Cap 2009 Uganda 1.Pdf (English)
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Mapping a Healthier Future
Health Planning Department, Ministry of Health, Uganda Directorate of Water Development, Ministry of Water and Environment, Uganda Uganda Bureau of Statistics International Livestock Research Institute World Resources Institute The Republic of Uganda Health Planning Department MINISTRY OF HEALTH, UGANDA Directorate of Water Development MINISTRY OF WATER AND ENVIRONMENT, UGANDA Uganda Bureau of Statistics Mapping a Healthier Future ISBN: 978-1-56973-728-6 How Spatial Analysis Can Guide Pro-Poor Water and Sanitation Planning in Uganda HEALTH PLANNING DEPARTMENT MINISTRY OF HEALTH, UGANDA Plot 6 Lourdel Road P.O. Box 7272 AUTHORS AND CONTRIBUTORS Kampala, Uganda http://www.health.go.ug/ This publication was prepared by a core team from fi ve institutions: The Health Planning Department at the Ministry of Health (MoH) leads eff orts to provide strategic support Health Planning Department, Ministry of Health, Uganda to the Health Sector in achieving sector goals and objectives. Specifi cally, the Planning Department guides Paul Luyima sector planning; appraises and monitors programmes and projects; formulates, appraises and monitors Edward Mukooyo national policies and plans; and appraises regional and international policies and plans to advise the sector Didacus Namanya Bambaiha accordingly. Francis Runumi Mwesigye Directorate of Water Development, Ministry of Water and Environment, Uganda DIRECTORATE OF WATER DEVELOPMENT Richard Cong MINISTRY OF WATER AND ENVIRONMENT, UGANDA Plot 21/28 Port Bell Road, Luzira Clara Rudholm P.O. Box 20026 Disan Ssozi Kampala, Uganda Wycliff e Tumwebaze http://www.mwe.go.ug/MoWE/13/Overview Uganda Bureau of Statistics The Directorate of Water Development (DWD) is the lead government agency for the water and sanitation Thomas Emwanu sector under the Ministry of Water and Environment (MWE) with the mandate to promote and ensure the rational and sustainable utilization, development and safeguard of water resources for social and economic Bernard Justus Muhwezi development, as well as for regional and international peace. -
Uganda Humanitarian Update
UGANDA HUMANITARIAN UPDATE MAY – JUNE 2010 I. HIGHLIGHTS AMID HEAVY RAINS, HUMANITARIAN ACCESS IN PARTS OF KARAMOJA AND TESO HAMPERED BY DETERIORATING ROAD CONDITIONS OVER 1,000 CHOLERA CASES REGISTERED IN KARAMOJA SINCE APRIL 2010 90% OF IDPS IN NORTHERN UGANDA NO LONGER LIVING IN CAMPS, BUT LAND CONFLICTS AND LANDMINES IMPEDING RETURN IN SOME AREAS II. SECURITY AND ACCESS SECURITY The general situation in Karamoja remained fragile, according to the United Nations Department for Safety and Security (UNDSS). Cattle raids, including on protected kraals, particularly affected Moroto and Kotido, with some resulting in fierce clashes between the Uganda People’s Defence Forces and the raiders. In South Karamoja incidents associated with food distributions involved theft of food and non-food items (NFIs), and attacks on food distributors as well as on food recipients. Following three road ambushes in Alerek sub-county of Abim District during the month, UNDSS issued an advisory limiting UN movement along the Abim-Kotido road to between 09.00Hrs and 16.00Hrs with effect from 28 June 2010. Three civilians were killed in one of those ambushes. In northern Uganda, Amuru District officials and partners carried out a joint assessment in the wake of a violent land dispute that occurred in Koli village of Pabbo sub-county on 23 June. Preliminary findings indicated that one person was killed and several others injured in the dispute involving two clans. Some 40 huts were torched and many members of either clan had fled the village. Also of concern in the region during the reporting period were raids by illegally armed Karamojong, particularly in Pader District. -
Country Operations Plan
COUNTRY OPERATIONS PLAN Country: Uganda Planning Year: 2004 2004 Country Operations Plan – Uganda __________________________________________________________________________________________ Part I: Executive - Summary 1.1 Context and Beneficiary Populations UNHCR’s presence in Uganda dates back from the 1960s. Though the earlier arrivals of Rwandan refugees had returned in 1994, the country still hosts 18,500 Rwandans who are residual caseloads of the 1996 repatriation from Tanzania. There are some 5,000 Rwandans who entered Mbarara district of Uganda from Tanzania when the Rwandan refugees were being repatriated from there in 2002. The Government of Uganda has not yet decided their status. The majority of the refugees in the country today are Southern Sudanese hosted in northern Uganda and who number about 172,300 (86%) of the total refugee population of 200,800 as of 28 February 2003. About 8,500 Congolese refugees hosted in the Southwest are from the Democratic Republic of Congo (DRC). There are other smaller groups from Somalia, Ethiopia and Kenya that are also being assisted. Sudanese and Congolese refugees are granted status on a prima facie basis, while the status of others is ascertained through individual refugee status determination. Almost all the refugees fled their respective countries of origin because of the civil war and fear of persecution caused by ethnic rivalries and political differences. The Government of Uganda, continues to host refugees from the neighbouring countries. Refugees who are in designated settlememnts are provided with agricultural lands, tools and seeds with the objective of making them self-sufficient. As a result, refugees in the northern settlements have managed to produce a certain percentage of their food requirements, thereby reducing dependence on the food assistance from WFP. -
WHO UGANDA BULLETIN February 2016 Ehealth MONTHLY BULLETIN
WHO UGANDA BULLETIN February 2016 eHEALTH MONTHLY BULLETIN Welcome to this 1st issue of the eHealth Bulletin, a production 2015 of the WHO Country Office. Disease October November December This monthly bulletin is intended to bridge the gap between the Cholera existing weekly and quarterly bulletins; focus on a one or two disease/event that featured prominently in a given month; pro- Typhoid fever mote data utilization and information sharing. Malaria This issue focuses on cholera, typhoid and malaria during the Source: Health Facility Outpatient Monthly Reports, Month of December 2015. Completeness of monthly reporting DHIS2, MoH for December 2015 was above 90% across all the four regions. Typhoid fever Distribution of Typhoid Fever During the month of December 2015, typhoid cases were reported by nearly all districts. Central region reported the highest number, with Kampala, Wakiso, Mubende and Luweero contributing to the bulk of these numbers. In the north, high numbers were reported by Gulu, Arua and Koti- do. Cholera Outbreaks of cholera were also reported by several districts, across the country. 1 Visit our website www.whouganda.org and follow us on World Health Organization, Uganda @WHOUganda WHO UGANDA eHEALTH BULLETIN February 2016 Typhoid District Cholera Kisoro District 12 Fever Kitgum District 4 169 Abim District 43 Koboko District 26 Adjumani District 5 Kole District Agago District 26 85 Kotido District 347 Alebtong District 1 Kumi District 6 502 Amolatar District 58 Kween District 45 Amudat District 11 Kyankwanzi District -
Arcview Print
District, Sub counties, IDP camps, Settlement Sites,Transport Network, Rivers & Protected Areas PADER DISTRICT ADMINISTRATIVE UNIT- IDP Camps and Settlement Sites Reference Date: January 2007 Ayuu Anak Labworoye à LEGENDà à LAYAMO Nam Okora $Z Moyo Koboko Kaabong District Border Yumbe Kitgum Maracha Paibony Adjumani Kotido AMIDA Arua PADER Gulu Abim Amuru Layamo Moroto $Z Nebbi à Oyam Lira Sub County Border Amuria Lapana Buliisa Guda Masindi Apac Dokolo à Kaberamaido Katakwi Nakapiripirit Amolatar à Soroti Kumi Hoima Kapchorwa Nakasonola Bukedea Pallisa Bukwa Nakaseke Kamuli BudakaSironko Kaliro Bududa Bundibugyo Kiboga Kibaale Kayunga ButaleMjabale Namutumba Manafwa Luwero Road Network OROM Kyenjojo Iganga Tororo Kabarole Mubende Jinja Busia Lukwor Bugiri Mityana Mayuge Pawena KITGUM TC Kamwenge Kampala Lumule Kasese Panykel Akwan$Zg à NAMOKORA Sembabule Mpigi Wakiso à Ibanda Mukono à à Lyantonde Bushenyi Kiruhura Major Rivers $ZOmiya-Anyima Masaka Mbarara Kalangala Rukungiri Rakai Kitgum Matidi Kanungu Isingiro Opette $Z Ntungamo Amid$Za à KisoKraobale Protected Areas Lamit tum Lamola àAlel Pàawidi à à à Teso Bar Aparo Hil $Z IDP Camp $ZOryang à PAIMOL Okidài KACHERI à Settlement Site Lagoro àDure Akuna Làab $Z OMIYA- ANYIMA AKWANG Degazzetted Camp Lakwor $ZOmia-Pacha c PALABEK GEM à Laber Bàul KOTIDO DISTRICT KITGUM DISTRICT $ZAcholibur $ZWol $ZPaimol Mutu LAGUTI àLajeng $ZLatanya àLamin Nyi àOkinga ALEREK PALARO ACHOLIBUR Toromàa WOL Lagu$Zti Amilobo Bur Lobo à $ZPorogali Kokil à Ku Ywee à àOtok P/S Amoko à AWACH Awal à à àApil $ZKalongo -
Implementation Status & Results
The World Bank Report No: ISR13907 Implementation Status & Results Uganda Second Northern Uganda Social Action Fund Project (NUSAF2) (P111633) Operation Name: Second Northern Uganda Social Action Fund Project Project Stage: Implementation Seq.No: 8 Status: ARCHIVED Archive Date: 03-May-2014 (NUSAF2) (P111633) Public Disclosure Authorized Country: Uganda Approval FY: 2009 Product Line:IBRD/IDA Region: AFRICA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Key Dates Public Disclosure Copy Board Approval Date 28-May-2009 Original Closing Date 31-Aug-2014 Planned Mid Term Review Date 30-Jan-2012 Last Archived ISR Date 19-Nov-2013 Effectiveness Date 25-Nov-2009 Revised Closing Date 31-Aug-2014 Actual Mid Term Review Date 14-Jun-2013 Project Development Objectives Project Development Objective (from Project Appraisal Document) To improve access of beneficiary households in Northern Uganda to income earning opportunities and better basic socio-economic services. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Public Disclosure Authorized Component(s) Component Name Component Cost Livelihood Investment Support 60.00 Community Infrastructure Rehabilitation 30.00 Institutional Development 10.00 Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory Overall Implementation Progress (IP) Moderately Satisfactory Moderately Satisfactory Public Disclosure Authorized Overall Risk Rating Implementation Status Overview The NUSAF II project originally planned to finance 9750 (i.e. 8000 Household Income Support (HIS), 1000 Public Works (PW) and 750 Community Infrastructure Rehabilitation) sub projects in the five year of its implementation period. As of February 3, 2013 a total of 8,764 subprojects (i.e. -
Monthly Programme Update
EMERGENCY AND HUMANITARIAN ACTION, UGANDA APRIL 200 9 Monthly Programme Update Highlights ♦ Under surge capacity organised by IST/AFRO, supported cholera control in Zimbabwe and VHF training in Zambia. ♦ Continued supporting the second round of Polio supplemental immunization activities continued in northern Uganda, Karamoja and Kamapla with an achievement of over 100 % coverage ♦ Continued supporting Hepatitis E epidemic in Kitgum district ♦ Support to Dokolo district in sleeping sickness control 1. General Situation: Political, Social and Security ♦ Security situation in northern Ugandan districts continued being stable ♦ In Karamoja the security situation remained stable on the roads although raids and other criminal activities continue to be reported in many places of the region. ♦ Disarmament initiated by the government in Karamoja is ongoing 2. Programme Implementation a. Activities Emergency Health, Nutrition and HIV/AIDS Response Project (Sida) In Kitgum District the programme; ♦ Continued to provide technical support towards Hepatitis E interventions to support/ guide sub- county activities including supervision A who staff assists health workers arrange vaccines used for the 2nd round of mass Polio campaigns. of VHTs to enhance community mobilization and public health education. ♦ Finicailly supported VHTs and CBDs with incentives to enable them perform health education/promotion and inspection, establishing completed latrines and tracing for Hepatitis E patients. ♦ Techinically and logistically supported the Polio supplemental immunization. In Gulu and Amuru ♦ Technically and logistically supported Gulu and Amuru districts with the 2nd round of mass Polio campaigns In Pader District, WHO/HAC ♦ Continued to technically support the district health team to coordinate, supervise and monitor Hepatitis E epidemic control interventions by organizing weekly coordination meetings. -
Final Evaluation of the Opportunities for Reducing Adolescent and Child Labor Through Education (ORACLE) Project in Uganda
This page left intentionally blank. Independent Final Evaluation of the Opportunities for Reducing Adolescent and Child Labor Through Education (ORACLE) Project in Uganda International Rescue Committee Cooperative Agreement Number: E-9-K-3-0053 22000077 Funding for this evaluation was provided by the United States Department of Labor under Task Order number DOLQ059622437. Points of view or opinions in this evaluation report do not necessarily reflect the views or policies of the United States Department of Labor, nor does the mention of trade names, commercial products, or organizations imply endorsement by the United States Government. TABLE OF CONTENTS LIST OF ACRONYMS v EXECUTIVE SUMMARY vii I INTRODUCTION AND BACKGROUND 1 II EVALUATION OF ORACLE 5 2.1 Final Evaluation Objectives 5 2.2 Methodology of Final Evaluation 6 2.3 Midterm Evaluation 8 III FINAL EVALUATION: FINDINGS 15 3.1 Program Design 15 3.2 Impact 17 3.3 Project Implementation and Performance 19 3.4 Project Monitoring and Measurement 25 3.5 Project Management 26 3.6 Partnership Coordination and Effectiveness 28 3.7 Sustainability and Replicability 30 IV CONCLUSIONS 35 4.1 Lessons Learned, Best Practices, and Innovations 35 4.2 Recommendations 37 ANNEXES Annex 1: Evaluation Terms of Reference Annex 2: Documents Review Annex 3: Cross Reference of USDOL Questions in TOR pages 5–6 and Answers in the Evaluation Report Annex 4: List of Most Individuals Interviewed and Sites Annex 5: List of Individual Interviews and Focus Group Meetings Conducted With ORACLE Beneficiaries and -
Emergency and Humanitarian Action (EHA), Uganda Weekly Activity Report
Emergency and Humanitarian Action (EHA), Uganda Weekly Activity Report I. General Situation a. Political, Social and Security; • DRC; Joint incursion on LRA base in Garamba by the armed forces from DRC, Sudan Week 11, and Uganda has ended. 1st bunch of Uganda soldiers have returned to Uganda. Report indicates that the incursion has succeeded in reducing the strength of LRA by 80%. • 9th to 15th March Acholi and Lango sub-region; the region is calm; population movement from IDP to 2009 village of origin is ongoing. • Karamoja sub-regio; Cattle raids by armed Karamojong worriers reported. The region is in security phase III. b. Main Events of Interest/Concern for Health • Mop up mass Polio immunization campaign was successfully conducted in Amuru district in epi-week 11 • Preparation for the first round of mass Polio immunization campaign is ongoing in 29 high risk districts in Uganda. II. Analysis and Health Consequences (Health Problems and Needs of Affected Population) Malaria: Lango; Lira district continues to report higher number of cases of clinical malaria in 2009 as compared to 2008. Apac district reports lower numbers of clinical malaria in 2009 as compared to 2008. See figure I below for details. Acholi, Kitgum and Pader districts continue to register low number of cases of clinical malaria in 2009 as compared to 2008. See figure II below. Highlights Polio immunization campaign was successfully conducted in Amuru district. Coverage of 150% was registered. Plans to conduct first round of Polio vaccination in 29 districts in Uganda from 23rd to 26th April is progressing well. Karamoja sub-regions; The number of cases of clinical malaria reported and the trend in 2009 is similar to that of 2008 for the same epi-week. -
Northern Uganda Land Study Analysis of Post Conflict
NORTHERN UGANDA LAND STUDY ANALYSIS OF POST CONFLICT LAND POLICY AND LAND ADMINISTRATION: A SURVEY OF IDP RETURN AND RESETTLEMENT ISSUES AND LESSON: ACHOLI AND LANGO REGIONS By : Team Members: Margaret A. Rugadya (Lead Consultant) Eddie Nsamba-Gayiiya Herbert Kamusiime World Bank UPI: 267367 Consultant Surveyors and Associates for Associates for Development Planners Development Tel. +414-541988, +0772-497145, Kampala Kampala +0712-497145 Email: [email protected] February, 2008 For the World Bank, to input into Northern Uganda Peace, Recovery and Development Plan (PRDP) and the Draft National Land Policy EXECUTIVE SUMMARY This is the second in a series of land studies for northern Uganda, whose core objective is to inform the Plan for Recovery and Development of Northern Uganda (PRDP) and the National Land Policy. It builds on the work of the first phase conducted in Teso region to present a more quantitative analysis of trends on disputes and claims on land before displacement, during displacement and emerging trends or occurrences on return for Acholi and Lango sub-regions. The key findings in the Teso study are that there is a high level of distrust towards the Central Government’s intentions toward land; customary tenure has evolved and adapted to changing circumstances but remains to be seen as a legitimate form of tenure; there was not a high prevalence of land disputes; the statutory and customary institutional framework for land administration and justice has been severely weakened; and vulnerable groups such as women and children have been marginalized during the return process. However, the Teso region has been one of the most secure regions during the conflict and has experienced very short periods of displacement and as such does not provide a good marker for the situation in the rest of northern Uganda. -
Otuke District HRV Profile.Pdf
THE REPUBLIC OF UGANDA Otuke District Hazard, Risk, and Vulnerability Profi le 2016 Contents Contents .......................................................................................................................i List of Figures .............................................................................................................. ii List of Tables ................................................................................................................ ii Acronyms.................................................................................................................... iii Acknowledgements .....................................................................................................v Executive Summary.................................................................................................... vi Introduction ..................................................................................................................1 Objectives ....................................................................................................................1 Methodology ................................................................................................................1 Overview of the District................................................................................................4 Historical Background..................................................................................................4 Location .......................................................................................................................4 -
Regional Development for Amuru and Nwoya Districts
PART 1: RURAL ROAD MASTER PLANNIN G IN AMURU AND NWOYA DISTRICTS SECTION 2: REGIONAL DEVELOPMENT FOR AMURU AND NWOYA DISTRICTS Project for Rural Road Network Planning in Northern Uganda Final Report Vol.2: Main Report 3. PRESENT SITUATION OF AMURU AND NWOYA DISTRICTS 3.1 Natural Conditions (1) Location Amuru and Nwoya Districts are located in northern Uganda. These districts are bordered by Sudan in the north and eight Ugandan Districts on the other sides (Gulu, Lamwo, Adjumani, Arua, Nebbi, Bulisa, Masindi and Oyam). (2) Land Area The total land area of Amuru and Nwoya Districts is about 9,022 sq. km which is 3.7 % of that of Uganda. It is relatively difficult for the local government to administer this vast area of the district. (3) Rivers The Albert Nile flows along the western border of these districts and the Victoria Nile flows along their southern borders as shown in Figure 3.1.2. Within Amuru and Nwoya Districts, there are six major rivers, namely the Unyama River, the Ayugi River, the Omee River, the Aswa River, Tangi River and the Ayago River. These rivers are major obstacles to movement of people and goods, especially during the rainy season. (4) Altitude The altitude ranges between 600 and 1,200 m above sea level. The altitude of the south- western area that is a part of Western Rift Valley is relatively low and ranges between 600 and 800 m above sea level. Many wild animals live near the Albert Nile in the western part of Amuru and Nwoya Districts and near the Victoria Nile in the southern part of Nwoya District because of a favourable climate.