Federal Register / Vol. 80, No. 152 / Friday, August 7, 2015 / Rules and Regulations 47411

at the end of the effective period of this questions on viewing the docket, call In accordance with 33 CFR 117.35(e), temporary deviation. Cheryl Collins, Program Manager, the drawbridges must return to their This deviation from the operating Docket Operations, telephone 202–366– regular operating schedules regulations is authorized under 33 CFR 9826. immediately at the end of the effective 117.35. period of this temporary deviation. This SUPPLEMENTARY INFORMATION: Dated: August 3, 2015. deviation from the operating regulations Multnomah County has requested a is authorized under 33 CFR 117.35. David M. Frank, temporary deviation from the operating Bridge Administrator, Eighth Coast Guard schedule for the Broadway Bridge, mile Dated: July 17, 2015. District. 11.7, , mile 12.4, Steven M. Fischer, [FR Doc. 2015–19377 Filed 8–6–15; 8:45 am] Morrison Bridge, mile 12.8, and Bridge Administrator, Thirteenth Coast Guard BILLING CODE 9110–04–P , mile 13.1, all District. crossing the at [FR Doc. 2015–19373 Filed 8–6–15; 8:45 am] , OR. The requested deviation is BILLING CODE 9110–04–P DEPARTMENT OF HOMELAND to accommodate the annual Providence SECURITY Bridge Pedal event. To facilitate this event, the draws of the bridges will be DEPARTMENT OF HEALTH AND Coast Guard maintained in the closed-to-navigation HUMAN SERVICES positions as follows: The Broadway 33 CFR Part 117 Bridge, mile 11.7, provides a vertical 42 CFR Part 110 [Docket No. USCG–2015–0624] clearance of 90 feet in the closed RIN 0906–AA79 position; Burnside Bridge, mile 12.4, Drawbridge Operation Regulation; provides a vertical clearance of 64 feet Countermeasures Injury Willamette River at Portland, OR in the closed position; Morrison Bridge, Compensation Program: Pandemic Influenza Countermeasures Injury AGENCY: Coast Guard, DHS. mile 12.8, provides a vertical clearance Table ACTION: Notice of deviation from of 69 feet in the closed position; and drawbridge regulation. Hawthorne Bridge, mile 13.1, provides a AGENCY: Health Resources and Services vertical clearance of 49 feet in the Administration (HRSA), Department of SUMMARY: The Coast Guard has issued a closed position; all clearances are Health and Human Services (HHS). temporary deviation from the operating referenced to the vertical clearance ACTION: Final rule. schedule that governs four Multnomah above Datum 0.0. The County bridges: the Broadway Bridge, normal operating schedule for all four SUMMARY: HHS is establishing the mile 11.7, Burnside Bridge, mile 12.4, bridges is set in 33 CFR 117.897, and Pandemic Influenza Countermeasures Morrison Bridge, mile 12.8, and states that the bridges need not open Injury Table as authorized by the Public Hawthorne Bridge, mile 13.1, all from 7 a.m. to 9 a.m., and from 4 p.m. Readiness and Emergency Preparedness crossing the Willamette River at to 6 p.m. Monday through Friday. These Act (PREP Act). Through this final rule, Portland, OR. This deviation is four bridges need not open for vessel the Secretary of the U.S. Department of necessary to accommodate the annual traffic from 6 a.m. on August 9, 2015, to Health and Human Services (Secretary) Portland Providence Bridge Pedal event. 12:30 p.m. on August 9, 2015. This adds regulations for the purpose of This deviation allows the bridges to deviation period is from 6 a.m. on creating Covered Countermeasures remain in the closed-to-navigation August 9, 2015, to 12:30 p.m. August 9, Injury Tables. The pandemic influenza position to allow safe roadway 2015. The deviation allows the countermeasures are identified in movement of event participants. Broadway Bridge, Burnside Bridge, Secretarial declarations relating to DATES: This deviation is effective from Morrison Bridge, and the Hawthorne pandemic influenza, including 6 a.m. on August 9, 2015, to 12:30 p.m. Bridge all crossing the Willamette River, influenza caused by the 2009 H1N1 on August 9, 2015. to remain in the closed-to-navigation pandemic influenza virus (hereafter ADDRESSES: The docket for this position and need not open for maritime referred to as the 2009 H1N1 virus) and deviation, [USCG–2015–0624] is traffic from 6 a.m. to 12:30 p.m. on other potential pandemic strains, such available at http://www.regulations.gov. August 9, 2015. The four bridges shall as H5N1 avian influenza. Type the docket number in the operate in accordance to 33 CFR DATES: This rule is effective September ‘‘SEARCH’’ box and click ‘‘SEARCH.’’ 117.897 at all other times. Waterway 8, 2015. Click on Open Docket Folder on the line usage on this part of the Willamette FOR FURTHER INFORMATION CONTACT: Dr. associated with this deviation. You may River includes vessels ranging from Avril M. Houston, Director, Division of also visit the Docket Management commercial tug and barge to small Injury Compensation Programs, Facility in Room W12–140 on the pleasure craft. Healthcare Systems Bureau, HRSA, ground floor of the Department of Vessels able to pass through the Parklawn Building, Room 11C–26, 5600 Transportation West Building, 1200 bridge in the closed-to-navigation Fishers Lane, Rockville, MD 20857, or New Jersey Avenue SE., Washington, positions may do so at any time. The by telephone (855) 266–2427. This is a DC 20590, between 9 a.m. and 5 p.m., bridges will be able to open for toll-free number. Monday through Friday, except Federal emergencies and there is no immediate SUPPLEMENTARY INFORMATION: On March holidays. alternate route for vessels to pass. The 30, 2014, HHS published the Notice of FOR FURTHER INFORMATION CONTACT: If Coast Guard will also inform the users Proposed Rulemaking (NPRM) in the you have questions on this temporary of the waterways through our Local and Federal Register to amend the deviation, call or email Mr. Steven Broadcast Notices to Mariners of the Countermeasures Injury Compensation Fischer, Bridge Administrator, change in operating schedule for the Program’s (CICP or Program) Thirteenth Coast Guard District; bridges so that vessels can arrange their implementing regulation and establish a telephone 206–220–7282, email d13-pf- transits to minimize any impact caused table of injuries resulting from the [email protected]. If you have by the temporary deviation. administration or use of covered

VerDate Sep<11>2014 15:21 Aug 06, 2015 Jkt 235001 PO 00000 Frm 00013 Fmt 4700 Sfmt 4700 E:\FR\FM\07AUR1.SGM 07AUR1 rmajette on DSK2TPTVN1PROD with RULES