MSE WALLS & SLOPES PROJECT PROFILE

Northeast

The ARES® Wall System provides This project received the Award of Excellence structural flexibility and installation in Transportation Infrastructure in 2011 from the efficiency. Consulting Engineers of .

LOCATION: Challenge , Alberta One of the main challenges for this project was PRODUCT: the overall scope of designing, fabricating, and ARES® MSE Retaining Wall System delivering 15,000 m2 of a mechanically reinforced PROJECT PARTNERS: earth system within a 10 month timeframe. Owner Alberta Transportation & Infrastructure Consultant AECOM, EarthTech, Parsons, EBA, Tensar International Contractor Stoney Trail Constructors (consortium led by Flatiron) Completion Date October 2009

Northeast Stoney Trail (NEST) is a 21 km section of Calgary’s which extends from , south to 17th Avenue SE. The project included design and construction of a four and six lane highway, 23 bridge structures and six interchanges, including one major at Deerfoot Trail and one at Trans- Canada Highway 1. Northeast Stoney Trail

In addition, the construction schedule ran through the winter months, where temperatures can plummet below -30˚C. Acute angles (i.e. 34.3˚) added an additional level of geometric complexity to the design process, not typically seen in MSE wall design.

Solution To accommodate the size and construction challenges, Nilex recommended the ARES System, a full-height pre-cast system for the bridge retaining walls, in conjunction with the innovative use of HDPE soil reinforcement. The pre-cast panels allow for custom textural and pattern designs to fit the architectural and The Nilex Advantage budgetary needs of the project. Nilex is committed to unearthing better Installation results. Whether it’s for a civil, resource or environmental project, we offer the latest The ARES System consisted of approximately engineered and technically superior materials 15,295 m2 of architectural wall face, along with and techniques to save our customers time 3,393 m2 of soil reinforcement abutment seat. and money, and minimize the need to move or The full-height characteristic of the wall system remove earth, and reduce the need for granular provided installation efficiency; a crew of four to materials. six could easily install an ARES wall in the range of up to 200 m2 per day. With over 35 years experience, a long-standing commitment to the environment and highly Results qualified staff, Nilex delivers the products and technologies that give clients an economic This project was completed on time and on advantage with environmental benefit. budget, opening to traffic on November 2, 2009. The ARES System provided an aesthetically pleasing and structurally dependable solution for a variety of geometric challenges. The significant face area of the panels, allowed the client to save significant time and money during installation.