SOCIAL IMPACT ASSESSMENT OF LAND ACQUISITION FOR ESTABLISHING INDUSTRIAL PARK BY KINFRA (Koodali, Pattannur and Keezhallur Villages – 313.81 Acres)
DRAFT REPORT JUNE 2020
Centre for Management Development Thiruvananthapuram
CONTENTS
CHAPTER 1 -EXECUTIVE SUMMARY ...... 01
CHAPTER 2 -DETAILED PROJECT DESCRIPTION ...... 04
CHAPTER 3 -TEAM COMPOSITIONAPPROACH, METHODOLOGY AND SCHEDULE OF THE SOCIAL IMPACT ASSESSMENT...... 08
CHAPTER 4 – LAND ASSESSMENT ...... 10
CHAPTER 5 -ESTIMATION AND ENUMERATION (WHERE REQUIRED) OF AFFECTED FAMILIES AND ASSETS ...... 13
CHAPTER 6 –SOCIAL ECONOMIC AND CULTURAL PROFILE (AFFECTED AREA AND RESETTLEMENT SITE)...... 15
CHAPTER 7 - SOCIAL IMPACT MANAGEMENT ...... 19
CHAPTER 8 –SOCIAL IMPACT MANAGEMENT PLAN INSTITUTIONAL FRAMEWORK...... 22
CHAPTER 9 - SOCIAL IMPACT MANAGEMENT PLAN BUDGET
AND FINANCING OF MITIGATION PLAN...... 24
CHAPTER 10 - SOCIAL IMPACT MANAGEMENT PLAN MONITORING AND EVALUATION...... 25
CHAPTER 11 - ANALYSIS OF COSTS AND BENEFITS AND RECOMMENDATION ON ACQUISITION...... 26
ANNEXURES ...... 28 SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
CHAPTER 1
EXECUTIVE SUMMARY
1.1 Project and public purpose The proposed project is intended to establish an Industrial Park by KINFRA under the IDZ scheme in Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in Kannur District. The project aims at improving the industrial facilities of the District thereby increasing the overall development of the State. This will in turn increase the employment opportunities to the populace. Establishment of industrial park can attract more investments in the state thus strengthening the economy as well.
1.2 Location
Government of Kerala had accorded administrative sanction vide to acquire a total area of 313.81 Acres of land from Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in Kannur District for establishing an Industrial Park by KINFRA.
1.3. Size and attributes of land acquisition
An extent of 313.81 acres of land under survey Nos. 84, 85, 86pt, 1pt, 2pt from Keezhallur Village, survey Nos. 73pt, 72pt, 167, 175, 176pt, 177/1, 3pt, 178pt, 179pt from Pattannur Village and survey Nos. 39pt, 40pt, 143pt, 144, 145, 146, 147, 148, 149, 150, 136pt, 134pt, 133pt, 132, 131pt from Koodali Village in Kannur district is required for the implementation the proposed project. The proposed are is situated 7 kms away from Pazhassi Dam.
The land identified for the project of establishing the Industrial Park belongs to around 78 families, within which around 10 residential structures are identified. The area mainly include cashew plantation and left over land after laterite stone mining. The number of houses to be acquired may change once the final plan is prepared.
Centre for Management Development, Thiruvananthapuram 1
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
1.4 Alternatives considered
The project is intended for developing various infrastructural and business ventures near to the Kannur International Airport. The implementation of the Industrial park can cater the development of the area. As the project is intended to improve infrastructure facilities near to the airport, no other alternatives are considered.
1.5 Social impacts
The land identified for the project of establishing the Industrial Park belongs to around 78families, within which around 10 residential structures are identified. The lion’s share of the area is rich with Cashew farms. A good portion of the area is the land remaining after mining of Laterite stones. The project area is around 28km away from District Collectorate and is bordered by the Pazhassi Dam constructed on the Irrikkur River to the south. The number of houses to be acquired may change once the final plan is prepared.
1.6 Mitigation measures
The land identified for the project of establishing the Industrial Park belongs to around 78 families, within which around 10 residential structures are identified. The area mainly include cashew plantation and left over land after laterite stone mining. The number of houses to be acquired may change once the final plan is prepared.
However, by considering the following measures the authorities can mitigate and compensate the possible negative impacts of the land acquisition.
Compensation for the land owners as per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013. Resettlement and Rehabilitation procedure as per the Policy issued by Revenue(B) Department, Government of Kerala vide G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLARR Act 2013.
Centre for Management Development, Thiruvananthapuram 2
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Reconstruction of livelihood of people is an important factor in this project. Majority of the directly affected families are relying on the project area for their livelihood through cashew farm and rubber plantations. The loss of these assets will cause them a significant impact. The directly affected people should be considered for the job opportunities that will be created by the establishment of the proposed project. Through this, the impact of losing livelihood as a result of land acquisition can be minimised. The successful rehabilitation of the directly affected families are the other major concern in this land acquisition. The authorities should make sure that the displaced families will get proper rehabilitation.
Centre for Management Development, Thiruvananthapuram 3
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
CHAPTER 2
DETAILED PROJECT DESCRIPTION
2.1 Background of the Project including Developer’s Background and Governance/Management structure
As part of the decision to establish an Industrial Park for KINFRA, Government of Kerala (GoK) had accorded administrative to acquire a total area of 313.81 Acres of land from Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in Kannur District for establishing an Industrial Park by KINFRA. The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (RFCTLARR) Act 2013, enacted by the Government of India, has mandated the conduct of Social Impact Assessment study prior to the land acquisition. Government of Kerala had accorded sanction vide G.O.(P) No.53/2019/RD dated 28/08/2019 to Centre for Management Development, Thiruvananthapuram to conduct SIA in this regard and to prepare a Social Impact Management Plan for the same. The entire project is designed to involve and integrate the local community in all intended developmental initiatives. The concept of the Industrial Park is to provide a single platform that brings together various infrastructural facilities and industrial assistance from the Government to the public. The project would take an environment friendly approach by conserving energy and making use of alternate technologies.
The land in Kannur district which has been proposed for the Industrial Park could be acquired due to the following reasons:
The number of stakeholders in the proposed project site is very few. Lion share of the proposed project site include cashew plantations and land remaining after laterite stone mining. Only 10 families need to be rehabilitated. The final number of families to be rehabilitated may be even less when the final pan is completed. Houses near the border may be excluded while preparing the final plan for the proposed project site.
Centre for Management Development, Thiruvananthapuram 4
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
A stone crusher plant is also situated in the proposed project site. If needed this can also be excluded.
2.2 Rationale for Project, including how the project fits the public purpose criteria listed in the Act.
The project aims in developing the district as a leading industrial hub. The industrial park can cater the social and economic development in the area. Industrialisation has resulted in a considerable rise in the standard of living of the people. Increase in job opportunities is a major advantage. As part of the decision to establish an Industrial Park for KINFRA, Government of Kerala (GoK) had accorded administrative sanction to acquire a total area of 313.81 Acres of land in Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in Kannur District for establishing an Industrial Park by KINFRA. The Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (RFCTLARR) Act 2013, enacted by the Government of India, has mandated the conduct of Social Impact Assessment study prior to the land acquisition. Government of Kerala had accorded sanction vide G.O.(P) No.53/2019/RD dated 28/08/2019 to Centre for Management Development, Thiruvananthapuram to conduct SIA in this regard and to prepare a Social Impact Management Plan for the same.
As per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 Section 2-(1)-(b)-(i), the project can be considered as a public purpose.
2.3 Details of Project size, location, capacity outputs, production targets, costs and risks
The affected area belongs to Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in Kannur District. A total area of313.81acres of land is required to be acquired for the proposed project. The land to be acquired is spread over MuttanurDesom in Koodali Village, Kunnoth and Kodolipram Desoms in Pattannur Village and Theroor and EdayannurDesoms in Keezhallur Village. The proposed land is situated ½ km from the Kannur-Mattanur National Higway and 1 and ½ km north-west to Mattanur town.
Centre for Management Development, Thiruvananthapuram 5
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Fig. 2.1: Photographs of Project Area
2.4 Examination of alternatives
The project is intended for developing various infrastructural and business ventures near to the Kannur International Airport. The implementation of the Industrial park can cater the development of the area. As the project is intended to improve infrastructure facilities near to the airport, no other alternatives are considered.
2.5 Phases of the Project Construction
The project is intended for developing various infrastructural and business ventures near to the Kannur International Airport. The project aims in developing the district
Centre for Management Development, Thiruvananthapuram 6
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
as a leading industrial hub. The industrial park can cater the social and economic development in the area. Increase in job opportunities is a major advantage for the district. The project would take an environment friendly approach by conserving energy and making use of alternate technologies.
2.6 Core design Features, size and Type of Facilities
The industrial park can cater the social and economic development in the area. Industrialisation has resulted in a considerable rise in the standard of living of the people. Increase in job opportunities is a major advantage for the district.The project would take an environment friendly approach by conserving energy and making use of alternate technologies even from early stages of inception and later continue the same for daily operations.
2.7 Need for Ancillary Infrastructural Facilities
The proposed project aims at constructing facilities which is environment friendly and safe. The construction of new buildings and better infrastructure in the area is one of the factors in this process. As part of the Industrial Park construction or improvisation of roads need to be done.
2.8 Workforce Requirements (Temporary and Permanent)
Both temporary and permanent workforce will be employed with modern machineries and equipment at appropriate stages of the project implementation.
2.9 Details of Social Impact Assessment/Environment Impact Assessment if Already Conducted and any Technical Facility Reports
No Social Impact Assessment/Environment Impact Assessment has been conducted previously.
2.10 Applicable legislations and policies
The land acquisition for the proposed project is governed by the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013.
Centre for Management Development, Thiruvananthapuram 7
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
CHAPTER 3
TEAM COMPOSITION, APPROACH, METHODOLOGY AND SCHEDULE OF THE SOCIAL IMPACT ASSESSMENT
3.1 List of all Team Members with Qualifications
The details of the team members involved in the SIA are given in Annexure III.
3.2 Description and Rationale for the Methodology and Tools Used to collect Information for the Social Impact Assessment
An inclusive and participatory approach through involvement of multiple stakeholders such as elected representatives and project affected people including vulnerable sections such as Scheduled Castes, Scheduled Tribes, women, and those among below poverty line, at appropriate stages of the project.
3.3 Sampling Methodology Used
Qualitative information was gathered along with the field survey through public consultation/Focus Group Discussions (FGDs) with all relevant stakeholders. The public consultation encompassed the project components as well as its socio- economic impacts. The SIA team had preliminary discussions with the key officials of the district administration and gathered information regarding the status of the government procedures, the project area and intensity of the acquisition. The team also made a preliminary site visit with the officials for physical inspection and information dissemination purposes. The existing conditions of land, status of infrastructure/structures, land use pattern and the facilities available to people residing in the project area were analysed.
The quantitative information regarding the families affected by the project was collected through household surveys, in the form of structured questionnaires. The survey was conducted in all the households of the persons affected by the project. The results of the survey provided information pertaining to the demography, socio-economic status and livelihood status of the target community, and formed the basis for development of Social Impact Management Plan.
Centre for Management Development, Thiruvananthapuram 8
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
3.4 Overview of Information/Data Sources Used
The primary data was collected directly from the representatives all affected families through face to face interview. Structured questionnaires were used for collecting the details of the affected people. The results of the survey provided information pertaining to the demography, socio-economic status and livelihood status of the target community
The secondary data was collected from the Requiring Body and the Revenue department. The SIA team had preliminary discussions with the key officials of the district administration and gathered information regarding the status of the government procedures, the project area and intensity of the acquisition.
3.5 Schedule of Consultations with Key Stakeholders
Date Details of Consultation
Collection of documents form January 2020 Land Acquisition office
Meeting with the officials of February 2020 Requiring Body
March 2020 Visit to project area
June 2020 Collection of Primary Data
July 2020 Public Hearing
3.6 Public Hearing
In accordance with the Section 5 of Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, a Public Hearing will be conducted to collect the views and opinions of the people affected by the project. Prior intimation will be given to all the stakeholders regarding the date and venue of the public hearing through advertisements in leading newspapers, individual letters and/or over telephone.
Centre for Management Development, Thiruvananthapuram 9
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
CHAPTER 4
LAND ASSESSMENT
4.1 Description of Land with the help of Maps, Information from Land Inventories and Primary Sources
Government of Kerala (GoK) had accorded administrative sanction to acquire a total area of 313.81 Acres of land in Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in Kannur District for establishing an Industrial Park by KINFRA.
Figure 4.1.1. Site for Establishing Industrial Park
Centre for Management Development, Thiruvananthapuram 10
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
4.2 Entire area of impact under the influence of the project
An extent of 313.81 acres of land from Keezhallur, Pattannur and Koodali Villages of Kannur district is required for the implementation of the proposed project. The land identified for the project of establishing the Industrial Park belongs to around 78 families, within which around 10 residential structures are identified. The area mainly include cashew plantation and left over land after laterite stone mining. The number of houses to be acquired may change once the final plan is prepared.
4.3 Total Land Requirement for the Project
An extent of 313.81 acres of land under survey Nos. 84, 85, 86pt, 1pt, 2pt from Keezhallur Village, survey Nos. 73pt, 72pt, 167, 175, 176pt, 177/1, 3pt, 178pt, 179pt from Pattannur Village and survey Nos. 39pt, 40pt, 143pt, 144, 145, 146, 147, 148, 149, 150, 136pt, 134pt, 133pt, 132, 131pt from Koodali Village in Kannur district is required for the implementation the proposed project.
4.4 Present Use of any Public, Utilized land in the Vicinity of the Project Area
The area is used for cashew plantations and laterite stone mining. No public utilized land is not identified.
4.5 Land (if any) Already Purchased, Alienated, Leased or Acquired, and the intended Use for Each Plot of Land required for the project
Not applicable.
4.6 Quantity and Location of Land Proposed to be Acquired for the Project
An extent of 313.81 acres of land under survey Nos. 84, 85, 86pt, 1pt, 2pt from Keezhallur Village, survey Nos. 73pt, 72pt, 167, 175, 176pt, 177/1, 3pt, 178pt, 179pt from Pattannur Village and survey Nos. 39pt, 40pt, 143pt, 144, 145, 146, 147, 148, 149, 150, 136pt, 134pt, 133pt, 132, 131pt from Koodali Village in Kannur district is required for the implementation the proposed project. The proposed area is situated 7 kms away from Pazhassi dam.
Centre for Management Development, Thiruvananthapuram 11
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
4.7 Nature, Present use and classification of Land and if Agricultural Land, Irrigation Coverage and Cropping Patterns
A major portion of the area to be acquired is rich with Cashew farms. A good portion of the area is the land remaining after mining of Laterite stones. In addition to that coconut trees and other kinds of trees are included in the area. Lion share of the land is classified as thottam, ashirapuncha and sthirapuncha. Even though land is classified as Dry Land, a portion is also identified as nilam.
4.8 Size of Holding, Ownership Pattern, Land Distributions and Number of Residential Houses
The proposed land for acquisition is owned by almost 78 families. 10 residential structures are identified. The number of houses to be acquired may vary in the final plan.
4.9 Land prices and recent changes in ownership, transfer and use of lands over the last 3 years
As per the information received from the respondents, no land transactions were done in the proposed area for the last 3 years.
Centre for Management Development, Thiruvananthapuram 12
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
CHAPTER 5
ESTIMATION AND ENUMERATION OF AFFECTED FAMILIES AND ASSETS
5.1 Estimation of families
a) Families which are directly affected (own land that is proposed to be acquired)
Around 78familieswho have either owned residence (10 residential structures) or land in the area that is proposed to be acquired are directly affected by the project. The families are presently residing there enjoy the benefits of cashew trees and various other variants.
5.2 Family of Scheduled Tribes and other Traditional Forest Dwellers who have lost any of their Forest Rights
Not included in the proposed area.
5.3 Families which depend on Common Property Resources which will be Affected due to Land Acquisition for their Livelihood
No common property resources are affected by this land acquisition.
5.4 Families which have been assigned Land by the State Government for the Central Government Under any of its Schemes and such Land is Under Acquisition
No family within the area been assigned Land by the State Government for the Central Government Under any of its Schemes
5.5 Families which have been Residing on any land in the Urban Areas for Proceeding three years of more prior to the acquisition of land
Not applicable
5.6 Families which have depended on the Land Being Acquired as a Primary Source of Livelihood for three years prior to the acquisition
Majority of the families who will be displaced as part of the proposed land acquisition are relying on the natural resources in the area for their livelihood. They
Centre for Management Development, Thiruvananthapuram 13
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
depend on cashew and other assets for meeting day to day expenses. The loss in these product assets will be a significant impact on the livelihood of the families who will be displaced from the proposed land for the acquisition.
5.6.1 Families which are indirectly impacted by the project (not affected directly by the acquisition of own lands)
As the project aims at creating least possible disruption to the balance of the area, the chances for indirect impact is relatively less.
5.6.2 Inventory of productive assets and significant lands
A large number or cashew trees, coconut trees and other various kinds of trees are included in the land which is proposed to be acquired. The site has the presence of left-over Laterite stone after mining.
Centre for Management Development, Thiruvananthapuram 14
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
CHAPTER 6
SOCIO-ECONOMIC AND CULTURAL PROFILE
6.1 Demographic Details of the Population in the Project Area
A total of around 78 families are directly affected by the proposed land acquisition. This chapter discusses the demographic details of the owners of the properties and their dependents.
a) Age Group of Affected Individuals
Table 6.1.1. Age Group of Affected Individuals
Sl. No. Age Frequency 1 0-18 47 2 19-40 65 3 41-59 47 4 60 and Above 42 5 N/A 36 Total 237
b) Gender of Affected Individuals
Table 6.1.2. Gender of Affected Individuals
Sl. No. Gender Number of Individuals
1 Male 113
2 Female 124
3 TG 00
Total 237
Centre for Management Development, Thiruvananthapuram 15
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
c) Marital Status of the Affected Individuals Table 6.1.3 Marital Status
Sl. No. Marital Status Frequency 1 Married 20 2 Unmarried 49 Widow/ 3 00 Widower 4 N/A 168 Total 237
d) Religious Group
Table 6.1.4 Religious Group
Sl. No. Religion No. of Families 1 Hindu 70 2 Christian 00 3 Muslim 07 4 N/A 01 Total 78
e) Ration Card Type
Sl. No. Ration Card No. of Families 1 APL 56 2 BPL 03 3 N/A 19 Total 78
Centre for Management Development, Thiruvananthapuram 16
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
f) Family Pattern
Sl. No. FamilyPattern No. of Families 1 Nuclear Family 61 2 Joint Family 00 3 N/A 17 Total 78
6.3 Vulnerable Group
Among the total affected family members 47 children are below the age of 18 years and there are 42 members who are aged above 60 years. Also, there 124 female members are affected by the project.
6.4 Land Use and Livelihood
A large number of cashew trees, coconut trees and other various kinds of trees are included in the land which is proposed to be acquired. These productive assets present in the area are a livelihood option for people who live in and around the project area.
6.5 Local Economic Activities
A good portion of the area is the land remaining after mining of Laterite stones. A large number or cashew trees, coconut trees and other various kinds of trees are included in the land which is proposed to be acquired.
6.6 Factors that Contribute to Local Livelihood
The families who own land in the proposed area depends on the cashew trees for livelihood.
6.7 Kinship Patterns and Social and Cultural Organization
Around10 families in the project area needs to be rehabilitated so as to acquire the land for the proposed project. The families in this area have good social and neighbourhood relations.
Centre for Management Development, Thiruvananthapuram 17
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
6.8 Administrative Organization
There are no administrative organisations are present in the vicinity of the project area.
6.9 Political Organization
Properties of any political organizations are not included in the area which is proposed for the acquisition.
6.10 Community Based Civil Society Organization
No such organizations are affected by the proposed the project.
6.11 Regional Dynamics &Historical Change Process
The project aims at improving the industrial facilities of the District thereby increasing the overall development of the State. This will in turn increase the employment opportunities to the populace. Establishment of industrial park can attract more investments in the state thus strengthening the economy as well.The concept of the Industrial Park is to provide a single platform that brings together various infrastructural facilities and industrial assistance from the Government to the public. Therefore, the proposed project will work towards improving the infrastructural facilities made available to the public. No historic change process is identified.
6.12 Quality of the Living Environment
The Quality of the Living Environment is good in the project area with decent livelihood options and transportation facilities with access to amenities such as Schools, Hospitals, Civil Organisations, Social Groups etc.
Centre for Management Development, Thiruvananthapuram 18
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
CHAPTER 7
SOCIAL IMPACT MANAGEMENT
7.1 Approach to Mitigation
The CMD team made use of a combination of two research approaches i.e., quantitative and qualitative, for the identification of various social impact and the mitigation measures. Adoption of a combination of both qualitative and quantitative methodology was indented to obtain a more comprehensive data and more holistic result without excluding any important area of assessment.
7.2 Measures to avoid, mitigate and compensate impact
An extent of 313.81 acres of land from Keezhallur, Pattannur and Koodali Villages of Kannur district is required for the implementation of the proposed project.The land identified for the project of establishing the Industrial Park belongs to around 78 families, within which around 10 residential structures are identified.The lion’s share of the area is rich with Cashew farms. A good portion of the area is the land remaining after mining of Laterite stones. Around 10 families in the project area are using this land for residential purposes. Other families are also getting their income from the proposed project area as they rely on these productive assets as a means of livelihood. However, by considering the following measures the authorities can mitigate and compensate the possible negative impacts of the land acquisition.
Compensation for the land owners as per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013. Resettlement and Rehabilitation procedure as per the Policy issued by Revenue(B) Department, Government of Kerala vide G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLARR Act 2013. Reconstruction of livelihood of people is an important factor in this project. Majority of the directly affected families are relying on the project area for
Centre for Management Development, Thiruvananthapuram 19
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
their livelihood through cashew farm and rubber plantations. The loss of these assets will cause them a significant impact. The directly affected people should be considered for the job opportunities that will be created by the establishment of the proposed project. Through this, the impact of losing livelihood as a result of land acquisition can be minimised. The successful rehabilitation of the directly affected families are the other major concern in this land acquisition. The authorities should make sure that the displaced families will get proper rehabilitation.
7.3 Measures that are included in terms of Rehabilitation and Resettlement and Compensation as outlined in the Act
The Rehabilitation and Resettlement package as per the Policy issued by Revenue(B) Department, Government of Kerala vide G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLARR Act 2013 shall be provided to the affected people.
7.4 Measures that the Requiring Body has stated it will introduce in the project proposal
The requiring body has stated that sufficient fund has been reserved as compensation.
7.5 Alterations to project design and additional measures that may be required to address the extend and intensity of impacts across various groups as identified during SIA
The design of these projects is prepared by considering the measures that will reduce the adverse effects of land acquisition to the owners.
7.6 Detailed Mitigation Plan including detailed activities to be carried out for each mitigation strategy, timelines for each mitigation strategy
To mitigate the social impact of the proposed land acquisition, R&R package should be provided to the families as per the Policies issued by Revenue (B)
Centre for Management Development, Thiruvananthapuram 20
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Department, Government of Kerala vide G.O.(MS)No.485/2015/RD dated 23/09/2015 and G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLARR Act 2013.
Compensation for the land owners as per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013. Resettlement and Rehabilitation procedure as per the Policy issued by Revenue(B) Department, Government of Kerala vide G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLARR Act 2013. Reconstruction of livelihood of people is an important factor in this project. Majority of the directly affected families are relying on the project area for their livelihood through cashew farm and rubber plantations. The loss of these assets will cause them a significant impact. The directly affected people should be considered for the job opportunities that will be created by the establishment of the proposed project. Through this, the impact of losing livelihood as a result of land acquisition can be minimised. The successful rehabilitation of the directly affected families are the other major concern in this land acquisition. The authorities should make sure that the displaced families will get proper rehabilitation.
7.7 The Social Impact Management Plan indicating which measures the Requiring Body has committed to undertake and those that have been proposed, but not committed to be undertaken by the Requiring Body
The requiring body has stated that sufficient fund has been reserved as compensation.
Centre for Management Development, Thiruvananthapuram 21
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
CHAPTER 8
SOCIAL IMPACT MANAGEMENT PLAN INSTITUTIONAL FRAMEWORK
8.1 Description of institutional structures and key person responsible for each mitigation measures
The Government of Kerala vide G. O. (P) No. 649/2015/RD dated 04/12/2015 had appointed Special Tehsildar (LA), Chalode to perform one or more functions of the collector under in the Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation Act (RFCTLARR), 2013 within their area of jurisdiction.
Also vide G. O. (P) M. No. 590/2015/RD dated 11 November 2015, Government of Kerala, in line with the sub-section (1) of section 43 of the Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation Act (RFCTLARR) 2013 and sub-rule (1) of rule 21 of Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (Kerala) Rules, 2015, the Deputy Collector (Land Acquisition) in each district has been appointed as the Administrator for Rehabilitation and Resettlement, for performing the functions under the said act and Rules in respect of involuntary displacement of persons due to requisition of land. The Administrator shall be responsible for the formulation, execution and monitoring of the Rehabilitation and Resettlement scheme in respect of land acquisition.
Vide G. O. (P) M. No. 589/2015/RD dated 11 November 2015, in exercise of the powers conferred by sub-section (1) of section 44 of the Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation Act (RFCTLARR), 2013, the commissioner for Rehabilitation and Resettlement supervising the formulation of Rehabilitation and Resettlement scheme or plans, proper implementation of the same and post implementation of social audit.
Centre for Management Development, Thiruvananthapuram 22
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
8.2 Specify the Role of Non-Governmental Organisation, if any
Rehabilitation is an important factor in this proposed land acquisition plan. Therefore, providing support services of a dependable NGO can help in alleviating the psycho-social impact of the displacement.
8.3 Indicate Capacities Required and Capacity Building Plan, Including Technical Assistance, if any
Not applicable
8.4 Timelines for Each Activity
Proper timeline for each activity should be framed in accordance with the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.
Centre for Management Development, Thiruvananthapuram 23
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
CHAPTER 9
SOCIAL IMPACT MANAGEMENT PLAN BUDGET AND FINANCING OF MITIGATION PLAN
9.1 Costs of all resettlement and rehabilitation costs
The requiring body stated that necessary budget provision exists for meeting the cost of acquisition .
9.2 Annual budget and plan of action
Not Applicable
9.3 Funding sources with break up
Not Applicable
Centre for Management Development, Thiruvananthapuram 24
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
CHAPTER 10
SOCIAL IMPACT MANAGEMENT PLAN MONITORING AND EVALUATION
10.1 Key monitoring and evaluative indicators
Monitoring is a long-term process, which should begin from the starting of the project and should continue throughout the life of the project. Its purpose is to establish benchmarks so that the nature and magnitude of anticipated social impacts can be continually assessed. Monitoring involves the continuous or periodic review to determine the effectiveness of recommended mitigation measures. The types of parameters that can be monitored may include mitigation measures or design features, or actual impacts. All the mitigation measures stated in Chapter 7 should be considered as the indicators for evaluation.
10.2 Reporting mechanisms and monitoring roles
Rehabilitation and Resettlement procedures as stated in the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement act, 2013 will be applicable.
10.3 Plan for independent evaluation
Not applicable
Centre for Management Development, Thiruvananthapuram 25
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
CHAPTER 11
ANALYSIS OF COSTS AND BENEFITS AND RECOMMENDATION ON ACQUISITION
11.1 Final conclusions on:Assessment of public purpose, less displacing alternatives, minimum requirements of land, the nature and intensity of social impacts, and viable mitigation measures and the extent to which mitigation measures will address costs
The Government of Kerala has initiated the construction of Industrial Park by KINFRA under the IDZ scheme in Koodali, Pattannur and Keezhallur Villages of Thalassery Taluk in Kannur District. The project aims at improving the industrial facilities of the District thereby increasing the overall development of the State. This will in turn increase the employment opportunities to the populace. Establishment of industrial park can attract more investments in the state thus strengthening the economy as well.
An extent of 313.81 acres of land under survey Nos. 84, 85, 86pt, 1pt, 2pt from Keezhallur Village, survey Nos. 73pt, 72pt, 167, 175, 176pt, 177/1, 3pt, 178pt, 179pt from Pattannur Village and survey Nos. 39pt, 40pt, 143pt, 144, 145, 146, 147, 148, 149, 150, 136pt, 134pt, 133pt, 132, 131pt from Koodali Village in Kannur district is required for the implementation the proposed project. The proposed are is situated 7 kms away from Pazhassi Dam.
The land identified for the project of establishing the Industrial Park belongs to around 78 families, within which around 10 residential structures are identified. The area mainly include cashew plantation and left over land after laterite stone mining. The number of houses to be acquired may change once the final plan is prepared.
The alignment of the proposed project was designed with an effort to reduce the number of people who will be affected with the land acquisition. However, through the proper measures as per RFCTLARR Act 2013 the negative impacts of land acquisition should be mitigated.
Centre for Management Development, Thiruvananthapuram 26
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
11.2 The above analysis will use the equity principle as a framework of analysis for presenting a final recommendation on whether the acquisition should go through or not.
Comparing/weighing the positive against the negative impacts, it can be observed that even though rehabilitation of displaced families and the recreation of livelihood are needs to be provided to the directly affected people, the implementation of the project will result in improving the overall development of Kannur district. The project will attract business ventures and other developments all around the world and further it will create more livelihood opportunities for the local people in the area. The owners of the land are supporting the project and they stated that they have no issues to handover the land if they get proper compensation and rehabilitation.
Thus, it can be concluded that the former outweighs the latter reaffirming the identified site as the most suitable and apt one for the project of establishing the Industrial Park. The families that are affected would require adequate and fair compensation and proper rehabilitation. The area which is considered for acquisition is mainly used for cashew plantation as well as for mining laterite stones. So, the authorities should make proper action plan to reconstruct the livelihood opportunities for the people who solely relied on the project area for livelihood activities. It is observed that many of the negative impacts highlighted can be minimized or reduced with effective and relevant mitigation measures and strategies mentioned. Thus the study recommends the acquisition of land by providing proper compensation to the affected people.
Centre for Management Development, Thiruvananthapuram 27
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
ANNEXURES
i. Details of the land covered in the SIA study
ii. List of key informants contacted and interacted
iii. SIA Team members
iv. Various Government Orders concerning Social Impact Assessment
v. Questionnaires used for survey
vi. Alignment sketches of the proposed project
vii. Details of Affected People
Centre for Management Development, Thiruvananthapuram 28
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
ANNEXURE-I
Details of the Land Covered in the SIA Study
Centre for Management Development, Thiruvananthapuram 29
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 30
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
ANNEXURE-II
List of Key Informants Contacted and Interacted
1. Deputy Collector, L.A, Kannur
2. Special Tehsildar, LA Chalode
3. Keeezhallur Panchayath President
4. Village officers of concerned villages
5. Officials of KINFRA
Centre for Management Development, Thiruvananthapuram 31
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
ANNEXURE-III
SIA Team Members
Sl. No. Name Designation Qualification
1. Dr. G. Suresh Project Director Ph. D.
2. Shri. Riyas K. Basheer Project Coordinator MBA, B.Tech.
3. Dr. S. Remadevi Domain Expert Ph. D.
4.. Shri. Suradh K. Surendran Field Coordinator M. Tech.
5. Shri. Albin M. Field Investigator MBA
6. Shri. Josukutty Kurian Field Investigator MSW
Centre for Management Development, Thiruvananthapuram 32
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
ANNEXURE-IV Various Government Orders Concerning Social Impact Assessment on Land Acquisition
Centre for Management Development, Thiruvananthapuram 33
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 34
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 35
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 36
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 37
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 38
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 39
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 40
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 41
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 42
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 43
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 44
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 45
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 46
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 47
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 48
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 49
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 50
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
ANNEXURE- V Questionnaires used for survey
Centre for Management Development, Thiruvananthapuram 51
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 52
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 53
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 54
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 55
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 56
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Centre for Management Development, Thiruvananthapuram 57
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
ANNEXURE- VI Alignment sketches of the proposed project
Centre for Management Development, Thiruvananthapuram 58
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
ANNEXURE- VII Details of Affected People
Centre for Management Development, Thiruvananthapuram 59
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
>നാ絍
വികസിക്കԂ. >The village > will expand.
കൂടകതൽ
>More people Muneeb Manzil 940048412 ആളുകൾക്് 1 1 Therur Nazar P.K Trees No Positive will get a job.
No
APL Therur 4 Land ജ ാലി കിട്ുԂ.
Owned Muslim >There should
Agricultural >കൃതയമായ be proper
Nuclear Family Nuclear
Directly purchased Directly നഷ്ടപരിഹാരԂ compensation. ജവണԂ.
949666860 2 85/1B Keezhallur 0(Sajitha)
>കൃതയമായിട്ു
>There should
ള്ള be proper
Amruthalayam,
Balakrishna നഷ്ടപരിഹാരԂ compensation.
3 173 Pattannur P.O 70 Trees Positive
No
APL n Land കിട്ണԂ. > There needs Kannur Owned
Hereditary to be Agricultural >വികസനԂ Nuclear Family Nuclear development. ജവണԂ.
Pushpa Vilasam
Rohini 944788867 > ആളുകൾക്് >People will
y
4 175/2 Pattannur Koodolipuram ral Trees Positive
No
APL Amma 2 Land ജ ാലി കിട്ുԂ. get a job. Pattannur P.O Owned
Hereditar
Agricultu
Padmanabh 996184668
5 175 Pattannur ral Trees No Positive
No
an Nambiar 6 APL
Hindu
Family
Nuclear Nuclear
Nambiar
Agricultu
>കൃതയമായിട്ു >There should
ള്ള be proper Radhakrish Padinjare 974448272
6 143 Koodali 10 Trees Positive നഷ്ടപരിഹാരԂ compensation.
APL nan parambil 8 Land
Family
Owned
Nuclear Nuclear Directly Directly . >
purchased കിട്ണԂ Agricultural Development. >വികസനԂ
>It is our >ഉപ ീവന means of
Gopalan 944665765 മാർഗമാണ്. livelihood.
7 Thariyil 30 Positive
APL K.V 2 Land >നഷ്ടപരിഹാ >There must
Owned
Directly Directly
purchased be Agricultural രԂ ജവണԂ. compensation.
Centre for Management Development, Thiruvananthapuram 60
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
>
>വികസനԂ 177/3, Pattannur, Sreevalsan 974730383 Development. > 8 Sreenilayam ral Trees No Positive ആളുകൾക്്
APL 40/1 Koodali K.V 5 Land >People will
Hindu
Family
Owned
Nuclear Nuclear
Directly Directly
Agricultu . purchased ജ ാലി കിട്ുԂ get a job.
143/1, 974730383
20
9 Koodali K.Usha Sreenilayam ral
No
APL 145 5 Land
Family
Owned
Nuclear Nuclear
Directly Directly
Agricultu
purchased >നാടിꅍറെ
>For the
വികസനത്തി
development നക Sreesha of place. 10 40/1 Koodali Trees Positive No ജവണ്ടിയാണ്
K.S Land >There must Owned
Hereditary be Agricultural >നഷ്ടപരിഹാ compensation. രԂ ജവണԂ.
974730383 11 143 Koodali Sreedish Sreenilayam 5
> വീടകԂ
>Not interested
സ്ഥലവകԂ
Both Vazhayil 984744895 in losing the 12 85 Keezhallur Vazhayil building No Negative No നഷ്ടറെടകത്താ
APL Janaki 3 Both house and the
Family
Owned
Nuclear Nuclear
Directly Directly building and trees purchased ൻ താല്പരയԂ space.
agricultural
Both land and and Both land residential and residential ഇലല. >വികസനԂ നാടിꅍറെ
ആവശ്യമാണ്. >Development
>നയായമായ is needed . 996184668 >There should 13 167 Pattannur P.R Valsala Koyiloth Trees No Positive 6 No തകԂ be fair and Owned മതിയായതകമാ Hereditary adequate
Agricultural യ compensation. നഷ്ടപരിഹാരԂ കിട്ണԂ.
Centre for Management Development, Thiruvananthapuram 61
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
>ജൊ蕍 ഇലലാത്തതി >There is the
ꅍറെ difficulty of
ബകദ്ധിമകട്ു not having a ഉണ്ട്. road. Therefore, ആയതിനാൽ
have to buy
പദ്ധതിക്് another piece
954420916 Building, സ്ഥലԂ of land in the 146/83, Gokulam 8, Trees and 14 Koodali Lisha No Positive amount of No നൽകകജപാൾ
146/84 Keezhallur 994656522 APL water
Hindu Owned compensation 9 resources കിട്ുന്ന it receives Nuclear Family Nuclear നഷ്ടപരിഹാര
Directly purchased Directly when giving
Both land and building and Both land തകക റകാണ്ട് the project മററാരക സ്ഥലԂ space.
Both residential and agricultural and Both residential വാങ്ങണԂ. >Should get > reasonable നയായമായ compensation. നഷ്ടപരിഹാരԂ കിട്ണԂ.
>നാ絍 >The village
വികസിക്കԂ. will developed. Radhakrish Padinjare 974448272 15 143 Koodali Trees Positive >കൃതയമായ >Need to get
APL nan O.K parambil 8 Land
Family
Owned
Nuclear Nuclear Directly Directly fair purchased നഷ്ടപരിഹാരԂ Agricultural compensation. കിട്ണԂ. >നാ絍 >The village
Cherikkal
വികസിക്കԂ.
Both Tree will developed.
House, 944773177
16 40/152 Koodali Vinod P 6 and water No Positive > >Need to get No കൃതയമായ
APL Muttannur, 4 Land
Barren
Family
Owned
Nuclear Nuclear Directly Directly resources fair Pattannur P.O purchased നഷ്ടപരിഹാരԂ compensation. കിട്ണԂ.
>നാ絍 >The village
വികസിക്കԂ.
Souparnika, will developed. Prabhakara 949537507 17 40 Koodali Harippanur, Trees No Positive > >Need to get No കൃതയമായ
APL n C.V 7 Land
Family
Owned Norora P.O Nuclear നഷ്ടപരിഹാരԂ fair
Hereditary Agricultural compensation. കിട്ണԂ.
Centre for Management Development, Thiruvananthapuram 62
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
>നാ絍
>The village
വികസിക്കԂ. will developed.
Rahul Nivas, both road >ആളുകൾക്് >People will
944677079 . 18 143 Koodali Rahul Edayannur, 50 facility and No Positive get a job. No ജ ാലി കിട്ുԂ
APL 9 Land
Hindu Edayannur P.O Owned tree >കൃതയമായ >Need to get
Hereditary Agricultural fair
Nuclear Family Nuclear നഷ്ടപരിഹാരԂ compensation. കിട്ണԂ.
Krishnakripa Both Tree
Sarojini 996150013
y
50
19 150 Koodali Kolappa ral and water No Positive
No
APL OM 1 Land
Hindu
Family
Owned
Pattannur P.O Nuclear resources
Hereditar
Agricultu
>നാ絍
>The village
പകജരാഗമി
K.V will developed. Pragathi, 996184668 ക്കԂ
13 175/1 Pattannur Padmanabh 15 Trees Positive >Need to get
No
Koodolipram 6 Land > Hindu നയായമായ
Owned
an Directly fair
purchased
Agricultural നഷ്ടപരിഹാരԂ compensation. കിട്ണԂ. >നാടിനക പകജരാഗതി
>The village . ഉണ്ടാവകԂ may make >റതാഴിലവസ progress. 974431557 21 175/1 Pattannur Narayani Thoduvayil Positive >Jobs will be 3 രങ്ങൾ സൃഷ്ടിക്റെ created. >Sufficient
Nuclear Family Nuclear . > ടകԂ മതിയായ compensation നഷ്ടപരിഹാരԂ ജവണԂ.
974431557
y
21 175 Pattannur Ashokan Thoduvayil ral Trees Positive
Yes
APL 3 Land
Family
Owned
Nuclear Nuclear
Hereditar
Agricultu
Sreesyas 994782451 >നാടിꅍറെ
23 175 Pattannur K. Usha y Positive >Development Nayattupara 7 വികസനԂ
Family
Owned
Nuclear Nuclear
Hereditar
Centre for Management Development, Thiruvananthapuram 63
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
>ജരാഗിയായ
മകൻ വീട്ിൽ >The sick son
918877451 Building, ഉണ്ട്. is at home. Padminiya 3, trees and 24 84 Keezhallur Kunnil Yes Negative > >Not interested mma 954452869 water വീ絍 വിട്ു
Hindu
Owned building ജപാകാൻ in leaving the 3 Hereditary resources
agricultural
Both land and and Both land house. താല്പരയԂ Both residential and and Both residential ഇലല.
>നയായമായ >Need to get
K.K. Remya, 949618949
y
25 167-B-2 ral Trees No Positive fair No നഷ്ടപരിഹാരԂ
Sumathi Nayattupara 5 Land
Family
Owned
Nuclear Nuclear compensation.
Hereditar Agricultu കിട്ണԂ.
> റപറട്ന്ന് >The project Thiruvonam,
തറന്ന പദ്ധതി should be
26 137/3 Ashok Lions Club road, l Trees Positive
No
Land നടെിലാക് implemented Mattannur Owned
Hereditary immediately. Agricultura ണԂ. >വികസനԂ വരകന്നതിൽ
എന്ത്
>It is not
പ്പശ്നമാണ് water known what
ഉണ്ടാകകന്നത്
Gopanam, resources, problems the 956200286 27 40/1A Koodali Prasanthan Muttannur, trees and . development. No എന്നെിയിലല
0 APL Pattannur P.O Owned road അതിനാൽ >So neither
Hereditary Agricultural facility favor nor Nuclear Family Nuclear അനകകൂലിക്ക disagree.
Both land and building and Both land ന്നകമിലല പ്പതികൂലിക്ക ന്നകമിലല.
Centre for Management Development, Thiruvananthapuram 64
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
>നിലവിൽ താമസിക്കന്ന സ്ഥലത്തക >We have to
നിന്നകԂ മററാരക move from one
സ്ഥലജത്തക്് house to
ജപാകണԂ. another.
pulanootu water > It is 950205493 > വികസനԂ 28 147 Koodali Gopalan house, resources Positive impossible to
No 4 APL റകാണ്ട് muttannur Owned and trees say what
Hereditary Agricultural നങ്ങൾക്് benefits people
Nuclear Family Nuclear എന്ത് ഗകണԂ will derive Both land and building and Both land from കിട്ുറമന്ന് development. ഇജൊൾ പെയാൻ സാധിക്ിലല.
>നാ絍
O.M. >The village
Meenakshi പകജരാഗമി water will developed. 150/3, yamma Vaduvilaan 949729619 ക്കԂ 29 Koodali resources Positive >Need to get
150/1 (Late)(Lalit veedu 6 Land >നയായമായ Owned and trees fair
ha, Usha, Hereditary Agricultural നഷ്ടപരിഹാരԂ compensation. Sheela) Family Nuclear കിട്ണԂ.
water
84/4, Gopalan resources,
land land 85/101, Keezhallur, Kariyil House, 944665765
30 Vazhakkali l trees and Positive
No
and and
APL 131/108, Koodali Idayannur P.O 2 Both
Family
Owned
directly directly
Nuclear Nuclear
l building road
Both 85/4A hereditary purchased Agricultura facility
M
y
31 167/2 Pattannur Kodakkatteri 974764355 ral No Positive
No
APL Sivadasan Land
Family
Owned
Nuclear Nuclear
Hereditar
Agricultu
Abdu Ruz House 944732864 Trees,Road
32 143/202 Koodali Rehman T ral No Positive >hnI-k\w >Development
No
APL Theroor 5 Land facilities
Family
Owned
Nuclear Nuclear
K Directly
Agricultu
purchased >നാ絍
Building, >The village
വികസിക്കԂ.
S S Manzil water will developed. V K 33 143 Koodali Therur resources, No Positive > >Need to get No കൃതയമായ
Musthafa APL
Family
Owned
Nuclear Nuclear
Directly Directly
building P O Edayannur 30 years Road fair
Industrial purchased നഷ്ടപരിഹാരԂ
Both land and and Both land Facilities compensation. കിട്ണԂ.
Centre for Management Development, Thiruvananthapuram 65
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
>നയായമായ
>Need to get Vasanthi/S Abhilash 808601122
34 143 Koodali ral Trees No Positive fair No നഷ്ടപരിഹാരԂ
and
Both arojini Tehroor 1 Land
Owned directly directly compensation.
Agricultu .
hereditary hereditary purchased കിട്ണԂ
Naz Villa Nazeela 963359497 Trees,Road
35 2/135, 2/1 Keezhallur Peroor ral No Positive
No
APL Chandroth 2 Land facilities
Family
Owned
Muslim
Nuclear Nuclear
P O Edayannur Directly
Agricultu
purchased
Building,Tr >സ്ഥലԂ
ees,Water >Due to the
ഏററടകക്കന്ന
Kokali Karyail Resources , acquisition of 989532053 ത് മൂലԂ മാെി 36 143/A Koodali Sreelesh House Compound No Negative place,
No
6 APL Hindu താമസിക്കന്ന
Owned
Muttannur building Wall relocation is
Building , Building
Hereditary Agriculture
Both land and and Both land Road ത് difficult.
Nuclear Family Nuclear Facilities ബകദ്ധിമകട്ാണ്. >പ്പായԂ കൂടിയ അവസരത്തില് മാെി താമസിക്കവാ >They do not want to move
ꅍ away when
താത്പരയമിലല. they are in old >വീ絍 age. Building,Tr
989532053 >Be clear on
ഏടകക്കന്നക
ees,Water Damodaara Kottiyath 6 whether you 37 40/14,143 Koodali Resources , No Negative No ജണ്ടാ എന്ന
n Edayannur 994799053 APL are taking the
Hindu Owned Road കാരയത്തില് 6 Hereditary house. Facilities Nuclear Family Nuclear വയക്തത >The
Building , Agriculture Building remaining one Both land and building and Both land വരകത്തണԂ. > acres should be ആറകയകള്ള removed from രണ്ട് two acre. ഏക്െില് നിന്ന് ഒജരക്셍 ഒഴിവാക്ിത്ത രണԂ.
149,132/1 P N Sree Bhavaan >സാപത്തികԂ. >Financial.
,145/2,13 0490
y >
38 Koodali Rahiniyam Kanad ral Trees No Positive >Should be No നഷ്ടപരിഹാ
4/9,134/1 2484584 Land
Family
Owned
ma Edayannur Nuclear compensated.
Hereditar . 1 Agricultu രԂ കിട്ണԂ
Centre for Management Development, Thiruvananthapuram 66
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
>സ്ഥലԂ
നഷ്ടറെടകന്നക >There is loss
ണ്ട്. of space.
Building,Tr >നഷ്ടപരിഹാ >Should be ees,Water
building compensated.
. Thiruvathira Resources , രԂ കിട്ണԂ Rama 944793780 >Agriculture is 39 40-1-A Koodali Mudannur Compound No Negative >കൃഷിയാണ്
Yes Krishnan 9 APL the means of Pattannur Owned Wall ഉപ ീവന Hereditary livelihood. Road Nuclear Family Nuclear . >That are lost Facilities മാ셍ഗ്ഗԂ when place is Both land and and Both land >സ്ഥലജമററടക taken over. Residencial House, Agriculture House, Residencial ക്കജപാള് അത് നഷ്ടറെടകന്നക. >ഏററടകക്കന്ന
സ്ഥലത്തിꅍ
>There should
മതിയായ Trees,Wate be adequate
Souparnika, r നഷ്ടപരിഹാരԂ compensation E K 960505702 40 40 1A Koodali Muttannur Resources, Positive കിട്ണԂ. for the land
Yes Santhosh 0 APL Pattannur Owned Road >ഗകണങ്ങറളാ acquired.
Hereditary Agricultural Facilities >No benefits
Nuclear Family Nuclear ന്നകԂ are expected.
Both land and building and Both land പ്പതിക്ഷിക്ക ന്നിലല. >നയായമായ
>Need to get
നഷ്ടപരിഹാരԂ
fair കിട്ണԂ. compensation.
E K Krishnapuram 949743309 >ഏററടകക്കന്ന >There should 41 40 1 A Koodali Kamaleksh Pattannur P O Trees Positive
No
50 +
APL 7 Land സ്ഥലത്തിꅍ be adequate mi Kannur Owned compensation Barren Land Barren മതിയായ Nuclear Family Nuclear for the land Directly purchased Directly നഷ്ടപരിഹാരԂ acquired. കിട്ണԂ.
>നാ絍 >The village
വികസിക്കԂ.
will developed. Vilangeri Vilangeri 42 167 Pattannur Trees No Positive > >Need to get Omana Kallumma Chal No കൃതയമായ
Owned building നഷ്ടപരിഹാരԂ fair
Hereditary
Agricultural
Both land and and Both land compensation. കിട്ണԂ.
Centre for Management Development, Thiruvananthapuram 67
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
Building,Tr
ees,Water
Vilangeri Vilangeri 984710587 Resources , 43 167 Pattannur
Yes Santa Kallumma Chal 9 APL Animals
House, House,
Family
Owned
Nuclear Nuclear
building
Hereditary Road
Agriculture
Residencial Residencial Both land and and Both land Facilities >വയവസായԂ >The industry
വളരകԂ.
will grow. > നാടിꅍ >The villaage
Thankaman Rayaroth House 994778487 ഗകണകരമാ will be 44 167/112 Pattannur Trees Positive
No
APL i Elampara 2 Land വകԂ. beneficial.
Owned
Hereditary >There should Agricultural >നഷ്ട Nuclear Family Nuclear be പരിഹാരԂ compensation. ജവണԂ.
>നാ絍 >The village
വികസിക്കԂ. will developed. Saraswathi Darsana 994782451 45 167/125 Pattannur Trees Positive >കൃതയമായ >Need to get
K K Mattannur 7 APL
Family
Owned Nuclear Nuclear നഷ്ടപരിഹാരԂ fair
Hereditary Agricultural compensation. കിട്ണԂ.
>കൃതയമായ
Karakkattu >Need to get
Kunji 994783227
y 10
46 133/4 Koodali House ral Trees No Positive fair No നഷ്ടപരിഹാരԂ
APL Raman 3 Land
Kanjirode Owned compensation.
Hereditar Agricultu കിട്ണԂ. >നാടിꅍറെ വികസനԂ. >Development
>ഏററടകക്കന്ന of the village.
സ്ഥലത്തിꅍ >There should
be adequate K K Kunji Kokkolikunnu 944665145 മതിയായ 47 40 1 A Koodali Trees Positive compensation
APL Kannan Muttannur 9 Land നഷ്ടപരിഹാരԂ Owned for the land Hereditary കിട്ണԂ. acquired.
Nuclear Family Nuclear >ഇജേഹԂ >He died last month. കഴിഞ്ഞ മാസԂ മരണറെട്ു.
Building,Tr
954478636 Soumayalayam ees,Water Nalabrath 4 48 40/1A Koodali Muttannur Resources , No
No
and Narayani 854728473 APL
House, House,
Family
Owned
Nuclear Nuclear
P O Pattannur building Road
Both land Both land
3 Hereditary
Agriculture Residencial Residencial Facilities
Centre for Management Development, Thiruvananthapuram 68
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
Muttannur, Pets and
49 40 A1 Koodali Kumaran ral
and Pattannur APL trees
Family
Owned
Nuclear Nuclear
Directly Directly
building
Agricultu
Both land Both land
purchased
>യകവാക്ൾക്് റതാഴിൽ >Young people should get
കിട്ണԂ.
employment. > നാ絍 > The village
Sindhu, Sindhu Nivas, trees and 952625375 വയാവസായി should 50 41-1 Koodali Bindhu, Muttannur, road No Positive
No
APL 6 Land ക മായി develope Beena Pannannur Owned facility
Hereditary industrially. Agricultural വളരണԂ. Nuclear Family Nuclear >There should >കൃതയമായ be നഷ്ടപരിഹാരԂ compensation. കിട്ണԂ.
>ജവറെ ഭൂമി
ലഭിക്കകയാ >If there is
റണങ്കിൽ another land
Trees and available it is K.C. Devaki Nivas, 701241141 അനകകൂലമാ
51 147, 136 Koodali 50 water Positive favorable. Varijakshi Muttannur 2 APL ണ്. Owned resources > The house
Hereditary agricultural > വീ絍 ഒററെട് should not be Nuclear Family Nuclear isolated. Both residential and and Both residential നിലയിൽ
Both land and building and Both land ആകരകത്. >കണ്ണൂരിꅍറെ
വികസനԂ >Development
ആവശ്യമാണ്. of Kannur is
> വീടകԂ required.
> Acquire all
സ്ഥലവകമകൾെ Gopalan, Pullanjottu, the land, 52 145 Koodali Positive റട മകഴകവൻ
Bhaskaran Muttannur APL including the
Hindu Owned ഭൂമിയകԂ Hereditary house and the
Agricultural
Nuclear Family Nuclear ഏററടകത്തക land, and pay proper Both land and building and Both land കൃതയമായ compensation. നഷ്ടപരിഹാരԂ തരണԂ.
Centre for Management Development, Thiruvananthapuram 69
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
>നാ絍 വികസിക്കԂ. >മാനയമായ നഷ്ടപരിഹാരԂ >The village . will develop. >ഉപ ീവന >Fair compensation. മാർഗത്തിനക >Show Building, ജവറെ വഴി another way of trees, water കാണിച്ചു Sreekrishna livelihood for
resources, .
Nilayam, 770603006 agricultural and തരണԂ us.
53 40-1, 143 Koodali Jindhu 30 compound No Positive
No Muttannur 0 APL >ടാെിങ്ങിനക >Tapping has Owned wall, pets Pattannur aged rubber. and road പ്പായമായ Nuclear Family Nuclear >There has
Directly purchased Directly facility . െബ്ബർ ഉണ്ട് been a lot of
Both land and building and Both land >ഒരകപാ絍 investment.
Both residential മകതൽമകടക്് >we live only ഉണ്ടായിട്ുണ്ട്. depending on the agriculture. >കൃഷിറയ മാപ്തԂ ആപ്ശ്യിച്ചാണ് ീവിക്കന്നത്. >യകവാക്ള്ക്് റതാഴില് കിട്ുԂ. >Youths get >നാടിꅍറെ jobs. >The village
വയവസായԂ
industry will . വളരകԂ grow.
U K Parambal 952625375 > വികസനԂ >Development 54 41-1 Koodali Trees No Positive
No
APL Vasanthi Muttannur 6 Land നടക്കԂ. will take place.
Owned
Hereditary >Have to find Agricultural >മററാരക Nuclear Family Nuclear a way to buy a സ്ഥലത്ത് place like this ഇതകജപാറല in another യകള്ള സ്ഥലԂ place. വാങ്ങാനകള്ള വഴി കിട്ണԂ.
Centre for Management Development, Thiruvananthapuram 70
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
>നഷ്ട
പരിഹാരԂ >Be sure to
compensate.
Kudakattori ഉെൊക്കക. Ramachand 963320729 >Cultivate 55 167 Pattannur Veedu Trees No Positive > No റതങ്ങിꅍറെ
APL ran ( Girija) 6 Land coconut trees Kunnoth Owned വരകമാനԂ Hereditary lives on its
Agricultural
Nuclear Family Nuclear റകാണ്ടാണ് income. ീവിക്കന്നത്.
>കൃതയമായ >Need to get
1/295, Rasheeda T Gaseera Manzil 974664662
y 20
56 Keezhallur ral Trees Positive fair No നഷ്ടപരിഹാരԂ
2/106 K Mattannur Court 6 Land
Owned compensation.
Hereditar Agricultu കിട്ണԂ.
>നയായമായ
>Need to get 134, Ramesan P Alanjattil 974723108
57 Koodali ral Trees No Positive fair No നഷ്ടപരിഹാരԂ
and
131,143 K Muttannur 0 Both
directly directly compensation.
Agricultu .
hereditary hereditary purchased കിട്ണԂ
>നയായമായ
Krishna Vihar Trees, >Need to get
Ramesan T
y
58 143 Koodali Muttannur 944321570 ral Water Positive fair No നഷ്ടപരിഹാരԂ
V Land
Family
Owned
Pattannur P O Nuclear Resources compensation.
Hereditar Agricultu കിട്ണԂ.
> Ammainathil നയായമായ >Need to get
974489297
y
59 1 Keezhallur Sreeshan House ral Trees Positive fair No നഷ്ടപരിഹാരԂ
70+
APL 8 Land
Family
Owned
Edayannur P O Nuclear compensation.
Hereditar Agricultu കിട്ണԂ. >വികസനԂ. >കൃതയസമയ >Development.
ത്ത് റപറട്ന്ന് > Ensure quick
Building, compensation
Sakeena Manzil നഷ്ട
974774150 Trees, on time.
60 149/2 Koodali Riyas T K Thoroor 30 Positive No പരിഹാരԂ
APL
2 Land compound >The farm is
Owned Odayannur Muslim ഉെൊക്കക. Hereditary wall, land.
Agricultural
Nuclear Family Nuclear >കൃഷിഭൂമിയാ >Is the source ണ്. വരകമാന of income. മാ셍ഗ്ഗമാണ്.
Trees,
Puthiya Valappil
Umaira Compound
House 944667269
l
61 143 Koodali Puthiya 20 Wall, No Positive
No
APL Kololam 8 Land
Family
Owned
Muslim
Nuclear Nuclear
Valappil Directly Tower-
P O Edayannur purchased Agricultura KSEB
Centre for Management Development, Thiruvananthapuram 71
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
Building, > വീ絍 >In favor of
Trees,
ഒഴിവാക്ി
exept the Kunji 828132653 Water 62 39/2 Koodali Hill View No Positive house and No സ്ഥലജമററടക
30 + Raman 4 APL resources,
Family
Owned
Nuclear Nuclear
Directly Directly building acquiring the
Building , Building purchased and road ക്കന്നതിꅍ
Agriculture
Both land and and Both land land. facility അനകകൂലԂ. >കൃതയമായ നഷ്ടപരിഹാരԂ . >പാ셍െിടԂ >Exact
ഉണ്ടാക്കവാ compensation. നകԂ,
>Land
അതകജപാറല
purchased for
Manoj, 949574421
63 39 Koodali 5 Positive residential No വാണി യാവ
Beena 1 Land
Owned purposes , as
Industrial ശ്യങ്ങള്ക്് well as for ഉപജയാഗിക്ാ
Directly purchased Directly commercial നകԂ ജവണ്ടി use. Kinfra. വാങ്ങിയ ഭൂമിയാണ്. കിꅍപ്ര.
Mariyottil Trees,
Kunji 994783227
y
64 133/4 Koodali House ral Road Positive
APL Raman 3 Land
Hindu
Family
Owned
Muttannur P O Nuclear Facilities
Hereditar
Agricultu
>നിലവില് സ്ഥലԂ
കാരയമായി >The space is
not currently Puthen Purayil 860675239 ഉപജയാഗറെ 65 143 Koodali P P Gouri Trees No Positive being used.
No
Muttannur 1 Land ടകന്നിലല. Owned >Accurate
Hereditary Agricultural >കൃതയമായ compensation. നഷ്ട പരിഹാരԂ.
>നാ絍 >The village
Misham Nivas
വികസിക്കԂ.
will developed. Kanjiramkari 994616304 66 143 Koodali Prasanna Trees No Positive > >Need to get No കൃതയമായ
APL Vezhiyamba 9 Land
Family Nuclear Nuclear നഷ്ടപരിഹാരԂ fair P R Nagar Hereditary Agricultural compensation. കിട്ണԂ.
Centre for Management Development, Thiruvananthapuram 72
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
Building,
Trees,
Thattanvalappil 904879599 Water 67 133 Koodali Manoj
No
APL Muttannur 1 Land resources,
Hindu
Owned
Hereditary Road Agricultural Facilities
Mariyottil Trees,
974415129
y
68 133/4 Koodali V Narayani House ral Road No Positive
No
BPL 0 Land
Hindu
Family
Owned
Muttannur P O Nuclear Facilities
Hereditar
Agricultu Building,
and and
143,40/1 Trees, >ജപാസിറീവ്. >Positive.
A, Rameshan 944665823 Water > 69 Koodali Jyothish House 20 No Positive >Development No വികസനԂ
136/115,1 K P 0 APL resources,
Hindu
Family
Owned
Nuclear Nuclear building . is needed. Building , Building ആവശ്യമാണ് 48/116 Hereditary Road
Agriculture Both land Both land Facilities >വീജടാടക കൂടി സ്ഥലജമററടക
ക്ാꅍ >It is a
സജന്താഷമാണ്. pleasure to >നിലവിലകള്ള take the place water
and home.
വീട്ിജലക്്
147/109, Devaki Nivas, resources, Varijakshi 964556139 > It is difficult 70 136/6,147 Koodali Muttannur trees and No Positive No വഴി
K C 2 APL to find a way
Hindu /113 Idayannur P O Owned road സൗകരയമിലലാ Hereditary to existing facility Nuclear Family Nuclear ത്തത് home. >And therefore Both land and building and Both land ബകദ്ധിമകട്ാണ്. > favorable. Residencial House, Agriculture House, Residencial അതിനാല് അനകകൂലമാ ണ്. >മറുള്ളവ셍 ക്ക വീടിനക ജവണ്ടി > It is a place
that others
കരകതിയ C O have reserved
സ്ഥലമാണ്.
C O Radhakrishnan Trees, for home. 940048418 71 136/3 Koodali Ammalu Sree Ragam Road No Positive > > Expect No പദ്ധതിക്്
APL 3 Land Amma Muttannur Owned Facilities എടകത്താല് reasonable
Hereditary Edayannur. P O Agricultural compensation
Nuclear Family Nuclear നയായമായ if taken to the നഷ്ടപരിഹാരԂ project. പ്പതീക്ഷിക്ക ന്നക.
Centre for Management Development, Thiruvananthapuram 73
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
Ottappurayil Suresh 974799757 Road 72 143 Koodali Muttannur Positive
and
10 + Babu 7 BPL facilities
Family
Owned
Nuclear Nuclear
Directly Directly Pattannur building
Building
al House
Both land Both land
Residenci
purchased
Chandroth 996178439
Building, Moonnuparamb 1 73 143 Koodali Nisha T M Road No
No
20 +
BPL ath 918872915 Land
Hindu
Family
Owned
Nuclear Nuclear
Directly Directly
l House Facilities
purchased
Muttannur 6 Residencia >കൃഷിയകԂ
ഭൂമിയകԂ >The
നഷ്ടറെടകന്നതി equivalent of 134/156,1
ꅍ the loss of 36/158,13 Building, തത്തകലയമായി agriculture and 4/157,143 Trees, Sree Nilayam land - the land /153,143/ V K 944677055 Water ഭൂമിയകԂ മറുԂ 74 Koodali Muttannur No Positive will not be
No 151, Manoharan 4 APL resources, ലഭിക്ിലലജലലാ. Patttannur Owned available.
143/152,1 Hereditary Road >സ്ഥലവകԂ >Get rid of the 47/106,14 Family Nuclear Facilities place and the 7/159 വീടകԂ Both land and building and Both land house and take ഒഴിവാക്ി action. Residencial House, Agriculture House, Residencial നടപടി സവീകരിക്കക.
>വീ絍 Building, >we are
ഒഴിവാക്ി
Subhash Trees, supporting the
C M Sadanam 974479634 Water സ്ഥലԂ acquiring the
75 40 14 Koodali Bhaskaran 50 No Positive
No
Muttannur 4 APL resources, land away
Hindu
House, House, ഏററടകക്കന്ന
Owned
Directly Directly
Nair building
P O Pattannur purchased Road from except
Agriculture Residencial Residencial
Both land and and Both land തിꅍ Nuclear Family Nuclear Facilities the house . അനകകൂലԂ.
>വികസനԂ. Building, > >Development. മറ് വീ絍
735606423 Trees, >To build K K നി셍മ്മിക്ാനാ Anjali, 0 Water other house 76 143,40/14 Koodali Narayanan Yes Positive
land and and land No വശ്യമായി
Muttannur 949575423 APL resources, needs to be
Hindu
Owned
Nair building 0 Road നഷ്ട compensated
Agriculture
Both Nuclear Family Nuclear Facilities പരിഹാരԂ for.
Directly purchased Directly
Residencial House, House, Residencial തരണԂ.
>വികസനԂ
Vadakkendathu Trees, >The Village
949646347
y
77 143, 143 Koodali O N Rajan Muttannur ral Road No Positive needs No വിജലല ിꅍ
APL 4 Land
Hindu
Family
Owned
edayannur Nuclear Facilities development.
Hereditar Agricultu ആവശ്യമാണ്.
Centre for Management Development, Thiruvananthapuram 74
SIA of Land Acquisition for Establishing Industrial Park by KINFRA (Koodali, Pattannur and Keezhallur Villages)
Survey Included Opinion Sl. Contact Disputes Opinions Numbe Village Name Address in the about the Opinions
No. No. Loan on land (Malayalam)
nature
r Type of plot project
Religion
Category
APL/BPL
Ownership Ownership
Family Type
Usage of land
Nature of land
Years of Usage
Sree
>നഷ്ട
T K Venu Chaithanyam 994766622 >Need fair
78 143/41 Koodali al Trees No Positive പരിഹാരԂ
APL
Gopalan Kodolipram 0 (Yes compansation.
Family
Owned Nuclear Nuclear .
Agricultur തരണԂ
Hereditary
Pattannur loan) Bank
Centre for Management Development, Thiruvananthapuram 75