Environment Impact Assessment Report

For Proposed New Project of Synthetic Organic Chemicals (Dye Intermediates &Specialty Chemicals) with Manufacturing Capacity of 170.5 MT/Month At Plot No. 719, Road No. 7, Sachin GIDC, Taluka - Chorasi, District - , , .

Plot Area- 2010 m2

[ToR NO: IA-J-11011/339/2019-IA-II(I) on Dated 26/12/2019] Monitoring done by M/s. ENPRO Enviro Tech and Engineers Pvt. Ltd. (Environmental Laboratories) (NABL Accredited Certificate No. TC-5885 (valid till 31/05/2021)) [Category “A”, Project or Activity 5(f)]

APPLICANT

M/s. Orgo Chem (Guj.) Pvt. Ltd. Plot No. 719, Road No. 7, Sachin GIDC, Taluka - Chorasi, District - Surat, Gujarat, INDIA. Email: [email protected] Contact.: +91 (261) 239 7474 Prepared By: ENPRO Enviro Tech & Engineers Pvt. Ltd. (QCI-NABET ACCREDITATION NO. NABET/EIA/1922/RA 0122 (Valid till 12th January,2022)) 306, Royal Park, Adajan Road, Surat- 395 009, Gujarat, INDIA Ph.: +91-261-27896130, Fax: +91-261-2786129 E-mail: [email protected], [email protected]

UNDERTAKING

The undersigned, hereby, undertakes that the present EIA study report for the proposed new project of Synthetic Organic Chemicals (Dyes Intermediates & Specialty Chemicals) of M/s. Orgo Chem (Guj.) Pvt. Ltd. located at Plot No. 719, Road No. 7, Sachin GIDC, Taluka- Chorasi, District-Surat is in entire compliance with Terms of Reference (TOR) prescribed by the contents (information and data) of the EIA report, as presented by the EIA consultant (M/s. ENPRO Enviro Tech and Engineers Pvt. Ltd) to be accurate, true and own responsibility for the same.

Date: 17/03/2020

Place: Sachin, Surat

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

INDEX

ANNEXURES

No. Annexure I Manufacturing Process with Chemical Reaction and Mass Balance II Land Possession Documents III Plant Layout IV Treatability Report V CA Certificate VI NOC from BEIL for Hazardous Waste Landfilling VII NOC from BEIL for Incineration and Co- processing Hazardous Waste VIII NOC from Rhythm Chemical for Spent Solvents IX Meteorological data for the Study Period X ENPRO NABET – NABL Certificate XI Demographic Details for the study Area XII MoEF Order Compliance

1

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

Sr. No. Title Page No. CHAPTER – 1: INTRODUCTION 1.1 Background 1.1 1.2 Purpose of EIA 1.1 1.3 Objective of EIA 1.2 1.4 The Project Proponent 1.2 1.5 The Project 1.3 1.5.1 Importance of the project to country and the region 1.4 1.6 Project Location 1.4 1.7 Regulatory Framework 1.6 1.8 Structure of the Project 1.6 CHAPTER – 2: PROJECT DESCRIPTION 2.1 Introduction 2.1 2.2 Need of the Project 2.1 2.3 Location 2.1 2.3.1 General Location of the Site 2.1 2.3.2 Specific Location of the Site with Project Boundary 2.3 2.3.3 Approach to the Site 2.3 2.3.4 Site History 2.4 2.4 Size and Magnitude of Operation 2.4 2.4.1 Project Resources 2.5 2.4.1.1 Land 2.5 2.4.1.2 Water 2.8 2.4.1.3 Energy (Power and Fuel) Requirement 2.8 2.4.1.4 Raw Material and Treatment Chemicals 2.9 2.4.1.5 Local and Other Infrastructure 2.9 2.5 Proposed Schedule for Approval and Implementation 2.11 2.6 Proposed Technology /Process 2.12 2.6.1 Raw Material, Storage & Mode of Transport 2.12 2.7 Gaseous Emission and its Control 2.22 2.8 Water Consumption, Waste Water Generation, Treatment of 2.23 Waste Water & Disposal Details 2.8.1 Process Description of Effluent Treatment Plant 2.26 2.8.1.1 In-house MEE treatment facility 2.26 2.8.1.2 Economical and Technical Viability of Effluent Treatment System 2.29 2.9 Solid & Hazardous Waste Management System 2.32 2.10 Solvent Management System 2.34 2.11 Rain Water Harvesting 2.37

2

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

Sr. No. Title Page No. CHAPTER – 3: DESCRIPTION OF THE ENVIRONMENT 3.1 Introduction 3.1 3.2 Methodology 3.1 3.3 Water 3.2 3.3.1 Introduction 3.2 3.3.2 Location of Water Monitoring Stations 3.2 3.3.3 Methodology for sampling, preservation and transportation 3.6 3.3.4 Results 3.8 3.3.5 Interpretation 3.13 3.4 Meteorology 3.13 3.4.1 Introduction 3.13 3.4.2 Interpretation For Month Of March - 2019 3.14 3.4.3 Interpretation For Month Of April - 2019 3.15 3.4.4 Interpretation For Month Of May - 2019 3.16 3.4.5 Interpretation For March To May - 2019 3.17 3.4.6 Interpretation 3.18 3.5 Ambient Air 3.18 3.5.1 Design of Air Monitoring Sample Network 3.18 3.5.2 AAQM Monitoring Locations 3.18 3.5.3 Results 3.20 3.5.4 Interpretation of Results 3.24 3.6 Noise 3.25 3.6.1 Introduction 3.25 3.6.2 Noise Sampling Locations 3.25 3.6.3 Results 3.27 3.6.4 Interpretation 3.28 3.7 Land Environment 3.28 3.7.1 Soil Quality 3.28 3.7.2 Results 3.29 3.7.3 Land Use Pattern-Remote Sensing Data 3.32 3.7.4 Topographical Data 3.34 3.7.5 Land Use Map Analysis 3.35 3.7.5.1 Spatial Data from SOI Topographical Sheets 3.36 3.7.5.2 Contour Map and Elevations of Study Area 3.38 3.7.5.3 Topography (Digital Elevation Model) 3.40 3.7.5.4 Land Use Land Cover Statistics of Buffer Zone 3.42 3.8 Ecology & Biodiversity 3.45 3.8.1 Biological Environment 3.45

3

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

Sr. No. Title Page No. 3.8.2 Scope of the Study 3.46 3.8.3 Methodology 3.46 3.8.4 Survey Type Used 3.47 3.8.5 Equipment/Instrument Deployed 3.47 3.8.6 Ecology of the Study Area 3.47 3.8.7 Field Observation 3.49 3.8.7.1 Habitats description of project site and its immediate 3.49 surroundings 3.8.7.2 Habitats description of the area (10 Km) 3.49 3.8.7.3 National Park/Sanctuaries and Biosphere reserve 3.50 3.8.8 Floral Diversity 3.50 3.8.8.1 Trees in the Study Area 3.50 3.8.8.2 Shrubs 3.52 3.8.8.3 Herbs 3.53 3.8.8.4 Hydrophytes 3.55 3.8.8.5 Grass 3.55 3.8.8.6 Climbers And Twiners 3.55 3.8.8.7 Cultivated Plants in the Study Area 3.56 3.8.9 Fauna 3.57 3.8.10 Phyto sociological data of study area 3.60 3.8.10.1 Distribution pattern (A/F ratio) 3.62 3.8.10.2 Fauna within the Core and buffer zones 3.63 3.8.10.3 Overall vegetation scenario of the study area 3.63 (from 0 to 10 km radius) 3.8.10.4 Endemic, Threatened and Endangered Species 3.63 3.9 Geology and Hydrology Studies 3.63 3.9.1 Geomorphology 3.63 3.9.2 Soil 3.65 3.9.3 Rainfall 3.65 3.9.4 Drainage 3.67 3.9.5 Geology 3.68 3.9.6 Hydrology 3.70 3.9.7 Ground Water Resources Estimation 3.73 3.10 Socio-Economic Environment 3.73 3.10.1 Demography 3.73 3.10.2 Description of Project Area 3.75 3.10.3 Work Participation Rate (Economic Status) 3.75 3.10.4 Industry – Trade & Commerce 3.76

4

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

Sr. No. Title Page No. 3.10.5 Education Status 3.77 3.10.6 Employment Opportunities 3.77 3.10.7 Quality of Life 3.78 CHAPTER – 4: ANTICIPATED ENVIRONMENTAL IMPACT &

MITIGATION MEASURE 4.1 Introduction 4.1 4.2 Identification of Activities 4.1 4.2.1 Construction Phase 4.1 4.2.2 Operational Phase 4.2 4.3 Environmental Attributes 4.2 4.4 Impact Identification Matrix 4.2 4.5 Approach to Evaluation of Impact through Matrix Method 4.3 4.5.1 Environmental Severity 4.4 4.5.2 Activity Score 4.4 4.5.3 Environmental Impact Score 4.10 4.6 Mitigation Measures 4.11 4.6.1 Construction Phase 4.11 4.6.2 Operation Phase 4.12 4.7 Model for Incremental Ground Level Concentration Due To 4.14 Proposed Project 4.7.1 Model Isopleths and Maximum Incremental Ground Level 4.15 Concentrations 4.7.2 Incremental Noise Generation Due to Proposed Project 4.21 4.7.3 Transportation of Vehicles 4.22 4.7.4 Incremental Emission Due to Proposed Transportation of 4.23 Vehicles 4.8 Anticipated Environmental Impacts and Mitigation Measures of 4.26 Hydrology and Geology 4.9 Anticipated Environmental Impacts and Mitigation Measures for 4.26 Land Environment 4.9.1 Anticipated Impacts 4.26 4.9.2 Mitigation Measures 4.27 4.10 Anticipated Environmental Impacts and Mitigation Measures of 4.27 Ecology & Biodiversity 4.11 Anticipated Environmental Impacts and Mitigation Measures of 4.30 Socio Economic 4.11.1 Anticipated Impacts 4.31 4.11.2 Mitigation Measures 4.32

5

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

Sr. No. Title Page No. CHAPTER – 5: ANALYSIS OF ALTERNATIVES 5.1 Site Alternatives 5.1 5.2 Analysis of Alternative Technologies 5.1 5.3 Alternatives of Other Parameters 5.4 CHAPTER – 6: ENVIRONMENTAL MONITORING PROGRAM 6.1 Environmental Monitoring Program and Surveillance System 6.1 6.2 Post Project Environmental Monitoring Program 6.1 6.2.1 Reporting Schedule and Documentation 6.4 6.2.2 Budgetary Provisions 6.5 CHAPTER – 7: ADDITIONAL STUDIES 7.1 Introduction Risk Assessment 7.1 7.1.1 Objectives of Risk Assessment 7.1 7.1.2 Plant Layout 7.2 7.2 Risk Assessment 7.5 7.2.1 Qualitative Risk Assessment 7.5 7.2.1.1 Storage And Handling Of Solid Chemicals 7.7 7.2.1.2 Storage And Handling Of Acids 7.9 7.2.1.3 Storage And Handling Of Caustic Lye 7.11 7.2.2 Quantitative Risk Assessment 7.13 7.3 Comments / Recommendations Based on Consequence Analysis 7.23 7.4 Other Safety Precautions / Recommendations 7.25 7.4.1 Safety/Control Measures to Reduce The Risk of Fire, Explosion 7.25 and Toxic Release 7.4.2 Fire Control Plan 7.26 7.4.3 Do’s & Don’ts 7.27 7.4.4 Antidote Details 7.28 7.4.5 Ways to Minimize The Manual Handling Of The Hazardous 7.29 Chemicals 7.4.6 Safety Precautions for Ammonia 7.29 7.4.7 Safe Operating Procedure 7.29 7.5 On-Site And Off-Site Emergency Management Plan 7.30 7.5.1 Defining The Nature/Level of Emergency 7.30 7.5.2 Objectives of Emergency Management System 7.30 7.5.3 Structure of Emergency Management System 7.31 7.5.4 Communication System 7.36 7.6 Occupational Health & Safety Programme 7.40 7.6.1 Occupational Health & Damage Control During Different Phases 7.40 7.6.2 Hospital Facilities /Factory Medical Officer & OHC 7.40

6

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

Sr. No. Title Page No. 7.6.3 Ambulance Van & First Aid Box 7.40 7.6.4 Plan for Periodic Medical Checkup 7.40 7.6.5 Details of Occupational Health Impacts and Safety Hazards 7.41 7.6.6 Details of Work Place Ambient Air Quality Monitoring Plan 7.41 7.6.7 Monitoring of The Occupational Injury & It’s Impact On Workers 7.41 7.6.8 Provision of Industrial Hygienist & Health Evaluation of Workers 7.42 7.6.9 Safety Trainings & Mock Drills 7.42 7.7 Plan to curb release of VOCs in the air 7.43 CHAPTER – 8: PROJECT BENEFITS 8.1 Improvement in Infrastructure 8.1 8.2 Employment Potential 8.1 8.3 Other Tangible & Intangible Benefits 8.1 8.4 Corporate Environment Responsibility 8.1 CHAPTER – 9: ENVIRONMENTAL COST BENEFITS CHAPTER – 10: ENVIRONMENTAL MANAGEMENT PLAN 10.1 Introduction 10.1 10.2 Objectives & Scope 10.1 10.3 Administrative Aspects for EMP 10.2 10.3.1 Operational Philosophy 10.2 10.3.2 Management Support - Corporate Environment Policy 10.2 10.3.3 Environment Management Cell 10.2 10.4 Details of Environmental Mitigation Measures 10.4 10.5 In-House Laboratory 10.9 10.6 Biological Environment 10.9 10.7 Occupational Health and Safety 10.11 10.7.1 Budgetary Allocation for Environment Protection 10.12 10.8 Application of Cleaner Production Technology 10.13 10.8.1 Pollution Prevention 10.13 10.8.2 Water Conservation 10.13 10.8.3 Energy Conservation 10.14 10.8.4 Good House Keeping 10.14 CHAPTER – 11: SUMMARY AND CONCLUSION 11.1 Introduction 11.1 11.2 Project Description 11.1 11.3 Baseline Environmental Status 11.5 11.4 Impact Assessment and Mitigation Measures 11.7 11.5 Environment Monitoring Programme 11.8 11.6 Environmental Management Cell 11.8

7

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

Sr. No. Title Page No. 11.7 Project Benefits 11.9 CHAPTER – 12: DISCLOSURE OF CONSULTANT 12.1 Names of the Consultants Engaged With Their Brief Resume and 12.1 Nature of Consultancy Rendered

LIST OF FIGURES

Figure No. Figures Page No. 1.1 Location of Project 1.5 2.1 Factory Layout Plan 2.7 2.2 Proposed Water Balance Diagram 2.25 2.3 Process Flow Diagram For Solvent Recovery System 2.36 2.4 Rain Water Harvesting Pit 2.39 3.1 Study Area Map – 5 Km & 10 Km From Project Site 3.2 3.2 Sampling Locations For Ground Water And Surface Water 3.5 3.3 Wind Rose Diagram For March – 2019 3.14 3.4 Wind Rose Diagram For April – 2019 3.15 3.5 Wind Rose Diagram For May – 2019 3.16 3.6 Wind Rose Diagram For March to May – 2019 3.17 3.7 Monitoring Location for Ambient Air Quality 3.20 3.8 Location Map of Noise Level Monitoring Stations 3.26 3.9 Location Map of Soil Monitoring Stations 3.29 3.10 Flow Chart of Methodology 3.35 3.11 Graphical Presentation of Land Use Statistics 3.45 3.12 Toposheet of the Project Site 3.48 3.13 Graphical representation of habit wise no of species in the given 3.60 study area 3.14 Graph showing important value index of dominant tree species 3.60 within study area 3.15 Annual Average Climatograph Of the Study Area (Surat) 3.66 3.16 Annual Rainfall During the Years 1963-2018 3.67 3.17 Drainage in Study Area 3.68 3.18 Depth to Water Levels in the Study Area 3.72 3.19 Study Area (10 KM) 3.74

4.1 (A) Isopleths Plot For PM2.5 (10 KM Radius) 4.16

4.1 (B) Isopleths Plot For PM10 (10 KM Radius) 4.17

4.1 (C) Isopleths Plot For SO2 (10 KM Radius) 4.18

4.1 (D) Isopleths Plot For NOx (10 KM Radius) 4.19

4.1 (E) Isopleths Plot For NH3 (10 KM Radius) 4.20

8

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

Figure No. Figures Page No. 4.2 Incremental Emission Concentration Due to Proposed Vehicular 4.25 Transportation (Vehicle at Point A) 4.3 Incremental Emission Concentration Due to Proposed Vehicular 4.25 Transportation (Vehicle at Point B) 7.1 Plot Plan M/s.Orgochem (Guj) Pvt.Ltd.,Sachin 7.2 10.1 Environmental Management Cell 10.3

LIST OF TABLES

Table No. Tables Page No. 1.1 List of Directors 1.2 2.1 Co-ordinates of Project Boundary 2.3 2.2 Salient Features of the Project Site 2.4 2.3 List of Proposed Products and Production Capacity 2.4 2.4 Area Breakup of the Site 2.8 2.5 Details of Equipment/Machinery 2.9 2.6 Project Implementation Schedule 2.11 2.7 Details of Raw Materials 2.12 Characteristics, Means of Storage and Transportation of Raw 2.8 2.19 Materials 2.9 Details of Stacks, Fuel Used And APCM Attached 2.22 2.10 Details of Water Consumption & Waste Water Generation 2.23 2.11 Characteristics of Composite Sample 2.26 2.12 List Of Effluent Treatment Plant Units (Concentrated Stream) 2.28 2.13 Economical viability of ETP 2.29 2.14 Categorization, storage and disposal of waste 2.32 2.15 Details Of Solvent Recovery 2.37 2.16 Runoff Co-efficient 2.38 2.17 Rainwater Harvesting at Site 2.38 3.1 Methodology of Data Collection 3.1 3.2 Details of Water Sampling Locations 3.3 3.3 Surface Water Quality of Study Area 3.9 3.4 Ground Water Quality of Study Area 3.11 3.5 Site Specific Meteorological Data (1st March – 31st May 2019) 3.13 3.6 AAQM Locations with Justification 3.19 3.7 Methodology of Analysing Ambient Air Monitoring Parameters 3.21 3.8 Ambient Air Quality Monitoring Results 3.22 3.9 Location of Noise Level Monitoring Stations 3.27

9

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

Table No. Tables Page No. 3.10 Noise Level at Project Site & Study Area 3.27 3.11 Location of Soil Sampling 3.28 3.12 Results for Soil Samples 3.30 3.13 Soil Test Results- Reference Tables 3.31 3.14 Land Use Land Covers Statistics of Buffer Zone 3.45 3.15 List of trees observed in the study area 3.50 3.16 List of shrubs observed in the study area 3.52 3.17 List of herbs observed in the study area 3.53 3.18 List of hydrophytes observed in the study area 3.55 3.19 List of grass observed in the study area 3.55 3.20 List of climbers and twiners observed in the study area 3.56 3.21 Checklist of Mammalian Species in the Study Area 3.57 List of Aves Either Spotted or Reported or Recorded from The 3.22 3.57 Study Area. 3.23 List of Reptiles Either Spotted or Reported from the Study Area. 3.59 List of Amphibians Either Spotted or Reported from the Study 3.24 3.59 Area 3.25 Biodiversity indices value of sampling site in buffer zone 3.62 3.26 Climate Data For Chorasi Taluka, , Gujarat 3.65 3.27 Geological Succession in Surat District 3.68 3.28 Details about Inventory of Wells 3.71 Ground Water Resources of Chorasi Taluka, Surat District, 3.29 3.73 Gujarat 3.30 Demographic Analysis for Project Area – 2011 3.74 3.31 Demographic Profile of the Project Area 3.75 3.32 SEZs located in Surat 3.77 Education Status of Working Population (In No.) in Different 3.33 3.77 Villages 3.34 Status of Pattern of Employment of Working Population (%) 3.78 Status Of Manpower For The Proposed Plan in M/s. Orgochem 3.35 3.78 Guj.Pvt.Ltd. 4.1 Impact Identification Matrix - Construction Phase 4.3 4.2 Impact Identification Matrix - Operation Phase 4.3 4.3 Severity Criteria 4.4 4.4 Impact Evaluation Matrix- Construction Phase 4.4 4.5 Impact Evaluation Matrix- Operational Phase 4.5 4.6 Justification of Assigned Values– Construction Phase 4.5 4.7 Justification of Assigned Values– Operational Phases 4.7

10

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

Table No. Tables Page No. 4.8 Environmental Impacts score and Potential of Impacts 4.10 4.9 Details of Predicted Emission from Stacks 4.14 4.10 Maximum Incremental Ground Level Concentration 4.21 4.11 Incremental Noise Generation 4.21 4.12 Design Bases of Vehicular Emission 4.23 4.13 Calculation of Source Strength Based on Emission Factor 4.23 Incremental Emission Concentration of ‘CO’, ‘HC’, ‘NOx’, ‘PM’ due 4.14 4.24 to Vehicular Transportation Summary of the Impact & Suggested Mitigation Measures for All 4.15 4.33 Parameter Analysis of alternative technologies with respect to environment 5.1 5.3 / waste management 5.2 Alternative of Parameters 5.4 Environmental Monitoring Parameters & Frequency & Monitoring 6.1 6.2 Points/Locations & Components 6.2 Detail Break Up of Budget for Environmental Monitoring Plan 6.5 7.1(A) Storage details of raw materials 7.3 7.1(B) Properties of hazardous chemicals 7.4 7.2 Risk Matrix for Qualitative Risk Assessment 7.6 7.3 Risk Acceptability Criteria 7.6 Risk & Recommendations For Storage and Handling of Solid 7.4 7.7 Chemicals 7.5 Risk & Recommendations For Storage and Handling of Acids 7.9 Risk & Recommendations For Storage and Handling of Caustic 7.6 7.11 Lye 7.7 Effects due to Incident Radiation Intensity 7.14 7.8 Damage Due To Over pressures 7.14 7.9 Weather data used for the study 7.15 7.10 Scenario Identified For Consequence Analysis 7.16 7.11 Scenario # 1- Release of Methanol 7.18 7.12 Scenario # 2- Release of Ammonia 7.20 7.13 Results 7.20 7.14 Flash Fire Scenarios 7.22 7.15 Late Pool Fire Scenarios 7.22 7.16 Toxic Scenarios 7.22 7.17 Safety Precautions 7.25 7.18 Antidotes/ Medical Treatment 7.28 7.19 Details of Probable Sources Leakage 7.46

11

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

Table No. Tables Page No. 7.20 Preventive Measures for Leakage 7.46 7.21 Checklist for Implementation of LDAR Program to Reduce 7.48 Emission of VOCs. 8.1 Proposed Social Activities 8.2 10.1 List of Major Laboratory Instruments 10.9 10.2 Plantation Near Waste Lands / Reserve Forested Areas / Road 10.10 Side 10.3 Proposed Financial Budget for The Green Belt Development 10.11 (Rs in Lakhs) 10.4 Environmental Budget Allocation 10.12 11.1 Product Along with Production Capacity 11.2 11.2 Details of Pollution Potential/ Identified Sources of Impacts 11.3

LIST OF MAPS

Map Page Maps No. No. 2.1 Location of Project Site 2.2 2.2 Specific Location Map with Project Boundary of Project Site 2.3 3.1 Satellite Image of the Site 3.34 3.2 Site Location Within 5 km & 10 km Radius on Topomap 3.38 3.3 Contour Map of Site Location Within 10 Km 3.40 3.4 Map Showing Digital Elevation Model in Study Area 3.42 3.5 Map Showing Land Use Land Cover in Study Area 3.44 3.6 Map Showing Water Bodies, Drainage in Study Area 3.45 3.7 Regional Map of Project Area 3.65 3.8 Project Site and Surroundings 3.65 3.9 Geological Distribution in Surat District 3.70

LIST OF PHOTOGRAPHS

Photo Page Photographs No. No. 2.1 Photographs of Proposed Site 2.6 3.1 Photographs of Water Sampling 3.4 3.2 Hand pump Fitted Borewell Village Near Taraj Village 3.71 3.3 Industrial Effluent Along the Stream Course Near Gabheni 3.73

12

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

LIST OF ABBREVIATIONS USED

AAQ AMBIENT AIR QUALITY AMSL ABOVE MEAN SEA LEVEL APHA AMERICAN PUBLIC HEALTH ASSOCIATION ASP ACTIVATED SLUDGE PROCESS ATFD AGITATED THIN FILM DRYER AWWA AMERICAN WATER WORKS ASSOCIATION BDL BELOW DETECTABLE LIMIT BEIL BEIL INFRASTRUCTURE LIMITED BOD BIOCHEMICAL OXYGEN DEMAND BP BOILING POINT CCA CONSENT CONSOLIDATED AND ATUTHORIZATION CEC CATION EXCHANGE CAPACIY CER CORPORATE ENVIRONMENTAL RESPONSIBILITY CGWA CENTRAL GROUND WATER AUTHORITY COD CHEMICAL OXYGEN DEMAND CPCB CENTRAL POLLUTION CONTROL BOARD CRZ COASTAL REGULATORY ZONE CSR CORPORATE SOCIAL RESPONSIBILITY CTE CONSENT TO ESTABLISH DEM DIGITAL ELEVATION MODEL DMF DIMETHYL FORMAMIDE DMP DISASTER MANAGEMENT PLAN DO DISSOLVED OXYGEN DPR DETAIL PROJECT REPORT EC ENVIRONMENT CLEARANCE EHS ENVIRONMENT, HEALTH & SAFETY EIA ENVIRONMENTAL IMPACT ASSESSMENT EMP ENVIRONMENT MANAGEMENT PLAN ENPRO ENPRO ENVIRO TECH AND ENGINEERS PVT. LTD. ETP EFFLUENT TREATMENT PLANT GIDC GUJARAT INDUSTRIAL DEVELOPMENT CORPORATION GLC GROUND LEVEL CONCENTRATION GPCB GUJARAT POLLUTION CONTROL BOARD GPS GLOBAL POSITIONING SYSTEM HDPE HIGH DENSITY POLY ETHYLENE HIRA HAZARDS IDENTIFICATION & RISK ASSESSMENT HSD HIGH SPEED DIESEL IPA ISO PROPYL ALCOHOL IS INDIAN STANDARD

13

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

LDO LIGHT DIESEL OIL LU LAND USE MBAS METHYLENE BLUE ACTIVE SUBSTANCE MEE MULTIPLE EFFECT EVAPORATOR MLD MILLION LITRE PER DAY MOC MATERIAL OF CONSTRUCTION MOEF MINISTRY OF ENVIRONMENT AND FOREST MP MELTING POINT NAAQS NATIONAL AMBIENT AIR QUALITY SYSTEM NOC NO OBJECTION CERTIFICATE NRSC NATIONAL REMOTE SENSING CENTRE PAH POLY AEROMATIC HYDROCARBON PM PARTICULATE MATTER PPE PERSONNEL PROTECTIVE EQUIPMENT R & D RESEARCH AND DEVELOPMENT RAQ RISK ASSESSMENT QUESTIONNAIRE REIA RAPID ENVIRONMENT IMPACT ASSESSMENT RO REVERSE OSMOSIS SAR SODIUM ADSOPTION RATIO SEAC STATE EXPERT APPRAISAL COMMITTEE SEZ SPECIAL ECONOMIC ZONE SIA SOCIAL IMPACT ASSESSMENT STP SEWAGE TREATMENT PLANT TDS TOTAL DISSOLVED SOLIDS THF TETRAHYDROFURAN TOR TERM OF REFERENCE TSDF TREATMENT STORAGE AND DISPOSAL FACILITY TSS TOTAL SUSPENDED SOLIDS VOC VOLATILE ORGANIC COMPOUND WHC WATER HOLDING CAPACITY

LIST OF SYMBOLS / NOTATIONS USED

µg/m3 microgram per cubic meter aq. Aqueous dB(A) Decibel HCl Hydrochloric Acid HF Hydrogen Fluoride HI Hydrogen Iodide kL kilo Liter kL/day kilo Liter per day

14

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Index Date 17/03/2020

km kilometer km/h kilo meter per hour kPa kilo pascal kVA kilo Volt Ampere Liq. Liquid m/s meter per second meq. mill equivalent mg/Nm3 milligram per normal cubic meter mmHg milli meter of Mercury Column MPN/100mL Most Probable Number per 100 mL MT Metric Ton NaOH Sodium Hydroxide

NH3 Ammonia

NOX Oxides of Nitrogen PM Particulate Matter ppm parts per million

SO2 Sulphur Dioxide

15

Tor Letter

No.IA-J-11011/339/2019-IA-II(I) Goverment of India Minister of Enviroment,Forest and Climate Change Impact Assessment Division ***

Indira Paryavaran Bhavan, Vayu Wing,3rd Floor,Aliganj, Jor Bagh Road,New Delhi-110003 26 Dec 2019

To,

M/s ORGOCHEM (GUJ.) PVT. LTD. Plot No. 719, Road No. 7, Sachin GIDC, Taluka-Chorasi, District-Surat, Surat-394230 Gujarat

Tel.No.0261-2397541; Email:[email protected]

Sir/Madam,

This has reference to the proposal submitted in the Ministry of Environment, Forest and Climate Change to prescribe the Terms of Reference (TOR) for undertaking detailed EIA study for the purpose of obtaining Environmental Clearance in accordance with the provisions of the EIA Notification, 2006. For this purpose, the proponent had submitted online information in the prescribed format (Form-1 ) along with a Pre-feasibility Report. The details of the proposal are given below:

1. Proposal No.: IA/GJ/IND2/124974/2019

2. Name of the Proposal: Orgochem (Guj.) Pvt. Ltd.

3. Category of the Proposal: Industrial Projects - 2

4. Project/Activity applied for: 5(f) Synthetic organic chemicals industry (dyes & dye intermediates; bulk

5. Date of submission for TOR: 19 Nov 2019

In this regard, under the provisions of the EIA Notification 2006 as amended, the Standard TOR for the purpose of preparing environment impact assessment report and environment management plan for obtaining prior environment clearance is prescribed with public consultation as follows: STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

5(f):STANDARD TERMS OF REFERENCE FOR CONDUCTING ENVIRONMENT IMPACT ASSESSMENT STUDY FOR SYNTHETIC ORGANIC CHEMICALS INDUSTRY (DYES & DYE INTERMEDIATES; BULK DRUGS AND INTERMEDIATES EXCLUDING DRUG FORMULATIONS; SYNTHETIC RUBBERS; BASIC ORGANIC CHEMICALS, OTHER SYNTHETIC ORGANIC CHEMICALS AND CHEMICAL INTERMEDIATES) AND INFORMATION TO BE INCLUDED IN EIA/EMP REPORT

A. STANDARD TERMS OF REFERENCE

1) Executive Summary 2) Introduction i. Details of the EIA Consultant including NABET accreditation ii. Information about the project proponent iii. Importance and benefits of the project 3) Project Description i. Cost of project and time of completion. ii. Products with capacities for the proposed project. iii. If expansion project, details of existing products with capacities and whether adequate land is available for expansion, reference of earlier EC if any. iv. List of raw materials required and their source along with mode of transportation. v. Other chemicals and materials required with quantities and storage capacities vi. Details of Emission, effluents, hazardous waste generation and their management. vii. Requirement of water, power, with source of supply, status of approval, water balance diagram, man-power requirement (regular and contract) viii. Process description along with major equipments and machineries, process flow sheet (quantative) from raw material to products to be provided ix. Hazard identification and details of proposed safety systems. x. Expansion/modernization proposals: c. Copy of all the Environmental Clearance(s) including Amendments thereto obtained for the project from MOEF/SEIAA shall be attached as an Annexure. A certified copy of the latest Monitoring Report of the Regional Office of the Ministry of Environment and Forests as per circular dated 30th May, 2012 on the status of compliance of conditions stipulated in all the existing environmental clearances including Amendments shall be provided. In STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

addition, status of compliance of Consent to Operate for the ongoing Iexisting operation of the project from SPCB shall be attached with the EIA-EMP report. d. In case the existing project has not obtained environmental clearance, reasons for not taking EC under the provisions of the EIA Notification 1994 and/or EIA Notification 2006 shall be provided. Copies of Consent to Establish/No Objection Certificate and Consent to Operate (in case of units operating prior to EIA Notification 2006, CTE and CTO of FY 2005-2006) obtained from the SPCB shall be submitted. Further, compliance report to the conditions of consents from the SPCB shall be submitted. 4) Site Details i. Location of the project site covering village, Taluka/Tehsil, District and State, Justification for selecting the site, whether other sites were considered. ii. A toposheet of the study area of radius of 10km and site location on 1:50,000/1:25,000 scale on an A3/A2 sheet. (including all eco-sensitive areas and environmentally sensitive places) iii. Details w.r.t. option analysis for selection of site iv. Co-ordinates (lat-long) of all four corners of the site. v. Google map-Earth downloaded of the project site. vi. Layout maps indicating existing unit as well as proposed unit indicating storage area, plant area, greenbelt area, utilities etc. If located within an Industrial area/Estate/Complex, layout of Industrial Area indicating location of unit within the Industrial area/Estate. vii. Photographs of the proposed and existing (if applicable) plant site. If existing, show photographs of plantation/greenbelt, in particular. viii. Landuse break-up of total land of the project site (identified and acquired), government/ private - agricultural, forest, wasteland, water bodies, settlements, etc shall be included. (not required for industrial area) ix. A list of major industries with name and type within study area (10km radius) shall be incorporated. Land use details of the study area x. Geological features and Geo-hydrological status of the study area shall be included. xi. Details of Drainage of the project upto 5km radius of study area. If the site is within 1 km radius of any major river, peak and lean season river discharge as well as flood occurrence frequency based on peak rainfall data of the past 30 years. Details of Flood Level of the project site and maximum Flood Level of the river shall also be provided. (mega green field projects) xii. Status of acquisition of land. If acquisition is not complete, stage of the acquisition process and expected time of complete possession of the land. xiii. R&R details in respect of land in line with state Government policy. STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

5) Forest and wildlife related issues (if applicable): i. Permission and approval for the use of forest land (forestry clearance), if any, and recommendations of the State Forest Department. (if applicable) ii. Landuse map based on High resolution satellite imagery (GPS) of the proposed site delineating the forestland (in case of projects involving forest land more than 40 ha) iii. Status of Application submitted for obtaining the stage I forestry clearance along with latest status shall be submitted. iv. The projects to be located within 10 km of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-à-vis the project location and the recommendations or comments of the Chief Wildlife Warden-thereon. v. Wildlife Conservation Plan duly authenticated by the Chief Wildlife Warden of the State Government for conservation of Schedule I fauna, if any exists in the study area. vi. Copy of application submitted for clearance under the Wildlife (Protection) Act, 1972, to the Standing Committee of the National Board for Wildlife. 6) Environmental Status i. Determination of atmospheric inversion level at the project site and site-specific micro- meteorological data using temperature, relative humidity, hourly wind speed and direction and rainfall. ii. AAQ data (except monsoon) at 8 locations for PM10, PM2.5, SO2, NOX, CO and other parameters relevant to the project shall be collected. The monitoring stations shall be based CPCB guidelines and take into account the pre-dominant wind direction, population zone and sensitive receptors including reserved forests. iii. Raw data of all AAQ measurement for 12 weeks of all stations as per frequency given in the NAQQM Notification of Nov. 2009 along with - min., max., average and 98% values for each of the AAQ parameters from data of all AAQ stations should be provided as an annexure to the EIA Report. iv. Surface water quality of nearby River (100m upstream and downstream of discharge point) and other surface drains at eight locations as per CPCB/MoEF&CC guidelines. v. Whether the site falls near to polluted stretch of river identified by the CPCB/MoEF&CC, if yes give details. vi. Ground water monitoring at minimum at 8 locations shall be included. vii. Noise levels monitoring at 8 locations within the study area. viii. Soil Characteristic as per CPCB guidelines. ix. Traffic study of the area, type of vehicles, frequency of vehicles for transportation of materials, additional traffic due to proposed project, parking arrangement etc. STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

x. Detailed description of flora and fauna (terrestrial and aquatic) existing in the study area shall be given with special reference to rare, endemic and endangered species. If Schedule- I fauna are found within the study area, a Wildlife Conservation Plan shall be prepared and furnished. xi. Socio-economic status of the study area. 7) Impact and Environment Management Plan i. Assessment of ground level concentration of pollutants from the stack emission based on site-specific meteorological features. In case the project is located on a hilly terrain, the AQIP Modelling shall be done using inputs of the specific terrain characteristics for determining the potential impacts of the project on the AAQ. Cumulative impact of all sources of emissions (including transportation) on the AAQ of the area shall be assessed. Details of the model used and the input data used for modelling shall also be provided. The air quality contours shall be plotted on a location map showing the location of project site, habitation nearby, sensitive receptors, if any. ii. Water Quality modelling - in case of discharge in water body iii. Impact of the transport of the raw materials and end products on the surrounding environment hall be assessed and provided. In this regard, options for transport of raw materials and finished products and wastes (large quantities) by rail or rail-cum road transport or conveyor- cum-rail transport shall be examined. iv. A note on treatment of wastewater from different plant operations, extent recycled and reused for different purposes shall be included. Complete scheme of effluent treatment. Characteristics of untreated and treated effluent to meet the prescribed standards of discharge under E(P) Rules. v. Details of stack emission and action plan for control of emissions to meet standards. vi. Measures for fugitive emission control vii. Details of hazardous waste generation and their storage, utilization and management. Copies of MOU regarding utilization of solid and hazardous waste in cement plant shall also be included. EMP shall include the concept of waste-minimization, recycle/reuse/recover techniques, Energy conservation, and natural resource conservation. viii. Proper utilization of fly ash shall be ensured as per Fly Ash Notification, 2009. A detailed plan of action shall be provided. ix. Action plan for the green belt development plan in 33 % area i.e. land with not less than 1,500 trees per ha. Giving details of species, width of plantation, planning schedule etc. shall be included. The green belt shall be around the project boundary and a scheme for greening of the roads used for the project shall also be incorporated. x. Action plan for rainwater harvesting measures at plant site shall be submitted to harvest rainwater from the roof tops and storm water drains to recharge the ground water and also to STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

use for the various activities at the project site to conserve fresh water and reduce the water requirement from other sources. xi. Total capital cost and recurring cost/annum for environmental pollution control measures shall be included. xii. Action plan for post-project environmental monitoring shall be submitted. xiii. Onsite and Offsite Disaster (natural and Man-made) Preparedness and Emergency Management Plan including Risk Assessment and damage control. Disaster management plan should be linked with District Disaster Management Plan. 8) Occupational health i. Plan and fund allocation to ensure the occupational health & safety of all contract and casual workers ii. Details of exposure specific health status evaluation of worker. If the workers' health is being evaluated by pre designed format, chest x rays, Audiometry, Spirometry, Vision testing (Far & Near vision, colour vision and any other ocular defect) ECG, during pre placement and periodical examinations give the details of the same. Details regarding last month analyzed data of above mentioned parameters as per age, sex, duration of exposure and department wise. iii. Details of existing Occupational & Safety Hazards. What are the exposure levels of hazards and whether they are within Permissible Exposure level (PEL). If these are not within PEL, what measures the company has adopted to keep them within PEL so that health of the workers can be preserved, iv. Annual report of heath status of workers with special reference to Occupational Health and Safety. 9) Corporate Environment Policy i. Does the company have a well laid down Environment Policy approved by its Board of Directors? If so, it may be detailed in the EIA report. ii. Does the Environment Policy prescribe for standard operating process / procedures to bring into focus any infringement / deviation / violation of the environmental or forest norms / conditions? If so, it may be detailed in the EIA. iii. What is the hierarchical system or Administrative order of the company to deal with the environmental issues and for ensuring compliance with the environmental clearance conditions? Details of this system may be given. iv. Does the company have system of reporting of non compliances / violations of environmental norms to the Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism shall be detailed in the EIA report STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

10) Details regarding infrastructure facilities such as sanitation, fuel, restroom etc. to be provided to the labour force during construction as well as to the casual workers including truck drivers during operation phase. 11) Enterprise Social Commitment (ESC) i. Adequate funds (at least 2.5 % of the project cost) shall be earmarked towards the Enterprise Social Commitment based on Public Hearing issues and item-wise details along with time bound action plan shall be included. Socio-economic development activities need to be elaborated upon. 12) Any litigation pending against the project and/or any direction/order passed by any Court of Law against the project, if so, details thereof shall also be included. Has the unit received any notice under the Section 5 of Environment (Protection) Act, 1986 or relevant Sections of Air and Water Acts? If so, details thereof and compliance/ATR to the notice(s) and present status of the case. 13) 'A tabular chart with index for point wise compliance of above TOR.

B. SPECIFIC TERMS OF REFERENCEFOREIASTUDIES FOR SYNTHETIC ORGANIC CHEMICALS INDUSTRY (DYES & DYE INTERMEDIATES; BULK DRUGS AND INTERMEDIATES EXCLUDING DRUG FORMULATIONS; SYNTHETIC RUBBERS; BASIC ORGANIC CHEMICALS, OTHER SYNTHETIC ORGANIC CHEMICALS AND CHEMICAL INTERMEDIATES)

1. Detailsonsolvents to be used,measuresfor solventrecovery and for emissions control. 2. Details of process emissions from the proposed unit and its arrangement to control. 3. Ambient air quality data should include VOC, otherprocess-specificpollutants* like NH3*, chlorine*, HCl*, HBr*, H2S*, HF*,etc.,(*-asapplicable) 4. Work zone monitoring arrangements for hazardous chemicals. 5. Detailed effluent treatment scheme including ssegregation of effluent streams for units adopting 'Zero' liquid discharge. 6. Action plan for odour control to be submitted. 7. A copy of the Memorandum of Understanding signed with cement manufacturers indicating clearly that they co-process organic solid/hazardous waste generated. 8. Authorization/Membership for the disposal of liquid effluent in CETP and solid/hazardous waste in TSDF, if any. 9. Action plan for utilization of MEE/dryers salts. 10. Material Safety Data Sheet for all the Chemicals are being used/will be used. 11. Authorization/Membership for the disposal of solid/hazardous waste in TSDF. STANDARD TERMS OF REFERENCE (TOR) FOR EIA/EMP REPORT FOR PROJECTS/ ACTIVITIES REQUIRING ENVIRONMENT CLEARANCE

12. Details of incinerator if to be installed. 13. Risk assessment for storage and handling of hazardous chemicals/solvents. Action plan for handling & safety system to be incorporated. 14. Arrangements for ensuring health and safety of workers engaged in handling of toxic materials.

***

ToR Compliance ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Terms of References and It’s Compliances

Sr. Standard Terms of References Compliances No. 1 Executive Summary Orgo Chem (Guj) Pvt. Ltd. is now proposing to set up a new manufacturing unit of dye intermediate and specialty chemical products @ 170.5 MT/Month at Plot No. 719, Road No. 7, Sachin GIDC, Surat, Gujarat.

Proposed project shall be located in 2010m2 area. In which, 805 m2 (40 % of the total plot area) shall be allotted to green belt development.

Total water requirement for the proposed project is 45 KL/Day which shall be sourced from Sachin GIDC. Total wastewater generation shall be 34.5 KL/Day. Unit will recycle and reuse 23 KL/Day water from MEE plant.

Total power requirement shall be 200 KVA which shall be sourced from DGVCL.

Total employment generation due to proposed project shall be 45.

Total capital cost of the project is Rs. 9.25 Crores. 2 Introduction I. Details of the EIA Consultant including EIA Consultant Name: NABET accreditation ENPRO Enviro Tech and Engineers Pvt. Ltd.

Certificate No.:

NABET/EIA/1922/RA 0122 valid till 12th January, 2022

Approved Sectors and Category:

1. Metallurgical industries (ferrous & non-ferrous)- Cat. A ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. 2. Synthetic organic chemicals industry (dye & dye intermediates; bulk drugs and intermediates excluding drug formulations; synthetic rubber; basic organic chemicals, other synthetic organic chemicals and chemical intermediates)- Cat. A

3. Common hazardous waste treatment, storage and disposal facilities (TSDFs) - Cat. A

4. Common Effluent Treatment Plant (CETPs) - Cat. B

5. Common Municipal Solid Waste Management Facility (CMSWMF) - Cat. B

6. Bio Medical Waste Treatment Facilities - Cat. B

7. Chlor alkali Industry- Cat. B

8. Isolated Storage and Handling of hazardous chemicals- Cat. B

9. Cement Plants – Cat A

10. Power Plants – Cat. A

Contact Details:

Email id: [email protected]

Contact: +91-81604-83760

Address: 306, Royal Park, Nr. Deepa Complex, Adajan Road, Surat, Gujarat – 395 009 II. Information about the project proponent Orgo Chem (Guj.) Pvt. Ltd. is promoted by Mr. Paras Mehta who is having more than 25 years of experience in the field of chemical industry specially in Dye intermediate products. The promoter is already having a unit of dye intermediate ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. products in Sachin GIDC which is under operation for more than two decades.

List of directors for the proposed project is given in Section 1.4 on page no. 1.2 in chapter 1. III. Importance and benefits of the project The global and local market for dye intermediates has been witnessing significant growth due to rising demand from end-user industries. Based on this requirement, the company proposes to install a new plant which will benefit the country and region. Also, based on informal survey of the market with their existing customers and various traders, company has found that there is a big potential for the range of the proposed products which will directly help to grow the market of Indian products worldwide.

More details are given in Section 1.5.1 on page no. 1.4 in chapter 1. 3 Project Description I. Cost of project and time of completion. Total cost for the proposed project is ₹ 9.25 Crores. CA Certificate is attached as Annexure V. Proposed Project activities are likely to start after getting Environmental Clearance from EAC, Delhi and NOC/CTE from GPCB.

Proposed schedule for approval and implementation is given in Section 2.5 on page no. 2.11 in chapter 2. II. Products with capacities for the Production capacity of the proposed proposed project. project will be 170.5 MT//Month.

List of proposed products with their manufacturing capacity per month is given in Table 2.3 in Section 2.4 on page no. 2.4 in chapter 2. III. If expansion project, details of existing Proposed project is new project. products with capacities and whether adequate land is available for expansion, However, Company has purchased a land reference of earlier EC if any. with existing construction available within ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. plot and they have proposed to modify the same as per requirement. IV. List of raw materials required and their List of raw material required with quantity source along with mode of and their source along with mode of transportation. transportation is given in Table 2.8 on page no. 2.19 in Section 2.6.1 in chapter 2. V. Other chemicals and materials required Other chemicals required for dosing in with quantities and storage capacities effluent treatment plant will be sourced from local market and will be stored in raw material storage area. Unit has proposed to provide 71.8 m2 area for raw material storage. VI. Details of Emission, effluents, hazardous Air Pollution: waste generation and their management. Unit has proposed to install Boiler having capacity of 2 MT/Hr and Thermopack having capacity of 200 U. Unit has proposed natural gas as a fuel for both utilities. Common stack with 33 m shall be provided to Boiler and Thermopack. D.G. Set having capacity of125 KVA shall be kept for emergency power back up. LDO (600 Liters/Day) will be used as a fuel for D.G. Set.

Details for the same is given in Section 2.7 on page no. 2.22 in chapter 2.

Wastewater Management:

Unit has proposed ZLD system for wastewater management.

Total water requirement for the proposed project is 45 KL/Day (37 KL/Day for Industrial + 5 KL/Day for Domestic + 3 Kl/Day for Gardening).

Total wastewater generation is 34.5 KL/Day (30 KL/Day + 4.5 Kl/Day Domestic).

Entire industrial wastewater (30 KL/Day) shall be send to inhouse MEE plant ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. followed by biological treatment and RO plant. 23 KL/Day RO permeate water shall be reused within the plant premises itself and RO reject water shall be again sent back to MEE plant. This way, fresh water demand for the proposed project shall be reduced to 22 KL/Day from 45 KL/Day.

Domestic wastewater (4.5 KL/Day) shall be disposed through septic tank / soak pit system.

Details for the same is given in section 2.8 on page no. 2.23 in chapter 2.

Hazardous waste management:

Hazardous waste shall be disposed of to TSDF site / recyclable waste shall be sent to authorized recycler as per Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2016.

Details for the same is given in section 2.9 on page no. 2.32 in chapter 2. VII. Requirement of water, power, with Water Requirement: source of supply, status of approval, water balance diagram, man-power Total water requirement for the proposed requirement (regular and contract) project is 45 KL/Day (37 KL/Day for Industrial + 5 KL/Day for Domestic + 3 Kl/Day for Gardening).

Details for the same is given in section 2.8 on page no. 2.23 in chapter 2.

Water balance diagram is presented as Figure 2.2 on page no. 2.25 in chapter 2.

Power Requirement:

Total power requirement for proposed project will be 200 KVA and shall be sourced from Dakshin Gujarat Vij Company Limited (DGVCL). To meet the emergency power requirement for critical ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. operations for ensuring safety, 01 D.G. Set having capacity 125 KVA will be kept as standby power back up.

Details of the same is given in Section 2.4.1.3 on page no. 2.8 in chapter 2. VIII. Process description along with major Details of manufacturing process along equipments and machineries, process with chemical reaction and mass balance flow sheet (quantitative) from raw is given in Annexure I. material to products to be provided Details of major equipments is given in Table 2.5 in section 2.4.1.5 on page no. 2.9 in chapter 2. IX. Hazard identification and details of Details of hazardous identification is proposed safety systems. given in Section 7.2 on page no. 7.6 in chapter 7.

Qualitative risk assessment is given in section 7.2.1 on page no. 7.6 in chapter 7. X. Expansion/modernization proposals: Copy of all the Environmental Not applicable as proposed project is new Clearance(s) including Amendments project. thereto obtained for the project from MOEF/SEIAA shall be attached as an Annexure. A certified copy of the latest Monitoring Report of the Regional Office of the Ministry of Environment and Forests as per circular dated 30th May, 2012 on the status of compliance of conditions stipulated in all the existing environmental clearances including Amendments shall be provided. In addition, status of compliance of Consent to Operate for the ongoing Iexisting operation of the project from SPCB shall be attached with the EIA-EMP report. In case the existing project has not Not applicable as proposed project is new obtained environmental clearance, project. reasons for not taking EC under the provisions of the EIA Notification 1994 and/or EIA Notification 2006 shall be provided. Copies of Consent to Establish/No Objection Certificate and ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. Consent to Operate (in case of units operating prior to EIA Notification 2006, CTE and CTO of FY 2005-2006) obtained from the SPCB shall be submitted. Further, compliance report to the conditions of consents from the SPCB shall be submitted. 4 Site Details I. Location of the project site covering Proposed project shall be located at Plot village, Taluka/Tehsil, District and State, no. 719, Road No. 7, Sachin GIDC, Surat, Justification for selecting the site, Gujarat. whether other sites were considered. Nearest town: Sachin (approx. 3 km)

District: Surat

Nearest water body: Mindhola River (approx. 5.45 km (S))

Nearest High way: National Highway No. 53 (Old NH 6) (approx. 1.08 km (NE))

State Highway No. 6 (approx. 1.18 km (NE))

Nearest railway station: Sachin railway station (approx. 2.45 km (SE))

Nearest airport: Surat airport (approx. 12.76 km (NW))

Note: Above distances are aerial distances.

More details are provided in Section 2.3 on page no. 2.1 in chapter 2.

Justification for selecting the site:

The main reason behind selection of this site is availability of existing construction facility in the well-established in Sachin GIDC. So, there is no alternative site was examined for the proposed project. ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No.

More details are provided in section 5.1 on page no. 5.1 in chapter 5. II. A toposheet of the study area of radius A toposheet of the study area of radius of of 10 km and site location on 10 km and site location on 1:50,000/1:25,000 scale on an A3/A2 1:50,000/1:25,000 scale on an A3/A2 sheet. (including all eco-sensitive areas sheet is presented in Map 3.2 on page no. and environmentally sensitive places) 3.37 in chapter 3. III. Details w.r.t. option analysis for Details about analysis of alternative site selection of site is given in section 5.1 on page no. 5.1 in chapter 5. IV. Co-ordinates (lat-long) of all four Geographical location of the project site: corners of the site. Latitude: 21°5'41.00"N Longitude: 72°51'27.00"E

Coordinates of the boundary:

Point Latitude Longitude A 21° 5'42.11"N 72°51'25.19"E B 21° 5'41.69"N 72°51'27.56"E C 21° 5'40.70"N 72°51'27.38"E D 21° 5'41.05"N 72°51'25.07"E - Specific Location of Site with Project Boundary is given in section 2.3.2 in on page no. 2.3 in chapter 2. V. Google map-Earth downloaded of the Specific location of the project site on project site. google earth is given as Map 2.2 on page no. 2.3 in chapter 2. VI. Layout maps indicating existing unit as Total plot area of the project site is 2010 well as proposed unit indicating storage m2. Company has purchased a land with area, plant area, greenbelt area, utilities existing construction available within plot etc. If located within an Industrial and they have proposed to modify the area/Estate/Complex, layout of same as per requirement. Industrial Area indicating location of unit Area proposed for Green belt within the Industrial area/Estate. development is 805 m2 (40 m2 of the total plot area)

Manufacturing area shall be located in 279.9 m2, Raw material storage area shall be located in 71.8 m2, hazardous waste storage area shall be located in 40.5 m2, final product storage area shall be located in 49.9 m2, ETP/MEE area ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. shall be located in 43.2 m2, remining area will covered utility area, office area, security, parking etc.

Plant layout is presented in Figure 2.2 and Annexure III. Area break up is presented in Table 2.4 on page no.2.8 in chapter 2. VII. Photographs of the proposed and Photographs of the project site is showing existing (if applicable) plant site. If in Figure 2.1 on page no. 2.6 in chapter existing, show photographs of 2. plantation/greenbelt, in particular. VIII. Landuse break-up of total land of the Mostly area is covered with fallow land 33 project site (identified and acquired), %, water bodies is located in 10 %, mud government/private - agricultural, area is located in 19 %, plantation is forest, wasteland, water bodies, located in 4%. settlements, etc shall be included. (not required for industrial area) Land use break up is presented in Table 3.14 in section 3.7.5.4 on page no. 3.54 in chapter 3. IX. A list of major industries with name and Project site is proposed within notified type within study area (10km radius) industrial area of Sachin GIDC, District: shall be incorporated. Land use details Surat. Sachin GIDC consist of of the study area approximately 65 textile processing industries, approximately 45 different chemical manufacturing units and many numbers of textile weaving units. Most of the industries located within Sachin GIDC are small and medium scale industries.

Land use break up for the study area is presented in Table 3.14 in section 3.7.5.4 on page no. 3.54 in chapter 3. X. Geological features and Geo- Geographically, the Surat district belongs hydrological status of the study area to the western coastlands of the Deccan shall be included. peninsula. The area is mainly characterized by the alluvial plains comprising the flood plains of the Tapi and Mindhola rivers.

Geology

The geological formations encountered in the Surat district are of Quaternary ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. alluvium, Tertiary limestone and sandstone, and Deccan Trap basalt.

Details of the same is given in section 3.9.5 on page no. 3.68 in chapter 3.

Hydrology

The major aquifers in the study area are mainly formed by alluvium and Tertiary formations. The common ground water abstraction structures are dug wells, dug- cum-bore wells and tube wells. The yields mainly depend on the recharge conditions. The depths of the wells in alluvium generally range from 3.0 to 20.0 and some even 25.0 m. Some of the dug wells have in-well bores down to >30 m. Depths to water levels in the area range from 0.5 to 15 m bgl about 90% wells shows water levels less than 10m bgl.

More details regarding the same is given in section 3.9.6 on page no. 3.70 in chapter 3. XI. Details of Drainage of the project upto 5 The area is regionally dissected by km radius of study area. If the site is perennial and intermittent rivers, streams within 1 km radius of any major river, and streamlets, and forming part of peak and lean season river discharge as either Tapi or Mindhola River Systems well as flood occurrence frequency comprising the flood plains deposits. The based on peak rainfall data of the past drainage pattern in general is sub- 30 years. Details of Flood Level of the dendritic. Both the rivers merge west of project site and maximum Flood Level of the study area before culminating into the river shall also be provided. (mega the Arabian Sea. The Tapi is the major green field river which passes through the central projects) parts of the district and flows towards the west. The river is perennial in nature.

More details area given in section 3.9.4 on page no. 3.67 in chapter 3. XII. Status of acquisition of land. If Orgo Chem (Guj) Pvt. Ltd. has purchased acquisition is not complete, stage of the a land from M/s. Siddhnath Tradelink Pvt. acquisition process and expected time of Ltd. which was manufacturing different complete possession of the land. type of yarns and threads. However, unit has shut down its facility and sell the plot ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. having total area of 2010 m2 with existing building constructed on 1300 m2 area to Orgo Chem (Guj.) Pvt. Ltd. Land documents mentioning the same is enclosed as Annexure II. XIII. R&R details in respect of land in line with R&R is not applicable as proposed project state Government policy. site is located in Notified Industrial Area (Sachin GIDC). 5 Forest and wildlife related issues (if applicable): I. Permission and approval for the use of Not applicable as proposed project site is forest land (forestry clearance), if any, located in notified industrial area (sachin and recommendations of the State GIDC). So, no forest or wildlife clearance Forest Department. (if applicable) is required as, wildlife sanctuary and national parks are not found within 10 km radius from the project site. II. Landuse map based on High resolution Not applicable satellite imagery (GPS) of the proposed site delineating the forestland (in case of projects involving forest land more than 40 ha) III. Status of Application submitted for Not applicable obtaining the stage I forestry clearance along with latest status shall be submitted. IV. The projects to be located within 10 km Not applicable of the National Parks, Sanctuaries, Biosphere Reserves, Migratory Corridors of Wild Animals, the project proponent shall submit the map duly authenticated by Chief Wildlife Warden showing these features vis-à-vis the project location and the recommendations or comments of the Chief Wildlife Warden-thereon. V. Wildlife Conservation Plan duly Not applicable authenticated by the Chief Wildlife Warden of the State Government for conservation of Schedule I fauna, if any exists in the study area. VI. Copy of application submitted for Not applicable clearance under the Wildlife (Protection) Act, 1972, to the Standing Committee of the National Board for Wildlife. 6 Environmental Status ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. I. Determination of atmospheric inversion Baseline motoring was carried out for the level at the project site and site-specific period of 1st March, 2019 to 31st May, micrometeorological data using 2019 by NABL approved laboratory temperature, relative humidity, hourly ENPRO Enviro Tech and Engineers Pvt. wind speed and direction and rainfall. Ltd. (Environmental Laboratories).

Interpretation of micrometeorological data:

Wind Pattern: 24 hourly wind rose diagram for March to May and resultant vector of wind rose diagram indicates that the predominant winds are from South – West to North - East direction with 36.75 % calm condition. Average wind speed is 1.06 m/s.

Temperature: During the month of March to May, temperature has varied in the range from 16 °C to 44 °C.

Relative Humidity: During the month of March to May, relative humidity has varied in the range from 16% to 89 %.

Details regarding the same is given in Section 3.4 on page no. 3.13 in chapter 3. II. AAQ data (except monsoon) at 8 Ambient air quality monitoring was locations for PM10, PM2.5, SO2, NOX, carried out at eight monitoring locations CO and other parameters relevant to the during 1st March, 2019 to 31st May, 2019. project shall be collected. The monitoring stations shall be based CPCB Interpretation of the results: guidelines and take into account the pre- dominant wind direction, population Average concentration of PM10, PM2.5, zone and sensitive receptors including Sox, NOx, CO and NH3 remains within the reserved forests. stipulated standards of NAAQS [24 hrs.] at all the monitoring locations. While HC, VOC and PAH were not detectable at any monitoring locations.

Details regarding ambient air quality monitoring is given in section 3.5 on page no. 3.18 in chapter 3. ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. III. Raw data of all AAQ measurement for 12 Results of Ambient air quality is weeks of all stations as per frequency presented in Table 3.8 in section 3.5 on given in the NAQQM Notification of Nov. page no. 3.22 in chapter 3 along with 2009 along with - min., max., average min, max, average and 98 %. Hard copy and 98% values for each of the AAQ of the same shall be made available at parameters from data of all AAQ stations the time of presentation. should be provided as an annexure to the EIA Report. IV. Surface water quality of nearby River Surface water monitoring was carried out (100m upstream and downstream of at six different location. In which, 5 were discharge point) and other surface lake water samples and 1 is river sample. drains at eight locations as per CPCB/MoEF&CC guidelines. Interpretation of the results

Surface water sources i.e. only Lakes and river water needs water treatment plant before it is used as domestic purposes.

Details of surface water monitoring and its results is presented in section 3.3 on page no. 3.2 in chapter 3. V. Whether the site falls near to polluted Not applicable. stretch of river identified by the CPCB/MoEF&CC, if yes give details. VI. Ground water monitoring at minimum at Ground water monitoring was carried out 8 locations shall be included. at seven different locations. Six samples were collected from bore well and one sample is collected from hand pump.

Interpretation of the results

Ground water can be used as drinking water as well as industrial water after obtaining permission from CGWA and after relevant treatment.

Details of ground water monitoring and its results is presented in section 3.3 on page no. 3.2 in chapter 3. VII. Noise levels monitoring at 8 locations Noise level monitoring was carried out at within the study area. eight different location. One is at project site and others are village area.

Interpretation of the results

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. Noise level in the industrial area as well as residential area found within the stipulated norms of GPCB/CPCB/MoEF.

More details regarding the same is presented in Section 3.6 on page no. 3.25 in chapter 3. VIII. Soil Characteristic as per CPCB Soil quality monitoring was carried out at guidelines. seven different locations.

Interpretation of the results

The pH of soil samples ranges from Moderately alkaline to strongly alkaline. The cation exchange capacity of the soils is moderately contributed mainly by potassium exchangeable ions. The soil texture is predominantly clay loam.

More details are presented in section 3.7 on page no. 3.28 in chapter 3. IX. Traffic study of the area, type of It is predicted that, there are nearly 3 vehicles, frequency of vehicles for vehicles visits per day at project site due transportation of materials, additional to proposed production activity. Detail traffic due to proposed project, parking regarding the transportation of the arrangement etc. vehicles is presented in section 4.7.3 on page no. 4.22 in chapter 4.

Unit has provided 20.8 m2 area for parking within the plant premises. And unit has also provided 4 m wide road within the plant with separate entry and exit for better movement of vehicles as shown in plant layout attached as Annexure III. X. Detailed description of flora and fauna The trees in the study area; were (terrestrial and aquatic) existing in the generally planted either as farmland study area shall be given with special plantation or homestead plantation or reference to rare, endemic and along the road sides. Otherwise natural endangered species. If Schedule-I fauna tree cover is very less in this part of Surat are found within the study area, a District. Homestead plantation was Wildlife Conservation Plan shall be dominated by Tamarindus indica (Amali), prepared and furnished. Mangifera indica (Keri), Moringa oleifera (Sargavo), Ficus benghalensis (Vad), and Cocos nucifera (Narial). ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No.

There is no notified/protected ecologically sensitive area including national park, sanctuary, Elephant/Tiger reserves or Schedule-I fauna existing in the study area covering 10 km radial distance.

Details on ecology and biodiversity is given in section 3.8 on page no. 3.45 in chapter 3. XI. Socio-economic status of the study area. The project area having a total of 24 villages and seven cities/towns in the radial distance of 10 km from the project site. The demographic profiles show huge deviation of the value from the average value of each demographic variables and are largely concentrated among 14 villages only in the project area having radial distance of 10 km from the project sites.

The villages/towns within the 10 km from the project sites shows Public amenities like presence of Anganwadi center, Self Help Group, Public/Private Transportation, Telephone/mobile, black toppled metal road, Govt. PHC/SC; Govt. Primary School; untreated tap water and regular power supply are present in almost 90%-100% of villages. While other public amentias like presence of river and canal in 52% of the villages, and presence of Community Centers; existence of commercial bank, presence of agriculture credit society, Total Sanitation Campaign and Govt. vocational training center – ITI ranges from 45% to 10% to the villages in the radial distance of 10 km from the project site.

More details are presented in section 3.10 on page no. 3.73 in chapter 3. ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. 7 Impact and Environment Management Plan I. Assessment of ground level Assessment of incremental ground level concentration of pollutants from the concentration of PM2.5, PM10, SO2, NOX stack emission based on site-specific and NH3 is provided in this Section 4.7 meteorological features. In case the using software AERMODCloud Version project is located on a hilly terrain, the 18.1 (Build: 36) developed by M/s. AQIP Modelling shall be done using Envitrans Consultancy Services. inputs of the specific terrain characteristics for determining the Details of Predicted Emission from Stacks potential impacts of the project on the is given in Table 4.9 on page no. 4.14 in AAQ. Cumulative impact of all sources of chapter 4. emissions (including transportation) on the AAQ of the area shall be assessed. Isopleths for the PM2.5, PM10, SO2, NOx Details of the model used and the input and NH3 are presented in section 4.701 data used for modelling shall also be on page no. 4.15 in chapter 4. provided. The air quality contours shall be plotted on a location map showing the location of project site, habitation nearby, sensitive receptors, if any. II. Water Quality modelling - in case of Not applicable. discharge in water body III. Impact of the transport of the raw Incremental emission due to proposed materials and end products on the transportation of vehicles is presented in surrounding environment hall be section 4.7.4 on page no. 4.23 in chapter assessed and provided. In this regard, 4. options for transport of raw materials and finished products and wastes (large Unit will prefer the transportation of the quantities) by rail or rail-cum road materials through rail whenever it is transport or conveyor cum-rail transport possible. Manual handling will be utilized shall be examined. in minimum activities. IV. A note on treatment of wastewater from Total wastewater generation is 34.5 different plant operations, extent KL/Day (30 KL/Day + 4.5 Kl/Day recycled and reused for different Domestic). purposes shall be included. Complete scheme of effluent treatment. Entire industrial wastewater (30 KL/Day) Characteristics of untreated and treated shall be send to inhouse MEE plant effluent to meet the prescribed followed by biological treatment and RO standards of discharge under E(P) Rules. plant. 23 KL/Day RO permeate water shall be reused within the plant premises itself and RO reject water shall be again sent back to MEE plant. This way, fresh water demand for the proposed project shall be reduced to 22 KL/Day from 45 KL/Day. ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No.

Domestic wastewater (4.5 KL/Day) shall be disposed through septic tank / soak pit system.

Details for the same is given in section 2.8 on page no. 2.23 in chapter 2. V. Details of stack emission and action plan Details of gaseous emission and its for control of emissions to meet control is presented in section 2.7 o page standards. no. 2.22 in chapter 2. VI. Measures for fugitive emission control Unit has proposed natural as a fuel for boiler and Thermopack. Common stack with height of 33 m shall be provided to control emission. In addition to this, Only PUC vehicle will be used for the transportation of materials and equipment. Vehicles shall use plastic cover sheet while transporting Hazardous waste/products from project site. Paved roads shall be made available within the plant premises to minimize the dust emission. VII. Details of hazardous waste generation Details of hazardous waste management and their storage, utilization and is given in section 2.9 on page no. 2.32 management. Copies of MOU regarding in chapter 2. utilization of solid and hazardous waste in cement plant shall also be included. Hazardous waste shall be disposed of to EMP shall include the concept of waste- TSDF site / recyclable waste shall be sent minimization, recycle/reuse/recover to authorized recycler as per Hazardous techniques, Energy conservation, and Waste (Management, Handling and natural resource conservation. Transboundary Movement) Rules, 2016.

NOC from M/s. BEIL for landfilling of haz. waste is attached as Annexure VI.

NOC from M/s. BEIL for incineration and co-processing of haz. Waste is attached as Annexure VII.

NOC from M/s. Rhythm Chemical for spent solvent is attached as Annexure VIII.

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. Details on cleaner production technology is given in section 10.8 on page no. 10.13 in chapter 10. VIII. Proper utilization of fly ash shall be Not applicable. ensured as per Fly Ash Notification, 2009. A detailed plan of action shall be provided. IX. Action plan for the green belt Total area of the project site is 2010 m2 development plan in 33 % area i.e. land as shown in plant lay out attached as with not less than 1,500 trees per ha. Annexure III. Giving details of species, width of plantation, planning schedule etc. shall Unit will develop green belt in 805 m2 be included. The green belt shall be area (40 % of the total plot area). around the project boundary and a scheme for greening of the roads used Details for green belt development for the project shall also be management is presented in section 10.6 incorporated. on page no. 10.9 in chapter 10. X. Action plan for rainwater harvesting Details regarding rain water harvesting is measures at plant site shall be submitted given in section 2.11 on page no. 2.37 in to harvest rainwater from the roof tops chapter 2. and storm water drains to recharge the ground water and also to use for the various activities at the project site to conserve fresh water and reduce the water requirement from other sources. XI. Total capital cost and recurring Total capital cost towards the cost/annum for environmental pollution environmental pollution control measures control measures shall be included. shall be ₹ 288 Lakhs and recurring cost shall be ₹ 146.1 Lakhs.

Detail break up is given in section 10.7.1 on page no. 10.12 in chapter 10. XII. Action plan for post-project Details regarding post project environmental monitoring shall be environmental monitoring plan is given in submitted. section 6.2 on page no. 6.1 in chapter 6.

Unit has allocated ₹ 5,45,900/- for environmental monitoring plan. Same is presented in table 6.2 on page no. 6.5 in chapter 6. XIII. Onsite and Offsite Disaster (natural and On site / off site emergency management Man-made) Preparedness and plan is given in section 7.5 on page no. Emergency Management Plan including 7.30 in chapter 7. Risk Assessment and damage control. Disaster management plan should be ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. linked with District Disaster Management Plan. 8 Occupational health I. Plan and fund allocation to ensure the Unit has allocated ₹ 22,500/- for health occupational health & safety of all monitoring of workers. contract and casual workers Details on occupational health & safety program is given in section 7.6 on page no. 7.40 in chapter 7. II. Details of exposure specific health status Details of provision of industrial hygienist evaluation of worker. If the workers' & health evaluation of workers is health is being evaluated by pre presented in section 7.6.8 on page no. designed format, chest x rays, 7.42 in chapter 7. Audiometry, Spirometry, Vision testing (Far & Near vision, colour vision and any Details on safety trainings and mock drill other ocular defect) ECG, during pre is presented in section 7.6.9 on page no. placement and periodical examinations 7.42 in chapter 7. give the details of the same. Details regarding last month analysed data of above mentioned parameters as per age, sex, duration of exposure and department wise. III. Details of existing Occupational & Safety Details of occupational health impacts Hazards. What are the exposure levels and safety hazards is given in section of hazards and whether they are within 7.6.5 on page no. 7.41 in chapter 7. Permissible Exposure level (PEL). If these are not within PEL, what measures the company has adopted to keep them within PEL so that health of the workers can be preserved IV. Annual report of heath status of workers Details on safety trainings and mock drill with special reference to Occupational is presented in section 7.6.9 on page no. Health and Safety. 7.42 in chapter 7. 9 Corporate Environment Policy I. Does the company have a well laid down Since the project is new, unit will comply Environment Policy approved by its the said condition after establishment of Board of Directors? If so, it may be proposed project. detailed in the EIA report. II. Does the Environment Policy prescribe Since the project is new, unit will comply for standard operating process / the said condition after establishment of procedures to bring into focus any proposed project. infringement / deviation / violation of the environmental or forest norms /conditions? If so, it may be detailed in the EIA. ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. III. What is the hierarchical system or Orgo Chem (Guj.) Pvt. Ltd. will formulate Administrative order of the company to the Environmental Management Cell for deal with the environmental issues and its proposed unit. The company will have for ensuring compliance with the a well-defined hierarchical system or environmental clearance conditions? administrative order to deal with the Details of this system may be given. environmental issues. EMC will involve personnel of plant level as well as corporate level for interaction with technical and statutory bodies to deal with environmental requirements/issues at all level.

Details of the same is attached in section 10.3.3 on page no. 10.2 in chapter 10. IV. Does the company have system of Since the project is new, unit will comply reporting of non-compliances / the said condition after establishment of violations of environmental norms to the proposed project. Board of Directors of the company and / or shareholders or stakeholders at large? This reporting mechanism shall be detailed in the EIA report 10 Details regarding infrastructure facilities Workers and truck drivers will use such as sanitation, fuel, restroom etc. to sanitation facility available in admin be provided to the labour force during building during operation phase. Unit will construction as well as to the casual made availability of rest room for worker workers including truck drivers during and others at the time of operation phase. construction/modification of building. 11 Enterprise Social Commitment (ESC) Adequate funds (at least 2.5 % of the The unit has proposed to spend nearly ₹ project cost) shall be earmarked towards 37,00,000/- Budget (4 % of the total cost the Enterprise Social Commitment based ₹ 9.25 Crores) for social development on Public Hearing issues and item-wise programs under CER activities for the details along with time bound action next 5 years. plan shall be included. Socio-economic development activities need to be More details are provided in section 8.4 elaborated upon. on page no. 8.1 in chapter 8. 12 Any litigation pending against the Not applicable as proposed project is project and/or any direction/order new. passed by any Court of Law against the project, if so, details thereof shall also be included. Has the unit received any notice under the Section 5 of Environment (Protection) Act, 1986 or relevant Sections of Air and Water Acts? ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. If so, details thereof and compliance/ATR to the notice(s) and present status of the case. 13 'A tabular chart with index for points Complied. wise compliance of above TOR. Specific Terms of References 1 Details on solvents to be used, measures Solvent management plan is given in for solvent recovery and for emissions section 2.10 on page no. 2.34 in chapter control. 2. Unit will try to recover up to 99 % solvents. 2 Details of process emissions from the There shall be emission of VOCs and NH3 proposed unit and its arrangement to during manufacturing process. Unit has control. proposed tow stage ammonia scrubbers to control the same.

Detail are given in the section 2.7 on page no. 2.22 in chapter 2. 3 Ambient air quality data should include Details of ambient air quality monitoring VOC, other process – specific pollutants* is given in section 3.5 on page no. 3.18 like NH3*, chlorine*, HCl*, HBr*, H2S*, in chapter 3. HF*, etc., (*- as applicable) 4 Work zone monitoring arrangements for Details on details of work place ambient hazardous chemicals. air quality monitoring plan is given in section 7.6.6 on page no. 7.41 in chapter 7. 5 Detailed effluent treatment scheme Total wastewater generation is 34.5 including segregation of effluent KL/Day (30 KL/Day + 4.5 Kl/Day streams for units adopting 'Zero' liquid Domestic). discharge. Entire industrial wastewater (30 KL/Day) shall be send to inhouse MEE plant followed by biological treatment and RO plant. 23 KL/Day RO permeate water shall be reused within the plant premises itself and RO reject water shall be again sent back to MEE plant. This way, fresh water demand for the proposed project shall be reduced to 22 KL/Day from 45 KL/Day.

Domestic wastewater (4.5 KL/Day) shall be disposed through septic tank / soak pit system.

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. Details for the same is given in section 2.8 on page no. 2.23 in chapter 2. 6 Action plan for odour control to be Details regarding the same is given in submitted. Section 4.6.2 (Point no. 1) on page no. 4.12 in chapter 4. 7 A copy of the Memorandum of NOC from M/s. BEIL for incineration and Understanding signed with cement co-processing of haz. Waste is attached manufacturers indicating clearly that as Annexure VII. they co-process organic solid/hazardous waste generated. 8 Authorization/Membership for the NOC from M/s. BEIL for landfilling of haz. disposal of liquid effluent in CETP and waste is attached as Annexure VI. solid/hazardous waste in TSDF, if any. NOC from M/s. Rhythm Chemical for spent solvent is attached as Annexure VIII. 9 Action plan for utilization of MEE/dryers Hazardous waste shall be disposed of to salts. TSDF site / recyclable waste shall be sent to authorized recycler as per Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2016.

Details of hazardous waste management is given in section 2.9 on page no. 2.32 in chapter 2. 10 Material Safety Data Sheet for all the Shall be complied. Chemicals are being used/will be used. 11 Authorization/Membership for the NOC from M/s. BEIL for landfilling of haz. disposal of solid/hazardous waste in waste is attached as Annexure VI. TSDF. NOC from M/s. BEIL for incineration and co-processing of haz. Waste is attached as Annexure VII.

NOC from M/s. Rhythm Chemical for spent solvent is attached as Annexure VIII. 12 Details of incinerator if to be installed. Not applicable. 13 Risk assessment for storage and Risk assessment for storage and handling handling of hazardous of hazardous chemicals/solvents is given chemicals/solvents. Action plan for in section 7.2.1 on page no. 7.5 in handling & safety system to be chapter 7. incorporated. ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title TOR Compliances Date 17/03/2020

Sr. Standard Terms of References Compliances No. Safety precautions are given in table no. 7.17 in section 7.4 on page no. 7.25 in chapter 7. 14 Arrangements for ensuring health and Proper storage area and dyke shall be safety of workers engaged in handling of provided. PPEs like Splash goggles, Full toxic materials. suit, Vapor respirator or self-contained breathing apparatus, Boots, Gloves etc., shall be used while handling toxic chemicals. Specialist will be consult, if required.

More details are provided in section 7.1 on page no. 7.1 in chapter 7.

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 1 Introduction Date 17/03/2020

CHAPTER 1 INTRODUCTION

1.1 BACKGROUND

Dyestuff sector is one of the important segments of the chemical industries in India, having forward and backward linkages with a variety of sectors like textiles, leather, paper, plastics, printing inks and foodstuffs. A dye intermediate is the main raw material used for manufacturing of dyestuff. The textile industry accounts for the largest consumption of dyestuffs (about 80% of the total dye production) which generates requirement of dye intermediates. Asian markets are growing at a very rapid pace and India has emerged as a global supplier of dye intermediates.

Orgo Chem (Guj) Pvt. Ltd. came into existence in the year 1967. The firm has won accolades all over the domain by offering different dye intermediate products involving various processes like Sulphonation, Condensation, Acetylation, Amination, Nitration, Oxidation, Sulphonamides and Cyclizations to the clients. Company exports 85% of its products to Europe, USA, Japan, Korea, China, Thailand, Brazil and Czech Republic. It has manufacturing facility located at Plot No. 256, G.I.D.C., Sachin-394 230, Tal: Chorasi, Dist: Surat near India’s business capital – Mumbai and a dedicated office in Mumbai for marketing & logistics.

Orgo Chem (Guj) Pvt. Ltd. is now proposing to set up a new manufacturing unit of dye intermediate and specialty chemical products @ 170.5 MT/Month at Plot No. 719, Road No. 7, Sachin GIDC, Surat, Gujarat. Unit has purchased entire plot with existing infrastructure having constructed building and other utilities. However, existing structure will be modified suitably as per requirement. Construction and demolished waste as generated shall be disposed of as per C&D waste and disposal rules. Geographical location of the proposed project site is at Latitude: 21°5'41.00"N, Longitude: 72°51'27.00"E

1.2 PURPOSE OF EIA

'Environmental Impact Assessment (EIA)' is the process of evaluating likely environmental impacts, both positive and negative, of a new or expansion project by taking into account natural, social and economic aspects. It also comprises of suggesting mitigation measures, for the possible negative impacts, before implementation of the project.

The purpose of the EIA study is identifying existing environmental condition in the study area, predicting and assessing environmental impacts due to the proposed project and suggesting measures to mitigate the adverse impacts and to delineate a comprehensive environment management plan along with recommendations and suggestions. The different activities that are likely to take place in the proposed project have been identified and mitigation measures have been proposed.

This report is prepared based on Generic Structure of EIA Document’ given in Appendix III and IIIA to EIA Notification dated 14th September 2006.

1.1

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 1 Introduction Date 17/03/2020

1.3 OBJECTIVES OF EIA

The overall objective of any EIA study is to identify and assess the adverse impacts of a project in the planning stage itself, so that necessary mitigation measures to prevent or minimize these adverse impacts can be planned early and cost-effectively. In view of this, the specific objectives of this EIA are -

 To have an in-depth know-how of the proposed project and to identify the probable sources of pollution that may arise from each stage of the process.

 To review the current environmental status of the study area within 10 km radius of the project site by collecting the baseline data on the environmental attributes including air, noise, water, land, ecological and socio-economic environments. The environmental monitoring was carried out during the period of 1st March 2019 to 31st May 2019.

 To estimate the impacts of the project activities on the surrounding environment on the basis of baseline monitoring data.

 To prepare a comprehensive Environmental Management Plan to ensure that the environmental quality of the area would be preserved.

 To formulate a strategy for effective monitoring and identify any deviations in the environmental quality after the project is operational, which would help in evolving measures to counter these.

1.4 PROJECT PROPONENT

Orgo Chem (Guj.) Pvt. Ltd. is promoted by Mr. Paras Mehta who is having more than 25 years of experience in the field of chemical industry specially in Dye intermediate products. The promoter is already having a unit of dye intermediate products in Sachin GIDC which is under operation for more than two decades. The proposed new project will be located at Plot No. 719, Road no. 7, Sachin GIDC, Surat, Gujarat.

List of directors is given in TABLE 1.1.

TABLE 1.1 - LIST OF DIRECTORS

Sr. Name of Directors Address Nationality No. 11-A Megha Tower No.2, Behind Union Park, 2 Paras R. Mehta Indian Ghod-Dod Road, Surat - 395 007 101, 1st Floor, Yash Apartment, August Kranti 3 Amar M. Jain Indian Marg, Opp. Jain Temple, Mumbai - 400 036 3/31, Navrang Housing Society, Peddar Road, 4 Mihir M. Jain Indian Mumbai - 400 026 5/3, Chikuwadi Complex, GHB Road, 5 Nagaraj V. Patil Indian Pandesara, Surat - 394 221

1.2

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 1 Introduction Date 17/03/2020

Company is having a dynamic team to manufacture best quality products and to ensure timely supplies. Moreover, proposed location is in Surat, near India’s business capital - Mumbai, with a dedicated office in Mumbai for marketing and logistic support.

1.5 THE PROJECT

Orgo Chem (Guj) Pvt. Ltd. proposes a new manufacturing unit of Dye intermediate and specialty chemical products at Plot No. 719, Road no. 7, Sachin GIDC, Surat, Gujarat. Production capacity is proposed for the activity is 170.5 MT/Month. Proposed project falls under item 5(f) (Synthetic Organic Chemicals), Category “A” due to its location within Critically Polluted Area as Notified in Office Memorandum of MoEF dated 31st October, 2019, F. No. 22-23/2018-IA.III (Pt).

Proposed plot is having total area of 2010 m2 on which building shed is existing and unit has proposed to modify and upgrade same construction for the proposed production activity. However, construction and demolished waste as generated shall be disposed of as per C&D waste and disposal rules. Unit will develop green belt in 805 m2 area (40 % of the total plot area).

During operational phase estimated fresh-water requirement would be 45 KL/Day (37 KL/Day for Industrial + 5 KL/Day for Domestic + 3 KL/Day for Gardening) which will be met through Sachin Notified Area Authority. Principle areas of water consumption are Process, boiling, Cooling Tower, scrubbing and Domestic Uses including gardening. Wastewater shall be generated from Process, boiler, Cooling Tower, scrubber, floor washing and domestic utilities. The total industrial wastewater generations will be 30 KL/Day, which shall be sent to inhouse MEE plant followed by biological treatment and RO plant. RO permeate water shall be reused back within plant premises and RO reject water shall be again sent back to MEE plant. Domestic wastewater generation will be 4.5 KL/Day, shall be disposed through septic tank /Soak pit system.

For proposed new project, industry will use Natural Gas (2000 SCM/Day) as fuel in Boiler (2 MT/Hr) and (500 SCM/Day) in Thermopack (200 U). Both of this unit shall be provided with the stack of 33 m height along with stack monitoring facility. 125 KVA D.G. Set shall be provided for emergency power supply and it shall be operated based on LDO fuel (600 Liters/Day). Unit will also utilize 25 MT/Day of steam for plant operation from common boiler house.

For proposed project, total power requirement will be 200 KVA which will be provided by Dakshin Gujarat Vij Company Limited (DGVCL). For Emergency Power Back up, D.G. Set with capacity of 125 KVA will be provided.

During plant operation industry will generate Hazardous Waste such as ETP sludge (52 MT/Month), MEE Salt (30 MT/Month), Iron Sludge (143.75 MT/Month), Nitric Acid (367.4 MT/Month), Spent Solvent (ODCB) (90 MT/Month), Spent Solvent (Methanol) (16.28 MT/Month), Mixed Salt (45 MT/Month) and Distillation Residue (2 MT/Month). Details of their final disposal is given in Section 2.10 in Chapter 2.

1.3

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 1 Introduction Date 17/03/2020

Proposed project will generate total 45 direct and indirect employments of skilled, semi-skilled and un-skilled workers from the local area.

Capital cost for the proposed project will be Rupees 9.25 Crores.

1.5.1 Importance of Project to the Country and the Region

The global and local market for dye intermediates has been witnessing significant growth due to rising demand from end-user industries. Based on this requirement, the company proposes to install a new plant which will benefit the country and region in a number of ways:

 Generate direct and indirect local employment  Export of products to other countries will increase foreign revenue.  Continuous development by R&D, providing growth and technological advancements in the field. This will support the technical and mechanical supply chain of the industry.

Also, based on informal survey of the market with their existing customers and various traders, company has found that there is a big potential for the range of the proposed products which will directly help to grow the market of Indian products worldwide.

1.6 PROJECT LOCATION

Proposed project shall be located at Plot No. 719, Road No. 7, Sachin GIDC, Surat, Gujarat. The site is situated at Latitude: 21° 5'41.00"N, Longitude: 72°51'27.00"E. The present plot is having existing building which will be used / upgraded / removed as per requirement for the proposed project.

The location of the project site is shown in FIGURE 1.1.

1.4

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 1 Introduction Date 17/03/2020

FIGURE 1.1 - LOCATION OF PROJECT

1.5

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 1 Introduction Date 17/03/2020

1.7 REGULATORY FRAMEWORK

As a part of Environmental Clearance process, Orgo Chem (Guj) Pvt. Ltd. has uploaded and submitted relevant documents, namely Form - 1 (as per the EIA Notification, 2006, as amended), along with a Pre-Feasibility Report and proposed Terms of Reference (ToRs) for carrying out environmental studies, to the Expert Appraisal Committee (SEAC), MoEF Delhi on dated 19th November 2019 and proposal was accepted on 25th November 2019 by Member Secretory.

Based on the information contained in the documents submitted, the project has been awarded file no. IA-J-11011/339/2019-IA-II(I) and standard ToR were finalized to conduct the Environmental Impact Assessment (EIA) & Environmental Management Plan (EMP) studies, vide its letter dated 26th December 2019.

1.8 STRUCTURE OF THE REPORT

Entire report has been prepared, in line with the generic structure of the EIA report as per the Appendix III of the EIA Notification, 2006.

Chapter-1: Gives brief outline of the project and project proponent, description of the project, project location and regulatory framework. It also includes the scope of the study as per the awarded Terms of Reference.

Chapter-2: Provides need for the project, details regarding the project location, layout, process description, required resources & infrastructure and the pollution potential.

Chapter-3: Describes the existing baseline status of the study area of 10 km radial periphery from proposed project site.

Chapter-4: Deals with the identification, prediction, evaluation of impacts and mitigation of the significant adverse impacts. Chapter 4 has been developed based on Chapter 2 and Chapter 3 by correlating the activities under the proposed project and their impacts on the receiving environmental attributes.

Chapter-5: Analysis of alternatives.

Chapter-6: Delineates the proposed post-project Environmental Monitoring Plan and the budgetary provisions for EMS components.

Chapter-7: Discusses the additional studies viz. Risk assessment study required for the project.

Chapter-8: Highlights benefits of the project.

Chapter-9: Environmental Cost Benefits.

Chapter-10: Delineates the Environment Management Plan highlighting the mitigation measures and roles and responsibilities of the management.

1.6

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 1 Introduction Date 17/03/2020

Chapter-11: Attempts to summarize the entire report and conclude the outcome of the study.

Chapter-12: Disclosure of Consultant engaged.

1.7

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

CHAPTER 2 PROJECT DESCRIPTION

2.1 INTRODUCTION

M/s. Orgo Chem (Guj.) Pvt. Ltd. proposes to set up a new manufacturing unit of dye intermediate and specialty chemical products at Plot no. 719, Road no. 7, Sachin GIDC, Surat, Gujarat. The proposed manufacturing capacity of the plant is 170.5 MT/Month. Company has purchased a land with existing construction available within plot and they have proposed to modify the same as per requirement.

Project site is proposed within notified industrial area of Sachin GIDC, District: Surat. Sachin GIDC consist of approximately 65 textile processing industries, approximately 45 different chemical manufacturing units and many numbers of textile weaving units. Most of the industries located within Sachin GIDC are small and medium scale industries. Sachin GIDC is well connected through air and roadways being near to Surat City. Wildlife sanctuary and national parks are not found within 10 km radius from the project site. All basic and infrastructure facilities such as road, electric power, storm water drains are available in Sachin GIDC. Manpower is also easily available from nearby area.

This chapter provides description of those aspects of the project which are likely to cause environmental effects. Details are described in following sections with regards to type, need, location, size or magnitude of project operations, technology and other related activities.

2.2 NEED OF THE PROJECT

A dye intermediate is the main raw material used for the manufacturing dyestuff which is one of the most important segments of the chemical industries having linkages with a variety of sectors like textiles, leather, paper, plastics, printing inks and foodstuffs. Further, Dye Intermediates also serve as important raw materials for the Acid, Solvent, Reactive and Direct Dyes. The global market for dyes and dye intermediates has been witnessing significant growth due to rising demand from end-user industries. Increasing demand for paints & coatings, particularly in emerging markets are expected to witness high global demand for dyes and dye intermediates over the next few years.

Proponent is having another manufacturing unit of Dye Intermediates in Sachin GIDC estate having valid EC and CCA. Unit is in the operation since more than 15 years. Moreover, considering increasing demand from their existing users for the range of products company has proposed, promoters have invoked to set up a new plant covering products as proposed in the list.

2.3 LOCATION

2.3.1 General Location of the Site

M/s. Orgo Chem (Guj) Pvt. Ltd. is located at Plot no. 719, Road no. 7, Sachin GIDC, Surat, Gujarat. The Project Location is shown in MAP 2.1.

2.1

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

MAP 2.1 - GENERAL LOCATION MAP OF PROJECT SITE

2.2

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

2.3.2 Specific Location of Site with Project Boundary

Location of the project site is at Plot no. 719, Road No. 7, Sachin GIDC, Surat, Gujarat. Geographical location of project site is Latitude: 21°5'41.00"N, Longitude: 72°51'27.00"E. Project site with co-ordinates are shown in TABLE 2.1 and Location map showing specific location is given in MAP 2.2.

TABLE 2.1 - CO-ORDINATES OF PROJECT BOUNDARY

Point LATITUDE LONGITUDE A 21° 5'42.11"N 72°51'25.19"E B 21° 5'41.69"N 72°51'27.56"E C 21° 5'40.70"N 72°51'27.38"E D 21° 5'41.05"N 72°51'25.07"E

MAP 2.2 - SPECIFIC LOCATION MAP WITH PROJECT BOUNDARY OF PROJECT SITE

2.3.3 Approach to the Site

The unit is located in a notified industrial area of Sachin GIDC, having good infrastructural facility for transportation, power and water supply. Sachin railway station is very nearby railway station to Sachin GIDC. The nearest airport is of Surat. Salient features in the study area of the project site are given in TABLE 2.2.

2.3

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

TABLE 2.2 - SALIENT FEATURES OF THE PROJECT SITE

Approx. Distance Particulars Details from Project Site Latitude: 21°5'41.00"N Geographical Co-ordinates - Longitude: 72°51'27.00"E Village /City / Industrial Area GIDC Sachin - District Surat - Nearest Water body Mindhola River 5.45 km (S) National Highway No. 53 (Old NH 6) 1.08 km (NE) Nearest Highway State Highway No. 6 1.18 km (NE) Nearest Railway station & Sachin railway station 2.45 km (SE) Railway line Nearest Airport/ Airbase Surat Airport 12.76 km (NW) Protected Area/ Sanctuaries No - CRZ applicability No - Note: All the above mention distances are aerial distances from the project site.

2.3.4 Site history

Orgo Chem (Guj) Pvt. Ltd. has purchased a land from M/s. Siddhnath Tradelink Pvt. Ltd. which was manufacturing different type of yarns and threads. However, unit has shut down its facility and sell the plot having total area of 2010 m2 with existing building constructed on 1300 m2 area to Orgo Chem (Guj.) Pvt. Ltd. Land documents mentioning the same is enclosed as ANNEXURE II. Now Company has proposed to modify existing building as per their production requirement. Construction waste will be disposed of as per C&D rule.

2.4 SIZE AND MAGNITUDE OF OPERATION

Unit proposes total manufacturing capacity as 170.5 MT/Month. TABLE 2.3 indicates the list of products along with their production capacity.

TABLE 2.3 - LIST OF PROPOSED PRODUCTS AND PRODUCTION CAPACITY

Sr. Proposed Total Product Group CAS No. No. MT/Month 1 CONDENSATION 1.1 4 Chloro Benzamide 619-56-7 1.2 4 Nitro Benzamide 619-80-7 1.3 4 Amino Benzamide ( 1 ) 2835-68-9 1.4 4 Amino Benzamide ( 2 ) 2835-68-9 1.5 3 Amino Benzamide 3544-24-9 25 1.6 4 Chloro 3 Amino Benzamide 19694-10-1 1.7 4 Methyl 3 Amino Benzamide 19406-86-1 1.8 MUB 7695-46-4 1.9 3 Nitro Benzamide 645-09-0 1.10 2 Amino - 5 - (4 aminobenzoylamino) Benzene 58862-43-4

2.4

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Sr. Proposed Total Product Group CAS No. No. MT/Month Sulphonic Acid 1.11 4 Amino Benzanlide 2657-85-4 1.12 3 Amino Benzamide 3544-24-9 1.13 4, 4 Di Amino Benzanilide 785-30-8 2 AMINATION 2.1 4 Chloro 3 Amino Benzoic Acid 2840-28-0 2.2 Para Amino Benzoic Acid 150-13-0 2.3 Di Amino Benzoic Acid 535-87-5 2.4 4 Chloro Aniline 3 Sulphonic Acid 88-43-7 2.5 2 Chloro Aniline 5 Sulphonic Acid 98-36-2 2.6 2 Amino Phenol 4 Sulphonic Acid 98-37-3 2.7 Meta Amino Benzoic Acid 99-05-8 50 2.8 3, 4 Di Amino Benzene Sulphonic Acid 7474-78-4 2.9 3, 4 Di Amino Benzoic Acid 619-05-6 2.10 Para Nitro Aniline Sulphonic Acid 616-84-2 2.11 Ortho Nitro Aniline Para Sulphonic Acid 82324-60-5 2.12 Para Amino Toluene Ortho Sulphonic Acid 121-03-9 2.13 4 Chloro 3, 5 Di Amino Benzoic Acid 32961-44-7 2.14 2, 5 Di Amino Benzene Sulphonic Acid 88-45-9 3 OXIDATION 3.1 Para Nitro Benzoic Acid 62-23-7 3.2 4 Chloro 3 Nitro Benzoic Acid 96-99-1 50 3.3 Para Chloro Benzoic Acid 74-11-3 3.4 Meta Nitro Benzoic Acid 121-92-6 4 CYCLIZATION 4.1 6-Nitro Benzoxazolone 3, Methyl Sulphone - 15 4.2 5-Nitro 2-Amino Phenol 121-88-0 5 METHOXYLATION 5.1 3 Nitro 4 Methoxy Benzoic Acid 97-52-9 15 6 AMMONIUM SULPHATE 7783-20-2 15 7 RESEARCH AND DEVELOPMENT PRODUCTS - 0.5 TOTAL 170.5

2.4.1 Project resources

2.4.1.1 Land

Company has purchased land with existing building shed having total plot area of 2010 m2. Photographs of the existing facility is shown under in PHOTOGRAPHS 2.1. Land possession document are attached vide with ANNEXURE II. Factory layout plan of the project site is shown in FIGURE 2.2 and ANNEXURE III. Details of breakup of plot area are covered under following TABLE 2.4.

2.5

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

PHOTOGRAPH 2.1 - PHOTOGRAPH OF EXISTING FACTORY SITE AND PLANT

2.6

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

FIGURE 2.1 - FACTORY LAYOUT PLAN

2.7

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

TABLE 2.4 - AREA BREAKUP OF THE SITE

Sr. No. Particular Area (m2) % of Land Use 1 Manufacturing Area 1 135.5 6.7 2 Manufacturing Area 2 144.4 7.2 3 Raw Material Storage Area 1 43.2 2.1 4 Raw Material Storage Area 2 28.6 2.4 5 Hazardous Waste Storage Area 40.5 2.0 6 Final Product Storage Area 49.9 2.5 7 ETP Area 43.2 2.1 8 Utility Area 30.6 1.5 9 Office Area 66.3 3.3 10 Parking Area 20.8 1.0 11 Security 9.0 0.4 12 Green Belt Area 805.0 400 13 Roads and Other Open to Sky Area 573.0 28.5 Total 2010 100

2.4.1.2 Water

Due to proposed activities, total fresh water requirement will be 45 KL/Day (37 KL/Day for Industrial + 5 KL/Day for Domestic Use + 3 KL/day for Gardening) which will be sourced from Sachin Notified Area Authority.

Total wastewater generation will be 34.5 KL/Day (30 KL/Day from Industrial Activity + 4.5 KL/Day from Domestic activity). 30 KL/Day industrial waste water shall be inhouse MEE plant followed by biological plant and RO plant. Permeate water from RO plant shall be recycle and reused back within plant premises and RO reject water shall be again sent back to MEE plant. And domestic wastewater shall be disposed through septic tank/soak pit system.

Detailed water balance and breakup of water consumption is provided below in Section 2.9.

2.4.1.3 Energy (Power and Fuel) Requirement

Total power requirement for proposed project will be 200 KVA and shall be sourced from Dakshin Gujarat Vij Company Limited (DGVCL). To meet the emergency power requirement for critical operations for ensuring safety, 01 D.G. Set having capacity 125 KVA will be kept as standby power back up.

For proposed project, industry will utilize Natural gas with capacity of 2000 SCM/Day as fuel in their boiler unit and 500 SCM/day of natural gas in their Thermopack unit. Each of this unit shall be provided with the stack of minimum 33 m height along with stack monitoring facility.

2.8

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

2.4.1.4 Raw Material and Treatment Chemicals

Raw materials shall be procured through registered suppliers within India and abroad (if any). Details regarding product wise raw material consumption, its transportation, storage are provided in Section 2.6.1.

2.4.1.5 Local and Other Infrastructure

GIDC, Sachin is largely an industrial area dominated by small and medium scale industries, specifically textile weaving and preparatory industries, textile processing industries and chemical plants. It has more than 705 units. Water is available from Sachin Notified Area Authority. GIDC Sachin is governing under notified area office, Sachin and Surat Urban Development Authority (SUDA).

GIDC Sachin is well connected with Road, Rail and Air from other part of country. It provides sufficient and adequate infrastructure such as water supply network, storm water network, common effluent treatment plant, fire station for settling up of new industries. Adequate skilled, semi-skilled and un skilled manpower is available due to presence of large number of industries in the estate. Emergency and regular health care facility is available in Sachin town adjacent to GIDC as well as in Surat City which is approx. 18 km from the GIDC.

The proposed project will require various plants and machineries for manufacturing activities, such as reactors, mixers and dryers etc. to carry out production activity. Details of such equipment /machinery including their material of construction (MOC) and capacity are provided in below TABLE 2.5

TABLE 2.5 - DETAILS OF EQUIPMENT / MACHINERY

Sr. Height Capacity Name of Vessels Diameter (m) MOC No. (m) (KL) 1. SSR 1-3 1.9 2.3 SS 316 3 2. PPR 1-3 2.1 3 PP 10 3. GLR 1-2 2.3 3 MSRL 3 4. ANF 1-2 - - SS 316 5 Plate Size: 10 cm 5. Filter press to 2.4 by 2.4 m - PP 30” and 0.3 to 20 cm 6. Centrifuge - 2 Mouth Dia: 230mm - MSRL 48” 7. Vessel-1 1.9 2.73 Bricks 7.7 8. Vessel-2 2.1 2.7 Bricks 9.3 9. Vessel-5 2.1 2.6 Tiles 9.0 10. Vessel-6 1.8 2.7 Tiles 6.8 11. Vessel-7 1.6 2.2 Bricks 4.4 12. Vessel-11 3.1 3 Tiles 22.6 13. Vessel-12 3.1 3 Tiles 22.6 14. Vessel-13 2.9 3.5 Tiles 23.1

2.9

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Sr. Height Capacity Name of Vessels Diameter (m) MOC No. (m) (KL) 15. Vessel-14 2.9 3.5 Tiles 23.1 16. Vessel-15 2.9 3.5 Tiles 23.1 17. Vessel-17 3 3.2 RR 22.6 18. Vessel-18 2.8 2.6 RR 16.0 19. Vessel-20 2.1 3.1 MS 10.7 20. Vessel-23 2 2.8 RR 8.8 21. Vessel-24 2.4 2.7 RR 12.2 22. Holder-1 2 2.7 MS 8.4 23. Holder-2 1.7 2.6 MS 5.8 24. Holder-3 1.7 2.6 MS 5.8 25. Holder-4 1.7 2.6 MS 5.8 26. Holder-5 1.7 2.6 MS 5.8 27. SSR-4 2.9 4.2 SS 27.7 28. SSR-5 2.3 3 SS 12.4 29. SSR-6 2.3 3 SS 12.4 30. SSR-7 2 3 SS 9.4 31. SSR-8 2 3 SS 9.4 32. SSR-9 2 3 SS 9.4 33. SSR-10 2.7 3.8 SS 21.7 34. PPV-1 2.1 3 PP 10.3 35. PPV-2 2.1 2.5 PP 8.6 36. PPV-3 2.3 3 PP 12.4 37. PPV-4 2 2.5 PP 7.9 38. Dissolving tank-1 1.8 2.1 MS 5.3 39. Dissolving tank-2 1.8 2.1 MS 5.3 40. Dissolving tank-3 1.8 2.1 MS 5.3 41. Dissolving tank-4 1.5 1.9 RR 3.3 42. Dissolving tank-5 2 2 MS 6.2 43. Batch-1 1.5 2.1 MS 3.7 44. Batch-2 1.7 2.5 MS 5.6 45. Batch-3 2 3 MS 9.4 46. Batch-4 2 3 MS 9.4 47. Batch-5 2 3 MS 9.4 48. Batch-6 2 3 MS 9.4 49. Batch-7 2 3 MS 9.4 50. Boiler Stack H – - 2 MT/Hr Stack Dia. – 0.2 m 51. Thermopack Unit 33 m - 200 U Stack H – 52. D.G. Set - 125 KVA 12 m (Source: Orgo Chem (Guj) Pvt. Ltd.)

2.10

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

2.5 PROPOSED SCHEDULE FOR APPROVAL AND IMPLEMENTATION

Proposed Project activities are likely to start after getting Environmental Clearance from EAC, Delhi and NOC/CTE from GPCB.

Project implementation schedule describing various activities from finalization of site to project commissioning is tabulated in TABLE 2.6.

TABLE 2.6 - PROJECT IMPLEMENTATION SCHEDULE

Project Schedule

Sr. Activity Time Months

Months 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24

Total 24

Application of 1 TOR and Receipt 2 of TOR

2 DPR Preparation 5

EIA Preparation 3 and submission 5 of EIA

EC Hearing, 4 Presentation and 5 Receipt of EC

Engineering and 5 4 RAQ

6 Procurement 2

Supply, Civil Construction as 7 applicable, 7 Installation and Erection

Commissioning 8 5 and Stabilization Note: Above schedule is subjected to change as per conditions.

2.11

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

2.6 PROPOSED TECHNOLOGY / PROCESS

Proposed products shall be manufactured using state of the art manufacturing technology so that maximum yield can be achieved at minimum wastages to reduce pollution load to the environment. As mentioned in TABLE 2.3, the proposed products are divided into different groups. Manufacturing process description for each product is provided in ANNEXURE I.

2.6.1 Raw Material, Storage & Mode of Transport

Based on the need and availability, raw materials shall be sourced from registered suppliers within India via road transportation by trucks, tankers & tempos. Few raw materials will be imported from abroad as well as per requirement. Details of raw materials along with its consumption is provided in the TABLE 2.7. The quantity, physical state and means of storage for raw materials are given in TABLE 2.8.

TABLE 2.7 - DETAILS OF RAW MATERIALS

Raw Material Sr. Name of Products Name of Raw Material CAS No. Consumption No. MT/Month 1 CONDENSATION Benzoyl chloride 98-88-4 35.29 1.1 4 Chloro Benzamide Ammonia 7664-41-7 14.71

4 Nitro Benzo chloride 122-04-3 36.76 1.2 4 Nitro Benzamide Ammonia 7664-41-7 14.71

4 Nitro Benzo chloride 122-04-3 36.76 Ammonia 7664-41-7 14.71 4 Amino Benzamide 1.3 Iron Powder 7439-89-6 23.53 (1) Hydrochloric Acid 7647-01-0 17.65 Soda 5968-11-6 11.76

4 Nitro Benzoic Acid 62-23-7 25.00 Ammonia 7664-41-7 6.25 Ortho Di Chloro Benzene 95-50-1 37.50 4 Amino Benzamide 1.4 Urea 57-13-6 6.25 (2) Iron Powder 7439-89-6 12.50 Soda 5968-11-6 12.50 Hydrochloric Acid 7647-01-0 9.38

3 Nitro Benzoic Acid 121-92-6 34.38 Ammonia 7664-41-7 6.25 Ortho Di Chloro Benzene 95-50-1 37.50 1.5 3 Amino Benzamide Urea 57-13-6 6.25 Iron Powder 7439-89-6 25.00 Soda 5968-11-6 15.63

2.12

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Raw Material Sr. Name of Products Name of Raw Material CAS No. Consumption No. MT/Month Hydrochloric Acid 7647-01-0 21.88

4 Chloro 3 Nitro Benzoic 96-99-1 34.38 Acid Ammonia 7664-41-7 6.25 4 Chloro 3 Amino Ortho Di Chloro Benzene 95-50-1 37.50 1.6 Benzamide Urea 57-13-6 6.25 Iron Powder 7439-89-6 25.00 Soda 5968-11-6 12.50 Hydrochloric Acid 7647-01-0 18.76

4 Methyl 3 Nitro Benzoic 96-98-0 34.38 Acid Ammonia 7664-41-7 9.38 4 Methyl 3 Amino Ortho Di Chloro Benzene 95-50-1 37.50 1.7 Benzamide Urea 57-13-6 6.25 Iron Powder 7439-89-6 25.00 Soda 5968-11-6 12.50 Hydrochloric Acid 7647-01-0 18.76

Meta Phenylene Diamine 4 88-63-1 25.00 Sulfonic Acid (MPDSA) Soda 5968-11-6 1.56 p- Nitrobenzoyl chloride 1.8 MUB 122-04-3 23.91 (PNBC) Iron Powder 7439-89-6 15.63 Soda 5968-11-6 12.50 Hydrochloric Acid 7647-01-0 18.76

3 Nitro Benzoyl chloride 121-90-4 36.76 1.9 3 Nitro Benzamide Ammonia 7664-41-7 14.71

Para Phenyle Di Amine Ortho Sulfonic Acid 88-45-9 25.00 (PPDSA) 2 Amino - 5 - (4 Soda 5968-11-6 1.56 1.10 aminobenzoylamino) p- Nitrobenzoyl chloride 122-04-3 23.91 Benzene Sulponic Acid Iron Powder 7439-89-6 15.63 Hydrochloric Acid 7647-01-0 18.75 Soda 5968-11-6 12.50

Benzoic Acid 65-85-0 36.76 1.11 4 Amino Benzanlide p-Phenylenediamine (PPD) 106-50-3 14.71

2.13

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Raw Material Sr. Name of Products Name of Raw Material CAS No. Consumption No. MT/Month

Benzoic Acid 65-85-0 36.76 1.12 3 Amino Benzamide 2-Methyl-2,4-pentanediol 107-41-5 14.71 (MPD)

p-Phenylenediamine 106-50-3 25.00 Soda 5968-11-6 1.56 4, 4 DI amino p- Nitrobenzoyl chloride 122-04-3 23.91 1.13 Benzanilide Iron Powder 7439-89-6 15.63 Soda 5968-11-6 12.50 Hydrochloric Acid 7647-01-0 18.76

2 AMINATION

2-chloro 5-nitrobenzoic 2516-96-3 63.64 acid (CNBA) 4 Chloro 3 Amino Iron Powder 7439-89-6 50.00 2.1 Benzoic Acid Acetic Acid 55896-93-0 2.73 Soda Ash 5968-11-6 27.27 Hydrochloric Acid 7647-01-0 40.91

p-Nitrobenzoic acid 62-23-7 70.00 (PNBA) Para Amino Benzoic Iron Powder 7439-89-6 26.67 2.2 Acid Acetic Acid 55896-93-0 2.00 Soda Ash 5968-11-6 16.67 Hydrochloric Acid 7647-01-0 26.67

3,5-Dinitrobenzoic Acid 99-34-3 70.00 (DNBA)

2.3 Di Amino Benzoic Acid Iron Powder 7439-89-6 26.67 Acetic Acid 55896-93-0 2.00 Soda Ash 5968-11-6 16.67 Hydrochloric Acid 7647-01-0 23.33

2- Chloro 5- Nitro Benzene 946-30-5 73.33 Sulfonic Acid (PNCBOSA) 4 Chloro Aniline 3 2.4 Iron Powder 7439-89-6 26.67 Sulphonic Acid Soda Ash 5968-11-6 16.67 Hydrochloric Acid 7647-01-0 28.67

2.14

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Raw Material Sr. Name of Products Name of Raw Material CAS No. Consumption No. MT/Month Ortho Nitro Chloro Benzene Para Sulfonic 17691-19-9 70.00 2 Chloro Aniline 5 Acid (ONCBPSA) 2.5 Sulphonic Acid Iron Powder 7439-89-6 26.67 Soda Ash 5968-11-6 16.67 Hydrochloric Acid 7647-01-0 22.00

Ortho Nitro Chloro Benzene Para Sulfonic 17691-19-9 56.25 Acid (ONCBPSA) 2 Amino Phenol 4 2.6 Caustic Lye 1310-73-2 18.75 Sulphonic Acid Hydrochloric Acid 7647-01-0 60.00 Iron Powder 7439-89-6 43.75 Soda Ash 5968-11-6 25.00

2-Methyl-6-nitrobenzoic 434935-69-0 70.00 anhydride (MNBA) Meta Amino Benzoic 2.7 Iron Powder 7439-89-6 26.67 Acid Soda Ash 5968-11-6 16.67 Hydrochloric Acid 7647-01-0 15.33

Ortho Nitro Chloro Benzene Para Sulfonic 17691-19-9 70.00 Acid (ONCBPSA) 3, 4 Di Amino Benzen 2.8 Ammonia 7664-41-7 50.00 Sulphonic Acid Hydrochloric Acid 7647-01-0 101.80 Iron Powder 7439-89-6 40.00 Soda 5968-11-6 45.00

3, 4 Di Amino Benzoic 2-Chloro-5-Nitrobenzoic 2.9 2516-96-3 70.00 Acid Acid (CNBA) Ammonia 7664-41-7 50.00 Hydrochloric Acid 7647-01-0 107.80

Iron Powder 7439-89-6 40.00 Soda 5968-11-6 45.00

2- Chloro 5- Nitro Benzene Para Nitro Aniline 946-30-5 60.00 2.10 Sulfonic Acid (PNCBOSA) Sulphonic Acid Ammonia 7664-41-7 20.00

Ortho Nitro Aniline Ortho Nitro Chloro 2.11 17691-19-9 70.00 Para Sulphonic Acid Benzene Para Sulfonic

2.15

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Raw Material Sr. Name of Products Name of Raw Material CAS No. Consumption No. MT/Month Acid (ONCBPSA) Ammonia 7664-41-7 30.00 Hydrochloric Acid 7647-01-0 57.80

Para Nitro Toluene Ortho Sulphonic 97-06-3 70.00 Para Amino Tolune Acid (PNTOSA) 2.12 Ortho Sulphonic Acid Iron Powder 7439-89-6 40.00 Hydrochloric Acid 7647-01-0 105.00 Soda 5968-11-6 30.00

Nitric Acid 7697-37-2 30.00 2-Chloro-5-Nitrobenzoic Acid 2516-96-3 70.00 4 Chloro 3, 5 Di 2.13 (CNBA) Amino Benzoic Acid Iron 7439-89-6 40.00 Hydrochloric Acid 7647-01-0 55.00 Soda 5968-11-6 35.00

4-Nitro Aniline 2 - Sulfonic Acid 30693-53-9 70.00 2, 5 Di Amino C6H6N2O5S (PNAOSA) 2.14 Benzene Sulphonic Iron Powder 7439-89-6 26.67 Acid Acetic Acid 55896-93-0 2.00 Soda Ash 5968-11-6 16.67 Hydrochloric Acid 7647-01-0 26.67

3 OXIDATION

Para Nitro Benzoic Nitric Acid 7697-37-2 22.72 3.1 Acid p-Nitro Toluene (PNT) 99-99-0 60.60

Water / Dilute Nitric Acid 7697-37-2 171.21 4 Chloro 3 Nitro Nitric Acid 7697-37-2 45.45 3.2 Benzoic Acid Polycyclohexylenedimethyl 106-43-4 60.60 ene terephthalate (PCT)

Nitric Acid 7697-37-2 22.72 Para Chloro Benzoic 3.3 Polycyclohexylenedimethyl Acid 106-43-4 60.60 ene terephthalate (PCT)

Meta Nitro Benzoic Water / Recycle Dilute 3.4 7697-37-2 144.69 Acid Nitric Acid

2.16

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Raw Material Sr. Name of Products Name of Raw Material CAS No. Consumption No. MT/Month Nitric Acid 7697-37-2 22.72 Mononitrotoluene (MNT) 99-08-1 60.60

4 CYCLIZATION

APMS 98-30-6 22.50 Dilute Sulphric Acid 7664-93-9 69.38 Nitric Acid 7697-37-2 15.00 6-Nitro Benzoxazolone Ortho Di Chloro Benzene 4.1 95-50-1 30.00 3, Methyl Sulphone (ODCB) Urea 57-13-6 7.50 Ammonia 7664-41-7 30.00 Hydrochloric Acid 7647-01-0 30.00

Hydrochloric Acid 7647-01-0 57.00 Recycle Hydrochloric Acid 7647-01-0 18.00 Ortho Amino Phenol (OAP) 95-55-6 15.00 Urea 57-13-6 18.00 5-Nitro 2-Amino 4.2 Ammonia 7664-41-7 18.00 Phenol Recycled Ortho Di Chloro 95-50-1 53.40 Benzene (ODCB) Nitric Acid 7697-37-2 39.00 Ammonia 7664-41-7 21.00

5 METHOXYLATION

Water/Dilute Nitric Acid 7697-37-2 34.64 Nitric Acid 7697-37-2 4.28 Polycyclohexylenedimeth- 106-43-4 5.71 3 Nitro 4 Methoxy ylene terephthalate (PCT) 5 Benzoic Acid 2-Chloro-5-Nitrobenzoic 2516-96-3 5.71 Acid (CNBA) Methanol 67-56-1 17.14 Sodium Methoxide 124-41-4 3

Ammonia 7664-41-7 6.25 6 Ammonium Sulphate Sulfuric acid 7664-93-9 10

2.17

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

TABLE 2.8 - CHARACTERISTICS, MEANS OF STORAGE & TRANSPORTATION OF RAW MATERIALS

Physical Consumption Mode of Sr. No. Name of Raw Material Suggested Source Storage BP °C MP °C State (MT/Year) Transportation

1 Acetic Acid Liquid 104.8 Pioneer Chemicals Tanks Road 118.1 16.6 2 Ammonia Liquid 3736.6 Ganesh traders Tanks Road 3 Benzoic Acid Solid 822.2 Imported from abroad HDPE bags Road 249.2 122.4 4 Benzoyl Chloride Liquid 423.5 Open Market Tanks Road 198 -1 5 Dilute Nitric Acid Liquid 4206 Shivam Products Tanks Road 82.6 (-41.6) 6 Dilute Sulphuric Acid Liquid 832.6 Niken Traders Tanks Road 119 10.49 A B Chemicals, Harsidhi (- 7 Hydrochloric Acid Liquid 11024.2 Tanks Road 108.58 Chemicals 62.25) Texchem, Thacker 8 Iron Powder Solid 6860.6 HDPE bags Road 3000 1535 Pulverizing Co. Meta Phenylene Diamine 4 9 Solid 300 Imported from abroad HDPE bags Road 284 62 Sulfonic Acid (MPDSA) 10 Methanol Liquid 205.7 Open Market Tanks Road 64.7 -97.8 A B Chemicals, Pioneer 11 NaOH (Caustic Lye) Liquid 205.9 Chloro Alkali Products, Tanks Road 1388 323 Shivam Products 12 Nitric Acid Liquid 2422.7 Shivam Products Tanks Road 121 (-41.6) 13 Ortho Amino Phenol (OAP) Solid 180 Imported from abroad HDPE bags Waterways NA 172 14 Ortho Di Chloro Benzene (ODCB) Liquid 2800.8 Panoli Intermediates Tanks Road 180 (-17.6) Ortho Nitro Chloro Benzene Para 15 Solid 727.2 Shri Arihant Dye-Chem HDPE bags Road NA NA Sulfonic Acid (ONCBPSA) 16 p- Nitrobenzoyl chloride (PNBC) Solid 840 Transpek Industries HDPE bags Road 202 70

2.18

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Physical Consumption Mode of Sr. No. Name of Raw Material Suggested Source Storage BP °C MP °C State (MT/Year) Transportation

17 p- Nitrobenzoyl chloride (PNBC) Solid 840 Jainik Industries HDPE bags Road 205 74 Para Nitro 18 Toluene Ortho Sulphonic Acid Solid 840 Imported from abroad HDPE bags Waterways 500 92 (PNTOSA) 19 p-Nitro Toluene (PNT) Liquid 727.2 Aarti Industries Ltd. Tanks Road 240 53 Chemcrux Enterprises 20 p-Nitrobenzoic acid (PNBA) Solid 840 HDPE bags Road 270 221 Ltd. Polycyclohexylenedimethylene 21 Solid 1522.9 Imported from abroad HDPE bags Waterways NA 285 terephthalate (PCT) 22 p-Phenylenediamine (PPD) Solid 476.5 Imported from abroad HDPE bags Waterways 267 146 23 Soda Ash Solid 4972.8 Ramesh Trading Co. HDPE bags Road 1600 851 24 Sodium Methoxide Liquid 36 Open Market Tanks Road 5 93 25 Sulphuric Acid Liquid 120 Niken Chemicals Tanks Road 270 (-35) 26 Urea Solid 606 Amos Corporations HDPE bags Road NA 132.7 2- Chloro 5- Nitro Benzene 27 Solid 300 Open Market HDPE bags Road NA NA Sulfonic Acid (PNCBOSA) 2-Acrylamido-2-methylpropane 28 Solid 270 Open Market HDPE bags Road NA NA sulfonic acid (APMS) Chemcrux Enterprises 29 2-Chloro-5-Nitrobenzoic Acid Solid 105.2 HDPE bags Road NA 142 Ltd. 30 2-Methyl-2,4-pentanediol (MPD) Liquid 176.5 Open Market Tanks Road 197 -40 2-Methyl-6-nitrobenzoic Chemcrux Enterprises 31 Solid 840 HDPE bags Road NA 108 anhydride (MNBA) Ltd. 32 3,5-Dinitrobenzoic Acid (DNBA) Solid 412.6 Ankur Chemicals HDPE bags Road NA 206 33 3-Nitro Benzoic Acid Solid 412.6 Shree Chemopharma HDPE bags Road NA 140

2.19

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Physical Consumption Mode of Sr. No. Name of Raw Material Suggested Source Storage BP °C MP °C State (MT/Year) Transportation

34 3-Nitro Benzoyl Chloride Solid 441.1 Transpek Industries HDPE bags Road 275 33 35 4-Chloro-3-Nitro Benzoic Acid Solid 412.6 Shree Chemopharma HDPE bags Road NA 181 36 4-Methyl-3-Nitro Benzoic Acid Solid 412.6 Chem. Crux Industries HDPE bags Road NA 188 4-Nitro Aniline 2 – Sulfonic Acid 37 Solid 840 Gurukant Industries HDPE bags Road NA >300 C6H6N2O5S (PNAOSA) 38 4-Nitro Benzoic Acid Solid 300 Shree Chemopharma HDPE bags Road NA NA 39 4-Nitro Benzoyl Chloride Solid 860.8 Transpek Industries HDPE bags Road 203 73 (Source: Orgo Chem Guj. Pvt. Ltd.)

2.20

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

2.7 GASEOUS EMISSIONS AND ITS CONTROL

Gaseous emissions will occur from boiler, Thermopack, DG set as well as from various manufacturing processes. Likely air pollutants from proposed project will be PM, SO2 & NOX from stacks attached to boiler and Thermopack and NH3 from process vents.

TABLE 2.9 - DETAILS OF STACKS, FUEL USED AND APCM ATTACHED

Sr. Stack Attached Stack Height Fuel Air Pollution No. To and Diameter Consumption Control System A FLUE GAS EMISSION Natural Gas is used as a fuel, Boiler Natural Gas 1. about 33 Meters Capacity - 2 MT/Hr 2000 SCM/Day Stack height is Height: 33 Meter provided. Dia.: 300 mm Natural Gas shall be used as a fuel, Thermopack Unit Natural Gas 2. about 33 Meters Capacity - 200 U 500 SCM/Day Stack height shall be provided. Stack Height of D. G. Set–Stand By LDO 3. Height: 12 Meters 12m will be Capacity: 125 KVA 600 Liters/Day provided. Note: Unit will use 25 MT/Day steam from Common Boiler House B PROCESS EMISSION Sr. Stack Attached Stack Height and Air Pollution Likely pollutant No. To Diameter Control System Two Stage Reactor & Drawing Height: 20 Meters 1. VOCs, NH Ammonia Vessel Dia.: 100 mm 3 Scrubber.

Technical Specification of Two Stage Scrubber:

Two Stage scrubber for Reactor & Drawing Vessel to scrub NH3 gases.

Counter current packed bed type two stage scrubbing system shall be provided with Reactor & Drawing Vessel for scrubbing NH3 gasses generated from the reaction vessels (in case of generation). The detailed of the scrubber shall be as under:

Type Two Stage Packed Bed Scrubber Dimensions Diameter 600 mm Packed Height 3000 mm Type of Packing PP Pall Ring Total Height 4000 mm M.O.C. HDPE

2.21

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Media 1st Stage: Chilled Water 2nd Stage: Sulphuric Acid

2.8 WATER CONSUMPTION, WASTEWATER GENERATION, TREATMENT OF WASTEWATER & DISPOSAL DETAILS

During operational phase estimated fresh-water requirement would be 45 KL/Day (37 KL/Day for Industrial + 5 KL/Day for Domestic + 3 KL/Day for Gardening) which will be met through Sachin Notified Area Authority. Principle areas of water consumption are Process, boiling, Cooling Tower, scrubbing and Domestic Uses including gardening. Wastewater shall be generated from Process, boiler, Cooling Tower, scrubber, floor washing and domestic utilities. The total industrial wastewater generations will be 30 KL/Day, which shall be sent to inhouse MEE plant followed by biological treatment and RO plant. RO permeate water shall be reused back within plant premises and RO reject water shall be again sent back to MEE plant. Domestic wastewater generation will be 4.5 KL/Day, shall be disposed through septic tank /Soak pit system.

Water consumption and wastewater generation for different heads are tabulated in TABLE 2.10. Water balance diagram is provided in below FIGURE 2.2.

TABLE 2.10 - WATER CONSUMPTION AND WASTEWATER GENERATION

Water Consumption Wastewater generation Description KL/Day KL/Day Total Industrial 37 30 Process 13.5 13.5 Boiler 10 5 Cooling 9 7 Washing 3 3 Scrubber 1.5 1.5 Domestic 5 4.5 Gardening 3 0 Grand Total 45 34.5

30 KL/Day Industrial Waste water

Unit has proposed to install in-house MEE plant. Wastewater generated due to industrial activities shall be send to inhouse MEE plant followed by biological treatment and RO plant. RO permeate water shall be reused within plant premises and RO reject water shall be again sent back to MEE plant.

4.5 KL/Day Domestic Wastewater Domestic wastewater shall be disposed through septic tank/soak pit system

2.22

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Following measures shall be taken to reduce fresh water demand:

 Use of drip irrigation/sprinkling system for green belt development, which will reduce the fresh water demand;  Washing water shall be reused as feasible;  To avoid leakage of water continuous monitoring of flow shall be done.

2.23

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

FIGURE 2.2 - WATER BALANCE DIAGRAM Fresh Water - 45 KL/Day SOURCE OF WATER: SACHIN (22 KL/Day Fresh + 23 KL/Day RO Permeate) NOTIFIED AREA AUTHORITY

13.5 10 9

KL/Day KL/Day KL/Day Process Boiler Cooling Washing Scrubber Gardening Domestic 60 KL/Day 40 KL/Day 33 KL/ Day 33 KL/

46.5 KL/ Day KL/ 46.5 3 KL/Day 3 KL/Day

30 KL/ Day 30 KL/ 42 KL/Day

1.5 KL/Day

5 KL/Day – – – Recycle Recycle Recycle Recycle Evaporation Recycle Evaporation Loss Loss To septic tank / 5 KL/Day 7 KL/Day 3 KL/Day 1.5 KL/Day soak pit Nil system 4.5 KL/Day

16.5 KL/Day 13.5 KL/Day

ETP for Neutralization In House MEE Condensate Biological RO Plant 23 KL/Day RO Permeate for Reuse 30 KL/Day 30 KL/Day 27 KL/Day Treatment 27 KL/Day 4 KL/Day RO Reject to MEE

Salt to TSDF Site Evaporation Loss

2.24

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

2.8.1 Process Description of Effluent Treatment Plant

Effluent generated during manufacturing process and other utility operations shall be sent to inhouse MEE plant followed by biological plant and RO plant. Permeate water from RO plant shall be recycle and reused back within plant premises and RO reject water shall be again sent back to MEE plant.

2.8.1.1 In-house MEE treatment facility

For Captive MEE facility, effluent first will be collected in collection tank. Such two collection tanks are provided. In each collection tank before sending effluent for further treatment, Lime solution / caustic lye is added for neutralization. Once one batch of collection tank is neutralized effluent is fed to inlet of settling tank. Here precipitated mass is allowed to settle under gravity. Clear supernatant is collected in MEE feed tank. Sludge from settling tank is dewatered through filter press.

Captive MEE:

Effluent from MEE feed tank is transferred to 2 stage multiple effect evaporation system. Here effluent is evaporated in 2 stages of forced circulation multiple effect evaporator by concentrating it from 1% solid content to 30% solid content. Concentrated mass is further subjected to evaporation in ATFD / Pusher centrifuge system where salt is recovered at the bottom. Evaporated mass obtained as condensate from MEE system is collected in condensate storage tank. It is expected that evaporated mass will have very less concentration of low volatiles though condensate can have COD/BOD in range of 1500 / 500 mg/lit which needs further polishing treatment for reuse in process.

Condensate such obtained is subjected to biological treatment using Activated Sludge Process in aeration tank. Aeration Tank mixed liquor is fed to secondary settling tank for separation of biomass. Clean liquor is then collected in treated waste water storage tank. Biomass is recycled back to aeration tank. At regular interval biomass is wasted as side stream and subjected to dewatering along with primary sludge.

Treated wastewater after aeration tank is subjected to treatment through RO plant for providing polishing treatment. Since TDS level of condensate is expected to be in range of 1000 mg/l, RO recovery of more than 90% is achieved in RO plant. RO reject is fed back to MEE feed tank for treatment. RO Permeate is recycled back to plant for reuse mainly as utility water in cooling tower and boiler application.

TABLE 2.11- CHARACTERISTICS OF COMPOSITE SAMPLE

Concentr Effluent Effluent Effluent ated Characteri Reduct Characteri Reduct Characteri Reduct Parame Unit Stream stics After ion stics After ion stics After ion ter Characte MEE (%) Biological (%) RO (%) ristics Treatment Treatment Treatment pH - 2.5 6.6 - 7.1 - 7.2 - COD mg/l 34561 3456 90 691 80 < 100 80 BOD mg/l 11234 640 94.3 160 75 < 30 70 TDS mg/l 44895 449 99 450 - < 50 90

2.25 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Concentr Effluent Effluent Effluent ated Characteri Reduct Characteri Reduct Characteri Reduct Parame Unit Stream stics After ion stics After ion stics After ion ter Characte MEE (%) Biological (%) RO (%) ristics Treatment Treatment Treatment Suspend mg/l 986 - - <20 - - - ed Solid (Treatability report is attached as ANNEXURE IV)

Block Diagram for Treatment of Effluent Streams into-in house MEE plant.

2.26

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Calculation of Chemical Consumption for Neutralization Inlet Effluent Flow kg/day 30000 Inlet Acidity as HCL % 5% Total Acid as HCL kg/day 1500 Caustic addition, 100% kg/day 1643.8 Sludge Solids Content % 65 Sludge Quantity, As such kg/day 2529.0 Filtrate After Sludge Removal kg/day 29114.9 Salt Content in Filtrate (TDS) kg/day 900 Total Salt Content, dry basis kg/day 900 Salt Percentage % 32 Salt Content from STFD % 90% Salts from ATFD kg/day 1000 Condensate kg/day 28114.9

TABLE 2.12 -LIST OF EFFLUENT TREATMENT PLANT UNITS (CONCENTRATED STREAM)

Effluent Flow Rate: 30 KL/Day

Design flow: 50 KL/day

Sr. Nos of Equipment Brief Specification No. unit Type: Circular 3 1. Collection Tank 2 Capacity: 25 m RCC Tile line Dosing Tank (pH Correction 2. 2 Capacity: 500 Litres System) Type: Rectangular tank 3. Neutralization Tank 1 Capacity: 25 m3 RCC Tile line Cap: 3 m3/hr Type: Tripple Effect Evaporator 4. MEE 1 MOC: Liq. Part, SS316 Vapour Part SS304 HE Tubes: SS316 Ti 3 Aeration Tank: Cap: 2 m /hr Lamella: 3 5. Biological treatment 1 Cap: 2m /hr MOC: MS Lined Volume: 5 m3 3 6. Pressure Sand Filter 1 Capacity: 2 m /hr 3 7. RO Plant 1 Capacity: 2 m /Hr Recovery: 85 % to 90 %

2.27

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Sr. Nos of Equipment Brief Specification No. unit Type: Circular 3 8. Treated water storage tank 1 Capacity: 50 m RCC Tile line

2.8.1.2 Economical and Technical Viability of Effluent Treatment System

Calculation for economic viability of effluent treatment system is provided as under in TABLE 2.13 below. TABLE 2.13 - ECONOMICAL VIABILITY OF ETP

Production 25 MT/Month 25000 Kg/Month 1. MUB 800 Kg/Batch

Rs/Kg of Rs of Raw Sr. Kg of Raw Description Raw Material /Kg of No. Material/batch Material Product 1 MPDSA 800 500 400000 2 Soda 450 26 11700 3 PNBC 765 700 535500 4 Iron Powder 500 25 12500 5 HCL 100 6 600 6 Total Manufacturing Cost 960300 7 Cost / Kg of Product 1200 8 *Other Cost 14 9 ETP Cost 6 10 Sale Price of Product 1220

Production 50 MT/Month 50000 Kg/Month 2. Ortho Nitro Aniline Para Sulphonic Acid 500 Kg/Batch

Rs/Kg of Rs of Raw Sr. Kg of Raw Description Raw Material /Kg No. Material/batch Material of Product 1 ONCBPSA 700 115 80500 2 Ammonia 300 20 6000 3 HCl 578 6 3468 7 Total Manufacturing Cost 89968 8 Cost / Kg of Product 180 9 *Other Cost 47 10 ETP Cost 13 11 Sale Price of Product 240

2.28

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Production 60 MT/Month 60000 Kg/Month 3. 4 Chloro 3 Nitro Benzoic Acid 660 Kg/Batch

Rs/Kg of Rs of Raw Sr. Kg of Raw Description Raw Material /Kg No. Material/batch Material of Product 1 Dilute Nitric Acid 4850 20 97000 2 Nitric Acid 600 30 18000 3 PCT 800 110 88000 7 Total Manufacturing Cost 203000 8 Cost / Kg of Product 308 9 *Other Cost 33 10 ETP Cost 10 11 Sale Price of Product 350

Production 20 MT/Month 20000 Kg/Month 4. 5-Nitro 2-Amino Phenol 420 Kg/Batch

Rs/Kg of Rs of Raw Sr. Kg of Raw Description Raw Material /Kg No. Material/batch Material of Product 1 HCl 1250 6 7500 3 OAP 250 650 162500 4 Urea 300 60 18000 5 Ammonia 650 20 13000 6 ODCB 890 55 48950 7 Nitric Acid 650 30 19500 10 Total Manufacturing Cost 269450 11 Cost / Kg of Product 642 12 *Other Cost 642 13 ETP Cost 17 14 Sale Price of Product 1300

2.29

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Operating Cost Estimates for ETP (With Captive Treatment) Working of Variable Cost PLANT CAPACITY 30 KLD CONSUMPTION COST DAILY COST A CHEMICAL CONSUMPTION UNIT KG/DAY RS/KG RS/DAY Caustic (100% Basis) 1,643.84 35.00 57,534.25 Lime 4.50 - PE 1 MG/L 0.03 350.00 10.50 UREA 1.32 60.00 79.01 DAP 0.64 105.00 67.06 TOTAL CHEMICAL RS/DAY 57,690.82 B POWER CONSUMPTION CONSUMPTION RATE DAILY COST KW KWH/DAY RS/KWH RS/DAY ETP 44 958.46 7.00 6,709.23 C SLUDGE DISPOSAL KG/DAY RS/KG RS/DAY 4951 2.2 10892.22527 Total ETP 75292.27 D RO Plant Rs/KL 15.0 450.00 F MEE Plant Rs/KL 2500.0 75000.00 G VARIABLE TOTAL RS/DAY 150742 H MAN POWER COST (SCHEDULE AS UNDER) 3433 I MAINTENANCE COST 2000 TOTAL RS/DAY 156176 Water Recycle 38 KL/Day @25 Rs/KL Rs/DAY 0.00 Net Operating Cost Rs/DAY 156176 RS/KL 5205.85 RS/Litre 5.2

2.30

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

ETP MANPOWER COSTING RS/MONTH RS/MONTH DESIGNATION NOS/DAY PER PERSON TOTAL Plant Supervisor 1 25,000 25,000 Operator 2 18,000 36,000 Labours 3 14,000 42,000 TOTAL 6 TOTAL 1,03,000 RS/MONTH 3,433

2.9 SOLID AND HAZARDOUS WASTE MANAGEMENT SYSTEM

Based on the Hazardous and Other Wastes (Management and Transboundary Movement) Rules, 2016, as amended till date, categorization, storage and disposal of wastes are provided in TABLE 2.14.

Hazardous waste generated from proposed facility will be stored in dedicated hazardous waste storage area. Each type of waste will be labelled separately before shifting to storage facility. Hazardous waste shall be disposed of to TSDF site / recyclable waste shall be sent to authorized recycler as per Hazardous Waste (Management, Handling and Transboundary Movement) Rules, 2016.

TABLE 2.14 – CATEGORIZATION, STORAGE AND DISPOSAL OF WASTE

TYPE OF CAT. QUANTITY HAZARDOUS SOURCE METHOD OF DISPOSAL NO. GENERATED WASTES Collection / Storage / Used / Spent From Plant & 100 Liters/Year 5.1 Transportation / send to Oil Machineries i.e. 0.90 MT/Year GPCB approved Recycler Collection / Storage / Discarded From raw 2500 Nos/Year Transportation / send back 33.1 bags / drums material i.e. 20 MT/Year to supplier / disposal to / barrels packaging GPCB approved Recycler Collection / Storage / 52 MT/Month 34.3 ETP Sludge From ETP Transportation / send to i.e. 624 MT/Year TSDF site for land filling Collection / Storage / From own 30 MT/Month -- MEE Salt Transportation / send to MEE i.e. 360 MT/Year TSDF site for landfilling From the production of Group 1 – Collection / Storage / Condensation 143.75 MT/Month 26.1 Iron Sludge Transportation / send for co Except (4 i.e. 1725 MT/Year processing Chloro Benzamide, 4 Nitro

2.31

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

TYPE OF CAT. QUANTITY HAZARDOUS SOURCE METHOD OF DISPOSAL NO. GENERATED WASTES Benzamide, 4 Nitro Benzamide, 3 Nitro Benzamide) And Group 2 – Amination except (Para Nitro Aniline Sulphonic Acid, Ortho Nitro Aniline Para Sulphonic Acid, 2, 5 Di Amino Benzene Sulphonic Acid) From 367.4 MT / Month Collection / Storage / recycle Manufacturing 26.3 Nitric Acid i.e. 4408.8 within same process of of Group 3 - MT/Year Oxidation. Oxidation From Manufacturing of 4 Amino Benzamide Spent Solvent (2), 4 Chloro 3 Collection / Storage / (Ortho Di Amino 90 MT / Month Transportation / recycle 26.4 Chloro Benzamide, 4 i.e. 1080 MT/Year within same process / send Benzene Methyl 3 to authorized recycler (ODCB)) Amino Benzamide and Group 4 - Cyclization From Collection / Storage / Manufacturing 16.28 MT/Month Spent Solvent Transportation / recycle 26.4 of 3 Nitro 4 i.e. 195.3 (Methanol) within same process / send Methoxy MT/Year to authorized recycler Benzoic Acid From Collection / Storage / manufacturing 45 MT/Month - Mixed Salt Transportation / send to of Group 4 - i.e. 540 MT/Year TSDF site for landfilling Cyclization

2.32

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

TYPE OF CAT. QUANTITY HAZARDOUS SOURCE METHOD OF DISPOSAL NO. GENERATED WASTES Collection / Storage / From Transportation / Distilled/ Distillation 2 MT/Month 20.3 Distillation of Sent to TSDF site for Residue i.e. 24 MT/Year Solvent incineration / sell for co processing Send to inhouse MEE plant From - Waste Water 1.5 KL/Day followed by biological Scrubber treatment and RO plant.

Methodology of decontamination of discarded containers

 The empty containers will be sent to decontamination area after ensuring that it will be completely empty and the lids will be tightly closed.  Treated wastewater will be charged in the containers and lid will be closed properly.  Containers will be rolled on the ground for 2 to 3 minutes and then emptied. The procedure will be repeated for 3 times.

2.10 SOLVENT MANAGEMENT SYSTEM

The industry proposes to install new unit for manufacturing of synthetic organic chemicals (Dye Intermediates), which require solvents during various unit processes. The solvent is used during the manufacturing process will be recovered by way of distillation and will be sold to authorized dealer. The process of the solvent recovery system is described hereunder;

 After the completion of the reaction, the solvents/mother liquor will be separated by centrifuge and pumped to distillation reactor. It will be subjected to distillation to separate and recover solvent.  Firstly, the mass will be distilled at required temperature where pure solvents will be distilled out depending on their boiling points and it will be collected in the recovered solvent storage tank and reused in the process and then residue will be sent to TSDF site for the disposal by incineration.  Vacuum will also be applied during distillation.

Measures for achieving maximum solvent recovery and minimize VOC generation:

 The entire manufacturing activities & distillation process will be carried out in a totally closed system.  Maintenance of the pipeline and valves & fittings will be carried out regularly to avoid any leakages.  Reactor will be connected with three numbers of condensers where in the first condenser chilled water will be used whereas in second and third condenser brine solution will be used as media and it will be also equipped with vacuum system as per requirement.  The condenser will be provided with sufficient HTA and residence time to achieve more than 95% recovery.

2.33

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

 All the Flange joints of the pipe lines which carry solvents will be covered with flange guards.  VOC detectors will be installed at various places to identify any fugitive emissions.  Minimum number of flanges, joints and valves in pipelines shall be provided.

FIGURE 2.3 - PROCESS FLOW DIAGRAM FOR SOLVENT RECOVERY SYSTEM

Condensor Loss

Chilled Chilled water in water out Condenser-1

Brine Condenser-2 Brine Solution in Solution out

Brine Condenser-3 Brine Solution in Solution out

Vacuum Reflux 752 mm of Hg

Steam Distillation Solvent Storage Recovered Tank Column Solvent Storage Transfer Losses Tank

Distillation Loss in Residue Effluent

2.34

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

TABLE 2.15 -DETAILS OF SOLVENT RECOVERY

Sr. Name of Product Name of Consumption Recovered % No. Group Name Solvent MT/Month MT/Month Recovery

3 Nitro 4 1 Group - 5 Methoxy Methanol 25.71 25.45 99 Benzoic Acid 5 - Nitro 2 – 2 Group 4 ODC 53.4 53.28 99 Amino Phenol

2.11 RAIN WATER HARVESTING

Rainwater harvesting is a mechanism involved in collecting, storing and putting rainwater to use when it is most needed. A rainwater harvesting system comprises of various stages - transporting rainwater through pipes or drains, filtration, and storage in tanks for reuse or recharge.

Rain water harvesting can be done by three ways;  Recharge through Roof Top  Rain water storage Tank (15 KL (2 no.) storage tank)  Recharge through surface run-off

There are five components in a rainwater harvesting system namely catchment, conveyance, filtration, storage and recharge.

Advantages of Rain Water Harvesting

There are various advantages of Rain Water Harvesting from which some of them are listed below:  Outsourcing is reduced as it allows use of rainwater in case of scarcity.  Solution to water problems.  Effective rise in Ground Water levels.  Inexpensive and simple technology.  It’s economical & energy saving as it prevents extraction of water from depleting Ground Water Table.  Provides high quality water, having low mineral content.  Easy operation & maintenance.  Reduces soil erosion.

Design of Rain Water Harvesting

Quantity of Rain water collected depends upon:  Average Rainfall Intensity.  Catchment area.

2.35

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

 Run-off coefficient.

Design Calculations

Area availability for Rain Water Harvesting: Area Available Rain Water Harvesting is as under:

Total Land Area: 2010 m2 Roof Top area of building/sheds: 568.8 m2 Roads/Paved Area: 573 m2 Green belt Area: 805 m2

Rainfall Intensity for the region:

Average Rainfall per year= 1211 mm, (Source: Ground Water Brochure, Surat District, Gujarat, CGWB, 2013)

Co-efficient and Factor Adopted:

TABLE 2.16 - RUNOFF CO-EFFICIENT

Surface Type Run off Co efficient Roof top area of building/sheds 0.85 Road/Paved area 0.65 Green belt area 0.15 Open land 0.20 (Source: Concepts & Practices for Rain Water Harvesting CPCB)

TABLE 2.17 - RAINWATER HARVESTING AT SITE

Description Area Rainfall in Runoff Co-Efficient Total in m3 Meter Roof Top of 568.8 1.211 0.85 402.9 building/Shed/ Road/Paved area 573 1.211 0.65 446.9 Green Belt 805 1.211 0.15 144.9 Total Quantum of Total (sqm) 1946.8 available runoff 994.7 (cum/y)

Average recharge of rain water annually is 994.7 m3.

2.36

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 2 Project Description Date 17/03/2020

Details of Treated Rain water storage tank is provided below:

Type : Treated rain water storage tank MOC : Rectangular RCC tank Nos : 2 tanks Volume : 10 m3 Dimensions Length : 2 m Width : 2 m Height : 2.5 m

Schematic diagram of rainwater harvesting is shown below.

FIGURE 2.4 - RAIN WATER HARVESTING PLAN

Terrace

Building

Sand Rain Filter Treated Water Water Storage Storage

2.37

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of the Environment Date 17/03/2020 CHAPTER 3 DESCRIPTION OF THE ENVIRONMENT

3.1 INTRODUCTION

This chapter illustrates the baseline status of environmental quality in the vicinity of project site serves as the basis for identification, prediction and evaluation of impacts. The baseline environmental quality is assessed through field studies within the impact zone for various components of the environment, viz. air, noise, water, land, geo-hydrology, and ecology and socio-economic. Information of baseline environmental status of the study area is useful for Impact Assessment Process of assessing and predicting the environmental consequences of the significant actions. Significant action depicts direct adverse changes caused by the action and its effect on the health of the biota including flora, fauna and human being, socio-economic conditions, current use of land and resources, physical and cultural heritage properties and biophysical surroundings.

3.2 METHODOLOGY

The baseline environmental quality has been assessed during 1st March 2019 to 31st May 2019 in a study area of 10 km radial distance from the project site. The map showing Location of the project site with 5 km & 10 km radius of the study area is given in FIGURE 3.1.

The Water, Soil and Air samples have been collected and analyzed by NABL approved laboratory ENPRO Enviro Tech and Engineers Pvt. Ltd. (Environmental Laboratories) The methodology of data collection and analysis adopted is given in TABLE 3.1.

TABLE 3.1 – METHODOLOGY OF DATA COLLECTION

Methods Attribute Sampling / Preservation Analysis A. A. Water Ground Water Standard Methods for IS 3025 & Standard Methods for Examination of Water and Examination of Water and Surface Water Wastewater Wastewater Site-specific meteorological data for the project site have been B. Climate & collected using Weather Station NA Meteorology for period from 1st March 2019 to 31st May 2019 C. Ambient Air As per IS: 5182 As per IS: 5182 Quality Survey carried out as per EPA D.Noise Sound level meter 1986 Land use map prepared by field area expert by visual image E. Land Use & interpretation using data of IRS P6 LISSIV, NRSC Satellite image, Land Cover Hyderabad 3.1 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of the Environment Date 17/03/2020

Primary data collection by site F. F. Ecology & Primary data collection by site visit visit and Secondary data Biodiversity Data and Secondary data verification verification Primary data collection by site G. G. Socio-economic Primary data collection by site visit visit and Secondary data Data and Secondary data verification verification

FIGURE 3.1 - STUDY AREA MAP – 5 KM & 10 KM FROM PROJECT SITE

3.3 WATER

3.3.1 Introduction

Describing the existing water environment helps in evaluating the existing health of water body and suggesting appropriate mitigation measures to minimize the potential impact from development projects. Water environment is widely divided into following two categories:

Surface water: River, Ponds/Lakes, etc. Ground water: Accumulation in deeper strata of ground / aquifers

3.3.2 Location of Water Monitoring Stations

Surface water sampling has been done at five different locations. One river water sample and one khadi sample whereas three pond water samples were collected during the study period. Groundwater sampling has been done at five locations distributed in the study area. Three bore well samples and two hand pump samples were collected during the study period. Sampling

3.2 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of the Environment Date 17/03/2020

locations for surface water and groundwater quality monitoring are shown in FIGURE 3.2 and are enlisted in TABLE 3.2.

TABLE 3.2 - DETAILS OF WATER SAMPLING LOCATIONS

Arial Dist. From Stn Elevation Location Latitude Longitude Project Site Code (m) (km) Surface Water Talangpor Village SW1 21° 4'31.28"N 72°50'57.84"E 9 2.3 (Lake Water) Gabheni Village SW2 21° 5'8.68"N 72°49'38.65"E 8 3.2 (Lake Water) Umber Village SW3 21° 4'1.38"N 72°50'7.68"E 8 3.7 (Lake Water) Budiya Village SW4 21° 6'9.16"N 72°49'19.37"E 6 3.8 (Lake Water) Kansad Village SW5 21° 3'34.80"N 72°52'31.20"E 11 4.3 (Lake Water) Mindhola SW6 21° 2'26.82"N 72°54'36.72"E 6 8.1 River Ground Water Umber Village GW1 21° 4'2.82"N 72°50'34.80"E 8 3.3 (Bore well) Raj Nagar GW2 21° 4'47.82"N 72°52'44.52"E 12 2.7 (Bore well) Kansad Village GW3 21° 3'36.12"N 72°52'20.34"E 11 4.1 (Bore well) Village GW4 21° 6'46.74"N 72°52'57.60"E 14 3.4 (Hand pump) Village GW5 21° 7'41.88"N 72°51'41.46"E 13 3.7 (Bore well) Navagam Village GW6 21° 9'5.34"N 72°51'51.60"E 11 6.3 (Bore well) Karankhat Village GW7 21° 1'13.32"N 72°49'56.04"E 7 8.6 (Hand pump)

3.3 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of the Environment Date 17/03/2020

PHOTOGRAPHS 3.1 - PHOTOGRAPHS OF WATER SAMPLING

3.4 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of the Environment Date 17/03/2020

FIGURE 3.2 - SAMPLING LOCATION FOR SURFACE WATER AND GROUND WATER

3.5 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of the Environment Date 17/03/2020

3.3.3 Methodology for sampling, preservation and transportation

Samples were collected by trained personnel having adequate experience. It is vital that all the procedures are followed during the process of sample transport and storage in order to ensure homogeneity of the samples. It is also important to note that care should be taken that the samples are not altered significantly in their condition and are in a state acceptable for analysis at the laboratory.

The key aspects which were taken care of during transport and storage are highlighted as under:

3.6 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of the Environment Date 17/03/2020

 Samples were collected in HDPE containers and packed to avoid breakage and cross contamination.  Sample degradation was reduced through appropriate preservation and 1ml 1N HNO3 per liter of sample was added for analysis of selected metals.  Sample containers were sealed, labelled and carefully packed with an appropriate packing material and stored in chilled containers (around 40C). The chain of custody records was also maintained as per standard protocol.  Microbiology samples were collected in sterile glass bottles  The pH and Temperature were monitored at the time of collection and the DO was fixed on site.

The list of parameters assessed and the methodologies for analysis of water samples are presented in below table. The method detection limits are also provided in the table with respective units of measurement.

METHODOLOGY FOR SAMPLING, PRESERVATION AND TRANSPORTATION

Minimum Sr. Parameter Unit METHOD OF MEASUREMENT Detection No. Limit 1 pH Value - IS 3025 (Part - 11) – 1983 2 APHA -23rd Edition 2 Colour Hazen 2 (Part – 2000, Section: 2120 C) 3 Total Dissolved Solids mg/L IS 3025 (Part - 16) – 1984 5 4 COD mg/L IS 3025 (Part - 58) – 2006 5 5 BOD mg/L IS 3025 (Part - 44) – 1993 2 6 Calcium as Ca mg/L IS 3025 (Part - 40) – 1991 0.5 7 Chloride as Cl mg/L IS 3025 (Part - 32) – 1988 10 APHA (23rd Edition) 8 Fluoride as F mg/L 0.5 (Part 4000, Section : 4500 F-- D) 9 Residual Free Chlorine mg/L IS 3025 (Part - 26) – 1986 1 10 Iron as Fe mg/L IS 3025 (Part - 53) – 2003 0.1 11 Magnesium as Mg mg/L IS 3025 (Part - 46) – 1994 0.5 Phenolic compounds 12 mg/L IS 3025 (Part - 43) – 1992 0.5 as C6H5OH 13 Sulphate as SO4 mg/L IS 3025 (Part - 24) – 1986 2 14 Total Alkalinity as CaCO3 mg/L IS 3025 (Part - 23) – 1986 5 15 Total Hardness as CaCO3 mg/L IS 3025 (Part - 21) – 2009 5 16 Hexavalent Chromium mg/L IS 3025 (Part - 52) – 2003 0.5 17 Oil & Grease mg/L IS 3025 (Part - 39) – 1991 1 18 Copper as Cu mg/L IS 3025 (Part - 42) – 1992 0.02 APHA -23rd Edition 19 Manganese as Mn mg/L (Part – 3000, Section: 3500 Mn - - B) 20 Mercury as Hg mg/L IS 3025 (Part - 48): 1994 0.001 21 Zinc as Zn mg/L IS 3025 (Part - 49): 1994 0.05 3.7 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of the Environment Date 17/03/2020

Minimum Sr. Parameter Unit METHOD OF MEASUREMENT Detection No. Limit 22 Cadmium as Cd mg/L IS 3025 (Part - 41): 1992 0.1 23 Lead as Pb mg/L IS 3025 (Part - 47): 1994 1 24 Boron mg/L IS 3025 (Part - 57): 2005 - 25 Aluminum as Al mg/L IS 3025 (Part - 55): 2003 0.03 26 Arsenic as As mg/L IS 3025 (Part - 37): 2003 0.001 27 Coliform MPN/100mL IS 1622: 1981 1 28 Fecal coliform MPN/100mL IS 1622: 1981 1 29 Dissolved Oxygen mg/L IS 3025 (Part – 38) - 1989 0.1

3.3.4 Results

As described in earlier section of this chapter, the standard methods (APHA, AWWA 2007) prescribed for surface and groundwater sampling preservation as well as the analytical procedures for individual parameter is followed in this study. The samples were collected on 20/05/2019. Results enlisted in TABLE 3.3 & TABLE 3.4.

3.8 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of the Environment Date 17/03/2020

TABLE 3.3 - SURFACE WATER QUALITY OF STUDY AREA

Sr. Parameter Unit SW1 SW2 SW3 SW4 SW5 SW6 No. 1 pH Value - 8.47 7.31 8.16 8.23 7.50 7.63 2 Color Hazen 85 142 132 125 141 414 3 Total Dissolved Solids mg/L 249 609 484 202 1040 4216 4 COD mg/L 20.1 73.8 149 28.3 123.5 570 5 BOD mg/L BDL 13.2 47.6 6.1 38.6 181 6 Calcium as Ca mg/L 42 120 20 35 196 180 7 Chloride as Cl mg/L 54.3 115 130 42.9 445 1590 8 Fluoride as F mg/L BDL BDL BDL BDL BDL BDL 9 Residual Free Chlorine mg/L BDL BDL BDL BDL BDL BDL 10 Iron as Fe mg/L 0.12 0.32 BDL 0.16 0.51 BDL 11 Magnesium as Mg mg/L 30 87 4.8 21 230 255 12 Phenolic compounds as C6H5OH mg/L BDL BDL BDL BDL BDL 2.95 13 Sulphate as SO4 mg/L 33.7 25.3 59.3 23.7 131 1004 14 Total Alkalinity as CaCO3 mg/L 60 110 10 50 30 70 15 Total Hardness as CaCO3 mg/L 90 310 70 75 275 770 16 Hexavalent Cromium mg/L BDL BDL BDL BDL BDL BDL 17 DO mg/L BDL 2.5 2.8 1.8 2.7 3.6 18 Oil & Grease mg/L BDL BDL BDL BDL BDL 5.6 19 Copper as Cu mg/L BDL BDL BDL BDL BDL BDL 20 Manganese as Mn mg/L BDL BDL BDL BDL BDL BDL 21 Mercury as Hg mg/L BDL BDL BDL BDL BDL BDL 22 Zinc as Zn mg/L BDL BDL BDL BDL BDL BDL

3.9 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of the Environment Date 17/03/2020

Sr. Parameter Unit SW1 SW2 SW3 SW4 SW5 SW6 No. 23 Cadmium as Cd mg/L BDL BDL BDL BDL BDL BDL 24 Lead as Pb mg/L BDL BDL BDL BDL BDL BDL 25 Boron mg/L BDL BDL BDL BDL BDL BDL 26 Aluminum as Al mg/L 0.041 0.09 0.04 0.10 0.04 BDL 27 Arsenic as As mg/L BDL BDL BDL BDL BDL BDL 28 Coliform MPN/100ml 220 240 350 300 280 170 29 Fecal coliform MPN/100ml 13 17 33 21 23 90 (BDL-Below Detectable Limits)

3.10 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

TABLE 3.4 - GROUND WATER QUALITY OF STUDY AREA

Sr.No. Parameter Unit GW1 GW2 GW3 GW4 GW5 GW6 GW7

1 pH Value - 7.55 7.44 7.45 7.88 7.94 7.93 8.18 2 Color Hazen 12.8 35.3 38.5 41.7 35.3 38.5 12.8 3 Total Dissolved Solids mg/L 1284 1548 944 553 1202 940 2068 4 COD mg/L 28.1 20.0 12.0 35.8 39.8 15.9 45.9 5 BOD mg/L 8.3 5.8 3.7 10.5 11.4 4.2 12.6 6 Calcium as Ca mg/L 72.1 120 92.2 20 60.1 32 8.0 7 Chloride as Cl mg/L 260 403 115 50 316 163 664 8 Fluoride as F mg/L BDL BDL BDL BDL BDL BDL BDL 9 Residual Free Chlorine mg/L BDL BDL BDL BDL BDL BDL BDL 10 Iron as Fe mg/L 0.19 0.24 0.75 2.2 0.18 0.2 0.13 11 Magnesium as Mg mg/L 65.6 182 238 17 58.3 38.8 21.8 12 Phenolic compounds as C6H5OH mg/L BDL BDL BDL BDL BDL BDL BDL 13 Sulphate as SO4 mg/L 153 228 52.8 63.8 85.5 96.5 323 14 Total Alkalinity as CaCO3 mg/L 30 40 50 40 40 50 70 15 Total Hardness as CaCO3 mg/L 450 814 110 120 390 240 910 16 Hexavalent Cromium mg/L BDL BDL BDL BDL BDL BDL BDL 17 DO mg/L 1.4 1.2 0.9 1.6 1.8 1.0 2.1 18 Oil & Grease mg/L BDL BDL BDL BDL BDL BDL BDL 19 Copper as Cu mg/L BDL BDL BDL BDL BDL BDL BDL 20 Manganese as Mn mg/L BDL BDL BDL BDL BDL BDL BDL 21 Mercury as Hg mg/L BDL BDL BDL BDL BDL BDL BDL 22 Zinc as Zn mg/L BDL BDL BDL BDL BDL BDL BDL 23 Cadmium as Cd mg/L BDL BDL BDL BDL BDL BDL BDL

3.11 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

Sr.No. Parameter Unit GW1 GW2 GW3 GW4 GW5 GW6 GW7

24 Lead as Pb mg/L BDL BDL BDL BDL BDL BDL BDL 25 Boron mg/L BDL BDL BDL BDL BDL BDL BDL 26 Aluminum as Al mg/L 0.04 0.05 0.06 0.063 0.04 0.05 0.04 27 Arsenic as As mg/L BDL BDL BDL BDL BDL BDL BDL 28 Coliform MPN/100ml <2 <2 <2 <2 <2 <2 <2 29 Fecal coliform MPN/100ml <2 <2 <2 <2 <2 <2 <2 (BDL-Below Detectable Limits)

3.12 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.3.5 Interpretation

Surface Water: Surface water samples SW1, SW2, SW3, SW4 and SW5 are lake water. TDS level in SW5 is comparatively higher than other lake water samples and also presence of coliform at all sampling locations. Presence of marginally higher TDS in SW5 and fecal coliform in all samples may be due to use of this source by cattle, local residents and mixing of domestic sewage. This water sources needs water treatment plant consisting of clarification, sand filter, carbon filter and disinfection treatment before they are used for domestic purpose. For drinking water purpose these sources need further treatment using UF/RO plant.

Surface water sample SW6 is river water. This sample point is upstream of industrial area. Un expectedly TDS level is found on higher side in this stream may be local residents, villages and commercial area.

Ground water: Ground water samples analysis results indicate that TDS, hardness and coliform levels are higher (> 1000 mg/l) at sampling point GW1, GW2, GW5 and GW 7. Other sample points GW3, GW4, GW6 has relatively lower TDS level (<1000 mg/l). Ground water is fit for use as industrial water and for non-direct contact domestic purpose after basic filtration and disinfection treatment. After desalination treatment ground water can be used for low TDS water application.

3.4 METEROLOGY

3.4.1 Introduction

Meteorology is the interdisciplinary scientific study of the atmosphere and is important tool in studying environmental phenomena like pollutant dispersion. When the EIA study is planned for any project meteorological data are very important and shall be collected through the entire period of the baseline study. Typically for EIA, micro meteorological data is required to collect as these data are essential to formulate the pollutant dispersion models. Besides, it also helps in understanding the current trend in climatologically variable as well as prevailing ambient air quality issues and forecasting. Site specific meteorological data (Minimum, Maximum & Average) during study period are given below in TABLE 3.5.

TABLE 3.5 - SITE SPECIFIC METEOROLOGICAL DATA

PARAMTERS 1st March 2019 to 31st May 2019 TEMPRATURE (˚C) March April May Minimum 16 23 25 Maximum 42 44 42 Average 28 31 31 WIND SPEED (m/sec) March April May Minimum 0 0 0 Maximum 5.1 5.5 6.2 Average 0.7 0.9 1.6

3.13 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.4.2 Results

For site-specific meteorological data, Weather Monitoring Station was set up at Orgo Chem (Guj.) Pvt. Ltd. from 1st March 2019 to 31st May 2019. The hourly records of wind speed and wind direction during the study period have been used for computing the relative percentage frequencies of wind occurrences in various directions. The wind rose diagram [Source: ENPRO] for the study period from 1st March 2019 to 31st May 2019 is shown in FIGURE 3.3. Site specific data for meteorology is attached in Annexure XIII.

FIGURE 3.3 - WIND ROSE DIAGRAM FOR MONTH OF MARCH – 2019

3.14 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.4.3 Interpretation

Wind Pattern: 24 hourly wind rose diagram for the month of march and resultant vector of wind rose diagram indicates that the predominant winds are from North to North East direction with 48.12 % calm condition. Average wind speed is 0.71 m/s.

Temperature: During the month of March, temperature has varied in the range from 16 °C to 42 °C.

Relative Humidity: During the month of March, relative humidity has varied in the range from 17 % to 89 %.

FIGURE 3.4 - WIND ROSE DIAGRAM FOR MONTH OF APRIL – 2019

3.15 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.4.4 Interpretation

Wind Pattern: 24 hourly wind rose diagram for the month of April and resultant vector of wind rose diagram indicates that the predominant winds are from North to North East direction with 42.22 % calm condition. Average wind speed is 0.91 m/s.

Temperature: During the month of April, temperature has varied in the range from 23 °C to 44 °C.

Relative Humidity: During the month of April, relative humidity has varied in the range from 16 % to 89 %.

FIGURE 3.5 - WIND ROSE DIAGRAM FOR MONTH OF MAY – 2019

3.16 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.4.5 Interpretation

Wind Pattern: 24 hourly wind rose diagram for the month of May and resultant vector of wind rose diagram indicates that the predominant winds are from North to North East direction with 20.05 % calm condition. Average wind speed is 1.54 m/s.

Temperature: During the month of May, temperature has varied in the range from 25 °C to 42 °C.

Relative Humidity: During the month of May, relative humidity has varied in the range from 25 % to 89 %.

FIGURE 3.6 - WIND ROSE DIAGRAM FOR MARCH TO MAY – 2019

3.17 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.4.6 Interpretation

Wind Pattern: 24 hourly wind rose diagram for March to May and resultant vector of wind rose diagram indicates that the predominant winds are from South – West to North - East direction with 36.75 % calm condition. Average wind speed is 1.06 m/s.

Temperature: During the month of March to May, temperature has varied in the range from 16 °C to 44 °C.

Relative Humidity: During the month of March to May, relative humidity has varied in the range from 16% to 89 %.

3.5 AMBIENT AIR

3.5.1 Design of Air Monitoring Sample Network

To design network of Air Quality monitoring stations following criteria have been considered-

1. Topography / terrain of study area 2. Pockets of habitants (Sensitive receptors) 3. Guideline of network selection criteria 4. Predominant wind direction for the season 5. Infrastructure for safe operation of AAQM station

Based on above consideration

1. Eight ambient air quality-monitoring stations have been selected

 Two AAQM station was setup in the downwind direction,  Three in upwind directions,  Two in cross wind,  One is Project site it self

2. Ambient Air quality has been assessed based on the pollutants: PM10, PM2.5, Sulphur Dioxide, Nitrogen Dioxide and Carbon Monoxide, Ammonia (NH3), Hydro Carbon (HC), VOCs, PAH.

3.5.2 AAQM Monitoring Locations

The locations for AAQM were decided based on the prescribed guidelines. For this EIA, the purpose is to ascertain the baseline pollutant concentrations in ambient air. Accordingly, the criterion was selected to ascertain quality of air at important human settlements. Monitoring locations for Ambient Air Quality are given below in TABLE 3.6 as well as FIGURE 3.7.

3.18 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

TABLE 3.6 - AAQM LOCATIONS WITH JUSTIFICATION

Directi Justificati Location Distance AAQM from on w.r.t on for s & Source Latitude Longitude Station Project Project Selection Address Site Site of Station Orgo Chem Project AA1 Industrial 21°5'41.00"N 72°51'27.00"E. 0 Core Zone (Guj.) Pvt. Site Ltd. Umber Down AA2 Residential 21° 4'2.82"N 72°50'34.80"E 3.2 Core Zone Village wind Cross AA3 Rajnagar Residential 21° 4'47.82"N 72°52'44.52"E 2.7 Core Zone wind Kansad Cross AA4 Residential 21° 3'36.12"N 72°52'20.34"E 4.1 Core Zone Village wind Eklera AA5 Residential 21° 6'46.74"N 72°52'57.60"E 3.2 Up wind Core Zone Village Bhestan AA6 Residential 21° 7'41.88"N 72°51'41.46"E 3.7 Up wind Core Zone Village Navagam Buffer AA7 Residential 21° 9'5.34"N 72°51'51.60"E 6.3 Up wind Village Zone Karankhat Down Buffer AA8 Residential 21° 1'13.32"N 72°49'56.04"E 8.6 Village wind Zone

3.19 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

FIGURE 3.7 – MONITORING LOCATIONS FOR AMBIENT AIR QUALITY

3.5.3 Results

PM10, PM2.5, SO2 and NOX have been monitored twice in a week at each location and CO, NH3, HC, VOCs and PAH has been monitored two times at each location. VOCs were monitored with the help of PID based VOC detector. Sampling was carried out during the study period from 1st March 2019 to 31st May 2019. Sample thus collected were analyzed at NABL approved laboratory by following Standard Procedures as described at TABLE 3.7. Results of PM10, PM2.5, SO2, NOX, CO, NH3, HC, VOC and PAH are presented in TABLE 3.8.

3.20 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

TABLE 3.7 - METHODOLOGY OF ANALYZING AMBIENT AIR MONITORING PARAMETERS

Sampling Minimum Method of Measurement Unit Parameter Detection Limit 3 PM10 IS: 5182 (Part 23) – 2006 (RA 2017) µg/m 10 3 PM2.5 SOP no.-WI/AA/01 µg/m 10 3 SO2 IS:5182 (Part 2) – 2001 (RA 2017) µg/m 5 NOx IS:5182 (Part 6) – 2006 (RA 2017) µg/m3 5 CO IS : 5182 (Part 10) – 1999 (RA 2014) mg/m3 25

CPCB NAAQS Monitoring & Analysis 3 NH3 µg/m 1 Guidelines Volume – I HC IS : 5182 (Part 17) - 1979 (RA 2014) µg/m3 - VOC-PAH IS : 5182 (Part 11) - 2006 (RA 2017) µg/m3 5

3.21 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

TABLE 3.8 - AMBIENT AIR QUALITY MONITORING RESULTS

Parameters & Results All stations are in Note: Figures in brackets indicate CPCB limits. Minimum Reportable Readings are 40.4 for Industrial, 3 3 Station PM10, 20.7 for PM2.5, 11.3 μg/m for SO2, 20.1 μg/m for NOX Residential, Rural Code PM10 PM2.5 SO2 NOx CO NH3 HC VOC PAH & Other Areas Not 100 3 3 80 2 400 3 (1 (CPCB) 3 60 µg/m 80 µg/m 3 3 3 Specified (5 µg/ m ) 3 µg/m µg/m mg/m µg/m (ppm) ng/m ) AA1 Orgochem Guj Pvt. Ltd Min 88.0 35.7 30.7 25.6 0.51 8.9 ND ND ND Max 120.7 68.1 50.2 45.6 0.74 15.4 ND ND ND Average 99.7 52.2 40.8 35.9 0.63 12.2 ND ND ND 98 % 119.8 68.0 49.8 45.6 0.7 15.3 ND ND ND AA2 Umber Village Min 70.5 37.8 30.6 23.0 0.19 7.9 ND ND ND Max 97.5 57.9 56.1 47.4 0.27 11.5 ND ND ND Average 83.9 47.0 38.8 31.0 0.23 9.7 ND ND ND 98 % 96.9 57.7 51.8 43.5 0.3 11.4 ND ND ND AA3 Rajnagar Min 70.6 31.4 29.8 31.2 0.43 3.8 ND ND ND Max 96.2 56.4 49.3 58.2 0.78 12.5 ND ND ND Average 85.7 42.0 39.2 44.3 0.61 8.2 ND ND ND 98 % 96.2 55.4 47.3 56.4 0.8 12.3 ND ND ND AA4 Kansad Village Min 52.8 30.2 11.3 21.1 0.19 5.9 ND ND ND Max 89.6 54.1 29.6 34.5 0.34 11.7 ND ND ND Average 72.0 38.2 19.3 27.4 0.27 8.8 ND ND ND

3.22 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

Parameters & Results All stations are in Note: Figures in brackets indicate CPCB limits. Minimum Reportable Readings are 40.4 for Industrial, 3 3 Station PM10, 20.7 for PM2.5, 11.3 μg/m for SO2, 20.1 μg/m for NOX Residential, Rural Code PM10 PM2.5 SO2 NOx CO NH3 HC VOC PAH & Other Areas Not 100 3 3 80 2 400 3 (1 (CPCB) 3 60 µg/m 80 µg/m 3 3 3 Specified (5 µg/ m ) 3 µg/m µg/m mg/m µg/m (ppm) ng/m ) 98 % 88.0 52.9 27.8 33.8 0.3 11.6 ND ND ND AA5 Eklera Village Min 70.5 30.7 20.2 25.6 ND 4.8 ND ND ND Max 97.5 50.4 35.7 40.5 ND 7.1 ND ND ND Average 86.0 39.9 27.2 32.3 ND 6.0 ND ND ND 98 % 96.9 49.6 34.9 40.0 ND 7.1 ND ND ND AA6 Bhestan Village Min 40.4 20.7 15.6 20.1 0.72 9.1 ND ND ND Max 80.5 34.2 40.1 50.9 0.91 11.7 ND ND ND Average 57.3 28.1 27.8 34.0 0.82 10.4 ND ND ND 98 % 79.1 34.0 39.8 50.6 0.9 11.6 ND ND ND AA7 Navagam Village Min 63.0 26.4 11.5 21.2 0.34 2.3 ND ND ND Max 89.4 34.9 24.7 39.3 0.47 6.7 ND ND ND Average 77.4 31.2 18.9 27.9 0.41 4.5 ND ND ND 98 % 89.3 34.8 24.5 38.9 0.5 6.6 ND ND ND AA8 Karankhat Village Min 55.0 25.0 18.6 26.1 BDL 5.7 ND ND ND Max 86.5 42.8 31.6 38.2 BDL 9.3 ND ND ND

3.23 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

Parameters & Results All stations are in Note: Figures in brackets indicate CPCB limits. Minimum Reportable Readings are 40.4 for Industrial, 3 3 Station PM10, 20.7 for PM2.5, 11.3 μg/m for SO2, 20.1 μg/m for NOX Residential, Rural Code PM10 PM2.5 SO2 NOx CO NH3 HC VOC PAH & Other Areas Not 100 3 3 80 2 400 3 (1 (CPCB) 3 60 µg/m 80 µg/m 3 3 3 Specified (5 µg/ m ) 3 µg/m µg/m mg/m µg/m (ppm) ng/m ) Average 73.5 33.3 25.4 32.0 BDL 7.5 ND ND ND 98 % 85.9 42.0 31.3 38.1 BDL 9.2 ND ND ND

3.24 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.5.4 Interpretation of Results

Based on the results presented at TABLE 3.8, the baseline ambient air quality, with reference to the parameters namely PM10, PM2.5, SO2, NOx, CO, NH3, HC, VOCs and PAH has been determined and discussed here under:

1. Particulate Matter:

3  PM10: PM10 concentration ranges between 40.4 – 120.7 μg/m within the study area during the period of sampling. Average concentration of PM10 are below the stipulated standards of NAAQS [24 hr.] at all monitoring locations. However, maximum PM10 concentration at project site is high may be due to the road construction activity which was ongoing at the time of monitoring near the project site.

3  PM2.5: PM2.5 concentration ranges between 20.7 – 68.1 μg/m within the study area during the period of sampling. Average PM2.5 concentration remains below the stipulated standards of NAAQS [24 hr.] at all the monitoring locations.

2. Gaseous Pollutants:

3  SO2: Minimum and maximum concentration of SO2 ranges between 11.3 – 56.1 μg/m . 3 Average concentration of SO2 remains within the stipulated value of 80 μg/m at all the monitoring locations.

3  NOx: Minimum and maximum concentration of NOx ranges between 20.1 – 58.2 μg/m . 3 Average concentration of NOx remains within the stipulated value of 80 μg/m at all the monitoring locations.

 CO: The minimum and maximum concentration of CO ranges between 0.19 – 0.91 mg/m3. The average remains within the stipulated value of 2 mg/m3 at all the monitoring locations.

3  NH3: The minimum and maximum concentration of NH3 ranges between 2.3 – 15.4 μg/m . The average remains within the stipulated value of 400 µg/m3 at all the monitoring locations.

 HC: The concentration of HC is Not detectable at any monitoring location.

 VOC: The concentration of VOC is Not detectable at any monitoring location.

 PAH: The concentration of PAH is Not detectable at any monitoring location.

3.25 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.6 NOISE

3.6.1 Introduction

As per Noise Pollution [Regulation and Control] Rules, 2000 notified by the Ministry of Environment and Forests, New Delhi, on February 14th, 2000, noise standards have been designated for different types of land-use i.e. Residential, Commercial, Industrial and Silence Zone during day time (6 am to 10 pm) and night time (10 pm to 6 am). The noise rating method as Leq i.e. Equivalent sound pressure level has been adopted for the measurement of noise level at sampling locations in the study area.

3.6.2 Noise Sampling Locations

The noise levels were measured at project site and the different locations falling within the study area as shown in FIGURE 3.8. The details of the sampling locations are given in TABLE 3.9.

3.26 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

FIGURE 3.8 – LOCATIONS OF NOISE LEVEL MONITORING STATIONS

3.27 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

TABLE 3.9 - LOCATION OF NOISE LEVEL MONITORING STATIONS

Station Elevation Distance from Location Latitude Longitude Code (m) site Orgo Chem (Guj.) NL1 21°5'41.00"N 72°51'27.00"E 12 0 Pvt. Ltd. NL2 Umber Village 21°4'2.82"N 72°50'34.80"E 8 3.2

NL3 Rajnagar 21°4’7.82"N 72°52'44.52"E 12 2.7

NL4 Kansad Village 21°3'36.12"N 72°52'20.34"E 11 4.1

NL5 Eklera Village 21°6'46.74"N 72°52'57.60"E 14 3.2

NL6 Bhestan Village 21°7'41.88"N 72°51'41.46"E 13 3.7

NL7 Navagam Village 21°9'5.34"N 72°51'51.60"E 11 6.3

NL8 Karankhat Village 21° 1'13.32"N 72°49'56.04"E 7 8.6

3.6.3 Results

The equivalent noise levels, Leq [day] and Leq [night] have been monitored and the results are tabulated in TABLE 3.10. Noise levels were measured using Sound Level Meter.

TABLE 3.10- NOISE LEVEL AT PROJECT SITE & STUDY AREA

Noise Level in dB(A) Sr. Location CPCB Noise Limits in dB(A) Leq Leq No. (Category of Area) Day time Night Time Day time Night Time Industrial Area Orgo Chem (Guj.) Pvt. 1 75.0 70.0 72.5 67.5 Ltd. (Project Site) Residential Area 2 Umber Village 55.0 45.0 52.4 36.5 3 Rajnagar 55.0 45.0 54.1 33.4 4 Kansad Village 55.0 45.0 50.9 31.5 5 Eklera Village 55.0 45.0 48.5 35.8 6 Bhestan Village 55.0 45.0 53.7 39.6 7 Navagam Village 55.0 45.0 49.3 42.2 8 Karankhat Village 55.0 45.0 43.1 38.9

 Day Time is from 6.00 AM to 10.00 PM.  Night Time is reckoned between 10.00 PM to 6.00 AM

3.28 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.6.4 Interpretation

Equivalent noise level of villages varies from 43.1-54.1 dB [A] and 31.5-42.2 dB [A] during day and night time respectively. Within the village location the noise level varied at the same place at different times due to fluctuations in traffic movements as well as Industrial / commercial and domestic activities going on in the study area.

3.7 LAND ENVIRONMENT

3.7.1 Soil Quality

Soil quality is the capacity of a specific kind of soil to function, within natural or managed ecosystem boundaries, to sustain plant and animal productivity, maintain or enhance water and air quality and support human health and habitation. Soil quality reflects how well a soil performs the functions of maintaining biodiversity and productivity, partitioning water and solute flow, filtering and buffering, nutrient cycling and providing support for plants and other structures. Thus, soil quality plays vital role in any particular geographical phenomenon of ecology as well as physico-chemical environment. Soil quality can indicate the current as well as future issues related with the water, ecology and life in the particular region. Thus, it is clearly visible that soil contamination may result in eventuality in form of contamination of water, ecological destruction, and loss of productivity, food crisis and so threat to life. Thus, to determine the exact impacts of any proposed project, it is very essential to determine the existing status of soil quality and existing stress through a study of soil quality assessment.

Soil samples were collected from seven locations of study area once in study period. The collected soil samples were analyzed by environmental laboratory of ENPRO Enviro Tech and Engineers Pvt. Ltd. Analysis was done for physical properties and chemical characteristics. The evaluation of initial soil quality based on the above characteristic is done and presented as below. The details about the sampling points are given in TABLE 3.11 & FIGURE 3.9.

TABLE 3.11 -LOCATION OF SOIL SAMPLING

Distance Station Elevation Location Latitude Longitude from Site Code. (m) km S1 Umber Village 21°4'2.82"N 72°50'34.80"E 8 3.2 S2 Rajnagar 21°4’7.82"N 72°52'44.52"E 12 2.7 S3 Kansad Village 21°3'36.12"N 72°52'20.34"E 11 4.1 S4 Eklera Village 21°6'46.74"N 72°52'57.60"E 14 3.2 S5 Bhestan Village 21°7'41.88"N 72°51'41.46"E 13 3.7 S6 Navagam Village 21°9'5.34"N 72°51'51.60"E 11 6.3 S7 Karankhat Village 21° 1'13.32"N 72°49'56.04"E 7 8.6

3.29 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

FIGURE 3.9 – LOCATIONS OF SOIL MONITORING STATIONS

3.7.2 Results

The results of physical and chemical analysis, carried out as per standards procedure is given in TABLE 3.12.

3.30 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

TABLE 3.12 – RESULTS FOR SOIL SAMPLING

Sr. Parameter Unit S1 S2 S3 S4 S5 S6 S7 No. 1 Texture Analysis -- Clay Loam Clay Loam Clay Loam Clay Clay Loam Clay Loam Sandy Loam 2 Sand % 43.9 32.5 30.2 29.4 36.2 39.4 52.7 3 Silt % 17.1 27.0 36.4 18.5 28.3 30.1 32 4 Clay % 39.0 40.5 33.4 52.1 35.4 30.5 15.3 6 Porosity % 40.75 42.26 44.15 49.43 44.15 45.66 35.09 7 SAR -- 40.9 43.7 6.8 5.1 6.7 6.0 18.2 8 CEC meq/100gm 63.27 65.40 64.91 66.85 63.68 61.30 70.50 9 pH Value - 8.32 8.65 8.11 8.39 8.47 8.22 8.72 10 Electrical Conductivity mS/cm 1.962 0.716 0.375 0.685 0.759 0.578 1.204 11 Moisture Content % 6.79 7.65 5.39 5.48 4.11 3.98 8.15 12 Exchangeable Calcium meq/100gm 12.54 13.93 16.0 13.42 13.0 16.2 15.08 Exchangeable 13 meq/100gm 11.40 10.80 12.04 10.59 5.3 7.02 11.55 Magnesium 14 Exchangeable Sodium mg/kg 1801 1974 327 227 224 221 857 Exchangeable 15 mg/kg 281 171 208 122 140 151 173 Potassium 16 Water Holding Capacity % 10.0 12.0 14.0 16.0 13.0 11.0 10.0

3.31 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

From the analytical data of eight soil samples finding of soil qualities are as follows:

The test results of soil samples collected in the impact area are interpreted referring to the book; “Interpreting soil test results”. The reference tables are presented in TABLE 3.13. The pH of soil samples ranges from Moderately alkaline to strongly alkaline. The cation exchange capacity of the soils is moderately contributed mainly by potassium exchangeable ions. The soil texture is predominantly clay loam.

TABLE 3.13 - SOIL TEST RESULTS – REFERENCE TABLES

General interpretation of pH Rating for Cation exchange Capacity measured pH Range Classification CEC (Cmol)+)/kg <4.5 Extremely Acidic Very low <6 * 4.51 -5.0 Very Strong Acidic Low 6-12 5.1-5.5 Strong Acid Moderate 12-25 5.6- 6.0 Moderately Acid High 25-40 6.1-6.5 Slightly acid Very >40 High 6.6-7.3 Neutral Source: Metson (1961) 7.4-7.8 Mildly Alkaline * Soils with CEC less than three are often low in 7.9 -8.4 Moderately Alkaline fertility and susceptible to soil acidification. 8.5-9.0 Strongly Alkaline >9.0 Very Strongly Alkaline Source: Bruce and Rayment (1982). Ca/mg Ratio Extractable Potassium (K) Description K <1 Ca Deficient low <150 ppm* (< 0.4 meq/100 g soil) 1-4 Ca (Low) medium 150–250 ppm (0.4–0.6 meq/100 g soil) 4-6 Balanced high 250–800 ppm (0.6–2.0 meq/100 g soil) 6-10 Mg (Low) excessive >800 ppm (>2.0 meq/100 g soil) >10 Mg deficient Source: Eckert (1987) Source: Abbott (1989) Rating of Total Nitrogen Rating (% by Description W) <0.05 Very low 0.05-0.15 Low 0.15-0.25 Medium 0.25-0.50 High >0.5 Very High Source: Bruce and Rayment (1982)

3.32 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.7.3 Land use Pattern-Remote Sensing data

The basic purpose of land use pattern and classification in EIA studies is to identify the manner in which different parts of land area is utilized or not utilized. Remote sensing data provides reliable accurate baseline information for land use mapping as it is a rapid method of acquiring up-to-date information of over a large geological area.

Studies on land use aspects of eco-system play an imperative role in identifying susceptible issues and to take appropriate action to uphold ecological equilibrium in the region. The main objective of this section is to provide a baseline status of the study area covering 10 km radius around the proposed project site so that temporal changes due to the industrial activities on the surroundings can be assessed in future.

The objectives of Land Use Pattern is to:

 Determine the present Land use pattern  Analyze the impacts on Land use due to the proposed project.  Study area considered as 10 km radius from the epic center of the proposed project and it is buffer area.  The project site is considered as core area. Boundaries are considered for land use study.

Satellite Data: The Satellite IRS P-6 LISSIV images are obtained from National Remote Sensing Centre (NRSC) Hyderabad. The latitude and longitudes as observed in the site by GPS are Latitude: 21°5'41.00"N, Longitude: 72°51'27.00"E. The satellite image of the site is presented in MAP 3.1.

3.33 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

MAP 3.1 - SATELLITE IMAGE OF THE SITE

3.34 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.7.4 Topographical Data

Topographical maps of Survey of India (SOI) were obtained for land use study as well to develop contour and drainages pattern of area from F43M16.

Methodology: The overall methodology adopted and followed to achieve the objectives of the present study involves the following:

 Collection of source data of Survey of India (SOI) toposheets. These are the main inputs for the preparation of essential layers.  Satellite data of IRS P-6 LISSIV sensor is geometrically corrected and enhanced using principal component method and nearest neighborhood re-sampling technique  Preparation of basic themes like layout map, transport & settlement map and contour map from the source data. Then updating of layout map, transport map and drainage map from the satellite image by visual interpretation  Essential maps (related to natural resources) like Land use / Land cover map are prepared by visual interpretation of the satellite imagery. Visual interpretation is carried out based on the image characteristics like tone, size, shape, pattern, texture, location, association, background etc. in conjunction with existing maps/ literature  Preliminary quality check and necessary corrections are carried out for all the maps prepared  All the maps prepared are converted into soft copy by digitization of contours and drainages. In that process editing, labeling, mosaicing, quality checking, data integration etc. are done, finally Land use areas are measured in Sq.km.

3.35 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

FIGURE 3.10 - FLOW CHART OF METHODOLOGY

3.7.5 Land use Map Analysis

Land use Map Analysis carried out based on the image color, texture, Tone etc. Following steps are used to analyze the Land use pattern of project site:

 Collection of scanned toposheets and Geo-reference the scanned image using the available coordinates  Collection of IRS LISS IV images and made fused and blended the images for color combinations using Image Interpreter-Utilities and Layer stack option available in ERDAS  Identification Area of interest (AOI) and made a buffer of 10 km radius.  Enhance the Fused and blended LISS IV image using the Spatial, Radiometric and Temporal options in ERDAS

3.36 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

 Rectified the LISS IV image using Geo-referencing technique, Toposheet to get UTM coordinate system  Subset the LISS IV image and Toposheet using 10 km buffer AOI  Automatic classifications done for LISS IV images using maximum iterations and number of options in unsupervised classification options  Created the signature file by selecting the more samples of different features with AOI on Unsupervised classification image  Visual interpretation and supervised classification mixed with recoding practice  Verified through the QC / QA and finalized the data.

3.7.5.1 Spatial Data from SOI Topographical Sheets

Creating a GIS spatial database is a complex operation, and is the main operation of the entire work; it involves data capture, verification and structuring processes. Raw geographical data are available in many different analogue and digital form such as toposheets, aerial photographs, satellite imageries and tables. Out of all these sources, the source of toposheets is of much concern to natural resource scientist and an environmentalist.

In the present study, the essential maps generated from SOI topographical maps. Using the topographical maps, the drainage map and contour Map were also developed. The maps are prepared to a certain scale and with attributes complying with the requirement of terms of reference (ToR). The location of entities on the earth’s surface is then specified by means of an agreed co-ordinate system. For most GIS, the common frame of co-ordinate system used for the study is UTM co-ordinates system. All the maps are first Geo-referenced. The same procedure is also applied on remote sensing data before it is used to prepare the Essential maps.

Map showing site location, Lakes, drains are connected to Mindhola river (MAP 3.2). Small linear water bodies are found around the site. There are no major rivers located within 1.0 km radius from the site location. There is a road network connecting built-up areas and industries. As the terrain conditions are silty, sand texture and flat terrain and also there is a drainage network around the site location, there is no chance of flooding. Hence risk factors are less. No National parks and wild life sanctuaries located in the study area. An industry area is marked in 10 km radius map is shown in MAP 3.2.

No National parks and wild life sanctuaries located in the study area. Major industries are marked in 10 km radius map is shown in MAP 3.2.

3.37 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

MAP 3.2 - SITE LOCATION WITHIN 5KM & 10 KM RADIUS ON TOPOMAP

3.38 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.7.5.2 Contour Map and Elevations of Study Area

The contours in Toposheet have been digitized in the GIS environment and assigned the respective elevation values in meters with reference to the mean sea level. Using the SRTM (Shuttle Radar Topography Mission) data, the elevation values has been verified. Thereafter final contour map has been prepared with combination of Toposheet and SRTM with contour interval of 10 m. Project site contours vary from 5 m to 15 m above MSL. Contour Map and Elevations of Study Area is presented in MAP 3.3.

3.39 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

MAP 3.3 - CONTOUR MAP OF SITE LOCATION WITHIN 10 KM

3.40 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.7.5.3 Topography (Digital Elevation Model)

A digital elevation model (DEM) is a digital representation of ground surface topography or terrain (MAP 3.4). It is also widely known as a digital terrain model (DTM). A DEM can be represented as a raster (a grid of squares, also known as a height map when representing elevation) or as a triangular irregular network. The proposed plant location is shown in that Relief map. For the relief study of the area very higher quality SRTM (Shuttle Radar Topography Mission) and DEM is downloaded. These DEMs of the Terra represents elevation at a 30 m resolution.

3.41 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

MAP 3.4 - MAP SHOWING DIGITAL ELEVATION MODEL IN STUDY AREA

3.42 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.7.5.4 Land use land cover statistics of buffer zone

Map showing the Land Use Land Cover classification in the study area is presented in MAP 3.5 it is clearly that the area is mostly covered with Fallow Land 33% and Mud around 19 % respectively of the total area. which is taken up for cultivation but is temporarily allowed to rest, cropped for one or more season, but not less than one year. Thus, total cultivable land is 33%. The open scrub is with 7 %, Other class is Roads within the study area 7%, Around the Fallow edges the Settlement (Built-up area) is located and occupies around 10%, and Industries are around 5% of the total study area. It is an area of human habitation developed due to non-agricultural use and that has a cover of buildings, transport and communication, utilities in association with water, vegetation and vacant lands. The Plantation is 4%, Railways is 5% respectively in the total study area. The proposed project is on Industrial area and does not have any significant impact on the surrounding villages and habitation. The water bodies cover 6% of the total area. These areas have a very prominent signature and can be seen as almost Dark blue and light blue in the satellite image. The statistical break-up of the land use classes of buffer zone are presented in TABLE 3.14 and depicted in FIGURE 3.11.

3.43 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

MAP 3.5 - MAP SHOWING LAND USE LAND COVER IN STUDY AREA

3.44 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

MAP 3.6 - MAP SHOWING WATER BODIES, DRAINAGE IN STUDY AREA

3.45 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

The statistical break-up of the land use classes of buffer zone are presented in TABLE 3.14 and depicted in FIGURE 3.11.

FIGURE 3.11 - GRAPHICAL PRESENTATION OF LAND USE STATISTICS

TABLE 3.14 - LAND USE LAND COVERS STATISTICS OF BUFFER ZONE

Sr. No. LULC Class Area (Ha) Area (%) 1 Water Bodies 3068.31 10% 2 Fallow Land 10180.44 33% 3 Open Scrub 2173.13 7% 4 Mud 5900.12 19% 5 Built Up 3234.13 10% 7 Industrial area 1581.00 5% 8 Plantation 1153.69 4% 9 Road 2166.75 7% 10 Railways 1653.69 5% Total 31111.25 100%

3.8 ECOLOGY & BIODIVERSITY

3.8.1 Biological Environment

The basic purpose to exploring the biological environment under Environmental Impact Assessment (EIA) is to assist in the decision-making process and to ensure that the project options under consideration are bio-environmental-friendly. EIA identifies ways of improving project environmentally by preventing, minimizing, mitigating or compensating for adverse impacts before construction and after construction phase.

3.46 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

The present study on the floral assessment of the proposed project is based on field survey of the area supported by secondary data from various governmental and non-governmental sources. A change in the composition of biotic communities is reflected by a change in the distribution pattern, density, diversity, frequency, dominance and abundance of natural species of flora and fauna existing in the ecosystem. These changes over a span of time can be assessed and related to the existing environmental factors. The sensitivity of animal and plant species to the changes occurring in their existing ecosystem can therefore, be used for monitoring Environmental Impact Assessment studies of any project.

3.8.2 Scope of the Study

To assess the implications of the proposed project on the surrounding ecology within study area following attributes were considered & executed:

 To document the diversity of the local flora and fauna.  To enlist the major agricultural crops, plantations and cultivated species.  To carry out phyto-sociological studies of existing flora of the region  Delineation of mitigation measures towards impacts (if any) on the biological environment in the study area.

3.8.3 Methodology

To achieve the above objectives a detailed study of the area was undertaken in 10km radius around proposed project site. The different methods adopted were as follows:

 Generation of primary data by undertaking systematic ecological studies in the area by Reconnaissance survey.  Discussion with local people so as to elicit information about local plants, animals and birds.

Extrapolation and prediction techniques were used to limit the number of sites to be assessed. The knowledge of species habitats requirement, soil type, terrain, vegetation etc. was used to predict species occurrence. The biological value of an area can be characterized by its species richness, degree of species endemism, uniqueness of the ecosystem and magnitude of threats facing by existing by flora and fauna of extinction. This Rapid biodiversity assessment were undertaken initially by identifying potentially rich sites from satellite imaginary (Google Earth) and conducting the field survey in the identified potential habitats. GPS was utilized for locating field sample plots as well as gathering positional attributes of sighted flora and fauna species.

For floral survey, the primary data was generated through: - Floral baseline survey was done using Belt Transects of area 100m X 10 m width. List of floral species observed at each transect was documented. The number of sampling points are depending on the Area- Species graph. Species listed are compared with standard books (BSI, ZSI and IUCN) and noted the species required for conservation criteria.

3.47 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

Determining the bird population of local birds by taking 10 random readings at every Location; Observing mammals, amphibians and reptiles, noting their calls, droppings, burrows, pugmarks and other signs.

The primary objective of survey was to describe the floral and faunal communities within the study area. About 16 sampling plots (Belt transects) for the floral inventory were selected randomly in the suitable habitats within the study area.

The methodology adopted for faunal survey include; random survey, opportunistic observations, diurnal bird observation and review of previous studies, literature review was conducted to identify the representative spectrum of threatened species, population and ecological communities.

Since any of the project related activities will not be associated with water bodies in the study area in terms of withdrawal or disposal/discharge hence no impact is envisaged on the water bodies so the studies pertaining to aquatic ecology have been kept out the purview of this study.

3.8.4 Survey Type Used

 Reconnaissance survey (Near Agricultural, Human habitations and Road side)  Belt transact method for trees, shrubs and herbs.  Belt transect method for certain faunal species and road side trees.  Point count method for birds.  Direct and indirect evidences for other faunal species.

3.8.5 Equipment / Instruments Deployed

 Digital Camera (NIKON 42 X zoom)  GPS  Binoculars  Field observation book, Pen etc.

3.8.6 Ecology of the Study Area

Ecology in essence is the study of interaction of living and non-living components, interaction of community and the environment and exchange of material (energy and nutrient) between living and non-living parts. The ecological study has been conducted to establish the prevailing baseline ecological data in terms of terrestrial biodiversity status in the study area & to identify and assess the probable impacts associated with the proposed project on the prevailing ecology & to advocate suitable mitigation measures for the same.

The proposed project shall be carried out in the well-established notified industrial estate of Sachin. The total land area of the site is 2010 m2, out of which 279.9 m2 area will be used for manufacturing area, 805 m2 area will be used for green belt, 121.7 m2 area will be used for

3.48 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020 raw material and finished product storage area, 43.2 m2 will be used for ETP/MEE area and rest area will be used for Admin building, utility, Approach road and Open area (open to sky).

Within 10 km study area, the land is mostly vacant with few trees, shrubs and small grasslands. The topo map shows the presence of water bodies in West side of the location as well as presence of Mindhola river in the South.

The flora and fauna assessments were made to assess the ecological importance of the species and habitat types present and to assess the potential ecological impacts of the proposed development. The site was surveyed on foot.

FIGURE 3.12 – TOPOSHEET OF THE PROJECT SITE

3.49 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

All areas of the site were visited; the different habitat types present were examined and mapped. Plant species and communities were identified all birds seen or heard were noted and all evidence of mammal activity was recorded.

The context of the site and its immediate surroundings within a broader area was assessed by walking and driving the road to the east of the site, stopping regularly and scanning with binoculars.

Secondary data: The key referral material is from Gujarat state working plan data of the forest department. Certain published papers related to region in the recent years are also considered. Ground validation has done through elderly village people and personal field visits.

3.8.7 Field Observation

3.8.7.1 Habitats Description of Project Site and its Immediate Surroundings

Project site is located within the Sachin GIDC area, Surat District, Gujarat. Immediate surroundings of the project site are dominated by industrial establishments; mainly chemical manufacturing units, few settlements of Pali village located within 1 km from project site are the nearest habitation. There is no eco-sensitive area likes forest patches, large water bodies of that attract migratory and other residential water fowls within the close proximity of the project site, and hence the direct impact due to the project on these eco-sensitive receptors are not envisaged. The green belt in the GIDC area is limited to very few industrial compounds mainly through the plantation of Asopalav (Polylathia longifolia), Sonmukhi, (Peltophorum pterocarpum), Sharu (Casuarina equisetifolia), Pardesi Baval (Leucaenaleucocephala) and Nilgari (Eucalyptus sp.).

3.8.7.2 Habitat Description of the Area (10 Km)

As already mentioned, the proposed site is located in the demarcated industrial area in Sachin GIDC in Surat district, Gujarat. The major portion in the Northern side of the study area (10 km radius) is occupied by the residential area of Surat City and industrial establishments in Sachin GIDC and Pandesara GIDC. Western portion of the study area was observed with vast patch of mud bank, which are submerged during the spring tide and exposed during the rest of period. Talangpore and umber lake are in the southern part of the project location These areas are getting inundated due to the tidal influx from the Gulf of Khambhath, through Mindhola estuary and other smaller creeks. The land use pattern of the Eastern region of the study area was dominated by Sugar cane fields. Due to the industrialization and urbanization, natural habitats in the area have been confined to very limited patches. Tree cover in the study area is restricted to homestead/farmland or road side plantation. These typical tree cover patterns are termed by Forest Survey of India (FSI) as Trees outside Forests (TOF), in the form of small woodlots and block plantations as trees along linear features, such as roads, canals bunds, etc. and scattered trees on farmlands, homesteads, community lands and urban areas. Dominant tree species planted as farmland plantation was dominated, Mangifera indica (Keri), Borassus flabellifer (Tad), Phoenix sp, Adirachta indica (Limbado), Casuarina

3.50 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

equisetifolia (Sharu), Ailanthus excelsa (Aurdso), Eucalyptus sp (Nilgiri), and Albizia lebbeck (Siris) etc. 3.8.7.3 National Park/Sanctuaries and Biosphere Reserve

There is no notified/protected ecologically sensitive area including national park, sanctuary, Elephant/Tiger reserves existing in the study area covering 10 km radial distance.

3.8.8 Floral Diversity

3.8.8.1 Trees in the Study Area

The trees in the study area; were generally planted either as farmland plantation or homestead plantation or along the road sides. Otherwise natural tree cover is very less in this part of Surat District. Homestead plantation was dominated by Tamarindus indica (Amali), Mangifera indica (Keri), Moringa oleifera (Sargavo),Ficus benghalensis (Vad), and Cocos nucifera (Narial). Road side Plantations were dominated by Acacia auriculiformis, Peltophorum pterocarpum (Sonmukhi), Tamarindus indica (Amali), Delonix regia (Gulmohar), Azadirachta indica (Limbado), Acacia leucophloea (Hermobaval), Acacia nilotica (Baval), Albizia lebbeck (Siris), Leucaena leucocephala (Pardesi Baval), Prosopis cineraria (Khyigdo), Ficus benghalensis (Piplo), Ailanthus excelsa (Aurdso), and Tectona grandis (Sag). The list of tree species observed in the study area is enlisted in the TABLE 3.15.

TABLE 3.15 - LIST OF TREES OBSERVED IN THE STUDY AREA

Sr Scientific Name Local Name Family Habit Status 1 Acacia auriculiformis Videshi Baval Mimosaceae Tree Dominant 2 Acacia catechu Khair Mimosaceae Tree Dominant 3 Acacia nilotica Deshi Baval, Bavar Mimosaceae Tree Dominant 4 Acacia senegal * Gorad, Kumbhatt Mimosaceae Tree Common 5 Adansonia digitata* Malvaceae Tree Rare 6 Adina cordifolia Haldu Rubiaceae Tree Common 7 Aegle marmelos Bili Patra, Bili, Rutaceae Tree Common Rukhdo, Moto 8 Ailanthus excelsa Simaroubaceae Tree Dominant arduso 9 Annona squamosa Jamfal Annonaceae Tree Common 10 Anogeissus latifolia Dhaudo Combretaceae Tree Common Artocarpus 11 Jack Moraceae Tree Common hertophyllus 12 Azadirachta indica Limbdo, Neem Meliaceae Tree Dominant 13 Bombax cieba Shamar Bomacaceae Tree Dominant 14 Borassus flabellifer Tad Arecaceae Tree Dominant Bougainvillea 15 Bogal Vel Nyctaginaceae Tree Common spectabilis 16 Carica papaya Papaiyu Caricaceae Tree Common 17 Casia fistula Amaltash Leguminosae Tree Dominant 3.51 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

Sr Scientific Name Local Name Family Habit Status 18 Casuarina equisetifolia Saru Casuarinaceae Tree Dominant 19 Cocos nucifera Nariar Arecaceae Tree Dominant 20 Delonix alata* Yellow gulmar Fabaceae Tree Common Diospirus 21 Tendu Ebanaceae Tree Dominant melanoxylon* 22 Emblica officinalis Ambara Euphorbiaceae Tree Dominant 23 Eucalyptus globulus Nilgiri Myrtaceae Tree Common 24 Ficus benghalensis Vad Moraceae Tree Common 25 Ficus hispida Hairy fig Moraceae Tree Dominant 26 Ficus microcarpa Nandhi Pipar Moraceae Tree Common 27 Ficus religiosa Piparo, Piparejo Zad Moraceae Tree Common 28 Eucalyptus sp Nilgiri Cluciaceae Tree Common 29 Gmelina arborea Latkesarjo Zad Verbenaceae Tree Common 30 Grewia flavescens* Rushad Gangni Tiliaceae Tree Dominant 31 Helicteres isora* Maradsing, Ati, Aiti Sterculiaceae Tree Rare 32 Ixora coccinea Ixora-Lal Rubiaceae Tree Common Lagarstromia 33 Dhuara Lythraceae Tree Rare parviflora 34 Lannea coramandalica Wodir Anacardiaceae Tree Rare 35 Madhuca indica Mahua Sapotaceae Tree Common 36 Mangifera indica Ambo, Keri Jo Zad Anacardiaceae Tree Dominant 37 Manilkara hexandra* Rayan Sapotaceae Tree Common 38 Manilkara zapota Chikoo Sapotaceae Tree Common 39 Millingtonia hartensis* Akash neem Bignoniaceae Tree Common 40 Mimusops elengi Mursal Jo Zad Sapotaceae Tree Common 41 Moringa concanensis Kharo Saragvo Moringaceae Tree Sparse 42 Murraya paniculata Kamini Rutaceae Tree Rare 43 Parkinsonia aculeata Vilayti Bavar Caesalpiniaceae Tree Sparse 44 Phoenix sylvestris Khajuri Jo Zad Arecaceae Tree Dominant 45 Plumeria rubra Khad Champo Apocynaceae Tree Dominant 46 Polyalthia longifolia Asopalav Annonaceae Tree Common 47 Pongamia pinnata Karanj Jo Zad Fabaceae Tree Common Kandhi, Khajdo, 48 Prosopis cineraria Mimosaceae Tree Dominant Kando 49 Psidium guajava Jayphal Myrtaceae Tree Sparse 50 Punica granatum Dadam Punicaceae Tree Common 51 Rauvolfia tetraphylla* Bara Chand Apocynaceae Tree Rare 52 Salvadora persica* Piludi Salvadoraceae Tree Common 53 Sammania samman Sona mahar Mimosaceae Tree Common 54 Saraca indica Ashoka Leguminosae Tree Rare 55 Syzygium cumini Jambude Jo Zad Myrtaceae Tree Common 3.52 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

Sr Scientific Name Local Name Family Habit Status Ambali Jo Zad, 56 Tamarindus indica Caesalpiniaceae Tree Common Ambali 57 Tecoma stans Pili Nim Jo Zad Bignoniaceae Tree Sparse 58 Tectona grandis Sag Jo Zad Verbenaceae Tree Common 59 Terminalia arjuna Sadado Combretaceae Tree Sparse 60 Terminalia bellarica Baheda Combretaceae Tree Common 61 Terminalia catappa Deshi Badam Combretaceae Tree Sparse 62 Terminalia crenuluta Asam Combretaceae Tree Common 63 Terminalia paniculata Kindal Combretaceae Tree Common 64 Thespesia populnea Paras pimplo Malvaceae Tree Sparse 65 Thevetia peruviana Piri Karen Apocynaceae Tree Common 66 Vitex negundo Nagat, Nigod Verbenaceae Tree Dominant 67 Zizyphus mauritiana Boedi Jo Zad Rhamnaceae Tree Common

3.8.8.2 Shrubs

Shrubs observed during the present survey are given in the TABLE 3.16.

The dominant shrub community in this area was represented by Prosopis juliflora (Gando baval), Calotropis procera, Ipomoea fistulosa (Nasarmo), Lawsonia inermis (Mendhi), and Lantana camara (Ganthai).

TABLE 3.16 - LIST OF SHRUBS OBSERVED IN THE STUDY AREA

Sr Scientific Name Local Name Family Habit Status 1 Agave americana Miri Kani, Ketki Agavaceae Shrub Rare 2 Calotropis procera Akado,Aak Asclepiadaceae Shrub Common 3 Cassia auriculata Avar Caesalpiniaceae Shrub Common 4 Clerodendrum inerme Madhi Verbenaceae Shrub Common 5 Dichrostachys cinerea Kai Bavari, Zizri Mimosaceae Shrub Rare 6 Euphorbia caducifolia Thor Euphorbiaceae Shrub Common 7 Euphorbia neriifolia Thuvar, Bhungar, Thor Euphorbiaceae Shrub Sparse 8 Hibiscus rosa-sinensis Jasund Malvaceae Shrub Common 9 Ipomoea fistulosa Nasarmo Convolvulaceae Shrub Common 10 Jatropha gossypifolia Ratan Jyot Euphorbiaceae Shrub Sparse 11 Lantana camara Indradhanu, Chundi Verbenaceae Shrub Dominant 12 Lawsonia inermis Mehandhi Lythraceae Shrub Common 13 Mimosa hamata Hooked mimosa Mimosaceae Shrub Sparse 14 Nerium indicum Lal Karen Apocynaceae Shrub Common 15 Prosopis juliflora Gando Baval Mimosaceae Shrub Common 16 Ricinus communis Arenda, Divela Euphorbiaceae Shrub Common 3.53 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.8.8.3 Herbs

The herbs observed in the sampling plots, during the survey period within the study area have been enlisted in the TABLE 3.17 Total 56 species of herbs belongs to 25 families were documented from the sampling plots laid in different habitats.

TABLE 3.17 - LIST OF HERBS OBSERVED IN THE STUDY AREA

Sr Scientific Name Local Name Family Habit Status 1 Abutilon indicum Khapato, Dabaliar Malvaceae Herb Common 2 Acalypha indica Dadar Jo Zad Euphorbiaceae Herb Common 3 Achyranthes aspera Agado, Kandhero Amaranthaceae Herb Common 4 Aerva javanica Bur,Gorakhganjo Amaranthaceae Herb Common 5 Aerva lanata Sani Buu, Gorkhadi Amaranthaceae Herb Common 7 Aloe barbadensis Kunvarpato Liliaceae Herb Common Kantaro Jar 8 Alternanthera pungens Amaranthaceae Herb Rare Bhangaro Jar Bhaji, Jar 9 Alternanthera sessilis Amaranthaceae Herb Common Bhangaro 10 Alysicarpus longifolius Motosamervo Fabaceae Herb Common Kandharo 11 Amaranthus spinosus Amaranthaceae Herb Sparse Tandarbhe Adbau Rajgaro, 12 Amaranthus viridis Amaranthaceae Herb Common Rajgaro 13 Anisomeles indica Chodhuro Lamiaceae Herb Common Darudi, Uzar 14 Argemone mexicana Papaverceae Herb Common Kandho Scrophulariacea 15 Bacopa monnieri* Herb Common e 16 Bryophyllum pinnatum Miracle leaf Crassulaceae Herb Dominant Vado Sundaro, 17 Cassia occidentalis Caesalpiniaceae Herb Dominant Vadi 18 Cassia tora Punvar, Povario Caesalpiniaceae Herb Dominant 19 Catharanthus roseus Asi Sada Suvagan Apocynaceae Herb Common 20 Celosia argentea Lamdi Amaranthaceae Herb Common Beddhro, 21 Cleome viscosa Capparaceae Herb Common Prlobidhro, Commelina 22 Sishmuliu Commelinaceae Herb Rare benghalensis* 23 Convolvulus arvensis Convolvulaceae Herb Common 24 Corchorus aestuans* Chunch Tiliaceae Herb Common 25 Corchorus depressus* Tiliaceae Herb Common 26 Cressa cretica* Palio, Rudanti Convolvulaceae Herb Common 27 Datura metel Dhaturo Solanaceae Herb Dominant

3.54 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

Sr Scientific Name Local Name Family Habit Status Desmodium 28 Trapani samarvo Leguminosae Herb Common dichotamum* 29 Desmodium oojeinense Tiwas Leguminosae Herb Dominant 30 Eichhornia crassipes Pontederiaceae Herb Common 31 Euphorbia granulata * Dudheli Euphorbiaceae Herb Sparse 32 Euphorbia heterophylla Lal Pati Euphorbiaceae Herb Common 33 Euphorbia hirta Vadi Dudheli Euphorbiaceae Herb Dominant 34 Euphorbia tirucalli Kharsani Thor Euphorbiaceae Herb Common 35 Hybiscus sabdariffa Jaswand Malvaceae Herb Sparse 36 Hygrophila auriculata Kantaro Akaro Acanthaceae Herb Sparse Gadar Gari, Ridha 37 Indigofera cordifolia * Fabaceae Herb Common Gari 38 Malachra capitata Pardesi bhindo Malvaceae Herb Common 39 Medicago sativa Fabaceae Herb Common 40 Merremia tridentata Topriyal, Convolvulaceae Herb Dominant Risamani, 41 Mimosa pudica Mimosaceae Herb Sparse Lajamani 42 Ocimum basilicum Maruo, Maruvo Lamiaceae Herb Common 43 Ocimum sanctum Tulsi Lamiaceae Herb Common Vara Val, Gadar 44 Plumbago zeylanica * Plumbaginaceae Herb Common Zipto 45 Sida retusa Khetrau Barbuvaro Malvaceae Herb Common 46 Sida rhombifolia Khetrau Balbuvaro Malvaceae Herb Common Jangali Ringani, 47 Solanum surattense Solanaceae Herb Rare Pat 48 Tephrosia purpurea Sarpankho Fabaceae Herb Common 49 Tribulus terrestris Mitha Gokharu Zygophyllaceae Herb Common 50 Trichodesma indicum Undh Fuli, Aagiya Boraginaceae Herb Common 51 Tridax procumbens Vilayati Bhangro Asteraceae Herb Dominant 52 Triumfetta pentandra Zepati Tiliaceae Herb Rare 53 Urena lobata San Bhindi Malvaceae Herb Dominant 54 Urena sinuate* Cango jute Malvaceae Herb Common Kantaru Zadvu, 55 Xanthium strumarium Asteraceae Herb Common Gokhru Bordi, Boedi, 56 Zizyphus nummularia Rhamnaceae Herb Common Chania Bor

3.55 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.8.8.4 Hydrophytes

TABLE 3.18 - LIST OF HYDROPHYTES OBSERVED IN THE STUDY AREA

Sr Scientific Name Local Name Family Habit Status 1 Ammannia baccifera Rato Jal Agio Lythraceae Hydrophyte Common 2 Aponogeton natans Aponogetonaceae Hydrophyte Common 3 Azolla pinnata Salviniaceae Hydrophyte Rare 4 Eichornia crassipes Pontederiaceae Hydrophyte Sparse 5 Hydrilla verticillata Paniji Sevar Hydrocharitaceae Hydrophyte Common 6 Ipomoea aquatica Nari Val, Pani Ji Val Convolvulaceae Hydrophyte Common 7 Lemna minor Paniji Sevar Araceae Hydrophyte Common 8 Marsilea quadrifolia Marsileaceae Hydrophyte Sparse 9 Nelumbo nucifera Kamal, Kum Nelumbonaceae Hydrophyte Rare 10 Pistia Vatana Araceae Hydrophyte Common 11 Typha angustata Gha Bajariu Typhaceae Hydrophyte Common 12 Vallisneria Jar Sevar, Seaar Hydrocharitaceae Hydrophyte Common

3.8.8.5 Grass

TABLE 3.19 - LIST OF GRASS OBSERVED IN THE STUDY AREA

Sr Scientific Name Local Name Family Habit Status 1 Aleuropus lagopoides Poaceae Grass Common 2 Chloris barbata * Rusad Gha, Punjaniu Ga Poaceae Grass Sparse 3 Chrysopogon fulvus Khad Sundhiyu Ga Poaceae Grass Sparse 4 Cymbopogon oliveri Geroi Gha, Kuyadi Gha Poaceae Grass Rare 5 Cynodon barberi Poaceae Grass Common 6 Cynodon dactylon Poaceae Grass Common 7 Cyperus exaltatus Zugar Cyperaceae Grass Sparse 8 Cyperus flavidus* Dhamur, Nirmanth, Cyperaceae Grass Common 9 Cyperus laevigatus - Cyperaceae Grass Common 10 Cyperus nutans* Chiya Ni Jat Cyperaceae Grass Rare 11 Sorghum bicolor Poaceae Grass Common

3.8.8.6 Climbers and Twiners

Climbers/ twiners in the study area dominated by Ipomea pes-caprae (Dariani vel), Coccinia grandis (Ghiloda), Luffa cylindrica (Galku), and Abrus precatorius (Chanothai). The major climbers and twiners observed in the study area in the sampling plots are given in the TABLE 3.20. Total 19 species of climbers/ twiners belong to 8 families are recorded from the area.

3.56 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

TABLE 3.20 - LIST OF CLIMBERS AND TWINERS OBSERVED IN THE STUDY AREA

Sr Scientific Name Local Name Family Habit Status 1 Abrus precatorius Chanothi Fabaceae Climber Common 2 Caesalpinia crista Kachka Caesalpiniaceae Climber Common Cissus Sandhiyal, 3 Vitaceae Climber Common quadrangularis Sandhaval 4 Clitora ternatea Gaeni, Kari Koagi Val Fabaceae Climber Dominant 5 Coccinia grandis Tindora, Ghiloda Cucurbitaceae Climber Rare 7 Cocculus hirsutus Vegai, Vagval, Asipal Menispermaceae Climber Common 8 Hemidesmus indicus Dudheli Periplocaceae Climber Sparse 9 Ipomoea carnea - Convolvulaceae Climber Common 10 Ipomoea hederifolia Kasirathnalu Convolvulaceae Climber Common 11 Ipomoea macrantha Convolvulaceae Climber Common 12 Ipomoea nil Trikhuni Potiyar, Kari Convolvulaceae Climber Dominant 13 Ipomoea obscura Convolvulaceae Climber Common 14 Ipomoea pes-caprae Bala-Banthi-Tiga Convolvulaceae Climber Common 15 Luffa cylindrical Galku Cucurbitaceae Climber Common 16 Mucuna prurita Kavach, Koyli Papilionaceae Climber Common 17 Pentatropis spiralis Asclepiadaceae Climber Common 18 Rhynchosia minima Trapanivel, Magiri Fabaceae Climber Rare 19 Stephania japonica Bangji Val Menispermaceae Climber Common

3.8.8.7 Cultivated Plants in The Study Area

The major agriculture activity of this region is Sugar cane (Saccharum officinarum) cultivation. mainly at Talangpor, Karsad, Bhonadara and Eklera villages, The crop occupying the highest percentage of the sown area of this region is taken as the major crop and all other possible alternative crops which are sown in this region either as substitutes of the base crop in the same season or as the crops which fit in the rotation in the subsequent season, are considered as minor crop.

Major Crops: Major crops in the study area are Sugar cane (Saccharum officinarum L) and rice (Oryza sativa). Minor Crops: The minor crops of this region are Bajra (Pennisetum typhoides), and Jowar (Sorghum bicolar). Vegetable: The vegetables grown in the study area are, ladies finger Abelmoschus esculentus L. Rigan (Solanum melongena).

Horticulture Practices and fruit grown: Horticulture activity was found to be restricted in few villages like Talangpore and Umber villages in the study area dominated by orchards of Mango and Chikoo.

3.57 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.8.9 Fauna

LIST OF FAUNA & THEIR CONSERVATION STATUS

TABLE 3.21 - CHECKLIST OF MAMMALIAN SPECIES IN THE STUDY AREA (* INDICATES PRIMARY DATA)

Scientific Name Common Name Family I - WPA Funambulus Three striped palm squirrel* Sciuridae palmarum Bendicota bengalensis Indian mole rat Muridae Bendicota indica Bandicoot rat Muridae Mus booduga Little Indian Field mouse Muridae Mus musculus House Mouse Muridae Rattus rattus House rat Muridae Lepus nigricollis Black-naped Hare Leporidae Schedule IV Herpestes javanicus Common Indian Mongoose Herpestidae Schedule II Part II Felis chaus Jungle cat Felidae Schedule II Part II Rhinopoma hardwickii Lesser Mouse-Tailed Bat Chiroptera Pipistrellus Indian Pipistrelle Chiroptera coromandra Taphozous Black-Bearded tomb bat Chiroptera melanopogon Hipposideros speoris Schneider’s Leaf-Nosed Bat Chiroptera

TABLE 3.22 - LIST OF AVES EITHER SPOTTED OR REPORTED OR RECORDED FROM THE STUDY AREA. (* INDICATES PRIMARY DATA)

Sr Scientific name Common Name Family IWL 1 Accipiter badius Shikra Accipitridae IV 2 Elanus caeruleus Black Shouldered Kite* Accipitridae IV 3 Haliastur indus Brahminy Kite Accipitridae IV 4 Milvus migrans Black kite* Accipitridae IV 5 Acrocephalus agricola Paddy field Warblers Acrocephalidae IV 6 Acrocephalus stentoreus Reed Warbler Acrocephalus IV 7 Eremopterix grisea Ashy crowned Sparrow Alaudidae IV 8 Nettapus coromandelianus Cotton Teal Anatidae IV 9 Apus affinis House Swift* Apodidae IV 10 Cypsiurus balasiensis Asian Palm Swift Apodidae IV 11 Ardeola grayii Pond Heron* Ardeidae IV 12 Bubulcus ibis Cattle Egret* Ardeidae IV 13 Egretta garzetta Little Egret* Ardeidae IV 14 Ceryle rudis Pied Kingfisher* Cerylidae IV 15 Charadrius hiaticula Ringed Plover Charadriidae IV

3.58 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

Sr Scientific name Common Name Family IWL 16 Vanellus indicus Red wattled Lapwing Charadriidae IV 17 Cisticola juncidis Streaked Fantail Warbler Cisticolidae IV 18 Streptopelia orientalis Spoted dove* Columbidae IV 19 Streptopelia turtur Turtle Doves Columbidae IV 20 Coraciiformesas Indian Roller* Coraciiformesida IV 21 Corovus macrorhynchos Jungle Crow* Corvidae IV 22 Dendrocitta formosae Grey Treepie Corvidae IV 23 Centropus sinensis Crow Pheasant Cuculidae IV 24 Eudynamys scolopacea Asian Koel Cuculidae IV 25 Dicrurus macrocercus Black Drongo* Dicruridae IV 26 Euodice malabarica White Throated Munia Estrildidae IV 27 Lonchura atricapilla Black Headed Munia* Estrildidae IV 28 Lonchura punctulata Spotted Munia* Estrildidae IV 29 Halcyon smyrnensis White Breasted Halcyonidae IV 30 Hirundo daurica Red Rumped Swallows Hirundinidae IV 31 Hydrophasianus chirurgus Pheasant Tailed Jacana Jacanidae IV 32 Metopidius indicus Bronze winged Jacana Jacanidae IV 33 Megalaima haemacephala Copper Smith Barbet Megalaimidae IV 34 Merops orientalis Small Bee eater* Meropidae IV 35 Nyctyornis athertoni Blue tailed Bee eaters Meropidae IV 36 Anthus rufulus Paddy pipet Motacilladae IV 37 Motacilla flava Yellow wagtail Motacilladae IV 38 Motacilla alba White wagtail Motacillidae IV 39 Motacilla cinerea Grey Wagtail* Motacillidae IV 40 Motacilla maderaspatensis Pied wagtail Motacillidae IV 41 Copsychus saularis Oriental Magpie Robin Muscicapidae IV 42 Saxicola caprata Pied bush chat Muscicapidae IV 43 Saxicoloides fulicata Indian Robin* Muscicapidae IV 44 Cinnyris asiaticus Purple Sunbird* Nectariniidae IV 45 leptocoma zeylonica Purple Rumped Sunbird Nectariniidae IV 46 Passer domesticus House Sparrow* Passeridae IV 47 Phalacrocorax niger Little Cormorant* Phalacrocorax IV 48 Francolinus pondicerianus Grey Patridge Phasianidae IV 49 Upupa epops Hoopoe Upupidae IV 50 Phylloscopus maculipennis Ashy Warblers Phylloscopidae IV 51 Tachybaptus ruficollis Little Grebe Podicipedidae IV 52 Tephrodornis pondicerianus Common Wood Shrike Prionopidae IV 53 Psittacula eupatria Alexandrine Parakeet* Psittacidae IV 54 Psittacula krameri Rose ringed Parakeet* Psittacidae IV 55 Pycnonotus cafer Red Vented Bulbul Pycnonotidae IV 56 Amaurornis phoenicurus White Breasted Water Hen Rallidae IV

3.59 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

Sr Scientific name Common Name Family IWL 57 Fulica atra Common Coot* Rallidae IV 58 Gallinula chloropus Common Moorhen Rallidae IV 59 Porphyrio porphyrio Purple Moorhen* Rallidae IV 60 Himantopus himantopus Black winged stilt* Recurvirostridae IV 61 Actitis hypoleucos Common Sandpipper* Scolopacidae IV 62 Calidris temminckii Temminck's Stint Scolopacidae IV 63 Sterna hirundo Common Terns* Sternidae IV 64 Acridotheres tristis Common Myna* Sturnidae IV 65 Gracupica contra Asian Pied starling Sturnidae IV 66 Turdoides caudata Common Babbler* Timaliidae IV 67 Turdoides malcolmi Large Grey Babblers Timaliidae IV 68 Turdoides striata Jungle Babbler* Timaliidae IV

TABLE 3.23 - LIST OF REPTILES EITHER SPOTTED OR REPORTED FROM THE STUDY AREA. (* INDICATES PRIMARY DATA)

Sr Scientific Name Common Name IUCN IWPA 1. Ahaetulla nasutus Green whip snake LC 2. Naja naja Indian Cobra LC II 3. Vipera russelli Russel Viper LR II 4. Dendrelaphis tristis Tree Snake LC 5. Ptyas mucosus Common Rat snake LC II 6. Amphiesma stolata Buffstriped keelback LC 7. Trimeresurus gramineus Green pit viper LC IV 8. Typhlops hypomethes Common blind snake LC IV 9. Enhydris enhydris Common Water Snake LC 10. Varanus bengalensis Common Indian monitor* LR II 11. Chamaeleon zelanicus Chameleon VU II 12. Mabuya carinata Common Skink* LC 13. Calotes rouxi Forest Calottes* LC 14. Calotes versicolor Common garden lizard* LC 15. Hemimidactylus brooki House gecko* LC 16. Hemidactylus forenatus Southern House Gecko LC

TABLE 3.24 - LIST OF AMPHIBIANS EITHER SPOTTED OR REPORTED FROM THE STUDY AREA. (LC MEANS LEAST CONCERN)

Sr Scientific Name Common Name IUCN IWPA 1. Bufo melanosticus Common toad * LC Sch-IV 2. Rana hexadactyla Commn green frog LC Sch-IV 3. Rana leptodactyla Small forg LC Sch-IV 4. Rana tigrina Bullfrog* LC Sch-IV 5. Rhacophorus maculatus Common Tree Frog LC Sch-IV

3.60 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.8.10 Phyto Sociological Data of Study Area

The study area is mainly focused through secondary data validation from primary observations. Checklist is prepared and marked the species noticed during rapid assessment. 16 sampling points are finalized through Area-Species graph. And the quantitative analysis done based on the methodology adopted for various species.

The habit wise and ecosystem wise status of various floral species observed are given here graphically.

FIGURE 3.13 - GRAPHICAL REPRESENTATION OF HABIT WISE NO OF SPECIES IN THE GIVEN STUDY AREA

FIGURE 3.14 - GRAPH SHOWING IMPORTANT VALUE INDEX OF DOMINANT TREE SPECIES WITHIN STUDY AREA

3.61 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

Rel Rel Rel S. Scientific Occura Densi Freque Abunda Abu Dens Freque IVI No Name nce ty ncy nce nda ity ncy nce Opuntia 1 3 0.3 1.41 19 2.0 1.3 2.9 6.25 dillenii Nerium 2 6 0.6 3.53 38 3.9 1.7 3.6 11.05 indicum Borassus 3 2 0.2 1.06 13 1.3 1.5 3.2 5.61 flabellifer Pandanus 4 4 0.4 2.47 25 2.6 1.8 3.8 8.87 fascicularis Azadirachta 5 13 1.7 9.54 81 8.5 2.1 4.5 22.52 indica Ricinus 6 4 0.4 2.12 25 2.6 1.5 3.2 7.97 communis Sarcostemma 7 4 0.4 2.47 25 2.6 1.8 3.8 8.87 viminale Zizyphus 8 9 0.8 4.59 56 5.9 1.4 3.1 13.60 mauritiana Agave 9 4 0.5 2.83 25 2.6 2.0 4.3 9.76 americana Calotropis 10 12 1.5 8.48 75 7.8 2.0 4.3 20.64 procera 11 Ficus hispida 5 0.7 3.89 31 3.3 2.2 4.8 11.91 Dalbergia 12 6 0.7 3.89 38 3.9 1.8 4.0 11.77 sisoo Leucaena 13 8 1.0 5.65 50 5.2 2.0 4.3 15.20 leucocephala Peltophorum 14 12 1.4 8.13 75 7.8 1.9 4.1 20.11 pterocarpum Phoenix 15 5 0.6 3.53 31 3.3 2.0 4.3 11.12 sylvestris Polyalthia 16 4 0.3 1.77 25 2.6 1.3 2.7 7.08 longifolia Pongamia 17 10 1.3 7.07 63 6.5 2.0 4.3 17.92 pinnata Prosopis 18 12 1.6 8.83 75 7.8 2.1 4.5 21.18 juliflora Tectona 19 5 0.5 2.83 31 3.3 1.6 3.5 9.55 grandis Thespecia 20 6 0.6 3.18 38 3.9 1.5 3.2 10.34 populnea Alstonia 21 5 0.4 2.47 31 3.3 1.4 3.0 8.76 scholaris Acacia 22 3 0.2 1.06 19 2.0 1.0 2.2 5.18 auriculiformis 23 Cassia fistula 3 0.2 1.06 19 2.0 1.0 2.2 5.18 Coccinia 24 4 1.0 5.65 25 2.6 4.0 8.6 16.91 grandis 25 Mitragyna 2 0.2 1.06 13 1.3 1.5 3.2 5.61 3.62 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

Rel Rel Rel S. Scientific Occura Densi Freque Abunda Abu Dens Freque IVI No Name nce ty ncy nce nda ity ncy nce parvifolia 26 Plumeria alba 2 0.3 1.41 13 1.3 2.0 4.3 7.04 100.0 100. Total 153 17.7 956 100.0 46.305 300.00 0 0

Species phytosociological characters were evaluated by analysing the frequency, density, abundance and Importance Value Index (IVI) using a formula-- Frequency =Total no. of quadrates in which the species occurred/ Total no. of transects studied× 100 Relative Frequency =Frequency of a species/ Frequency of all species × 100

Density =Total no. of individuals of a species/Total no. of quadrates studied

Relative density =Number of individuals of a species/Number of individuals of all species x 100

Abundance =Total number of individuals of a species/Total number of quadrates in which the species occurred

Relative Abundance =Abundance/Abundance of all the species x 100

IVI = Relative frequency + Relative density + Relative Abundance

TABLE 3.25 - BIODIVERSITY INDICES VALUES OF THE SAMPLING SITES IN BUFFER ZONE

Shannon H 3.046 Simpson 1-D 0.944 Evenness e^H/S 0.935 A/F value 0.048

3.8.10.1 Distribution pattern (A/F ratio)

The ratio between abundance and frequency was used to interpret the distribution pattern of species (Whitford, 1949). Distribution pattern of species in the study area is identified as random distribution as the value of A/F ratio is 0.048. This may be due to GIDC, Surat is totally industrial belt and remaining buffer area is enriched with forested species. The Shannon indices value of buffer zone is 3.046 indicates good potential diversity within the study area. Population size and Dominance of the species is 48% (which means no individual or few tree species are occurred continuously in the study area) and Evenness is around 93.5% (Indicates the species are evenly distributed in core and buffer zones). This might be due to contiguous patches of Weed species and natural species such Azadirachta indica, Prosopis juliflora (near the villages), Pongamia.pinnata, Peltophorum pterocarpum (near road side) and coconut, mango in plantation area. The present study indicates ACE in 3.63 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

frequency classification and as per the Raunkiaer’s law of frequency classification indicates that species diversity is distributed maximum for 60 to 80%. This result indicates that most of the plant species are very common throughout the region.

3.8.10.2 Fauna within the Core and buffer zones

Throughout the study area, there no direct evidence of wild animal species observed. Common mongooses, Squirrels are sighted apart from few reptilian species. From the secondary source (local people near villages) it is also revealed that presence of langurs and common snakes exists here. Common bird species such as Paddy egrets, Green bees eaters, Indian rollers, Parakeets, White headed babblers, Weaver birds, Mynas, Black drangos, Crows, Sparrows are sighted here.

3.8.10.3 Overall vegetation scenario of the study area (from 0 to 10 km radius)

The survey reveals that there are specific patches for certain species and mass plantations such as Eucalyptus, mango etc. There are good number of plantations on the road side such as Ficus, Polyalthia longifolia, Alstonia scholaris, Peltophorum pterocarpum, Delonix regia, Tectona grandis and Acacia auriculiformis. The general field observation in this study area is the presence of certain very common species such as Borassus, Coconut and Phoenix dominant throughout the region. A good number of Butterfly and Dragon fly species are recorded in the wasteland and agricultural habitats. The larval and nectar host plants are very common here. The specific observations were also made for the micro habitats. Borassus flabellifer, Ceiba pentandra, Cocos nucifera, Ficus benghalensis, Ficus religiosa, Ficus racemosa, Mangifera indica, Prosopis juliflora, Tamarindus indica found near the village premises.

3.8.10.4 Endemic, Threatened and Endangered Species

From the present survey it appears that none of the terrestrial species are under endangered and threatened species, and not listed in the Schedule I of the Indian Wildlife (Protection) Act, 1972 as amended in 1991.

3.9 GEOLOGY& HYDROLOGY STUDIES

3.9.1 Geomorphology

Geographically, the Surat district belongs to the western coastlands of the Deccan peninsula. The area is mainly characterized by the alluvial plains comprising the flood plains of the Tapi and Mindhola rivers. Both the rivers have meandering courses and entrenched fairly with deep cut terraces. The topography is generally plain with regional slope towards the Bay of Bengal in the west, and locally towards Tapi and Mindhola Rivers (MAP 3.7 and 3.8). The project area is almost plain and flat surface with elevation around 15 m above mean sea level (amsl).

Estuarine tracts were developed about 6 km west of the site formed by the merging of the drainage courses Tapi and Mindhola Rivers. Regionally also the alluvial plains towards west merge into a dry barren sandy coastal plain fringed by marshy shore line. All the rivers form 3.64 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020 estuarine mouths. There are sand bars and spits near to the shore (MAP 3.7 and FIGURE 3.17).

MAP 3.7 - REGIONAL MAP OF PROJECT AREA

MAP 3.8 - PROJECT SITE AND SURROUNDINGS

3.65 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.9.2 Soil

The area is largely covered by alluvial soil. It is generally ranges in thickness up to one meter, with silt clay loam to clay loam composition. The water holding capacity of the soil is moderate to more, depending on the permeability aspect. In the plain areas, the soil is deep (more than 1.0 m bgl), light grayish to yellowish brown in colour. The texture is fine clay loam to sandy loam. The clay content varies from 25 to 60%. Towards the coastal direction (Bay of Bengal) the soil become deep to very deep and attains dark grey to black colour. The texture is clay loam to silty loam (CGWB, 2013).

3.9.3 Rainfall

The area has a tropical savanna climate (as per Köppen: Aw Classification), moderated strongly by the sea to the Gulf of Cambay. The summer begins in early March and lasts till June. April and May are the hottest months, the average maximum temperature being 37 °C (99 °F). Monsoon begins in June, with intense rain in the month of July. The months of October and November see the retreat of the monsoon and a return of high temperatures till late November. Winter starts in December and ends in late February, with average mean temperatures of around 23 °C (73 °F), and negligible rain. In general, humidity is high during the monsoon period and moderate during non-monsoon period. The relative humidity varies from a minimum of 48% in February to a high of 84% in August. The climate variations in the area are given in TABLE 3.26 with graphical presentation in FIGURE 3.15.

TABLE 3.26 - CLIMATE DATA FOR CHORASI TALUKA, SURAT DISTRICT, GUJARAT

[Source:climate-data.org]

3.66 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

FIGURE 3.15 - ANNUAL AVERAGE CLIMATOGRAPH OF THE STUDY AREA (SURAT)

[Source: climate-data.org]

The analysis of 56 years rainfall data of Choryasi (Taluka headquarters, located 26 km northeast of Sachin) for the years 1963-2018 was collected and analyzed, as it is the representative station located nearer to the project site. As shown in FIGURE 3.16, the data illustrate the mean annual rainfall of 1213 mm, with a variation from a low of 528 mm in the year 2002 to a high of 2806 mm in year 1983. Over all the study period of 56 years 32 years recorded rainfall below the normal. The rainfall pattern gives standard deviation of 519.12 and coefficient of variation of 42.128.

3.67 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

FIGURE 3.16 - ANNUAL RAINFALL DURING THE YEARS 1963-2018

[Source: climate-data.org]

3.9.4 Drainage

The area is regionally dissected by perennial and intermittent rivers, streams and streamlets, and forming part of either Tapi or Mindhola River Systems comprising the flood plains deposits. In this type fluvial deposit and alluvial areas, it is difficult to identify watershed demarcation considering the possibility of trans-boundary aquifer system. The drainage pattern in general is sub-dendritic. Both the rivers merge west of the study area before culminating into the Arabian Sea.

The Tapi is the major river which passes through the central parts of the district and flows towards the west. The river is perennial in nature. It originates in Madhya Pradesh near Betul and has about 62225 sq. Km. of catchment area. The average width of the river upstream of Kathor bridge is about 500m

Mindhola River takes its origin is near Doswada, Songadh area. The Mindhola basin has a maximum length of 105 km (65 miles). The total catchment area of the basin is 1,518 km2 (586 sq miles). It takes meandering course in the study area before merging with the Tapi River.

3.68 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

FIGURE 3.17 – DRAINAGE IN STUDY AREA

3.9.5 Geology

The geological formations encountered in the Surat district are of Quaternary alluvium, Tertiary limestone and sandstone, and Deccan Trap basalt. The geological succession is given in TABLE 3.27, and the distribution geology is shown in MAP 3.9 (Kulkarni, 1985).

TABLE 3.27 - GEOLOGICAL SUCCESSION IN SURAT DISTRICT

(Source: Ground Water Brochure of Surat District, CGWB, 2013) 3.69 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

MAP 3.9 - GEOLOGICAL DISTRIBUTION IN SURAT DISTRICT

Source: Ground Water Brochure of Surat District, CGWB, 2013]

The study area mainly comprises of undifferentiated alluvial and fluvial sediments of recent to Quaternary (Holocene) period. The fluvial (river) alluvium forming the unconsolidated sediments comprise of rock, sand, silt and clay sediments in varying amounts with variable effective porosity and permeability. Far eastern and northeastern parts are covered with basaltic flows of Deccan trap origin.

Structural Features

The intensity and direction of “lineaments” in the area are not prominent, but can be perceived through the distribution of river courses and hard rocks occurring in the eastern part of the district. The major lineaments are in northeast-southwest direction, and at few places even in the northwest-southeast and east-west directions.

The main drainage in the area is south-westerly or westerly flowing rivers like Tapi and Mindhola, both of which merging west of the study area before draining into Gulf of Cambay. The Tapi and Mindhola have established their courses along faulted planes or rift valleys.

3.70 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.9.6 Hydrology

Ground Water Conditions

Ground water occurrence, movement and recharge to aquifers are controlled by the degree of weathering, fracture pattern, geomorphological setup and rainfall.

The major aquifers in the study area are mainly formed by alluvium and Tertiary formations. These aquifers can broadly be demarcated into two zones namely newer alluvium and older alluvium. The newer alluvium is present along the river courses and comprises fine to coarse grained sand trap wash with clay intercalations. The sand is unconsolidated but shows some degree of cohesion at places. Water levels in general are comparatively deep in newer alluvium. Older alluvium is present in inter river plains and comprises sand, clay, kankar, gravel and silt. The ground water occurs mostly under unconfined conditions but at places semi-confined conditions are also observed, probably due to presence of clay lenses (CGWB, 2013).

The common ground water abstraction structures are dug wells, dug-cum-bore wells and tube wells. The yields mainly depend on the recharge conditions. The depths of the wells in alluvium generally range from 3.0 to 20.0 and some even 25.0 m. Some of the dug wells have in-well bores down to >30 m. Depths to water levels in the area range from 0.5 to 15 m bgl about 90% wells shows water levels less than 10m bgl. The yields of the dug and dug-cum-bore wells generally range between 100 and 450 m3/day.

In alluvial areas the depth of tube wells range from 36 to >120 m with piezometric levels varying from 2 to 10 m below ground level (bgl). The specific capacity of the wells ranges from 19 to 1658 m3/day/m. The transmissivity values obtained at these tube wells ranges from 104 () to 2965m2/day (Vihan, CGWB, 2013).

PHOTOGRAPHS 3.2 – HAND PUMP FITTED BOREWELL VILLAGE NEAR TARAJ VILLAGE

3.71 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

Ground Water Levels

Behaviour of ground water level is essentially controlled by physiography, lithology and rainfall. There is general decline and rise of water during pre- and post-monsoon season. The rises are due to the general buildup of water levels in response to rains, and declines are due to erratic monsoon, less recharge (due to urbanization), and exploitation of groundwater resources.

The depth to water levels in the area generally varies from 0.5 to >12.0 m bgl. The dug wells usually show phreatic, and the borewells indicate semi-confined conditions. Well inventory of representative dug / borewells were undertaken on 25th May 2019 with in the 10 km radius of the proposed project area. The well inventory details are given in TABLE 3.28. Based on the water level data a depth to water level map of the study area was prepared as shown in FIGURE 3.18.

TABLE 3.28 - DETAILS ABOUT INVENTORY OF WELLS

Note: m: meters; amsl: above mean sea level; agl: above ground level; bgl: below ground level; GL: ground level; Directions: East, West, North, & South are indicated by E, W, N, & S; All the bore wells inventories were fitted electrical pump sets (usually 1.5 to 5 HP for domestic use, and 5-7 HP for agriculture); Some shallow domestic borewells (less than 40 m depth) are fitted with hand pumps; lps: liters per second; Fluctuations: Low usually indicate <1 m per annum, Moderate: 1-3 m/annum and High: >3 m annum.

As observed in the well inventory the depth to ground water levels in the area ranges from 0.7 to >12 m bgl. The general ground water flow gradient is westwards; mostly along the general Mindhola flow direction FIGURE 3.18.

The picture depicts occurrence of moderately deep water level conditions of more than 9.0 m bgl in the northeastern parts of the study area, especially around Bhestan and Saniya Kande villages. This is partly due to its geographical location, and being situated in upland areas and away from estuarine tracts. The shallow water level conditions of < 2.0 m bgl occur in areas near to river/stream courses and marshy areas. The marshy tracts along the stream courses

3.72 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020 near Gabheni area are filled with dark-grey sludge released from the Common Effluent Treatment Plant (CETP) in the area.

FIGURE 3.18 - DEPTH TO WATER LEVELS IN THE STUDY AREA (The ground water flow gradient is indicated by pink arrow)

PHOTOGRAPHS 3.3 – INDUSTRIAL EFFLUENT ALONG THE STREAM COURSE NEAR GABHENI

3.73 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.9.7 GROUND WATER RESOURCESW ESTIMATION

In collaboration with the state departments, Central Ground Water Board (CGWB) has formed the ‘Groundwater Estimation Committee (GEC)’, and has carried out ground water resource estimation and categorization studies for the Choryasi Taluka of Surat District for the year 2009. The CGWB has categorized the area as ‘safe’ with the stage of ground water utilization of 77.72 %, indicating scope for further ground water development. These details are applicable to the study area also, as it forms part of the Choryasi Taluka.

TABLE 3.29 – GROUND WATER RESOURCES OF CHORASI TALUKA, SURAT DISTRICT, GUJARAT.

S. Item Total No. (Ha.m) 1 Annual Ground Water Recharge 10134.66 2 Natural Discharge during Non-monsoon 506.73 3 Net Annual Ground Water Availability (1-2) 9627.93 4 Existing Draft for Domestic and Industrial Water Supply 3702.00 5 Ground Water Draft for Irrigation 3780.50 6 Existing Ground Water Draft for All Uses (4 + 5) 7482.50 7 Allocation for Domestic and Industrial Requirement (i.e. next 25 5188.00 years) 8 Net Ground Water Availability for future Irrigation 659.43 9 Level of Ground Water Development % 77.72 10 Category Safe Note: Year of Ground Water Assessment: 2009. Source: CGWB Ground Brochure, Surat District, 2013.

3.10 SOCIO ECONOMICS

3.10.1 Demography

The project area in the radial distance of 10 km comprises of 70% of the area from Surat district as indicated in FIGURE 3.19 (For details of the area refer ANNEXURE XI) and 30% falls in Navsari District. The project area is 7.5% of Gujarat State; 75% of the Surat district and much greater than Navsari District. Since most of the population resides in urban area, the population density of the Surat district is highest compared to native state of Gujarat; and other district and talukas. The population density is the highest in Surat city while the project area it is second from bottom when compared with the state of Gujarat. This shows there is great influx of the population in Surat district for the livelihood as indicated in TABLE 3.30.

3.74 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

TABLE 3.30 - DEMOGRAPHIC ANALYSIS FOR PROJECT AREA – 2011

Distri Distri Navs Chora Jalalpo Proje Sr State Surat Demographic Information ct ct ari si re ct (2011) Navs Taluk Taluk No Gujarat Surat Taluka City Area ari a a 60792 92053 31123 44677 45868 1 Total Population 60383628 86,225 228,065 31 5 8 97 34 Decadal Population Growth Rate 2 19.3 42.19 8.15 13.01 0.39 3.92 60.05 49.2 (2001-2011) Density of population (Per Sq 3 308 1337 592 1187 819 476 13304 1658 km) Total Sex Ratio (Females per 000' 4 919 788 961 944 640 909 756 756 males) Rural Sex Ratio (Females per 4a 949 925 981 961 725 958 756 923 000' males) Urban Sex Ratio (Females per 4b 880 756 917 934 593 841 0 756 000' males) 5 Proportion of Urban Population 42.6 79.7 30.8 64.8 62.4 40.3 100 99 6 Proportion of Scheduled tribes 14.75 14.09 62.12 56.14 13.34 8.2 22.7 33.5 7 Proportion Literate 78.03 86.65 83.88 88.21 90.3 89.1 87.89 72.6 8 Proportion of female Literacy rate 69.8 81.02 78.3 84.3 86.67 85.63 83.44 77.5 Work Participation rate (Main + 9 40.98 41.99 44.51 42.13 49.7 40.0 40.17 46.0 Marginal Workers) NOTE: Project Area – 10 km Radial distance from Project site Source: Gujarat State Census Handbook and Surat& Navsari District Census Handbook 2011;

FIGURE 3.19 – STUDY AREA (10 KM)

This status remains the same for decadal population growth as observed for population density. This suggests that the population growth rate is very high in the Surat district and project area being near to the Surat district maintain the same status. Sex ratio in rural areas is more skewed

3.75 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020 towards female population and is highest for the Navsari district. While in urban areas, the sex ratio of the project area is second lowest after Chorasi. The proportion of the urban population is highest in Surat district largely cornered to Surat city and then followed by project area. The proportion of total literacy rate in project areas is the lowest while it is highest in Chorasi taluka and the same status is also true for female literacy rate. Looking the total literacy rate and female literacy rate, it becomes apparent to initiate literacy program in the project area and that too for the female population under Corporate Environment Responsibility.

3.10.2 Description of Project Area

The project area having a total of 24 villages and seven cities/towns in the radial distance of 10 km from the project site. The demographic profiles show is indicated in TABLE 3.31. It shows huge deviation of the value from the average value of each demographic variables and are largely concentrated among 14 villages only in the project area having radial distance of 10 km from the project sites. These villages could also be considered for social development programs under Corporate Environmental Responsibilities to improve the social and economic condition of the resident population among these villages.

TABLE 3.31 - DEMOGRAPHIC PROFILE OF THE PROJECT AREA

Maximum Minimum Village/Town Average Village Minimu Village Value Name m Name Population 147962 4467797 Surat City 357 Goja Population density/km 1658 13304 Surat City 46 Magob Sex ratio /1000 males 883 1103 Eklera 404 Pali (OG) Sex_ratio_0-6/1000 870 1588 Dalki 538 Popda males % of SC Population 4.8 26.0 Arsan 0.6 Wada % of ST Population 33.5 72.8 Arsan 2.9 Surat City Total Literacy rate 72.6 91.5 Karankhat 61.3 Goja Female Literacy Rate 77.5 98.5 Karankhat 63.2 Goja Work Participation rate 46.0 63.1 Pali (OG) 33.7 Karankhat Popda; Mohni; % Main Worker 93.1 100.0 62.3 Ponsara Deladva; Khambhasla % Marginal Worker 6.9 37.7 Ponsara 0.3 Arsan Source: Surat & Navsari District Census Handbook 2011;

3.10.3 Work Participation Rate (Economic Status)

Since Surat areas witness maximum industrialization due better facilities provided by three GIDC, the work participation rate of project area and Surat district is almost same. The project area is comprised of rural areas from Kim covering major industrial zone. The percentage of main worker

3.76 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

in the project area is highest in Popda; Mohni; Deladva; Khambhasla villages (100%) and lowest is in village Ponsara (62.3%), while the average percentage of main worker is 93.1% in the villages located in the 10 km radial distance from the project site. The work participation rate is maximum in the village Pali (OG) (63.1%) and the minimum is in village Karankhat (33.7%); while the average work participation rate is 46% in the villages located in the radial distance of 10 km from the project site. The population largely engaged in service sector (47%); Followed by Agriculture sector (26%); Casual labor work (17%); and Petty Business (10%). The detailed villages’ wise demographic and work participation status is indicated in ANNEXURE XI.

3.10.4 Industry – Trade & Commerce

Surat is mainly known for its textiles and diamond processing industries. The district is emerging as a potential hub for IT/ITeS sector in Gujarat. Hazira and Magdalla Ports in the district provide logistic support to industrial operations in the state. Industrial development in Surat district could be attributed to the presence of a large number of diamond processing, textiles and chemical & petrochemical industries. There are over 40,000 small and medium industries functioning in the district. It is also known as synthetic capital of India. Surat–The synthetic capital of India hosts over 40,000 powers looms and provides over 6 lakh jobs. It contributes almost 20 % to the total manmade fiber exports and almost 35 % of manmade fabric production in India. Maximum number of in small and medium enterprises is related to textile industry in the district, followed by repairing and service industry with more than 10,000 units.

At present, there are 2250 units, including 1750 textile units, 70 textiles dying and printing mills, 40 dyes and chemical units, 50 engineering units and the rest are textile ancillary units. Sachin GIDC has annual turn over exceeding Rs. 8000 crores and it provides direct employments to over 3 lakhs people, which include majority of workers employed in textile, chemical, textile processing and engineering units.

Gujarat has the distinction of being the first state to enact the Special Economic Zone Act - 2004. SEZs is growth engines that can boost manufacturing, augment exports and generate employment. The Government has enacted Special Economic Zones Act - 2004 in order to provide hassle free operation regime and encompassing state of the art infrastructure and support services. Board of approval in Ministry of Commerce and Industries, New Delhi has accorded approvals to 60 SEZs in Gujarat at the end of March-2011. The status of SEZ in Surat district is highlighted in TABLE 3.32.

TABLE 3.32 – SEZs LOCATED IN SURAT

Sr. Location Nature of SEZ Area (in hectares) (As on Oct-2010) 1 Sachin, Surat SURSEZ Multi-product 50 2 Vanj, Surat Apparel SEZ 56.5 3 Ichhapor, Surat Gujarat Hira Bourse Gems &Jewellery 75 4 Hazira, Surat Essar Hazira SEZ Engineering 270 5 Suvali, Surat Essar Power SEZ 180 Source: District Census Handbook Surat 2011.

3.77 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

3.10.5 Education Status

The education status was explored in 10% of the sample villages which was discussed with Panchayat members or school teacher for adult working population only. TABLE 3.33 shown mere approximate to give the rough idea of possible employment opportunity among the industries located in the project areas. It is to be noted that the Skill gaps in the industries for persons having skilled jobs degree are largely fulfill by the urban areas while the persons with unskilled jobs are largely taken up from surrounding villages during construction and operation stage of the industries.

TABLE 3.33 - EDUCATION STATUS OF WORKING POPULAION (IN NO.) IN DIFFERENT VILLAGES

Sample Literate* *Illiterate **Professiona **Post **Graduat **Below Village Populatio Populatio l Course Graduat e Graduat n n e e Sachin (CT) 20323 7779 15 10 25 50 Pali (OG) 5618 1707 12 9 22 57 Nadod 1278 577 6 11 18 65 Dalki 349 64 4 9 15 72 * Figure taken from District Census Hand book of Surat 2011; ** Field survey data from FGDs in 10% of villages. It also includes school going population.

3.10.6 Employment Opportunities

Further the Village Panchyat members, teachers and other members in Focus group discussion (FGD) pointed out the pattern employment among working population as indicated in TABLE 3.34.

TABLE 3.34 - STATUS OF PATTERN OF EMPLOYMENT OF WORKING POPULATION (%)

Sample Village Cultivator Agriculture Casual Petty Service Sector /Farmer Labour Labour Business Skilled Unskilled Sachin (CT) 8 9 14 9 12 47 Pali (OG) 7 13 16 11 13 39 Nadod 13 17 22 11 8 33 Dalki 15 22 15 8 9 37 Average 11 15 17 10 11 39

The proposed project shall increase in employment; this will indirectly contribute to the development of entire area. TABLE 3.35 shows the manpower details for construction of new site in the factory premises. Owing to the pattern of employment existing in the area and the proposed demand of manpower for the new construction within the factory premises, it is suggested that the proponent should employ highly managerial skilled from urban areas, while mid-level technocrats from both urban as well rural areas and unskilled work force mostly from rural areas.

3.78 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 3 Description of The Environment Date 17/03/2020

TABLE 3.35 - STATUS OF MANPOWER FOR THE PROPOSED PROJECT PLAN IN M/S ORGOCHEM GUJ PVT. LTD.

Phase of project Type of labour No. of individuals During Construction Contractual 10 During Commissioning Contractual 10 During Operations Managerial 07 Skilled 10 Un-skilled 28 Total 45 SOURCE: M/s. Orgo Chem (Guj.) Pvt. Ltd.

3.10.7 Quality of Life

The quality of Life is best described in relation to the public amenities avail to resident population. The villages/towns within the 10 km from the project sites shows Public amenities like presence of Anganwadi center, Self Help Group, Public/Private Transportation, Telephone/mobile, black toppled metal road, Govt. PHC/SC; Govt. Primary School; untreated tap water and regular power supply are present in almost all of villages. While other public amentias like presence of river and canal in 50% of the villages, and presence of Community Centers; existence of commercial bank, presence of agriculture credit society, Total Sanitation Campaign and Govt. vocational training center – ITI ranges from 44% to 9% to the villages in the radial distance of 10 km from the project site. In order to improve the quality of life, the deficient amenities should be improved taking development program under CSR/CER allocated funds for the current project.

3.79 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

CHAPTER 4 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES

4.1 INTRODUCTION

Any industrial activity will lead to a specific impact, either beneficial or harmful to the environment. Therefore, prediction of impacts is one of the important components in the environmental impact assessment process. Several techniques and methodologies are being used for predicting the impacts due to development activities on physico-ecological and socio- economic components of the environment.

The environmental impact identification & prediction aims to identify the degree of impacts in terms of being temporary/permanent, direct/indirect, positive/negative or short term/long term on the present environment. Such predictions are superimposed over the baseline (pre- project) status of environmental quality to develop the post-project scenario of environmental quality. The objective prediction and evaluation of impact leads to the need for a comprehensive environmental management plan for implementation during the operational phase of proposed activities for minimizing the adverse impacts on environmental quality.

In this chapter, an attempt has been made to identify the probable environmental impacts due to different types of project components involved in the proposed project by establishing cause-effect relationship through impact identification matrix. For, identification and evaluation of impacts associated with the project, related information presented in Chapter - 2 and baseline environmental information presented in Chapter - 3 have been utilized. The various activities of the proposed project and anticipated environmental attributes likely to be affected have been described in subsequent sections of this chapter.

4.2 IDENTIFICATION OF ACTIVITIES

An impact can be defined as any change in physical, chemical and biological, cultural and/or socio-economic environment that can be attributed to activities related to alternatives under study for meeting the project needs. Overall environmental impact is divided into two categories i.e. during Construction Phase and Operation Phase. The environmental impact assessment is accomplished by identification and prediction of impacts and their assessment.

4.2.1 Construction Phase

 Transportation of Construction Materials (Required for Modification of Existing Structure as per Requirement)  Storage and Handling of Construction Material, C&D Waste  Modification in Existing Civil Structure/Minor Civil Construction  Mechanical Erection  Green Belt Development

4.1

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

4.2.2 Operational Phase

 Transportation of Raw Materials and Finished Products  Handling and Storage of Raw Material and Product  Production and Utility Operations.  Green Belt Development  Solid/Hazardous Waste Generation  Effluent Treatment

The identification of environmental impacts has been made, based on the understanding of cause-condition-effect relationship between an activity and the impact component. The activities identified as sources having potential to cause impact upon above stated environmental parameters due to proposed project during the construction & operation phase are given in TABLE 4.1 and TABLE 4.2 respectively.

4.3 ENVIRONMENTAL ATTRIBUTES

Potential impacts of proposed project on various environmental attributes given below are predicted;  Air Environment - Air Quality  Water Environment - Quality - Quantity  Land Environment - Soil Characteristics and land use pattern  Noise Environment  Health & Safety  Ecology - Flora & Fauna  Socio Economic Environment - Employment Generation

4.4 IMPACT IDENTIFICATION MATRIX

The proposed project will be carried out in the plot having civil construction available on site. However, modification in the existing structure will be carried out as per requirement which leads to minimum impact during the construction phase. Impact identification matrix has been developed to establish cause-effect relationship between activities of project and environmental attributes stated in Sections 4.2 & 4.3 respectively. These VECs are considered based on natural resources and human world to attribute value for economic, social, environmental, aesthetic and ethical reasons. The same has been presented in TABLE 4.1 & TABLE 4.2.

4.2

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

TABLE 4.1 - IMPACTIDENTIFICATION MATRIX - CONSTRUCTION PHASE

Activity

Material Material Green Belt Green Existing Civil Existing Civil Construction Modification in Modification in Development Development of Construction Construction of

Environmental of Transportation Structure/Minor Civil Structure/Minor Mechanical Erection Mechanical Storage and Handling Handling Storage and Attributes Construction Materials Air √ √ √ √ √ Water X X √ X √ Land √ √ √ X X Noise √ X √ √ √ Ecology √ X √ X √ Health & Safety √ √ √ √ √ Socio Economic √ √ √ √ √ Note: (√): Possibility of Impact (X): No Impact Will Occur

TABLE 4.2 - IMPACTIDENTIFICATION MATRIX - OPERATION PHASE

Activity

Effluent Effluent

Product Greenbelt Greenbelt Treatment Treatment Material and and Material Development Environmental and Handling Production and Production and Storage of Storage Raw of Solid/Hazardous Solid/Hazardous UtilityOperation Transportation of Transportation Finished Products Finished Waste Generation Waste Attributes Raw and Materials Air √ √ √ √ √ √ Water X X √ √ √ √ Land √ √ √ √ √ √ Noise √ X √ √ X √ Ecology √ X √ √ X √ Health & Safety √ √ √ √ √ √ Socio Economic √ √ √ √ √ √ Note: (√): Possibility of Impact (X): No Impact Will Occur

4.5 APPROACH TO EVALUATION OF IMPACT THROUGH MATRIX MATHOD

For the proposed project, the impact evaluation matrix has been developed to calculate the environmental impact score, which is helpful to define the overall impact of the project and as well as focus on areas for mitigation measures. The processes involved in computing Environmental Impact Score are described below:

4.3

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

4.5.1 Environmental Severity

Severity/impact score has been assigned to all the activities for each of its environmental attributes as per criteria shown in TABLE 4.3.

TABLE 4.3 – SEVERITYCRITERIA

Score Description of Severity 0 No impact 1 Insignificant impact 2 Short term reversible impact 3 Long term reversible impact 4 Irreversible impact

4.5.2 Activity Score

After assigning score of severity (value), the total activity score has been computed by algebraically adding score of each environmental attribute for each activity for construction as well as for operation phase separately. Based on the severity criteria, matrix has been prepared assigning specific value as shown in TABLE 4.4 and TABLE 4.5 for construction and operation phase respectively. Also impacts and mitigation measures are explained in TABLE 4.6 and TABLE 4.7 for both the phases of project separately.

TABLE 4.4 - IMPACT EVALUATION MATRIX- CONSTRUCTION PHASE

Activity

Material Material Erection Materials Minor Civil MinorCivil Green Belt Green Structure / Structure Mechanical Mechanical Handling of Handling

Environmental Storage and Construction Construction Construction Construction Existing Civil Existing Civil Construction Development Development Modification of Modification of

Attributes of Transportation Air Air Quality -2 -2 -2 -1 +1 Water Quality - - -1 - -1 Quantity - - -1 - - Land Soil Characteristics -1 -1 -1 - - Noise -1 - -1 -2 +1 Ecology Flora & Fauna -2 - - - +1 Health & Safety -2 -1 -1 -2 +1 Socio Economic +2 +2 +2 +2 +1 Total Activity Score -6 -2 -5 -3 +4 Net Total -12

4.4

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

TABLE 4.5 -IMPACT EVALUATION MATRIX- OPERATIONAL PHASE

Activity

Product Product Environmental Greenbelt Development Production and Production and

Attributes Solid/Hazardous Utility Operations Operations Utility Transportation of Transportation Finished Products Products Finished Effluent Treatment Effluent Waste Generation Generation Waste Raw Materials Raw and Materials Handling & Storage & Handling Storage of Raw Material and and Raw of Material Air Air Quality -1 -1 -3 +3 -2 -1 Water Quality - - -1 - -1 -1 Quantity - - -3 -1 - -1 Land Soil Characteristics -2 -1 -2 +3 -1 -1 Noise -1 - -2 +3 - -1 Ecology Flora & Fauna -2 - -2 +3 -1 -1 Health & Safety -1 -2 -2 +1 -1 -1 Socio Economic Employment Generation +3 +3 +3 +2 +3 +3 Total Activity Score -4 -1 -12 +14 -2 -4 Total -9 Total Score (Construction + (-12) + (-9) = -21 Operational Phase)

Environment Impact -21/7 (No. of Environment Attributes) = -3 Score

TABLE 4.6 – JUSTIFICATIONOF ASSIGNED VALUES– CONSTRUCTION PHASE

Sr. Project Environmental Score Impacts No. Activities Attributes Short term impact on air quality is Air Quality -2 anticipated due to transportation of construction material. Transportation of There will be insignificant impact on Soil Characteristics -1 I Construction soil due to vehicular movement. Materials There will be insignificant impact due to noise generated from Noise -1 vehicular movement during transportation.

4.5

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

Sr. Project Environmental Score Impacts No. Activities Attributes Due to fugitive and exhaust emissions during transportation Flora & Fauna -2 there will be impact on flora and fauna. There will be short term impacts on Health & Safety -2 health of workers due to possibility of accidents. There will be employment generation on temporary basis due Socio economic +2 to transportation and material handling activities. Due to handling of construction Air Quality -2 material, short term impact on air will be envisaged. There will be some insignificant Storage & Soil Characteristics -1 impact on soil due to soil erosion Handling of during construction phase. II Construction Occupational Health Minor accidents may occur during -1 Material & Safety handling of materials. For storage & handling of construction material, there will be Socio economic +2 generation of employment from the nearby villages on short term basis. There will be short term impact due Air Quality -2 to dust emission during demolition or construction activities. Contamination of water during civil Water Quality -1 construction/modification is possible. Requirement of water will be limited Water Quantity -1 to construction purpose. Modification in Temporary construction erosion will Existing Civil Soil Characteristics -1 III have negligible effect on soil. Structure/Minor There will be insignificant impact on Civil Construction Noise -1 noise due to noise generated from construction activity. There will be short term impact to Occupational Health -1 workers during civil construction & Safety due to minor injuries or accidents. There will be temporary Socio economic +2 employment due to civil construction. Mechanical Possibilities of dust emission during IV Air Quality -1 Erection mechanical erection.

4.6

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

Sr. Project Environmental Score Impacts No. Activities Attributes Erection of machineries will Noise -2 generate noise for which is insignificant.

Injuries and minor accidents will be Occupational Health -2 envisaged which is short term & Safety impact on worker health and safety. There will be generation of Socio economic +2 employment for said activity. There will be positive insignificant Air Quality +1 impact on air due to plantation at the time of construction. Water will be required at the time of Water Quality -1 plantation. Green Belt development will help to Noise +1 reduce noise level around the plant premises. Green Belt V Green belt development within plant Development Flora & Fauna +1 premises will have positive impacts. Plantation / green belt development Occupational Health within plant will be helpful for the +1 & Safety workers available there during construction phase. There will be employment Socio economic +1 (Gardener) will be appointed for the said activity.

TABLE 4.7 – JUSTIFICATIONOF ASSIGNED VALUES – OPERATIONAL PHASES

Sr. Project Environmental Score Remarks No. Activities Attributes There will be dust emission due to transportation of trucks and Air Quality -1 vehicular movement which can cause insignificant impact. Due to vehicular movement, there Soil Characteristics -2 Transportation of will be insignificant impact on soil. I raw Material and Finished products Transportation vehicle generate Noise -1 noise during transportation which will be insignificant impact. Due to vehicular emission, there will Flora & Fauna -2 be short term reversible impact on flora & fauna.

4.7

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

Sr. Project Environmental Score Remarks No. Activities Attributes There are chances to minor injuries Occupational Health due to accidents during -1 & Safety transportation of raw material and products. There will be permanent Socio Economic +3 employment generation due to Transportation. Due to odour from raw material Air Quality -1 storage and product, insignificant impact is envisaged. There will be insignificant impact on soil due to leakage during storage Soil Characteristics -1 Handling & and handling of raw material and Storage of Raw II product. Material and Occupational Health Injuries can occur during handling of Product -1 & Safety materials or finished products. There will be a positive impact on socio economic due to employment Socio Economic +4 generation during raw material storage and handling.

There will be emission of PM, SO2, NOx from boiler, Thermopack and Air Quality -3 VOC, NH3 from process vents during operation phase. Chances of failure of ETP/MEE which Water Quality -1 may affect quality of water. Consumption of water will remain to Water Quantity -3 be continue during plant activity. Operation of plant is lead to generation of noise during Production and III production activities on continues utility operations Soil Characteristics -2 basis as well as from Boiler, Thermopack, DG set and other plant utilities. Due to Production, there is short Flora & Fauna -2 term impact on flora & fauna. Occupational Health Injuries and minor accidents are -2 & Safety possible during operation of plant. Plant operation is lead to Socio Economic +3 employment generation directly and indirectly. Air Quality +3 Green belt is absorbing air pollutants

4.8

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

Sr. Project Environmental Score Remarks No. Activities Attributes and confine the pollution within the area. It is permanent positive impact on air quality. There will be continues consumption Water quantity -1 of water for maintaining green belt.

Development of greenbelt and green

Spaces will enhance the soil Soil Characteristics +3 characteristics permanently in

positive manner.

Green belt is attenuating the noise IV Green Belt Development Noise +3 levels and has permanent positive impact. Development of greenbelt will Flora & Fauna +3 enhance the soil characteristics permanently in positive manner. Due to development of greenbelt, Occupational Health emission of pollutants is less which +1 & Safety will improve human life at plant area. For maintenance of greenbelt, there Socio Economic +2 is permanent employment. Due to odor compound in hazardous waste generated during process as Air Quality -2 well as ETP or MEE handling, there is short term impact on air quality. Solid/ hazardous waste generation is Water Quality -1 lead to degradation of water quality insignificantly. Soil contamination is envisaged Soil Characteristics -1 because due to possibility of leakage Solid / Hazardous of hazardous wastes. V Waste Generation There will be insignificant impact due Flora & Fauna -1 to hazardous waste generation. Due to odor compound, there is Occupational Health -1 insignificant impact on health of & Safety workers. Solid hazardous waste handling and disposal at CHWTSDF site will result Socio Economic +3 in generation of employment on long term period for transportation and facility operation. VIII Effluent Treatment Air Quality -1 During effluent treatment, odor is

4.9

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

Sr. Project Environmental Score Remarks No. Activities Attributes generated, which has reversible impact on air. There will be consumption of water Water Quantity -1 during operation of ETP for dosing and other purposes. There are possibilities of Water Quality -1 contamination of effluent during operation. Due to spill or leaks of effluent Soil Characteristics -1 impact on soil characteristics are insignificant. Generation of noise from pumps Noise -1 during ETP operation. There is insignificant impact on local Flora & Fauna -1 flora and fauna due to possibility of leakage. Occupational Health -1 Minor injuries to workers are possible. & Safety Operation of effluent treatment plant Socio Economic +3 will lead to employment generation on long term basis.

4.5.3 Environmental Impact Score

To evolve Environmental Impact Score - the algebraic sum of impacts due to all the activities, during construction and operation phases, on the various environmental attributes gives the net activity score. Divide the net activity score by no. of environmental attributes to get Environmental Impact Score. Potential of impacts on environment based on Environmental Impact Score is anticipated based on TABLE 4.8.

TABLE 4.8 – ENVIRONMENTAL IMPACT SCORE AND POTENTIAL OF IMPACTS

Environmental Potential of Impacts Impact Score -37.7 > X > -50.2 Overall Highly negative impacts -25.1 > X > -37.7 Overall Moderately negative impacts -12.5 > X > -25.1 Overall Slightly negative impacts 0 > X > -12.5 Overall Insignificantly negative impacts X = 0 Overall Neutral impacts 0 < X < 12.5 Overall insignificantly positive impacts 12.5 < X < 25.1 Overall Slightly positive impacts 25.1 < X < 37.7 Overall Moderately positive impacts

4.10

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

37.7 < X < 50.2 Overall Highly positive impacts Where X is Environment Impact Score

Interpretation: The total Environment Impact score is - 3 which indicates that impacts due to proposed project is Overall insignificantly negative impacts on all environmental attributes. The mitigation measures of overall impacts are described below.

4.6 MITIGATION MEASURES

4.6.1 CONSTRUCTION PHASE

Company will utilize the existing infrastructure for proposed production activity; only minor construction activities like up gradation of manufacturing area, internal roads, parking area, installation of own MEE, installation of new stack etc. will be done.

However, there will be short term negligible impacts during this phase and mitigation measures for the same are proposed as under.

I. Air

 Temporary wind barrier will be provided.  Regular water sprinkling activity will be done to avoid dust generation on working site.  Separate bins will be provided storing Garbage/wastes and will be disposed of adequately as per guidelines.  Proper traffic management to be follow during loading and unloading of construction material. Only PUC vehicle will be used for the transportation of materials and equipment.  The heights, from which materials will be dropped, will be the minimum practical height to limit fugitive dust generation.

II. Water

 The water will be sourced through GIDC and hence potential impact on groundwater resources is not envisaged as No ground water will be abstracted for construction purpose.  Proper site management will minimize the surface water runoff and soil erosion.  Good housekeeping should be practiced like handling and disposing of solid waste i.e. debris to enter from drainage column.

III. Land

 No major excavation will be carried out as project will take place in GIDC Land where there is no requirement of major construction for particular project.  Designated area with concrete flooring shall be provided to prevent contamination of soil during operation for mechanical works like cutting & welding and fabrication.  Spillage control will be carried out by disposing the affected soil at adequate place.

4.11

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

IV. Noise

 Noise impacts due to construction activities will be mainly due to construction machineries and vehicular movement. However, it will be limited to the premises and for very short period of time.  Vehicular movement carrying construction materials will be avoided during night time.  Vehicles will be regularly maintained and optimum use of the same will be made.  All vehicles entering the project site will be informed to maintain speed limits, and not blow horns unless it is required.  The noise generated from construction machinery will be kept low by keeping the moving parts serviced and properly lubricated.

V. Occupational Health & Safety

 All the activities will be carried out under the supervision and control of the management.  The Vehicles must be maintained and checked thoroughly at least once a week by the competent person authorized by the Management.  Safety equipment such as helmet, goggles, ear plug, etc., shall be provided.

4.6.2 OPERATION PHASE

I. Air

 It is proposed to use plastic cover sheet while transporting Hazardous waste/products from project site. All safety & control measures shall be provided to prevent spill, leak and accident during transportation.

 33-meter height of stack will be provided for proposed Boiler and Thermopack unit. In addition to this, 12-meter height of stack is provided for DG Set which will be operated in case of power failure only.

 For process emission of VOC and NH3, two stage ammonia scrubbers is proposed.

 Adequate PPEs will continue to provide to workers, during plant operation.

 Solvent called as Methanol and ODCB shall be recovered and reused in the process itself. Recovery with solvent management plant is proposed and mentioned in section 2.10 of chapter 2.

 From air modeling study, it has proved that the air emission from the proposed project will not be increase in significant manner which is mention in section 4.7. Assessment of incremental ground level concentration of PM2.5, PM10, SO2, NOX and NH3 is provided in this Section 4.7 using software AERMODCloud Version 18.1 (Build: 36) developed by M/S. Envitrans Consultancy Services. AERMODCloud is an integrated graphical user interface of AERMOD, ISCST3, AERMAP and AERMET.

4.12

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

 All liquid raw material handled in drum will be cool down during summer before charging so as to minimize its vapor pressure and control of odor. Adequate ventilation system will be provided.

 Sludge will be stored in designated sludge storage area and sent to TSDF site on regular basis. If this sludge required to store longer time when TSDF facility is in non- operational condition, then sludge will be covered under tarpaulin for minimization of odor generated from sludge storage.

II. Water

 The source of water will be Sachin Notified Authority (i.e. Sachin GIDC)

 Flowmeter with totalizer will be provided at the inlet and outlet of ETP for data monitoring.

 Unit has proposed ZLD for as wastewater management. Entire effluent generated from industrial activity shall be send to MEE plant followed by biological plant and RO plant. RO permeate water shall be reused within plant premises it self and RO reject water shall be again sent back to MEE plant. This way, unit will reduce the fresh water demand.

 Skilled manpower will be deployed for continuous and efficient operation of ETP.

III. Land

 There will be no change in existing land use pattern as project has no major construction.

 Any spillage of raw material, water and waste water resulting in local contamination of soil, such soil will be recovered from ground and will be sent as hazardous waste for final disposal to TSDF site.

 All possible recyclable/reusable wastes shall be reused/ recycled within the premises itself.

 Dedicated Hazardous waste storage area is provided for storage of hazardous waste at industry.

IV. Noise

 Preventive maintenance of vehicles shall be adopted to control noise generated due to vehicle movement.

 Regular monitoring of noise level will be carried out and corrective measures in concerned machinery will be adopted accordingly.

4.13

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

 Noise attenuating devices like earplugs and earmuffs will be provided to the workers exposed to high noise level area like boiler, processing area, DG Set.

 Vehicles will be regularly maintained and optimum use of the same will be made.

 For DG Set and other high noise generating equipment acoustic enclosures shall be provided.

V. Occupational Health and Safety

 All necessary implementation & actions for ensuring safe work condition will be implemented.

 Health check-up programs will be carried out regularly and all records & documents related with employee health check-up program will be maintained.

 Regular inspection for the safety procedures and use of PPEs & Safety equipment / material will be done by the management / safety cell.

 Training programs & safety audit shall be done on regular basis to prevent impacts of the operational activities on occupational health as well as to improve workplace condition & safe work system.

 Incident / accident reporting system should be followed and all the employees should be made aware of the same.

4.7 MODEL FOR INCREMENTAL GROUND LEVEL CONCENTRATION DUE TO PROPOSED PROJECT

For the modelling purpose air emission from the proposed project can be considered with parameters being PM2.5, PM10, SO2, NOX and NH3 from the stacks.

Details of predicted emission from proposed stack are given in following TABLE 4.9.

TABLE 4.9 - DETAILS OF PREDICTED EMISSION FROM STACKS

Source of Emission Stack Attached to Process Vent Attached to Sr. Operating Thermo Unit Boiler No. Parameter pack Reactor and Unit D. G. Set (STACK 03) (STACK (STACK 01) 02) 1 Stack height m 33 12 20 2 Diameter m 0.3 12 0.1

4.14

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

Flue gas 3 K 423 353 323 temperature Two Stage Ammonia Air Pollution Two Stage Ammonia Adequate Scrubber. Activated 4 Control Scrubber. Activated Carbon Stack Carbon Equipment Towers/adsorber Height Towers/adsorber Flue gas 5 m/s 9.06 - 7 velocity 6 Flow Rate Nm3/hr 1623.90 - 182.508 Emission 7 Concentration 3 PM2.5 mg/m 80* - 3 PM10 mg/m 40* 3 SO2 mg/m 80* - 3 NOX mg/m 40* - mg/ NH - - 140* 3 Nm3 Emission 8 Rate

PM2.5 g/s 0.03609 - PM 0.01804 10 - SO2 g/s 0.09446 - NOX g/s 0.03395 - NH3 g/s - - 0.00710 (* Permissible Limits for Located in Critically Polluted Area)

4.7.1 MODEL ISOPLETHS AND MAXIMUM INCREMENTAL GROUND LEVEL CONCENTRATIONS

Isopleths plots for the parameters – PM2.5, PM10, SO2 and NOX, NH3 for proposed scenario are given in Figure 4.1 (A, B, C, D, E). The maximum incremental ground level concentration (24 Hourly) for PM2.5, PM10, SO2 and NOX, NH3 due to the proposed project is given in TABLE 4.10.

4.15

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

FIGURE 4.1(A) - ISOPLETHS PLOT FOR PM2.5

3 Interpretation: Maximum incremental Ground Level Concentration for PM2.5 is 0.08 µg/m at X: 278035 m and Y: 2334129 m at 600 m distance in East direction from source of emission as shown in above Figure 4.1(A).

4.16

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

FIGURE 4.1(B) - ISOPLETHS PLOT FOR PM10

3 Interpretation: Maximum incremental Ground Level Concentration for PM10 is 0.03 µg/m at X: 278135 m and Y: 2334129 m at 700 m distance in East direction from source of emission as shown in above Figure 4.1(B).

4.17

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

FIGURE 4.1(C) - ISOPLETHS PLOT FOR SO2

Interpretation: Maximum incremental Ground Level Concentration for SO2 is 0.13 µg/ m3 at X: 278135 m and Y: 2334129 m as at 700 m distance in East direction from source of emission shown in above Figure 4.1(C).

4.18

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

FIGURE 4.1(D) - ISOPLETHS PLOT FOR NOX

3 Interpretation: Maximum incremental Ground Level Concentration for NOX is 0.05 µg/ m at X: 278135 m and Y: 2334129 m at 700 m distance in East direction from source of emission as shown in above Figure 4.1(D).

4.19

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

FIGURE 4.1(E) - ISOPLETHS PLOT FOR NH3

3 Interpretation: Maximum incremental Ground Level Concentration for NH3 is 0.06 µg/ m at X: 277635 m and Y: 2334129 m at 200 m distance in East direction from source of emission as shown in above Figure 4.1(E).

4.20

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

TABLE 4.10 - MAXIMUM INCREMENTAL GROUND LEVEL CONCENTRATION

Sr. Maximum GLC Parameters Distance and Direction No. (µg/m3)

1 PM2.5 0.08 700 m in E 2 PM10 0.03 700 m in E 3 SO2 0.13 700 m in E 4 NOX 0.05 700 m in E 5 NH3 0.06 200 m in E

4.7.2 Incremental Noise Generation Due to Proposed Project

Prediction of anticipated noise levels have been computed using point source model. A basic phenomenon of the model is the geometric attenuation of sound. Noise at a point generates spherical waves which are propagated outward from the source through the air at a speed of 1,100 ft/sec, with the first wave making an ever-increasing sphere with time. As the wave spreads the intensity of noise diminishes as the fixed amount of energy is spread over an increasing surface area of the sphere.

The assumption of the model is based on point source relationship i.e. for every doubling of the distance the noise levels are decreased by 6 dB(A). Point source propagation is defined by the following equation:

Lp2 = Lp1 – 20 log r2/r1

Where, Lp1 and Lp2 are sound pressure levels at points located at distances r1 and r2, respectively, from the source.

Predictions carried out are on as is basis without taking into consideration any attenuation factors. Additional attenuation is expected, due to atmospheric effect or its interaction with objects in the transmission path.

Noise level at the plant boundary, calculated from the above equation, is expected to be less than 65 dB(A) without considering any attenuation factors. Orgo chem (Guj.) Pvt. Ltd. has proposed Boiler (1 T/hr), Thermopack having capacity of 200 U, 1 nos. of D.G. Set having capacity of 125 KVA each, Reactors etc. Considering above details, noise level predicted at sensitive receptors around project shall be as per below Table.

TABLE 4.11 - INCREMENTAL NOISE GENERATION

Sr. Particular Value No. 1 Noise generated due to operation of Boiler 70 Noise generated due to operation D.G. Set and 2 40 other utilities Decease in Noise level due to provision of acoustic 3 50 enclosures

4.21

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

Effective Noise generation due to operation of 4 60 Boiler, D.G. Set and other utilities Receptor, Umber Kansad Eklera Bhestan Navagam Karankhat 5 Location Rajnagar Village Village Village Village Village Village (Type) Distance, 3200 2700 4100 3200 3700 6300 8600 meter Direction SSW SE SE NE NNE NNE SSW Noise at receptor 6 due to Nil Nil Nil Nil Nil Nil Nil proposed project Baseline 7 Noise Level 52.4 54.1 50.9 48.5 53.7 49.3 43.1 (Day time) Incremental Noise Level 52.4 54.1 50.9 48.5 53.7 49.3 43.1 (Day time) Baseline 8 Noise Level 36.5 33.4 31.5 35.8 39.6 42.2 38.9 (Night time) Incremental noise Level 36.5 33.4 31.5 35.8 39.6 42.2 38.9 (Night time) Note: * As per formula, LP (Total) = 10 log (10 LPQ1/10 + 10 LPQ2/10), where LPQ1 and LPQ2 are noise generated by source 1 and 2 respectively. ** Considering decrease in noise by 6 dB(A) for every doubling of distance.

From above results mentioned in TABLE 4.11, it can be predicted that, due to noise generation from proposed project activities, over all noise will remain within permissible limit at sensitive location.

Predicted Noise at Plant Boundary – 54 dB(A)

From above results mentioned in TABLE 4.11 it can be predicted that, due to noise generation from proposed project activities, over all noise will remain within permissible limit at sensitive location.

4.7.3 Transportation of Vehicles

One of the sources likely to be affecting the pollutant concentrations in project area would be vehicular emission due to transportation. It is estimated that 53 Nos. of trucks/tankers will be required for raw material transportation, 9 Nos for transportation of finished products and 17 No of trucks for hazardous waste transportation per month. Thus Total 79 Nos. of trucks will be arriving / leaving the project site in a month which accounts to 3 No. of trucks per day.

4.22

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

 Total Raw Material Consumption - 1063.08 TPM  Total Production - 170.5 TPM  Total Transportation of Haz. Waste - 334.67 TPM  Capacity of Truck - 20 T  Trucks required for Raw material - 53 nos./ Month  Trucks required for product - 9 nos. / Month  Trucks required for Haz. Waste - 17 nos. / Month  Total nos. of truck per Month - 79 nos. / Month  Total nos. of truck per day - 2.6 Truck/ Day ̴ 3 Truck / Day

4.7.4 INCREMENTAL EMISSION DUE TO PROPOSED TRANSPORTATION OF VEHICLES

Industry has given provision of sufficient storage area for chemicals and hazardous waste at premises. However, due to minimum required transportation of trucks and tankers from plant, there will be negligible incremental emission of different air pollutants in ambient air due to proposed project activities. Basis of emission generation and its mathematical modeling is shown as under:

TABLE 4.12 – DESIGN BASES OF VEHICULAR EMISSION

Vehicular Emission Inputs Sr. No. Parameters Quantity Unit 1 No. of Vehicle per day 3 2 Average speed of Vehicle 60 km/hr 3 Surface wind speed 4 m/sec

Note: *No of vehicles per day are decided based on daily chemical consumption and hazardous waste disposal quantity considering storage area is provided. *Wind speed is considered on the bases of moderate to slightly unstable meteorological conditions based on Pasquill-Stability classes (stability ‘C’ is noted for above case)

TABLE 4.13 – CALCULATION OF SOURCE STREGTH BASED ON EMISSION FACTOR

Emission Factor Emission Emission Gas q (g/m/sec) (g/km) (g/hr) (g/sec) CO 6 360 0.100000 2.08333E-07 HC 0.37 22.2 0.006167 1.28472E-08 NOX 8.63 517.8 0.143833 2.99653E-07 PM 0.42 25.2 0.007000 1.45833E-08

Note: * Emission factors (source: ARAI 2011) * Emission is calculated by formula (g/hr) = Emission Factor x Average speed of Vehicle * q – Line Source strength (g/s-m) = Vehicle/meter x Emission of particular gas

4.23

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

(Reference: Environmental Health and Hazard Risk Assessment: Principles and Calculations By Louis Theodoure, R. Ryan Dupont) Based on above table, incremental concentration of different parameters are calculated and given below:

TABLE 4.14 - INCREMENTAL EMISSION CONCENTRATION OF ‘CO’, ‘HC’, ‘NOx’, ‘PM’ DUE TO VEHICULAR TRANSPORTATION

6z (m) (For Conc of Conc of CO Conc of HC Conc of PM x (m) urban - from PG NOx (µg/m3) (µg/m3) (µg/m3) curve) (µg/m3) 100 20 0.002078 0.000128 0.002988 0.000145 200 40 0.001039 0.000064 0.001494 0.000073 500 100 0.000416 0.000026 0.000598 0.000029 1000 200 0.000208 0.000013 0.000299 0.000015 2000 400 0.000104 0.000006 0.000149 0.000007 3000 600 0.000069 0.000004 0.000100 0.000005 4000 800 0.000052 0.000003 0.000075 0.000004 5000 1000 0.000042 0.000003 0.000060 0.000003 6000 1020 0.000041 0.000003 0.000059 0.000003 7000 1050 0.000040 0.000002 0.000057 0.000003 8000 1070 0.000039 0.000002 0.000056 0.000003 9000 1090 0.000038 0.000002 0.000055 0.000003 10000 2000 0.000021 0.000001 0.000030 0.000001

Note: * X (m) - Downwind Distance from center line of source * 6z (m) – Vertical Dispersion Parameter which is calculated based on Pasquill-Gifford curves * Concentration of pollutant (g/m3) - 2q*[exp{-1/2(H2/6z)}]/[√2ᴫ(6z*u)] * H (m) – Height of source (Reference: Environmental Health and Hazard Risk Assessment: Principles and Calculations By Louis Theodoure, R. Ryan Dupont)

4.24

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

FIGURE 4.2 - INCREMENTAL EMISSION CONCENTRATION DUE TO PROPOSED VEHICULAR TRANSPORTATION (VEHICLE AT POINT A)

FIGURE 4.3 - INCREMENTAL EMISSION CONCENTRATION DUE TO PROPOSED VEHICULAR TRANSPORTATION (VEHICLE AT POINT B)

AboveMaximum FIGURE Incremental 4.3 and FIGURE 4.4 indicates different vehicular positions pointWind ADirection and PointGLC B @on 10000 road m from map of vehicular transportation and impact within study area whenSW towind NE direction source:is from SW to NE. it indicates that vehicular proposed vehicular movement from CO: 0.000021 µg/m3 point A to Point B (within 10 km study area). The incremental concentration of pollutantsMaximum Incremental is GLC negligible.HC: 0.000001 µg/m3 NOx: 0.000030 µg/m3 @ 5000 m from source: CO: 0.000042 µg/m3 PM: 0.000001 µg/m3 HC: 0.000003 µg/m3 Interpretation: NOx: 0.000060 µg/m3 PM: 0.000003 µg/m3 It can be observed that the maximum incremental concentration due to proposed traffic load Vehicle at will be 0.009695 μg/m3 for CO, 0.000598 μg/m3 for HC, 0.013945 μg/m3 for NOx and 0.000679 Point B μg/m3 for PM at 100-meter downwind distance from center line source (As shown in TABLE 4.14) and concentration gets decreasing further upto 10 km distance from center line source. Based on NAAQ standards it is assessed that the impact on the present ambient air quality will be negligible due to proposed traffic load in 10 km study area.

4.25

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

4.8 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEAUSRES OF HYDROLOGY AND GEOLOGY

The impacts felt during the field surveys, consultation of available literature, and discussion with farmers, public and officials are as follows. The mitigation measures are given thereby.

1. Rainfall: The study area receives an average annual rainfall of about 1211 mm. Study of rainfall records indicate that more than 90 % of total annual rainfall is within four months between June and September (FIGURE 3.8 and 3.9 in Chapter 3). Most of this rainfall flows as surface runoff following the general gradient of the terrain which is from East to West. Suitable peripheral garland drains are suggested around the COP of GIDC area so as to check and control the excess surface runoff water into the COP during monsoon season. Excess rainfall or runoff water collected into the garland drains should be discharged into the nearby streams in the downward reaches.

2. Water Utilization: There are adequate ground water resources in the area, in addition to the presence of potential river water systems. There is no tank or pond or canal irrigation in the 10 km radius area. The Ground Water Estimation Committee (GEC) has categorized the Choryasi Taluka as ‘safe’ with the stage of ground water utilization of 77.72 %, indicating scope for further ground water development, as well to meet the drinking, irrigation and industrial requirements (CGWB, 2013).

3. Water Quality: Ground Water quality in the surveyed area is generally potable with instances of brackish to saline water occurrences. The Arabian Sea coast is about 27 km west of the site. The deeper aquifers in some alluvial tracts of the district were reported to be saline. The excessive withdrawal water from tube wells in the area may result in saline water intrusion which may deteriorate the ground water quality. Hence caution should be undertaken by avoiding heavy pumping from tube wells.

4.9 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEAUSRES OF LAND ENVIRONMENT

As described in earlier section, additional land is not required for the proposed project. Also, proposed project does not require any additional major building & infrastructure. Hence, issues related with land has not been cited to be major except the issues of potential pollution & contamination likely to be arise due to spill/leak of hazardous chemicals & waste which are described below along with necessary mitigation measures.

4.9.1 Anticipated Impacts

The proposed plant in Industrial area consist of Built-up area, minor greenery, BT/CC roads area, Parking area and Open / lawn area etc., which is under possession of project proponent. Hence, there are no Resettlement & Rehabilitation issues involved in the proposed project as it is industrial area.

No land cutting or filling activity is involved during construction / operation of the plant as the site is mostly plain land and hence the land degradation is not envisaged.

4.26

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

The materials of the project are likely to be transported in truck/tanker or drums through national highway, which may have considerable impacts on environment of the area falling in the route of the transportation. During the incidence of major accident, the hazardous materials being transported can have serious impacts on land where on it spilled or leaked.

Hence, it is suggested that the transportations of such materials shall be done with utmost care as per the statutory requirements through the approved vehicles only. Also it is to ensure that all vehicles are following the HAZMAT guidelines for specific chemicals and possesses all necessary safety gears and safety documents & manual.

4.9.2 Mitigation Measures

Following mitigation measures are suggested.  All possible recyclable/reusable wastes shall be reused/ recycled within the premises itself.  Hazardous waste management to be followed as per statutory guidelines & requirements.  All transportation shall be done in closed truck/tanker approved as per statutory requirement to prevent volatile emissions as well as leak/spill during transportation.  HAZMAT guidelines shall be followed for transport of all hazardous materials. All required safety & emergency equipment & materials including safety & emergency management guidelines shall be provided on the transport vehicles.  Monitoring of soil samples shall be done as per Environmental monitoring plan.

4.10 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEAUSRES OF ECOLOGY AND BIODIVERSITY

The proposed project shall be located in GIDC area & since there is existing structure available on site, it does not involve any sort of habitat loss. Also the proposed project does not envisage any liquid or solid (effluent/hazardous waste) discharge/disposal on the ground or in the water bodies within the study area since it will be operated as zero liquid discharge & hazardous waste to be disposed at TSDF, also any species of conservation concern is not present within the study area & moreover & the project plot being located well within precincts of GIDC area no adverse impacts are anticipated on the biotic environment.

LIST OF POSSIBLE IMPACTS AND THEIR MITIGATION MEASURES

Sr Project activity Impact Mitigation measures no Here the proponent has The untreated effluent if efficient treatment system discharged into the natural for wastewater. Unit has water bodies, it will result in proposed ZLD system as 1 Effluent discharge. detrimental effect on not only wastewater management. the aquatic ecosystem but There shall be no also the associated terrestrial discharge of water outside flora and fauna the plant premises. Any propose Air and noise pollution are Necessary APCD’s and 2 construction/demolition going to be pertinent. During acoustics measures to be

4.27

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

Sr Project activity Impact Mitigation measures no shall bring in some construction phase, installed by the project construction activity in anthropogenic activity and proponent. plant premises. noise generated by different During the construction, machinery may lead to the fencing barricading temporary shifting of should be created which sensitive species prevents the dust spread and sound created by machinery, vehicles etc. Depending upon its nature Movement of can result in air pollution it is transportation vehicles volatile. should be done in daytime Accidental spill in water only and avoided in the bodies can result in water nighttime to ensure least pollution and spill over on disturbance. Hazardous Raw land can cause soil pollution. 3 material transportation Solvents transfer from storage tank to Day tank Check for mechanical might lead to Leakage & seals. Pump auto cut off Spillage due to Line rupture. with day tank high level to This might cause soil and air be provided. pollution thereby affecting the residing flora and fauna. Haul roads will be sprinkled with water which would reduce the dust emission, thus avoiding damage to the crops. It is proposed to Fugitive emissions will form a include Azadirachta indica, layer in leaves thus reducing Ficus religosa, Pongamia the gaseous exchange glabra and Ficus racemosa 4 Fugitive emissions process. This ultimately in the plantation program affects the growth of plants as they serve as sinks for and crop yield. gaseous emissions. . Annual biomonitoring of roadside plants exposed to vehicular pollution will be done to check the dust load and Air Pollution Tolerance Index (APTI). The noise from Use of exhaust silencers transportation activity will and optimized acoustical Transportation of hinder the same. Chances of pipe lagging (acoustical 5 materials vehicle collisions with animal wrapping) to minimize attempting to crossroads are compressor noise. If any possible animal is noticed crossing

4.28

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

Sr Project activity Impact Mitigation measures no the area, they will not be disturbed at all. Since, there is no wildlife sanctuary, reserved forest within the study area wild animals’ movement is not envisaged. Green belt and community forestry will be encouraged to mitigate the noise level. Plantation will be carried out on approach roads and nearby vicinity. The process involved and the end product/s also pose the same risk over the 6 Process End products environment as mentioned for raw material and ultimately affect the biota either directly or indirectly. Development of the green belt is the prime requirement with proper selection of the plant species that are having a The emissions generated can high Air Pollution settle down on the Tolerance Index and in surrounding flora leading to Process by-products addition to that also help in 5 their deterioration and like air emissions minimizing noise pollution. affecting the dependent The green belt not only fauna therein. overcomes the problem

but also enhances the aesthetic value of the landscape and restores the ecosystem to a great extent

Today we are facing challenging problems like habitat loss, habitat fragmentation, species loss, increasing pressure of alien and invasive species, desertification etc. All these factors contribute significantly to the loss of biodiversity at local, regional or national level. Thus, considering these factors, following mitigation measures are recommended:

1. Development of the green belt is the prime requirement with proper selection of the plant species that are having a high Air Pollution Tolerance Index and in addition to that also help in minimizing noise pollution. The green belt not only overcomes the

4.29

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

problem but also enhances the aesthetic value of the landscape and restores the ecosystem to a great extent.

2. Selection of proper plant species is necessary for developing the greenbelt, as care needs to be taken that the selected floral species are of evergreen type so that no leaf litter occurs during the dry season and chances of fire are prevented. Also, utmost care needs to be taken for monitoring and maintaining the greenbelt.

3. It has been reported that gaseous pollutants are absorbed by the leaves, while the particulate forms are absorbed through the outer surface of the plants having thick canopy. (Prajapati & Tripathi, 2008). Plant species particularly trees and shrubs are important sinks for trapping and absorbing many gases, particulates, aerosols and airborne pollutants (Gajghate and Hassan 1999). To reduce the impact of gaseous pollutants in the surrounding area thick plantation is proposed in the company premises and open areas outside the plant boundary. During construction and operation phase proper green belt should be developed. To minimize air pollution, due to gaseous pollutants, vehicular pollution & dust to attract different faunal groups and maintain the biodiversity.

4. In between agriculture fields and human habitation, a strips of 5 m width of Miyawaki method of afforestation / planting trees should be developed by GIDC, which will create a barrier between buffer zone and Industrial area. This will also reduce noise and pollution levels from different sources considerably. Secondly similar type of plantation is suggested in between GIDC area and Human settlement.

5. Ornamental plant varieties should also be encouraged as these will not only enhance the aesthetic value of the location but shall also attract butterflies and other insects and some birds which in turn add on to the biodiversity of the area

Impact Assessment

Nevertheless, the impacts associated with any kind of proposed activity on the environment cannot be completely nullified however the severity of such impacts can be minimized to a great extent by advocating suitable mitigation measures.

Proposed project shall not decrease any vegetation or displace any fauna. The unit shall continue to take safeguard measures for existing vegetation around project site. Air pollution control devices shall be installed for the process, boiler and DG emissions. Fugitive emissions shall be channeled to wet scrubber. Raw material and Finished products shall be transported in closed trucks. There will be no discharge of wastewater on any existing water body or land. Thus, should be no impact of proposed project on flora and fauna.

4.11 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEAUSRES OF SOCIO ECONOMIC

As described in earlier sections & chapters, the project does not require any additional land & major construction work. Impacts on socio-economic environment due to proposed project

4.30

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures are envisaged due to direct & indirect employment only which will be beneficial. The details of environmental impacts of the proposed project are described below.

4.11.1 Anticipated Impacts

As mentioned above, impacts on socio-economic environment may occur mainly due to pollution of environment, competing use of water resources, hazardous material handling & storage, hazards associated with proposed project, noise generation, traffic & load on other public amenities.

The site is adjacent to the national highway and considerably away from the locality. Further, the water requirement will be met through the Sachin Notified Area. To control noise level, necessary mitigation like acoustic enclosures, housing of noise generating machineries in closed area/room, proper maintenance & lubrication has been proposed by the proponent. Besides, the transportation will be managed with special transport vehicles having high carrying capacity to reduce the frequency of vehicle on road. Hence, the traffic will not cause any major impact on road networks.

Further, impacts on the socio-economic environment may occur due to hazards associated with the hazardous chemicals and operations of the proposed project. Improper storage and handling facilities of raw-materials, products and fuels may result in spillages, contamination or accidents and ultimately damage to the total environment including human health. To prevent & minimize the chances of such impacts of hazardous chemical & operation, the designs of storage area & tanks have been provided as per the regulatory provisions applicable for particular material. Similar proper arrangement for storage & handling of material have made available within the plant for proposed project.

Further, direct & indirect employment of skilled and unskilled person for operation of the plant has result in slight beneficial impacts on socio-economic environment. Besides, the indirect employment will also have beneficial impacts on socio-economic environment. Mainly, the increased transportation activities have result in considerable indirect employment as well as opportunity of trade & services. Thus, with the adoption of policy of local employment, a marginal long-term positive impact is foreseen on the economic environment. It is also noteworthy that the beneficial long-term impacts have been occur due to the CSR activities conducted by the proponent. Thus after reviewing all above details it is envisaged that the proposed project would not have any considerable adverse impacts on the socio-economic environment.

4.31

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

4.11.2 Mitigation Measures

Considering the above-mentioned impacts on Socio-Economic environment following mitigation measures are planned & suggested.  All mitigation measures shall be implemented for control of air pollution, water pollution, land pollution and noise pollution.  Employment after proposed project shall be done with priority to the local people and at least 35 % employment shall be done from local areas.  Hazards associated with the proposed project shall be managed/control by implementation of safe work procedures, risk/hazard control /prevention measures and provision of PPEs for all employees etc.  The company shall conduct social activities as part of its CSR Program and activities shall be planned by the proponent to enhance the social condition mainly for education & health improvement in the project area.

Summary of impacts and mitigation measures for all parameter is tabulated as under in TABLE 4.15.

4.32

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

TABLE 4.15 - SUMMARY OF THE IMPACT & SUGGESTED MITIGATION MEASURES FOR ALL PARAMETER

Sr. Project Suggested Mitigation Identified Impact No. Aspects/Activities Measures  Considering the failure scenarios such as tripping of scrubber circulation motor, Process gas emissions variation in pH value and envisaged are NH from level of scrubbing media, Polluted gas(air) 3 manufacturing processes. alarm system shall be 1 due to failure of Scrubbing system is provided to indicate above process proposed to control emission failure scenarios so that of these gases. immediately control measures shall be taken such as closing of manufacturing process.  Some noise is anticipated through heavy vehicular  Necessary mitigation like movement while bringing acoustic enclosures, housing the material to/from the of noise generating project site. Noise due Vehicle machineries in closed  Noise from DG set will be 2 movement & area/room, proper generated only during power Machinery maintenance & lubrication failure. should be done to control  During manufacturing noise level. process, there will be

generation of noise from plant machineries and boiler. Partial Impact:  The major impacts in term  Safety measures & action of adverse health effects on plan for prevention of fauna and enrichment of spreading of materials being toxic content in flora due to transported shall be the Hazardous waste provided in transport management may occur in vehicles to ensure safety & case of mishap in operation On Ecological protection of ecological 3 of transportation & disposal Settings factors during major hazardous/solid waste accident. (Use of Dyke resulting in contamination of bond) soil & air of the mishap or

disposal area. The eventual  Industry has decided to effects of this may vary develop greenbelt area of at depending on the toxic local least 804 Sq meter. of the waste being transported or disposed.

4.33

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

Sr. Project Suggested Mitigation Identified Impact No. Aspects/Activities Measures  Temporary employment generated during  Impact of the project construction and during operation phase will commissioning of proposed be positive, as it will project will have slight upgrade the socio- beneficial impacts on economic status of local economic environment. inhabitants by providing  The company should frame Employment employment opportunities the policy that all 4 Generation & from nearby villages. recruitments of non- Safety  It is projected that technical (Temporary/ proposed project would Permanent) should be generate direct made from the surrounding employments. There is a villages. potential to employ about  All aspects of occupational 45 Local People. health must be implemented as identified in chapter 7.  Improper storage/ disposal  It is advice able to have of construction wastes such proper covered storage as construction rubble, facility for both raw material scrap materials, discarded as well as for finished topsoil etc. may impact soil product and proposed to quality. register under ISO 14001;  Spillages of and BS OHSAS 18001 for oils/fuels/chemicals and such process. other material in the  Construction solid waste construction area, vehicle should be collected, parking, equipments in segregated, stored and operation areas, disposed as per the Handling of raw maintenance areas and ‘Construction & Demolition 5 material and storage areas may also Waste Management Rules, finished products contaminate the soil. 2016’.  Use, storage, transport,  The wastes such as oil, handling or production of diesel containers or etc. substances or materials, should be disposed as per which could be harmful to the Hazardous & Other human health or the Wastes (Management and environment or raise Trans boundary Movement) concerns about actual or Rules, 2016. perceived risks to human  It is recommended that health. Spillage will be avoided  The material handling through proposed handling including storage and and providing training transportation may

4.34

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 4 Anticipated Environmental Impacts and Date 17/03/2020 Mitigation Measures

Sr. Project Suggested Mitigation Identified Impact No. Aspects/Activities Measures contribute to fugitive emission.

 A regular monitoring of the occupational Health and Safety is proposed as per the requirement of factory act that will reduce the chances of accidents. This information will be reviewed  Some health and safety and evaluated to improve hazards are anticipated to the effectiveness of affect the persons Human Health & Environmental Health and employed in the project as 6 Safety Hazards Safety program. regards dust particles;  Proponent should prepare a offensive odors; different contingency plan listing type of waste materials, procedure to be executed accidents etc. immediately whenever there is fire, explosion or unexpected release of hazardous waste during the active period as well as during the closure and post- closure periods.

4.35

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 5 Analysis of Alternatives Date 17/03/2020

CHAPTER 5 ANALYSIS OF ALTERNATIVES

5.1 SITE ALTERNATIVES

M/s. Orgo Chem (Guj.) Pvt. Ltd. proposes to set up a new manufacturing unit of dye intermediate and specialty chemical products at Plot no. 719, Road no. 7, Sachin GIDC, Surat, Gujarat. Orgo Chem (Guj) Pvt. Ltd. has considered proposed site for their manufacturing facility in Sachin GIDC considering following criteria:

 The main reason behind selection of this site is availability of existing construction facility in the well-established in Sachin GIDC.  Availability of all basic facilities like infrastructure, communication, medical facilities, fuel, water, power, unskilled & skilled manpower, raw materials, road network etc.  Availability of common effluent treatment plant in the estate.  Availability of Fire station, Police station, Hospital and other life supportive facilities  GIDC is surrounded by many small villages hence worker availability will be ease.  Site is very well connected to SH-168 and NH-6.  In addition to this, Company has purchased a land with existing construction available within plot and they have proposed to modify the same as per requirement. This can reduce the construction cost for the proposed project.

5.2 ANALYSIS OF ALTERNATIVE TECHNOLOGIES

The manufacturing unit will accept and adopt technology and new invention provided by their own R & D centre.

Company’s Process will be based on Below Four Things:

1. Innovative 2. Environment-Friendly 3. Safe 4. Cost-Effective

R & D Focus:

Research is a critical area for Orgo Chem (Guj.) Pvt. Ltd., because it is the foundation upon which company’s strategy of multiple markets, new products and delivering quality products to customers stands. Orgo Chem (Guj.) Pvt. Ltd. is a technology driven company and apart from developing the new technologies, the R&D efforts are also aimed at continuously upgrading the manufacturing techniques at their existing unit located at Plot No. 256, Sachin GIDC, Surat, Gujarat to improve the process, yield and quality. Here company has experienced that the technology is updating every single minute as the deceases are changing their shapes and sizes every minute.

5.1

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 5 Analysis of Alternatives Date 17/03/2020

R & D Activities:

Company’s R&D activities can be categorized into:

 Process improvement  Pilot studies of new and upgraded molecules for clients  Process optimization and improvement  Research for in-house applications (Production of Dyes Intermediates)  And to find and develop such processes which will yield minimum wastage so far as water  and other raw material is concerned.

The R & D activities result into substantial cost reduction of the chemistry in question and allow easy scale-up. The research teams are further supported by our exhaustive library, made up of text books, journals, encyclopaedias. These learned scientists work on synthetic routes, physico-chemical characteristics, MSDSs, analytical techniques and also take pain to find out the processes which can generate minimum waste.

Reducing Cycle Time and Batch Times

Orgo Chem (Guj.) Pvt. Ltd. will adopt such system that it reduces its production time and batch cycle time from time to time. This helps the company to save input like power and meet customer requirements in time. Batch optimization is every day exercise. The material which becomes waste is reused and recycled by the Company. Solvents and other raw material are used to such an extent that the final waste which remains at the end is totally defunct and harmless.

Reducing Resources Used in the Process

Continuous improvement is an essential element in a modern quality system and it aims at improving efficiency by optimizing a process and eliminating wasted efforts in production. In the proposed system continuous improvement is difficult, but not impossible. Reducing variability provides a "win-win" opportunity from both public health and industry perspectives, therefore, continuous improvement needs to be facilitated for which Orgo Chem (Guj.) Pvt. Ltd. will all the times on its heel. Orgo Chem (Guj.) Pvt. Ltd. is also focusing on resource and environment management through its system and improvement programs and objectives.

Unit proposes to manufacture Dyes Intermediates (Synthetic Organic Chemicals) and manufacturing process involves some chemical reactions like Condensation, Filtration, Isolation, Reduction etc. For the proposed products, unit will adopt latest and best technology with automated machinery over manual machineries available so far in the market to achieve maximum yield with minimum pollution generation and fugitive emission.

Moreover, the company is very concerns and conscious about the product quality and equally about the environmental protection and resource conservation; and hence they will put their efforts for replacing/ upgrading their plant and machineries from time to time with the best available technology in future.

5.2

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 5 Analysis of Alternatives Date 17/03/2020

TABLE 5.1 – ANALYSIS OF ALTERNATIVE TECHNOLOGIES WITH RESPECT TO ENVIRONMENT / WASTE MANAGEMENT

Particulars Proposed Technology Remarks Process  The company will use the Best Available  Product manufacturing Technology Process Technology (BAT) for the process will implement the production. This section includes the principles of Sustainable manufacturing process of the product, development which chemical reactions and mass balance of emphasizes to minimize each product. water consumption, air  The product will be manufactured by unit emissions; and maximum will be based on maximum R&D studies amount of water to be and the technology which is establish recycle to reduce waste since a long time which also increases water generation. the reaction efficiency up to optimum level. However, most of the products which are proposed are tailor made products based on literature review and set in R&D. However, alternative technology will be explore which can reduce pollution and increase yield. Water Supply  Total fresh water consumption will be  Unit will use GIDC Water only 45 KL/Day. therefore no Ground water  Water will be supplied by Sachin Notified table will be used by unit. Area Authority (Sachin GIDC) for proposed new project. Wastewater  Domestic effluent will be discharged into  Unit will try to recover and Disposal septic tank/soak pit system. recycle maximum amount  Unit has proposed Zero Liquid Discharge of water. for the proposed project. Entire industrial effluent shall be treated into inhouse MEE plant. There shall be no discharge of effluent outside the plant premises. Fuel  Unit has proposed to use natural gas as a  Unit has proposed to use Requirement / fuel for Boiler and Themopack. LDO shall natural gas as a fuel for and Air be used for D.G. Set only, which shall be boiler and Thermopack. Emissions operated during emergency power Control cut-off only.  Unit has proposed to install two stage ammonia scrubbers for emission control 5.3

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 5 Analysis of Alternatives Date 17/03/2020

of VOC and NH3. Hazardous  The hazardous wastes generated from  All type of wastes to be Waste Disposal the units are mainly; ETP sludge, used properly segregated, oil, discarded drum /containers/ carboys collected & stored in a etc. separate/ designated  These wastes will be properly collected storage area and safely and stored in a separated/designated transported to GPCB storage area and safely disposed to authorized agencies(s) for approve TSDF/ CHWMF/ authorized its final disposal. recycler.  Unit have / will obtain the membership/NOC for TSDF/CHWIF site to accommodate additional hazardous prior to Consent to Operate.

5.3 ALTERNATIVE OF OTHER PARAMETERS

TABLE 5.2 – ALTERNATIVE OF PARAMETERS

Sr. Alternative Alternative Particular Remarks No. Option 1 Option 2 Local employment will be preferred. Benefits:  Provides employment to Local Outsource 1. Employment local people along with employment employment financial benefits  No residential building/housing is required. Local labours will be deployed so that they can either reach to plant by Labour Private bicycle or by foot. 2. Public transport transportation transport Benefits:  Cost of transportation of employees will be negligible. Material will be transported through trucks on the Raw Material Private contract basis on most of 3. and product Private transport transport the cases. transportation Benefits:  It will give indirect

5.4

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 5 Analysis of Alternatives Date 17/03/2020

Sr. Alternative Alternative Particular Remarks No. Option 1 Option 2 employment. Water supply from Sachin Notified Area Authority will be preferred. Benefits:  No change in the The water surface water or ground requirement of water quality. Water the unit will be 4. Bore well  No ground water will be Requirement met from extracted. Sachin Notified  Unit has proposed ZLD Area Authority. treatment for proposed project. So, there shall be no discharge of effluent outside the plant premises. Project is in Notified 5. Road Metallic Road Metallic Road Industrial Area (GIDC). The road is well furnished.

5.5

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 6 Environmental Monitoring Program Date 17/03/2020

CHAPTER 6 ENVIRONMENTAL MONITORING PROGRAM

6.1 ENVIRONMENTAL MONITORING PROGRAM AND SURVEILLANCE SYSTEM

Based on the baseline data collected on various environmental parameters in the study area and the prediction and assessment of impacts due to the proposed project, a comprehensive Environmental Monitoring Program is required to be developed, to satisfy the various statutory requirements for discharges and emissions and also to identify the trend of various environmental parameters.

Environmental monitoring program covers various areas like –

 Ambient air quality  Water quantity and quality  Effluent quality  Noise  Soil characteristics  Ecology, etc.

Objectives of the Environmental Monitoring Program are given hereunder:

1. To confirm the statutory compliance, 2. To establish a database for future impact assessment studies, 3. Assessment of the changes in environmental conditions, if any, during the operational phase of the project, 4. Monitoring and tracking the effectiveness of the mitigation measures which have been implemented, 5. Identification of any significant adverse transformation in environmental condition and plan any additional mitigation measures.

Moreover, the EIA study for any project is carried out over a short period of time and the data generated and analyzed is usually needs to cross verify to predict all variations induced by natural or human activities over a period of time. Hence, regular monitoring program is essential to take into account the changes in the environmental quality.

6.2 POST PROJECT ENVIRONMENTAL MONITORING PROGRAM

Details of Environmental Monitoring Program is provided as under in TABLE 6.1.

6.1

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 6 Environmental Monitoring Program Date 17/03/2020

TABLE 6.1 - ENVIRONMENTAL MONITORING PARAMETERS & FREQUENCY & MONITORING POINTS/LOCATIONS & COMPONENTS

Sr. Frequency & Monitoring Item Parameters No. Responsible Party Points/Locations

Monthly ‐ External MoEF & CC Ambient air quality at villages recognized Lab at within 10 km radius of Project site on project site. upward and PM , PM , SO , Ambient air quality at Ambient Air 2.5 10 2 downward wind 1. NO , CO, VOC, minimum 1 location in quality X direction. NH , HC downwind direction 3 Quarterly - External preferably at between 500 MoEF & CC meter & 1 km distance from recognized Lab at 5 plant boundary. stations in 10 km radius of project site.

Stationary All Stacks including stacks of PM, SO , NO , Monthly by External 2. Emission from 2 X Thermopack, Boiler, D.G. NH and VOC Lab Stack 3 Sets and process vent.

Groundwater from nearby villages within 5 km. Twice in a year In case of accidental 3. Ground Water As per IS 10500 (except monsoon) spillage/leak, groundwater (2 location) samples from the area likely to be affected.

pH, EC, Turbidity, TDS, Calcium, Magnesium, Total Effluent being sent to Hardness, Total Monthly (preferably common facilities. Alkalinity, DO, two times)- External 4. Wastewater COD, BOD MoEF & CC In case of inhouse Chlorides, recognized lab treatment; raw effluent and Sulphates, treated effluent at final Phosphate, outlet. Ammonia, Nitrite, Nitrate

6.2

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 6 Environmental Monitoring Program Date 17/03/2020

Sr. Frequency & Monitoring Item Parameters No. Responsible Party Points/Locations At all sources (D.G. Set, Boiler, Thermopack, Production Utilities/machineries, Pumps, Equivalent Noise Monthly- External Compressors etc.) and at Level - dB (A) (At 5. Noise MoEF & CC different areas (Production least 1 hr. recognized lab area, Storage area, continuous) transportation area, Administrative area, security area, utility house, ETP) within premises.

At Two locations within premises i.e. from storage & pH, EC, Moisture, greenbelt area. Organic matter, Quarterly by External

6. Soil N, P, K, SO -2, Lab. 4 In case of accidental Cl-, Ca+2, Mg+2 spillage/leak, soil of the & Na+ affected area from various spots & depth

Hazardous General Quarterly by External ETP (Neutralized) Sludge 7. Waste Parameters Lab. Area and MEE Salt

Number of plantation (Units), Throughout Year at Number of regular interval: In Greenbelt Area at Boundary 8. Greenbelt Survived House by EHS & Garden Plants/Trees, Executive & other Number of Poor EMC members Plant/Trees

Yearly through Employee As per statutory Approved Medical Every employee and workers 9. Medical/Health provision & Officer & Doctor as of the plant Check-up requirement per OHS Plan

6.3

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 6 Environmental Monitoring Program Date 17/03/2020

6.2.1 Reporting Schedule and Documentation

Records of the monitoring program shall be kept on regular basis for all aspects of the monitoring. Separate records for water, wastewater, solid waste, air, emission, soil & manure shall be prepared and preserved regularly.

Immediately upon the completion of monitoring as per the planned schedule, report shall be done & necessary documents shall be forwarded to the concern person. Methodology of monitoring (sampling & analysis) shall be prepared as separate documents as SOP (Standard Operating Procedure) wherever required.

Environmental statements &/or performance report/compliance report/audit report as per conditions of EC and CC&A shall be prepared and submitted to the concern authority as per the guidelines provided by the authorities within the stipulated timeframe. CC&A and other statutory permission/consents must be obtained & renewed timely as per legal provision & guidelines.

Similarly, all necessary report & forms shall be prepared and submitted to the concern authority as per the statutory requirement of Environmental Acts/rules, Factory Act & MSIHC rules. Reporting of accident & other requirements shall be made in prescribed format well within stipulated time frame as per statutory requirements & guidelines.

6.4

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 6 Environmental Monitoring Program Date 17/03/2020

6.2.2 Budgetary Provisions

The budget shall include provisions for:

 Environmental Monitoring Program: Detailed break up cost is provided as mentioned in TABLE 6.2.  Greenbelt development: Company has allocated ₹15,00,000 for 5 Years for Green belt development

TABLE 6.2 - DETAIL BREAK UP OF BUDGET FOR ENVIRONMENTAL MONITORING PLAN

Budget per Quantity per Total Budget Sr. No. Environmental Components Frequency Environmental year (Rs.) Components 1 Ambient Air Monitoring 2 locations Monthly 2x12=24 44 ₹ 5500 ₹ 2,42,000 5 locations Quarterly 5x4=20 2 Stack Gas Monitoring Flue gas emission 3 stacks Monthly 3x12=36 36 ₹ 3000 ₹ 1,08,000 (PM, SO2, NOx) Process Gas Emission 1 parameter Monthly 1x12=12 12 ₹ 1000 ₹ 12,000 (NH3) 3 Wastewater Analysis 2 times Monthly 2x12=24 24 ₹ 4000 ₹ 96,000 4 Haz. Waste Sample 1 Sample Quarterly 1x4=4 4 ₹ 1100 ₹ 4,400 5 Soil Sample 2 Locations Quarterly 2x4=8 8 ₹ 4500 ₹ 36,000 6 Ground Water Sample 2 Locations twice in a year 2x2=4 4 ₹ 4000 ₹ 16,000 7 Noise monitoring 5 Locations Monthly 5x12=60 60 ₹ 150 ₹ 9,000 8 Health Monitoring Yearly Check-up 45x1=45 45 ₹ 500 ₹ 22,500 Total ₹ 5,45,900

6.5

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020 CHAPTER 7 ADDITIONAL STUDIES

In order to support the Environment Impact Assessment and Environment Management Plan, following additional studies have been included in this report.

 Risk Assessment  On-Site / Off-Site Emergency Plan  Occupational Health Programme

7.1 INTRODUCTION TO RISK ASSESSMENT

M/s. Orgochem (Guj) Pvt. Ltd., Sachin will handles chemicals, some of which are hazardous in nature by virtue of their intrinsic chemical properties or their operating temperatures or pressures or a combination of them. Fire, toxic release or combinations of them are the hazards associated with industrial plants using hazardous chemicals. More comprehensive, systematic and sophisticated methods of Safety Engineering, such as, Hazard Analysis and Qualitative/Quantitative Risk Assessment have been developed to improve upon the integrity, reliability and safety of industrial plants, the same has been discussed in detail under their respective headings.

7.1.1 Objectives of Risk Assessment

Risk analysis follows an extensive hazard analysis. It involves the identification and assessment of risks the neighbouring populations are exposed to as a result of hazards present. This requires a thorough knowledge of failure probability, credible accident scenario, vulnerability of population etc. Much of this information is difficult to get or generate. Consequently, the risk analysis is often confined to maximum credible accident studies.

Risk assessment is carried out for the following objectives:

1. To identify hazard and risk resulting from the hazards 2. To study and foresee the effects of such risks on the workers, public, property and environment and to find out necessary control measures to prevent or minimize risk. 3. To comply the legal requirement by various safety and environment laws of the country like…

 The Factories Act, 1948 / The Gujarat Factories Act, 1963  The Environment Protection Act and Rules, 1986  Hazardous waste (Management & Handling) Rules, 1989  Public Liability Insurance Act & Rules,1991  Chemical Accident, (Emergency, planning, preparedness and response) Rules, 1996. 4. To get the necessary information for Emergency planning and evacuation.

7.1 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

7.1.2 Plant Layout

FIGURE 7.1 - PLOT PLAN OF M/S. ORGOCHEM (GUJ) PVT. LTD., SACHIN

7.2 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

TABLE 7.1 (A) - STORAGE DETAILS OF RAW MATERIALS

NAME OF SR. POSSIBLE TYPE THE RAW CAPACITY MODE OF STORAGE STATE Proposed Control Measures No. OF HAZARDS MATERIALS  Proper storage area and dyke is provided.  PPEs like Splash goggles, Full suit, Vapor 1. Methanol 9MT MS Tank Liq.  Flammable respirator or self-contained breathing apparatus, Boots, Gloves etc., are used while handling this chemical. Specialist will be consult, if required.  For detailed control measures & fire fighting facilities, refer section 7.5.  2. Ammonia 9MT MS Tank Liq. Toxic  Self-contained breathing apparatus are used.

NOTES: 1. Size of the biggest storage tank is 9MT and dyke of sufficient capacity i.e. 10% extra than tank capacity is provided. 2. The unit is classified as Non Major Accident Hazard (NMAH) unit based on the quantity of Hazardous Chemicals stored at site, as the quantity of these chemicals being stored within the factory premises are well within the threshold storage quantity as per schedules of Manufacture, Storage & Import of Hazardous Chemicals (MSIHC) Rules of major hazardous chemicals. 3. Considering the maximum quantity of the solvents mentioned in above table; PESO license is applicable for all the solvents falling under Class A, B, and C as per petroleum rules. PESO licence is not required for Ammonia as it is not considered petroleum products as per petroleum rules. PESO licence is for Methanol as it is considered petroleum products as per petroleum rules.

7.3 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

TABLE 7.1 (B) - PROPERTIES OF HAZARDOUS CHEMICALS (I.E. HAZARDOUS CHARACTERISTICS & TOXICITY)

IDLH SP. VAP. VAP. LD50 LD50 VALUE STEL BY TLV-TWA Sr. FP BP GR DEN. PR. LEL UEL ORAL LC50 CHEMICAL DERMAL BY OSHA BY OSHA No. ( OC) ( OC) @ VS @ % % MG/ MG/L

STATE MG/KGS ACGIH/ (PPM) (PPM) 20OC AIR 20OC KGS PHYSICAL NIOSH 5628 64000 12.26 20 mg/kg 1. Methanol Liq. 12 64.5 0.79 1.1 6 36 mg/kg ppm 200 310 200 ppm kPa (Rabbit) [Rat]. (Rat) 2000 24.7- ppm 2. Ammonia Liq. NA 0.89 NA 287.9 - - 350 NA 300 35 25 37.7 (rat, 4 hours)

7.4 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

7.2 RISK ASSESSMENT

Identification of hazards in the proposed project activity is of primary significance. Hazard states the characteristics of system/plant/process that presents potential for an accident. All the components of a system/plant/process are need to be thoroughly examined to assess their potential for initiating or propagating an unplanned event/sequence of events, which can be termed as an accident.

IDENTIFICATION OF HAZARDOUS AREAS

At M/s. Orgochem (guj) Pvt.Ltd. Sachin, major risks will identify for the following areas:

 Raw Material Storage Area

As a conservative approach, we will analyze the risk qualitatively and quantitatively for the same.

In this study, we have considered the following:

 Storage & Handling of hazardous chemicals like Ammonia and Methanol have been considered for Consequence Analysis. Their storage location has been shown in Figure-7.1. Hazardous (physical & chemical) properties of the chemicals have been summarized in Table 7.1B.  Storage & Handling Solid Chemicals, Acids and Caustic Lye have been considered for Qualitative Risk Assessment.

7.2.1 Qualitative Risk Assessment

Many a times Risk involved in various processes / process equipments cannot be addressed completely by Consequence Analysis. As a conservative approach, these risks have been considered separately under this topic. The approach is to identify hazards associated in operation of equipments as well as in processes, assessing its impacts, ranking the risk posed by it and finally to propose remedial actions/mitigation measures such that the risk is minimized to tolerable level.

The Risk Matrix presented below should be referred in evaluating this assessment.

In Qualitative Risk Assessment, risk has been analyzed using methodology called HIRA- Hazards Identification & Risk Assessment. In HIRA, major manual activities carried out by plant personnel as well as contract labors have been considered.

Qualitative Risk Assessment has been carried out for the following areas:

1. Storage & Handling of Solid Chemicals. 2. Storage & Handling of Acids. 3. Storage & Handling of Caustic Lye.

7.5 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

TABLE 7.2 - RISK MATRIX FOR QUALITATIVE RISK ASSESSMENT

SEVERITY

Major/ Moderate Minor/ LIKEHOOD/ Catastrophic Critical (Less Marginal Insignificant/Negligible PROBABILITY (Death/ (Serious Serious (Minor (No injury/ System Loss) injury/ Injury/ Injury/ illness) illness) illness) illness) 5 4 3 2 1 Almost 5 H H H M M Certain Likely 4 H H M M L

Possible 3 H M M M L

Unlikely 2 M M M L L iimpossible 1 M M L L L

TABLE 7.3 - RISK ACCEPTABILITY CRITERIA Risk Risk Acceptability Remarks Range Criteria H Unacceptable/ Management’s Decision/Action Plan Required. Potential off-site High Impact. M Medium Generally Minor Impact. Acceptable with Management’s Review. Specific monitoring or SOP to be followed. L Low Acceptable without Review. Manage through Routine Procedure.

7.6 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

7.2.1.1 STORAGE AND HANDLING OF SOLID CHEMICALS

TABLE 7.4 - [√] RISKS AND RECOMMENDATIONS:

INITIAL RESIDUAL RISK RISK

PROCESS HEALTH & SR. ASSOCIATED PROPOSED ADDITIONAL OR SAFETY No. HAZARDS MEASURES RECOMMENDATIONS ACTIVITY IMPACT (RISK) SEVERITY LIKELIHOOD RISK SEVERITY LIKELIHOOD RISK 1. Handling  Chemical  Skin/Eye 2 3 M  PPEs like suitable 2 2 L 1. Operators/Workers Chemical Exposure. irritation. protective clothing, to be trained for Safe bags  Dusting.  Ingestion gloves, face shield, dust Work Practices. & Inhalation of and splash proof safety 2. Chemical handling dust powder. goggles; chemically bags & dusty area to be resistant safety shoes, labelled properly for each etc. will be used. chemicals.  Standard Approved respirators will be used.  Eyewash station and safety showers will be made available.  Dust monitoring will be carried out periodically.

7.7 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

2. Cleaning of  Fumes  Severe 3 3 M  Certified Dust 2 2 L Chemical Inhalation. irritation to eyes, respirator shall be used. Spillage.  Dust skin.  PPEs are will be Exposure.  Inhalation. used.  Chemicals should be stored in isolated storage rooms having provision for natural & forced ventilation.  Spillage will be cleaned or neutralized with suitable media.  Fire fighting facilities will be made available near storage locations, if required.

7.8 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

7.2.1.2 STORAGE AND HANDLING OF ACIDS

TABLE 7.5 - [√] RISKS AND RECOMMENDATIONS:

INITIAL RESIDUAL RISK RISK HEALTH & SR. PROCESS OR ASSOCIATED SAFETY PROPOSED ADDITIONAL No. ACTIVITY HAZARDS IMPACT MEASURES RECOMMENDATIONS (RISK) SEVERITY LIKELIHOOD RISK SEVERITY LIKELIHOOD RISK 1. Loading &  Exposure to  Skin/Eye 2 3 M  Loading & 2 2 L Unloading of Acid fumes due to irritation. Unloading activity Acids. leakage in  Toxic shall be carried out pipe/container/valves Vapour in well-ventilated etc. inhalation etc. area.  Spillage of liq.  Neutralization Acid. media will be made available in areas where acid is stored/handled/used.  PPEs will be used. 2. Working in  Exposure to  Severe 2 3 M  Storage area 2 1 L Storage Area. acid fumes. irritation to shall be well eyes, skin. ventilated.  Body  Dyke shall be

7.9 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

burns. made.  Neutralization will be done immediately with soda ash/lime or spill shall be absorbed in sand or by suitable adsorbent.  PPEs like face mask, gloves etc. shall be worn by concerned person. 3. Tank  Exposure to  Severe 3 3 M  Same as 2 1 L 3. Work overflow/leakage acid fumes. irritation to Above. Instruction for checking from joints etc. eyes, skin. tank level to be prepared and followed.

7.10 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

7.2.1.3 STORAGE AND HANDLING OF CAUSTIC LYE

TABLE 7.6 - [√] RISKS AND RECOMMENDATIONS:

INITIAL RISK RESIDUAL RISK HEALTH & PROCESS SR. ASSOCIATED SAFETY PROPOSED ADDITIONAL OR IMPACT MEASURES RECOMMENDATIONS No. ACTIVITY HAZARDS (RISK) SEVERITY LIKELIHOO D RISK SEVERITY LIKELIHOO D RISK 1 NaOH  Exposure  Skin 4 C M  Dyke will be 4 B L 4. Proper trainings handling due to leakage burn. made available. to be provided to the /Loading & from joints,  Eye  NaOH will be operators/workers. Unloading corroded lines irritation and stored in well- 5. SOPs to be failure etc. respiratory ventilated area. prepared and followed disorder.  Eye wash the same. station will be 6. Corroded lines available nearby. to be painted/replaced.  Maintenance will be carried as per schedule.  PPEs will be used. 2 Working in  Exposure  Severe 4 C M  Neutralization 4 B L Storage due to spillage irritation to media will be kept Area eyes, skin etc. available.  Internal  PPEs like face body burns. mask, gloves etc. will 7.11 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

be worn by concerned person.  Eye wash station will be available nearby. 3 Tank  Chemical  Eyes 4 C M  Level 4 B L 7. Working of level overflow Exposure and Skin indicator will be gauge to be checked. irritation. available and the same is checked for proper operation.  Dyke wall will be available to contain the spill.

7.12 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

7.2.2 QUANTITATIVE RISK ASSESSMENT

Quantitative Risk Assessment (QRA) is a structured approach to identifying and understanding the hazards & risks associated with Storage and Handling of flammable/toxic chemicals. The assessment starts by taking into account an inventory of hazardous chemicals stored, likelihood of leakage/spillage associated with it and selecting the worst case scenario for consequence estimation.

Finally, suggesting the measures to minimize or mitigate risks to meet appropriate acceptability criteria. The planning for emergency evacuation shall be borne in mind whilst interpreting the results.

 CONSEQUENCE ANALYSIS

In a plant handling hazardous chemicals, the main hazard arises due to storage and handling of hazardous chemicals as mentioned above. If these chemicals are released into the atmosphere, it may cause damage due to resulting fires or vapour clouds. Blast Overpressures depend upon the reactivity class of material between two explosive limits.

 DAMAGE CRITERIA

In Consequence Analysis studies, in principle three types of exposure to hazardous effects are distinguished:

1. Heat radiation, from a pool fire, a flash fire or a BLEVE. 2. Explosion 3. Toxic effects, from toxic materials or toxic combustion products.

In the next three paragraphs, the chosen damage criteria are given and explained as per the Guidelines for QRA – Phast (Micro) Software (DNV) & Purple Book for QRA released by Centre for Chemical Process Safety (CCPS).

Heat Radiation

The consequence caused by exposure to heat radiation is a function of:  The radiation energy onto the human body [kW/m2];  The exposure duration [sec];  The protection of the skin tissue (clothed or naked body).

In this report following damage criteria has been considered for the effects due to Fire/Explosion.

7.13 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

TABLE 7.7- EFFECTS DUE TO INCIDENT RADIATION INTENSITY

INCIDENT RADIATION – TYPE OF DAMAGE kW/m2 Immediate ignition of wood (without flame 37.5 Contact). 100 % fatal. Minimum Energy required for igniting wood. 25 (Without flame contact). 100 % fatal in 1 min. Significant injury in 10 sec. Minimum heat required to ignite wood 12.5 (With flame contact). 1 % fatal in 1 min. First. degree burn in 10 sec. 4 Pain after 20 sec. Blistering unlikely. 2 No discomfort for long exposure.

Explosion

In case of vapour cloud explosion, two physical effects may occur:

 A flash fire over the whole length of the explosive gas cloud;  A blast wave, with typical peak over pressures circular around ignition source.

As explained above, 100% lethality is assumed for all people who are present within the cloud proper.

The following damage criteria may be distinguished with respect to the peak over pressures resulting from a blast wave:

TABLE 7.8- DAMAGE DUE TO OVER PRESSURES

Peak Overpressure Damage Type 0.40 bar Ear Drum Rupture to humans 50 % probability of fatality inside 15% probability of fatality in open

0.21 bar Structural Damage to buildings 20% probability of fatality to personnel inside 0% probability of fatality in the open 0.13 bar Minor Structural Damage to nearby structures 10% probability of fatality to personnel inside 0% probability of fatality in the open 0.02 bar Glass Damage 0.01 bar Minor Damage

7.14 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

Intoxication

In this report, IDLH & LC50 Concentrations have been considered for Consequence Analysis.

 ASSUMPTIONS FOR CONSEQUENCE ANALYSIS

For Consequence Analysis, assumptions regarding Meteorological, Pasquil Stability Classes, Wind velocity, Ambient Temperature, Relative Humidity, Inventory, Ground Roughness, Model used etc. are very important. In this report, the following assumptions have been considered. i. Meteorological Data

 Atmospheric Conditions: No Inversion  Ambient Temperature: 30°C has been considered as MCA approach.  Relative Humidity: As the site is not in rainy zone RH of 50% has been considered. ii. Pasquil Stability Classes

 Pasquil Stability category D/F is considered as conservative approach. iii. Other assumptions:

 Ground Roughness: Ground Roughness has been considered as 0.3 M.  Dispersion model of both Heavy Model and also Gaussian distribution have been used as applicable/appropriate.  Inventory: Release of 100% of the inventory has been considered. For this, failure of the container has been considered from the bottom.  Storage conditions: Storage conditions have been considered as they are practically stored at site.

Following Weather data has been used for the study:

TABLE 7.9 - WEATHER DATA USED FOR THE STUDY

WIND SPEED (M/S) PASQUILL STABILITY

1.5 F 1.5 D 5 D

7.15 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 SOFTWARE USED FOR CALCULATIONS

1. PHAST MICRO

 SCENARIOS CONSIDERED FOR CONSEQUENCE ANALYSIS

1. In this study, the scenarios for consequence analysis have been selected considering:

 The physical and chemical properties of hazardous materials.  Storage conditions & Modes of Storage (Above ground Tanks).  Hazards ranking by NFPA.  Guidelines by OSHA (29 CFR).  Operating and storage conditions of handling and storage of hazardous chemical.

2. This report considers the worst case scenario which is possible during any set of operation variable and production methodologies. The objective of the study is emergency planning, hence only holistic & conservative assumptions are used for obvious reasons. Hence though the outcomes may look pessimistic, the planning for emergency concept should be borne in mind whilst interpreting the results.

3. Identification of solvents/chemicals to be considered for Consequence Modeling: Out of all the chemicals and solvents being handled and used within the site; most hazardous chemicals have been identified based on their properties like flash point, LEL & UEL Limits and NFPA rating. The results, outcomes, effects and recommendations suggested for these chemicals will be applicable for all the other chemicals which are less hazardous in nature

In this regard, the failure cases which may lead to release of hazardous chemicals are as under, out of which maximum worst case shall be considered:

 Failure of unloading arm of the ISO tanker during unloading of solvents,

4. The scenarios of flammable solvent storage tanks (if it is stored in tanks) have been considered assuming unavailability of bunds. Practically a bund shall be provided as per OISD guidelines.

5. In this study, results of consequence analysis shall be used for;

 Emergency Planning  Deciding Evacuation Routes  Deciding Location of Assembly Points and ECC  Resource Allocation for mitigation

TABLE 7.10 - SCENARIO IDENTIFIED FOR CONSEQUENCE ANALYSIS

Storage Description of Scenarios Pressure & Scenarios considered Scenario Temp. FIRE SCENARIOS 7.16 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

1. Release of Methanol Ambient Flash Fire, Late Pool Fire TOXIC SCENARIOS Press.: Atm.; 2. Release of Ammonia Dispersion Temp.: 30 deg.C

 Considerations Made:

 In Case of Solvents Methanol we have considered the failure case of unloading line (2” i.e. 50 mm pipe dia.) during the unloading of these chemical from the tank for a period of 10 mins. As the solvent tanker is compartmentalized, the maximum release quantity equals the storage quantity of a single compartment.

 In Case of Dispersion for Ammonia, we have considered the following scenarios:  Leak from 50 mm hole size for LC50 (2000 ppm) concentration.  Leak from 50 mm hole size for IDLH (300 ppm) concentration.

Note: Release of above chemicals from process equipments like Reactor or any other equipment is not possible as these chemicals will be in diluted/intermediate form in all process equipments and not in pure form.

 Selection Criteria of Scenarios:

 As per the relevant guidelines for consequence analysis, we have considered the maximum credible scenarios for all the above mentioned chemicals, which is the representative of all kinds of minor/major leakages for the respective chemicals.  Modelling has been carried out for dispersion up to IDLH concentration, in case of toxic chemicals. Evacuation should be carried out in less than 30 min from the areas covered under IDLH in case of relevant leakage scenario. The purpose is to avoid irreversible health effects to persons inside the area of IDLH concentration.  Based on the above considerations and the input parameters considered for worst case scenarios & maximum credible scenarios, the risk contours are plotted on the plant layout map clearly showing which of the facilities would be affected in case of an accident taking place. Based on the same the safety measures/recommendations are proposed and On-Site & Off- Site Emergency Plan shall be prepared as mentioned under the section 7.5. Competency.  The worst-case scenario has taken into account the maximum inventory of storage at site at any point of time.

7.17 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

TABLE 7.11-SCENARIO # 1 – RELEASE OF METHANOL

Basis: Possible Release/Leakage due to failure of Unloading Arm of Tanker. Input Data Leak Size Considered 50mm Release rate 1.04639 kg/s Release Duration 600 s Pressure Ambient Temperature 30 ° C Weather Condition 1.5/F, 1.5/D, 5/D LFL 73000 UFL 360000 CASE:1 FLASH FIRE

CASE:2 VAPOUR CLOUD EXPLOSION (OVERPRESSURE RESULTS)

Not Reached CASE:3 LATE POOL FIRE (EFFECTS OF RADIATION LEVEL)

7.18 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

Risk Contours for Flash Fire:

Risk Contour for Late Pool Fire:

7.19 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

TABLE 7.12-SCENARIO # 2 – RELEASE OF AMMONIA

Basis: Possible Release/Leakage due to failure of Unloading Arm of Tanker. Input Data Leak Size Considered 50 mm Release rate 1.4466 kg/s Release Duration 600 s Pressure 1 Bar Temperature Ambient Weather Condition 1.5/F, 1.5/D, 5/D IDLH 300 ppm LC50 2000 ppm

TABLE 7.13-RESULTS Downwind Distance (meters) Sr. Concentration No. Category 1.5/F Category 1.5/D Category 5/D

LC50 (2000 ppm) 46.39 48.58 17.04 1 IDLH(300 ppm) 34.72 31.60 Not Reached

7.20 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

Risk Contours for IDLH Concentration:

Risk Contours for LC50 Concentration:

7.21 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 CONSEQUENCE ANALYSIS SUMMARY

TABLE7.14 - FLASH FIRE SCENARIOS

Distance (meters) SR. Concentration Scenario No. (ppm) Category Category Category 1.5/F 1.5/D 5/D

LFL Frac.36500 4.21 3.15 2.18 1. Release of Methanol LFL. 73000 1.97 1.94 2.18

TABLE 7.15 – LATE POOL FIRE SCENARIOS

Radiation Downwind Distance (meters) SR. Scenario Level Category Category No. 2 Category 5/D (KW/m ) 1.5/F 1.5/D 4 16.27 16.24 16.09 10.92 Release of 12.5 10.98 11.49 1 Methanol 25 8.79 8.76 9.57 37.5 7.62 7.59 8.63

TABLE 7.16 - TOXIC SCENARIOS

Downwind Distance (meters) Sr. Concentration No. Category 1.5/F Category 1.5/D Category 5/D

Ammonia

LC50 (2000ppm) 46.39 48.58 17.04 1 IDLH(300ppm) 34.72 31.60 Not Reached

7.22 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

7.3 COMMENTS / RECOMMENDATIONS BASED ON CONSEQUENCE ANALYSIS

Flash Fire, UVCE and Late Pool Fire Scenarios:

 In case of release of Methanol vapour travels to the farthest distance (4.21m) in 1.5/F weather condition. In case of release of Methanol vapour travels to the farthest distance (16.27 m) in 1.5/F having radiation level 4 Kw/m2.  Evacuation plan to be designed considering the worst case scenario of Methanol as mentioned above.

Toxic Release Scenarios:

 Dispersion of Ammonia covers more distance in case of LC50 concentration (2000 ppm) that is 48.58mts in 1.5/D weather condition.  Evacuation plan to be designed considering the worst case scenario of the same.

Recommendations:

 Evacuation routes shall be planned such that alternate route is available from any corner in more than one direction.  Extra precautions to be taken in unloading of flammable/toxic chemicals. The details of precautions during storage handling and transportation of chemicals have been given in separate paragraph.  Firefighting arrangements shall be provided as per the appropriate guidelines.  Hazard Identification Studies like HAZOP, HAZAN, Fault tree analysis, Event tree analysis, Checklist Audit etc. will be carried out (if required) for safe operation of plant.  Safety audit (i.e. Third Party Safety Audit as per IS: 14489) and its Compliance shall be carried out as per the frequency decided by the management. Audit is an important tool to identify organizational & operational safety policy, and practices, plant conditions or operating procedures that could lead to an accident and significant losses in life or property and their effectiveness against accident preventative program.

Storage Location:

Storage location for flammable solvents must be kept separate and away from plant, boiler, DG Set or any other source of ignition. The storage to be done in accordance with the guidelines of PESO mentioned below:

7.23 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

Guidelines for storage of petroleum products as per PESO:

 Precautions against fire.

 No person shall smoke in any installation, storage shed or service station saves in places specifically authorized by the licensing authority for the purpose.  No person shall carry matches, fuses or other appliances capable of producing ignition or explosion in any installation or storage shed, which is used for the storage of petroleum.  No fire, furnace or other source of heat or light capable of igniting inflammable vapour shall be allowed in any installation, storage shed or service station save in places specially authorized by the licensing authority for the purpose.  An adequate number of portable dry chemical powder or any other fire extinguisher capable of extinguishing oil fires shall always be kept in every storage shed and small class B or C installations at strategic point and all persons employed at such locations shall be conversant with the use of such fire extinguishers.  Supervision of operations within an installation, service station or storage shed. –  All operations within an installation, service station or storage shed shall be conducted under supervision of an experienced responsible agent or supervisor who is conversant with the terms and conditions of the licence held for the installation, service station or storage shed as the case may be and those persons should have proper safety training.  Cleanliness of installation, service station or storage shed. – The ground in the interior of an installation or service station and the protected areas surrounding any installation, service station or storage shed shall be kept clean and free from all vegetation, waste material and rubbish.  Drainage. –  All enclosures surrounding above ground tanks in an installation shall be provided with proper drainage facilities in such a way that no water is allowed to accumulate in the enclosures.  No part of the enclosure referred to in sub-rule (1) shall be below the level of the surrounding ground within the protected area.  Where drainage is affected by means of a pipe, the pipe shall be fitted with a valve which is capable of being operated from the outside of the enclosure.  All valves and other opening for draining off water shall be kept closed except when water is being drained off.  The nature of the drainage arrangements and the position of all openings and valves therein shall be shown in the plan/layout.

7.24 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

7.4 OTHER SAFETY PRECAUTIONS / RECOMMENDATIONS

7.4.1 SAFETY/CONTROL MEASURES TO REDUCE the risk of fire, explosion and toxic release:

Following Mitigation Measures are followed /practiced and same shall be updated during transportation, unloading and handling of flammable & toxic chemicals, in order to ensure health & safety of workers involved in handling of hazardous chemicals and to avoid the human health impacts.

TABLE 7.17-SAFETY PRECAUTIONS

Sr. ACTIVITY SAFETY PRECAUTIONS

1 Transportation of  Training is given to driver and cleaner regarding the safe Chemicals by road driving, hazards of chemicals, emergency handling, and use of SCBA truck. sets.  TREM card is kept with TL.  SCBA set is kept with TL.  Fire extinguishers are kept with TL.  Flame arrestor is provided to TL exhaust.  Instructions are given not to stop road tanker/truck in populated area.  Hazard Identification symbol and emergency telephone number are displayed as per HAZCHEM CODE.  Appropriate PPEs are kept with TL. In case of leak or spill:  Source of leakage are checked.  Damaged containers or spilled material are not attended without wearing appropriate protective clothing.  Leak is stopped, if possible to do so without risk.  Water spray is used to reduce vapours (but do not put water directly on leak, spill area or inside container).  Combustibles (wood, paper, oil, etc.) are kept away from spilled material. 2 Unloading of  Priority is given to Tanker/truck to immediately enter the Chemicals from storage premises at site and shall not be kept waiting near the gate tanker/truck. or the main road.  Security person checks License, TREM CARD, Fire extinguisher condition; SCBA set condition, Antidote Kit, required PPEs as per SOP laid down. Following precautions are taken during unloading:  Wheel stopper is provided to TL at unloading platform.  Static Earthing is provided to road tanker.  Tanker unloading procedure is followed according to check list and implemented strictly.  Flexible SS hose connection is done at TL outlet line.  All TL valves are closed in TL. 7.25 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 Only day time unloading is permitted. 3 Chemicals Storage  Pipes and equipment are inspected at regular intervals. Area safety.  All storage areas are isolated from all sources of open flame and well posted with ”Hazardous Chemical Storage”, “No Smoking”, “Hot work Restricted” and provided with adequate fire fighting/extinguishing systems.  Spark-resistant tools are used.  Water spray is used to reduce vapours (but do not put water directly on leak, spill area or inside container).  Combustibles (wood, paper, oil, etc.) are kept away from spilled material.  Flame arrestors and breather valve has been provided for solvent storage tanks.  Dyke wall is provided to storage tanks. Separate area has been provided for drums storage.  Level transmitter is also available with low level/high level auto cut-off provision.  Vents are connected to water trap and vent of water trap are provided with flame arrestor.  Fire hydrant monitor with foam attachment facility is available.  Dumping /Drain vessel/alternate vessel shall be made available to collect the spillage material inside the dyke wall.  FLP type pumps shall be provided.  Flame proof electrical fittings are available.  Double static earthing shall be provided to storage tank as well as day tank, as per the requirement.  Double Jumper clip shall be provided to all solvent handling pipeline flanges. 4 Chemicals transfer  Double mechanical seal type FLP type pump shall be provided. from storage areas  Flame arrestor with breather valve shall be provided on vent to Process Plant. line.  Lightening arrestor is provided on the top of tallest structure.  Over flow system shall be provided for additional safety and it is connected to main storage tank.  NRV’s shall be provided on pump discharge line.  Double Jumper clip shall be provided to all solvent handling pipelines.

7.4.2 FIRE CONTROL PLAN

M/s. Orgochem (guj) Pvt.Ltd. Sachin has considered fire prevention measures at the project planning stage to avoid any outbreak of fire by looking to the hazardous nature of process and the chemicals that are handled and processed, the chances of outbreak of fire cannot be totally ignored. Hence to tackle such a situation, company has planned to develop a well- resourced and adequate fire protection system/fire fighting network.

7.26 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

The company has planned to keep the different types of fire extinguishers at various conspicuous locations.

Other details on Fire Control Plan and same shall be updated for proposed facility if required:  Fire fighting facilities will have two main pumps, two standby pump, jockey pump and fire water reservoir will be installed as per the GFR and TAC guidelines, the same shall be updated for new facilities, if required.  Fire Extinguishers like DCP, Carbon Dioxide & Foam types should be provided as per the GFR and TAC guidelines, at conspicuous locations.  Other Fire fighting facilities like, fire monitor, foam trolley, fire hose boxes with hose pipe, sand buckets, fire blanket, Jumbo bags, Water Jet Fire Blanket, etc. should be provided within the company at conspicuous locations.  Working staff will be given training on how to operate DCP and CO2 extinguishers.  The Fire Hydrant Network shall be installed; capacity of the same shall be updated after the for new facilities, if required.  Emergency Action Team members will be working round the clock in all shifts.  First aid would be made available round the clock in all shifts of all plants / sections.  Rescue kits with SCBA sets will be available at site to treat with any kind of chemical emergencies.  Volume level indication with alarm and trips for high level will be provided for vessels containing flammable materials.  DG Set should be made available for power backup.

7.4.3 DO’S & DON’TS

Management has listed some of the Do's & Don'ts activities to strengthen the SAFETY AT WORK, which will be followed strictly:

For Preventive Maintenance

Do's:

 Inspection of Storage Area, Earthing & Bonding system.  Inspection of all Fire Fighting Facilities /Check Alarms operation.  Ensuring that operators/workers etc. follows the SOPs, Safety procedures & standards, work permit system etc.  Checking the availability of Spill Containment Kit.  Make sure fire extinguishers are fully charged and ready for action.  Inspections of plant, machinery, tools, equipment, premises, work practices, processes, procedures and general environment must be carried out for the health and safety of plant, people and surrounding.  On-site and Offsite Emergency Plans shall be reviewed and updated, as per the requirement.

Don’ts:

 Don't allow anyone who hasn't received specific safety and operational training to get indulge in any site activity. 7.27 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 Don't perform your own maintenance.  Don’t compromise on Design and Engineering part.  Don't perform any activity without proper permit.  Don't panic if you are in a risky situation.  Don't allow spilled chemicals to drain to sewers/gutters etc.

Strengthening of HSE (Applicable for Manufacturing Utility Staff)

Do's:

 Follow instructions. Do not take chances. If you don’t know, ask.  Correct or report unsafe conditions.  Include a timeline for completion of each recommendation.  Make recommendations that are measurable and track able.  Ensure that each recommendation is assigned to an individual to oversee implementation.  Help keep things clean & orderly. Keep gangways clear.  Do not Horseplay. Do not run. Avoid distracting others. Avoid throwing things.  Report all injuries. Get first aid promptly.  Use, adjust and repair equipment only, when authorized.  Use right tools & equipments for the job, use them safely.  Do not smoke in restricted areas. Do not flick cigarette / beedi in company.  Use prescribed protective equipment; keep them in good working conditions.  Respect signs / warnings. Abide by rules laid down for your safety.

Don’ts:

No worker in a factory-  Shall wilfully interfere with or misuse any appliance, convenience or other thing provided in the factory for the purpose of securing the Health, Safety or Welfare of the workers therein:  Shall wilfully and without reasonable cause do anything likely to endanger himself or others; and  Shall wilfully neglect to make use of any appliance or other thing provided in the factory for the purposes of securing the Health or Safety of the workers therein.  Do not make vague statements, do not overrule supervisor, do not adopt shortcuts.

7.4.4 ANTIDOTES DETAILS:

The appropriate antidotes for the hazardous chemicals for the facility are available at site and the same shall be updated & kept available.

Following Antidotes for major hazardous chemicals are kept available at the site.

TABLE 7.18-ANTIDOTES/ MEDICAL TREATMENT

Chemical Antidote / Medical Treatment

7.28 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

Methanol  Ethanol (30% solution from inside, 5% solution from outside i.e. by intravenous injection), Epicake Syrup.  In case of acidosis give Sodium bicarbonate.  In case of delirium give Diazepam 10 mg. by intravenous injection.  Folinic acid (Leucovorin), 1 mg/kg, iv, 4 hourly. Ammonia  If skin is affected then wash with plenty of water for 15 min. and then wash with dilute lactic acid and apply soframycin cream.  If eye is affected, then wash by eye fountain with plenty of water for 15 min. Put one drop of 0.4% Benzocaine (Novocaine) solution in eye. Boric or lactic acid solution eye drops can also be given,  If entered in throat, then give smell through cotton dipped in ethanol or ether through nose.  Administer oxygen in case of breathing difficulty.

7.4.5 WAYS TO MINIMIZE THE MANUAL HANDLING OF THE HAZARDOUS CHEMICALS

1. Fork lifts are used for unloading chemical barrels/carboys, their movements within plant, handling carboys, bulk chemical bags, etc. 2. Cranes, hoists, pallet trucks, conveyors, etc. are used as per the requirement, to eliminate manual handling. 3. Lifting tools & tackles are used, wherever required. 4. SOPs, work instructions are prepared and followed. 5. Trainings are provided to relevant staff, operators, workers for the risk associated with manual handling of hazardous chemicals, ways to overcome those risk, etc.

7.4.6 SAFETY PRECAUTIONS FOR AMMONIA

 In event of a spill or leak, escape-type respirator shall be used.  Non-sparking ventilation systems and intrinsically safe electrical systems shall be used.  An automatic leak detection system shall be used.  Water Sprinklers shall be checked for its proper working condition.  HCl torch shall be made available to be used for the detection of ammonia leakage.  Safety warning postures/signs shall be displayed inside the area.  A dead-end siding shall be provided to limit the movement of tankers while storage and handling.  Excess-flow protection valves shall be provided in the distribution lines.  Antidotes (Skin): Wash with Lactic Acid, Apply soframycin, (Eye): Benoxynate , (Throat) :Smelling Ethanol or Ether.  Name plate shall be provided for electrical fittings.

7.4.7 SAFE OPERATING PROCEDURE

 SOP is a procedure which is specific to the operation that describes the activities necessary to complete tasks in accordance with industrial activities.  SOP shall be well prepared, documented and displayed in local language.  SOPs like Raw Material Charging, Operation of APCM and Operation in utilities already being followed.  Some of the following SOPs will be prepared on need basis: 7.29 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 Raw material Charging  Loading & Unloading Activities  Pre Start Up Safety Review (PSSR)

7.5 ON-SITE AND OFF-SITE EMERGENCY MANAGEMENT PLAN

M/s. Orgochem (guj) Pvt.Ltd. Sachin shall prepare the Proposed On-Site / Off-Site Emergency Plan which shall be followed from the project construction & erection phase.

The purpose of this plan is to provide M/s. Orgochem (guj) Pvt.Ltd. Sachin, with the means to effectively utilize all the resources at its disposal for the protection of life, environment and property.

The details of the same are discussed in the following sections.

7.5.1 DEFINING THE NATURE/LEVEL OF EMERGENCY

THE LEVEL OF EMERGENCY CAN BE CLASSIFIED IN THREE CATEGORIES: LEVEL - 1:

The leakage or emergency, which is confinable within the plant/area which may arise due to:

 Small pipe/valve rupture or similar leakages that do not affect outside premises.  Release of toxic chemicals for short duration.  Small fire in the plant.

LEVEL - 2:

The emergency, which is confinable within the factory premises which may arise due to -

 Leakage of toxic chemicals for long duration.  Medium scale explosion confined to the factory premises.  Medium scale fire inside the factory premises.

LEVEL - 3:

The emergency, which is not confinable within the factory premises and general public in the vicinity are likely to be affected. It may arise due to -

 Heavy / Profuse leakage of toxic / flammable gases for a long duration.  Explosion of high magnitude affecting the adjacent area.  Major fire inside the factory premises.

7.5.2 OBJECTIVES OF EMERGENCY MANAGEMENT SYSTEM

The objectives of the emergency management system are summarized as under.

 To identify and assess types of emergencies due to different types of hazards. 7.30 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 To work out plan with all provisions to handle emergencies and safeguard employees and people in the vicinity of the factory.  To provide for emergency preparedness and the periodical rehearsal of the plan.  To plan mode of proper communication and actions to be followed in the event of emergency.  To keep all necessary information with respect to hazard/accident control and emergency contacts in one document for easy and speedy reference.  To inform employees, general public and the authorities about the hazards/risk if any and the role to be played by them in the event of emergency.  To control and contain the accident.  To effect rescue and treatment of casualties.  To inform and help relatives of casualties.  To secure rehabilitation of affected area and restore normalcy.  To provide information to media and government agencies.  To preserve record, equipment etc. for investigating cause of emergency.  To be ready for “mutual aid” if need arises to help neighbouring units.

7.5.3 STRUCTURE OF EMERGENCY MANAGEMENT SYSTEM

M/s. Orgochem (guj) Pvt.Ltd. Sachin, shall develop an Emergency Management Team. The management structure shall include the following personnel’s;

 Site Main Controllers.  Incident Controllers and Deputy Incident Controllers.  Key Personnel’s.  Essential Workers.

The other elements of Emergency Plan shall be:  Assembly points.  Emergency control centre.  Fire control arrangements.  Medical arrangements.

 SITE MAIN CONTROLLER

Senior most Executives (i.e. Director& Supervisor) of the company shall be nominated as SMC. His task will be to co-ordinate all internal and external activities from the Emergency Control Centre at Main Security Gate, from where all operations will be directed. He shall:

 Immediately on being informed of the emergency and its location, will arrive at the site, review the situation and control further actions.  Direct all Emergency Operations within the approved area with the following priorities: a. Personnel Safety, b. Plant, Property and Environment Safety and c. Minimum loss of production.  Co-ordinate to avail services from external agencies like fire brigade, hospitals etc., if called for, following the declaration of major emergency. If necessary, major installations in the vicinity may also be informed of the situation.  Exercise direct operational control of the unaffected section of the plant. 7.31 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 In consultation with the advisory team, expedite the shutting down of loading / unloading operations and if necessary, instruct the supervisor / security personnel to evacuate that area.  Ensure that all employees are evacuated from the affected area and the casualties, if any, are given necessary medical attention. Instruct P & A Assistant / Security for rushing casualties to hospitals if required.  Liaise with fire and police officials, pollution control board officials and other statutory bodies and advise them of all possible consequence effects outside the premises.  Arrange for relief of personnel when emergency is prolonged.  Issue authorized statement or press release to the news – media.  Ensure preservation of evidence for enquiries to be conducted by statutory authorities.  Authorize the sounding of “All Clear” and “Evacuation Siren”.  Arrange for obtaining the head – count of all personnel within the premises and cross- checking with the data from records available for no. of persons within the premises.  Nominate a person from advisory team, to maintain chronological log of event during the entire period of emergency.

 ROLE OF INCIDENT CONTROLLER AND DEPUTY INCIDENT CONTROLLER

His primary duties shall be to take charge at the scene of the incident. In the initial stage he may be required to take decisions involving the operation of the other plants or to stop or continue any process and to take technical decisions to control the incident. The deputy incident controller will take the charge of incident controller, if he is not available due to any reason. They will be always available in each shift and can take charge of the incident.

Responsibilities/Duties of Incident Controller and Deputy Incident Controller:   Managers connected with Plants/the respective Plant-In-Charge from each shift have been designated as I.C.  Two Production officers in each shift will be identified as Deputy Incident Controllers.  He shall take charge at the scene of incident.  He shall immediately assess the gravity of risk and alert panel and field operators to start controlling their respective section.  He will work under the direction of the SMC, but till his arrival he may have to execute following responsibilities.  He will ensure that all the Key Personnel are called.  Direct for evacuation of plant and areas likely to be affected by the emergency.  He shall communicate to the SMC the type of outside help needed.  He shall direct all emergency operations within the affected area with the following priorities.  Personnel safety, including of surrounding community.  Minimum damage to Plant, Property and Environment.  Appropriate actions to minimize loss of Production and Material.  Give information to the head of fire fighting and rescue team and other emergency services.  Depending on the incident, instruct partial or total shut down, isolations, depressurization, Nitrogen purging, fire fighting, rescue operations.  Instruct upstream/downstream units to take emergency shutdown /cutting off supply and other appropriate actions and emergency evacuation help etc.  Direct for search of casualties.  Evacuate non-essential workers/visitors/contractors to safe assembly points. 7.32 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 Brief site main controller and keep him informed about the developments.  Preserve evidences. This will be necessary for investigation for cause and concluding preventive measures.

 KEY PERSONNELS

Senior officers of various departments like Fire, Security, Safety, Administration, Engineering, Project, Production, Transport, Pollution control, Technical Services and Stores shall be nominated as Key Personnel in their respective fields. As necessary, they shall decides the actions needed to shutdown plants, evacuate personnel, carryout emergency engineering work, arrange for supplies of equipments, utilities, carryout environment monitoring, provide catering facilities, liaise with police, fire brigade and other local authorities, relative of casualties, hospital, press & neighbouring industries, action at assembly points, outside shelters and mutual aid centre under the direction of the SMC. All the key personnel and other called in so to assist, shall report to the ECC. They are available at any time on duty or on call or on holidays.

 ESSENTIAL WORKERS

Essential Workers shall be those who shall be trained in Fire Fighting and First Aid. One Supervisor and two helpers from each shift will be Identified as E.W.’s & shall supposed to report at EMERGENCY SITE to take instructions from I.C. or Dy. I.C. Such work instructions will include:

 Fire fighting and spill control till a Fire Brigade takes the charge.  To help the Fire Brigade and mutual aid teams, if it is so required.  Shutting down plant and making it safe.  Emergency engineering work e.g. isolating equipment, material process, providing temporary by-pass lines, safe transfer of materials, urgent repairing or replacement, electrical work, etc.  Provision of emergency power, water, lighting, instruments, equipments, materials, etc.  Movement of equipment, special vehicle and transport to or from the scene of the accident.  Search, evacuation, rescue and welfare.  The injured will be given First Aid.  Carrying out atmospheric test and pollution control.  Manning of assembly points to record the arrival of evacuated personnel. Manning for outside shelters and welfare of evacuated persons there.  Assistance at causalities reception areas to record details of causalities.  Assistance at communication centres to handle outgoing and incoming calls and to act as messengers if necessary.  Manning of works entrances in liaison with the police to direct emergency vehicles entering the work, to control traffic leaving the works and to turn away or make alternative safe arrangements for visitors, contractors and other traffic arriving at the works.  Informing surrounding factories and the public as well as directed by the Site Main Controller.  Any special help required.

7.33 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

OTHER ELEMENTS OF DMP:

 ASSEMBLY POINT

In affected & vulnerable plants, all nonessential workers (who are not assigned any emergency duty) will be evacuated from the area & they shall report to specified Assembly Points.

To ensure that workers do not have to approach the affected area to reach the Assembly Point, proper location and number shall be marked at Assembly Points. Each Assembly Point shall be manned by a nominated person to record the names and dept. At each Assembly Point, duties of Assembly Point In-charge are displayed in brief. Before reaching an Assembly Point or subsequently, if it is required to pass through an affected area or due to presence of toxic substances, suitable PPE's including respirators, helmet etc., shall be issued & made available with workers.

 EMERGENCY CONTROL CENTER

The Emergency Control Centre is the place or room from where the operations to handle the emergency are directed and coordinated. A safe room near security gate shall be earmarked /identified as the Emergency Control Room.

Telephone and other facilities required with necessary documents shall be displayed in ECC for ready reference. Designated trained personnel shall operate ECC. In case of Major Emergency, the Site Main Controller will operate from ECC.

The ECC centre shall be equipped with the following facilities.  Internal and external telephone including STD facility  Telephone directory/ Telephone nos. of mutual aid centres  First Aid  Muster roll of Workers  Identity card register  Layout plan of the factory showing the location of hazardous materials, assembly point, and first aid centres etc.  Map of surrounding area with Fire Extinguishers location  M.S.D.S

 MEDICAL SERVICES

The roles of Medical officers are as follows;

 He will report immediately to the SMC/IC.  He will render necessary treatment, at Occupational Health Centre.  He will arrange for Hospitalization and Treatment at outside hospitals, if required.  He will mobilize in getting the services of External medical agencies, other Para –medical services etc. and transportation services etc.  He will arrange for extra medical assistance/antidotes, from out, if required.  He will arrange for first-aid trained volunteers for necessary help.

7.34 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 He will liaise with the Government Health Authorities for treatment of the affected persons nearby.

 ROLE OF SECURITY IN-CHARGE (SECURITY OFFICER)

 On hearing the emergency siren, he shall find out the location of the incident (fire / gas leak / spill / explosion) and inform the location of the same to the key personnel coming to the plant.  He will depute the security guards for managing gates and traffic control at the incident site & send remaining guards to the site of incident.  He will prevent unauthorized entry in to the site  He will render assistance as demanded by the safety in-charge.  He will mobilize additional security force for help, if required.  He will direct ambulance(s) and emergency vehicle(s) to the scene of incident.  He will help evacuate persons within the scene of incident.  As directed by the site main controller, he may be required to address the public of surrounding villages for warning / evacuation.

 ROLE OF MUTUAL-AID MEMBERS

 Company will have Mutual Aid with various nearby factories.  On receiving the call, they shall proceed immediately with fire squad & fire tenders.  They will be guided to the place of the incident by the main gate security guard.  The fire squad in-charge will report to the safety in-charge of the unit in which the incident has occurred.

 OTHER ARRANGEMENTS

Other arrangements include external transport (transport centre), heavy vehicles, lift/cranes, generator sets to supply emergency power, environment monitoring equipment, special instruments/equipments, rescue items etc. shall be made available (if required) from near-by Industries /locations, when available resources do not meet the requirements.

STANDARD OPERATING PROCEDURE (SHALL BE FOLLWED DURING EMERGENCY)

 As soon as emergency alarm is heard, all essential workers shall report to IC or SMC.  They shall carefully listen to the instructions given by IC or SMC  According to the type of emergency/accident, they shall get equipped with PPE/Fire-fighting equipment and devices.  The runner among the workers shall inform SMC/IC and key personnel if they are not at site.  The messenger amongst the workers shall deliver messages to nearby units as per the instructions of SMC/IC.  The in-charge of medical arrangements shall prepare first-aid and other required facilities for the injured.  The other essential workers shall try to control the emergency as per the instructions given to IC.  IC would keep SMC informed about the status of control measures being taken at the site and ask for other requirements e.g. Mutual aid, equipment, etc. if he find necessary.

7.35 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 SMC would co-ordinate with outside agencies regarding control measures being taken, need for external help, evacuation, medical treatment etc.

7.5.4 COMMMUNICATION SYSTEM

Communication System is a Crucial Factor while handling emergency. Company has quick & effective Communication System through which, any situation, which can lead to emergency, can be informed or known to…

 All persons working inside the plant.  Key Personnel outside during normal working hours & during off-duty hours.  Outside emergency services, Statutory and Local Authorities and  Neighbouring facilities and public leaving in vicinity.

Each and every section, Plant & Department of the Factory will be connected by internal telephones with SMC, Supervisor or IC’s. External Phone at Office and Residence and Mobile shall also be made available with Key Personnel and top executive of the factory. The Communication System shall begin with raising the alarm declaring the emergency, Telephone messages and Procedure to communicate the emergency to other persons & General Public.

 RAISING THE ALARM

As soon as incident takes place inside the factory and is noticed by someone, the first step shall be to raise the nearest manual emergency bell to alert the nearby people. Next, he/she shall inform the security persons to raise the emergency siren located at the factory gate. The security personnel sound the siren.

The alarm sound informs the I.C and the S.M.C that an emergency has been created and emergency organization is to be activated. The I.C. rushes to the site and shall takes charge of the scene.

 DECLARING THE MAJOR EMERGENCY

Major emergency is declared after sufficient and thorough check because the declaration of major emergency puts many agencies on action and it may disturb the running system, which may be Costly at, time or its Consequence may be Serious. Therefore, major emergency must not be decided on whims or immature judgment or without proper thought. Looking to all the above, we shall nominate the persons (SMC: Director & Incident Controllers) who can declare the emergency; we have selected them on the basis of their knowledge & experience. These persons will be technically qualified and experienced. The decision about major emergency shall be taken as early as possible and without wasting time so that control action can be started immediately.

 TELEPHONE MESSAGES

A Telephone operator who is precise, sharp, attentive and quick in receiving and noting the message and subsequently effective in further Communication, shall be appointed. A form to record emergency telephone calls will be available with telephone operator or Person available in Emergency Control Centre, who shall record such calls during emergency. Telephonic messages

7.36 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020 shall be given out by the telephone operator to Site main Controller and key personnel as per the instructions of the Incident Controller. Telephonic messages will also be given to authorities and external agencies to describe the type of emergency. All details of emergency will be collected /delivered according to this format, available with the telephone operator.

 COMMUNICATION OF EMERGENCY & STATUTORY INFORMATION

Communication of Emergency An effective system to communicate emergency shall be made to communicate about the emergency situation as mentioned below:

 Inside the factory i.e. workers including key personnel and essential workers, on duty & inside during normal working hours.  To key personnel and essential workers not on duty and outside during normal working hours.  To the outside emergency services and the Government authorities.  To the neighbouring factory & the General Public in the vicinity.

STATUTORY INFORMATION a) Information to Workers

Set of Statutory information regarding types of hazards and their prevention and control as directed in the Factories Act shall be prepared by the unit. This information shall be printed in the local language and will be given in the form of booklet to all workers including contract workers. b) To the outside emergency services and authorities

Statutory information in the form of booklet will be given to outside emergency services and authorities, if required. c) To neighbouring firms and the general public

Statutory information in the form of booklet will be given to neighbouring units and the general public of the villages in the vicinity of the unit, if required.

 EMERGENCY TIME ACTIVITIES

The probable emergency situation that can arise in the unit and the corresponding control actions as described below shall be followed:

1. FLAMMABLE RELEASES

Source / Incident – Fire involving spilled combustible material near or in flammable storage areas.

Following Control actions shall be taken –

1. Anyone who notices fire shall sound emergency alarm.

7.37 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

2. SMC/IC who is at site, shall immediately rush to the scene and assess the situation. For fire due to spillage of combustible material, he activates the on-site plan as -

 He cuts off electric supply to that area and evacuates all the persons to safe assembly points.  He calls in DIC (if DIC is not present there) and asks essential workers to fight fire with dry chemical / CO2 fire extinguisher or sand.  He informs fire brigade telling them in briefly about kind of fire and type of extinguishers required.  He informs mutual aid teams and asks for necessary help.  He arranges first-aid / hospitalization for the affected persons.  Fire officer on reaching the site, takes charge of the fire-fighting operations  Mutual aid teams are asked for help in the form of first-aid, transport etc.  If fire is growing, fire officer informs IC who alerts neighbouring units and through SMC gets more fire-fighting help.  Fire fighting shall be continued till fire is fully overcome.  After extinguishing fire, fire officer cools the entire area with water spray and checks that no re-ignition is likely to occur. After that, he declares the area safe.  IC tells essential workers to sound all clear.  The incident shall be recorded.  SMC arranges to inform families / relatives of injured / dead.  SMC issues authorized statement to press / media.  SMC informs Factories Inspector about the incident and related information.

2. TOXIC RELEASES

 Source / Incident – Pressure release due to failure of a. Stuffing box gland packing b. Pressure release valve c. Vessel / pipeline failure

Following Control Actions will be taken –

1. Anyone who notices the release shall sound emergency alarm. 2. SMC/IC who is at site, shall immediately rush to the scene and assess the situation. For toxic release from a reactor, he activates the on-site plan as -

 He evacuates all the persons to safe assembly point.  He calls in DIC (if DIC is not present there) and asks essential workers to wear self-breathing apparatus and if the reaction is exothermic, start cooling water flow in the reactor jacket and cool the reactor as soon as possible.  The essential workers stop all the charging pumps of that reactor and the nearby reactors.  He informs mutual aid teams and asks for necessary help.  He arranges first-aid / hospitalization for the affected persons.  Mutual aid teams shall be asked for help in the form of first-aid, transport etc.  When the leak stops and the air shall clear of toxic release, IC tells essential workers to sound all clear.  The vessel / rupture disc/gland packing will be attended by maintenance department.

7.38 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 The incident shall be recorded  SMC arranges to inform families / relatives of injured / dead.  SMC issues authorized statement to press / media.  SMC informs Factories Inspector about the incident and related information

3. CHEMICAL SPILL

Most of the chemicals will be stored in tank and shall be located in separate isolated storage area. Neutralizing material shall be kept available. Spill containment kit shall be kept available. For dilution, water connection will be provided on all sides of Storage Area. Sand buckets shall be available for covering spillage of flammable / corrosive materials. Fire fighting facilities shall be made available nearby.

7.39 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

7.6 OCCUPATIONAL HEALTH & SAFETY PROGRAMME

(Specific Program To Monitor Safety And Health Protection Of Workers)

M/s. Orgochem (guj) Pvt.Ltd. Sachin has prepared the Occupational Health Surveillance Program which shall be followed right from the project construction & erection phase and the same shall be updated for the upcoming new facility, if required.

The details of the same are described in the following sections.

7.6.1 OCCUPATIONAL HEALTH & DAMAGE CONTROL DURING DIFFERENT PHASES

Occupational health needs attention both during construction & erection and operation & maintenance phases. However, the problem varies both in magnitude and variety in the above phases.

7.6.2 HOSPITAL FACILITIES /FACTORY MEDICAL OFFICER & OHC

Company shall made formal agreements with nearby hospitals having facilities to attend fire and toxic effect cases, emergency cases, attending the affected persons in the emergency arising out of accidents, if any, etc.

All types of first aid related accessories, Medicines & Antidotes as prescribed by FMO, etc shall be made available at conspicuous locations.

7.6.3 Ambulance Van & First Aid Box

An Emergency Vehicle shall be made available round the clock to be used as an Ambulance during emergency.

First Aid Boxes will be made available at the different location in the plant. Training shall be given to employees for First Aid.

7.6.4 PLAN FOR PERIODIC MEDICAL CHECKUP

Periodic Medical Examination shall be conducted as per the following schedule; Workers employed will be examined by a Qualified Medical Practitioner/ Factory Medical Officer, in the following manner: a) Before employment, to ascertain physical fitness of the person; b) During employment, every six months (blood & physical examination) as per Gujarat Factories Rules, to ascertain physical fitness of the person to do the particular job;

7.40 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

7.6.5 DETAILS OF OCCUPATIONAL HEALTH IMPACTS AND SAFETY HAZARDS

Occupational Hazards Identification Occupational Health Impacts

 Exposure to Toxic Chemicals.  Toxication, Irritation,  Exposure to Flammable Solvents.  Fall Injury, Electrocution,  Fire due to Static charge generation  Body Injury, Burns, Skin sensitization,  Slip/trip, fall, electric shock, etc.  Severe irritation to eyes & skin,  Spillage/leakage,  Respiratory disorder,  Overflow,  Damage to nearby equipments,  Exposure to Corrosive Chemicals.  Fatality, etc.

Mitigation measures/Safety Measures proposed to avoid the human health hazards are mentioned under section 7.4. In addition to these safety measures, personal protective equipment (IS approved) like safety Helmet, Safety shoes/ Gumboots Hand gloves, Gas Mask / Nose Mask, PVC apron, SCBA Set, PVC pressure suit, goggles, hood, etc. will also be provided to the required personnel.

7.6.6 DETAILS OF WORK PLACE AMBIENT AIR QUALITY MONITORING PLAN

Work zone monitoring will be carried out by independent competent third party every month. Records will be kept in Form No. 37 as per Gujarat Factories Rules. Location for samplings shall be identified. Ambient Air & Noise Monitoring shall be done every 3 months as per GPCB CCA requirements. Following information will be incorporated in the format for maintaining records of work zone monitoring:

Location/Operation monitored

 Identified contaminant  Sampling instrument used  Number of Samples  Range of contaminant concentration as measured in sample  Average concentration  TWA concentration of contaminant (As given in Second Schedule of Factories Act)  Reference method used for analysis  Number of workers exposed at the location being monitored  Signature of the person taking samples  Other relevant details

7.6.7 MONITORING OF THE OCCUPATIONAL INJURY & IT’S IMPACT ON WORKERS

Following action plan will be prepared & followed to monitor the occupational injury to workers:

 Each workplace will be evaluated for the work conditions.  Unsafe Act & Unsafe Practices will be identified.  Unsafe equipment, unsafe areas, etc., will be identified.  Area will be checked for proper Ventilation and Illumination. 7.41 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 Air-borne concentration of toxic chemicals will be measured and records will be kept.  Evaluation of training & on the job work.

Impact of the above mentioned unsafe conditions on workers will be studied and remedial measures for the same will be adopted.

7.6.8 PROVISION OF INDUSTRIAL HYGIENIST & HEALTH EVALUATION OF WORKERS

1. It is proposed that management will devise a plan to check and evaluate the exposure specific health status evaluation of workers. 2. Workers will be checked for physical fitness with special reference to the possible health hazards likely to be present, where he/she is being expected to work before being employed for that purpose. Complete medical examinations including PFT, Urine and Blood examination, Liver Function tests, chest X-ray, Audiometry, Spirometry Vision testing, ECG, etc. shall be carried out. However, the parameters and frequency of such examination will be decided in consultation with Factory Medical Officer and Industrial Hygienists. 3. While in work, also all the workers will be periodically examined for the health with specific reference to the hazards which they are likely to be exposed to during work. Again, the parameters and frequency of such examination will be decided in consultation with Factory Medical Officer and Industrial Hygienists. Plan of monthly and yearly report of the health status of workers with special reference to Occupational Health and Safety, will be maintained.

7.6.9 SAFETY TRAININGS & MOCK DRILLS

Safety trainings (on Safe Material Handling, First Aid, & all Safety Aspects) shall be provided every 15 days by the Safety Officers with the assistance of faculty members called from other Professional Safety Institutions and Universities. In addition to regular employees, limited contractor labours will also be given safety training. To create safety awareness, safety films shall be shown to workers and leaflets are distributed.

MOCK DRILLS

To evaluate the effectiveness of emergency preparedness and to spread the awareness among employees mock drill will be carried out at the interval of every six months. After completion of the mock drill, summary report shall be made and corrections will be done if any weakness has been observed.

FREQUENCY OF mock DRILLS:

 On-site emergency: Once every 6 months  Off-site emergency: Once every year

7.42 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

7.7 Plan to curb release of VOCs in the air:

Leak Detection and Repair (LDAR) Program

Leak Detection and Repair (LDAR) is a program implemented to comply with environmental regulations for reducing the fugitive emissions of targeted chemicals into the environment. In addition to control fugitive emissions, LDAR Program also helps the industries to reduce unwanted losses of chemicals and thereby conserving energy & increasing their profitability.

Need of Leak detection and Repair (LDAR) programs:

Fugitive emissions constitute a source of air pollution and fire. EPA has determined that leaking equipment, such as valves, pumps, and connectors, are the largest source of emissions of volatile organic compounds (VOCs) and volatile hazardous air pollutants (VHAPs) from chemical manufacturing facilities.

A benefit of LDAR program is reduction of product losses. Facility that apply LDAR also increase safety for workers and operators, decrease exposure of the surrounding community, reduce emission fees and help facilities avoid enforcement action.

The typical flow of the activities of the LDAR program will be as follows:

7.43 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 Identifying Components  Assign a unique identification (ID) number to each regulated component.  Identify each regulated component on a site plot plan or on a continuously updated equipment log.  Promptly note in the equipment log when new and replacement pieces of equipment are added and equipment is taken out of service.

 Leak Definition  A leak is detected whenever the measured concentration exceeds the threshold standard (i.e., leak definition) for the applicable regulation.  Leak definitions vary by regulation, component type, service (e.g., light liquid, heavy liquid, gas/vapor), and monitoring interval.  Many equipment leak regulations also define a leak based on visual inspections and observations (such as fluids dripping, spraying, misting or clouding from or around components), sound (such as hissing), and smell.

 Monitoring Components  Monitoring intervals vary according to the applicable regulation, but are typically weekly, monthly, quarterly, and yearly.  For connectors, the monitoring interval can be every 2, 4, or 8 years.  The monitoring interval depends on the component type and periodic leak rate for the component type.

 Repairing Components  Repair leaking components as soon as practicable, but not later than a specified number of calendar days (usually 5 days for a first attempt at repair and 15 days for final attempt at repair) after the leak is detected.  First attempts at repair include, but are not limited to, the following practices where practicable and appropriate:  Tightening bonnet bolts  Replacing bonnet bolts  Tightening packing gland nuts

 Recordkeeping  Maintain records of the equipment ID number, the instrument and operator ID numbers, and the date the leak was detected.  Maintain a list of the dates of each repair attempt and an explanation of the attempted repair method.  Note the dates of successful repairs.  Include the results of monitoring tests to determine if the repair was successful.

Following steps shall be followed for effective implementation of LDAR Program:

1. Process Controls:  To control fugitive emission from process / reaction, all reactor condensers shall be connected to a scrubber to minimize loss of solvents / fugitive emission in to the atmosphere.  Solvent recovery system shall be followed.

7.44 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

2. Emissions control program:

Following steps shall be followed for effective implementation of LDAR Program a. Identification of volatile chemicals which may contribute in VOCs :

In plant, following are the list of chemicals which may contribute in VOCs.

 Methanol  Ammonia b. Identification of all the probable sources of leakage; such as valves, pumps, and connectors.

List of the sources of probable leakage is as follows:

 Valves/Flanges  Pump glands handling above chemicals  Open vents from the tank top  Pump seals Compressor seals  Pressure relief devices  Process drains  LPDs (Low Point Drains)  HPVs (High Point Vents)

7.45 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

TABLE 7.19- DETAILS OF PROBABLE SOURCES LEAKAGE

Leakage/ Source of equipment leak Detection Method Component Valves Flange leakage Visual Check Pump From pump seal Visual Check Open vents from the Overflow of tank High level alarm tank top High pressure leak - Audible Method For welded flanges place the probe at the outer edge of the flange-gasket interface and sample the Gasket failure and improperly Connectors circumference of the flange. torqued bolts on flanges. If the source is rotating shaft, position the probe within 1 cm of the shaft seal interface for the survey. At the point of line Place the probe inlet at approximately Open ended line Incorrect implementation of the entry of the opening to the block and bleed procedure atmosphere. A list of all such items shall be made and same shall be incorporated in the checklist for LDAR.

3. Selection of appropriate method for leak detection:

Considering the nature of the chemical; appropriate method shall be selected for leak detection of individual chemicals from the list given below:

 Visual Checks  LEL meter  VOC meter  Gas Detector  Etc.

4. Scheduling and checklist for Leak Detection:

All points shall be checked as per the checklist given in Table 7.5.7.1

5. Methods for rectification of identified leaks:

For all identified leaks, closure shall be ensured with the help of maintenance department and records for the same shall be maintained.

TABLE 7.20- Preventive Measures for Leakage

Leakage/ Preventive measures Component  Use sealless design Valves  Plug type valves can be lubricated with grease to reduce emission. 7.46 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

 Many valves have no means of in service repair and must be isolated from the process.  Use sealless design  Use dual mechanical seal with barrier fluid maintained at a higher pressure than the pump fluid Pump  Provide closed vent system  Use spare pumps at the time of repair  Tighten the packing glands. Open vents from the  Dyke area to be provided with proper slope and pit tank top  Proper welding to be done Connectors  Flange gaskets to be replaced to avoided flange leakage. Open ended line  It can be controlled by using blind, cap, and plug.

6. Frequency of Monitoring

The monitoring interval is the frequency at which individual component monitoring is conducted. For example, valves are generally required to be monitored once a month using a leak detection instrument, but the monitoring interval may be extended (e.g. to once every quarter for each valve that has not leaked for two successive months OR on a process unit basis of once every quarter for process units that have less than a 2% leak rate.

7. Record keeping of LDAR Program:

 An internal and third-party audit of LDAR records will be conducted on a regular basis to ensure compliance.  All records will be electronically monitored and stored for reference and further actions.  Environment cell shall continually search for and update the regulatory requirements and other government guidelines regarding emission control and LDAR program shall be updated accordingly.  Properly record and report first attempts at repair.  Proper records of components, equipment and instruments required for LDAR program shall be maintained to ensure its quality, integrity and operability.

7.47 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 7 Additional studies Date 17/03/2020

TABLE 7.21- CHECKLIST FOR IMPLEMENTATION OF LDAR PROGRAM TO REDUCE EMISSIONS OF VOCS.

Sr. List of Name of Method Frequency Checked Checked Observations/ Leak to be Leak Closure Note No. Source of Chemical of leak Weekly/Monthly on by Remarks attended by attended on leakage check / Quarterly (Repair to be done within 5 working days)

Records of leak detection have been maintained by client and are available at site.

7.48 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 8 Project Benefits Date 17/03/2020

CHAPTER 8 PROJECT BENEFITS

8.1 IMPROVEMENT IN INFRASTRUCTURES

Orgo Chem (Guj.) has proposed a project on the land which is having a building construction available on site. It does not require major construction work. Also, the proposed site is in notified industrial estate of GIDC – Sachin and the estate is years old with all required infrastructures. Hence no major benefits in terms of development of new infrastructures & direct improvement in infrastructure due to proposed project.

However, due to daily activities like transportation, communication; there will be boost to the local economy and quality of life of the local people which may generate a possibility of development of new infrastructure facilities in the region.

8.2 EMPLOYMENT POTENTIAL

Proposed project will require 45 employees during operation stage. Thus, the activities of proposed project will require considerable manpower which will be beneficial to employment structure of local area as maximum recruitments will be done from local area on merit basis. Further, the indirect employment via contractual works, transportation activities & local economic activities like shops will also add in the employment potential of the proposed project. Thus, the potential of employment will be considerably beneficial to the local people. This phase is expected to create a beneficial impact on the socio-economic environment.

8.3 OTHER TANGIBLE & INTANGIBLE BENEFITS

As mentioned earlier sections, the proposed project is to setup for production of dye intermediate and specialty chemical products which is having a good market potential. By this, company can have good share in state’s & country’s economic status. The products have also good demand in foreign market and company is already exporting its products to many foreign countries from their other unit. Up on successful achievement of export by company, the proposed project will result in benefit to the country in form of foreign revenue.

8.4 CORPORATE ENVIRONMENT RESPONSIBILITY

The proponent has taken part for the eco-development measures including community welfare measures for the overall improvement of the society from another unit in Sachin. Project proponent will allocate about approx. Rs. 37 Lakhs for social activities, thus proponent is very well aware about their responsibility towards social services.

8.1

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 8 Project Benefits Date 17/03/2020

In future M/s. Orgo Chem (Guj.) Pvt. Ltd. Will be committed to behave ethically and to contribute to economic development, while improving the quality of life for the workforce and their families, as well as the local community and society at large.

As per demand and based on quality of life in nearby villages, company has proposed to earmark funds for social development and welfare measures in the surrounding villages for Education Facilities, Health Care and Family Welfare, Infrastructure Developments and Social Causes. The company has planned to spend ₹ 37,00,000/- Budget (4 % of the total cost Rs. 9.25 Crores) for social development programs under CER activities for the next 5 years. List of proposed activities for social welfares is given in below table:

TABLE 8.1 – PROPOSED SOCIAL ACTIVITIES

2nd 1st Year 3rd Year 4th Year Year 5th Year Total

Sr. No. Particulars (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) (Rs.) Education Support in 1 2,00,000 3,00,000 4,00,000 5,00,000 5,00,000 19,00,000 Government Public School Health Care Centers / 2 1,00,000 1,50,000 2,00,000 2,00,000 2,50,000 9,00,000 Medical Camps Miscellaneous 3 1,00,000 1,50,000 2,00,000 2,00,000 2,50,000 9,00,000 Fund Total 4,00,000 6,00,000 8,00,000 9,00,000 10,00,000 37,00,000

% 11% 16% 22% 24% 27% 100% (Total Cost per year) Total 3700000

Details of Educational Support in Government Public School

Village Unit Total Place Type of Requirement Number Name Rate Amount RO water 3 5,000 15,000 Scholarship for Students 10 20,000 2,00,000 Pali School Tree Plantation activity 1 1,7000 17,000 Computers 8 25,000 2,00,000 Scholarship for Students 10 20,000 2,00,000 Umber School Books for library 3 20,000 60,000 Computers 7 25,000 1,75,000 RO water 3 5,000 15,000 Eklera School Books for library 1 20,000 20,000 8.2

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 8 Project Benefits Date 17/03/2020

Village Unit Total Place Type of Requirement Number Name Rate Amount Scholarship for Students 10 20,000 2,00,000 Sports Equipmets 3 25,000 75,000 Computers 7 25,000 1,75,000 Tree Plantation activity 1 18,000 18,000 Bhestan School Books for library 3 20,000 60,000 Scholarship for Students 10 20,000 2,00,000 RO water 4 5,000 20,000 Kanakpur- Computers 7 25,000 1,75,000 School Kansad Sports Equipments 3 25,000 75,000 Total 19,00,000

Details of Support in Health Care Centers / Medical Centre

Village Unit Total Place Type of Requirement Number Name Rate Amount Primary health Construction of Health Umber 1 4,00,000 4,00,000 Centre centre Organize free medical Primary health 2 50,000 1,00,000 Eklera check up Centre Renovation of health centre 1 50,000 50,000 Primary health Organize free medical Umber 2 50,000 1,00,000 Centre check up Organize free medical 2 50,000 1,00,000 Primary health check up Pali Centre Provide new medical 1 1,00,000 1,00,000 equipment Primary health Kansad Renovation of health centre 1 50,000 50,000 Centre Total 9,00,000

Details of Miscellaneous Funds

Village Type of Total Place Number Unit Rate Name Requirement Amount Drinking water 5000 ft Rs.100/feet 5,00,000 pipeline Deladva Public Amenities Construction of 5 20,000 1,00,000 Public Toilets Public Amenities Boring 5 25,000 1,25,000 Construction of Kansad Public Amenities 5 20,000 1,00,000 Public Toilets

8.3

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 8 Project Benefits Date 17/03/2020

Village Type of Total Place Number Unit Rate Name Requirement Amount Renovation of Public Amenities 1 20,000 20,000 pond Talangpor Maintenance of Public Amenities 3 15,000 45,000 garden Renovation of Umber Public Amenities 1 10,000 10,000 pond Total 9,00,000

8.4

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 9 Environmental Cost Benefit Analysis Date 17/03/2020

CHAPTER 9 ENVIRONMENTAL COST BENEFIT ANALYSIS

As per EIA Notification 2006, this chapter of the ‘Environmental Cost Benefit Analysis’ is applicable only if it is recommended at the Scoping stage. However, as per the Standard TOR points issued by MoEF, the Environmental Cost Benefit Analysis is not asked for and hence has not been prepared.

9.1

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

CHAPTER 10 ENVIRONMENTAL MANAGEMENT PLAN

10.1 INTRODUCTION

Environment Management plan is prepared with a view to facilitate effective environmental management of the project, in general and implementation of the mitigation measures in particular. The EMP provides a delivery mechanism to address potential adverse impacts and to introduce standards of good practice to be adopted for all project works. For each stage of the program, the EMP lists all the requirements to ensure effective mitigation of every potential biophysical and socio-economic impact identified in the EIA. For each impact or operation, which could otherwise give rise to impact, the following information is presented:

• To treat and dispose off all the pollutants viz. liquid, gaseous and solid waste so as to meet statutory requirements (Relevant Pollution Control Acts) with appropriate technology. • To support and implement work to achieve environmental standards and to improve the methods of environmental management. • To promote green-belt development. • To encourage good working conditions for employees. • To reduce fire and accident hazards. • Budgeting and allocation of funds for environment management system. • To adopt cleaner production technology and waste minimization program.

10.2 OBJECTIVE & SCOPE

The main objective of Environmental Management Plan is to warrant that the industrial development in an identified particular study area needs to be entangled with judicious utilization of non-renewable resources and to ensure that the stress/load on the ecosystem is within its permissible assimilative capacity i.e. it carrying capacity. In above context, assimilative capacity refers to the maximum amount of pollution load that can be discharged into the environment without affecting the designated use of various environmental attributes and is governed by dilution, dispersion and removal due to physico-chemical and biological process. An effective EMP ensures that these environmental requirements and objectives are satisfied during all phases of project.

The long-term objectives of the EMP for all the environmental attributes are as under: • To comply with all the regulations / applicable laws stipulated by Central & State Pollution Control Boards. • To create good working conditions (devoid of air & noise pollution) for employees. • To rationalize and streamline environmental activities to add value in efficiency and effectiveness. • To encourage and achieve highest performance and response from individual employees and contractors. • Perspective budgeting and allocation of funds for environment management expenditure. • To contribute significantly for sustainable development. 10.1

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

• To encourage support and conduct developmental works for the purpose of achieving environmental standards and to improve methods of environment management. • Continuous development and search for innovative technologies for a cleaner and better environment.

The present EMP has been prepared to meet the requirements of pollution control from existing & proposed project as an integrated environment management plan.

10.3 ADMINISTRATIVE ASPECTS FOR EMP

10.3.1 Operational Philosophy

Philosophy behind designing the Environment Management Plan for a particular project is that all the activities being undertaken at the plant should be in complete compliance with all applicable laws, regulations, standards and guidelines. In order to achieve this, the management of the Orgo Chem (Guj.) Pvt. Ltd. will establish a resource base for the management of health, safety, environment and social issues at operation phase of the project. Technically qualified and experienced staff will be in-charge of this activity. The HSE objectives will consist of no accidents in plant, no harm to people of surrounding area and no damage to the environment. Plant management will be responsible to the community regarding environmental protection and promoting all practicable control measures to ensure implementation of project operation phase in an efficient and environmentally responsible manner. Success of the Environment Management Plan is due to following aspects:

1. Management support; 2. Efficiency of Environment Management Cell; 3. Acceptability of resulting environmental quality.

10.3.2 Management Support – Corporate Environment Policy

To implement and facilitate the Environment Management System for any project, one of the most important aspects is management support. An Environmental Policy covering following aspects shall be laid down prior to commencement of proposed project:

• Prevention of pollution through conservation of resources, careful handling and disposal of hazardous wastes in an eco-friendly manner and re-use / recycle of materials wherever possible;

• Providing continual training to employees and associates for up gradation of awareness and skills for better implementation of EHS management system;

• Adherence to all legal requirements concerning environment and occupational health and safety.

10.3.3 Environmental Management Cell

Orgo Chem (Guj.) Pvt. Ltd. will formulate the Environmental Management Cell for its proposed unit. The company will have a well-defined hierarchical system or administrative order to deal 10.2

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date with the environmental issues. EMC will involve personnel of plant level as well as corporate level for interaction with technical and statutory bodies to deal with environmental requirements/issues at all level. Environment Management Cell is represented in FIGURE 10.1.

FIGURE 10.1 - ENVIRONMENT MANAGEMENT CELL

MANAGING DIRECTOR

GENERAL MANAGER

MEDICAL HR MANAGER/ ENVIRONMENTAL OFFICER PRO MANAGER

APPROVED SHIFT SAFETY LAB ENVIRONMENT INCHARGE OFFICER INCHARGE CONSULTANT, LAB & AUDITOR PLANT CHEMIST INCHARGE

OPERATOR HELPER

HELPER

The major duties and responsibilities of Environment Management Cell shall be as given below:

• To implement the Environment Management Plan • To assure regulatory compliance with all relevant rules and regulations • To ensure regular operation and maintenance of Plant • To minimize environmental impacts of operations by strict adherence to the EMP • To initiate the environmental monitoring plan as per approved schedule • Review and interpretation of monitoring as per approved schedule and corrective measures in case monitoring results are above the permissible limits • Maintain documents of good environmental practices and applicable environmental laws as ready reference 10.3

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

• Coordination with regulatory agencies, external consultants & monitoring laboratories • Maintain log of public complaints and preventive and corrective actions to be taken.

10.4 DETAILS OF ENVIRONMENTAL MITIGATION MEASURES

The probable impacts identified & the mitigation measures envisaged for protection of Environmental Components during the construction and operational phase are as tabulated in the table below.

CONSTRUCTION PHASE Proposed Sr. Environmental Aspect Attributes Impact Mitigation No Parameters Measures • Temporary tin sheets of sufficient height (3m) will be erected around the site of dust generation or all around the project site as barrier for dust control. Workers getting • Regular water exposed to the dust sprinkling activity will • Minor dust pollution generated be done to avoid emission will be due to the dust generation generated due to construction activity • Only PUC vehicle 1. Air handling and can suffer from will be used for the transportation of respiratory problems transportation of construction and prolonged materials and material exposure can lead to equipment. malfunctioning of • Construction lungs. activities will be done during day time only. • PPE’s like dust, mask, ear plug, helmet, safety belt will be provided to workers to wear them during working hours. • Noise • The impacts of • Appropriate PPE’s generation due to high noise level would like ear muffs will be movement/operati be Temporary / provided to the 2. Noise on of vehicles and Permanent hearing workers. equipment/ loss, Mental • All vehicles will machineries disturbance be informed to 10.4

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

CONSTRUCTION PHASE • Transportation • Increase in heart maintain speed limits of construction rate, Affecting and not blow horns materials. worker's unless it is required. performance. • Wastewater • Proper surface generation during water runoff the construction Contamination of the management would period will be from soil and nearby water be implemented. 3. Water the sanitary units. bodies due to the • Domestic sewage • Water which is surface runoff. will be disposed going to be used in through packaged construction. Sock pit. • The effect on land due to transportation of construction materials will be insignificant because • Minor waste there will be minor will be generated construction. during Demolition / • Trucks/Container Soil Erosion / Modification work s will be covered from contamination due to 4. Soil during construction the top as well as construction phase. water will be activities. • Transportation sprinkled on the land of construction that will help to material reduce air/dust pollution. • Concrete floor shall be provided for mechanical works to prevent soil contamination. • Construction • Reusable and demolished construction waste waste as generated will be used in other shall be disposed of Unhealthy work construction activities Solid Waste as per C&D waste 5. condition at project and other waste will Management and disposal rules site be disposed as per and minor C&D waste quantities of solid management waste generation is guidelines. anticipated OPERATION PHASE 1. Air • Emission from • The Maximum • 33-meter height 10.5

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

CONSTRUCTION PHASE Boiler, Thermopack Incremental of stack will be and D.G. Set during concentration of provided to Boiler, operation phase. Thermopack and 12- • Due to volatile PM2.5 – 0.08 µg/m3 meter height of stack solvent the VOC PM10 – 0.03 µg/m3 is provided to D. G. 3 emission can have SO2 – 0.13 µg/m Set. D. G. Set is/will 3 an effect on Worker NOx – 0.05 µg/m be operated in case of 3 health. NH3 – 0.06 µg/m power failure only. • It is proposed to is found through use plastic cover AERMODCloudTM Air sheet while Dispersion Software transporting as mention in section Hazardous waste / 4.7 in chapter 4. products from project • The Health effects site. All safety & related to particulate control measures matter are shall be provided to respiratory, can cause prevent spill, leak and pulmonary injury & accident during lung cancer etc. transportation. Exposure to SO2 and • Adequate PPEs NOX majorly leads to provided to workers, respiratory problems. during plant • The health effects operation. related to VOC • All safety & emission are eye, control measures nose and throat shall be provided to irritation and prevent spill, leak headaches. during effluent treatment and disposal. • Air Blower will be The impacts of high provided with noise level would be acoustic enclosure. Temporary/Permanen • Proper and time t hearing loss, Mental to time maintenance Operation of Boiler, disturbance Increase will be done to all Thermopack & in heart rate Decrease machineries and D.G. Set, other in the workers’ 2. Noise vehicles to control utilities & performance due to noise. transportation psychiatric disorder • Isolation of high activity. Workers developing intensity noise Tinnitus due to high generating level of noise equipment. exposure on regular • Appropriate PPE’s basis. should be provided 10.6

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

CONSTRUCTION PHASE to workers. • Unit has proposed ZLD scheme for the proposed manufacturing plant. Entire quantity of wastewater generated due to • Effluent from Indiscriminate industrial activity manufacturing release/discharge of shall be treated into process. effluents may inhouse MEE plant • Waste water contaminate the followed by 3. Water from Boiler, surrounding surface biological plant and Washing and and groundwater & RO Plant. Ro Cooling Tower. there by affecting the permeate water shall • Domestic overall ecology. be reused within wastewater. plant premises and RO reject water shall be sent back again to MEE plant. • Domestic Waste water will be disposed through to soak pit. • Proper concrete floor construction for storage and handling of raw materials/hazardous waste. Soil contamination Soil Contamination • Contaminated may occur in case of during soil due to spillage of leakage or spillage of handling/storage waste water will be hazardous Waste or 4. Soil of raw recovered from raw material/hazardous ground and is sent as materials/chemicals waste, vehicle hazardous waste for which can affect the transportation. final disposal to soil quality. TSDF site. • Hazardous waste management as per statutory guidelines & requirements. Solid Waste • Hazardous Unscientific handling • Hazardous waste 5. Management waste generated & disposal may lead generated from the 10.7

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

CONSTRUCTION PHASE from the to contamination of manufacturing manufacturing surrounding soil, process, ETP sludge process. water sources & there and MEE salt will • Sludge by affecting the disposed to TSDF generated from the ecology & health of site. ETP operation. the workers coming in Salt generated direct contact with the from the MEE hazardous waste like operation. skin allergies/rashes/ etc.

10.8

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

10.5 In-House Laboratory

Orgo Chem (Guj.) Pvt. Ltd. will develop an in-house laboratory facility of plant performance and continuous up gradation and optimization of plant operation. List of major instruments available in laboratory are given below.

TABLE 10.1 – LIST OF MAJOR LABORATORY INSTRUMENTS

Sr. No. Name of Equipment Quantity 1 pH meter 1 Nos. 2 COD Digester 1 Nos. 3 BOD Incubator 1 Nos. 4 Oven 1 Nos. 5 Single Pan Analytical Balance 1 Nos. 6 Digital Balance 1 Nos. 7 Hot Plates 2 Nos. 8 Refrigerator 1 Nos. 9 Magnetic Stirrer 1 Nos. 10 Vacuum Pump 1 Nos. 11 Water Bath 1 Nos. 12 DO Meter 2 Nos. 13 Required glassware, chemicals and reagents 1 Nos.

10.6 Biological Environment

Greenbelt Development

The proponent will focus on green belt development plan with an area of around 805 m2 (40% area of total land).

• The tress shall be planted in three tiers pattern so as to ensure that the entire area gets covered and ensure effective pollution abatement. For this, management shall ensure that plantation of trees shall include mixture of lower, higher and middle canopy structure, which shall be mixed appropriately / proportionately / uniformly. • Indigenous species with fast growth are only selected or form the base of selection as Green Belt can come in view as fast as possible. • The plantation shall also include fruit bearing trees/ species which shall be uniformly distributed which shall act as dwelling place for Varity of birds and other fauna and form a breeding ground for them. • Care shall be taken to plant ample trees along the road side, boundary wall as well as within the plant premises. It shall enable proper balance of atmosphere both outside the campus by absorbing noise and gaseous pollutants of the road side movement of vehicles and also absorption of noise and emissions within the premises of the plant. • The non-structural actions shall be initiated with inception of commissioning stage and shall be implemented & practiced as routine throughout the project life.

10.9

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

As per the present project activities, it is recommended to raise the following plant species. These species can be also available near the forest department nurseries.

TABLE 10.2 - PLANTATION NEAR WASTE LANDS / RESERVE FORESTED AREAS / ROAD SIDE

No. Botanical name of Importance Suggested planting Zone/ Direction trees Trees Shade, food Ficusbenghalensis 10 Buffer zone for birds Ficusracemosa 10 Edible fruits Buffer zone Peltophorumpterocarpum 20 Shade Buffer zone Samaniasaman 100 avenue tree Buffer zone Cassia fistula 50 avenue tree Buffer zone Delonixregia 20 avenue tree Buffer zone Shade, Calophylluminophyllum 50 Buffer zone medicinal Pulp and Casuarina equisetifolia 100 construction Core zone material Ornamental Callistemon citrinus 50 Core zone tree Cocos nucifera 20 fruit Buffer zone Dendrocalamusstrictus 10 Bamboo Buffer zone Syzygiumcumini 10 Fruits Buffer zone Tamarindusindica 10 Shade, fruits Buffer zone Tecomastans 20 Shade Buffer zone Tectonagrandis 100 Shade, Wood Buffer zone Terminalia bellirica 50 Fruits, Shade Buffer zone Termineliachebula 20 Fruits, Shade Buffer zone Thespeciapopulnea 10 Shade Buffer zone Thevetianeriifolia 10 Shade Buffer zone Tremaorientalis 20 Shade Buffer zone Vitex negundo 100 Shade Buffer zone Wrightiatinctoria 50 Shade Buffer zone Phyllanthus emblica 20 Fruits Buffer zone Pithecellobium dulce 20 Fruits Buffer zone Plumeria alba 20 Shade Buffer zone

10.10

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

TABLE 10.3 - PROPOSED FINANCIAL BUDGET FOR THE GREEN BELT DEVELOPMENT (RS IN LAKHS)

Sr. Component First Second Third Fourth Fifth Total No year year year year year 1 Plant seeds/ saplings 2.0 2.0 2.0 2.0 2.0 10.0 2 Pits and watering 0.4 0.4 0.4 0.4 0.4 2.0 3 Regular maintenance 0.4 0.4 0.4 0.4 0.4 2.0 4 Transportation 0.2 0.2 0.2 0.2 0.2 1.0 Grand Total 3.0 3.0 3.0 3.0 3.0 15.0

10.7 OCCUPATIONAL HEALTH AND SAFETY

• Pre-medical examination and periodical examination will be carried out once in a six month and records will be maintained in Form No-32 & 33 as per GFR. PFT, LFT, Cardiac as well as Haematological & Urine test will be carried out during pre-placement and periodical examination and shall follow the same after site is ready to operate. • Provision of conveyance facilities like safe drinking water & dining rooms etc. and good sanitation including proper waste disposal • Isolation of drinking water & refreshment area including canteen etc. from the area of hazardous materials storage & handling • Chemical Safety Booklet/Documents for all hazardous chemicals shall be prepared and safety Booklet/Documents thus prepared will be made available well before commissioning of the project to all employees working with chemicals. • Chemical safety booklet will include all necessary details like permissible exposure level/limit, Health effect, symptoms of toxic effects on human health, on-site first aid and necessary medical treatment guidelines etc. • All required & necessary health manual & procedures for all activities are developed and implemented. Such Manual & Procedures shall be made available to all concern employees. • Proponent have done preparation to implement the Emergency action plan including on- site & off-site emergency management plan • Comprehensive risk assessment shall be conducted after commissioning of plant and necessary safety measures shall be implemented. • Well planned transportation scheduled to minimize unusual trips of vehicles to reduce traffic and speed of vehicles on road especially in populated area & site. • Strict Prohibition of match box, lighters, clothes having potential of static charges as well as smoking in plant & storage area. • Proponent has plan for regular safety audit and necessary improvement as suggested by auditor. • Properly designed & designated storage area and provision of good handling equipment and procedures are ensured before commissioning. • Proper shift planning of workers exposed to hazard prone areas to manage the total exposure level as per stipulated standards & / or statutory norms. • Medical & First-aid facilities within premises & in all departments.

10.11

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

• Mechanical handling system & arrangement wherever possible to avoid manual handling & so to avoid issues related to handling & storage of Hazardous Chemicals. Wherever, automatic system is not possible, adequate manual handling facilities like trolley & Crain to reduce the stress of pulling -pushing and lifting to prevent or minimize the chances of issues related to handling & storage of Hazardous Chemicals. • Provision of ergonomic design of all facilities wherever possible (e.g. chairs, tables, working platforms, self and position & height of display screens & panel etc.) to prevent or minimize the chances of issues related with MSDS • Management provides all necessary PPEs, safety equipment/materials to ensure healthy & safe work conditions. Regular inspection for the safety procedures and use of PPEs & Safety equipment/material is done by the management/safety officer. • Necessary training programs & audit shall be done on regular basis to prevent impacts of the operational activities on human health as well as to improve workplace condition & safe work system.

10.7.1 BUDGETARY ALLOCATION FOR ENVIRONMENT PROTECTION

Capital investment towards the environmental protection, control & mitigation measures will be about Rs. 288 Lakhs for the proposed project.

The unit will keep provision for adequate funds aside to meet with regular expenses for the environmental control measures. Recurring cost for environmental management for the proposed project is given in TABLE 10.4.

TABLE 10.4 - ENVIRONMENTAL BUDGET ALLOCATION

Capital Cost Recurring Cost Sr. Rs. In Description Rs. In Basis of Cost Basis of Cost No. Lakhs per Lakhs estimation estimation annum Power consumption Air Pollution Installation of 1 40 30 and maintenance of Control Scrubber System & APCD. Power Construction and Water Pollution consumption, 2 230 Installation of 90 Control maintenance cost MEE & ETP of ETP Hazardous / Membership of Transportation and 3 Solid Waste 4 20 TSDF/CHWIF disposal cost Management Acoustic enclosure 4 Noise Pollution 2 for Boiler, DG Set, 0.5 Maintenance cost Pumps housing Development of Hiring of panel Occupational Occupational Health doctors, medical 5 2 0.2 Health Center / First Aid examiners and Center expenses

10.12

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

Capital Cost Recurring Cost Sr. Rs. In Description Rs. In Basis of Cost Basis of Cost No. Lakhs per Lakhs estimation estimation annum Third party cost for Installation of environmental Environmental process monitoring 6 10 5.4 Monitoring gas, VOC detector; and Statutory compliance and chartered services. Total 288 Total 146.1

10.8 APPLICATION OF CLEANER PRODUCTION TECHNOLOGY

Cleaner Production in recent times has emerged as an attractive proposition to tackle the environmental problems posed by rapid industrialization and is being accepted worldwide. Besides reducing pollution, it also improves the process efficiency, thus reducing the cost of production. Applications of CP mainly focus on preventing or minimizing the generation of waste and gaseous emission. The basic idea of cleaner production is to avoid a problem altogether rather than trying to find remedial measure by adopting proactive approach of waste management. As far as the production processes are concern, CP will be achieved by raw material and energy conservation, by reducing quantum of emission and waste generation. To obtain fruitful results, CP should be implemented by adopting the concept of product modification, source reduction and recycling.

Proposed project shall implement various techniques of CP in factory premises and put continues efforts for developing new techniques. Implementation of techniques of CP is described below.

10.8.1 Pollution Prevention

• High density polythene bags or drums shall be used. Hence, the generation of plastic waste can be reduced. Moreover, Discarded Bags/ Container shall be decontaminated and reuse/sold. • The unit shall maintain the proper inventory of the hazardous chemicals and keeping the buffer stock as minimum as possible. This will help to reduce the possibilities & magnitude of environmental hazards. • There shall be periodic arrangement of environmental training program to create understanding among plant personnel towards environment. • Unit shall manufacture products with maximum yield by using high-quality of raw material and advanced process technology. • To minimize material wastage, standard SOP shall be followed by the unit.

10.8.2 Water Conservation

• As a part of water conservation, excess service water taps shall not be provided in the plant premises.

10.13

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/ Rev. 0 Title Chapter 10 Environmental Management Plan Date

• Flow meter shall be installed at raw water intake and at ETP. • Mopping shall be done for floor cleaning. • Provision for High Pressure Jet Pump shall be used for the cleaning of equipment, vessel & rector etc. • Water sprinkle system shall be used instead of hose pipe for the green belt development.

10.8.3 Energy Conservation

• First step to conserve energy is to identify source of energy utilization. • Variable frequency drives (VFD) in pumps shall be provided to save energy. • Use of low loss transformer instead of conventional transformer. • Proper air to fuel ratio shall be maintained for the maximum efficiency of boiler. • Good insulation practice shall be adopted to prevent heat losses. • Regular cleaning of the lamps and fixtures shall be done to get better illumination in the plant. • To avoid loss of precious quantum of energy, regular maintenance / servicing shall be provided to all the equipment. • Unit shall plan energy audit regularly as a tool for monitoring purpose.

10.8.4 Good House Keeping

Good housekeeping means changing existing practices or introducing new ways of operating and maintaining equipment. Proper good housekeeping can prevent accidents, spillages and leakages, raw material & product loses. For Good housekeeping following practices shall be adopted.

• All the materials must be stored in compatible group. • Appropriate tools shall be provided for handling of all the materials. • Regular training shall be given to all workforces. • All the passages, floors and stairways shall be maintained in good condition. The system shall have made available to deal with any spillage at the plant. • Sufficient disposable bins have clearly marked and these are suitably located in the plant. • In the plant, precaution and instructions shall display at strategic locations. • Proper working instructions have given to all the workers in factory. • Roads/walkways within the plant must be maintained neat and clean. Walkways must be clearly marked and free from obstructions.

10.14

ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 11 Summary and Conclusion Date 17/03/2020

CHAPTER 11 SUMMARY AND CONCLUSION

11.1 INTRODUCTION

1. Orgo Chem (Guj) Pvt. Ltd. is a manufacturer of dye intermediates since 1967 and exporter since 1975. It has manufacturing facility located at Plot No. 256, G.I.D.C., Sachin-394 230, Tal: Chorasi, Dist: Surat near India’s business capital – Mumbai and a dedicated office in Mumbai for marketing & logistics. The proposed project will be located at Plot number 719, Road no. 7, GIDC-Sachin, Surat.

2. Orgo Chem (Guj.) Pvt. Ltd. is manufacturing various products involving various processes viz. Condensation, Filtration, Isolation, Reduction at their existing unit. Company exports 85 % of its products to Europe, USA, Japan, Korea, China, Thailand, Brazil and Czech Republic.

3. Company is proposing another new manufacturing plant of dye intermediates with the capacity of 170.5 MT/Month at Plot no. 719, Sachin GIDC, Surat, Gujarat due to rising demand from end-user industries in global and local market for dye intermediates.

4. The proposed project falls under item 5(f) of Schedule to EIA Notification dated 14th September, 2006, i.e. Synthetic Organic Chemicals, Category – “A” (as the project site is located in CPA).

5. In order to assess the potential environmental impacts arising due to proposed project, the promoter has assigned the work of EIA to M/s. ENPRO Enviro Tech & Engineers Pvt. Ltd. (ENPRO), Surat for collecting the information on existing environmental conditions and assess the impacts on environment due to proposed project and suggest the environmental safeguards and mitigation measures.

11.2 PROJECT DESCRIPTION

1. Total production capacity will be 170.5 MT/Month. Proposed facility shall be carried out within total plot area of 2010 m2. The Product list with its capacity of proposed project is given below.

11. 1 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 11 Summary and Conclusion Date 17/03/2020

TABLE 11.1 - PRODUCTS ALONG WITH PRODUCTION CAPACITY

Sr. Proposed Total Product Group CAS No. No. MT/Month 1 CONDENSATION 1.1 4 Chloro Benzamide 619-56-7 1.2 4 Nitro Benzamide 619-80-7 1.3 4 Amino Benzamide ( 1 ) 2835-68-9 1.4 4 Amino Benzamide ( 2 ) 2835-68-9 1.5 3 Amino Benzamide 3544-24-9 1.6 4 Chloro 3 Amino Benzamide 19694-10-1 1.7 4 Methyl 3 Amino Benzamide 19406-86-1 25 1.8 MUB 7695-46-4 1.9 3 Nitro Benzamide 645-09-0 2 Amino - 5 - (4 aminobenzoylamino) 1.10 58862-43-4 Benzene Sulphonic Acid 1.11 4 Amino Benzanlide 2657-85-4 1.12 3 Amino Benzamide 3544-24-9 1.13 4, 4 Di Amino Benzanilide 785-30-8 2 AMINATION 2.1 4 Chloro 3 Amino Benzoic Acid 2840-28-0 2.2 Para Amino Benzoic Acid 150-13-0 2.3 Di Amino Benzoic Acid 535-87-5 2.4 4 Chloro Aniline 3 Sulphonic Acid 88-43-7 2.5 2 Chloro Aniline 5 Sulphonic Acid 98-36-2 2.6 2 Amino Phenol 4 Sulphonic Acid 98-37-3 2.7 Meta Amino Benzoic Acid 99-05-8 50 2.8 3, 4 Di Amino Benzene Sulphonic Acid 7474-78-4 2.9 3, 4 Di Amino Benzoic Acid 619-05-6 2.10 Para Nitro Aniline Sulphonic Acid 616-84-2 2.11 Ortho Nitro Aniline Para Sulphonic Acid 82324-60-5 2.12 Para Amino Toluene Ortho Sulphonic Acid 121-03-9 2.13 4 Chloro 3, 5 Di Amino Benzoic Acid 32961-44-7 2.14 2, 5 Di Amino Benzene Sulphonic Acid 88-45-9 3 OXIDATION 3.1 Para Nitro Benzoic Acid 62-23-7 3.2 4 Chloro 3 Nitro Benzoic Acid 96-99-1 50 3.3 Para Chloro Benzoic Acid 74-11-3 3.4 Meta Nitro Benzoic Acid 121-92-6 4 CYCLIZATION

11. 2 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 11 Summary and Conclusion Date 17/03/2020

Sr. Proposed Total Product Group CAS No. No. MT/Month 4.1 6-Nitro Benzoxazolone 3, Methyl Sulphone - 15 4.2 5-Nitro 2-Amino Phenol 121-88-0 5 METHOXYLATION 5.1 3 Nitro 4 Methoxy Benzoic Acid 97-52-9 15 6 AMMONIUM SULPHATE 7783-20-2 15 RESEARCH AND DEVELOPMENT 7 - 0.5 PRODUCTS TOTAL 170.5

2. The total cost of proposed project is estimated around Rs.9.25 Crores.

3. The proposed project in existing land area is located in Notified Industrial Area. The total area of land is 2010 m2.

4. The water requirement for the proposed project is 45 KLD.

5. The power requirement for the proposed plant is 200 KVA. For Power Back up, D.G. Set with capacity of 125 KVA will be provided.

6. Industry will use Natural Gas (2000 SCM/Day) as fuel in Boiler (2 MT/Hr) and (500 SCM/Day) in Thermopack (200 U). Each of this unit shall be provided with the stack of minimum 20 m height along with stack monitoring facility. 125 KVA D.G. Set shall be provided for emergency power supply and it shall be operated based on LDO fuel (600 Liters/Day). Unit will also use 25 MT/Day steam for plant operation from common boiler house.

7. Total employment generation due to proposed project will be 45.

8. Details of Pollution potential/Sources of proposed project is given below.

TABLE 11.2 - DETAILS OF POLLUTION POTENTIAL/ IDENTIFIED SOURCES OF IMPACTS

Pollution Potential/Identified Sr. No. Proposed Sources Total – 34.5 KL/Day 1 Waste water Industrial – 30 KL/Day Domestic – 4.5 KL/Day Stack-I: Stack attached to Boiler (Ht.-33 Mt., Dia-200 mm) 2 Utility emissions Stack-II: Stack attached to Thermopack (Ht.-33 Mt., Dia-200 mm), Stack-II: D.G. Set,1 Nos. (Ht.-12 Mt.)

11. 3 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 11 Summary and Conclusion Date 17/03/2020

Process Stacks: 1 Nos. (Ht.-20 M, Dia-100 mm) Used / Spent Oil: 100 Liters/Year i. e. 0.90 MT/Year (Collection / Storage / Transportation / send to GPCB approved Recycler) Discarded bags / drums / barrels: 2600 Nos./Year i.e. 20 MT/Year (Collection / Storage / Transportation / send back to supplier / disposal to GPCB approved Recycler) ETP Sludge: 52 MT/Month i.e. 624 MT/Year (Collection / Storage / Transportation / send to TSDF site for land filling) MEE Salt: 30 MT/Month i.e. 360 MT/Year (Collection / Storage / Transportation / send to TSDF site for landfilling) Iron Sludge: 143.75 MT/Month i.e. 1725 MT/Year (Collection / Storage / Transportation / send to cement industry for co processing) Spent Solvent (ODCB): 90 MT / Month 3 Solid Hazardous Waste (Collection / Storage / Transportation / reuse in to same process / send to GPCB approved recycler) Spent Solvent (Methanol): 16.28 MT/Month (Collection / Storage / Transportation / recycle into same process / send to authorized recycler) Nitric Acid: 367.4 MT/Month i.e. 4408.8 MT/Year (Collection / Storage / recycle within same process of Oxidation) Mixed Salt: 45 MT/ Month i.e. 540 MT/Year (Collection / Storage / Transportation / send to TSDF site for landfilling) Distillation Residue: 2 MT/Month i.e. 24 MT/Year (Collection / Storage / Transportation / Redistilled /Sent to CHWTSDF site for incineration / sell to cement industries for co processing Wastewater (Bleed) from Scrubber: 1.5 KL/Day (send to inhouse MEE plant followed by biological treatment and RO plant.

11. 4 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 11 Summary and Conclusion Date 17/03/2020

11.3 BASELINE ENVIRONMENTAL STATUS

1. Environmental scenario has been described for the specific environmental components as delineated in TOR for study area of plant.

2. Ambient air quality data for the proposed project has been generated during the study period starting from 1st March 2019 to 31st May, 2019 at six locations within study area of 10 km.

3. The average concentration of all pollutants at all ambient air locations are found to be varying in the following range:

3 PM10: 40.4 – 120.7 µg/m 3 PM2.5: 20.7 – 68.1 µg/m 3 SO2: 11.3 – 56.1 µg/m 3 NOX: 20.1 – 58.2 µg/m CO: 0.91 – 0.91 mg/m3 3 NH3: 2.3 – 15.4 µg/m HC: Not Detectable VOC: Not Detectable PAH: Not Detectable

The average PM10, PM2.5, SO2, NOX, CO and NH3 concentrations at each location remains below the stipulated standards of NAAQS [24 hr.].

4. Base on meteorological data, wind roses have been prepared for the post monsoon season. As per meteorological data, it shows that average wind speed in this season is 1.06 m/sec. It can be observed that in this season, wind blows mostly from South West to North East.

5. The surface water samples have been collected from 6 different sources – Lake Water and River within study area. The ground water samples have been collected from 7 different Bore wells. Surface water sources i.e. only Lakes and river water needs water treatment plant before it is used as domestic purposes. Ground water can be used as drinking water as well as industrial water after obtaining permission from CGWA and after relevant treatment.

6. Soil samples have been collected from 7 locations to ascertain its physical and chemical characteristics within study area. Physical parameter suggested that type of soil within study area is clay loam. Chemical parameters are presented in Chapter 3.

7. The noise levels have been measured at project site and 8 other locations falling within study area and they were found in permissible limit as per CPB/GPCB/MOEF.

8. The land use / land cover mapping has been carried out for 10 km radius area with project site at center. The study area is mostly covered with Fallow Land 33% and Mud around 19 %

11. 5 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 11 Summary and Conclusion Date 17/03/2020

respectively of the total area. Total cultivable land is 33%. The open scrub is with 7 %, Other class is Roads within the study area 7%, Around the Fallow edges the Settlement (Built-up area) is located and occupies around 10%, and Industries are around 5% of the total study area. The Plantation is 4%, Railways is 5% respectively in the total study area. The proposed project is in Industrial area and does not have any significant impact on the surrounding villages and habitation. The water bodies cover 6% of the total area.

9. The base line study for evaluation of the flora and fauna bio diversity of the terrestrial environment of the study area was carried out within 10 km radius of the proposed plant.

10. Throughout the study area, there no direct evidence of wild animal species observed. Common mongooses, Squirrels are sighted apart from few reptilian species. From the secondary source (local people near villages) it is also revealed that presence of langurs and common snakes exists here. Common bird species such as Paddy egrets, Green bee eaters, Indian rollers, Parakeets, White headed babblers, Weaver birds, Mynas, Black drangos, Crows, Sparrows are sighted here.

11. Project site is located within the existing plant area in Sachin GIDC area, Surat District, Gujarat. Immediate surroundings of the project site are dominated by industrial establishments; mainly chemical manufacturing units, few settlements of Pali village located within 1 km from project site are the nearest habitation. There is no eco-sensitive area likes forest patches, large water bodies of that attract migratory and other residential water fowls within the close proximity of the project site, and hence the direct impact due to the project on these eco-sensitive receptors are not envisaged. The green belt in the GIDC area is limited to very few industrial compounds mainly through the plantation of Asopalav (Polylathia longifolia), Sonmukhi, (Peltophorum pterocarpum), Sharu (Casuarina equisetifolia), Pardesi Baval (Leucaenaleucocephala) and Nilgari (Eucalyptus sp.). Tree cover in the study area is restricted to homestead/farmland or road side plantation. These typical tree cover patterns is termed by Forest Survey of India (FSI) as Trees outside Forests (TOF), in the form of small woodlots and block plantations as trees along linear features, such as roads, canals bunds, etc. and scattered trees on farmlands, homesteads, community lands and urban areas. Dominant tree species planted as farmland plantation was dominated, Mangifera indica (Keri), Borassus flabellifer (Tad), Phoenix sp, Adirachta indica (Limbado), Casuarina equisetifolia (Sharu), Ailanthus excelsa (Aurdso), Eucalyptus sp (Nilgiri), and Albizia lebbeck (Siris) etc.

12. The Socio-Economic Impact Assessment has been done based on (secondary data collected from Census 2001 and 2011) covering around 24 villages in and around the project site. The project area is comprised of rural areas from Kim covering major industrial zone. The percentage of main worker in the project area is highest in Popda; Mohni; Deladva; Khambhasla villages (100%) and lowest is in village Ponsara (62.3%), while the average percentage of main worker is 93.1% in the villages located in the 10 km radial distance from the project site. The work participation rate is maximum in the village Pali (OG)(63.1%) and the minimum is in village Karankhat (33.7%); while the average work participation rate

11. 6 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 11 Summary and Conclusion Date 17/03/2020

is 46% in the villages located in the radial distance of 10 km from the project site. The population largely engaged in service sector (47%); Followed by Agriculture sector (26%); Casual labor work (17%); and Petty Business (10%).

11.4 IMPACT ASSESSMENT AND MITIGATIONS

1. Impact identification matrix has been developed by establishing cause-effect relationship between activities of project and environmental attributes.

2. Unit has proposed ZLD system for wastewater management. Entire effluent generated from industrial activity shall be send to inhouse MEE plant followed by biological treatment and RO plant. Here, RO permeate water shall be reused within plant premises. RO reject water shall be again sent back to MEE plant.

3. Further, it has been noticed that the impacts due to utility operations would be negligible as the Natural gas and LDO will be used as fuel. Natural gas is eco-friendly fuel which does not emit any toxic pollutant and hence, there would not be any major impacts due to emission. For control of particulate emission from process, company will install adequate APCDs which will minimize the impacts of process/fugitive emissions. Modelling of pollutant emission (PM2.5, PM10, SO2, NOX, NH3.) was carried out using AERMOD to assess incremental ground level concentration within 10 km radius study area. Incremental ground concentration was found insignificant in study area.

4. Hazardous waste generated from industry will be stored in hazardous waste storage area and then disposed to TSDF site. Impact on land pollution due to solid waste generation is found insignificant due to proposed scientific disposal of solid and Haz. waste.

5. Unit will develop green belt within plant premises in 805 m2 area (40% of the total plot area).

6. There are no notified ecological sensitive locations, migratory paths, sanctuaries etc. within the study area.

7. Insignificant effect on ecological environmental and geology and hydro-geology aspects is predicted due to adequate control measures for effluent management, emission control and solid waste management.

8. There is no major noise generating machinery in industry. DG Set is provided for power failure condition. All DG Set are provided with acoustic enclosure to mitigate noise generation during operation. ETP blowers are provided with acoustic enclosure to mitigate noise generation during operation. The impacts of increased noise level will be further mitigated by provision of PPEs and shift management. The noise level out of the premises is envisaged to be 67.4 – 73.2 dB(A) in day and 62.8-68.9 dB(A) in night. Thus, looking to the

11. 7 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 11 Summary and Conclusion Date 17/03/2020

source, potential noise level generation & planned mitigation measures; impacts due to noise are not envisaged.

9. The socio-cultural and economic structure within the study area is not also likely to be affected by the proposed project. The manpower requirement for the proposed plant is expected to generate some permanent jobs and secondary jobs for the operation phase. The proposed project is expected to create 45 employments.

10. Risk assessment study has been conducted for the proposed project and the suggestions made in the report shall be implemented strictly to prevent any chances of environmental contamination and employee health & safety. By the efficient implementation of Hazard/Risk control/Prevention measures the negative impacts would be avoided.

11.5 ENVIRONMENT MONITORING PROGRAMME

The environmental monitoring program is prepared for (Ambient Air, Stack Gas, Effluent, Soil, ground water and Surface water, Noise) for effective monitoring of the environmental conditions to ensure that EMP is implemented efficiently to prevent/minimize the anticipated impacts.

11.6 ENVIRONMENT MANAGEMENT CELL

1. Qualified and experienced personnel in the field of environment pollution control shall be working as plant in-charge for overall responsibility, for the management of all the issues related to Environment, Health and Safety within the plant, and responsible person will be directly reporting to the Director of the plant management, for issues related to the Environment Management System.

2. The overall management of the project will be managed by Board of Directors. The technical and scientific staff will be working under Technical Director.

3. QC Manager – shall be working for Quality Control and directly report to Technical Director if any issue is there regarding Quality of Products.

4. Production Manager – shall be looking after Supervisor, Dispatch, Maintenance I/c, Effluent Treatment Plant I/c etc.

5. Operators will be working under supervisor in the different section of the plant area. Whereas, Fitters and Electricians will be working under Maintenance I/c. Other than these, there is also Safety Engineer, Store I/c.

6. Guidelines for Management, Operation and Maintenance of plant issued by Central Pollution Control Board are followed to operate plant effectively and efficiently. Maintenance schedule of plant shall be planned, considering stand by storage facility, availability of manpower, availability of maintenance tools, safety equipment and other required facilities.

11. 8 ENPRO Enviro Tech and Engineers Pvt. Ltd. Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 11 Summary and Conclusion Date 17/03/2020

7. Preventive maintenance schedule for plant machineries shall be prepared and strictly followed on regular basis for effective and efficient operation of plant.

8. Plant operation staff shall be trained for safe handling of chemicals and operation of unit.

9. All personnel working at plant will be provided with necessary personnel protective equipment (PPEs).

10. Adequate number of fire extinguishers shall be provided in the plant.

11. Proper storage of all hazardous waste in the respective designated storage area shall be maintained on regular basis.

11.7 PROJECT BENEFITES

1. Employment Generation. 2. Benefit to the country in form of foreign revenue, duties etc. 3. Economic and social development through CSR activities.

11. 9 ENPRO Enviro Tech and Engineers Pvt Limited Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 12 Disclosure of Consultant Date 17/03/2020

CHAPTER 12 DISCLOSURE OF CONSULTANT

12.1 NAMES OF THE CONSULTANTS ENGAGED WITH THEIR BRIEF RESUME AND NATURE OF CONSULTANCY RENDERED

(A) Name M/s. ENPRO Enviro tech & Engineers Pvt. Ltd. (ENPRO) (B) Address 306, Royal Park, Adajan Road, Surat-395009 Gujarat, INDIA Telephone 91-261-3295244 Fax 91-261-2786129 E-mail address [email protected] , [email protected]

(C) Company’s Capabilities ENPRO deals with the issues related to environmental pollution control and also provide better options/ solutions for effective control of environmental pollution i.e. air, water and solid waste disposal. ENPRO has sufficing infrastructure of its technical staff and has its own laboratory for analysis of water, waste water, solid wastes and gaseous emissions.

(D) Company’s Work area At present ENPRO is capable to undertake following type of assignments: 1. To design the water, waste water and sewage treatment plant. 2. To carry out rapid as well comprehensive Environment Impact Assessment study and report preparation. 3. To undertake work related Environment Clearance from Ministry of Environment, Forest and Climate Change (MoEF& CC). 4. To carry out Environment audits. 5. To provide advice in respect of statutory obligations related environmental pollution control (Form-V, Form-IV, Water Cess returns) which is required to be complied by industries as well as techno-legal consultation related to environmental issues. 6. To carry out Treatability studies for evolving effluent treatment system. 7. To carry out analysis of water, wastewater, hazardous waste & gaseous emission. 8. To operate or assist for efficient operation of effluent/ sewage treatment plants. 9. To design secured landfill site for hazardous waste, bio-medical waste disposal and to prepare techno economical feasibility report. 10. To carry out waste minimization study for the industrial pollution control.

(E) Accreditation & Recognition

12.1

ENPRO Enviro Tech and Engineers Pvt Limited Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 12 Disclosure of Consultant Date 17/03/2020

1. QCI-NABET Accredited EIA Consultant, (Certificate No. NABET/EIA/1922/RA 0122 Dated on 27th March 2019)

2.

NABL Accredited Environment Testing Laboratory, (Certificate No. TC- 5885 Dated on 1st June 2019) Certificate No. TC- 5885 (in lieu of T-1961) 3. Certificate No. QACS-A-EE-09.18.041 Dated on 30th November 2018 ISO 9001: 2015 4.

Certificate No. QACS-EMS-EE-5953 Dated on 30th November 2018

ISO 14001: 2015 5.

Certificate No. QACS-OH-EE-02955 Dated on 30th November 2018

ISO 45001: 2018 6. Certificate No. Q.15018/45/2015-CPW Dated on 9th February 2017

(F) Analytical capability The existing laboratory facilities are capable of estimation of following pollutants. (1). For water and wastewater 1). pH 2). Suspended Solids 3). Total Dissolved Solids 4). Total Solids 5). Acidity 6). Alkalinity 7). Hardness 8). Chlorides 9). Sulphate 10). Dissolved Oxygen 11). Bio Chemical Oxygen 12). Chemical Oxygen demand Demand

12.2

ENPRO Enviro Tech and Engineers Pvt Limited Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 12 Disclosure of Consultant Date 17/03/2020

13). Phenol 14). Heavy Metals Like CU, Ni, Zn etc 15). Residual Chlorine 16). Ammonical Nitrogen 17). Oil and grease 18). Sodium 19). Potassium 20). Color 21). Conductivity 22). Turbidity 23). Volatile & Fixes Solids 24). Reactive Silica 25). Cr+6, Total Cr, Fe, B 26). Sulphide 27). Fluoride 28). Phosphate 29). Nitrate 30). Temperature

(2). For Process/ Flue gas emission 1. Suspended particulate matter 2. Sulphur dioxide 3. Oxides of nitrogen

4. other process gases like HCl, Cl2, NH3 etc.

(3). For Ambient Air 1. Sulphur dioxide 2. Oxides of nitrogen 3. PM2.5, PM10

4. Other gases like HCl, Cl2 etc. 5. Ground level ozone concentration

(G) Details of Technical Persons Sr. Name of Qualification Designation Working tenure Total No. Experts with the company Experience 1. Mr. Paresh M. Tech. (Chem.) Director Since 1998 24 Mevawala 2. Mr. (Dr.) Ph. D with Water Sr. Scientist Since 2001 18 Dhaval Naik Pollution 3. Ms. Nirupam B.E Civil (Elective Environment Since 2001 20 Patnaik – Env.Engg.) engineer 4. Mr. (Dr.) Ph. D. with Head of the Since 1998 23 Tulesh Patel Structure Civil Engineering Department

12.3

ENPRO Enviro Tech and Engineers Pvt Limited Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 12 Disclosure of Consultant Date 17/03/2020

Declaration by Experts Contributing to the EIA Report of Orgo Chem (Guj.) Pvt. Ltd.

I, hereby, certify that I was a part of the EIA team in the following capacity that developed the above EIA.

EIA Coordinator: Name & Designation Dr. Dhaval Naik (Sr. Scientist) Signature & Date

Date: 17-03-2020 Contact information ENPRO Enviro Tech and Engineers Pvt. Ltd. 306, Royal Park, Adajan Road, Surat- 395 009, Gujarat, India, Ph.: +91-261-3295244 Fax: +91-261-2786129 E-mail [email protected] , [email protected]

Functional Area Experts:

Sr. Functional Name of Involvement Period Sign No. area Experts 1 Water Pollution Dr. Dhaval August 2019 to till date Prevention, Naik Control & Task: Site visit, Prediction of Finalization of sampling Impacts locations, finalizing *Rushabh water balance for the Mevawala project, inference of baseline data collected identification of impacts and preparation of mitigation plan. 2 Air Pollution Mr. Paresh August 2019 to till date Prevention, Mevawala Monitoring & Task: Site visit, Control Finalization of sampling locations, suggestion of APCM for the control of *Rushabh emission, inference of Mevawala baseline data collected identification of impacts and preparation of mitigation plan.

12.4

ENPRO Enviro Tech and Engineers Pvt Limited Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 12 Disclosure of Consultant Date 17/03/2020

3 Solid Waste and Mr. Paresh August 2019 to till date Hazardous Mevawala Waste Task: Identification of Management solid waste to be generated from the industry and suggesting mitigation plan. 4 Socio-Economics Mr. Nanaji September 2019 till Kairika date

Task: Undertaking primary socio-economic survey, identification of

social impact due to proposed project, preparation of mitigation plan. 5 Ecology and Mr. I Siva September 2019 till Biodiversity Rama Krishna date

Task: Field survey. **Dr. Shenaz Impact prediction and Jadeja suggesting mitigation measures. Preparation of management plan for green belt development in or around the project site. 6 Hydrology, Mr. N.H. September 2019 till Ground Water & Reddy date Water

Conservation Task: Aquifer details, 7 Geology Mr. N.H. groundwater potential, Reddy determination of ground use pattern, Study of local hydrogeology, development of rainwater harvesting program, preparation of contour map for the study area and estimation of groundwater direction.

12.5

ENPRO Enviro Tech and Engineers Pvt Limited Client Orgo Chem (Guj.) Pvt. Ltd. Project Rapid EIA Report Report No EP/REIA/24 Rev. 0 Title Chapter 12 Disclosure of Consultant Date 17/03/2020

8 Meteorology, Air Mr. Paresh August 2019 to till date Quality Mevawala Modelling & Task: Supervision of air Prediction quality modeling, monitoring and identification of impacts *Mr. Manan N. due to proposed Desai project. Finalization of mitigation measures. 9 Land Use Mr. Jada September 2019 till Srinivas Rao date

Task: Preparation of **Dr. Tulesh land use land cover Patel maps for the study area using GIS/ related tools followed by ground truth verification. 10 Risk Assessment Mr. Nilesh September 2019 till & Hazard Jogal date Management Task: Identification of risk due to storage of **Paresh fuel and raw materials, Mevawala interpreting consequence contours, suggesting risk mitigation measures. 11 Noise & Vibration Mr. Shrirang September 2019 till Chavan date

Task: Identification of major noise generating **Mr. Manan factors due to proposed Desai project. Modelling/Analysis of noise generation level due to proposed project. Impacts and mitigation measures due to noise generation. Note: - **Assisting as a Team Member *Functional Area Associate

12.6