66746 Federal Register / Vol. 75, No. 209 / Friday, October 29, 2010 / Notices

DEPARTMENT OF ENERGY The licensees state that the benefits of protests must set forth their evidentiary using Power Company’s water basis and otherwise comply with the Federal Energy Regulatory storage space for uses other than requirements of 18 CFR 4.34(b). All Commission providing a target flow in the bypassed comments, motions to intervene or [Project No. 2899–136] reach outweigh the benefits of the above protests should relate to project works license article requirements. Further, which are the subject of the license Company and Milner the licensees request the Commission to amendment. Agencies may obtain Dam, Inc; Notice of Application for delete Article 401, which requires them copies of the application directly from Amendment of License, and Soliciting to lease available water from the Upper the applicant. A copy of any protest or Comments, Motions To Intervene, and Snake Water Supply Bank. motion to intervene must be served Protests l. Locations of the Application: A upon each representative of the copy of the application is available for applicant specified in the particular October 22, 2010. inspection and reproduction at the application. If an intervener files Take notice that the following Commission’s Public Reference Room, comments or documents with the hydroelectric application has been filed located at 888 First Street, NE., Room Commission relating to the merits of an with the Commission and is available 2A, Washington, DC 20426, or by calling issue that may affect the responsibilities for public inspection: (202) 502–8371. This filing may also be of a particular resource agency, they a. Type of Application: Non-Capacity viewed on the Commission’s Web site at must also serve a copy of the document Amendment of License. http://www.ferc.gov/docs-filing/ on that resource agency. A copy of all b. Project No.: 2899–136. efiling.asp. Enter the docket number other filings in reference to this c. Date Filed: April 14, 2010. excluding the last three digits in the application must be accompanied by d. Applicant: Idaho Power Company docket number field to access the proof of service on all persons listed in and Milner Dam, Inc. document. You may also register online the service list prepared by the e. Name of Project: Milner at http://www.ferc.gov/docs-filing/ Commission in this proceeding, in Hydroelectric Project. esubscription.asp to be notified via e- accordance with 18 CFR 4.34(b) and f. Location: The project is located on mail of new filings and issuances 385.2010. the in and related to this or other pending projects. Cassia Counties, Idaho. For assistance, call 1–866–208–3676 or Kimberly D. Bose, g. Filed Pursuant to: Federal Power e-mail [email protected], Secretary. Act, 16 U.S.C. 791(a)–825(r). for TTY, call (202) 502–8659. A copy is [FR Doc. 2010–27402 Filed 10–28–10; 8:45 am] h. Applicant Contact: Rex Blackburn, also available for inspection and BILLING CODE 6717–01–P Senior Vice President and General reproduction at the address in item (h) Counsel, and Nathan F. Gardiner, Idaho above. Power Company, 1221 West Idaho m. Individuals desiring to be included DEPARTMENT OF ENERGY Street, P.O. Box 70, Boise, Idaho 83707– on the Commission’s mailing list should 0070; telephone: (208) 388–2713. so indicate by writing to the Secretary Federal Energy Regulatory i. FERC Contact: Any questions of the Commission. Commission regarding this notice should be directed n. Comments, Protests, or Motions to [Project No. 13832–000] to Mr. Anthony DeLuca (202) 502–6632 Intervene: Anyone may submit or [email protected]. comments, a protest, or a motion to SPS of Oregon; Notice of Application j. Deadline for filing comments, intervene in accordance with the Accepted for Filing and Soliciting motions to intervene and protest: requirements of Rules of Practice and Comments, Motions To Intervene, November 22, 2010. All documents may Procedure, 18 CFR 385.210, .211, .214. Protests, Recommendations, and be filed electronically via the Internet. In determining the appropriate action to Terms and Conditions See, 18 CFR 385.2001(a)(1)(iii) and the take, the Commission will consider all instructions on the Commission’s Web protests or other comments filed, but October 22, 2010. site at http://www.ferc.gov/docs-filing/ only those who file a motion to Take notice that the following efiling.asp. If unable to be filed intervene in accordance with the hydroelectric application has been filed electronically, mailed to: Secretary, Commission’s Rules may become a with the Commission and is available Federal Energy Regulatory Commission, party to the proceeding. Any comments, for public inspection: 888 First Street, NE., Washington, DC protests, or motions to intervene must a. Type of Application: Conduit 20426. Commenters can submit brief be received on or before the specified Exemption. b. Project No.: 13832–000. comments up to 6,000 characters, comment date for the particular c. Date filed: August 9, 2010. without prior registration, using the application. d. Applicant: SPS of Oregon. eComment system at http:// o. Filing and Service of Responsive e. Name of Project: SPS of Oregon www.ferc.gov/docs-filing/ Documents: Any filing must (1) bear in Hydroelectric Project. ecomment.asp. You must include your all capital letters the title f. Location: The project is located near name and contact information at the end ‘‘COMMENTS’’, ‘‘PROTEST’’, or the City of Wallowa, in Wallowa of your comments. ‘‘MOTION TO INTERVENE’’ as County, Oregon. Please include the project number (P– applicable; (2) set forth in the heading g. Filed Pursuant to: Federal Power 2899–136) on any comments, motions, the name of the applicant and the Act 16 U.S.C. 791a–825r. or recommendations filed. project number of the application to h. Applicant Contact: Mr. Ben k. Description of Request: The which the filing responds; (3) furnish Henson, Renewable Energy Solutions, licensees proposes to delete Articles 407 the name, address, and telephone LLC, P.O. Box 156, Enterprise, Oregon and 425 from the ‘‘Order Issuing number of the person protesting or 97828, (541) 426–4100. License’’ issued December 15, 1988, intervening; and (4) otherwise comply i. FERC Contact: Mr. Jeremy Jessup, which require a target flow of 200 cubic with the requirements of 18 CFR (202) 502–6779, [email protected]. feet per second in the bypassed reach 385.2001 through 385.2005. All j. Status of Environmental Analysis: and a related drought contingency plan. comments, motions to intervene or This application is ready for

VerDate Mar<15>2010 15:23 Oct 28, 2010 Jkt 223001 PO 00000 Frm 00031 Fmt 4703 Sfmt 4703 E:\FR\FM\29OCN1.SGM 29OCN1 WReier-Aviles on DSKGBLS3C1PROD with NOTICES