ONGOING PROJECTS Construction Underway Projects added for the current month are highlighted and in bold face type

Diameter: 40 inches Comments: Pipeline will have a capacity of 16 Bcm/y GAS – International Location: Kaduna - Kano Africa Cost: $2.8 billion GAIL INDIA LTD. – (3/18) Completion: 4Q 2020 Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas DANGOTE INDUSTRIES LTD. – (4/18) Comments: Project will help establish connectivity Pipeline (Phase I) Owner: Dangote Group between the East, West and North parts Type: Project includes construction of a Project: East West Offshore Gas Gathering System of Nigeria transmission pipeline and multiple spur Type: Project includes construction of two lines parallel subsea pipelines Contractor: OilServe/Oando Length: 470 miles Length: 684 miles Type: Contract includes construction of Lot 1 Diameter: 4, 8, 12, 18, 30 and 36 inches Diameter: 38 inches of the pipeline Location: Phulpur – Dobhi Location: Bonny, Rivers - Ogidigben – Olokola - Length: 125 miles Capacity: 565 Bcf/d (Phase I and II) Lekki, Lagos Cost: $855 million Cost: $50 million Capacity: 3 Bcf/d Completion: 4Q 2018 Completion: 3Q 2018 (Phase I) Contractor: Brentex/China Pipeline Comments: Project will usher Industrial development 2Q 2025 (Phase II) Bureau in eastern part of India by supplying Comments: Project will create a corridor for Type: Contract includes construction of Lot 3 environmentally clean to evacuation of trapped gas from offshore of the pipeline fertilizer and power plant, refineries, steel platforms in Nigeria to allow their Length: 137 miles plants and other Industries monetization and will deliver gas to a new Cost: $1.2 billion build gas receiving plant to be located at Contract: JSIW Infrastructure Pvt. Ltd. the Dangote Refinery Complex in Lekki, Type: Project includes engineering, design, Lagos Asia Pacific procurement and construction

Contractor: Paradigm Environmental System APA GROUP – (3/18) Contract: IL&FS Engineering & Construction Co. Ltd. Consultants Owner 1: Gold Road Resources Ltd., 50% Type: Project includes pipelaying Type: Contracts includes conducting an Owner 2: Gold Fields Ltd., 50% Environmental Impact Assessment for the Project: Yamarna Gas Pipeline Project: Jagdishpur-Haldia-Bokaro-Dhamra Gas project Type: Project includes pipeline construction Pipeline (Phase II) and a gas-fired station Type: Project includes pipeline construction GALSI PIPELINE – (REV 10/16) Length: 123 miles Length: 1,180 miles Owners: Sonatrach/Edison/Enel/Hera Group Location: Yamarna, Western Australia Diameter: 4, 8, 12, 18, 30 and 36 inches Project: Galsi Pipeline Cost: $180 million Location: Jharkhand - West Bengal - Odisha Type: Project includes the construction of Comments: Project is part of the Gruyere Project and Capacity: 565 Bcf/d (Phase I and II) 351 miles of offshore pipeline crossing will be built east of Laverton in Western Cost: $146 million the Mediterranean Sea and 161 miles Australia, running from a connection Completion: 4Q 2020 of onshore pipeline, including gas point off the existing Eastern Goldfields Comments: Project will usher Industrial development compression facilities Gas Pipeline to the new Gruyere gold in eastern part of India by supplying Length: 512 miles mine project site environmentally clean natural gas to Location: Koudiet Draouche - Piombino fertilizer and power plant, refineries, steel Completion: 2018 Contractor: Nacap plants and other Industries Comments: The initial transport capacity will be 8 Bcm Type: Project includes pipeline construction per year Contract: JSIW Infrastructure Pvt. Ltd. ARROW ENERGY – (REV 5/16) Type: Project includes engineering, design, KINGDOM OF MOROCCO/ Project: Arrow Bowen Pipeline procurement and construction FEDERAL REPUBLIC OF NIGERIA – (1/17) Type: Project includes the construction of Pipeline: Trans-African Pipeline high-pressure steel pipeline Contract: IL&FS Engineering & Construction Co. Ltd. Type: Project includes the construction of a new Length: 512 miles Type: Project includes pipelaying gas pipeline Location: Bowen Basin - Gladstone Location: Nigeria – Morocco - Europe. Completion: 2018 GUJARAT STATE PETROLEUM Comments: The Trans-African Pipeline will improve CORP. – (REV 12/16) access to energy across West Africa and AZERBAIJAN INTERNATIONAL Contractor: GSPL India Gasnet establish a competitive regional market for OPERATING CO. – (REV 11/15) Project: Mehsana-Bhatinda Pipeline electricity Project: Azeri Pipeline Type: Project includes the construction of new Type: Project includes the construction of new pipeline NIGERIAN NATIONAL PETROLEUM CORP. — pipeline Length: 1,037 miles (6/18) Length: 2,175 miles Location: Mehsana-Bhatinda Project: Ajaokuta - Kaduna – Kano (AKK) Pipeline Location: Georgia, , , , Comments: Pipeline is currently being considered Type: Project includes pipeline construction and for cancellation but, if built, will have a Length: 381 miles Completion: 2019 transportation capacity of 30 MMcf/d

26 Pipeline News | December 2018 | pipeline-news.com MMcm/y Contractor: Transgaz Contractor: GAIL Type: Contract includes the first phase of Project: Mallavaram-Bhilwara Pipeline PUNJ LLOYD – (5/16) construction for the Romanian section of Type: Project includes the construction of new Type: Project includes the construction of a the pipeline pipeline 14-inch pipeline (186 miles) and a 32-inch Length: 297 miles Length: 984 miles pipeline (187 miles) and the construction Location: Podisor - Recas Location: Mallavaram - Bhilwara of a block valve and pigging stations Comments: Pipeline is currently being considered Length: 373 miles GASCADE – (10/18) for cancellation but, if built, will have a Location: Oman New Delhi Project: European Gas Pipeline Link (EUGAL) transportation capacity of 30 MMcf/d Completion: 2018 Type: Project includes pipeline construction Length: 298 miles IIL&FS ENGINEERING AND RELIANCE INDUSTRIES – (REV 11/16) Diameter: 56 inches CONSTRUCTION CO. LTD. – (REV 2/17) Owner: China National Petroleum Corp. Location: Mecklenburg-Western Pomerania – Owner: Gas Authority of India Ltd. Project: Shahdol-Phulpur Pipeline Brandenburg - Saxony Project: Kochi-Koottanad-Bangalore-Mangalore Type: Project includes the construction of new Capacity: 55 Bcf/y Pipeline pipeline Completion: 4Q 2020 Type: Project includes the laying and Length: 188 miles Comments: System will be powered by the Nord construction of 30-inch pipeline along Location: Shahdol - Jaysing Nagar - Beohari-Gurh Stream 2, the gas transport network that with associated works - Phulpur connects Siberia to the heart of Europe via Length: 685 miles Completion: 2023 the Baltic Sea Location: Kerala Comments: Pipeline will have a capacity of 4.3 Completion: 2019 MMcm/d Contractor: Bonatti/Max Streicher JV Comments: GAIL has won a second extension for Type: Contract includes construction of six lots completing the project as it faces Project: Dahej Nagothane Ethane Pipeline Project of the European Gas Pipeline Link unprecedented problems in getting land Type: Project includes the construction of new in Kerala and Tamil Nadu pipeline Contractor: Europipe Length: 301 miles Type: Contract includes pipeline supply and PERUSAHAAN GAS NEGARA – (8/17) Location: Dahej, Gujarat – Nagothane, Maharashtra delivery for the project Operator: Pertamina Comments: Project will transport 1.25 MMtpa of liquid Project: Duri-Dumai Pipeline System ethane Contractor: Mulheim Pipecoatings Type: Project includes construction of Type: Contract includes pipe coating for the transmission and distribution pipelines FSU Eastern Europe project Length: 75 miles AZERBAIJAN INTERNATIONAL Diameter: 24 inches OPERATING CO. – (REV 12/16) – (2/16) Location: Dumai, Riau Project: South Caucasus Pipeline Expansion Project: Pipeline Capacity: 140 MMcf/d Type: Project includes pipeline looping and two Type: Project includes the construction of Cost: $574 million new compressor stations 55-inch pipeline that will run through Start: 3Q 2017 Length: 303 miles swampy, mountainous and seismically Completion: 4Q 2018 Completion: 2019 hazardous areas Location: Azerbaijan - Georgia-Turkey border Length: 1,864 miles Contractor: P.T. Connusa Energindo Comments: Project will connect with the Trans- Location: Irkutsk Region - Republic of Sakha Type: Project includes engineering, Anatolian Natural Gas Pipeline (Yakutia) - Amur Region procurement and design Capacity: 38 Bcm/y of natural gas from FGSZ LTD. – (12/17) Cost: $400 billion Contractor: Pertamina Project: Bulgaria--- (BRUA) Status: According to Russian media, the project is Type: Project includes construction of Pipeline Project moving ahead of schedule and 448 miles transmission and distribution pipelines Type: Project includes construction of pipeline of the pipeline has been completed and three compressor stations Completion: 2018 PETROVIETNAM GAS/MOECO/ Length: 819 miles Comments: Project is a key element in a 30-year gas PTTEP – (REV 6/16) Diameter: 32 inches supply deal between Moscow and Beijing Project: O Mon Gas Pipeline Location: Bulgaria - Romania - Hungary – Austria Type: Project includes the construction of risers, Capacity: 1.7 Bcm/y (initial) Contractor: DENSO Group Germany subsea pipeline, onshore pipeline and a 4.4 Bcm/y (maximum) Type: Contract includes field-joint coatings, line break valve Completion:4Q 2019 pipe rehabilitation and coatings Length: 248 miles Comments: Project will increase security of gas supply Location: Malay Basin - southern Vietnam and to reduce energy dependence by Project: Yakutia-Kahbarovsk-Vladivostok Pipeline Completion: 2023 making it possible to diversify gas supply Type: Project includes the construction of new Comments: Pipeline will have a capacity of 20.3 routes and sources 56-inch pipeline Length: 2,500 miles

pipeline-news.com | December 2018 | Pipeline News 27 ONGOING PROJECTS Construction Underway

Location: Yakutia - Vladivostok Capacity: 55 Bcm/y into 2, and will have an Completion: 2019 Completion: 4Q 2019 annual capacity of 45 Bcm of natural gas Comments: Project will have a design capacity of 61 Bcm/y of natural gas Contractor: Next Geosolutions AG – (10/16) Type: Project includes survey work on the Contractor: Himachal Futuristic Communications Ltd. GAZ-SYSTEM S.A — (8/18) pipeline deploying the Go Electra vessel Owner: Trans Adriatic Pipeline AG Project: Lwówek-Odolanów Pipeline from Hanko in Finland, which will be Project: Trans Adriatic Pipeline Type: Project includes pipeline construction supported by 15 of M² Subsea’s personnel Type: Project includes the supply and delivery of Length: 168 miles who will carry out the UXO identification 963 miles of fiber optic cable Location: Lwówek-Odolanów work Length: 545 miles Completion: 2020 Location: Azerbaijan – Europe Comments: System is part of the international North- Contractor: Allseas Group Completion: 2020 South Gas Corridor. It also constitutes the Type: Project includes offshore pipe laying of Comments: The pipeline will connect with the Trans final element of the mainline connecting both pipelines through the Baltic Sea Anatolian Pipeline the LNG terminal in Swinoujscie with the underground gas storage facilities in Contractor: Wasco Contractor: SPIECAPAG Wierzchowice and Mogilno Type: Project includes applying concrete weight Owner: Trans Adriatic Pipeline AG coating to the 48-inch pipe Project: Trans Adriatic Pipeline Project: Baltic Connector Pipeline Type: Project includes supplying 4-inch pre- Type: Project includes the construction of a Contractor: MMT Sweden commissioning tools, tracking equipment, bi-directional gas transmission pipeline, Type: Project includes the visual and as well as accessories for the pipeline two onshore gas transmission pipelines, a instrumental inspection of both lines with gas metering station and two compressor remotely operated vehicles over the entire Contractor: Siemens stations length of the route, including the project’s Project: Trans Adriatic Pipeline Length: 93 miles trenched sections and cable crossings Type: Project includes the installation of six Diameter: 20 and 27 inches 15-megawatt SGT-400-driven turbo Location: Paldiski (Estonia) - Inkoo (Finland) Contractor: Wasco Coatings Europe BV compressor trains Capacity: 7.2 MMcm/d Type: Project includes transport, handling and Completion: 1Q 2020 storage of 113,000 pipes Comments: Project will connect the Finnish and Baltic Contractor: Technip gas grids, which are also expected to be Contractor: Intertek Project: Trans Adriatic Pipeline linked with Poland at around the end of Type: Project includes pipeline inspection Type: Project includes supplying 4-inch pre- this decade. Russia’s Gazprom is currently commissioning tools, tracking equipment, the sole supplier of pipeline natural gas POLAND/LITHUANIA – (REV 3/12) as well as accessories for the pipeline to Finland. The EU is striving to reduce its Type: Project includes the construction of new reliance on Russian gas across its member pipeline Contractor: Technip states to improve the security of its Length: 445 miles Project: Trans Adriatic Pipeline supplies Location: Estonia - Latvia - Lithuania - Poland Type: Project includes the overall project and Comments: Project is in the feasibility stage site management, procurement and Contractor: Dovre Group subcontracting for all the EPC packages Type: Contract includes project management ROSTEC – (12/15) throughout the engineering, procurement for the pipeline Owner: Russia/Pakistan and construction phases, as well as Project: Karachi-Lahore Pipeline warranty management and the project Contractor: Neste Jacobs Type: Project includes the construction of new close-out Type: Contract includes engineering for the pipeline and eight compressor stations project along the route Contractor: Industria Meccanica Bassi S.p.A Length: 684 miles Project: Trans Adriatic Pipeline Contractor: MMT Location: Karachi - Lahore Type: Project includes two contracts: first, for engineering, manufacturing and Type: Contract includes a route survey for the Completion: 2018 delivery of 48-inch and 36-inch piggable offshore pipeline Comments: Project will have a capacity of 12.4 Bcm/y will link the liquefied natural gas terminals T-pieces and welded elbows of different characteristics and, second, scraper traps Contractor: Corinth Pipeworks in the port of Karachi and the city of units for intelligent pigging Type: Contract includes pipeline supply for the Lahore onshore portion of the project STROYGAZMONTAZH – (2/17) Contractor: Nuova Giungas Project: Trans Adriatic Pipeline Contractor: Allseas Owner: Gazprom Type: Project includes the engineering, Type: Contract includes offshore pipeline Project: Ukhta-Torzhok 2 Pipeline manufacturing and delivery of 48-inch installation Type: Project includes the construction and installation of 60-inch pipeline and seven and 36-inch isolating joints NORD STREAM 2 AG – (5/18) compressor stations Length: 173 miles (602 miles total) Project: Nord Stream 2 Pipeline Middle East Type: Project includes twinned pipeline Location: Yamal - Ukhta - Torzhok construction Completion: 2019 PETROJET – (3/17) Length: 745 miles Comments: Project will play a key role in ensuring Owner: Oman Gas Co. Diameter: 48 inches the delivery of the needed gas volumes Project: Duqm Pipeline Location: Russia - Baltic Sea - Greifswald in to northwestern Russia for domestic Type: Project includes the construction and Germany consumption and export purposes, looping of 36-inch pipeline including an order to deliver natural gas Length: 137 miles

28 Pipeline News | December 2018 | pipeline-news.com Location: Saih Nihayda - Wusta coast Capacity: 200 Mbpd Completion: 2018 OIL - International Cost: $4 billion Asia Pacific Status: President Museveni and his Tanzanian SAUDI ARABIAN OIL CO. – (9/18) counterpart John Pombe Magufuli Project: South Gas Compression Plant Pipelines BANGLADESH PETROLEUM CORP. – (12/17) signed the East African Crude Oil Pipeline Type: Project includes construction of flowlines, Type: Project includes the construction of off Agreement in Dar es Salaam to express trunklines and transmission lines shore and onshore pipeline intent to go ahead with the construction Length: 435 miles Length: 135 miles (90 miles offshore) and (45 miles of the project Location: Eastern Saudi Arabia onshore) Completion: 4Q 2020 Completion: 2021 Location: Bay of Bengal Comments: Project is associated with the Haradh Gas Cost: $550 million Plant and comes under the Southern Area Status: Exim Bank of China will finance the project Africa Energy Efficiency Program Completion: 1Q 2020 GOVERNMENT OF KENYA – (7/18) Comments: Pipeline will unload oil from ships in the Owner 1: PLC Contractor: Saipem Bay of Bengal and deliver it onshore Owner 2: African Oil Ltd. Type: Contract includes procurement and Owner 3: Maersk Oil construction for the project CHINA – (8/16) Project: Lokichar - Lamu Pipeline (Kenya Crude Oil Project: Gwadar-Kashgar Pipeline Pipeline) Contractor: Tefken Type: Project includes the construction of Type: Project includes pipeline construction Type: Contract includes building satellite gas pipeline Length: 537 miles compression plant pipelines for the Length: 1,500 miles Diameter: 20 inches Haradh Gas Plant Location: Gwadar - Kashgar Location: Lokichar, Kenya – Lamu, Kenya Start: 2017 Capacity: 80 Mbpd (initial) TAPI PIPELINE CO. LTD. – (4/18) Completion: 2021 120 Mbpd (maximum) Owners: TurkmenGaz, Afghan Gas Enterprise, Inter Completion: 1Q 2021 State Gas Systems, GAIL RELIANCE INDUSTRIES LTD. – (12/17) Comments: Pipeline will transport Uganda’s crude oil Project: Turkmenistan – Afghanistan – Pakistan - Project: KG-D6 Subsea Field Development from Kabaale, in Hoima district, northwest India (TAPI) Pipeline Type: Project includes developing the R-series of Kampala to Chongoleani peninsula, Type: Project includes pipeline construction fields as a subsea tieback to the existing near the Tanga port in Tanzania Length: 1,127 miles control and riser platform off Block KGD6 Diameter: 56 inches Location: Krishna Godavari Basin, offshore India Contractor: Wood Group Location: Heart – Kandahar – Chamman – Zhob Capacity: 425 MMcf/d Type: Contract includes the front-end – DG Khan – Multan - Fazilika (Pakistan- Cost: $6 billion engineering design for the project India Border) Capacity: 3.2 Bcf/d Completion: 2020 Cost: $22.5 billion Contractor: Total SA Completion: 1Q 2020 Contractor: McDermott International Inc. Type: Project includes pipeline construction Comments: Project is being funded by the Asian Type: Contract includes engineering, Development Bank and will connect the procurement, installation and state of Punjab in northern India with pre-commissioning for the project FSU Eastern Europe the Galkynysh gas field in the desert in Comments: The optional scope also consists of two AMBO LLC – (9/13) additional subsea structures and flowlines eastern Turkmenistan Project: AMBO Pipeline at a water depth between 4,593 and 5,905 Type: Project includes the construction of new feet LNG - International pipeline Length: 575 miles TRANSNEFT PCD LLC — (8/18) Asia Pacific Location: - Vlore Project: Novovelichkovskaya - Krasnodar Oil Comments: Pipeline is on hold due to the lack of KUMUL PETROLEUM HOLDINGS LTD. — Pipeline availability of crude oil coupled with (10/17) Type: Project includes pipeline construction financial hurdles Project: Kikori Energy Hub Length: 31 miles Type: Project includes a mid-scale LNG Diameter: 21 inches liquefaction and regional export Location: Novovelichkovskaya - Krasnodar Middle East facility,180MW power generation Capacity: 4.5 MMt/y facility, methanol process facility and a Completion: 2019 KURDISTAN REGIONAL GOVERNMENT – condensate stabilization, storage and Comments: System will join Novovelichkovskaya oil (1/18) regional export facility pump station with refineries of Krasnodar Project: Kirkuk–Ceyhan Pipeline Location: Gulf Province, Papua New Guinea Territory - Afipsky and Ilsky Type: Project includes the construction of Status: Project is in the preliminary front-end pipeline and two pumping stations engineering and design stage UGANDA/TOTAL E&P – (7/17) Length: 217 miles Comments: Project is part of the Western Pipeline Contractor: Gulf Interstate Engineering has been Diameter: 40 inches Extension Project, which will allow awarded a contract for the front-end Location: Baiji, Saladin Province - Fish-Khabur stranded oil and gas fields in the western engineering and design of the pipeline border crossing with Turkey provinces to come to the coast for export Project: Uganda–Tanzania Crude Oil Pipeline Type: Project includes the construction of an Contractor: KBR Inc. export pipeline and an associated oil Type: Project includes conceptual development refinery and feasibility study services for the Kikori Length: 897 miles Energy Hub Diameter: 24 inches Location: Hoima, Uganda - Tanga, Tanzania 29 ONGOING PROJECTS Construction Underway

Capacity: 1 MMbpd Project: Basra-Aqaba Pipeline Type: Project includes the engineering, Comments: The new pipeline section will replace an Type: Project includes construction of dual oil installation and commissioning of a old pipeline that suffered severe damage and gas pipelines major multi-product fuel pipeline system in terror attacks after ISIS took control of Length: 1,044 consisting of three integrated pipelines Mosul in June 2014 Location: Basra, Iraq - Aqaba, Jordan Length: 404 miles Capacity: 1 MMbpd (oil), 258 MMcf/d (gas) Location: Ellesmere port in northwestern England - KUWAIT OIL CO. – (11/17) Cost: $18 billion southeastern coast Project: Al Zour Refinery Comments: Project will help to meet Jordan’s energy Completion: 2018 Type: Project includes construction of an oil needs and crude will be supplied by state- Comments: The pipelines connect to the City of refining plant, which will be one of the owned South Oil Co., via the State Oil London’s major airports and are a critical largest refining plants worldwide Marketing Organization part of the UK’s infrastructure Location: Kuwait Capacity: 615 Mbpd Contractor: SNC Lavalin Cost: $14.5 billion Type: Project includes engineering, OFFSHORE – Completion: 1Q 2019 procurement and design International Comments: Project is part of the Clean Fuels Project to upgrade, expand, and transform the 270 NATIONAL IRANIAN OIL ENGINEERING AND Africa Mbpd Mina Abdullah and 466 Mbpd Mina CONSTRUCTION CO. – (REV 12/17) DANGOTE OIL REFINERY CO. – (3/18) Al Ahmadi refineries into an integrated Project: Goureh-Jask Crude Oil Pipeline Owner: Dangote Group 800 Mbpd merchant refining complex and Type: Project includes construction of pipeline Project: Dangote Oil Pipeline permanently shut down the 200 Mbpd and five pumping facilities Type: Project includes the transportation and Shuaiba Refinery Length: 621 miles installation of nine subsea pipelines Diameter: 42 inches Length: 62 miles Contractor: Larsen & Toubro Location: Genaveh – Jask Diameter: 24 and 48 inches Type: Project includes engineering, Capacity: 1 MMbpd Location: Lagos, Nigeria procurement and construction for the Comments: Project will transfer crude oil to Jask Oil Completion: 3Q 2019 refinery Terminal in the southern Hormozgan Comments: Project will connect to the 650 Mbpd Cost: $265 million Province Dangote Oil Refinery and is part of Dangote’s $17 billion gas pipeline, Contractor: Saipem fertilizer, petrochemicals and refinery Type: Project includes engineering, PRODUCTS – projects procurement, construction and International commissioning activities associated with Contractor: China Harbor Engineering Co. the feed pipelines for the Al Zour Refinery Middle East Type: Project includes engineering, Length: 280 miles TENGIZCHEVROIL – (3/18) procurement and construction Cost: $850 million Project: Area 51 Pipelines Comments: Project is designed to transport crude oil Type: Project includes construction of a pipeline Contractor: China’s Offshore Oil Engineering Co. and gas from various South Tank Farm gathering system Type: Project includes engineering, manifolds to the new Al Zour Refinery and Length: 234 miles procurement and construction refined products to storage areas in the Location: Kazakhstan Mina Al Ahmadi Refinery Comments: Project is part of the FGP-WPMP Project MOBIL PRODUCING NIGERIA UNLIMITED — and will transport fluids (water, fuel (6/18) Contractor: Amec Foster Wheeler gas, diesel) from the Tengiz and Korolev Project: Uplift Pipeline Type: Work scope includes front-end reservoirs to the new FGP processing Type: Project includes offshore pipeline engineering and design for the project facilities construction Length: 12.5 miles Contractor: Essar Projects Contractor: Bonatti Diameter: 24 inches Type: Work scope includes engineering, Type: Project includes construction and pre- Location: offshore Nigeria procurement and construction for the commissioning of the pipeline gathering Comments: Project will run between the Idoho Al-Zour Refinery Project, Package-4 system platform, an onshore terminal, and the Cost: $1.57 billion Edop and Idoho platforms ZAKHEM INTERNATIONAL – (REV 8/14) Contractor: Fluor Corp. Owner: Kenya Pipeline Co. Contractor: Subsea 7 Type: Work scope includes two engineering, Project: Mombasa-Nairobi Pipeline Type: Contract includes engineering, procurement and construction contracts Type: Project includes the design and construction, transportation, installation for key process units, utilities and supervision of the construction of new and pre-commissioning of pipeline infrastructure for the new Al-Zour Refinery 14-inch pipeline Cost: $300 million Project Length: 280 miles Cost: $2.6 billion Location: Mombasa-Nairobi PETROSHOROUK – (11/17) Comments: As of April 2016, the project has been Project: Zohr Field Development Project Contractor: Técnicas Reunidas delayed Type: Project includes construction and Type: Work scope includes the installation of installation of an export pipeline and processing units for the Al-Zour Refinery umbilicals Project Western Europe & Diameter: 8 and 30 inches Cost: $4.1 million Location: offshore Egypt EU Countries Completion: 4Q 2018 MINISTRY OF OIL OF IRAQ – (4/18) YOKOGAWA ELECTRIC CORP. – (3/17) Operator: Iraq State Co. for Oil Projects Owner: British Pipeline Agency Ltd. Contractor: BHGE

30 Pipeline News | December 2018 | pipeline-news.com Segment: Zohr Field Development Project Phase II through an existing pipeline for power Type: Project includes construction of the Type: Contract includes project management, generation, but will also target the Pearl central processing facility associated with engineering, procurement, fabrication, River Mouth Delta region in Guangdong the Ichthys LNG Project construction, testing and transportation of province the subsea production system Contractor: Daewoo Shipbuilding and Marine Contractor: Offshore Oil Engineering Co. Engineering Contractor: Saipem Type: Contract includes the front-end Type: Project includes construction of the FPSO Segment: Optimized Ramp Up Phase engineering and design for the project associated with the Ichthys LNG Project Type: Project includes engineering, procurement, construction and Contractor: Wood Group L&T HYDROCARBON installation of an export pipeline and Type: Contract includes subsea and flow ENGINEERING LTD. – (5/17) umbilicals assurance services Project: Neelam Re-Development & B173AC Cost: $900 million Project Comments: Saipem will deploy several vessels from INPEX OPERATIONS AUSTRALIA PTY LTD. — Type: Project includes the engineering, its highly specialized fleet, including (10/17) procurement, construction, installation the Castorone (the latest generation Operator: INPEX Operations Australia Pty Ltd. and commissioning and includes one ultra-deepwater pipelayer); the subsea Project: Ichthys LNG Project new process platform containing gas field development ship DSSaipem F2; Type: Project includes the development of a processing and compression facilities, the Saipem 3000 (a subsea construction gas export pipeline (lchthys LNG Project three new well head platforms, a 20-mile vessel), the Castoro 6 and the trenching GEP), onshore LNG facilities, a central pipeline, and modification work on eight barge Castoro 10 processing facility and an FPSO facility existing platforms Length: 553 miles Length: 20 miles Diameter: 42 inches Location: Neelam Field offshore India Asia Pacific Location: offshore Western Australia Completion: 2019 CHEVRON AUSTRALIA – (9/18) Capacity: 8.9 MMtpa (LNG) Project: Gorgon LNG Project (Stage II) 1.6 MMtpa (LPG) MURPHY SABAH OIL – (12/17) Type: Project includes 15 new wells, subsea 100 Mbpd (condensate) Owner 2: PETRONAS (56%) installations and pipelaying work Cost: $34 billion Project: Phase 1A Block H Gas Development Location: Offshore Australia Completion: 3Q 2018 Type: Project includes the construction of a Capacity: 15.6 MMtpy Comments: Gas and condensate from the Ichthys floating LNG facility Comments: Project comprises offshore field facilities Field will be exported to onshore facilities Location: offshore Sabah, Malaysia (Sabah Delta feeding gas and condensate into three for processing near Darwin via the export Basin – Block H) LNG trains and a domestic gas plant on pipeline. Most condensate will be directly Completion: 2018 Barrow Island shipped to global markets from a floating production, storage and offloading facility Contractor: TechnipFMC Contractor: TechnipFMC permanently moored near the Ichthys Type: Contract includes the engineering, Type: Contract includes project management Field in the Browse Basin procurement, construction, installation and engineering, transportation, and commissioning of the umbilicals, installation and pre-commissioning of Contractor: Saipem risers and flowlines as well as the umbilicals and flying leads as well as Type: Project includes engineering, transportation and installation of subsea manifolds procurement, construction and hardware and controls Comments: Contract also includes fabrication, installation of the gas export pipeline transportation, installation and testing of associated with Ichthys LNG Project NEXEN PETROLEUM UK LTD. – (9/18) rigid spools Comments: Saipem’s deep water installation vessel, Project: Buzzard Phase II Development Project Castorone, will lay the pipe to the Ichthys Type: Project includes a subsea development of Contractor: Wood Group Field the Buzzard northern area consisting of Type: Contract includes engineering, design, a 12-slot manifold and will be tied back construction management, procurement, Contractor: Wood Group to the existing Buzzard complex with a logistics, quality assurance, health, Type: Projects includes subsea engineering pipeline bundle assembly incorporating environment and safety management services for the gas export pipeline pipelines, manifolds, subsea controls and services for Chevron-operated onshore associated with Ichthys LNG Project chemical injection and offshore assets Location: Offshore Scotland Contractor: Halfwave Completion: 1Q 2021 CHINA NATIONAL OFFSHORE OIL CORP. – Type: Project includes multiple inline pipeline Completion: Project will allow production at Buzzard (11/17) inspections to be accelerated and increased by Project: Lingshui 17-2 Gas Development Comments: The scope of work includes a custom built accessing reserves in these reservoir Type: Project includes construction and 42-inch acoustic resonance technology blocks which cannot be reached from the installation of a subsea production system, (ART) Scan™ by Halfwave to inspect the existing Buzzard Wellhead Platform including the installation of a subsea subsea pipeline that requires a low flow distribution unit south of the floater, a subsea launch with high speed inspection Contractor: TechnipFMC pipeline-end manifold and five other of the transmission pipeline Type: Contract includes project management, manifolds, three to be installed in the east engineering, procurement, construction and two in the west Contractor: JKC Australia LNG and installation of a pipeline bundle along Location: Qiongdongnan Basin, South China Sea Type: Project includes construction of the with associated well and platform tie-ins, Capacity: 2.3 Bcm/y (initial) onshore facilities associated with Ichthys and provision of a heavy lift vessel for 30 Bcm/y (maximum) LNG Project transport and installation of a new topside Completion: 2020 module Comments: Gas will initially be sent to Hong Kong Contractor: Samsung Heavy Industries

pipeline-news.com | December 2018 | Pipeline News 31 ONGOING PROJECTS Construction Underway

OIL & NATURAL GAS CORP. – (1/18) Pipeline Project: Pipeline Replacement Project-4 (PRP4) Location: Kıyıköy, Turkey Middle East Type: Project includes surveys; residual design; Capacity: 31.5 Bcm/y BP OMAN – (3/18) engineering, procurement and fabrication; Cost: $409 million Owner 2: Oman Oil Company Exploration & anti-corrosion and weight coating; Comments: The facility will receive gas from the Production, 40% installation of a submarine pipeline, riser TurkStream Pipeline, originating from the Project: BP Khazzan Project (Phase II) and I/J tubes; modifications on existing compressor station in , Russia Type: Project includes the ongoing expansion of facilities; and hook-up, testing, pre- the gas gathering system, wellsite facilities commissioning and commissioning of Contractor: Allseas Group S.A. and export pipelines facilities Type: Project includes pipe laying of the first Location: Sultanate of Oman Length: 54 miles and second string of the pipeline’s Comments: Khazzan is considered to be one of the Location: Arabian Sea offshore section biggest tight gas projects in the Middle Comments: Project is part of ONGC’s strategy to Length: 560 miles offshore (1,190 total) East and Phase 1 is expected to develop replace some of its well fluid, gas lift approximately 7 Tcf of gas, deliver plateau and water injection pipelines along with PREMIER – (10/18) production of 1 Bcf/d and 25 Mbpd of gas brownfield modification works on existing Project: Tolmount Field Gas Project condensate platforms in the company’s Mumbai High, Type: Project includes a minimal facilities Neelam, Heera and Bassein and Satellite platform exporting gas to shore via a new Contractor: Jacobs Engineering Group Inc. fields in the Western Offshore field in the gas pipeline Type: Project includes engineering, Arabian Sea on the continental shelf of Location: Southern procurement and construction Western India Capacity: 300 MMcf/d management of the gathering system, Completion: 4Q 2020 export pipeline and wellsite facilities Contractor: L&T Hydrocarbon Engineering Ltd. Comments: Field is scheduled to produce gas for 10 - Type: Project includes engineering, 15 years Contractor: Corp. procurement, construction, installation Type: Project includes engineering, and commissioning activities Contractor: Storage Ltd. procurement and construction Cost: $194 million Type: Contract includes modifications to its management of an additional third gas Easington Terminal so that it can receive train, liquid and compression trains and SUBSEA 7 S.A. – (5/17) and process the gas from the Tolmount associated infrastructure, as well as Owner: Cooper Energy Ltd. field, which will arrive through a new gas brownfield work Project: Sole Development Project pipeline Cost: $800 million Type: Project includes the subsea tie-back Location: Easington, Yorkshir Comments: The third gas train with a capacity for of the Sole well to the Orbost Gas Comments: Contract will extend the life of CSL’s nominally handling 500 MMcfd will help Plant, the fabrication and installation of gas terminal at Easington, Yorkshire, drive increased total production capacity pipeline, spool and manifold, along with until at least 2030, creating hundreds from the CPF to 1.5 Bcfd installation of a 40-mile umbilical and the of jobs during the construction phase commissioning of the system and securing 80 over the lifetime of the ENERGEAN OIL & GAS PLC – (5/18) Length: 40 miles contract Project: Karish & Tanin Development Project Location: Gippsland Basin Type: Project includes pipeline construction Completion: 2018 Contractor: Rosetti Marino Length: 56 miles Type: Contract includes engineering, Location: offshore Israel procurement, construction, installation Capacity: 3.8 Bcm/y FSU Eastern Europe and commissioning of the platform Completion: 1Q 2021 GAZPROM — (REV 1/18) Updates: In support of the project, Energean has Operator: Transport B.V. Contractor: Saipem signed long-term agreements with some Project: TurkStream Pipeline Project Type: Contract includes engineering, of the largest private power producers Type: Project includes construction of two procurement, construction and and industrial companies in Israel parallel pipelines installation of the pipeline Comments: System will connect a proposed FPSO to Length: 1,190 miles Israel’s domestic sales gas grid Diameter: 32 inches STATOIL – (5/18) Location: Ipsala, Turkey – – Krasnodar, Project: Askeladd - Snøhvit Pipeline Contractor: Technip FMC Russia Type: Project includes pipeline construction Type: Contract includes engineering, Capacity: 31.5 Bcm/y Length: 115 miles procurement, construction, installation Cost: $14 billion Diameter: 27 inches and commissioning for the project Status: Project construction has reached Turkish Location: weBarents Sea waters Comments: Snøhvit development consists of the SAIPEM — (7/18) Completion: 4Q 2019 Snøhvit and Albatross fields, which are Type: Contract includes engineering, Comments: Project will directly connect the large currently operational, and the Askeladd procurement, construction and gas reserves in Russia to the Turkish gas field, which is under development and installation activities for four pipelines transportation network, to provide reliable designed to maintain a full capacity utili- Diameter: 24 and 32 inches energy supplies for Turkey and south-east zation at the Melkøya LNG plant Location: Middle East Europe Comments: Company has not said where the pipelines Contractor: Subsea 7 S.A. will be built or which operating company Contractor: Petrofac Type: Contract includes pipelaying has awarded the contract Type: Project includes engineering, Length: 75 miles procurement and construction services Diameter: 20 inches SAUDI ARAMCO – (1/18) for onshore pipelines and a gas receiving Completion: 1Q 2020 Project: Zuluf Field Expansion terminal associated with the TurkStream Type: Project includes the installation of water

32 Pipeline News | December 2018 | pipeline-news.com injection and oil wellhead platforms, tie-in templates or manifolds, as well as nine field, which is under development and platforms, trunk lines and flowlines along trees designed to maintain a full capacity utili- with onshore central processing facilities Location: Norwegian Continental Shelf zation at the Melkøya LNG plant Location: offshore Saudi Arabia Completion: 2Q 2021 Capacity: 600 Mbpd Comments: The initial development was carried Contractor: Ramboll Completion: 1Q 2021 out over two phases, and now Equinor Type: Project includes pipeline front-end Comments: The gas and condensate will be sent to is starting the Phase 3 development to engineering and procurement the new Tanajib gas plant, which is part of recover the large amount of gas resources the new Marjan Program in the western part of the field Contractor: GE Oil & Gas Type: Project includes project development and Contractor: Jacobs Engineering Group Inc. Contractor: Nexans S.A. equipment supply Type: Contract includes engineering and project Type: Contract includes providing umbilicals management for the project required to power and control the subsea Operator: Statoil systems Project: Johan Sverdrup Field Project: Haradh Gas Increment Program Length: 18 miles Segment: Johan Sverdrup Pipeline Type: Project includes construction of pipeline Type: Project includes installation of a gas and new gas compression facilities GASTRADE S.A. — (8/17) export pipeline and an oil export pipeline Length: 280 miles Project: Alexandroupolis Independent Natural Gas Length: 170 miles (oil) Location: offshore Saudi Arabia System 102 miles (gas) Capacity: 290 Mcf/d Type: Project includes pipeline construction Diameter: 18 and 36 inches Completion: 2Q 2019 Location: offshore Greece Location: North Sea Comments: Pipeline will transport natural gas from the Length: 17 miles Cost: $18 billion Haradh field to the Hawiyah processing Diameter: 30 inches Completion: 1Q 2019 plant Capacity: 6.1 Bcf/y Comments: The oil pipeline will be installed and Completion: 4Q 2019 connected to the Mongstad oil terminal Contractor: China Petroleum Pipelines Co. Comments: Pipeline is associated with the and the gas pipeline will be installed and Type: Contract includes pipeline construction Alexandroupolis LNG project connected to the Kårstø gas terminal

Project: Safaniya Field Expansion Contractor: Wood Group Contractor: Petroleum Safety Authority (PSA) Norway Type: Project includes the construction and Type: Project includes front-end engineering Type: Project includes an audit and installation of a tie in platform to serve and design development of an installation concept as an extra gathering hub for future oil wellhead platforms, along with a trunkline HURRICANE ENERGY PLC – (11/17) Contractor: Samsung Heavy Industries Length: 16 miles Project: Lancaster Early Production System Project Type: Project includes supply of pipeline and Diameter: 30 inches Type: Project includes installation of production fittings Location: offshore Saudi Arabia flowlines, manifolds and the FPSO Comments: Pipeline will run between the new TP-21 mooring system; and commissioning and Contractor: Mitsui & Co. Norway AS and the onshore Safaniya GOSP-1 ongoing production of oil via the FPSO Type: Project includes pipeline fabrication Location: offshore west Shetland Contractor: McDermott International Inc. Capacity: 17 Mbpd Contractor: Wasco Coatings Malaysia Sdn. Bhd. Type: Contract includes the engineering, Completion: 1Q 2019 Type: Project includes external anticorrosion procurement, construction and treatment and concrete weight coating installation of the platform Contractor: TechnipFMC Type: Contract includes engineering, Contractor: Saipem Ltd. Contractor: National Petroleum Construction Co. procurement, construction and Type: Project includes pipelay Type: Contract includes the engineering, installation for the project procurement, construction and Contractor: DeepOcean installation of the pipeline NDT GLOBAL – (8/16) Type: Project includes engineering, Owner: Statoil procurement, construction and Project: Åsgard Pipeline installation of umbilicals and manifolds Western Europe & Type: Project includes the development of a suitable inline inspection tool and Contractor: TechnipFMC EU Countries corresponding survey for the 14-inch Project: Visund Nord IOR Project ENI – (8/17) pipeline Owner 2: Sonatrach Length: 440 miles Contractor: Wood Group Operator: Transmediterranean Pipeline Co. Ltd. Location: Norwegian Sea Project: Tampen Oil Pipeline Contractor: DOF Subsea Start: 2016 Project: Trans-Mediterranean Pipeline Completion: 2017 STATOIL – (2/18) Type: Project includes pipeline inspection of five Owners: Petoro AS (30%); ExxonMobil Exploration submarine pipelines STATOIL – (9/17) and Production Norway AS (17.44%); Length: 466 miles Project: Askeladd - Snøhvit Pipeline Idemitsu Petroleum Norge AS (9.6%); DEA Diameter: 20 and 48 inches Type: Project includes pipeline construction Norge AS (8.57%); and Point Resources AS Location: Sicily-Tunisia Length: 115 miles (1.1%) Diameter: 27 inches Project: Snorre Expansion Project EQUINOR ASA — (8/18) Location: Barents Sea Type: Project includes fabrication and Project: Trolls Phase III Project Comments: Snøhvit development consists of the installation of a pipeline bundle system, Type: Project includes subsea production Snøhvit and Albatross fields, which are modification work on Snorre A and a rig systems will comprise two subsea currently operational, and the Askeladd deal

pipeline-news.com | December 2018 | Pipeline News 33 ONGOING PROJECTS Construction Underway

Location: Tampen area, North Sea procurement, construction and Completion: 2020 installation services for the project Comments: Snorre has been producing oil and gas Cost: $250 million since August 1992 WOODSIDE ENERGY – (8/17) Contractor: TechnipFMC Operator: Woodside Petroleum Ltd. Type: Project includes an EPC contract for the Project: Greater Western Flank (GWF) Project subsea production system Phase II Type: Project includes development of six Contractor: Subsea 7 hydrocarbon fields, installation of Type: Project includes fabrication and a flowline, subsea hardware and an installation of the pipeline bundle system umbilical to tie wells into the GWF-2 Pipeline Contractor: Aibel Location: North West Shelf Type: Project includes modification work on Capacity: 1.2 Tcf Snorre A Cost: $2 billion Completion: 1Q 2019 Contractor: Transocean Type: Project includes a rig deal for the Contractor: FMC Technologies expansion Type: Project includes design, manufacture and supply of subsea production systems TOTAL E&P DENMARK – (11/18) Cost: $180 million Project: Tyra Redevelopment Subsea Installation Phase II Operator: Woodside Petroleum Ltd. Type: Project includes relocating and Project: GWF-2 Pipeline connecting subsea pipelines as well as the Type: Project includes construction of pipeline installation of manifolds, vertical platform Length: 22 miles production risers and umbilicals Diameter: 16 inches Location: Danish North Sea Comments: Pipeline is part of the Greater Western Flank Project Phase II Contractor: Royal Boskalis Westminster N.V. Type: Contract includes subsea engineering, Contractor: Wood Group Kenny procurement, fabrication and installation Type: Project includes engineering support for the project during the fabrication and construction stages of the pipeline VNG NORGE – (2/18) Cost: $6 million Owners: VNG Norge (operator, 30%); Faroe Petroleum (25%); and Point Resources Contractor: McDermott (45%) Type: Project includes transportation and Project: Fenja Redevelopment Project installation of pipeline Type: Project includes installation of subsea equipment including umbilicals, risers, Owner: BP flowlines and the subsea production Project: Forties Pipeline System system for the Fenja Project, which will Type: Project includes delivering engineering, be tied back to the Njord platform with an procurement and construction services electrically trace heated pipeline to six U.K. continental shelf offshore Length: 23 miles upstream assets Location: offshore Norway Location: North Sea Completion: 2020 Contractor: Reinertsen AS Type: Contract includes providing engineering services for the project OTHER – International

Contractor: Aker Solutions Asia Pacific Type: Contract includes FEED services for DUBAI ELECTRICITY AND WATER AUTHORITY subsea production systems for the project (8/17) Project: Dubai Plan 2021 Project Contractor: Subsea7 Type: Project includes main water pipe Type: Contract includes FEED services for extension subsea structures, umbilicals, risers and Length: 25 miles flowlines for the project Diameter: 23 to 47 inches Location: Dubai Contractor: TechnipFMC Cost: $67.5 million Type: Contract includes integrated engineering, Completion: 1Q 2021 Status: Project has been awarded to an unknown contractor

34 Pipeline News | December 2018 | pipeline-news.com