Friday Volume 3 Issue 97 Issue Date: February 1, 2013

CONNECTING THE LOCAL BUILDING INDUSTRY

Del E Webb School of Construction to Get New $54.5M Home By Rebekah Last week ASU broke ground on what is arguably one Connecting ASU to Downtown Tempe Morris for the of the more meaningful developments to this industry Builder’s in the Downtown Tempe campus – Block 12, or, College Much of the discussion at the groundbreaking was Avenue Commons – where the Del E Webb School of of connectivity – not only in providing a space for Exchange Construction (DEWSC) will have a permanent place to call students and the public to connect in person and by home. This building is a “tremendous step forward for wi-fi/teleconferencing, but in providing a conduit to the Del E. Webb School of Construction” says Dr. Michael Downtown Tempe from the center of ASU. Located at Crow, President of ASU. the corner of 7th Street and College Avenue, the stated intent of creating a ‘College Avenue experience’ was Continued on page 3

The $54.5 million College Avenue Commons will be located on the corner of 7th Street and College Ave. in Tempe. Photo Credit: Gensler/Architekton

Project Solicitations in this Issue: 25 Design/Consultants 32 Horizontal 19 Commercial 19 Products & Equipment

5 Development Opps 22 Utilities 34 Maintenance 25 Bid Results/Awards

The Arizona Builder’s Exchange is a compilation of information gathered from the public domain. Individual articles are protected by their respective copyright. The publication as a whole is copyright protected to the Arizona Builder’s Exchange. To forward or share the information with others outside of your firm is a violation of that copyright, punishable by law. 2 Volume 3, Issue 97 Table of Contents

Articles 4 4 Agreement Will Limit Apartments near Santan Village Mall 4 New N. Phoenix QT Facility to Have More-Spacious Look 6 Line Drawn Between North and South 8 New Yavapai Jail Plan Grows Far Past $12M Estimate 9 Plan Inches Ahead for Rio Salado Trolley 9 Chino Valley to Study Industrial Park at Old Home Manor 6 10 Construction Defects Plague Gilbert Sports Complex 11 Applewood Pet Resort’s Plan to Expand Moves Step Closer 11 Regus Opens Scottsdale Flexible Working Space 11 Peoria Council Approves Plan for RV Park 12 Zoning Panel Advances Queen Creek Movie Theater 17 Bond-Debt Maneuver May Save Mesa a Bundle 17 Cigna Medical Group Pumping $20M into Phoenix Clinics 10

Sections 12 Classifieds 13 Local Industry Professional Making News 14 Bid Results / Project Awards 16 Local Projects Making News 11 18 Industry Events Project Opportunities 19 Planning/Design/Inspection/Consultant 22 Development Opportunities 23 Horizontal 16 28 Utilities 31 Commercial 34 Maintenance & Alterations 38 Products & Equipment 39 Pre-Solicitations 3 Friday, February 1, 2013

Del E Webb School of Construction to Get New $54.5M Home Meet the evidenced by the proximity to Sun Devil Stadium Team! and Wells Fargo Arena to the north, and the way faculty spoke of closing down College Avenue for major events. Rebekah Morris - Publisher Dan Marino Future development in the area includes 480-709-4190 repurposing an existing art annex into a restaurant (ASU is waiting for a tenant to [email protected] propose a use for the space), and at least one more mixed-use building on the northeast Rachel Kettenhofen - Editor corner of Block 12. Joe Montana

Henderson Engineers 5-Story, 137K SF, LEED Platinum Building to be 480-227-2620 Living Laboratory for Students [email protected] PK Associates In a true nod to ASU, Okland Construction and Wood/Patel the design team joint venture of Gensler and Eric Jay Toll - Senior Correspondent Architekton are using the $54.5M project as a John Elway Edge Industries living laboratory: webcams will be streaming 602-617-3797 into the space construction students currently [email protected] Abacus occupy, and exposed construction details like ductwork will demonstrate how details come The Sextant Group together. Besides the Del E Webb School of Michele Carey - General Manager Construction, the Sustainability Engineering Jim Kelly Jeremiah Associates program and the Alliance for Construction 480-686-4315 Excellence will also be housed in the new ASU Block 12 Consultants GreEn A/E Consultants building. Additional amenities include a 200- [email protected] seat auditorium, a marketplace, coffee/wine bar, and a community room. Arizona Builders Exchange 1400 E Indian School Road Sustainability features designed into the project Phoenix, AZ 85014 include: potable water reduction programs, use of recycled/renewable materials, shade trees, an exterior skin designed to shade the building, and AZBEX News maximizing the use of natural light. Pedestrian access from all sides of the building was another Have an idea for a story? key feature of the design. The project is Let us know! targeting LEED Gold certification. E-mail [email protected] and Continued on page 4 we’ll go after it!

AZBEX - Tip of the Week

Are you looking for Sub bids on a private project? Let us know and we will post if for you in our Projects Bidding Section.

Editor’s Picks from the Last Issue • Architecture Billing Gains for Fifth Month • SRP Proposes 59 Acre 3M SF Development to Finish College Avenue Commons ASU. Photo Credit: Gensler/Architecton Papago Park Center

Click here to return to Table of Contents 4 Volume 3, Issue 97 Del E Webb School of Construction to Get New $54.5M Home (Cont’d)

Goal is to Double Enrollment in Construction Program supporters present at the groundbreaking – from industry with Industry Support associations to General Contractors and Subcontractors – all were in attendance last week. Wink Ames, Minard- Mirroring President Crow’s lofty goals for the entire Ames Insurance, is a long-time champion of the project, campus, Dean Paul Johnson spoke of the goal of the stating that his wish to walk into the building started DEWSC is to double enrollment and graduates. He 40 years ago. The charitable foundation of Del E. also noted his desire to clone the industry support Webb donated millions to make the building a reality, the Construction school enjoys. No other industry most recently pushing the project forward with a $2M supports their respective program with the enthusiasm contribution. of Construction. This was emphasized by the amount of Agreement Will Limit Apartments near Santan Village Mall Ray Road By Parker Leavitt Even as work nears completion ence center. That complex is pro- for the Arizona on a large cluster of three-story jected at 382 units on a 19-acre site Republic apartment buildings across the and is expected to open in March. street from the mall, the property A special “planned-area develop- owners are preparing to roll out a ment” zone around SanTan Village new proposal for apartments on 17 mall, called Crossroads, allows for acres south of Ray Road and west of up to 20 percent of the area to Santan Village Parkway, according to develop as multifamily housing, as a town staff report. The council took long as the developer is awarded action to limit residential develop- the necessary permits. ment in the area. The agreement, approved Thursday The entire area around the mall is with a 7-0 vote, limits multifamily zoned for “regional commercial” development to 17 acres at Ray and development, which can include Coronado roads and a combined 25 large-scale shopping centers, hotels, acres on two large parcels directly entertainment complexes and car north and west of the mall. dealerships. The agreement is void, however, if Despite the commercial zoning, the town does not approve the land- multifamily housing is allowed with owners’ request for a use permit to the Planning Commission’s approval build the initial 17-acre complex, of a use permit and as part of an “in- planners said. LeSueur Investments tegrated mixed-use plan,” according is listed as the principal landowner to the land development code. for the parcels affected by the Del Mar, Calif.-based LWI Advi- agreement. Santan Village Parkway sory Group in 2011 received such a Read more at AZCentral. Note: permit for the Redstone at San Tan AZCentral is now premium content. Village apartment complex, which is Readers are permitted 20 free article under construction at Santan Village views per month. Parkway and Coronado Road, next to the DoubleTree hotel and confer- New N. Phoenix QT Facility to Have More-Spacious Look

By Brittany Smith QuikTrip plans to open a location in north Phoenix that will be larger than traditional 5K SF QTs. will look and feel a little different to people familiar with for the Arizona QT has 100 stores in Arizona. Ten of those stores, the convenience store, a company spokesman said. Republic including six in the Phoenix area, follow the same service model as the new north Phoenix location . The company Officials with QuikTrip Corp. say the store at 2840 W. does not have an expected opening date yet. Cactus Rd. will be in the same shopping center where workers are demolishing a Food City. Read more at AZCentral. Note: AZCentral is now premium content. Readers are permitted 20 free article views per The new QT will have a more spread-out layout, both month. inside the store and by the pumps. The 5.7K SF store also

Click here to return to Table of Contents

6 Volume 3, Issue 97 Line Drawn Between North and South – Uses at ASU’s Downtown Student Center at the Post Office

“I’d like to buy a packet of first class stamps and pick up but this time, it’s the far demarcation of ASU’s downtown By Eric Jay Toll for this package from my P.O. box. Oh, can I have an applica- campus. Arizona Builder’s tion to renew my passport, an hour of billiards and some Exchange help with this essay, please?” A Line On The Floor

It’s a little sampling of what goes on both sides of the “There were significant design challenges,” explains Mi- yellow wall at the historic main Phoenix post office, span- chael Jacobs. “We wanted to retain the functionality and ning West Fillmore Street on the block between North historic design of the post office—especially fronting the Central Avenue and First Avenue. The 96K SF tri-level street.” How to turn three-quarters of the building into building is now retaining its role as a downtown post the multi-use facility that ASU desired and keep the post office and taking on responsibility as the ASU Downtown office the neighborhood wanted was the head-scratcher. campus’ student center. “A student union without the food,” says Holly Street Studio principal Michael Jacobs. “This is one of our most-collaborative efforts. We worked with faculty, administration, students, the city, post office History, Functionality, Usability and postal patrons,” he says.

The Student Center at the Post Office is a triumph of his- Backing up to a park and “Patience,” the City’s public tory, design, creative construction and function. Wrestled art net sculpture, Holly Street Studio was faced with a from its under-utilization as the Phoenix-owned old building serving two masters—ASU students to the south federal office building, Holly Street Studio and Caliente needed a gathering place, and the neighborhood of post Constructionconverted it to retain history with moder- office users on the north who liked the building just as it nity of mixed uses. was. Limiting front and side exterior changes to cosmet- ics, the Jacobs’ team turned the rear loading docks into There’s a bit of irony in the post office’s conversion to patios and drew a line to divide and connect the build- ASU Downtown student center, says Architect Diane ing’s dual use. Jacobs, “When the original building was proposed in the late 1920s, its location was moved from a preferred Running through the center of the old building, a mean- downtown site to the extreme north side of Phoenix.” dering ASU-gold wall of mostly opaque glass panels sepa- rates the post office from the student center. Students It would be similar to putting downtown icon Chase Field are drawn to the center under the jelly fish sculpture, on Carefree Highway. In the 1930’s, the Fillmore Street lo- through the park and onto the expansive loading dock’s cation was far from the bustle of central Phoenix. Today, patio. The first level includes collaborative meeting rooms the Student Center is the extreme northern edge again, interconnected to the Tempe campus and the world via

AZBEX Note: Major subcontractors to GC Caliente Construction include: Jones Concrete, Allred Steel, RML Electric, Ever-Ready Glass, IMCOR, Commercial Wallboard, ICON, Apex National, and Wholesale Floors.

Major Design Consultants to Holly Street Studio include: Rudow + Berry, ICDS, Woodward Engineering, Roger Smith Lighting Design, Brevoort Preservation Strategies, The Design Element, RLGA Technical Services, Rider Levett Bucknall, Special Systems Engineering Inc., and Lerch Bates.

Photo Credit: Holly Street Studio Click here to return to Table of Contents 7 Friday, February 1, 2013

Line Drawn Between North and South (Cont’d)

large-screen telecommunications panels, a lounge area, walkway across a portion linking rest rooms—which also and conference rooms. On the other side of the gold have skylights—to the student center lounge. A snack line, the historic post office and its boxes just as it looked bar is nestled into one corner near where the elevator when new in 1936. will ultimately be installed.

Harvesting Sunlight on Upper and Lower Levels “We kept the original floors in most places,” Diane points out, “leveling them for safety, but depicting the differ- “The best feature in the building is the central skylight,” ent uses and flow from the original building.” Floors are he continues. “We decided to cut through the floor to tile in places, concrete in others and occasional carpet bring sunlight into the entire building.” as needed for the supported uses. The ancient tiles and layout add artistic merit to the building’s new and old “Harvesting sunlight was a really important design con- character. sideration,” adds Diane. “With the building designed like a grotto—including lower level light wells, we snatched Lessons Learned natural light wherever we could.” The classrooms, writ- ing center and offices on the perimeter of the lower level “Always test preconceived notions,” said Michael, “that’s all have large windows facing into the grotto the sur- the big lesson we learned. Another lesson was to look rounds the building. closely at what is there to see how it can be adapted.” If others were charged with adapting a building to multiple Caliente Construction faced daunting obstacles to open uses as Holly Street Studio and Caliente faced, the Jacobs the building. The concrete floor required cutting and would tell them, “Listen carefully to your stakeholders structural features to open the massive skylight to the and always find the creative ways to stay in budget. Get performance and gathering space three stories below the contractor on board early.” it. The completed project includes a wooden balcony-

Photo Credit: Holy Street Studio

Click here to return to Table of Contents 8 Volume 3, Issue 97 New Yavapai Jail Plan Grows Far Past $12M Estimate

By Scott Orr for When the Yavapai County Board of Supervisor Tom Thurman said that “So (we) regrouped, and we deter- the Daily Courier Supervisors gave the green light in the board needs to have an architect mined what we needed and what we May 2012 to preliminary planning design the building so it could get an wanted to do,” Mascher said, noting for a new county jail to be located accurate estimate of the cost to build that he had requested a 240- to 300- in Prescott, then-Supervisor Carol a jail. bed jail. Springer said she felt that the facility But, Sheriff Scott Mascher said He said the Juvenile Justice Center, could be built for about $12M, a Wednesday at the board’s retreat which was built for roughly the $12M number that the board accepted as that the project has grown as more figure Springer quoted, was started realistic. and more features were added to when the economy was worse, when what was supposed to be a basic jail. contractors needed to keep their The price tag has grown as well, to people working and would take on the point that the supervisors con- projects for less money. templated the need for an additional “Things are getting better (now), and sales tax to finance the project. I don’t see how we’re going to get Capital Improvements Coordinator contractors to be doing these things Jim Holst said the project as it stands for cost only (anymore),” Thurman could cost “in the neighborhood of said. “I would estimate it’s now in $20M.” the $15M to $18M range, and I’m going to tell you right now, we don’t “The process was hijacked,” Chair- have it.” man Chip Davis said, by the “courts systems, the probation system, the Read more at Daily Courier Sheriff Scott Mascher makes his case to the Board of juvenile court system - it just got out Supervisors at Wednesday’s retreat. of hand. Now we’re basically starting Photo Credit: Scott Orr/The Daily Courier over.”

• 3d modeling in Revit, CAD, Civil 3d, SketchUp, etc. • Scan for existing as-built conditions • 2d and 3d deliverables available • Laser scanning to BIM

Visit www.precision3dscanning.com to learn more or request a free demonstration by calling (480) 510-1049 or email [email protected].

Click here to return to Table of Contents 9 Friday, February 1, 2013

Plan Inches Ahead for Rio Salado Trolley Linking Tempe with Mesa

By Gary Nelson Representatives of Tempe, Mesa, early financial analysis of linking the The Rio Salado route covers 3.9 for The Arizona and Valley Tempe streetcar project into Mesa, miles from Mill Avenue to Dobson Metro, the regional transportation according to minutes of a meeting Road. From the heart of downtown Republic agency, have agreed to conduct an held January 7th. Tempe and Tempe Town Lake, it would pass Sun Devil Stadium, The parties are looking into whether and the Chicago a public-private partnership would Cubs complex before arriving at work, as opposed to funding the line Mesa Riverview shopping center. entirely with tax dollars. That could bring the project to fruition far more ASU will conduct a “value for quickly than if it had to stand in line money” analysis as to whether for scarce public money. the project would pencil out and a design charrette, visualizing Tempe and Valley Metro already are potential development along the Rio in the thick of planning a streetcar Salado corridor. line from Southern Avenue to Rio Salado Parkway on Mill Avenue. At Transit officials nationwide have Rio Salado, it would jut west to Ash gravitated toward fixed-track Avenue, south to University Drive, systems in recent years because they then east back to Mill. spur more economic development than bus lines, which can be moved That total route would be 2.6 miles around at will. for an estimated cost of $129 million, of which $73 million already Officials say, however, that whereas is available. It is part of a regional redevelopment along light-rail lines transportation plan approved by typically occurs near the stations, Maricopa County voters through streetcar tracks tend to spawn new Proposition 400 in 2004, but it also projects along their entire length. depends on federal grants. Read more at AZCentral. Note: Rio Salado Trolley Separate from AZCentral is now premium content. Mill Avenue Trolley The Rio Salado line would be a separate project from a link between Tempe and Mesa.

Click map to Enlarge. Map Credit: Valley Metro Chino Valley to Study Industrial Park at Old Home Manor

By Matt Santos for After many months of discussion, town administration with the town we’ve had two or three different plans. the Daily Courier has officially been given the green light to move forward We’ve spent money, then put them on the shelf. So now with developing an industrial park at Old Home Manor, we have another idea, and I would like to see an execu- some 200 acres located off of Perkinsville Rd. east of tive summary of what you see happening in the next one Highway 89. year, two years, five years.” Town Manager Robert Smith presented the request, The Council also authorized staff to proceed with the which was for initiating a survey of the land. development of seven acres on the northeast corner of the Community Center Park, located near Perkinsville “We’re not going to entertain any costs until we have Rd. and Road 1 East. The project will include a dog park an estimate for the survey work, and we’ll bring that to with donated materials, and a walking path lined with council for their approval under a separate action item,” trees. The money for the expansion will come from town said Smith. “The research for the zoning work has been Parks Impact Fees that, according to Town Engineer Ron done and is sitting in the file.” Grittman. Vice Mayor Carl Tenney stated his concern about moving Read more at Daily Courier forward on a project, “In the years I’ve been involved

Click here to return to Table of Contents 10 Volume 3, Issue 97 Construction Defects Plague Gilbert Sports Complex

By Srianthi Perera An engineering study of the Big Mortenson Responds to City Report Report finds 39 Trouble Spots for The Arizona League Dreams sports complex Republic in Gilbert has indicated several Chris Norcross, vice president and The purpose of the recent evaluation construction flaws and areas that general manager of Mortenson’s was to determine whether the don’t meet the town’s building Phoenix office, declined an interview building’s walking surfaces conform standards. for this story but released the to the building code adopted by following statement: Gilbert at the time of construction The report, by Exponent Failure and to identify any potential hazards. Analysis Associates, was ordered “Mortenson has been actively following several pedestrian falls at working with the town of Gilbert The 68-page evaluation pinpoints the sports complex. Gilbert entered to help identify and resolve those 39 trouble spots, supported by into a design-build contract in 2005 issues that require remedial action. photographs. with Minneapolis-headquartered As the design builder, we stand M.A. Mortenson. behind our work along with the work They include cracks in the concrete of our subcontractors and we are and asphalt with noticeable offsets, committed to the town’s satisfaction. crumbling concrete, uneven steps It is important to everyone involved with varying tread depths and riser that the teams, fans and community heights, lack of handrails in places continue to enjoy the activities that where they should have been the sports park provides.” installed and excessive ramp slopes.

Read more at AZCentral. Note: AZCentral is now premium content. Readers are permitted 20 free article Crumbled concrete at views per month. Big League Dreams

presents: Arizona Conference on Where: The Phoenix Convention Center When: March 16th-30th 2013 Roads & Streets Join Us! What: American Council of Engineering Companies presents the 62nd Arizona Roads & Streets Conference

When: March 27-29th, 2013 Where: JW Marriott Starr Pass Resort & Spa 3800 West Starr Pass Boulevard, Tucson, AZ

Cost: Individual - $250 Sponsor - $2,500 Teams are able to register through Jan 31st. Exhibitors/Booths - $1,600 AZBEX is a proud sponsor and participant of Canstruction The Arizona Conference on Roads and Streets is Canstruction® combines the competitive spirit of a design/ the largest annual event for Arizona engineers and build competition with a unique way to help feed the hungry. Competing teams, led by architects, engineers and contractors from the public and private sectors. contractors, showcase their talents by designing and building Approximately 1,400 attendees and 100 exhibitors giant structures made entirely out of canned foods. are expected to participate in the conference. Click here to return to Table of Contents 11 Friday, February 1, 2013 Applewood Pet Resort’s Plan to Expand Moves Step Closer

By Philip The Applewood Pet Resort in Paradise Valley is working The resort offers a number of amenities for dogs, cats, Haldiman for the with the town for a new building that will expand its and small animals, including boarding, day care and Arizona Republic current capabilities. grooming. Züger said the expansion will bring more of a one-stop shopping amenity to the resort, especially with Manager Marcia Züger said improvements include adding the creation of a veterinary facility. veterinary facilities and expanding the resort’s boarding and daycare services. Thursday night, the Town Council approved the hotel’s statement of direction, intended to guide the review by the Planning Commission. The body will review it in a work session, Feb.5, and a public hearing is scheduled for Feb.28.

The Applewood Pet Resort, 6909 E. Lincoln Dr., is part of the East Lincoln Drive South Growth Area, one of three areas in Paradise Valley designated by the General Plan for growth and development.

Read more at AZCentral. Note: AZCentral is now premium content. Readers are permitted 20 free article views per month. Johan Garcia grooms a Bichon Frise at the Applewood Pet Resort in Paradise Valley. Photo Credit: Emmanuel Lozano/The Republic

Regus Opens Scottsdale Flexible Working Space

Luxembourg-based Regus January Greg Waddington, area director for Regus offers space at its centers for a By Tim Gallen for 28th opened its 15th full-service busi- Regus in Phoenix, said an additional few hours at a time to professionals Phoenix Business ness center in the Phoenix market at three to four centers are planned for who need a place to get some work Journal 16427 N. Scottsdale Road. later this year. Regus is eying spots in done. In addition, the company leases the West Valley and additional spots out space to companies for terms as Regus provides flexible office space in the East Valley and Phoenix. short as three months at a time. for professionals and companies who do not want to become tied down Traditionally, a company must shop Regus officials say the model lowers with long-term lease arrangements around for a commercial space, nego- companies’ costs and risks in terms of for office space. tiate a lease in the range of three to leasing real estate. seven years, hire an architect and a Regus has 15 locations in the Phoenix Read more at contractor, install IT and phone lines, market in Scottsdale, Tempe, Gilbert, Phoenix Business Journal and hire staff, said. Mesa and Phoenix. Peoria Council Approves Plan for RV Park, Hotel Near Lake Pleasant

By Allie Seligman A 187-acre RV resort southwest of Lake Pleasant, the lat- The RV resort, Cholla Hills, allows for three RVs per acre, for The Arizona est major development near the lake, is one step closer to much lower density than traditional RV parks, and a six Republic construction. month maximum stay. The resort will have a clubhouse, pool, fitness center, tennis court and lawn bowling, and The Peoria City Council January 21st approved a plan to pickle ball areas. rezone 454 acres, split into two parcels. Roughly half the land will be used for the RV resort and the other half will The projects, surrounded by state land but in Peoria’s include a two-story hotel. planning area, are expected to bring in about $6.23M in direct sales, use, lease, bed and property taxes over 12 The RV resort will sit just north of Arizona 74, west of Old years. Lake Pleasant Road. The hotel and some homes will be just northwest. The hotel will have 240 rooms and, at most, 144 1-acre resort residential properties. The property is accessible by The project, headed by Phoenix-based developers DLGCII Old Lake Pleasant Road. LLC, and Lake Pleasant Group LLP, changes the plan the city approved in the late 1990s. Read more at AZCentral. Note: AZCentral is now premium content. Click here to return to Table of Contents 12 Volume 3, Issue 97 Zoning Panel Advances Queen Creek Movie Theater

By Kathleen The Queen Creek Planning and Zoning Commission has The town has not developed a concept plan because it Stinson for the recommended council approval of a town request to hopes to leave that to a future buyer, town officials aid. Arizona Republic rezone a 20-acre parcel of town-owned land from gen- eral commercial to “town-center zoning” to attract an Phoenix Commercial Advisors is marketing the property entertainment venue, such as a movie theater. to potential businesses and developers. “We definitely have seen some interest in the property but like any Town-center zoning “provides concentrated downtown good plan, things like this take time,” Cott said. retail, service, office and mixed uses,” according to the zoning ordinance, and these types of businesses typically Read more at AZCentral. Note: AZCentral is now premi- attract higher numbers of people into the area than uses um content. Readers are permitted 20 free article views allowed under the current commercial-use zoning. per month.

The rezoning also would permit buildings with a height up to 49 feet to accommodate some uses the town envi- sions on the property, such as a bowling alley or a movie theater, said Wayne Balmer, town planning administra- tor. Classifieds

The rezoning case is scheduled to be voted on by the council on February 6th. If you would like to submit an ad to our classified section please email [email protected]. The Cost is The 20 acres is bordered by Maya Boulevard, Ritten- $25 for 40 words at four weeks in the house Road, Ellsworth Loop Road and Ellsworth Road. publication. It is situated at the northern edge of Old Town Queen Creek. Employment Opps

6th Annual AWIC - Advancing Women in Construction Mentorship and Scholarship Program Fund Raising Event

$50

PHX Architecture seeks Architect/AIT If you have an under graduate or graduate degree in Architecture, When: Wednesday, February 27th 2013, 8am-1pm and 3-6 years of experience working in a firm, please send your resume to [email protected]. Where: Arizona Historical Society We are looking for talented, self- 1300 North College Avenue starters who are interested in career Tempe, AZ advancement to assist our team of architects designing a variety of Contact: Leslie Moat with interesting projects. Learn more about us at phxarch.com. Hensel Phelps Construction

Click here for more information A Click here to return to Table of Contents 13 Friday, February 1, 2013 Local Industry Professionals Making News

Awards, Accolades, Appointments 1 2 1. GPEC’s executive vice president,Chris the economic and quality of life benefits Camacho, is a “rising star” according to that Sky Harbor brings to the people of Development Counsellors International. Arizona, and to support the airport’s ongo- Camacho has been inducted onto DCI’s ing development and enhancement. More “40 Under 40” panel as a young leader in than 50 companies and organizations fund economic development marketing. He is the coalition, which was founded in 2003. Chris Camacho Scott Ellison responsible for GPEC’s business develop- 3. Arizona Commercial Real Estate Magazine ment efforts. Camacho was chosen from a has announced its “40 CRE Companies list of 150 national nominees. 4 4 to Watch in 2013” list. AZRE compiled its 2. Scott Ellison, Manager of Southwest list from the activity in 2012 and forward- Construction Services,Turner Construc- looking projections for the coming year. tion, was appointed to serve as Treasurer Developers, CRE brokers, GC’s and Archi- on the Executive Committee of the Board tects such as Douglas Allred Company, of Directors for the Support Sky Harbor Cassidy Turley, hardison/downey, Sundt Coalition. The coalition carries out a Construction and SmithGroupJJR are Bo Mills Mark Detmer mission to educate the community about among those making the list.

Transitions 5 6 4. Jones Lang LaSalle added investment tects to join the PHX Architecture team. sales expert Bo Mills and Mark Detmer Campbell joins the firm from Leo A. Daly to their team. The two are stepping into and BBG-BBGM. Traynor comes to the the industrial sales team in response to firm from New York where he worked on increased activity in the sector. Pat Harlan the National September 11 Memorial and and Steve Sayre are joining the firm in the Museum at the World Trade Center. Dave Ullrich Anthony Jeffers CRE leasing line. 9. Shane Malkowski, P.E., is Sundt Construc- 5. Dave Ullrich is the new planning director tion’s new project manager for heavy civil 7 8 for O’Neill Engineering, LLC, Phoenix. Dave projects. Malkowski is responsible for sup- joins the firm following 12 years with the porting project and business development city of Phoenix, including a posting as the efforts related to highways and transporta- Hillside Development Administrator. He tion construction projects. He brings 13 was instrumental in implementation of the years of experience in Arizona, Texas and city’s design review standards. Dave will Utah to his new role. assume new duties for entitlements and 10. Castle Rock, Colo., finance director Charles Emy Burbank John Campbell project management. A. Montoya is the new city manager of 6. Anthony Jeffers was promoted to the role Florence. The 43-year old was with Castle of vice president of project development Rock for 4-1/2 years and prior to that had 8 9 for Johnson Carlier. He was formerly the the same role with Centennial, Colo. His senior project manager. Jeffers has been in track record in Colorado includes a CFO the industry for 23 years and had oversight position for a county. Montoya intends to on projects in both the Phoenix and Las challenge staff to succeed as a city and as Vegas markets. individuals.

7. Emy Burbank joins Dibble Engineering as 11. Tempe city manager Charlie Meyer’s Stuart Traynor Shane Malkowski its marketing manager. She brings more termination January 28th came too late to than decade of experience to the role. get his hat in the ring for Florence. The Burbank will be responsible for branding, five year veteran of the role was booted 10 11 marketing and communications for the on a 5-to-2 vote. Meyer did not attend Phoenix office of the firm. the meeting, and had fired off a memo to all city employees last week saying he 8. Stuart Traynor is a London-born chartered expected to be fired in the near future. architect in Britain, and a member of the Meyer was appointed by the council in Royal Institute of British Architects. He and 2007. His contract was narrowly extended John Campbell are the newest archi- in 2009 by a 4-3 vote. Charles Montoya Charlie Meyer Click here to return to Table of Contents 14 Volume 3, Issue 97 Final project awards are delineated with a dark, double border. The Bid Results and Project Awards single border notes “As-Read” Bid Results, subject to final contract negotiation and approval by the authority having jurisdiction.

City of Avondale - Professional Engineering services for Wellhead City of Chandler - Right of Way Repairs - MUD Treatment Facility Study Due Date: 10/30/12 Due Date: Awarded on 1/7/13 Reference # WD3-745-3178 The contract was awarded to NCS Engineers in the amount of Click here for the previously published bid tabulation $130,832.00 The contract was awarded to CPC Construction

ADOT - Upgrade Pavement Markings - Town of Colorado City ADOT - Upgrade Pavement Markings - Town of Parker Due Date: 1/17/13 Due Date: 12/27/12 Reference # ADOT13-00002490 Reference # ADOT13-00002456 The contract was awarded to RoadSafe Traffic Systems The contract was awarded to RoadSafe Traffic Systems

Town of Gilbert - Madera Park FY13 Improvements City of Mesa - Traffic Signal Head Replacement Services Due Date: 1/14/13 Due Date: 12/18/13 Reference # 2013-8003-0009 Reference # 2012247 1. R. D. Sanders Contracting Co. LLC $49,850.00 The contract was awarded to Brooks Bros Utility Contractors, LLC 2. TSG Constructors, LLC $69,700.00 at $66,825.00

City of Chandler - Above Ground Fuel System City of Prescott - Zone 12 Reservoir Project Due Date: 1/24/13 Awarded on 12/18/13 Reference # 3-629; FD3-830-3202 Reference # 13PWD0062 1. Legal Contracting $64,392.19 Click here for the previously published bid tabulation 2. Cochise Contractors $71,043.84 The contract was awarded to Fann Contracting, Inc.in the amount of $3,156,755.00 3. R and H Contractors $73,123.39 4. Eaton Sales and Service $76,899.84 5. HDP of Arizona $88,162.47 City of Chandler - Emergency Water Main (Line Stop Parts & 6. Frye Construction $88,249.77 Service) Due Date: 11/9/13 Reference # WD3-910-3144 City of Bisbee - Hauling Of Biosolids From San Jose WWTP For The Bisbee Wastewater Department The contract was awarded to Pipeline Services Due Date: 12/20/12 The following firms submitted bids: ASU - ERC First Floor QESST/Bertoni Renovation 1. EADS Construction Redi Mix Inc. Due Date: 11/27/12 2. KE&G Construction Reference # CMAR 2012-50293 3. Maddux & Sons Inc. The contract was awarded to Haydon Building Corp Click here for breakdown of bid tabulation

Arizona Department of Emergency and Military Affairs - Modular ASU - CMAR for Polytechnic Preparatory Academy Building Assembly Due Date: 5/3/12 Due Date: 12/28/13 Reference # CMAR 2012-50172 Reference # DEMA13-00002371 Click here for the previously published submittal list The contract was awarded to Ameri-Fab, LLC The contract was awarded to Core Construction Inc.

Click here to return to Table of Contents 15 Friday, February 1, 2013 Final project awards are delineated with a dark, double border. The Bid Results and Project Awards single border notes “As-Read” Bid Results, subject to final contract negotiation and approval by the authority having jurisdiction.

City of Mesa - Bus Shelter Maintenance and Repair Services Yuma Educational Materials Management Consortium - Irrigation Due Date: 12/10/12 Pump Repairs And Maintenance Reference # 2012246 Due Date: 12/10/12 The contract was awarded to A Mind for Detail in the amount of Reference # RFP 1-12-12-5 $264,285.00 annually. The following firms were awarded contracts: 1. Advanced Pump & Control Systems LLC City of Chandler - Roof Replacement - Fire Training Facility 2. RHD Equipment, Inc. Due Date: 12/21/12 Reference # BF3-946-3200 Lake Havasu City - Aquatic Center Gym Floor Replacement Click here for the previously published bid tabulation Due Date: 1/24/13 The contract was awarded to Jim Brown & Sons Roofing in the Reference # ITB-B13-003-0-2013/KP amount of $76,500.05 1. Stan Woods $68,194.53 2. Dynamic Sports Const. Inc. $77,908.00 City of Bisbee - Copper Mine’s Monument Restoration for the City of Bisbee Due Date: 11/28/13 Maricopa Community Colleges - Running Track Resurfacing at SCC The following firms submitted bids: Awarded on 12/11/12 1. Architectural Preservations Services, LLC The contract was awarded to Sunland Asphalt in the amount of 2. Conservation Solutions, Inc. $275,339.19 3. Desert Copper 4. Materials Conservation Collaborative, LLC City of Prescott - Supply and/or Delivery of Aggregate Materials 5. Rosa Lowinger & Associates Due Date: 11/8/12 6. Smith Art Conservation Reference # 13PWD0061 The following firms were awarded contracts: ADOT - Irrigation Systems, supplies and parts 1. Asphalt Paving & Supply Due Date: 11/27/12 2. Cemex Reference # ADOT13-00002172 The contracts were awarded to: State Procurement Office Commercial- Flooring Products and Services 1. Horizon Due Date: 12/11/12 2. Sprinkler World of AZ Inc. Reference # ADSPO13-00002054 Mohave County - Aggregate cover materials The following companies were awarded contracts: Due Date: 1/15/13 1. Continental Flooring Company Reference # 12-B-15 2. Diversified Flooring Services Phoenix LLC The following firms submitted bids: 3. Norcon Industries Inc. Campbell Redi Mix 4. Wholesale Floors LLC Cemex Construction Materials South, LLC Arizona Department of Corrections - Roofing Material Supplies City of Phoenix - Ready Mix Concrete for Facilities and Engineering Bureau Posted on 1/23/13 Due Date: 12/20/12 Reference # IFB 13-097 Reference # ADOC13-00002332 ALL BIDS REJECTED The contract was awarded to Border Construction Specialties LLC

Click here to return to Table of Contents 16 Volume 3, Issue 97 Local Projects Making News

2 Accolades

1. The town of Marana and Arizona Traffic interchange. The grand award Department of Transportation are comes from the American Council of proud winners of the Engineering Engineering Companies Arizona chapter Excellence Judge’s Choice Award for the for 2012. newly completed I-10/Twin Peaks Road

Photo Credit: Phoenix Business Journal Groundbreaking

2. Dignity Healthcare has broken ground services. Groundbreaking for a $100M, 3 on its new $44M Glendale hospital, 230K SF outpatient cancer clinic in Glendale Rd. at Loop 101. With a 2014 partnership with the University of opening, the facility will open on a Arizona on the Phoenix Biomedical 35 acre campus with a small number Campus is scheduled in February for a of beds and emphasis on out-patient 2015 opening.

Progress Reports Photo Credit: AZRE 3. Plaza Companies is ramping up activity the formerly private west extension of at Plaza Del Rio, Thunderbird Rd. at 94th Northsight and creating a roundabout 4 Ave., Glendale. The kicker is Maracay where it hits Hayden is under Homes’ plan to build 185 homes in The construction. Many local businesses are Preserve at Plaza Del Rio. The three- critical of the traffic-calming solution. phase development proposes homes of City officials say that it’ll move traffic 1,500 SF to 2,500 SF. Silverado Senior more smoothly and provide alternate Living (AZBEX, January 25th) is sticks up access into the area (AZCentral in the heart of the campus. A number premium content). of other projects are planned or under th Photo Credit: Patrick Breen/The Republic construction in the area. 5. Las Abuelitas Family Housing, E. 26 St. near S. 4th Ave., Tucson, is bringing 4. Common across the Northeast U.S., 12 grand-family residential units to 5 roundabouts are not finding fans market for low-income senior citizens in Arizona. The latest is on heavily- charged with raising grandchildren. The traveled and clogged Hayden Road at number of families where grandparents Northsight Boulevard, Scottsdale. The are responsible for grandchildren has gridlocked access to Frank Lloyd Wright skyrocketed in Tucson. Primavera is hemmed by fast food, strip malls, Foundation is developing the project, vehicle dealers and offices. Traffic back- its second in Arizona, one of only seven ups from the FLW-Hayden intersection in the U.S. The project has as $3.6M Photo Credit: Mike Christy / Arizona Daily Star flood the lanes for more than a quarter price tag on the Pima County-donated mile. Scottsdale’s solution—acquiring acre. 6 Openings 6. The International Auto Museum is bringing its quarterly classic car expos moving indoors at Metrocenter. As part to the massive Metrocenter parking lot. of the giant mall’s efforts to incorporate The Scottsdale shows drew upwards of local businesses in its renaissance, the 10K people to the former location in museum and its vintage collection of the Pavilions at Talking Stick shopping classic cars is in a 7K SF space at the center. Photo Credit: Metrocenter shopping center. The facility is also Click here to return to Table of Contents 17 Friday, February 1, 2013 Local Projects Making News

7 Openings (Cont’d) 7. River Center Plaza, N. Craycroft Rd. 9. The town of Maricopa is busy running and River Rd., Tucson, celebrated the from groundbreaking to opening of end of construction January 26th for the new city facilities. Fire Station 572, new Whole Foods and rebuilt parking Hartman and Bowlin roads, in the lot. The healthy foods grocery chain Tortosa subdivision, is a 6K SF addition will anchor the complex along with to the city’s infrastructure. The station Dry Creek Outfitters, The West and will house a fire truck and, when an Photo Credit: Arizona Daily Star Southern Arizona Watercolor Guild agreement with Southwest Ambulance Gallery. is concluded, an ambulance. A fifth fire 9 station is slated for a fall opening. The 8. Southeast Tucson is the home of the station is part of a strategy to reduce newest McDonald’s restaurant, 7090 response times everywhere in the city nd E. 22 St at Kolb Rd. The restaurant is to four minutes or less. highlighted by the newest technology kitchen, digital menus and a PlayPlace. This is franchisee Dias Management Inc.’s 13th McDonald’s in the Tucson metro. Photo Credit: Howard Waggner/Maricopa Monitor Bond-Debt Maneuver May Save Mesa a Bundle

By Gary Nelson Mesa is looking to save millions Last year’s savings also allowed considerable uncertainty over the for the Arizona of dollars by refinancing existing Mesa to forgo utility-rate hikes that future and cost of municipal bonds. bond debt at a lower interest rate had been anticipated, City Manager Republic Councilman Dennis Kavanaugh said and could save Mesa taxpayers and Chris Brady said. he had just come back from national utility customers nearly $7M. Most of the savings, nearly $4.6 M, meetings with other city officials would come from reselling utility who are worried that Congress Last year’s bond refinancing saved bonds. The next-biggest chunk, might revoke the tax-exempt status about $72M over about five years. $1.6 M, is from street and highway of municipal bonds. “It was a case of Mesa used some of it to build bonds. General-obligation bonds mild hysteria,” Kavanaugh said. an economic-development fund account for the rest. through which it is paying, among Read more at AZCentral. Note: other things, for renovations to Despite the good-news nature AZCentral is now premium content. accommodate college campuses in of Odom’s presentation, council Readers are permitted 20 free article downtown city buildings. members and Given said there is views per month.

Cigna Medical Group Pumping $20M into Phoenix-Area Clinics

By Angela Cigna Medical Group (CMG) is investing about In addition, the group is in the early stages of creating Gonzales for $20M this year in construction projects at its clinics a new health center. Executives plan to conduct focus Phoenix Business throughout the Valley. groups with Medicare patients to see what services would be important to them in a health center. Journal CMG’s largest investment to date is moving its downtown Phoenix urgent care center to 3003 N. In previous years, CMG’s parent, Bloomfield, Conn.- Third St., from its former facility at Seventh Street and based Cigna Corp., had looked at duplicating the CMG McDowell Road. CMG invested $15M in the 95K SF medical group model in other markets, but those clinic and urgent care center. attempts were unsuccessful. The multi-specialty group practice also is pumping Read more at Phoenix Business Journal an additional $3.6M to upgrade five of its existing multispecialty centers throughout the Valley.

Click here to return to Table of Contents 18 Tuesday, January 29, 2013 Some links work best in Internet Explorer. Industry Events REV: Revised notes will be italicized

Marketing / BD / Economic Development Professional Development Scaffolding Training - ACT (Tucson); 3:30pm- Feb 5 Phoenix Membership Lunch - AAED (Phoenix); Feb 5 11:30am 7:30pm, $50/%75 First Aid/CPR Class - ABA (Tucson); 9:00am- Winning Work Lecture Series: Negotiation Skills Feb 7 Feb 6 that Deliver Work - ACE (Phoenix); 8:00am- NEW 2:00pm, $55/$70 11:30am, $220/$245 Best Value Procurement - CMAA (Phoenix); Project Delivery Methods Task Force Meeting - Feb 15 7:30am, $20/$25 Feb 7 “New Normals in Project Development” - ACE NEW SRP Residential Solar Basics Workshop - AGC (Phoenix); 7:30am-9:00am, $0/$40 Feb 27 (Phoenix), 4:00pm-6:00pm The Sun Corridor Casa Grande MPO - ASHE

NEW Feb 12 (Phoenix); 7:30am, $20/$25 Achieving Greater Project Success and Profitability Feb 28 through Pre-Construction Planning - SMACNA Arizona Bioindustry New Jobs, Quality Jobs, and (Phoenix); 8:00am-12:00pm, FREE Feb 15 Companies - AZBIO (Phoenix); 7:30am-9:00am, $25/$45

Volunteer Opportunities The Reference Library Feb 2 Block Kids Building Contest - NAWIC (Phoenix); Delta - Technology’s Influence on Water Delivery in 8:30am-12:30pm, FREE Feb 6 the Home - TRL (Phoenix); 11:45am-1:00pm, FREE

High Performance Metal Roofing - TRL (Tempe); Feb 7 7:30am-8:30am, FREE Conferences

ULI Arizona’s 2013 Real Estate Trends Day - ULI AZ Feb 12 (Phoenix); 7:15am - 5:00pm, $ Varies Mixer / Social 6th Annual Women in Construction Industry 2013 Book of Lists Party - Phoenix Business Journal Feb 27 Networking Event - AWIC (Tempe); 8:30am- Feb 5 (Scottsdale); 5:30am-8:30am, $79 12:00pm, $50 AAED Social Media Mixer - AAED (Gilbert); 4:30pm- Feb 5 6:30pm, FREE Minard-Ames Joint Association Mixer- AGC/ASA Green / Energy Feb 20 (Phoenix); 4:00pm-6:00pm Green Cleaning: Overview, Benefits and LEED ASA of Arizona Networking Social - Details coming Feb 6 Project Contributions - USGBC (Mesa); 11:30am- Feb 21 soon - ASA (Phoenix); 4:00pm-6:00pm, FREE 1:00pm, $20/$25 Feb 14 5th Annual Alternative Energy Update: Above and Below (tentative) - CMAA (Phoenix); Golf Tournaments / Awards 7:30am, $35/$45 26th Annual Valley Partnership Golf Tournament - Feb 28 LEED Green Associate Exam Prep Seminar - Green April 12 Valley Partnership (Phoenix); 7:00am Ideas (TBD); 8:00am - 4:00pm, $345

Click here Is there an event you would like us to promote on our Calendar? for a list of Trade Let us know! E-mail details to [email protected] Association Acronyms

Click here to return to Table of Contents 19 Friday, February 1, 2013 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

How to Read Projects Bidding Projects are Color Coded by Category: Planning/Design/Inspection/Consultant, Development, Horizontal, Utilities, Commercial, Alterations & Maintenance, and Products & Equipment. They are listed by their Due Date and the Darker Shade noted solicitations New or Revised in this Issue.

CMAR - Construction Manager at Risk D-B-B - Design Bid Build IFB - Invitation for Bids RFP - Request for Proposals Consult - Consultant IDIQ - Indefinite Delivery, Indefinite JOC - Job Order Contract RFQ - Request for Qualifications DB - Design Build Quantity Sub Bids - GC requesting sub bids RFQuote - Request for Quotations

Planning/Design/Inspection/Consultant Includes Design, Construction Administration, Inspection, Master Planning, Surveying, and Environmental Analysis Solutions. Also includes Misc. Land and Title solicitations.

Due Date Project Plan- RFP/RFQ / Type Owner - Project Description Pre- Link & Time Volume Holders Project # Proposal 2/1/13 List 6663211093- RFQ City of Phoenix - Aviation Capital Program Management 1/22 Link 12pm 1010 Staff Support Services. Provide professional services 3:30pm required for program management staff support and to provide oversight for the Aviation Department’s Capital Improvement Program. Contact: First published on 1/11

2/1/13 2013-001 RFQ ADOT - Environmental On-Call Administration. Contact: Link 2pm Brenda Tipton, Contract Specialist, at [email protected]. REVISED First published on 12/18 & revised bid date on 2/1

2/1/13 List 12163-ROQ-2013 RFQ Maricopa County Facilities Management - Professional 1/22 Link 3pm Building and Site Assessment Services for Durango 8am REVISED Facilities Assessment (Jails). Contact: Brian Garcia at 602- 506-3246 or [email protected]. First published on 1/8 & revised bid date and pre-submittal date on 1/22

2/1/13 List 12162-ROQ-2013 RFQ Maricopa County Facilities Management - Architectural 1/22 Link 3pm Services for Durango Facilities Assessment (Non-Jails). 9am REVISED The project will include architectural and engineering assessment services of selected buildings and sites on the County’s Durango Campus, approximately 1,415,937 gross square feet of space. Contact: Brian Garcia at 602-506-3246 or [email protected]. First published on 1/8 & revised bid date and pre-submittal date on 1/22

2/4/13 <$75K List RFP City of Phoenix - Professional Services to Conduct Adams 1/22 Link 12pm Street Activation Study. Consultant services to conduct a 10am conceptual master planning study to explore strategies to activate and enhance the pedestrian and economic vitality of Adams Street between Central Avenue and 2nd Street. Contact: Joni Lindsey, Project Management Assistant, at 602-495-0857 or [email protected]. First published on 1/4 & posted addendum with Sign-in sheets on 1/29

Click here to return to the Table of Contents 20 Volume 3, Issue 97 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Planning/Design/Inspection/Consultant

Due Date Project Plan- RFP/RFQ / Type Owner - Project Description Pre- Link & Time Volume Holders Project # Proposal 2/6/13 2013-016 RFQ City of Flagstaff - Brownfield Route 66 Community-wide 1/30 Link 3pm assessment program. Contact: Patrick Brown, Senior 2:30pm Procurement Specialist, at [email protected]. First published on 1/18 2/7/13 $20M CP0206 RFQ City of Mesa - Design Services for Oakland A’s Spring 1/30 Link 4pm Training Facility. Contact: Gordon Haws, P.E., Supervising 9:30am Engineer of the City of Mesa Engineering Department at 480-644-338 or [email protected]. First published on 1/22

2/8/13 List EASARC1315 RFQ City of Phoenix - Architectural On-Call Services for Calendar 1/29 Link 12pm Years 2013-2015. Contact: Mr. Emeka Ekpe at 2pm 602-256-4107. First published on 1/8 2/8/13 List AVNAQC1315 RFQ City of Phoenix - Aviation Department Air Quality none Link 12pm Conformity Analysis On-Call Consulting Services. Contact: Vivian Escobar at 602-683-3865. First published on 1/18

2/11/13 2013-016 RFQ ADOT - Supplemental Services: Roadway Design - Plans Link 2pm Review Engineer. Contact: Carmen Banks, Contract Specialist, at [email protected]. First published on 2/1 2/12/13 RFQ WSD12-003 RFQ City of Phoenix - Wastewater Facilities Coating Consultant. Link 3pm Provide technical assistance in evaluating, updating, and preparing the coatings specifications for CSI Division 9 – Finishes, and any other specification sections related to painting/coating. Contact: Sylvia Arenas at 602-534-7508 or via email at [email protected]. First published on 1/18 2/14/13 RFQ City of Phoenix - Conceptual design Master Plan for Link 4pm Margaret T. Hance Park. Contact: Leslie Lewis, Clerical Supervisor, at 602-261-8605 or [email protected]. First published on 1/4 2/15/13 List EASSBE1315 RFQ City of Phoenix - Small Business Enterprise Architectural 1/29 Link 12pm On-Call Services for Calendar Years 2013-2015. Contact: Mr. 2pm Emeka Ekpe at 602-256-4107. First published on 1/8 2/16/13 IFB The Pascua Yaqui Tribe - CDO/Los Reales Design Services. Link 3pm The project consists of Design and Construction Documents for roadway improvements on the Pascua Yaqui Reservation in Tucson. Contact: Development Services Department at 520-879-6325. First published on 1/18 2/19/13 13SQ009; D0502 RFQ City of Scottsdale - Scottsdale Civic Center Infrastructure Link 10am Assessment. Provide assessment to existing infrastructure and conceptual plans to upgrade and renovate the current Scottsdale Civic Center. Contact: Robin Rodgers at [email protected]. First published on 1/22 Click here to return to the Table of Contents 21 Friday, February 1, 2013 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Planning/Design/Inspection/Consultant

Due Date Project Plan- RFP/RFQ / Type Owner - Project Description Pre- Link & Time Volume Holders Project # Proposal 2/19/13 RFP Maricopa Association of Governments - Develop a Strategic Link 12pm Transportation Safety Plan.DBE goal of 3.54%. Contact: Sarath Joshua at [email protected]. First published on 1/22 2/20/12 $100K- List 2013-001; RFQ Maricopa County - Wintersburg Parkway Feasibility Study: 2/6 Link 10am $400K 2013-002 Salome Highway to Turner Parkway & Southern Parkway 1:30pm Feasibility Study: SR85 to Salome Highway. Contact: Bonnie Williams at [email protected]. First published on 1/25 2/20/13 $750K- RFQ Maricopa County Flood Control - Tempe - Area Drainage 2/6/13 Link 2pm $1M Master Study/Plan. The project will include data collection, 10am development of a comprehensive and detailed urban FLO- 2D / SWMM model for the majority of the City of Tempe, compilation of the data collection results with the 2D model output to identify and quantify significant drainage and flooding issues, conceptual development of mitigation alternatives within a CSFHM context, consideration of LID measures as potential mitigation, public and stakeholder involvement, and preparation of an implementation plan. Pre-Solicitation first published on 12/14 & moved to active opportunity on 1/29 2/21/13 List 13005-ROQ-2013; RFQ Maricopa County - Jail Master Plan Request for Link 9am FM1311215 Qualifications. Contact: Corry Slama at [email protected]. First published on 1/18 & added planholders list on 1/22 2/22/13 $6.2M List AV41000069 FAA RFQ City of Phoenix - Aviation Department, Goodyear Airport Link 12pm & AV41000070 Runway Rehabilitation and Runway Shift Design Services. FAA The runway has approximately 76,667 square yards of asphalt concrete surface that will require 3” asphalt pavement mill and overlay. In addition, 12,778 square yards of asphalt concrete surface of the shoulders will require mill and overlay. Drainage improvements, runway lighting adjustment, pavement striping and layout will be required. Contact: Vivian Escobar at 602-683-865 2/22/13 List 6663211093- RFQ City of Phoenix - Airport Development Program Qualified 1/22/13 Link 12pm 2010 Vendor List. Provide Aviation Capital Program Management 3:30pm Staff Support Services for a variety of civil and building capital improvement projects. Contact: Holly Bosch at 602-256-4108. First published on 2/1

2/25/13 $78M DP(CMAR) 2013- RFQ ASU - for Law and Society (New Law School 2/4/13 Link 10am 70086 Building) in downtown Phoenix. Contact: Pollie Carter, 10am Purchasing Construction Manager, at 480-965-2234 or [email protected]. First published on 1/29

Click here to return to the Table of Contents 22 Volume 3, Issue 97 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Planning/Design/Inspection/Consultant

Due Date Project Plan- RFP/RFQ / Type Owner - Project Description Pre- Link & Time Volume Holders Project # Proposal 2/26/13 $400K RFQ Maricopa Association of Governments - On-call list Link 2pm for Bottleneck Data Collection, Mode Validation, and improvement for 36 months. Contact: Vladimir Livshits, System Analysis Program Manager, at [email protected]. First published on 1/22 3/1/13 2013-PW-12 RFQ City of Cottonwood - On-Call Airport Design Consultant 2/21/13 Link 1pm Services. Contact: Lisa Elliott at [email protected] 10am with a copy to Morgan Scott at [email protected]. First published on 2/1 Open till 11.160.131 RFQ Arizona Board of Regents - 2013 Annual RFQ for Facility- 12/17 Link 12/31/17 Related Professional Services including: Design Professional 11am (DP) Architectural, Pre-Construction, Cost Estimating, Commissioning, Facility Project Programming, and Engineering Services. Contact: Candace Awbrey at 928-523-4227. First published on 12/14/12 Horizontal

Development Opportunities Includes Requests for Development Proposals, Entitlements, and Misc. Real Estate Services.

Due Date Plan- RFP/RFQ Type Owner - Project Description Pre- Link & Time Holders Project # Proposal 2/8/13 List 6663211093-2 RFQ City of Phoenix - Airport Development Program Qualified Vendor 1/22 Link 12pm List. Provide Aviation Capital Program Management Staff Support 3:30pm Services for a variety of civil and building capital improvement projects. Contact: Holly Bosch at 602-256-4108. First published on 1/15 2/28/13 RSOQ RFQ City of Maricopa - Development Partnership for Business Park. The 1/14 Link 2pm 13ED122612 City of Maricopa Economic Development Department desires to 9:30am work cooperatively with an interested qualified development team that has experience designing, entitling, financing, constructing, and managing light industrial/office business parks. Contact: Pattie LaCombe, Purchasing Manager, at 520-316-6846 or [email protected]. First published on 1/4

2/28/13 13-073 RFP City of Tempe - Lease of City-owned Land for Hotel Development at 2/12/13 Link 5pm Rolling Hills Golf Course. Contact: Michael Greene at 9:30am [email protected] or 480-350-8516. First published on 1/29

Click here to return to the Table of Contents 23 Friday, February 1, 2013 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Planning/Design/Inspection/Consultant Development Opportunities

Due Date Plan- RFP/RFQ Type Owner - Project Description Pre- Link & Time Holders Project # Proposal 3/7/13 RFP Pima County Regional Wastewater Reclaimation Department Link 4pm - Biogas Utilization Project. Prepare a proposal for beneficial utilization of the renewable Biogas produced at the County’s Ina Road Wastewater Reclamation Facility. Contact: Jerome Rizzo at [email protected]. First published on 2/1

3/15/13 RFP-CED-2012- RFP City of Phoenix - Develop or Redevelop Urban and/or Mixed-Use Link 12pm UMD01 Development Projects on Property within Downtown Phoenix. REVISED Contact: Community Development Division at 602-262-5040 or [email protected]. First published on 9/14 & revised due date on 12/28

Horizontal Horizontal Includes Earthwork, Roadway Improvements, Paving Maintenance, Transportation, and Single-Trade Solicitations directly related to Horizontal Construction (i.e. Traffic Signal Signalization and Pavement Marking). Development Opportunities Due Date Project Plan- Solicitation/ Type Owner - Description Pre-bid Link & Time Volume Holders Project # 2/5/13 $1M- 12-B-16 IFB Mohave County - Horizon Six - Mockingbird Wash Drainage 1/14 Link 2pm $5M Improvements. Contact: Tara Acton at 928-753-0752 or 10:30am [email protected]. First published on 1/4 2/5/13 List ADOT13- IFB ADOT - Airfield Pavement Surface Treatment for the 1/25 Link 3pm 00002464 Page, Prescott, Seligman, Springerville & Taylor Airport. 9am Contact: Earl Payne, at 602-712-8514 or [email protected]. First published on 1/22 & added planholders list on 1/29. Replaced planholders list with sign-in sheet on 2/1 2/6/13 $50K- List DTFH68- Sources US DOT - Expedited Surfacing and Resurfacing for AZ, CO, Link 4pm $7.5M 13-B-00002 Sought NM, UT, and WY. Small Business Set-aside. Contact: Jeremiah Rogers at [email protected] or 720-963-3090. First published on 2/1 2/7/13 121312 IFB City of Glendale - 2013 Slurry Seal Program. Project 1/30 Link 2pm includes surface preparation and repairs to prioritized 2pm residential streets by crack sealing, slurry seal and micro-seal applications. First published on 1/22 2/7/13 EN 13-029 IFB City of Avondale - Dysart Road Left Turn Lane Improvements 1/29 Link 3pm at Van Buren Street. Work include installing asphalt concrete 10am pavement, curb, concrete work, street light relocation, Mand. removals, and landscape irrigation modifications. Contact: Charles Andrews at [email protected] or 623-333-4216 and Anna Hudson at [email protected] or 623-333-4213. First published on 1/22 Click here to return to the Table of Contents 24 Volume 3, Issue 97 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Horizontal

Bid Date & Project Plan- Project # Contract Owner – Project description Pre-Bid Link Time Volume holders Type 2/7/13 ADOT13- IFB ADOT - Traffic Control Services, Routine and Emergency, 1/29 Link 3pm 00002536 Phoenix District. Contact: Amir Sakhi at 602-712-8584 or 9:30am [email protected]. First published on 1/18 2/8/13 $23M List 086-A-NFA IFB ADOT - System preservation and widening on SR 86, Link 11am 086-A-(209)T approx. 15 miles west of Robles Junction, in Pima County. REVISED The work consists of roadway excavation and embankment, super elevation correction by milling, furnishing and placing aggregate base course, asphaltic concrete (End Product), poly chip seal coat, extending existing highway box culverts and pipe culverts, removal and replacement of box culverts and pipe culverts, signing and pavement markings, and other related work. DBE goal of 2.56%. Contact Engineering Specialist: Mohammed Salahuddin at 602-712-8260 or Construction Supervisor: Mindy Teague at 520-838-2985. First published on 7/3 & revised bid date on 10/26 & 12/7 2/8/13 $3.7M List 040-E(206)T & IFB ADOT - Superstructure replacement and deck replacement Link 11am 040-E(207)T of traffic interchange underpass along I-40 in Apache County. DBE goal is 9.42%. Contact Engineering Specialist: Mohammed Patwary at 602-712-8187 or Construction Supervisor: Carl Ericksen at 928-524-5421. First published on 12/28 2/8/13 $1.5M List 089-B-(205)T IFB ADOT - Construct new sidewalks and landscaping on SR 89 Link 11am in Yavapai County within the town of Chino Valley. DBE goal REVISED of 3.31%. Contact: Engineering Specialist, Don Pierson at 928-778-4679, or Construction Supervisor, Andy Roth, at 928-759-2426. First published on 7/3 & revised on 8/28 & 11/2 & 1/11 2/8/13 $265K List 999-A-(357)T IFB ADOT - Install new Countdown Pedestrian Modules in Yuma Link 11am District, Kingman District and Prescott District. DBE goal of 3.0%. Contact: Engineering Specialist: David Do at 602-712-7445 or Construction Supervisor: Andrew Roth at 928-759-2426. First published on 1/11 2/13/13 SM313N IFB Lake Havasu City - FY 2012-2013 Crack Seal Program. Link 3pm Contact: Kimberly Fiumara at 928-453-6660. First published on 1/25 2/13/13 2013-25 IFB City of Flagstaff - Route 66 Culvert at Rio De Flag, 2013 Bond none Link 3pm Project. The Project consists of replacing the existing 42” undersized culvert with a 60” culvert. Contact: Patrick Brown, Sr. Procurement Specialist, at [email protected]. First published on 2/1 2/14/13 B-01-13-CO01 IFB Santa Cruz County - Furnish & Deliver & Apply Emulsified Link 7am Polymer Asphalt (CRS-2P) Product. Contact: Public Works Department at 520375-7830. First published on 1/25 & revised link on 1/29 Click here to return to the Table of Contents 25 Friday, February 1, 2013 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Horizontal

Bid Date & Project Plan- Project # Contract Owner – Project description Pre-Bid Link Time Volume holders Type

2/14/13 $1.3M 1220327 & IFB Yavapai County -Page Springs Road Overlay & Cornville Road 2/5/13 Link 1:30pm 1320709 Pavement Preservation Projects. Contact: Aric M. Stewart, 10am P.E., Construction Project Engineer, at 928-777-7519 or Mand. [email protected] and MaryAn Sala, Contract Administration, at 928-777-7522 or [email protected]. First published on 1/29 2/14/13 $241K- IFB #80018; IFB Pima County - Julian Wash Greenway: Sixth Avenue to 1/31 Link 2pm $305K 4JWPK6 Park Avenue Phase 1. This project consists of construction 9am of a new asphaltic concrete multi-use path along the south side of Ajo Way and the west side of Park Avenue. Contact: Christopher J. Barnhill at [email protected]. First published on 1/25 2/15/13 $300K List 999-A-(359)T IFB ADOT - Install new Countdown Pedestrian Modules in Link 11am Flagstaff, Holbrook, & Globe districts. DBE goal of 3.0%. Contact Engineering Specialist: David Do at 602-712-7445 or Construction Supervisor: Andrew Roth at 928-759-2426. First published on 1/22 2/15/13 $400K List STP- IFB ADOT - Box Culvert Extension and Erosion Control on US 160 Link 11am 160-B(203)T approx. 20 miles east of the community of Mexican Water within the Navajo Nation. Contact: Sarker Sajedur Rahman. IFB not yet released. First published on 1/8 & revised link and contact on 1/11 2/15/13 $635K List 010-A-(220)T IFB ADOT - Crack Sealing on I-10 in La Paz County east of Link 11am Quartzsite. DBE goal of 1.03%. Contact: Engineering Specialist: Mahmood B. Ghorbani at 602-712-6093 or Construction Supervisor: Jaime Hernandez at 928-317-2158. First published on 1/11 2/15/13 $5.3M List B08-A-(203)T IFB ADOT - Safety improvements on SR B-8 in the City of Yuma Link 11am (State Line to 1st Street). Work includes milling the existing asphaltic concrete and replacing it with new asphaltic concrete, removing the existing railway and replacing with new railway. The work also includes constructing new bridge barrier and replacing pavement markings. DBE goal of 1.61%. Contact C&S Technical Leader: Iqbal Hossain at 602-712-7471 or Construction Supervisor: Jaime Hernandez 928-317-2158. First published on 1/15 2/15/13 $5.3M List STP- IFB ADOT - Safety improvements on SR B-8 in the City of Yuma Link 11am YUM-0(212)T (4th Ave, 1st Street to Catalina Dr). Work includes milling the existing asphaltic concrete and replacing it with new asphaltic concrete, removing the existing railway and replacing with new railway. The work also includes constructing new bridge barrier and replacing pavement markings. DBE goal of 1.61%. Contact C&S Technical Leader: Iqbal Hossain at 602-712-7471 or Construction Supervisor: Jaime Hernandez 928-317-2158. First published on 1/15

Click here to return to the Table of Contents 26 Volume 3, Issue 97 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Horizontal

Bid Date Project Plan- Project # Contract Owner – Project description Pre-Bid Link & Time Volume holders Type 2/15/13 $6.2M List 017-B-(209)T IFB ADOT - Pavement Maintenance on I-17 in Yavapai County. Link 11am The work consists of milling and replacing AC Overlay and an Asphalt Rubber – ACFC, shoulder buildup, bridge barrier replacement, removing and installing guardrail, replacing guardrail end terminals, replacing pavement markers, and other related work. DBE goal of 1.65%. Contact Engineering Specialist: Jim Wimmenauer at 602-712-7765 or Construction Supervisor: Audra Merrick at 928-774-1491. First published on 1/25 2/18/13 $2.8M List 070-A-(213)T IFB ADOT - Pavement Preservation on US 70 in Graham County, Link 11am east of Globe. The project consists of milling and replacing existing asphalt with Asphaltic Concrete and new Asphalt Rubber-Asphaltic Concrete Friction Course (AR-ACFC). The project also includes Fog Coat of shoulders, new guard rail, temporary striping and new permanent striping, traffic control and other related work. DBE goal of 1.43%. Contact Engineering Specialist: Jim Wimmenauer at 602-712-7765 or Construction Supervisor: Rod Lane at 928-402-5612. First published on 1/29 2/18/13 2013-70093 RFQ ASU - College Avenue Streetscape from 6th to 7th Streets. 2/6/13 Link 2pm CMAR The project will involve new grade plane surfaces, plantings, 2pm site amenities, grading and stormwater management and accommodate a space for game day events. Contact: Gail Horney at [email protected]. First published on 2/1 2/19/13 IFB City of Kingman - Eastern Sidewalk Project (Railroad Street Link 3pm from Mountain Road to Louise Ave). Contact: Engineering Department Office at 928-753-8122. First published on 1/22 2/21/13 C10416 IFB City of Mesa - Upgrade 79 Traffic Cabinets and 67 Signal Link 1pm Controllers. Contact: Marc Ahlstrom at 480-644-4622 or [email protected]. First published on 2/1 2/21/13 2013-012; RFQ ADOT - Multiple Selections for Landscape and Irrigation Link 2pm H8603 01D Design for SR303L, Glendale Ave to Peoria Ave. Contact: Greg Wristen, Contract Manager, at [email protected]. First published on 1/25 2/21/13 $12M- List 2011C022 CMAR Maricopa County Flood Control District - White Tanks FRS 2/6/13 Link 2pm $19M #4 - Phase II. Construction includes grading of the flood 1pm pool to remove the ADOT borrow pit, extension of the dam Mand. embankment along Jackrabbit Trail to eliminate the east spillway, removal and realignment of the inlet channel to accommodate the new dam embankment, widening of the west spillway, widening the embankment for future height increases of the dam, removal of existing CMP outlets and construction of a new inlet riser and RCP outlet at the southeast corner of the dam. Contact: Dave Degerness at 602-506-4730 or [email protected]. Pre-solicitation first published on 3/16. Moved to solicitations on 2/1

Click here to return to the Table of Contents 27 Friday, February 1, 2013 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Horizontal

Bid Date Project Plan- Project # Contract Owner – Project description Pre-Bid Link & Time Volume holders Type 2/21/13 130701 JOC City of Tucson - JOC for Striping. Contact: Matt Hausman at 2/11/13 Link 4pm 520-837-4123 or [email protected]. 10:30am First published on 2/1

2/28/13 $650K- 11PB039 IFB City of Scottsdale - Scottsdale/McDowell Transit Facility. 2/13/13 Link 2pm $800K Project includes reconstruction and expansion of existing 1pm bus bays including new bus shelters and streetscape improvements. Contact: Karie Ingles at 480-312-5744 or [email protected]. First published on 2/1 3/7/13 PW IFB Pinal County - Lamb & Milligan Dip Improvements. Work 2/12/13 Link 2pm 12/13/002; includes removal and disposal of existing pavement and 9am 64038 constructing new DIP section. Contact: Public Works at 520-866-6099. First published on 1/29 4/5/13 $1.3M List 888-A-(212)T IFB ADOT - Centralized Control Systems of Signals at various Link 11am traffic Interchanges on highways in Maricopa County on REVISED I-10, I-17, Loop 101, Loop 202, SR87, and along Grand Avenue. DBE Goal of 12.22%. Contact Engineering Specialist: Adrian C. Gutierrez at 602-712-8257, or Construction Supervisor: Girgis Girgis at 602-712-6710. First published on 8/28 & revised on 11/2 & 1/29 5/17/13 $4.6M List 089-A-(201)T IFB ADOT - Road widening on SR 89 within the City of Link 11am Prescott.The work consists of widening White Spar Road to REVISED accommodate a center left turn lane and bike lanes in each direction. DBE goal of 3.56%. Contact: Engineering Specialist Don Pierson at 928-778-4679 or Construction Supervisor Andy Roth at 928-759-2426. First published on 7/3 & revised bid date on 9/7 & 10/5 & 12/18

Broadcast your company’s good news! Send us your annoucements of new hires, project milestones, community involvement, and project awards. Email: [email protected] or call 480-709-4190

Click here to return to the Table of Contents 28 Volume 3, Issue 97 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Utilities Includes water, waste-water, and other utilities (excluding traffic signalization projects), as well as solar, biomass, and other energy-related solicitations.

Bid Date & Project Plan- Project # Contract Owner – Project description Pre-Bid Link Time Volume Holders Type 2/1/13 List 2013-003 RFP Town of Marana - As-Needed Well Repair Services. 1/25 Link 4pm Contact: Patrick O’Kane at 520-382-2679 or 10am [email protected]. First published on 1/25 & added sign-in sheet on 1/29 2/4/13 P3-12-02 RFQ & ADOT - Solar P3 Project. Development and implementation none Link 2pm RFP of a public-private partnership (P3) to assist in meeting the electric power needs through a solar power generation agreement. Size of project to be calculated by developer. Contact: Sanja Katic-Jauhar at 602-712-7525 or [email protected] with cc to: [email protected] and [email protected]. First published on 12/28 & revised bid date on 1/22 2/5/13 $1.8M 79447 IFB Pima County - Green Valley WRF Sludge Processing/Odor 1/23 Link 2pm Improvements Project. Contact: Jerry Rizzo at jerome. 10am [email protected]. First published on 1/11 2/5/13 $2.6M- List PW16810004 D-B-B City of Phoenix - SR 85 Landfill Stormwater Control 1/23 Link 2pm $3.2M System, Phase 2 Design Bid Build Services. Work shall 10am consist of approximately 316,000 C.Y. of excavation and construction of phase 2 of a stormwater system which includes 80,000 S.Y. of riprap material, associated geotextile material and gabions. This project has a 12% SBE goal. Contact: Kandi Kowalsky at 602-534-8352. First published on 1/11 2/6/13 13-6913 RFP Education Service Center-Region 19 - National Energy Link 2pm Performance Services and Related Items (Free registration required). Contact: Royce Cleveland at [email protected]. First published on 1/8 2/6/13 $5M- P13-0042 JOC City of Peoria - JOC for Water and Wastewater Facilities 1/22 Link 5pm $6M Projects. Contact: Christine Finney at 10am [email protected]. First published on 1/15 2/8/13 # 00100 IFB City of Eloy - Construction of Houser Road and Toltec 1/18 Link 2pm Road Waterlines and Pump Station No. 2 Expansion. The 2pm project consists of a new booster pump station, temporary pumping station, and new 12” & 16” pipelines. Bid documents available on January 4th, 2013 at PRI. Contact: Carollo Engineers at 602-263-9500. First published on 12/14 2/12/13 IFB City of Winslow - First Street Waterline Extension. Base bid 2/5 Link 2pm includes construction of an 8” waterline along First Street 2pm from Parker Avenue to Alder Avenue, alternate includes Mand. Alder from First Street to Second Street. Contact: Woodson Engineering and Surveying FTP site: [email protected]. First published on 1/15

Click here to return to the Table of Contents 29 Friday, February 1, 2013 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Utilities Utilities

Bid Date & Project Plan- Project # Contract Owner – Project description Pre-Bid Link Time Volume Holders Type 2/12/13 $1M- 13-B-01 IFB Mohave County - Moccasin Wash Culvert Replacement. 1/24 Link 2pm $5M Contact: Tara Acton at 928-753-0752 or 12:30pm [email protected]. First published on 1/22 2/12/13 W-5212 IFB City of Show Low - Show Low Heights Waterline 1/31/13 Link 3pm Replacement, Phase 4. Work includes installation of 2pm approximately 4,000 linear feet of 8” PVC Waterline. Mand. Contact: Marian Agan at 928-532-4040. First published on 1/29 2/13/13 ADOC13- RFQuote Arizona Department of Corrections - Radio Tower for ASPC 2/6/13 Link 3pm 00002572 Douglas. Contact: Martin Ruppert at 520-364-7521. 11am First published on 2/1 2/14/13 $825K 3209391 RFQ City of Tempe - Gravity Sewer Replacement and Upsize. Link 9am Replace approximately 1,500 ft of 12” gravity sewer with new 15” line in Scottsdale road and Gilbert. Contact: City of Tempe Engineering Division at 480-350-8200. First published on 2/1 2/14/13 $22M List #12-9135 CMAR UA - CMAR for North Campus Infrastructure. Work Link 2pm includes mechanical; electrical; telecommunication utility distribution systems; central plant heating, chilled water and potable water production; sewer and surface drainage to support new research facilities and future campus development. Contact: Ralph Banks at 520-621-3326 or [email protected]. First published on 1/22 2/18/13 DB WA:K O’odham Foundation Inc. - Design and build a 1/18 Link 12pm Photovoltaic parking shade structure to supply power 9am REVISED to an existing community center located at 2030 W. San Mand. Xavier Rd. Tucson AZ. 85746 on the San Xavier Indian Reservation. Contact: Richard DeLaCerda, Materials Manager at 520-573-4012 or [email protected]. More details available at Mandatory Pre-bid meeting. First published on 1/4 & added bid date on 1/25 2/19/13 $120K- IFB City of Casa Grande - Casa Grande Underground Storage Link 1:30pm $200K Facilities Monitoring Wells.Contact: Terrence S. McKeon, P.E. at 520-421‐8625 or [email protected]. First published on 2/1

2/20/13 $1.2M- List WS90500255 IFB City of Phoenix - Water Services Department 2010 Link 2pm $1.5M Sanitary Sewer Relief Program, Project 8B. Work will include installation of approximately 1,850 linear feet of 27 inch gravity sewer pipe, 6 manholes, street repair and restoration, and other miscellaneous work. This project has a 12% SBE goal. Contact: Kandi Kawolsky at 602-534-8352. First published on 1/25 Click here to return to the Table of Contents 30 Volume 3, Issue 97 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Utilities Commercial

Bid Date & Project Plan- Project # Contract Owner – Project description Pre-Bid Link Time Volume Holders Type 2/20/13 List 13-080 RFP City of Tempe - Solar Photovoltaic Electric Generating 1/15 Link 3pm Systems. Contact: Michael Greene at 9am REVISED [email protected] or 480-350-8516. Site Mand. visits are mandatory. First published on 1/4 and added mandatory site visit info from addendum #1 on 1/11. Revised bid date and added sign-in Sheet on 1/25 2/20/13 Q13-09 RFQuote City of Peoria - Cooling Tower Water Treatment. Contact: Link 5pm Jennifer Miller at 623-773-7115 or [email protected]. First published on 2/1 2/21/13 DB The City of Globe - Design Build Emergency Generator. 1/24 Link 3pm Design and install a system to provide emergency power at 10am the City’s wastewater treatment plant. Contact: Gina Paul Mand. at 928-425-7146 x21 or [email protected]. First published on 1/18

2/26/13 IFB City of Sedona - Minor Lift Station Modifications & Back 1/24 Link 2pm O’Beyond Lift Station Replacement Project. Contact: 2:30pm Roxanne Holland at [email protected]. Mand. First published on 1/15 2/26/13 DE- IFB Department of Energy - DSW NERS Mitigation Year 1. Link 2pm SOL-0004963 Work includes removing 2.2-miles of three-phase double bundled 345-kV transmission line conductor, complete with suspension clamps and compression dead ends from existing insulator assemblies. Small Business Set-aside. Contact: Patrick Harvey at [email protected] or 602-605-2768. Pre-Solicitation first published on 1/22. Solicitation first published on 1/29 3/5/13 #184 IFB City of Page - Subdivision underground infrastructure 2/7 Link 4pm upgrade project consisting of lateral boring & conduit 10am installation as well as the installation of owner supplied Mand. conductor. Contact: Utility office at 928-645-2419 or 928-645-2446 ex 213. First published on 1/25 Moving On? Take us with you! Introduce AZBEX to your new firm and stay up-to-date with all the news and project leads you’ve become accustomed to.

Click here to return to the Table of Contents 31 Friday, February 1, 2013 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Utilities Commercial Commercial Includes new construction and major renovations/additions/alterations to real property. Includes multi-trade requests for subcontractor bids and Bid Date & Project Plan- Project # Contract Owner – Project description Pre-Bid Link development RFP’s that indicate future commercial construction. Time Volume Holders Type

Bid Date Project Plan- Project # Contract Owner – Project Description Pre-Bid Link & Time Volume Holders Type 2/1/13 $7.4M List RFQ 13-040 CMAR Paradise Valley Unified School District - CM@R Services 1/17 Link 2:30pm for Pinnacle High School Renovations(Free registration 12:30pm required). Contact: Ken Carter at 602-449-2071 or [email protected]. ADM Group is the Architect. First published on 12/28 & added addendum (Sign-in Sheet) on 1/29

2/5/13 $2.5M RFQ 13-041 CMAR Paradise Valley Unified School District - CM@R Services none Link 2:30pm RFQ for Mercury Mine Elementary School Renovations (Free registration required). Contact: Leslie Small at 602-449-2080 or [email protected]. The architect is NTD Architects. First published on 12/18 2/6/13 List DEMA13- IFB AZ DEMA - USPF&O Bathroom Remodel. Provide Tenant 1/29 Link 10am 00002577 Improvement for four (4) existing bathrooms located 9am REVISED at PPMR, USPF&O 5636 East McDowell Rd, Phoenix, AZ REVISED 85008. Contact: Chris Moehr at 602-267-2727 or Betty Austin at 602-267-2765. First published on 1/18 & revised bid date/time, Pre-bid meeting date/time and added planholders list on 1/22

2/7/13 12-0053 IFB Amphitheater Public Schools - Nash Elementary School 1/14 Link 3pm Library Improvements. Contact: Peter Burgard, Purchasing 2pm Manager, at 520-696-3713. First published on 1/22 2/7/13 IFB Casa Grande Union High School District - Exterior 2/1 Link 5pm Weatherproofing at Casa Grande High School. Project 4pm Manual and Drawings may be obtained at the office of HDA Architects at 480-539-8800. First published on 1/22

2/8/13 W912PL- Sources Department of the Army - Sources Sought for Indefinite Link COB 13-S-0004 Sought Delivery Indefinite Quantity (IDIQ) Multiple Award Task (DB) Order Contract (MATOC) for Construction Services for the US Army Corps of Engineers, South Pacific Division. Provide construction services, primarily, design build under construction task orders issued under a MATOC for various VA projects at in AZ, CA, CO, ID, NV, NM, Mexico, OR, TX, UT, WY. Service-Disabled Veteran-Owned Small Business Set-aside. Contact: Julie Ayala at 213-452-3241. First published on 1/29

Click here to return to the Table of Contents 32 Volume 3, Issue 97 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Commercial

Bid Date Project Plan- Project # Contract Owner – Project description Pre-Bid Link & Time Volume Holders Type 2/11/13 $13.3M 12-022MRQ CMAR Tempe Union High School District - Construction 2/5/13 Link 2pm Manager at Risk (CM@R) for Compadre Academy (Free 1pm registration required). Provide Construction Manager @ Risk services for design support and possible construction for renovations, improvements and additions on the Compadre Academy campus and District office. Contact: Missy Mudry at 480-345-3714 or [email protected]. First published on 1/29

2/12/13 List W912L213B0001 IFB Department of the Army - Construct Predator Launch and 1/22 Link 2pm Recovery Element (LRE) at Ft. Huachuca. This project will 9am provide an approximately 20,600 SF maintenance hangar and 2,000 SF LRE, with reinforced concrete foundation and floor slab, steel framed masonry walls and sloped standing seam metal roof. Small Business Set-aside. This project will meet or exceed a USGBC LEED Silver Certifiable level of construction. Contact: Thomas Schoening at 602-267-2804. Pre-Solicitation First published on 12/14 2/12/13 $30M- List 13-102-SOL- DB Department of Health and Human Services - Kayenta Link 2pm $40M 00001 Quarters Design-Build Construction Project. Small Business Set-aside. Contact: Jane A. Stuessy, Contract Specialist, at [email protected] or 206-615-2533. Pre-Solicitation first published on 12/28 & moved to solicitations on 1/15 2/12/13 RFQ 13-039 CMAR Paradise Valley Unified School District - Construction Link 2:30pm Manager at Risk Services for Paradise Valley High School Renovations (Free registration required). Contact: Leslie Small at 602-449-2080 or [email protected]. First published on 1/22 2/12/13 ADOT13- IFB ADOT - Modular Office Buildings delivered and assembled 12/12 Link 4pm 00002119 to sites (TBD). Contact: Earl Payne at [email protected] 9:30am REVISED or 602-712-8514. First published on 12/11 & revised bid date on 12/28 & 1/15 & 1/29 2/14/13 #13-01 RFQ JOC The Cooperative Purchasing Network - Arizona Job Order Link 2pm Contracting Services. First published on 1/29 2/14/13 List 072382-13-A- JOC United States Postal Service - Indefinite Quantity 1/31 Link 3pm 0003 Contract- Job Order Contract for the State of Arizona. 1pm Work includes all labor, materials, equipment and services necessary for a wide range of repair and alteration projects. Contact: Lillian B Davila, Facilities Contract Specialist at [email protected] or 303-853-6935. First published on 1/18

Click here to return to the Table of Contents 33 Friday, February 1, 2013 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Commercial Commercial

Bid Date Project Plan- Project # Contract Owner – Project description Pre-Bid Link Bid Date Project Plan- Project # Contract Owner – Project description Pre-Bid Link & Time Volume Holders Type & Time Volume Holders Type 2/25/13 $3.2M 13DSD012213 DB City of Maricopa - Design Build Public Works Maintenance 2/7/13 Link 2pm and Fire Admin Facility. The project consists of developing 1:30pm approximately seven (7) acres of a 50 acre property for a Public Works Maintenance and Fire Administration Facility (Shop, Office, Vehicle Wash, Fuel Station, etc) as well as design and construction of extending the infrastructure to the site (i.e. water and electrical utilities and minor roadwork). Contact: Pattie LaCombe at 520-316-6846 or [email protected]. First published on 1/29 2/26/13 PD3-680-3206 RFP City of Chandler - Police Shooting Range Improvements. 2/12/13 Link 3pm Scope released at award. Contact: Kristy Garcia at 9am 480-782-2402 or [email protected]. First published on 1/29 Your Missing Piece Hungry for a particular project? Pivotal will smoothly blend into your firm when you need a expertly crafted proposal or custom marketing collateral. Mara Prendergast 602.501.8090 & Kelly Billings 602.810.2112 PIVOTAL www.pivotalmarketingpartners.com MARKETING PARTNERS THE MISSING PIECE 2/27/13 $1M List 13007-CMR- CMAR Maricopa County Facilities Management - CMAR for 2/12/13 Link 1pm 2013 Installing New Cooling Tower and Heat Exchanger in the 2pm Lower Buckeye Jail Central Plant, Phoenix. Contact: Corry Slama [email protected]. First published on 2/1

2/27/13 $1.5M- 3-637, PR1307- CMAR City of Chandler - CMAR for Veteran’s Memorial. Provide 2/13/13 Link 4pm $2M 251 pre-construction and construction services to build a 11am Veteran’s Memorial at Veteran’s Oasis Park located at the corner of Chandler Heights and Lindsay Roads, in southeast Chandler (Free registration required). Contact: Dara Griffith at 480-782-3314 or [email protected]. First published on 2/1

2/28/13 $25K- List F13PS00127 IFB Department of the Interior - Willow Beach Shop Link 1pm $100K Renovations at Willow Beach National Fish Hatchery in Willow Beach, AZ. Work includes replace stairs, install partition walls, repair, and replace concrete, install doors, install wiring, switches and light fixtures. Small Business Set -aside. Contact: Ray A. Fletcher at [email protected]. First published on 1/11

Click here to return to the Table of Contents 34 Volume 3, Issue 97 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Commercial

Bid Date Project Plan- Project # Contract Owner – Project description Pre-Bid Link & Time Volume Holders Type 2/28/13 $3M- List N6247312R0262 IDIQ Department of the Navy - IDIQ for new construction, Link COB $9M renovation, and repair, primarily by design-build or secondarily by design-bid-build, of general building construction at various locations within the NAVFAC Southwest area of responsibility (AOR) including but not limited to California, Arizona, Nevada, Utah, Colorado, and New Mexico. HUBZone, Small Business and Service- Disabled Veteran-Owned Small Business Set-aside. Contact: Michelle Sanders at 619-532-3834 or michelle. [email protected]. Pre-Solicitation first published on 1/18 & moved to open solicitations on 2/1

Maintenance & Alterations MaintenanceMaintenance Includes abatement, remediation, landscaping, irrigation, fencing, single-trade, and maintenance solicitations. Also captures public- agency owned renovations of residential properties. In the “Contract Type” column, RFQ generally translates into a qualifications-based selection, while RFP notes a lump-sum proposal.

Bid Date/ $/Plan- Project # Contract Owner – Project Description Pre-Bid Link Tine Holders Type 2/1/13 13-064 IFB City of Phoenix - Preventative Maintenance of Lenel Access 1/8 Link 2pm Control Systems - Requirements Contract. Contact: Barbara 10:30am Hummell, 602-495-0699 or [email protected]. First published on 12/18

2/1/13 IFB 13-082 IFB City of Phoenix - Metal Millwork, Repair, and Replace. 1/16 Link 2pm Requirements Work includes fabricating, replacing and 9am repairing, and installing all types of metal millwork. Contract. Contact: Barbara Hummell at 602-495-0699 or [email protected]. First published on 1/11

2/1/13 RFQuote Gilbert Public Schools - E-Rate Wireless LAN and Cabling for 1/15 Link COB Access Points at Harris Elementary School in Gilbert. Contact: 3pm Jim Pacek at [email protected]. First published on 1/8 2/1/13 RFQuote Gilbert Public Schools -E-Rate Internal Connections – Network Link COB Infrastructure Equipment at Harris Elementary School in Gilbert. Contact: Jim Pacek at [email protected]. First published on 1/8 2/1/13 RFQuote Gilbert Public Schools - E-Rate Internal Connections – Structured 1/15 Link COB Cabling at Harris Elementary School in Gilbert. Contact: Jim 3pm Pacek at [email protected]. First published on 1/8

Click here to return to the Table of Contents 35 Friday, February 1, 2013 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Commercial Maintenance & Alterations

Bid Date Project Plan- Project # Contract Owner – Project description Pre-Bid Link Bid Date/ $/Plan- Project # Contract Owner – Project Description Pre-Bid Link & Time Volume Holders Type Time holders Type 2/1/13 RFQuote Gilbert Public Schools - E-Rate Wide Area Network at all Gilbert Link COB public schools. Contact: Jim Pacek at [email protected]. First published on 1/8 2/1/13 IFB American Legion Post No. 9 - Exterior painting, stucco repair, Link COB soffit and fascia replacement, Florence, 441 N Main Street. Contact: Rick LaBakis at 520-431-0631 or Bill Wood at 520-868-5576. First published on 1/22 & added location on 1/25 2/4/13 120550 RFP City of Tucson - Security Hardware: Purchase, Install & Link 4pm Maintenance. Contact: Cherie Odeski at 520-837-4126 or [email protected]. First published on 1/18 2/4/13 RFQuote Cartwright School District - E-Rate Internal Connections - 1/11/13 Link COB Structured Cabling. Contact: Tom McGorray at [email protected]. 10am First published on 1/29 2/4/13 RFQuote Cartwright School District - E-Rate Internal Connections - Wide Link Maintenance & Alterations COB Area Network. Contact: Tom McGorray at [email protected]. First published on 1/29 2/4/13 RFQuote Cartwright School District - E-Rate Internal Maintenance of Link COB Internal Connections. Contact: Tom McGorray at erate@csd83. org. First published on 1/29 2/4/13 RFQuote Cartwright School District - E-Rate wireless LAN and Cabling for Link COB Access Points. Contact: Tom McGorray at [email protected]. First published on 1/29 2/4/13 RFQuote Cartwright School District - E-Rate Internal Connections Network Link COB Infrastructure Equipment. Contact: Tom McGorray at [email protected]. First published on 1/29 2/5/13 13-200-006 RFP Yuma County - Upgrade Existing Signage at Sheriff’s Office Link 12pm Detention Center. Contact: Steve Mendoza at 928-817-5104 or [email protected]. First published on 2/1 2/6/13 $200K 55078A IFB Pima County - Mobile Home Weatherization Services. Potential 1/17 Link 2pm services include furnace removal or replacement, window/door 8am replacement, plumbing, electrical and related work. Contact: Melissa Hala’ufia at [email protected]. First published on 1/15 & added sign-in sheet on 1/22 2/6/13 IFB City of Safford - Sand Filter Shade Structure. Supply and install Link 4pm a 60 ft by 60 ft shade structure. Contact: Reed Larson, Staff Engineer, at [email protected]. First published on 1/11 2/7/13 FA3-910-3205 IFB City of Chandler - Fire Station #5 Bay Door Replacements. 1/24/13 Link 3pm Contact: Kristy Garcia at 480-782-2402 or 9am [email protected]. A site visit has been scheduled for 1/29 at 10am & 12pm only separate from Pre-bid conference. First published on 1/11 & added site visit information on 1/29

Click here to return to the Table of Contents 36 Volume 3, Issue 97 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Maintenance & Alterations

Bid Date/ $/Plan- Project # Contract Owner – Project Description Pre-Bid Link Time holders Type 2/7/13 251303 IFB ASU - UCENT Window tinting (Re-Bid). Install window tinting none Link 3pm at the University Center to reduce solar energy gain. Contact: Pamela Veal at 480-727-3752 or [email protected]. First published on 1/18 2/7/13 IFB Casa Grande Union High School District - Roofing at Casa Grande 2/4/13 Link 5pm High School. Project Manual and Drawings may be obtained at 10am the office of HDA Architects at 480-539-8800. First published on 1/22 2/8/13 IFB City of Litchfield Park - Community Pool Resurfacing Project. Link 2pm Contact: Tanja Jockovic at [email protected]. First published on 1/29 2/8/13 004-1213 RFP Phoenix Elementary School District - Fire Protection System for Link 2pm ASU Preparatory Academy (Free registration required). Contact: Alberto Martinez at 602-257-3768 or [email protected]. First published on 1/29 2/8/13 IFB 13-112 IFB City of Phoenix - Encanto Sports Complex Ramadas. Project 2/1/13 Link 2pm includes installation of three 20 ft. diameter hexagon metal 9am ramadas. Contact: Alan Koberna at 602-261-8700 or alan. [email protected]. First published on 2/1 2/8/13 List N6247313R4008 Sources Department of the Navy - Sources Sought for Facilities Support, Link Sought Multiple Awards Service Contract at Various Locations in AZ, CA, CO, NV, NM, and UT. Contact: Johannes Cardenas at 619-532-3190. First published on 2/1 Products & Equipment 2/11/13 List P13-0048 RFP City of Peoria - Right-of-Way Landscape Maintenance Services. 1/28/13 Link 5pm Contact: Christine Finney at 623-773-7115 or [email protected]. 8am First published on 1/25 & added sign-in sheet on 2/1 2/12/13 2013014 RFP City of Mesa - Chiller Maintenance & Repair Services. Contact: 1/31/13 Link 3pm Clayton Campbell at 480-644-2655. First published on 1/29 1:30pm 2/13/13 B13-WW13-01 IFB Lake Havasu City - Replacement of 550 Low Pressure Amalgam none Link 3pm UV Lamps for Trojan 3000+ Disinfection Systems. Contact: Sharon Mann, administrative specialist II at [email protected]. First published on 1/18 2/14/13 $59K 2013-20000094 IFB City of Yuma - Electric Motor / Pump Purchases and Repairs. 1/31/13 Link 2pm Work includes purchase and delivery of Liquid Cationic Polymer 9am for its Water Treatment Plant. Electric Motor, Pump purchases and repair of various pumps, pump stations and irrigation pumps as needed. Contact Sherial Magallanes at 928-373-5102 or [email protected]. First published on 2/1 2/14/13 PARKS13- IFB Arizona State Parks - Roof Repair for Kartchner Caverns. Contact: 2/5/13 Link 3pm 00002619 Margie Silva at 602-542-6937. First published on 1/29 11am 2/14/13 ADOT13- IFB ADOT - Highway Landscape Maintenance Services on SR 51; none Link 3pm 00002412 Northern Avenue to Bell Road, M.P. 7.2 to 13.6. Contact: Amir Sakhi at 602-712-8584 or [email protected]. First published on 1/29 Click here to return to the Table of Contents 37 Friday, February 1, 2013 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Maintenance & Alterations

Bid Date/ $/Plan- Project # Contract Owner – Project Description Pre-Bid Link Time holders Type 2/14/13 AGFD13- IFB Arizona Game and Fish Department - Installation of Canopies at 2/7/13 Link 3pm 00002576 Kingman Regional Office of the AZ Game & Fish Department. 10am Contact: Elizabeth Burgard, Sr. Procurement Specialist, at 623-236-7459 or [email protected]. First published on 2/1

2/18/13 RFP City of Eloy - Housing Rehabilitation Services. Contact: Zenia M. Link 2pm Cornejo, Management Assistant, at 520-464-3429, or [email protected]. First published on 2/1

2/19/13 13-200-008 RFP Yuma County - Boiler Installation at Sheriff’s Office Detention 2/12/13 Link 12pm Center. Contact: Steve Mendoza at 928-817-5104 or 9am [email protected]. First published on 2/1 Mand.

2/20/13 Link W912L213T1003 RFQuote Department of the Army - Replace rooftop air conditioning units 2/7/13 Link 10am at buildings 1,33,34 and 40, Tucson. Small Business Set-aside. 9am Contact: Thomas Schoening at 602-267-2804. First published on 1/29

2/22/13 IFB Litchfield Park -2013 Tree Trimming. Contact: Terri Roth, Link 2pm Executive Assistant, at (623) 935-1066 ext. 110. First published on 2/1

Products & Equipment Products & EquipmentPre-Solicitations Requests for equipment (purchase and rental), furnish only of materials, and related items.

Date Solicitation/ Type Owner - Project Description Pre-bid Link Project # 2/5/13 AGFD13-00002611 IFB Arizona Game and Fish Department - Steel for Horse Barn delivered to none Link 3pm Phoenix. Contact: Cindy Arnold at 623-236-7460 or [email protected]. First published on 1/25

2/6/13 2012011 IFB City of Mesa - Supply two (2) Magnetic Drive Centrifugal Pumps. Link 3pm Contact: Angela Bennett at [email protected]. First published on 1/22

2/6/13 2013012 IFB City of Mesa - Traffic Signal Control Cabinets. Contact: Clayton Campbell Link 3pm at Clayton. Campbell @mesaaz.gov. First published on 1/22

2/7/13 B13/9802 IFB Pima County Community College District - Northwest Campus Smart Link 3pm Boards and Projectors. Contact: Purchasing at 520-206-4759. First published on 1/25 2/7/13 B13/9802 IFB Pima Community College District - Northwest Campus Smart Boards and Link 3pm Projectors. Contact: 520-206-4759. First published on 2/1

Click here to return to the Table of Contents 38 Volume 3, Issue 97 All attempts have been made to ensure the accuracy of the information presented. However, AZBEX is not responsible for any errors or omissions Project Solicitations in this data. Links may not be valid once the bid date/time has passed. All bidders are responsible for verifying the content of the information.

Products & Equipment

Date Project # Type Owner - Project Description Pre-bid Link

2/8/13 IFB 13-112 IFB City of Phoenix - 85’ Articulating Boom Lift- Requirements Contract. 1/31 Link 2pm Contact: Chuck Garvey at 602-261-8668 or [email protected]. 8:30am First published on 1/25 2/11/13 2013008 RFP City of Mesa - Asphalt Materials. Contact: Brandy Anderson at Link 3pm [email protected]. First published on 1/22

2/12/13 13-48MB IFB Mesa Unified School District - Fasteners, Nuts, Bolts, Screws, Etc. for 1/23 Link 2pm Mesa Unified School District #4 (Free registration required). Contact: 9am Lauren Jaramillo at 480-472-6122or [email protected]. First published on 1/22 2/12/13 2013-200000094 IFB City of Yuma - Electric Motor / Pump Purchase and Repairs. Contact: 1/31/13 Link 2pm Sherial Magallanes at 928-373-5102 or [email protected]. 9am First published on 1/29 2/12/13 ADOT13-00002535 IFB ADOT - Erosion and Sediment Control Products. Contact: Amir Sakhi at none Link 3pm 602-712-8584 or [email protected]. First published on 1/25 2/12/13 IFB City of Safford - Box Culverts. Contact: Michael R. Faunce, Material Link 3pm Management Supervisor, at 928-432-4081 or [email protected]. First published on 1/25 2/13/13 2013020 IFB City of Mesa - Preformed Thermoplastic Pavement Marking Materials. Link 3pm Contact: Brandy Anderson at 480-644-2655 or [email protected]. First published on 2/1 2/14/13 B-03-13-CO03 IFB Santa Cruz County - Furnish & Deliver Cold Plant Mix (3/8”) Product. Link 7am Contact: Public Works Department at 520-375-7830. First published on 1/25 & revised link on 1/29 2/14/13 B-02-13-CO02 IFB Santa Cruz County - Furnish & Deliver Aggregate Cover (Chip) Material. Link 7am Contact: Public Works Department at 520-375-7830. First published on 1/25 & revised link on 1/29 2/14/13 TE3-065-3214 IFB City of Chandler - Purchase of Bucket Trucks. Contact: Mike Mandt at 1/31 Link 2pm 480-782-2406 or [email protected]. First published on 1/22 2pm 2/14/13 130738 RFP City of Tucson - Supply Residential and Commercial Water Meters. 1/31/13 Link 4pm Contact: James Gaston at 520-837-4139 or [email protected]. 2pm First published on 1/29 2/15/13 IFB 13-022 IFB City of Phoenix - Citywide Air Conditioning Equipment and Parts - N/A Link 2pm Requirements Contract-Citywide. Contact: Mary Hammer at 602-262- REVISED 7793 or [email protected]. First published on 1/5 & revised bid date on 2/1 2/22/13 RFP 13-020 RFP City of Phoenix - Plumbing Supplies - Requirements Contract (Citywide). N/A Link 2pm Contact: Mary Hammer at 602-262-7793 or [email protected]. REVISED First published on 1/6 & revised bid date on 2/1 3/1/13 AG-84M8-S-13-7000 RFQuote Department of Agriculture - VIPR I-BPA for Heavy Equipment with Water Link 5pm for Region 4 - Intermountain Region. Small Business Set aside. Contact: Kimberly Luft at 303-275-5405 or [email protected]. Pre-Solicitation first published on 11/2 & published as a solicitation on 11/27 Click here to return to the Table of Contents Volume 3, Issue 97 Friday, February 1, 2013

The Arizona Builder’s Exchange is a trade and focus publication About Us dedicated to promoting the building industry by connecting builders, designers, developers, subcontractors, vendors, and service providers with local, current, and relevant information. AZBEX publishes an electronic newsletter twice a week (Tuesdays and Fridays), distributed by e-mail only. The fourth week of November and the second to last week of December will only have one issue published. CONNECTING THE LOCAL BUILDING INDUSTRY While we cannot stop anyone from forwarding the digital publication, we do ask that if you find this information valuable, please respect the work we do and support us with your subscription dollars. With your support we will continue to expand and improve the scope of the information we provide. 1400 E. Indian School Road Phoenix, AZ 85014 Follow us in print and online at azbex.com 480-709-4190 [email protected] www.azbex.com AZBEX is Local, Current, and Relevant!

Pre-Solicitations

Status Solicitation/ Project Target Type Owner/Project Description Link Project # Volume Date Changed to N6247312R0262 $3M- Target: 1/29 RFP Department of the Navy - IDIQ for new construction, Link Solicitation $9M renovation, and repair, primarily by design-build or on 2/1 secondarily by design-bid-build, of general building construction at various locations within the NAVFAC Southwest area of responsibility (AOR) including but not limited to California, Arizona, Nevada, Utah, Colorado, and New Mexico. HUBZone, Small Business and Service-Disabled Veteran-Owned Small Business Set-aside. Contact: Michelle Sanders at 619-532-3834 or [email protected]. Pre-Solicitation first published on 1/18 & moved to open solicitations on 2/1 Changed to Target: CMAR Maricopa County Flood Control District - White Tanks FRS Link Solicitation March 2013 #4 - Phase II ($5M - $7M). Construction includes grading of on 2/1 the flood pool to remove the ADOT borrow pit, extension of the dam embankment along Jackrabbit Trail to eliminate the east spillway, removal and realignment of the inlet channel to accommodate the new dam embankment, widening of the west spillway, widening the embankment for future height increases of the dam, removal of existing CMP outlets and construction of a new inlet riser and RCP outlet at the southeast corner of the dam. Contact: Dave Degerness at 602-506-4730 or [email protected]. Pre-solicitation first published on 3/16 & revised Target date from June to Sept on 6/12. Revised target date from Sept to March 2013 on 10/16. Moved to solicitations on 2/1

azbex.com Click here to return to the Table of Contents