Northern Highways Program 2014-2018
Ministry of Northern Development and Mines
TABLE OF CONTENTS
Northern Regional Map 1
Introduction 2
Expansion Projects 3
Rehabilitation Projects 6
MINISTRY OF TRANSPORTATION Northern Regions
MTO Provincial Highways Management Region
Northeastern
Northwestern
Central/Eastern/West
OPS Regions
Roads
NORTHWESTERN
NORTHEASTERN Kenora !
11 dc71 dc17 dc Cochrane ! 11 17 Marathon dc dc ! ! Thunder Bay dc101 dc11 17 New Liskeard dc ! dc144
Sudbury Sault Ste. Marie ! ! North Bay ! 17 17 dc69 dc dc Ottawa 6 11 dc ! dc dc417 ! 416 Produced by: Bancroft 400 Huntsville ! dc Geomatics Office dc 7 Highway Standards Branch dc dc11 EAST Sources: Owen Sound ! 26 Base: DCRB dc ! Kingston Roads: LHRS Routes, January 2014 6 dc 400 401 dc ! dc Projection: CSRS Ontario MNR Lambert 21 CENTRAL Port Hope Datum: NAD 83 dc ! WEST Toronto October 28, 2014 7 dc QEW ! St. Catharines This map should not be relied on as a precise indicator of dc routes or locations, nor as a guide to navigation. 402 ! London 3 The Ontario Ministry of Transportation (MTO) shall not dc dc be liable in any way for the use of, or reliance upon, 401 this map or any information on this map Windsor dc ! © Queen's Printer for Ontario, 2014 dc3
1 NORTHERN HIGHWAYS PROGRAM 2014-2018 INTRODUCTION Creating Jobs and Building a Stronger Ontario In 2014/15, the Ontario government will be investing almost $2.5 billion to repair and expand provincial highways and bridges. This includes $527 million for Northern Ontario, creating or sustaining more than 5,200 direct and indirect jobs. Improving Ontario’s transportation network is part of the government’s plan to strengthen the economy.
2014 Planned Accomplishments Northern Ontario
New highways 19 lane km
Highways rehabilitated 390 centreline km
Bridges rehabilitated 43
The time of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
2
NORTHERN EXPANSION 2014 – 2018
NORTHEASTERN ONTARIO EXPANSION 2014-2018 Target Completion Hwy Status Location Type of Work Date
66 Planned Hwy 66, Virginiatown Re-alignment 2017
Four-lane 69 Planned CNR Re-alignment, south of Hwy 522 2017 widening
Four-lane Beyond 69 Planned Hwy 526 northerly, Britt widening 2018
Four-lane Beyond 69 Planned Hwy 69 Connection to Sudbury SE By-Pass widening 2018
Four-lane 69 Planned Hwy 7182 (Shebeshekong Rd.) widening 2016
North Hwy 7182 (Shebeshegong Rd.) Four-lane Beyond 69 Planned northerly, north of Nobel widening 2018
Four-lane Beyond 69 Planned North of Hwy 522 northerly, French River widening 2018
Four-lane Beyond 69 Planned North of Hwy 559, northerly widening 2018
North of Hwy 607 northerly, north of French Four-lane 69 Underway 2016 River widening
Four-lane 69 Underway North of Hwy 64 northerly, north of Alban widening / new 2015 four-lane highway
Four-lane Beyond 69 Planned South of Hwy 7182 northerly 5 km widening 2018
3
NORTHEASTERN ONTARIO EXPANSION 2014-2018
Target Completion Hwy Status Location Type of Work Date
South junction of Hwy 529 northerly, Pointe Four-lane Beyond 69 Planned au Baril widening 2018
South of north junction of Hwy 529 northerly, Four-lane Beyond 69 Planned Pointe au Baril Station widening 2018
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
4
NORTHWESTERN ONTARIO EXPANSION 2014-2018 Target Completion Hwy Status Location Type of Work Date
Four-lane 11/17 Planned 5.0 km west Hwy 587, easterly 2017 widening
Four-lane Beyond 11/17 Planned Black Sturgeon River to Red Rock widening 2018
Four-lane 11/17 Underway Hwy 527 easterly to Mackenzie Station Rd. 2015 widening
Four-lane Beyond 11/17 Planned Hwy 587 to Pearl Creek widening 2018
Four-lane 11/17 Underway Nipigon River Bridge and approaches 2018 widening
Four-lane 11/17 Underway South Trout Creek Bridge, west of Nipigon 2014 widening
Four-lane Beyond 11/17 Planned Stillwater Creek, Nipigon, westerly widening 2018
Four-lane Beyond 17 Planned Manitoba border easterly widening / new 2018 four-lane highway
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
5
NORTHERN REHABILITATION 2014 – 2018
NORTHEASTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km) Resurfacing / culvert 11 Planned Mattice to Hearst rehabilitation / 2016 31 replacement Meadow Creek, south Hwy 11 Underway Culvert replacement 2014 n/a 579, Cochrane
Mondor Creek culvert, south of 11 Planned Culvert replacement 2015 n/a Hwy 579, Cochrane Montcalm Creek Bridge, Crow 11 Underway Creek Bridge, west of Bridge replacement 2014 n/a Opasatika Otasawian River Bridge, west 11 Underway Bridge replacement 2014 n/a of Calstock
Smooth Rock Falls to 11 Underway Resurfacing 2014 26 Driftwood
South of Hwy 64 northerly, Resurfacing / bridge 11 Underway 2014 28 Marten River rehabilitation
Valentine River Bridge, west of 11 Underway Bridge replacement 2015 n/a Hearst
White Clay River Bridge, north 11 Underway Bridge replacement 2014 n/a of Hwy 66, Sesekinika
11 & Englehart River, Aidie Creek Underway Bridge rehabilitation 2014 n/a 573 Bridges, Earlton
11, 636 Underway West and east of Cochrane Culvert replacement 2014 n/a & 652
Batchawana River Bridge, Carp 17 Underway Bridge rehabilitation 2014 n/a River Bridge, Batchawana Bay
Coldwater River Bridge, north 17 Underway Bridge rehabilitation 2014 n/a of Montreal River
6
NORTHEASTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km) CPR overhead, west of Hwy 6, 17 Underway Bridge replacement 2015 n/a Webbwood
East of Hwy 548 easterly, Resurfacing / culvert 17 Underway 2014 17 Bruce Mines replacement
17 Underway Hwy 64 easterly, Verner Resurfacing 2014 5
Hwy 94 easterly to Hwy 531, 17 Underway Resurfacing 2015 12 Corbeil Chippewa River, Harmony 17 & Bridge rehabilitation / Underway River, Goulais River, south of 2014 n/a 532 culvert rehabilitation Batchawana Bay 17 & Mississagi River and Lauzon Bridge rehabilitation / Underway 2014 n/a 538 Creek Bridges, Iron Bridge bridge replacement
17 & Culvert replacement / Planned South and north of Hornpayne 2015 n/a 631 rehabilitation Ottawa River Bridge (West 63 Underway Channel), Ontario / Quebec Bridge replacement 2015 n/a Border Blanche River, Wright Creek, 65 Underway Bridge rehabilitation 2014 n/a east of New Liskeard
Ontario / Quebec boundary Resurfacing / bridge 65 Underway 2015 22 westerly, east of New Liskeard rehabilitation
Sutton Creek, east of Hwy 11B, 65 Underway Culvert replacement 2015 n/a east of New Liskeard
Crooked Creek, west of Hwy 66 Underway Culvert replacement 2014 n/a 11, Kenogami Lake
Hwy 11 easterly to Chaput 66 Underway Resurfacing 2014 12 Huges Rd., Kirkland Lake
7
NORTHEASTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km) Hwy 144 westerly, west of 101 Underway Resurfacing 2015 17 Timmins
101 Underway Ivanhoe River Bridge, Foleyet Bridge rehabilitation 2014 n/a
West of Hwy 144 westerly, 101 Underway Resurfacing 2015 31 Timmins
North of Hwy 17, south of 108 Underway Culvert replacement 2014 n/a Elliot Lake
112 & Hwy 11 northerly, Kirkland Underway Resurfacing 2015 21 650 Lake West junction Hwy 520 124 Underway easterly to Distress River, Resurfacing 2014 21 Dunchurch 129 & North of Iron Bridge, north of Culvert replacement / Planned 2015 n/a 546 Thessalon rehabilitation
Hwy 69 easterly, west of 141 Underway Resurfacing 2014 19 Rosseau
Half Way Lake northerly, north 144 Underway Resurfacing 2015 19 of Cartier
South of Hwy 560 northerly, 144 Underway Resurfacing 2015 17 north of Cartier
518 & Haines Creek east of Orrville, Underway Culvert rehabilitation 2014 n/a 520 Jenkins Creek, Magnetawan
Devees Creek, north of Hwy 554 Underway Culvert replacement 2014 n/a 546, north of Iron Bridge
Gowganda East Limits to 560 Underway Resurfacing 2014 3 Gowganda West Limits
Little Mollie Creek, east of Hwy 560 Underway Culvert replacement 2014 n/a 144, Westree
8
NORTHEASTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km) Blanche River Bridges, 573 Underway Bridge replacement 2014 n/a Charlton
Jessie River, Prune Creek, 583 Underway south of Hwy 11, south of Bridge replacement 2015 n/a Hearst
631 Underway Hwy 17 northerly, White River Resurfacing 2015 51
North of Hwy 11, Smooth Rock 634 Underway Culvert replacement 2014 n/a Falls
Leeburn Creek Bridge, west of 638 Underway Bridge rehabilitation 2014 n/a Hwy 670, Leeburn
Stokley Creek Bridge, north of 7088 Underway Bridge replacement 2014 n/a Hwy 552, Goulais River
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements
9
NORTHEASTERN ONTARIO REHABILITATION 2015 Target Project Completion Length Hwy Location Type of Work Date (km)
Duchesnay Creek and Chippewa Creek, Bridge replacement / 11 2016 n/a north of North Bay culvert rehabilitation
South of Lakeshore Dr. southerly, 11 Resurfacing 2016 11 Temagami
South junction Hwy 11B northerly to 11B Resurfacing 2016 7 Haileybury
Agawa River and Speckled Trout Creek 17 Culvert rehabilitation 2015 n/a culverts, north of Sault Ste. Marie
Aux Sables River Bridge and CPR 17 Bridge rehabilitation 2016 n/a overhead,west and east of Sudbury
Resurfacing / culvert 17 Hwy 539, Warren to Hwy 64, Verner 2015 14 rehabilitation
Municipal Rd. 55 interchange westerly, 17 Resurfacing 2017 22 Sudbury
17 Sturgeon Falls westerly Resurfacing 2016 10
17 & Resurfacing / culvert South of Hwy 101 northerly, Wawa 2016 33 101 rehabilitation
Resurfacing / bridge 60 Hwy 127 easterly, east of Whitney rehabilitation / culvert 2016 19 replacement
101 Borden Lake culvert, east of Chapleau Culvert replacement 2015 n/a
Shawmere River Bridge easterly to Resurfacing / bridge 101 2015 48 Foleyet rehabilitation
10
NORTHEASTERN ONTARIO REHABILITATION 2015 Target Project Completion Length Hwy Location Type of Work Date (km)
108 Hwy 17 northerly to Elliot Lake Resurfacing 2015 25
Culvert replacement / 129 Hwy 129 culverts, Thessalon 2016 n/a rehabilitation
Resurfacing / culvert 144 Onaping northerly to Cartier rehabilitation / 2015 18 replacement
144 Regional Rd. 12 northerly, Dowling Resurfacing 2016 12
531 & Hwy 531 southerly, Bonfield and Hwy Resurfacing 2015 7 533 533 northerly, Mattawa
540 & Mud Creek culverts, west of Little Culvert replacement / 2015 n/a 542 Current rehabilitation
542 & East junction Hwy 542 northerly, Resurfacing 2015 14 551 Mindemoya
Resurfacing / bridge 654 Hwy 534 easterly to Hwy 11, Nipissing 2016 23 rehabilitation
Jocko Creek, north of Hwy 101, north 655 Culvert replacement 2015 n/a of Timmins
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
11
NORTHEASTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km) Resurfacing / culvert 6 Little Current southerly 19 rehabilitation
6 & Resurfacing / bridge West of Hwy 6 easterly to Nairn Centre 21 17 rehabilitation
11 Bradburn Creek culvert, west of Hearst Culvert replacement n/a
11 ONR overhead, Earlton Bridge rehabilitation n/a
Calamity Creek culvert, north of Hwy 11B, New 11 Culvert replacement n/a Liskeard
Fraser River Bridge and culverts, west Hwy 631, Bridge rehabilitation / culvert 11 n/a west of Hearst replacement
Bridge replacement / culvert 11 Groundhog River Bridge, Fauquier n/a rehabilitation
Hwy 11B interchange northerly to south junction 11 Resurfacing 6 Hwy 17 interchange, North Bay
Resurfacing / culvert 11 Kapuskasing to Opasatika replacement / bridge 32 rehabilitation
11 Nagagmi River to Shekek River, west of Calstock Bridge replacement 10
North of north junction Hwy 17/11B northerly, 11 Resurfacing 7 north of North Bay
North of south junction 592 interchange, Novar Resurfacing / culvert 11 8 northerly rehabilitation
11 Opasatika River Bridge westerly, Opasatika Resurfacing 32
12
NORTHEASTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km)
11 South of Hwy 579, south of Cochrane Resurfacing 17
Resurfacing / culvert 11 West junction Hwy 101 northerly, Nellie Lake 34 rehabilitation
11 West of Hwy 631 easterly, west of Calstock Resurfacing 21
East junction Municipal Rd. 55 easterly to Hwy Resurfacing / bridge 17 39 535, Sudbury to Hagar rehabilitation
Resurfacing / culvert 17 East of Hwy 6 easterly, Nairn Centre 20 rehabilitation
17 Harris Creek culvert, west of Iron Bridge Culvert rehabilitation n/a
17 Hwy 631 easterly, White River Resurfacing 59
17 Lauzon Creek culvert, Algoma Mills Culvert rehabilitation n/a
North of Harmony Lake Bridge northerly, Sault Resurfacing / bridge and culvert 17 27 Ste. Marie rehabilitation
Sand River and Barrett River Bridges, south of 17 Bridge rehabilitation n/a Wawa
Santala, CPR, Municipal Rd. 3 underpasses, Hwy 17 Bridge rehabilitation n/a 17, Sudbury
17 South of Hwy 519, north of Wawa Culvert replacement n/a
17 Resurfacing / culvert & Hwy 546 easterly, Iron Bridge to Blind River 24 rehabilitation 546
13
NORTHEASTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km) 17, Shewfelt Creek, Rydal Bank Creek, Kaskawan Culvert rehabilitation and 548 & n/a River, Bruce Mines replacement 638
Duchesnay Creek Bridge, CNR overhead, North Resurfacing / bridge n/a 17B Bay replacement
27 60 Hwy 127 westerly, Whitney Resurfacing
14 60 Station Rd. easterly, Algonquin Park Resurfacing
12 64 From Hwy 539 northerly, Field Resurfacing / bridge removal
n/a 65 Makobe River Bridge, east of Elk Lake Bridge replacement
65 South of Hwy 66 northerly, north of Englehart Resurfacing 15
11 67 North junction Hwy 11 easterly, Iroquois Falls Resurfacing
n/a 69 Still River Bridge, north of 529, Britt Bridge rehabilitation
Resurfacing / bridge and culvert 3 94 Hwy 654 westerly, Callander rehabilitation
101 Foleyet easterly Resurfacing 21
101 Unknown Creek, Shillington Creek, Shillington Culvert replacement n/a
101 & Sideburned, Nemegosenda, Nebskawash n/a 129 Bridges, Chapleau Bridge rehabilitation
Blanche River Bridge, north Hwy 11, south of n/a 112 Kirkland Lake Bridge rehabilitation
14
NORTHEASTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km) South of south junction Hwy 101 southerly, 129 Resurfacing 22 South of Chapleau
Gravel River, Snowshoe Creek and Mississagi 129 Bridge rehabilitation n/a River Bridges, east of Ranger Lake
South junction Hwy 101 southerly, south of 129 Resurfacing 26 Chapleau
Shadow River Bridge, west of Hwy 632, west of 141 Bridge rehabilitation n/a Rosseau
144 Creek culvert, north of Hwy 661, Gogama Culvert rehabilitation n/a
144 Lord’s Creek culvert, north of Onaping Culvert rehabilitation n/a
144 Municipal Roads 35/15 northerly, Chelmsford Resurfacing 5
Resurfacing / bridge and culvert 144 North of Hwy 17 northerly, Chelmsford 8 replacement
144 Regional Rd. 12 northerly, Dowling Resurfacing 12
Resurfacing / bridge and culvert 519 Hwy 17 easterly, Dubreuilville 31 rehabilitation
520 Distress River Bridges, Magnetewan Bridge rehabilitation n/a
520 Ontario St. westerly, Burk's Falls Resurfacing 1
Hwy 11/McFadden Line interchange westerly, 522 Resurfacing / bridge replacement 4 Trout Creek
15
NORTHEASTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km) Naiscott River culverts and bridge, CPR Culvert replacement, bridge 529 n/a overhead, north of Pointe au Baril rehabilitation
532 & Bridge replacement / culvert West of Glendale and east of Ranger Lake n/a 556 rehabilitation
CPR underpass, east of west junction Hwy 17, 538 Bridge rehabilitation n/a east of Blind River
539 & McCarty Creek and Sturgeon River Bridges, Bridge rehabilitation / culvert n/a 805 Silver Creek culvert, River Valley rehabilitation
539A Temagami River Bridge, River Valley Bridge replacement n/a
540 Little Current westerly Resurfacing 18
540 West of Hwy 551 easterly, Kagawong Resurfacing 27
540 & West of Hwy 551, Kagawong Resurfacing 18 540B
Hawk Creek and McVeigh Creek Bridges, east 547 Bridge rehabilitation n/a of Wawa
551 Mindemoya Creek Bridge, Providence Bay Bridge replacement n/a
552 Hwy 17 westerly, Goulais River Resurfacing 5
552 & Hwy 556 and Hwy 552 east of Hwy 17, Resurfacing 11 556 Heyden
553 & Sauble River and Cameron Creek, north Hwy Bridge replacement n/a 810 17, Massey
16
NORTHEASTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km) 6 mile Creek culvert, Tamarac Creek culvert, Bridge rehabilitation / culvert 560 n/a and Lost Lake Bridge replacement / rehabilitation
Bridge rehabilitation / bridge 577 Driftwood River Bridges, north of Shillington n/a replacement
579 Gilles (Brower) Creek Bridge, north of Clute Bridge replacement n/a
583 Obijou River culvert, south of Hearst Culvert replacement n/a
CNR overhead Bridge and Ragged Creek 592 Bridge replacement n/a Bridge, north of Novar
Little East River Bridges, north of Hwy 11, 592 Bridge replacement n/a Novar
Culvert replacement / 634 North of Hwy 11, north of Smooth Rock Falls n/a rehabilitation
Massey Creek culvert, west of Hwy 69, south 637 Culvert replacement 1 of Estaire
639 Christian Creek culvert, north of Elliot Lake Culvert replacement n/a
652 Louis River culverts, east of Cochrane Culvert rehabilitation n/a
Deception Creek and Smith Creek Bridges, Bridge rehabilitation / bridge 668 n/a south of Hunta replacement
7044 South of North Entrance, Cartier Culvert replacement n/a
7289 Silver Lake and Blackstone River culverts, & Culvert rehabilitation n/a South of Horseshoe Lake 7290
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
17
NORTHWESTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km)
Atikokan easterly and Hwy 11 Underway Resurfacing 2015 20 11B to Atikokan
11 Planned Beardmore easterly Resurfacing 2014 23
French River Bridge, east of 11 Underway Bridge replacement 2014 n/a Atikokan
Kabaigon River Bridge, west of 11 Planned Bridge replacement 2015 n/a Shebandowan
Noden Causeway, east of Fort 11 Underway Bridge rehabilitation 2014 n/a Frances
Pickerel River Bridge, east of 11 Underway Bridge replacement 2014 n/a Atikokan
Seven Mile Bridge, east of Fort 11 Underway Bridge replacement 2014 n/a Frances
Swamp River Bridge, west of 11 Underway Bridge replacement 2014 n/a Shabaqua
11 Underway West of Atikokan westerly Resurfacing 2014 21
Resurfacing and 11 Underway West of Geraldton westerly 2014 28 culvert replacement
17 Planned CPR overhead, Rossport Bridge rehabilitation 2015 n/a
17 Planned CPR overhead, Schreiber Bridge replacement 2015 n/a
Cypress River Bridge, east of 17 Underway Bridge replacement 2014 n/a Nipigon
18
NORTHWESTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km)
East of Hwy 71 easterly, east 17 Underway Resurfacing 2015 28 of Kenora
17 Underway East of Nipigon easterly Resurfacing 2014 17
English River Bridge, English 17 Underway Bridge replacement 2014 n/a River
Gulliver River Bridge, east of 17 Underway Bridge replacement 2014 n/a Ignace
17 Planned Ignace westerly Resurfacing 2015 20
Jackfish River Bridge, east of 17 Underway Bridge rehabilitation 2014 n/a Nipigon
Jackpine River Bridge, east of 17 Underway Bridge rehabilitation 2014 n/a Nipigon
Little Gravel River Bridge, east 17 Underway Bridge replacement 2014 n/a of Nipigon
Little Pic River Bridge, west of 17 Underway Bridge rehabilitation 2014 n/a Marathon
Pic River Bridge, east of 17 Underway Bridge replacement 2016 n/a Marathon
Raleigh Lake culvert, west of 17 Underway Culvert replacement 2015 n/a Ignace
Canada/US Boundary 61 Underway Resurfacing 2015 21 northerly
Black River culvert, north of 71 Planned Culvert replacement 2016 n/a Sioux Narrows
19
NORTHWESTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km)
Log River Tributary culvert, 71 Planned Culvert replacement 2016 n/a south of Caliper Lake
Pine Lake culvert, south of 71 Planned Culvert replacement 2016 n/a Caliper Lake
Abram Lake culvert, south of 72 Underway Culvert replacement 2014 n/a Sioux Lookout
Trout Lake River Bridge, north 105 Underway Bridge replacement 2015 n/a of Ear Falls
Gull River Bridge, north of Hwy 527 Planned Bridge rehabilitation 2015 n/a 811
Kabitotikwia River Bridge, 527 Planned Bridge rehabilitation 2015 n/a north of Hwy 811
Kopka River Bridge, north of 527 Planned Bridge rehabilitation 2015 n/a Hwy 811
Merkley (Lachapelle) Creek 527 Underway Culvert replacement 2015 n/a culvert, south of Hwy 811
Sibley Creek Bridge, Lake 587 Underway Bridge rehabilitation 2014 n/a Superior
Whitefish River Bridge, west of 588 Underway Bridge replacement 2014 n/a Thunder Bay
594 Underway Dryden westerly Resurfacing 2015 5
Medcalf Lake Narrows Bridge, 599 Underway Bridge rehabilitation 2014 n/a north of Savant Lake
Little Grassy River Bridge, east 600 Underway Bridge rehabilitation 2014 n/a of Bergland
20
NORTHWESTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km)
601 Underway Dryden northerly Resurfacing 2015 5
Hastie River Bridge, north of 613 Planned Bridge rehabilitation 2015 n/a Hwy 11, Devlin
Munro River Bridge, north of 613 Planned Bridge rehabilitation 2015 n/a Hwy 11, Devlin
Barabara culvert, south of 614 Underway Culvert replacement 2015 n/a Manitouwadge
Barehead culvert, south of 614 Underway Culvert replacement 2014 n/a Manitouwadge
Phillips culvert, south of 614 Underway Culvert replacement 2014 n/a Manitouwadge
Off Lake Bridge, north of Hwy 615 Underway Bridge rehabilitation 2015 n/a 11, Emo
Little Grassy River Bridge, 621 Underway Bridge replacement 2014 n/a Bergland
658 Underway Black River Bridge, Redditt Bridge replacement 2014 n/a
Vermillion Lake Narrows 664 Underway Bridge replacement 2014 n/a Bridge, west of Hwy 72
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
21
NORTHWESTERN ONTARIO REHABILITATION 2015 Target Project Completion Length Hwy Location Type of Work Date (km)
Dilke Creek culvert, east of 11 Culvert replacement 2016 n/a Pinewood
Everett Creek culvert, west of Fort 11 Culvert replacement 2016 n/a Frances
11 Fort Frances westerly Resurfacing 2016 18
11 Longlac easterly Resurfacing 2016 22
Noden Causeway, east of Fort 11 Bridge rehabilitation 2017 n/a Frances
Pagwachuan River culverts, east of 11 Culvert replacement 2016 n/a Longlac
Ramsdale Creek culvert, east of 11 Culvert replacement 2016 n/a Emo
Westovers Creek culvert, west of 11 Culvert replacement 2016 n/a Barwick
Cedar Creek Bridge, west of Hwy 17 Bridge rehabilitation 2015 n/a 614 to Manitouwadge
17 CPR overhead, west of Schreiber Bridge rehabilitation 2016 n/a
17 Gravel River Bridge, east of Nipigon Bridge rehabilitation 2015 n/a
Ozone Creek Bridge, east of 17 Bridge rehabilitation 2015 n/a Nipigon
Pays Plat River Bridges, east of 17 Bridge rehabilitation 2017 n/a Nipigon, Pays Plat
22
NORTHWESTERN ONTARIO REHABILITATION 2015 Target Project Completion Length Hwy Location Type of Work Date (km)
17 Shabaqua Corners westerly Resurfacing 2015 13
West of Ignace, westerly to Hwy 17 Resurfacing 2015 31 622
Pine River Bridge, south of Thunder 61 Bridge replacement 2015 n/a Bay
71 Nestor Falls northerly Resurfacing 2015 28
Moose Creek Bridge, south of Sioux 72 Bridge rehabilitation 2016 n/a Lookout
72 Pelican River Bridge, Sioux Lookout Bridge rehabilitation 2015 n/a
Strawberry Creek Bridges, west of 102 Bridge rehabilitation 2015 n/a Thunder Bay
18 km north of Hwy 609 northerly, 105 Resurfacing 2015 30 north of Vermillion Bay
Surprise Lake Narrows Bridge, 589 Bridge rehabilitation 2015 n/a north of Lappe
Elbow Creek Bridge, north of Silver 599 Bridge rehabilitation 2015 n/a Dollar
Sturgeon River Bridge, north of 599 Bridge rehabilitation 2015 n/a Silver Dollar
Big Trout Creek culvert, north of 628 Culvert replacement 2015 n/a Red Rock
23
NORTHWESTERN ONTARIO REHABILITATION 2015 Target Project Completion Length Hwy Location Type of Work Date (km)
Minnikau River culverts, east of 642 Culvert replacement 2016 n/a Sioux Lookout
658 Hwy 17A northerly, Kenora Resurfacing 2015 26
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.
24
NORTHWESTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km)
11 Baudette Rainy River International Bridge to U.S. Bridge replacement n/a
11 Brule Creek culvert, west of Thunder Bay Culvert replacement n/a
11 Caribus Lake Tributary culvert, west of Atikokan Culvert replacement n/a
11 Chowder Creek culvert, east of Longlac Culvert replacement n/a
11 Fish Creek culvert, east of Longlac Culvert replacement n/a
11 Flood Creek West culvert, west of Sapawe Culvert replacement n/a
11 Flynne Creek culvert, east of Longlac Culvert replacement n/a
11 Flynne Creek East culvert, east of Longlac Culvert replacement n/a
11 Fort Frances easterly Resurfacing 27
11 Gagne Lake culvert, west of Atikokan Culvert replacement n/a
11 Helen Lake culvert, north of Nipigon Culvert replacement n/a
11 Kakabeka Falls Bridge, Kakabeka Bridge rehabilitation n/a
11 Mills Creek culvert, west of Atikokan Culvert replacement n/a
25
NORTHWESTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km)
11 Mineral Creek culvert, west of Longlac Culvert replacement n/a
11 Shamrock Lake Centre culvert, west of Macdiarmid Culvert replacement n/a
11 Shamrock Lake East culvert, west of Macdiarmid Culvert replacement n/a
11 Shamrock Lake West culvert, west of Macdiarmid Culvert replacement n/a
11 Suckle Creek culvert, west of Longlac Culvert replacement n/a
17 Rae Lake Arch culvert, east of Hwy 71 Culvert replacement n/a
17 Revell River Bridge, west of Ignace Culvert replacement n/a
17 Marathon westerly Resurfacing 27
17 White Lake Narrows Bridge, west of White River Bridge rehabilitation n/a
61 Jarvis River culvert, south of Thunder Bay Culvert replacement n/a
61 Slate River Tributary culvert, south of Thunder Bay Culvert replacement n/a
71 Hwy 17 southerly, west of Emo Resurfacing 23
105 Hwy 17, Vermilion Bay northerly Resurfacing 31
26
NORTHWESTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km)
105 Pickerel Creek culvert, north of Vermillion Bay Culvert replacement n/a
502 North of Hwy 11 northerly, Dryden Resurfacing 38
502 Kawawia Creek culvert, north of Hwy 11 Culvert replacement n/a
516 Mills Creek culvert, east of Sioux Lookout Culvert replacement n/a
527 North of Hwy 11/17 northerly, north of Thunder Bay Resurfacing 22
527 East Dog River culvert, north of Thunder Bay Culvert replacement n/a
588 Hwy 11/17 southerly, Thunder Bay Resurfacing 7
589 McIntyre River culvert, north of Highway 102 Culvert replacement n/a
590 Hwy 11/17, Kakabeka southerly Resurfacing 24
595 Cedar Creek culvert, west of Thunder Bay Culvert replacement n/a
595 Sitch Creek culverts, west of Thunder Bay Culvert Replacements n/a
596 Alice Creek culvert, south of Minaki Culvert replacement n/a
Crow River (July Falls) Bridge north of Central 599 Bridge replacement n/a Patricia
27
NORTHWESTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km)
Albany River Overflow(Cedar Rapids), south of 599 Bridge rehabilitation n/a Pickle Lake
Wabigoon River Tributary culvert, north of 601 Culvert replacement n/a Hwy 17, Dryden
603 Melgund River culvert, north of Hwy 17 Culvert replacement n/a
605 Shoshowae Creek culvert, north of Hwy 17 Culvert replacement n/a
614 Black River Bridge, north of Hwy 17 Bridge rehabilitation n/a
617 Pinewood River Bridge, north of Hwy 11 Bridge replacement n/a
625 Sandlink Creek culvert, north of Caramat Culvert replacement n/a
Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.