CPY Document
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
DEERFIELD RIVER WATERSHED Assessment Report
DEERFIELD RIVER WATERSHED Assessment Report 2004-2008 Downstream of Fife Brook Dam The Commonwealth of Massachusetts Executive Office of Environmental Affairs The Commonwealth of Massachusetts Executive Office of Environmental Affairs 251 Causeway Street, Suite 900 Boston, MA 02114-2119 Mitt Romney GOVERNOR Kerry Healey LIEUTENANT GOVERNOR Tel: (617) 626-1000 Fax: (617) 626-1181 Ellen Roy Herzfelder or (617) 626-1180 SECRETARY http://www.state.ma.us/envir November 19, 2004 Dear Friends of the Deerfield River Watershed: It is with great pleasure that I present you with the Assessment Report for the Deerfield River Watershed. The report helped formulate the 5-year watershed action plan that will guide local and state environmental efforts within the Deerfield River Watershed over the next five years. The report expresses some of the overall goals of the Executive Office of Environmental Affairs, such as improving water quality, restoring natural flows to rivers, protecting and restoring biodiversity and habitats, improving public access and balanced resource use, improving local capacity, and promoting a shared responsibility for watershed protection and management. The Deerfield River Watershed Assessment Report was developed with input from the Deerfield River Watershed Team and multiple stakeholders including watershed groups, state and federal agencies, Regional Planning Agencies and, of course, the general public from across the Watershed. We appreciate the opportunity to engage such a wide group of expertise and experience as it allows the state to focus on the issues and challenges that might otherwise not be easily characterized. From your input we have identified the following priority issues: • Water Quantity • Water Quality • Fish Communities • Wildlife and Terrestrial Habitat • Open Space • Recreation I commend everyone involved in this endeavor. -
Transcanada Hydro Northeast Inc. Deerfield River Project (Lp 2323)
TRANSCANADA HYDRO NORTHEAST INC. DEERFIELD RIVER PROJECT (LP 2323) LOW IMPACT HYDROPOWER CERTIFICATION APPLICATION ATTACHMENT C PROJECT DESCRIPTION Project Overview TransCanada Hydro Northeast, Inc. (the Company) owns and operates the Deerfield River Project (the Project) on the Deerfield River, a major tributary to the Connecticut River. The Project is located in Bennington and Windham Counties in Vermont, and in Berkshire and Franklin Counties in Massachusetts. It consists of eight developments: Somerset, Searsburg, Harriman, Sherman, Deerfield No. 5, Deerfield No. 4, Deerfield No. 3 and Deerfield No.2, having a total installed capacity of 86 megawatts (MW). All dam operations and generation operations are controlled remotely from the Deerfield River Control Center in Monroe Bridge Massachusetts, located near the Deerfield No. 5 Dam. The Project area encompasses about a 65-mile reach of the river, including reservoirs. Two other developments not owned by the company are also located within this area. They are Brookfield Renewable Power’s Bear Swamp Project located downstream of the Deerfield No. 5 development; and Consolidated Edison’s Gardner Falls Project located downstream of the Deerfield No. 3 development. Exhibit 1 depicts the general Project area. Settlement Agreement The Deerfield River Project was one of the first FERC Projects to be relicensed under a comprehensive Settlement Agreement approach executed in 1994. A five-year cooperative consultation process involving state and federal resource agencies, various non-governmental organizations (NGOs) and the licensee (at that time New England Power Company) resulted in settlement by the parties. The process of reaching this agreement included examination of the power and non-power tradeoffs and effects of a wide variety of operational scenarios. -
Mount Holyoke Range Planning Unit
Massachusetts Department of Conservation and Recreation Bureau of Planning and Resource Protection Resource Management Planning Program RESOURCE MANAGEMENT PLAN Mount Holyoke Range Planning Unit Including Mount Holyoke Range State Park, Joseph Allen Skinner State Park, Mount Tom State Reservation and Holyoke Heritage State Park July 2013 Mount Holyoke Range Planning Unit Including Mount Holyoke Range State Park, Joseph Allen Skinner State Park, Mount Tom State Reservation and Holyoke Heritage State Park RESOURCE MANAGEMENT PLAN 2013 Deval L. Patrick, Governor Richard K. Sullivan, Jr., Secretary John P. Murray, Commissioner Resource Management Plans provide guidance for managing properties under the stewardship of the Department of Conservation and Recreation (DCR). They are intended to be working documents for setting priorities, enabling the Department to adapt to changing fiscal, social and environmental conditions. The planning process provides a forum for communication and cooperation with park visitors and the surrounding communities to ensure transparency in the DCR’s stewardship efforts. As I travel the Commonwealth, I am reminded of the variety of high-quality experiences offered by DCR parks. Those within the Mount Holyoke Range Planning Unit are among the best that this state has to offer. They provide a variety of recreational opportunities, from challenging hikes along mountain ridgelines, to family picnics on a promontory overlooking the Connecticut River Valley, to taking in a summer concert in downtown Holyoke. Although they may all be visited in a single day, the true character of these parks is best revealed through repeat visits. In addition to providing outstanding recreational opportunities, these parks protect important natural and cultural resources. -
New Hampshire Fish and Game Department NEW HAMPSHIRE SALTWATER FISHING 2021 DIGEST
New Hampshire Fish and Game Department NEW HAMPSHIRE SALTWATER FISHING 2021 DIGEST Fish the Coast! The Official New Hampshire Digest of Regulations fishnh.com A Legacy of High Performance NEW! SARAGOSA SW REEL Infinity Drive Technology increases this reel’s winding torque under load compared to its TERAMAR XX SW RODS predecessor to give anglers a distinct advantage Shimano’s Spiral X and Hi-Power X technologies enhance power over hard fighting game fish. Combined with transmission through the rod blank for increased casting distance a battle-tested rigid HAGANE Body that won’t and lifting power as well as reduced blank twist during tough flex under immense loads and the battles. Whether fishing for stripers in the Northeast, reds in the HAGANE Gear to create eternally smooth reeling. Southeast or Southwest, or salmon on the West Coast, there is a Cross Carbon drag and X-Protect offer high-level Teramar XX rod to fit your fishing needs. water resistance to create long-lasting durability. No matter whether anglers are fishing inshore or offshore, jigging for bottom fish or casting baits at tailing fish, they can count on — just like they always have — the Saragosa SW to stay smooth no matter the conditions and perform when TREVALA PX RODS needed most. The bar is raised for saltwater spinning reels. Incorporates a redesigned rod blank with Shimano’s Hi-Power X reinforcing technology to increase overall strength and control while also enhancing rod twist resistance when jigging or fighting a fish. Save the date! FISHINGFEST® 2021 ~ April 1-4 Quality components for enhanced performance. -
Holyoke: a Massachusetts Municipal Light Plant Seizes Internet Access Business Opportunities
A Massachusetts Municipal Light Plant Seizes Internet Access Business Opportunities David Talbot Waide Warner Carolyn Anderson Kira Hessekiel Daniel Dennis Jones HOLYOKE olyoke Gas & Electric’s telecom division provides high-speed Internet access to local businesses and public agencies, bringing in revenue Hand profits while aiding in local economic development and saving the municipality more than $300,000 a year. At the same time, it has expanded to other lines of business and serves three communities outside Holyoke which need its help. HG&E Telecom’s success in a competitive environment suggests opportunities for other municipal light plants in Massachusetts and other states. July 2015 at Harvard University ABSTRACT This report describes the development and recent expansion of HG&E Telecom, the fiber optic network division of Holyoke Gas and Electric (HG&E) in Holyoke, Massachusetts. HG&E is one of 41 long- standing municipal light plants providing electricity service in Mas- sachusetts, of which 10 offer Internet access and other telecom ser- vices to retail customers, and 31 do not. HG&E Telecom competes with Comcast and Charter and serves approximately 300 business customers. It saves the municipality more than $300,000 per year. Its revenue has increased by 10 percent over the past two years and it has expanded into new lines of business. Given that data transport needs are growing while electricity sales are flattening, the record of HG&E Telecom suggests opportunities for other municipal electric utilities across the country, as long as they are in states that haven’t raised barriers to the provision of such services. -
Official List of Public Waters
Official List of Public Waters New Hampshire Department of Environmental Services Water Division Dam Bureau 29 Hazen Drive PO Box 95 Concord, NH 03302-0095 (603) 271-3406 https://www.des.nh.gov NH Official List of Public Waters Revision Date October 9, 2020 Robert R. Scott, Commissioner Thomas E. O’Donovan, Division Director OFFICIAL LIST OF PUBLIC WATERS Published Pursuant to RSA 271:20 II (effective June 26, 1990) IMPORTANT NOTE: Do not use this list for determining water bodies that are subject to the Comprehensive Shoreland Protection Act (CSPA). The CSPA list is available on the NHDES website. Public waters in New Hampshire are prescribed by common law as great ponds (natural waterbodies of 10 acres or more in size), public rivers and streams, and tidal waters. These common law public waters are held by the State in trust for the people of New Hampshire. The State holds the land underlying great ponds and tidal waters (including tidal rivers) in trust for the people of New Hampshire. Generally, but with some exceptions, private property owners hold title to the land underlying freshwater rivers and streams, and the State has an easement over this land for public purposes. Several New Hampshire statutes further define public waters as including artificial impoundments 10 acres or more in size, solely for the purpose of applying specific statutes. Most artificial impoundments were created by the construction of a dam, but some were created by actions such as dredging or as a result of urbanization (usually due to the effect of road crossings obstructing flow and increased runoff from the surrounding area). -
Proposed Revisions to 314 CMR 4.00 (Tables and Figures, Clean)
Please see the 314 CMR 4.00 Summary and Notice to Reviewers document, as well as the Fact Sheets on particular topics for additional information and explanatory detail associated with these proposed regulatory changes. These documents are available on the MassDEP Website. 314 CMR: DIVISION OF WATER POLLUTION CONTROL 4.06: continued LIST OF TABLES AND FIGURES* TABLE & TABLE AND CORRESPONDING FIGURE TITLE Page # FIGURE # A (Figure only) River Basins and Coastal Drainage Areas TF-2 1 Blackstone River Basin TF-3 2 Boston Harbor Drainage Area (formerly Boston Harbor Drainage System and Mystic, Neponset and Weymouth & Weir River Basins) TF-8 3 Buzzards Bay Coastal Drainage Area TF-17 4 Cape Cod Coastal Drainage Area TF-22 5 Charles River Basin TF-30 6 Chicopee River Basin TF-34 7 Connecticut River Basin TF-40 8 Deerfield River Basin TF-49 9 Farmington River Basin TF-58 10 French River Basin TF-60 11 Housatonic River Basin TF-62 12 Hudson River Basin (formerly Hoosic, Kinderhook and Bashbish) TF-70 13 Ipswich River Basin TF-76 14 Islands Coastal Drainage Area (formerly Martha's Vineyard and Nantucket) TF-79 15 Merrimack River Basin TF-81 16 Millers River Basin TF-86 17 Narragansett Bay and Mount Hope Bay Drainage Area TF-90 18 Nashua River Basin TF-93 19 North Coastal Drainage Area TF-103 20 Parker River Basin TF-109 21 Quinebaug River Basin TF-113 22 Shawsheen River Basin TF-116 23 South Coastal Drainage Area TF-118 24 Sudbury, Assabet, and Concord (SuAsCo) River Basin (formerly Concord) TF-123 25 Taunton River Basin TF-128 26 Ten Mile River Basin TF-132 27 Westfield River Basin TF-134 28 (Table only) Site-Specific Criteria TF-144 29 (Table only) GenerallyApplicable Criteria: 29a. -
Annual Town Report
ANNUANNUALAL TOWNTOWN REPORTREPORT JJULYULY 1,1, 20182017 –– JUNEJUNE 30,30, 20192018 TOWN OF SOUTH HADLEY ANNUAL TOWN REPORT JULY 1, 2018 – JUNE 30, 2019 1 TABLE OF CONTENTS Annual Town Meeting Warrant 50 Appointed Officials for Fiscal Year 2019 6 Assessors 11 Bike/Walk Committee 12 Boards & Committees 8-9 Cable Studio 12 Canal Park Committee 13 Conservation Commission 14 Council on Aging 14 Directory and Calendar – Board Meetings, Officials, Services 4 Elected Officials – April 9, 2019 5 Emergency Management 18 Employee Gross Wages – Calendar Year 2019 31-39 Facts of Interest about South Hadley 3 Golf Commission 19 GROSouth Hadley (Community Garden) 19 Health Department 19 Human Resources 21 Inspection Services 21 Libraries 22 Master Plan Implementation Committee 23 Memoriam 9 National, State and County Officials 3 Planning Board 23 Police Department 24 Public Health Nurse 20 Public Works 15-18 Recreation Commission 25 Redevelopment Authority 25 Retirements 9 School Committee 28 School Superintendent 26 Selectboard 10 Special Town Meeting Warrant – May 8, 2019 79 Special Town Meeting Warrant – Nov. 20, 2019 82 Sustainability & Energy Commission 29 Town Accountant (Change in Fund Balance/Combined Balance Sheet) 40-44 Town Clerk 28 Town Election – April 9, 2019 45-49 Town Meeting Members – April 9, 2019 7 Treasurer / Collector 30 Zoning Board of Appeals 29 2 Population Facts of Interest about South Hadley Federal Census 2010-17,514 Federal Census 2000-17,196 South Hadley area was first part of Old Hadley. 2017 Local Census – 17,682 1675-1719 Individual grants of land were made by Hadley for Form of Government settlement south of the Mt. -
Deerfield and CT River Project History.Pmd
HISTORY OF HYDROELECTRIC DEVELOPMENT ON THE CONNECTICUT AND DEERFIELD RIVERS HISTORY OF HYDROELECTRIC DEVELOPMENT ON THE CONNECTICUT AND DEERFIELD RIVERS INTRODUCTION increasingly complex. While the Depression limited further growth of the industry, a new era emerged In 1903, Malcolm Greene Chace (1875-1955) and after World War II, with streamlined management Henry Ingraham Harriman (1872-1950) established structures and increased regulations and Chace & Harriman, a company that, in its many government involvement (Cook 1991:4; Landry and incarnations over the course of the following Cruikshank 1996:2-5). The first of the 14 decades, grew into one of the largest electric utility hydroelectric facilities built on the Connecticut and companies in New England. The company built a Deerfield rivers by Chace & Harriman and its series of hydroelectric facilities on the Connecticut successors were developed in the early 1900s, and Deerfield rivers in Vermont, New Hampshire shortly after the potential of hydroelectric power and western Massachusetts, which were intended was realized on a large scale. Subsequent facilities to provide a reliable and less expensive alternative were constructed during the maturation of the to coal-produced steam power. Designed primarily industry in the 1920s, and two of the stations were to serve industrial centers in Massachusetts and completed in the post-World War II era. The history Rhode Island, the facilities also provided power to of the companies that built these stations is residential customers and municipalities in New intrinsically linked with broader trends in the history England. Chace & Harriman eventually evolved of electricity, hydropower technology, and industrial into the New England Power Association (NEPA) architecture in America. -
Westfield River, Massachusetts Wild and Scenic River Evaluation J and Environmental Assessment
WESTFIELD RIVER, MASSACHUSETTS WILD AND SCENIC RIVER EVALUATION J AND ENVIRONMENTAL ASSESSMENT Findings regarding the Commonwealth of Massachusetts' application for designation of the Westfield River into the National Wild and Scenic Rivers System under Section 2(a)(ii) of the Wild and SCf''1ic Rivers Act as submitted to the Secretary of the Interior by: National Park Service North Atlantic Region Boston, Massachusetts July 1993 Table of Contents Executive Summary ........... ...... ........ .......... ..... ......... Introduction . 1 I Purpose ..... .................. .................... .... ........ ... 1 ' ) Structure of this Report . 2 The Wild & Scenic Rivers Act and Designation Process . 3 J Westfield River Segments Proposed for Designation ........... .. .. ........ 4 The Westfield River Greenway Plan . .. ....... .. ..... .......... ............ 6 Development of the Greenway Plan . 6 Contents of the Greenway Plan . 8 State Designation and Management Requirements . 10 State Scenic River Designation . 10 State and Local River Management Responsibility . 11 Evaluation of Eligibility and Classification . 12 ', Introduction ................ ..... .. .. ....... : . 12 I I Eligibility Findings . 14 West Branch ................................ ................ 14 Middle Branch and Glendale Brook . 16 East Branch . 17 Classification Findings . 19 I West Branch ............. ...... .... ........................ 19 . I Middle Branch and Glendale Brook . 20 East Branch . 20 t Conclusion ................ .............. .... .. ............... -
A Hiking and Biking Guide
Amherst College Trails Cadwell Memorial Forest Trail, Pelham Goat Rock Trail, Hampden Laughing Brook Wildlife Sanctuary Trails, Hampden Redstone Rail Trail, East Longmeadow Amherst College trails near the main campus traverse open fields, wetlands, This 12,000-acre forest offers a trail includes 24 individually numbered stations, each The 35-acre Goat Rock Conservation Area connects two town parks via a popular Laughing Brook Wildlife Sanctuary features woodlands, meadows, and streams along The Redstone Rail Trail connects two major destinations in town. The wide and flat flood plain, upland woods, and plantation pines. The Emily Dickinson railT is with information about a different aspect of the forest’s wildlife habitat. The main hiking trail called the Goat Rock Ridge Trail, which runs along the Wilbraham its four-mile trail system in its 356 acre property. Laughing Brook was once the home asphalt path connects town soccer fields and industrial district with the center of south of the Fort River. trail links to the M&M Trail. Mountain ridge for a little over a mile. There are two scenic vistas, Lookout Point at of beloved children’s author Thornton Burgess and the beautiful brook inspired many town. The trail passes by fields, wetlands, and wooded areas. PIONEER VALLEY Location: The trail network can be accessed from the Mass Central Rail Location: Take Enfield Road off Pelham Road; after 2 miles bear left on the east end of the trail and the historic Goat Rock at the west end. of his timeless tales. Location: From the rotary in the center of town travel ¼ mile west on Trail, and from South East St., College St., South Pleasant St., Packardville Road. -
CONNECTICUT RIVER BASIN ANADROMOUS FISH RESTORATION: Coordination and Technical Assistance F-100-R-31
CONNECTICUT RIVER BASIN ANADROMOUS FISH RESTORATION: Coordination and Technical Assistance F-100-R-31 Annual Progress Report October 1, 2013 - September 30, 2014 U.S. Fish and Wildlife Service Connecticut River Coordinator's Office Kenneth Sprankle, Project Leader 103 East Plumtree Road Sunderland, MA 01375-9138 Executive Summary Federal Aid Project #F-100-R-31 States: Connecticut, Massachusetts, New Hampshire and Vermont Project Title: Connecticut River Basin Anadromous Fish Restoration: Coordination and Technical Assistance Period Covered: October 1, 2013 - September 30, 2014 This annual report provides an opportunity to organize and document, to varying degrees, all work activities conducted by the Connecticut River Coordinator’s Office, which includes work outside of the Connecticut River basin and numerous activities not funded by this grant. Objectives: Coordinate the Connecticut River Anadromous Fish Restoration Program as a unified effort of State and Federal fishery agencies Provide technical assistance to the fishery agencies and other program cooperators Identify fishery program priorities, design and implement field projects to address issues, plans, and opportunities Administer several different federal grant programs to address fish habitat, fish passage, and research projects Accomplishments: Program Coordination: Coordinated two Connecticut River Atlantic Salmon Commission (CRASC) and two CRASC Technical Committee meetings Organized a CRASC Shad Studies and River Herring subcommittee meeting Assisted in the completion