S Prairie View Rd Windsor Rd Cardinal Rd Bradley Ave Springeld Ave Kirby Ave P Pintail Rd ip - PhinneyBranch - Kaskaskia River - Copper Slough - Boneyard Greenways e l in e 7 M 2 u lt

Fall 2009Draft Champaign TrailsPlan i -U Barker Rd se T ra i l S Kaskaskia River Greenway L p o u Existing TrailSegments Greenway, Planned Multi-Use Trail,Planned Railtrail, Planned Greenwayw r e r

Co pp er

C

Rising Rd oad Multi- Use Trail Rising R

S W

l o

u e

s g HAMPAI

- Wabash - City ofNew Orleans Railtrails

t h Lindsey Rd

Pipeline Multi-Use Trail

S

M

M

W

p

K

u

r

u

i

i i

n B

r

l

n

l

U

t

b t

d l W

g o

i

i

p

y

-

- s

o

U

U

p

o a

A m

e

s b e

r

s

v

Staley Rd l i

e a

e r

d n

R

e

s

g

C

T

T

o

n h A

r t

o r

a o u Greenway

a R

v

a

p

d n

e

i e

i a

l

p

l

R

n i

e l o

u t

r r

a

e a

S d

i l

R

l o

FALL 2009DRAFT

a

u

i

l

g

t M

G

h

r

a

u

i l

l t Duncan Rd i

-

Duncan Rd U

Multi-Use Duncan s N Road e Railroad Lines Interstate Major Roads Connection

Trail C Trail B Trail A

- Kirby Avenue - DuncanRoad Road - Curtis - BloomingtonRoad Multi- Use Trails

T

r

Gr a

e i

T enb l C e 1 lt B u ike

r wa

t y R

i

s

RAILS o

b

R P

n

i

h y

o n

e T

B

y University Ave

Church St

Mattis Ave a r a n F

r Mattis

c or a

d h

Ch

i

G Interstate Dr Olympian Dr Olympian

d Harris Harris d

r l

e w a y Avenue e

n

Multi-Use Trail M

ama

Rd u

l

t

i

- U

pap s

O e

- Olympian Drive - North Champaign - Mattis Avenue 5

l 7 T ig

y

P r g

m

a Prospect Ave i n

p l Prospect Rd

i North Champaign a

n

Boulware Trail Multi-UseTrail D

r

M A

i L

v

s

a h

e r 0

King Trail

l

t

U a

M

i

n n A

p

d

u

City of New Orleans Railtrail L p

u

l P e

t

t

a

r i

h

- r e B N

U

k

r

o

T

s

L n Market St

r treet Trail e

irst S e F o

First St y a

w

i

Greenway a l

e r

d

y a w n e r e r

G T

B r o a

n i

- Windsor Road - Windsor - RisingRoad - Pipeline l

e y

1 Mile

a

r

d

7 4

Lincoln Ave Springeld Ave Curtis Rd Curtis Florida Av Windsor Rd Windsor Old Church Rd Old Church Green St N Boneyard Greenway

The Boneyard Greenway has two distinct sections the nothern section which connects to the North Champaign Multi-UseTrail and southern section which intersects with the planned City of New Orleans Railtrail and Wabash Railtrail. The Boneyard Greenway is 1.8 miles long. It links to the commercial areas at the northern end and leads to Downtown Champaign and 10’ Path Campustown at the southern end. 50’ Easement Market St Market Prospect Ave N

Opportunity 1 Connection to North Champaign Multi-Use Trail

74 North ChampaignMulti-Use Trail Trail ChampaignMulti-Use North Champaign

U PPE Constraint 1 R BO Need for a connection between N E Upper and Lower Boneyard Greenway Y Bristol A Park Hazel R D Bradley Ave Park

Wabash Railtrail Beardsley Jones Wesley Franklin Park Park Spalding Stratton Douglass Park Elementary Park Washington Elementary

Constraint 2 Railroad Pedestrian Crossing Needed Opportunity 2 GREENWAY Connection to Wabash Railtrail and

City of New Orleans Railtrail Trail Martin Luther King

Westside Opportunity 3 Park University Ave Connection to Multiple Neighborhood Parks

d r a

y

e City of New Orleans Railtrail Holycross n Downtown o

B

Elementary r

Champaign e

Scott

ow

L

Park

Green Street Opportunity 4 Connection to Downtown and Campustown Campustown 0 0.25 Mile First St Neil St Neil Wright St

Multi-Use Trail, Planned 74 Railtrail, Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 2 Boneyard Greenway

Wabash Railtrail North Champaign Multi-Use Trail Market Place Mall Wesley Park City of New Orleans Railtrail Martin Luther King Trail Prospect Avenue Commercial Center Scott Park Bristol Park Douglass Park

Opportunities

Connection to North Champaign Multi-Use Trail A proposed connection between the North Champaign Multi-Use Trail and the Boneyard Greenway will link 1 neighborhoods north of I-74, including major shopping centers and newly developing residential areas, with neighborhoods south of I-74, including the University of and downtown Champaign.

Marketplace Mall

Connection to Wabash Railtrail and City of New Orleans Railtrail 2 Boneyard Greenway connects to two greenways running along major railway lines through Champaign. These are the 9 mile Wabash Railtrail and the 4 mile City of New Orleans Railtrail. Through these trails, the Boneyard Greenway becomes integrated into the regional trails network.

City of New Orleans Railroad Connection to Multiple Neighborhood Parks 3 The Boneyard Greenway forms an excellent link between several Community Parks through its course. The 1.5 acres Wesley Park, 2 acres Bristol Park and 3.5 acres Scott Park, all lie along the Boneyard Greenway. Douglass Park and Douglass Center, which are 12.5 acres of park area with facilities including playground, baseball diamond and soccer field, lighted basketballs courts, is located just Douglass Community Center 0.2 miles east of the Boneyard Greenway.

Connection to Downtown and Campustown 4 The Boneyard Greenway connects the neighborhoods located north of Champaign, including the Market Place Mall and the North Prospect commercial center, to downtown Champaign and Campustown located at the south end of the trail.

Downtown Champaign Constraints

Need for a Connection between Upper and Lower Boneyard Greenway The Upper and the Lower Boneyard Greenway Trails should be coordinated with the 1 Martin Luther King Trail to form a continuous north-south local trail on the east side of the city.

Existing Boneyard Greenway

Railroad Pedestrian Crossing Needed The development of an at-grade trail crossing will be necessary to allow the Boneyard Greenway 2 to cross the Wabash Railroad. (See the County Greenways and Trails Design Guidelines for at-grade trail crossing designs.)

Rails with Trails Crossing example

Champaign Trails Plan 3 Fall 2009 Draft Copper Slough Greenway

A multi-use trail is planned to border the Copper Slough Creek between the Kaskaskia River and Kaufman Lake. The trail consists of two segments; the lower segment lies between Kaskaskia Greenway and Pipeline Multi-UseTrail, the upper segment is located between Kirby Avenue Multi-Use Trail and Duncan Road Multi-Use Trail. The trail will cover 2.1 miles in total, linking an existing trail and six planned trails within the network. The Copper Slough Greenway will provide residents with access to the citywide 10’ Path trail network. 50’ Easement

Rising Rd #$ Staley Rd Staley Lake Duncan Rd N

%5

Opportunity 1 O’Malley’s Alley Barker Rd Barker Trail Connection to O’Malley’s Alley Trail Rd Kenwood and Kaufman Lake Centennial Park Park Pipeline Multi-Use Trail Pipeline Multi-Use '7% H #5

G Rising Road Multi- Use Trail Use Multi- Rising Road $7

U Middle O

L A Trail Multi-Use Duncan Road

S

R - UPPER E P Aquatic Kirby Avenue Multi-Use Trail P Kirby Ave O Center C

Kaskaskia Greenway 7 % % '- Opportunity 2 Access to Schools, Parks and ',7 Residential Neighborhoods

(5 ) Pipeline Multi-Use Trail Spur 57 * Opportunity 3 5 Access to Local and Regional Trails Square *7 Park Park % Windsor Rd GREEN WAY Windsor Road Multi-Use Trail +% Fire Park Zahnd 7>

LOWER Park Constraint 1 5 Design Pedestrian Crossing for Urban Arterial COPPER SLOUGH )%$% Opportunity 4 Coordination with Future Developments

Curtis Rd Curtis Road Multi-Use Trail 0 0.25 Mile

Multi-Use Trail, Planned 74 Railtrail , Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 4 Copper Slough Greenway

Kaskaskia Greenway Kirby Avenue Multi-Use Trail Porter Family Park Kenwood Elementary Rising Road Multi-Use Trail Duncan Road Multi-Use Trail Dog Park O’Malley’s Alley Trail Pipeline Multi-Use Trail O’ Malley’s AlleyTrail Neighborhood Shopping Kaufman Lake Windsor Road Multi-Use Trail

Opportunities

Connection to O’Malley’s Alley Trail and Kaufman Lake Upper Copper Slough Greenway links to the existing 0.5 mile O’Malley’s Alley Trail and its future extension 1 along Kenwood Road. This will provides access to Jefferson Middle School and Sholem Aquatic Center through the 74 acre Centennial Park. The Copper Slough Greenway also leads to Kaufman Park and Lake through the existing Greenbelt Bikeway trail. Kaufman Park is 8 acres and the Lake covers about 16 acres.

Kaufman Lake

Connection to Schools, Parks and Residential neighborhoods. Upper Copper Slough connects to several residential neighborhoods: Tumberry Ridge, Kenwood, 2 Ridgewood which leads to Kenwood elementary, Kaufman Lake and Kaufman Park. The Lower Copper Slough Greenway connects to Ironwood, Copper Ridge, Charter Oak and Lincolnshire Fields neighborhoods. Also, the greenway leads to the 38 acres Porter Family Park and the 7 acres Dog Park at the intersection of Rising Road and Windsor Road. Porter Park

Access to Local and Regional Trails Copper Slough Greenway connects to the larger regional network through two major north-south trails 3 located on the west side of the city. These trails are the future 10 mile Kaskaskia Greenway and the 6.5 mile Pipeline Multi-Use Trail. Copper Slough also connects to the 7 mile Rising Road Multi-Use Trail which is the local north-south trail. Kaskaskia River

Coordination with Future Developments The planned Copper Slough Greenway requires coordination to incorporate this trail into future developments. 4 To ensure connection between the lower Copper Slough Greenway and the planned Kaskaskia Greenway, coordination is needed in the areas south of Windsor and the west of Rising Road. For the Upper Copper Slough Greenway coordination is most needed between Duncan Road and I-57 when development is Undeveloped Copper Slough proposed.

Constraints

Design Pedestrian Crossing for Urban Arterials Where trails cross urban arterial roadways specific design guidelines ensuring safe pedestrian crossing will be necessary. An example where this is needed is the intersection of the Upper Copper Slough Greenway at Safe Pedestrian Crossing example Kirby Avenue. In the County’s Long Range Transportation Plan, Rising Road will become a high volume road, 1 which makes it critical to have a safe pedestrian crossing at the intersection of Rising Road and Copper Slough Greenway. (See the Champaign County Greenway and Trails Design Guidelines for details)

Intersection of Rising Road and Windsor Road

Champaign Trails Plan 5 Fall 2009 Draft Kaskaskia River Greenway

The Kaskaskia River Greenway will begin at Bloomington Road and continue south 9.9 miles along the west side of Champaign. The 100-500 foot width of the proposed greenway will include the Kaskaskia River, bordering land, and a 10-foot-wide multi-use trail. The Kaskaskia Greenway will be provide recreation 10’ Path space along the banks of the Kaskaskia River and will link with six other trails and greenways, contributing to the connectivity of the regional trail network. 100’ - 500’ Easement Barker Rd Barker Lindsey Rd Mattis Ave Duncan Rd Market St Market N Opportunity 1 5 7 North Champaign Trail Connections Prospect Ave B Pintail Rd lo Olympian Drive Multi- Use Trail om ing to 74 Constraint 1 n R oa Olympian Dr Railroad Pedestrian d M ul Wabash Railtrail ti- Crossing Needed Us e T

r l ail i

a

l

i r

T

a

r

n

T

l

g

l Cardinal Rd i

i e

i

a s

a

a

r

r

p

U

T

T

- e

i m

e

t s

a l s

h

U u

U -

C

- i

i

M t

Staley Rd Staley

t l

h

l

d t

GREENWAY u

u

r a

o M

o U Constraint 2 M p

N

e R

p Multi-Use Trail Multi-Use

n e

Mattis Avenue Avenue Mattis r g i B

Interstate Crossing l on

n e i e

s y

p i

i a R Bradley Ave P rd

G

r

e

e

n

w

a 72 y

KASKASKIA RIVER Springeld Ave

Opportunity 2 Lower Boneyard

Residential Neighborhood Accessibility Greenway Multi-Use Trail A Trail Multi-Use Kirby Ave Kirby Avenue Multi-UseTrail Road Duncan

City of NewOrleans Railtrail Constraint 3

Need for Aquiring Right-Of-Way

Ph i n r n

u e

p y S Greenway Windsor Road Multi-UseTrail Windsor Rd l

i B

a B Trail Multi-Use Duncan Road Road Duncan r r T an se U c i- h lt u G First St M Copper Slough r e e

lin en e Opportunity 3 w ip

P a

South Champaign Trail Connections y

Multi-Use Trail C Trail Multi-Use Duncan Road Road Duncan Curtis Rd 0 0.5 Mile Curtis Road Multi-Use Trail

Multi-Use Trail, Planned 74 Railtrail, Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 6 Kaskaskia River Greenway

Bloomington Road Multi-Use Trail Pipeline Multi-Use Trail Spur As a regional greenway and trail, the Kaskaskia Greenway will Wabash Railtrail Copper Slough Greenway serve as a destination for recreation. Springfield Avenue Greenway Curtis Road Multi-Use Trail

Opportunities

Northern Champaign Trail Connections 1 The Kaskaskia River Greenway and Multi-Use Trail will be easily accessible from communities on the north end of Champaign. The Greenway will connect with the Bloomington Road Multi-Use Trail, providing a paved, off-road path leading to Mattis Avenue. The Kaskaskia Greenway will also connect with the Wabash Railtrail, which is proposed to connect the cities of Decatur and Danville. Example Multi-Use Trail Providing Access to Greenway Residential Neighborhood Accessibility 2 The Kaskaskia River Greenway will be accessible from many newly developed residential neighborhoods in western Champaign. The Trail will benefit these neighborhoods, as well as future developments, by providing them with nearby recreational opportunities and linking them to a regional trail network. esidential Neighbohood in Champaign

Southern Champaign Trail Connections Connections to trails on the south end of Champaign will provide neighborhoods in the area with direct access 3 to the Kaskaskia Greenway. The greenway will connect with the Curtis Road Multi-Use Trail, which is proposed to end at the City of New Orleans Railtrail. The Kaskaskia Greenway will also connect with the Copper Slough Greenway, which is proposed to link several existing and proposed trails throughout the center of the city, ending at the Bloomington Road Multi-Use Trail. Example Connection Between Greenways Constraints

Railroad Pedestrian Crossing Needed The development of an at-grade trail crossing will be necessary to allow the Kaskaskia River Greenway and Trail 1 to cross the Wabash Railroad. (See the County Greenways and Trails Design Guidelines for at-grade trail crossing designs)

At-grade rail crossing example Interstate Crossing A pedestrian and bicycle bridge will be necessary at the intersection of the Kaskaskia River and Interstate-72. 2 The design could involve widening of the existing bridge to include pedestrian and bicycle facilities. Another option is to construct a seperate pedestrian overpass bridge. Further analysis is required to identify a suitable design solution. (Refer to the Interstate Overpass Enhancements Plan for design guidelines)

Kaskaskia River and I-72 Intersection

Need for Aquiring Right-Of-Way The Kaskaskia River is located within Champaign’s Extra Territorial Juristdiction and beyond the city limits. In order to establish the proposed greenway, it will be necessary to coordinate with property owners to aquire the 3 70-foot right-of-way including and surrounding the Kaskaskia River. The preservation of this land can be ensured through the establishment of a conservation easement before development pressure increases in the area.

Kaskaskia River

Champaign Trails Plan 7 Fall 2009 Draft Phinney Branch Greenway

The planned Phinney Branch Greenway will run 2.1 miles along the Phinney Branch Creek starting at the existing Robeson Meadow Trail and extending south towards the proposed Curtis Road Multi-Use Trail . The Phinney Branch Greenway connects several residential neighborhoods like Southwood and Devonshire with community parks and schools. Also the southern end of the Greenway connects to the Liberty on the Lake 10’ Path neighborhood and The Village of Savoy along the Curtis Road Multi-Use Trail. 50’ Easement

Centennial Park Centennial High School Kenwood Elementary N Duncan Road Duncan Road A Multi-Use Trail Middle School Copper Slough Copper Sholem er pp Aquatic U Opportunity 1

Kirby Avenue Multi-Use Trail Center Connection to Parks and Trails

Carrie Busey Elementary

St. Matthews Elementary , Elementary Roby Trail Devonshire

Robeson City of NewOrleans Railtrail Robeson Park Elementary

Constraint 1 Boulware Trail Need For Acquiring Right-Of-Way PHINNEY Southwood Robeson Meadow Morrisey Windsor Road Multi-Use Trail Duncan Road Duncan Road B Multi-UseTrail Park Windsor Rd

BRANCH Christie Hallbeck Clinic Devonshire Park Robeson South Meadow Noel GREENWAY West Park

Opportunity 2 Constraint 2 Robeson Meadows West Trail Connection to Major Health Care Clinics Design Pedestrian Crossing for Urban Arterials

Cherry Hills

Barkstall Prospect Ave Prospect Elementary Duncan Road C Trail Multi-Use Curtis Road Multi-Use Trail Curtis Rd 57 Carle Clinic Opportunity 3 Mattis Ave Connection to Curtis Road Multi-Use Trail Opportunity 4 Freedom Blvd Coordination with Future Developments Liberty on the lake

0 0.25 Mile Duncan Rd

Multi-Use Trail, Planned 74 Railtrail, Planned 72 Greenway, Planned 57 Existing Trail Segments Connection

Champaign Trails Plan Fall 2009 Draft 8 Phinney Branch Greenway

Curtis Road Development Area Sholem Aquatic Center Curtis Road Multi-Use Trail Robeson Park Carrie Busey Elementary Roby Trail Christie Clinic Robeson Elementary Duncan Road Multi-Use Trail Carle Clinic

Opportunities

Connection to Parks and Trails Phinney Branch Greenway connects to the existing RobyTrail at the Robeson Meadow Park which further 1 connects to the Robeson Elementary School, Carrie Busey Elementary School and the Sholem Aquatic Center. Centennial Park is located approximately a quater mile north of the Phinney Branch Greenway.

The Existing Phinney Branch Connection to Major Health Care Clinics 2 The Phinney Branch Greenway connects the surrounding residential neighborhoods, like Southwood, Robeson Park and Devonshire to major health care clinics. Christie Health Care Clinic is located at the intersection of Windsor Road and Mattis Avenue and Carle Clinic is at the intersection of Curtis Road and Mattis Avenue. The Existing Pipeline Trail

Connection to Curtis Road Multi-Use Trail 3 The Phinney Branch Greenway allows easy access to the newer developments along the Curtis Road Multi-Use Trail, like the Liberty On The Lake neighborhood to the south and the Cherry Hills neighborhood to the north of Curtis Road. I-57 and Curtis Road Interchange area

Coordination with Future Developments 4 The location of the planned Phinney Branch Greenway requires coordination with future developments before the trail can be implemented. This coordination will help connect the Phinney Greenway to the Village of Savoy through the Curtis Road Multi-Use Trail. Curtis Road at I-57

Constraints

Need For Acquiring Right-of-Way This will require effort by Park District Staff to encourage land donations, easements, estate planning, etc, in 1 order to aquire land to build the trail in an already built area.

Phinney through Developed Area Design Pedestrian Crossing for Urban Arterials Where trails cross urban arterials roadways specific design guidelines ensuring safe pedestrian crossing will be necessary. The intersection of Phinney Branch Greenway at Windsor is an example where this will be needed. 2 Also, the crossing from Phinney Branch Greenway to Freedom Boulevard in the Liberty on the Lake neighborhood will require special attention to ensure safe pedestrian movement across Curtis Road. Safe Pedestrian Crossing Example (See the Champaign County Greenway and Trails Design Guidelines for details)

Champaign Trails Plan 9 Fall 2009 Draft City of New Orleans Railtrail

A 3.7 mile railtrail is planned along the Canadian National Railroad in east Champaign. This railtrail will link the Wabash Railtrail in northern Champaign, with Curtis Road in southern Champaign. There will be opportunities for future expansion in both directions. Due to its location between downtown Champaign

and the University of Illinois campus, the City of New Orleans Greenway will 10’ Path serve as a good commuting trail. 50’ - 200’ Easement

Up Parland Dodds p 5 er 7 College Bone Park W ya

Duncan Rd r y ab d a G a sh R r w ail e e tra e k i i l n N B Hazel way Bradley Ave

t l e Park Wesley b n Franklin Park e Opportunity 1 Stratton e Douglass r Access to Local and Regional Trails Middle Elementary St Market G Spalding Park Washington School Park Elementary Martin Luther King Trail 74 Downtown Church St Constraint 1 West Side

y

Park a University Ave Railroad Pedestrian Crossing Needed Illinois

w

Terminal n Marquette

e

Holy Cross e

r School

G

Elementary

Scott

Springeld Ave d

r

a

y Park e

Opportunity 2 n

o Lowe

r B Green St Commuting Corridor Trail Edison

Middle Opportunity 3 Duncan Road Road Duncan Constraint 2 Connection to Downtown

Need for Pedestrian Overpass and Campustown l

i University of Illinois Copper Slough Copper a

r r T pe p t Hessel U e e Park r

t Kirby Ave

S

Multi-Use Trail t

s

r

i F

,

Elementary

l i a r

T

!

e University

r

a

Research

w l

u Park Mattis

o

B Park

Windsor Road Multi-Use Trail CITY OF

Multi-Use Trail B Trail Multi-Use Duncan Road Road Duncan

Windsor Ave

P

h

i n Constraint 3 n e y Access to Elevated Trail at Key Locations B r a n

c

h

G

r

e

e

n w

a y

First St

Multi-Use Trail C Trail Multi-Use Duncan Road Road Duncan Mattis Ave Prospect Ave Curtis Rd 0 0.5 Mile Curtis Road MultI-Use Trail

Multi-Use Trail, Planned 74 Railtrail, Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 10 City of New Orleans Railtrail

Downtown Champaign Hessel Park Wabash Railtrail Curtis Road Multi-Use Trail Campustown Westside Park Boneyard Greenway Martin Luther King Trail Village of Savoy Douglass Park

Opportunities

Access to Local and Regional Trails 1 City of New Orleans Railtrail connects to several local trails, making it part of a larger regional network. The railtrail intersects with the Boneyard Greenway, which leads it to major shopping centers to the north and the University of Illinois to the south. The City of New Orleans Railtrail also connects to two major east-west local trails, the 9 mile Wabash Railtrail and the 5 mile Curtis Road Multi-Use Trail. Existing City of New Orleans Railway

Commuting Corridor Trail City of New Orleans Railtrail acts as a good commuting corridor by providing a nonstop connection between 2 downtown and University, the surrounding residential neighborhoods and parks. Hazel Park, Wesley Park, Douglass Park, Scott Park, West Side Park, Mattis Park and Hessel Park are within a half-mile from the City of New Orleans Greenway. Several schools, like Stratton Elementary, Edison Middle School, Marquette School are all located within a half mile area.

Hessel Park Connection to Downtown and Campustown 3 Through the Boneyard Greenway, the City of New Orleans Railtrail leads to neighborhoods located north of Champaign, including the Market Place Mall and the North Prospect commercial center. The Greenway also connects to downtown Champaign and Campustown located at the south end. Illinois Terminal, the community’s transit center, is adjacent to the City of New Orleans Greenway.

Illinois Terminal Constraints

Railroad Pedestrian Crossing Needed The development of an at-grade trail crossing will be necessary to allow the City of New Orleans Railtrail to cross the Wabash Railroad. (See the County Greenways and Trails Design Guidelines for at-grade 1 trail crossing designs)

Rails with Trails example

Need for Pedestrian Overpass A separate pedestrian and bicycle overpass will be necessary at certain intersections to allow the City of New Orleans Railtrail to continue along the course of the railway line. For example the pedestrian 2 overpass should be considered at the intersection of: University Avenue, Springfield Avenue, Green Street, Kirby Avenue and Windsor Road. The proposed overpass will ensure safe pedestrian access over the busy arterials. (Refer to the Interstate Overpass Enhancements Plan for design guidelines)

Pedestrian Overpass example

Access Points to Elevated Trail at Key Locations 3 The City of New Orleans Railtrail is elevated from the road level and it requires the construction of access points at key locations.These Key location include campustown near Green Street and at University Railway at Neil and Kirby Research Park.

Champaign Trails Plan 11 Fall 2009 Draft Wabash Railtrail

The planned Wabash Railtrail will begin at the Kaskaskia River and continue southeast 9.1 miles adjacent to the railroad. This Greenway would run diagonally through the city. Connecting several residential areas, like Garden Hills, Spalding Park and Neighborhood. This trail also connects with three major north-south regional trails by integrating the Wabash Railtrail to a 10’ Path

larger network. 50’ - 200’ Easement

Constraint 1 Railroad Pedestrian Crossing Needed Lindsey Rd B Duncan Rd Market St Market lo Mattis Ave N om 74 i 5 ng 7 to n Ro ad Prospect Ave M u Pintail Rd lt Olympian Drive Multi- Use Trail i-U se Constraint 2 "# Interstate Crossing North Prospect Avenue Opportunity 1 Commercial Center

n

Access to Local and Regional Trails g

i

a Marketplace Mall

p

l

i

Cardinal Rd l

i

a m Commercial Center

r

a

a

r

T

h

T

e

C

s e

s Opportunity 2 h

U

t

U

r

-

Multi-Use Trail Multi-Use

i -

i o Connection to Boneyard Greenway t Garden Hills

l t

l Trail Multi-Use

N

u

y u Parland Elementary Upp a M e

M

r w d College Bo e n n a e

n y

e

i o a

l e r

R

r e Dodds d G

p

G g

i Constraint 3 Stratton r

Bradley Ave n r

P Park i e

e

s e

i v Design Pedestrian Crossing y Elementary i Champaign n

R a w R

for Urban arterials w a a Heights Franklin i e y Washington k k i

s B Middle a Spalding Elementary t k l

72 s e Schoolol a b Park

K n e e r

G Opportunity 3 Springeld St Connection between Residential Neighborhoods, Schools and Parks

ower Boneyard

Greenway Kirby Ave Road Duncan Opportunity 4

Connection to Kickapoo Trail r City of NewOrleans Railtrail u p

S

il a

r T se Ph i -U n i n lt u e M Greenway Windsor Road Multi-Use Trail y

e B n Windsor Rd

r Multi-Use Trail B Trail Multi-Use li Road Duncan e an ip P c h G r Copper Slough e

en

w a

y Multi-Use Trail C Trail Multi-Use Staley Rd Staley Curtis Rd Road Duncan 0 0.5 Mile Curtis Road MultI-Use Trail

Multi-Use Trail, Planned 74 Railtrail, Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 12 Wabash Railtrail

Kaskaskia River Greenway Mattis Avenue Multi-Use Trail Kickapoo State Park Rising Road Multi-Use Trail Greenbelt Bikeway Decatur Pipeline Multi-Use Trail City of New Orleans Railtrail Boneyard Greenway Danville

Opportunities

Access to Local and Regional Trails Wabash Railtrail connects to the larger regional network through two major north-south trails located on the 1 west side of the city. These trails are the 10 mile Kaskaskia Greenway and the 6.5 mile Pipeline Multi-Use Trail. Wabash Trail also conects to the 7 mile Rising Road, which is the local north-south trail.

Example of a Multi-Use Trail Connection to Boneyard Greenway The connection between the Wabash and Boneyard Greenways will link neighborhoods north of the Wabash 2 Railtrail including major shopping centers and residential areas like Garden Hills; with neighborhoods to the south. These include the Spalding Park, Champaign Heights neighborhoods and the University of Illinois campus and downtown Champaign further south of the Boneyard Greenway. The Existing Boneyard Trail Connection Between Residential Neighborhoods, Schools and parks Wabash Railtrail connects residential neighborhoods and schools along the path to several parks, the largest 3 one being Dodds Community Park. Dodds Park is 110 Acres public park and sports complex featuring 11 soccer fields, 7 lighted softball diamonds, concession stands, public restrooms, trails, and ample parking. Additionally, the Wabash Railtrail connects to the 1.6 mile trail, that begins in Dodds Park called the Greenbelt Bikeway. Dodds Park Connection to Kickapoo State Park, Danville 4 Wabash Railtrail will stretch beyond the limits of Champaign and forms an excellent link from Decatur, located southwest of Champaign to Danville on the east. This trail is proposed to connect to Kickapoo State Park in Danville, making it part of a larger network of trails. Kickapoo Park Constraints Railroad Pedestrian Crossing Needed The development of an at-grade trail crossing will be necessary to allow the Kaskaskia River Greenway and Trail to cross the Wabash Railroad. The intersection of the Wabash Railtrail and the City of 1 New Orleans also requires a similar trail crossing. (See the County Greenways and Trails Design Guidelines for at-grade trail crossing designs) Rails with Trails example Interstate Crossing A pedestrian and bicycle bridge will be necessary at the intersection of the Wabash Railtrail and . 2 The design could involve widening of the existing bridge to include pedestrian and bicycle facilities. Another option is to construct a seperate pedestrian overpass bridge. Further analysis is required to identify a suitable design solution. (Refer to the Interstate Overpass Enhancements Plan for design guidelines) Intersection of the Kaskaskia River and I-72 Design Pedestrian Crossing for Urban Arterials Where trails cross urban arterial roadways specific design guidelines ensuring safe pedestrian crossing will 3 be necessary. The intersection of Wabash Railtrail at Mattis Avenue and at Prospect Avenue are examples where this will be needed. (See the Champaign County Greenway and Trails Design Guidelines for details) Urban Arterial Crossing Example

Champaign Trails Plan 13 Fall 2009 Draft West Springfield Avenue Railtrail

Kaskaskia River Greenway with the existing O’Malley’s Alley Trail Duncan Road. The + border West $-:T@+T#6% &T 10’ Path 7 +( T 50’ - 200’ Easement 7 + * N 5 7

Parkland + PipelineMulti-Use Trail % Park ,% Rising Road Multi- Use Trail Use Multi- Rising Road Bre7 e

% Park y a 5% w e ik B lt

e b

Kaskaskia Greenway wn 72 e Opportunity 1 e r

G Opportunity 2 Access to Local and Regional trails

Connection to Kaufman Lake

Constraint 1

and Kaufman Park

Need for Screening near the Oil Storage Tanks

Kaufman Lake WEST SPRINGFIELD AVENUE RAILTRAIL Marathon %5 O’Malley’s Alley Trail % Kenwood Constraint 2 Centennial Railroad Pedestrian Crossing Needed Park Park

Opportunity 3 Uppeer Cop Kenwood Connection to O’Malley’s Alley Trail Elementary Middle School Duncan Road Multi-Use Trail A Trail Multi-Use Duncan Road

'7% p

e

r

S Sholem o

u

g h Aquatic Kir 7 e Kirby Avenue Multi-UseTrail Center 7 % School %

0 0.25 Mile

Pipeline Multi-Use Trail Spur Multi-Use Trail, Planned 74 Railtrail , Planned ?: Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 14 West Springfield Avenue Railtrail

Kaskaskia Greenway Pipeline Multi-UseTrail Kaufman Park Centennial Park Rising Road Multi-Use Trail Duncan Road Multi-Use Trail Kaskaskia Greenway Kenwood Elementary O’ Malley’s Alley Trail Sholem Aquatic Center Jefferson Middle School

Opportunities

Access to Local and Regional Trails West Springfield Avenue Railtrail connects to the larger regional network through two major north-south trails 1 located on the west side of the city. These trails are the 10 mile Kaskaskia Greenway and the 6.5 mile Pipeline multi-use Trail. West Springfield Avenue Railtrail also conects to the 7 mile long Rising Road multi-use trail, which is the local north-south trail.

Kaskaskia River

Connection to Kaufman Lake and Kaufman Park 2 The West Springfield Railtrail connects to Kaufman Park and Lake through the existing Greenbelt Bikeway trail. Kaufman Park is 8 acres and the Lake covers about 16 acres. The park provides the surrounding residential neighborhoods with outdoor recreational activities.

Fire Ring at Kaufman Lake

Connection to O’Malley’s Alley Trail The 3 mile West Springfield Avenue Railtrail connects to the existing O’Malley’s Alley Trail extending the 3 east - west trail network by half mile. O’Malley’s Alley Trail provides access to Jefferson Middle School and Sholem Aquatic Center through the 74 acre Centennial Park. The existing trail also connects to Ridgewood and Kenwood residential neighborhoods.

Sholem Aquatic Center

Constraints

Need for Screening Near the Oil Storage Tanks There is a need to screen the proposed West Springfield Avenue Railtrail from the area around oil storage 1 tanks, in order to provide a better visual appeal for bikers and pedestrians. However this would require coordination with surrounding property owners.

Area requiring screening

Railroad Pedestrian Crossing Needed The development of an at-grade trail crossing will be necessary to allow Rising Road and Duncan Road to 2 cross the West Springfield Avenue Railtrail. (See the County Greenways and Trails Design Guidelines for at-grade trail crossing designs)

Rails with Trails example

Champaign Trails Plan 15 Fall 2009 Draft Bloomington Road Multi-Use Trail

The Bloomington Road Multi-Use Trail is 4.9 miles long and is adjacent to Bloomington Road in northwest Champaign. The 10-foot-wide trail on the north of Bloomington Road will connect the future Kaskaskia River Greenway with the existing Greenbelt Bikeway at Dodds Park. There is an opportunity for trail expansion northwest towards Mahomet. The south end of the trail connects to Mattis Avenue extending the Champaign-Mahomet Multi-Use Trail by half a 10’ Path mile south. 50’ Easement Lindsey Rd Mattis Ave Duncan Rd Barker Rd Barker Opportunity 3 N

Coordination with future developments

Opportunity 1

Connection to Future Regional Park

Olympian Drive Multi-Use Trail

B Future Regional St. Thomas More L O Opportunity 2 O Park High School M 74 Access to Local and Regional trails IN GT O Pintail Rd N RO A D

5 Wabash Railtrail M 7 UL TI Clearview -U S E T R Constraint 1 A

I Interstate Crossing L Constraint 2

Need for Acquiring Right-Of-Way

Cardinal Rd

Constraint 3 Garden HIls Design Pedestrian Crossing for Urban Arterials Park Garden Hills Elementary Multi-Use Trail Multi-Use Trail Parkland Dodds Mattis Avenue College Park

Garden Hills Bradley Ave

Heritage Park

Greenbelt Bikeway

72

Kaskaskia Greenway Church St

University Ave Staley Rd Staley Kaufman PipelineMulti-Use Trail Springeld Ave Trail Use Multi- Rising Road Lake 0 0.5 Mile

Multi-Use Trail, Planned 74 Railtrail , Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 16 Bloomington Road Multi-Use Trail

Parkland College Dodds Park Kaskaskia Greenway Pipeline Multi-Use Trail Garden Hills Park Heritage Park Rising Road Multi-Use Trail Olympian Drive Multi-Use Trail Future Regional Parks Kaufman Lake Mahomet Trail Mattis Avenue Multi-Use Trail Mahomet Lake of the Woods

Opportunities

Coordination with Future Developments 1 The Bloomington Road Multi-Use Trail is part of a long term plan and it will be implemented when development occurs along Bloomington Road. The trail is planned to be built on the north of the Bloomington.

Undeveloped land near Bloomington Road

Connection to Future Regional Park The 2008 Landfill Reuse Park Plan detailed the design for the future 90 acre site public park. Proposed

2 recreational uses for the site include model aviation field, non-motorized BMX bicycle track and mountain bike skills course, frisbee disc golf course, canine training/dog park. Other amenities in the design proposal include a multi-use trail, naturalized prairie and wildlife habitat, sled hill, observation hill, play area, picnic areas, large gathering and event space. Future Regional Park

Access to Local and Regional Trails Bloomington Road Multi-Use Trail is a link to the larger regional network through two major north-south 3 trails located on the west side of the city. These trails are the 10 mile Kaskaskia Greenway and the 6.5 mile Pipeline Multi-Use Trail. The Multi-Use Trail also connects to the 7 mile Rising Road Multi-Use Trail, which is the local north-south trail.

Kaskaskia River

Constraints

Interstate Crossing A separate pedestrian and bicycle overpass crossing I-57 will be necessary to allow the Bloomington Road Multi-Use Trail to continue to the Mattis Avenue Multi-Use Trail and the Greenbelt Bikeway. The design 1 could involve widening of the existing bridge to include pedestrian and bicycle path, or the construction of an independent overpass. Further analysis is required to identify a suitable design solution. (Refer to the Interstate Overpass Enhancements Plan for design guidelines)

Northwest corner of Mattis and Bloomington

Need for Aquiring Right-Of-Way Bloomington Road Multi-Road Trail lies in developing areas, and there is a need to acquire the 2 right-of-way to the north of Bloomington Road, where the future trail will be built.

Existing Bloomington Road

Design Pedestrian Crossing for Urban Arterials Where trails cross urban arterial roadways specific design guidelines ensuring safe pedestrian crossing will be 3 necessary. The intersection of Bloomington Multi-Use Trail at Mattis Avenue is an example where this will be needed. (See the Champaign County Greenway and Trails Design Guidelines for details)

Safe Pedestrian Crossing example

Champaign Trails Plan 17 Fall 2009 Draft Curtis Road Multi-Use Trail

The planned Curtis Road Multi-Use Trail is 5.2 miles along the southern edge of Champaign. It will begin at the Kaskaskia River and will be on the north and south sides of Curtis Road, leading to the Village of Savoy. The Curtis Road Trail will provide a space for various types of recreational use. The trail will connect several

residential communities with convenience centers throughout southern Champaign and 10’ Path will create links with six other trails within the regional network. 50’ Easement

5

l

i 7 Staley Rd Staley Barker Rd Barker Wabash Railtrail a

r

T

l

i

e

a

s

r

T

U

N

-

i e

t

s

l

U Prospect Ave

u

-

Bradley Ave i Duncan Rd

M

t Mattis Ave

l

d

u

a

M

o

e

R

n

g

i

l

n

e

i

s

p

i

i

R

P 72 Church St

Kaskaskia RiverGreenway University Ave

Springeld Ave Springeld Ave

Green St

Multi-Use Trail A Trail Multi-Use Duncan Road Road Duncan

Kirby Ave Kirby Avenue Multi-Use Trail

r pu S il Roby Trail ra T e s Opportunity 1 U City of NewOrleans Railtrail

- i

t

l

Existing Design for Pedestrian Overpass

u

M e P h Trail Boulware in l i

Windsor Road n e Greenway Multi-Use Trail

Trail Street First

p n i G

P e

y

r

Multi-Use Trail B Trail Multi-Use Duncan Road Road Duncan

ee

B

nw r a n a c Constraint 1 Cherry Hills y h Copper Slough Design Trails Within Existing Subdivision Right-Of-Way Opportunity 2 Coordination with the Village of Savoy Barkstall

Elementary

Trail C Trail

Multi-Use Duncan Road Road Duncan CURTIS ROAD MULTI-USE TRAIL

Constraint 2 74 First St Opportunity 3 Design Pedestrian Crossing Connections to Rising Road and Pipeline Trails for Urban Arterials

Opportunity 4 Trail System throughout New Development 0 0.5 Mile

Multi-Use Trail, Planned 74 Railtrail, Planned 72 Greenway, Planned 57 Existing Trail Segments Connection

Champaign Trails Plan Fall 2009 Draft 18 Curtis Road Multi-Use Trail

Kaskaskia River Greenway Phinney Branch Greenway Curtis Road Interchange Development Area Carle Clinic Rising Road Multi-Use Trail City of New Orleans Railtrail Barkstall Elementary Cherry Hills Pipeline Multi-Use Trail

Opportunities

Existing Design for Pedestrian Overpass A separate bicycle and pedestrian bridge adjacent to the new interchange has been designed and will be built 1 when connecting trails are provided to connect with surrounding development. By offering pedestrians safe access to development on both sides of the interchange, this overpass will benefit residents, as well as future businesses within the area. It will also allow the Curtis Road Multi-Use Trail to form a direct line across southern Champaign, linking the Kaskaskia River and the City of New Orleans Greenways.

I-57 and Curtis Road Interchange area

Coordination with the Village of Savoy The location of the proposed Curtis Road Trail provides opportunities to coordinate with the Village of Savoy 2 to create a more complete regional network of trails and greenways. Through coordination with Savoy, the Curtis Road Trail would provide links with both the proposed Phinney Branch Greenway and City of New Orleans Railtrail.

Savoy Connection to the Local and Regional Trails The Curtis Road Multi-Use Trail will connect with two major north-south regional trails located on the west 3 side of the city, making it park of a larger trails network. These trails are the planned 10 mile Kaskaskia River Greenway and the 6.5 mile Pipeline Multi-Use Trail. The planned Curtis Road Multi-Use trail also connects to the 7 mile long Rising Road Multi-Use Trail, which is the local north-south trail.

Kaskaskia River

Trail System throughout New Development 4 Design standards for land around the Curtis Road interchange will require the construction of a connected system of trails throughout new development. The Curtis Road trail will link with the trail system, providing users with access to the civic spaces and mixed-use development surrounding the new interchange.

Proposed Trail at Curtis Road Interchange Constraints

Design Trails Within Existing Right-Of-Way

Trails need to be designed to fit within the existing right-of-way on Curtis Road. 1

Existing Curtis Road

Design Pedestrian Crossing for Urban Arterials Barkstall Elementary School is located on Hallbeck Drive, a quarter mile north of Curtis Road. A pedestrian 2 crossing should be designed at the intersection of Hallbeck Drive and Curtis Road in order to provide students with safe access to the Curtis Road multi-use trail along the south side of Curtis Road.

Pedestrian crossing example

Champaign Trails Plan 19 Fall 2009 Draft Duncan Road Multi-Use Trail

The planned Duncan Road Multi-Use Trail is 1.6 miles and it starts at the O’Malley’s Alley Trail at the north and extends south towards the proposed Curtis Road Multi-Use Trail . The Trail is divided into three connector segments A,B and C. These trail segments serve to form a connection between

several local trails and links them to the larger regional network of trails. It also 10’ Path connects several residential neighborhoods with community parks and schools. 50’ Easement

Constraint 1 Railroad Pedestrian Crossing Needed N Kaufman Opportunity 1 Springeld Ave Lake Connection between Residential Neighborhoods, Parks and Schools Ridgewood O’Malley’s Alley Trail

Johnston Centennial

Park A Trail

MULTI-USE MULTI-USE Park Centennial High School Kenwood Elementary Tumberry Ridge Middle School

Copper Slough Copper Sholem Pipeline Multi-Use Trail Spur er Aquatic pp U Center Kirby Ave Kirby Avenue Multi-Use Trail Opportunity 2 Countryside Connection to Local Trails Elementary Trails at 57 Brittany

Duncan Rd Roby Trail

Lincolnshire Robeson Fields Park Devonshire Robeson Ironwood Elementary Mullikan Constraint 3 Park Design Trails Within Existing Right-Of-Way Robeson Southwood Trail Trail B Meadows Phinney Branch Greenway Porter Family Park ROAD Copper Slough Windsor Rd Windsor Road Multi-Use Trail

Dog Christie Park Zahnd Robeson Clinic Park Meadows Hallbeck West Park Park

Robeson Meadows Millage Park Staley Rd Staley West Trail Constraint 3 Opportunity 3 Design Pedestrian Crossing for Urban Arterials Coordination with Future Developments Cherry Hills Pipeline Multi-Use Trail Pipeline Multi-Use Rising Road Multi- Use Trail Use Multi- Rising Road Barkstall Trail C Trail

DUNCAN Elementary

Curtis Rd Curtis Road Multi-Use Trail Mattis Ave 0 0.25 Mile

Multi-Use Trail, Planned 74 Railtrail, Planned 72 Greenway, Planned 57 Existing Trail Segments Connection

Champaign Trails Plan Fall 2009 Draft 20 Duncan Road Multi-Use Trail

West Springfield Avenue Railtrail Roby Trail Kaufman Lake Robeson Meadows West Park O’ Malley’s Alley Trail Robeson Meadows West Trail Centennial Park Hallbeck Park Copper Slough Greenway Curtis Road Multi-Use Trail Robeson Park Sholem Aquatic Center

Opportunities

Connection between Residential Neighborhoods, Schools and Parks Duncan Road Multi-Use Trail, connects multiple residential neighborhoods like, Ridgewood, Kenwood, 1 Lincolnshire Fields, Robeson Meadows and Cherry Hills to Kenwood Elementary, Robeson Elementary, Centennial High School and Jefferson Middle School. The Multi-Use Trail also leads to several parks, through the existing and proposed trails. Trail A is a quater-mile from the Johnston Park and a half-mile from the Centennial Park. O’Malley’s Alley Trail to the north of Duncan Road Multi-Use Trail A, leads to the Kaufman Lake and Park. Trail B intersects the Robeson Park and Trail C is a half-mile from the Robeson Meadows West Park. Robeson Park

Connection to Local Trails Duncan Road Multi-Use Trail forms crucial links between several local trails. Trail A connects the West 2 Springfield Avenue Railtrail to the Upper Copper Slough Greenway. Trail B starts at the existing Roby Trail and connects to the Windsor Road Multi Use Trail to the south. Trail C begins at the existing 2 mile Robeson Meadows West Trail and ends at the proposed Curtis Road Multi-Use Trail.

Existing Duncan Road

Coordination with Future Developments 3 The planned Duncan Road Multi-Use Trail requires coordination to incorporate this trail into future developments. This coordination will help connect Duncan Road Multi-Use Trail to Curtis Road Multi-Use Trail and Copper slough Greenway. Existing Copper Slough Constraints

Railroad Pedestrian Crossing Needed The development of an at-grade trail crossing will be necessary to allow the Duncan Road Multi-Use Trail to cross the West Springlfield Avenue Railroad. (See the County Greenways and Trails Design Guidelines 1 for at-grade trail crossing designs)

Duncan Rd and Springfield Ave Railroad

Design Trails Within Existing Right-Of Way Trails need to be designed to fit within the existing right-of-way on Duncan Road. Analysis is required to 2 determine if the trail is required on both sides or along one side of the road.

Developments around Duncan Rd

Design Pedestrian Crossing for Urban Arterials Where trails cross urban arterial roadways specific design guidelines ensuring safe pedestrian crossing will 3 be necessary. The intersection of Duncan Road Multi-Use Trail at Curtis road is an example where this will be needed. (See the Champaign County Greenway and Trails Design Guidelines for details)

Example of Safe Pedestrian Crossing

Champaign Trails Plan 21 Fall 2009 Draft Kirby Avenue Multi-Use Trail

A multi-use trail is planned along Kirby Avenue connecting the future Rising Road Multi-Use Trail and the Upper Copper Slough Greenway. The trail is designed to be built 10 feet wide with 5 foot wide clear zone on either sides, within the right-of way on Kirby Avenue. The trail will cover 2 miles linking to the north-south Pipeline Trail, making it part of a larger regional network. 10’ Path 50’ Easement Staley Rd Staley

Rising Rd Kaufman Lake 57 Duncan Rd N

Ridgewood

O’Malley’s Alley Trail Barker Rd Barker Opportunity 1 Connection to Copper Slough Greenway Centennial Park Park

Tumberry Ridge Kenwood Constraint 1 Elementary Design Pedestrian Crossing for Urban Arterial Middle

Duncan Road Multi-Use Trail A Trail Multi-Use Duncan Road School

Slough Copper - er Sholem pp U Aquatic

Center Kirby Ave Kaskaskia Greenway KIRBY AVENUE MULTI-USE TRAIL 7 Neighborhood School Commercial Opportunity 2 ' ' Access to Local and Regional Trail Brittany Constraint 2 - Interstate Crossing Opportunity 3 Connection to Residential Neighborhoods and Neighborhood Commercial Areas Constraint 3 Design Trails Within Existing Right-Of-Way Ironwood Mullikan Park ) 5 Porter * Square Pipeline Multi-Use Trail Spur Family Park Park Copper Ridge Windsor Rd Windsor Road Multi-Use Trail Dog Park Park

Lower Copper Slough Greenway Pipeline Multi-Use Trail Pipeline Multi-Use Curtis Rd Trail Use Multi- Rising Road Curtis Road Multi-Use Trail 0 0.25 Mile

Multi-Use Trail, Planned 74 Railtrail , Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 22 Kirby Avenue Multi-Use Trail

Pipeline Multi-Use Trail O’Malley’s Alley Trail Copper Slough Greenway Neighborhood Commercial Rising Road Multi-Use Trail Countryside School

Opportunities

Connection to Upper Copper Slough Greenway 1 Kirby Avenue Multi-Use Trail is linked to the Upper Copper Slough Greenway, which further leads to Sholem Aquatic Center through the 74 acres Centennial Park located south of O’Malley’s Alley Trail. The Upper Copper Slough Connector also leads to the Kaufman Park and Lake through the existing O’Malley’s Alley Trail.

Kaufman Lake

Access to Local and Regional Trails Kirby Avenue Multi-Use Trail connects to both regional and local network through two of the major north-south 2 trails located on the west side of the city. These trails are the 6.5 mile Pipeline Multi-Use Trail and the 7 mile Rising Road Multi-Use Trail respectively. The Pipeline Trail further connects it to Kaskaskia Greenway.

Kaskaskia River

Connection to Residential Neighborhoods and Neighborhood Commercial Areas 3 Kirby Avenue Multi-Use Trail connects the residential neighborhoods of Trails at Brittany, Trails at Chestnut Grove, Lincolnshire Fields and Tumberry Ridge to Countryside School. It also provides access to Kenwood Elementary and Kaufman Lake through the Upper Copper Slough Greenway.

Copper Slough

Constraints

Design Pedestrian Crossing for Urban Arterials Where trails cross urban arterial roadways specific design guidelines ensuring safe pedestrian crossing will be necessary. The intersection of Kirby Avenue Multi-Use Trail at Staley Road and Rising Road are examples 1 where this will be needed. (See the Champaign County Greenway and Trails Design Guidelines for details)

Safe Pedestrian Crossing example Interstate Crossing A pedestrian and bicycle overpass crossing I-57 will be necessary to allow Kirby Avenue Multi-UseTrail to continue to the Upper Copper Slough Greenway. The design could involve widening of the existing bridge 2 to include pedestrian and bicycle facilities. Another option is to construct a seperate pedestrian overpass bridge. Further analysis is required to identify a suitable design solution. (Refer to the Interstate Overpass Enhancements Plan for design guidelines) Pedestrian Overpass example

Design Trails Within Existing Right-Of-Way

Trails need to be designed to fit within the existing right-of-way on Kirby Avenue. Analysis is required to determine if the trail is required on both sides or along one side of the road. 3

Existing developments around Kirby Avenue

Champaign Trails Plan 23 Fall 2009 Draft Mattis Avenue Multi-Use Trail

The planned Mattis Avenue Multi-Use Trail is a half-mile connector located in northern Champaign. The multi-use trail will start at the Bloomington Road Multi-Use Trail and extends south to the existing Greenbelt Bikeway at Dodds Park west of Mattis Avenue. The Mattis Avenue Multi-Use Trail connects the Bloomington Road Multi-Use Trail to Garden Hills residential neighborhood and the park and elementary school located within the neighborhood. 10’ Path 50’ Easement

Olympian Drive Multi-Use Trail Bloomington Road Multi-Use Trail

Lindsey Rd 5

Mattis Ave 7 N

74

Clearview Wabash Railtrail Duncan Rd

Opportunity 1 Connection to Bloomington Road Cardinal Rd Multi- Use Trail

Garden HIls

Constraint 1 S Park I

Railroad Pedestrian Crossing Needed T Garden Hills

Elementary

AT M Avenue Multi-Use Trail Avenue Trail Multi-Use Parkland Dodds College Park Garden Hills

Bradley Ave Constraint 2 Opportunity 2 Design Trails Within Existing Right-Of-Way Connection to Parks and Heritage Park Greenbelt Bikeway

72

Church St

University Ave

Kaufman Staley Rd Staley Springeld Ave PipelineMulti-Use Trail Lake 0 0.5 Mile

Multi-Use Trail, Planned 74 Railtrail , Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 24 Mattis Avenue Multi-Use Trail

Dodds Park Parkland College Wabash Railtrail Greenbelt Bikeway Heritage Park Garden Hills Park Bloomington Road Multi-Use Trail Kaufman Lake Garden Hills Elementary

Opportunities

Connection to Bloomington-Road Multi-Use Trail 1 North of Mattis Avenue Multi-Use Trial is connected to the 49 mile Bloomington Road Multi-Use Trail, which is a local trail. This trail further connects the Mattis Avenue Multi-Use Trail to the future regional park located northwest of the Bloomington Road Multi-Use Trail.

Intersection of Bloomington Rd and Mattis Ave

Connection to Parks and Parkland College The Bloomington Road and Mattis Avenue Multi-Use Trail connect to the 2 mile existing Greenbelt 2 Bikeway Trail in Dodds Park. This trail further leads to the 42 acre Heritage Park and Kaufman Lake and Park. Dodds Park is 110 Acre public park and sports complex featuring 11 soccer fields, 7 lighted softball diamonds, concession stands, public restrooms, trails, and ample parking. Kaufman Park is 8 acres and the Lake covers about 16 acres. The exisiting Greenbelt Bikeway also provides access to Parkland College, which is west of Dodds Park.

Dodds Park

Constraints

Railroad Pedestrian Crossing Needed The development of an at-grade trail crossing will be necessary to allow the Bloomington Road and 1 Mattis Avenue Road Multi-Use Trail to cross the Wabash Railroad. (See the County Greenways and Trails Design Guidelines for at-grade trail crossing designs)

Rails with Trails example

Design Trails Within Existing Right-Of Way Trails need to be designed to fit within the confines of the existing right-of-way on Windsor Road. Analysis is 2 required to determine if the trail is required on both sides or along one side of the road.

Developments Around Mattis Avenue

Champaign Trails Plan 25 Fall 2009 Draft North Champaign Multi-Use Trail

The planned North Champaign Multi-Use Trail is 1.6 miles in northeast Champaign. It will be located between two major commercial centers and will be accessible to the residential communities of North Champaign. The trail will create a safe alternative to Prospect Avenue for pedestrian travel between Olympian Drive and

I-74 and provide new recreational opportunities for residents. 10’ Path 50’ Easement

Prospect Ave Olympian Drive Multi- Use Trail St Market N Olympian Dr

57 Ashland Park Laurel Heights Opportunity 1 Interstate Research Park Ashland Park and Olympian Drive Trail Connections

Ashland Park Trail Ashland Park Toalson Park Apollo Industrial Area

Interstate Dr Constraint 1 Design Pedestrian Crossing for Urban arterials

North Prospect Avenue

Commercial Center TRAIL

Town Center Opportunity 2 Apartments LocLocationation betbetweenweenM MajorajorC Commercialommercial CeCententers Marketplace Mall

MULTI-USE Commercial Center

Opportunity 3 Access to Pond and Proposed Park Constraint 2 Interstate Crossing

74 NORTH CHAMPAIGN NORTH CHAMPAIGN

Constraint 3 Champaign Public Need for Aquiring Right-Of-Way Works

Upp erB on ey Wabash Railtrail a rd

G r e e n Opportunity 4 w Boneyard Greenway Connection ay

0 0.25 Mile

Multi-Use Trail, Planned 74 Railtrail, Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 26 North Champaign Multi-Use Trail

Ashland Park Trail Marketplace Mall Boneyard Greenway Prospect Avenue Commercial Center

Opportunities

Ashland Park and Olympian Drive Trail Connections 1 The North Champaign Multi-Use Trail will provide direct trail access for the Ashland Park neighborood. It will connect with the existing trail system throughout the subdivision and will allow for easy access to the future multi-use trail along Olympian Drive. Example Connection between Trails

Location Between Major Commercial Centers 2 The location of the planned North Champaign Multi-Use Trail places it conveniently between two major commercial centers, Marketplace Mall and North Prospect Avenue. With connections to several surrounding apartment complexes and neighborhoods, North Champaign Multi-Use Trail will provide an effective link between the shopping centers and their neighboring residential areas. Marketplace Mall

Access to Pond and Proposed Park 3 The North Champaign Multi-Use Trail will provide users with various recreational opportunities. Part of this trail will enter the proposed future park off of North Neil Street and border an existing pond in the area.

Proposed Park N Neil St. Boneyard Greenway Connection 4 A proposed connection between the North Champaign Multi-Use Trail and the Boneyard Greenway will link neighborhoods north of I-74, including major shopping centers and newly developing residential areas, with neighborhoods south of I-74, including the University of Illinois campus and downtown Champaign. The Existing Boneyard Trail Constraints

Design Pedestrian Crossing for Urban Arterials Where trails cross urban arterial roadways specific design guidelines ensuring safe pedestrian crossing will be necessary. The intersection of the North Champaign Multi-Use Trailand Interstate Drive is an example where this 1 will be needed. (See the Champaign County Greenway and Trails Design Guidelines for details)

Safe Pedestrian crossing example Interstate Crossing A separate pedestrian and bicycle overpass crossing I-74 will be necessary to allow the North Champaign Multi-Use Trail to continue south and connect with the Boneyard Greenway. The design could involve widening 2 of the existing bridge to include pedestrian and bicycle facilities. Another option is to construct a seperate pedestrian overpass bridge. Further analysis is required to identify a suitable design solution. (Refer to the Interstate Overpass Enhancements Plan for design guidelines) Proposed Pedestrian Overpass example

Need for Aquiring Right-Of-Way Due to the possibility of land aquisition challenges south of I-74, alternative route through City of Champaign 3

NO RFO L property located west of the proposed North Champaign Multi-Use Trail should be considered. K S OUTH ER N R .R.

Aerial of I-74 and I-57 Intersection

Champaign Trails Plan 27 Fall 2009 Draft Olympian Drive Multi-Use Trail

The planned Olympian Drive Multi-Use Trail is a 4.6 mile trail located in north- ern Champaign. The Multi-Use Trail will start at Bloomington Road on the west and extend east to the railroad. The trail will be along both sides of Olym- pian Drive and will connect to the Apollo Industrial Park, Ashland Park, Toalson Park and Ashland Park Trail to the east. To the west the trail will also connect to

the Interstate Research Park and future Clearview development. 10’ Path 50’ Easement Mattis Ave Duncan Rd Market St Market Constraint 1 N Interstate Crossing Constraint 2 Prospect Ave Prospect St. Thomas More Design Pedestrian Crossing over Ditches High School

OLYMPIAN DRIVE MULTI-USE TRAI L Clearview Ashland Interstate Laurel Heights Bloomington Road Park Toalson Research Park Park Apollo Industrial Park

Ashland Park Trail Opportunity 1 Constraint 3 Opportunity 2 North Prospect Avenue Villas at Ashland Farm Access to Local Trails 74 Design Trails Within Coordination with Residential, Existing Right-Of-Way Commercial Center Park and Employment Centers

Multi-Use Trail Town Center Apartments Cardinal Rd Marketplace Mall Commercial Center Garden HIls 5 7 Park

Garden Hills Elementary

North Champaign Trail Multi-Use Upper Boneyard Greenway Multi-Use Trail Multi-Use Trail Mattis Avenue Mattis Avenue Parkland Dodds Wabash Railtrail College Park

Garden Hills Columbia Alternative Bradley Ave School Heritage Stratton Douglass Park Franklin Spalding Elementary Park Middle Park B.T Washington Greenbelt Bikeway Elementary

Church St Westside University Ave Park

Kaufman Downtown Springeld Ave Lake Champaign 0 0.5 Mile Green St. Lower Boneyard Greenway Lower Boneyard

Multi-Use Trail, Planned 74 Railtrail , Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 28 Olympian Drive Multi-Use Trail

Dodds Park Toalson Park Bloomington Road Multi-Use Trail North Champaign Multi-USe Trail Heritage Park Ashland Park Ashland Park Trail Kaufman Lake Marketplace Mall

Opportunities

Access to Local Trails Olympian Multi-Use Trail connects to a regional network trail, which is the 5 mile Bloomington Multi-Use Trail. The Olymipian Multi-Use Trail also passes along the existing 2 mile Ashland Park Trail which leads to the 1 North Champaign Multi-Use Trail. North Champaign Multi-Use Trail will link neighborhoods north of I-74, including major shopping centers and newly developing residential areas, with neighborhoods south of I-74, including the University of Illinois campus and downtown Champaign. The Olympian Drive Multi-Use Trail will also connect to future planned trail within the Clearview Development.

Existing Trail Segments

Connection to Residential, Park and Employment Centers

Olympian Drive Multi-Use Trail links to the residential neighboods of Laurel Heights and Ashland Park. 2 The trail also links to the 2 mile Ashland Park Trail and the 7 acre Toalson Park, both located within the Ashland Park neighborhood. The Multi-Use Trail will connect to the Apollo Subdivision on the east and the Interstate Research Park and future Clearview development to the west.

Toalson Park

Constraints

Need for Pedestrian Overpass A separate pedestrian and bicycle overpass crossing I-74 and I-57 will be necessary to allow the Olympian Multi-Use Trail to continue east to the Wabash Railway. The design could involve widening of the existing 1 bridge to include pedestrian and bicycle facilities. Another option is to construct a seperate pedestrian overpass bridge. Further analysis is required to identify a suitable design solution. Also, when the East Olympian Drive extension is designed, the bridge over the railroad should be designed for safe pedestrian crossing. (Refer to the Interstate Overpass Enhancements Plan for design guidelines)

Proposed Pedestrian Overpass Example

Design Pedestrian Crossing over Ditches Ditches run along the Olympian Drive to facilitate storm water management in this area. Culverts with at 2 grade crossings must be constructed to all intersections to provide complete connectivity to trail users.

Olympian Drive at Ashland Park

Design Trails Within Existing Right-Of-Way

Trails need to be designed to fit within the existing right-of-way on Olympian Drive. 3

Existing ROW on Olympian Drive

Champaign Trails Plan 29 Fall 2009 Draft Pipeline Multi-Use Trail

The Pipeline Multi-Use Trail is 6.5 miles within the city boundaries with opportunities to expand in both directions, north of Bloomington Road and south of Curtis Road. The Pipeline Spur will intersect with the existing Pipeline Trail and extend southwest past the city limits. The Marathon Oil Pipeline easement creates a strip of undevelopable land which can be utilized for the Pipeline Multi-Use Trail. Within this easement, developers are required to 10’ Path dedicate and build a 10 feet trail. 50’ Easement Lindsey Rd

Bl Market St Market o Mattis Ave N om in 5 g 7

t Duncan Rd Opportunity 1 on R oa Access to Regional Trails d Prospect Ave M ul Olympian Drive Multi- Use Trail Pintail Rd ti-

y U s a e

l

i

w

a n 74

r

e

T

e

r e

s

G

W

U r a - b

e i as t v h

l

i R

u

a Trail

R i lt

r e

M

a a

s

i i

l

k

d

U

s

-

a

L i

Cardinal Rd a t

o I l

k

R

s Constraint 2 u

a

g

M

R

K n Railroad Pedestrian Crossing

i n

s

T

i g Needed i

R a

E p

S

m Multi-Use Trail Multi-Use U a pp U Parland e h r - B

Dodds C I College one

h y

T a Park t r

y r

L d

Constraint 1 a o G

U r

Bradley Ave w N e e

e n M Interstate Crossing k w i B

a t l y

E e b

N n

I

e

y L e

72 a r

E

G w

n

P

I

e

e

P

r

G

Springeld St

d

r

a

y

 e

n

Trails at o Lowe

r Constraint 3 B Crowwood Design Pedestrian Crossing Abbey

for Urban Arterials Fields

Duncan Road Road Duncan Kirby Ave Trails at Chestnut Opportunity 2 ur Connection to Neighborhoods City of NewOrleans Railtrail p l

l S Grove i l i i a

a

a r r and Parks r

T

T T

e Porter t

s e

e U R Ironwood r - e i Family a lt U r

t

u w

P l

S

M Park

S u e t

o in Windsor Road Multi-UseTrail s l r

B e i Windsor Rd

ip F

P Dog Park Zahnd Multi-Use Trail B Trail Multi-Use Park Road Duncan Opportunity 3 Copper Slough South Champaign Trail Connections

Greenway Legends of Greenway Branch Phinney Champaign Curtis Rd 0 0.5 Mile

Curtis Road Multi-Use Trail

Multi-USe Trail C Trail Multi-USe Duncan Road Duncan

Multi-Use Trail, Planned 74 Railtrail, Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 30 Pipeline Multi-Use Trail

Bloomington Multi-Use Trail Rising Road Multi-Use Trail Spur Porter Family Park Wabash Railtrail Kaskaskia Greenway Dog Park Curtis Road Multi-Use Trail Copper Slough Greenway Zahnd Park West Springfield Ave Railtrail

Opportunities

Access to Regional Trails Pipeline Multi-Use Trail intersects with two major east-west trails, the 9 mile Wabash Railtrail and the 5 mile 1 Bloomington Multi-Use Trail. It also connects to two major north-south trails located on the west side of the city making Pipeline Multi-Use Trail part of a larger regional network. The north-south trails are the 10 mile Kaskaskia Greenway and the 7 mile Rising Road Multi-Use Trail. Connections with Regional Trails Connection to Neighborhoods and Parks The planned Pipeline Multi-Use Trail will lead through numerous residential neighborhoods, Trails at 2 Abbey Fields, Trails at Chestnut Grove, Cobblefield, Crowwood, Ironwood, and some newer neighborhoods at the southern end like Legends of Champaign. The trail also leads to the Porter Family Park and the Dog Park to the west, through the lower Copper Slough Greenway and the Zahnd Park to the east, through the Windsor Road Multi-Use Trail. Dog Park South Champaign Trail Connections

The south end of the Pipeline Multi-Use Trail is intersected by the Lower Copper Slough Greenway, Windsor 3 Road Multi-Use Trail and the Curtis Road Multi-Use Trail. Copper Slough forms an excellect connection between the three major north-south trails: Kaskaskia Greenway, Rising Road Multi-Use Trail and Pipeline Trail. The Windsor Road Multi-Use Trail, connects the Pipeline Multi-Use Trail to the local trails, like the Duncan Road Multi-Use Trail, Roby Trail and the Robeson Meadows West Trail. South Champaign Constraints Interstate Crossing A separate pedestrian and bicycle overpass crossing I-74 and I-72 will be necessary to allow the Pipeline Multi-Use trail to continue south and connect with the other local trails. The design could involve widening 1 of the existing bridge to include pedestrian and bicycle path, or the construction of an independent overpass. Further analysis is required to identify a suitable design solution. (Refer to the Interstate Overpass Enhancements Plan for design guidelines)

Pedestrian Overpass Example

Railroad Pedestrian Crossing Needed The development of an at-grade trail crossing will be necessary to allow Pipeline Multi-Use Trail to 2 cross the future West Springfield Avenue Railtrail and the Wabash Railtrail. (See the County Greenways and Trails Design Guidelines for at-grade trail crossing designs) Rails with Trails Example

Design Pedestrian Crossing for Urban Arterials Where trails cross urban arterial roadways specific design guidelines ensuring safe pedestrian crossing will be necessary. The intersection of Pipeline Multi-Use Trail at Rising Road, at Kirby Avenue and at Windsor Road 3 are examples where this will be needed. (See the Champaign County Greenway and Trails Design Guidelines for details)

Safe Pedestrian Crossing Example

Champaign Trails Plan 31 Fall 2009 Draft Rising Road Multi Use Trail

The Rising Road Multi-Use Trail will begin at Bloomington Road and continue south 6.9 miles along Rising Road on the west side of Champaign. The trail is proposed to end at Curtis Road Trail. As per the Staley/ Rising Corridor Study, the multi-use trail will provide access to newly developing neighborhoods, parks, and commercial centers. Rising Road Multi-Use Trail will also serve as an important link in the regional network by connecting to three major multi-use 10’ Path trails, two major railtrails and a greenway.. 50’ Easement Lindsey Rd B lo Duncan Rd Market St Market om Mattis Ave N Opportunity 1 in 4 g 7 5 Access to Regional Trails to 7 n R oa d M Prospect Ave u lti Pintail Rd -U Olympian Drive Multi- Use Trail se

l

i

a

r W

T ab e as s h R

U a i - lt

i ra n t i

l

l g i

u a

Staley Rd Staley p Cardinal Rd M

e m

n a

i

l h

e

C

p

i

h t

P

r o

Multi-Use Trail

N y Trail Multi-Use a U Parland p w pe L Dodds r n B I College on e e e Park y r Constraint 1 a G R Bradley Ave y rd r

T a G e Interstate Crossing v w r i e e E

R e

k i n

S

a

i B w

k U t

l a s

-

e y a

I b k

72 s T n

a e

L e K r

U G

M Springeld St

Constraint 2 D Constraint 3 Railroad Pedestrian Crossing Design Pedestrian Crossing Lower Boneyard O Greenway

R for Urban Arterials

Needed

Duncan Road Road Duncan Kirby Ave

G

Opportunity 2 l

i

N

a City of NewOrleans Railtrail

I

r r l u Connection to Parks i T

S

p a

t I

l S r

e

i T

R a Porter r e

e

T r r e t s Family P a S

h U i

n t - w

i l lt Park n s

r

u

i u e

Windsor Road Multi-UseTrail o M y F

B Multi-Use Trail B Trail Multi-Use e Road Duncan Windsor Rd lin B e Dog Park r ip an P Opportunity 3 c h South Champaign Trail Connections G Copper Slough r e en

Greenway

w a y

Curtis Rd 0 0.5 Mile

Curtis Road MultI-Use Trail

Multi-USe Trail C Trail Multi-USe Duncan Road Duncan

Multi-Use Trail, Planned 74 Railtrail, Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 32 Rising Road Multi-Use Trail

Bloomington Multi-Use Trail West Springfield Ave Railtrail Porter Family Park Wabash Railtrail Pipeline Multi-Use Trail Spur Dog Park Curtis Road Multi-Use Trail Copper Slough Greenway

Opportunities

Access to Regional Trails Rising Road Multi-Use Trail intersects with two major east-west trails, the 9 mile Wabash Railtrail and the 1 5 mile Bloomington Multi-Use Trail. This further connects to two major north-south trails located on the west side of the city making Rising Road Multi-Use Trail part of a larger regional network. The north-south trails are the 10 mile Kaskaskia Greenway and the 6.5 mile Pipeline Multi-Use Trail.

Kaskaskia River

Connection to Parks Rising Road Multi-Use Trail leads to the Porter Family Park and the Dog Park at the intersection of Rising 2 Road and Windsor Road near the southern end of the trail. Porter Family Park is 38 acres of park area and provides the surrounding neighborhoods with outdoor recreational space. The Dog Park is 7 acres of park area including, a four foot fence, double-gated entry area and seperate areas for small and large dogs.

Dog Park

South Champaign Trail Connections 3 The south end of the Rising Road Multi-Use Trail is intersected by the Copper Slough Greenway and the Curtis Road Multi-Use Trail. Copper Slough acts as an excellect connector between the three major north-south trails; Kaskaskia Greenway, Rising Road Multi-Use Trail and Pipeline Trail.

South Champaign

Constraints

Interstate Crossing A separate pedestrian and bicycle overpass crossing I-72 will be necessary to allow the Rising Road Multi-Use trail to continue south and connect with the other local trails. The design could involve widening of the 1 existing bridge to include pedestrian and bicycle facilities. Another option is to construct a seperate pedestrian overpass bridge. Further analysis is required to identify a suitable design solution. (Refer to the Interstate Overpass Enhancements Plan for design guidelines)

Proposed Pedestrian Overpass Example

Railroad Pedestrian Crossing Needed The development of an at-grade trail crossing will be necessary to allow Rising Road Multi-Use Trail to cross the West Springfield Avenue Railtrail. (See the County Greenways and Trails Design Guidelines for 2 at-grade trail crossing designs)

Rails with Trails Example

Design Pedestrian Crossing for Urban Arterials Where trails cross urban arterial roadways specific design guidelines ensuring safe pedestrian crossing will be 3 necessary. The intersection of Rising Road Multi-Use Trail at Windsor Road and at Kirby Avenue are examples where this will be needed. (See the Champaign County Greenway and Trails Design Guidelines for details)

Safe Pedestrian Crossing Example

Champaign Trails Plan 33 Fall 2009 Draft Windsor Road Multi-Use Trail

The Windsor Road Multi-Use Trail is planned along Windsor Road connecting the future Pipeline Multi-Use Trail and Duncan Road. Through coordination with existing development, the Windsor Road Trail will form connections with several trails and provide access to parks, neighborhood shopping and residential areas. The trail will be 10 feet in width and 1.5 miles 10’ Path in length. 50’ Easement Staley Rd Staley Rising Rd

Duncan Rd N Barker Rd Barker

Centennial Park

Pipeline Multi-Use Trail Pipeline Multi-Use Kenwood

Rising Road Multi- Use Trail Use Multi- Rising Road Elementary Middle

Duncan Road Multi-Use Trail A Trail Multi-Use Duncan Road School

Slough Copper Sholem er pp 57 U Aquatic

Kirby Ave Center

Kaskaskia Greenway Countryside Opportunity 1 Trails at School Connection to Local Trails Chestnut Grove

Trails at Brittany

Roby Trail Lincolnshire Robeson Fields Park Constraint 1 Design Pedestrian Crossing for Urban Arterial Mullikan Park Constraint 2 Interstate Crossing Meadows Pipeline Multi-Use Trail Spur Porter Square Duncan Road Duncan Road

Family Park B Trail Multi-Use Park Copper Ridge Windsor Rd Opportunity 2 WINDSOR ROAD MULTI-USE TRAIL Access to Regional Trail Dog Fire Village at Park Robeson Zahnd Station #6 the Crossing Meadows Park West Park Hallbeck Constraint 3 Park Design Trails Within Millage Existing Right-Of-Way Opportunity 3 Park Connection to Park and Residential Robeson Meadows Lower Copper Slough Greenway Neighborhoods West Trail Opportunity 4 Connection to Neighborhood Shopping Legends of Champaign Cherry Hills Duncan Road Duncan Road

Curtis Rd Curtis Road Multi-Use Trail A Trail Multi-Use 0 0.25 Mile

Multi-Use Trail, Planned 74 Railtrail , Planned 72 Greenway, Planned Existing Trail Segments Connection 57

Champaign Trails Plan Fall 2009 Draft 34 Windsor Road Multi-Use Trail

Robeson Park Hallbeck Park Pipeline Multi-Use Trail Village at the Crossing Millage Park Duncan Road Multi-Use Trail Zahnd Park Porter Family Park Dog Park

Opportunities Connection to Local Trails

Windsor Road Multi-Use Trail is linked to the Duncan Road Multi-Use Trail B, which further leads to Roby Trail 1 at Robeson Park. Roby Trail connects to the Robeson Elementary School, Carrie Busey Elementary School and the Sholem Aquatic Center. The south of the Windsor Road Trail connects to the 2 mile Robeson Meadows West Trail. This further leads to Cherry Hills neighborhood and the Duncan Road Mult-Use Trail A. Sholem Aquatic Center Access to Regional Trail Windsor Road Multi-Use Trail connects to the larger regional network through one of the major north-south 2 trails located on the west side of the city, which is the 6.5 mile Pipeline Multi-Use Trail. The Pipeline Trail further connects it to Kaskaskia Greenway and the Rising Road Multi-Use Trails, both of which are important regional and local trails. Kaskaskia River Connection to Park and Residential Neighborhoods .Windsor Road Multi-Use Trail connects the residential neighborhoods of Copper Ridge, Legends of 3 Champaign, Robeson Meadows, Lincolnshire Fields to Zahnd Park, Hallbeck Park, Millage Park. Zahnd Park is 20 acres in area which includes lighted ball fields. Windsor Road Multi-Use Trail also connects to Porter Park and Dog Park through the Lower Copper Slough Greenway. Zahnd Park Connection to Neighborhood Shopping The west end of the Windsor Road Multi-Use Trail is the Village at the Crossing. This is a mixed use 4 neighborhood center containing restaurants, retail and office. Neighborhoods near the Windsor Road Multi-Use Trail can use this trail to access the Village at the Crossing. At the south-west corner of Windsor Road and Staley Road, zoning provides for additional neighborhood commercial spaces. Village at the Crossing Constraints

Design Pedestrian Crossing for Urban Arterials Where trails cross urban arterial roadways specific design guidelines ensuring safe pedestrian crossing will be 1 necessary. The intersection of Windsor Road Multi-Use Trail at Staley Road and at Duncan are examples where this will be needed. (See the Champaign County Greenway and Trails Design Guidelines for details) Safe Pedestrian Crossing Example Interstate Crossing A pedestrian and bicycle overpass crossing I-57 will be necessary to allow Windsor Road Multi-Use Trail to continue east towards Duncan Road Multi-Use Trail. The design could involve widening of the existing 2 bridge to include pedestrian and bicycle facilities. Another option is to construct a seperate pedestrian overpass bridge. Further analysis is required to identify a suitable design solution. (Refer to the Interstate Overpass Enhancements Plan for design guidelines) Pedestrian Overpass Example

Design Trails Within Existing Right-Of-Way Trails need to be designed to fit within the existing right-of-way on Windsor Road. Analysis is required to 3 determine if the trail is required on both sides or along one side of the road.

Existing Developments at Windsor Road

Champaign Trails Plan 35 Fall 2009 Draft