Roadworks & Events Report

Total Page:16

File Type:pdf, Size:1020Kb

Roadworks & Events Report Roadworks & events report Effective from 29 January 2021 Links to further information Traffic Scotland - information on trunk roads including Edinburgh City Bypass Key SE Scotland trunk roads maintained by BEAR New information in this version Transport for Edinburgh - Lothian Buses, Edinburgh Trams and Cyclehire Scheme Spaces for People measures Underlined entries contain links to maps or further information Scottish Roadworks Register temporary traffic lights in use Follow Edintravel on Twitter for regular updates diversion in operation Planned roadworks and events affecting major routes have been approved by the Citywide Traffic Management Group (a partnership between City of Edinburgh Council Transport Officers, Locality teams, Lothian Buses and Police Scotland.) Entries are arranged by Ward and then by start date. See details of Ward boundaries Ward Street Location Contractor / works description Traffic Control Start Finish Various lane closures / contraflow arrangements. Speed limit reduced to 30mph along whole length between Barnton and Almond MAYBURY ROAD Between East Craigs and Barnton CALA / Barratt Homes development 08/01/20 Ongoing Maybury junctions. New signalised junctions in operation at site access roads. Between Silverknowes Parkway and City of Edinburgh Council - to provide space for safe Until further Almond SILVERKNOWES ROAD Road closed to all vehicles except cycles 30/04/20 Marine Drive walking and cycling notice City of Edinburgh Council - to provide space for safe Until further Almond CAMMO WALK Road closed except for residents' access, pedestrians and cycles 08/05/20 walking and cycling notice Between Craigs Road and roundabout at City of Edinburgh Council - to provide space for safe Until further Almond MAYBURY ROAD Temporary pedestrian crossing in operation 30/06/20 Maybury Drive walking and cycling notice Until further Almond HAWES PIER Police Scotland initiative Car park closed 10pm - 5am each night 10/07/20 notice City of Edinburgh Council - to provide space for safe Until further Almond PENNYWELL ROAD Segregated cycle lanes 14/09/20 walking and cycling notice QUEENSFERRY ROAD, City of Edinburgh Council - footway widening and Work substantially complete as at 26/10/20, dates for lighting columns Almond At Kirkliston crossroads 29/09/20 TBC KIRKLISTON installation of puffin crossing. replacement TBC City of Edinburgh Council - to provide space for safe Until further Almond SOUTH BARNTON AVENUE East leg at junction wih Barnton Avenue Road closed 10/12/20 walking and cycling notice Between Milton Cottage and Dundas Almond B800 SGN - gas leak repairs 2-way temporary traffic lights 18/01/21 TBC Castle At the north rail bridge (approximately Scottish Water - manhole repairs Almond CLIFTONHALL ROAD Road closed 9.30am - 6pm 25/01/21 25/01/21 between DPD Depot and Tesla unit Postponed Between Cramond Glebe Road and Almond CRAMOND ROAD NORTH SGN - increasing network capacity Temporary traffic lights 25/01/21 08/02/21 Cramond Place Between Maybury Road and West Craigs Scottish Power - cable installation Road closed Almond TURNHOUSE ROAD 25/01/21 2 weeks Crescent Start date TBC Lane and footway restrictions, temporary traffic lights during w/c 01/02/21 At no. 48 (north side of Cammo estate, Road closed to through traffic. Diversion signed via Cammo Road - Cammo Almond CAMMO ROAD Scottish Power - cable installation 28/01/21 07/02/21 back road to Turnhouse) Gardens - Maybury Road - Craigs Road - Turnhouse Road Between Silverknowes Neuk and West Almond / Forth FERRY ROAD City of Edinburgh Council - carriageway patching Various locations, stop / go boards in use 30/01/21 31/01/21 Granton Access Start dates indicate earliest anticipated start. Finish dates represent formal notice periods - From 29 January 2021 www.edinburgh.gov.uk/edintravel works may finish earlier or be extended. Around 200m east of B924 Bo'Ness Almond BUILYEON ROAD Cherry-picker access to phone mast Off-peak 2-way temporary traffic lights 01/02/21 03/02/21 Road KIRKLANDS PARK STREET Almond Between Maude Place and Eilston Drive Scottish Water - manhole repairs Road closed to through traffic 01/02/21 01/02/21 / EILSTON ROAD Around 500m north from East Craigs Almond MAYBURY ROAD BT / KN - installation of ducting across the carriageway Temporary traffic lights 01/02/21 03/02/21 roundabout Almond MAYBURY ROAD At Craigs Road Scottish Water - ironwork repairs Northbound lane closure, temporary stop for buses towards East Craigs 01/02/21 01/02/21 HOPETOUN ROAD, Between Morison Gardens and High Almond Openreach - cabling Rolling programme with 2 / 3 / 4-way temporary traffic lights 08/02/21 10/02/21 QUEENSFERRY Street South west corner (between Muirhouse 02/02/21 02/02/21 Almond MUIRHOUSE GARDENS Openreach - pole replacement Road closed Grove and cul-de-sac at no. 60) 09/02/21 09/02/21 Between Silverknowes Green and Almond SILVERKNOWES BRAE BT / KN - network upgrade Road closed to through traffic 15/02/21 15/02/21 Silverknowes Gardens Varying lane closures and contraflow arrangements. St James' Place, LEITH STREET / PICARDY City Centre St James redevelopment works. Cathedral Lane and St James' car parks closed. Alterations to lane layout on 04/01/16 Ongoing AREA all approaches to Picardy roundabout as work progresses Between Waverley station access and Unsafe rock face, restrictions in place to provide safety City Centre CALTON ROAD Temporary traffic lights. 01/12/18 Ongoing New Street zone City of Edinburgh Council / Balfour Beatty - bridge Traffic reduced to one lane in each direction. Footway closures and temporary City Centre NORTH BRIDGE 15/02/20 Summer 2021 refurbishment walkways as signed. Bus stops relocated as required. To provide adequate pedestrian space passed the Until further City Centre LEVEN STREET At Valleyfield Street Lane closures / contraflow to accommodate pedestrian walkway 04/06/20 development site at Pacific Building notice Between South St David Street and East City of Edinburgh Council - to provide space for safe Until further City Centre PRINCES STREET Buses, taxis and cycles only 7.30am - 6.30pm each day 18/06/20 End junction walking and cycling notice City of Edinburgh Council - to provide space for safe Road closed at Princes Street (except for cycles). Taxi and loading access via Until further City Centre WAVERLEY BRIDGE 18/06/20 walking and cycling Market Street notice City of Edinburgh Council - to provide space for safe Until further City Centre FORREST ROAD Segregated cycle lanes 22/06/20 walking and cycling notice City of Edinburgh Council - to provide space for safe Road closed except for cycles and blue badge holders. Until further City Centre COCKBURN STREET 10/07/20 walking and cycling Loading permitted 6.30am - 10.30am each day. notice Start dates indicate earliest anticipated start. Finish dates represent formal notice periods - From 29 January 2021 www.edinburgh.gov.uk/edintravel works may finish earlier or be extended. Road closed except for cycles and blue badge holders. City of Edinburgh Council - to provide space for safe Loading permitted 6.30am - 10.30am each day. Until further City Centre VICTORIA STREET 10/07/20 walking and cycling From 11/12/20 - 24hr delivery and blue badge access via George IV Bridge, notice road remains closed at Grassmarket At Leven Street, Home Street. City of Edinburgh Council - to provide space for safe Re-designating key parts of the road to help pedestrians, people using Until further City Centre TOLLCROSS 31/07/20 Brougham Street and Earl Grey Street walking and cycling wheelchairs, prams or bicycles to physically distance notice Road closed to westbound traffic. City Centre COWGATE At Candlemaker Row Redevelopment of India Buildings Diversion via Pleasance - West Richmond Street - West Nicolson Street - 24/08/20 18 months Potterrow - Teviot Place - Lauriston Place - Lady Lawson Street - West Port Lane closures QUEEN STREET GARDENS City Centre At Queen Street SGN - gas leak repairs From Monday 25/01/21 - eastbound lane closure on Queen Street, no left turn 22/12/20 TBC EAST into or right turn out of Queen Street Gardens East Scottish Water - pipe renewal City Centre GEORGE IV BRIDGE Between Lawnmarket and Victoria Street 2-way temporary traffic lights 09/01/21 11/01/21 To be rescheduled 25/01/21 City Centre SOUTH ST DAVID STREET Between Rose Street and Princes Street Scottish Water - repairs to burst main Southbound lane closure 18/01/21 Ongoing Scottish Water - pipe renewal (worksite on Great King City Centre DUNDAS STREET At Great King Street Street, west side of junction) 4-way temporary traffic lights 19/01/21 25/01/21 Cancelled 18/01/21 City Centre LAURISTON PLACE At Lauriston Street Scottish Water - repairs to burst pipe Lane closures 22/01/21 TBC Between Dundas Street and Nelson Morrison Utility Services - trial holes 24/01/21 24/01/21 City Centre ABERCROMBY PLACE 2-way temporary traffic lights Street Not completed on 24/01/21, new dates TBC 31/01/21 31/01/21 Scottish Power - cable connections City Centre LOTHIAN ROAD At Morrison Street Citybound nearside lane closure either side of Morrison Street junction 26/01/21 29/01/21 Postponed SOUTH EAST BT - clearing blocked cable ducts 17/02/21 21/02/21 City Centre CUMBERLAND STREET Road closed to through traffic Note change of date 27/01/21 31/01/21 LANE City Centre CANNING STREET T-junction at Caledonian Exchange Morrison Utility Services - trial holes 3-way temporary traffic lights 31/01/21 31/01/21 Between India Street and Queen Street City Centre HERIOT ROW Morrison Utility Services - trial holes 2-way temporary traffic lights 31/01/21 31/01/21 Gardens West City Centre MORAY PLACE At Great Stuart Street Morrison Utility Services - trial holes 2-way temporary traffic lights 31/01/21 31/01/21 Morrison Utility Services - trial holes 24/01/21 24/01/21 City Centre SHANDWICK PLACE Manor Place to Stafford Street Road closed to citybound traffic midnight - 4am Note change of date 31/01/21 31/01/21 Start dates indicate earliest anticipated start.
Recommended publications
  • Edinburgh Airport Masterplan
    Masterplan 2016- 2040 Contents Foreword 2 Executive summary 4 1. Introduction 8 2. The social and economic benefits of aviation 12 3. Policy and regulation 22 4. Edinburgh Airport changes 2011 – 2016 30 5. Surface access (transport links) 34 6. Local environment 48 7. Future land uses 56 8. Maps 66 2 3 Foreword Foreword Growth It seems to be a word that we at Edinburgh So yes, growth is good. Airport have had to deal with for a number of years now. But we also firmly believe that our growth is something that must be linked We’ve grown by one million passengers to, supported by and supportive of each year since 2012. We’ve grown our Edinburgh’s future development. route network, serving more destinations and working with more airlines than ever. That’s why this Masterplan is so important. It sets out how we think we’ll grow in the We believe that this growth is good for decades to come, and poses questions Scotland. An independent study that around future growth. Your views are was carried out earlier this year gives important in making sure that our thinking evidence to that – the activity at the airport is correct and that it fits with wider plans. generates almost £1 billion per year for the Scottish economy while supporting over It’s important to stress that our Masterplan 23,000 jobs. is focused on our growth on the ground. It is not concerned with air space change. We also believe that growth will continue We’ll be consulting again on that early in 2017.
    [Show full text]
  • Edinburgh Barclay Viewforth Church of Scotland Redacted.Pdf
    EDINBURGH BARCLAY VIEWFORTH CHURCH OF SCOTLAND Accrued (SORP Compliant) Accounts for Year Ending 31 December 2020 Congregation No: 010010 Scottish Charity No: SC014757 CONTENTS Page No. 3 – 8 Trustees’ Annual Report 9 Report of the Independent Examiner 10 Statement of Financial Activities 11 Balance Sheet 12 – 13 Accounting Policies 14 – 21 Notes to Accounts 22 Appendix 2 Edinburgh Barclay Viewforth Church of Scotland Trustees’ Report Year ended 31 December 2020 The trustees present their annual report and financial statements of the charity for the year end- ed 31 December 2020. The financial statements have been prepared in accordance with the accounting policies set out in the accounts and comply with the General Assembly Regulations for Congregational Finance, the Charities and Trustee Investment (Scotland) Act 2005, the Charities Accounts (Scotland) Regulations 2006 (as amended) and Accounting and Reporting by Charities: Statement of Recommended Practice applicable to charities preparing their ac- counts in accordance with the Financial Reporting Standard applicable in the UK and Republic of Ireland (FRS102) (effective 1 January 2019) - Charities SORP (FRS 102). Objectives and Activities . The congregation's objectives are summed up in our mission statement …making known God's love in Jesus Christ…, which we work towards through ministry and mission. At the beginning of 2020 we were looking forward to welcoming our new minister , moving from Prestwick, following a unanimous election after he preached as sole nominee on 23 February. Then the COVID lockdown was imposed, and this had a huge impact on the life of the congregation, as it has had on the lives of members and the community of which we are part.
    [Show full text]
  • Frommer's Scotland 8Th Edition
    Scotland 8th Edition by Darwin Porter & Danforth Prince Here’s what the critics say about Frommer’s: “Amazingly easy to use. Very portable, very complete.” —Booklist “Detailed, accurate, and easy-to-read information for all price ranges.” —Glamour Magazine “Hotel information is close to encyclopedic.” —Des Moines Sunday Register “Frommer’s Guides have a way of giving you a real feel for a place.” —Knight Ridder Newspapers About the Authors Darwin Porter has covered Scotland since the beginning of his travel-writing career as author of Frommer’s England & Scotland. Since 1982, he has been joined in his efforts by Danforth Prince, formerly of the Paris Bureau of the New York Times. Together, they’ve written numerous best-selling Frommer’s guides—notably to England, France, and Italy. Published by: Wiley Publishing, Inc. 111 River St. Hoboken, NJ 07030-5744 Copyright © 2004 Wiley Publishing, Inc., Hoboken, New Jersey. All rights reserved. No part of this publication may be reproduced, stored in a retrieval sys- tem or transmitted in any form or by any means, electronic, mechanical, photo- copying, recording, scanning or otherwise, except as permitted under Sections 107 or 108 of the 1976 United States Copyright Act, without either the prior written permission of the Publisher, or authorization through payment of the appropriate per-copy fee to the Copyright Clearance Center, 222 Rosewood Drive, Danvers, MA 01923, 978/750-8400, fax 978/646-8600. Requests to the Publisher for per- mission should be addressed to the Legal Department, Wiley Publishing, Inc., 10475 Crosspoint Blvd., Indianapolis, IN 46256, 317/572-3447, fax 317/572-4447, E-Mail: [email protected].
    [Show full text]
  • The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report
    The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report January 2003 Ove Arup & Partners International Ltd Admiral House, Rose Wharf, 78 East Street, Leeds LS9 8EE Tel +44 (0)113 242 8498 Fax +44 (0)113 242 8573 REP/FI Job number 68772 The City of Edinburgh Council Edinburgh LRT Masterplan Feasibility Study Final Report CONTENTS Page EXECUTIVE SUMMARY 1 1. INTRODUCTION 9 1.1 Scope of the Report 9 1.2 Study Background and Objectives 9 1.3 Transport Trends 10 1.4 Planning Context 10 1.5 The Integrated Transport Initiative 11 1.6 Study Approach 13 1.7 Light Rapid Transit Systems 13 2. PHASE 1 APPRAISAL 18 2.1 Introduction 18 2.2 Corridor Review 18 2.3 Development Proposals 21 2.4 The City of Edinburgh Conceptual Network 22 2.5 Priorities for Testing 23 2.6 North Edinburgh Loop 24 2.7 South Suburban Line 26 2.8 Appraisal of Long List of Corridor Schemes 29 2.9 Phase 1 Findings 47 3. APPROACH TO PHASE 2 50 3.1 Introduction 50 3.2 Technical Issues and Costs 50 3.3 Rolling Stock 54 3.4 Tram Services, Run Times and Operating Costs 55 3.5 Environmental Impact 55 3.6 Demand Forecasting 56 3.7 Appraisal 61 4. NORTH EDINBURGH LOOP 63 4.1 Alignment and Engineering Issues 63 4.2 Demand and Revenue 65 4.3 Environmental Issues 66 4.4 Integration 67 4.5 Tram Operations and Car Requirements 67 4.6 Costs 68 4.7 Appraisal 69 5.
    [Show full text]
  • Greenbank Parish Church, Edinburgh
    Greenbank Connecions April 2019 Issue 678 Scottish Charity SCO11325 It’s that time again – the Greenbank Scout Group Annual Jumble Sale (see pages 9 and 16) Greenbank Parish Church, Edinburgh Online version: www.greenbankchurch.org/about/the-newsletter/ www.greenbankchurch.org Contents Minister’s Letter Dear Friends Minister’s Letter 2 Communion at Home 3 ‘Bunnies and Eggs’ 4 Monday Bible Study 4 Connections Feedback Form 4 Castle Community Bank 5 Message from the Treasurer 5 New Faces – the Haddens 6 Heart and Soul 7 Morlich House Coffee Morning 7 YACHT News 8 It hardly seems a year since my ordination Greenbank Running Group 9 and induction – the time has fairly flown Scout Group Jumble Sale 9 by! It was lovely to be reminded of the anniversary at worship on Sunday 17th Pre School 10 March, and I was very grateful for Valerie’s Greenbank Easter Appeal 11 kind words, the warm applause of the congregation, and the promise of cake World Mission Team 12 afterwards – two pieces were smuggled The Guild 13 out to me at the door, just in case you wondered!! The Friendship Club 13 One of the delights of Greenbank is how the congregation gets behind things. In Flower Rota 14 particular, we are thrilled with over 70 Contacts and Deadlines 14 people taking part in our Community Bi­ ble Experience during Lent. This is really Welcome Teams 14 wonderful, and I’m so grateful to all of our Coffee Rota 14 hosts and facilitators for making it happen. As we head through Lent towards Holy Greenbank Calendar for April 15 Week, thoughts turn to our joint services Congregational Register 15 with Morningside Parish Church – this time taking place at Morningside.
    [Show full text]
  • Hydropower Generating Scheme Hydro Project Will Provide Scottish Water with Self-Generated Power for Their Assets by William Ancell BA (Hons)
    Renewable Energy www.WaterProjectsOnline.com Hydropower Generating Scheme hydro project will provide Scottish Water with self-generated power for their assets by William Ancell BA (Hons) he topography of Scotland means a large amount of Scottish Water’s energy use is in pumping water around the country. Additionally, a lot of energy is required to treat water to meet regulatory standards, despite the Tgenerally high raw water quality in Scotland. In order to reduce power costs for water supply and treatment by 10%, and in doing so help keep down Scottish Water’s operating expenditure, the company is progressing with a £20 million+ hydropower generating scheme that will use the existing water supply pipes to generate electricity for the utility’s own assets. Wide shot of the turbine at Turret WTW in Crieff, Scotland - Courtesy of Scottish Water, Gilkes and Black & Veatch Project background This is nothing new; Scottish Water’s asset base is already generating The project involves installation of hydro turbines at raw water 5% of the company’s power requirements across Scotland and and treated potable water locations. More than 30 sites have been this investment will double that output. The project team have identified that could, using techniques most commonly seen in identified a number of potential sites and these will be whittled hydroelectric schemes, power the water treatment process in areas down to the best 20 or so small hydro schemes. such as rural Lanarkshire, the Borders, Stirlingshire, Angus and Fife. The project team is working closely with the national park The schemes will make good use of existing Scottish Water buildings authorities, community councils, power companies and planning and also see the construction of some small buildings and electricity officials to make sure these small hydro turbines have minimal infrastructure to transfer the power from the point of generation effect on the landscape.
    [Show full text]
  • Mapping Urban Residents' Place Attachment to Historic Environments
    Wang, Yang (2021) Mapping urban residents’ place attachment to historic environments: a case study of Edinburgh. PhD thesis. http://theses.gla.ac.uk/82345/ Copyright and moral rights for this work are retained by the author A copy can be downloaded for personal non-commercial research or study, without prior permission or charge This work cannot be reproduced or quoted extensively from without first obtaining permission in writing from the author The content must not be changed in any way or sold commercially in any format or medium without the formal permission of the author When referring to this work, full bibliographic details including the author, title, awarding institution and date of the thesis must be given Enlighten: Theses https://theses.gla.ac.uk/ [email protected] Mapping Urban Residents’ Place Attachment to Historic Environments: A Case Study of Edinburgh Yang Wang BE, MArch Submitted in fulfilment of the requirements for the degree of Doctor of Philosophy School of Social and Political Sciences College of Social Sciences University of Glasgow May 2021 Abstract Place attachment refers to the positive emotional bonds between people and places. Disrupting place attachment has a negative impact on people’s psychological well-being and the health of their communities. Place attachment can motivate people’s engagement in civic actions to protect their beloved places from being destroyed, especially when buildings and public spaces are demolished or redeveloped in historic places. However, the UK planning and heritage sectors have made only limited attempts to understand people’s attachment to the historic environment and how it may influence planning, conservation and development that affects historic places.
    [Show full text]
  • Care Shelter Annual Report 2019-2020
    Care Shelter Annual Report 2019-2020 The quotes found throughout the report were said by people staying at the Care Shelter. All images are used with consent. Names in stories are changed to protect guest identities. Bethany Christian Trust Registered Scottish Charity No. SC003783 65 Bonnington Road Edinburgh EH6 5JQ 0131 561 8930 Executive Summary 5 Operational Background 1. Introduction 10 2. Aim 10 3. Operational context 11 4. Church and volunteer overview 15 5. Staffing 18 6. Finance 21 Impact 7. Partnership working 24 8. Accommodation outcomes 29 Statistics 9. Attendance 32 10. Who needs the Care Shelter? 37 Conclusion 51 Luke Luke arrived at the Care Shelter with the world on his shoulders. He had recently lost a very good friend to a drugs overdose and had also split up with his long-term partner. He had no-one else to turn to. He was directed to the Care Shelter where he found himself surrounded by strangers. It took time for Luke to open up to Bethany staff and as he shared his story over a period of weeks, a trusting relationship was established. Luke also connected with the GP who visits the Care Shelter each week. His confidence grew and he began to think about his next step. He connected with the Link Workers at the Care Shelter who were able to support him into accommodation. Luke wrote a message on a Christmas card for staff one night, expressing his gratitude for the Shelter, its staff and the services that it provides. Luke shared that when he arrived at the Care Shelter, he was in a very dark place with thoughts of doing something that he would regret, but the way he was always looked after and spoken to by Bethany staff helped him make a different decision.
    [Show full text]
  • List of Affected Addresses
    APPENDIX 1 – List of Affected Addresses The addresses listed below are properties which were registered with the Council as at November 2016 and will be directly affected by the proposals. For confirmation of which catchment area will apply to properties not listed below please refer to the proposed catchment area maps in Appendix 5 or email [email protected] or call 0131 469 3161. The addresses are grouped according to the school catchment change that will directly affect them: 1) Gracemount Primary School to New South East Edinburgh Primary School; 2) Gilmerton Primary School to New South East Edinburgh Primary School; 3) Gilmerton Primary School to Gracemount Primary School; 4) Liberton Primary School to Gracemount Primary School; 5) ‘Gracemount High School / Liberton High School Dual Catchment’ to Gracemount High School Only 6) ‘Gracemount High School / Liberton High School Dual Catchment’ to Liberton High School Only 7) Liberton High School to Gracemount High School 1) Gracemount Primary School to New South East Edinburgh Primary School Street Properties Alnwickhill Court All numbers 1 to 34 Alnwickhill Crescent All numbers 1 to 21 Alnwickhill Drive All numbers 1 to 49, 51, 53, 55 Alnwickhill Gardens All numbers 1 to 36 Alnwickhill Grove All numbers 1 to 21, 23, 24, 25, 26, 27, 28 Alnwickhill Loan All numbers 1 to 16, 18, 19, 20, 21, 23, 24 Alnwickhill Park All numbers 1 to 40 Alnwickhill Road Even numbers 124 to 174 Alnwickhill Terrace All numbers 1 to 28 Alnwickhill View All numbers 1 to 19 Backlee All numbers
    [Show full text]
  • 46 Featherhall Avenue
    7 Tranter Crescent, Edinburgh Call us on 0131 447 4747 A5 portrait brochure.indd 1 23/08/2017 15:33:52 46 Featherhall Avenue CALL US ON 0131 447 4747 Corstorphine, Edinburgh EH12 7UN 46 Featherhall Avenue, GENERAL DESCRIPTION LOCATION Extended terraced house situated within the sought after Featherhall Avenue is situated within the sought after residential area of Corstorphine to the west of Corstorphine district of the city perfectly positioned for Edinburgh City Centre. There are excellent local amenities within Corstorphine including a large 24hr Corstorphine, Edinburgh access to local amenities and a short journey to the west Tesco, restaurants, takeaways, beauty salons, banks and shops. More extensive shopping facilities of the City Centre. The property is in need of modernisation can be found at the nearby Gyle Shopping Centre which houses an excellent selection of high street EH12 7UN and redecoration but offers excellent potential to be a good stores and restaurants, including a Marks and Spencers and a large Morrisons. Leisure facilities can be home in an excellent location. found at the David Lloyd Leisure Centre, Edinburgh Zoo, Turnhouse and Royal Burgess Golf Courses and Corstorphine Hill. The property is well situated for access to the City Bypass, Forth Road Bridge and all routes east and west. There are also regular buses to the City Centre, Edinburgh International Airport, For price and viewing information please visit Edinburgh Business Park and the Royal Bank of Scotland at Gogarburn. residential.gillespiemacandrew.co.uk or call 0131 447 4747 • Reception hall with storage. COUNCIL TAX BAND - D. EXTRAS: TRAIN STATION - APPROXIMATELY 2.8 MILES TO HAYMARKET STATION.
    [Show full text]
  • 47 Bus Time Schedule & Line Route
    47 bus time schedule & line map 47 Granton Harbour View In Website Mode The 47 bus line (Granton Harbour) has 4 routes. For regular weekdays, their operation hours are: (1) Granton Harbour: 5:29 AM - 11:06 PM (2) Ladywood: 5:24 AM - 9:49 PM (3) South Side: 7:10 PM Use the Moovit App to ƒnd the closest 47 bus station near you and ƒnd out when is the next 47 bus arriving. Direction: Granton Harbour 47 bus Time Schedule 85 stops Granton Harbour Route Timetable: VIEW LINE SCHEDULE Sunday 9:09 AM - 10:06 PM Monday 5:29 AM - 11:06 PM Wyvis Park, Ladywood Tuesday 5:29 AM - 11:06 PM Yarrow Court, Ladywood Wednesday 5:29 AM - 11:06 PM Teviot Grove, Ladywood Thursday 5:29 AM - 11:06 PM Eastƒeld Farm Road, Ladywood Friday 5:29 AM - 11:06 PM Windsor Drive, Ladywood Saturday 6:19 AM - 11:06 PM Strathesk Road, Ladywood Windsor Drive, Penicuik Windsor Road, Ladywood 47 bus Info Direction: Granton Harbour Dunlop Terrace, Ladywood Stops: 85 Trip Duration: 82 min Kirkhill Gardens, Penicuik Line Summary: Wyvis Park, Ladywood, Yarrow Court, Ladywood, Teviot Grove, Ladywood, Eastƒeld Farm Road, Ladywood, Windsor Drive, Ladywood, Imrie Place, Penicuik Strathesk Road, Ladywood, Windsor Road, St Mungo's View, Penicuik Ladywood, Dunlop Terrace, Ladywood, Kirkhill Gardens, Penicuik, Imrie Place, Penicuik, Town Town Centre, Penicuik Centre, Penicuik, Wilson Street, Penicuik, John Street Lane, Penicuik, Angle Park, Penicuik, Cuiken Avenue, Wilson Street, Penicuik Penicuik, Queensway, Penicuik, Mauricewood Road, 57 John Street, Penicuik Mauricewood, Beeslack High
    [Show full text]
  • West Craigs Limited Response (7 May 2019)
    Response on behalf of West Craigs Limited 1 INTRODUCTION 1.1 We act for West Craigs Limited, and have been instructed by them to submit a response to Scottish Government following the City of Edinburgh Council’s response dated 5 April 2019 to the Scottish Government’s letter of 7 March 2019. 1.2 The Council has produced four different draft versions of its Supplementary Guidance (SG) following the adoption of the Edinburgh Local Development Plan in November 2016. Our clients have submitted responses to these drafts, and copies of those should already have been made available to you. For completeness, we enclose copies of our clients’ submissions. 1.3 The Council’s response is 39 pages and accompanied by a significant amount of supporting material. The response contains new explanations from the Council as to its approach, as well as new submissions of policy and fact. These submissions were not provided by the Council when responding to third party representations on the various different versions of the draft SG. 1.4 Our clients previously raised concerns regarding the Council’s failure to undertake proper and meaningful consultation on its draft SG, constituting a failure to comply with the requirements of Section 22 of the Town and Country Planning (Scotland) Act 1997 and Regulation 27 of the Town and Country Planning (Development Planning) (Scotland) Regulations 2008. The extensive nature of the Council’s response illustrates its failure to provide sufficient information during the consultation process. 2 QUESTION 1 LDP POLICY DEL 1 AND CIRCULAR 3/2012 2.1 In response to question 1, the Council make various submissions on policy Del 1 of the Edinburgh Local Development Plan, and Circular 3/2012.
    [Show full text]