2021 ABOUT US

Since 1976, following the family tradition, KRALICEK OBRAS CIVILES S.A., is dedicated to the construction of both public and private works. During all these years, we have developed a style based on service, quality and personalized attention in Capital Federal, Gran and the inside of the country.

Our professionals are at the customer's service at all stages of the proj- ect; from the preliminary analysis to the completion of the work , providing reliability and security. We have specialized personnel for all tasks or activities that directly or indirectly involve construction.

At KRALICEK OBRAS CIVILES S.A. we seek to exceed the expectations of those who hire us, establishing strong and lasting relationships, working proactively, efficiently and effectively, through the participation of all staff of the company.

We have the human and technical resources necessary to provide the best service and quality, strictly meet the execution deadlines and provide competitive costs that strengthen our position in the market. We are a growing company that is committed to the future and development of our country. OUR MAIN CUSTOMERS OUR WORKS The new control tower of the San Fernando International Airport will have a height of 34.79 meters, with the observation plane at 29.76 meters. The work with its reinforced concrete completed today, rises to the right of the current passenger terminal.

On the ground floor, all technical requirements will be resolved (reserve tanks, TGBT and GEL room), while the shaft will have six levels that will concentrate the means of vertical circulation, paliers and services. At the head there will be an office level for the ground control service, another with the rest area, and a third technical level with spaces for racks and ventilation equipment. The control cabin will have capacity for five workstations.

Although the San Fernando airport does not receive regular commercial flights, its intense civil and executive aviation activity makes it the third airport with the highest movement of aircraft in , after Aeroparque Year: 2019 - In action and Ezeiza. Location: Buenos Aires, SAN FERNANDO Control Tower International Airport Project: AA2000 San Fernando Customer: AA2000 Lumina San Isidro

Year: 2018 - In action Location: Panamá 1221, Buenos Aires, San Isidro Project: MRA+A Customer: Grupo SIMPA LUMINA SAN ISIDRO is the largest development of the LUMINA Group.

Located at the intersection of the streets Panamá and Cuyo, San Isidro, and implanted on four hectares of land, it will be a construction of 80,310m2 of total surface and 42,716m2 of profitable surface, with just over 1000 units of garages distributed in 2 basements.

All the avant-garde criteria available in the market are applied to the project.

The sustainable criteria applied since the genesis of the project point to a LEED GOLD degree certification.

There will be two office modules of 21,000 m2 each, with floors of just over 5,000 m2, which position it as the project with the largest plants in the San Isidro district and one of the largest on the market.

Both buildings will have a central atrium that will be unique and distinctive of the project. Year: 2017 - 2019 Location: Nordelta - Buenos Aires Northlands School Project: Gonzalez Poggi Architects Customer: Northlands School Sports Center The NORTHLANDS school on the eve of the anniversary of its centenary, faces the construction of a new sports center for its campus in Nordelta. It is located as the end of the central axis of the campus following the guidelines of the original master plan.

The 3,600m2 work is made up of 2 buildings made of exposed concrete, brick and tensioned textile facades. Both buildings are linked through a semi-covered atrium linking to the ground floor and 1st floor through a bridge.

In one of the buildings is the SUM with a total capacity for 892 people and in the second a semi-olympic pool that complies with the FINA and RFEN standards for the development of competition with tiers for 280 people. Torcuato Di Tella University Sáenz Valiente Building

Year: 2017 - 2019 Location: Nuñez, Ciudad Autónoma de Buenos Aires Project: Josep Ferrando Architecture Customer: Torcuato Di Tella University Foundation SAENZ VALIENTE building The new building added covered 6,200 m2 to the campus in 6 levels for classrooms, offices, auditorium, meeting rooms, gastronomic premises, mini-bank, multipurpose premises and has a landscaped walkable terrace. The project includes 2 underground levels where 309 garages are located, turning the old parking lot into a large central garden. Structural simplicity, flexibility and integration with the environment, exposed concrete and glass building with metal bridge connections with the Alcorta building.

Tasks executed: MAIN CONTRACTOR of civil works, concrete structure, masonry, sanitary installation.

Surface: 11,922 m2

Execution period: 16 months Multilevel Covered Parking Aeroparque Jorge Newbery

Year: 2017 - 2019 Aeroparque Jorge Newbery Ciudad Autónoma de Buenos Aires Customer: Helport S.A. / AA2000 In the Jorge Newbery Metropolitan Airport, a new multilevel building was completed in June 2017 to meet the growing demand by passengers and airport employees for parking spaces.

The new building is in the southern sector of the airport, following the line built in front of the Río de la Plata, connected to the existing parking building (Building II). It is a six-level concrete construction with a capacity for 720 garages.

The need for garages had become critical in the area before this build due to the lack of alternatives for parking in the airport environment and the modality that allows passengers to leave their vehicle parked when they start their trip and withdraw it upon return.

• Construction of a 25,000 m2 garage building on 6 levels. • 10,000 m3 of reinforced concrete structure founded on 30 ml deep piles was executed. • Work done: complete civil and road works. • Execution period: 17 months. Year: 2017 - 2019 Location: Nordelta, Bs. As. Single Family Home Project: Fernando Kralicek and Mariano Boruchowicz Architects Customer: Single family home Cabos del Lago Detached house with views of Lake Nordelta with a constructed area of 760m2 developed on 3 levels. The house was built with the highest quali- ty standards. For its execution, the soil was replaced by Tosca of the first quality, more than 70 micropiles for its foundation and the entire structure was treated as exposed concrete, since the house is developed with a diversity of materi- als, the predominant being concrete in partitions, beams and slabs.

At the same time, more than 250m2 of San Luis stone and a variety of wood coatings were installed indoors and outdoors. A priority was the energy efficiency of the house, which is why it was executed with PVC carpentry of DVH glass, double walls with air chamber in all exterior walls, slabs with lightened subfloors to which 2 green terraces are added at first and second floor and a domotized lighting. Year: 2015 - 2018 Location: Venezuela esq. Echeverria, Vicente Florida Office Center López, Buenos Aires Project: MRA+A Construction management: Ing. Mariano Migone Customer: Grupo SIMPA The BUILDINGS II and III of FLORIDA OFFICE CENTER, with more than 18000m2 of development, make up a set of free perimeter towers with sustainability criteria governed by the LEED standard of the USGBC (U.S. Green Building Council) in a GOLD degree.

They consist of 3 basements of garages, ground floor, between floor and 10 floors. DVH system.

• Construction of two towers 12 stories high for offices of 5,000 m2 and 9,000 m2 respectively with 3 basements of 6,000 m2

• Work done: complete civil works.

• Execution period: 18 months. “Mirador de Palermo” Tower

Year: 2014 - 2017 Location: Av. Córdoba 5443 - Ciudad Autónoma de Buenos Aires. Project and Construction management: ZAS LAVARELLO & ASOC. Customer: Desarrollos de Inversiones Inmobiliarias SRL The MIRADOR DE PALERMO tower with more than 13,000m2 covered, was erected on a 1500m2 terrain, in which 2 basements of garages were developed, ground floor, between floor and 18 floors with units of 1, 2, 3, and 4 rooms (a total of 143 units).

It has open views, a pool on the 18th floor, and a wide variety of amenities.

• Construction of an 18-story high tower for apartments of 1, 2, 3 and 4 rooms with 2 basements of 3,000 m2 for garages. • 14,000 m2 of reinforced concrete structure was executed. • Work done: complete civil works. • Execution period: 24 months. Year: 2017 Location: Bº San Calixto - Parcelas Colegio 5 y 20, Salta Project: Estudio ERA arquitectos - Santo Tomás Ezequiel Rivarola y asoc. Customer: Orden de San Agustín de Villanueva It is a building destined for kindergarten and nursery rooms, organized on the ground floor and first floor.

Ground Floor Destination: • Main access: access hall and battery of public toilets • Maternity room, changing rooms, toilete and maternity patio • Initial level rooms: classroom for children of 2 and 3 year with built-in toiletes tubs • Kindergarten rooms: classroom for children of 4 and 5 year old • Toilets for classroom for children of 4 and 5 years • Semi-covered patio • Administrative area: Direction, Secretary and Toilet.

Upstairs Destination: • Semi-covered play area • Indoor multipurpose room • Toilets

Structure with a free perimeter, with foundations with piles and beams and boxtoned concrete slabs. It consists of two fire protected stair cores and a third core with the same characteristics, with access to the roof terrace for a green terrace. Because the building is located in an area with the highest risk of earthquakes, the resistant structure was designed taking this condition into account. Surface: 3,000 m2 Execution period: 120 days Year: 2014 Aeroparque Jorge Newbery Covered Parking Expansion Ciudad Autónoma de Buenos Aires Aeroparque Customer: Helport S.A. / AA2000 Jorge Newbery • On an area of 4,500 m2, new vehicular ramps, pavements, facades of partitions, columns and exposed reinforced concrete beams were executed, as well as the civil works of stair cores and elevator hall.

• Execution of structure and metal roof (4,500 m2). Lofts en Ayres Vila Stage 1

Year: 2011- 2012 Location: Pilar, Buenos Aires Customer: Ayres Vila • Civil Works of a Complex of 92 Homes

• Execution period: 360 days Terminal 4 Aeroparque Jorge Newbery

Year: 2011-2012 Aeroparque Jorge Newbery Ciudad Autónoma de Buenos Aires Customer: Helport S.A. • Execution of 13,000 m3 of reinforced concrete structure generating an area of 33,000 m2 for the passenger terminal and administrative offices.

• Execution period: 240 days. Stadium Club Atlético Independiente

Year: 2008 - 2011 Location: Avellaneda. Prov. de Buenos Aires Customer: Club Atlético Independiente • Execution of 10,000 m3 of reinforced concrete structures for so called Bocas del Diablo. • Execution of the main access portico to the playing field. • Execution of cistern tanks. • Complementary works: access stairs to stalls and stands. Year: 2009 - 2011 Ezeiza International Airport, New Passenger Terminal Ministro Pistarini. Provincia de Buenos Aires Customer: Helport S.A. Stage 1 Ezeiza International Airport • Execution of 8,000 m3 of reinforced concrete structure of passenger terminal building with application of the lightened slab technique with spheres.

• Execution period: 150 days. Year: 2008 Ruta Nacional Nº8 km 66. Pilar. Prov. de Buenos Aires

Customer: Helport S.A. Larena Toll • Construction of 2,500 m2 of the Operational and Administrative buildings. • Execution of 150 m of reinforced concrete tunnel for the transit of personnel and flows under the highway between both buildings. • Construction of squares and reinforced concrete bumpers for toll booths. • Execution period: 120 days. Year: 2007 - 2008 Puerto San Martín. Prov. de Biodiesel Santa Fe Customer: Unitec Bio S.A. Plant • Execution of API pool. • Construction of a cooling tower pool. • Construction of 2,000 ml of underground electrical conduits. • Execution of CCM buildings and generators. • Execution period: 120 days. Year: 2007 - 2008 Location: Rosario, Provincia de Hotel Santa Fe Customer: Riva S.A. Casino Rosario • Execution of reinforced concrete structure (Sup. 20000 m2).

• Execution period: 10 months. Year: 2006 Argentina Cargo Terminal, West Building Ezeiza International Airport, Ministro Pistarini Provincia de Buenos Aires Offices Customer: Helport S.A. • Constructed area: 5.000 m2. • Work done: 7 months. Year: 2005 Location: Río Grande, Pcia. Río Grande Airport de Tierra del Fuego Customer: Helport S.A. • Execution of the reinforced concrete structure of the passenger terminal. Year: 2004 Argentina Cargo Terminal, Customs Building Ezeiza International Airport, Ministro Pistarini. Provincia de Buenos Aires Airport Customer: Helport S.A. • Built area: 2.000 m2 Works at Argentina Cargo Terminal

Year: 2003 - 2019 Ezeiza International Airport, Ministro Pistarini Provincia de Buenos Aires • Various extensions of warehouses and office construction. • Construction of pits for the installation of load conveyor systems. • Road constructions in asphalt and concrete pavement for circulation and parking of vehicles and large trucks and cargo transport dollys. • Construction of deposits for explosives and tank tanks. Edition: January 2021 www.kralicek.com.ar Dardo Rocha 3428 • [B1640GAB] Martínez • República Argentina • Tel. +54 11 5245.3315