TC Energy t~ 450 – 1 Street SW , T2P 5H1

Tel: (403) 920-7835 Fax: (403) 920-2308 Email: [email protected] May 13, 2020 Filed Electronically

Ontario Energy Board P.O. Box 2319 2300 Yonge Street, 27th Floor Toronto, ON M4P 1E4

Attention: Ms. Christine Long, Board Secretary

Dear Ms. Long:

Re: Gas Inc. (EGI) OEB File No. EB-2020-0091 - Enbridge Gas Integrated Resource Planning Proposal TransCanada PipeLines Limited (TCPL) Application for Intervenor Status

TCPL requests intervenor status in Ontario Energy Board proceeding EB-2020-0091. Attached is TCPL’s application in support of its request.

Yours truly, TransCanada PipeLines Limited

Original signed by

Namrita Sohi Legal Counsel Canadian Law, Natural Gas Pipelines

Enclosure

cc: Adam Stiers, Enbridge Gas Inc. Guri Pannu, Enbridge Gas Inc.

ONTARIO ENERGY BOARD EB-2020-0091

TRANSCANADA PIPELINES LIMITED APPLICATION FOR INTERVENOR STATUS

To: Ms. Christine Long Board Secretary Ontario Energy Board

TransCanada PipeLines Limited EB-2020-0091 Application for Intervenor Status

APPLICATION

1. TransCanada PipeLines Limited (TCPL) requests intervenor status in the proceeding for adjudication of the application.

2. TCPL is a company incorporated under the laws of .

3. TCPL owns and operates a high-pressure natural gas transmission system that extends from Alberta to Ontario and through a portion of , connecting to various downstream Canadian and international pipelines (the Mainline). The Canada Energy Regulator regulates TCPL's operation of the Mainline.

4. TCPL transports natural gas on the Mainline on behalf of others for use in the Canadian domestic market and for export from Canada to the .

5. TCPL has contracted for M12, M12-X, C1 and Rate 332 transportation services on the pipeline systems of Enbridge Gas Inc. (EGI). TCPL uses this capacity to provide integrated services on the Mainline and therefore has an interest in matters that may affect the rates or facilities on the EGI systems.

6. In addition, EGI is a large domestic customer on the Mainline. TCPL has a direct interest in matters involving the EGI systems, facilities, rates and policies; and the effects it may have on the services TCPL provides to its customers on the Mainline. This interest extends to include any Integrated Resource Planning proposals that may affect how EGI plans its system from either a supply-side or demand-side perspective.

7. TCPL would reserve its rights to participate in all aspects of the proceeding, including potential evidence, interrogatories, cross-examination and argument.

8. TCPL further requests receipt of all pre-filed material and any further notices or other material that may be issued or filed in connection with this proceeding. The names, mailing and electronic addresses, and telephone and facsimile numbers of TCPL representatives are as follows:

Attention:

Mrs. Namrita Sohi Mr. Matthew Wharton Legal Counsel Manager, Regulatory Tolls & Tariffs East and Canadian Law, Natural Gas Pipelines Regulatory Research 450 – 1st Street SW 450 – 1st Street SW Calgary, Alberta T2P 5H1 Calgary, Alberta T2P 5H1

Telephone: (403) 920-7835 Telephone: (403) 920-5812 Facsimile: (403) 920-2308 Facsimile: (403) 920-2451 Email: [email protected] E-mail: [email protected]

May 13, 2020 Page 1 of 2 TransCanada PipeLines Limited EB-2020-0091 Application for Intervenor Status

9. TCPL does not intend to seek an award of costs for its participation in this proceeding.

Respectfully submitted,

Calgary, Alberta May 13, 2020

TransCanada PipeLines Limited

Original signed by ______Namrita Sohi Legal Counsel Canadian Law, Natural Gas Pipelines

May 13, 2020 Page 2 of 2