SOCIAL IMPACT ASSESSMENT OF LAND ACQUISITION FOR ESTABLISHING INDUSTRIAL PARK BY KINFRA (Koodali, Pattannur and Villages – 313.81 Acres)

DRAFT REPORT JUNE 2020

Centre for Management Development

CONTENTS

CHAPTER 1 -EXECUTIVE SUMMARY ...... 01

CHAPTER 2 -DETAILED PROJECT DESCRIPTION ...... 04

CHAPTER 3 -TEAM COMPOSITIONAPPROACH, METHODOLOGY AND SCHEDULE OF THE SOCIAL IMPACT ASSESSMENT...... 08

CHAPTER 4 – LAND ASSESSMENT ...... 10

CHAPTER 5 -ESTIMATION AND ENUMERATION (WHERE REQUIRED) OF AFFECTED FAMILIES AND ASSETS ...... 13

CHAPTER 6 –SOCIAL ECONOMIC AND CULTURAL PROFILE (AFFECTED AREA AND RESETTLEMENT SITE)...... 15

CHAPTER 7 - SOCIAL IMPACT MANAGEMENT ...... 19

CHAPTER 8 –SOCIAL IMPACT MANAGEMENT PLAN INSTITUTIONAL FRAMEWORK...... 22

CHAPTER 9 - SOCIAL IMPACT MANAGEMENT PLAN BUDGET

AND FINANCING OF MITIGATION PLAN...... 24

CHAPTER 10 - SOCIAL IMPACT MANAGEMENT PLAN MONITORING AND EVALUATION...... 25

CHAPTER 11 - ANALYSIS OF COSTS AND BENEFITS AND RECOMMENDATION ON ACQUISITION...... 26

ANNEXURES ...... 28 SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

CHAPTER 1

EXECUTIVE SUMMARY

1.1 Project and public purpose The proposed project is intended to establish an Industrial Park by KINFRA under the IDZ scheme in Koodali, Pattannur and Keezhallur Villages of Taluk in District. The project aims at improving the industrial facilities of the District thereby increasing the overall development of the State. This will in turn increase the employment opportunities to the populace. Establishment of industrial park can attract more investments in the state thus strengthening the economy as well.

1.2 Location

Government of had accorded administrative sanction vide to acquire a total area of 313.81 Acres of land from Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in for establishing an Industrial Park by KINFRA.

1.3. Size and attributes of land acquisition

An extent of 313.81 acres of land under survey Nos. 84, 85, 86pt, 1pt, 2pt from Keezhallur Village, survey Nos. 73pt, 72pt, 167, 175, 176pt, 177/1, 3pt, 178pt, 179pt from Pattannur Village and survey Nos. 39pt, 40pt, 143pt, 144, 145, 146, 147, 148, 149, 150, 136pt, 134pt, 133pt, 132, 131pt from Koodali Village in Kannur district is required for the implementation the proposed project. The proposed are is situated 7 kms away from .

The land identified for the project of establishing the Industrial Park belongs to around 78 families, within which around 10 residential structures are identified. The area mainly include cashew plantation and left over land after laterite stone mining. The number of houses to be acquired may change once the final plan is prepared.

Centre for Management Development, Thiruvananthapuram 1

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

1.4 Alternatives considered

The project is intended for developing various infrastructural and business ventures near to the Kannur International Airport. The implementation of the Industrial park can cater the development of the area. As the project is intended to improve infrastructure facilities near to the airport, no other alternatives are considered.

1.5 Social impacts

The land identified for the project of establishing the Industrial Park belongs to around 78families, within which around 10 residential structures are identified. The lion’s share of the area is rich with Cashew farms. A good portion of the area is the land remaining after mining of Laterite stones. The project area is around 28km away from District Collectorate and is bordered by the Pazhassi Dam constructed on the Irrikkur River to the south. The number of houses to be acquired may change once the final plan is prepared.

1.6 Mitigation measures

The land identified for the project of establishing the Industrial Park belongs to around 78 families, within which around 10 residential structures are identified. The area mainly include cashew plantation and left over land after laterite stone mining. The number of houses to be acquired may change once the final plan is prepared.

However, by considering the following measures the authorities can mitigate and compensate the possible negative impacts of the land acquisition.

 Compensation for the land owners as per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013.  Resettlement and Rehabilitation procedure as per the Policy issued by Revenue(B) Department, vide G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLARR Act 2013.

Centre for Management Development, Thiruvananthapuram 2

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

 Reconstruction of livelihood of people is an important factor in this project. Majority of the directly affected families are relying on the project area for their livelihood through cashew farm and rubber plantations. The loss of these assets will cause them a significant impact.  The directly affected people should be considered for the job opportunities that will be created by the establishment of the proposed project. Through this, the impact of losing livelihood as a result of land acquisition can be minimised.  The successful rehabilitation of the directly affected families are the other major concern in this land acquisition. The authorities should make sure that the displaced families will get proper rehabilitation.

Centre for Management Development, Thiruvananthapuram 3

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

CHAPTER 2

DETAILED PROJECT DESCRIPTION

2.1 Background of the Project including Developer’s Background and Governance/Management structure

As part of the decision to establish an Industrial Park for KINFRA, Government of Kerala (GoK) had accorded administrative to acquire a total area of 313.81 Acres of land from Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in Kannur District for establishing an Industrial Park by KINFRA. The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (RFCTLARR) Act 2013, enacted by the Government of , has mandated the conduct of Social Impact Assessment study prior to the land acquisition. Government of Kerala had accorded sanction vide G.O.(P) No.53/2019/RD dated 28/08/2019 to Centre for Management Development, Thiruvananthapuram to conduct SIA in this regard and to prepare a Social Impact Management Plan for the same. The entire project is designed to involve and integrate the local community in all intended developmental initiatives. The concept of the Industrial Park is to provide a single platform that brings together various infrastructural facilities and industrial assistance from the Government to the public. The project would take an environment friendly approach by conserving energy and making use of alternate technologies.

The land in Kannur district which has been proposed for the Industrial Park could be acquired due to the following reasons:

 The number of stakeholders in the proposed project site is very few.  Lion share of the proposed project site include cashew plantations and land remaining after laterite stone mining.  Only 10 families need to be rehabilitated. The final number of families to be rehabilitated may be even less when the final pan is completed.  Houses near the border may be excluded while preparing the final plan for the proposed project site.

Centre for Management Development, Thiruvananthapuram 4

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

 A stone crusher plant is also situated in the proposed project site. If needed this can also be excluded.

2.2 Rationale for Project, including how the project fits the public purpose criteria listed in the Act.

The project aims in developing the district as a leading industrial hub. The industrial park can cater the social and economic development in the area. Industrialisation has resulted in a considerable rise in the standard of living of the people. Increase in job opportunities is a major advantage. As part of the decision to establish an Industrial Park for KINFRA, Government of Kerala (GoK) had accorded administrative sanction to acquire a total area of 313.81 Acres of land in Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in Kannur District for establishing an Industrial Park by KINFRA. The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (RFCTLARR) Act 2013, enacted by the Government of India, has mandated the conduct of Social Impact Assessment study prior to the land acquisition. Government of Kerala had accorded sanction vide G.O.(P) No.53/2019/RD dated 28/08/2019 to Centre for Management Development, Thiruvananthapuram to conduct SIA in this regard and to prepare a Social Impact Management Plan for the same.

As per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 Section 2-(1)-(b)-(i), the project can be considered as a public purpose.

2.3 Details of Project size, location, capacity outputs, production targets, costs and risks

The affected area belongs to Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in Kannur District. A total area of313.81acres of land is required to be acquired for the proposed project. The land to be acquired is spread over MuttanurDesom in Koodali Village, Kunnoth and Kodolipram Desoms in Pattannur Village and Theroor and EdayannurDesoms in Keezhallur Village. The proposed land is situated ½ km from the Kannur- National Higway and 1 and ½ km north-west to Mattanur town.

Centre for Management Development, Thiruvananthapuram 5

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Fig. 2.1: Photographs of Project Area

2.4 Examination of alternatives

The project is intended for developing various infrastructural and business ventures near to the Kannur International Airport. The implementation of the Industrial park can cater the development of the area. As the project is intended to improve infrastructure facilities near to the airport, no other alternatives are considered.

2.5 Phases of the Project Construction

The project is intended for developing various infrastructural and business ventures near to the Kannur International Airport. The project aims in developing the district

Centre for Management Development, Thiruvananthapuram 6

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

as a leading industrial hub. The industrial park can cater the social and economic development in the area. Increase in job opportunities is a major advantage for the district. The project would take an environment friendly approach by conserving energy and making use of alternate technologies.

2.6 Core design Features, size and Type of Facilities

The industrial park can cater the social and economic development in the area. Industrialisation has resulted in a considerable rise in the standard of living of the people. Increase in job opportunities is a major advantage for the district.The project would take an environment friendly approach by conserving energy and making use of alternate technologies even from early stages of inception and later continue the same for daily operations.

2.7 Need for Ancillary Infrastructural Facilities

The proposed project aims at constructing facilities which is environment friendly and safe. The construction of new buildings and better infrastructure in the area is one of the factors in this process. As part of the Industrial Park construction or improvisation of roads need to be done.

2.8 Workforce Requirements (Temporary and Permanent)

Both temporary and permanent workforce will be employed with modern machineries and equipment at appropriate stages of the project implementation.

2.9 Details of Social Impact Assessment/Environment Impact Assessment if Already Conducted and any Technical Facility Reports

No Social Impact Assessment/Environment Impact Assessment has been conducted previously.

2.10 Applicable legislations and policies

The land acquisition for the proposed project is governed by the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013.

Centre for Management Development, Thiruvananthapuram 7

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

CHAPTER 3

TEAM COMPOSITION, APPROACH, METHODOLOGY AND SCHEDULE OF THE SOCIAL IMPACT ASSESSMENT

3.1 List of all Team Members with Qualifications

The details of the team members involved in the SIA are given in Annexure III.

3.2 Description and Rationale for the Methodology and Tools Used to collect Information for the Social Impact Assessment

An inclusive and participatory approach through involvement of multiple stakeholders such as elected representatives and project affected people including vulnerable sections such as Scheduled Castes, Scheduled Tribes, women, and those among below poverty line, at appropriate stages of the project.

3.3 Sampling Methodology Used

Qualitative information was gathered along with the field survey through public consultation/Focus Group Discussions (FGDs) with all relevant stakeholders. The public consultation encompassed the project components as well as its socio- economic impacts. The SIA team had preliminary discussions with the key officials of the district administration and gathered information regarding the status of the government procedures, the project area and intensity of the acquisition. The team also made a preliminary site visit with the officials for physical inspection and information dissemination purposes. The existing conditions of land, status of infrastructure/structures, land use pattern and the facilities available to people residing in the project area were analysed.

The quantitative information regarding the families affected by the project was collected through household surveys, in the form of structured questionnaires. The survey was conducted in all the households of the persons affected by the project. The results of the survey provided information pertaining to the demography, socio-economic status and livelihood status of the target community, and formed the basis for development of Social Impact Management Plan.

Centre for Management Development, Thiruvananthapuram 8

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

3.4 Overview of Information/Data Sources Used

The primary data was collected directly from the representatives all affected families through face to face interview. Structured questionnaires were used for collecting the details of the affected people. The results of the survey provided information pertaining to the demography, socio-economic status and livelihood status of the target community

The secondary data was collected from the Requiring Body and the Revenue department. The SIA team had preliminary discussions with the key officials of the district administration and gathered information regarding the status of the government procedures, the project area and intensity of the acquisition.

3.5 Schedule of Consultations with Key Stakeholders

Date Details of Consultation

Collection of documents form January 2020 Land Acquisition office

Meeting with the officials of February 2020 Requiring Body

March 2020 Visit to project area

June 2020 Collection of Primary Data

July 2020 Public Hearing

3.6 Public Hearing

In accordance with the Section 5 of Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, a Public Hearing will be conducted to collect the views and opinions of the people affected by the project. Prior intimation will be given to all the stakeholders regarding the date and venue of the public hearing through advertisements in leading newspapers, individual letters and/or over telephone.

Centre for Management Development, Thiruvananthapuram 9

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

CHAPTER 4

LAND ASSESSMENT

4.1 Description of Land with the help of Maps, Information from Land Inventories and Primary Sources

Government of Kerala (GoK) had accorded administrative sanction to acquire a total area of 313.81 Acres of land in Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in Kannur District for establishing an Industrial Park by KINFRA.

Figure 4.1.1. Site for Establishing Industrial Park

Centre for Management Development, Thiruvananthapuram 10

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

4.2 Entire area of impact under the influence of the project

An extent of 313.81 acres of land from Keezhallur, Pattannur and Koodali Villages of Kannur district is required for the implementation of the proposed project. The land identified for the project of establishing the Industrial Park belongs to around 78 families, within which around 10 residential structures are identified. The area mainly include cashew plantation and left over land after laterite stone mining. The number of houses to be acquired may change once the final plan is prepared.

4.3 Total Land Requirement for the Project

An extent of 313.81 acres of land under survey Nos. 84, 85, 86pt, 1pt, 2pt from Keezhallur Village, survey Nos. 73pt, 72pt, 167, 175, 176pt, 177/1, 3pt, 178pt, 179pt from Pattannur Village and survey Nos. 39pt, 40pt, 143pt, 144, 145, 146, 147, 148, 149, 150, 136pt, 134pt, 133pt, 132, 131pt from Koodali Village in Kannur district is required for the implementation the proposed project.

4.4 Present Use of any Public, Utilized land in the Vicinity of the Project Area

The area is used for cashew plantations and laterite stone mining. No public utilized land is not identified.

4.5 Land (if any) Already Purchased, Alienated, Leased or Acquired, and the intended Use for Each Plot of Land required for the project

Not applicable.

4.6 Quantity and Location of Land Proposed to be Acquired for the Project

An extent of 313.81 acres of land under survey Nos. 84, 85, 86pt, 1pt, 2pt from Keezhallur Village, survey Nos. 73pt, 72pt, 167, 175, 176pt, 177/1, 3pt, 178pt, 179pt from Pattannur Village and survey Nos. 39pt, 40pt, 143pt, 144, 145, 146, 147, 148, 149, 150, 136pt, 134pt, 133pt, 132, 131pt from Koodali Village in Kannur district is required for the implementation the proposed project. The proposed area is situated 7 kms away from Pazhassi dam.

Centre for Management Development, Thiruvananthapuram 11

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

4.7 Nature, Present use and classification of Land and if Agricultural Land, Irrigation Coverage and Cropping Patterns

A major portion of the area to be acquired is rich with Cashew farms. A good portion of the area is the land remaining after mining of Laterite stones. In addition to that trees and other kinds of trees are included in the area. Lion share of the land is classified as thottam, ashirapuncha and sthirapuncha. Even though land is classified as Dry Land, a portion is also identified as nilam.

4.8 Size of Holding, Ownership Pattern, Land Distributions and Number of Residential Houses

The proposed land for acquisition is owned by almost 78 families. 10 residential structures are identified. The number of houses to be acquired may vary in the final plan.

4.9 Land prices and recent changes in ownership, transfer and use of lands over the last 3 years

As per the information received from the respondents, no land transactions were done in the proposed area for the last 3 years.

Centre for Management Development, Thiruvananthapuram 12

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

CHAPTER 5

ESTIMATION AND ENUMERATION OF AFFECTED FAMILIES AND ASSETS

5.1 Estimation of families

a) Families which are directly affected (own land that is proposed to be acquired)

Around 78familieswho have either owned residence (10 residential structures) or land in the area that is proposed to be acquired are directly affected by the project. The families are presently residing there enjoy the benefits of cashew trees and various other variants.

5.2 Family of Scheduled Tribes and other Traditional Forest Dwellers who have lost any of their Forest Rights

Not included in the proposed area.

5.3 Families which depend on Common Property Resources which will be Affected due to Land Acquisition for their Livelihood

No common property resources are affected by this land acquisition.

5.4 Families which have been assigned Land by the State Government for the Central Government Under any of its Schemes and such Land is Under Acquisition

No family within the area been assigned Land by the State Government for the Central Government Under any of its Schemes

5.5 Families which have been Residing on any land in the Urban Areas for Proceeding three years of more prior to the acquisition of land

Not applicable

5.6 Families which have depended on the Land Being Acquired as a Primary Source of Livelihood for three years prior to the acquisition

Majority of the families who will be displaced as part of the proposed land acquisition are relying on the natural resources in the area for their livelihood. They

Centre for Management Development, Thiruvananthapuram 13

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

depend on cashew and other assets for meeting day to day expenses. The loss in these product assets will be a significant impact on the livelihood of the families who will be displaced from the proposed land for the acquisition.

5.6.1 Families which are indirectly impacted by the project (not affected directly by the acquisition of own lands)

As the project aims at creating least possible disruption to the balance of the area, the chances for indirect impact is relatively less.

5.6.2 Inventory of productive assets and significant lands

A large number or cashew trees, coconut trees and other various kinds of trees are included in the land which is proposed to be acquired. The site has the presence of left-over Laterite stone after mining.

Centre for Management Development, Thiruvananthapuram 14

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

CHAPTER 6

SOCIO-ECONOMIC AND CULTURAL PROFILE

6.1 Demographic Details of the Population in the Project Area

A total of around 78 families are directly affected by the proposed land acquisition. This chapter discusses the demographic details of the owners of the properties and their dependents.

a) Age Group of Affected Individuals

Table 6.1.1. Age Group of Affected Individuals

Sl. No. Age Frequency 1 0-18 47 2 19-40 65 3 41-59 47 4 60 and Above 42 5 N/A 36 Total 237

b) Gender of Affected Individuals

Table 6.1.2. Gender of Affected Individuals

Sl. No. Gender Number of Individuals

1 Male 113

2 Female 124

3 TG 00

Total 237

Centre for Management Development, Thiruvananthapuram 15

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

c) Marital Status of the Affected Individuals Table 6.1.3 Marital Status

Sl. No. Marital Status Frequency 1 Married 20 2 Unmarried 49 Widow/ 3 00 Widower 4 N/A 168 Total 237

d) Religious Group

Table 6.1.4 Religious Group

Sl. No. Religion No. of Families 1 Hindu 70 2 Christian 00 3 Muslim 07 4 N/A 01 Total 78

e) Ration Card Type

Sl. No. Ration Card No. of Families 1 APL 56 2 BPL 03 3 N/A 19 Total 78

Centre for Management Development, Thiruvananthapuram 16

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

f) Family Pattern

Sl. No. FamilyPattern No. of Families 1 Nuclear Family 61 2 Joint Family 00 3 N/A 17 Total 78

6.3 Vulnerable Group

Among the total affected family members 47 children are below the age of 18 years and there are 42 members who are aged above 60 years. Also, there 124 female members are affected by the project.

6.4 Land Use and Livelihood

A large number of cashew trees, coconut trees and other various kinds of trees are included in the land which is proposed to be acquired. These productive assets present in the area are a livelihood option for people who live in and around the project area.

6.5 Local Economic Activities

A good portion of the area is the land remaining after mining of Laterite stones. A large number or cashew trees, coconut trees and other various kinds of trees are included in the land which is proposed to be acquired.

6.6 Factors that Contribute to Local Livelihood

The families who own land in the proposed area depends on the cashew trees for livelihood.

6.7 Kinship Patterns and Social and Cultural Organization

Around10 families in the project area needs to be rehabilitated so as to acquire the land for the proposed project. The families in this area have good social and neighbourhood relations.

Centre for Management Development, Thiruvananthapuram 17

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

6.8 Administrative Organization

There are no administrative organisations are present in the vicinity of the project area.

6.9 Political Organization

Properties of any political organizations are not included in the area which is proposed for the acquisition.

6.10 Community Based Civil Society Organization

No such organizations are affected by the proposed the project.

6.11 Regional Dynamics &Historical Change Process

The project aims at improving the industrial facilities of the District thereby increasing the overall development of the State. This will in turn increase the employment opportunities to the populace. Establishment of industrial park can attract more investments in the state thus strengthening the economy as well.The concept of the Industrial Park is to provide a single platform that brings together various infrastructural facilities and industrial assistance from the Government to the public. Therefore, the proposed project will work towards improving the infrastructural facilities made available to the public. No historic change process is identified.

6.12 Quality of the Living Environment

The Quality of the Living Environment is good in the project area with decent livelihood options and transportation facilities with access to amenities such as Schools, Hospitals, Civil Organisations, Social Groups etc.

Centre for Management Development, Thiruvananthapuram 18

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

CHAPTER 7

SOCIAL IMPACT MANAGEMENT

7.1 Approach to Mitigation

The CMD team made use of a combination of two research approaches i.e., quantitative and qualitative, for the identification of various social impact and the mitigation measures. Adoption of a combination of both qualitative and quantitative methodology was indented to obtain a more comprehensive data and more holistic result without excluding any important area of assessment.

7.2 Measures to avoid, mitigate and compensate impact

An extent of 313.81 acres of land from Keezhallur, Pattannur and Koodali Villages of Kannur district is required for the implementation of the proposed project.The land identified for the project of establishing the Industrial Park belongs to around 78 families, within which around 10 residential structures are identified.The lion’s share of the area is rich with Cashew farms. A good portion of the area is the land remaining after mining of Laterite stones. Around 10 families in the project area are using this land for residential purposes. Other families are also getting their income from the proposed project area as they rely on these productive assets as a means of livelihood. However, by considering the following measures the authorities can mitigate and compensate the possible negative impacts of the land acquisition.

 Compensation for the land owners as per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013.  Resettlement and Rehabilitation procedure as per the Policy issued by Revenue(B) Department, Government of Kerala vide G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLARR Act 2013.  Reconstruction of livelihood of people is an important factor in this project. Majority of the directly affected families are relying on the project area for

Centre for Management Development, Thiruvananthapuram 19

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

their livelihood through cashew farm and rubber plantations. The loss of these assets will cause them a significant impact.  The directly affected people should be considered for the job opportunities that will be created by the establishment of the proposed project. Through this, the impact of losing livelihood as a result of land acquisition can be minimised.  The successful rehabilitation of the directly affected families are the other major concern in this land acquisition. The authorities should make sure that the displaced families will get proper rehabilitation.

7.3 Measures that are included in terms of Rehabilitation and Resettlement and Compensation as outlined in the Act

The Rehabilitation and Resettlement package as per the Policy issued by Revenue(B) Department, Government of Kerala vide G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLARR Act 2013 shall be provided to the affected people.

7.4 Measures that the Requiring Body has stated it will introduce in the project proposal

The requiring body has stated that sufficient fund has been reserved as compensation.

7.5 Alterations to project design and additional measures that may be required to address the extend and intensity of impacts across various groups as identified during SIA

The design of these projects is prepared by considering the measures that will reduce the adverse effects of land acquisition to the owners.

7.6 Detailed Mitigation Plan including detailed activities to be carried out for each mitigation strategy, timelines for each mitigation strategy

To mitigate the social impact of the proposed land acquisition, R&R package should be provided to the families as per the Policies issued by Revenue (B)

Centre for Management Development, Thiruvananthapuram 20

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Department, Government of Kerala vide G.O.(MS)No.485/2015/RD dated 23/09/2015 and G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLARR Act 2013.

 Compensation for the land owners as per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013.  Resettlement and Rehabilitation procedure as per the Policy issued by Revenue(B) Department, Government of Kerala vide G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLARR Act 2013.  Reconstruction of livelihood of people is an important factor in this project. Majority of the directly affected families are relying on the project area for their livelihood through cashew farm and rubber plantations. The loss of these assets will cause them a significant impact.  The directly affected people should be considered for the job opportunities that will be created by the establishment of the proposed project. Through this, the impact of losing livelihood as a result of land acquisition can be minimised.  The successful rehabilitation of the directly affected families are the other major concern in this land acquisition. The authorities should make sure that the displaced families will get proper rehabilitation.

7.7 The Social Impact Management Plan indicating which measures the Requiring Body has committed to undertake and those that have been proposed, but not committed to be undertaken by the Requiring Body

The requiring body has stated that sufficient fund has been reserved as compensation.

Centre for Management Development, Thiruvananthapuram 21

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

CHAPTER 8

SOCIAL IMPACT MANAGEMENT PLAN INSTITUTIONAL FRAMEWORK

8.1 Description of institutional structures and key person responsible for each mitigation measures

The Government of Kerala vide G. O. (P) No. 649/2015/RD dated 04/12/2015 had appointed Special Tehsildar (LA), to perform one or more functions of the collector under in the Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation Act (RFCTLARR), 2013 within their area of jurisdiction.

Also vide G. O. (P) M. No. 590/2015/RD dated 11 November 2015, Government of Kerala, in line with the sub-section (1) of section 43 of the Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation Act (RFCTLARR) 2013 and sub-rule (1) of rule 21 of Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (Kerala) Rules, 2015, the Deputy Collector (Land Acquisition) in each district has been appointed as the Administrator for Rehabilitation and Resettlement, for performing the functions under the said act and Rules in respect of involuntary displacement of persons due to requisition of land. The Administrator shall be responsible for the formulation, execution and monitoring of the Rehabilitation and Resettlement scheme in respect of land acquisition.

Vide G. O. (P) M. No. 589/2015/RD dated 11 November 2015, in exercise of the powers conferred by sub-section (1) of section 44 of the Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation Act (RFCTLARR), 2013, the commissioner for Rehabilitation and Resettlement supervising the formulation of Rehabilitation and Resettlement scheme or plans, proper implementation of the same and post implementation of social audit.

Centre for Management Development, Thiruvananthapuram 22

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

8.2 Specify the Role of Non-Governmental Organisation, if any

Rehabilitation is an important factor in this proposed land acquisition plan. Therefore, providing support services of a dependable NGO can help in alleviating the psycho-social impact of the displacement.

8.3 Indicate Capacities Required and Capacity Building Plan, Including Technical Assistance, if any

Not applicable

8.4 Timelines for Each Activity

Proper timeline for each activity should be framed in accordance with the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.

Centre for Management Development, Thiruvananthapuram 23

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

CHAPTER 9

SOCIAL IMPACT MANAGEMENT PLAN BUDGET AND FINANCING OF MITIGATION PLAN

9.1 Costs of all resettlement and rehabilitation costs

The requiring body stated that necessary budget provision exists for meeting the cost of acquisition .

9.2 Annual budget and plan of action

Not Applicable

9.3 Funding sources with break up

Not Applicable

Centre for Management Development, Thiruvananthapuram 24

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

CHAPTER 10

SOCIAL IMPACT MANAGEMENT PLAN MONITORING AND EVALUATION

10.1 Key monitoring and evaluative indicators

Monitoring is a long-term process, which should begin from the starting of the project and should continue throughout the life of the project. Its purpose is to establish benchmarks so that the nature and magnitude of anticipated social impacts can be continually assessed. Monitoring involves the continuous or periodic review to determine the effectiveness of recommended mitigation measures. The types of parameters that can be monitored may include mitigation measures or design features, or actual impacts. All the mitigation measures stated in Chapter 7 should be considered as the indicators for evaluation.

10.2 Reporting mechanisms and monitoring roles

Rehabilitation and Resettlement procedures as stated in the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement act, 2013 will be applicable.

10.3 Plan for independent evaluation

Not applicable

Centre for Management Development, Thiruvananthapuram 25

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

CHAPTER 11

ANALYSIS OF COSTS AND BENEFITS AND RECOMMENDATION ON ACQUISITION

11.1 Final conclusions on:Assessment of public purpose, less displacing alternatives, minimum requirements of land, the nature and intensity of social impacts, and viable mitigation measures and the extent to which mitigation measures will address costs

The Government of Kerala has initiated the construction of Industrial Park by KINFRA under the IDZ scheme in Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in Kannur District. The project aims at improving the industrial facilities of the District thereby increasing the overall development of the State. This will in turn increase the employment opportunities to the populace. Establishment of industrial park can attract more investments in the state thus strengthening the economy as well.

An extent of 313.81 acres of land under survey Nos. 84, 85, 86pt, 1pt, 2pt from Keezhallur Village, survey Nos. 73pt, 72pt, 167, 175, 176pt, 177/1, 3pt, 178pt, 179pt from Pattannur Village and survey Nos. 39pt, 40pt, 143pt, 144, 145, 146, 147, 148, 149, 150, 136pt, 134pt, 133pt, 132, 131pt from Koodali Village in Kannur district is required for the implementation the proposed project. The proposed are is situated 7 kms away from Pazhassi Dam.

The land identified for the project of establishing the Industrial Park belongs to around 78 families, within which around 10 residential structures are identified. The area mainly include cashew plantation and left over land after laterite stone mining. The number of houses to be acquired may change once the final plan is prepared.

The alignment of the proposed project was designed with an effort to reduce the number of people who will be affected with the land acquisition. However, through the proper measures as per RFCTLARR Act 2013 the negative impacts of land acquisition should be mitigated.

Centre for Management Development, Thiruvananthapuram 26

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

11.2 The above analysis will use the equity principle as a framework of analysis for presenting a final recommendation on whether the acquisition should go through or not.

Comparing/weighing the positive against the negative impacts, it can be observed that even though rehabilitation of displaced families and the recreation of livelihood are needs to be provided to the directly affected people, the implementation of the project will result in improving the overall development of Kannur district. The project will attract business ventures and other developments all around the world and further it will create more livelihood opportunities for the local people in the area. The owners of the land are supporting the project and they stated that they have no issues to handover the land if they get proper compensation and rehabilitation.

Thus, it can be concluded that the former outweighs the latter reaffirming the identified site as the most suitable and apt one for the project of establishing the Industrial Park. The families that are affected would require adequate and fair compensation and proper rehabilitation. The area which is considered for acquisition is mainly used for cashew plantation as well as for mining laterite stones. So, the authorities should make proper action plan to reconstruct the livelihood opportunities for the people who solely relied on the project area for livelihood activities. It is observed that many of the negative impacts highlighted can be minimized or reduced with effective and relevant mitigation measures and strategies mentioned. Thus the study recommends the acquisition of land by providing proper compensation to the affected people.

Centre for Management Development, Thiruvananthapuram 27

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

ANNEXURES

i. Details of the land covered in the SIA study

ii. List of key informants contacted and interacted

iii. SIA Team members

iv. Various Government Orders concerning Social Impact Assessment

v. Questionnaires used for survey

vi. Alignment sketches of the proposed project

vii. Details of Affected People

Centre for Management Development, Thiruvananthapuram 28

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

ANNEXURE-I

Details of the Land Covered in the SIA Study

Centre for Management Development, Thiruvananthapuram 29

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 30

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

ANNEXURE-II

List of Key Informants Contacted and Interacted

1. Deputy Collector, L.A, Kannur

2. Special Tehsildar, LA Chalode

3. Keeezhallur Panchayath President

4. Village officers of concerned villages

5. Officials of KINFRA

Centre for Management Development, Thiruvananthapuram 31

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

ANNEXURE-III

SIA Team Members

Sl. No. Name Designation Qualification

1. Dr. G. Suresh Project Director Ph. D.

2. Shri. Riyas K. Basheer Project Coordinator MBA, B.Tech.

3. Dr. S. Remadevi Domain Expert Ph. D.

4.. Shri. Suradh K. Surendran Field Coordinator M. Tech.

5. Shri. Albin M. Field Investigator MBA

6. Shri. Josukutty Kurian Field Investigator MSW

Centre for Management Development, Thiruvananthapuram 32

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

ANNEXURE-IV Various Government Orders Concerning Social Impact Assessment on Land Acquisition

Centre for Management Development, Thiruvananthapuram 33

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 34

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 35

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 36

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 37

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 38

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 39

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 40

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 41

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 42

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 43

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 44

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 45

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 46

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 47

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 48

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 49

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 50

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

ANNEXURE- V Questionnaires used for survey

Centre for Management Development, Thiruvananthapuram 51

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 52

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 53

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 54

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 55

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 56

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Centre for Management Development, Thiruvananthapuram 57

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

ANNEXURE- VI Alignment sketches of the proposed project

Centre for Management Development, Thiruvananthapuram 58

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

ANNEXURE- VII Details of Affected People

Centre for Management Development, Thiruvananthapuram 59

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land ()

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

>നാ絍

വികസിക്കԂ. >The village > will expand.

കൂടകതൽ

>More people Muneeb Manzil 940048412 ആളുകൾക്് 1 1 Therur Nazar P.K Trees No Positive will get a job.

No

APL Therur 4 Land ജ ാലി കിട്ുԂ.

Owned Muslim >There should

Agricultural >കൃതയമായ be proper

Nuclear Family Nuclear

Directly purchased Directly നഷ്ടപരിഹാരԂ compensation. ജവണԂ.

949666860 2 85/1B Keezhallur 0(Sajitha)

>കൃതയമായിട്ു

>There should

ള്ള be proper

Amruthalayam,

Balakrishna നഷ്ടപരിഹാരԂ compensation.

3 173 Pattannur P.O 70 Trees Positive

No

APL n Land കിട്ണԂ. > There needs Kannur Owned

Hereditary to be Agricultural >വികസനԂ Nuclear Family Nuclear development. ജവണԂ.

Pushpa Vilasam

Rohini 944788867 > ആളുകൾക്് >People will

y

4 175/2 Pattannur Koodolipuram ral Trees Positive

No

APL Amma 2 Land ജ ാലി കിട്ുԂ. get a job. Pattannur P.O Owned

Hereditar

Agricultu

Padmanabh 996184668

5 175 Pattannur ral Trees No Positive

No

an Nambiar 6 APL

Hindu

Family

Nuclear Nuclear

Nambiar

Agricultu

>കൃതയമായിട്ു >There should

ള്ള be proper Radhakrish Padinjare 974448272

6 143 Koodali 10 Trees Positive നഷ്ടപരിഹാരԂ compensation.

APL nan parambil 8 Land

Family

Owned

Nuclear Nuclear Directly Directly . >

purchased കിട്ണԂ Agricultural Development. >വികസനԂ

>It is our >ഉപ ീവന means of

Gopalan 944665765 മാർഗമാണ്. livelihood.

7 Thariyil 30 Positive

APL K.V 2 Land >നഷ്ടപരിഹാ >There must

Owned

Directly Directly

purchased be Agricultural രԂ ജവണԂ. compensation.

Centre for Management Development, Thiruvananthapuram 60

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

>

>വികസനԂ 177/3, Pattannur, Sreevalsan 974730383 Development. > 8 Sreenilayam ral Trees No Positive ആളുകൾക്്

APL 40/1 Koodali K.V 5 Land >People will

Hindu

Family

Owned

Nuclear Nuclear

Directly Directly

Agricultu . purchased ജ ാലി കിട്ുԂ get a job.

143/1, 974730383

20

9 Koodali K.Usha Sreenilayam ral

No

APL 145 5 Land

Family

Owned

Nuclear Nuclear

Directly Directly

Agricultu

purchased >നാടിꅍറെ

>For the

വികസനത്തി

development നക Sreesha of place. 10 40/1 Koodali Trees Positive No ജവണ്ടിയാണ്

K.S Land >There must Owned

Hereditary be Agricultural >നഷ്ടപരിഹാ compensation. രԂ ജവണԂ.

974730383 11 143 Koodali Sreedish Sreenilayam 5

> വീടകԂ

>Not interested

സ്ഥലവകԂ

Both Vazhayil 984744895 in losing the 12 85 Keezhallur Vazhayil building No Negative No നഷ്ടറെടകത്താ

APL Janaki 3 Both house and the

Family

Owned

Nuclear Nuclear

Directly Directly building and trees purchased ൻ താല്പരയԂ space.

agricultural

Both land and and Both land residential and residential ഇലല. >വികസനԂ നാടിꅍറെ

ആവശ്യമാണ്. >Development

>നയായമായ is needed . 996184668 >There should 13 167 Pattannur P.R Valsala Koyiloth Trees No Positive 6 No തകԂ be fair and Owned മതിയായതകമാ Hereditary adequate

Agricultural യ compensation. നഷ്ടപരിഹാരԂ കിട്ണԂ.

Centre for Management Development, Thiruvananthapuram 61

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

>ജൊ蕍 ഇലലാത്തതി >There is the

ꅍറെ difficulty of

ബകദ്ധിമകട്ു not having a ഉണ്ട്. road. Therefore, ആയതിനാൽ

have to buy

പദ്ധതിക്് another piece

954420916 Building, സ്ഥലԂ of land in the 146/83, Gokulam 8, Trees and 14 Koodali Lisha No Positive amount of No നൽകകജപാൾ

146/84 Keezhallur 994656522 APL water

Hindu Owned compensation 9 resources കിട്ുന്ന it receives Nuclear Family Nuclear നഷ്ടപരിഹാര

Directly purchased Directly when giving

Both land and building and Both land തകക റകാണ്ട് the project മററാരക സ്ഥലԂ space.

Both residential and agricultural and Both residential വാങ്ങണԂ. >Should get > reasonable നയായമായ compensation. നഷ്ടപരിഹാരԂ കിട്ണԂ.

>നാ絍 >The village

വികസിക്കԂ. will developed. Radhakrish Padinjare 974448272 15 143 Koodali Trees Positive >കൃതയമായ >Need to get

APL nan O.K parambil 8 Land

Family

Owned

Nuclear Nuclear Directly Directly fair purchased നഷ്ടപരിഹാരԂ Agricultural compensation. കിട്ണԂ. >നാ絍 >The village

Cherikkal

വികസിക്കԂ.

Both Tree will developed.

House, 944773177

16 40/152 Koodali Vinod P 6 and water No Positive > >Need to get No കൃതയമായ

APL Muttannur, 4 Land

Barren

Family

Owned

Nuclear Nuclear Directly Directly resources fair Pattannur P.O purchased നഷ്ടപരിഹാരԂ compensation. കിട്ണԂ.

>നാ絍 >The village

വികസിക്കԂ.

Souparnika, will developed. Prabhakara 949537507 17 40 Koodali Harippanur, Trees No Positive > >Need to get No കൃതയമായ

APL n C.V 7 Land

Family

Owned Norora P.O Nuclear നഷ്ടപരിഹാരԂ fair

Hereditary Agricultural compensation. കിട്ണԂ.

Centre for Management Development, Thiruvananthapuram 62

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

>നാ絍

>The village

വികസിക്കԂ. will developed.

Rahul Nivas, both road >ആളുകൾക്് >People will

944677079 . 18 143 Koodali Rahul Edayannur, 50 facility and No Positive get a job. No ജ ാലി കിട്ുԂ

APL 9 Land

Hindu Edayannur P.O Owned tree >കൃതയമായ >Need to get

Hereditary Agricultural fair

Nuclear Family Nuclear നഷ്ടപരിഹാരԂ compensation. കിട്ണԂ.

Krishnakripa Both Tree

Sarojini 996150013

y

50

19 150 Koodali Kolappa ral and water No Positive

No

APL OM 1 Land

Hindu

Family

Owned

Pattannur P.O Nuclear resources

Hereditar

Agricultu

>നാ絍

>The village

പകജരാഗമി

K.V will developed. Pragathi, 996184668 ക്കԂ

13 175/1 Pattannur Padmanabh 15 Trees Positive >Need to get

No

Koodolipram 6 Land > Hindu നയായമായ

Owned

an Directly fair

purchased

Agricultural നഷ്ടപരിഹാരԂ compensation. കിട്ണԂ. >നാടിനക പകജരാഗതി

>The village . ഉണ്ടാവകԂ may make >റതാഴിലവസ progress. 974431557 21 175/1 Pattannur Narayani Thoduvayil Positive >Jobs will be 3 രങ്ങൾ സൃഷ്ടിക്റെ created. >Sufficient

Nuclear Family Nuclear . > ടകԂ മതിയായ compensation നഷ്ടപരിഹാരԂ ജവണԂ.

974431557

y

21 175 Pattannur Ashokan Thoduvayil ral Trees Positive

Yes

APL 3 Land

Family

Owned

Nuclear Nuclear

Hereditar

Agricultu

Sreesyas 994782451 >നാടിꅍറെ

23 175 Pattannur K. Usha y Positive >Development Nayattupara 7 വികസനԂ

Family

Owned

Nuclear Nuclear

Hereditar

Centre for Management Development, Thiruvananthapuram 63

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

>ജരാഗിയായ

മകൻ വീട്ിൽ >The sick son

918877451 Building, ഉണ്ട്. is at home. Padminiya 3, trees and 24 84 Keezhallur Kunnil Yes Negative > >Not interested mma 954452869 water വീ絍 വിട്ു

Hindu

Owned building ജപാകാൻ in leaving the 3 Hereditary resources

agricultural

Both land and and Both land house. താല്പരയԂ Both residential and and Both residential ഇലല.

>നയായമായ >Need to get

K.K. Remya, 949618949

y

25 167-B-2 ral Trees No Positive fair No നഷ്ടപരിഹാരԂ

Sumathi Nayattupara 5 Land

Family

Owned

Nuclear Nuclear compensation.

Hereditar Agricultu കിട്ണԂ.

> റപറട്ന്ന് >The project Thiruvonam,

തറന്ന പദ്ധതി should be

26 137/3 Ashok Lions Club road, l Trees Positive

No

Land നടെിലാക് implemented Mattannur Owned

Hereditary immediately. Agricultura ണԂ. >വികസനԂ വരകന്നതിൽ

എന്ത്

>It is not

പ്പശ്നമാണ് water known what

ഉണ്ടാകകന്നത്

Gopanam, resources, problems the 956200286 27 40/1A Koodali Prasanthan Muttannur, trees and . development. No എന്നെിയിലല

0 APL Pattannur P.O Owned road അതിനാൽ >So neither

Hereditary Agricultural facility favor nor Nuclear Family Nuclear അനകകൂലിക്ക disagree.

Both land and building and Both land ന്നകമിലല പ്പതികൂലിക്ക ന്നകമിലല.

Centre for Management Development, Thiruvananthapuram 64

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

>നിലവിൽ താമസിക്കന്ന സ്ഥലത്തക >We have to

നിന്നകԂ മററാരക move from one

സ്ഥലജത്തക്് house to

ജപാകണԂ. another.

pulanootu water > It is 950205493 > വികസനԂ 28 147 Koodali Gopalan house, resources Positive impossible to

No 4 APL റകാണ്ട് muttannur Owned and trees say what

Hereditary Agricultural നങ്ങൾക്് benefits people

Nuclear Family Nuclear എന്ത് ഗകണԂ will derive Both land and building and Both land from കിട്ുറമന്ന് development. ഇജൊൾ പെയാൻ സാധിക്ിലല.

>നാ絍

O.M. >The village

Meenakshi പകജരാഗമി water will developed. 150/3, yamma Vaduvilaan 949729619 ക്കԂ 29 Koodali resources Positive >Need to get

150/1 (Late)(Lalit veedu 6 Land >നയായമായ Owned and trees fair

ha, Usha, Hereditary Agricultural നഷ്ടപരിഹാരԂ compensation. Sheela) Family Nuclear കിട്ണԂ.

water

84/4, Gopalan resources,

land land 85/101, Keezhallur, Kariyil House, 944665765

30 Vazhakkali l trees and Positive

No

and and

APL 131/108, Koodali Idayannur P.O 2 Both

Family

Owned

directly directly

Nuclear Nuclear

l building road

Both 85/4A hereditary purchased Agricultura facility

M

y

31 167/2 Pattannur Kodakkatteri 974764355 ral No Positive

No

APL Sivadasan Land

Family

Owned

Nuclear Nuclear

Hereditar

Agricultu

Abdu Ruz House 944732864 Trees,Road

32 143/202 Koodali Rehman T ral No Positive >hnI-k\w >Development

No

APL Theroor 5 Land facilities

Family

Owned

Nuclear Nuclear

K Directly

Agricultu

purchased >നാ絍

Building, >The village

വികസിക്കԂ.

S S Manzil water will developed. V K 33 143 Koodali Therur resources, No Positive > >Need to get No കൃതയമായ

Musthafa APL

Family

Owned

Nuclear Nuclear

Directly Directly

building P O Edayannur 30 years Road fair

Industrial purchased നഷ്ടപരിഹാരԂ

Both land and and Both land Facilities compensation. കിട്ണԂ.

Centre for Management Development, Thiruvananthapuram 65

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

>നയായമായ

>Need to get Vasanthi/S Abhilash 808601122

34 143 Koodali ral Trees No Positive fair No നഷ്ടപരിഹാരԂ

and

Both arojini Tehroor 1 Land

Owned directly directly compensation.

Agricultu .

hereditary hereditary purchased കിട്ണԂ

Naz Villa Nazeela 963359497 Trees,Road

35 2/135, 2/1 Keezhallur Peroor ral No Positive

No

APL Chandroth 2 Land facilities

Family

Owned

Muslim

Nuclear Nuclear

P O Edayannur Directly

Agricultu

purchased

Building,Tr >സ്ഥലԂ

ees,Water >Due to the

ഏററടകക്കന്ന

Kokali Karyail Resources , acquisition of 989532053 ത് മൂലԂ മാെി 36 143/A Koodali Sreelesh House Compound No Negative place,

No

6 APL Hindu താമസിക്കന്ന

Owned

Muttannur building Wall relocation is

Building , Building

Hereditary Agriculture

Both land and and Both land Road ത് difficult.

Nuclear Family Nuclear Facilities ബകദ്ധിമകട്ാണ്. >പ്പായԂ കൂടിയ അവസരത്തില് മാെി താമസിക്കവാ >They do not want to move

ꅍ away when

താത്പരയമിലല. they are in old >വീ絍 age. Building,Tr

989532053 >Be clear on

ഏടകക്കന്നക

ees,Water Damodaara Kottiyath 6 whether you 37 40/14,143 Koodali Resources , No Negative No ജണ്ടാ എന്ന

n Edayannur 994799053 APL are taking the

Hindu Owned Road കാരയത്തില് 6 Hereditary house. Facilities Nuclear Family Nuclear വയക്തത >The

Building , Agriculture Building remaining one Both land and building and Both land വരകത്തണԂ. > acres should be ആറകയകള്ള removed from രണ്ട് two acre. ഏക്െില് നിന്ന് ഒജരക്셍 ഒഴിവാക്ിത്ത രണԂ.

149,132/1 P N Sree Bhavaan >സാപത്തികԂ. >Financial.

,145/2,13 0490

y >

38 Koodali Rahiniyam Kanad ral Trees No Positive >Should be No നഷ്ടപരിഹാ

4/9,134/1 2484584 Land

Family

Owned

ma Edayannur Nuclear compensated.

Hereditar . 1 Agricultu രԂ കിട്ണԂ

Centre for Management Development, Thiruvananthapuram 66

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

>സ്ഥലԂ

നഷ്ടറെടകന്നക >There is loss

ണ്ട്. of space.

Building,Tr >നഷ്ടപരിഹാ >Should be ees,Water

building compensated.

. Thiruvathira Resources , രԂ കിട്ണԂ Rama 944793780 >Agriculture is 39 40-1-A Koodali Mudannur Compound No Negative >കൃഷിയാണ്

Yes Krishnan 9 APL the means of Pattannur Owned Wall ഉപ ീവന Hereditary livelihood. Road Nuclear Family Nuclear . >That are lost Facilities മാ셍ഗ്ഗԂ when place is Both land and and Both land >സ്ഥലജമററടക taken over. Residencial House, Agriculture House, Residencial ക്കജപാള് അത് നഷ്ടറെടകന്നക. >ഏററടകക്കന്ന

സ്ഥലത്തിꅍ

>There should

മതിയായ Trees,Wate be adequate

Souparnika, r നഷ്ടപരിഹാരԂ compensation E K 960505702 40 40 1A Koodali Muttannur Resources, Positive കിട്ണԂ. for the land

Yes Santhosh 0 APL Pattannur Owned Road >ഗകണങ്ങറളാ acquired.

Hereditary Agricultural Facilities >No benefits

Nuclear Family Nuclear ന്നകԂ are expected.

Both land and building and Both land പ്പതിക്ഷിക്ക ന്നിലല. >നയായമായ

>Need to get

നഷ്ടപരിഹാരԂ

fair കിട്ണԂ. compensation.

E K Krishnapuram 949743309 >ഏററടകക്കന്ന >There should 41 40 1 A Koodali Kamaleksh Pattannur P O Trees Positive

No

50 +

APL 7 Land സ്ഥലത്തിꅍ be adequate mi Kannur Owned compensation Barren Land Barren മതിയായ Nuclear Family Nuclear for the land Directly purchased Directly നഷ്ടപരിഹാരԂ acquired. കിട്ണԂ.

>നാ絍 >The village

വികസിക്കԂ.

will developed. Vilangeri Vilangeri 42 167 Pattannur Trees No Positive > >Need to get Omana Kallumma Chal No കൃതയമായ

Owned building നഷ്ടപരിഹാരԂ fair

Hereditary

Agricultural

Both land and and Both land compensation. കിട്ണԂ.

Centre for Management Development, Thiruvananthapuram 67

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

Building,Tr

ees,Water

Vilangeri Vilangeri 984710587 Resources , 43 167 Pattannur

Yes Santa Kallumma Chal 9 APL Animals

House, House,

Family

Owned

Nuclear Nuclear

building

Hereditary Road

Agriculture

Residencial Residencial Both land and and Both land Facilities >വയവസായԂ >The industry

വളരകԂ.

will grow. > നാടിꅍ >The villaage

Thankaman Rayaroth House 994778487 ഗകണകരമാ will be 44 167/112 Pattannur Trees Positive

No

APL i Elampara 2 Land വകԂ. beneficial.

Owned

Hereditary >There should Agricultural >നഷ്ട Nuclear Family Nuclear be പരിഹാരԂ compensation. ജവണԂ.

>നാ絍 >The village

വികസിക്കԂ. will developed. Saraswathi Darsana 994782451 45 167/125 Pattannur Trees Positive >കൃതയമായ >Need to get

K K Mattannur 7 APL

Family

Owned Nuclear Nuclear നഷ്ടപരിഹാരԂ fair

Hereditary Agricultural compensation. കിട്ണԂ.

>കൃതയമായ

Karakkattu >Need to get

Kunji 994783227

y 10

46 133/4 Koodali House ral Trees No Positive fair No നഷ്ടപരിഹാരԂ

APL Raman 3 Land

Kanjirode Owned compensation.

Hereditar Agricultu കിട്ണԂ. >നാടിꅍറെ വികസനԂ. >Development

>ഏററടകക്കന്ന of the village.

സ്ഥലത്തിꅍ >There should

be adequate K K Kunji Kokkolikunnu 944665145 മതിയായ 47 40 1 A Koodali Trees Positive compensation

APL Kannan Muttannur 9 Land നഷ്ടപരിഹാരԂ Owned for the land Hereditary കിട്ണԂ. acquired.

Nuclear Family Nuclear >ഇജേഹԂ >He died last month. കഴിഞ്ഞ മാസԂ മരണറെട്ു.

Building,Tr

954478636 Soumayalayam ees,Water Nalabrath 4 48 40/1A Koodali Muttannur Resources , No

No

and Narayani 854728473 APL

House, House,

Family

Owned

Nuclear Nuclear

P O Pattannur building Road

Both land Both land

3 Hereditary

Agriculture Residencial Residencial Facilities

Centre for Management Development, Thiruvananthapuram 68

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

Muttannur, Pets and

49 40 A1 Koodali Kumaran ral

and Pattannur APL trees

Family

Owned

Nuclear Nuclear

Directly Directly

building

Agricultu

Both land Both land

purchased

>യകവാക്ൾക്് റതാഴിൽ >Young people should get

കിട്ണԂ.

employment. > നാ絍 > The village

Sindhu, Sindhu Nivas, trees and 952625375 വയാവസായി should 50 41-1 Koodali Bindhu, Muttannur, road No Positive

No

APL 6 Land ക മായി develope Beena Pannannur Owned facility

Hereditary industrially. Agricultural വളരണԂ. Nuclear Family Nuclear >There should >കൃതയമായ be നഷ്ടപരിഹാരԂ compensation. കിട്ണԂ.

>ജവറെ ഭൂമി

ലഭിക്കകയാ >If there is

റണങ്കിൽ another land

Trees and available it is K.C. Devaki Nivas, 701241141 അനകകൂലമാ

51 147, 136 Koodali 50 water Positive favorable. Varijakshi Muttannur 2 APL ണ്. Owned resources > The house

Hereditary agricultural > വീ絍 ഒററെട് should not be Nuclear Family Nuclear isolated. Both residential and and Both residential നിലയിൽ

Both land and building and Both land ആകരകത്. >കണ്ണൂരിꅍറെ

വികസനԂ >Development

ആവശ്യമാണ്. of Kannur is

> വീടകԂ required.

> Acquire all

സ്ഥലവകമകൾെ Gopalan, Pullanjottu, the land, 52 145 Koodali Positive റട മകഴകവൻ

Bhaskaran Muttannur APL including the

Hindu Owned ഭൂമിയകԂ Hereditary house and the

Agricultural

Nuclear Family Nuclear ഏററടകത്തക land, and pay proper Both land and building and Both land കൃതയമായ compensation. നഷ്ടപരിഹാരԂ തരണԂ.

Centre for Management Development, Thiruvananthapuram 69

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

>നാ絍 വികസിക്കԂ. >മാനയമായ നഷ്ടപരിഹാരԂ >The village . will develop. >ഉപ ീവന >Fair compensation. മാർഗത്തിനക >Show Building, ജവറെ വഴി another way of trees, water കാണിച്ചു Sreekrishna livelihood for

resources, .

Nilayam, 770603006 agricultural and തരണԂ us.

53 40-1, 143 Koodali Jindhu 30 compound No Positive

No Muttannur 0 APL >ടാെിങ്ങിനക >Tapping has Owned wall, pets Pattannur aged rubber. and road പ്പായമായ Nuclear Family Nuclear >There has

Directly purchased Directly facility . െബ്ബർ ഉണ്ട് been a lot of

Both land and building and Both land >ഒരകപാ絍 investment.

Both residential മകതൽമകടക്് >we live only ഉണ്ടായിട്ുണ്ട്. depending on the agriculture. >കൃഷിറയ മാപ്തԂ ആപ്ശ്യിച്ചാണ് ീവിക്കന്നത്. >യകവാക്ള്ക്് റതാഴില് കിട്ുԂ. >Youths get >നാടിꅍറെ jobs. >The village

വയവസായԂ

industry will . വളരകԂ grow.

U K Parambal 952625375 > വികസനԂ >Development 54 41-1 Koodali Trees No Positive

No

APL Vasanthi Muttannur 6 Land നടക്കԂ. will take place.

Owned

Hereditary >Have to find Agricultural >മററാരക Nuclear Family Nuclear a way to buy a സ്ഥലത്ത് place like this ഇതകജപാറല in another യകള്ള സ്ഥലԂ place. വാങ്ങാനകള്ള വഴി കിട്ണԂ.

Centre for Management Development, Thiruvananthapuram 70

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

>നഷ്ട

പരിഹാരԂ >Be sure to

compensate.

Kudakattori ഉെൊക്കക. Ramachand 963320729 >Cultivate 55 167 Pattannur Veedu Trees No Positive > No റതങ്ങിꅍറെ

APL ran ( Girija) 6 Land coconut trees Kunnoth Owned വരകമാനԂ Hereditary lives on its

Agricultural

Nuclear Family Nuclear റകാണ്ടാണ് income. ീവിക്കന്നത്.

>കൃതയമായ >Need to get

1/295, Rasheeda T Gaseera Manzil 974664662

y 20

56 Keezhallur ral Trees Positive fair No നഷ്ടപരിഹാരԂ

2/106 K Mattannur Court 6 Land

Owned compensation.

Hereditar Agricultu കിട്ണԂ.

>നയായമായ

>Need to get 134, Ramesan P Alanjattil 974723108

57 Koodali ral Trees No Positive fair No നഷ്ടപരിഹാരԂ

and

131,143 K Muttannur 0 Both

directly directly compensation.

Agricultu .

hereditary hereditary purchased കിട്ണԂ

>നയായമായ

Krishna Vihar Trees, >Need to get

Ramesan T

y

58 143 Koodali Muttannur 944321570 ral Water Positive fair No നഷ്ടപരിഹാരԂ

V Land

Family

Owned

Pattannur P O Nuclear Resources compensation.

Hereditar Agricultu കിട്ണԂ.

> Ammainathil നയായമായ >Need to get

974489297

y

59 1 Keezhallur Sreeshan House ral Trees Positive fair No നഷ്ടപരിഹാരԂ

70+

APL 8 Land

Family

Owned

Edayannur P O Nuclear compensation.

Hereditar Agricultu കിട്ണԂ. >വികസനԂ. >കൃതയസമയ >Development.

ത്ത് റപറട്ന്ന് > Ensure quick

Building, compensation

Sakeena Manzil നഷ്ട

974774150 Trees, on time.

60 149/2 Koodali Riyas T K Thoroor 30 Positive No പരിഹാരԂ

APL

2 Land compound >The farm is

Owned Odayannur Muslim ഉെൊക്കക. Hereditary wall, land.

Agricultural

Nuclear Family Nuclear >കൃഷിഭൂമിയാ >Is the source ണ്. വരകമാന of income. മാ셍ഗ്ഗമാണ്.

Trees,

Puthiya Valappil

Umaira Compound

House 944667269

l

61 143 Koodali Puthiya 20 Wall, No Positive

No

APL 8 Land

Family

Owned

Muslim

Nuclear Nuclear

Valappil Directly Tower-

P O Edayannur purchased Agricultura KSEB

Centre for Management Development, Thiruvananthapuram 71

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

Building, > വീ絍 >In favor of

Trees,

ഒഴിവാക്ി

exept the Kunji 828132653 Water 62 39/2 Koodali Hill View No Positive house and No സ്ഥലജമററടക

30 + Raman 4 APL resources,

Family

Owned

Nuclear Nuclear

Directly Directly building acquiring the

Building , Building purchased and road ക്കന്നതിꅍ

Agriculture

Both land and and Both land land. facility അനകകൂലԂ. >കൃതയമായ നഷ്ടപരിഹാരԂ . >പാ셍െിടԂ >Exact

ഉണ്ടാക്കവാ compensation. നകԂ,

>Land

അതകജപാറല

purchased for

Manoj, 949574421

63 39 Koodali 5 Positive residential No വാണി യാവ

Beena 1 Land

Owned purposes , as

Industrial ശ്യങ്ങള്ക്് well as for ഉപജയാഗിക്ാ

Directly purchased Directly commercial നകԂ ജവണ്ടി use. Kinfra. വാങ്ങിയ ഭൂമിയാണ്. കിꅍപ്ര.

Mariyottil Trees,

Kunji 994783227

y

64 133/4 Koodali House ral Road Positive

APL Raman 3 Land

Hindu

Family

Owned

Muttannur P O Nuclear Facilities

Hereditar

Agricultu

>നിലവില് സ്ഥലԂ

കാരയമായി >The space is

not currently Puthen Purayil 860675239 ഉപജയാഗറെ 65 143 Koodali P P Gouri Trees No Positive being used.

No

Muttannur 1 Land ടകന്നിലല. Owned >Accurate

Hereditary Agricultural >കൃതയമായ compensation. നഷ്ട പരിഹാരԂ.

>നാ絍 >The village

Misham Nivas

വികസിക്കԂ.

will developed. Kanjiramkari 994616304 66 143 Koodali Prasanna Trees No Positive > >Need to get No കൃതയമായ

APL Vezhiyamba 9 Land

Family Nuclear Nuclear നഷ്ടപരിഹാരԂ fair P R Nagar Hereditary Agricultural compensation. കിട്ണԂ.

Centre for Management Development, Thiruvananthapuram 72

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

Building,

Trees,

Thattanvalappil 904879599 Water 67 133 Koodali Manoj

No

APL Muttannur 1 Land resources,

Hindu

Owned

Hereditary Road Agricultural Facilities

Mariyottil Trees,

974415129

y

68 133/4 Koodali V Narayani House ral Road No Positive

No

BPL 0 Land

Hindu

Family

Owned

Muttannur P O Nuclear Facilities

Hereditar

Agricultu Building,

and and

143,40/1 Trees, >ജപാസിറീവ്. >Positive.

A, Rameshan 944665823 Water > 69 Koodali Jyothish House 20 No Positive >Development No വികസനԂ

136/115,1 K P 0 APL resources,

Hindu

Family

Owned

Nuclear Nuclear building . is needed. Building , Building ആവശ്യമാണ് 48/116 Hereditary Road

Agriculture Both land Both land Facilities >വീജടാടക കൂടി സ്ഥലജമററടക

ക്ാꅍ >It is a

സജന്താഷമാണ്. pleasure to >നിലവിലകള്ള take the place water

and home.

വീട്ിജലക്്

147/109, Devaki Nivas, resources, Varijakshi 964556139 > It is difficult 70 136/6,147 Koodali Muttannur trees and No Positive No വഴി

K C 2 APL to find a way

Hindu /113 Idayannur P O Owned road സൗകരയമിലലാ Hereditary to existing facility Nuclear Family Nuclear ത്തത് home. >And therefore Both land and building and Both land ബകദ്ധിമകട്ാണ്. > favorable. Residencial House, Agriculture House, Residencial അതിനാല് അനകകൂലമാ ണ്. >മറുള്ളവ셍 ക്ക വീടിനക ജവണ്ടി > It is a place

that others

കരകതിയ C O have reserved

സ്ഥലമാണ്.

C O Radhakrishnan Trees, for home. 940048418 71 136/3 Koodali Ammalu Sree Ragam Road No Positive > > Expect No പദ്ധതിക്്

APL 3 Land Amma Muttannur Owned Facilities എടകത്താല് reasonable

Hereditary Edayannur. P O Agricultural compensation

Nuclear Family Nuclear നയായമായ if taken to the നഷ്ടപരിഹാരԂ project. പ്പതീക്ഷിക്ക ന്നക.

Centre for Management Development, Thiruvananthapuram 73

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

Ottappurayil Suresh 974799757 Road 72 143 Koodali Muttannur Positive

and

10 + Babu 7 BPL facilities

Family

Owned

Nuclear Nuclear

Directly Directly Pattannur building

Building

al House

Both land Both land

Residenci

purchased

Chandroth 996178439

Building, Moonnuparamb 1 73 143 Koodali Nisha T M Road No

No

20 +

BPL ath 918872915 Land

Hindu

Family

Owned

Nuclear Nuclear

Directly Directly

l House Facilities

purchased

Muttannur 6 Residencia >കൃഷിയകԂ

ഭൂമിയകԂ >The

നഷ്ടറെടകന്നതി equivalent of 134/156,1

ꅍ the loss of 36/158,13 Building, തത്തകലയമായി agriculture and 4/157,143 Trees, Sree Nilayam land - the land /153,143/ V K 944677055 Water ഭൂമിയകԂ മറുԂ 74 Koodali Muttannur No Positive will not be

No 151, Manoharan 4 APL resources, ലഭിക്ിലലജലലാ. Patttannur Owned available.

143/152,1 Hereditary Road >സ്ഥലവകԂ >Get rid of the 47/106,14 Family Nuclear Facilities place and the 7/159 വീടകԂ Both land and building and Both land house and take ഒഴിവാക്ി action. Residencial House, Agriculture House, Residencial നടപടി സവീകരിക്കക.

>വീ絍 Building, >we are

ഒഴിവാക്ി

Subhash Trees, supporting the

C M Sadanam 974479634 Water സ്ഥലԂ acquiring the

75 40 14 Koodali Bhaskaran 50 No Positive

No

Muttannur 4 APL resources, land away

Hindu

House, House, ഏററടകക്കന്ന

Owned

Directly Directly

Nair building

P O Pattannur purchased Road from except

Agriculture Residencial Residencial

Both land and and Both land തിꅍ Nuclear Family Nuclear Facilities the house . അനകകൂലԂ.

>വികസനԂ. Building, > >Development. മറ് വീ絍

735606423 Trees, >To build K K നി셍മ്മിക്ാനാ Anjali, 0 Water other house 76 143,40/14 Koodali Narayanan Yes Positive

land and and land No വശ്യമായി

Muttannur 949575423 APL resources, needs to be

Hindu

Owned

Nair building 0 Road നഷ്ട compensated

Agriculture

Both Nuclear Family Nuclear Facilities പരിഹാരԂ for.

Directly purchased Directly

Residencial House, House, Residencial തരണԂ.

>വികസനԂ

Vadakkendathu Trees, >The Village

949646347

y

77 143, 143 Koodali O N Rajan Muttannur ral Road No Positive needs No വിജലല ിꅍ

APL 4 Land

Hindu

Family

Owned

edayannur Nuclear Facilities development.

Hereditar Agricultu ആവശ്യമാണ്.

Centre for Management Development, Thiruvananthapuram 74

SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)

Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions

No. No. Loan on land (Malayalam)

nature

r Type of plot project

Religion

Category

APL/BPL

Ownership Ownership

Family Type

Usage of land

Nature of land

Years of Usage

Sree

>നഷ്ട

T K Venu Chaithanyam 994766622 >Need fair

78 143/41 Koodali al Trees No Positive പരിഹാരԂ

APL

Gopalan Kodolipram 0 (Yes compansation.

Family

Owned Nuclear Nuclear .

Agricultur തരണԂ

Hereditary

Pattannur loan) Bank

Centre for Management Development, Thiruvananthapuram 75