STATE ELECTRICITY BOARD LIMITED KSEB (lncorporated under the Companies Act, 1956) Reg. Office: Wdyuthi Bhavanam, Pattom, - 695 004 Cl N :U40100K12011SG C027424 Website: www kseb. i n /5ffi Vydyuthi Bhavanam, Pattom, Thiruvananthapuram - 695 004, Kerala Phone: +97 477 2446885, Fax: +9L 47L 2444738 E-mail:[email protected] ABSTRACT

Construction of 66/LLKV GIS Substation at Thripunithura and installation of 66 KV cable under Transmission Circle Kalamassery on turn key basis under IPDS Scheme- Completion of project ahead of schedule Appreciation for Engineers and Staff -Sanctioned- Orders issued.

Corporate Office(SBU-T) B.O.(FTD) No. 39712019/D(T&SO)/T2|KLSY /GlS TPRA - Appreciation/2019-20 dated Tvpm17.05.2019

ORDER Read : Note No.D(T&SO)/I2/KLSY/Tr|punithura-Appreciation/2O19-20 dated: 09.05.2019 of the Directo r (Tra nsm ission &System Operation ) (Agen da 25 / 5 / L9)

The Chief Engineer (Transmission South) has intimated that the work of 'Construction of 66/11KV GIS Substation at Thripunithura and installation of 66 KV cable under Transmission Circle Kalamassery on turn key basis under IPDS Scheme-'was carried out in a commendable way under the leadership of the Deputy Chief Engineer Transmission Circle ,Kalamassery . The work included the supply and installation of 66/L7KV , 2xIO MVA Gas Insulated Switchgear Substation was awarded to M/s Seimens on 16.01.2018 on turnkey basis for a contract amount of Rs.17,62,76,495/- & the supply and installation of 66KV,400 sqmm , XLPE cable was awarded to M/s Finolex JPS Pvt Ltd., on turnkey basis for a contract amount of Rs. 6,55,I9,329/-.Mls Seimens had started the work on 2O.O2.20I8 and M/s Finolex JPS Pvt Ltd had started site work on 20.o4.20L8.

Consequently, 66KV cable feeders to the substation were energised on 30.11.2018 and 66 KV Switchgears on l-.12.2018. L0MVA transformers were commissioned on 01,.12.2078.66 KV GIS Substation is a fully automated substation and the control and operation of the same will be done from 110KV Substation, Vytilla. Contract period for 66KV GIS Substation Tripunithura was 12 months, with completion date 15.01.2019. The Substation was energised well ahead of l-2 months. This could be achieved only because of dedicated and and hard work of Engineers and Staff of Transmission Circle, Kalamassery.

The Chief Engineer (TS) has also reported that multiple activities were arranged and planned Round the Clock on war footing basis by the field Engineers and supervisors in orderto achieve the target and avail grant of IPDS for KSEBL. Utmost care was given on quality of the work. Hence some Assistant Engineers, Sub Engineers and Overseers from other sections under Transmission Circle, Kalamassery had also been employed for the erection work , since the same is not possible by one Assistant Engineer and one Sub Engineer of TC Section Tripunithura. Approvals for the drawing/ documents were done in a professional manner , through various committees. Contribution of varioustechnicalcommittees was also excellent. As a result KSEBL has reached the milestone ahead of schedule.

Hence , Considering the meritorious service rendered by the following officers and staff of KSEBL for the subject work, Chief Engineer (TS) has recommended to order Good service Entry , as a token of appreciation.

1. Sri" George V. James, Deputy Chief Engineer, Transmission Circle, Kalamassery. 2. Smt. Pushpa l, Executive Engineer, Transmission Division, Bhrahmapuram. 3. Sri.Pradeep S, Assistant Executive Engineer(C), Civil Sub Division, Kalamassery. 4. Smt. Sheeja B, Assistant Executive Engineer, TC Sub Division ,Bhrahmapuram. 5. Sri. Saju M.P, Assistant Engineer(C), CivilSub Division, Kalamassery. 6. Smt. Sudha M.R, Assistant Engineer, TC Section, Tripunithura. 7. Sri. Rajasekhar Rao T.R, Assistant Engineer; 1L0KV Substation,Panangad. 8. 5ri. Antony D'Cruze, Sub Engineer; 110 kV Substation, Mattanchery. 9. Sri. Santhosh N.C, Sub Engineer, 66 kV Substation, .

Considering the above, Director (T&SO) recommended to accord sanction to order Good service Entry for the above officers & staff for the work of 'Construction of 66/ILKV GIS Substation at Thripunithura and installation of 66 KV cable underTransmission Circle Kalamassery on turn key basis under IPDS Scheme-' which was carried out in a commendable way .

Having considered all the aspects vide note read above , the Full Time Directors Meeting held on 09.05.201-9, resolved to accord sanction to award Good service Entry to the following officers for the work of 'Construction of 66/IIkV GIS Substation at Thripunithura and installation of 66 KV cable under Transmission Circle Kalamassery on turn key basis under IPDS Scheme-' which was carried out in a commendable way.

1. Sri. George V. James, Deputy Chief Engineer, Transmission Circle, Kalamassery. 2. Smt. Pushpa 1l Executive Enginee4 Transmission Division, Bhrahmapuram. 3. Sri.Pradeep S, Assistant Executive Engineer(C), Civil Sub Division, Kalamassery. 4. Smt. Sheeja B, Assistant Executive Engineer, TC Sub Division ,Brahmapuram. 5. Sri. Saju M.P, Assistant Engineer(C), CivilSub Division, Kalamassery. 6. Smt. Sudha M.R, Assistant Engineer, TC Section, Thripunithura 7. Sri. Rajasekhar Rao T.R, Assistant Engineeri 110kV Substation,Panangad. B. Sri. Antony D'Cruze, Sub Engineer, LL0 kV Substation, Mattanchery. 9. Sri. Santhosh N.C, Sub Engineer, 66 kV Substation, Kakkanad.

Orders are issued accordingly. By order of the Full Time Directors, sd/- Lekha G. Company Secretary (In- Chargc)

To, The Chief Engineer (Transmission South) Copy to: The Deputy Chief Engineer(lT) The Deputy Chief Engineer, Transmission Circle , Kalamasserry The Chief Internal Auditor/The Financial Adviser/ The RCAO/The RAO The TA to Chairman & Managing Director/D (T&SO)/ D (D&lT)/ D (G-C&HRM)/ D(CP,GE,SCM&S) Th e PA to Di recto r( Fi n a n ce)/Secreta ry (Ad m in istration ). The Fair Copy Superintendent. Library/Stock File.