.r.tco'l cncet co o6(oP mlcora(ruG @I06[DlCo fiDO@P(Do (I)6s@) Jlcroo'lsc

(ruCD cuco (r)o$@o og)o, og)(i, og). (il os hro(ola ojl 6 m'l @1 @6coo a@

Q(D@o OalCBto o

ocruaec6 ac"olmrcE SPECIAL DEVELOPMENT FUND FOR 2O11-16 'Name of MLA. : Shrl,Kollyakode N Krishnan Nair Name of Vamana m A.S.Amt No.& date of 5t. lmplementang Prese n t Name of Work Sa nctioned Expenditure Administrative No agency Stage (Rs.ln la khs) Sanction 20tt-12 Construction of Vellamkudi - BDO D6t697/L2 1 fhanniyam - 300000 297235 Completed Vamana pura m dtr7t3n2 road in Kallara Panchayath, Construction of BDO D6/69stL2 z Pa kistanm ukku-Chettakada 550000 550000 Completed Vamana pura m Dt23.3.2012 'oad in Pangodu Panchayath. Construction of Kalunkinmugam-Pothakuzhi BDO D6l696lr2 3 550000 550000 Completed road in Pullampara vamanapuram 23.O3.t2 Panchayath. of ShaktiDuram- Construction BDO D6/697tr2 200000 189631 Completed Mundanthadikadu road in Vamanapuram 23.03.r2 Pullampara Panchayath. Concreting of Chirathalakkal- BDO D6/6991L2 road in 200000 200000 Completed 5 Pulinjikkapoika Vamanapura m Dt.23.3.20t2 Vamanapuram Panchayath. Construction of Waitingshed at BDO D6t700l12 125000 89208 Completed 6 Vamanapuram Hospital Jn. in Vamanapuram Dt.23.3.2012 Nellanad Panchayath. Construction of Manikodu- D6l70r/L2 BDO 394626 Completed 7 Kokkottu kona m-Palam kona m 400000 Vamanapuram Dtr2.ol.2012 road in Nellanad Panchayath. Construction of Waitingshed at BDO D6l702lL2 Alanthara- 125000 90645 Com pleted I Shasthakhetram nada jn. in Vamanapuram Dt.4l4l12 Nellanad Panchayath, Construction of OzhukuPara- D6t703/r2 BDO 628431 Completed 9 It4 ulluvila road in Peringamala 700000 Vamanapuram Dt.4.4.2012 Panchayath. 5halivahanm u kku- BDO D6/7041L2 300000 283730 Completed 10 N4aruthumood road in Vamanapuram 28.07.12 Nanniyodu Pt Construction of Thottumukku BDO D61705112 Completed t-1 Chinanvila road in NanniYodu 300000 300000 Dt.28.7.2012 of Vamanapuram Construction of ParaPPil- D6l693l12 BDO 300000 Completed T2 Aanakkulam road in Kallara 300000 Vamanapuram r7.o3.20r2 Panchayath

Construction of Public Comfort D6/692112 BDO t9a472 Com pleted L3 Station at Muthuvila Junction 200000 Vamanapuram dt.17.3.2012 in Kallara Panchayath

Construction of D6t698lL2 Da rfa kattakkal-KalamudaPPan BDO Completed 14 500000 480353 pong road in Vamanapuram Vamana pura m Dt.23.3201"2 Panchayath. Total 47sOOO0 4552737 2012-13 lmpts to Nagacheri D6/TO5L/L2 L Bhadrapeedom Kalladakunnu 350000 BDO Ndd 3s0000 Completer road in Pt dt:14,05.l-2 lmpts to lrinjaya m-Meen mood D6ILLI2I12 z 350000 BDO Ndd 350000 Completed road in Anad Pt dt:11..05.L2 Construction of Mottakavu- D6lrLLt/12 3 Komalloor road in Panavoor 400000 BDO Ndd 400000 Completed JT dt:11.05.12

Perayam-R S Puram road in BDO D6/L7L0112 4 300000 300000 Completed Pa navoor Pt dt:1-1.05.12 eonstrn of Chirathakkal - BDO D6/34113 5 Pulinch ikkapoyka road in 300000 300000 Completed vamanapuram gp Vamanapuram dt.08.01.13 Constrn of Kattakkada- D6/30881L2 b Pallikunnu Amachal road in 600000 BDO NDD 598643 Completed y'amanapuram gp dt.t7.L2.L2 Constn of Kuttimoodu- BDO D6/L974112 7 Kanjirampara Road in VMPM 500000 496607 Completed Vamanapuram dt1-0/9/L2

Pa rikka ppara-Kad u man kuzhy- 8 BDO D6l3L79tL2 Alamukku Road in Pullampara 300000 298487 Com pleted Panchayath Vamanapuram dt.26.I2.I2 Pa nachamoodu-M a nnanvila 9 Road in Pullamoara BDO D6t3I80/L2 l^ 300000 299224 Lom Pleteo Panchayath Vamanapuram dt.26.L2'rz I Constrn of Kurumpayam Poothakuzhy Unnimukku BDO 10 500000 500000 D6lI970/t2 Iharatta road Tarring in Vamanapuram DtL0/91L2 Completed Kallara gp Constn of Ambalamukku 11 Thannippara BDO D6tr97U12 Kailasathukunnu s00000 477378 Completed road in VMPM Block Vamanapuram Dt L0t9/r2 Constrn of building to t2 Neera mankadadavu- BDO D6lt972/12 Vinjanapeedom s00000 497769 Grandasalain Va manapuram DtI0/9/12 Completed Kallara GP Constrn ofThottumukku BDO 13 Chonanvila road in 2nd reach 500000 499440 D6l2192/1.2 ln Peringamala pt Vamanapuram dt22t9/1,2 Completed Constrn of Parakkonam- BDO 14 Mailakkunnu Boundermukku 1000000 1000000 D612302/12 road in Peringamala pt Vamanapuram Dt27/9/L2 Completed Construction of a hall on 2n0 floor I) of Govt:HSS BDO 1000000 984490 D6t1.367 tr2 in Nellanao Vamanapuram dt:13.06.12 Pt Completed Constrn of KudavanaEul- BDO 16 Thazhe Kudavanadu Road in 500000 s00000 D6/2L90/12 Nanniyodu Pt Vamanapuram Dt22/9/t2 Completed Borewell Construction and MWSS BDO at Kannampara 52s000 515000 D6l1606/L2 Pangodu Gr Pt Va mana pu ram dt.07.10.12 Completed Sonstrn of Chettakkadamukku D6/1968/12Dr BDO 1000000 .U Sivakshethram Road in 1000000 Vamanapuram rot9tr,2 Completed Pangodu GP Ponkuzhi kkonam-Sivankovil D6l74l13 BDO 500000 1.9 Road in Vamanapuram 500000 Vamanapuram 08.01.13 Completed Panchayath. Construction of Library D6i3118/12 & 20 building at Gow.LPS Anad in 500000 BDO NDD 492355 17.12.12 Completed Anad Panchavath . 02.12.13 Construction of Ayurvedlc D6/3090/12 2l clinic at Vellanchira in 1000000 BDO NDD 995705 17.L2.L2 Completed Panavoor Pt Constrn of ParaPPil Anakulam BDO D6/3181/12 Completed 22 300000 299365 road in Kallara gP Vamanapuram 26.12.L2 Construction of Kollamkavu- D6t309UL2 Completed 23 300000 BDO NDD 294536 Paranada road in Anad Pt 26.L2.r2 Construction of Kollamkavu- D6t3092112 26.12.!2&. Completed 24 Panniyottukonam -Pangodu 500000 BDO NDD 500000 road in Anad Pt 03.12.1.4 eonstruction of stair room and D611366172 Partly one class room on 2nd floor of BDO 1000000 3r.68s6 Completed z) Venjaramood Govt:HSS in Vamanapuram dt:13.06.12

of building to Construction BDO D6lt536l12 As revised 26 Govt: LPS Ambalamukku in 700000 Vamanapuram dt:19.07.1.2 Nellanad Pt Total 14225()(l(, L2766255 2o13-14

Constrn of ldathattu I D6/1879i 13 BDO 400000 lcotpt",", 1 NanamkodeAyiravallikunnu I 400000 Vamanapuram dt,05.07.13 road in Kallara GP I Constrn of sidewall of the NDD 273640 2 thodu near Moozhi 300000 BDO "3!13;lil' lcomoreteo Ooralikonam road in Anad gP Constrn of parapPil- BDO 199790 J Grandhasala jn Cheruvalam 200000 VamanaPuram "3iiil:/l' lcomnreteo road in Kallara GP Constrn of Perumala BDO 499633 nreted 4 Pandarathodu road in 500000 Vamanapuram ?:i'-1i3113 lcom Pullampara GP constrn of Kottukunnam D6/3339/13 BDO 500000 Completed 5 Grandhasala MudiYoorkonam s00000 VamanaPuram dt.24.10.13 road in Nellanad D6/3343/13 Constrn of VellamkudY AKG BDO 496352 Completed o 500000 dt.24.10.1.3 colony road in Kallara VamanaPuram

Constrn of Varikkallil D6134041t3 BDO 499541 Completed 7 Chalippankonam road in 500000 VamanaPuram dt.24.10.13 Pullamoara D613439113 ThandramPoika BDO Completed Constrn of 500000 499538 dt.24.10.13 o Aviloorkonam road in Nellanad VamanaPuram Constrn of Thirichittoor 9 Kodumpara Thycadunada D6/3441./13 roa s00000 BDO NDD 498s32 Comple\ din Anad dt.24.10.13 Constrn of Maruthummoodu 10 fhazheku nnathuma la raod in 500000 BDO NDD 498803 D6/3442t13 Anad dt.24.10.13 Completed Constrn of Mulamoodu 11 neenilam vattarathala D6/3443/13 road in 1"000000 BDO NDD 998088 Panavoor dt.24.10.13 Completed Constrn of Pachanmukku T2 BDO D6/3603/13 Senanipuram road pangodu 500000 498844 in Vamanapuram dt.11.11.13 Com pleted Constrn of Mailakkunnu 13 Parakkonam BDO road in 500000 499242 D61368s/13 Peringamala Vamanapuram dt.13.11.13 Completed uonstrn of RKV 1.4 BDO Pandarakonam road in 500000 49945I D6/3686/13 Peringamala Gp Vamanapuram dt.24.11.l-3 Com pleted Constrn Alummkuzhi l-5 Anganvadi BDO building in 500000 499898 D6/240/1,4 Nanniyode gp Vamanapuram 29.O]-t4 Completed Purchase of Computer, UpS The General 16 and Printer for Chullimanoor 43200 D6/s48l14 panchayath Manager, 43200 Completed S.H.UPS in Anad Keltron 26.02.L4 Constrn of buildino for 'l'l Venjaramoodu BDO HS3 in 1000000 980205 D6/3340/13 Nellanad GP Vamanapuram dt.24.10.13 Com pleted Constrn of Marathummoodu 18 Channamkonam road BDO in 300000 298198 D6/3342/L3 Kallara Vamanapuram dt.24.10.13 Completed Consrn of pezhummooEf- L9 Poopuram road in pullampara BDO 1000000 9987L5 D6/3604/13 Lr l' Vamanapuram dr,11.11.13 Completed Constrn 20 of Thanniyam stadium BDO road in Pangodu 500000 499987 D6/360s/13 Vamanapuram dr.11.11.13 Completed Total to243200 t -u,o181657 L IMLA SDF Share to S;c6l--l Uustice Department for the I 1 lconstruction of Model I 626888 Director of D6/1855/14 Center Social ustice 626888 Completed lAnganawadipanchayath in Anad I J 13.08.14 lcrama I Purchase of a Bus to 2 Govt. UPS, Attukal in panavoor L000000 HM, Attukal D6/2657/r4 Grama 1000000 Completed Panchayath UPS 13.1.0. t 4 Construction of pavathoor Kidarakkuzhi Road in 3 Nanniyodu 500000 BDO D6/3074/14 - Grama 500000 Completed Panchayathu Vamanapuram 2L.1.L.I4 Purchase of a Bus 6 dttllss 4 bna rathanoor in Panqodu HM, 1000000 1000000 D6/3453/t4 Grama Panchayath Bharathannoor 05.12.14 Completed Bore Well Hand Pump Scheme at.Onpathekkar SC Colony in District 9T497 Officer, D6t3625/L4 Nanniyodu Grama Ground water 5951-0 22.I2.L4 Completed Panchayath Construction of Vattathioalli BDO D6l370Llr4 6 Road in Pullampara Grama 500000 500000 Completed Panchavath Vamanapuram 20.L2.I4 Construction of Chavarod Moozhi Ayyampara Road in BDO 1 300000 299644 D6/370s114 Pullampara Grama Vamanapu ram 20.L2.L4 Completed Panchayath Construction of Venjaramoodu Kannankodu Kokkottukonam BDO D6/3702tL4 I 500000 499330 Road in [ellanad Grama Vamanapuram 20.I2.L4 Completed Panchayath Construction of Mammoodu Sooryakanthi Road in BDO D6t3706/L4 9 900000 900000 Completed Peringammala Grama Vama na pu ram 20.t2.L4 Panchayath

Construction of Thottumukku BDO D6/3707/t4 L0 Chonanvila Road in Nanniyodu s00000 479847 Completed Grama Panchayath Vamanapuram 20.L2.t4

Construction of Meenmutti BDO D6/3708/L4 1L Thekkumkadu Road in 500000 500000 Com pleted Nanniyodu Grama Panchayath Vamanapu ram 20.L2.L4 Construction of Chirathalaka Village office road in BDO D6/38T7tL4 L2 200000 200000 Completed Pullampara Grama Vamanapuram 13.01.1.5 Panchavath Construction of Vanathil BDO D61382L1L4 13 Kalluvaramb Kottayil road in s00000 499865 Completed Kallara Grama Panchayath Vamanapuram 1.3.0r..15 Construction of Venjaramood BDO D6l69stLs t4 Market - LP School Road in 200000 200000 Completed Nellanad Grama Panchayath Vamanapuram 22.O2.L5 Construction of Vadakkanad - BDO D6/698i15 15 Makkamkonam Road in 300000 300000 Completed Vama na pu ram 22.02.L5 Nellanad Grama Panchavath Pa rtlw Construction of Vanjuvam - Completed Keezh kkottu moozhi - and D6/63tLs reported 16 Vaalakuzhi - Theakkummoodu 500000 BDO NDD 297965 Road in Anad Grama 1.4.01-. L5 that can't Panchayath comlete do to local Construction of Vattavila D613822/r4 tsSues It4annuvilakam road in BDO 13.01.15 & 17 1000000 AS Revised Vamanapuram Grama Vamanapuram 15.08.15 & Panchayath 27.04.L7 Total 9118385 7863049 2015-16

Construction of Veangavila -- Naith office - Kollakonam 1 - D61L584/1"s Pashuvilakkonam 500000 BDO NDD 500000 Com pleie Road in l-1.05.l_s Anad Grama Panchayath

Purchase of Computers to The General z Chullimanoor Govt.LpS D6/18s8/1s in 8l-030 Manager, 81030 Completed Anad Grama Panchayath Keltron 1L.05.15 Purchase of Computers to Thannimoodu The General 3 Tribal School in D6/1859/15 Peringamala Grama 190530 Manager, 190530 Completed Panchayath. Keltron 11..05.1s Hurcnase ot Computers to Vayyakkavu The General UPS in D6/1860/1s Pullampara Grama 44530 Manager, 44530 Completed Panchayath. Keltron 11.05.l-5 -onsrruction of Muthuvila _ N4araykkadu - Ayanikkuzhi 5 200000 BDO D6/2093/1,5 load in Kallara Grama 200000 Completed )anchaVath. Vamanapuram L7.07.I5 lonstruction of AKG Colonv - 6 ]hoothakkuzhi Road in 200000 BDO D6/20941L5 199909 Completed Gllara Grama panchayath. Vamanapuram 08.07.t 5 lconstruction of peringamala- lKattaikkal - Bund - 7 lPadinjarekkara Road in 800000 BDO D6/209s/Ls 800000 pleted lPeringamala Grama Vamanapuram 08.07.15 Com lPanchaVath. lLUnsLrucuon or lheriyamvila 8 in Nanniyodu BDO lRoad drama 400000 400000 D6/2096tL5 lPanchayath. Vamanapuram L7.07.I5 Completed Construction of Naarakathumvila - 9 Thannimoodu BDO D6/2097/Ls Road in 400000 400000 Nanniyodu Grama Vamanapuram 08.07.15 & Com pleted Panchayath. 26.09.1.5

Lunsrrucfton or Palodu - Prince t-0 Plantation Road in Nanniyodu 400000 BDO D6/2098/rs Grama Vamanapuram 400000 Completed Panchayath. 08.07.l-5

lSecond llletat lin g eTaGior lKurumbayam - Ushas roal rn lKallara Grama nchayath.Second lPa Metalting & of Kurumbavam 11 lTarring - BDO Ushas road 300000 D6/2rcUL5 in Kallara Grama Vamanapuram 300000 Completed Panchayath.Second Metalline & 08.07.15 Tarring ofKurumbavam - Ushas road in Kallara Grama Panchayath. Construction of Attukal Ottathengu Road in BDO D6122901L5 I2 400000 400000 Completed Pullambara Grama Vamanapuram 17.07.15 Panchayath. Condtruction of Udhayagiri - BDO D6l229L/rs 13 R.S Puram road in Nanniyodu 500000 500000 Completed Vamanapura m r7.o7.15 Grama Panchayath Construction of Maadambhara - Kaavara Neerchalil Road BDO D6t2373t15 I4 - 300000 300000 Completed n Nellanad Grama Vamanapuram 17.07.r5 Pa nchayath. Concreting of Arippa - Kunnubanglavu road in Peringamala Grama Panchayath.Concreting of Arippa Kunnubanglavu road BDO D6125531L5 15 - 300000 300000 Completed in Peringamala Grama Vamanapuram 29.07.L5 Panchayath.Concreting of Arippa - Kunnubanglavu road in Peringamala Grama Panchayath.

f4ini water supply scheme at Cnpathekkar SC colony in Nanniyodu Grama Pa nchayath.Mini water supply rcheme at Onpathekkar SC District Officer, D612610115 L6 300000 300000 Completed colony in Nanniyodu Grama Ground water 01.08.15 Panchayath.Mini water supply lcheme at Onpathekkar SC colony in Nanniyodu Grama Panchavath,

Concreting of Kanikkapetty BDO D6l264LlLs LI 400000 400000 Completed Palamukku road in Vamanapuram 03.08.15 Grama Panchavath Iarring of Kannangod Kokkottukonam road in Nellanad Grama Pa nchayath.Tarring of Kannangod Kokkottukonam BDO D6/26431Ls 18 135000 135000 Completed road in Nellanad Grama Vamanapuram 03.08.15 Panchayath.Tarring of Kannangod Kokkottukonam road in Nellanad Grama Panchayath.

Concreting of Kattadi Society mukku road in Peringamala Gra ma Panchayath.Concreting of Kattadi Society mukku road BDO D6/26471r5 19 300000 300000 Completed in Peringamala Grama Vama na puram 03.08.1-5 Panchayath.Concreting of Kattadi Society mukku road in Peringamala Grama Panchayath. Construction of Toilet and setting up a room for Laboratory facilities in Venjaramood HSS in Nellanad G rama Panchayath.Construction of Toilet and setting up a room for 20 300000 BDO 292r22 D612649/1.s Laboralory facilities in Vamanapuram 03.08.15 Completed Venjaramood HSS in Nellanad Grama Panchayath,Construction ofToilet and setting up a room for Laboratory facilities in Venjaramood HSS in Nellanad Grama Panchavath.

Side wall construction and concreting of Neelimana BDO D6/26961rs 2T 1000000 1000000 pleted Karikuzhi road in Nellanad Vamanapuram 08.08.15 Com Grama Panchayath

Concreting of Koppam 22 BDO D6t2783tLs Chekkalakonam road in 400000 400000 Com pleted Nanniyodu Grama Panchayath Vamanapuram 15.08.15

Concreting of Panthuvila Pattikonam road in BDO ZJ 400000 400000 D6/2184/rs Vamanapuram Grama Vamanapura m l-5.08.l-5 Completed Panchayath Construction of side wall in 24 Moozhi D6/28341L5 - Killiyar road in Anao 250000 BDO NDD 250000 completed Grama Panchavath 22.08.1.5 Construction of Kundarakuzhi 25 Paulottukonam D612835/L5 road in Anad 250000 BDO NDD 246934 Completed Grama Panchayath 22.08.r5 Construction of Mundoorkonam - 26 700000 BDO NDD 700000 D6/2836115 Punnavakkunnu road in Anad 22.08.t5 Completed Grama Panchayath Construction of Thevarumoozhi 27 - Chornodu D6/2837 road in Panavoor 300000 BDO NDD 299315 tLs pleted Grama 22.08.l-5 Com Panchayath Construction of Chappath - Valiyakonga 28 namcode - Vellanchira panavoor 800000 BDO NDD 798830 D6/28381Ls road in 22.08.I5 Completed Grama Panchayath

iide wall construction of )u linchikkapoika - 29 /ayalikkada BDO road in 425000 396546 D6/323211,s /amanapuram Grama Vamanapuram 30,09.l-s Completed 'anchayath Supply Erection and Qommissioning of 8 Meter Mini Mast with 4 No's of LED JU (200 Watts) D6/180i1-6 Lighting System 350000 KSIE 350000 Completed (3 Years Warranty) at Tharatra 25.01. r.6 lunction in Kallara Grama Panchayath Supply Erection and Commissioning of 8 Meter Mini Mast with 4 No's of LED 31 (200 D6/LgL/16 Watts) Lighting System 350000 KSIE 350000 Completed (3 Years Warranty) at 2s.01. L6 Vellamkudi Junction in Kallara Grama Panchavath Supply Erection and Commissioning of 8 Meter Mini Mast with 4 No's of LED (200 32 Watts) Lighting System D6/183/16 (3 350000 KSIE 350000 Completed Years Warranty) at 25.01.1.6 Vengamala Kshethram Nada in Pullampara Grama Panchayath

Supply Erection and Commissioning of L2 Meter High Mast with 6 No's of LED (200 Watts) Lighting System D6tL84/r6 33 566983 KSIE 566983 Completed (3 Years Warranty) at 25.01-.16 Kuttimoodu Junction in Vamanapuram Grama Panchayath

Construction of a Bore Well & Installation of Tank & Taos at District Officer, D6t7s0lr6 34 Vettambally Laksham veedu 300000 284423 Completed Colony in Anad Grama Ground water 27.02.L6 Panchayath.

Construction of Building for D6/1948/rs 35 Nethaji Memmorial Library in 500000 BDO Vamanapuram 08.07.ls & AS Revised Kallara Grama Panchayath 29.09.1s Tarring of Sabarmathi Road BDO D6/194711.5 36 in Nellanad Grama 500000 AS issued Panchavath Vamanapuram 08.07.15 Concreting of Aksharapatha road in Peringamala Grama BDO D612554115 of 200000 AS issucd 31 Panchayath.Concreting Vamanapuram 29.O7.r5 Aksharapatha road in Peringamala Grama Panchayath,

Metalling and Tarring of Pazhavila Pangade road in Pangode Grama BDO D612648115 Panchayath.Metalling and 500000 AS issued 38 Vamanapuram 03.08.15 Tarring of Pazhavila Pangade road in Pangode Grama Panchayath. Construction of road to Vamanapuram Govt.Hospital BDO D6/32LL/ts 39 759000 AS issued in Nellanad Grama Vamanapuram 29.09.15 Panchayath. Total 15352073 12836152 $l.ln".l