65 West Central 3 #06-04 648332

5 May 2016

The following property has been valued based on our indicative valuation methodology.

1. Property Address 6 5 Central 3 # 0 6 -0 4 S ingapore 6 48 332 2. Property Details Project Name THE CENTRIS Street Name Jurong West Central 3 Property Type Apartment Age Completed in 2009 Tenure 99 Yrs From 21/06/2006 Floor Area 85 sq m/ 915 sq ft (Based on official data) 3. Method of Valuation Direct Comparison Method 4. Open Market Value $ 1, 0 70 , 0 0 0 /- 5. Forced S ale Value $ 749 , 0 0 0 /- 6 . Location

Te rms o f Use Te rms o f Use

7. S upporting Data

The following transactions have been considered to arrive at the open market value

Area Price Price Date Address (sqft) (S $ ) (S $ psf) 25 Jan 2016 83 Jurong West Central 3 #09-42 936 1,120,000 1,196 6 Jul 2015 77 Jurong West Central 3 #12-28 980 1,128,000 1,152 14 May 2015 65 Jurong West Central 3 #06-04 915 1,100,000 1,202

The methodology applies many of the s ame principles of a formal apprais al. It is endors ed by 3C Property Cons ultants Pte Ltd and GB Global Pte Ltd, property valuation firms in S ingapore whos e valuers have over 30 years of valuation experience each. They are als o panel valuers of Hous ing Development Board (HDB) and a local bank in S ingapore. If you require a formal apprais al, pleas e contact 3C Property Cons ultants Pte Ltd at +65 9008 2090.

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 1 OF 1

Floor Plan

The floor plan is not to scale and may represent a mirror image of the physical unit.

1. Property CENTRIS , THE 2. Unit Block 6 5, # 0 6 -0 4 3. Type 2 Bdrm

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 1 OF 1

THE CENTRIS

DEVELOPER PRIME POINT REALTY DEVELOPMENT PTE LTD ARCHITECT CGNARCHITECTS MAIN CONTRACTOR WOH HUP (PRIVATE) LIMITED LAND SIZE (SQM) 33,524 GFA (SQM) 70,400 PLOT RATIO (INCL. BONUS) 2.1 PROJECT NAME THE CENTRIS STREET NAME JURONG WEST CENTRAL 3 PROPERTY TYPE APARTMENT TENURE 99 YRS FROM 2006 DISTRICT / PLANNING AREA D22 / JURONG WEST COMPLETION 2009 NUMBER OF UNITS 610 UNITS SOLD PRICE RANGE / AVERAGE* S$ 743 - S$ 1,202 SQFT / S$ 1,049 PSF

LEASED RENTAL RANGE / S$ 2.3 - S$ 4.5 PSF PM / S$ 3.5 PSF PM AVERAGE* IMPLIED RENTAL YIELD 4.0%

HISTORICAL HIGH S$ 1,386 SQFT IN JUN 2013 FOR A 872-SQFT UNIT

INDICATIVE AVERAGE PRICE -24.3% FROM HISTORICAL HIGH

HISTORICAL LOW S$ 315 SQFT IN OCT 2006 FOR A 2,347-SQFT UNIT BUYER PROFILE BY RESIDENTIAL SINGAPOREAN 80.7%, PR 10.5%, FOREIGNER STATUS 7.9%, COMPANY 0.8%

BUYER PROFILE BY PURCHASER HDB 60.6%, PRIVATE 39.4% ADDRESS

Price Trends

PRICE TRENDS So urce: URA, http: //www. theedg eproperty. com. sg >500sqft Polynomial Trendline 1,500 1,500

1,250 1,250 )

f 1,000 1,000 s p

$

S 750 750 (

e c i

r 500 500 P

250 250

0 0 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016

HISTORICAL MONTHLY PRICE RANGE & VOLUME

So urce: URA, http: //www. theedgeproperty. com. sg

Average Price Volume 1,500 500

1,250 400 ) f s V p o

1,000 300 l $ u S m (

e e

c 750 200 i r P

500 100

250 0 Jan 2006 Jan 2007 Jan 2008 Jan 2009 Jan 2010 Jan 2011 Jan 2012 Jan 2013 Jan 2014 Jan 2015 Jan 2016

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 1 OF 49

Rental Trends

RENTAL TRENDS

So urce: URA, http: //www. theedgeproperty. com. sg

2-Bedroom 3-Bedroom 4-Bedroom 7,000 7,000

6,000 6,000 ) $ S (

l

a 5,000 5,000 t n e R

4,000 4,000

3,000 3,000 Jan '12 Jul '12 Jan '13 Jul '13 Jan '14 Jul '14 Jan '15 Jul '15 Jan '16

Sales

SALES TRANSACTIONS

So urce: URA, http: //www. theedgeproperty. com. sg

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

23 Feb 16 69 Jurong West Central 3 # 15-13 Resale 1,292 Strata 1,037 1,340,000 Private

25 Jan 16 83 Jurong West Central 3 # 09-42 Resale 936 Strata 1,196 1,120,000 Private

13 Nov 15 67 Jurong West Central 3 # 16-08 Resale 1,851 Strata 743 1,375,000 HDB

2 Oct 15 73 Jurong West Central 3 # 05-20 Resale 1,884 Strata 948 1,785,000 Private

4 Sep 15 81 Jurong West Central 3 # 15-37 Resale 1,292 Strata 1,107 1,430,000 Private

11 Aug 15 83 Jurong West Central 3 # 07-40 Resale 1,238 Strata 1,115 1,380,000 Private

5 Aug 15 87 Jurong West Central 3 # 13-51 Resale 1, 389 Strata 1,080 1,500,000 HDB

6 Jul 15 77 Jurong West Central 3 # 12-28 Resale 980 Strata 1,152 1,128,000 Private

1 Jul 15 75 Jurong West Central 3 # 05-25 Resale 1,292 Strata 968 1,250,000 HDB

18 May 15 65 Jurong West Central 3 # 10-05 Resale 1,302 Strata 990 1,290,000 Private

14 May 15 65 Jurong West Central 3 # 06-04 Resale 915 Strata 1,202 1,100,000 Private

16 Apr 15 69 Jurong West Central 3 # 14-11 Resale 936 Strata 1,098 1,028,000 HDB

15 Apr 15 75 Jurong West Central 3 # 10-22 Resale 1,259 Strata 1,043 1,313,000 Private

27 Mar 15 65 Jurong West Central 3 # 07-03 Resale 1,001 Strata 1,077 1,078,000 HDB

20 Mar 15 73 Jurong West Central 3 # 14-21 Resale 1,109 Strata 1,173 1,300,000 HDB

24 Feb 15 81 Jurong West Central 3 # 12-39 Resale 936 Strata 1,153 1,080,000 HDB

17 Feb 15 79 Jurong West Central 3 # 05-34 Resale 1,270 Strata 866 1,100,000 HDB

18 Dec 14 77 Jurong West Central 3 # 12-31 Resale 872 Strata 1,133 988,000 Private

28 Nov 14 79 Jurong West Central 3 # 07-35 Resale 1,066 Strata 1,135 1,210,000 HDB

21 Nov 14 67 Jurong West Central 3 # 07-06 Resale 936 Strata 1,143 1,070,000 HDB

21 Nov 14 69 Jurong West Central 3 # 12-10 Resale 1,066 Strata 1,182 1,260,000 Private

20 Nov 14 83 Jurong West Central 3 # 13-43 Resale 1,152 Strata 998 1,150,000 Private

21 Oct 14 67 Jurong West Central 3 # 16-07 Resale 1,733 Strata 949 1,645,000 HDB

3 Oct 14 73 Jurong West Central 3 # 10-21 Resale 1,066 Strata 1,126 1,200,000 HDB

22 Sep 14 75 Jurong West Central 3 # 10-24 Resale 1,302 Strata 1,013 1,320,000 HDB

15 Aug 14 65 Jurong West Central 3 # 10-04 Resale 915 Strata 1,246 1,140,000 HDB

11 Aug 14 69 Jurong West Central 3 # 05-12 Resale 2,099 Strata 1,055 2,215,000 Private

18 Jul 14 87 Jurong West Central 3 # 14-51 Resale 1,302 Strata 1,013 1,320,000 HDB

7 May 14 87 Jurong West Central 3 # 13-49 Resale 1,313 Strata 1,066 1,400,000 Private

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 2 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

23 Apr 14 65 Jurong West Central 3 # 10-03 Resale 1,001 Strata 1,189 1,190,000 HDB

16 Jan 14 67 Jurong West Central 3 # 11-06 Resale 936 Strata 1,292 1,210,000 HDB

28 Aug 13 87 Jurong West Central 3 # 15-50 Resale 1,313 Strata 1,127 1,480,000 HDB

19 Aug 13 87 Jurong West Central 3 # 07-50 Resale 1,259 Strata 1,197 1,508,000 Private

19 Jul 13 81 Jurong West Central 3 # 06-39 Resale 936 Strata 1,212 1,135,000 HDB

12 Jul 13 79 Jurong West Central 3 # 12-34 Resale 1,066 Strata 1,267 1,350,000 HDB

8 Jul 13 79 Jurong West Central 3 # 13-32 Resale 1,066 Strata 1,314 1,400,000 Private

27 Jun 13 83 Jurong West Central 3 # 05-42 Resale 1,087 Strata 1,058 1,150,000 HDB

17 Jun 13 71 Jurong West Central 3 # 05-17 Resale 2,099 Strata 1,072 2,250,000 HDB

13 Jun 13 83 Jurong West Central 3 # 16-42 Resale 1,561 Strata 897 1,400,000 Private

6 Jun 13 73 Jurong West Central 3 # 15-20 Resale 1,238 Strata 1,115 1,380,000 Private

6 Jun 13 77 Jurong West Central 3 # 14-31 Resale 872 Strata 1,386 1,208,000 HDB

23 May 13 81 Jurong West Central 3 # 06-37 Resale 1,238 Strata 1,232 1,525,000 Private

22 May 13 69 Jurong West Central 3 # 14-10 Resale 1,066 Strata 1,243 1,325,000 Private

17 May 13 69 Jurong West Central 3 # 09-10 Resale 1,066 Strata 1,206 1,285,000 HDB

16 May 13 85 Jurong West Central 3 # 11-47 Resale 936 Strata 1,281 1,200,000 HDB

7 May 13 69 Jurong West Central 3 # 06-10 Resale 1,066 Strata 1,173 1,250,000 Private

29 Apr 13 83 Jurong West Central 3 # 07-42 Resale 936 Strata 1,121 1,050,000 Private

23 Apr 13 83 Jurong West Central 3 # 15-41 Resale 1,485 Strata 1,144 1,700,000 Private

4 Apr 13 85 Jurong West Central 3 # 13-44 Resale 958 Strata 1,242 1,190,000 HDB

21 Mar 13 65 Jurong West Central 3 # 16-04 Resale 1,572 Strata 865 1,360,000 Private

12 Mar 13 69 Jurong West Central 3 # 05-13 Resale 1,582 Strata 1,011 1,600,000 Private

18 Feb 13 85 Jurong West Central 3 # 05-47 Resale 1,270 Strata 945 1,200,000 HDB 16 Jan 13 83 Jurong West Central 3 # 15-40 Resale 1, 292 Strata 1,215 1,570,000 HDB 7 Jan 13 65 Jurong West Central 3 # 05-04 Resale 1,604 Strata 842 1,350,000 HDB

3 Dec 12 65 Jurong West Central 3 # 10-01 Resale 1,302 Strata 1,052 1,370,000 HDB

29 Nov 12 67 Jurong West Central 3 # 15-07 Resale 1,066 Strata 1,196 1,275,000 Private

16 Nov 12 75 Jurong West Central 3 # 13-22 Resale 1,346 Strata 1,041 1,400,000 HDB

2 Nov 12 79 Jurong West Central 3 # 14-33 Resale 1,292 Strata 1,200 1,550,000 Private

22 Oct 12 85 Jurong West Central 3 # 08-46 Resale 1,066 Strata 1,144 1,218,888 HDB

16 Oct 12 71 Jurong West Central 3 # 07-14 Resale 936 Strata 1,281 1,200,000 Private

28 Sep 12 77 Jurong West Central 3 # 08-31 Resale 872 Strata 1,179 1,027,780 HDB

27 Sep 12 69 Jurong West Central 3 # 09-11 Resale 936 Strata 1,260 1,180,000 Private

26 Sep 12 79 Jurong West Central 3 # 14-35 Resale 1,119 Strata 1,143 1,280,000 Private

5 Sep 12 75 Jurong West Central 3 # 13-23 Resale 1,389 Strata 1,080 1,500,000 HDB

3 Sep 12 81 Jurong West Central 3 # 15-37 Resale 1,292 Strata 1,154 1,490,000 HDB

22 Aug 12 65 Jurong West Central 3 # 06-05 Resale 1,302 Strata 1,098 1,430,000 HDB

15 Aug 12 71 Jurong West Central 3 # 14-16 Resale 1,238 Strata 1,196 1,480,000 HDB

8 Aug 12 81 Jurong West Central 3 # 14-38 Resale 1,066 Strata 1,143 1,218,000 Private

3 Aug 12 69 Jurong West Central 3 # 13-13 Resale 1,324 Strata 1,109 1,468,890 HDB

3 Aug 12 73 Jurong West Central 3 # 05-18 Resale 1,593 Strata 861 1,370,888 HDB

27 Jul 12 83 Jurong West Central 3 # 14-43 Resale 1,066 Strata 1,191 1,268,888 Private

26 Jul 12 69 Jurong West Central 3 # 06-11 Resale 936 Strata 1,127 1,055,000 Private

19 Jul 12 83 Jurong West Central 3 # 08-43 Resale 1,066 Strata 1,116 1,188,888 HDB

16 Jul 12 87 Jurong West Central 3 # 14-50 Resale 1,259 Strata 1,093 1,376,500 HDB

12 Jul 12 77 Jurong West Central 3 # 09-31 Resale 872 Strata 1,181 1,030,000 HDB

6 Jul 12 67 Jurong West Central 3 # 08-08 Resale 1,238 Strata 1,115 1,380,000 HDB

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 3 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

6 Jul 12 81 Jurong West Central 3 # 13-38 Resale 1,152 Strata 1,085 1,250,000 HDB

29 Jun 12 79 Jurong West Central 3 # 08-33 Resale 1,238 Strata 1,115 1,380,000 HDB

19 Jun 12 87 Jurong West Central 3 # 16-50 Resale 2,110 Strata 825 1,740,000 Private

12 Jun 12 75 Jurong West Central 3 # 16-26 Resale 1,615 Strata 876 1,415,000 HDB

1 Jun 12 85 Jurong West Central 3 # 11-45 Resale 1,238 Strata 1,171 1,450,000 HDB

14 May 12 75 Jurong West Central 3 # 07-26 Resale 1,001 Strata 1,199 1,200,000 Private

8 May 12 75 Jurong West Central 3 # 14-22 Resale 1,259 Strata 1,120 1,410,000 HDB

4 May 12 87 Jurong West Central 3 # 06-50 Resale 1,259 Strata 1,012 1,275,000 Private

21 Apr 12 85 Jurong West Central 3 # 14-47 Resale 990 Strata 1,149 1,138,000 Private

16 Apr 12 75 Jurong West Central 3 # 06-25 Resale 915 Strata 1,100 1,006,500 HDB

16 Apr 12 69 Jurong West Central 3 # 08-13 Resale 1,238 Strata 1,175 1,454,288 HDB

9 Apr 12 69 Jurong West Central 3 # 06-12 Resale 1,442 Strata 1,043 1,505,000 Private

2 Apr 12 75 Jurong West Central 3 # 11-25 Resale 915 Strata 1,202 1,100,000 HDB

30 Mar 12 75 Jurong West Central 3 # 16-24 Resale 1,894 Strata 823 1,558,888 Private

23 Mar 12 69 Jurong West Central 3 # 07-11 Resale 936 Strata 1,105 1,035,000 Private

22 Mar 12 75 Jurong West Central 3 # 06-24 Resale 1,302 Strata 960 1,250,000 Private

16 Mar 12 85 Jurong West Central 3 # 12-45 Resale 1,324 Strata 1,095 1,450,000 HDB

22 Feb 12 77 Jurong West Central 3 # 13-27 Resale 1,001 Strata 1,137 1,138,000 Private

21 Feb 12 77 Jurong West Central 3 # 08-30 Resale 1,259 Strata 1,016 1,280,000 HDB

20 Feb 12 71 Jurong West Central 3 # 13-16 Resale 1,324 Strata 1,076 1,425,000 Private

22 Jan 12 81 Jurong West Central 3 # 06-36 Resale 1,442 Strata 1,005 1,450,000 Private

28 Dec 11 73 Jurong West Central 3 # 09-21 Resale 1,066 Strata 1,276 1,360,000 Private

20 Dec 11 75 Jurong West Central 3 # 05-22 Resale 1,701 Strata 882 1,500,000 HDB 19 Dec 11 75 Jurong West Central 3 # 15-23 Resale 1, 356 Strata 1,091 1,480,000 Private 16 Dec 11 67 Jurong West Central 3 # 16-09 Resale 1,561 Strata 787 1,228,000 HDB

25 Nov 11 67 Jurong West Central 3 # 11-06 Sub Sale 936 Strata 1,063 995,000 Private

16 Nov 11 87 Jurong West Central 3 # 11-51 Sub Sale 1,302 Strata 1,031 1,343,000 Private

15 Nov 11 65 Jurong West Central 3 # 11-04 Sub Sale 915 Strata 1,202 1,100,000 Private

10 Nov 11 75 Jurong West Central 3 # 16-22 Sub Sale 2,110 Strata 810 1,708,000 Private

24 Oct 11 87 Jurong West Central 3 # 12-49 Sub Sale 1,227 Strata 1,125 1,380,000 Private

14 Oct 11 85 Jurong West Central 3 # 14-46 Sub Sale 1,119 Strata 1,090 1,220,000 Private

14 Oct 11 75 Jurong West Central 3 # 10-23 Sub Sale 1,302 Strata 1,060 1,380,000 Private

7 Oct 11 67 Jurong West Central 3 # 09-09 Sub Sale 958 Strata 1,180 1,130,000 Private

6 Oct 11 77 Jurong West Central 3 # 08-27 Sub Sale 969 Strata 1,156 1,120,000 HDB

6 Oct 11 77 Jurong West Central 3 # 16-29 Sub Sale 1,808 Strata 823 1,488,000 HDB

22 Sep 11 73 Jurong West Central 3 # 10-18 Sub Sale 1,066 Strata 1,107 1,180,000 Private

9 Sep 11 69 Jurong West Central 3 # 16-10 Sub Sale 1,744 Strata 853 1,488,000 Private

8 Sep 11 83 Jurong West Central 3 # 16-43 Sub Sale 1,744 Strata 773 1,348,000 Private

29 Aug 11 87 Jurong West Central 3 # 11-49 Sub Sale 1,227 Strata 1,091 1,339,000 Private

22 Aug 11 73 Jurong West Central 3 # 06-21 Sub Sale 1,066 Strata 1,145 1,220,000 Private

19 Aug 11 73 Jurong West Central 3 # 07-18 Sub Sale 1,066 Strata 1,127 1,200,888 Private

4 Aug 11 75 Jurong West Central 3 # 06-22 Sub Sale 1,259 Strata 953 1,200,000 HDB

3 Aug 11 71 Jurong West Central 3 # 05-15 Sub Sale 1,593 Strata 816 1,300,000 Private

3 Aug 11 65 Jurong West Central 3 # 15-01 Sub Sale 1,356 Strata 1,010 1,370,000 HDB

15 Jul 11 67 Jurong West Central 3 # 14-07 Sub Sale 1,119 Strata 1,017 1,138,000 HDB

13 Jul 11 71 Jurong West Central 3 # 06-16 Sub Sale 1,238 Strata 1,115 1,380,000 HDB

4 Jul 11 77 Jurong West Central 3 # 13-29 Sub Sale 1,335 Strata 1,075 1,435,000 Private

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 4 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

24 Jun 11 85 Jurong West Central 3 # 16-44 Sub Sale 1,561 Strata 1,012 1,580,000 Private

15 Jun 11 67 Jurong West Central 3 # 09-08 Sub Sale 1,238 Strata 1,049 1,298,000 Private

26 May 11 65 Jurong West Central 3 # 05-01 Sub Sale 2,250 Strata 728 1,638,000 Private

23 May 11 79 Jurong West Central 3 # 12-35 Sub Sale 1,152 Strata 1,007 1,160,000 HDB

16 May 11 65 Jurong West Central 3 # 11-03 Sub Sale 1,001 Strata 1,079 1,080,000 Private

13 May 11 85 Jurong West Central 3 # 12-47 Sub Sale 980 Strata 1,103 1,080,000 Private

12 May 11 77 Jurong West Central 3 # 05-27 Sub Sale 1,302 Strata 898 1,170,000 Private

10 May 11 81 Jurong West Central 3 # 10-37 Sub Sale 1,238 Strata 1,010 1,250,000 Private

5 May 11 71 Jurong West Central 3 # 14-14 Sub Sale 936 Strata 1,014 950,000 HDB

25 Apr 11 81 Jurong West Central 3 # 05-38 Sub Sale 1,572 Strata 795 1,250,000 HDB

13 Apr 11 71 Jurong West Central 3 # 11-17 Sub Sale 1,442 Strata 1,095 1,580,000 Private

8 Apr 11 73 Jurong West Central 3 # 10-19 Sub Sale 1,066 Strata 1,070 1,140,000 Private

28 Mar 11 69 Jurong West Central 3 # 08-12 Sub Sale 1,442 Strata 1,075 1,550,000 Private

25 Feb 11 81 Jurong West Central 3 # 05-39 Sub Sale 1,087 Strata 883 960,000 HDB

1 Feb 11 75 Jurong West Central 3 # 05-25 Sub Sale 1,292 Strata 813 1,050,000 HDB

31 Jan 11 75 Jurong West Central 3 # 05-26 Sub Sale 1,421 Strata 911 1,295,000 Private

27 Jan 11 75 Jurong West Central 3 # 11-23 Sub Sale 1,302 Strata 906 1,180,000 Private

3 Jan 11 69 Jurong West Central 3 # 09-11 Sub Sale 936 Strata 961 900,000 HDB

31 Dec 10 85 Jurong West Central 3 # 12-46 Sub Sale 1,152 Strata 920 1,060,000 HDB

20 Dec 10 69 Jurong West Central 3 # 10-11 Sub Sale 936 Strata 961 900,000 Private

10 Dec 10 75 Jurong West Central 3 # 09-24 Sub Sale 1,302 Strata 906 1,180,000 Private

2 Dec 10 69 Jurong West Central 3 # 14-11 Sub Sale 936 Strata 1,020 955,000 Private

18 Nov 10 67 Jurong West Central 3 # 14-06 Sub Sale 990 Strata 934 925,000 HDB 8 Nov 10 67 Jurong West Central 3 # 16-07 Sub Sale 1, 733 Strata 767 1,330,000 Private 7 Nov 10 65 Jurong West Central 3 # 10-04 Sub Sale 915 Strata 907 830,000 Private

30 Oct 10 73 Jurong West Central 3 # 05-21 Sub Sale 1,410 Strata 851 1,200,000 Private

25 Oct 10 77 Jurong West Central 3 # 06-28 Sub Sale 980 Strata 949 930,000 Private

19 Oct 10 87 Jurong West Central 3 # 07-50 Sub Sale 1,259 Strata 913 1,150,000 HDB

14 Oct 10 75 Jurong West Central 3 # 14-23 Sub Sale 1,302 Strata 921 1,200,000 HDB

8 Oct 10 67 Jurong West Central 3 # 11-07 Sub Sale 1,066 Strata 901 960,000 HDB

6 Oct 10 81 Jurong West Central 3 # 08-37 Sub Sale 1,238 Strata 687 850,000 Private

1 Oct 10 77 Jurong West Central 3 # 15-28 Sub Sale 1,033 Strata 893 923,000 HDB

17 Sep 10 85 Jurong West Central 3 # 06-44 Sub Sale 958 Strata 908 870,000 Private

9 Sep 10 73 Jurong West Central 3 # 06-18 Sub Sale 1,066 Strata 845 900,000 Private

27 Aug 10 87 Jurong West Central 3 # 08-49 Sub Sale 1,227 Strata 978 1,200,000 HDB

23 Jul 10 77 Jurong West Central 3 # 10-30 Sub Sale 1,259 Strata 881 1,110,000 Private

16 Jul 10 75 Jurong West Central 3 # 12-24 Sub Sale 1,302 Strata 837 1,090,000 HDB

15 Jul 10 77 Jurong West Central 3 # 12-30 Sub Sale 1,259 Strata 953 1,200,000 Private

7 Jul 10 81 Jurong West Central 3 # 07-36 Sub Sale 1,442 Strata 980 1,413,000 HDB

2 Jul 10 69 Jurong West Central 3 # 14-10 Sub Sale 1,066 Strata 877 935,000 HDB

17 Jun 10 73 Jurong West Central 3 # 09-21 Sub Sale 1,066 Strata 901 960,000 Private

4 Jun 10 77 Jurong West Central 3 # 09-28 Sub Sale 980 Strata 909 890,000 Private

31 May 10 73 Jurong West Central 3 # 07-21 Sub Sale 1,066 Strata 941 1,003,000 HDB

26 May 10 65 Jurong West Central 3 # 09-01 Sub Sale 1,302 Strata 760 990,000 Private

14 May 10 81 Jurong West Central 3 # 14-39 Sub Sale 936 Strata 902 845,000 HDB

26 Apr 10 67 Jurong West Central 3 # 13-06 Sub Sale 936 Strata 929 870,000 HDB

23 Apr 10 79 Jurong West Central 3 # 05-33 Sub Sale 1,948 Strata 657 1,280,000 Private

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 5 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

15 Apr 10 71 Jurong West Central 3 # 05-15 Sub Sale 1,593 Strata 620 988,000 Private

9 Apr 10 79 Jurong West Central 3 # 10-34 Sub Sale 1,066 Strata 871 928,000 Private

7 Apr 10 77 Jurong West Central 3 # 15-27 Sub Sale 1,012 Strata 872 882,000 Private

5 Apr 10 65 Jurong West Central 3 # 05-04 Sub Sale 1,604 Strata 574 920,000 HDB

26 Mar 10 85 Jurong West Central 3 # 16-46 Sub Sale 1,733 Strata 701 1,215,000 Private

26 Mar 10 73 Jurong West Central 3 # 05-20 Sub Sale 1,884 Strata 664 1,250,000 Private

25 Mar 10 65 Jurong West Central 3 # 05-05 Sub Sale 2,110 Strata 572 1,207,000 Private

23 Mar 10 73 Jurong West Central 3 # 15-21 Sub Sale 1,066 Strata 931 992,000 HDB

17 Mar 10 75 Jurong West Central 3 # 07-26 Sub Sale 1,001 Strata 869 870,000 Private

16 Mar 10 73 Jurong West Central 3 # 06-21 Sub Sale 1,066 Strata 868 925,000 Private

12 Mar 10 83 Jurong West Central 3 # 15-41 Sub Sale 1,485 Strata 572 850,000 Private

5 Mar 10 65 Jurong West Central 3 # 16-04 Sub Sale 1,572 Strata 636 1,000,000 Private

26 Feb 10 71 Jurong West Central 3 # 07-14 Sub Sale 936 Strata 839 786,000 Private

22 Feb 10 77 Jurong West Central 3 # 13-27 Sub Sale 1,001 Strata 827 828,000 HDB

19 Feb 10 67 Jurong West Central 3 # 16-07 Sub Sale 1,733 Strata 600 1,040,000 HDB

18 Feb 10 87 Jurong West Central 3 # 15-50 Sub Sale 1,313 Strata 838 1,100,000 HDB

12 Feb 10 83 Jurong West Central 3 # 12-41 Sub Sale 1,442 Strata 801 1,155,000 Private

3 Feb 10 77 Jurong West Central 3 # 16-28 Sub Sale 1,550 Strata 581 900,000 HDB

29 Jan 10 81 Jurong West Central 3 # 11-37 Sub Sale 1,238 Strata 832 1,030,000 Private

27 Jan 10 87 Jurong West Central 3 # 09-48 Sub Sale 1,507 Strata 730 1,100,000 Private

18 Jan 10 85 Jurong West Central 3 # 06-44 Sub Sale 958 Strata 814 780,000 Private

14 Jan 10 71 Jurong West Central 3 # 08-15 Sub Sale 1,066 Strata 793 845,000 HDB

14 Jan 10 67 Jurong West Central 3 # 09-07 Sub Sale 1,066 Strata 859 915,000 HDB 8 Jan 10 71 Jurong West Central 3 # 08-14 Sub Sale 936 Strata 854 800,000 HDB 8 Jan 10 83 Jurong West Central 3 # 16-42 Sub Sale 1,561 Strata 595 928,000 HDB

31 Dec 09 79 Jurong West Central 3 # 07-32 Sub Sale 1,066 Strata 826 880,000 HDB

29 Dec 09 77 Jurong West Central 3 # 10-28 Sub Sale 980 Strata 847 830,000 HDB

21 Dec 09 71 Jurong West Central 3 # 10-16 Sub Sale 1,238 Strata 800 990,000 HDB

18 Dec 09 81 Jurong West Central 3 # 09-39 Sub Sale 936 Strata 812 760,000 HDB

14 Dec 09 75 Jurong West Central 3 # 15-22 Sub Sale 1,313 Strata 739 970,000 Private

11 Dec 09 67 Jurong West Central 3 # 05-07 Sub Sale 1,550 Strata 581 900,000 HDB

11 Dec 09 85 Jurong West Central 3 # 10-47 Sub Sale 936 Strata 801 750,000 Private

8 Dec 09 65 Jurong West Central 3 # 09-02 Sub Sale 1,259 Strata 715 900,000 Private

7 Dec 09 83 Jurong West Central 3 # 16-43 Sub Sale 1,744 Strata 602 1,050,000 Private

7 Dec 09 65 Jurong West Central 3 # 14-04 Sub Sale 915 Strata 861 788,000 Private

30 Nov 09 81 Jurong West Central 3 # 05-37 Sub Sale 1,679 Strata 644 1,081,800 Private

26 Nov 09 73 Jurong West Central 3 # 10-19 Sub Sale 1,066 Strata 779 830,000 HDB

23 Nov 09 79 Jurong West Central 3 # 10-32 Sub Sale 1,066 Strata 826 880,000 HDB

19 Nov 09 65 Jurong West Central 3 # 07-01 Sub Sale 1,302 Strata 691 900,000 Private

17 Nov 09 81 Jurong West Central 3 # 13-37 Sub Sale 1,324 Strata 801 1,060,000 Private

16 Nov 09 83 Jurong West Central 3 # 16-40 Sub Sale 1,905 Strata 584 1,112,000 Private

12 Nov 09 71 Jurong West Central 3 # 05-15 Sub Sale 1,593 Strata 537 855,000 Private

10 Nov 09 79 Jurong West Central 3 # 13-32 Sub Sale 1,066 Strata 826 880,000 HDB

6 Nov 09 79 Jurong West Central 3 # 16-34 Sub Sale 1,711 Strata 584 999,000 Private

5 Nov 09 65 Jurong West Central 3 # 07-03 Sub Sale 1,001 Strata 809 810,000 HDB

30 Oct 09 71 Jurong West Central 3 # 06-15 Sub Sale 1,066 Strata 751 800,000 Private

27 Oct 09 67 Jurong West Central 3 # 08-09 Sub Sale 958 Strata 835 800,000 HDB

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 6 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

26 Oct 09 79 Jurong West Central 3 # 12-32 Sub Sale 1,152 Strata 818 942,000 Private

26 Oct 09 85 Jurong West Central 3 # 16-47 Sub Sale 1,561 Strata 601 938,000 HDB

21 Oct 09 75 Jurong West Central 3 # 15-23 Sub Sale 1,356 Strata 737 1,000,000 Private

21 Oct 09 71 Jurong West Central 3 # 12-14 Sub Sale 936 Strata 783 733,000 HDB

16 Oct 09 65 Jurong West Central 3 # 13-02 Sub Sale 1,346 Strata 706 950,000 Private

14 Oct 09 85 Jurong West Central 3 # 14-46 Sub Sale 1,119 Strata 715 800,000 HDB

12 Oct 09 79 Jurong West Central 3 # 13-33 Sub Sale 1,238 Strata 727 900,000 Private

9 Oct 09 69 Jurong West Central 3 # 06-11 Sub Sale 936 Strata 747 700,000 HDB

9 Oct 09 81 Jurong West Central 3 # 12-37 Sub Sale 1,238 Strata 808 1,000,000 Private

7 Oct 09 75 Jurong West Central 3 # 05-22 Sub Sale 1,701 Strata 576 980,000 HDB

5 Oct 09 83 Jurong West Central 3 # 08-41 Sub Sale 1,442 Strata 811 1,170,000 HDB

5 Oct 09 75 Jurong West Central 3 # 13-26 Sub Sale 1,044 Strata 777 811,000 HDB

28 Sep 09 75 Jurong West Central 3 # 12-26 Sub Sale 1,001 Strata 836 837,000 Private

25 Sep 09 79 Jurong West Central 3 # 15-32 Sub Sale 1,066 Strata 863 920,000 HDB

25 Sep 09 83 Jurong West Central 3 # 08-43 Sub Sale 1,066 Strata 798 850,000 HDB

23 Sep 09 75 Jurong West Central 3 # 15-25 Sub Sale 958 Strata 814 780,000 HDB

22 Sep 09 73 Jurong West Central 3 # 07-18 Sub Sale 1,066 Strata 784 835,000 HDB

18 Sep 09 75 Jurong West Central 3 # 16-22 Sub Sale 2,110 Strata 506 1,068,000 HDB

18 Sep 09 67 Jurong West Central 3 # 07-07 Sub Sale 1,066 Strata 760 810,000 HDB

17 Sep 09 83 Jurong West Central 3 # 10-43 Sub Sale 1,066 Strata 788 840,000 Private

17 Sep 09 75 Jurong West Central 3 # 11-25 Sub Sale 915 Strata 781 715,000 Private

15 Sep 09 65 Jurong West Central 3 # 05-04 Sub Sale 1,604 Strata 511 820,000 Private

14 Sep 09 67 Jurong West Central 3 # 13-09 Sub Sale 958 Strata 783 750,000 HDB 14 Sep 09 79 Jurong West Central 3 # 14-35 Sub Sale 1, 119 Strata 759 850,000 Private 11 Sep 09 85 Jurong West Central 3 # 12-46 Sub Sale 1,152 Strata 747 860,000 Private

9 Sep 09 85 Jurong West Central 3 # 08-45 Sub Sale 1,238 Strata 771 955,000 HDB

8 Sep 09 69 Jurong West Central 3 # 05-13 Sub Sale 1,582 Strata 521 825,000 HDB

8 Sep 09 65 Jurong West Central 3 # 06-04 Sub Sale 915 Strata 787 720,000 HDB

7 Sep 09 85 Jurong West Central 3 # 09-47 Sub Sale 936 Strata 801 750,000 HDB

7 Sep 09 73 Jurong West Central 3 # 12-19 Sub Sale 1,152 Strata 747 860,000 HDB

3 Sep 09 73 Jurong West Central 3 # 10-18 Sub Sale 1,066 Strata 760 810,000 Private

2 Sep 09 77 Jurong West Central 3 # 07-31 Sub Sale 872 Strata 814 710,000 HDB

31 Aug 09 73 Jurong West Central 3 # 11-20 Sub Sale 1,238 Strata 784 970,000 Private

31 Aug 09 67 Jurong West Central 3 # 08-07 Sub Sale 1,066 Strata 769 820,000 HDB

31 Aug 09 77 Jurong West Central 3 # 11-30 Sub Sale 1,259 Strata 699 880,000 HDB

27 Aug 09 65 Jurong West Central 3 # 09-04 Sub Sale 915 Strata 842 770,000 Private

27 Aug 09 87 Jurong West Central 3 # 07-48 Sub Sale 1,507 Strata 730 1,100,000 Private

27 Aug 09 87 Jurong West Central 3 # 11-51 Sub Sale 1,302 Strata 656 855,000 Private

26 Aug 09 73 Jurong West Central 3 # 07-21 Sub Sale 1,066 Strata 732 780,000 HDB

26 Aug 09 85 Jurong West Central 3 # 07-47 Sub Sale 936 Strata 759 711,000 Private

24 Aug 09 79 Jurong West Central 3 # 10-34 Sub Sale 1,066 Strata 753 802,000 Private

19 Aug 09 65 Jurong West Central 3 # 09-01 Sub Sale 1,302 Strata 676 880,000 Private

18 Aug 09 85 Jurong West Central 3 # 10-44 Sub Sale 958 Strata 802 768,000 Private

18 Aug 09 85 Jurong West Central 3 # 12-45 Sub Sale 1,324 Strata 740 980,000 Private

14 Aug 09 87 Jurong West Central 3 # 14-48 Sub Sale 1,507 Strata 677 1,020,000 HDB

12 Aug 09 87 Jurong West Central 3 # 07-51 Sub Sale 1,302 Strata 660 860,000 Private

11 Aug 09 83 Jurong West Central 3 # 14-42 Sub Sale 936 Strata 745 698,000 HDB

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 7 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

7 Aug 09 79 Jurong West Central 3 # 08-35 Sub Sale 1,066 Strata 690 735,000 Private

7 Aug 09 65 Jurong West Central 3 # 07-04 Sub Sale 915 Strata 743 680,000 HDB

7 Aug 09 77 Jurong West Central 3 # 09-28 Sub Sale 980 Strata 766 750,000 HDB

6 Aug 09 85 Jurong West Central 3 # 13-47 Sub Sale 936 Strata 726 680,000 HDB

4 Aug 09 65 Jurong West Central 3 # 06-03 Sub Sale 1,001 Strata 709 710,000 HDB

30 Jul 09 69 Jurong West Central 3 # 10-12 Sub Sale 1,442 Strata 666 960,000 Private

30 Jul 09 65 Jurong West Central 3 # 05-05 Sub Sale 2,110 Strata 450 950,000 HDB

28 Jul 09 77 Jurong West Central 3 # 07-28 Sub Sale 980 Strata 743 728,000 HDB

28 Jul 09 85 Jurong West Central 3 # 12-47 Sub Sale 980 Strata 730 715,000 Private

27 Jul 09 81 Jurong West Central 3 # 12-37 Sub Sale 1,238 Strata 687 850,000 HDB

23 Jul 09 65 Jurong West Central 3 # 11-03 Sub Sale 1,001 Strata 699 700,000 HDB

22 Jul 09 81 Jurong West Central 3 # 11-37 Sub Sale 1,238 Strata 711 880,000 HDB

22 Jul 09 83 Jurong West Central 3 # 16-43 Sub Sale 1,744 Strata 567 988,000 Private

22 Jul 09 75 Jurong West Central 3 # 06-24 Sub Sale 1,302 Strata 630 820,000 HDB

17 Jul 09 73 Jurong West Central 3 # 05-20 Sub Sale 1,884 Strata 483 910,000 Private

16 Jul 09 75 Jurong West Central 3 # 07-24 Sub Sale 1,302 Strata 653 850,000 Private

15 Jul 09 67 Jurong West Central 3 # 11-08 Sub Sale 1,238 Strata 687 850,000 Private

15 Jul 09 85 Jurong West Central 3 # 07-46 Sub Sale 1,066 Strata 676 720,000 HDB

14 Jul 09 75 Jurong West Central 3 # 05-23 Sub Sale 2,347 Strata 383 898,000 Private

10 Jul 09 85 Jurong West Central 3 # 13-47 Sub Sale 936 Strata 694 650,000 HDB

8 Jul 09 81 Jurong West Central 3 # 10-39 Sub Sale 936 Strata 683 640,000 HDB

7 Jul 09 85 Jurong West Central 3 # 16-47 Sub Sale 1,561 Strata 500 780,000 HDB

3 Jul 09 67 Jurong West Central 3 # 08-08 Sub Sale 1,238 Strata 679 840,000 HDB 24 Jun 09 85 Jurong West Central 3 # 14-47 Sub Sale 9 90 Strata 687 680,000 HDB 24 Jun 09 81 Jurong West Central 3 # 16-36 Sub Sale 2,045 Strata 570 1,165,000 HDB

22 Jun 09 79 Jurong West Central 3 # 09-34 Sub Sale 1,066 Strata 718 765,000 Private

22 Jun 09 87 Jurong West Central 3 # 14-50 Sub Sale 1,259 Strata 651 820,000 HDB

19 Jun 09 71 Jurong West Central 3 # 13-15 Sub Sale 1,152 Strata 696 802,000 Private

19 Jun 09 85 Jurong West Central 3 # 15-44 Sub Sale 958 Strata 710 680,000 HDB

17 Jun 09 73 Jurong West Central 3 # 08-18 Sub Sale 1,066 Strata 704 750,000 Private

16 Jun 09 69 Jurong West Central 3 # 13-12 Sub Sale 1,528 Strata 615 940,000 HDB

12 Jun 09 85 Jurong West Central 3 # 11-47 Sub Sale 936 Strata 715 670,000 HDB

11 Jun 09 65 Jurong West Central 3 # 16-04 Sub Sale 1,572 Strata 493 775,000 Private

8 Jun 09 75 Jurong West Central 3 # 10-22 Sub Sale 1,259 Strata 580 730,000 HDB

5 Jun 09 65 Jurong West Central 3 # 15-04 Sub Sale 958 Strata 699 670,000 HDB

3 Jun 09 65 Jurong West Central 3 # 06-03 Sub Sale 1,001 Strata 644 645,000 Private

3 Jun 09 79 Jurong West Central 3 # 12-35 Sub Sale 1,152 Strata 677 780,000 HDB

2 Jun 09 75 Jurong West Central 3 # 12-25 Sub Sale 915 Strata 721 660,000 HDB

2 Jun 09 85 Jurong West Central 3 # 09-45 Sub Sale 1,238 Strata 604 748,000 HDB

29 May 09 71 Jurong West Central 3 # 12-17 Sub Sale 1,442 Strata 648 935,000 Private

29 May 09 77 Jurong West Central 3 # 10-30 Sub Sale 1,259 Strata 625 787,000 Private

28 May 09 65 Jurong West Central 3 # 08-03 Sub Sale 1,001 Strata 659 660,000 HDB

21 May 09 69 Jurong West Central 3 # 09-12 Sub Sale 1,442 Strata 638 920,000 HDB

20 May 09 75 Jurong West Central 3 # 08-24 Sub Sale 1,302 Strata 630 820,000 HDB

19 May 09 87 Jurong West Central 3 # 14-48 Sub Sale 1,507 Strata 622 938,000 HDB

15 May 09 87 Jurong West Central 3 # 15-49 Sub Sale 1,281 Strata 648 830,000 HDB

14 May 09 71 Jurong West Central 3 # 08-14 Sub Sale 936 Strata 641 600,000 HDB

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 8 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

14 May 09 75 Jurong West Central 3 # 12-26 Sub Sale 1,001 Strata 659 660,000 Private

14 May 09 65 Jurong West Central 3 # 09-05 Sub Sale 1,302 Strata 607 790,000 HDB

6 May 09 65 Jurong West Central 3 # 13-03 Sub Sale 1,044 Strata 630 657,720 Private

4 May 09 73 Jurong West Central 3 # 13-21 Sub Sale 1,066 Strata 657 700,000 HDB

30 Apr 09 65 Jurong West Central 3 # 09-02 Sub Sale 1,259 Strata 584 735,000 HDB

30 Apr 09 65 Jurong West Central 3 # 11-05 Sub Sale 1,302 Strata 614 800,000 HDB

30 Apr 09 83 Jurong West Central 3 # 05-43 Sub Sale 1,528 Strata 496 758,000 Private

23 Apr 09 75 Jurong West Central 3 # 16-22 Sub Sale 2,110 Strata 427 900,000 Private

21 Apr 09 83 Jurong West Central 3 # 09-40 Sub Sale 1,238 Strata 616 763,000 Private

20 Apr 09 81 Jurong West Central 3 # 15-36 Sub Sale 1,485 Strata 640 950,000 Private

20 Apr 09 85 Jurong West Central 3 # 10-45 Sub Sale 1,238 Strata 630 780,000 Private

20 Apr 09 87 Jurong West Central 3 # 14-49 Sub Sale 1,227 Strata 640 785,000 HDB

18 Apr 09 79 Jurong West Central 3 # 12-32 Sub Sale 1,152 Strata 651 750,000 Private

17 Apr 09 77 Jurong West Central 3 # 07-30 Sub Sale 1,259 Strata 580 730,000 Private

16 Apr 09 67 Jurong West Central 3 # 12-08 Sub Sale 1,324 Strata 597 790,000 Private

15 Apr 09 77 Jurong West Central 3 # 13-28 Sub Sale 1,023 Strata 641 655,000 HDB

14 Apr 09 75 Jurong West Central 3 # 07-22 Sub Sale 1,259 Strata 572 720,000 HDB

13 Apr 09 83 Jurong West Central 3 # 07-40 Sub Sale 1,238 Strata 600 743,000 Private

13 Apr 09 85 Jurong West Central 3 # 16-44 Sub Sale 1,561 Strata 441 688,000 Private

13 Apr 09 77 Jurong West Central 3 # 05-28 Sub Sale 1,690 Strata 426 720,000 HDB

13 Apr 09 75 Jurong West Central 3 # 09-22 Sub Sale 1,259 Strata 572 720,000 HDB

9 Apr 09 69 Jurong West Central 3 # 08-12 Sub Sale 1,442 Strata 607 875,000 Private

7 Apr 09 81 Jurong West Central 3 # 11-37 Sub Sale 1,238 Strata 604 748,000 HDB 6 Apr 09 69 Jurong West Central 3 # 06-10 Sub Sale 1,0 66 Strata 593 632,000 HDB 5 Apr 09 75 Jurong West Central 3 # 12-24 Sub Sale 1,302 Strata 591 770,000 HDB

3 Apr 09 83 Jurong West Central 3 # 14-42 Sub Sale 936 Strata 625 585,000 HDB

3 Apr 09 77 Jurong West Central 3 # 12-27 Sub Sale 969 Strata 638 618,000 HDB

3 Apr 09 81 Jurong West Central 3 # 06-36 Sub Sale 1,442 Strata 603 870,000 HDB

2 Apr 09 77 Jurong West Central 3 # 08-27 Sub Sale 969 Strata 610 591,000 HDB

31 Mar 09 87 Jurong West Central 3 # 07-48 Sub Sale 1,507 Strata 574 865,000 HDB

30 Mar 09 81 Jurong West Central 3 # 14-39 Sub Sale 936 Strata 651 610,000 Private

23 Mar 09 81 Jurong West Central 3 # 08-36 Sub Sale 1,442 Strata 617 890,000 Private

21 Mar 09 83 Jurong West Central 3 # 09-42 Sub Sale 936 Strata 600 562,000 HDB

19 Mar 09 87 Jurong West Central 3 # 11-50 Sub Sale 1,259 Strata 564 710,000 HDB

18 Mar 09 85 Jurong West Central 3 # 08-45 Sub Sale 1,238 Strata 604 748,000 HDB

12 Mar 09 79 Jurong West Central 3 # 11-33 Sub Sale 1,238 Strata 610 755,000 HDB

11 Mar 09 69 Jurong West Central 3 # 05-12 Sub Sale 2,099 Strata 447 938,000 HDB

9 Mar 09 69 Jurong West Central 3 # 14-11 Sub Sale 936 Strata 619 580,000 HDB

9 Mar 09 87 Jurong West Central 3 # 07-51 Sub Sale 1,302 Strata 535 696,570 Private

9 Mar 09 77 Jurong West Central 3 # 13-31 Sub Sale 893 Strata 649 580,000 HDB

9 Mar 09 87 Jurong West Central 3 # 07-50 Sub Sale 1,259 Strata 555 699,000 HDB

5 Mar 09 79 Jurong West Central 3 # 09-32 Sub Sale 1,066 Strata 629 670,000 HDB

5 Mar 09 81 Jurong West Central 3 # 06-37 Sub Sale 1,238 Strata 614 760,000 HDB

2 Mar 09 79 Jurong West Central 3 # 14-33 Sub Sale 1,292 Strata 587 758,000 HDB

27 Feb 09 77 Jurong West Central 3 # 12-28 Sub Sale 980 Strata 615 602,000 HDB

27 Feb 09 67 Jurong West Central 3 # 09-09 Sub Sale 958 Strata 616 590,000 HDB

27 Feb 09 77 Jurong West Central 3 # 16-29 Sub Sale 1,808 Strata 466 842,000 HDB

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 9 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

26 Feb 09 75 Jurong West Central 3 # 09-23 Sub Sale 1,302 Strata 560 730,000 HDB

24 Feb 09 87 Jurong West Central 3 # 06-51 Sub Sale 1,302 Strata 530 690,000 Private

24 Feb 09 67 Jurong West Central 3 # 12-09 Sub Sale 1,001 Strata 609 610,000 HDB

14 Feb 09 85 Jurong West Central 3 # 12-46 Sub Sale 1,152 Strata 586 675,000 HDB

13 Feb 09 73 Jurong West Central 3 # 10-19 Sub Sale 1,066 Strata 582 620,000 HDB

6 Feb 09 79 Jurong West Central 3 # 11-34 Sub Sale 1,066 Strata 563 600,000 Private

5 Feb 09 85 Jurong West Central 3 # 05-47 Sub Sale 1,270 Strata 480 609,600 Private

3 Feb 09 83 Jurong West Central 3 # 08-40 Sub Sale 1,238 Strata 598 740,000 HDB

29 Jan 09 67 Jurong West Central 3 # 06-08 Sub Sale 1,238 Strata 588 728,000 HDB

23 Jan 09 65 Jurong West Central 3 # 07-04 Sub Sale 915 Strata 601 550,000 HDB

21 Jan 09 65 Jurong West Central 3 # 09-04 Sub Sale 915 Strata 623 570,000 HDB

18 Jan 09 65 Jurong West Central 3 # 06-04 Sub Sale 915 Strata 639 585,000 Private

16 Jan 09 79 Jurong West Central 3 # 08-33 Sub Sale 1,238 Strata 578 715,000 HDB

15 Jan 09 67 Jurong West Central 3 # 06-07 Sub Sale 1,066 Strata 591 630,000 HDB

14 Jan 09 65 Jurong West Central 3 # 16-01 Sub Sale 1,991 Strata 427 850,000 HDB

13 Jan 09 87 Jurong West Central 3 # 06-50 Sub Sale 1,259 Strata 520 655,000 HDB

13 Jan 09 69 Jurong West Central 3 # 07-10 Sub Sale 1,066 Strata 601 640,000 HDB

7 Jan 09 77 Jurong West Central 3 # 11-29 Sub Sale 1,292 Strata 557 720,000 HDB

6 Jan 09 75 Jurong West Central 3 # 05-26 Sub Sale 1,421 Strata 436 620,000 HDB

5 Jan 09 65 Jurong West Central 3 # 14-01 Sub Sale 1,302 Strata 556 724,000 Private

5 Jan 09 67 Jurong West Central 3 # 10-09 Sub Sale 958 Strata 601 575,800 HDB

2 Jan 09 87 Jurong West Central 3 # 10-50 Sub Sale 1,259 Strata 548 690,000 HDB

29 Dec 08 65 Jurong West Central 3 # 12-03 Sub Sale 1,001 Strata 609 610,000 HDB 22 Dec 08 83 Jurong West Central 3 # 10-40 Sub Sale 1, 238 Strata 592 733,000 HDB 18 Dec 08 79 Jurong West Central 3 # 10-33 Sub Sale 1,238 Strata 602 745,000 Private

5 Dec 08 79 Jurong West Central 3 # 08-32 Sub Sale 1,066 Strata 610 650,000 HDB

1 Dec 08 65 Jurong West Central 3 # 08-03 Sub Sale 1,001 Strata 579 580,000 HDB

17 Nov 08 83 Jurong West Central 3 # 08-41 Sub Sale 1,442 Strata 638 920,000 HDB

14 Nov 08 79 Jurong West Central 3 # 14-32 Sub Sale 1,109 Strata 604 670,000 HDB

12 Nov 08 77 Jurong West Central 3 # 11-31 Sub Sale 872 Strata 631 550,000 HDB

10 Nov 08 73 Jurong West Central 3 # 08-20 Sub Sale 1,238 Strata 587 727,000 HDB

10 Nov 08 77 Jurong West Central 3 # 13-27 Sub Sale 1,001 Strata 619 620,000 HDB

7 Nov 08 87 Jurong West Central 3 # 07-49 Sub Sale 1,227 Strata 600 736,200 HDB

31 Oct 08 69 Jurong West Central 3 # 13-13 Sub Sale 1,324 Strata 631 835,000 HDB

31 Oct 08 85 Jurong West Central 3 # 09-47 Sub Sale 936 Strata 641 600,000 HDB

21 Oct 08 67 Jurong West Central 3 # 15-06 Sub Sale 936 Strata 651 610,000 HDB

16 Oct 08 67 Jurong West Central 3 # 15-09 Sub Sale 958 Strata 652 625,000 HDB

15 Oct 08 77 Jurong West Central 3 # 08-30 Sub Sale 1,259 Strata 556 700,000 HDB

30 Sep 08 81 Jurong West Central 3 # 10-36 Sub Sale 1,442 Strata 636 918,000 HDB

30 Sep 08 77 Jurong West Central 3 # 15-28 Sub Sale 1,033 Strata 644 665,000 HDB

30 Sep 08 69 Jurong West Central 3 # 06-12 Sub Sale 1,442 Strata 641 925,000 Private

29 Sep 08 67 Jurong West Central 3 # 10-08 Sub Sale 1,238 Strata 618 765,000 Private

24 Sep 08 73 Jurong West Central 3 # 15-21 Sub Sale 1,066 Strata 685 730,000 Private

19 Sep 08 73 Jurong West Central 3 # 11-19 Sub Sale 1,066 Strata 648 690,000 HDB

5 Sep 08 67 Jurong West Central 3 # 10-06 Sub Sale 936 Strata 619 580,000 HDB

5 Sep 08 73 Jurong West Central 3 # 12-20 Sub Sale 1,324 Strata 587 777,000 HDB

1 Sep 08 81 Jurong West Central 3 # 13-39 Sub Sale 980 Strata 623 610,000 HDB

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 10 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

29 Aug 08 75 Jurong West Central 3 # 07-26 Sub Sale 1,001 Strata 637 638,000 HDB

19 Aug 08 73 Jurong West Central 3 # 14-21 Sub Sale 1,109 Strata 643 713,000 HDB

15 Aug 08 75 Jurong West Central 3 # 07-23 Sub Sale 1,302 Strata 576 750,000 HDB

15 Aug 08 83 Jurong West Central 3 # 16-42 Sub Sale 1,561 Strata 485 757,500 HDB

8 Aug 08 67 Jurong West Central 3 # 12-06 Sub Sale 980 Strata 628 615,000 HDB

7 Aug 08 75 Jurong West Central 3 # 11-26 Sub Sale 1,001 Strata 634 635,000 HDB

5 Aug 08 75 Jurong West Central 3 # 07-25 Sub Sale 915 Strata 656 600,000 HDB

4 Aug 08 65 Jurong West Central 3 # 13-04 Sub Sale 958 Strata 626 600,000 HDB

1 Aug 08 69 Jurong West Central 3 # 06-10 Sub Sale 1,066 Strata 602 642,000 HDB

1 Aug 08 77 Jurong West Central 3 # 15-27 Sub Sale 1,012 Strata 642 650,000 HDB

21 Jul 08 79 Jurong West Central 3 # 08-34 Sub Sale 1,066 Strata 638 680,000 Private

18 Jul 08 81 Jurong West Central 3 # 12-39 Sub Sale 936 Strata 630 590,000 HDB

9 Jul 08 79 Jurong West Central 3 # 09-35 Sub Sale 1,066 Strata 629 670,000 Private

8 Jul 08 71 Jurong West Central 3 # 09-15 Sub Sale 1,066 Strata 629 670,000 Private

4 Jul 08 67 Jurong West Central 3 # 07-08 Sub Sale 1,238 Strata 630 780,000 Private

30 Jun 08 85 Jurong West Central 3 # 11-47 New Sale 936 Strata 623 583,000 HDB

24 Jun 08 87 Jurong West Central 3 # 14-49 Sub Sale 1,227 Strata 623 765,000 HDB

16 Jun 08 81 Jurong West Central 3 # 07-36 Sub Sale 1,442 Strata 645 930,000 HDB

9 Jun 08 85 Jurong West Central 3 # 14-47 Sub Sale 990 Strata 596 590,000 HDB

5 Jun 08 67 Jurong West Central 3 # 12-07 Sub Sale 1,152 Strata 625 720,000 HDB

29 May 08 81 Jurong West Central 3 # 13-38 Sub Sale 1,152 Strata 590 680,000 Private

29 May 08 73 Jurong West Central 3 # 07-21 Sub Sale 1,066 Strata 666 710,000 Private

27 May 08 77 Jurong West Central 3 # 10-31 Sub Sale 872 Strata 625 545,000 HDB 26 May 08 77 Jurong West Central 3 # 09-29 Sub Sale 1, 292 Strata 619 800,000 Private 22 May 08 85 Jurong West Central 3 # 10-47 Sub Sale 936 Strata 614 575,000 Private

20 May 08 77 Jurong West Central 3 # 14-28 Sub Sale 980 Strata 633 620,000 Private

16 May 08 85 Jurong West Central 3 # 06-44 Sub Sale 958 Strata 637 610,000 HDB

30 Apr 08 83 Jurong West Central 3 # 16-43 Sub Sale 1,744 Strata 494 862,000 Private

21 Apr 08 65 Jurong West Central 3 # 13-05 Sub Sale 1,346 Strata 550 740,000 Private

19 Apr 08 71 Jurong West Central 3 # 12-15 Sub Sale 1,066 Strata 638 680,000 HDB

17 Apr 08 65 Jurong West Central 3 # 14-05 New Sale 1,302 Strata 587 765,000 Private

5 Apr 08 85 Jurong West Central 3 # 06-46 Sub Sale 1,066 Strata 610 650,000 HDB

4 Apr 08 69 Jurong West Central 3 # 16-10 Sub Sale 1,744 Strata 493 860,000 HDB

3 Apr 08 67 Jurong West Central 3 # 07-06 Sub Sale 936 Strata 598 560,000 HDB

27 Mar 08 81 Jurong West Central 3 # 05-37 Sub Sale 1,679 Strata 506 850,000 Private

13 Mar 08 83 Jurong West Central 3 # 11-42 Sub Sale 936 Strata 598 560,000 HDB

29 Feb 08 69 Jurong West Central 3 # 14-10 Sub Sale 1,066 Strata 636 678,000 HDB

22 Feb 08 71 Jurong West Central 3 # 13-17 Sub Sale 1,528 Strata 625 955,000 Private

15 Feb 08 71 Jurong West Central 3 # 07-14 Sub Sale 936 Strata 566 530,000 Private

11 Feb 08 73 Jurong West Central 3 # 08-18 Sub Sale 1,066 Strata 633 675,000 HDB

25 Jan 08 73 Jurong West Central 3 # 05-21 Sub Sale 1,410 Strata 603 850,000 HDB

23 Jan 08 69 Jurong West Central 3 # 07-11 Sub Sale 936 Strata 603 565,000 Private

10 Dec 07 71 Jurong West Central 3 # 12-16 New Sale 1,238 Strata 632 782,416 HDB

27 Nov 07 87 Jurong West Central 3 # 16-49 Sub Sale 2,024 Strata 469 950,000 Private

16 Nov 07 69 Jurong West Central 3 # 12-11 Sub Sale 936 Strata 614 575,000 HDB

19 Oct 07 71 Jurong West Central 3 # 06-16 Sub Sale 1,238 Strata 598 740,000 Private

2 Oct 07 77 Jurong West Central 3 # 08-28 New Sale 980 Strata 522 511,612 Private

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 11 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

28 Sep 07 71 Jurong West Central 3 # 09-17 New Sale 1,442 Strata 527 760,037 Private

28 Sep 07 83 Jurong West Central 3 # 12-43 New Sale 1,066 Strata 540 575,553 HDB

26 Sep 07 77 Jurong West Central 3 # 07-30 Sub Sale 1,259 Strata 564 710,000 Private

14 Sep 07 83 Jurong West Central 3 # 11-43 Sub Sale 1,066 Strata 610 650,000 HDB

3 Sep 07 85 Jurong West Central 3 # 07-47 Sub Sale 936 Strata 571 535,000 Private

30 Aug 07 79 Jurong West Central 3 # 09-34 Sub Sale 1,066 Strata 591 630,000 HDB

27 Aug 07 67 Jurong West Central 3 # 08-08 Sub Sale 1,238 Strata 630 780,000 HDB

17 Aug 07 77 Jurong West Central 3 # 13-31 Sub Sale 893 Strata 632 565,000 Private

10 Aug 07 77 Jurong West Central 3 # 07-31 Sub Sale 872 Strata 619 540,000 HDB

7 Aug 07 73 Jurong West Central 3 # 09-21 Sub Sale 1,066 Strata 662 705,000 HDB

31 Jul 07 73 Jurong West Central 3 # 11-20 Sub Sale 1,238 Strata 618 765,000 Private

27 Jul 07 75 Jurong West Central 3 # 11-25 Sub Sale 915 Strata 612 560,000 HDB

23 Jul 07 75 Jurong West Central 3 # 12-25 Sub Sale 915 Strata 628 575,000 HDB

18 Jul 07 77 Jurong West Central 3 # 08-31 Sub Sale 872 Strata 614 535,000 Private

18 Jul 07 79 Jurong West Central 3 # 15-32 Sub Sale 1,066 Strata 656 699,000 Private

18 Jul 07 79 Jurong West Central 3 # 13-32 Sub Sale 1,066 Strata 732 780,000 Private

16 Jul 07 75 Jurong West Central 3 # 09-25 Sub Sale 915 Strata 601 550,000 HDB

11 Jul 07 77 Jurong West Central 3 # 07-28 Sub Sale 980 Strata 621 608,000 Private

6 Jul 07 65 Jurong West Central 3 # 10-04 Sub Sale 915 Strata 639 585,000 HDB

6 Jul 07 65 Jurong West Central 3 # 10-01 Sub Sale 1,302 Strata 541 705,000 HDB

2 Jul 07 77 Jurong West Central 3 # 15-28 Sub Sale 1,033 Strata 590 610,000 Private

28 Jun 07 75 Jurong West Central 3 # 08-26 New Sale 1,001 Strata 504 504,733 HDB

28 Jun 07 77 Jurong West Central 3 # 07-29 Sub Sale 1,292 Strata 542 700,000 Private 22 Jun 07 79 Jurong West Central 3 # 13-33 Sub Sale 1, 238 Strata 590 730,000 Private 8 Jun 07 69 Jurong West Central 3 # 08-10 Sub Sale 1,066 Strata 593 632,000 HDB

4 Jun 07 79 Jurong West Central 3 # 13-35 New Sale 1,066 Strata 563 600,000 Private

28 May 07 87 Jurong West Central 3 # 05-50 New Sale 2,099 Strata 371 778,721 Private

25 May 07 69 Jurong West Central 3 # 07-11 Sub Sale 936 Strata 557 522,000 Private

21 May 07 75 Jurong West Central 3 # 10-26 New Sale 1,001 Strata 579 580,000 HDB

18 May 07 65 Jurong West Central 3 # 06-01 New Sale 1,302 Strata 518 674,989 Private

18 May 07 87 Jurong West Central 3 # 05-51 New Sale 2,443 Strata 344 840,372 HDB

17 May 07 77 Jurong West Central 3 # 08-29 Sub Sale 1,292 Strata 516 666,000 HDB

17 May 07 83 Jurong West Central 3 # 14-42 New Sale 936 Strata 572 535,636 Private

16 May 07 85 Jurong West Central 3 # 12-47 New Sale 980 Strata 548 537,052 Private

15 May 07 65 Jurong West Central 3 # 14-04 New Sale 915 Strata 607 555,485 HDB

15 May 07 81 Jurong West Central 3 # 05-38 New Sale 1,572 Strata 431 676,579 HDB

14 May 07 83 Jurong West Central 3 # 05-43 New Sale 1,528 Strata 459 701,127 Private

11 May 07 73 Jurong West Central 3 # 05-19 New Sale 1,464 Strata 465 680,413 Private

7 May 07 67 Jurong West Central 3 # 05-07 New Sale 1,550 Strata 458 709,477 HDB

7 May 07 77 Jurong West Central 3 # 09-27 New Sale 969 Strata 609 590,000 HDB

7 May 07 85 Jurong West Central 3 # 13-46 New Sale 1,066 Strata 576 614,278 HDB

3 May 07 85 Jurong West Central 3 # 05-46 New Sale 1,528 Strata 448 684,737 HDB

2 May 07 85 Jurong West Central 3 # 11-46 New Sale 1,066 Strata 570 607,290 HDB

2 May 07 69 Jurong West Central 3 # 05-10 New Sale 1,550 Strata 453 701,433 Private

2 May 07 65 Jurong West Central 3 # 14-03 New Sale 1,001 Strata 605 605,517 HDB

2 May 07 85 Jurong West Central 3 # 14-47 New Sale 990 Strata 554 548,973 Private

30 Apr 07 65 Jurong West Central 3 # 05-01 New Sale 2,250 Strata 371 835,653 Private

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 12 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

30 Apr 07 87 Jurong West Central 3 # 13-51 New Sale 1,389 Strata 508 705,088 HDB

27 Apr 07 65 Jurong West Central 3 # 06-02 New Sale 1,259 Strata 523 659,073 HDB

27 Apr 07 83 Jurong West Central 3 # 12-42 New Sale 936 Strata 566 529,781 Private

26 Apr 07 65 Jurong West Central 3 # 12-04 New Sale 915 Strata 601 549,510 HDB

25 Apr 07 85 Jurong West Central 3 # 10-46 New Sale 1,066 Strata 567 603,826 Private

24 Apr 07 85 Jurong West Central 3 # 07-46 New Sale 1,066 Strata 557 593,550 Private

24 Apr 07 65 Jurong West Central 3 # 14-01 New Sale 1,302 Strata 539 702,578 HDB

23 Apr 07 83 Jurong West Central 3 # 10-43 New Sale 1,066 Strata 577 614,652 Private

20 Apr 07 65 Jurong West Central 3 # 07-01 New Sale 1,302 Strata 521 678,377 Private

13 Apr 07 65 Jurong West Central 3 # 13-02 New Sale 1,346 Strata 529 712,112 HDB

11 Apr 07 65 Jurong West Central 3 # 06-04 New Sale 915 Strata 581 531,971 Private

10 Apr 07 85 Jurong West Central 3 # 14-46 New Sale 1,119 Strata 565 633,000 HDB

9 Apr 07 87 Jurong West Central 3 # 14-50 New Sale 1,259 Strata 528 665,491 Private

5 Apr 07 79 Jurong West Central 3 # 10-32 Sub Sale 1,066 Strata 610 650,000 HDB

5 Apr 07 81 Jurong West Central 3 # 10-37 New Sale 1,238 Strata 565 699,000 HDB

5 Apr 07 65 Jurong West Central 3 # 14-02 Sub Sale 1,259 Strata 507 638,808 Private

4 Apr 07 87 Jurong West Central 3 # 07-50 New Sale 1,259 Strata 472 594,260 Private

4 Apr 07 87 Jurong West Central 3 # 06-50 New Sale 1,259 Strata 469 591,191 Private

4 Apr 07 65 Jurong West Central 3 # 07-04 New Sale 915 Strata 541 495,236 Private

4 Apr 07 87 Jurong West Central 3 # 06-51 New Sale 1,302 Strata 465 605,408 Private

4 Apr 07 87 Jurong West Central 3 # 07-51 New Sale 1,302 Strata 467 608,478 Private

4 Apr 07 87 Jurong West Central 3 # 11-50 New Sale 1,259 Strata 482 606,697 Private

4 Apr 07 65 Jurong West Central 3 # 11-04 Sub Sale 915 Strata 553 506,063 Private 4 Apr 07 85 Jurong West Central 3 # 09-47 Sub Sale 936 Strata 510 477,820 Private 2 Apr 07 85 Jurong West Central 3 # 09-46 New Sale 1,066 Strata 522 555,908 HDB

2 Apr 07 71 Jurong West Central 3 # 13-15 Sub Sale 1,152 Strata 526 605,615 HDB

2 Apr 07 83 Jurong West Central 3 # 05-42 New Sale 1,087 Strata 515 560,254 Private

2 Apr 07 85 Jurong West Central 3 # 15-46 New Sale 1,066 Strata 540 575,322 Private

30 Mar 07 87 Jurong West Central 3 # 16-50 New Sale 2,110 Strata 345 727,920 Private

29 Mar 07 83 Jurong West Central 3 # 13-43 Sub Sale 1,152 Strata 528 608,072 HDB

27 Mar 07 65 Jurong West Central 3 # 08-01 New Sale 1,302 Strata 487 634,280 Private

27 Mar 07 65 Jurong West Central 3 # 08-02 New Sale 1,259 Strata 492 619,544 HDB

27 Mar 07 87 Jurong West Central 3 # 12-50 New Sale 1,259 Strata 484 609,846 Private

26 Mar 07 69 Jurong West Central 3 # 06-10 New Sale 1,066 Strata 520 554,186 Private

26 Mar 07 85 Jurong West Central 3 # 08-47 New Sale 936 Strata 507 475,176 HDB

25 Mar 07 87 Jurong West Central 3 # 13-50 New Sale 1,346 Strata 513 690,080 Private

22 Mar 07 83 Jurong West Central 3 # 14-43 New Sale 1,066 Strata 546 582,057 HDB

21 Mar 07 67 Jurong West Central 3 # 06-06 New Sale 936 Strata 512 479,331 Private

20 Mar 07 85 Jurong West Central 3 # 16-46 New Sale 1,733 Strata 393 680,392 HDB

20 Mar 07 87 Jurong West Central 3 # 16-51 New Sale 1,991 Strata 373 742,514 HDB

16 Mar 07 83 Jurong West Central 3 # 10-42 New Sale 936 Strata 518 485,178 HDB

16 Mar 07 87 Jurong West Central 3 # 10-50 New Sale 1,259 Strata 479 603,563 HDB

15 Mar 07 69 Jurong West Central 3 # 07-10 Sub Sale 1,066 Strata 523 557,253 Private

13 Mar 07 71 Jurong West Central 3 # 13-14 New Sale 980 Strata 514 503,348 Private

13 Mar 07 65 Jurong West Central 3 # 15-04 New Sale 958 Strata 559 535,631 HDB

13 Mar 07 73 Jurong West Central 3 # 05-18 Sub Sale 1,593 Strata 410 652,672 HDB

12 Mar 07 73 Jurong West Central 3 # 06-19 New Sale 1,066 Strata 515 549,282 HDB

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 13 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

7 Mar 07 71 Jurong West Central 3 # 07-15 New Sale 1,066 Strata 521 554,801 HDB

6 Mar 07 85 Jurong West Central 3 # 07-47 Sub Sale 936 Strata 505 472,547 HDB

6 Mar 07 67 Jurong West Central 3 # 07-07 New Sale 1,066 Strata 532 567,130 Private

6 Mar 07 83 Jurong West Central 3 # 07-42 New Sale 936 Strata 510 477,246 HDB

5 Mar 07 87 Jurong West Central 3 # 15-50 New Sale 1,313 Strata 481 632,077 HDB

5 Mar 07 65 Jurong West Central 3 # 15-01 New Sale 1,356 Strata 494 669,446 HDB

5 Mar 07 65 Jurong West Central 3 # 07-02 New Sale 1,259 Strata 487 613,391 HDB

5 Mar 07 71 Jurong West Central 3 # 14-14 New Sale 936 Strata 528 494,364 HDB

5 Mar 07 73 Jurong West Central 3 # 12-18 New Sale 1,152 Strata 523 602,282 HDB

5 Mar 07 71 Jurong West Central 3 # 06-14 New Sale 936 Strata 506 473,508 HDB

5 Mar 07 71 Jurong West Central 3 # 07-14 New Sale 936 Strata 508 476,066 Private

2 Mar 07 65 Jurong West Central 3 # 09-01 Sub Sale 1,302 Strata 487 634,449 HDB

1 Mar 07 65 Jurong West Central 3 # 13-04 Sub Sale 958 Strata 547 524,016 HDB

28 Feb 07 79 Jurong West Central 3 # 16-34 New Sale 1,711 Strata 380 650,514 HDB

27 Feb 07 67 Jurong West Central 3 # 15-07 New Sale 1,066 Strata 556 592,848 HDB

26 Feb 07 71 Jurong West Central 3 # 16-15 New Sale 1,744 Strata 397 691,734 Private

26 Feb 07 85 Jurong West Central 3 # 05-44 New Sale 1,528 Strata 419 639,679 Private

26 Feb 07 67 Jurong West Central 3 # 05-06 New Sale 1,270 Strata 429 545,045 Private

23 Feb 07 65 Jurong West Central 3 # 13-01 New Sale 1,389 Strata 485 673,770 HDB

22 Feb 07 65 Jurong West Central 3 # 06-05 New Sale 1,302 Strata 488 635,447 HDB

21 Feb 07 73 Jurong West Central 3 # 16-18 New Sale 1,733 Strata 398 688,876 HDB

21 Feb 07 83 Jurong West Central 3 # 15-43 New Sale 1,119 Strata 536 599,795 HDB

21 Feb 07 73 Jurong West Central 3 # 05-20 New Sale 1,884 Strata 405 762,832 Private 21 Feb 07 85 Jurong West Central 3 # 16-44 New Sale 1, 561 Strata 415 647,417 Private 21 Feb 07 65 Jurong West Central 3 # 10-04 Sub Sale 915 Strata 550 503,334 Private

16 Feb 07 83 Jurong West Central 3 # 07-43 New Sale 1,066 Strata 525 559,610 HDB

16 Feb 07 67 Jurong West Central 3 # 05-09 New Sale 1,442 Strata 439 632,724 Private

16 Feb 07 83 Jurong West Central 3 # 12-41 Sub Sale 1,442 Strata 588 848,000 HDB

16 Feb 07 67 Jurong West Central 3 # 16-09 New Sale 1,561 Strata 422 658,428 Private

15 Feb 07 87 Jurong West Central 3 # 09-51 New Sale 1,302 Strata 472 614,663 HDB

15 Feb 07 65 Jurong West Central 3 # 11-02 New Sale 1,259 Strata 497 626,102 Private

15 Feb 07 83 Jurong West Central 3 # 15-42 New Sale 990 Strata 521 516,021 HDB

14 Feb 07 67 Jurong West Central 3 # 14-09 New Sale 1,001 Strata 581 581,381 HDB

13 Feb 07 65 Jurong West Central 3 # 10-01 Sub Sale 1,302 Strata 490 637,635 HDB

12 Feb 07 65 Jurong West Central 3 # 12-02 New Sale 1,259 Strata 500 629,321 Private

6 Feb 07 73 Jurong West Central 3 # 06-18 New Sale 1,066 Strata 521 554,734 Private

6 Feb 07 65 Jurong West Central 3 # 11-03 New Sale 1,001 Strata 552 552,411 HDB

6 Feb 07 65 Jurong West Central 3 # 12-01 New Sale 1,302 Strata 494 644,052 HDB

6 Feb 07 65 Jurong West Central 3 # 11-01 New Sale 1,302 Strata 492 640,835 HDB

5 Feb 07 67 Jurong West Central 3 # 16-07 New Sale 1,733 Strata 405 701,117 HDB

5 Feb 07 65 Jurong West Central 3 # 10-03 New Sale 1,001 Strata 549 549,687 HDB

5 Feb 07 73 Jurong West Central 3 # 12-19 New Sale 1,152 Strata 518 596,695 HDB

2 Feb 07 65 Jurong West Central 3 # 15-02 New Sale 1,313 Strata 497 652,195 Private

2 Feb 07 67 Jurong West Central 3 # 14-07 Sub Sale 1,119 Strata 540 604,177 HDB

30 Jan 07 65 Jurong West Central 3 # 07-05 New Sale 1,302 Strata 490 638,652 HDB

30 Jan 07 73 Jurong West Central 3 # 07-19 Sub Sale 1,066 Strata 518 552,349 HDB

26 Jan 07 67 Jurong West Central 3 # 11-06 New Sale 936 Strata 526 492,549 HDB

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 14 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

25 Jan 07 65 Jurong West Central 3 # 09-02 New Sale 1,259 Strata 492 619,714 HDB

24 Jan 07 73 Jurong West Central 3 # 14-19 Sub Sale 1,119 Strata 526 588,518 Private

23 Jan 07 85 Jurong West Central 3 # 16-47 New Sale 1,561 Strata 372 580,589 HDB

22 Jan 07 65 Jurong West Central 3 # 10-05 New Sale 1,302 Strata 498 648,366 Private

21 Jan 07 65 Jurong West Central 3 # 09-05 New Sale 1,302 Strata 495 645,112 Private

19 Jan 07 67 Jurong West Central 3 # 16-08 New Sale 1,851 Strata 436 807,935 HDB

17 Jan 07 73 Jurong West Central 3 # 14-18 Sub Sale 1,119 Strata 531 594,043 HDB

16 Jan 07 75 Jurong West Central 3 # 16-24 Sub Sale 1,894 Strata 378 716,482 HDB

10 Jan 07 79 Jurong West Central 3 # 11-32 Sub Sale 1,066 Strata 596 635,000 Private

6 Jan 07 65 Jurong West Central 3 # 12-05 New Sale 1,302 Strata 503 654,924 Private

3 Jan 07 67 Jurong West Central 3 # 08-07 New Sale 1,066 Strata 535 570,282 HDB

3 Jan 07 65 Jurong West Central 3 # 08-05 New Sale 1,302 Strata 493 641,873 Private

3 Jan 07 65 Jurong West Central 3 # 16-02 New Sale 2,110 Strata 356 751,052 HDB

26 Dec 06 87 Jurong West Central 3 # 08-51 New Sale 1,302 Strata 470 611,563 HDB

22 Dec 06 83 Jurong West Central 3 # 08-42 New Sale 936 Strata 512 479,876 HDB

20 Dec 06 65 Jurong West Central 3 # 10-02 New Sale 1,259 Strata 495 622,900 HDB

19 Dec 06 87 Jurong West Central 3 # 05-49 New Sale 2,002 Strata 385 769,964 HDB

19 Dec 06 69 Jurong West Central 3 # 05-13 New Sale 1,582 Strata 460 728,626 Private

15 Dec 06 71 Jurong West Central 3 # 05-16 New Sale 1,582 Strata 459 725,626 HDB

15 Dec 06 67 Jurong West Central 3 # 15-09 New Sale 958 Strata 590 564,819 HDB

15 Dec 06 87 Jurong West Central 3 # 15-51 New Sale 1,356 Strata 478 648,730 Private

14 Dec 06 83 Jurong West Central 3 # 13-42 New Sale 980 Strata 515 504,868 HDB

14 Dec 06 67 Jurong West Central 3 # 06-09 New Sale 958 Strata 564 540,304 HDB 14 Dec 06 71 Jurong West Central 3 # 10-14 New Sale 936 Strata 517 483,824 Private 14 Dec 06 71 Jurong West Central 3 # 10-14 New Sale 936 Strata 517 483,824 Private

13 Dec 06 77 Jurong West Central 3 # 16-30 New Sale 1,916 Strata 363 695,694 Private

13 Dec 06 79 Jurong West Central 3 # 16-35 New Sale 1,733 Strata 379 656,473 Private

13 Dec 06 67 Jurong West Central 3 # 11-07 New Sale 1,066 Strata 544 579,847 HDB

12 Dec 06 67 Jurong West Central 3 # 13-07 New Sale 1,066 Strata 550 586,311 HDB

12 Dec 06 65 Jurong West Central 3 # 15-05 New Sale 1,356 Strata 502 680,781 HDB

12 Dec 06 87 Jurong West Central 3 # 09-50 New Sale 1,259 Strata 477 600,447 Private

8 Dec 06 65 Jurong West Central 3 # 16-03 New Sale 1,615 Strata 408 658,864 Private

8 Dec 06 67 Jurong West Central 3 # 09-07 New Sale 1,066 Strata 538 573,453 HDB

8 Dec 06 67 Jurong West Central 3 # 09-06 New Sale 936 Strata 520 487,218 HDB

7 Dec 06 73 Jurong West Central 3 # 08-19 New Sale 1,066 Strata 521 555,433 HDB

7 Dec 06 67 Jurong West Central 3 # 10-07 New Sale 1,066 Strata 541 576,640 HDB

6 Dec 06 65 Jurong West Central 3 # 08-03 New Sale 1,001 Strata 544 544,280 HDB

6 Dec 06 65 Jurong West Central 3 # 07-03 New Sale 1,001 Strata 541 541,595 HDB

6 Dec 06 67 Jurong West Central 3 # 16-06 New Sale 1,561 Strata 379 591,623 HDB

5 Dec 06 73 Jurong West Central 3 # 13-19 New Sale 1,066 Strata 536 571,115 HDB

5 Dec 06 65 Jurong West Central 3 # 06-03 New Sale 1,001 Strata 538 538,925 Private

5 Dec 06 69 Jurong West Central 3 # 14-13 New Sale 1,238 Strata 553 684,894 Private

5 Dec 06 71 Jurong West Central 3 # 11-15 New Sale 1,066 Strata 532 567,241 HDB

4 Dec 06 69 Jurong West Central 3 # 07-13 New Sale 1,238 Strata 535 662,766 HDB

4 Dec 06 67 Jurong West Central 3 # 08-09 New Sale 958 Strata 560 536,000 Private

4 Dec 06 69 Jurong West Central 3 # 13-13 New Sale 1,324 Strata 537 711,263 HDB

4 Dec 06 83 Jurong West Central 3 # 09-43 New Sale 1,066 Strata 531 565,933 Private

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 15 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

4 Dec 06 67 Jurong West Central 3 # 13-06 New Sale 936 Strata 532 497,938 HDB

4 Dec 06 67 Jurong West Central 3 # 07-09 New Sale 958 Strata 567 542,975 Private

4 Dec 06 69 Jurong West Central 3 # 07-13 New Sale 1,238 Strata 535 662,766 HDB

4 Dec 06 67 Jurong West Central 3 # 08-09 New Sale 958 Strata 560 536,000 Private

4 Dec 06 73 Jurong West Central 3 # 09-19 New Sale 1,066 Strata 524 558,535 HDB

1 Dec 06 79 Jurong West Central 3 # 10-34 New Sale 1,066 Strata 504 537,186 HDB

1 Dec 06 67 Jurong West Central 3 # 10-09 New Sale 958 Strata 575 551,066 Private

1 Dec 06 67 Jurong West Central 3 # 05-08 New Sale 1,593 Strata 468 745,082 HDB

1 Dec 06 77 Jurong West Central 3 # 14-30 New Sale 1,259 Strata 469 591,176 HDB

1 Dec 06 81 Jurong West Central 3 # 14-38 New Sale 1,066 Strata 525 559,146 HDB

30 Nov 06 73 Jurong West Central 3 # 06-20 New Sale 1,238 Strata 524 648,025 HDB

30 Nov 06 69 Jurong West Central 3 # 06-13 New Sale 1,238 Strata 533 659,664 HDB

30 Nov 06 77 Jurong West Central 3 # 07-27 New Sale 969 Strata 511 495,347 HDB

30 Nov 06 75 Jurong West Central 3 # 06-22 New Sale 1,259 Strata 454 572,386 HDB

29 Nov 06 65 Jurong West Central 3 # 08-04 New Sale 915 Strata 544 497,921 Private

29 Nov 06 65 Jurong West Central 3 # 09-03 New Sale 1,001 Strata 546 546,977 HDB

29 Nov 06 69 Jurong West Central 3 # 12-13 New Sale 1,238 Strata 548 678,498 HDB

29 Nov 06 73 Jurong West Central 3 # 07-18 New Sale 1,066 Strata 523 557,801 HDB

29 Nov 06 73 Jurong West Central 3 # 11-20 New Sale 1,238 Strata 536 663,683 HDB

28 Nov 06 67 Jurong West Central 3 # 10-08 New Sale 1,238 Strata 554 685,271 Private

28 Nov 06 87 Jurong West Central 3 # 08-48 New Sale 1,507 Strata 512 770,832 HDB

28 Nov 06 77 Jurong West Central 3 # 11-27 New Sale 969 Strata 522 505,255 HDB

28 Nov 06 67 Jurong West Central 3 # 14-08 New Sale 1,292 Strata 555 716,372 HDB 28 Nov 06 77 Jurong West Central 3 # 08-29 New Sale 1, 292 Strata 464 598,889 Private 27 Nov 06 65 Jurong West Central 3 # 05-03 New Sale 1,518 Strata 418 633,722 Private

27 Nov 06 75 Jurong West Central 3 # 10-23 New Sale 1,302 Strata 462 601,121 HDB

27 Nov 06 71 Jurong West Central 3 # 11-14 New Sale 936 Strata 519 486,437 HDB

27 Nov 06 65 Jurong West Central 3 # 05-05 New Sale 2,110 Strata 361 761,596 HDB

27 Nov 06 65 Jurong West Central 3 # 12-03 New Sale 1,001 Strata 555 555,148 HDB

24 Nov 06 73 Jurong West Central 3 # 16-19 New Sale 1,733 Strata 394 682,979 HDB

24 Nov 06 67 Jurong West Central 3 # 13-09 New Sale 958 Strata 584 559,277 HDB

24 Nov 06 67 Jurong West Central 3 # 06-08 New Sale 1,238 Strata 543 672,363 Private

23 Nov 06 73 Jurong West Central 3 # 15-19 New Sale 1,066 Strata 542 577,510 HDB

22 Nov 06 67 Jurong West Central 3 # 09-08 New Sale 1,238 Strata 551 682,021 HDB

22 Nov 06 85 Jurong West Central 3 # 13-44 New Sale 958 Strata 576 552,182 Private

22 Nov 06 83 Jurong West Central 3 # 14-40 New Sale 1,238 Strata 570 705,705 HDB

22 Nov 06 69 Jurong West Central 3 # 09-12 New Sale 1,442 Strata 530 765,037 HDB

22 Nov 06 83 Jurong West Central 3 # 08-40 New Sale 1,238 Strata 554 686,282 HDB

21 Nov 06 69 Jurong West Central 3 # 05-11 New Sale 1,195 Strata 439 524,585 Private

21 Nov 06 85 Jurong West Central 3 # 14-45 New Sale 1,292 Strata 558 720,876 HDB

21 Nov 06 85 Jurong West Central 3 # 08-46 New Sale 1,066 Strata 519 552,737 HDB

21 Nov 06 73 Jurong West Central 3 # 16-21 New Sale 1,701 Strata 419 711,785 Private

21 Nov 06 67 Jurong West Central 3 # 15-08 New Sale 1,238 Strata 567 701,756 HDB

21 Nov 06 69 Jurong West Central 3 # 10-13 New Sale 1,238 Strata 543 672,160 HDB

20 Nov 06 67 Jurong West Central 3 # 08-08 New Sale 1,238 Strata 548 678,786 Private

20 Nov 06 67 Jurong West Central 3 # 11-09 New Sale 958 Strata 578 553,790 Private

20 Nov 06 71 Jurong West Central 3 # 08-15 New Sale 1,066 Strata 524 557,885 Private

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 16 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

20 Nov 06 83 Jurong West Central 3 # 06-40 New Sale 1,238 Strata 549 679,927 Private

20 Nov 06 67 Jurong West Central 3 # 07-08 New Sale 1,238 Strata 546 675,567 Private

17 Nov 06 67 Jurong West Central 3 # 09-09 New Sale 958 Strata 572 548,356 Private

17 Nov 06 85 Jurong West Central 3 # 10-47 New Sale 936 Strata 513 480,479 HDB

17 Nov 06 73 Jurong West Central 3 # 08-18 New Sale 1,066 Strata 526 560,885 HDB

16 Nov 06 71 Jurong West Central 3 # 12-14 New Sale 936 Strata 522 489,065 HDB

16 Nov 06 87 Jurong West Central 3 # 14-49 New Sale 1,227 Strata 542 664,780 HDB

16 Nov 06 79 Jurong West Central 3 # 05-34 New Sale 1,270 Strata 436 553,261 HDB

16 Nov 06 77 Jurong West Central 3 # 07-30 New Sale 1,259 Strata 452 569,720 HDB

15 Nov 06 71 Jurong West Central 3 # 09-14 New Sale 936 Strata 514 481,224 HDB

15 Nov 06 75 Jurong West Central 3 # 16-23 New Sale 1,991 Strata 363 722,583 Private

15 Nov 06 75 Jurong West Central 3 # 13-24 New Sale 1,346 Strata 465 625,981 HDB

15 Nov 06 71 Jurong West Central 3 # 15-15 New Sale 1,119 Strata 531 594,329 HDB

14 Nov 06 83 Jurong West Central 3 # 06-42 Sub Sale 936 Strata 507 474,632 HDB

14 Nov 06 71 Jurong West Central 3 # 16-14 New Sale 1,561 Strata 374 584,159 Private

14 Nov 06 85 Jurong West Central 3 # 06-45 New Sale 1,238 Strata 547 676,983 Private

14 Nov 06 71 Jurong West Central 3 # 12-15 Sub Sale 1,066 Strata 535 570,394 HDB

14 Nov 06 73 Jurong West Central 3 # 11-18 Sub Sale 1,066 Strata 535 570,241 Private

14 Nov 06 85 Jurong West Central 3 # 07-44 Sub Sale 958 Strata 560 536,230 HDB

14 Nov 06 85 Jurong West Central 3 # 14-44 New Sale 1,001 Strata 573 574,004 HDB

13 Nov 06 87 Jurong West Central 3 # 10-51 New Sale 1,302 Strata 474 617,779 HDB

13 Nov 06 71 Jurong West Central 3 # 15-14 New Sale 990 Strata 519 514,359 HDB

13 Nov 06 87 Jurong West Central 3 # 13-49 New Sale 1,313 Strata 526 690,604 Private 13 Nov 06 77 Jurong West Central 3 # 11-30 New Sale 1, 259 Strata 462 581,883 HDB 13 Nov 06 73 Jurong West Central 3 # 09-18 Sub Sale 1,066 Strata 529 563,986 HDB

13 Nov 06 77 Jurong West Central 3 # 16-28 New Sale 1,550 Strata 404 626,612 Private

13 Nov 06 85 Jurong West Central 3 # 06-47 New Sale 936 Strata 502 469,932 HDB

10 Nov 06 83 Jurong West Central 3 # 05-40 New Sale 1,679 Strata 460 771,880 Private

10 Nov 06 87 Jurong West Central 3 # 08-50 New Sale 1,259 Strata 474 597,345 HDB

10 Nov 06 77 Jurong West Central 3 # 14-29 Sub Sale 1,292 Strata 478 617,299 Private

10 Nov 06 87 Jurong West Central 3 # 06-49 New Sale 1,227 Strata 521 639,534 HDB

9 Nov 06 87 Jurong West Central 3 # 14-48 New Sale 1,507 Strata 508 765,000 HDB

9 Nov 06 87 Jurong West Central 3 # 14-51 New Sale 1,302 Strata 484 630,402 HDB

9 Nov 06 69 Jurong West Central 3 # 15-13 New Sale 1,292 Strata 546 705,746 HDB

9 Nov 06 77 Jurong West Central 3 # 16-29 New Sale 1,808 Strata 388 701,076 HDB

9 Nov 06 85 Jurong West Central 3 # 12-44 New Sale 1,001 Strata 562 562,399 HDB

9 Nov 06 73 Jurong West Central 3 # 13-18 New Sale 1,066 Strata 541 576,566 HDB

9 Nov 06 77 Jurong West Central 3 # 06-30 New Sale 1,259 Strata 450 566,719 HDB

9 Nov 06 77 Jurong West Central 3 # 13-29 Sub Sale 1,335 Strata 468 624,026 HDB

9 Nov 06 69 Jurong West Central 3 # 06-11 Sub Sale 936 Strata 508 475,807 HDB

9 Nov 06 79 Jurong West Central 3 # 14-34 New Sale 1,066 Strata 516 549,564 HDB

9 Nov 06 75 Jurong West Central 3 # 07-24 New Sale 1,302 Unknown 459 597,887 Private

8 Nov 06 83 Jurong West Central 3 # 16-41 New Sale 2,045 Strata 414 847,666 Private

8 Nov 06 83 Jurong West Central 3 # 15-40 New Sale 1,292 Strata 533 688,182 Private

8 Nov 06 75 Jurong West Central 3 # 07-23 New Sale 1,302 Strata 455 592,026 Private

8 Nov 06 69 Jurong West Central 3 # 11-12 New Sale 1,442 Strata 536 772,400 Private

8 Nov 06 83 Jurong West Central 3 # 15-41 New Sale 1,485 Strata 516 766,461 Private

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 17 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

8 Nov 06 79 Jurong West Central 3 # 07-34 New Sale 1,066 Strata 496 528,086 Private

8 Nov 06 75 Jurong West Central 3 # 06-23 New Sale 1,302 Strata 452 589,024 HDB

8 Nov 06 75 Jurong West Central 3 # 07-22 New Sale 1,259 Strata 457 575,387 Private

8 Nov 06 87 Jurong West Central 3 # 08-49 New Sale 1,227 Strata 526 645,754 HDB

8 Nov 06 75 Jurong West Central 3 # 08-22 New Sale 1,259 Strata 459 578,404 HDB

8 Nov 06 83 Jurong West Central 3 # 16-40 New Sale 1,905 Strata 410 780,551 Private

8 Nov 06 71 Jurong West Central 3 # 10-15 New Sale 1,066 Strata 529 564,105 HDB

8 Nov 06 69 Jurong West Central 3 # 11-13 New Sale 1,238 Strata 546 675,322 Private

8 Nov 06 77 Jurong West Central 3 # 07-29 Sub Sale 1,292 Strata 461 595,875 HDB

7 Nov 06 83 Jurong West Central 3 # 06-41 New Sale 1,442 Strata 533 769,322 HDB

7 Nov 06 69 Jurong West Central 3 # 13-10 New Sale 1,152 Strata 525 605,201 HDB

7 Nov 06 75 Jurong West Central 3 # 16-22 New Sale 2,110 Strata 334 705,091 HDB

7 Nov 06 69 Jurong West Central 3 # 10-12 New Sale 1,442 Strata 533 768,709 Private

7 Nov 06 77 Jurong West Central 3 # 12-30 New Sale 1,259 Strata 464 584,965 HDB

7 Nov 06 85 Jurong West Central 3 # 16-45 New Sale 1,851 Strata 439 812,883 HDB

7 Nov 06 69 Jurong West Central 3 # 06-12 New Sale 1,442 Strata 523 754,123 HDB

7 Nov 06 85 Jurong West Central 3 # 09-45 New Sale 1,238 Strata 555 686,538 Private

7 Nov 06 87 Jurong West Central 3 # 12-48 Sub Sale 1,507 Strata 521 785,550 HDB

7 Nov 06 85 Jurong West Central 3 # 09-44 Sub Sale 958 Strata 565 541,495 Private

7 Nov 06 75 Jurong West Central 3 # 16-26 New Sale 1,615 Strata 379 611,195 HDB

7 Nov 06 69 Jurong West Central 3 # 07-12 Sub Sale 1,442 Strata 525 757,743 Private

7 Nov 06 75 Jurong West Central 3 # 13-23 Sub Sale 1,389 Strata 458 635,289 HDB

6 Nov 06 87 Jurong West Central 3 # 10-49 New Sale 1,227 Strata 531 652,035 HDB 6 Nov 06 69 Jurong West Central 3 # 13-12 New Sale 1, 528 Strata 520 794,290 HDB 6 Nov 06 81 Jurong West Central 3 # 07-38 New Sale 1,066 Strata 505 537,676 HDB

6 Nov 06 73 Jurong West Central 3 # 14-20 New Sale 1,292 Strata 535 690,543 HDB

6 Nov 06 79 Jurong West Central 3 # 12-34 Sub Sale 1,066 Strata 510 543,340 HDB

6 Nov 06 85 Jurong West Central 3 # 10-45 New Sale 1,238 Strata 557 689,753 Private

6 Nov 06 87 Jurong West Central 3 # 15-49 Sub Sale 1,281 Strata 533 682,358 HDB

6 Nov 06 73 Jurong West Central 3 # 12-20 Sub Sale 1,324 Strata 526 695,882 HDB

6 Nov 06 87 Jurong West Central 3 # 11-51ET C New Sale 2,605 Strata 478 1,244,970 Private

6 Nov 06 69 Jurong West Central 3 # 15-11 New Sale 990 Strata 522 516,749 Private

6 Nov 06 79 Jurong West Central 3 # 06-35 New Sale 1,066 Strata 495 527,485 HDB

6 Nov 06 75 Jurong West Central 3 # 05-25 Sub Sale 1,292 Strata 412 532,758 HDB

6 Nov 06 79 Jurong West Central 3 # 07-35 Sub Sale 1,066 Strata 498 530,484 HDB

6 Nov 06 79 Jurong West Central 3 # 09-35 New Sale 1,066 Strata 503 536,533 HDB

6 Nov 06 75 Jurong West Central 3 # 14-22 New Sale 1,259 Strata 474 596,839 HDB

6 Nov 06 69 Jurong West Central 3 # 08-11 New Sale 936 Strata 514 480,937 HDB

4 Nov 06 75 Jurong West Central 3 # 10-25 New Sale 915 Strata 520 475,597 HDB

3 Nov 06 81 Jurong West Central 3 # 12-38 New Sale 1,066 Strata 519 552,926 HDB

3 Nov 06 69 Jurong West Central 3 # 08-13 New Sale 1,238 Strata 538 665,883 HDB

3 Nov 06 73 Jurong West Central 3 # 08-20 New Sale 1,238 Strata 529 654,243 Private

3 Nov 06 73 Jurong West Central 3 # 09-20 Sub Sale 1,238 Strata 531 657,375 HDB

3 Nov 06 69 Jurong West Central 3 # 09-13 New Sale 1,238 Strata 540 669,014 HDB

2 Nov 06 75 Jurong West Central 3 # 16-25 New Sale 1,572 Strata 372 584,769 Private

2 Nov 06 73 Jurong West Central 3 # 12-21 New Sale 1,152 Strata 544 626,872 HDB

2 Nov 06 81 Jurong West Central 3 # 09-36 New Sale 1,442 Strata 514 742,047 Private

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 18 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

2 Nov 06 75 Jurong West Central 3 # 08-25 New Sale 915 Strata 514 470,530 HDB

2 Nov 06 81 Jurong West Central 3 # 11-37 New Sale 1,238 Strata 532 658,510 Private

2 Nov 06 81 Jurong West Central 3 # 16-38 New Sale 1,744 Strata 385 670,649 HDB

2 Nov 06 81 Jurong West Central 3 # 07-36 New Sale 1,442 Strata 510 734,995 Private

2 Nov 06 77 Jurong West Central 3 # 15-29 New Sale 1,346 Strata 472 635,394 HDB

2 Nov 06 69 Jurong West Central 3 # 15-12 New Sale 1,485 Strata 532 790,261 HDB

2 Nov 06 73 Jurong West Central 3 # 16-20 New Sale 1,851 Strata 421 778,837 HDB

2 Nov 06 75 Jurong West Central 3 # 06-25 New Sale 915 Strata 509 465,517 Private

2 Nov 06 73 Jurong West Central 3 # 10-21 Sub Sale 1,066 Strata 554 590,204 Private

2 Nov 06 73 Jurong West Central 3 # 07-21 New Sale 1,066 Strata 545 580,801 HDB

2 Nov 06 75 Jurong West Central 3 # 14-24 New Sale 1,302 Strata 476 619,322 HDB

2 Nov 06 75 Jurong West Central 3 # 12-22 New Sale 1,259 Strata 469 590,630 HDB

2 Nov 06 77 Jurong West Central 3 # 09-29 Sub Sale 1,292 Strata 466 601,919 HDB

2 Nov 06 75 Jurong West Central 3 # 07-25 New Sale 915 Unknown 512 468,017 Private

2 Nov 06 71 Jurong West Central 3 # 15-17 New Sale 1,485 Strata 529 785,261 Private

2 Nov 06 75 Jurong West Central 3 # 15-26 New Sale 1,055 Strata 512 539,746 Private

2 Nov 06 75 Jurong West Central 3 # 15-24 New Sale 1,356 Strata 470 637,327 HDB

2 Nov 06 77 Jurong West Central 3 # 11-28 Sub Sale 980 Strata 536 525,099 HDB

2 Nov 06 81 Jurong West Central 3 # 10-36 New Sale 1,442 Strata 517 745,598 Private

2 Nov 06 77 Jurong West Central 3 # 12-28 New Sale 980 Strata 539 527,659 Private

2 Nov 06 75 Jurong West Central 3 # 14-26 New Sale 1,001 Strata 520 520,075 HDB

2 Nov 06 81 Jurong West Central 3 # 09-39 New Sale 936 Strata 498 466,035 HDB

2 Nov 06 87 Jurong West Central 3 # 09-49 Sub Sale 1,227 Strata 529 648,886 HDB 2 Nov 06 81 Jurong West Central 3 # 12-36 New Sale 1 ,442 Strata 522 752,752 Private 2 Nov 06 79 Jurong West Central 3 # 08-33 New Sale 1,238 Strata 518 641,030 Private

2 Nov 06 79 Jurong West Central 3 # 15-33 New Sale 1,238 Strata 535 662,529 Private

2 Nov 06 81 Jurong West Central 3 # 13-38 New Sale 1,152 Strata 507 584,164 HDB

2 Nov 06 77 Jurong West Central 3 # 13-28 New Sale 1,023 Strata 530 542,368 HDB

1 Nov 06 75 Jurong West Central 3 # 11-25 New Sale 915 Strata 523 478,152 Private

1 Nov 06 81 Jurong West Central 3 # 11-38 New Sale 1,066 Strata 516 549,842 Private

1 Nov 06 83 Jurong West Central 3 # 13-40 Sub Sale 1,324 Strata 554 733,079 HDB

1 Nov 06 77 Jurong West Central 3 # 10-29 Sub Sale 1,292 Strata 468 604,964 HDB

1 Nov 06 81 Jurong West Central 3 # 08-36 New Sale 1,442 Strata 512 738,513 Private

1 Nov 06 81 Jurong West Central 3 # 15-36 New Sale 1,485 Strata 516 766,461 Private

1 Nov 06 77 Jurong West Central 3 # 11-31 Sub Sale 872 Strata 495 431,149 HDB

1 Nov 06 83 Jurong West Central 3 # 08-41 New Sale 1,442 Strata 539 776,739 Private

1 Nov 06 85 Jurong West Central 3 # 15-45 New Sale 1,238 Strata 570 706,054 HDB

1 Nov 06 77 Jurong West Central 3 # 13-27 New Sale 1,001 Strata 522 522,077 Private

1 Nov 06 75 Jurong West Central 3 # 05-26 New Sale 1,421 Strata 403 572,697 HDB

1 Nov 06 79 Jurong West Central 3 # 16-32 New Sale 1,701 Strata 411 699,568 HDB

1 Nov 06 81 Jurong West Central 3 # 16-39 New Sale 1,561 Strata 363 565,900 HDB

1 Nov 06 79 Jurong West Central 3 # 12-35 New Sale 1,152 Strata 498 573,316 Private

1 Nov 06 75 Jurong West Central 3 # 05-24 New Sale 1,604 Strata 399 640,451 HDB

1 Nov 06 77 Jurong West Central 3 # 12-31 New Sale 872 Strata 497 433,724 Private

1 Nov 06 87 Jurong West Central 3 # 06-48 New Sale 1,507 Strata 507 763,576 Private

1 Nov 06 75 Jurong West Central 3 # 14-23 New Sale 1,302 Strata 471 613,466 Private

1 Nov 06 75 Jurong West Central 3 # 07-26 New Sale 1,001 Strata 502 502,220 HDB

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 19 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

1 Nov 06 75 Jurong West Central 3 # 15-23 New Sale 1,356 Strata 465 631,301 Private

1 Nov 06 77 Jurong West Central 3 # 14-28 New Sale 980 Strata 544 532,817 HDB

1 Nov 06 81 Jurong West Central 3 # 08-37 New Sale 1,238 Strata 525 649,385 Private

1 Nov 06 77 Jurong West Central 3 # 12-29 New Sale 1,292 Strata 473 611,100 Private

1 Nov 06 75 Jurong West Central 3 # 12-24 New Sale 1,302 Strata 471 613,121 HDB

1 Nov 06 69 Jurong West Central 3 # 15-10 Sub Sale 1,119 Strata 533 596,852 Private

1 Nov 06 71 Jurong West Central 3 # 16-16 New Sale 1,905 Strata 418 797,116 Private

1 Nov 06 71 Jurong West Central 3 # 10-16 New Sale 1,238 Strata 541 669,160 Private

1 Nov 06 73 Jurong West Central 3 # 05-21 Sub Sale 1,410 Strata 459 647,856 HDB

1 Nov 06 87 Jurong West Central 3 # 12-49 New Sale 1,227 Strata 537 658,376 HDB

1 Nov 06 75 Jurong West Central 3 # 15-22 New Sale 1,313 Strata 466 612,223 HDB

1 Nov 06 77 Jurong West Central 3 # 16-31 New Sale 1,453 Strata 360 523,309 HDB

1 Nov 06 75 Jurong West Central 3 # 06-24 New Sale 1,302 Strata 457 594,886 HDB

31 Oct 06 81 Jurong West Central 3 # 07-37 New Sale 1,238 Strata 522 646,371 HDB

31 Oct 06 71 Jurong West Central 3 # 05-17 New Sale 2,099 Strata 420 881,010 Private

31 Oct 06 85 Jurong West Central 3 # 10-44 Sub Sale 958 Strata 568 544,148 HDB

31 Oct 06 79 Jurong West Central 3 # 11-35 New Sale 1,066 Strata 509 542,651 HDB

31 Oct 06 81 Jurong West Central 3 # 06-38 New Sale 1,066 Strata 502 534,678 HDB

31 Oct 06 77 Jurong West Central 3 # 08-31 New Sale 872 Strata 486 423,515 Private

31 Oct 06 81 Jurong West Central 3 # 15-37 New Sale 1,292 Strata 533 688,182 HDB

31 Oct 06 81 Jurong West Central 3 # 14-39 New Sale 936 Strata 511 478,886 HDB

31 Oct 06 71 Jurong West Central 3 # 16-17 New Sale 2,045 Strata 425 868,459 Private

31 Oct 06 79 Jurong West Central 3 # 14-32 New Sale 1,109 Strata 548 607,533 Private 31 Oct 06 77 Jurong West Central 3 # 08-30 New Sale 1, 259 Strata 455 572,737 HDB 31 Oct 06 71 Jurong West Central 3 # 08-16 New Sale 1,238 Strata 536 662,883 Private

31 Oct 06 69 Jurong West Central 3 # 09-10 New Sale 1,066 Strata 529 563,439 Private

31 Oct 06 85 Jurong West Central 3 # 08-45 New Sale 1,238 Strata 552 683,339 Private

31 Oct 06 71 Jurong West Central 3 # 09-16 New Sale 1,238 Strata 538 666,014 Private

31 Oct 06 87 Jurong West Central 3 # 16-48 New Sale 2,185 Strata 413 903,484 HDB

31 Oct 06 87 Jurong West Central 3 # 11-49 Sub Sale 1,227 Strata 534 655,198 HDB

31 Oct 06 83 Jurong West Central 3 # 11-40 New Sale 1,238 Strata 562 695,926 Private

31 Oct 06 77 Jurong West Central 3 # 14-27 New Sale 969 Strata 529 512,815 HDB

31 Oct 06 73 Jurong West Central 3 # 06-21 New Sale 1,066 Strata 542 577,700 HDB

30 Oct 06 79 Jurong West Central 3 # 07-32 New Sale 1,066 Strata 536 571,244 HDB

30 Oct 06 85 Jurong West Central 3 # 11-44 New Sale 958 Strata 571 546,813 HDB

30 Oct 06 77 Jurong West Central 3 # 13-31 Sub Sale 893 Strata 498 444,626 HDB

30 Oct 06 75 Jurong West Central 3 # 14-25 New Sale 915 Strata 531 485,896 HDB

30 Oct 06 75 Jurong West Central 3 # 12-25 New Sale 915 Strata 525 480,718 HDB

30 Oct 06 79 Jurong West Central 3 # 06-32 Sub Sale 1,066 Strata 533 568,245 HDB

30 Oct 06 75 Jurong West Central 3 # 09-25 New Sale 915 Strata 517 473,057 HDB

30 Oct 06 81 Jurong West Central 3 # 09-37 New Sale 1,238 Strata 527 652,413 Private

30 Oct 06 75 Jurong West Central 3 # 12-23 New Sale 1,302 Strata 466 607,262 HDB

30 Oct 06 81 Jurong West Central 3 # 16-37 New Sale 1,905 Strata 410 780,551 HDB

30 Oct 06 83 Jurong West Central 3 # 07-41 New Sale 1,442 Strata 536 773,022 HDB

30 Oct 06 69 Jurong West Central 3 # 11-10 New Sale 1,066 Strata 535 569,692 Private

30 Oct 06 69 Jurong West Central 3 # 09-11 New Sale 936 Strata 516 483,522 HDB

30 Oct 06 71 Jurong West Central 3 # 08-17 Sub Sale 1,442 Strata 524 756,381 HDB

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 20 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

30 Oct 06 83 Jurong West Central 3 # 14-41 Sub Sale 1,442 Strata 554 799,423 HDB

30 Oct 06 79 Jurong West Central 3 # 12-33 New Sale 1,324 Strata 515 681,694 Private

30 Oct 06 79 Jurong West Central 3 # 06-33 New Sale 1,238 Strata 513 635,016 Private

30 Oct 06 85 Jurong West Central 3 # 13-45 New Sale 1,238 Strata 565 699,488 Private

27 Oct 06 81 Jurong West Central 3 # 15-39 New Sale 990 Strata 503 498,257 HDB

27 Oct 06 71 Jurong West Central 3 # 11-17 New Sale 1,442 Strata 532 767,400 HDB

27 Oct 06 77 Jurong West Central 3 # 16-27 New Sale 1,561 Strata 386 602,685 Private

27 Oct 06 71 Jurong West Central 3 # 14-16 New Sale 1,238 Strata 551 681,894 HDB

27 Oct 06 73 Jurong West Central 3 # 15-20 New Sale 1,238 Strata 546 676,482 HDB

27 Oct 06 87 Jurong West Central 3 # 09-48 New Sale 1,507 Strata 514 774,486 HDB

27 Oct 06 75 Jurong West Central 3 # 13-26 New Sale 1,044 Strata 507 528,960 Private

27 Oct 06 75 Jurong West Central 3 # 06-26 Sub Sale 1,001 Strata 499 499,720 HDB

27 Oct 06 79 Jurong West Central 3 # 14-33 New Sale 1,292 Strata 524 676,383 HDB

27 Oct 06 75 Jurong West Central 3 # 09-24 New Sale 1,302 Strata 464 603,934 HDB

27 Oct 06 77 Jurong West Central 3 # 07-28 New Sale 980 Strata 526 514,981 Private

27 Oct 06 73 Jurong West Central 3 # 08-21 New Sale 1,066 Strata 548 583,919 HDB

26 Oct 06 77 Jurong West Central 3 # 10-31 New Sale 872 Strata 492 428,589 HDB

26 Oct 06 77 Jurong West Central 3 # 05-31 New Sale 1,152 Strata 407 468,798 HDB

26 Oct 06 71 Jurong West Central 3 # 13-16 New Sale 1,324 Strata 535 708,263 HDB

26 Oct 06 85 Jurong West Central 3 # 08-44 New Sale 958 Strata 562 538,856 HDB

26 Oct 06 69 Jurong West Central 3 # 10-10 New Sale 1,066 Strata 532 566,557 HDB

26 Oct 06 77 Jurong West Central 3 # 09-28 New Sale 980 Strata 525 514,106 Private

25 Oct 06 81 Jurong West Central 3 # 05-39 New Sale 1,087 Strata 461 500,870 HDB 25 Oct 06 71 Jurong West Central 3 # 06-17 New Sale 1 ,442 Strata 519 749,123 HDB 25 Oct 06 69 Jurong West Central 3 # 14-12 New Sale 1,442 Strata 543 783,580 HDB

25 Oct 06 81 Jurong West Central 3 # 13-37 New Sale 1,324 Strata 524 693,666 HDB

25 Oct 06 71 Jurong West Central 3 # 15-16 New Sale 1,292 Strata 544 702,746 HDB

25 Oct 06 75 Jurong West Central 3 # 08-23 New Sale 1,302 Strata 457 595,042 HDB

25 Oct 06 79 Jurong West Central 3 # 16-33 New Sale 1,851 Strata 412 762,772 HDB

25 Oct 06 71 Jurong West Central 3 # 12-17 New Sale 1,442 Strata 535 771,109 Private

25 Oct 06 77 Jurong West Central 3 # 06-28 New Sale 980 Strata 523 512,482 HDB

25 Oct 06 83 Jurong West Central 3 # 12-41 New Sale 1,442 Strata 549 791,789 HDB

25 Oct 06 81 Jurong West Central 3 # 13-36 New Sale 1,528 Strata 504 770,466 HDB

25 Oct 06 83 Jurong West Central 3 # 13-41 New Sale 1,528 Strata 530 810,440 HDB

25 Oct 06 75 Jurong West Central 3 # 05-23 New Sale 2,347 Strata 315 739,909 Private

25 Oct 06 81 Jurong West Central 3 # 14-36 New Sale 1,442 Strata 527 759,975 HDB

25 Oct 06 81 Jurong West Central 3 # 06-39 New Sale 936 Strata 490 458,491 HDB

25 Oct 06 77 Jurong West Central 3 # 05-30 New Sale 1,496 Strata 403 602,942 HDB

25 Oct 06 85 Jurong West Central 3 # 06-44 New Sale 958 Strata 557 533,617 HDB

23 Oct 06 79 Jurong West Central 3 # 05-32 New Sale 1,722 Strata 403 693,309 HDB

23 Oct 06 79 Jurong West Central 3 # 14-35 New Sale 1,119 Strata 505 565,565 Private

23 Oct 06 77 Jurong West Central 3 # 05-29 Sub Sale 1,593 Strata 408 649,374 HDB

23 Oct 06 79 Jurong West Central 3 # 15-34 Sub Sale 1,066 Strata 519 552,702 HDB

23 Oct 06 81 Jurong West Central 3 # 09-38 Sub Sale 1,066 Strata 510 543,726 HDB

23 Oct 06 83 Jurong West Central 3 # 10-40 Sub Sale 1,238 Strata 560 692,697 Private

21 Oct 06 73 Jurong West Central 3 # 10-18 New Sale 1,066 Strata 532 567,105 Private

20 Oct 06 81 Jurong West Central 3 # 10-38 New Sale 1,066 Strata 513 546,775 HDB

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 21 OF 49

Area Price Price Date Address T ype of Sale (sqf t) T ype of Area (S$ psf ) (S$) Purchaser Address

20 Oct 06 69 Jurong West Central 3 # 10-11 New Sale 936 Strata 519 486,122 HDB

20 Oct 06 81 Jurong West Central 3 # 15-38 New Sale 1,119 Strata 515 576,185 HDB

20 Oct 06 83 Jurong West Central 3 # 11-41 New Sale 1,442 Strata 546 787,999 HDB

20 Oct 06 85 Jurong West Central 3 # 11-45 New Sale 1,238 Strata 560 692,983 HDB

20 Oct 06 79 Jurong West Central 3 # 05-33 New Sale 1,948 Strata 392 764,501 HDB

20 Oct 06 75 Jurong West Central 3 # 11-22 New Sale 1,259 Strata 467 587,550 HDB

20 Oct 06 87 Jurong West Central 3 # 13-48 New Sale 1,593 Strata 504 803,368 Private

20 Oct 06 83 Jurong West Central 3 # 10-41 New Sale 1,442 Strata 544 784,228 HDB

20 Oct 06 71 Jurong West Central 3 # 13-17 New Sale 1,528 Strata 516 789,290 Private

19 Oct 06 75 Jurong West Central 3 # 10-22 New Sale 1,259 Strata 464 584,485 HDB

19 Oct 06 71 Jurong West Central 3 # 11-16 Sub Sale 1,238 Strata 543 672,322 HDB

19 Oct 06 71 Jurong West Central 3 # 14-17 New Sale 1,442 Strata 540 778,580 HDB

19 Oct 06 79 Jurong West Central 3 # 09-33 New Sale 1,238 Strata 520 644,058 HDB

19 Oct 06 81 Jurong West Central 3 # 08-39 New Sale 936 Strata 495 463,507 HDB

19 Oct 06 73 Jurong West Central 3 # 10-20 New Sale 1,238 Strata 629 778,580 HDB

18 Oct 06 75 Jurong West Central 3 # 08-24 New Sale 1,302 Strata 461 600,903 HDB

18 Oct 06 83 Jurong West Central 3 # 09-41 New Sale 1,442 Strata 541 780,475 HDB

18 Oct 06 81 Jurong West Central 3 # 11-36 New Sale 1,442 Strata 519 749,167 HDB

18 Oct 06 75 Jurong West Central 3 # 15-25 New Sale 958 Strata 528 506,010 HDB

18 Oct 06 79 Jurong West Central 3 # 07-33 New Sale 1,238 Strata 515 638,016 HDB

18 Oct 06 77 Jurong West Central 3 # 14-31 New Sale 872 Strata 503 438,920 HDB

17 Oct 06 73 Jurong West Central 3 # 13-21 Sub Sale 1,066 Strata 563 599,761 HDB

17 Oct 06 81 Jurong West Central 3 # 14-37 Sub Sale 1,238 Strata 539 667,764 HDB 8 Oct 06 79 Jurong West Central 3 # 13-34 New Sale 1,0 66 Strata 513 546,443 HDB 7 Oct 06 87 Jurong West Central 3 # 15-48 New Sale 1,561 Strata 516 805,311 HDB

7 Oct 06 79 Jurong West Central 3 # 15-35 New Sale 1,066 Strata 521 555,098 HDB

7 Oct 06 69 Jurong West Central 3 # 16-12 New Sale 2,045 Strata 427 873,459 HDB

7 Oct 06 87 Jurong West Central 3 # 11-48 New Sale 1,507 Strata 519 781,845 Private

5 Oct 06 75 Jurong West Central 3 # 11-24 New Sale 1,302 Strata 468 610,043 HDB

2 Oct 06 75 Jurong West Central 3 # 05-22 New Sale 1,701 Strata 377 641,504 HDB

2 Oct 06 81 Jurong West Central 3 # 10-39 New Sale 936 Strata 500 468,577 HDB

1 Oct 06 77 Jurong West Central 3 # 15-31 New Sale 915 Strata 501 458,000 HDB

30 Sep 06 77 Jurong West Central 3 # 09-31 New Sale 872 Strata 489 426,044 HDB

30 Sep 06 77 Jurong West Central 3 # 15-30 New Sale 1,270 Strata 473 601,335 Private

30 Sep 06 73 Jurong West Central 3 # 09-21 New Sale 1,066 Strata 551 587,053 HDB

20 Jan 06 73 Jurong West Central 3 # 15-18 New Sale 1,066 Strata 547 582,960 Private

PROFITABLE TRANSACTIONS (TOTAL OF 382 TRANSACTIONS)

No te: Transactio ns with the same address are matched. P ro fitability o f each ro und-trip transactio n is based o nly o n the chang e in asset price and do es no t take into acco unt transactio n co sts and the effect o f financing .

So urce: URA, http: //www. theedgeproperty. com. sg

Area Sale Price Purchase Price Prof it Days Annualised Sold On Address (sqf t) (S$ psf ) Boug ht On (S$ psf ) (S$) (days) (%)

23 Feb 16 69 Jurong West Central 3 # 15-13 1,292 1,037 9 Nov 06 546 634,254 3,393 7.1

25 Jan 16 83 Jurong West Central 3 # 09-42 936 1,196 21 Mar 09 600 558,000 2,501 10.6

13 Nov 15 67 Jurong West Central 3 # 16-08 1,851 743 19 Jan 07 436 567,065 3,220 6.2

2 Oct 15 73 Jurong West Central 3 # 05-20 1,884 948 26 Mar 10 664 535,000 2,016 6.7

11 Aug 15 83 Jurong West Central 3 # 07-40 1,238 1,115 13 Apr 09 600 637,000 2,311 10.3

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 22 OF 49

Area Sale Price Purchase Price Prof it Days Annualised Sold On Address (sqf t) (S$ psf ) Boug ht On (S$ psf ) (S$) (days) (%)

5 Aug 15 87 Jurong West Central 3 # 13-51 1,389 1,080 30 Apr 07 508 794,912 3,019 9.6

6 Jul 15 77 Jurong West Central 3 # 12-28 980 1,152 27 Feb 09 615 526,000 2,320 10.4

1 Jul 15 75 Jurong West Central 3 # 05-25 1,292 968 1 Feb 11 813 200,000 1,611 4.0

18 May 15 65 Jurong West Central 3 # 10-05 1,302 990 22 Jan 07 498 641,634 3,038 8.6

14 May 15 65 Jurong West Central 3 # 06-04 915 1,202 8 Sep 09 787 380,000 2,074 7.7

16 Apr 15 69 Jurong West Central 3 # 14-11 936 1,098 2 Dec 10 1,020 73,000 1,596 1.7

15 Apr 15 75 Jurong West Central 3 # 10-22 1,259 1,043 8 Jun 09 580 583,000 2,137 10.5

27 Mar 15 65 Jurong West Central 3 # 07-03 1,001 1,077 5 Nov 09 809 268,000 1,968 5.4

20 Mar 15 73 Jurong West Central 3 # 14-21 1,109 1,173 19 Aug 08 643 587,000 2,404 9.5

24 Feb 15 81 Jurong West Central 3 # 12-39 936 1,153 18 Jul 08 630 490,000 2,412 9.6

17 Feb 15 79 Jurong West Central 3 # 05-34 1,270 866 16 Nov 06 436 546,739 3,015 8.7

18 Dec 14 77 Jurong West Central 3 # 12-31 872 1,133 1 Nov 06 497 554,276 2,969 10.7

28 Nov 14 79 Jurong West Central 3 # 07-35 1,066 1,135 6 Nov 06 498 679,516 2,944 10.8

21 Nov 14 67 Jurong West Central 3 # 07-06 936 1,143 3 Apr 08 598 510,000 2,423 10.2

20 Nov 14 83 Jurong West Central 3 # 13-43 1,152 998 29 Mar 07 528 541,928 2,793 8.7

21 Oct 14 67 Jurong West Central 3 # 16-07 1,733 949 8 Nov 10 767 315,000 1,443 5.5

3 Oct 14 73 Jurong West Central 3 # 10-21 1,066 1,126 2 Nov 06 554 609,796 2,892 9.4

15 Aug 14 65 Jurong West Central 3 # 10-04 915 1,246 7 Nov 10 907 310,000 1,377 8.8

11 Aug 14 69 Jurong West Central 3 # 05-12 2,099 1,055 11 Mar 09 447 1,277,000 1,979 17.2

18 Jul 14 87 Jurong West Central 3 # 14-51 1,302 1,013 9 Nov 06 484 689,598 2,808 10.1

7 May 14 87 Jurong West Central 3 # 13-49 1,313 1,066 13 Nov 06 526 709,396 2,732 9.9

23 Apr 14 65 Jurong West Central 3 # 10-03 1,001 1,189 5 Feb 07 549 640,313 2,634 11.3

16 Jan 14 67 Jurong West Central 3 # 11-06 936 1,292 25 Nov 11 1,063 215,000 783 9.5 28 Aug 13 87 Jurong West Central 3 # 15-50 1,313 1,127 18 Feb 10 838 380,000 1,287 8.8 19 Aug 13 87 Jurong West Central 3 # 07-50 1,259 1,197 19 Oct 10 913 358,000 1,035 10.0

19 Jul 13 81 Jurong West Central 3 # 06-39 936 1,212 25 Oct 06 490 676,509 2,459 14.4

12 Jul 13 79 Jurong West Central 3 # 12-34 1,066 1,267 6 Nov 06 510 806,660 2,440 14.6

8 Jul 13 79 Jurong West Central 3 # 13-32 1,066 1,314 10 Nov 09 826 520,000 1,336 13.5

27 Jun 13 83 Jurong West Central 3 # 05-42 1,087 1,058 2 Apr 07 515 589,746 2,278 12.2

17 Jun 13 71 Jurong West Central 3 # 05-17 2,099 1,072 31 Oct 06 420 1,368,990 2,421 15.2

13 Jun 13 83 Jurong West Central 3 # 16-42 1,561 897 8 Jan 10 595 472,000 1,252 12.7

6 Jun 13 77 Jurong West Central 3 # 14-31 872 1,386 18 Oct 06 503 769,080 2,423 16.5

6 Jun 13 73 Jurong West Central 3 # 15-20 1,238 1,115 27 Oct 06 546 703,518 2,414 11.4

23 May 13 81 Jurong West Central 3 # 06-37 1,238 1,232 5 Mar 09 614 765,000 1,540 17.9

22 May 13 69 Jurong West Central 3 # 14-10 1,066 1,243 2 Jul 10 877 390,000 1,055 12.8

17 May 13 69 Jurong West Central 3 # 09-10 1,066 1,206 31 Oct 06 529 721,561 2,390 13.4

16 May 13 85 Jurong West Central 3 # 11-47 936 1,281 12 Jun 09 715 530,000 1,434 16.0

7 May 13 69 Jurong West Central 3 # 06-10 1,066 1,173 6 Apr 09 593 618,000 1,492 18.2

29 Apr 13 83 Jurong West Central 3 # 07-42 936 1,121 6 Mar 07 510 572,754 2,246 13.7

23 Apr 13 83 Jurong West Central 3 # 15-41 1,485 1,144 12 Mar 10 572 850,000 1,138 24.9

4 Apr 13 85 Jurong West Central 3 # 13-44 958 1,242 22 Nov 06 576 637,818 2,325 12.8

21 Mar 13 65 Jurong West Central 3 # 16-04 1,572 865 5 Mar 10 636 360,000 1,112 10.6

12 Mar 13 69 Jurong West Central 3 # 05-13 1,582 1,011 8 Sep 09 521 775,000 1,281 20.8

18 Feb 13 85 Jurong West Central 3 # 05-47 1,270 945 5 Feb 09 480 590,400 1,474 18.3

16 Jan 13 83 Jurong West Central 3 # 15-40 1,292 1,215 8 Nov 06 533 881,818 2,261 14.2

7 Jan 13 65 Jurong West Central 3 # 05-04 1,604 842 5 Apr 10 574 430,000 1,008 14.9

3 Dec 12 65 Jurong West Central 3 # 10-01 1,302 1,052 6 Jul 07 541 665,000 1,977 13.0

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 23 OF 49

Area Sale Price Purchase Price Prof it Days Annualised Sold On Address (sqf t) (S$ psf ) Boug ht On (S$ psf ) (S$) (days) (%)

29 Nov 12 67 Jurong West Central 3 # 15-07 1,066 1,196 27 Feb 07 556 682,152 2,102 14.2

2 Nov 12 79 Jurong West Central 3 # 14-33 1,292 1,200 2 Mar 09 587 792,000 1,341 21.5

22 Oct 12 85 Jurong West Central 3 # 08-46 1,066 1,144 21 Nov 06 519 666,151 2,162 14.3

16 Oct 12 71 Jurong West Central 3 # 07-14 936 1,281 26 Feb 10 839 414,000 963 17.4

28 Sep 12 77 Jurong West Central 3 # 08-31 872 1,179 18 Jul 07 614 492,780 1,899 13.4

27 Sep 12 69 Jurong West Central 3 # 09-11 936 1,260 3 Jan 11 961 280,000 633 16.9

26 Sep 12 79 Jurong West Central 3 # 14-35 1,119 1,143 14 Sep 09 759 430,000 1,108 14.4

5 Sep 12 75 Jurong West Central 3 # 13-23 1,389 1,080 7 Nov 06 458 864,711 2,129 15.9

3 Sep 12 81 Jurong West Central 3 # 15-37 1,292 1,154 31 Oct 06 533 801,818 2,134 14.1

22 Aug 12 65 Jurong West Central 3 # 06-05 1,302 1,098 22 Feb 07 488 794,553 2,008 15.9

15 Aug 12 71 Jurong West Central 3 # 14-16 1,238 1,196 27 Oct 06 551 798,106 2,119 14.3

8 Aug 12 81 Jurong West Central 3 # 14-38 1,066 1,143 1 Dec 06 525 658,854 2,077 14.7

3 Aug 12 69 Jurong West Central 3 # 13-13 1,324 1,109 31 Oct 08 631 633,890 1,372 16.2

3 Aug 12 73 Jurong West Central 3 # 05-18 1,593 861 13 Mar 07 410 718,216 1,970 14.7

27 Jul 12 83 Jurong West Central 3 # 14-43 1,066 1,191 22 Mar 07 546 686,831 1,954 15.7

26 Jul 12 69 Jurong West Central 3 # 06-11 936 1,127 9 Oct 09 747 355,000 1,021 15.8

19 Jul 12 83 Jurong West Central 3 # 08-43 1,066 1,116 25 Sep 09 798 338,888 1,028 12.7

16 Jul 12 87 Jurong West Central 3 # 14-50 1,259 1,093 22 Jun 09 651 556,500 1,120 18.4

12 Jul 12 77 Jurong West Central 3 # 09-31 872 1,181 30 Sep 06 489 603,956 2,112 16.5

6 Jul 12 81 Jurong West Central 3 # 13-38 1,152 1,085 29 May 08 590 570,000 1,499 16.0

6 Jul 12 67 Jurong West Central 3 # 08-08 1,238 1,115 3 Jul 09 679 540,000 1,099 17.9

29 Jun 12 79 Jurong West Central 3 # 08-33 1,238 1,115 16 Jan 09 578 665,000 1,260 21.0

19 Jun 12 87 Jurong West Central 3 # 16-50 2,110 825 30 Mar 07 345 1,012,080 1,908 18.1 12 Jun 12 75 Jurong West Central 3 # 16-26 1,615 876 7 Nov 06 379 803,805 2,044 16.2 1 Jun 12 85 Jurong West Central 3 # 11-45 1,238 1,171 20 Oct 06 560 757,017 2,051 14.0

14 May 12 75 Jurong West Central 3 # 07-26 1,001 1,199 17 Mar 10 869 330,000 789 16.0

8 May 12 75 Jurong West Central 3 # 14-22 1,259 1,120 6 Nov 06 474 813,161 2,010 16.9

4 May 12 87 Jurong West Central 3 # 06-50 1,259 1,012 13 Jan 09 520 620,000 1,207 22.3

21 Apr 12 85 Jurong West Central 3 # 14-47 990 1,149 24 Jun 09 687 458,000 1,032 20.0

16 Apr 12 69 Jurong West Central 3 # 08-13 1,238 1,175 3 Nov 06 538 788,405 1,991 15.4

16 Apr 12 75 Jurong West Central 3 # 06-25 915 1,100 2 Nov 06 509 540,983 1,992 15.2

9 Apr 12 69 Jurong West Central 3 # 06-12 1,442 1,043 30 Sep 08 641 580,000 1,287 14.8

2 Apr 12 75 Jurong West Central 3 # 11-25 915 1,202 17 Sep 09 781 385,000 928 18.5

30 Mar 12 75 Jurong West Central 3 # 16-24 1,894 823 16 Jan 07 378 842,406 1,900 16.1

23 Mar 12 69 Jurong West Central 3 # 07-11 936 1,105 23 Jan 08 603 470,000 1,521 15.6

22 Mar 12 75 Jurong West Central 3 # 06-24 1,302 960 22 Jul 09 630 430,000 974 17.1

16 Mar 12 85 Jurong West Central 3 # 12-45 1,324 1,095 18 Aug 09 740 470,000 941 16.4

22 Feb 12 77 Jurong West Central 3 # 13-27 1,001 1,137 22 Feb 10 827 310,000 730 17.2

21 Feb 12 77 Jurong West Central 3 # 08-30 1,259 1,016 15 Oct 08 556 580,000 1,224 19.7

20 Feb 12 71 Jurong West Central 3 # 13-16 1,324 1,076 26 Oct 06 535 716,737 1,943 14.0

22 Jan 12 81 Jurong West Central 3 # 06-36 1,442 1,005 3 Apr 09 603 580,000 1,024 20.0

28 Dec 11 73 Jurong West Central 3 # 09-21 1,066 1,276 17 Jun 10 901 400,000 559 25.5

20 Dec 11 75 Jurong West Central 3 # 05-22 1,701 882 7 Oct 09 576 520,000 804 21.3

19 Dec 11 75 Jurong West Central 3 # 15-23 1,356 1,091 21 Oct 09 737 480,000 789 19.9

16 Dec 11 67 Jurong West Central 3 # 16-09 1,561 787 16 Feb 07 422 569,572 1,764 13.8

25 Nov 11 67 Jurong West Central 3 # 11-06 936 1,063 26 Jan 07 526 502,451 1,764 15.7

16 Nov 11 87 Jurong West Central 3 # 11-51 1,302 1,031 27 Aug 09 656 488,000 811 22.5

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 24 OF 49

Area Sale Price Purchase Price Prof it Days Annualised Sold On Address (sqf t) (S$ psf ) Boug ht On (S$ psf ) (S$) (days) (%)

15 Nov 11 65 Jurong West Central 3 # 11-04 915 1,202 4 Apr 07 553 593,937 1,686 18.3

10 Nov 11 75 Jurong West Central 3 # 16-22 2,110 810 18 Sep 09 506 640,000 783 24.5

24 Oct 11 87 Jurong West Central 3 # 12-49 1,227 1,125 1 Nov 06 537 721,624 1,818 16.0

14 Oct 11 75 Jurong West Central 3 # 10-23 1,302 1,060 27 Nov 06 462 778,879 1,782 18.6

14 Oct 11 85 Jurong West Central 3 # 14-46 1,119 1,090 14 Oct 09 715 420,000 730 23.5

7 Oct 11 67 Jurong West Central 3 # 09-09 958 1,180 27 Feb 09 616 540,000 952 28.3

6 Oct 11 77 Jurong West Central 3 # 16-29 1,808 823 27 Feb 09 466 646,000 951 24.4

6 Oct 11 77 Jurong West Central 3 # 08-27 969 1,156 2 Apr 09 610 529,000 917 29.0

22 Sep 11 73 Jurong West Central 3 # 10-18 1,066 1,107 3 Sep 09 760 370,000 749 20.1

9 Sep 11 69 Jurong West Central 3 # 16-10 1,744 853 4 Apr 08 493 628,000 1,253 17.3

8 Sep 11 83 Jurong West Central 3 # 16-43 1,744 773 7 Dec 09 602 298,000 640 15.3

29 Aug 11 87 Jurong West Central 3 # 11-49 1,227 1,091 31 Oct 06 534 683,802 1,763 15.9

22 Aug 11 73 Jurong West Central 3 # 06-21 1,066 1,145 16 Mar 10 868 295,000 524 21.3

19 Aug 11 73 Jurong West Central 3 # 07-18 1,066 1,127 22 Sep 09 784 365,888 696 21.0

4 Aug 11 75 Jurong West Central 3 # 06-22 1,259 953 30 Nov 06 454 627,614 1,708 17.1

3 Aug 11 71 Jurong West Central 3 # 05-15 1,593 816 15 Apr 10 620 312,000 475 23.5

3 Aug 11 65 Jurong West Central 3 # 15-01 1,356 1,010 5 Mar 07 494 700,554 1,612 17.6

15 Jul 11 67 Jurong West Central 3 # 14-07 1,119 1,017 2 Feb 07 540 533,823 1,624 15.3

13 Jul 11 71 Jurong West Central 3 # 06-16 1,238 1,115 19 Oct 07 598 640,000 1,363 18.2

4 Jul 11 77 Jurong West Central 3 # 13-29 1,335 1,075 9 Nov 06 468 810,974 1,698 19.6

24 Jun 11 85 Jurong West Central 3 # 16-44 1,561 1,012 13 Apr 09 441 892,000 802 46.0

15 Jun 11 67 Jurong West Central 3 # 09-08 1,238 1,049 22 Nov 06 551 615,979 1,666 15.1

26 May 11 65 Jurong West Central 3 # 05-01 2,250 728 30 Apr 07 371 802,347 1,487 18.0 23 May 11 79 Jurong West Central 3 # 12-35 1,152 1,007 3 Jun 09 677 380,000 719 22.3 16 May 11 65 Jurong West Central 3 # 11-03 1,001 1,079 23 Jul 09 699 380,000 662 27.0

13 May 11 85 Jurong West Central 3 # 12-47 980 1,103 28 Jul 09 730 365,000 654 25.9

10 May 11 81 Jurong West Central 3 # 10-37 1,238 1,010 5 Apr 07 565 551,000 1,496 15.2

5 May 11 71 Jurong West Central 3 # 14-14 936 1,014 5 Mar 07 528 455,636 1,522 17.0

25 Apr 11 81 Jurong West Central 3 # 05-38 1,572 795 15 May 07 431 573,421 1,441 16.8

13 Apr 11 71 Jurong West Central 3 # 11-17 1,442 1,095 27 Oct 06 532 812,600 1,629 17.6

8 Apr 11 73 Jurong West Central 3 # 10-19 1,066 1,070 26 Nov 09 779 310,000 498 26.2

28 Mar 11 69 Jurong West Central 3 # 08-12 1,442 1,075 9 Apr 09 607 675,000 718 33.7

25 Feb 11 81 Jurong West Central 3 # 05-39 1,087 883 25 Oct 06 461 459,130 1,584 16.2

1 Feb 11 75 Jurong West Central 3 # 05-25 1,292 813 6 Nov 06 412 517,242 1,548 17.3

31 Jan 11 75 Jurong West Central 3 # 05-26 1,421 911 6 Jan 09 436 675,000 755 42.8

3 Jan 11 69 Jurong West Central 3 # 09-11 936 961 30 Oct 06 516 416,478 1,526 16.0

31 Dec 10 85 Jurong West Central 3 # 12-46 1,152 920 11 Sep 09 747 200,000 476 17.4

20 Dec 10 69 Jurong West Central 3 # 10-11 936 961 20 Oct 06 519 413,878 1,522 15.9

10 Dec 10 75 Jurong West Central 3 # 09-24 1,302 906 27 Oct 06 464 576,066 1,505 17.6

2 Dec 10 69 Jurong West Central 3 # 14-11 936 1,020 9 Mar 09 619 375,000 633 33.3

8 Nov 10 67 Jurong West Central 3 # 16-07 1,733 767 19 Feb 10 600 290,000 262 40.9

7 Nov 10 65 Jurong West Central 3 # 10-04 915 907 6 Jul 07 639 245,000 1,220 11.0

30 Oct 10 73 Jurong West Central 3 # 05-21 1,410 851 25 Jan 08 603 350,000 1,009 13.3

25 Oct 10 77 Jurong West Central 3 # 06-28 980 949 25 Oct 06 523 417,518 1,461 16.1

19 Oct 10 87 Jurong West Central 3 # 07-50 1,259 913 9 Mar 09 555 451,000 589 36.1

14 Oct 10 75 Jurong West Central 3 # 14-23 1,302 921 1 Nov 06 471 586,534 1,443 18.5

8 Oct 10 67 Jurong West Central 3 # 11-07 1,066 901 13 Dec 06 544 380,153 1,395 14.1

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 25 OF 49

Area Sale Price Purchase Price Prof it Days Annualised Sold On Address (sqf t) (S$ psf ) Boug ht On (S$ psf ) (S$) (days) (%)

6 Oct 10 81 Jurong West Central 3 # 08-37 1,238 687 1 Nov 06 525 200,615 1,435 7.1

1 Oct 10 77 Jurong West Central 3 # 15-28 1,033 893 30 Sep 08 644 258,000 731 17.8

17 Sep 10 85 Jurong West Central 3 # 06-44 958 908 18 Jan 10 814 90,000 242 17.9

9 Sep 10 73 Jurong West Central 3 # 06-18 1,066 845 6 Feb 07 521 345,266 1,311 14.4

27 Aug 10 87 Jurong West Central 3 # 08-49 1,227 978 8 Nov 06 526 554,246 1,388 17.7

23 Jul 10 77 Jurong West Central 3 # 10-30 1,259 881 29 May 09 625 323,000 420 34.8

16 Jul 10 75 Jurong West Central 3 # 12-24 1,302 837 5 Apr 09 591 320,000 467 31.2

15 Jul 10 77 Jurong West Central 3 # 12-30 1,259 953 7 Nov 06 464 615,035 1,346 21.5

7 Jul 10 81 Jurong West Central 3 # 07-36 1,442 980 16 Jun 08 645 483,000 751 22.5

2 Jul 10 69 Jurong West Central 3 # 14-10 1,066 877 29 Feb 08 636 257,000 854 14.7

17 Jun 10 73 Jurong West Central 3 # 09-21 1,066 901 7 Aug 07 662 255,000 1,045 11.4

4 Jun 10 77 Jurong West Central 3 # 09-28 980 909 7 Aug 09 766 140,000 301 23.1

31 May 10 73 Jurong West Central 3 # 07-21 1,066 941 26 Aug 09 732 223,000 278 39.1

26 May 10 65 Jurong West Central 3 # 09-01 1,302 760 19 Aug 09 676 110,000 280 16.6

14 May 10 81 Jurong West Central 3 # 14-39 936 902 30 Mar 09 651 235,000 410 33.7

26 Apr 10 67 Jurong West Central 3 # 13-06 936 929 4 Dec 06 532 372,062 1,239 17.9

23 Apr 10 79 Jurong West Central 3 # 05-33 1,948 657 20 Oct 06 392 515,499 1,281 15.8

15 Apr 10 71 Jurong West Central 3 # 05-15 1,593 620 12 Nov 09 537 133,000 154 40.9

9 Apr 10 79 Jurong West Central 3 # 10-34 1,066 871 24 Aug 09 753 126,000 228 26.3

7 Apr 10 77 Jurong West Central 3 # 15-27 1,012 872 1 Aug 08 642 232,000 614 19.9

5 Apr 10 65 Jurong West Central 3 # 05-04 1,604 574 15 Sep 09 511 100,000 202 23.1

26 Mar 10 85 Jurong West Central 3 # 16-46 1,733 701 20 Mar 07 393 534,608 1,102 21.2

26 Mar 10 73 Jurong West Central 3 # 05-20 1,884 664 17 Jul 09 483 340,000 252 58.4 25 Mar 10 65 Jurong West Central 3 # 05-05 2,110 572 30 Jul 09 450 257,000 238 44.4 23 Mar 10 73 Jurong West Central 3 # 15-21 1,066 931 24 Sep 08 685 262,000 545 22.8

17 Mar 10 75 Jurong West Central 3 # 07-26 1,001 869 29 Aug 08 637 232,000 565 22.2

16 Mar 10 73 Jurong West Central 3 # 06-21 1,066 868 31 Oct 06 542 347,300 1,232 15.0

12 Mar 10 83 Jurong West Central 3 # 15-41 1,485 572 8 Nov 06 516 83,539 1,220 3.1

5 Mar 10 65 Jurong West Central 3 # 16-04 1,572 636 11 Jun 09 493 225,000 267 41.7

26 Feb 10 71 Jurong West Central 3 # 07-14 936 839 15 Feb 08 566 256,000 742 21.4

22 Feb 10 77 Jurong West Central 3 # 13-27 1,001 827 10 Nov 08 619 208,000 469 25.3

19 Feb 10 67 Jurong West Central 3 # 16-07 1,733 600 5 Feb 07 405 338,883 1,110 13.8

18 Feb 10 87 Jurong West Central 3 # 15-50 1,313 838 5 Mar 07 481 467,923 1,081 20.6

12 Feb 10 83 Jurong West Central 3 # 12-41 1,442 801 16 Feb 07 588 307,000 1,092 10.9

3 Feb 10 77 Jurong West Central 3 # 16-28 1,550 581 13 Nov 06 404 273,388 1,178 11.9

29 Jan 10 81 Jurong West Central 3 # 11-37 1,238 832 22 Jul 09 711 150,000 191 35.1

27 Jan 10 87 Jurong West Central 3 # 09-48 1,507 730 27 Oct 06 514 325,514 1,188 11.4

18 Jan 10 85 Jurong West Central 3 # 06-44 958 814 16 May 08 637 170,000 612 15.8

14 Jan 10 67 Jurong West Central 3 # 09-07 1,066 859 8 Dec 06 538 341,547 1,133 16.2

14 Jan 10 71 Jurong West Central 3 # 08-15 1,066 793 20 Nov 06 524 287,115 1,151 14.1

8 Jan 10 71 Jurong West Central 3 # 08-14 936 854 14 May 09 641 200,000 239 55.2

8 Jan 10 83 Jurong West Central 3 # 16-42 1,561 595 15 Aug 08 485 170,500 511 15.6

31 Dec 09 79 Jurong West Central 3 # 07-32 1,066 826 30 Oct 06 536 308,756 1,158 14.6

21 Dec 09 71 Jurong West Central 3 # 10-16 1,238 800 1 Nov 06 541 320,840 1,146 13.3

18 Dec 09 81 Jurong West Central 3 # 09-39 936 812 2 Nov 06 498 293,965 1,142 16.9

14 Dec 09 75 Jurong West Central 3 # 15-22 1,313 739 1 Nov 06 466 357,777 1,139 15.9

11 Dec 09 67 Jurong West Central 3 # 05-07 1,550 581 7 May 07 458 190,523 949 9.6

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 26 OF 49

Area Sale Price Purchase Price Prof it Days Annualised Sold On Address (sqf t) (S$ psf ) Boug ht On (S$ psf ) (S$) (days) (%)

11 Dec 09 85 Jurong West Central 3 # 10-47 936 801 22 May 08 614 175,000 568 18.6

8 Dec 09 65 Jurong West Central 3 # 09-02 1,259 715 30 Apr 09 584 165,000 222 39.5

7 Dec 09 83 Jurong West Central 3 # 16-43 1,744 602 22 Jul 09 567 62,000 138 17.5

7 Dec 09 65 Jurong West Central 3 # 14-04 915 861 15 May 07 607 232,515 937 14.6

30 Nov 09 81 Jurong West Central 3 # 05-37 1,679 644 27 Mar 08 506 231,800 613 15.4

26 Nov 09 73 Jurong West Central 3 # 10-19 1,066 779 13 Feb 09 582 210,000 286 45.1

23 Nov 09 79 Jurong West Central 3 # 10-32 1,066 826 5 Apr 07 610 230,000 963 12.2

19 Nov 09 65 Jurong West Central 3 # 07-01 1,302 691 20 Apr 07 521 221,623 944 11.6

17 Nov 09 81 Jurong West Central 3 # 13-37 1,324 801 25 Oct 06 524 366,334 1,119 14.8

16 Nov 09 83 Jurong West Central 3 # 16-40 1,905 584 8 Nov 06 410 331,449 1,104 12.4

10 Nov 09 79 Jurong West Central 3 # 13-32 1,066 826 18 Jul 07 732 100,000 846 5.3

6 Nov 09 79 Jurong West Central 3 # 16-34 1,711 584 28 Feb 07 380 348,486 982 17.3

5 Nov 09 65 Jurong West Central 3 # 07-03 1,001 809 6 Dec 06 541 268,405 1,065 14.8

27 Oct 09 67 Jurong West Central 3 # 08-09 958 835 4 Dec 06 560 264,000 1,058 14.8

26 Oct 09 85 Jurong West Central 3 # 16-47 1,561 601 7 Jul 09 500 158,000 111 83.4

26 Oct 09 79 Jurong West Central 3 # 12-32 1,152 818 18 Apr 09 651 192,000 191 54.6

21 Oct 09 75 Jurong West Central 3 # 15-23 1,356 737 1 Nov 06 465 368,699 1,085 16.7

21 Oct 09 71 Jurong West Central 3 # 12-14 936 783 16 Nov 06 522 243,935 1,070 14.8

16 Oct 09 65 Jurong West Central 3 # 13-02 1,346 706 13 Apr 07 529 237,888 917 12.2

14 Oct 09 85 Jurong West Central 3 # 14-46 1,119 715 10 Apr 07 565 167,000 918 9.8

12 Oct 09 79 Jurong West Central 3 # 13-33 1,238 727 22 Jun 07 590 170,000 843 9.5

9 Oct 09 81 Jurong West Central 3 # 12-37 1,238 808 27 Jul 09 687 150,000 74 122.9

9 Oct 09 69 Jurong West Central 3 # 06-11 936 747 9 Nov 06 508 224,193 1,065 14.1 7 Oct 09 75 Jurong West Central 3 # 05-22 1,701 576 2 Oct 06 377 338,496 1,101 15.1 5 Oct 09 83 Jurong West Central 3 # 08-41 1,442 811 17 Nov 08 638 250,000 322 31.3

5 Oct 09 75 Jurong West Central 3 # 13-26 1,044 777 27 Oct 06 507 282,040 1,074 15.6

28 Sep 09 75 Jurong West Central 3 # 12-26 1,001 836 14 May 09 659 177,000 137 88.3

25 Sep 09 79 Jurong West Central 3 # 15-32 1,066 863 18 Jul 07 656 221,000 800 13.4

23 Sep 09 75 Jurong West Central 3 # 15-25 958 814 18 Oct 06 528 273,990 1,071 15.9

22 Sep 09 73 Jurong West Central 3 # 07-18 1,066 784 29 Nov 06 523 277,199 1,028 15.4

18 Sep 09 75 Jurong West Central 3 # 16-22 2,110 506 23 Apr 09 427 168,000 148 52.5

18 Sep 09 67 Jurong West Central 3 # 07-07 1,066 760 6 Mar 07 532 242,870 927 15.1

17 Sep 09 75 Jurong West Central 3 # 11-25 915 781 27 Jul 07 612 155,000 783 12.1

17 Sep 09 83 Jurong West Central 3 # 10-43 1,066 788 23 Apr 07 577 225,348 878 13.9

14 Sep 09 67 Jurong West Central 3 # 13-09 958 783 24 Nov 06 584 190,723 1,025 11.0

14 Sep 09 79 Jurong West Central 3 # 14-35 1,119 759 23 Oct 06 505 284,435 1,057 15.1

11 Sep 09 85 Jurong West Central 3 # 12-46 1,152 747 14 Feb 09 586 185,000 209 52.7

9 Sep 09 85 Jurong West Central 3 # 08-45 1,238 771 18 Mar 09 604 207,000 175 66.5

8 Sep 09 69 Jurong West Central 3 # 05-13 1,582 521 19 Dec 06 460 96,374 994 4.7

8 Sep 09 65 Jurong West Central 3 # 06-04 915 787 18 Jan 09 639 135,000 233 38.4

7 Sep 09 85 Jurong West Central 3 # 09-47 936 801 31 Oct 08 641 150,000 311 29.9

7 Sep 09 73 Jurong West Central 3 # 12-19 1,152 747 5 Feb 07 518 263,305 945 15.2

3 Sep 09 73 Jurong West Central 3 # 10-18 1,066 760 21 Oct 06 532 242,895 1,048 13.2

2 Sep 09 77 Jurong West Central 3 # 07-31 872 814 10 Aug 07 619 170,000 754 14.2

31 Aug 09 77 Jurong West Central 3 # 11-30 1,259 699 13 Nov 06 462 298,117 1,022 15.9

31 Aug 09 73 Jurong West Central 3 # 11-20 1,238 784 31 Jul 07 618 205,000 762 12.0

31 Aug 09 67 Jurong West Central 3 # 08-07 1,066 769 3 Jan 07 535 249,718 971 14.6

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 27 OF 49

Area Sale Price Purchase Price Prof it Days Annualised Sold On Address (sqf t) (S$ psf ) Boug ht On (S$ psf ) (S$) (days) (%)

27 Aug 09 65 Jurong West Central 3 # 09-04 915 842 21 Jan 09 623 200,000 218 65.5

27 Aug 09 87 Jurong West Central 3 # 07-48 1,507 730 31 Mar 09 574 235,000 149 80.2

26 Aug 09 85 Jurong West Central 3 # 07-47 936 759 3 Sep 07 571 176,000 723 15.4

26 Aug 09 73 Jurong West Central 3 # 07-21 1,066 732 29 May 08 666 70,000 454 7.9

24 Aug 09 79 Jurong West Central 3 # 10-34 1,066 753 1 Dec 06 504 264,814 997 15.8

19 Aug 09 65 Jurong West Central 3 # 09-01 1,302 676 2 Mar 07 487 245,551 901 14.2

18 Aug 09 85 Jurong West Central 3 # 10-44 958 802 31 Oct 06 568 223,852 1,022 13.1

14 Aug 09 87 Jurong West Central 3 # 14-48 1,507 677 19 May 09 622 82,000 87 42.1

12 Aug 09 87 Jurong West Central 3 # 07-51 1,302 660 9 Mar 09 535 163,430 156 63.7

11 Aug 09 83 Jurong West Central 3 # 14-42 936 745 3 Apr 09 625 113,000 130 64.2

7 Aug 09 65 Jurong West Central 3 # 07-04 915 743 23 Jan 09 601 130,000 196 48.5

7 Aug 09 77 Jurong West Central 3 # 09-28 980 766 26 Oct 06 525 235,894 1,016 14.5

6 Aug 09 85 Jurong West Central 3 # 13-47 936 726 10 Jul 09 694 30,000 27 84.0

4 Aug 09 65 Jurong West Central 3 # 06-03 1,001 709 3 Jun 09 644 65,000 62 76.0

30 Jul 09 69 Jurong West Central 3 # 10-12 1,442 666 7 Nov 06 533 191,291 996 8.5

30 Jul 09 65 Jurong West Central 3 # 05-05 2,110 450 27 Nov 06 361 188,404 976 8.6

28 Jul 09 77 Jurong West Central 3 # 07-28 980 743 11 Jul 07 621 120,000 748 9.2

28 Jul 09 85 Jurong West Central 3 # 12-47 980 730 16 May 07 548 177,948 804 13.9

23 Jul 09 65 Jurong West Central 3 # 11-03 1,001 699 6 Feb 07 552 147,589 898 10.1

22 Jul 09 81 Jurong West Central 3 # 11-37 1,238 711 7 Apr 09 604 132,000 106 75.0

22 Jul 09 83 Jurong West Central 3 # 16-43 1,744 567 30 Apr 08 494 126,000 448 11.8

22 Jul 09 75 Jurong West Central 3 # 06-24 1,302 630 1 Nov 06 457 225,114 994 12.5

17 Jul 09 73 Jurong West Central 3 # 05-20 1,884 483 21 Feb 07 405 147,168 877 7.6 16 Jul 09 75 Jurong West Central 3 # 07-24 1,302 653 9 Nov 06 459 252,113 980 14.0 15 Jul 09 85 Jurong West Central 3 # 07-46 1,066 676 24 Apr 07 557 126,450 813 9.1

14 Jul 09 75 Jurong West Central 3 # 05-23 2,347 383 25 Oct 06 315 158,091 993 7.4

8 Jul 09 81 Jurong West Central 3 # 10-39 936 683 2 Oct 06 500 171,423 1,010 11.9

7 Jul 09 85 Jurong West Central 3 # 16-47 1,561 500 23 Jan 07 372 199,411 896 12.8

3 Jul 09 67 Jurong West Central 3 # 08-08 1,238 679 27 Aug 07 630 60,000 676 4.1

24 Jun 09 85 Jurong West Central 3 # 14-47 990 687 9 Jun 08 596 90,000 380 14.6

22 Jun 09 79 Jurong West Central 3 # 09-34 1,066 718 30 Aug 07 591 135,000 662 11.3

22 Jun 09 87 Jurong West Central 3 # 14-50 1,259 651 9 Apr 07 528 154,509 805 9.9

19 Jun 09 71 Jurong West Central 3 # 13-15 1,152 696 2 Apr 07 526 196,385 809 13.5

17 Jun 09 73 Jurong West Central 3 # 08-18 1,066 704 11 Feb 08 633 75,000 492 8.1

16 Jun 09 69 Jurong West Central 3 # 13-12 1,528 615 6 Nov 06 520 145,710 953 6.7

12 Jun 09 85 Jurong West Central 3 # 11-47 936 715 30 Jun 08 623 87,000 347 15.8

8 Jun 09 75 Jurong West Central 3 # 10-22 1,259 580 19 Oct 06 464 145,515 963 8.8

5 Jun 09 65 Jurong West Central 3 # 15-04 958 699 13 Mar 07 559 134,369 815 10.5

3 Jun 09 79 Jurong West Central 3 # 12-35 1,152 677 1 Nov 06 498 206,684 945 12.6

3 Jun 09 65 Jurong West Central 3 # 06-03 1,001 644 5 Dec 06 538 106,075 911 7.5

2 Jun 09 85 Jurong West Central 3 # 09-45 1,238 604 7 Nov 06 555 61,462 938 3.4

2 Jun 09 75 Jurong West Central 3 # 12-25 915 721 23 Jul 07 628 85,000 680 7.7

29 May 09 71 Jurong West Central 3 # 12-17 1,442 648 25 Oct 06 535 163,891 947 7.7

28 May 09 65 Jurong West Central 3 # 08-03 1,001 659 1 Dec 08 579 80,000 178 30.3

21 May 09 69 Jurong West Central 3 # 09-12 1,442 638 22 Nov 06 530 154,963 911 7.7

20 May 09 75 Jurong West Central 3 # 08-24 1,302 630 18 Oct 06 461 219,097 945 12.8

19 May 09 87 Jurong West Central 3 # 14-48 1,507 622 9 Nov 06 508 173,000 922 8.4

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 28 OF 49

Area Sale Price Purchase Price Prof it Days Annualised Sold On Address (sqf t) (S$ psf ) Boug ht On (S$ psf ) (S$) (days) (%)

15 May 09 87 Jurong West Central 3 # 15-49 1,281 648 6 Nov 06 533 147,642 921 8.1

14 May 09 65 Jurong West Central 3 # 09-05 1,302 607 21 Jan 07 495 144,888 844 9.2

4 May 09 73 Jurong West Central 3 # 13-21 1,066 657 17 Oct 06 563 100,239 930 6.3

30 Apr 09 83 Jurong West Central 3 # 05-43 1,528 496 14 May 07 459 56,873 717 4.1

30 Apr 09 65 Jurong West Central 3 # 09-02 1,259 584 25 Jan 07 492 115,286 826 7.8

23 Apr 09 75 Jurong West Central 3 # 16-22 2,110 427 7 Nov 06 334 194,909 898 10.4

20 Apr 09 85 Jurong West Central 3 # 10-45 1,238 630 6 Nov 06 557 90,247 896 5.1

20 Apr 09 87 Jurong West Central 3 # 14-49 1,227 640 24 Jun 08 623 20,000 300 3.2

20 Apr 09 81 Jurong West Central 3 # 15-36 1,485 640 1 Nov 06 516 183,539 901 9.1

17 Apr 09 77 Jurong West Central 3 # 07-30 1,259 580 26 Sep 07 564 20,000 569 1.8

15 Apr 09 77 Jurong West Central 3 # 13-28 1,023 641 2 Nov 06 530 112,632 895 8.0

14 Apr 09 75 Jurong West Central 3 # 07-22 1,259 572 8 Nov 06 457 144,613 888 9.7

13 Apr 09 85 Jurong West Central 3 # 16-44 1,561 441 21 Feb 07 415 40,583 782 2.9

7 Apr 09 81 Jurong West Central 3 # 11-37 1,238 604 2 Nov 06 532 89,490 887 5.4

5 Apr 09 75 Jurong West Central 3 # 12-24 1,302 591 1 Nov 06 471 156,879 886 9.8

3 Apr 09 83 Jurong West Central 3 # 14-42 936 625 17 May 07 572 49,364 687 4.8

30 Mar 09 81 Jurong West Central 3 # 14-39 936 651 31 Oct 06 511 131,114 881 10.5

23 Mar 09 81 Jurong West Central 3 # 08-36 1,442 617 1 Nov 06 512 151,487 873 8.1

19 Mar 09 87 Jurong West Central 3 # 11-50 1,259 564 4 Apr 07 482 103,303 715 8.4

18 Mar 09 85 Jurong West Central 3 # 08-45 1,238 604 31 Oct 06 552 64,661 869 3.9

9 Mar 09 77 Jurong West Central 3 # 13-31 893 649 17 Aug 07 632 15,000 570 1.7

9 Mar 09 87 Jurong West Central 3 # 07-51 1,302 535 4 Apr 07 467 88,092 705 7.3

9 Mar 09 87 Jurong West Central 3 # 07-50 1,259 555 4 Apr 07 472 104,740 705 8.8 2 Mar 09 79 Jurong West Central 3 # 14-33 1,292 587 27 Oct 06 524 81,617 857 5.0 27 Feb 09 77 Jurong West Central 3 # 12-28 980 615 2 Nov 06 539 74,341 848 5.8

27 Feb 09 67 Jurong West Central 3 # 09-09 958 616 17 Nov 06 572 41,644 833 3.3

27 Feb 09 77 Jurong West Central 3 # 16-29 1,808 466 9 Nov 06 388 140,924 841 8.3

24 Feb 09 87 Jurong West Central 3 # 06-51 1,302 530 4 Apr 07 465 84,592 692 7.1

3 Feb 09 83 Jurong West Central 3 # 08-40 1,238 598 22 Nov 06 554 53,718 804 3.5

29 Jan 09 67 Jurong West Central 3 # 06-08 1,238 588 24 Nov 06 543 55,637 797 3.7

23 Jan 09 65 Jurong West Central 3 # 07-04 915 601 4 Apr 07 541 54,764 660 6.0

18 Jan 09 65 Jurong West Central 3 # 06-04 915 639 11 Apr 07 581 53,029 648 5.5

16 Jan 09 79 Jurong West Central 3 # 08-33 1,238 578 2 Nov 06 518 73,970 806 5.1

13 Jan 09 87 Jurong West Central 3 # 06-50 1,259 520 4 Apr 07 469 63,809 650 5.9

13 Jan 09 69 Jurong West Central 3 # 07-10 1,066 601 15 Mar 07 523 82,747 670 7.8

6 Jan 09 75 Jurong West Central 3 # 05-26 1,421 436 1 Nov 06 403 47,303 797 3.7

5 Jan 09 67 Jurong West Central 3 # 10-09 958 601 1 Dec 06 575 24,734 766 2.1

5 Jan 09 65 Jurong West Central 3 # 14-01 1,302 556 24 Apr 07 539 21,422 622 1.8

2 Jan 09 87 Jurong West Central 3 # 10-50 1,259 548 16 Mar 07 479 86,437 658 7.7

29 Dec 08 65 Jurong West Central 3 # 12-03 1,001 609 27 Nov 06 555 54,852 763 4.6

22 Dec 08 83 Jurong West Central 3 # 10-40 1,238 592 23 Oct 06 560 40,303 791 2.6

1 Dec 08 65 Jurong West Central 3 # 08-03 1,001 579 6 Dec 06 544 35,720 726 3.2

17 Nov 08 83 Jurong West Central 3 # 08-41 1,442 638 1 Nov 06 539 143,261 747 8.6

14 Nov 08 79 Jurong West Central 3 # 14-32 1,109 604 31 Oct 06 548 62,467 745 4.9

12 Nov 08 77 Jurong West Central 3 # 11-31 872 631 1 Nov 06 495 118,851 742 12.7

10 Nov 08 77 Jurong West Central 3 # 13-27 1,001 619 1 Nov 06 522 97,923 740 8.8

10 Nov 08 73 Jurong West Central 3 # 08-20 1,238 587 3 Nov 06 529 72,757 738 5.4

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 29 OF 49

Area Sale Price Purchase Price Prof it Days Annualised Sold On Address (sqf t) (S$ psf ) Boug ht On (S$ psf ) (S$) (days) (%)

31 Oct 08 69 Jurong West Central 3 # 13-13 1,324 631 4 Dec 06 537 123,737 697 8.8

31 Oct 08 85 Jurong West Central 3 # 09-47 936 641 4 Apr 07 510 122,180 576 15.5

16 Oct 08 67 Jurong West Central 3 # 15-09 958 652 15 Dec 06 590 60,181 671 5.7

15 Oct 08 77 Jurong West Central 3 # 08-30 1,259 556 31 Oct 06 455 127,263 715 10.8

30 Sep 08 69 Jurong West Central 3 # 06-12 1,442 641 7 Nov 06 523 170,877 693 11.4

30 Sep 08 77 Jurong West Central 3 # 15-28 1,033 644 2 Jul 07 590 55,000 456 7.2

30 Sep 08 81 Jurong West Central 3 # 10-36 1,442 636 2 Nov 06 517 172,402 698 11.5

29 Sep 08 67 Jurong West Central 3 # 10-08 1,238 618 28 Nov 06 554 79,729 671 6.2

5 Sep 08 73 Jurong West Central 3 # 12-20 1,324 587 6 Nov 06 526 81,118 669 6.2

29 Aug 08 75 Jurong West Central 3 # 07-26 1,001 637 1 Nov 06 502 135,780 667 14.0

15 Aug 08 75 Jurong West Central 3 # 07-23 1,302 576 8 Nov 06 455 157,974 646 14.3

5 Aug 08 75 Jurong West Central 3 # 07-25 915 656 2 Nov 06 512 131,983 642 15.2

4 Aug 08 65 Jurong West Central 3 # 13-04 958 626 1 Mar 07 547 75,984 522 9.9

1 Aug 08 69 Jurong West Central 3 # 06-10 1,066 602 26 Mar 07 520 87,814 494 11.5

9 Jul 08 79 Jurong West Central 3 # 09-35 1,066 629 6 Nov 06 503 133,467 611 14.2

4 Jul 08 67 Jurong West Central 3 # 07-08 1,238 630 20 Nov 06 546 104,433 592 9.3

24 Jun 08 87 Jurong West Central 3 # 14-49 1,227 623 16 Nov 06 542 100,220 586 9.1

16 Jun 08 81 Jurong West Central 3 # 07-36 1,442 645 2 Nov 06 510 195,005 592 15.6

9 Jun 08 85 Jurong West Central 3 # 14-47 990 596 2 May 07 554 41,027 404 6.7

29 May 08 81 Jurong West Central 3 # 13-38 1,152 590 2 Nov 06 507 95,836 574 10.1

29 May 08 73 Jurong West Central 3 # 07-21 1,066 666 2 Nov 06 545 129,199 574 13.6

27 May 08 77 Jurong West Central 3 # 10-31 872 625 26 Oct 06 492 116,411 579 16.4

26 May 08 77 Jurong West Central 3 # 09-29 1,292 619 2 Nov 06 466 198,081 571 19.9 22 May 08 85 Jurong West Central 3 # 10-47 936 614 17 Nov 06 513 94,521 552 12.6 20 May 08 77 Jurong West Central 3 # 14-28 980 633 1 Nov 06 544 87,183 566 10.3

16 May 08 85 Jurong West Central 3 # 06-44 958 637 25 Oct 06 557 76,383 569 9.0

19 Apr 08 71 Jurong West Central 3 # 12-15 1,066 638 14 Nov 06 535 109,606 522 13.1

22 Feb 08 71 Jurong West Central 3 # 13-17 1,528 625 20 Oct 06 516 165,710 490 15.3

15 Feb 08 71 Jurong West Central 3 # 07-14 936 566 5 Mar 07 508 53,934 347 12.0

11 Feb 08 73 Jurong West Central 3 # 08-18 1,066 633 17 Nov 06 526 114,115 451 16.2

25 Jan 08 73 Jurong West Central 3 # 05-21 1,410 603 1 Nov 06 459 202,144 450 24.6

23 Jan 08 69 Jurong West Central 3 # 07-11 936 603 25 May 07 557 43,000 243 12.6

26 Sep 07 77 Jurong West Central 3 # 07-30 1,259 564 16 Nov 06 452 140,280 314 29.2

3 Sep 07 85 Jurong West Central 3 # 07-47 936 571 6 Mar 07 505 62,453 181 28.4

27 Aug 07 67 Jurong West Central 3 # 08-08 1,238 630 20 Nov 06 548 101,214 280 19.9

17 Aug 07 77 Jurong West Central 3 # 13-31 893 632 30 Oct 06 498 120,374 291 35.1

7 Aug 07 73 Jurong West Central 3 # 09-21 1,066 662 30 Sep 06 551 117,947 311 24.0

31 Jul 07 73 Jurong West Central 3 # 11-20 1,238 618 29 Nov 06 536 101,317 244 23.7

27 Jul 07 75 Jurong West Central 3 # 11-25 915 612 1 Nov 06 523 81,848 268 24.0

23 Jul 07 75 Jurong West Central 3 # 12-25 915 628 30 Oct 06 525 94,282 266 27.9

18 Jul 07 77 Jurong West Central 3 # 08-31 872 614 31 Oct 06 486 111,485 260 38.8

16 Jul 07 75 Jurong West Central 3 # 09-25 915 601 30 Oct 06 517 76,943 259 23.7

11 Jul 07 77 Jurong West Central 3 # 07-28 980 621 27 Oct 06 526 93,019 257 26.6

6 Jul 07 65 Jurong West Central 3 # 10-01 1,302 541 13 Feb 07 490 67,365 143 29.2

6 Jul 07 65 Jurong West Central 3 # 10-04 915 639 21 Feb 07 550 81,666 135 50.2

28 Jun 07 77 Jurong West Central 3 # 07-29 1,292 542 8 Nov 06 461 104,125 232 28.8

17 May 07 77 Jurong West Central 3 # 08-29 1,292 516 28 Nov 06 464 67,111 170 25.6

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 30 OF 49

Area Sale Price Purchase Price Prof it Days Annualised Sold On Address (sqf t) (S$ psf ) Boug ht On (S$ psf ) (S$) (days) (%)

16 Feb 07 83 Jurong West Central 3 # 12-41 1,442 588 25 Oct 06 549 56,211 114 24.6

UNPROFITABLE TRANSACTIONS (TOTAL OF 2 TRANSACTIONS)

No te: Transactio ns with the same address are matched. P ro fitability o f each ro und-trip transactio n is based o nly o n the chang e in asset price and do es no t take into acco unt transactio n co sts and the effect o f financing .

So urce: URA, http: //www. theedgeproperty. com. sg

Area Sale Price Purchase Price Prof it Days Annualised Sold On Address (sqf t) (S$ psf ) Boug ht On (S$ psf ) (S$) (days) (%)

4 Sep 15 81 Jurong West Central 3 # 15-37 1,292 1,107 3 Sep 12 1,154 -60,000 1,096 -1.4

6 Apr 09 69 Jurong West Central 3 # 06-10 1,066 593 1 Aug 08 602 -10,000 248 -2.3

Rental

RENTAL TRANSACTIONS

So urce: URA, http: //www. theedgeproperty. com. sg

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

Mar 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Mar 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,400 3.6

Mar 16 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,600 3.7

Mar 16 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,600 3.4

Mar 16 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 2 3,600 2.3

Mar 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

Mar 16 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,500 2.9

Feb 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,400 3.6 Feb 16 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 4,900 3.0 Feb 16 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,700 3.5

Feb 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Feb 16 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 6,000 4.1

Feb 16 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,000 3.7

Feb 16 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 4,700 2.8

Feb 16 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,550 3.6

Feb 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Feb 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,300 3.5

Feb 16 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 5,300 3.7

Feb 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Feb 16 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 4,250 2.6

Feb 16 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 2 4,000 2.8

Feb 16 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,500 4.1

Feb 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,700 3.9

Feb 16 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,900 3.7

Feb 16 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,600 3.4

Feb 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

Feb 16 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 2 3,600 2.9

Feb 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,600 3.8

Feb 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,300 4.5

Jan 16 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Jan 16 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,350 3.5

Jan 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,300 4.5

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 31 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

Jan 16 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,000 3.2

Jan 16 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,000 3.0

Jan 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

Jan 16 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 4 5,000 3.2

Jan 16 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,750 3.6

Jan 16 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Jan 16 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,400 3.3

Jan 16 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,500 3.3

Jan 16 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,388 3.6

Jan 16 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,000 3.8

Dec 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,200 3.4

Dec 15 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 4,300 2.5

Dec 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,400 3.6

Dec 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,400 3.6

Dec 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,700 3.5

Dec 15 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 4,300 2.5

Dec 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Dec 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,800 3.6

Dec 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,300 3.4

Dec 15 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 5,500 3.8

Dec 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,000 3.2

Nov 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,300 3.4

Nov 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,800 3.6 Nov 15 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 2 4,000 2.8 Nov 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,900 3.7

Nov 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,300 4.1

Nov 15 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 3,800 2.5

Nov 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 2 3,700 2.7

Nov 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,800 3.6

Nov 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Nov 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,750 3.9

Nov 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Nov 15 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,750 4.4

Nov 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,500 3.3

Oct 15 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 4,800 3.3

Oct 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,580 3.4

Oct 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,950 3.8

Oct 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,200 3.9

Oct 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,600 3.8

Oct 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 3,900 2.9

Oct 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,500 3.3

Oct 15 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 2 3,700 3.2

Oct 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Oct 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,550 3.4

Sep 15 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 3,900 3.4

Sep 15 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,200 2.7

Sep 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,300 3.1

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 32 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

Sep 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,600 3.4

Sep 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,500 3.3

Sep 15 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,600 4.2

Sep 15 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,700 4.4

Sep 15 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 5,000 3.4

Sep 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,000 4.0

Sep 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Sep 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,200 3.4

Sep 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 2 4,100 3.0

Sep 15 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 5,200 3.2

Sep 15 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 3 4,200 2.9

Aug 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Aug 15 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 3,700 3.2

Aug 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,200 3.4

Aug 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,500 4.3

Aug 15 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 6,000 4.1

Aug 15 JURONG WEST CENT RAL 3 Non-landed 1,900 to 2,000 4 5,000 2.6

Aug 15 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 3,800 3.3

Aug 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,500 3.3

Aug 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,200 3.1

Aug 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,288 3.2

Jul 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,400 4.2 Jul 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,600 3.8 Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,400 3.5

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,500 3.3

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,000 3.2

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,800 3.6

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,500 3.3

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 4,300 2.5

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,000 3.0

Jul 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,750 3.9

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,350 3.5

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,350 3.2

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 4,200 2.4

Jul 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,300 3.5

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,200 3.1

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,500 3.3

Jul 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,800 3.6

Jun 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,000 3.2

Jun 15 JURONG WEST CENT RAL 3 Non-landed 1,800 to 1,900 3 4,500 2.4

Jun 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,300 3.4

Jun 15 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 3,800 3.3

Jun 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,000 4.0

Jun 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 33 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

Jun 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,600 3.4

Jun 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,000 3.0

Jun 15 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 4,500 2.7

Jun 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,650 3.5

Jun 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 3,800 3.0

Jun 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 3,800 2.8

May 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 3,900 3.1

May 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

May 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,650 3.8

May 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

May 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,200 4.4

May 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,100 3.9

May 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,500 3.3

May 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 3,600 2.7

May 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,600 3.8

May 15 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,000 2.6

Apr 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

Apr 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Apr 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,600 3.7

Apr 15 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 4,300 2.5

Apr 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,600 3.8

Apr 15 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,500 4.1

Apr 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,750 3.9 Apr 15 JURONG WEST CENT RAL 3 Non-landed 1,800 to 1,900 3 4,500 2.4 Apr 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,600 3.8

Apr 15 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,500 4.1

Apr 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Apr 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 3,850 3.1

Apr 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,350 3.5

Apr 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,700 3.5

Apr 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,000 3.8

Apr 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

Apr 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,850 4.1

Apr 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

Apr 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Mar 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

Mar 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,500 3.3

Mar 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,350 3.5

Mar 15 JURONG WEST CENT RAL 3 Non-landed 1,900 to 2,000 3 4,500 2.3

Mar 15 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 4,800 2.9

Mar 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

Mar 15 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,000 3.5

Mar 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,400 3.3

Mar 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,200 3.4

Mar 15 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,250 3.7

Mar 15 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 5,200 3.6

Mar 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 34 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

Mar 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,300 3.5

Mar 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 3,920 3.1

Mar 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Feb 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,800 3.6

Feb 15 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 4,250 2.6

Feb 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,800 3.6

Feb 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

Feb 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,300 3.4

Feb 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,200 3.4

Feb 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Feb 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,400 4.6

Feb 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Feb 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,100 4.3

Jan 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,350 3.5

Jan 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Jan 15 JURONG WEST CENT RAL 3 Non-landed 1,900 to 2,000 4 5,000 2.6

Jan 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,100 4.3

Jan 15 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,500 3.3

Jan 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,200 4.4

Jan 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,050 3.2

Jan 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,800 3.6

Jan 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,800 3.6

Jan 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,000 4.0 Jan 15 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,100 3.3 Jan 15 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,400 3.5

Jan 15 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,700 3.5

Jan 15 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 5,000 3.0

Dec 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Dec 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

Dec 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,800 3.6

Dec 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,100 4.3

Dec 14 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,000 3.5

Dec 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Dec 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,500 3.3

Dec 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,300 4.1

Dec 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,000 3.2

Dec 14 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 4,200 2.5

Dec 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 2,800 2.9

Dec 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,700 3.9

Dec 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,400 3.6

Dec 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,800 3.8

Dec 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,200 3.1

Dec 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,800 3.8

Nov 14 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 2 3,600 3.1

Nov 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Nov 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,800 3.6

Nov 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,750 3.9

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 35 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

Nov 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

Nov 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Nov 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

Nov 14 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,800 4.5

Nov 14 JURONG WEST CENT RAL 3 Non-landed 2,100 to 2,200 3 4,500 2.1

Nov 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,300 3.5

Nov 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,800 3.8

Nov 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,500 3.3

Nov 14 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 2 4,000 2.8

Nov 14 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,600 3.0

Nov 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,800 3.6

Nov 14 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,100 2.6

Nov 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,000 3.2

Nov 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Nov 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,300 3.5

Oct 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Oct 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Oct 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 2 4,000 3.2

Oct 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,300 3.5

Oct 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 2 4,000 3.2

Oct 14 JURONG WEST CENT RAL 3 Non-landed 1,900 to 2,000 4 5,300 2.7

Oct 14 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,125 3.6

Oct 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,000 3.8 Oct 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,000 3.8 Oct 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,750 3.9

Oct 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 2 4,000 3.2

Oct 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,400 3.6

Oct 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,600 3.7

Oct 14 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 4,000 4.7

Sep 14 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 2 3,800 3.3

Sep 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,300 4.5

Sep 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

Sep 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Sep 14 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 6,200 3.5

Sep 14 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 4 5,100 3.3

Sep 14 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,800 4.5

Sep 14 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 2 3,800 3.3

Sep 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,300 3.4

Sep 14 JURONG WEST CENT RAL 3 Non-landed 2,000 to 2,100 3 4,200 2.0

Sep 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,200 4.4

Sep 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

Sep 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,600 3.8

Sep 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,300 3.2

Sep 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,900 3.7

Sep 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Sep 14 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,700 4.4

Sep 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 36 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

Sep 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,000 3.7

Sep 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 2 4,100 3.0

Aug 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Aug 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

Aug 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,800 3.6

Aug 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Aug 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

Aug 14 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 5,500 3.8

Aug 14 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,450 2.9

Jul 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

Jul 14 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 2 4,000 2.8

Jul 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,800 3.6

Jul 14 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,000 3.5

Jul 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Jul 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,500 3.3

Jul 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,200 4.2

Jul 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,100 3.9

Jul 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 6,000 4.4

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,700 3.5

Jun 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Jun 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,930 4.1

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,710 4.5 Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,800 3.6 Jun 14 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,700 4.4

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 5,200 3.6

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,000 3.7

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,450 4.2

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,900 3.9

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,400 4.3

Jun 14 JURONG WEST CENT RAL 3 Non-landed 2,000 to 2,100 4 5,000 2.4

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,100 3.0

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,500 3.9

Jun 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,400 3.6

Jun 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,400 3.6

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,000 3.8

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 5,200 3.2

Jun 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,050 4.3

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,650 3.5

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,500 3.3

Jun 14 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,300 3.9

Jun 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,000 4.0

May 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

May 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

May 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,400 3.6

May 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,800 3.6

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 37 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

May 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

May 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

May 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,400 3.5

May 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,400 3.6

May 14 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,900 4.6

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,600 3.7

Apr 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,600 4.8

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,000 3.5

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,800 3.6

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 2 4,700 3.2

Apr 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 5,820 3.8

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 4 5,300 3.4

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 4,500 2.7

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 5,000 3.0

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,800 3.8

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,900 3.9

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 5,000 3.4

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,400 3.5

Apr 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Apr 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,000 3.8

Mar 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,500 3.3 Mar 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,100 3.9 Mar 14 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,400 2.8

Mar 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,900 3.6

Mar 14 JURONG WEST CENT RAL 3 Non-landed 1,800 to 1,900 3 5,000 2.7

Mar 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,200 4.0

Mar 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,500 3.3

Mar 14 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 2 3,750 2.4

Mar 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,100 4.3

Mar 14 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,300 2.8

Mar 14 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,200 3.1

Mar 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,200 4.4

Mar 14 JURONG WEST CENT RAL 3 Non-landed 2,000 to 2,100 4 5,900 2.9

Mar 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Feb 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

Feb 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,200 4.4

Feb 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,400 3.5

Feb 14 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 5,000 3.0

Feb 14 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,900 4.6

Jan 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,150 4.1

Jan 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,000 4.0

Jan 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,400 4.2

Jan 14 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 4,500 5.3

Jan 14 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Jan 14 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 5,800 4.0

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 38 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

Jan 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,400 4.2

Jan 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,000 3.8

Jan 14 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,100 3.9

Jan 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Jan 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

Jan 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,700 3.9

Jan 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,600 4.8

Jan 14 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

Dec 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Dec 13 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 2 4,200 2.9

Dec 13 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 4,500 2.6

Dec 13 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 5,000 2.9

Dec 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,600 3.7

Dec 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 3,600 2.9

Dec 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,300 4.1

Dec 13 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 5,500 3.8

Dec 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 6,300 4.7

Nov 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Nov 13 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,600 3.0

Nov 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,000 3.7

Nov 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Oct 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,100 4.1

Oct 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,800 3.6 Oct 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,600 3.8 Oct 13 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 2 4,100 2.6

Oct 13 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 2 4,200 3.7

Oct 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Oct 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

Oct 13 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 5,800 4.0

Oct 13 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 4,800 2.9

Sep 13 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 2 3,800 3.3

Sep 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Sep 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,500 3.3

Sep 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,500 4.3

Sep 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,200 3.1

Sep 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Sep 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,400 3.3

Sep 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

Sep 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,000 4.0

Sep 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Sep 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,100 3.9

Sep 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,400 3.3

Sep 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Sep 13 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 6,000 4.1

Sep 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,200 4.4

Aug 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,700 4.5

Aug 13 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,000 3.5

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 39 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

Aug 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Aug 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,300 3.9

Aug 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,600 3.7

Aug 13 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,500 4.1

Aug 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,300 4.5

Aug 13 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 2 4,200 2.9

Aug 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,100 3.9

Aug 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,100 4.3

Aug 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,800 3.8

Aug 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,000 3.7

Aug 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,900 3.9

Aug 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,000 3.7

Aug 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,800 3.8

Jul 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

Jul 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,600 3.7

Jul 13 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,400 3.8

Jul 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 2 3,800 3.0

Jul 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,600 3.7

Jul 13 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 4,500 5.3

Jul 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,100 4.1

Jul 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,400 4.2

Jul 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Jul 13 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 5,500 3.1 Jul 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,100 4.3 Jul 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,500 3.3

Jul 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,700 3.9

Jul 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,800 3.8

Jul 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

Jul 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,500 4.7

Jun 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Jun 13 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 6,800 4.7

Jun 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,850 4.1

Jun 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,000 4.0

Jun 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,500 4.7

Jun 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,700 3.9

Jun 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,400 3.5

Jun 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,100 4.1

Jun 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,200 4.4

Jun 13 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 4 6,000 4.1

Jun 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 2 4,000 3.2

Jun 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,100 3.3

Jun 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Jun 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,400 3.3

Jun 13 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 4,800 2.7

Jun 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Jun 13 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 4,400 5.2

May 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 40 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

May 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

May 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

May 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,700 3.9

May 13 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,700 4.4

May 13 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 2 3,800 3.3

May 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,200 4.0

May 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

May 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

May 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

May 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

May 13 JURONG WEST CENT RAL 3 Non-landed 2,000 to 2,100 3 5,000 2.4

May 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,200 4.4

May 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,300 4.1

May 13 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 5,300 3.4

May 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,700 3.9

May 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

May 13 JURONG WEST CENT RAL 3 Non-landed 1,800 to 1,900 3 5,000 2.7

Apr 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Apr 13 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 2 4,500 3.1

Apr 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,000 4.0

Apr 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,200 4.4

Apr 13 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 4,300 2.5

Apr 13 JURONG WEST CENT RAL 3 Non-landed 1,800 to 1,900 3 4,500 2.4 Apr 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,800 3.6 Apr 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,500 4.7

Apr 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Mar 13 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,000 3.5

Mar 13 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,800 4.5

Mar 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Mar 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Mar 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,200 4.4

Mar 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

Mar 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,000 3.7

Mar 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,200 4.0

Mar 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,800 3.6

Mar 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,600 3.8

Mar 13 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,300 2.8

Mar 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Mar 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,400 3.3

Feb 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

Feb 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,700 3.5

Feb 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Feb 13 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,300 2.8

Feb 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,600 4.8

Feb 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,700 3.9

Feb 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,400 4.6

Feb 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 41 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

Jan 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Jan 13 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 4,000 4.7

Jan 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,300 4.5

Jan 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,300 4.5

Jan 13 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 5,200 4.2

Jan 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,000 3.8

Jan 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,500 4.7

Jan 13 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 4,900 5.8

Jan 13 JURONG WEST CENT RAL 3 Non-landed 1,800 to 1,900 3 5,200 2.8

Jan 13 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,900 3.6

Jan 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Jan 13 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Jan 13 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,000 3.5

Jan 13 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,600 3.0

Jan 13 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,000 3.8

Dec 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,400 4.2

Dec 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,100 4.3

Dec 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,300 4.1

Nov 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,700 4.5

Nov 12 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,500 4.1

Nov 12 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,000 3.7

Nov 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,300 4.5

Nov 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,500 4.7 Nov 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6 Nov 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,900 3.9

Nov 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,800 4.6

Nov 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 2 4,700 3.8

Nov 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,300 4.1

Nov 12 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,200 2.7

Nov 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Nov 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,600 4.4

Nov 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,500 4.7

Nov 12 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 5,500 3.1

Oct 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,000 3.8

Oct 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Oct 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 5,200 5.0

Oct 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,700 3.8

Oct 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 4,000 3.8

Oct 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,500 4.3

Oct 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,600 4.4

Oct 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,500 4.7

Sep 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,400 3.6

Sep 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,300 4.5

Sep 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,380 4.6

Sep 12 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 4 5,200 3.4

Sep 12 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 5,000 2.9

Sep 12 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 2 4,700 3.2

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 42 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

Sep 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,400 4.6

Sep 12 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 3,700 2.7

Sep 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,900 3.7

Sep 12 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,000 3.7

Sep 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 2 4,000 3.2

Sep 12 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 2 4,300 3.7

Aug 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,750 3.9

Aug 12 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 6,500 3.7

Aug 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 1,200 1.1

Aug 12 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,000 3.7

Aug 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 2 4,500 3.6

Aug 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,200 4.4

Aug 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,300 4.5

Aug 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,200 4.0

Aug 12 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 2 4,400 3.0

Aug 12 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,300 3.2

Aug 12 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 7,700 4.4

Aug 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

Aug 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,500 4.7

Jul 12 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 4,300 5.1

Jul 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,600 3.7

Jul 12 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,100 3.6

Jul 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,000 3.2 Jul 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,300 4.1 Jul 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Jul 12 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,500 3.3

Jul 12 JURONG WEST CENT RAL 3 Non-landed 800 to 900 2 3,600 4.2

Jul 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,400 3.5

Jul 12 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,400 3.8

Jul 12 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 5,500 3.1

Jul 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 2 3,700 3.5

Jul 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,300 4.1

Jul 12 JURONG WEST CENT RAL 3 Non-landed 1,400 to 1,500 2 5,000 3.4

Jul 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Jun 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,300 4.5

May 12 JURONG WEST CENT RAL 3 Non-landed 2,300 to 2,400 3 4,300 1.8

Apr 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,600 4.8

Apr 12 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 4,500 2.7

Mar 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,100 4.3

Mar 12 JURONG WEST CENT RAL 3 Non-landed 2,000 to 2,100 4 5,700 2.8

Mar 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

Mar 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,100 3.3

Mar 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,200 4.4

Mar 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,900 4.1

Mar 12 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,500 3.3

Mar 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,900 5.2

Mar 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,600 3.8

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 43 OF 49

Unit size Monthly rent Monthly rent Lease Start Street T ype (sqf t) Bedrooms (S$) (Est. S$ psf )

Mar 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,800 4.0

Mar 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Mar 12 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,500 2.9

Mar 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,000 3.2

Mar 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,800 3.8

Mar 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 3,600 3.4

Mar 12 JURONG WEST CENT RAL 3 Non-landed 1,600 to 1,700 3 4,300 2.6

Mar 12 JURONG WEST CENT RAL 3 Non-landed 2,000 to 2,100 3 4,300 2.1

Mar 12 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 4,400 3.8

Feb 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,750 3.9

Feb 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 3,500 3.7

Feb 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,400 3.5

Feb 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8

Feb 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,300 4.5

Feb 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,300 4.1

Feb 12 JURONG WEST CENT RAL 3 Non-landed 1,500 to 1,600 3 4,500 2.9

Feb 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,500 4.7

Feb 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 5,200 5.0

Feb 12 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 4,600 2.6

Jan 12 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 5,250 3.9

Jan 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,300 4.1

Jan 12 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,500 3.3

Jan 12 JURONG WEST CENT RAL 3 Non-landed 1,700 to 1,800 3 4,500 2.6 Jan 12 JURONG WEST CENT RAL 3 Non-landed 1,000 to 1,100 3 4,000 3.8 Jan 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,500 4.7

Jan 12 JURONG WEST CENT RAL 3 Non-landed 1,800 to 1,900 3 3,400 1.8

Jan 12 JURONG WEST CENT RAL 3 Non-landed 1,100 to 1,200 3 5,400 4.7

Jan 12 JURONG WEST CENT RAL 3 Non-landed 1,300 to 1,400 3 4,500 3.3

Jan 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,500 3.6

Jan 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Jan 12 JURONG WEST CENT RAL 3 Non-landed 900 to 1,000 2 4,000 4.2

Jan 12 JURONG WEST CENT RAL 3 Non-landed 1,200 to 1,300 3 4,300 3.4

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 44 OF 49

Nearby Properties

PRICE AND RENTAL COMPARISON (UP TO 50)

No te: Excludes pro perties with no transactio ns in the past 6 mo nths. *P rices and rentals are based o n data in the past 6 mo nths.

So urce: URA, http: //www. theedgeproperty. com. sg

Map OneMap MP2014

Te rms o f Use Min Avg Max Min Avg Max Rental Distance Price* Price* Price* Rental* Rental* Rental* Yield Marker Project Name T enure Completion Date (m) (S$ psf ) (S$ psf ) (S$ psf ) (S$ psf pm) (S$ psf pm) (S$ psf pm) (%)

T HE CENT RIS 99 Yrs FROM 2006 2009 - 743 992 1,196 2.32 3.51 4.53 4.2

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 45 OF 49

Nearby Amenities

NEARBY AMENITIES

So urce: http: //www. theedgeproperty. com. sg

Map OneMap MP2014

Te rms o f Use

Bus S tops

1. INT (220 0 9 ) 2. BLK 6 9 1A CP (2248 1) 3. OPP BOON LAY S TN 4. BLK 6 8 3A (2248 9 ) (283M (87M AWAY) (267M AWAY) (N28 0 1) (279M AWAY) AWAY) Services: 30, 79, 154, 157, Services: 199, 242, 405, 502 Services: NR5 Services: 199, 242, 405, 502, 172, 174, 174e, 178, 179, 180, 502A 181, 182, 182M, 187, 192, 193, 194, 198, 199, 240, 241, 242, 243, 246, 249, 251, 252, 254, 255, 257, 405

5. OPP BLK 6 6 2C (2249 9 ) 6 . BLK 6 6 2D (2249 1) (332M 7. BLK 6 6 5A (22251) (353M 8 . BLK 6 6 3E (2250 9 ) (360M (296M AWAY) AWAY) AWAY) AWAY) Services: 172, 178, 180, Services: NR5, 5N, 172, 178, Services: NR5, 243, 257 Services: 179, 241, 255 182M, 182, 187, 194, 240, 254 180, 182, 182M, 187, 194, 240, 254

9 . BLK 6 6 8 D (22259 ) (369M 10 . BLK 6 8 5B (22449 ) 11. BLK 6 6 9 (22441) (374M 12. BLK 6 9 5 (2136 1) (392M AWAY) (370M AWAY) AWAY) AWAY) Services: 243, 257 Services: NR5, 181, 192, 193, Services: 181, 192, 193, 243, Services: NR5, 157, 172, 174, 243, 502, 502A 502 174e, 198

13. BLK 6 6 2A (2250 1) (406M 14. OPP BLK 6 9 5 (2136 9 ) 15. OPP CHARTERED IND 16 . CHARTERED IND AWAY) (419M AWAY) (21351) (445M AWAY) (21359 ) (492M AWAY) Services: 5N, 179, 241, 255 Services: NR5, 5N, 157, 172, Services: 79, 246, 249 Services: 79, 246, 249 174, 174e, 198

MRTs

1. BOON LAY (164M AWAY) EW27

S hopping Malls

1. (120M AWAY) 1 JURONG WEST CENTRAL 2 (S)648886

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 46 OF 49

ATMs

1. DBS /POS B NTUC 2. DBS /POS B JURONG 3. DBS /POS B NTUC 4. DBS /POS B JURONG JURONG POINT S HOPPING POINT BRANCH (84M AWAY) JURONG POINT S HOPPING POINT BRANCH (109M CENTRE (84M AWAY) 63 Jurong West Central 3 CENTRE (109M AWAY) AWAY) 63 Jurong West Central 3 #B1-47/48/49/50 Jurong Point 1 Jurong West Central 2 1 Jurong West Central 2 #B1- Level 3 Singapore 648331 Shopping Centre Singapore Basement 1 Jurong Point 20 Jurong Point Shopping 648331 Shopping Centre Singapore Centre Singapore 648886 648886

5. OCBC JURONG POINT 6 . UOB JURONG POINT 7. UOB JURONG POINT 8 . OCBC JURONG POINT S HOPPING CENTRE (118M BRANCH (120M AWAY) S HOPPING CENTRE (120M S HOPPING CENTRE (123M AWAY) 1 JURONG WEST CENTRAL 2 AWAY) AWAY) 63 Jurong West Central 3 #01-16C JURONG POINT 1 JURONG WEST CENTRAL 2 1 Jurong West Central 2 Singapore 648331 - #03-01 SHOPPING CENTRE #01-16 JURONG POINT Singapore (648886) - #B1- Fairprice (cash-in facility SINGAPORE 648886 SHOPPING CENTRE 31/32/33/46 OCBC Jurong available) SINGAPORE 648886 Point Branch -#01-31A (in front of Coffee Bean) - #B1- 09 Fairprice (cash-in facility available)

9 . UOB BOON LAY BUS 10 . OCBC BOON LAY BUS 11. DBS /POS B BOON LAY 12. OCBC BOON LAY MRT INTERCHANGE (137M AWAY) INTERCHANGE (137M AWAY) MRT S TATION (164M AWAY) S TATION (173M AWAY) 61 JURONG WEST CENTRAL 3 61 JURONG WEST CENTRAL 3 301 Boon Lay Way Singapore 301 BOON LAY WAY BOON LAY BUS SINGAPORE 648330 649846 CONCOURSE AREA INTERCHANGE SINGAPORE SINGAPORE 649846 648330

13. UOB BOON LAY MRT S TATION (173M AWAY) 301 BOON LAY WAY MRT STATION - BOON LAY SINGAPORE 649846

Bank Branches

1. DBS POS B JURONG 2. DBS POS B JURONG 3. OCBC OCBC JURONG 4. UOB JURONG POINT POINT BRANCH (84M AWAY) POINT BRANCH (109M POINT BRANCH (120M BRANCH (123M AWAY) 63 Jurong West Central 3 AWAY) AWAY) 1 Jurong West Central 2 #01- #B1-47/48/49/50 Jurong Point 1 Jurong West Central 2 #B1- 1 JURONG WEST CENTRAL 2 16CJurong Point Shopping Shopping Centre Singapore 20 Jurong Point Shopping #B1-31/32/33/46 JURONG Centre Singapore 648886 648331 Hours: Business Centre Singapore 648886 POINT SHOPPING CENTRE Hours: Mon - Fri: 11am - 6pm Hours:Mon to Sat 10.00am to Hours: Business Hours:Mon - SINGAPORE 648886 Hours: Sat: 11am - 4pm Sun: Closed 8.00pm Sat: 10.00 AM - 8.00 PM MON - SUN: 11.00AM TO 7.00PM

Childcare Centres

1. MY FIRS T S KOOL (84M 2. WHIS PERING HEARTS 3. PCF S PARKLETOTS 4. OUR LITTLE LEARNING AWAY) INFANT & CHILD CARE PIONEER (BLK 6 9 4) (352M HOUS E 2 (403M AWAY) 63, JURONG WEST CENTRAL CENTRE (109M AWAY) AWAY) 667C, JURONG WEST STREET 3, #03 - 200/201, JURONG 688, JURONG WEST CENTRAL 694, JURONG WEST CENTRAL 65, #01 - 139, SINGAPORE POINT SHOPPING CENTRE, 1, #01 - 237, SINGAPORE 1, #01 - 01, SINGAPORE 643667 Phone: 67919909 SINGAPORE 648331 Phone: 640688 Phone: 67922321 640694 Phone: 67911792 66349989

5. MY FIRS T S KOOL (486M 6 . BRIGHT JUNIORS PTE AWAY) LTD (495M AWAY) 681A, JURONG WEST 660D, JURONG WEST STREET CENTRAL 1, #01 - 94, 64, #01 - 334, SINGAPORE SINGAPORE 641681 Phone: 644660 Phone: 68625606 66349989

Clinics

1. ACUMED MEDICAL 2. DR W K KOO & 3. FULLERTON 4. GJ MEDICAL CLINIC

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 47 OF 49

GROUP (120M AWAY) AS S OCIATES P L (120M HEALTHCARE @ TRYTHALL (120M AWAY) 1 JURONG WEST CENTRAL 2 AWAY) HOY DAVIES (120M AWAY) 1 JURONG WEST CENTRAL 2 B1A-19E JURONG POINT 1 JURONG WEST CENTRAL 2 1 JURONG WEST CENTRAL 2 B1A-19A JURONG POINT SHOPPING CENTRE 01-16A&B JURONG POINT B1A-19B JURONG POINT SINGAPORE 648886 Phone: SINGAPORE 648886 Phone: SINGAPORE 648886 Phone: SINGAPORE 648886 Phone: 67958658 Hours:MON - WED: 67923822 Hours:MON - TUE: 67922669 Hours:MON - FRI: 67930611 Hours:MON - FRI: 0900 - 1300; 1400 - 1700; 0830 - 1800; 1830 - 2100 0830 - 2130 SAT: 0830 - 1300; 0830 - 1800 SAT: 0830 - 1300 1800 - 2100 THU - FRI: 0900 - WED - FRI: 0830 - 1700 SAT: 1400 - 1700; 1800 - 2130 SUN SUN: 0900 - 1200 CLOSED 1300; 1400 - 1700 SUN: 1400 0830 - 1300 CLOSED ON & PH: 1000 - 1300; 1400 - ON PH - 1800 CLOSED ON SAT & PH SUNDAY & PH 1700; 1800 - 2130

5. JURPOINT MEDICARE 6 . POINT MEDICAL GROUP 7. S HENTON MEDICAL 8 . ACUMED MEDICAL CLINIC (120M AWAY) (JURONG POINT) (120M GROUP (JURONG POINT) GROUP (173M AWAY) 1 JURONG WEST CENTRAL 2 AWAY) (120M AWAY) 301 BOON LAY WAY 01-18/19 B1A-20B JURONG POINT 1 JURONG WEST CENTRAL 2 1 JURONG WEST CENTRAL 2 BOON LAY MRT STATION SINGAPORE 648886 Phone: B1A-20A JURONG POINT 01-40/41/42 JURONG POINT SINGAPORE 649846 Phone: 67940070 Hours:MON - FRI: SINGAPORE 648886 Phone: SINGAPORE 648886 Phone: 65159919 Hours:MON-FRI: 0830 - 1300; 1400 - 1630; 67922370 Hours:MON - FRI: 67915100 Hours:MON - SUN 0800 - 1330; 1400 - 1730; 1730 - 2000 SAT: 0830 - 1200 0830 - 1300; 1400 - 1730; INCL PH: 0830 - 1230; 1330 - 1800 - 2200 SAT: 0830 - CLOSED ON SUN & PH 1830 - 2030 SAT: 0830 - 1300; 1730; 1830 - 2100 1300; 1400 - 1700; 1800 - 1400 - 1700 CLOSED ON SUN 2100 SUN & PH: 0900 - 1200; & PH 1800 - 2100

9 . DR. W. K. KOO & 10 . HEALTHWAY JURONG AS S OCIATES P. L. (173M WES T CLINIC (179M AWAY) AWAY) 690 JURONG WEST CENTRAL 301 BOON LAY WAY 01-02 1 01-193 SINGAPORE 640690 BOON LAY MRT STATION Phone: 67921812 Hours:MON SINGAPORE 649846 Phone: - FRI: 0830 - 1230; 1400 - 67948767 Hours:MON - FRI: 1800 1900 - 0000 SAT: 0830 - 0830 - 1200; 1330 - 1700; 1230; 1900 - 0000 SUN & PH: 1730 - 2030 SAT: 0830 - 1200 0830 - 1230; 1900 - 2300 CLOSED ON SUN & PH CLOSED ON PH Community Clubs 1. THE FRONTIER CC (145M AWAY) 60 Jurong West Central 3

Dentists

1. UNITY DENTICARE (109M 2. RAFFLES DENTAL (109M 3. JURONG POINT DENTAL 4. DENTALTRENDZ PTE. AWAY) AWAY) S URGERY (109M AWAY) LTD. (109M AWAY) 1 JURONG WEST CENTRAL 2 1 JURONG WEST CENTRAL 2 1 JURONG WEST CENTRAL 2 1 JURONG WEST CENTRAL 2 JURONG POINT SHOPPING JURONG POINT SHOPPING JURONG POINT SHOPPING JURONG POINT #01-16A & CENTRE #B1A-20B Singapore CENTRE #B1A-19D Singapore CENTRE #B1A-20D Singapore 16B Singapore 648886 648886 648886 648886

5. JURONG MEDICAL 6 . Q & M DENTAL S URGERY 7. Q & M DENTAL S URGERY 8 . VIS TA DENTAL S URGERY CENTRE (152M AWAY) (BOON LAY MRT) (164M (BOON LAY MRT) PTE LTD (164M AWAY) 60 JURONG WEST CENTRAL 3 AWAY) (164M AWAY) 301 BOON LAY WAY BOON Singapore 648346 BLK 301 BOON LAY WAY 301 BOON LAY WAY BOON LAY MRT STATION #01-10 BOON LAY MRT STATION #01- LAY MRT STATION #01-01 Singapore 649846 05 Singapore 649846 Singapore 649846

Groceries

1. NTUC (84M AWAY) 2. NTUC (109M AWAY) #03-01 63 Jurong West #B1-09 1 Jurong West Central 3 Singapore 648331 Central 2 Singapore 648886 Hours: 12:00 AM-11:59 PM Hours: 8:00 AM-11:00 PM

Kindergartens

1. PCF PIONEER BLK 6 6 5A- 2. PCF PIONEER BLK 6 6 2B 3. PCF PIONEER BLK 6 6 1B-

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 48 OF 49

6 6 5B (276M AWAY) (426M AWAY) 6 6 2C (466M AWAY) Block 665A, Jurong West Block 662B, Jurong West Block 661B, Jurong West Street 64, #01-160 Street 64, #01-312 Street 64, #01-426

Libraries

1. JURONG WES T PUBLIC LIBRARY (152M AWAY) 60 Jurong West Central 3

Petrol S tations

1. S HELL BOON LAY (483M AWAY) 2 BOON LAY AVENUE S(649960) Services: 7-ELEVEN STORE, AUTOSERV SERVICE, MANUAL CAR WASH Others: UOB ATM

S chools

1. YUHUA S ECONDARY S CHOOL (493M AWAY) 247 JALAN BOON LAY SINGAPORE 619522

Disclaimer

The Analytics are pro vided “AS IS” and we do no t warranty as to its accuracy. We are no t respo nsible o r liable fo r any claims, damag es, lo sses, expenses, co sts o r liabilities whatso ever. P lease seek pro fessio nal advice befo re relying o n the Analytics. The Analytics are based o n the data available at the date o f publicatio n and may be subject to further revisio n as and when mo re data is made available to us. We reserve the rig hts to mo dify, alter, delete o r withdraw the Analytics at any time witho ut no tice to yo u. All news, info rmatio n, co ntents and o ther material displayed o n the Website and Services including the P o sting s are fo r yo ur g eneral info rmatio n purpo se o nly and are no substitute fo r independent research and/o r verificatio ns and sho uld no t be reg arded as a substitute fo r pro fessio nal, leg al, financial o r real estate advice.

The Ed g e Pro p e rty This report was generated on Thurs day, 5 May 2016 at 9:25am Visit www.t he e dge prope rt y.com PAGE 49 OF 49