to replace three existing boilers located at the Coney Island Rail Yard in , New York. The existing dual-fuel fired boilers (natural gas and #2 fuel oil) are old and beyond repair. In fact, two of the three existing boilers have failed as they are beyond their useful life, and are inoperable. As a result, the boiler plant is currently being supplemented by a temporary portable boiler. NYCT would replace the existing boilers with three new factory-built dual-fuel fired 24.5 million BTU/hour rated boilers (2 operating, 1 spare). The proposed new units have higher energy efficiency, lower emissions and higher reliability. The goals of the project are supportive of Mayor Michael Bloomberg’s goals for New York City outlined in PlaNYC, and include:

x Decreasing CO2, particulate, and greenhouse gas (GHG) emissions; x Improving local air quality; and x Achieving energy efficiencies and cost savings. The project is currently in the process of finalizing the construction contract for the installation of the new boilers. During the construction period, a 24.5 million BTU/hour rated temporary boiler and a 32.7 million BTU/hour rated temporary portable boiler would be used to provide the heat and steam needed at the yard. Once the permanent boilers are installed and being operating, the temporary and portable boilers would be shut down and removed from the site. Construction and equipment installation is slated to begin in mid-2012 with the startup of the new replacement boilers targeted for the Fall of 2012. This Public Participation Plan (PPP) is part of NYCT’s permitting application to the New York State Department of Environmental Conservation (NYSDEC) to modify the existing Title V Facility Air Permit to include the operation of the three new permanent boilers as well as the temporary and portable boilers to be used at the Coney Island Rail Yard boiler plant during the construction and installation of the new permanent boilers. In accordance with Commissioner Policy-29 Environmental Justice and Permitting (CP-29), NYSDEC requires the permit applicant to develop and execute a public participation plan targeting the local community, and conduct outreach as part of the environmental permit review process.

In contrast to the existing boilers, which do not have an NOx permit cap, the potential NOx emissions from the new replacement boilers would be capped to 24.5 tons/year. In addition, the new boilers will be equipped with low- NOx burners and will comply with all applicable air quality regulations and requirements. Total CO2 emissions from the new boilers will be less than the 25,000 metric tons per year GHG reporting threshold, and much less than the 100,000 tons per year Prevention of Signification Determination (PSD)/Title V threshold.

Final Draft ~ 1 ~ April 2012 New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan

Public Participation Plan The draft PPP for this permit application includes a number of activities and tasks that will be undertaken to inform stakeholders about the proposed project and the Title V Permit Modification being sought from NYSDEC. This will provide stakeholders access to information about the project and permit and encourage dialogue. Task # 1 -- Identify Affected Area Because of the project’s location (in the existing Boiler House, off of Shell Road within the larger NYCT Coney Island Rail Yard transit property in Brooklyn), a 1- mile radius from the proposed boiler replacement site has been selected in consultation with NYSDEC staff, to ensure that outreach to an appropriate area and interested entities (stakeholders) is undertaken. This is shown in Figure 1, attached. This area will serve as an initial component in identifying stakeholders. Particular emphasis will be placed on identifying stakeholders representing the area’s minority and low-income populations for outreach during the public participation process. Within this 1-mile radius of the proposed project site lies the entire Coney Island Rail Yard facility, an approximately 1-mile section of the , and portions of the following Brooklyn neighborhoods: Homecrest in the northeastern portion, Gravesend in the northwestern portion, in the southeastern portion, and Coney Island in the southwestern portion. South of the Belt Parkway and west of , the Coney Island portion of the study area is largely characterized by auto-related and parking uses, and residential uses. The Luna Park Houses are in this area, comprising a 5-building Mitchell-Lama residential cooperative complex of almost 1,600 apartments, making it one of the largest Mitchell Lama developments in the state. Additional large tracts of residential uses are located in the southwestern portion of the study area, including housing operated by the New York City Housing Authority (NYCHA). NYCT operates a subway along . The communities of Homecrest, Gravesend, and Brighton Beach are largely residential. Task #2 -- Identify Stakeholders and Create an Outreach Contact List Stakeholders who may be affected by the operation of the upgraded boiler plant at the NYCT Coney Island Rail Yard will be identified. This will be done in coordination with Community Board representatives and with input from NYCT. It is expected that the stakeholders for this plan will include, but may not be limited to: • NYCT employees who work at or visit portions of the Coney Island Rail Yard facility, • Residents/neighborhood groups who reside or are active in the vicinity of the proposed project • Community boards, local community and civic organizations, environmental and business groups, and any entities recommended by these groups • Neighborhood religious establishments • Elected officials

Final Draft ~ 2 ~ April 2012

AV R QUENTIN RD KINGS HWY

W 3 ST AV R 1.27.12 21 AV E HIGHLAWN AV PKWY

BAY AV S

OCEAN PKWY

23 AV

W 6 ST AV T

86 ST 24 AV BENSON AV AV U

MC DONALDAV AV V

GRAVESEND NECK RD

25 AV AV V AV V

26 AV AV W CONEY ISLAND AV

CROPSEY AV 27 AV W 11 ST BATH AV

AV W 25 AV AV X

W 8 ST

CROPSEY AV LLEHS DR

E 13 ST AV X AV Y

HARWAY AV 28 AV

44 ST BAY AV Z

STILLWELL AV

AV Z

OCEAN PKWY SHORE PKWY GUIDER AV

W 22 ST BAY 54 ST WEST AV

CROPSEY AV CONEY ISLAND AV

NEPTUNE AV

BRIGHTON 11 ST

TS 21 W 21 TS OCEAN PKWY NEPTUNE AV W 5 ST

W BRIGHTON AV BRIGHTON BEACH AV MERMAID AV SEA BREEZE AV

BOARDWALK E

VPS

W 15 ST

SURF AV

PED O W 10 ST

BOARDWALK W

W 29 ST

Project Site Feet 0 1,000 2,000 1-Mile Study Area 2000 Census Block Group Boundaries

Public Participation Plan Outreach Area NYCT BOILER REPLACEMENT TITLE V Figure 1 New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan

• Other appropriate state and local government officials. A preliminary outreach contact list of stakeholders is being assembled, including names, addresses, telephone numbers and e-mail addresses (if available) of individuals and organizations (as described above) with a possible interest in the proposed project. This list will be updated regularly to include new stakeholders identified as the public participation process continues. The preliminary outreach contact list that has been developed to date for this plan is included in Attachment A. Task #3 -- Prepare Written Information Written information on the proposed action and the environmental permit review process will be prepared for posting and distribution. The following written materials will be prepared and made available to the public as part of this outreach effort: • Project Fact Sheet (An outline of the contents of the Fact Sheet has been developed, and is included in the draft PPP as Attachment B.) • Information Availability Notices • Title V Permit Modification Application • Draft Title V Modification Permit • Environmental Justice Analysis • Draft Public Participation Plan Prepared materials will be written in clear, concise language, avoiding legal or overly technical terminology. Materials will be prepared in English; translation into Spanish will be undertaken if necessary, to the extent possible and practical. Task #4 -- Establish Document Repositories/Distribute Project Information Easily accessible public Document Repositories will be established at locations close to the proposed project and easily accessible to stakeholders. It is anticipated that these will include local Libraries and Community Board offices in or near the outreach area (defined above), as well as at the Coney Island Rail Yard facility office, and postings on the MTA-NYCT website (http://www.mta.info/nyct). The proposed locations of these repositories are shown in Attachment C. The availability of any additional public Document Repositories, if they are established, will be noted on NYCT website, when they become active. The repositories will contain a copy of the written information prepared for the proposed project’s PPP, (as outlined above in Task #3) as well as copies of the permit applications, and draft permits, once they are available. The contents of the repositories will be checked and updated regularly to ensure that no documents are missing. A list of document contents will be prepared and updated, to help keep the repositories organized. The locations and web address of the physical and web-based Document Repositories will be included in the Project Fact Sheet and in any project notices and/or flyers distributed publicly.

Final Draft ~ 3 ~ April 2012

New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan

It is envisioned that information will be distributed or made available to NYCT staff by the following means: i) an official memorandum would be circulated at the Coney Island Rail Yard facility containing a brief explanation of the project to provide information to on-site staff; and ii) flyers could be posted in employee meeting and notice areas. With the implementation of these measures, adequate notification would be provided to NYCT Coney Island Rail Yard staff to learn about the proposed project, and thus afford them the opportunity to provide comments. Task #5 -- Conduct Public Information Meeting/Informational Briefings One Public Information Meeting will be held at a publicly accessible location in the outreach area to provide information about the proposed boiler replacement and upgrade project, and the associated NYSDEC permitting process. In addition, project information will be sent to elected officials and the Brooklyn Community Boards, to provide information about the proposed Coney Island Rail Yard Boiler Plant Upgrade project and the associated NYSDEC permitting process. Stakeholders will also be invited to the Public Information Meeting and will be invited to provide comments on project materials and the draft PPP, in writing to a specified NYCT representative. NYCT and consultant team staff members will be available to receive and answer questions about the project at the Public Information Meeting and/or at any project briefings held. The meeting (and any briefings requested) will be scheduled after consulting Community Board calendars and with municipal and agency officials. This will help to avoid conflicts with important meetings or events that are regularly held or already scheduled within the community. The Public Information Meeting will be held after the draft permit application has been submitted to NYSDEC for review. Meeting logistics will be publicized approximately ten (10) days ahead of the meeting date, in order to give stakeholders reasonable notification. A general mailing will be prepared for the project for delivery to all interested parties on the Contact List (see Attachment A). This mailing will include Project Notices announcing the project’s Public Information Meeting, as well as a copy of the Project Fact Sheet (written in English and Spanish), which will also be sent to the local organizations and all other stakeholders identified on the Contact List for posting at those locations. These Project Information Notices will include: • the name of the project sponsor; • the name and address of the proposed project; • a brief description about the project information available for review; • the description of why the project information is being sent; • the comment period being provided for submitting comments on the project, and when the comment period will end; • contact information for any questions about the project information, or how and where to provide comments (written or via website); and

Final Draft ~ 4 ~ April 2012

New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan

Where answers to any questions or comments submitted will be made available, and approximately by when, after the comment period has concluded. An agenda will be prepared and distributed when the Public Information Meeting is held. Attendees will also be informed of where they can obtain answers to any questions they may have after the meeting has concluded. Outreach documents related to this boiler replacement and upgrade project will be available at the following website:

http://www.mta.info/nyct

Task #6 - Prepare Participation Plan Outreach Summary/Certification Document A written summary of the outreach conducted under the PPP will be prepared and submitted to the NYSDEC. This report will serve as the participation plan’s Certification Document, and will include: • A summary of PPP milestones, outlining plan implementation; • Methods used to engage the public and solicit outreach; • Time and date of the Public Information Meeting; • Time and date of project informational briefings undertaken (if any); • Any substantive concerns/issues raised during outreach activities or received during the public comment period from stakeholders or the public at large: • Descriptions of how the issues raised were addressed; and • A description of any unresolved or outstanding issues. The written Certification Document will confirm that the applicant has complied with the PPP, and will include a summary detailing the activities that occurred pursuant to the plan. The Certification Document will become part of the permit application and will be made available to the public at the document repositories. The Certification Document will also include several appendices as follows: • Copies of written information such as notices, flyers, and briefing invitations; • Copies of meeting agendas • Meeting summary of the Public Information Meetings; and • Names of attendees at the Public Information Meeting and at any other project informational briefings, if any are held (copies of sign-in sheets). Ï

Final Draft ~ 5 ~ April 2012

New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan Attachment A – Preliminary Contact List

COMMUNITY BOARD OFFICES Brooklyn Community Board #11 2214 Bath Avenue Brooklyn, NY 11214 Phone: 718-266-8800 Fax: 718-266-8821 Email: [email protected] Chair: William Guarinello District Manager: Marnee Elias-Pavia Brooklyn Community Board #13 1201 Surf Avenue, 3rd Floor Brooklyn, NY 11224 Phone: 718-266-3001 Fax: 718-266-3920 Email: [email protected] Chair: Eddie Mark District Manager: Chuck Reichenthal Brooklyn Community Board #15 Kingsboro Community College 2001 Oriental Boulevard, C Cluster Room C124 Brooklyn, NY 11235 Phone: 718-332-3008 Fax: 718-648-7232 Email: [email protected] Chair: Theresa Scavo District Manager: Pearl Burg

NEW YORK STATE ELECTED OFFICIALS

Sixth Congressional District, New York Congressman Gregory Meeks St. Albans District Office 153-01 , 2nd floor Jamaica, New York 11432 Tel 718-725-6000 | Fax 718-725-9868

Final Draft April 2012 New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan Attachment A – Preliminary Contact List

Ninth Congressional District, New York New York State Assembly District 32 Congressman Robert Turner Assemblywoman Vivian E. Cook Office Jamaica District Office 82-20A Eliot Avenue 142-15 Rockaway Blvd. Middle Village, NY 11379 Jamaica, NY 11436 Tel: (718) 426-5000 718-322-3975 New York State 10th Senate District New York State Assembly District 29 State Senator Shirley L. Huntley Assemblyman William Scarborough District Office Jamaica District Office 161-10 Jamaica Avenue 129-32 Merrick Blvd. Suite 504 Jamaica, NY 11434 Jamaica, New York 11432 718-723-5412 Tel (718) 523-3069 | Fax (718) 523-3670 8th Congressional District of New York Rosedale-Laurelton Satellite Office Congressman Jerrold Nadler 133-24 233rd Street Brooklyn Office Rosedale, New York 11422 445 Neptune Avenue Tel (718) 949-1601 | Fax (718) 949-1619 Brooklyn, NY 11224 New York State 15th Senate District 718-373-3198 State Senator Joseph P. Addabbo Jr. 13th Congressional District of New York District Office Congressman Michael Grimm 159-53 102nd Street Brooklyn Office Howard Beach, NY 11414 7308 13th Avenue Tel 718-738-1111 | Fax 718-322-5760 Brooklyn, NY 11228 New York State 14th Senate District Tel 718-630-5277 | Fax 718-630-5388 State Senator Malcolm A. Smith New York State 23rd Senate District District Office State Senator Diane J. Savino 205-19 District Office 2 St. Albans, NY 11412 2872 West 15th Street Tel (718) 528-4290 | Fax (718) 528-4898 Brooklyn, NY 11224-2602 New York State Assembly District 31 Phone: 718-333-0311 Assemblywoman Michele R. Titus Fax: 347-492-3263 South Ozone Park District Office New York State Assembly District 47 131-17 Assemblymember South Ozone Park, NY 11420 District Office 718-322-4958 155 New York State Assembly District 23 Brooklyn, NY 11223 Assemblyman Phillip Goldfeder 718-236-1598 Ozone Park District Office New York State 27th Senate District 108-14 Crossbay Blvd. Seat is Currently Vacant Ozone Park, NY 11417 Carl Kruger – resigned 718-641-8755 Seat currently empty

Final Draft April 2012 New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan Attachment A – Preliminary Contact List

New York State Assembly District 46 Assemblymember Alec Brook-Krasny District Office District Office 2823 West 12th Street, Suite 1F 8703 3rd Avenue Brooklyn, NY 11224 Brooklyn, NY 11209 718-266-0267 718-680-2845

NEW YORK CITY OFFICIALS & COUNCIL REPRESENTATIVES

Brooklyn Borough President Legislative Office Honorable Marty Markowitz 250 , Room 1816 New York, NY 10007 209 Joralemon Street Tel 212-788-6850 | Fax 212-442-2729 Brooklyn, NY 11201 718-802-3700 New York City Council, District 32 Council Member Eric Ulrich) New York City Council, District 31 Council Member James Sanders, Jr. District Office 93-06 101st Avenue District Office Ozone Park 11416 234-26 A Merrick Blvd. Tel 718-738-1083 | Fax 718738-1918 Laurelton, New York 11422 Tel 718-527-4356 | Fax 718-527-4402 Legislative Office 250 Broadway Legislative Office Suite 1555 250 Broadway, Suite 1820 New York, NY 10007 New York, NY 10007 Tel 212-788-7069 Tel 212-788-7216 | Fax 212-227-1210 New York City Council, District 28 Council Member Thomas White, Jr. District Office 145-40 Rockaway Blvd. South Ozone Park, New York 11436 Tel 718-843-2735 | Fax 718-845-0817

RELIGIOUS & COMMUNITY ORGANIZATIONS St Paul's Evangelical Lutheran Coney Island Congregation 2801 West 8th Street 2829 West 16th Street Brooklyn, NY 11224-3603 Brooklyn, NY 11224-2605 (718) 266-1831 (718) 449-4912 Contact: Harvey W. von Harten, Pastor Salt & Sea Mission Congregation Meor Hachaim-L 1530 Mermaid Avenue 2880 W 12th Street, #8 Brooklyn, NY 11224-2618 Brooklyn, NY 11224-2901 (718) 372-3576 (718) 449-1208 Contact: Debbe Santiago, Pastor

Final Draft April 2012 New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan Attachment A – Preliminary Contact List

Sisters of St Joseph Beach Haven Jewish Center 1840 West 6th Street 723 Ave Z Brooklyn, NY 11223-2646 Brooklyn, NY 11223 (718) 627-5456 (718) 375-5200

Horizon Christian Fellowship Avenue Z Jewish Center 2585 West 13th Street 875 Avenue Z Brooklyn, NY 11223 Brooklyn, NY 11235 (718) 714-5433 (718) 646-9874 Contact: John Connors, Pastor Young Israel of Sheepshead Bay Jehovah's Witnesses 2546 East 7th Street 2160 West 11th Street Brooklyn, NY 11235-6207 Brooklyn, NY 11223-3529 (718) 891-6767 (718) 372-6526 Congregation Beth El-Flatbush House of Prayer 2181 East 3rd Street 170 Avenue T Brooklyn, NY 11223 Brooklyn, NY 11223-3725 (718) 336-1926 (718) 333-2233 Contact: Gannady P. Zavaliy, Pastor Trinity Tabernacle-Gravesend 121 Gravesend Neck Road First Korean Church Brooklyn, New York 14 Gravesend Neck Road (718) 998-7827 Brooklyn, NY 11223-3827 Contact: Rev. Dr. Lucian Gandolfo, Pastor (718) 265-2584 Congregation Beth Yosef Marlboro Jewish Center 2108 Ocean Parkway 2324 West 13th Street Brooklyn, NY 11223-4829 Brooklyn, NY 11223 (718) 645-0448

Our Lady of Grace Church Jewish Community Council 430 Avenue W 2298 West 8th Street Brooklyn, NY 11223-5499 Brooklyn, NY 11223-4555 (718) 627-2020 (718) 373-6161 Contact: Rev. Thomas F. Leach, Pastor Al Mustafa Islamic Center Congregation Shaare Zion 3126 2022 Ocean Parkway Brooklyn, NY 11235-6449 Brooklyn, NY 11223-4045 (718) 743-6666 (718) 375-3834

Final Draft April 2012 New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan Attachment A – Preliminary Contact List

Universal Foundation Ltd. Coney Island Chamber of Commerce 2727 Coney Island Avenue 1000 Surf Avenue Brooklyn, NY 11235-5004 Brooklyn, NY 11224 (718) 332-5775 (718) 265-2100 Contact: Carol Albert 60th Precinct Community Council 2951 West 8th Street Friends of the Boardwalk Brooklyn, NY 11224 199 27th Avenue, 1st Floor (718) 946-3328 Brooklyn, NY 11214 Contact: Judd Fischler email: [email protected] Contact: Todd Dobrin, President Astella Development Corporation 1618 Mermaid Avenue Grace Gravesend Athletic Association Brooklyn, NY 11224 430 Avenue W (718) 266-4653 Brooklyn, NY 11223 Contact: Judi Orlando (718) 336-7148 Contact: Lou Cornacchia Bensonhurst West End Community Council 521 West Avenue Jewish Association for Services for the Aged Brooklyn, NY 11224 (JASA) Luna Park Senior Center (718) 946-0234 2880 West 12th Street Contact: Carmine Santamaria Brooklyn, NY 11224 (718) 996-6666 Comprehensive Care Management (CCM) Contact: Adrienne Sloman 1519 Mermaid Avenue Brooklyn, NY 11224 P.R.I.D.E. (718) 688-0200 PO Box #240-453 Contact: Inna Goldshmidt Brooklyn, NY 11224 (718) 373-7633 Coney Island Board of Trade Contact: Georganna Deas, President 1618 Mermaid Avenue Brooklyn, NY 11224 Police Service Area #1 tel: (718) 266-4653 Police Residents Council tel: (917) 710-1004 2860 West 23rd Street Contact: Edwin Cosme, President Brooklyn, NY 11224 (718) 265-7313 Coney Island Community Emergency Response Contact: Emily Sterling Team (CERT) Youth D.A.R.E.S 1201 Surf Avenue 2857 West 8th Street Brooklyn, NY 11224 Brooklyn, NY 11224 (718) 266-3001 (718) 996-5551 Contact: Charles Reichenthal Contact: John Pasagiannis Final Draft April 2012 New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan Attachment A – Preliminary Contact List

Urban Neighborhood Services, Inc. PO Box #423 1718 Mermaid Avenue Brooklyn, NY 11224 Brooklyn, NY 11224 (718) 801-1054 (347) 374-2455 Contact: Mathylde Frontus, Executive Director -or-

CIVIC ORGANIZATIONS Amalgamated Warbasse Houses Inc. Harway Terrace 2800 West 5th Street 2475 West 16th Street Brooklyn, NY 11224 Brooklyn, NY 11214 718-266-9000 (718) 332-0777 Contact: Thomas Auletti, Acting Property Manager Luna Park Housing 2879 West 12th Street Brighton Towers Corporation Brooklyn, NY 11224 50 Brighton 1st Road (718) 266-5400 Brooklyn, NY 11235 Contacts: Keith R. Murphy, Board President, (718) 266-3301 Fikret Deljanin, General Manager

Brightwater Towers NYCHA – Marlboro Houses 601A Surf Avenue 2740 86th Street Brooklyn, NY 11224 Brooklyn, NY 11224 (718) 996-1300 (718) 373-9513 Contact: Victoria Stancil Contello Towers 2 2740 Trump Village Co-Op Office Brooklyn, NY 11214 2915 West 5th Street, Suite #1 (718) 265-8625 Brooklyn, NY 11224 (718) 946-1860

GOVERNMENT AGENCY NEW YORK STATE DEPARTMENT OF ENVIRONMENTAL CONSERVATION (NYSDEC) Region 2 – Division of Environmental Permits Contact: Michelle Moore, Environmental Analyst 3 1 Hunters Point Plaza 47-40 21st Street Long Island City, NY 11101-5407 (718) 482-4900

Final Draft April 2012

New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan Attachment B – Fact Sheet Outline

The following is an outline of the proposed contents of the Fact Sheet to be distributed for the boiler plant’s Title V facility permit modification, as part of the outreach materials for the project.

Title of Fact Sheet We proposed to use:

New York City Transit Coney Island Yard Boiler Plant Upgrade Project Fact Sheet

The NYCT Coney Island Rail Yard

A brief description of the rail yard and boiler plant’s purpose will be provided under this heading.

Issues/Project Goals

This section would provide a brief outline of the issues with the existing boilers, the project’s overall goals, and how they relate to and support the city-wide PlaNYC goals.

The Solution/Project Benefits

This section will include a brief description of the proposed replacement boilers and any other related improvements, their proposed locations, and the benefits of operating them. There will be a graphic showing the proposed site plan.

Public Outreach

This section mentions that this is part of the permit review process, refers to the Public Participation Plan, indicates where project information is available.

Document Repositories

There will be a special “Information Box” on the Fact Sheet that shows the addresses and locations of the document repositories for the project. There will also be a line indicating a NYCT contact and web address for more information.

Final Draft April 2012 New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan Attachment C – Proposed Document Repositories

LIBRARIES Brooklyn Public Library–Gravesend Branch 303 Avenue X Brooklyn, NY 11223-5933 718-382-5792 Brooklyn Public Library–Ulmer Park Branch 2602 Bath Avenue Brooklyn, NY 11214-5502 718-265-3443 Brooklyn Public Library–Coney Island Branch Library 1901 Mermaid Avenue Brooklyn, NY 11224-2507 718-265-3220 Brooklyn Public Library– Brighton Beach Branch 16 Brighton 1st Road Brooklyn, NY 11235 718- 946-2917

COMMUNITY BOARD OFFICES

Brooklyn Community Board #11 2214 Bath Avenue, Brooklyn, NY 11214 Phone: 718-266-8800 Fax: 718-266-8821 Email: [email protected] Chair: William Guarinello District Manager: Marnee Elias-Pavia

Brooklyn Community Board #13 1201 Surf Avenue, 3rd Floor Brooklyn, NY 11224 Phone: 718-266-3001 Fax: 718-266-3920 Email: [email protected] Chair: Eddie Mark District Manager: Chuck Reichenthal

Final Draft April 2012 New York City Transit Coney Island Yard Boiler Plant Upgrade Draft Public Participation Plan Attachment C – Proposed Document Repositories

Brooklyn Community Board #15 Kingsboro Community College 2001 Oriental Boulevard, C Cluster Room C124 Brooklyn, NY 11235 Phone: 718-332-3008 Fax: 718-648-7232 Email: [email protected] Chair: Theresa Scavo District Manager: Pearl Burg

ON-LINE WEBSITE Outreach documents related to this boiler upgrade and replacement project will be available at the MTA NYC Transit website: http://www.mta.info/nyct

Final Draft April, 2012