Progressive Credit Union Site, East Wall, Dublin 3

Total Page:16

File Type:pdf, Size:1020Kb

Progressive Credit Union Site, East Wall, Dublin 3 DEVELOPMENT SITE S.P.P APPROX. 0.04HA (0.1 ACRES) PROGRESSIVE CREDIT UNION SITE, EAST WALL, DUBLIN 3 For Sale by Private Treaty Executive Summary: · Prime Residential Development Site S.P.P · Excellent location in the heart of East Wall, Dublin 3 · Site extends to approx. 0.04Ha (0.1 acres) · Existing Credit Union building extending to approximately 230 sq. m (2,482sq. ft) · Zoned ‘Z1 Residential’ under the Dublin City Council Development Plan · A feasibility study has been undertaken which estimates an infill scheme of up to 13 units would be feasible. Location & Transport: East Wall is one of the city’s main arterial hubs, connecting Dublin Port and the expanding Docklands areas with the northern suburbs of Fairview, Clontarf and further north the Malahide Road. In recent years there has been an expansion of the retail offering in the area with a leading line-up of Lidl, Aldi, McDonalds, Centra, Spar and Starbucks all locating on East Wall Road. The North Docklands is currently experiencing a substantial level of investment with the new Central Bank HQ building and the Dublin Landings developments complete. These developments along with the existing Convention Centre Dublin, Spencer Dock, and The Point Village are all within a short walk of the subject property. East Wall is one of the most accessible locations in the city by both private and public transport. The Port Tunnel, directly accessed from East Wall Road, makes it highly convenient to both Dublin International Airport and the M1 and M50 motorways; while the East Link Bridge provides quick access to the N11 and South City. The location is located close to Connolly Train Station, the DART, LUAS line and Busaras, which means that the area is popular with young families and professionals alike. For Sale by Private Treaty Development Site c 0.04Ha (0.1 acres) Credit Union Site, East Wall, Dublin 3 Description: The property comprises a prime corner residential development site extending to approx. 0.04Ha (0.1 acres). Currently, the site contains a single storey credit union and a community centre which extends to approximately 2,482 Sq.ft (230 Sq.m). Internally, the credit union comprises a ground floor banking hall with a consultation suite together with offices, tea station to the rear and attic space overhead.Specification includes plastered and painted walls, fluorescent strip lighting, CCTV and carpet floor covering. Access to the community centre is from the gated paved area to the front of the property. Internally, the property comprises of a large community centre with kitchen W/C and storage area. Specification includes, laminate flooring, plastered and painted walls, suspended ceiling with a mix of spot and fluorescent lighting. There is a shared courtyard to the rear of the properties. Zoning: The property is Zoned Z1 Sustainable Residential Neighbourhoods ‘To protect, provide and improve residential amenities’, under the Dublin City Development Plan 2016 - 2021. Uses permitted in principle within the subject zoning includes; Buildings for the health, safety and welfare of the public, childcare facility, embassy residential, enterprise centre, residential, shop (local), training centre.professionals alike. For Sale by Private Treaty Development Site approx. 0.04Ha (0.1 acres) Credit Union Site, East Wall, Dublin 3 Feasibility Study While there is no current planning permission pertaining to the property for future development, a feasibility study has been prepared to illustrate the development potential of the subject site, subject to planning permission. This feasibility study, prepared by NMA Architects illustrates the potential of the site to accommodate a scheme comprising 669 sqm three story residential block comprising 13 no. apartments (10*1 beds, 3*2 beds), subject to planning permission. This feasibility pack is available from QRE. Schedule of accommodation CGI For identification purposes only For Sale by Private Treaty Development Site approx. 0.04Ha (0.1 acres) Credit Union Site, East Wall, Dublin 3 Ground Floor Second Floor First Floor Architects Impression Title Viewing: Freehold By appointment through the sole selling agent QRE Guide Price €650,000 BER: VAT Please refer to agent QRE Contacts Brian Kelly BSc (Hons) Surveyor T: +353 (0) 1 637 5555 E: [email protected] Bryan Garry MRICS MSCSI Divisional Director T: +353 (01) 637 55 55 E: [email protected] Website qre.ie PSRA Registration No. 003587 The agents on their own behalf and on behalf of the vendor/lessor of this property, give notice that: (a) these particulars do not constitute in whole or in part an offer or contract for sale or lease; (b) none of the statements contained in these particulars as to the property are to be relied on as statements or representations of fact; and (c) the vendor/lessor does not make or give, and neither the agents nor any of its members or any person in its employment has any authority to make or give, any representation or warranty whatsoever in relation to the property. The only representations, warranties, undertakings and contractual obligations to be given or undertaken by the vendor/lessor are those contained and expressly referred to in the written contract for sale or agreement for lease between the vendor/lessor and a purchaser or tenant. Prospective purchasers or tenants are strongly advised to: (a) satisfy themselves as to the correctness of each statement contained in these particulars; (b) inspect the property and the neighbouring area; (c) ensure that any items expressed to be included are available and in working order; (d) arrange a full structural (and where appropriate environmental) survey of the property; and (e) carry out all necessary searches and enquiries. Any representation including descriptions, dimensions, references to condition, permissions or licenses for uses or occupation, access and any other details are given in good faith and are believed to be correct, but any intending purchaser or tenant should not rely on them as statements or representations of fact but must satisfy themselves (at their own expense) as to their correctness..
Recommended publications
  • Download Date 26/09/2021 08:24:43
    Eastern Regional Health Authority annual report 2003 Item Type Report Authors Eastern Regional Health Authority (ERHA) Rights ERHA Download date 26/09/2021 08:24:43 Link to Item http://hdl.handle.net/10147/44836 Find this and similar works at - http://www.lenus.ie/hse Area Health Boards Acute Hospitals Ambulance Services Physical and Sensory Disability Services Services for the Elderly Rehabilitation Services Orthopaedic Services Mental Health Services 2003 ERHA Annual Report Maternity Hospitals Children's Hospitals Public Health Intellectual Disabilities Services Children's Services Cancer Treatments Drug Treatments Primary Care Buying and assuring best health for you Do chúram ár gcúram 01 Regional Maps p2 02 Chairman’s Report p4 03 Authority Board Members p8 04 Board Meetings p12 05 Board Committees p13 06 Area health Boards p15 07 Voluntary Service Providers p16 08 Management Team p22 09 Regional Chief Executives Report p24 10 Health Status/Socia-Demographic trends p28 11 Customer Services p40 12 Cardiovascular Strategy p42 13 Children/Families p48 14 Physical & Sensory Disabilities p59 15 Intellectual Disabilities p67 16 Older Persons p72 17 Adult Homelessness p80 18 Youth Homelessness p83 2003 19 Social Inclusion p86 20 Addiction p91 21 Mental Health p100 22 Primary Care p106 23 EHSS p117 24 Acute Hospitals p119 25 National Supra/Regional Specialities p135 26 Ambulance and Emergency Planning p142 27 Capital Development p144 28 Public Health p147 29 NMPDU p156 30 Corporate Services p162 31 M&E p171 32 Finance Directorate p173 33
    [Show full text]
  • 1 Boolavogue Road, East Wall, Dublin 3
    1 Boolavogue Road, East Wall, Dublin 3 c. 75 SqM DNG Fairview Negotiator: 2 Malahide Road, Fairview, Dublin 3 Rachel Cunningham T: 01 8331802 | E: [email protected] PSL 002049 For independent mortgage advice contact GMC Mortgages. Call 1890 462 462 or email [email protected]. Messrs. Douglas Newman Good for themselves and for the vendors or lessors of the property whose Agents they are, give notice that: (i) The particulars are set out as a general outline for the guidance of intending purchasers or lessees, and do not constitute part of, an offer or contract. (ii) All descriptions, dimensions, references to condition and necessary permissions for use and occupation, and other details are given in good faith and are believed to be correct, but any intending purchasers or tenants should not rely on them as statements or represen tations of fact but must satisfy themselves by inspection or otherwise as to the correctness of each of them. (iii) No person in the employment of Messrs. Douglas Newman Good has any authority to make or give representation or warranty whatever in relation to this development. 1 Boolavogue Road, East Wall, Dublin 3 Features DNG are delighted to present to the market this fine two bedroom semi detached property situated on a large corner site on • LARGE CORNER SITE PROPERTY a mature and residential road in the heart of East Wall. With a total site area of c. 170 SqM, there is excellent scope for a side and rear extension subject to planning permission and guidelines. Having been lovingly maintained throughout the years and • DOUBLE GLAZED WINDOWS with well laid out accommodation, the property enters the market in excellent condition affording a new owner the perfect • INTRUDER ALARM opportunity to effortlessly create a substantial family home just a short 1KM from Dublin City Centre.
    [Show full text]
  • Sheriff St 20Jan Final
    MONDAYS WEDNESDAYS SATURDAYS AQUAFIT DANCE FITNESS PARKRUN (€3 Supplement) 6.15pm to 7pm 9.20am 12pm to 1pm and 7pm to 8pm Contact Point: Contact Point: Participants must register at www.parkrun.com Contact: Alysia Arkins (Fitness Instructor) Fairview Park Mary Bolger Hinds (Swim Ireland) 085 826 4065 St. Laurence O’ Toole Recreation Centre 086 775 9954 BOXFIT Sean Mc Dermott St Swimming Pool STRENGTH AND CONDITIONING 11am to 12pm Participants must register for this activity on the morning Evening Contact Point: of the activity through the contact above Contact: Elaine O Neill WALKING GROUP Adam Maguire (Duty Supervisor) 085 130 7765 1pm to 2pm 01 547 2257 Ballybough Boxing Club Contact: St. Laurence O’ Toole Recreation Centre Michael Darragh Macauley SATURDAYS / SUNDAYS 087 182 2010 THURSDAYS St. Laurence O’ Toole Recreation Centre ADVENTURE PROJECT GAA FOR MA’S 10am Additional registration with project Contact Point: YOGA 6pm to 7pm Contact: Willie Whelan (Adventure Project) 6.30pm to 7.30pm 087 294 3970 Contact: Thomas Gleeson 085 113 7728 Meet at Adventure Project every week David Mc Guinness (HSCL) St. Laurence O’ Toole Recreation Centre 085 844 8342 Participants must register for activity early in week through Willie Whelan. St. Laurence O’ Toole Recreation Centre FRIDAYS TUESDAYS YOGA 1pm to 2pm COUCH TO 5KM Contact: 1pm to 2pm Michael Darragh Macauley Contact: 087 182 2010 Colette Quinn (Athletics Officer) St. Laurence O’ Toole Recreation Centre 085 871 2817 Mountjoy Square COUCH TO 5 TAGS 5.45pm to 6.45pm Contact: Stephen Maher (Rugby Officer) 086 199 4569 St. Laurence O’ Toole Recreation Centre * Please note some classes may be limited by capacity ** that charge a supplementary 10am 11am 6pm 7pm 9am 1pm Get you moving through physical activity classes.
    [Show full text]
  • Travelling to the O2 Couldn't Be Easier
    Colour palette Primary colour Pantone CMYK RGB Websafe Gardiner St Upper Port land Five Clontarf Road ll Row hi Lamps Ea r Dart Station s Pedestrian Entry Points t W ROY 1km / 14min walk all Rd l Summe A L unne CANAL T rt Please take B t o S P per 20 27 116 145 note of the Up Parnel B A B A PMS 2747 C100 M094 Y000 K029 R000 G000 B102 Hex 000066 27C 29 31 31 32B Seville Plac B Gardiner St 40 40 120 123 A A Amiens East Rd LEGEND entrance l Sq East 42 42B 43 51 53 St Connolly A points. These Secondary colours 53 53 142 ll Rd Dorset St 90 127 129 130 142 e Rail / Dart Line A Station t Wall Rd 11 11 B s Parnell Docklands correlate to Lower Wa A Ea LUAS Red Line PMS 2768 C095 M081 Y000 K059 R025 G034 B079 Hex 000033 13 13 14 Station the designated A 93 151 O’Connell St 16 16 19 LUAS Sheriff St Upper LUAS Green Line Sheriff St Lwr East A A entry point 40C 48 123 PMS 2945 C100 M038 Y000 K015 R000 G088 B150 Hex 003399 Mayor Pedestrian Route Taxi Rank printed on 747748 Square Commons St The Guild St Bus Route Stop Busáras your event PMS 2925 C087 M023 Y000 K000 R000 G144 B208 Hex 3399CC 2 3 4 5 Spire Mayor St Lower 4 5 Car Park Parnell St A A chq Convention ticket. B A 7 7 8 10 10 A Castleforbes Rd D 7 B 7 8 53 PMS 2915 C060 M011 Y000 K000 R101 G180 B228 Hex 66CCFF D New Wapping St A Centre 14A 16 16 19 38 151 A A D A C North Wall Quay 38C 46B 46E 48 58 Quay 93 90 North Wall Quay North Wall Quay C Abbey St Lower House A Custom PMS 290 C016 M000 Y000 K000 R190 G217 B237 Hex * C Capel St 63 121 122 145 746 38 38 Sean O’Casey Samuel Beckett 151 Foot-Bridge
    [Show full text]
  • 47178-Owen Reilly-52 West Road.Indd
    52 West Road, East Wall, Dublin 3. For Sale By Private Treaty 52 West Road, East Wall, Dublin 3 DESCRIPTION and Aldi supermarkets on East Wall Road, the house would also be a most convenient Owen Reilly presents this extremely charming base for commuters who use the Port Tunnel large two-bedroom red brick mid-terrace or East Link Bridge – each a five-minute drive house located in a mature neighbourhood in from the house. Facebook have just moved heart of East Wall adjacent to the IFSC and just into their new offices in East Wall which five minutes from Facebook’s new office. This reflects that this is an area on the up! is a perfect starter home or investment given the value and convenience of the location FEATURES with a host of amenities on the doorstep. Recently redecorated, the accommodation • Charming two bedroom townhouse briefly comprises on the ground floor of a • Superb location adjacent to a host of hall, a living room with original feature brick amenities fireplace, a sitting room which leads to a • Close to East point Business Park galley style kitchen with French door access to an east facing rear garden. On the first • Bright interior floor there are two generous bedrooms with • Ample on street parking original feature fireplaces. Ample on street • Gas fired central heating parking to front. This delightful property must be viewed to be appreciated. • Generous east facing rear garden • High ceilings LOCATION • Convenient to the city centre and IFSC • Easy access to the M1 via the Port Tunnel At the north-eastern corner of Dublin’s North Docklands is East Wall, an established residential community with great personality.
    [Show full text]
  • East Wall Road, Dublin 3 HEADQUARTER OFFICES 1 the North Docklands DUBLIN's PRIMARY CORPORATE QUARTER
    AT GATEWAY BE IN PRIME POSITION East Wall Road, Dublin 3 HEADQUARTER OFFICES 1 The North Docklands DUBLIN'S PRIMARY CORPORATE QUARTER HIGH PROFILE DEVELOPMENT EXCELLENT AMENITIES Leading business environment • The Gateway development, located in the North Docklands, comprises three seperate blocks of high specification, third generation, office space extending to almost 16,000 sq.m. • The new docklands masterplan provides for the expenditure of €1.24 billion in a public private partnership to improve infrastructure and provide for major commercial and residential developments between now and 2020. • Gateway is located in one of Dublin's best served public transport areas with Dart, Mainline Rail, Dublin Bus and Luas connections all in the vicinity. There are a host of shops, restaurants, bars and hotels within walking distance in the neighbouring IFSC / Spencer Dock area not to mention the convenience store on your doorstep at Gateway. 2 Prime CORPORATE EFFICIENCY SPECTACULAR VIEWS STRATEGIC POSITION Centrepiece of the Gateway Development • PRIME, the centrepiece of the hugely successful Gateway Development in the North City Docklands, has been designed to meet the most demanding requirements expected of a corporate headquarter. • This 3rd generation office space meets the highest specification, in both presentation and technology. The presentation is impressive and authoritative and includes solid wood panelling in the reception areas. Internal structures and external amenities combine to provide the levels of corporate efficiency which are essential in today’s business world. The building also offers spectacular views across the city. • Strategically positioned on East Wall Road, between the dynamic Dublin Docklands and the East Wall Business Campus, PRIME is highly accessible, being served by all primary transport modes including Dublin Port Tunnel.
    [Show full text]
  • Inspectors Report (307/R307987.Pdf, .PDF Format 303KB)
    Inspector’s Report ABP-307987-20. Development Demolition of premises and construction of a 2-4 storey apartment block with 13 no. apartments. Location Church Road, East Wall, Dublin. Planning Authority Dublin City Council. Planning Authority Reg. Ref. 2773/20. Applicant MKN Property Group. Type of Application Permission. Planning Authority Decision Refuse. Type of Appeal First Party Appellant MKN Property Group. Observer Steve O’Connor. Date of Site Inspection 14th January 2021. Inspector Philip Davis. ABP-307987-20 Inspector’s Report Page 1 of 20 Contents 1.0 Introduction .......................................................................................................... 3 2.0 Site Location and Description .............................................................................. 3 3.0 Proposed Development ....................................................................................... 4 4.0 Planning Authority Decision ................................................................................. 4 Decision ........................................................................................................ 4 Planning Authority Reports............................................................................ 5 Prescribed Bodies ......................................................................................... 6 Third Party Observations .............................................................................. 7 5.0 Planning History ..................................................................................................
    [Show full text]
  • Dublin City Council
    Dublin City Council Weekly Planning List 11/21 (15/03/2021-19/03/2021) All applications received will be considered by the Planning Authority to determine their validity in accordance with Planning and Development Regulations 2001. Any application pending validation listed hereunder, and subsequently declared to be invalid, will be detailed in the DECISIONS SECTION of the Weekly List in a subsequent publication. 1 | P a g e Area 3 COMMERCIAL Area Area 3 - Central Application Number 2395/21 Application Type Permission Applicant Abbey Lane Hotel Trading Ltd Location The Abbey Hotel, 52 Middle Abbey Street , North City, Dublin 1 D01 W9H6 Registration Date 15/03/2021 Additional Information Proposal: Permission for an extension to The Abbey Hotel consisting of additional floors to existing hotel, to increase accommodation from 21 bedrooms to 45 bedrooms, comprising the following development: A) Demolition of localised internal walls & floor structure at Ground, First, Second, & Third Floor levels and demolition of pitched roof to rear at Second Floor Level and to flat roof at front at Fourth Floor Level. B) Proposed infill floor extension at first Floor Level to rear C) Proposed floor extensions at Second, Third & Fourth Floors to rear D) Proposed new Fifth & Sixth floor extensions E) Revisions & alterations to upper floor facade to Abbey Street Elevation and proposed new shopfront/entrance & facade to North Lotts elevation with alterations to all elevations, with localised internal floor layout modifications at all levels. F) Provision of lightwells and rooflights at First Floor and at Sixth Floor Level G) Proposed surface water attenuation at basement level and all associated site and development works.
    [Show full text]
  • (Public Pack)Agenda Document for Traffic and Transport SPC, 02/09
    NOTIFICATION TO ATTEND MEETING OF THE TRAFFIC AND TRANSPORT SPC BY REMOTE VIDEO CONFERENCE ON WEDNESDAY 2 SEPTEMBER 2020 AT 3.00 PM WEBCASTING NOTICE This meeting may be filmed for live or subsequent broadcast via the Council’s website. At the start of the meeting the Chair will confirm if all or part of the meeting is being filmed. You should be aware that the Council is subject to the Freedom of Information Act 2014, the Data Protection Act 1988 and 2018, General Data Protection Regulations (EU) 2016/679 and the Defamation Act 2009. Data collected during this webcast will be retained in accordance with the legislation. Therefore, by entering the Council Chamber/Meeting Room and using the seats around the meeting tables, public gallery etc., you are consenting to being filmed and to the possible use of those images and sound recordings for webcasting. If you have any queries regarding this, please contact the Chief Executives Department on Extn. 2101 or DD (01) 222 2100. AGENDA WEDNESDAY 2 SEPTEMBER 2020 PAGE 1 Minutes of the Meeting of the Traffic and Transport SPC, 3rd June 2020 3 - 4 2 Luas Finglas - Presentation on the Extension of the Luas Green Line - Transport Infrastructure Ireland 3 Update on COVID Mobility Measures - Brendan O'Brien, Acting Executive Manager (Traffic) 4 Dublin City Council Special Speed Limit Bye-Laws 2020 (COVID 19) - Report on 5 - 26 Public Consultation and Draft Bye-Laws 5 Mobility Education Presentation - Helen Smirnova, Senior Executive Engineer 6 Traffic and Transport SPC Sub-Committees - Next steps Walking and Cycling Sub-Committee Public Transport Sub-Committee 7 Motion in the name of Councillor Jane Horgan-Jones The Traffic and Transport SPC request an assessment of the advantages and the disadvantages of running bus routes against the flow of traffic on the quays in the City Centre to be undertaken by Dublin City Council, with a view to the findings being presented to Dublin Bus and the NTA.
    [Show full text]
  • To the Lord Mayor and Report No. 26/2021 Members of Dublin City Council Report of the Assistant Chief Executive
    To the Lord Mayor and Report No. 26/2021 Members of Dublin City Council Report of the Assistant Chief Executive _________________________________________________________________________ Dublin City Council Housing Delivery Report – January 2021 _________________________________________________________________________ The current four-year housing programme 2018-2021 began in January 2018.The total delivery target for this four-year period in Dublin City is 9,094. This target figure includes Local Authority New Build, Acquisitions, Refurbishment/voids, Leasing and Part V. It also includes similar activity by Approved Housing Bodies (AHB’s). Separate targets are set for the Housing Assistance Payment Scheme (HAP). The projected delivery for the complete (2018-2021) programme was: Programmes 2018 2019 2020 2021 Total New Build – DCC 271 302 455 1,860 2,888 New Build – AHB’s 403 343 284 609 1,639 Part V 71 207 400 400 1,078 Voids Restored by DCC 300 58 58 58 474 Total new build 1,045 910 1,197 2,927 6,079 Long Term Leasing 440 460 495 498 1,893 Acquisitions 278 254 295 295 1,122 Total Delivery 1,763 1,624 1,987 3,720 9,094 HAP Tenancies 585 1,276 1,500 1,500 4,861 (Homeless, DRHE) HAP Tenancies 2,040 739 780 825 4,384 (Mainstream) HAP Tenancies (Rent 2,068 1,530 780 825 5,203 Supplement) Total HAP Output 4,693 3,545 3,060 3,150 14,448 Additional Voids Restored 571 725 800 800 2,896 Overall Total 7,027 5,894 5,847 7,670 26,438 Brendan Kenny Assistant Chief Executive 11th January 2021 Homes Under Construction Committee Provider Schemes Funding
    [Show full text]
  • The Parish of Taney
    THE PARISH OF TANEY D NDR M A HISTORY OF U U , EA D BL N R U IN, D AND ITS NEIG HBOURHOO . FRANCIS EL RING TON BAL L EVERARD HAMIL TON , B . A . , UNIV . OF DU B . , ' M em ber R oy a l S ocie ty of A ntzq ua ries of Ireland D U B L I N H D D RA F O S FI I CO . L T . G TON ST. G E G G S , , , , PUBL ISHERS TO THE U NIVERS ITY . TO TH E R EV M A FR ED M I L TO N D D . W I L L IA L H A , . , S ome tim e Canon of Clz ris t Ch u rch C a thed ra l THIS HISTORYOF HIS PARISH IS IN S C R IB ED E F A E P R C . IN b efore ublic placing this little work the p , the authors desire to acknowledge the valuable assist ance they have received from the following amongst other friends . D. D. The Rev . Canon Stokes , , the learned author f Ireland and the Celtic Church Ireland and o , and - h r h the A n l N rman C u c &c . &c . g o o , , , has very kindly revised the chapter upon the Antiquities of the Parish , and supplied the materials for interesting note s . l R l B D. e ne . The, Rev William y , , placed his ample knowledge of the clergy of the Diocese d f of Dublin at their isposal , besides urnishing many particulars for the biographical portions of the work .
    [Show full text]
  • Major Changes to Bus Services in Dublin North-West Planned
    Major Changes to Bus Services in Dublin North-West Planned The National Transport Authority is planning to make major changes to the bus network affecting all of the bus services in the North-West of the city. For many people, this would result in more frequent ser- vices to and from town. But for some areas it would mean people would have to walk further to get to the bus. Under the proposals services would be primarily concentrated on main roads. While all local services would be affected, some areas would have replacement services. However it is proposed the number 11 route would be scrapped, and the number 44 would no longer go into Larkhill. This leaflet sets out the most up-to-date information we have about the plans and the public consultation. A full map of the pro- posed changes for Dublin North West is overleaf. Proposed Main Routes: A Route: Whitehall to Terenure (Every Five Minutes or Better) All A services would run from Whitehall to Terenure, but at the northern end, the A route would split at Whitehall into four branches, each with service every 15 minutes. In the south, the A route services would remain together to Terenure, then split into the four 15-minute branches A1: Clongriffin-Clare Hall, Northside Shopping Centre-Beaumont Hospital –Swords Road-City Centre- Templeogue- Knocklyon. (Every 15 Minutes) A2: Airport-Swords Road-City Centre-Templeogue-Tallaght (Every 15 Minutes) A3: DCU-Swords Road-City Centre- Ballinteer- Dundrum (Every 15 Minutes) A4: Swords-Swords Road-City Centre-Rathfarnham Village. (Every 15 Minutes) E Route: Ballymun to Deansgrange (Every 5 Minutes) This would operate every 5 minutes, and extend from Ballymun through Phibsborough, city center to the Stillorgan Road and on to Deansgrange.
    [Show full text]