PIER 42 Located along the East River, from Montgomery St to Jackson St, in the borough of Manhattan 9 MARCH 2020 MNLA, NYCEDC, LMDC, NYC PARKS CONTENTS 1. MASTER PLAN AND EXISTING CONDITIONS 2. PHASE 1B SITE PLAN AND MATERIALS 3. PHASE 1B PLAYGROUND 4. PHASE 1B COMFORT STATION 5. INTERIM PIER DECK SITE PLAN & MATERIALS 6. SCHEDULE 7. APPENDIX: RESILIENCY & SUSTAINABILITY
Pier 42 Community Engagement Meeting 9 March 2020 2 of 38 COMMUNITY BOARD #3 MEETINGS 7/27/2017: Added programming for the playground and comfort station 9/14/2017: Presented the conceptual park design 5/10/2018: Presented the design for PDC Preliminary Approval 7/12/2019: Presented updated design for PDC Final Approval 2/13/2020: Presented the Interim Pier Deck design
Pier 42 Phase 1B Community Outreach Community Engagement Meeting 9 March 2020 3 of 38 STAKEHOLDER ENGAGEMENT PROCESS
CB3 Meeting #1 June 27, 2012
Pier 42 Walking tour w/ community September 30, 2012
CB3 Meeting #2: LISTENING PROGRAMMING October 4, 2012
CAAAV Meeting December 16, 2012
CB3 Meeting #3: LISTENING PROGRAMMING January 23, 2013
Seward Park Coop January 28, 2013
Local High Schools January 31, 2013
NYCHA Houses: LaGuardia, Vladeck, Baruch and Rutgers February 5, 2013
Lower East Side Ecology Center February 5, 2013
Blueway Plan, WXY architecture + urban design February 15, 2013
PS 134 February 27, 2013
CB3 Meeting #4: MASTER PLAN CONCEPTS May 9, 2013
CB3 Meeting #5: THE MASTER PLAN December 5, 2013
PDC Conceptual Meeting January 6, 2014 CONTENTS 1. MASTER PLAN AND EXISTING CONDITIONS 2. PHASE 1B SITE PLAN AND MATERIALS 3. PHASE 1B PLAYGROUND 4. PHASE 1B COMFORT STATION 5. INTERIM PIER DECK SITE PLAN & MATERIALS 6. SCHEDULE 7. APPENDIX: RESILIENCY & SUSTAINABILITY
Pier 42 Community Engagement Meeting 9 March 2020 5 of 38 East River Park
1
3 2 3 4 PROGRAM LEGEND
1 Knoll 5 2 Picnic Lawn 6 3 Bikeway 4 East River Esplanade 8 7 5 Seating Steps 10 6 Marsh 7 Overlook 5 11 8 Buffer 9 13 9 Nature Walk 10 Bridge 6 12 10 11 Grove 12 River Promenade/Seating 14 13 13 Lawn 14 Habitat Restoration 15 15 Playground 16 17 16 Concession/ Comfort Station 17 Pier Pavillion 20 18 Multi-use Play Space 19 EAST RIVER 19 Fountain Plaza 18 N 20 Entrance Garden
CDOT Yard / EDC Master Plan
Pier 42 Master Plan Programming (2013) Community Engagement Meeting 9 March 2020 6 of 38 CLINTON STREET
MONTGOMERY STREET GOUVERNEUR STREET JACKSON STREET
EAST RIVER PARK
CORLEARS HOOK PARK CHERRY STREET EAST RIVER PARK AMPHITHEATER WATER STREET
EAST RIVER PARK COMPOST (LESEC) FDR DRIVE
SOUTH STREET PIER 42 PHASE 1B
PIER 42 PHASE 1A
BASKETBALL CITY/ PIER 36 NYC FERRY - LOWER EAST SIDE CORLEARS HOOK STOP CONED AIR VENT STRUCTURE NYCDOT MAINTENACE YARD
EAST RIVER
Pier 42 Neighborhood Activity Update Community Engagement Meeting 9 March 2020 7 of 38 CONTENTS 1. MASTER PLAN AND EXISTING CONDITIONS 2. PHASE 1B SITE PLAN AND MATERIALS 3. PHASE 1B PLAYGROUND 4. PHASE 1B COMFORT STATION 5. INTERIM PIER DECK SITE PLAN & MATERIALS 6. SCHEDULE 7. APPENDIX: RESILIENCY & SUSTAINABILITY
Pier 42 Community Engagement Meeting 9 March 2020 8 of 38 MONTGOMERY STREET GOUVERNEUR SLIP WEST GOUVERNEUR SLIP EAST JACKSON STREET
FDR DRIVE
LIMIT OF WORK FUTURE SHARED PATH (ESCR) 2 7 1 4 5 3 11 8 EAST RIVER PROMENADE 6 10 13 13 NYCDOT PIER 42 SHED DEMOLITION NYC FERRY BASKETBALL 9 MAINTENANCE PHASE 1A 12 CITY/ PIER 36 YARD
EAST RIVER N 100’
Key 1. ENTRY PLAZA 6. VIEWING PLAZA 10. CON ED AIR VENT 2. COMFORT STATION 7. PICNIC KNOLL 11. EXISTING TREES TO REMAIN 3. PLAYGROUND 8. FERRY LANDING WITH BOULDER TERRACE 12. ELEVATED DECK 4. LOWLAND GARDENS 9. RETAINED SHED STRUCTURE FROM 13. ELEVATED DECK MAINTENANCE ACCESS 5. LAWN PHASE 1A
Pier 42 Site Plan Phase 1B Community Engagement Meeting 9 March 2020 9 of 38 12 FDR ON RAMP
14 FUTURE SHARED PATH (ESCR) 8 LIMIT OF WORK 6 7 2 5 1
13 4
3
10
9 5 15
BASKETBALL CITY/ PIER 36 NYCDOT MAINTENANCE PIER 42 PHASE 1A YARD 11 N 30’
Key 1. COMFORT STATION 6. NYCDPR M&0 PARKING 11. RETAINED SHED STRUCTURE, PAINTED. PHASE 1A 2. MAIN PEDESTRIAN ENTRY WITH BOULDER "TOTEM" 7. BIKE PARKING 12. FERRY DIRECTIONAL SIGNAGE (BY OTHERS) 3. VEHICULAR ACCESS WITH REMOVABLE BOLLARDS 8. BENCHES, TYP. 13. SPECIALTY PAVING, TYP. 4. ENTRY PLAZA 9. 8' HEIGHT CHAIN LINK FENCE AT NYCDOT YARD 14. CURB WALL 5. BUFFER PLANTING 10. PLAYGROUND (SEE ENLARGEMENT 2) 15. ELEVATED DECK MAINTENANCE ACCESS KEY PLAN
Pier 42 Plan Enlargement: Entry Plaza Community Engagement Meeting 9 March 2020 10 of 38 1
KEY PLAN
Pier 42 Perspective 1: Park Entry Community Engagement Meeting 9 March 2020 11 of 38 2
KEY PLAN
Pier 42 Perspective 2: Comfort Station Community Engagement Meeting 9 March 2020 12 of 38 15 LIMIT OF WORK 14 2 FUTURE SHARED PATH (ESCR) 2
2 2
1
6 13 3
5 4 EAST RIVER ESPLANADE TO CORLEARS HOOK PARK TO MONTGOMERY STREET AND EAST RIVER PARK 7 11 12 17 17 16 10 9
EAST RIVER NYC FERRY N 30’
Key 1. PICNIC KNOLL 4. FERRY LANDING WITH SEATING 9. BULKHEAD WITH MARINE RAIL 14. CURBWALL AT FUTURE SHARED PATH 2. TWO (2) 1964 WORLD'S FAIR BENCHES, 5. EXISTING TREES TO REMAIN, TYP. 10. BACKLESS 1964 WORLD'S FAIR BENCHES 15. LES FERRY ELECTRICAL BOX (BY OTHERS) BACKED AND SPACE FOR COMPANION 6. BOULDER SEATING 11. VIEWING PLAZA 16. LES FERRY GATE + SIGNAGE (BY OTHERS) SEATING 7. TRASH RECEPTACLE 12. CON ED AIR VENT 17. EXISTING BENCHES AT EAST RIVER 3. TERRACED BOULDERS ESPLANADE 8. NOT USED 13. LAWN KEY PLAN
Pier 42 Plan Enlargement: Ferry Landing Community Engagement Meeting 9 March 2020 13 of 38 3
KEY PLAN
Pier 42 Perspective 3: View of Ferry Landing from Shared path Community Engagement Meeting 9 March 2020 14 of 38 BOULDERS
1 Large Entry ‘Totem’ 2 Boulder seating 3 Stepping stones through planting area
1 6 6 3 4 5 2
4 Natural cut boulders in lawn 5 Boulder Terrace 6 Small Boulder Scramble
Pier 42 Proposed Site Materials Community Engagement Meeting 9 March 2020 15 of 38 SITE FURNISHINGS BENCHES RECEPTACLES TRASH RACK BIKE 1964 World’s Fair Bench (Backed and Backless) Big Belly Solar Receptacles NYC DOT City Rack Bicycle Rack Finish: Galvanized Recycled Plastic Lumber Color: Weathered Wood PAVING PATHWAY PAVING PATHWAY PAVING ACCENT Standard Concrete - Major Pathways and Plazas Concrete with Exposed Aggregate - Plazas Hex Block - Esplanade Transition Colored Concrete - Water Play
Pier 42 Proposed Site Materials Community Engagement Meeting 9 March 2020 16 of 38 PLAYGROUND COLORS RES, I ONCR UCTU NC. ED C ETE TR OR S ONENTS OL Y SURFAC PE P C LA E A M D P C O L R S C IE E D Y F O T N A A A L C L S P W
ALL PA R EZ F HOCK D BE H S UB RFACE IT TURF R U W IC LL S L T E Y IL E H T F H C E N T I T F N I A O Y M N S S
OTHER PARK MATERIALS XPOSED ON ON E FO G TI C TI O UN D IN TA ICK: OBA TA NST NE DA S ERE WO M D S R L S E T AT TH O A E T B T T V IO L A D R R R D R A S E F : O E O R N T F F : H W D N Z U C : E I M A M N L H A O L O M E P S C C B P G C R
Pier 42 Proposed Site Materials Community Engagement Meeting 9 March 2020 17 of 38 CONTENTS 1. MASTER PLAN AND EXISTING CONDITIONS 2. PHASE 1B SITE PLAN AND MATERIALS 3. PHASE 1B PLAYGROUND 4. PHASE 1B COMFORT STATION 5. INTERIM PIER DECK SITE PLAN & MATERIALS 6. SCHEDULE 7. APPENDIX: RESILIENCY & SUSTAINABILITY
Pier 42 Community Engagement Meeting 9 March 2020 18 of 38 FUTURE SHARED PATH (ESCR)
LIMIT OF WORK
16 TO COMFORT STATION
+15.50 10 +11.00 +11.60 9 +11.00 4 11 +13.00 8 8 +11.50 14 15 6 7 +17.50 13 18 2 1 +13.50 5
3 +12.00 +12.00 +11.25
17 19 21 12 21 20 19
PIER 42 PHASE 1A 20’ N
Key 1. WEEVOS PLAY STRUCTURE (2-5 YEARS) 7. SYNTHETIC TURF HILLSIDE 13. PIER BRIDGE INCLUSIVE ACCESS TO 17. WHILRLY GIG SPINNER 2. COZY DOME (2-5 YEARS) 8. ACCESSIBLE RAMP TOWERS WITH INCLUSIVE PLAY ELEMENTS 18. ECLIPSE NET CLIMBER (AGES 5-12) 3. SADDLE SPINNER (2-5 YEARS) 9. LANDING 14. WIDE SLIDE (AGES 5-12) INCLUSIVE 19. RHAPSODY DRUMS 4. WATER PLAY AREA (MIXED AGES, SEE 10. SCRAMBLE STEPS 15. TOWER PLAY STRUCTURE WITH SLIDES, 20. INTERACTIVE PANELS ENLARGEMENT 2.1) CLIMBING, AND GROUND LEVEL INCLUSIVE 11. CLIMBING WALL PLAY COMPONENTS (AGES 5-12) 21. BENCH (TYP) 5. BOULDER WALK/LOW SCRAMBLE 12. PIER POLE STEPPERS 16. TALK TUBES 6. 8' HEIGHT SWINGS (DPR STANDARD) KEY PLAN
Pier 42 Plan Enlargement: Playground Community Engagement Meeting 9 March 2020 19 of 38 4
KEY PLAN
Pier 42 Perpsective 4: 5-12 Play Area Community Engagement Meeting 9 March 2020 20 of 38 1 WAVE FOUNTAIN 2 MISTER FOUNTAIN 11
6
2 8 3 3 FOUNTAIN SPRAY TYPE 1 4 JET STREAM FOUNTAIN S
4
1 7 9
5 5 FOUNTAIN SPRAY TYPE 2 6 TURTLE STREAM 10 SWINGS
2-5 PLAY AREA
BOULDERS
PLANTING DRY CRAB POOL *SEQUENCING TBD 7 8 BEACHED SEALS **NO STANDING WATER 9 ACCESSIBLE BRIDGE N EXAMPLES OF OTHER PROPOSED SEALS: 10 BOULDERS 8' 11 1964 WORLD'S FAIR BENCH, TYP.
KEY PLAN
Pier 42 Plan Enlargement: Tidal Pool Water Play Community Engagement Meeting 9 March 2020 21 of 38 5 12
KEY PLAN
Pier 42 Perspective 5: Water Play and 2-5 Playground Areas Community Engagement Meeting 9 March 2020 22 of 38 CONTENTS 1. MASTER PLAN AND EXISTING CONDITIONS 2. PHASE 1B SITE PLAN AND MATERIALS 3. PHASE 1B PLAYGROUND 4. PHASE 1B COMFORT STATION 5. INTERIM PIER DECK SITE PLAN & MATERIALS 6. SCHEDULE 7. APPENDIX: RESILIENCY & SUSTAINABILITY
Pier 42 Community Engagement Meeting 9 March 2020 23 of 38 Pier 42 Comfort Station Perspective Community Engagement Meeting 9 March 2020 24 of 38 CONTENTS 1. MASTER PLAN AND EXISTING CONDITIONS 2. PHASE 1B SITE PLAN AND MATERIALS 3. PHASE 1B PLAYGROUND 4. PHASE 1B COMFORT STATION 5. INTERIM PIER DECK SITE PLAN & MATERIALS 6. SCHEDULE 7. APPENDIX: RESILIENCY & SUSTAINABILITY
Pier 42 Community Engagement Meeting 9 March 2020 25 of 38 FDR DRIVE
FUTURE SHARED PATH (ESCR)
8
FUTURE PIER 42 PHASE 1 B: UPLAND PARK
2 18 10 5 2 +7.07 +7.08 +7.66 +10.77 +10.77 +11.79 +11.84 6 10' +11.19 12 340' +/- NYCDOT +10.86 300' +/- 3 MAINTENANCE +10.18 +10.31 14 +9.96 YARD
9 170'+/- 150'+/- 16 +9.40 +9.28 4 +9.59 11 +9.07 15 +9.55 Existing deck slopes north to south,
+8.45 +9.45 10' toward the East River at +/- 1.3%. +8.42 LIMIT OF WORK 5 13 17 11 1 EAST RIVER 10 7
Key 1. EXISTING FRAME, PAINTED RED 10. RAISED CURB AT SOCCER FIELD WITH MODIFIED 16' HEIGHT 2. DECK ACCESS FROM PIER 42 PHASE 1B: UPLAND PARK FENCE 3. EXISTING RAMP 11. ACCESS TO SOCCER FIELD (MAX 5% SLOPE) 4. RAISED DECK, TYP. 12. OUTDOOR EXERCISE EQUIPMENT AREA 5. EXISTING 8' HEIGHT CHAIN LINK FENCE 13. 16' HEIGHT CHAIN LINK FENCE ON DECK 6. ELEVATED DOCK 14. PAINTED TENNIS COURT, TYP OF 4. 7. EXISTING BOAT CLEATS, TYP. 15. PAINTED HALF COURT BASKETBALL, TYP OF 4. 8. COMFORT STATION 16. PICNIC TABLE, TYP 0F 13. 9. SYNTHETIC TURF 17. BENCH, TYP OF 17. 18. MODIFIED RAMP TO COMPLY WITH ADA REGULATIONS
Pier 42 Deck Site Plan Community Engagement Meeting 9 March 2020 26 of 38 DECK SURFACES
CONCRETE DECK COATING OUTDOOR FITNESS SAFETY SURFACE SYNTHETIC TURF
DECK FURNISHINGS
BENCHES PICNIC TABLES TRASH RECEPTACLES 1964 World’s Fair Bench (Backed) Standard DPR picnic table Big Belly Solar Receptacles Finish: Galvanized Finish: Recycled Plastic Lumber: Weathered Wood Recycled Plastic Lumber: Weathered Wood
Pier 42 Proposed Materials & Furnishings Community Engagement Meeting 9 March 2020 27 of 38 1
KEY PLAN
Pier 42 Perpsective 1 Community Engagement Meeting 9 March 2020 28 of 38 2
KEY PLAN
Pier 42 Perpsective 2 Community Engagement Meeting 9 March 2020 29 of 38 TRIPLE PARALLEL BARS CHEST/BACK PRESS STRETCH BALANCE STEPS
HAND CYCLER AB CRUNCH & LEG LIFT ASSISTED ROW & PUSH-UP PULL-UP & DIP
Pier 42 Outdoor Fitness Equipment Community Engagement Meeting 9 March 2020 30 of 38 FDR DRIVE
LIMIT OF WORK
NYCDOT PIER 42 PHASE 1A MAINTENANCE NYC FERRY AREA PERCENTAGE YARD EXISTING IMPERVIOUS 130,672 SF 88.22% PROPOSED IMPERVIOUS 52,440 SF 35.40% EAST RIVER APPROX. REDUCTION 78,232 SF 52.82% EXISTING
FDR DRIVE
LIMIT OF WORK COMFORT STATION
NYCDOT PIER 42 PHASE 1A Legend MAINTENANCE NYC FERRY Permeable Area YARD
EAST RIVER N PROPOSED 100’
Pier 42 Impervious Reduction Community Engagement Meeting 9 March 2020 31 of 38 CONTENTS 1. MASTER PLAN AND EXISTING CONDITIONS 2. PHASE 1B SITE PLAN AND MATERIALS 3. PHASE 1B PLAYGROUND 4. PHASE 1B COMFORT STATION 5. INTERIM PIER DECK SITE PLAN & MATERIALS 6. SCHEDULE 7. APPENDIX: RESILIENCY & SUSTAINABILITY
Pier 42 Community Engagement Meeting 9 March 2020 32 of 38 2020 2021 2022 2023 MAR JUL OCT MAR JUL OCT MAR JUL OCT MAR JUL OCT
PIER 42 PHASE 1B: UPLAND PARK
PIER 42:INTERIM DECK
EAST SIDE COASTAL RESILIENCY
BASKETBALL CITY (TBD)
Pier 42 DRAFT Schedule Community Engagement Meeting 9 March 2020 33 of 38 CONTENTS 1. MASTER PLAN AND EXISTING CONDITIONS 2. PHASE 1B SITE PLAN AND MATERIALS 3. PHASE 1B PLAYGROUND 4. PHASE 1B COMFORT STATION 5. INTERIM PIER DECK SITE PLAN & MATERIALS 6. SCHEDULE 7. APPENDIX: RESILIENCY & SUSTAINABILITY
Pier 42 Community Engagement Meeting 9 March 2020 34 of 38 CLINTON STREET MONTGOMERY STREET GOUVERNEUR STREET JACKSON STREET
EAST RIVER PARK
CORLEARS HOOK PARK CHERRY STREET 500 YEAR FLOOD LEVEL EAST RIVER PARK WATER STREET AMPHITHEATER 100 YEAR FLOOD LEVEL
FDR DRIVE
LIMIT OF WORK SOUTH STREET PIER 42 PHASE 1B
PIER 42 PHASE 1A BASKETBALL CITY/ PIER 36 NYC FERRY - LOWER EAST SIDE CORLEARS HOOK STOP CONED AIR VENT STRUCTURE
NYCDOT MAINTENACE YARD
EAST RIVER
Pier 42 Existing Flood Levels Community Engagement Meeting 9 March 2020 35 of 38 MONTGOMERY STREET GOUVERNEUR SLIP WEST GOUVERNEUR SLIP EAST JACKSON STREET
FDR DRIVE
COMFORT STATION LIMIT OF WORK FFE: 12.5
PIER 42 UPLAND PARK
NYCDOT BASKETBALL MAINTENANCE CITY/ PIER 36 NYC FERRY YARD
EAST RIVER
100 YEAR FLOODPLAIN 11.00*
EXISTING UPLAND ELEVATION 6.65-8.65* N 100’ MEAN HIGH WATER MARK 1.96* *DATUM: NAVD88
Pier 42 Phase 1B Proposed Elevations Community Engagement Meeting 9 March 2020 36 of 38 40’
125° 30’
25° 30°
20’
10’
NORTH 0’
Proposed tree locations to be coordinated with solar light locations to not restrict light collection and output.
Evergen Solar LED Light by Sol.
Pier 42 Solar Lighting Community Engagement Meeting 9 March 2020 37 of 38 FDR DRIVE
ESCR SHARED PATH* LIMIT OF WORK ESCR SHARED PATH*
EXISTING PROMENADE LIGHTING TO REMAIN
NYCDOT BASKETBALL MAINTENANCE CITY/ PIER 36 PIER 42 PHASE 1A NYC FERRY YARD
EAST RIVER
Legend
Solar Light and Photometric Reach
*Lighting for shared path to be designed and installed under ESCR contract N 100’
Pier 42 Solar Lighting Plan Community Engagement Meeting 9 March 2020 38 of 38