Environment Impact Assessment Report
Total Page:16
File Type:pdf, Size:1020Kb
Environment Impact Assessment Report For Proposed New Project of Synthetic Organic Chemicals (Dye Intermediates &Specialty Chemicals) with Manufacturing Capacity of 170.5 MT/Month At Plot No. 719, Road No. 7, Sachin GIDC, Taluka - Chorasi, District - Surat, Gujarat, INDIA. Plot Area- 2010 m2 [ToR NO: IA-J-11011/339/2019-IA-II(I) on Dated 26/12/2019] Monitoring done by M/s. ENPRO Enviro Tech and Engineers Pvt. Ltd. (Environmental Laboratories) (NABL Accredited Certificate No. TC-5885 (valid till 31/05/2021)) [Category “A”, Project or Activity 5(f)] APPLICANT M/s. Orgo Chem (Guj.) Pvt. Ltd. Plot No. 719, Road No. 7, Sachin GIDC, Taluka - Chorasi, District - Surat, Gujarat, INDIA. Email: [email protected] Contact.: +91 (261) 239 7474 Prepared By: ENPRO Enviro Tech & Engineers Pvt. Ltd. (QCI-NABET ACCREDITATION NO. NABET/EIA/1922/RA 0122 (Valid till 12th January,2022)) 306, Royal Park, Adajan Road, Surat- 395 009, Gujarat, INDIA Ph.: +91-261-27896130, Fax: +91-261-2786129 E-mail: [email protected], [email protected] UNDERTAKING The undersigned, hereby, undertakes that the present EIA study report for the proposed new project of Synthetic Organic Chemicals (Dyes Intermediates & Specialty Chemicals) of M/s. Orgo Chem (Guj.) Pvt. Ltd. located at Plot No. 719, Road No. 7, Sachin GIDC, Taluka- Chorasi, District-Surat is in entire compliance with Terms of Reference (TOR) prescribed by the contents (information and data) of the EIA report, as presented by the EIA consultant (M/s. ENPRO Enviro Tech and Engineers Pvt. Ltd) to be accurate, true and own responsibility for the same. Date: 17/03/2020 Place: Sachin, Surat ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020 INDEX ANNEXURES No. Annexure I Manufacturing Process with Chemical Reaction and Mass Balance II Land Possession Documents III Plant Layout IV Treatability Report V CA Certificate VI NOC from BEIL for Hazardous Waste Landfilling VII NOC from BEIL for Incineration and Co- processing Hazardous Waste VIII NOC from Rhythm Chemical for Spent Solvents IX Meteorological data for the Study Period X ENPRO NABET – NABL Certificate XI Demographic Details for the study Area XII MoEF Order Compliance 1 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020 Sr. No. Title Page No. CHAPTER – 1: INTRODUCTION 1.1 Background 1.1 1.2 Purpose of EIA 1.1 1.3 Objective of EIA 1.2 1.4 The Project Proponent 1.2 1.5 The Project 1.3 1.5.1 Importance of the project to country and the region 1.4 1.6 Project Location 1.4 1.7 Regulatory Framework 1.6 1.8 Structure of the Project 1.6 CHAPTER – 2: PROJECT DESCRIPTION 2.1 Introduction 2.1 2.2 Need of the Project 2.1 2.3 Location 2.1 2.3.1 General Location of the Site 2.1 2.3.2 Specific Location of the Site with Project Boundary 2.3 2.3.3 Approach to the Site 2.3 2.3.4 Site History 2.4 2.4 Size and Magnitude of Operation 2.4 2.4.1 Project Resources 2.5 2.4.1.1 Land 2.5 2.4.1.2 Water 2.8 2.4.1.3 Energy (Power and Fuel) Requirement 2.8 2.4.1.4 Raw Material and Treatment Chemicals 2.9 2.4.1.5 Local and Other Infrastructure 2.9 2.5 Proposed Schedule for Approval and Implementation 2.11 2.6 Proposed Technology /Process 2.12 2.6.1 Raw Material, Storage & Mode of Transport 2.12 2.7 Gaseous Emission and its Control 2.22 2.8 Water Consumption, Waste Water Generation, Treatment of 2.23 Waste Water & Disposal Details 2.8.1 Process Description of Effluent Treatment Plant 2.26 2.8.1.1 In-house MEE treatment facility 2.26 2.8.1.2 Economical and Technical Viability of Effluent Treatment System 2.29 2.9 Solid & Hazardous Waste Management System 2.32 2.10 Solvent Management System 2.34 2.11 Rain Water Harvesting 2.37 2 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020 Sr. No. Title Page No. CHAPTER – 3: DESCRIPTION OF THE ENVIRONMENT 3.1 Introduction 3.1 3.2 Methodology 3.1 3.3 Water 3.2 3.3.1 Introduction 3.2 3.3.2 Location of Water Monitoring Stations 3.2 3.3.3 Methodology for sampling, preservation and transportation 3.6 3.3.4 Results 3.8 3.3.5 Interpretation 3.13 3.4 Meteorology 3.13 3.4.1 Introduction 3.13 3.4.2 Interpretation For Month Of March - 2019 3.14 3.4.3 Interpretation For Month Of April - 2019 3.15 3.4.4 Interpretation For Month Of May - 2019 3.16 3.4.5 Interpretation For March To May - 2019 3.17 3.4.6 Interpretation 3.18 3.5 Ambient Air 3.18 3.5.1 Design of Air Monitoring Sample Network 3.18 3.5.2 AAQM Monitoring Locations 3.18 3.5.3 Results 3.20 3.5.4 Interpretation of Results 3.24 3.6 Noise 3.25 3.6.1 Introduction 3.25 3.6.2 Noise Sampling Locations 3.25 3.6.3 Results 3.27 3.6.4 Interpretation 3.28 3.7 Land Environment 3.28 3.7.1 Soil Quality 3.28 3.7.2 Results 3.29 3.7.3 Land Use Pattern-Remote Sensing Data 3.32 3.7.4 Topographical Data 3.34 3.7.5 Land Use Map Analysis 3.35 3.7.5.1 Spatial Data from SOI Topographical Sheets 3.36 3.7.5.2 Contour Map and Elevations of Study Area 3.38 3.7.5.3 Topography (Digital Elevation Model) 3.40 3.7.5.4 Land Use Land Cover Statistics of Buffer Zone 3.42 3.8 Ecology & Biodiversity 3.45 3.8.1 Biological Environment 3.45 3 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020 Sr. No. Title Page No. 3.8.2 Scope of the Study 3.46 3.8.3 Methodology 3.46 3.8.4 Survey Type Used 3.47 3.8.5 Equipment/Instrument Deployed 3.47 3.8.6 Ecology of the Study Area 3.47 3.8.7 Field Observation 3.49 3.8.7.1 Habitats description of project site and its immediate 3.49 surroundings 3.8.7.2 Habitats description of the area (10 Km) 3.49 3.8.7.3 National Park/Sanctuaries and Biosphere reserve 3.50 3.8.8 Floral Diversity 3.50 3.8.8.1 Trees in the Study Area 3.50 3.8.8.2 Shrubs 3.52 3.8.8.3 Herbs 3.53 3.8.8.4 Hydrophytes 3.55 3.8.8.5 Grass 3.55 3.8.8.6 Climbers And Twiners 3.55 3.8.8.7 Cultivated Plants in the Study Area 3.56 3.8.9 Fauna 3.57 3.8.10 Phyto sociological data of study area 3.60 3.8.10.1 Distribution pattern (A/F ratio) 3.62 3.8.10.2 Fauna within the Core and buffer zones 3.63 3.8.10.3 Overall vegetation scenario of the study area 3.63 (from 0 to 10 km radius) 3.8.10.4 Endemic, Threatened and Endangered Species 3.63 3.9 Geology and Hydrology Studies 3.63 3.9.1 Geomorphology 3.63 3.9.2 Soil 3.65 3.9.3 Rainfall 3.65 3.9.4 Drainage 3.67 3.9.5 Geology 3.68 3.9.6 Hydrology 3.70 3.9.7 Ground Water Resources Estimation 3.73 3.10 Socio-Economic Environment 3.73 3.10.1 Demography 3.73 3.10.2 Description of Project Area 3.75 3.10.3 Work Participation Rate (Economic Status) 3.75 3.10.4 Industry – Trade & Commerce 3.76 4 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020 Sr. No. Title Page No. 3.10.5 Education Status 3.77 3.10.6 Employment Opportunities 3.77 3.10.7 Quality of Life 3.78 CHAPTER – 4: ANTICIPATED ENVIRONMENTAL IMPACT & MITIGATION MEASURE 4.1 Introduction 4.1 4.2 Identification of Activities 4.1 4.2.1 Construction Phase 4.1 4.2.2 Operational Phase 4.2 4.3 Environmental Attributes 4.2 4.4 Impact Identification Matrix 4.2 4.5 Approach to Evaluation of Impact through Matrix Method 4.3 4.5.1 Environmental Severity 4.4 4.5.2 Activity Score 4.4 4.5.3 Environmental Impact Score 4.10 4.6 Mitigation Measures 4.11 4.6.1 Construction Phase 4.11 4.6.2 Operation Phase 4.12 4.7 Model for Incremental Ground Level Concentration Due To 4.14 Proposed Project 4.7.1 Model Isopleths and Maximum Incremental Ground Level 4.15 Concentrations 4.7.2 Incremental Noise Generation Due to Proposed Project 4.21 4.7.3 Transportation of Vehicles 4.22 4.7.4 Incremental Emission Due to Proposed Transportation of 4.23 Vehicles 4.8 Anticipated Environmental Impacts and Mitigation Measures of 4.26 Hydrology and Geology 4.9 Anticipated Environmental Impacts and Mitigation Measures for 4.26 Land Environment 4.9.1 Anticipated Impacts 4.26 4.9.2 Mitigation Measures 4.27 4.10 Anticipated Environmental Impacts and Mitigation Measures of 4.27 Ecology & Biodiversity 4.11 Anticipated Environmental Impacts and Mitigation Measures of 4.30 Socio Economic 4.11.1 Anticipated Impacts 4.31 4.11.2 Mitigation Measures 4.32 5 ENPRO Enviro Tech and Engineers Pvt.