Northern Highways Program 2014-2018

Ministry of Northern Development and Mines

TABLE OF CONTENTS

Northern Regional Map 1

Introduction 2

Expansion Projects 3

Rehabilitation Projects 6

MINISTRY OF TRANSPORTATION Northern Regions

MTO Provincial Highways Management Region

Northeastern

Northwestern

Central/Eastern/West

OPS Regions

Roads

NORTHWESTERN

NORTHEASTERN Kenora !

11 dc71 dc17 dc Cochrane ! 11 17 Marathon dc dc ! ! dc101 dc11 17 New Liskeard dc ! dc144

Sudbury Sault Ste. Marie ! ! North Bay ! 17 17 dc69 dc dc Ottawa 6 11 dc ! dc dc417 ! 416 Produced by: Bancroft 400 Huntsville ! dc Geomatics Office dc 7 Highway Standards Branch dc dc11 EAST Sources: Owen Sound ! 26 Base: DCRB dc ! Kingston Roads: LHRS Routes, January 2014 6 dc 400 401 dc ! dc Projection: CSRS MNR Lambert 21 CENTRAL Port Hope Datum: NAD 83 dc ! WEST Toronto October 28, 2014 7 dc QEW ! St. Catharines This map should not be relied on as a precise indicator of dc routes or locations, nor as a guide to navigation. 402 ! London 3 The Ontario Ministry of Transportation (MTO) shall not dc dc be liable in any way for the use of, or reliance upon, 401 this map or any information on this map Windsor dc ! © Queen's Printer for Ontario, 2014 dc3

1 NORTHERN HIGHWAYS PROGRAM 2014-2018 INTRODUCTION Creating Jobs and Building a Stronger Ontario In 2014/15, the Ontario government will be investing almost $2.5 billion to repair and expand provincial highways and bridges. This includes $527 million for , creating or sustaining more than 5,200 direct and indirect jobs. Improving Ontario’s transportation network is part of the government’s plan to strengthen the economy.

2014 Planned Accomplishments Northern Ontario

New highways 19 lane km

Highways rehabilitated 390 centreline km

Bridges rehabilitated 43

The time of projects in the following lists is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

2

NORTHERN EXPANSION 2014 – 2018

NORTHEASTERN ONTARIO EXPANSION 2014-2018 Target Completion Hwy Status Location Type of Work Date

66 Planned Hwy 66, Virginiatown Re-alignment 2017

Four-lane 69 Planned CNR Re-alignment, south of Hwy 522 2017 widening

Four-lane Beyond 69 Planned Hwy 526 northerly, Britt widening 2018

Four-lane Beyond 69 Planned Hwy 69 Connection to Sudbury SE By-Pass widening 2018

Four-lane 69 Planned Hwy 7182 (Shebeshekong Rd.) widening 2016

North Hwy 7182 (Shebeshegong Rd.) Four-lane Beyond 69 Planned northerly, north of Nobel widening 2018

Four-lane Beyond 69 Planned North of Hwy 522 northerly, widening 2018

Four-lane Beyond 69 Planned North of Hwy 559, northerly widening 2018

North of Hwy 607 northerly, north of French Four-lane 69 Underway 2016 River widening

Four-lane 69 Underway North of Hwy 64 northerly, north of Alban widening / new 2015 four-lane highway

Four-lane Beyond 69 Planned South of Hwy 7182 northerly 5 km widening 2018

3

NORTHEASTERN ONTARIO EXPANSION 2014-2018

Target Completion Hwy Status Location Type of Work Date

South junction of Hwy 529 northerly, Pointe Four-lane Beyond 69 Planned au Baril widening 2018

South of north junction of Hwy 529 northerly, Four-lane Beyond 69 Planned Pointe au Baril Station widening 2018

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

4

NORTHWESTERN ONTARIO EXPANSION 2014-2018 Target Completion Hwy Status Location Type of Work Date

Four-lane 11/17 Planned 5.0 km west Hwy 587, easterly 2017 widening

Four-lane Beyond 11/17 Planned Black Sturgeon River to Red Rock widening 2018

Four-lane 11/17 Underway Hwy 527 easterly to Mackenzie Station Rd. 2015 widening

Four-lane Beyond 11/17 Planned Hwy 587 to Pearl Creek widening 2018

Four-lane 11/17 Underway Bridge and approaches 2018 widening

Four-lane 11/17 Underway South Trout Creek Bridge, west of Nipigon 2014 widening

Four-lane Beyond 11/17 Planned Stillwater Creek, Nipigon, westerly widening 2018

Four-lane Beyond 17 Planned Manitoba border easterly widening / new 2018 four-lane highway

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

5

NORTHERN REHABILITATION 2014 – 2018

NORTHEASTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km) Resurfacing / culvert 11 Planned Mattice to Hearst rehabilitation / 2016 31 replacement Meadow Creek, south Hwy 11 Underway Culvert replacement 2014 n/a 579, Cochrane

Mondor Creek culvert, south of 11 Planned Culvert replacement 2015 n/a Hwy 579, Cochrane Montcalm Creek Bridge, Crow 11 Underway Creek Bridge, west of Bridge replacement 2014 n/a Opasatika Otasawian River Bridge, west 11 Underway Bridge replacement 2014 n/a of Calstock

Smooth Rock Falls to 11 Underway Resurfacing 2014 26 Driftwood

South of Hwy 64 northerly, Resurfacing / bridge 11 Underway 2014 28 Marten River rehabilitation

Valentine River Bridge, west of 11 Underway Bridge replacement 2015 n/a Hearst

White Clay River Bridge, north 11 Underway Bridge replacement 2014 n/a of Hwy 66, Sesekinika

11 & Englehart River, Aidie Creek Underway Bridge rehabilitation 2014 n/a 573 Bridges, Earlton

11, 636 Underway West and east of Cochrane Culvert replacement 2014 n/a & 652

Batchawana River Bridge, Carp 17 Underway Bridge rehabilitation 2014 n/a River Bridge, Batchawana Bay

Coldwater River Bridge, north 17 Underway Bridge rehabilitation 2014 n/a of Montreal River

6

NORTHEASTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km) CPR overhead, west of Hwy 6, 17 Underway Bridge replacement 2015 n/a Webbwood

East of Hwy 548 easterly, Resurfacing / culvert 17 Underway 2014 17 Bruce Mines replacement

17 Underway Hwy 64 easterly, Verner Resurfacing 2014 5

Hwy 94 easterly to Hwy 531, 17 Underway Resurfacing 2015 12 Corbeil Chippewa River, Harmony 17 & Bridge rehabilitation / Underway River, Goulais River, south of 2014 n/a 532 culvert rehabilitation Batchawana Bay 17 & Mississagi River and Lauzon Bridge rehabilitation / Underway 2014 n/a 538 Creek Bridges, Iron Bridge bridge replacement

17 & Culvert replacement / Planned South and north of Hornpayne 2015 n/a 631 rehabilitation Ottawa River Bridge (West 63 Underway Channel), Ontario / Quebec Bridge replacement 2015 n/a Border Blanche River, Wright Creek, 65 Underway Bridge rehabilitation 2014 n/a east of New Liskeard

Ontario / Quebec boundary Resurfacing / bridge 65 Underway 2015 22 westerly, east of New Liskeard rehabilitation

Sutton Creek, east of Hwy 11B, 65 Underway Culvert replacement 2015 n/a east of New Liskeard

Crooked Creek, west of Hwy 66 Underway Culvert replacement 2014 n/a 11, Kenogami Lake

Hwy 11 easterly to Chaput 66 Underway Resurfacing 2014 12 Huges Rd., Kirkland Lake

7

NORTHEASTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km) Hwy 144 westerly, west of 101 Underway Resurfacing 2015 17 Timmins

101 Underway Ivanhoe River Bridge, Foleyet Bridge rehabilitation 2014 n/a

West of Hwy 144 westerly, 101 Underway Resurfacing 2015 31 Timmins

North of Hwy 17, south of 108 Underway Culvert replacement 2014 n/a Elliot Lake

112 & Hwy 11 northerly, Kirkland Underway Resurfacing 2015 21 650 Lake West junction Hwy 520 124 Underway easterly to Distress River, Resurfacing 2014 21 Dunchurch 129 & North of Iron Bridge, north of Culvert replacement / Planned 2015 n/a 546 Thessalon rehabilitation

Hwy 69 easterly, west of 141 Underway Resurfacing 2014 19 Rosseau

Half Way Lake northerly, north 144 Underway Resurfacing 2015 19 of Cartier

South of Hwy 560 northerly, 144 Underway Resurfacing 2015 17 north of Cartier

518 & Haines Creek east of Orrville, Underway Culvert rehabilitation 2014 n/a 520 Jenkins Creek, Magnetawan

Devees Creek, north of Hwy 554 Underway Culvert replacement 2014 n/a 546, north of Iron Bridge

Gowganda East Limits to 560 Underway Resurfacing 2014 3 Gowganda West Limits

Little Mollie Creek, east of Hwy 560 Underway Culvert replacement 2014 n/a 144, Westree

8

NORTHEASTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km) Blanche River Bridges, 573 Underway Bridge replacement 2014 n/a Charlton

Jessie River, Prune Creek, 583 Underway south of Hwy 11, south of Bridge replacement 2015 n/a Hearst

631 Underway Hwy 17 northerly, White River Resurfacing 2015 51

North of Hwy 11, Smooth Rock 634 Underway Culvert replacement 2014 n/a Falls

Leeburn Creek Bridge, west of 638 Underway Bridge rehabilitation 2014 n/a Hwy 670, Leeburn

Stokley Creek Bridge, north of 7088 Underway Bridge replacement 2014 n/a Hwy 552, Goulais River

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements

9

NORTHEASTERN ONTARIO REHABILITATION 2015 Target Project Completion Length Hwy Location Type of Work Date (km)

Duchesnay Creek and Chippewa Creek, Bridge replacement / 11 2016 n/a north of North Bay culvert rehabilitation

South of Lakeshore Dr. southerly, 11 Resurfacing 2016 11 Temagami

South junction Hwy 11B northerly to 11B Resurfacing 2016 7 Haileybury

Agawa River and Speckled Trout Creek 17 Culvert rehabilitation 2015 n/a culverts, north of Sault Ste. Marie

Aux Sables River Bridge and CPR 17 Bridge rehabilitation 2016 n/a overhead,west and east of Sudbury

Resurfacing / culvert 17 Hwy 539, Warren to Hwy 64, Verner 2015 14 rehabilitation

Municipal Rd. 55 interchange westerly, 17 Resurfacing 2017 22 Sudbury

17 Sturgeon Falls westerly Resurfacing 2016 10

17 & Resurfacing / culvert South of Hwy 101 northerly, Wawa 2016 33 101 rehabilitation

Resurfacing / bridge 60 Hwy 127 easterly, east of Whitney rehabilitation / culvert 2016 19 replacement

101 Borden Lake culvert, east of Chapleau Culvert replacement 2015 n/a

Shawmere River Bridge easterly to Resurfacing / bridge 101 2015 48 Foleyet rehabilitation

10

NORTHEASTERN ONTARIO REHABILITATION 2015 Target Project Completion Length Hwy Location Type of Work Date (km)

108 Hwy 17 northerly to Elliot Lake Resurfacing 2015 25

Culvert replacement / 129 Hwy 129 culverts, Thessalon 2016 n/a rehabilitation

Resurfacing / culvert 144 Onaping northerly to Cartier rehabilitation / 2015 18 replacement

144 Regional Rd. 12 northerly, Dowling Resurfacing 2016 12

531 & Hwy 531 southerly, Bonfield and Hwy Resurfacing 2015 7 533 533 northerly, Mattawa

540 & Mud Creek culverts, west of Little Culvert replacement / 2015 n/a 542 Current rehabilitation

542 & East junction Hwy 542 northerly, Resurfacing 2015 14 551 Mindemoya

Resurfacing / bridge 654 Hwy 534 easterly to Hwy 11, Nipissing 2016 23 rehabilitation

Jocko Creek, north of Hwy 101, north 655 Culvert replacement 2015 n/a of Timmins

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

11

NORTHEASTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km) Resurfacing / culvert 6 Little Current southerly 19 rehabilitation

6 & Resurfacing / bridge West of Hwy 6 easterly to Nairn Centre 21 17 rehabilitation

11 Bradburn Creek culvert, west of Hearst Culvert replacement n/a

11 ONR overhead, Earlton Bridge rehabilitation n/a

Calamity Creek culvert, north of Hwy 11B, New 11 Culvert replacement n/a Liskeard

Fraser River Bridge and culverts, west Hwy 631, Bridge rehabilitation / culvert 11 n/a west of Hearst replacement

Bridge replacement / culvert 11 Groundhog River Bridge, Fauquier n/a rehabilitation

Hwy 11B interchange northerly to south junction 11 Resurfacing 6 Hwy 17 interchange, North Bay

Resurfacing / culvert 11 Kapuskasing to Opasatika replacement / bridge 32 rehabilitation

11 Nagagmi River to Shekek River, west of Calstock Bridge replacement 10

North of north junction Hwy 17/11B northerly, 11 Resurfacing 7 north of North Bay

North of south junction 592 interchange, Novar Resurfacing / culvert 11 8 northerly rehabilitation

11 Opasatika River Bridge westerly, Opasatika Resurfacing 32

12

NORTHEASTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km)

11 South of Hwy 579, south of Cochrane Resurfacing 17

Resurfacing / culvert 11 West junction Hwy 101 northerly, Nellie Lake 34 rehabilitation

11 West of Hwy 631 easterly, west of Calstock Resurfacing 21

East junction Municipal Rd. 55 easterly to Hwy Resurfacing / bridge 17 39 535, Sudbury to Hagar rehabilitation

Resurfacing / culvert 17 East of Hwy 6 easterly, Nairn Centre 20 rehabilitation

17 Harris Creek culvert, west of Iron Bridge Culvert rehabilitation n/a

17 Hwy 631 easterly, White River Resurfacing 59

17 Lauzon Creek culvert, Algoma Mills Culvert rehabilitation n/a

North of Harmony Lake Bridge northerly, Sault Resurfacing / bridge and culvert 17 27 Ste. Marie rehabilitation

Sand River and Barrett River Bridges, south of 17 Bridge rehabilitation n/a Wawa

Santala, CPR, Municipal Rd. 3 underpasses, Hwy 17 Bridge rehabilitation n/a 17, Sudbury

17 South of Hwy 519, north of Wawa Culvert replacement n/a

17 Resurfacing / culvert & Hwy 546 easterly, Iron Bridge to Blind River 24 rehabilitation 546

13

NORTHEASTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km) 17, Shewfelt Creek, Rydal Bank Creek, Kaskawan Culvert rehabilitation and 548 & n/a River, Bruce Mines replacement 638

Duchesnay Creek Bridge, CNR overhead, North Resurfacing / bridge n/a 17B Bay replacement

27 60 Hwy 127 westerly, Whitney Resurfacing

14 60 Station Rd. easterly, Algonquin Park Resurfacing

12 64 From Hwy 539 northerly, Field Resurfacing / bridge removal

n/a 65 Makobe River Bridge, east of Elk Lake Bridge replacement

65 South of Hwy 66 northerly, north of Englehart Resurfacing 15

11 67 North junction Hwy 11 easterly, Iroquois Falls Resurfacing

n/a 69 Still River Bridge, north of 529, Britt Bridge rehabilitation

Resurfacing / bridge and culvert 3 94 Hwy 654 westerly, Callander rehabilitation

101 Foleyet easterly Resurfacing 21

101 Unknown Creek, Shillington Creek, Shillington Culvert replacement n/a

101 & Sideburned, Nemegosenda, Nebskawash n/a 129 Bridges, Chapleau Bridge rehabilitation

Blanche River Bridge, north Hwy 11, south of n/a 112 Kirkland Lake Bridge rehabilitation

14

NORTHEASTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km) South of south junction Hwy 101 southerly, 129 Resurfacing 22 South of Chapleau

Gravel River, Snowshoe Creek and Mississagi 129 Bridge rehabilitation n/a River Bridges, east of Ranger Lake

South junction Hwy 101 southerly, south of 129 Resurfacing 26 Chapleau

Shadow River Bridge, west of Hwy 632, west of 141 Bridge rehabilitation n/a Rosseau

144 Creek culvert, north of Hwy 661, Gogama Culvert rehabilitation n/a

144 Lord’s Creek culvert, north of Onaping Culvert rehabilitation n/a

144 Municipal Roads 35/15 northerly, Chelmsford Resurfacing 5

Resurfacing / bridge and culvert 144 North of Hwy 17 northerly, Chelmsford 8 replacement

144 Regional Rd. 12 northerly, Dowling Resurfacing 12

Resurfacing / bridge and culvert 519 Hwy 17 easterly, Dubreuilville 31 rehabilitation

520 Distress River Bridges, Magnetewan Bridge rehabilitation n/a

520 Ontario St. westerly, Burk's Falls Resurfacing 1

Hwy 11/McFadden Line interchange westerly, 522 Resurfacing / bridge replacement 4 Trout Creek

15

NORTHEASTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km) Naiscott River culverts and bridge, CPR Culvert replacement, bridge 529 n/a overhead, north of Pointe au Baril rehabilitation

532 & Bridge replacement / culvert West of Glendale and east of Ranger Lake n/a 556 rehabilitation

CPR underpass, east of west junction Hwy 17, 538 Bridge rehabilitation n/a east of Blind River

539 & McCarty Creek and Sturgeon River Bridges, Bridge rehabilitation / culvert n/a 805 Silver Creek culvert, River Valley rehabilitation

539A Temagami River Bridge, River Valley Bridge replacement n/a

540 Little Current westerly Resurfacing 18

540 West of Hwy 551 easterly, Kagawong Resurfacing 27

540 & West of Hwy 551, Kagawong Resurfacing 18 540B

Hawk Creek and McVeigh Creek Bridges, east 547 Bridge rehabilitation n/a of Wawa

551 Mindemoya Creek Bridge, Providence Bay Bridge replacement n/a

552 Hwy 17 westerly, Goulais River Resurfacing 5

552 & Hwy 556 and Hwy 552 east of Hwy 17, Resurfacing 11 556 Heyden

553 & Sauble River and Cameron Creek, north Hwy Bridge replacement n/a 810 17, Massey

16

NORTHEASTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km) 6 mile Creek culvert, Tamarac Creek culvert, Bridge rehabilitation / culvert 560 n/a and Lost Lake Bridge replacement / rehabilitation

Bridge rehabilitation / bridge 577 Driftwood River Bridges, north of Shillington n/a replacement

579 Gilles (Brower) Creek Bridge, north of Clute Bridge replacement n/a

583 Obijou River culvert, south of Hearst Culvert replacement n/a

CNR overhead Bridge and Ragged Creek 592 Bridge replacement n/a Bridge, north of Novar

Little East River Bridges, north of Hwy 11, 592 Bridge replacement n/a Novar

Culvert replacement / 634 North of Hwy 11, north of Smooth Rock Falls n/a rehabilitation

Massey Creek culvert, west of Hwy 69, south 637 Culvert replacement 1 of Estaire

639 Christian Creek culvert, north of Elliot Lake Culvert replacement n/a

652 Louis River culverts, east of Cochrane Culvert rehabilitation n/a

Deception Creek and Smith Creek Bridges, Bridge rehabilitation / bridge 668 n/a south of Hunta replacement

7044 South of North Entrance, Cartier Culvert replacement n/a

7289 Silver Lake and Blackstone River culverts, & Culvert rehabilitation n/a South of Horseshoe Lake 7290

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

17

NORTHWESTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km)

Atikokan easterly and Hwy 11 Underway Resurfacing 2015 20 11B to Atikokan

11 Planned Beardmore easterly Resurfacing 2014 23

French River Bridge, east of 11 Underway Bridge replacement 2014 n/a Atikokan

Kabaigon River Bridge, west of 11 Planned Bridge replacement 2015 n/a Shebandowan

Noden Causeway, east of Fort 11 Underway Bridge rehabilitation 2014 n/a Frances

Pickerel River Bridge, east of 11 Underway Bridge replacement 2014 n/a Atikokan

Seven Mile Bridge, east of Fort 11 Underway Bridge replacement 2014 n/a Frances

Swamp River Bridge, west of 11 Underway Bridge replacement 2014 n/a Shabaqua

11 Underway West of Atikokan westerly Resurfacing 2014 21

Resurfacing and 11 Underway West of Geraldton westerly 2014 28 culvert replacement

17 Planned CPR overhead, Rossport Bridge rehabilitation 2015 n/a

17 Planned CPR overhead, Schreiber Bridge replacement 2015 n/a

Cypress River Bridge, east of 17 Underway Bridge replacement 2014 n/a Nipigon

18

NORTHWESTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km)

East of Hwy 71 easterly, east 17 Underway Resurfacing 2015 28 of Kenora

17 Underway East of Nipigon easterly Resurfacing 2014 17

English River Bridge, English 17 Underway Bridge replacement 2014 n/a River

Gulliver River Bridge, east of 17 Underway Bridge replacement 2014 n/a Ignace

17 Planned Ignace westerly Resurfacing 2015 20

Jackfish River Bridge, east of 17 Underway Bridge rehabilitation 2014 n/a Nipigon

Jackpine River Bridge, east of 17 Underway Bridge rehabilitation 2014 n/a Nipigon

Little Gravel River Bridge, east 17 Underway Bridge replacement 2014 n/a of Nipigon

Little Pic River Bridge, west of 17 Underway Bridge rehabilitation 2014 n/a Marathon

Pic River Bridge, east of 17 Underway Bridge replacement 2016 n/a Marathon

Raleigh Lake culvert, west of 17 Underway Culvert replacement 2015 n/a Ignace

Canada/US Boundary 61 Underway Resurfacing 2015 21 northerly

Black River culvert, north of 71 Planned Culvert replacement 2016 n/a Sioux Narrows

19

NORTHWESTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km)

Log River Tributary culvert, 71 Planned Culvert replacement 2016 n/a south of Caliper Lake

Pine Lake culvert, south of 71 Planned Culvert replacement 2016 n/a Caliper Lake

Abram Lake culvert, south of 72 Underway Culvert replacement 2014 n/a Sioux Lookout

Trout Lake River Bridge, north 105 Underway Bridge replacement 2015 n/a of Ear Falls

Gull River Bridge, north of Hwy 527 Planned Bridge rehabilitation 2015 n/a 811

Kabitotikwia River Bridge, 527 Planned Bridge rehabilitation 2015 n/a north of Hwy 811

Kopka River Bridge, north of 527 Planned Bridge rehabilitation 2015 n/a Hwy 811

Merkley (Lachapelle) Creek 527 Underway Culvert replacement 2015 n/a culvert, south of Hwy 811

Sibley Creek Bridge, Lake 587 Underway Bridge rehabilitation 2014 n/a Superior

Whitefish River Bridge, west of 588 Underway Bridge replacement 2014 n/a Thunder Bay

594 Underway Dryden westerly Resurfacing 2015 5

Medcalf Lake Narrows Bridge, 599 Underway Bridge rehabilitation 2014 n/a north of Savant Lake

Little Grassy River Bridge, east 600 Underway Bridge rehabilitation 2014 n/a of Bergland

20

NORTHWESTERN ONTARIO REHABILITATION 2014 Target Project Completion Length Hwy Status Location Type of Work Date (km)

601 Underway Dryden northerly Resurfacing 2015 5

Hastie River Bridge, north of 613 Planned Bridge rehabilitation 2015 n/a Hwy 11, Devlin

Munro River Bridge, north of 613 Planned Bridge rehabilitation 2015 n/a Hwy 11, Devlin

Barabara culvert, south of 614 Underway Culvert replacement 2015 n/a Manitouwadge

Barehead culvert, south of 614 Underway Culvert replacement 2014 n/a Manitouwadge

Phillips culvert, south of 614 Underway Culvert replacement 2014 n/a Manitouwadge

Off Lake Bridge, north of Hwy 615 Underway Bridge rehabilitation 2015 n/a 11, Emo

Little Grassy River Bridge, 621 Underway Bridge replacement 2014 n/a Bergland

658 Underway Black River Bridge, Redditt Bridge replacement 2014 n/a

Vermillion Lake Narrows 664 Underway Bridge replacement 2014 n/a Bridge, west of Hwy 72

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

21

NORTHWESTERN ONTARIO REHABILITATION 2015 Target Project Completion Length Hwy Location Type of Work Date (km)

Dilke Creek culvert, east of 11 Culvert replacement 2016 n/a Pinewood

Everett Creek culvert, west of Fort 11 Culvert replacement 2016 n/a Frances

11 Fort Frances westerly Resurfacing 2016 18

11 Longlac easterly Resurfacing 2016 22

Noden Causeway, east of Fort 11 Bridge rehabilitation 2017 n/a Frances

Pagwachuan River culverts, east of 11 Culvert replacement 2016 n/a Longlac

Ramsdale Creek culvert, east of 11 Culvert replacement 2016 n/a Emo

Westovers Creek culvert, west of 11 Culvert replacement 2016 n/a Barwick

Cedar Creek Bridge, west of Hwy 17 Bridge rehabilitation 2015 n/a 614 to Manitouwadge

17 CPR overhead, west of Schreiber Bridge rehabilitation 2016 n/a

17 Gravel River Bridge, east of Nipigon Bridge rehabilitation 2015 n/a

Ozone Creek Bridge, east of 17 Bridge rehabilitation 2015 n/a Nipigon

Pays Plat River Bridges, east of 17 Bridge rehabilitation 2017 n/a Nipigon, Pays Plat

22

NORTHWESTERN ONTARIO REHABILITATION 2015 Target Project Completion Length Hwy Location Type of Work Date (km)

17 Shabaqua Corners westerly Resurfacing 2015 13

West of Ignace, westerly to Hwy 17 Resurfacing 2015 31 622

Pine River Bridge, south of Thunder 61 Bridge replacement 2015 n/a Bay

71 Nestor Falls northerly Resurfacing 2015 28

Moose Creek Bridge, south of Sioux 72 Bridge rehabilitation 2016 n/a Lookout

72 Pelican River Bridge, Sioux Lookout Bridge rehabilitation 2015 n/a

Strawberry Creek Bridges, west of 102 Bridge rehabilitation 2015 n/a Thunder Bay

18 km north of Hwy 609 northerly, 105 Resurfacing 2015 30 north of Vermillion Bay

Surprise Lake Narrows Bridge, 589 Bridge rehabilitation 2015 n/a north of Lappe

Elbow Creek Bridge, north of Silver 599 Bridge rehabilitation 2015 n/a Dollar

Sturgeon River Bridge, north of 599 Bridge rehabilitation 2015 n/a Silver Dollar

Big Trout Creek culvert, north of 628 Culvert replacement 2015 n/a Red Rock

23

NORTHWESTERN ONTARIO REHABILITATION 2015 Target Project Completion Length Hwy Location Type of Work Date (km)

Minnikau River culverts, east of 642 Culvert replacement 2016 n/a Sioux Lookout

658 Hwy 17A northerly, Kenora Resurfacing 2015 26

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.

24

NORTHWESTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km)

11 Baudette Rainy River International Bridge to U.S. Bridge replacement n/a

11 Brule Creek culvert, west of Thunder Bay Culvert replacement n/a

11 Caribus Lake Tributary culvert, west of Atikokan Culvert replacement n/a

11 Chowder Creek culvert, east of Longlac Culvert replacement n/a

11 Fish Creek culvert, east of Longlac Culvert replacement n/a

11 Flood Creek West culvert, west of Sapawe Culvert replacement n/a

11 Flynne Creek culvert, east of Longlac Culvert replacement n/a

11 Flynne Creek East culvert, east of Longlac Culvert replacement n/a

11 Fort Frances easterly Resurfacing 27

11 Gagne Lake culvert, west of Atikokan Culvert replacement n/a

11 Helen Lake culvert, north of Nipigon Culvert replacement n/a

11 Kakabeka Falls Bridge, Kakabeka Bridge rehabilitation n/a

11 Mills Creek culvert, west of Atikokan Culvert replacement n/a

25

NORTHWESTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km)

11 Mineral Creek culvert, west of Longlac Culvert replacement n/a

11 Shamrock Lake Centre culvert, west of Macdiarmid Culvert replacement n/a

11 Shamrock Lake East culvert, west of Macdiarmid Culvert replacement n/a

11 Shamrock Lake West culvert, west of Macdiarmid Culvert replacement n/a

11 Suckle Creek culvert, west of Longlac Culvert replacement n/a

17 Rae Lake Arch culvert, east of Hwy 71 Culvert replacement n/a

17 Revell River Bridge, west of Ignace Culvert replacement n/a

17 Marathon westerly Resurfacing 27

17 White Lake Narrows Bridge, west of White River Bridge rehabilitation n/a

61 Jarvis River culvert, south of Thunder Bay Culvert replacement n/a

61 Slate River Tributary culvert, south of Thunder Bay Culvert replacement n/a

71 Hwy 17 southerly, west of Emo Resurfacing 23

105 Hwy 17, Vermilion Bay northerly Resurfacing 31

26

NORTHWESTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km)

105 Pickerel Creek culvert, north of Vermillion Bay Culvert replacement n/a

502 North of Hwy 11 northerly, Dryden Resurfacing 38

502 Kawawia Creek culvert, north of Hwy 11 Culvert replacement n/a

516 Mills Creek culvert, east of Sioux Lookout Culvert replacement n/a

527 North of Hwy 11/17 northerly, north of Thunder Bay Resurfacing 22

527 East Dog River culvert, north of Thunder Bay Culvert replacement n/a

588 Hwy 11/17 southerly, Thunder Bay Resurfacing 7

589 McIntyre River culvert, north of Highway 102 Culvert replacement n/a

590 Hwy 11/17, Kakabeka southerly Resurfacing 24

595 Cedar Creek culvert, west of Thunder Bay Culvert replacement n/a

595 Sitch Creek culverts, west of Thunder Bay Culvert Replacements n/a

596 Alice Creek culvert, south of Minaki Culvert replacement n/a

Crow River (July Falls) Bridge north of Central 599 Bridge replacement n/a Patricia

27

NORTHWESTERN ONTARIO REHABILITATION 2016-2018 Project Length Hwy Location Type of Work (km)

Albany River Overflow(Cedar Rapids), south of 599 Bridge rehabilitation n/a Pickle Lake

Wabigoon River Tributary culvert, north of 601 Culvert replacement n/a Hwy 17, Dryden

603 Melgund River culvert, north of Hwy 17 Culvert replacement n/a

605 Shoshowae Creek culvert, north of Hwy 17 Culvert replacement n/a

614 Black River Bridge, north of Hwy 17 Bridge rehabilitation n/a

617 Pinewood River Bridge, north of Hwy 11 Bridge replacement n/a

625 Sandlink Creek culvert, north of Caramat Culvert replacement n/a

Note: Project timing is subject to change based on funding, planning, design, environmental approval, property acquisition and construction requirements.