RAIL DEVELOPMENTAL WORKS Tirupati 3 Lifts 1.5 Crore Provided Tirupati Parliamentary Constituency Jurisdiction 1
Total Page:16
File Type:pdf, Size:1020Kb
Green Initiatives 1. Water Recycling plant is completed at Tirupati station with the cost of Rs.1.78 crore and revival of water bodies is completed with cost of ` 1.4 Lakhs. 2. LED lighting is completed at all stations in Tirupati Parliamentary Constituency. 4. Towards Energy conservation measures, installation of 43 kWp Solar Panels at Tirupati and 540 kWp Solar Panels at Carriage Repair Shop/Tirupati is completed. Passenger Train Services Details of New Trains/ Special Trains/ Provision of Stoppages/ Extension/Increase in frequency of Trains in the jurisdiction of Tirupati Parliamentary constituency. Tirupati Parliamentary Constituency New Trains introduction Express stoppage at Renigunta 5. Tr.No.17487/17488 Visakhapatnam– 1. Tr. No. 174 17/ 174 18 T irupati – 6. Tr.No.19419/19420 Chennai– Tirupati up to Kadapa Shirdi–Tirupati Weekly Express Ahmedabad– Chennai (Bi‐weekly) 6. Tr.No.20889/20890 Hourah– 2. Tr.No.17419/17420 Tirupati–Vasco‐ Express stoppage at Renigunta Vijayawada up to Tirupati Shri Narendra Modi da‐Gama–Tirupati Weekly Express 7. Tr.No. 22863/22864 Howrah– Hon’ble Prime Minister 3. Tr.No.22708/22707 Tirupati– Yesvantpur AC (Weekly) Express Special trains from Renigunta to Visakhapatnam–Tirupati Double stoppage at Renigunta 1. Aurangabad 1 special train Decker Tri–Weekly Express 8. T r . N o . 2 2 8 3 7 / 2 2 8 3 8 2. Kurnool City 1 special train 4. Tr.No.22705/22706 Tirupati– Hatia–Ernakulam Humsafar weekly Jammutawai–Tirupati weekly Express stoppage at Renigunta 3. Visakhapatnam 1 special train Humsafar Express 9. Tr.No.22887/22888 Howrah– 4. Visakhapatnam 9 special trains RAIL DEVELOPMENTAL WORKS 5. Tr.No.17621/17622 Aurangabad– Yesvantpur Humsafar weekly 5. Chennai Beach 10 special trains Renigunta–Aurangabad Weekly Express stoppage at Renigunta Special trains from Tirupati to Tirupati Parliamentary Constituency Jurisdiction Express 10. Tr.No.22877/22878 Howrah– 6. Adilabad 2 special trains 6. Tr.No.16793/16794 Rameswaram – Ernakulam Antyodaya weekly 7. Akola 2 special trains Faizabad Express Express stoppage at Renigunta 11. Tr.No.22833/ 22834 Bhubaneswar– 8. Aurangabad 38 special trains 7. Tr . N o . 1 1 0 6 5 / 1 1 0 6 6 M y s u r u – Krishnarajapuram–Bhubaneswar 9. Bhubaneswar 1 special train Renigunta Express Weekly Humsafar Express stoppage 10. Bilaspur 1 special train 8. Tr.No. 14815/14816 Bagath Ki Koti– at Renigunta 11. Vijayawada 9 special trains South Central Railway Tambaram Express 12. Tr.No.22920/22919 Ahmedabad– 12. Kakinada 37 special trains 9. Tr.No.22841/22842 Santragachi– Chennai Central–Ahmedabad serving the entire state of Chennai Express Humsafar Weekly Express stoppage 13. Dharmavaram 37 special trains 14. Howrah 7 special trains Telangana, major portion 10. Tr . N o . 1 9 6 0 3 / 1 9 6 0 4 A j m e r – at Renigunta Rameswaram Express 13. Tr.No.12245/12246 Howrah– 15. Hyderabad 3 special trains of Andhra Pradesh and 11. Tr.No.17237/17238 Chennai Central– Yesvantpur–Howrah Duronto 16. Jammutawi 1 special train Nellore MEMU Express Express stoppage at Renigunta 17. Kacheguda 59 special trains considerable portion of 14. Tr.No.12253/12254 Yesvantpur– SOUTH CENTRAL 12. Tr . N o . 2 2 3 5 3 / 2 2 3 5 4 P a t n a – 18. Nanded 108 special trains Karnataka, Maharastra Bhagalpur Express stoppage at 19. Narasapur 23 special trains Banaswadi Express Renigunta states and small parts 15. Tr.No.16733/16734 Rameshwaram– 20. Nagarsol 129 special trains RAILWAY Provision of Stoppage Okha Express stoppage at Renigunta 21. Secunderabad 10 special trains of Tamilnadu and 1. Tr.No.16353/16354 Kacheguda– Extension of Trains 22. Tuni 1 special train Nagercoil–Kacheguda Weekly 1. Tr.No.57477/57478 Tirupati– 23. Velankini 1 special train Madhya Pradesh. express stoppage at Tirupati & Guntakal–Tirupati Passenger was 24. Vasco–da–Gama 1 special train Renigunta first extended upto Kalyandurg and 25. Visakhapatnam 166 special trains 2. Tr.No.17417/17418 Tirupati–Shirdi subsequently extended upto 26. Anantapur 5 special trains Tirupati Parliamentary –Tirupati weekly express stoppage Kadiridevarapalle 27. Kakinada 59 special trains at Renigunta 2. Tr.No.17429/17430 Tirupati ‐ constituency, focused 3. Tr.No.17419/17420 Tirupati–Vasco‐ Hyderabad Rayalaseema Express 28. Guntakal 5 special trains da‐Gama–Tirupati Weekly Express extended upto Nizamabad with 29. Krishna 11 special trains attention has been given stoppage at Renigunta & Kodur new Train No. 12793/12794 30. Machilipatnam 1 special train for improvement in the 4. Tr.No.22708/22707 Tirupati– 3. Tr.No.17401/17402/17403/17404 31. Nizamabad 1 special train Visakhapatnam–Tirupati Double Machilipatnam/Narsapur–Tirupati 32. Purna 1 special train thrust areas such as D e c k e r Tr i ‐ We e k l y E x p r e s s Express up to Dharmavaram with stoppage at Renigunta & Tirupati new Tr.No. 17245/17246/17247/17248 33. Rajahmundry 11 special trains infrastructure, safety, 5. Tr.No.11073/11074 LTT Mumbai– 4. Tr.No.12733/12734 Tirupati– (Total 752 special Trains) Chennai–LTT Mumbai (Weekly) Secunderabad up to Lingampalli security and Passenger amenities/ facilities. ASSEMBLY SEGMENTS SafetyRoad Over – The / Under First Priority Bridges Road Over Bridge 1. ROB in lieu of LC No.103 between Gudur– Vijayawada With a view to strengthen safety at Level Crossing with the cost of `33.93 crore is completed and ROB Sarvepalli gates and to avoid untoward incidents and also to commissioned for traffic. provide seamless journey to road traffic, the Road Under Bridge Gudur following Road under /over Bridges (RuB/RoB) are 1. All unmanned level crossings are eliminated in constructed / proposed for construction under T i r u p a t i J u r i s d i c t i o n t h r o u g h c o n s t r u c t i o n o f Sullurpeta Tirupati Parliamentary constituency. RUB/LHS/Manning/Closure Venkatagiri Tirupati Srikalahasti Passenger Amenities Station Amenity Amount Status Yellakaru Toilets ` 1 Lakh Constructed Sathyavedu Provision of Passenger Amenities and Tirupati Waiting Room ` 4.62 crore Constructed facilities, and its improvements at Tirupati Waiting Room ` 2.72 crore Proposed Railway Stations is one of the most Rapur PF Shelter ` 4.04 crore Proposed Gudur CoTVM 4.5 lakh Provided important aspect of Railway Services. Tirupati 4 Escalators 4 crore Provided RAIL DEVELOPMENTAL WORKS Tirupati 3 Lifts 1.5 crore Provided Tirupati Parliamentary Constituency Jurisdiction 1. Proposed for Platform Construction / Renigunta 1 Escalator 1 crore In Progress Extension works at Renigunta, Venkatagiri, Gudur 1 Escalator 1 crore Provided Srikalahasti, Akkurthi, Rapur, Venkatachalam Gudur 1 Lift 0.5 crore In progress with an estimated cost of `7 Crore Infrastructural Development 4. It is proposed for Additional loop line (Standard lay Tirupati Improved Illumination – Provided o u t ) a t C h a n d r a g i r i Gudur Signages ` 1 crore Proposed (Tirupati – Katpadi section) with an estimated cost 2. Construction / Improvements of Station Tirupati, Gudur Wi‐Fi Facility ` 3.2 Lakhs Provided New Railway Lines of ` 11.30 Cr. Buildings is progress at Tirupati, Renigunta Renigunta, Wi‐Fi Facility `3.2 Lakhs Provided 1. A new railway line between Piduguralla – Savalyapuram 5. By‐Pass Line between Renigunta–Gudur is and Gudur with the cost of ` 1.31 crores and Venkatagiri for a distance of 45 Kms of Nadikudi – Srikalahasthi completed with cost of `16 Crore proposed for construction / improvement of Tirupati, Pakala 25 CCTV Cameras ` 52 Lakhs Provided section with an estimated cost of ` 330 crore is under station buildings at Rapur and Tirupati with Renigunta 2 Lifts ` 1 crore In Progress progress 6. Intermediate Block Signal provision at Renigunta – the cost of ` 3.75 crore ` 2. It is proposed to construct a new railway line between Mamanduru & Mamanduru – Balapalle is under Gudur 2 Lifts 1 crore Provided Savalyapuram – Venkatagiri for a distance of 264 Kms of progress Srikalahasthi 2 Lifts ` 1 crore In Progress Nadikudi – Srikalahasthi section with an estimated cost of 7. Covered Accomodation for IOH activities with 10 Tonne Venkatagiri CIB & TIB ` 65 Lakhs Provided ` 1953.60 crore crane arrangements at a cost of ` 7 Crores and Gudur CIB & TIB ` 1.64 crore Provided Augmentation of POH facilities for LHB coaches at a cost 3. A new railway line between Venkatachalam – Tirupati Southern Side Entry ` 77.72 crore In Progress of ` 19 crores in under progress at Tirupati Shed (TPYS) Obulavaripalli of Obulavaripalli– Krishnapatnam section Tirupati DiGiPAY ‐‐‐ Converted for a distance of 93 kms with an estimated cost of ` 956. 04 crore is completed and commissioned Tirupati BOOT Mode Mechanized Laundry ` 10.56 crore Completed 4. It is proposed to construct a new railway line between Tirupati 10 WVMs ‐‐‐ Installed Gudur – Duggarajapatnam for a distance of 42 Kms with Safety – The First Priority an estimated cost of ` 761.37 crore Renigunta 9 WVMs ‐‐‐ Installed Gudur 4 WVMs ‐‐‐ Installed Third Railway Line Construction Safety is the priority on SCR, to ensure safety of the Srikalahasti 1 WVM ‐‐‐ Installed 1. It is proposed for tripling of Vijayawada – Gudur for a Rail users, Foot over Bridges (FoBs)/ Road under/over ` distance of 288 Kms with an estimated cost of ` 3246.26 Cr. Bridges are constructed / proposed for construction Renigunta Concrete Apron 1.95 crore Completed Renigunta Cover Over Platform ` 76 Lakhs Completed Capacity Enhancement at various stations/ locations in Tirupati Parliamentary Constituency Jurisdiction. Gudur, Tirupati 9 ATVMs ` 19.5 Lakhs Installed 1. Conversion of stabling line to pitline is completed Renigunta 2 ATVMs ` at Tirupati station with the cost of 5.15 Cr. Tirupati 4 CoTVM ` 22.5 Lakhs Installed 2. Provision of cross over facility to the existing Constructed FOBs Renigunta CoTVM shunting neck towards Renigunta end with electrification at Tirupati Station is completed with Station Cost (`) Tirupati Toilets ` 75 lakh Completed the cost of ` 44.93 Cr.