Finanical details of State Sector Roads (Projectization) during 2015-16 (R&B) Department

(Rs in lakhs) Physical Progressive Year of Target Expdt Cost of Date of Progress of expdt to the S.No. Name of the Project/ Work Commenc Year of during the work sanction work in end of the edment completion year Percentage year 1 2 3 4 5 6 7 8 9 DISTRICT

Baramulla town roads : Main chowk,Fish Market, Jehlum Market,Park Link,DC Office link 238 PWD Complex,D.P.Line Link incl SSP ,Dewanbagh 290.47 2013-14 2013-14 2018-19 79% 48.20 228.20 link upto Masjid including Diary farm link GHSS link, General Bus Stand & Jaded links, Court Links

Inner links at Old Town incl right side app. Of 239 chatipadshai bridge ( Specific links, not covered 269.67 2013-14 2013-14 2020-21 16% 8.00 44.00 under SADP)

Inner links at Old Town incl right side app. of 240 chatipadshai bridge ( Specific links, not covered 657.81 2013-14 2013-14 2022-23 12% 39.70 81.37 under SADP)

241 Delina road via Gurdwara 144.06 2013-14 2013-14 2018-19 48% 16.00 69.00

Sheeri Heewan Dangerpora road, incl 242 405.93 2013-14 2013-14 2020-21 48% 10.00 194.00 Reshimuqam link

243 Inner links at Usmanabad Colony Gutyar 78.84 2013-14 2013-14 2017-18 42% 14.00 33.50

Const/Upgrd of road Kawahar Payeen Masjid to 244 123.78 2013-14 2013-14 2019-20 16% 2.00 20.00 HSS, Leridoora incld allid links

245 Faqirbagh Rajpora Sultanpora road 144.18 2013-14 2013-14 2018-19 69% 20.00 99.00

Const of road from National Highway to 246 65.00 2013-14 2013-14 2017-18 72% 3.00 46.90 Cooperative Society Delina Karewa incl DPS

247 Upgrd of links at Drangbal Baramulla 210.60 2013-14 2013-14 2019-20 8% 3.00 16.60 248 Dardpora road 141.03 2013-14 2013-14 2019-20 19% 6.00 27.50 249 Upgrd of roads at Village 40.00 2013-14 2013-14 2017-18 75% 17.00 30.00 Baramulla Babareshi Km 1st to Km 22nd ( Phase --- 250 100.00 2013-14 2013-14 2018-19 55% 34.60 54.60 Iind)

Pattan town roads and other allied works:- 251 424.34 2013-14 2013-14 2020-21 43% 17.20 184.41 Ziyarat ,Wanigam Taligam Chanderseer road

252 Kripalpora Batakcheck road 156.94 2013-14 2013-14 2019-20 31% 15.50 48.60 253 Gohal Tengpora road 55.00 2012-13 2012-13 2017-18 77% 12.50 42.16 254 Puchnag Puthar Shalbagh road 50.84 2013-14 2013-14 2017-18 38% 4.40 19.50

255 Palhallan to Palhallan Ghat road 108.00 2013-14 2013-14 2018-19 42% 20.06 45.06

256 Haritrath Singpora road Km 1-3 near Duslipora 75.00 2013-14 2013-14 2018-19 62% 24.65 46.65

Const of Binner Kawdora Venkura road incl Binner 257 250.78 2013-14 2013-14 2020-21 14% 5.00 36.00 Gujarpati

Town Roads at :- Roads at , Keeri, Dolipora, Putkhah Muqam link, & Tapper Kalanatra road, Banday Bala, Kohilina 258 432.15 2013-14 2013-14 com 100% 17.15 432.15 road, Kandi Sultanpora road, Bus Adda to BDO Office Wagoora to , Bandabala link and Watergam Kalantra

260 Wagoora Wagila Kachwamuqam 84.16 2013-14 2013-14 2017-18 77% 40.00 65.00 262 Doolipora Sheikhpora road 124.21 2013-14 2013-14 2018-19 55% 29.05 67.93

Upgd. Bulgam hygam Tarzoo road incl Hanjipora 264 link, Upgd. of Chankhan seer and Sangrama Seer 230.00 2012-13 2012-13 2016-17 100% 10.54 229.29 road

266 Tarzoo Haritar road 62.00 2012-13 2012-13 2017-18 81% 1.50 50.00 Tarzoo Hygam road incl. Imambara at Hygam Km 268 30.00 2012-13 2012-13 2016-17 72% 2.00 21.50 3rd 270 Dawalatpora to Dongdara 368.40 2013-14 2013-14 2021-22 10% 4.76 36.26 Impvt/upgrd of Takiya Wani to Bonpora 272 24.95 2013-14 2013-14 2017-18 23% 0.65 5.85 Watergam and allied links

274 Upgd of inner links at Hygam 120.00 2012-13 2012-13 10% 3.00 11.80

276 Upgd of inner link road at Kriri 58.83 2013-14 2013-14 18% 0.91 10.30

Page 1 of 6 Physical Progressive Year of Target Expdt Cost of Date of Progress of expdt to the S.No. Name of the Project/ Work Commenc Year of during the work sanction work in end of the edment completion year Percentage year 1 2 3 4 5 6 7 8 9 278 Uthoora Saloosa Thindum road 10.08 2013-14 2013-14 91% 4.80 9.22

280 Impvt of Nowpora Mirangund upto BSF HQ 125.50 2013-14 2013-14 8% 4.00 10.55

Sopore town roads and other roads in constituency :-Chinkipora Dar-ul-Aloom road via Handicraft centre, Mohalla Qadira Model Town A main link Hatishah incld link form Hatishah to chowk,New Colony Central link,Neharpora S,Noobagh link,Inner link road at Baadambagh Sopore via Masjid Hamza / Faktoo link,Sopore 281 599.53 2009-10 2009-10 2018-19 77% 7.32 459.37 Krankshiven road Km 1st,Bugoo to Jama masjid via Kralteng and Muslim peer,Chota Bazar link, Super Bazar to Ashpeer junction, Muslim Peer, Kralteng link, inner of upper Ashpeer, Faisalabad link, Ziyarat Rahim Sahib link, Noorbagh via B-Ed College, , Krankshiven Colony Iqbal Nagar, Chanakhan Seer, and New light link

282 Hatlangoo link road 80.00 2018-19 31% 3.00 25.00 283 Choora Wagub Panjipora road incld links 80.00 2018-19 26% 8.80 21.00

Total Sopore Constituency 759.53 19.12 505.37 Constituency:

Tangmarg Town:- road ,Tangmarg Drung road ,Tangmarg Qazipora 284 road,Devdagar Khaipora Sheikhpora road 140.00 2013-14 2013-14 com 100% 4.00 140.00 (Adda),Paths & C.C drain at Hariwatnoo,Ziran Hajibal road

285 Druroo Sharai Baderkote road 160.00 2013-14 2013-14 com 100% 9.00 160.00 286 Chandilora Kalantra Road 135.00 2012-13 2012-13 com 100% 11.00 135.00 Qazipora Kampora Link and Kampora Hariwatnoo 287 240.00 2013-14 2013-14 2019-20 19% 1.70 45.81 Road 288 Baderkot Chandil Road 75.00 2013-14 2013-14 com 100% 11.75 75.00 Malmooh Nooripora incld Dangerpora, Mir 289 96.00 2013-14 2013-14 2018-19 58% 6.00 55.78 Mohalla, Agrikallan Road

290 Drung Zandpal road Baramula 22.00 2013-14 2013-14 com 100% 1.65 22.00

291 Sonlipora Kutipora Hardsoora road 160.00 2012-13 2012-13 2019-20 20% 3.00 31.50

292 Baramulla Baba Reshi Sahib road (Km 23 to 32) 200.00 2013-14 2013-14 2018-19 51% 18.50 101.72

Chuntipathri Saterseeram Dardhajan, Nagbal, 293 150.00 2013-14 2013-14 2019-20 9% 12.00 13.89 Shranz Baba Reshi road

Mangloora to Shirpora via Mamoosa road incld 294 Mangloora Krishama Pahalbani, Kunzer Hardboni 200.00 2013-14 2013-14 2019-20 33% 21.00 65.04 links

Hagerpora Badibugh, Gund Khawaja qasim, 295 Kungamdara road incld Tantraypora Nooripora 110.00 2013-14 2013-14 2018-19 52% 21.00 57.20 Haftchinar links

296 Baba Reshi Sahib (Km 16 to 21) 125.00 2013-14 2013-14 2018-19 78% 23.00 96.94 297 Seriwarpora Chuker road 161.72 2013-14 2013-14 com 100% 20.64 161.72 298 Seeru Dangerpora road 79.11 2014-15 2014-15 2018-19 26% 14.50 20.24 Seriwarpora Sonium, Sonium Newra and Nanlu 299 65.00 2014-15 2014-15 2018-19 14% 7.03 9.22 road

Constr of approaches for right track of ROB in Km 5th RD 785 to Km 6th RD 550 incld impvt's & 300 upgrd of road surface and other allied works from 300.00 2014-15 2014-15 2021-22 24% 12.00 72.00 Km 1st to Km 24.5th of NTR (Phase- wise)/(Change nomenclature)

Upgrd of Mehmoodpora Gundarpora road incld 301 100.00 2014-15 2014-15 2018-19 40% 30.00 40.00 allied links

Upgrd of Krishama Habligam Divbugh road incld 302 100.00 2014-15 2014-15 2018-19 31% 18.00 31.00 allied links 303 Gantmulla Bala 72.95 2012-13 2012-13 2018-19 41% 0.00 30.00 304 Salamabad bridge to Dachi 87.90 2012-13 2012-13 2018-19 69% 15.99 60.39 Page 2 of 6 Physical Progressive Year of Target Expdt Cost of Date of Progress of expdt to the S.No. Name of the Project/ Work Commenc Year of during the work sanction work in end of the edment completion year Percentage year 1 2 3 4 5 6 7 8 9 305 Burnate road 296.33 2013-14 2013-14 2020-21 34% 11.00 101.44 306 Gingal Bijhama Lachipora road 257.25 2012-13 2012-13 2020-21 28% 10.00 72.80

307 Parallel road from Choolan to Paranpillan 80.00 2012-13 2012-13 2017-18 55% 20.00 44.34 308 Gantmulla/Poshwan road 77.25 2012-13 2012-13 2018-19 8% 2.00 6.55 309 Upgrd of Zehanpora link road 45.00 2017-18 80% 19.20 36.00 310 Garison road at Baramulla 75.00 2014 - 15 2014 - 15 2018-19 13% 10.00 10.00

Upgradation of roads in Johama Village B.w.O 311 50.00 2014 - 15 2014 - 15 2018-19 33% 16.50 16.50 WBM G - II & Drains ( Hon'ble Minister)

Constr of cenement concrete drain at Iffat Mohalla, 312 15.00 2014 - 15 2014 - 15 2016-17 33% 5.00 5.00 Kanlibagh ( Hon'ble Minister)

Chandiloora Badipora Mirchipora Kailwra, 313 Hariwatnoo Pandithpora Heer Rawatpora road 100.00 2014 - 15 2014 - 15 2019-20 15% 15.00 15.00 (Authorized by AD)

Widening of Malpora Watergam/compund walling 314 Zayart Sharief Gundikarim incld Kanguroosa inner 100.00 2014 - 15 2014 - 15 2019-20 20% 20.00 20.00 links 315 Sopore Model Town ( 1 Kms 100.00 2014 - 15 2014 - 15 25% 25.00 25.00

Upgrd of low lying road roads of village 316 34.75 2014 - 15 2014 - 15 2017-18 23% 8.00 8.00 constructionof cement concrete drain

317 Dara Gutilyar Road ( 4 Kms) 100.00 2014 - 15 2014 - 15 2019-20 15% 15.00 15.00 318 Approach road to Chadanwari 100.00 2014 - 15 2014 - 15 2019-20 15% 15.00 15.00 Const of road from Bijhama to Peermohalla 319 100.00 2014 - 15 2014 - 15 2019-20 5% 5.00 5.00 Nakhwara TOTAL DIST. BARM'LLA ( 115 SCHEMES) 10532.34 916.75 4642.35

Page 3 of 6 Finanical details of State Sector Roads (Projectization) during 2015-16 (R&B) Department Kashmir

Revised cost Payment if any/date pending of revision

10 11

62.27 290.47

225.67 269.67

576.44 657.81

75.06 144.06

211.93 405.93

45.34 78.84

103.78 123.78

45.18 144.18

18.10 65.00

194.00 210.60 113.53 141.03 10.00 40.00

45.40 100.00

239.93 424.34

108.34 156.94 12.84 55.00 31.34 50.84

62.94 108.00

28.35 75.00

214.78 250.78

0.00 432.15

19.16 84.16 56.28 124.21

0.71 230.00

12.00 62.00

8.50 30.00 332.14 368.40

19.10 24.95

108.20 120.00

48.53 58.83

Page 4 of 6 Revised cost Payment if any/date pending of revision

10 11 0.86 10.08

114.95 125.50

140.16 599.53

55.00 80.00 59.00 80.00

254.16 759.53

0.00 140.00

0.00 160.00 0.00 135.00 194.19 240.00 0.00 75.00

40.22 96.00

0.00 22.00

128.50 160.00

98.28 200.00

136.11 150.00

134.96 200.00

52.80 110.00

28.06 125.00 0.00 161.72 58.87 79.11 55.78 65.00

228.00 300.00

60.00 100.00

69.00 100.00

42.95 72.95 27.51 87.90 Page 5 of 6 Revised cost Payment if any/date pending of revision

10 11 194.89 296.33 184.45 257.25

35.66 80.00 70.70 77.25 9.00 45.00 65.00 75.00

33.50 50.00

10.00 15.00

85.00 100.00

80.00 100.00

75.00 100.00

26.75 34.75

85.00 100.00 85.00 100.00 95.00 100.00 5889.99 10532.34