RP946 v2

GOVERNMENT OF PUBLIC WORKS DEPARTMENT

KARNATAKA STATE HIGHWAYS IMPROVEMENT PROJECT - II Public Disclosure Authorized

RESETTLEMENT IMPLEMENTATION PLAN WAP 1 ( – Pavagada)

Public Disclosure Authorized

Public Disclosure Authorized

Public Disclosure Authorized

June 2012

Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Table of Contents

ABBREVIATIONS ...... iii EXECUTIVE SUMMARY ...... 1

I. INTRODUCTION ...... 4 Objectives of RIP ...... 5 Scope of RIP ...... 5

II. LAND ACQUISITION AND RESETTLEMENT IMPACTS ...... 9 Land Acquisition Status ...... 9 Process of Private Negotiations…………………………………………………………………………………………………………10 Valuation of Assets ...... 11 Loss of Community Assets ...... 11

III. BASELINE CENSUS SURVEYS AND CONSULTATIONS ...... 12 Characteristics of displaced households ...... 12 Major and Minor Impacts ...... 13 Vulnerable groups ...... 16 Consultations...... 16

IV. IMPLEMENTATION MECHANISMS...... 19 Institutional Arrangements ...... 19 Extending R& R Assistance to PAPs ...... 19 Implementation support by NGOs ...... 21 Income Restoration Activities ...... 22 Monitoring and Evaluation ...... 23 Grievance Redressal mechanism ...... 23 Protection of RoW ...... 24 Impacts on Municipal Towns ...... 25 Data Base Management ...... 25 Co –ordination between R&R and Civil works ...... 26 Monitoring and R&R Activities ...... 27 Additional Impacts ...... 27 Budget ...... 28 Disclosure ...... 28

ANNEXURES

Annexure 1: Guidance Value as on June 2011 ...... 29 Annexure 2: Details of PAFs 63A (Malavalli – Maddur) ...... 33 Annexure 3 Details of PAFs link 63B (Maddur – ) ...... 34 Annexure 4 Details of PAFs Link 63C (Huliyurdurga – ) ...... 41 Annexure 5: Details of PAFs of Link 63D (Kunigal- ) ...... 44 Annexure 6: Details of PAFS of Link 63E (Tumkur –) ...... 49 Annexure: 7 Details of PAFs in Link 64F (Koratagere- Madhugiri) ...... 52 Annexure 8: Details of PAFs in Link 64G (Madhugiri – Pavagada) ...... 54 Annexure 9: Community Asset Details ...... 57

i Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

List of Tables

Table 1- 1: Package Details ...... 4 Table 1- 2: Summary Tables on Impacts ...... 8

Table 2- 1: WAP1 Notifications under Section 15 ...... 9 Table 2- 2: Summary Table on Community Assets ...... 12

Table 3- 1: Baseline Socio Economic information - for Major impacts (190) ...... 13 Table 3- 2: Distribution of PAFs by Major and Minor Impacts for WAP 1 ...... 14 Table 3- 3: Consultation Summary ...... 16

Table 4- 1: R& R Assistance ...... 19 Table 4- 2: Time line for Key LA and R & R Activities ...... 26 Table 4- 4: Monitoring Indicators for Physical Progress ...... 27 Table 4- 5: Budget ...... 28 Table 4- 6: Guidance Value for Link 63A ...... 29 Table 4- 7: Guidance Value for Link 63B ...... 29 Table 4- 8: Guidance Value for Link 63C ...... 30 Table 4- 9: Guidance Value for Link 63D ...... 30 Table 4- 10: Guidance Value for Link 63 E ...... 31 Table 4- 11: Guidance Value for Link 64F ...... 31 Table 4- 12: Guidance Value for Link 64G ...... 31 Table 4- 13: PAF Structure details of link 63A (Malavalli-Maddur) ...... 33 Table 4- 14: PAF Structure details of link 63B (Maddur - Huliyurdurga) ...... 34 Table 4- 15: PAF Structure details of link 63C (Huliyurdurga - Kunigal) ...... 41 Table 4- 16: PAF Structure details of link 63D (Kunigal - Tumkur) ...... 44 Table 4- 17: PAF Structure details of link 63E (Tumkur - Koratagere) ...... 49 Table 4- 18: PAF Structure details of link 64F (Koratagere - Madhugiri) ...... 52 Table 4- 19: PAF Structure details of link 64G (Madhugiri - Pavagada) ...... 54 Table 4- 20: Community Asset Details of link 63A (Malavalli-Maddur)...... 57 Table 4- 21: Community Asset Details of link 63B (Maddur - Huliyurdurga)...... 60 Table 4- 22: Community Asset Details of link 63C (Huliyurdurga - Kunigal) ...... 65 Table 4- 23: Community Asset Details of link 63D (Kunigal - Tumkur) ...... 69 Table 4- 24: Community Asset Details of link 63E (Tumkur - Koratagere) ...... 76 Table 4- 25: Community Asset Details of link 64F (Koratagere - Madhugiri) ...... 79 Table 4- 26: Community Asset Details of link 64G (Madhugiri - Pavagada) ...... 82

List of Figures Figure 1- 1: Distribution of PAFs for Package WAP1 ...... 15 Figure 1- 2: Distribution of PAFS by Major Impact for Package WAP1 ...... 15

ii Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

ABBREVIATIONS

AC Assistant Commissioner ADSW Assistant Director Social Welfare CAO Chief Administrative Officer CPO Chief Project Officer CPR Common Property Resources COI Corridor of Impact DC Deputy Commissioner DPR Detail Project Report EWS Economically Weaker Section EPC Engineering Procurement Contract GOI Government of GOK Government of Karnataka GRC Grievance Redressal Cell ID Identity Card IPDP Indigenous People Development Plan IR Income Restoration KHA Karnataka Highways Act KSHIP Karnataka State Highways Improvement Project LAA Land Acquisition Act LAO Land Acquisition Officer LAP Land Acquisition Plan NGO Non-Governmental Organization PAF Project Affected Family PAG Project Affected Group PAP Project Affected Person PIU Project Implementation Unit PGB Project Governing Body PWD Public Works Department PU Pre University PGB Project Governing Body RTC Record of Rights R & R Resettlement and Rehabilitation RAP Resettlement Action Plan ROW Right of Way SIA Social Impact Assessment SDO Social Development Officer SDRC Social Development Resettlement Cell SWI Social Welfare Inspector SC Scheduled Caste SR Schedule of Rates ST Scheduled Tribes SHG Self Help Group

iii Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

SIA Social Impact Assessment ToR Terms of Reference UR Upgradation ZP Zilla Panchayat

iv Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

EXECUTIVE SUMMARY The Karnataka State Highways Improvement Project (KSHIP) – II, covers a length of 826.6 kms. The roads have been categorized into two types of contracts EPC and Annuity. It consists of 269.4 kms of EPC roads consisting of 5 packages and 557.3 kms of roads under annuity contract consisting of 4 packages. Contract package WAP 1, is an Annuity package which covers 190 kms consisting of 7 links, passing through the districts of Mandya and Tumkur. This Resettlement Implementation Plan covers the implementation requirements for Package WAP1. In this package about 120 acres land has to be acquired, of this about 96 acre is dry and about 21 acres is wet and the remaining is plantation and waste land. As a result of land acquisition and related impacts, 1191 PAFs will lose part of their land; and another 497 PAFs lose their house hold/commercial/ assets /livelihood are getting affected. In addition, 106 community assets will also be affected. Out of these impacts, 190 PAFs are in the major impact category losing their houses/shop and livelihood and 1498 PAFs in the minor impact category who loses only part of their land or assets and the remaining land and asset is sufficient to continue their shelter and livelihoods. A baseline survey was conducted amongst affected people which indicated that a large majority of them are Hindus (97.27 percent). Distribution of PAPs by occupation indicates that 62.38 percent are in cultivation, agricultural laborers account for 16.03 percent; and 8.83 % work in commerce and trade related activities. In this package 63.21 percent of population has income less than Rs.26, 000, which has been used for the poverty line cut off for the project. 66.0 percent of the population falls within the age group of 18-60, which happens to be the working age group. In this package illiterate population accounts for 16.67 percent; those with primary education account for 8.36 percent; those with secondary education account for 28.22 percent and professionals account for 0.24 percent. Public consultations were held at 7 important locations along this corridor in February, 2008 and 534 were participated in these consultations. The consultations focused on mainly in explaining the entitlements under the R&R policy and measures taken to minimize the impacts and receive the suggestions from the participants. The consultations have helped in not only in disseminating the policy provisions to deal with land acquisition related impacts , but also assisted in gathering suggestions for mitigation of adverse impacts, improvement in designs and facilitating inputs for the resettlement plan preparation and implementation. During Consultations a number of issues have been raised, most of which have been addressed, such as reduction of COI in K M Doddi, minimizing the impacts to a temple at Hemmanahalli avoiding the impact to private bore wells at Dodda Maavathur , suggestion for replacement mini water scheme and avoiding the impact tot temple at Karegelapalya by reducing the width of COI. Besides this, safety concerns have been addressed by building foot paths in built up area, providing foot path barricades, school/village signages, rumble strips and road humps. One issue raised was that of the Tenancy Act, how those under this Act, if affected, would be dealt with, it was explained that this would be taken up on a case to case basis. This road also passes through fertile land, where farmers from Kunigal indicated that they were reluctant to part with land for road widening. This issue will be further identified, if any, when notice under section 17 of the KHA is given.

1 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Key potential land acquisition and resettlement issues are being taken care by the 3 bypasses proposed. The bypasses proposed in this package are at Huliyurdurga, Koratagere and Madhugiri towns to minimize impacts. These bypasses were determined based on various alternatives taking in consideration technical, social and environmental concerns. Besides there are a number of smaller realignments proposed. There are 12 cross section options adopted in this package to minimize impacts, the COI width varies from 11 m to 26 m. The GOK has adopted the Resettlement and Rehabilitation (R&R) Policy for KSHIP- II consistent with the NRRP, 2007 and the World Bank policy on involuntary resettlement to address the adverse impacts arising out of this project. Land Acquisition will be done through the Karnataka Highways Act 1964. Land acquisition under this Act will help the PAPs to receive the market price/replacement cost of land as compensation is negotiated through negotiations. Negotiation Committee has been constituted to negotiate the price of land with the landlord. The minimum negotiated price will be twice the current guidance value for Tumkur and Mandya districts. Some of the entitlements include payment of compensation through negotiation according to the Karnataka Highways Act, 1964; additional compensation for those becoming marginal farmers; grant for replacement of cattle shed; alternative house or developed plot +construction cost for those losing house; additional 25% compensation for partially affected structures towards reconstruction; support for purchase of income generating assets; rental allowance for affected tenants; and support for non titleholders to provide alternative houses or developed plot; construction cost; support for providing alternate shop or income generating asset to those who are losing commercial structures; employees losing livelihood will be given a onetime payment; vulnerable groups including physically challenged and those above 60 years will be assisted to get Government pension, if they are eligible or given a lump sum amount as assistance; and all community assets will be replaced and reconstructed.

This RIP will be implemented by Karnataka PWD-PIU Social Development Resettlement Cell (SDRC) with support from the NGO - STEM (Centre for Symbiosis of Technology Environment Management). The SDRC is responsible for monitoring the implementation of all resettlement and rehabilitation activities, including land acquisition The Special Deputy Commissioner, Land Acquisition, will be responsible for land acquisition activities while the Chief Administrative Officer will be responsible for all Resettlement and Rehabilitation works. A Grievance Redressal Cell with 3 members is constituted with Deputy Commissioner of the District as the Chairman. An independent agency viz., Samaj Vikas has been hired for Monitoring and Evaluation support. The SDRC, PIU will facilitate land acquisition and compensation, relocation and resettlement, distribution of assistance for the PAPs. WAP 1 will be implemented by KHSIP Division, Tumkur. The SDO and SWIs appointed for the Tumkur division will take care of R&R activities of this package.

The civil works for this package is likely to commence in December 2012. The R&R and land acquisition is targeted to be completed by August 2012. Implementation activities include land acquisition process, relocation and rehabilitation and monitoring. The budget estimated for land acquisition and R&R activities for this package is Rs.18.46 crores which forms a part of the overall budget approved by the GoK. All cash allowances to be paid to the PAPs is adjusted for inflation for 2012-13 and those who receive the assistance beyond April, 2013 will further be adjusted by 10% as needed.

2 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

This RIP will be disclosed through public consultations, Government of Karnataka/PWD Website. In addition, copies will be kept in: (i) State Government Library at Bangalore; (ii) - District library of Mandya and Tumkur districts; and (iii) in the taluk offices along the project roads.

3 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

I. INTRODUCTION

1. The Karnataka State Highways Improvement Project (KSHIP) – II Phase-I covers a length of 826.6 kms. In this connection a detailed Resettlement Action plan has been prepared in consultation with the affected persons, PIU and other stakeholders. This document includes, amongst other things, legal frame work and Resettlement Policy Provisions, Land acquisition and compensation payment, Social impact assessment and base line Socio-Economic characteristic and the implementation arrangement. The Government approved the Resettlement Action plan vide its order dated 28th July 2010. This has been published in the PWD web sites in the month of August 2010. This Resettlement Implementation Plan outlines the steps for resettlement and rehabilitation of PAFs/PAPs losing their land and structures and relocation of community assets for WAP 1.

2. Contract package WAP 1 covers 190 kms consisting of 7 links. The details about the package are given in Table 1. In the annexure the list of those loosing structures are provided which are enumerated in 2007-08 and verified by NGOs in 2011. Details of those loosing land are given in the notifications issued u/s 15 of the KHA. The list of vulnerable people will be subsequently prepared and assistance extended as needed. Any additional people moved into the ROW after the cut off date and are not served notices subsequently will be identified through additional verification by 31st July 2012. The question of extending assistance to them will be examined on case to case basis. In case of those who are mobile type of shop will not be provided any assistance since, the keep on changing on regular basis and they can easily find another alternative place to continue their petty business.

Table 1- 1: Package Details Link Description Length Districts Taluks Cutoff date 63A Malavalli – Maddur 22.8 Mandya Malavalli, Maddur 06.11.2007 Mandya, Maddur, Kunigal 15.10.2007 63B Maddur – Huliyurdurga 27.53 Tumkur 63C Huliyurdurga – Kunigal 21.11 Tumkur Kunigal 18.10.2007 63D Kunigal – Tumkur 35.19 Tumkur Kunigal, Tumkur 22.9.2207 63E Tumkur – Koratagere 27.89 Tumkur Tumkur, Koratagere 19.9.2007 Tumkur Koratagere, 02.08.2007 64F Koratagere – Madhugiri 20.02 Madhugiri Tumkur Madhugiri, 03.08.2007 64G Madhugiri – Pavagada 35.79 Pavagada

3. WAP 1 falls within the Southern Karnataka Plateau. The package cuts across the districts of Tumkur and Mandya. This region largely covers the area of the Cauvery basin making the region very fertile. In these region major crops grown are Sugarcane, Paddy, Ragi, Coconut, Areca nut, Vegetables, Groundnut, Mulbury plants and Maize. 4. The entire package is regarded as a single milestone. All the R&R and land acquisition has to be complete at the time handing over of package to the contractor.

4 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

5. In this package 146 acres 27 ¼ guntas land has to be acquired, of this 96 acre 2 ¾ guntas is dry land, 21 acres 27 ¼ is wet land, 13 acres 13 ¾ acres is plantation and 15 acres 23 ½ is kharab land; there are 497 PAFs whose house hold/commercial structures/ assets/ livelihood is getting affected and 1048 PAFs losing land;. There are 736 community assets getting affected. The PAPs listed in this RIP is as recorded during the cut-off date and further verified by the NGOs.

6. Major issues were identified in the towns of Huliyurduarga, Koratagere and Madhugiri where bypasses have been proposed. This road also passes through fertile land, where farmers indicated that they did not want any road widening which will affect their lands. This issue will be further identified, if any, during negotiations for land acquisition.

Objectives of RIP 7. The objective of this RIP is to provide a package specific guideline for implementation for R&R activities. The implementation plan identifies the persons affected, the type of entitlements to be provided for specific losses, what are the steps that will be adopted in getting compensation, details of members of the Negotiation Committee and the GRC members in the package, time table and steps to be taken by the PIU for protecting right ROW. Overall it provides how the RAP will be implemented in this particular package.

Main activities of RIP 8. The main activities to be carried out in finalizing the RIP includes, Joint verification, distribution of ID cards, identification of sites for relocation, identification of income generating options, identification of vulnerable people who are not getting any assistance from Government, identification of resettlement centers and vendor markets, negotiations for land acquisition, payment of compensation, relocation and shifting of community assets. The members of the GRC and Negotiation committees have to be identified and informed, as mentioned in the RIP. The RIP after finalization will be disclosed.

Minimization of Impacts and Corridor of Impact 9. For minimizing impacts, 3 bypasses were proposed in this package at Huliyurdurga, Koratagere and Madhugiri towns. Besides there are a number of smaller realignments were also proposed. There are 12 cross section options adopted in this package to minimize impacts , the COI width varies from 11 m to 26m. Besides this, safety concerns have been addressed by building foot paths in built up area, providing foot path barricades, school/village signages, rumble strips and road humps The different cross sections used are: 1. UR1A Rural Cross section with paved shoulders varying from 18-26 m 2. UR1C Rural Cross section with paved shoulder in link 64 F change 4+500 to 5+200, upto maximum width of 20m at Mugandanhally.

5 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

3. UR2 Rural Cross section through village width varying from 11m to 22m. 4. UR3 Urban Cross Section in built up area with covered drain with a maximum width of 22m 5. UR4 Urban Dual lane Cross section in built up area with covered drain with a maximum width of 24 m. 6. UR4C Urban Dual Lane Cross- Section in built up area with covered drain in link 63 B from chainage 0+000 to 0+400 at Hulaganahally. 7. UR5 Rural Cross section in Sugarcane belt width varying from 8. UR7 rural cross section cutting 9. UR15 Rural Cross Section with paved shoulder at tank bund location link 63 D chainage 20+280 to 22+130 10. UR16 Rural Cross section with paved shoulder at tank bund location with paved shoulder link 63D chainage 0+750 to 1+300. 11. UR 17 Urban dual lane cross section in built up area with retaining wall in link 63 E chainage 0+750 to 1+300 12. 12. UR26 Urban dual lane cross section in built up is with covered drain.

Options Studied for bypasses

10. Given below are the different options looked into for finalizing bypass alignment.

1. Huliyurdurga The existing road passing through Huliyurdurga town is narrow and congested. Alternative I – Road through the town itself: This option involves widening and strengthening of the existing carriageway with covered drains cum footpath on either side of the road through settlement. The existing road through Huliyurdurga town is congested, narrow and bordered by residential, commercial and other community establishments, which have to be shifted and rehabilitated if the project is executed.. Alternative II – Road alignment on the eastern side of the town: There is a big tank adjacent to the town on the eastern side. The alignment (alternative) if considered has to detour the tank affecting the aquatic ecosystem of the tank. The project activity increases the amount of sediment flow (siltation) into the aquatic ecosystem during the construction phase. This alternative decreases the catchment flow of water into tank by blocking the surface runoff of rainwater. The heavy motor vehicle owners and drivers will have easy access to the tank and misuse of water body for cleaning of their vehicles affecting the aquatic flora and fauna of the tank. Alternative III – Road alignment on the western side of the town: This alternative runs on the western side of the Huliyurdurga town. The alignment runs on agricultural land. This alternative connects roads leading to and Haleyur villages and forms a good network of roads in the area.

6 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Considering all the above points it is recommended that Alternative III, alignment on the eastern side of the Huliyurdurga town was considered as the best choice as it causes minimum impacts to the natural, social and cultural environment in the study area. 2. Koratagere The existing road passing through Koratagere village is narrow and congested. Alternative I – Alignment along the existing road This option involves widening and strengthening of the existing carriageway with covered drains cum footpath on either side of the road through settlement. The existing road through Koratagere village is congested and bordered by residential, commercial and other community establishments; all the structures within the Corridor of Impact should be shifted and rehabilitated if the project is executed. Alternative II - Road alignment on the western side of the town Western side of the Koratagere village is covered with rocky hills and it is not feasible to align the road on this side. This alternative involves huge cut and fill activity and causes severe environmental impact such as changes in geomorphology, surface hydrology (drainage morphometry) of the area. This alternative attracts huge costs for constructing the road through hilly area. Alternative III - Road alignment on the eastern side of the town Eastern side of the Koratagere village being comparatively plain, it is advised to align the road on this side of the town. Major part of the village being distributed on the western side, the alignment causes least damage to properties along the length of the alignment. The alignment runs along the dry agricultural lands and causes least impact on the environment. Alternative III is the best choice among the three alternatives. 3. Madhugiri Madhugiri town being tourist place needs good road network for tourist to access. All the narrow roads within the town are already congested with local commuters. To facilitate the decongestion of the town roads easy movement of vehicle traffic there is necessity to look into alternatives of bypassing the town. Congested and deteriorated roads will lead to hindrance to industrial development, business and economic investment. Alternative I– Project road through the town: This option involves widening and strengthening of the existing carriageway with covered drains cum footpath on either side of the road through settlement. All the roads of the town are saturated with local road users. Taking project road through these roads will lead to problems such as traffic congestion, air pollution, accidents, etc. and worsen the situation further. Roads within the town has poor geometrics with many sharp curves are accident prone. Therefore road through the Madhugiri town alternative does not satisfy the objectives of the project. Alternative II - Alignment on western side of the town: Extensive hills surround western side of the Madhugiri town. It is difficult to take the road alignment through these hills as it economically not viable. The road alignment through these hills increases the

7 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada) length of the alignment. Moreover taking a road through hills will cause irreversible damages to the environment as it involves huge quantity of cuts and fills. Alternative III – Alignment on eastern side of the town Eastern side of the Madhugiri town has no hills and it is feasible to align the road here. This alignment has passes through agricultural land and is also free from permanent structures that have to be demolished. Alternative III is the best suited realignment amongst the four alternatives considered.

Table 1- 2: Summary Tables on Impacts

Land Major Impact Minor Community LA Pvt Description Transfer Impact Assets Link ( in acres) ( in acres) 63A Malavalli – Maddur 7.39 0.29 29 121 76 Maddur – 13.37 ¼ 1.10 1/4 33 520 121 63B Huliyurdurga 10.28 ¾ 2.07 17 161 93 Huliyurdurga – 63C Kunigal

63D Kunigal – Tumkur 10.01 1/4 3.14 ½ 29 269 187 Tumkur – 0.13 ¾ 17 101 62 63E 8.22 Koratagere Koratagere – 0.23 ¼ 19 107 67 64F 3.35 1/2 Madhugiri 64G Madhugiri – 4.21 ½ 0.27 ¼ 44 76 130 Pavagada

64FG Madhugiri Bypass 51.00 ½ 3.17 ¾ 0 338 0

Huliyurdurga 20.1 ¼ 3.31 ¾ 0 254 0 63CD bypass* 110.25 ¾ 12.22 ¾ 190 1665 736 TOTAL

Note: Survey for Koratagere by pass to be done

8 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

II. LAND ACQUISITION AND RESETTLEMENT IMPACTS

11. This chapter provides an overview of the extent of land acquisition and the process of land price negotiations and details of documents to be submitted. It also provides the impacts of the project on community assets.

12. In this package 146 acres 27 ¼ guntas land has to be acquired, of this 96 acre 2 ¾ guntas is dry land, 21 acres 27 ¼ is wet land , 13 acres 13 ¾ acres is plantation and 15 acres 23 ½ is kharab land. The details of the PAFs losing land is given in Notification issued under section 15 of the KHA 1964 in connection with land Acquisition. There are 240 PAFs who are losing 5 guntas and more of agricultural land as per preliminary notification.

Land Acquisition Status 13. The Notifications under section 15 under the KHA for WAP is done. The date of 15 Notification under the KHA is given below. Table 2- 1: WAP1 Notifications under Section 15

Link No. Notification Details No. PWD :145: EAP : 2011, Bangalore, dated 21.10.2011 63 A No. PWD :129: EAP : 2011, Bangalore, dated 29.8.2011 63B PWD :128: EAP : 2011, Bangalore, dated 29.8.2011 63C No. PWD :127: EAP : 2011, Bangalore, dated 29.8.2011 63 D No. PWD :146: EAP : 2011, Bangalore, dated 19.10.2011 63 E No. PWD :148: EAP : 2011, Bangalore, dated 28.10.2011 64 F : No. PWD :149: EAP : 2011, Bangalore, dated 28.10.2011 64G No. PWD :153: EAP : 2011, Bangalore, dated 18.11.2011 64 F&GBypass

Guidance Value 14. The Guidance Value of land for different categories of land, as on June 2011, for the villages along the project road in is given in Annexure 1. This guidance value will be referred to by the Negotiation Committee. 15. The rates will be revised annually by 10% on the 1st of April every year, in case Government has not revised it. The guidance value varies from a minimum of Rs. 30,000 per acre in Kanivenahalli village to Rs 6,00,000 per acre in Guluru village as of June 2011.

9 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Negotiation Committee 16. The Replacement Cost of land for consent award will be determined by the Negotiation Committee. In this package the Negotiation Committee has been constituted vide GO No. PWD 215 EAP 2007 dated 24-10-2009. This Committee consists the following members: 1. Assistant Commissioner of the concerned Sub Division : Chairman 2. Assistant Commissioner of KSHIP : Member Secretary 3. Executive Engineer KSHIP Division, : Member 4. Zilla Panchayat Member of the concerned jurisdiction : Member.

17. The details about the committee members will be updated by 30st June 2012.

Method of Price Negotiation 1. The concerned Land Acquisition officer who is the member secretary of the Negotiation Committee will call for a meeting; 2. Dates for price negotiation will be given village wise. Negotiation will be conducted village wise calling all the land losers together for negotiation. This is to ensure transparency. 3. The PIU will provide information on the guidance value of the land to land losers before Negotiations. 4. The minimum negotiated price will be twice the current guidance value for Mandya and Tumkur districts. 5. The Negotiation Committee will negotiate the price with the landlord; 6. Based on the decision of the Negotiation Committee the Special Land Acquisition Officer will initiate action to collect documents after obtaining the approval of competent authority in the PIU. 7. Compensation will be given within 30 days of receiving all the necessary documents by the Special LA officer. In case of delay, 9% interest will be given to the beneficiary upto a period of one year and after which, it will be increased to15% . (This is as per the provisions of the LA Act). 8. On approval of the award by the Special DC or PD, the Special Land Acquisition Officer will make the payments accordingly. 9. Possession of Land will be taken vide Section 19, which will be only after the payment of compensation.

Records to be submitted by the Land Owners 18. As soon as Notification u/s 19 is issued, the NGO shall collect the following documents in respect of lands to be acquired, before inviting for negotiations. 1. Original copy of RTC for current year; 2. Original or attested copy of mutation in respect of land and Khatha Certificate in respect of site / building; 3. Encumbrance Certificate for 13 years; 4. No Tenancy Certificate and Certificate regarding 79A, 79B and 66; 5. Bank Account details; 6. Land holding / small / marginal farmers Certificate whenever necessary; and 7. G. Tree.

After negotiations, the NGO shall collect the remaining documents such as –

10 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

1. Attested copy of Sale Deed/Partition Deed/Saguvali Chit/Regrant Order etc., to prove title of land; 2. Indemnity Bond; 3. Agreement and Affidavit and submit them to the Assistant Commissioner for processing for Compensation. Any fees incurred by the NGO in obtaining the documents shall be reimbursed by the Executive Engineer of the Division

Failure of KHA and Appellate Committee 19. Even after the minimum negotiation price as per the RAP is offered and the land owner does not agree for it, then the negotiation will be treated as failed and award will be passed as per the general LA Act. The price offered and the price demanded by the land owner in such cases will be recorded in the proceedings. The provisions of the LA Amendment Bill will be followed when they come into force. Valuation of Assets on land under LA. Valuation of Assets on land under L.A. 20. The valuation of structures and other assets will be carried out by Government approved valuators appointed by the Executive Engineer in consultation with PIU. Valuation will be done on the basis of current PWD Schedule of Rates, without depreciation Based on the valuation another 30% will be given as top up those who come forward for consent award. Trees will be valued by the Agriculture / Horticulture / Forest department. Valuation of Crops 21. Crop loss will be compensated based on the valuation done by the Agriculture/Horticulture Department.

Valuation of other structures/assets 22. The valuation of structures and other assets will be carried out as mentioned above. However, this will be verified and approved by the concerned Executive Engineer. Site Requirement for Residential and Commercial impacts 23. Actual requirement of sites in each package has been indicated in the Joint Verification report of NGO. For the Nontitleholder there are 9 sites required, verification for titleholder is under progress. As for as possible, Government land will be identified for formation of sites and allotted to the eligible PAFs/PAPs. Where Government land is not available then the PIU, KSHIP shall examine alternatives such as - cash in lieu of sites or purchase of private land - on case to case basis, based on local factors.

Loss of Community Assets 24. In the contract package WAP 1, 736 community Assets getting affected.

11 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Table 2- 2: Summary Table on Community Assets

Sl. Type of Community Asset No No. 1. Temple/Shrines 63 2. Aralikatte 56 3. Bus Shelters 62 4. Hand Pumps 70 5. MWS/Water supply tanks 107 6. Borewells 53 7. Others 325 Total 736 25. All community assets on government land will be shifted by PIU. All assets on private land will be shifted with assistance of NGO. There are two community assets belonging to private trust and another two CPRs on private land. In case these assets are affected, compensation has to be paid according to the entitlement matrix.

26. For Temple/shrine, Aralikatte, new site has to be identified by NGO in coordinating with SDO/SWI at the Divisional level. This site should be a Grama thana land or land given as donation. For land that is donated the concerned Engineer has to take a site consent letter from the donor of the site in prescribed format which will be prepared by NGO. The format will have Donor name and address, Site details(Survey nos, place, boundary) with measurement,; the signatures of at least 3 persons from the village is necessary on the letter for evidence. The donor has to also sign on the consent letter. The letter will be submitted to the Executive Engineer of the division. The EE will then have to construct the new community structure/Temple/Shrine/ Aralikatte etc. After the construction of the new structure the SDO/SWI and NGO will jointly convince the concerned village people to demolish the existing structure, and shift the activities to the new place.

27. Bus shelters, Hand pump, MWS tanks, Bore wells and other community assets will be relocated and reconstructed. The KSHIP divisional staff will be taking necessary action with assistance of SDO/SWI. The chainage wise community assets details are given in Annexure 9.

III. BASELINE CENSUS SURVEYS AND CONSULTATIONS

Characteristics of displaced households 28. This chapter outlines the characteristics of displaced households. As a part of the project, a census survey of Project Affected Families / Persons (PAFs and PAPs) was carried out in the month of August-November, 2007. The findings of the census survey provided the magnitude of social impacts on the PAFs and PAPs. In this chapter, baseline socio-economic analysis has been done separately for the major impacted families. 29. Among religious groups, Hindus dominate with 97.27 percent the remaining being Muslims. Distribution of PAPs by occupation indicates that 62.38 percent are in agriculture; agricultural

12 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

labourers account for 16.03 percent; commerce and trade supports 8.83 percent. In this package 63.21 percent of population has income less than Rs.26,000. 66.0 percent of the population falls within the age group of 18-60, which happens to be the working age group. In this package illiterate population accounts for 16.67; those with primary education account for 8.36 percent; those with secondary education account for 28.22 percent; professionals account for 0.24 percent. Average land holding size is 6.20 acres. A look at the ownership of household assets indicate 55.95 percent own televisions; 33.26 percent own 2/4 wheelers while only 4.83 percent own refrigerators. Some of the baseline parameters identified for those with major impacts are given in the table below. The details of the PAPs losing structures are given in Annexure 2 to 8. Table 3- 1: Baseline Socio Economic information - for Major impacts (190) 1. Losing total house + total house and commercial 38 2. Average area 46.57 sq.m 3. % of houses electrified 11.05% 4. % of houses having water supply 4.21% 5. Average earning Rs. 21,171/- 6. % of earners 31.72% 7. % of PAPs earning less than Rs.26,000* 23.64% 8. Average land holding (A-G) 2.17 Acres 9. % of Farmers having less than 2.20 acres of holding 52.73% 10. % of PAPs in agriculture 8.08% 11. % of PAPs working as agriculture labour 8.52% 12. % of PAPs in the service sector 1.62 13. % of PAPs in Commerce and Trade 21.73% 14. Loss of commercial structures 152 15. Type of commercial structure 1 Pucca 7.83% 2. Semi pucca 6.96% 3. Kutcha 86.09% 16. Average area of commercial structure 13.70 sqm 17. Type of shops affected (majority) 1. Pan/cigarette – 5.22% 2. Tea shop/hotel - 29.57% 3. Barber- 6.96% 18. Average monthly turnover of shops 1. Rs.15,500 19. Ownership of Household assets 1. Television - 22.63% 2. Refrigerator – 2.63% 3. Telephone – 7.7% 4. Cooking Gas – 8.95% 5. 2/4 wheeler - 12.63%

Note : * Rs.26,000 has been taken as the cut off for BPL

Major and Minor Impacts 30. The list of major and minor impacts for this package is given below.

13 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Table 3- 2: Distribution of PAFs by Major and Minor Impacts for WAP 1

Sl. Squatt Encroac TOTAL Extent of Loss Owner Tenant No. er her Major Impact 1 Losing Total House 16 6 5 0 27 2 Losing Total Com. Struc. 12 3 88 1 104 3 Losing Total House and Com. Struc. 6 0 5 0 11 4 Tenants Losing Total Livelihood 0 48 0 0 48 Total Major Impact 34 57 98 1 190 Minor Impact 1 Losing only Part of House 104 4 6 3 117 2 Losing Part of Com. Struc. 27 0 4 3 34 3 Losing Part of House and Com. Struc. 17 0 0 0 17 4 Partial Plot 37 0 0 2 39 5 Total Boundary Wall 4 0 0 0 4 6 Partial Boundary Wall 1 0 0 0 1 7 Cattle shed 4 0 1 1 6 8 Farmers 1191 0 0 0 1191 9 Others 31 31 2 25 89 Total Minor Impact 1416 35 13 34 1498 Total (Major & Minor Impacts) 1450 92 111 35 1688

14 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Figure 1- 1: Distribution of PAFs for Package WAP1

Figure 1- 2: Distribution of PAFS by Major Impact for Package WAP1

15 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Vulnerable groups 31. Based on the Census survey there are 1698 PAPs who come within the purview of vulnerable group. The categories include 399 widows; 1194 persons above the age of 60 and 105 persons with disabilities. However this is only an enlistment of all persons coming under the vulnerable category. Only after verification by the NGO it will be confirmed whether these people are vulnerable. If so it will be verified further whether are getting pension/ or other assistance from the government. If the person is already receiving pension / assistance, then this offer will not be extended. Only after such verification will the person be entitled to assistance under this category.

Consultations 32. Seven consultations were carried out in this package. The outcomes of the consultations are summarized below. Table 3- 3: Consultation Summary Section Details Issued Raised Response of project Authority 63 A Date: 20.02.2008  People wanted to know what the compensation  Structures will be compensated for affected land and structures would be. depending on loss., without depreciation. Place: K M Doddi  People are of the opinion that that if curve All compensation will according to the No. of straightening is avoided than a lot of structures project policy. Participants: 31 can be saved.  For curve straightening it will depend on  Those losing their houses asked for alternative technical feasibility. sites.  Those losing houses will be provided  People wanted to know how the community houses or sites. assets affected by the project will be replaced.  All community assets will be replaced by  Those losing agriculture land demanded present the project on land identified by the market rate as compensation. community.  Land will be compensated based on market prices. 63 B Date: 20.02.2008  Due to curve straightening people are losing  This will be looked into. For curve their residential structures. They asked to avoid straightening it will depend on technical Place: affecting their structures and maintain equal feasibility. Mallankuppe width form the existing center line. People said No. of where ever curve straightening is required; the Participants: 113 available government land should be used.  In Hemmanahalli village, the Sri  This will be looked into. Chowdeshwari temple is getting affected; people asked the project authority to avoid affecting the temple.  People wanted to know what compensation  Land will be compensated based on would be paid by the project for agricultural market prices. Structures will be land and structure. They demanded current compensated depending on loss., market rates as compensation. without depreciation.  The women of the village supported the road  It was explained that safely measures improvement project. They asked for proper will be incorporated in the design safety measures in the village limits to prevent accidents.

63 C Date: 19.02.2008  People asked regarding compensation to be  Land will be compensated based on

16 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Section Details Issued Raised Response of project Authority Place: Dodda paid for loss of land and structures. market prices. Structures will be Mavathur  Those losing bore wells wanted the project to compensated depending on loss., provide for alternative borewells. without depreciation. No. of Participants: 57  The people to asked the project authority to  Alternative borewell will be provided by avoid affecting their residential structures. the project.  It was explained as far as possible the design is such so as to minimize impact on structures. 63 D Date: 19.02.2008  People unanimously wanted the road alignment  The matter will be looked into. in Kothagere village to be changed. They said Place: Kothagere that government is available on the right side of No. of the road, after the bridge. Changing the Participants: 91 alignment along this side will prevent the residential structures from being affected in the village.  - As far as possible the people asked road  It was explained that Design will be widening equally from the center of the road. based on technical feasibility.  Those losing their houses mentioned that, they  It was told that if a house was affected the did not have any alternative site, and asked to project will compensate with another avoid their houses. house.  Those losing their land and plantation asked for  All compensation would be according to appropriate compensation. the project entitlement policy.  Some farmers losing their land near Kunigal  The matter will be further discussed with said they will not allow the project authorities the farmers to take any major part of their agricultural land. 63 E Date: 18.02.2008  The people wanted to know what alternatives  It was told that if a house was affected the would be provided by the project for those project will compensate with another Place: Beladara losing their house, as most of them did have house. No. of any other alternative. Participants: 67  They wanted to know what the process of  The compensation will be based on the compensation would be. extent and type of loss.  The people asked for equal widening on either  Any request for equal widening will side of the center line instead of taking more on depend on technical feasibility. one side to straighten curves. They felt that this will prevent their houses from being affected.  Those cultivating under the Tenancy Act,  All land will be compensated under the wanted to know who will get the compensation. KHA . Those under the Tenancy Act will  The people asked for safety measures in be looked into a case to case basis. hospital and school zones.  It was informed that the project will take sufficient safety measures to prevent accidents. 64F Date: 18.02.2008  People wanted to widen the road equally from  Any request for equal widening will the centerline. They wanted know what depend on technical feasibility. It was Place: compensation will be paid to title holder and explained that both titleholder and non Keregalapalya non title holders titleholder will be compensated. No. of  Those losing house wanted to know what  It was told that if a house was affected the Participants: 83 alternative would be provided by the project. project will compensate with another Most of the people asked for alternative house. house/site.  The people asked the project authority not to  The Project Authority will look into the impact the aralikatte of Keregalapalya village, matter. as it was considered holy place in the village,

17 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Section Details Issued Raised Response of project Authority and was used for various religious and community purposes. This is at Ch.3+100 to 3+350.  The Project Authority will look into the  The people asked the project authorities to matter. consider available open land wherever it was available instead of impacting their house and land.  It was informed that the project will take  The people asked for safety measures in sufficient safety measures to prevent hospital and school zones. accidents.  In Keregalapalya village there are about 10  This suggestion will be looked into houses getting affected. The people said there during implementation. is gram thana land available (3 acres). The people asked for site there.  People said that if the existing road is maintained there will be no problem. However they mentioned that sufficient land is available on left side of the alignment. 64 G Date: 18.02.2008  The people asked for equal widening of the  Any request for equal widening will road from the existing centerline. This will save depend on technical feasibility. Place: Hoskere a number of structures from getting affected by  For those losing house alternate house No. of road widening. will be provided by the project. Participants: 92  Those losing houses wanted to know what  All affected community assets will be alternatives would be provided by the project. replaced by the project on land identified  - There are some important community assets, by the community. such as the Anjaneya Temple in Basavanahalli  It was explained that compensation will village getting affected. The people asked for be based on the type and extent of loss. the relocation of the same.  The people wanted to know about the compensation to be given by the project.

18 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

IV. IMPLEMENTATION MECHANISMS

Institutional Arrangements 33. This chapter outlines the implementation mechanism specifically for this package, including the tasks of the NGO and the GRC. It also outlines the assistance to be paid to affected persons and provides the tasks to be completed before the start of civil works.

34. The SDRC PIU will facilitate land acquisition and compensation, relocation and resettlement, distribution of assistance for the PAPs. The SDRC is responsible for monitoring the implementation of all resettlement and rehabilitation activities, including land acquisition. WAP 1 will be implemented by KHSIP Division, Tumkur. The SDO and SWIs appointed for the Tumkur division will take care of R&R activities of this package. The SDRC will be supported by the NGO for implementation of RAP.

Extending R& R Assistance to PAPs 35. R& R assistance will be disbursed according to the R&R Policy. The NGO will verify the PAPs and ensure that they get the assistance in accordance with their entitlements. The entitlements given here are accurate as far as possible; however, because only preliminary notification for land losers has been given at this stage, the exact details about entitlements need to be updated at the time of paying R&R assistance. The Cash allowance are updated for 2012-13 and will be further adjusted as needed for 2013-14 and beyond. .. The exact number of disbursements made for each year will be computed after all assistance is given. The annually revised amounts are mentioned in the Implementation Manual. Table 4- 1: R& R Assistance Entitlement Category of loss Entitlement Category 1a 1191 PAF losing  Negotiation as per Karnataka State Highway Act, 1964; land  Amount equivalent to current stamp duty and registration charges on compensation amount;  **Additional 25% compensation in case remaining land is severed;  Crop/tree damage compensation as assessed by concerned Departments;  *In case land owners becomes landless or marginal families, the following additional entitlements will be offered: (a) subsistence allowance of Rs.30,000 for land less and marginal; and, (b) assistance for creating Income generation asset valued upto Rs.75,000 for those becoming marginal farmers and landless only;  Additional amount of Rs.20,0001 will be restricted to those who loose narrow stretch of land as additional compensation in lieu of

1 Narrow stretch of land is defined as persons losing upto 5 guntas of land.

19 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Entitlement Category of loss Entitlement Category all other benefits. Additional amount of Rs 24,200 to those who lose more than a narrow stretch and are not eligible for any other additional benefits.  *For those becoming landless and all marginal farmers training assistance will be provided for income generating vocational training and skill upgradation options as per affected persons choice ;  Employment opportunity for affected persons as per his skills and availability of suitable work in road construction work. Ib 16 owners losing  Compensation at current PWD scheduled rates without total residential depreciation and 30% solatium 2 structure  Alternative houses in resettlement colony or developed plot and construction cost of Rs. 60,000 linked to construction progress.  Shifting assistance of Rs. 12,100  Subsistence allowance of Rs. 36,300 1b 104 owners losing  Compensation at current PWD scheduled rates without partial residential depreciation and 30% solatium structures  Additional 25% compensation for partially affected structures towards reconstruction Ic 12 owners losing  Compensation at current PWD scheduled rates without commercial depreciation and 30% solatium structure  Alternative shop or assistance for income generation asset valuated upto Rs. 90,750  Shifting assistance of Rs. 12,100  Subsistence allowance of Rs. 36,300 1d 6 owners losing  Compensation at current PWD scheduled rates without residential cum depreciation and 30% solatium. commercial  Alternative shop or assistance for income generation asset structure valuated upto Rs. 90,750 or Alternative houses in resettlement colony or developed plot and construction cost of Rs. 60,000 linked to construction progress.  Shifting assistance of Rs. 12,100  Subsistence allowance of Rs. 36,300  Additional amount of Rs. 30,250 as grant. 1c 27 owner PAFs  Compensation at current PWD scheduled rates without losing partial depreciation and 30% solatium commercial  Additional 25% compensation for partially affected structures towards reconstruction

1d 17 owner PAFs  Compensation at current PWD scheduled rates without losing partial depreciation and 30% solatium commercial cum  Additional 25% compensation for partially affected structures residential towards reconstruction

structure

*These entitlements will be applicable only when the farmers submit the landholding/ marginal farmer document, and if found applicable. ** This will be verified after issue of notification u/s 19.

2 Developed plot will be restricted to those who do not have any homestead land.

20 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Entitlement Category of loss Entitlement Category 1 73 owners losing  Compensation at current PWD scheduled rates without other partial assets depreciation and 30% solatium 1 4 Owner losing  A grant of Rs. 18,150 for replacement of Cattle shed; cattle shed II b 51 tenants losing  Rental allowance for 6 months @ Rs. 1,210 per month in rural commercial  Shifting assistance of Rs. 12,100 structure  Assistance for income generation asst up to Rs. 90,750 IIa 6 tenants losing  Rental allowance for 6 months @ Rs. 605 per month in rural and residential Rs. 1,210 in urban areas structure  Shifting assistance of Rs. 12,100 IIIa 5Squatter s losing  House in resettlement colony or developed plot and construction residential cost of Rs. 60,000 linked to construction progress. structure  Subsistence allowance of Rs.18,150  Shifting Allowance of Rs.6,050 IIIb 88 Squatter losing  Alternative shop of 100 sq.ft or assistance for income generation commercial asset valuated upto Rs. 36,300 structures  Subsistence allowance of Rs.18,150  Shifting Allowance of Rs. 6,050. 4 Squatter losing  - House in resettlement colony or developed plot and residential cum construction cost of Rs. 60,000 linked to construction progress commercial OR . Alternative shop of 100 sq.ft or assistance for income structure generation asset valuated upto Rs. 36,300  Subsistence allowance of Rs.16,300  Shifting Allowance of Rs.6,050 IIIc 35 encroachers  Replacement cost of affected structure calculated at current PWD scheduled rates without depreciation

Implementation support by NGOs 36. The work of the NGO will include consultations and counseling of PAPs, encouraging PAPs for productive utilization of compensation and rehabilitation grants, facilitating PAP access to income generating assets, increasing the social acceptability, ensuring effectiveness of training programs organized for PAPs electing participation in self employment schemes etc.

37. The NGO will work as a link between the PIU - SDR Cell and the affected community. For this section the NGO is: STEM (Symbiosis Technology of Environment Management). The division office of this NGO is located in Tumkur. They will educate the PAPs on the need to implement the Project, on aspects relating to LA and R&R measures and ensure proper utilization of various compensations extended to the PAPs under the R&R entitlement package. The tasks of the NGO will be to facilitate the resettlement process. The responsibilities of the NGOs include 1. Identification, verification and updating of PAP Census, includes verification of properties of PAPs and estimation of their type and level of losses; 2. Educate PAPs on their rights, entitlements, and obligations under the RAP; Assist the PAPs to identify suitable alternate land for resettlement purposes;

21 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

3. Preparation and Distribution of Entitlement cum Identity Card. All eligible project affected families will be issued Identity Cards, giving details of the type of losses and type of entitlements. 4. Ensure that PAPs receive their full entitlements; Where options are available, the NGO will provide advice to PAPs on benefits of each option; Ensure proper utilization by the PAPs of various compensations available under the R&R package; Assist the PAPs in getting benefits from various government development programs; 5. Rehabilitation of Affected Families and restoration of Income and Livelihood. The NGO will help the communities derive maximum benefits out of the project without losing their livelihoods and the least impact on socio-cultural aspects of their lives. 6. Assist PAPs on grievance redressal through the established system; and 7. Will relocate PAPs. Assist PIU in making arrangements for the smooth relocation of the PAPs; No Physical relocation from agriculture land, residential units, commercial establishments or other immovable properties will begin before alternate arrangements are made. 8. Any other responsibility that may be assigned by the PIU for the welfare of the affected communities. 38. In order to carry out the above tasks, NGO staff will be stationed in the site office in Tumkur. Besides contacting the PAPs on an individual basis to regularly update the baseline information, group meetings and village-level meetings will be conducted by the support agency on a regular basis. The frequencies of such meetings will depend on the requirements of the PAPs but should occur at least once a month. The support agency will have to encourage participation of individual APs in such meeting by discussing their problems regarding LA, R&R and other aspects relating to their socio- economic lives. Such participation will make it easier to find a solution acceptable to all involved.

IR Activities 39. There are two types of IR activities, i.e. short term and long term. Process of identifying income generating options for those losing their commercial structures and livelihood is under progress. Short Term IR activities: Short-term IR activities mean restoring APs’ income during periods immediately before and after relocation. For this, the NGO shall ensure that: compensation and R&R assistance as provided in the entitlement matrix such as subsistence allowance and shifting allowance are provided to the PAPs. Other works of the NGO include facilitating employment to the PAPs in the project construction activities, depending on their skill and other allied activities. Long Term IR Activities: This includes provision of shops for those losing their total livelihood to re- establish their commercial activities. It also includes providing of a shop plot in a commercial block or purchase of income generating assets upto Rs.36,300 in case of commercial squatters.

40. The steps to be followed for income restoration include:

Step 1: Identification of Target Groups – NGOs need to identify the affected persons; Step 2: Identification of IR Activities - Prepare a list of possible and feasible income restoration options. While identifying IR options, the following factors shall also be considered: (i) Education

22 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

level of APs; (ii) Skill possession;(iii)Likely economic activities in the post displacement period; (iii) Extent of land left; (iii) Suitability of economic activity to supplement the income; (iv)Market potential and marketing facilities. Based on socio-economic characteristics and options preferred by APs, the NGO may have to re-assign trades to PAPs. Options include (i) petty trade (iii) skill related schemes and loans for pumps, bore wells, bullock carts etc to increase productivity. The NGO will assist PAPs in identifying appropriate alternative economic rehabilitation schemes through counseling and consultation. Step 3: Training: Option for training for skill enhancement for those losing their livelihood has been provided in the Entitlement Matrix for owners losing commercial structure and employees losing their livelihood. Step 4: Identification of Trainers / Training Institutes: Based on trades selected, NGO shall have to identify master trainer and/or training institute for different trades / activities who can provide on the job training. Step 5: Training Arrangement: NGO shall make different groups of PAPs as per trades selected and make all the arrangements such as fixing the venue etc. Step 6: Monitoring of APs: After training the NGO shall monitor the PAPs in order to take mid-term correction measures, if required.

Monitoring and Evaluation support for RAP 41. An external monitoring and evaluation agency, Samaj Vikas, has been appointed to concurrently monitor and evaluate R&R activities on periodical basis with NGOs. The role of such an agency will facilitate process of R&R and thus provide support in the proper implementation of rehabilitation programmes. And the M&E Consultant will ensure and certify that the stretch is free from all encumbrances’ related R&R measures, at every stage - prior to issue of bids, prior to signing concession agreement, prior to appointed date and prior to handover of the second mile stone stretches to the developer. The end evaluation will be carried out through independent consultants not associated with the implementation to verify as to how the R&R objectives are realized and the changes in the living conditions of the PAPs which will be compared with the baseline data on key impact indicators related to income, occupation, assets, housing conditions, landownership pattern, etc..

Grievance Redressed mechanism 42. The project will establish a Grievance Redressal process with district-level committees. The following persons constitute the District Level Grievance Redressal Cell : 1. Deputy Commissioner of the District – Chairman 2. Academician (to be selected by the DC) – Member 3. Representative from PAPs (to be selected by the DC) – Member 4. Divisional EE – Convener The members of the GRC to be selected by the DC and representatives from the PAPs are under progress and will be completed by 30th June, 2012. 43. The main functions of the GRC will be: a. to provide support to PAPs on problems arising out of eligibility for RAP-provided entitlements and assistance provided;

23 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

b. to record the grievances of the PAPs, and categorize, prioritize and solve them within one month; c. to inform PIU of serious cases within one week; and d. to report to the aggrieved parties about the developments regarding their grievance and decisions of the PIU, within one month.

44. The Grievance Committees will meet regularly during implementation of the RAP, at least once a month. The committees will suggest corrective measures at the field level itself and fix responsibilities for implementation of its decisions. However the NGOs will form the first level of intervention in resolving PAP related grievances and attempt to motivate the PAP to facilitate implementation of the R&R program. Details regarding registering complaints, response times, communication modes, and mechanisms for appeal or approaching civil courts if other provisions fail are: 1. At the first level intervention the NGO will attempt to resolve the grievance; 2. Next the CAO will attempt to address land related grievance and the ADSW will address the non- land related grievances; 3. The third step will be to approach the Grievance Redressal Committee; 4. Next the PAP can approach the Regional Commissioner who is the Appellate Authority. 5. If all the above fails, the PAPs can approach the court. It is the responsibility of the SDRC/NGO to inform the affected persons decisions of the GRC to make it effective.

Resettlement Colonies and Vendor Markets 45. In this package there is no requirement for resettlement colony, as more than 20 families are not losing their residential structure in this stretch.

Protection of RoW 46. Section 5 of the KHA mentions the Highway Authority will exercise power and discharge duties in accordance with provisions of the KHA for restriction of ribbon development along the highways and for prevention and removal of encroachments. The Highway Authority under Section 7 has power to fix boundary of building and control lines of highways. Section 21 mentions prevention of unauthorized occupation of highway. Thus the onus of protecting the COI/RoW lies with the Project Authority. Once the COI/Row has been identified and frozen, the COI/RoW has to be clearly marked with boundary stones.

47. Any new encroachment into the area will be monitored the concerned KSHIP Division from the time the cut-off date is established and the baseline surveys are completed. The Divisional Engineers shall visit the project roads periodically, at least once in three months, in order to ensure that no new encroachments take place and submit quarterly reports in this regard. Any additional encroachments noticed through periodical visits will be issued notices and their shifting will be done immediately to avoid implications of R&R assistance to those additional movers. To avoid future encroachments, it is proposed to construct drains at the edge of ROW and ROW stones will also be laid.

24 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

48. The NGOs shall take photographs of the affected structures at the time of JV and also after their shifting / demolition of the affected portion and prepare documentation of structures.

49. Those Non-titleholders already identified by the project will be issued Identity Cards by the PIU. All new encroachers / squatters not present during the time of survey, will have to be verified by the NGO/PIU. All squatter and encroachers have to be shifted from out of the COI and RoW. Those who remain in the Row will not be eligible to entitlements.

Impacts on Municipal Towns 50. Verification for non titleholders has already been completed on this package. All the persons identified at the time of survey and verified by the NGOs at the time of Joint Verification but subsequently shifted by the Municipalities will be extended assistance as per the RAP.

51. KSHIP shall address all the Municipalities in the Project Roads informing them of the Rehabilitation and Resettlement Policy of the Government under KSHIP-II and the details of persons identified as Project Affected Persons in their jurisdiction. If the Municipality wants to shift any of them for their development works, they may do so after providing them assistance as per the R&R Policy of the Government or inform the details of such persons to KSHIP for extending assistance under the project

52. In this package the project road passes through the Municipality areas of Malavalli, Maddur, Kunigal, Koratagere, Madhugiri and Pavagada. It also passes through the Corporation limits of Tumkur. All these Municipalities and City Corporation will be addressed informing them of the Rehabilitation and Resettlement policy of Government under KSHIP-II project and the details of the persons identified as ‘Project Affected Persons’ in their respective jurisdiction. In case the Municipalities / Corporation desire to shift any of the Project Affected Person on account of development work, they may do so after providing assistance to them as per the R&R Policy of Government or inform the details of such displaced persons to KSHIP for extending assistance to them under the project.

Data Base Management 53. The database generated will be used for tracking progress of this package by PIU. The data in the HQ will be updated based on the information sent by the division office. PIU will be responsible for tracking payments, generation of ID cards etc through the Data base Management Consultants. The socio –economic date for all PAPs are recorded in the database and will used for monitoring and impact evaluation and other purposes. Compensation and R&R Assistance Payment 54. All the compensation and R&R assistance will be directly credited to the individual Bank accounts. The deduction of income tax is not applicable for receipt of compensation. The NGOs will assistance. In opening of the Bank accounts and the details of payments will be recorded in the individual identify card pass books. In case where the house/shop plots are allotment, the titles to those will be provided in the joint name of wife and husband.

25 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Co –ordination between R&R and Civil works 55. The resettlement program will be co-coordinated with the timing of civil works. The Civil works for this package is expected to start in December 2012. R&R and land acquisition is estimated to be completed by August 2012. Under the Annuity packages all land has to be handed over at one stage. This will be after issue of notification u/s 19 of KHA. The timeline for key activities is given below.

56. The implementation of RIP will be performed in coordination with the procurement process and civil works. The key mile stone in the process includes: issue of bids, singing of concession agreement, appointed date and handing over of second mile stone stretches within 3 month of appointed date. The various land acquisition and resettlement implementation actions to be completed prior to those mile stones are listed below with respective target dates. The completion of these actions will be certified through certification and confirmation by the M&E consultants.

Table 4- 2: Time line for Key LA and R & R Activities Tasks Target Date Prior to Event I Land Acquisition Land Acquisition Plans Section 15 Notification (first November, 2011 Issue of bids notification) Section 27 (negotiation ) August 2012 Signing of concession agreement Section 28(award declaration) September 2012 Appointed Date Notification Section 19 Possession of land December 2012 Appointed Date Section 39 (compensation offer and November 2012 Appointed Date payment ) Transfer/ No objection received for December 2012 Appointed Date Government land

II R&R Implementation activities PIU Approval and Disclosure of Mid June 2012 Issue of bids RIP Completion of additional joint June 2012 Signing concession verification for identification of agreement additional PAPs Issue of ID cards May 2012 Issue of bids Constitution of GRCs June 2012 Signing concession agreement Completion of structure valuation June, 2012 Signing of concession agreement Relocation of Community assets November, 2012 Appointed Date completed Identification of alternative sites October , 2012 Signing Concession and options agreement

26 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Disbursement of assistance October, 2012 Appointed Date Completion of allotment of November, 2012 Appointed Date developed Sites and first installment of construction grant

III Resettlement Relocation of PAPs March, 2013 Handing over second mile stone stretches Handing over of CPRs to November,2012/March, 2013 Appointed Date/Second community mile stone stretches Certification by M&E consultants As needed Prior to each event for site readiness

Joint Inspection of site : Prior to appointed date, representatives of KSHIP and Developer will be undertaken a joint site visit to ascertain the encumbrance free site on the ground and record any encumbrance noticed and accordingly a time frame for mitigating those encumbrances within the agreed time frame and accordingly measures will be taken to mitigation encumbrances.

Monitoring and R&R Activities 57. The R&R Monitoring indictors for physical progress are given in the table below.

Table 4- 3: Monitoring Indicators for Physical Progress % against Implementa Revised Progress Cumulati Sl. Monitoring Indicators for Physical Revised tion Target Implementati This ve No Progress Implementati Nos on Target Month Progress on Target 1 Land Acquired- private 123.08 ½

2 Land transferred – Government 12.22 ¾ guntas 3 PAFs paid compensation for land 1191 Construction cost for residential 22

owners Construction cost for residential 4 squatters 10 Alternative plot or IGA for 5 Commercial squatter 93 6 Subsistence allowance for squatters 98 7 Shifting allowance for squatters 98 8 Community Assets 736

Additional Impacts 58. Any additional impacts identified during the implementation will be considered in accordance with RAP and the project entitlement matrix given therein. Any observation on additional

27 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

impacts will be forwarded by the Division to the PIU. The NGO will follow up the matter in the field. A note will be prepared for the concurrence of the CPO.

Budget 59. The budget for land acquisition and R&R activities for this package is Rs.18.46 crores which forms a part of the overall budget approved by the GoK. The details of the budget have been given in the RAP. Any additional budget need, will be obtained through additional approvals. Table 4- 4: Budget Sl. No Category Total (INR) 1. Land Acquisition 19003950 2. Alternative site cost 16160000 3. Structure cost 74036144 4. R&R assistance 75464000 WEP 4 total 184661094

Disclosure 60. The RIP will be disclosed on the KSHIP website and the document will be available in PIU HQ and the respective PIU division office at Tumkur, and Taluk offices of Malavalli, Maddur, Kunigal, Tumkur, Koratagere, Madhugiri and Pavagada. General consultations will also be done for the package, documented and recorded. As part of disclosure of RIP, public consultations will be held at important locations to explain the contents of RIP and make them understand the process of implementation of RAP and also information about whether the document and the list of PAPs will be available for their information. The details of grievance redress process will also be explained. In addition the periodical progress reports and other studies carried out in relation to R&R will also be disclosed in the web site.

28 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Annexure 1: Guidance Value as on June 2011 Table 4- 5: Guidance Value for Link 63A

Dry Land Wet Land Sl. No. District Taluk Village Name Minimum- Maximum- Maximum /acre Maximum /acre

1 Mandya Maddur Chennasandra 125000 130000

2 Mandya Maddur Chikkarasinakere 200000 200000

3 Mandya Maddur Devarahalli 90000 120000

4 Mandya Maddur 470000 470000

5 Mandya Maddur Goravanahalli 500000 500000

6 Mandya Maddur Huligeripura 100000 150000

7 Mandya Maddur Kuduragundi 300000 300000

8 Mandya Maddur Sadholalu 70000 135000

9 Mandya Malavalli Malavalli 240000 235000

10 Mandya Malavalli Kagepura 70000 125000

Table 4- 6: Guidance Value for Link 63B

Dry Land Wet Land Sl. No. District Taluk Village Name Minimum Maximum 1 Tumkur Kunigal Lakkashettipura NA NA 2 Tumkur Kunigal Nidasale NA NA 3 Tumkur Kunigal P Honnamachanahalli NA NA

4 Mandya Maddur Athaguru 80000 100000

5 Mandya Maddur Dundanahalli 80000 100000

6 Mandya Maddur Hanumanthapura 65000 80000

7 Mandya Maddur Hemmanahalli 200000 200000

8 Mandya Maddur Kesturu 180000 180000

9 Mandya Maddur Machahalli 50000 65000

10 Mandya Maddur Mallanakuppe 80000 100000

11 Mandya Maddur Mallanayakanahalli 45000 65000

12 Mandya Maddur Thoreshettahalli 100000 120000

13 Mandya Maddur Thubinakere 45000 65000

14 Mandya Maddur Yaraganahalli 125000 125000

29 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Table 4- 7: Guidance Value for Link 63C

Dry Land Wet Land Sl. No. District Taluk Village Name Minimum Maximum 1 Tumkur Kunigal Hasige Hobali NA NA

2 Tumkur Kunigal 250000 250000

3 Tumkur Kunigal Beeragonahalli 450000 450000

4 Tumkur Kunigal Doddamavattur NA NA

5 Tumkur Kunigal Bolenahalli NA NA

6 Tumkur Kunigal Kempanahalli 110000 110000

7 Tumkur Kunigal Santhemavattur 150000 175000

8 Tumkur Kunigal Tharikere 100000 120000

9 Tumkur Kunigal T Hosahalli 100000 100000

10 Tumkur Kunigal 200000 250000

11 Tumkur Kunigal Kadumattikere 150000 120000

12 Tumkur Kunigal Gavimata 150000 120000

13 Tumkur Kunigal Kottipura 320000 420000

Table 4- 8: Guidance Value for Link 63D

Dry Land Wet Land Sl. No. District Taluk Village Name Minimum Maximum

1 Tumkur Kunigal Kunigal Bagayat 350000 350000

2 Tumkur Kunigal Ramabanahanta 150000 150000

3 Tumkur Kunigal Kottagere 300000 300000

4 Tumkur Kunigal Honnenahalli 200000 230000

5 Tumkur Kunigal Vaddarakuppe 200000 200000

6 Tumkur Tumkur Kalkere 300000 300000

7 Tumkur Tumkur 300000 325000

8 Tumkur Tumkur Hebbur Amanikere 300000 310000

9 Tumkur Tumkur Kalyanpura 300000 300000

10 Tumkur Tumkur Ballagere 400000 400000

11 Tumkur Tumkur Nagavalli Amanikere 150000 200000

12 Tumkur Tumkur Nagavalli 400000 425000

13 Tumkur Tumkur Lakkenahalli 100000 150000

14 Tumkur Tumkur A K Kaval NA NA

15 Tumkur Tumkur Guluru 600000 600000

16 Tumkur Tumkur Guluru Amanikere 500000 500000

17 Tumkur Tumkur Maraluru Amanikere 250000 250000

30 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Table 4- 9: Guidance Value for Link 63 E

Dry Land Wet Land Sl. No. District Taluk Village Name Minimum Maximum

1 Tumkur Tumkur 110000 200000

2 Tumkur Tumkur Hosahalli 300000 320000

3 Tumkur Tumkur Hirekodatakallu 100000 120000

4 Tumkur Tumkur Beladhara 150000 180000

5 Tumkur Tumkur Hanumanthagiri 200000 250000

6 Tumkur Tumkur M.Gollahalli 60000 100000

7 Tumkur Koratagere Jampenahalli 70000 70000

8 Tumkur Koratagere Agrahara 85000 120000

9 Tumkur Koratagere 60000 85000

10 Tumkur Koratagere Hanumanthapura 100000 120000

11 Tumkur Koratagere Tharati 70000 95000

Table 4- 10: Guidance Value for Link 64F

Dry Land Wet Land Sl. No. District Taluk Village Name Minimum Maximum

1 Tumkur Koratagere Musuvinakallu 55000 60000

2 Tumkur Koratagere Muggondanahalli 55000 85000

3 Tumkur Koratagere Thumbadi 80000 120000

4 Tumkur Koratagere Pemmadevarahalli 60000 90000

5 Tumkur Koratagere Dasarahalli 65000 95000

6 Tumkur Madhugiri Chinakavajra 50000 60000

7 Tumkur Madhugiri Harahararoppa 60000 70000

Table 4- 11: Guidance Value for Link 64G

Dry Land Wet Land Sl. No. District Taluk Village Name Minimum Maximum

1 Tumkur Madhugiri Jadegondanahalli 60000 70000

2 Tumkur Madhugiri Avaragallu 60000 70000

3 Tumkur Madhugiri Thippagondanahalli 50000 60000

4 Tumkur Madhugiri Chinnenahalli 60000 70000

5 Tumkur Madhugiri Midigeshi 50000 60000

6 Tumkur Madhugiri Bidarakere 60000 70000

7 Tumkur Madhugiri Kyatagondanahalli 50000 60000

8 Tumkur Pavagada Kanivenahalli 30000 40000

31 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Dry Land Wet Land Sl. No. District Taluk Village Name Minimum Maximum

9 Tumkur Pavagada Rajavanthi 40000 50000

10 Tumkur Pavagada Pavagada 300000 300000

32 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Annexure 2: Details of PAFs 63A (Malavalli – Maddur) Table 4- 12: PAF Structure details of link 63A (Malavalli-Maddur) Sl. Chaina Occu. Side District Taluk Village Name Loss Type No. ge Status (O) Open 1 3.770 RHS Mandya Malavalli Kagepura Bellekere Raju Owner Space Boundary 2 8.690 RHS Mandya Maddur Manigere M Kempegowda Owner Wall,(O) Open Space (O) Open 3 8.71 RHS Mandya Maddur Manigere Rajanna Owner Space Chikka 4 9.03 RHS Mandya Maddur Manigere Squatter Commercial Puttalingaiah Kalakempana 6.927 RHS Mandya Maddur Gavigowda Squatter Cattle shed Doddi Thimmaiah S/o 5 11.105 RHS Mandya Maddur K M Doddi Squatter Commercial Gandaiah Doddaiah S/o 6 11.110 RHS Mandya Maddur K M Doddi Squatter Commercial Beeraiah Vanaraju S/o 7 11.120 LHS Mandya Maddur K M Doddi Squatter Commercial Maneiah Revanna S/o Beera 8 11.130 RHS Mandya Maddur K M Doddi Squatter Commercial Hegde Kamalamma W/o 9 11.175 RHS Mandya Maddur K M Doddi Squatter Commercial Mahadeva 10 11.530 LHS Mandya Maddur K M Doddi Puttaswamy Squatter Commercial Legal 11 11.540 LHS Mandya Maddur K M Doddi Puttaswamy Commercial Tenant 12 11.540 LHS Mandya Maddur K M Doddi Puttaswamy K R Squatter Commercial Swamy S/o Seesa 13 11.560 LHS Mandya Maddur K M Doddi Squatter Commercial Shetty Girish S/o Maralu 14 11.562 LHS Mandya Maddur K M Doddi Squatter Commercial Swamy Legal 15 11.583 LHS Mandya Maddur K M Doddi Venkataiah Gowda Commercial Tenant Legal 16 11.620 LHS Mandya Maddur K M Doddi Jayamma Commercial Tenant Chikka Tayamma 17 11.680 LHS Mandya Maddur K M Doddi Squatter Commercial W/o Shyame Gowda Lakshmi W/o 18 11.730 LHS Mandya Maddur K M Doddi Squatter Commercial Nagaraju Jayamma W/o 19 11.731 LHS Mandya Maddur K M Doddi Squatter Commercial Puttaswamy Jayamma W/o 20 11.733 LHS Mandya Maddur K M Doddi Squatter Commercial Ramachari 21 11.760 LHS Mandya Maddur K M Doddi K M Puttalingaiah Squatter Commercial Ramesh S/o 22 11.955 LHS Mandya Maddur K M Doddi Squatter Commercial Venkataramanashett

33 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Chaina Occu. Side District Taluk Village Name Loss Type No. ge Status y

(O) Open 23 11.960 LHS Mandya Maddur K M Doddi Refused Owner Space Partha S/o Kale 24 12.082 LHS Mandya Maddur K M Doddi Squatter Commercial Gowda Putta Lakshmamma 25 12.084 LHS Mandya Maddur K M Doddi Squatter Commercial W/o Kariyappa 26 12.140 LHS Mandya Maddur K M Doddi Nayaz Pasha Squatter Commercial A M Chinna Mare 27 12.160 LHS Mandya Maddur K M Doddi Gowda S/o Squatter Commercial Maregowda 28 12.210 LHS Mandya Maddur K M Doddi Thammaiah Squatter Commercial Susheelamma W/o 29 12.270 LHS Mandya Maddur K M Doddi Squatter Commercial Madaiah Doddarasinak Marigowda S/o 30 14.230 LHS Mandya Maddur Squatter Commercial ere Hucchegowda Chikkarasina Venkata Ramu S/o 31 15.005 RHS Mandya Maddur Squatter Commercial kere Venkata Shetty Chikkarasina 32 15.025 RHS Mandya Maddur Ningamma Squatter Commercial kere Chikkarasina Shivanna s/o 15.045 RHS Mandya Maddur Squatter Commercial kere Bhadraiah Chikkarasina 33 15.054 RHS Mandya Maddur Raju S/o Eraiah Squatter Residential kere Kenche 34 15.245 Gowdana Prameelamma (O) Open LHS Mandya Maddur Doddi Owner Space Kenche NA During the (O) Open 35 15.270 LHS Mandya Maddur Gowdana Owner Survey Time Space Doddi

Annexure 3 Details of PAFs link 63B (Maddur – Huliyurdurga) Table 4- 13: PAF Structure details of link 63B (Maddur - Huliyurdurga) Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status Lakshmamma 1 1.470 RHS Mandya Maddur Hemmanahalli W/o Owner Residential Kariyanna 2 1.510 LHS Mandya Maddur Hemmanahalli Puttaswamy Squatter Cattle Shed 3 1.659 LHS Mandya Maddur Hemmanahalli Mahesh H B Owner Residential Puttaswamy S/o Residential/ 4 1.685 RHS Mandya Maddur Hemmanahalli Owner Hombalegow Commercial da Shivalingaiah 5 1.790 LHS Mandya Maddur Hemmanahalli S/o Chikka Owner Commercial Thammaiah

34 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status H G 6 1.850 RHS Mandya Maddur Hemmanahalli Ashwathnara Owner Residential yan G Krishna 7 1.930 LHS Mandya Maddur Hemmanahalli S/o Late Owner Residential Gendegowda Shivaraj S/o Late 8 1.940 LHS Mandya Maddur Hemmanahalli Owner Residential Shivalingacha r Krishna S/o 9 1.960 LHS Mandya Maddur Hemmanahalli Late Owner Residential Hiregowda Lingaiah S/o 10 1.965 LHS Mandya Maddur Hemmanahalli Owner Residential Channaiah Ramanna S/o (O) Toilet & 11 2.020 LHS Mandya Maddur Hemmanahalli Owner Hiregowda Stare Case Sarojamma W/o Residential/ 12 3.620 LHS Mandya Maddur Yaraganahalli Owner Nagarajachar Commercial ya Gundashetty S/o 13 3.645 LHS Mandya Maddur Yaraganahalli Owner Residential Thimmashett y Suresh S/o Residential/ 14 3.665 LHS Mandya Maddur Yaraganahalli Kenchegowd Owner Commercial a Jayamma 15 5.780 LHS Mandya Maddur Thore Settihalli W/o Squatter Commercial Ramachandra 16 6.120 LHS Mandya Maddur Thore Settihalli Jayaram Squatter Commercial Marigowda 17 7.750 LHS Mandya Maddur Machahalli S/o Poojari Owner Cattle Shed Myalegowda Girigowda 18 7.800 RHS Mandya Maddur Machahalli S/o Squatter Commercial Thirumalaiah Chikkolomm 19 7.805 LHS Mandya Maddur Machahalli a W/o Owner Residential Gowdaiah Rachachari (O) 20 8.710 RHS Mandya Maddur S/o Owner Projection Lingachari 21 9.005 LHS Mandya Maddur Kesthur Madhu Shetty Owner Commercial T Legal 22 9.010 LHS Mandya Maddur Kesthur Commercial Shivalingaiah Tenant T 23 9.010 LHS Mandya Maddur Kesthur Owner Commercial Shivalingaiah T Legal 24 9.012 LHS Mandya Maddur Kesthur Commercial Shivalingaiah Tenant 25 9.015 LHS Mandya Maddur Kesthur T Legal Commercial

35 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status Shivalingaiah Tenant Venkatesh 26 9.100 LHS Mandya Maddur Kesthur S/o Dodda Squatter Commercial Dasegowda Chikka Dasegowda (O) 27 9.105 RHS Mandya Maddur Kesthur S/o Owner Basement Kenchegowd Projection a K Venkategowd (O) 28 9.125 RHS Mandya Maddur Kesthur a S/o Owner Basement Kenchegowd Projection a (O) Ningaiah S/o 29 9.125 LHS Mandya Maddur Kesthur Owner Basement & Basavegowda Projection Chikka Thimmegowd (O) 30 9.137 RHS Mandya Maddur Kesthur a S/o Owner Projection Kenchegowd a Channamma 31 9.140 W/o LHS Mandya Maddur Kesthur Marigowda Owner Commercial Channamma Legal 32 9.141 LHS Mandya Maddur Kesthur W/o Late Commercial Tenant Marigowda Chennamma Legal 33 9.144 LHS Mandya Maddur Kesthur W/o Commercial Tenant Marigowda Channamma Legal 34 9.147 LHS Mandya Maddur Kesthur S/o Commercial Tenant Marigowda Sakamma Residential/ 35 9.148 LHS Mandya Maddur Kesthur W/o Owner Commercial Basavegowda Sakamma Legal 36 9.148 LHS Mandya Maddur Kesthur W/o Commercial Tenant Basavegowda Rangaswamy S/o Legal 37 9.160 LHS Mandya Maddur Kesthur Commercial Thimmashett Tenant y Rangaswamy 38 9.160 LHS Mandya Maddur Kesthur S/o Thimma Owner Commercial Shetty K N Legal 39 9.166 LHS Mandya Maddur Kesthur Commercial Channappa Tenant K N Channappa 40 9.169 LHS Mandya Maddur Kesthur Owner Commercial S/o Narayana Shetty

36 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status K N Legal 41 9.172 LHS Mandya Maddur Kesthur Commercial Channappa Tenant K S Swamy S/o Late (O) 42 9.175 LHS Mandya Maddur Kesthur Owner Srinivas Projection Shetty K N Krishna Commercial, 43 9.180 LHS Mandya Maddur Kesthur Shetty S/o Owner (O) Narasappa Projection K R Rangaswamy 44 9.190 LHS Mandya Maddur Kesthur Owner (O) Steps S/o Ranga Shetty Siddaraju S/o 45 9.205 LHS Mandya Maddur Kesthur Puttaswamy Squatter Commercial Acharya Kariyappa S/o 46 9.220 LHS Mandya Maddur Kesthur Squatter Commercial Puttaswamac harya B K Madaiah (O) 47 9.265 LHS Mandya Maddur Kesthur S/o Owner Projection Kodegowda K N Krishna (O) Stare 48 9.275 LHS Mandya Maddur Kesthur Shetty S/o Owner Case & Narasappa Projection K N Nagaraj (O) 49 9.278 LHS Mandya Maddur Kesthur S/o Owner Projection Narasappa K R Rangaswamy 50 9.280 LHS Mandya Maddur Kesthur Owner Residential S/o Thimma Shetty Commercial, Raju S/o 51 10.020 RHS Mandya Maddur Kesthur Owner Boundary Karigowda Wall Guruswamy S/o Late 52 10.910 LHS Mandya Maddur Dundanahalli Owner Residential Chennegowd a Raju S/o 53 11.840 RHS Mandya Maddur Dundanahalli Owner Residential Pelwa Mallesh S/o Residential/ 54 11.895 RHS Mandya Maddur Dundanahalli Dodda Owner Commercial Mallaiah Krishna S/o Residential/ 55 11.910 RHS Mandya Maddur Dundanahalli Owner Mallegowda Commercial Nagaraj S/o 56 12.100 RHS Mandya Maddur Dundanahalli Gadi Owner Residential Javaraiah Venkatappa 57 12.160 RHS Mandya Maddur Dundanahalli S/o Late Owner Residential Kanakaiah

37 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status Thimmaiah 58 12.163 RHS Mandya Maddur Dundanahalli S/o Owner Residential Kanakaiah Shiva Kumar 59 12.170 RHS Mandya Maddur Dundanahalli S/o Chikka Owner Residential Marigowda Gowramma 60 12.177 RHS Mandya Maddur Dundanahalli W/o Late Owner Residential Doddaiah Narayan S/o 61 12.185 RHS Mandya Maddur Dundanahalli Owner Commercial Boregowda Chowdaiah S/o 62 12.200 LHS Mandya Maddur Dundanahalli Encroacher Commercial Marilingegow da P Mariswamy 63 12.200 RHS Mandya Maddur Dundanahalli S/o Owner Residential Puttaswamy Thimmaiah Residential/ 64 12.210 RHS Mandya Maddur Dundanahalli Owner W/o Ningaiah Commercial Chikkolamma Residential/ 65 12.230 LHS Mandya Maddur Dundanahalli W/o Late Owner Commercial Motegowda Puttaswamy S/o Boki 66 12.230 RHS Mandya Maddur Dundanahalli Owner Residential Channegowd a K Puttalingaiah 67 12.233 LHS Mandya Maddur Dundanahalli Owner Residential S/o Kempegowda Puttalingaiah 68 12.233 RHS Mandya Maddur Dundanahalli Owner Residential S/o Ningaiah Puttaiah S/o 69 12.236 RHS Mandya Maddur Dundanahalli Owner Residential Kempegowda Venkatesh 70 12.236 RHS Mandya Maddur Dundanahalli S/o Squatter Commercial Subbegowda Sarojamma W/o 71 12.250 RHS Mandya Maddur Dundanahalli Owner Residential Bommegowd a Raju S/o 72 12.257 RHS Mandya Maddur Dundanahalli Owner Residential Kempegowda Chowdaiah 73 12.260 RHS Mandya Maddur Dundanahalli S/o Owner Residential Kempaiah Kotevenkatai 74 12.265 RHS Mandya Maddur Dundanahalli ah S/o Squatter Commercial Narasimhaiah Lingaiah S/o 75 12.280 LHS Mandya Maddur Dundanahalli Owner Cattle Shed Mugakempai

38 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status ah

Swamy S/o 76 12.290 LHS Mandya Maddur Dundanahalli Thimmegowd Owner Residential a Motegowda S/o Dabagun 77 12.405 LHS Mandya Maddur Dundanahalli Owner Residential Channegowd a Puttaswamy S/o Late (O) Open 78 14.070 LHS Mandya Maddur Mallanakuppe Owner Dodda Space Puttegowda M P 79 14.245 LHS Mandya Maddur Mallanakuppe Squatter Commercial Puttaswamy Susheelamma 80 14.250 LHS Mandya Maddur Mallanakuppe W/o Late Squatter Commercial Puttaiah Basavalingac 81 14.300 RHS Mandya Maddur Mallanakuppe harya S/o Encroacher Commercial Lingacharya Basavacharya 82 14.320 RHS Mandya Maddur Mallanakuppe S/o Squatter Commercial Lingacharya Ramesh S/o 83 14.385 LHS Mandya Maddur Mallanakuppe Owner Residential Lakshmaiah Mallanayakanah Raju S/o 84 14.860 RHS Mandya Maddur Owner Cattle Shed alli Sannaiah Narasimhaiah Mallanayakanah 85 15.600 LHS Mandya Maddur S/o Squatter Commercial alli Narasimhaiah Govindaiah Mallanayakanah 86 15.605 LHS Mandya Maddur W/o Squatter Commercial alli Kadegowda Mallanayakanah Raju S/o 87 15.615 LHS Mandya Maddur Squatter Commercial alli Chikkanna Papamma Mallanayakanah 88 15.625 LHS Mandya Maddur D/o Bunda Squatter Residential alli Boraiah Mallanayakanah Muddaiah S/o 89 15.630 LHS Mandya Maddur Squatter Residential alli Muddaiah Boralingaiah 90 17.720 RHS Tumkur Kunigal Nidasale Owner Residential S/o Prakash Owner Stay 91 17.820 LHS Tumkur Kunigal Nidasale Owner Residential in Bangalore Boraiah S/o 92 17.830 LHS Tumkur Kunigal Nidasale Owner Residential Boraiah N B Legal 93 17.830 LHS Tumkur Kunigal Nidasale Residential Boregowda Tenant N P 94 17.840 LHS Tumkur Kunigal Nidasale Shivaramaiah Owner Commercial S/o Late

39 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status Puttaswamaia h Shivamma W/o Late N 95 17.850 LHS Tumkur Kunigal Nidasale Owner Commercial M Thirumalaiah N C Krishnappa Residential/ 96 17.854 LHS Tumkur Kunigal Nidasale Owner S/o Commercial Channappa Krishna Murthy S/o 97 17.860 LHS Tumkur Kunigal Nidasale Venkata Owner Residential Subramanya m Sathyamurthy 98 17.870 LHS Tumkur Kunigal Nidasale Rao S/o Owner Residential Srinivas Rao N S Ananthashaya 99 17.874 LHS Tumkur Kunigal Nidasale Owner Residential na S/o Srinivas Rao N S Nagaraja 100 17.878 LHS Tumkur Kunigal Nidasale Rao S/o N Owner Residential Srinivas Rao Residential/ 101 17.885 LHS Tumkur Kunigal Nidasale Krishnappa Owner Commercial Krishnappa Boundary 102 18.195 LHS Tumkur Kunigal Nidasale S/o Range Owner Wall Gowda Venkatachari 103 18.350 LHS Tumkur Kunigal Nidasale S/o Late Owner Commercial Kalachari Chikka Honnamachanah Mariyappa Residential/ 104 18.590 RHS Tumkur Kunigal Owner alli S/o Commercial Hanumaiah Shivaramaiah Honnamachanah 105 18.600 RHS Tumkur Kunigal S/o Peechana Owner Residential alli Thimmaiah Honnamachanah Puttaswamy Residential/ 106 18.610 RHS Tumkur Kunigal Owner alli S/o Peechaiah Commercial Honnamachanah Indramma Legal 107 18.640 LHS Tumkur Kunigal Commercial alli W/o Suresh Tenant Honnamachanah Indramma Residential/ 108 18.640 LHS Tumkur Kunigal Owner alli W/o Suresh Commercial Rajappa S/o Residential,( Honnamachanah 109 18.761 LHS Tumkur Kunigal Channegowd Owner O) Open alli a Plot Chikka Residential,( Honnamachanah 110 18.778 LHS Tumkur Kunigal Hanumaiah Owner O) Open alli S/o Beesaiah Plot

40 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status Hanumaiah Honnamachanah 111 18.786 LHS Tumkur Kunigal S/o Owner Residential alli Bajjegowda Honnamachanah Rajshekar S/o 112 18.960 RHS Tumkur Kunigal Squatter Commercial alli Channaiah Honnamachanah Mugappa S/o 113 20.430 LHS Tumkur Kunigal Owner Residential alli Lingaiah Hema W/o Honnamachanah 114 20.440 LHS Tumkur Kunigal Late H L Owner Residential alli Rajanna

Annexure 4 Details of PAFs Link 63C (Huliyurdurga – Kunigal) Table 4- 14: PAF Structure details of link 63C (Huliyurdurga - Kunigal) Sl. Chain Occu. Side District Taluk Village Name Loss Type No. age Status 1 4.078 RHS Tumkur Kunigal D Hosahalli Chikkahanumaiah Squatter Residential Residential/Co 2 4.095 RHS Tumkur Kunigal D Hosahalli Anand Owner mmercial,(O) Sheet Residential/Co 3 4.115 RHS Tumkur Kunigal D Hosahalli Andani Gowda Owner mmercial

4 4.175 RHS Tumkur Kunigal D Hosahalli H N Savandaiah Owner (O) Open Space 5 4.620 LHS Tumkur Kunigal Kambara Palya G K Shanmugam Squatter Residential 6 4.630 LHS Tumkur Kunigal Kambara Palya Alavelamma Squatter Residential 7 4.640 LHS Tumkur Kunigal Kambara Palya Vasanthamma Squatter Commercial 8 4.990 RHS Tumkur Kunigal Gollarahatti Venkatesh Achari Squatter Commercial Residential/Co 9 5.006 RHS Tumkur Kunigal Gollarahatti Chinna Raju Squatter mmercial 10 5.012 RHS Tumkur Kunigal Gollarahatti Nanjundaiah Squatter Commercial 11 5.022 RHS Tumkur Kunigal Gollarahatti Kempamma Squatter Commercial 12 5.035 RHS Tumkur Kunigal Gollarahatti Jaya Lakshmamma Squatter Commercial Residential,(O) 13 5.047 LHS Tumkur Kunigal Gollarahatti Sarojamma Encroacher Open Space 14 5.047 RHS Tumkur Kunigal Gollarahatti Venkataswamaiah Squatter Commercial 15 7.975 LHS Tumkur Kunigal Doddamavathur Thayamma Owner (O) Open Space

(O) Projection 16 7.988 RHS Tumkur Kunigal Doddamavathur Prakash D R Encroacher Sheet Commercial,(O 17 8.007 LHS Tumkur Kunigal Doddamavathur Chennappa Owner ) Sheet 18 8.010 LHS Tumkur Kunigal Doddamavathur Nagarajaiah Owner Residential 19 8.013 LHS Tumkur Kunigal Doddamavathur Hucchamma Owner Residential Residential,(O) 20 8.018 LHS Tumkur Kunigal Doddamavathur Nagaraj S/o Gulaiah Owner Sheet

41 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Chain Occu. Side District Taluk Village Name Loss Type No. age Status Residential/Co 21 8.022 LHS Tumkur Kunigal Doddamavathur Kariyappa Owner mmercial Legal 22 8.022 LHS Tumkur Kunigal Doddamavathur Chennappa Commercial Tenant 23 8.025 LHS Tumkur Kunigal Doddamavathur Ramanna Owner Residential 24 8.028 LHS Tumkur Kunigal Doddamavathur Kariyanna Owner Residential 25 8.038 LHS Tumkur Kunigal Doddamavathur Thimmaiah Owner Residential 26 8.043 LHS Tumkur Kunigal Doddamavathur Nagamma Owner Residential 27 8.047 LHS Tumkur Kunigal Doddamavathur Jayamma Owner Residential 28 8.052 LHS Tumkur Kunigal Doddamavathur Shivaramaiah Owner Residential 29 8.055 LHS Tumkur Kunigal Doddamavathur Boramma Owner Residential 30 8.060 LHS Tumkur Kunigal Doddamavathur Puttamma Owner Residential 31 8.063 LHS Tumkur Kunigal Doddamavathur Ramachandraiah Owner Residential 32 8.067 LHS Tumkur Kunigal Doddamavathur Chandrakala Owner Residential Shivanna S/o 33 8.272 LHS Tumkur Kunigal Doddamavathur Encroacher Residential Mallaiah 34 8.286 LHS Tumkur Kunigal Doddamavathur Bettaswamy Owner Residential (O) Open Space 35 8.300 LHS Tumkur Kunigal Doddamavathur Kadaiah Encroacher & Coconut Tree

36 8.402 RHS Tumkur Kunigal Doddamavathur Thimmaiah Encroacher (O) Open Space 37 11.260 LHS Tumkur Kunigal Kempanahalli Bettaswamaiah Squatter Commercial Commercial,(O Legal 38 12.360 RHS Tumkur Kunigal Santhemavathur Basavaraj ) Projection Tenant Sheet Legal Commercial,(O 39 12.363 RHS Tumkur Kunigal Santhemavathur Basavaraj Tenant ) Sheet Commercial,(O Legal 40 12.366 RHS Tumkur Kunigal Santhemavathur Basavaraj ) Projection Tenant Sheet 41 12.380 LHS Tumkur Kunigal Santhemavathur Vimalamma Squatter Commercial 42 12.517 LHS Tumkur Kunigal Santhemavathur Riaz Pasha Squatter Commercial Residential,Bou 43 14.275 LHS Tumkur Kunigal Vajara Palya Jaya Lakshmi Owner ndary Wall,(O) Open Space

44 14.290 LHS Tumkur Kunigal Vajara Palya Jayalakshmi Owner (O) Open Space

Residential,(O) 45 14.302 LHS Tumkur Kunigal Vajara Palya T M Gopalaiah Owner Open Space Residential,(O) 46 14.310 LHS Tumkur Kunigal Vajara Palya Ramachandra Owner Open Space Residential/Co 47 14.319 LHS Tumkur Kunigal Vajara Palya Varalakshmi Owner mmercial,(O) Sheet 48 14.326 LHS Tumkur Kunigal Vajara Palya Siddappa Owner Residential 49 14.350 RHS Tumkur Kunigal Vajara Palya Ramanna Squatter Commercial

42 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Chain Occu. Side District Taluk Village Name Loss Type No. age Status 50 15.055 RHS Tumkur Kunigal T Hosahalli S R Ramya Squatter Commercial 19.33 LHS Tumkur Kunigal Gavimata Kamakshamma Squatter Res cum Comm

Commercial,(O 51 19.470 RHS Tumkur Kunigal Gavimata Ramachandraiah Squatter ) Sheet Residential/Co 52 19.490 RHS Tumkur Kunigal Gavimata Shivamma Squatter mmercial 53 19.770 LHS Tumkur Kunigal Kothipura Renuka Squatter Commercial

43 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Annexure 5: Details of PAFs of Link 63D (Kunigal- Tumkur) Table 4- 15: PAF Structure details of link 63D (Kunigal - Tumkur)

Sl. Chainag Side District Taluk Village Name Occu. Status Loss Type No. e

Commercial,(O) 1 0.074 RHS Tumkur Kunigal Kunigal Chinnappa Legal Tenant Projection Cement Slab

2 0.078 RHS Tumkur Kunigal Kunigal Chinnappa Legal Tenant Commercial 3 2.236 RHS Tumkur Kunigal Kothagere Squatter Commercial

4 2.247 LHS Tumkur Kunigal Kothagere Srinivas Owner (O) Open Space

5 2.320 LHS Tumkur Kunigal Kothagere Vishwanath Owner Residential Residential/Comme 6 2.327 LHS Tumkur Kunigal Kothagere Reva Siddappa Owner rcial 7 2.335 LHS Tumkur Kunigal Kothagere Revana Siddappa Legal Tenant Commercial 8 2.343 LHS Tumkur Kunigal Kothagere Lakshmamma Owner Residential 9 2.343 LHS Tumkur Kunigal Kothagere Lakshmamma Legal Tenant Commercial 10 2.348 LHS Tumkur Kunigal Kothagere Lakshmamma Legal Tenant Commercial Residential/Comme 11 2.353 LHS Tumkur Kunigal Kothagere K S Rudersh Owner rcial

Residential/Comme 12 2.353 LHS Tumkur Kunigal Kothagere Chandrappa Owner rcial 13 2.358 LHS Tumkur Kunigal Kothagere K S Rudresh Legal Tenant Commercial 14 2.358 LHS Tumkur Kunigal Kothagere K S Rudresh Legal Tenant Commercial 15 2.370 LHS Tumkur Kunigal Kothagere Shiva Shankar Legal Tenant Residential

16 2.390 LHS Tumkur Kunigal Kothagere K V Srinivas Owner (O) Open Spcae

17 2.390 LHS Tumkur Kunigal Kothagere Raja Shekar Owner (O) Basement

18 2.410 LHS Tumkur Kunigal Kothagere Gundappa Owner (O) Open Space

Residential/Comme 19 2.427 LHS Tumkur Kunigal Kothagere Gundappa Owner rcial,(O) Sheets

20 2.942 RHS Tumkur Kunigal Kothagere Palya Chennappa Owner (O) Open Space

21 3.005 RHS Tumkur Kunigal Kothagere Palya Gangappa Squatter Commercial 22 3.008 RHS Tumkur Kunigal Kothagere Palya Jayanna Owner Residential,5 23 3.024 LHS Tumkur Kunigal Kothagere Ramanna Encroacher Residential 24 3.400 LHS Tumkur Kunigal Kothagere Prakash Owner Residential 25 4.293 LHS Tumkur Kunigal Kothagere Ramanna Encroacher Cattle Shed 26 4.700 LHS Tumkur Kunigal Chigani Palya Rajanna Encroacher Residential Bannimarada 27 11.922 RHS Tumkur Kunigal Krishnappa Squatter Commercial Katte Bannimarada 28 11.941 RHS Tumkur Kunigal Kempe Gowda Squatter Commercial Katte Bannimarada 29 11.950 LHS Tumkur Kunigal K T Rangappa Legal Tenant Commercial Katte Bannimarada 30 11.959 RHS Tumkur Kunigal Ramachari Squatter Commercial Katte 31 11.960 LHS Tumkur Kunigal Bannimarada Shanaiah Squatter Commercial

44 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Chainag Side District Taluk Village Name Occu. Status Loss Type No. e Katte Bannimarada 32 11.965 LHS Tumkur Kunigal Anandaiah Squatter Commercial Katte Bannimarada 33 11.968 LHS Tumkur Kunigal Ganga Hanumaiah Squatter Commercial Katte Bannimarada 34 11.970 RHS Tumkur Kunigal Rathnamma Squatter Commercial Katte Bannimarada 35 11.972 RHS Tumkur Kunigal K C Shanaiah Legal Tenant Commercial Katte Bannimarada 36 Commercial 11.975 RHS Tumkur Kunigal Katte Shanaiah Legal Tenant Bannimarada 37 11.995 LHS Tumkur Kunigal Putta Raju Squatter Commercial Katte Bannimarada 38 11.997 LHS Tumkur Kunigal Nagaraju Squatter Commercial Katte Bannimarada (O) Projection AC 39 12.016 RHS Tumkur Kunigal Ganga Siddaiah Encroacher Katte Sheet

Bannimarada 40 12.231 LHS Tumkur Kunigal Eranna Owner (O) Open Space Katte 41 14.387 LHS Tumkur Tumkur Hebbur D Chikkaiah Owner Boundary Wall

Boundary Wall,(O) 42 14.395 LHS Tumkur Tumkur Hebbur Beeraiah Owner Bath Room

D Doddaiah S/o Kage 43 14.403 LHS Tumkur Tumkur Hebbur Owner (O) Open Space Doddiah

Boundary Wall,(O) 44 14.403 LHS Tumkur Tumkur Hebbur Latha Legal Tenant Open Space

Boundary Wall,(O) 45 14.932 LHS Tumkur Tumkur Honnenahalli Kshadaksharaiah H B Owner Bath Room

Commercial,(O) 46 15.012 RHS Tumkur Tumkur Hebbur Prakash Encroacher Sheet

Commercial,(O) 47 15.017 RHS Tumkur Tumkur Hebbur Chikka Swamy Legal Tenant Sheet

Commercial,(O) 48 15.051 RHS Tumkur Tumkur Hebbur T N Ramakrishnaiah Encroacher Metal Steps and RCC Sheet

Commercial,(O) 49 15.058 RHS Tumkur Tumkur Hebbur Dase Gowda Encroacher Sheet

Commercial,(O) 50 15.062 RHS Tumkur Tumkur Hebbur Suresh H G Encroacher Sheet

Commercial,(O) 51 15.066 RHS Tumkur Tumkur Hebbur H S Nagashetty Encroacher Sheet

Commercial,(O) 52 15.073 RHS Tumkur Tumkur Hebbur Vishwanatha Shetty Encroacher Sheet

Residential,(O) 53 15.077 RHS Tumkur Tumkur Hebbur Narasimha Rao Encroacher Sheet

Commercial,(O) 54 15.082 RHS Tumkur Tumkur Hebbur Basava Raju Encroacher Projection Sheet

45 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Chainag Side District Taluk Village Name Occu. Status Loss Type No. e

Commercial,(O) 55 15.086 RHS Tumkur Tumkur Hebbur Uma Devi Legal Tenant Sheet

(O) Projection 56 15.086 RHS Tumkur Tumkur Hebbur H S Umesh Encroacher Sheet

Commercial,(O) 57 15.089 RHS Tumkur Tumkur Hebbur Umesh Legal Tenant Projection Sheet

Commercial,(O) 58 15.093 RHS Tumkur Tumkur Hebbur Mailaraiah Encroacher Projection Sheet

Commercial,(O) 59 15.097 RHS Tumkur Tumkur Hebbur H R Nagaraj Encroacher Projection Sheet

Commercial,(O) 60 15.103 RHS Tumkur Tumkur Hebbur Venkataiah Gowda Encroacher Sheet

Commercial,(O) 61 15.107 RHS Tumkur Tumkur Hebbur Venkataiah Gowda Legal Tenant Sheet

Commercial,(O) 62 15.111 RHS Tumkur Tumkur Hebbur Gangadhar Encroacher Sheet

Commercial,(O) 63 15.114 RHS Tumkur Tumkur Hebbur Vishwanath Legal Tenant Sheet Commercial,(O) 64 15.118 RHS Tumkur Tumkur Hebbur Vacant Squatter Sheet Ganapathi Yuvaka 65 Commercial 15.124 RHS Tumkur Tumkur Hebbur Sangam Legal Tenant Ganapathi Yuvaka Commercial,(O) 66 15.127 RHS Tumkur Tumkur Hebbur Legal Tenant Sangam Sheet 67 15.147 RHS Tumkur Tumkur Hebbur Sidda Lingappa Squatter Commercial 68 15.205 LHS Tumkur Tumkur Hebbur H D Venkatesh Kumar Legal Tenant Commercial (O) Projection 69 15.208 Rajanna Legal Tenant LHS Tumkur Tumkur Hebbur Sheet (O) Projection 70 15.211 LHS Tumkur Tumkur Hebbur Venkata Rao Legal Tenant Sheet

Commercial,(O) 71 15.214 LHS Tumkur Tumkur Hebbur Venkata Rao Legal Tenant Projection Sheets

(O) Projection 72 15.217 LHS Tumkur Tumkur Hebbur Venkata Rao Legal Tenant Sheet

Commercial,(O) 73 15.259 LHS Tumkur Tumkur Hebbur Chikka Acharya Legal Tenant Projection Sheet

Commercial,(O) 74 15.262 LHS Tumkur Tumkur Hebbur Kantha Raja Legal Tenant Projection Sheet

Commercial,(O) 75 15.281 LHS Tumkur Tumkur Hebbur H A Sattar Encroacher Projection Sheet

46 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Chainag Side District Taluk Village Name Occu. Status Loss Type No. e

Commercial,(O) 76 15.294 LHS Tumkur Tumkur Hebbur Venkatesh Legal Tenant Projection Slab

Commercial,(O) 77 15.319 LHS Tumkur Tumkur Hebbur Munnawar Encroacher Sheet & Slab

Commercial,(O) 78 15.328 LHS Tumkur Tumkur Hebbur Narasimhaiah Legal Tenant Sheet & Slab

Commercial,(O) 79 15.331 LHS Tumkur Tumkur Hebbur Parameshappa Legal Tenant Slab

Commercial,(O) 80 15.331 LHS Tumkur Tumkur Hebbur Parameshappa Encroacher Steps 81 15.335 LHS Tumkur Tumkur Hebbur Shivalingappa Encroacher (O) Steps 82 15.340 LHS Tumkur Tumkur Hebbur Kalaiah Encroacher (O) Sheet Hebbur 83 16.260 LHS Tumkur Tumkur Krishnappa Owner (O) Open Place Amanikere 84 16.400 RHS Tumkur Tumkur Kudi Palya Kalappa Squatter Commercial Doddaiah Kattan 85 17.350 RHS Tumkur Tumkur Nagaraj Squatter Commercial Palya Residential,(O) 86 19.272 RHS Tumkur Tumkur Balagere Thimmaiah Owner Open Space

Residential,(O) 87 19.307 RHS Tumkur Tumkur Balagere Narasimhachari Owner Open Space

88 19.440 RHS Tumkur Tumkur Balagere Chikka Narasaiah Owner (O) Open Space

Kalaiah S/o Dodda 89 19.465 RHS Tumkur Tumkur Balagere Owner (O) Open Space Thopaiah 90 19.944 LHS Tumkur Tumkur Belagere B M Narayanappa Legal Tenant Commercial 91 22.881 LHS Tumkur Tumkur Nagavalli Dodda Rangaiah Legal Tenant Commercial 92 22.881 LHS Tumkur Tumkur Nagavalli Dodda Rangiah Squatter Commercial 93 22.915 LHS Tumkur Tumkur Nagavalli Sri Ram Legal Tenant Commercial Commercial,(O) 94 23.105 RHS Tumkur Tumkur Nagavalli Lakshmamma Squatter Sheet 95 23.198 RHS Tumkur Tumkur Nagavalli Shankramma Squatter Commercial Honnudike Hand 96 28.823 LHS Tumkur Tumkur Hanumanthappa Owner Boundary Wall Post Honnudike Hand 97 28.890 LHS Tumkur Tumkur Chennappa S/o Rayappa Owner (O) Open Space Post Honnudike Hand 98 28.936 LHS Tumkur Tumkur Manjanna Legal Tenant Residential Post Honnudike Hand 99 29.696 LHS Tumkur Tumkur Hanumanthaiah Owner Residential Post (O) Compound 100 31.694 RHS Tumkur Tumkur Gulur Rudra Prakash Encroacher Wall

Commercial,(O) 101 32.664 RHS Tumkur Tumkur Gulur G V Gangadharaiah Legal Tenant Sheet

Commercial,(O) 102 32.666 RHS Tumkur Tumkur Gulur Legal Tenant Sheet

Commercial,(O) 103 32.669 RHS Tumkur Tumkur Gulur Baji Rao Legal Tenant Projection Sheet

47 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Chainag Side District Taluk Village Name Occu. Status Loss Type No. e

(O) Projection 104 32.672 RHS Tumkur Tumkur Gulur Revanna Legal Tenant Sheet

Commercial,(O) 105 32.675 RHS Tumkur Tumkur Gulur G K Revanna Legal Tenant Projection Sheet

Commercial,(O) 106 32.678 RHS Tumkur Tumkur Gulur G R Revann Legal Tenant Projection Sheet

107 32.681 RHS Tumkur Tumkur Gulur Jayamma Legal Tenant Commercial

Commercial,(O) 108 32.684 RHS Tumkur Tumkur Gulur Jayamma Legal Tenant Projection Sheet

Commercial,(O) 109 32.687 RHS Tumkur Tumkur Gulur Jayamma Legal Tenant Projection Sheet

Renukappa S/o Late 110 32.726 LHS Tumkur Tumkur Gulur Owner (O) Open Space Nanjappa

Commercial,(O) 111 32.733 RHS Tumkur Tumkur Gulur Babu Legal Tenant Sheet

112 32.750 LHS Tumkur Tumkur Gulur Lakshmamma Owner (O) Open Space

113 32.756 LHS Tumkur Tumkur Gulur Chandra Shekar Owner (O) Open Space

114 32.763 LHS Tumkur Tumkur Gulur Renukappa Owner Residential Renukappa S/o Sidda 115 32.768 LHS Tumkur Tumkur Gulur Owner Residential Gangappa

116 32.784 LHS Tumkur Tumkur Gulur Shivanna Owner (O) Open Space

Residential/Comme 117 32.801 LHS Tumkur Tumkur Gulur Ganeshappa Owner rcial,(O) Open Space

118 32.824 LHS Tumkur Tumkur Gulur Muralidhar Owner (O) Open Space

48 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Annexure 6: Details of PAFS of Link 63E (Tumkur –Koratagere) Table 4- 16: PAF Structure details of link 63E (Tumkur - Koratagere) Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status Nagaraj S/o Legal 1 0.065 RHS Tumkur Tumkur Sira Gate Commercial Hanumanthappa Tenant Suresh S/o Veera Legal 2 0.125 RHS Tumkur Tumkur Sira Gate Commercial Chikkaiah Tenant T V Suresh S/o 3 0.128 RHS Tumkur Tumkur Sira Gate Owner Commercial Veea Chikkaiah Dhananjaya R S/o 4 0.140 RHS Tumkur Tumkur Sira Gate Owner Commercial Ramesh Rajanna S/o 5 0.143 RHS Tumkur Tumkur Sira Gate Owner Residential Sanjeevaiah Rameeza Bee W/o 6 0.160 RHS Tumkur Tumkur Sira Gate Owner Commercial Late A Basha Sab Vijaya Kumar S/o 7 0.165 RHS Tumkur Tumkur Sira Gate Kempahanumanth Owner (O) Open Space aiah Ramanna S/o Late 8 0.260 LHS Tumkur Tumkur Sira Gate Owner Commercial Siddagangaiah Ramanna S/o Late Legal 9 0.260 LHS Tumkur Tumkur Sira Gate Commercial Siddagangaiah Tenant S Gangaiah S/o 10 0.262 LHS Tumkur Tumkur Sira Gate Late Owner Residential Siddagangaiah Hanumakka W/o 11 0.268 LHS Tumkur Tumkur Sira Gate Late Owner Residential Rangaswamaiah Hanumantha Raju 12 0.555 LHS Tumkur Tumkur Antharasanahalli Encroacher (O) Toilet S/o K Chikkanna Abdul Rehaman 13 0.640 LHS Tumkur Tumkur Antharasanahalli S/o Shekh Sarvar Owner (O) Toilet Sab Jayanna S/o Late 14 5.900 LHS Tumkur Tumkur Amalapur Squatter Commercial Yeliyappa 15 13.000 RHS Tumkur Tumkur Beladhara Kalyanamma Owner Residential Legal 16 13.003 LHS Tumkur Tumkur Beladhara Pushpavathi B R Residential Tenant Legal 17 13.009 LHS Tumkur Tumkur Beladhara Pushpavathi B R Residential Tenant 18 13.015 LHS Tumkur Tumkur Beladhara B R Devaraj Owner Residential Kalandar S/o Legal 19 13.020 RHS Tumkur Tumkur Beladhara Commercial Rasul Sab Tenant 20 13.023 RHS Tumkur Tumkur Beladhara Sunandamma Owner Residential Legal 21 13.025 RHS Tumkur Tumkur Beladhara Narayanappa B P Commercial Tenant Residential/Com 22 13.027 LHS Tumkur Tumkur Beladhara R Muddiraiah Owner mercial

49 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status Surya Prakash S/o 23 13.028 RHS Tumkur Tumkur Beladhara Late B P Owner Residential Channappa Sidda Gangamma 24 13.031 RHS Tumkur Tumkur Beladhara Owner Residential W/o Chandrappa Basavaraj S/o 25 13.034 LHS Tumkur Tumkur Beladhara Owner Commercial Puttarudrappa Basavaraj S/o 26 13.037 LHS Tumkur Tumkur Beladhara Owner Residential Putta Rudrappa Sidda Gangamma 27 13.039 RHS Tumkur Tumkur Beladhara Owner Commercial W/o Chandrappa Sidda Gangamma Legal 28 13.042 RHS Tumkur Tumkur Beladhara Commercial W/o Chandrappa Tenant Siddalingamma Legal 29 13.045 LHS Tumkur Tumkur Beladhara Commercial W/o Mallanna Tenant B N Raj Shekhar 30 13.049 LHS Tumkur Tumkur Beladhara Owner Residential Murthy B N Rajashekar Legal 31 13.053 LHS Tumkur Tumkur Beladhara Commercial Murthy Tenant 32 13.056 LHS Tumkur Tumkur Beladhara Mohan Kumar Owner Commercial Legal 33 13.056 LHS Tumkur Tumkur Beladhara Ashwathamma Commercial Tenant 34 13.065 LHS Tumkur Tumkur Beladhara Siddappa Owner Commercial Shanthamma W/o Legal 35 13.075 LHS Tumkur Tumkur Beladhara Late Commercial Tenant Neelakantappa Shanthamma W/o Legal 36 13.078 LHS Tumkur Tumkur Beladhara Late Commercial Tenant Neelakantappa Residential/Com 37 13.081 LHS Tumkur Tumkur Beladhara Rajkumar B S Owner mercial Gowramma W/o 38 13.090 LHS Tumkur Tumkur Beladhara Owner Residential Lingappa 39 13.093 LHS Tumkur Tumkur Beladhara C Shankarappa Owner Residential Gangarajaiah S/o 40 13.112 LHS Tumkur Tumkur Beladhara Owner Residential Basappa Residential/Com 41 13.120 LHS Tumkur Tumkur Beladhara P Rudrappa Owner mercial Ashwathappa S/o 42 13.520 LHS Tumkur Tumkur Beladhara Owner Cattle Shed Appayanna Rangaswamaiah 43 14.820 LHS Tumkur Tumkur Hanumanthagiri S/o Mudda Owner Residential Rangiah Hanumantha 44 14.827 LHS Tumkur Tumkur Hanumanthagiri Rayappa S/o Owner Residential Muddu Rangiah 45 14.830 LHS Tumkur Tumkur Hanumanthagiri Gangaraju Owner Residential Sidda 46 14.840 LHS Tumkur Tumkur Hanumanthagiri Owner (O) Open Space Rameshwara S/o

50 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status Somanna

Legal 47 14.845 LHS Tumkur Tumkur Hanumanthagiri Nanjundappa Residential Tenant Owner Stay in 48 14.848 LHS Tumkur Tumkur Hanumanthagiri Owner Residential Bangalore Rathnamma W/o Legal 49 14.851 LHS Tumkur Tumkur Hanumanthagiri Commercial Rangoji Rao Tenant 50 14.865 LHS Tumkur Tumkur Hanumanthagiri N Maruthi Owner Residential G E Residential/Com 51 14.870 LHS Tumkur Tumkur Hanumanthagiri Owner Gangadharaiah mercial Narasamma D/o 52 20.570 RHS Tumkur Koratagere Jampenahalli Lakshmi Owner Residential Narasappa Rama Krishnappa 53 20.640 RHS Tumkur Koratagere Jampenahalli S/o Late Putta Owner Residential Hanumanthappa

51 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Annexure: 7 Details of PAFs in Link 64F (Koratagere- Madhugiri) Table 4- 17: PAF Structure details of link 64F (Koratagere - Madhugiri) Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status Ramakrishnaiah S/o 1 4.190 LHS Tumkur Koratagere Muggondanahalli Owner Residential Nanjappa 2 4.200 LHS Tumkur Koratagere Muggondanahalli Seenappa Squatter Commercial Hanumarangiah S/o 3 4.210 LHS Tumkur Koratagere Muggondanahalli Squatter Commercial Dodda Rangaiah 4 5.312 RHS Tumkur Koratagere Tumbadi Veeranna Squatter Residential 5 5.312 RHS Tumkur Koratagere Tumbadi Veeranna Owner Residential Hanumantha Legal 6 5.395 RHS Tumkur Koratagere Tumbadi Commercial Rayappa Tenant 7 5.395 RHS Tumkur Koratagere Tumbadi T D Chikkanna Owner Commercial 8 5.401 RHS Tumkur Koratagere Tumbadi T D Chikkanna Owner Commercial 9 5.466 RHS Tumkur Koratagere Tumbadi Shivakumar T V Encroacher Commercial Legal 10 5.505 LHS Tumkur Koratagere Tumbadi Hanumanthachari Commercial Tenant 11 5.581 LHS Tumkur Koratagere Tumbadi Nagesh S/o Dasappa Encroacher (O) Stare Case (O) Boundary 12 5.700 LHS Tumkur Koratagere Tumbadi C Thimmaiah Owner Wall and Open Place T N Narasimha 13 5.750 LHS Tumkur Koratagere Tumbadi Owner Residential Murthy Residential,(O) 14 5.762 LHS Tumkur Koratagere Tumbadi Gowramma Owner Open Plot Thimmanna S/o 15 5.775 LHS Tumkur Koratagere Tumbadi Owner Residential Yellappa 16 7.016 LHS Tumkur Madhugiri Pammedevarahalli Venkataraj Owner Residential 17 7.363 LHS Tumkur Koratagere Pammedevarahalli Govindappa Squatter Commercial 18 7.832 LHS Tumkur Koratagere Dasarahalli Bheemanna Squatter Commercial 19 8.075 LHS Tumkur Koratagere Dasarahalli Ramachandraiah Squatter Commercial 20 13.147 RHS Tumkur Madhugiri Keregala Palya Hanumakka Owner Residential 21 13.166 RHS Tumkur Madhugiri Keregala Palya Lakshmamma Owner Residential 22 13.170 RHS Tumkur Madhugiri Keregala Palya Krishnappa Owner Residential 23 13.179 RHS Tumkur Madhugiri Keregala Palya Narayanappa Owner Residential 24 13.183 RHS Tumkur Madhugiri Keregala Palya Thimmaraj Owner Residential 25 13.183 RHS Tumkur Madhugiri Keregala Palya Hanumaiah Owner Commercial Bojanna S/o 26 13.183 RHS Tumkur Madhugiri Keregala Palya Owner Residential Hanumaiah 27 13.183 RHS Tumkur Madhugiri Keregala Palya Hanumaiah Owner Residential Residential,Boun 28 13.232 RHS Tumkur Madhugiri Keregala Palya K Timmaiah Owner dary Wall,(O) Steps Legal 29 13.232 RHS Tumkur Madhugiri Keregala Palya K Thimmaiah Residential Tenant Legal 30 13.232 RHS Tumkur Madhugiri Keregala Palya K Thimmaiah Residential Tenant 31 13.232 RHS Tumkur Madhugiri Keregala Palya K Thimmaiah Legal Residential

52 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status Tenant Residential,(O) 32 13.250 RHS Tumkur Madhugiri Keregala Palya Hasina Owner Open Space Residential,(O) 33 13.258 RHS Tumkur Madhugiri Keregala Palya Yunus beg Owner Bath Room 34 13.261 RHS Tumkur Madhugiri Keregala Palya Jabeena Owner Residential 35 13.270 LHS Tumkur Madhugiri Keregala Palya C Chowdaiah Owner Residential Legal 36 13.270 RHS Tumkur Madhugiri Keregala Palya Shri Ram Residential Tenant Legal 37 13.272 RHS Tumkur Madhugiri Keregala Palya Mallikarjun Residential Tenant 38 13.272 RHS Tumkur Madhugiri Keregala Palya Rangappa Owner Residential 39 13.310 LHS Tumkur Madhugiri Keregala Palya K C Kallaiah Owner (O) Open Plot Lokappa S/o 40 13.318 LHS Tumkur Madhugiri Keregala Palya Owner (O) Plot Thimmanna 41 13.323 LHS Tumkur Madhugiri Keregala Palya Venkataswamiyappa Owner (O) Open Plot 42 13.350 LHS Tumkur Madhugiri Keregala Palya Govindappa Squatter Commercial 43 13.350 LHS Tumkur Madhugiri Keregala Palya Govindappa Owner (O) Plot 44 13.358 LHS Tumkur Madhugiri Keregala Palya Narasimhaiah C N Owner (O) Open Plot 45 13.380 LHS Tumkur Madhugiri Keregala Palya C N Chikkanna Owner Residential 46 13.380 LHS Tumkur Madhugiri Keregala Palya Narasappa K T Squatter Commercial Legal 47 13.383 LHS Tumkur Madhugiri Chinakavajra Srinivas Residential Tenant Residential/Com 48 13.400 LHS Tumkur Madhugiri Keregala Palya Moodala Giriyappa Owner mercial 49 13.415 LHS Tumkur Madhugiri Keregala Palya Veera Kethappa Owner Residential

(O) Open Space 50 13.446 LHS Tumkur Madhugiri Keregala Palya Narayanappa Owner & Boundary Wall

Parvathamma W/o (O) Open Space 51 13.455 LHS Tumkur Madhugiri Keregala Palya Owner Guru Murthy & Toilet Prakash S/o Legal 52 13.836 LHS Tumkur Madhugiri Keregala Palya Residential Munishamaiah Tenant

53 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Annexure 8: Details of PAFs in Link 64G (Madhugiri – Pavagada) Table 4- 18: PAF Structure details of link 64G (Madhugiri - Pavagada) Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status 1 4.16 RHS Tumkur Madhugiri Jadegondanahalli Era Nagappa Squatter Commercial Somasundara S/o 2 6.030 RHS Tumkur Madhugiri Chikkanahalli Owner Residential Nanjunda Shastri 3 7.860 RHS Tumkur Tumkur Giriyammana Palya Nidhi S/o Chittanna Squatter Commercial Nagamma W/o 4 8.850 LHS Tumkur Madhugiri Avargallu Owner Residential Sanna Ramanna Lakshmi Rangappa 5 8.854 LHS Tumkur Madhugiri Avargallu Owner Residential S/o Rangappa 6 11.450 RHS Tumkur Madhugiri Hosakere Ubedulla Owner Commercial 7 11.470 RHS Tumkur Madhugiri Hosakere Lal Badshah Owner Commercial Ameer Jaan S/o Legal 8 11.482 RHS Tumkur Tumkur Hosakere Commercial Gafar Sab Tenant Basavalingaiah S/o 9 11.512 RHS Tumkur Madhugiri Hosakere Owner Commercial Mallaiah Legal 10 11.525 RHS Tumkur Madhugiri Hosakere Ramakrishna Commercial Tenant 11 11.525 RHS Tumkur Madhugiri Hosakere Ramakrishna Owner Commercial Legal 12 11.528 RHS Tumkur Madhugiri Hosakere Ramakrishna Commercial Tenant 13 11.535 RHS Tumkur Madhugiri Hosakere Shivram Shetty Owner Commercial Legal 14 11.535 RHS Tumkur Madhugiri Hosakere Shivaramaiah Commercial Tenant 15 11.628 LHS Tumkur Madhugiri Hosakere Govinda Raju Owner (O) Stare Case Nanjundappa S/o 16 11.632 LHS Tumkur Madhugiri Hosakere Owner (O) Stare Case Puttaiah 17 13.200 LHS Tumkur Madhugiri Thippagondanahalli Prakash T M Owner Residential 18 16.370 RHS Tumkur Madhugiri Chinnenahalli C T Rama Reddy Owner Residential 19 16.520 RHS Tumkur Madhugiri Chinnenahalli Puttalingappa L Owner Residential 20 16.530 RHS Tumkur Madhugiri Chinnenahalli C R Rudracharya Owner Residential Ramappa S/o 21 16.546 RHS Tumkur Madhugiri Chinnenahalli Owner Residential Lakshman 22 16.55 RHS Tumkur Madhugiri Chinnenahalli Shankar Shetty Owner Residential K N Ashwatha 23 16.560 RHS Tumkur Madhugiri Chinnenahalli Owner Commercial Narayana Shetty Gangappa S/o 24 16.590 RHS Tumkur Madhugiri Chinnenahalli Owner Residential Rangaswamaiah 25 16.595 RHS Tumkur Madhugiri Chinnenahalli Muddu Krishnappa Owner (O) Toilet Ramakrishnappa S/o 26 16.680 RHS Tumkur Madhugiri Chinnenahalli Squatter Commercial Hanumanthappa Sarojamma W/o Late 27 19.460 RHS Tumkur Madhugiri Midigeshi Owner Commercial Venkatachalaiah Legal 28 Commercial 19.46 RHS Tumkur Madhugiri Midigeshi Sarojamma Tenant Legal 29 19.466 RHS Tumkur Madhugiri Midigeshi Sarojamma Commercial Tenant

54 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status Legal 30 19.468 RHS Tumkur Madhugiri Midigeshi Sarojamma Commercial Tenant Legal 31 Commercial 19.47 RHS Tumkur Madhugiri Midigeshi Sarojamma Tenant Residential/Co 32 19.480 RHS Tumkur Madhugiri Midigeshi Manjunath M C Owner mmercial 33 19.490 RHS Tumkur Madhugiri Midigeshi Chandrashekar Owner Commercial Residential/Co 34 19.49 RHS Tumkur Madhugiri Midigeshi Srinath S/o Shivaraju Owner mmercial Legal 35 Commercial 19.493 RHS Tumkur Madhugiri Midigeshi Srinath S/o Shivaraju Tenant Kamanna S/o 36 19.500 RHS Tumkur Madhugiri Midigeshi Neeragunte Owner (O) Open plot Nanjappa Mehaboob Sab S/o Residential/Co 37 19.505 RHS Tumkur Madhugiri Midigeshi Owner Kasim Sab mmercial Sufiyabi W/o Ismail Residential,(O) 38 19.510 RHS Tumkur Madhugiri Midigeshi Owner Sab Open Plot 39 19.573 RHS Tumkur Madhugiri Midigeshi Tippeswamy C Owner Commercial Chowdamma W/o Residential/Co 40 22.010 RHS Tumkur Madhugiri Nallekamanahalli Squatter Late Chowdashetty mmercial B C Shivaraj S/o Residential/Co 41 24.485 RHS Tumkur Madhugiri Bidarakere Squatter Chikkarangappa mmercial Sathyanarayana 42 24.585 LHS Tumkur Madhugiri Bidarakere Squatter Commercial Reddy Putta Sidda Reddy 43 25.300 RHS Tumkur Madhugiri Bidarakere S/o Late Henjara Owner Reddy Govindappa S/o Residential,(O) 44 25.760 LHS Tumkur Madhugiri Kyathagondanahalli Owner Venkatappa Open Plot 45 25.800 LHS Tumkur Madhugiri Kyathagondanahalli K G Thimmappa Owner Residential Thimmappa S/o Residential/Co 46 25.800 LHS Tumkur Madhugiri Kyathagondanahalli Owner Gangappa mmercial Gangamma W/o 47 25.900 LHS Tumkur Madhugiri Kyathagondanahalli Owner Residential Eranna Anuradha W/o 48 25.905 LHS Tumkur Madhugiri Kyathagondanahalli Owner Residential Shanta Kumar 49 27.655 LHS Tumkur Madhugiri Chandrabhavi Srinath Squatter Commercial Govindaiah S/o 50 27.680 LHS Tumkur Madhugiri Chandrabhavi Encroacher Commercial Ugrappa 51 28.600 RHS Tumkur Madhugiri Chandrabhavi Narasimhalu Squatter Residential Sanjeevappa S/o (O) Toilet 52 44.840 RHS Tumkur Pavagada Rajavanthi Owner Hanumaiah Room 53 44.842 RHS Tumkur Pavagada Rajavanthi Mahesh Kumar Squatter Commercial Nagaraj S/o 54 44.845 RHS Tumkur Pavagada Rajavanthi Owner (O) Open Place Hanumaiah Ashwathappa S/o 55 44.850 RHS Tumkur Pavagada Pavagada Owner Residential Narayanappa 56 44.900 RHS Tumkur Pavagada Rajavanthi Subbarayappa Owner Residential

55 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Sl. Occu. Chainage Side District Taluk Village Name Loss Type No. Status Commercial,Ca ttle Padmavathi W/o R S Shed,Boundary 57 45.690 Owner Rao Wall,(O) Boundary Wall RHS Tumkur Pavagada Rajavanthi & Shop Mohammad 58 Commercial 51.55 LHS Tumkur Pavagada Pavagada Fazalulla Owner Mujeeb S/o Ahmad 59 Commercial 51.56 LHS Tumkur Pavagada Pavagada Sab Squatter 60 51.593 LHS Tumkur Pavagada Pavagada Maruti Prakash Owner Residential Manjunath S/o 61 Commercial 51.65 LHS Tumkur Pavagada Pavagada Lakshmappa Squatter Nagarathnamma 62 W/o Late Narayana (O) Basement 51.86 RHS Tumkur Pavagada Pavagada Rao Encroacher 63 51.9 RHS Tumkur Pavagada Pavagada Krishna Nayak K P Squatter Commercial A T Balaji Natha S/o 64 A T Thimmappa (O) Open Plot 51.9 RHS Tumkur Pavagada Pavagada Shetty Owner 65 51.96 RHS Tumkur Pavagada Pavagada Imam Sab Squatter Commercial Venkatesh S/o 66 Commercial 51.966 RHS Tumkur Pavagada Pavagada Hanumantharayappa Squatter Narasimha Murthy 67 Commercial 51.968 RHS Tumkur Pavagada Pavagada S/o Govindappa Squatter Rajappa S/o 68 Commercial 51.975 RHS Tumkur Pavagada Pavagada Venkatappa Squatter Ramu S/o 69 Commercial 51.982 RHS Tumkur Pavagada Pavagada Sanjeevappa Squatter 70 51.998 RHS Tumkur Pavagada Pavagada Lakshmamma Squatter Commercial Gangamma W/o 71 Commercial 52.02 RHS Tumkur Pavagada Pavagada Subbarayappa Squatter

56 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Annexure 9: Community Asset Details Table 4- 19: Community Asset Details of link 63A (Malavalli-Maddur) Area in Sq.m

Tota % of % of Total Sl. Chaina Typeof Owner l Affecte Land Affected Str. Side District Taluk Village Struc No. ge Asset Type Lan d Land Getting Strcture Getting ture d Affected Affected

0.280 LHS Mandya Malavalli Malavalli Compound Governm 285.0 15.00 5.26 1 Wall ent 0 2 0.315 LHS Mandya Malavalli Malavalli Steps Panchayat 85.50 4.50 5.26 0.528 RHS Mandya Malavalli Malavalli Communi 43.99 14.31 32.53 3 Temple ty 0.680 LHS Mandya Malavalli Malavalli Communi 42.63 17.88 41.94 4 Temple ty 5 1.650 LHS Mandya Malavalli Malavalli Hand Pump Panchayat 18.00 1.50 8.33 1.660 LHS Mandya Malavalli Malavalli Communi 65.25 65.25 100.00 6 Aralikatte ty 1.670 LHS Mandya Malavalli Malavalli Temple Communi 84.00 30.00 35.71 Building ty 7 Commercial Shop 1.680 LHS Mandya Malavalli Malavalli Communi 123.5 123.50 100.00 8 Temple ty 0 2.390 RHS Mandya Malavalli Bugataga Communi 13.00 4.00 30.77 9 Samadhi halli ty 2.580 LHS Mandya Malavalli Bugataga Panchayat 1.70 0.04 2.35 10 Water Tap halli 2.620 LHS Mandya Malavalli Bugataga Panchayat 2.00 0.04 2.00 11 Water Tap halli 3.250 LHS Mandya Malavalli M Communi 6.30 1.50 23.81 12 Basavapur Shrine ty a 3.270 LHS Mandya Malavalli M Water Panchayat 8.50 1.50 17.65 13 Basavapur Supply a Valve 14 3.800 RHS Mandya Malavalli Kagepura Water Tap Panchayat 3.60 0.25 6.94 3.935 LHS Mandya Malavalli Kagepura Mini Water Panchayat 16.50 9.00 54.55 15 Supply Tank 16 4.240 LHS Mandya Malavalli Kagepura Water Tap Panchayat 7.80 0.20 2.56 17 4.270 RHS Mandya Malavalli Kagepura Bus Stand Panchayat 45.00 9.00 20.00 4.290 LHS Mandya Malavalli Kagepura Communi 12.00 4.00 33.33 18 Statue ty 5.080 RHS Mandya Malavalli Nelamaka Panchayat 49.00 28.00 57.14 19 Bus Stand nahalli 5.740 LHS Mandya Malavalli Talagavad Water Panchayat 18.00 4.00 22.22 20 i Supply Valve 5.765 LHS Mandya Malavalli Talagavad Panchayat 87.75 11.25 12.82 21 Bus Stand i 7.090 LHS Mandya Malavalli Kalakemp Water Panchayat 18.00 2.00 11.11 22 ana Doddi Supply Valve 8.490 LHS Mandya Malavalli Bidarahos Private 12.75 3.00 23.53 23 Samadhi ahalli 24 8.590 LHS Mandya Maddur Manigere Hand Pump Panchayat 17.10 2.25 13.16 25 8.710 RHS Mandya Maddur Manigere Water Tap Panchayat 14.00 1.00 7.14 26 8.950 LHS Mandya Maddur Manigere Hand Pump Panchayat 21.00 1.50 7.14 27 9.015 RHS Mandya Maddur Manigere Temple Private 109.5 25.50 23.29

57 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in Sq.m

Tota % of % of Total Sl. Chaina Typeof Owner l Affecte Land Affected Str. Side District Taluk Village Struc No. ge Asset Type Lan d Land Getting Strcture Getting ture d Affected Affected

0 28 9.020 RHS Mandya Maddur Manigere Water Tap Panchayat 2.19 0.09 4.11 9.200 LHS Mandya Maddur Manigere Water Panchayat 14.00 2.00 14.29 29 Supply Valve 9.710 LHS Mandya Maddur K P Compound Governm 16.50 1.50 9.09 30 Doddi Wall ent 9.750 LHS Mandya Maddur K P Water Panchayat 17.40 0.60 3.45 31 Doddi Supply Valve 9.810 LHS Mandya Maddur K P Water Panchayat 14.00 3.00 21.43 32 Doddi Supply Valve 10.645 LHS Mandya Maddur Water Panchayat 20.00 4.00 20.00 33 Supply Valve 10.790 RHS Mandya Maddur K M Panchayat 30.60 4.50 14.71 34 Water Tap Doddi 10.920 RHS Mandya Maddur K M Water Tap & Panchayat 16.95 2.25 13.27 35 Doddi Tank 10.922 RHS Mandya Maddur K M Communi 34.50 7.50 21.74 36 Aralikatte Doddi ty 10.965 LHS Mandya Maddur K M Panchayat 5.25 0.25 4.76 37 Bore Well Doddi 11.070 LHS Mandya Maddur K M Panchayat 6.75 0.25 3.70 38 Water Tap Doddi 11.300 RHS Mandya Maddur K M Panchayat 22.40 4.00 17.86 39 Pump House Doddi 11.630 LHS Mandya Maddur K M Mini Water Panchayat 25.20 4.00 15.87 40 Doddi Supply Tank 11.762 LHS Mandya Maddur K M Communi 70.00 28.00 40.00 41 Aralikatte Doddi ty 11.835 LHS Mandya Maddur K M Panchayat 7.50 0.25 3.33 42 Water Tank Doddi 11.860 LHS Mandya Maddur K M Governm 42.00 9.00 21.43 43 Fruit Stall Doddi ent 11.890 LHS Mandya Maddur K M Mini Water Panchayat 24.00 4.00 16.67 44 Doddi Supply Tank 12.080 LHS Mandya Maddur K M Mini Water Panchayat 23.00 4.00 17.39 45 Doddi Supply Tank 12.180 LHS Mandya Maddur K M Panchayat 6.20 0.25 4.03 46 Water Tap Doddi 12.185 LHS Mandya Maddur K M Compound Governm 277.5 55.50 20.00 47 Doddi Wall ent 0 12.210 LHS Mandya Maddur K M Compound Panchayat 304.5 73.50 24.14 48 Doddi Wall 0 12.280 LHS Mandya Maddur K M Compound Governm 464.0 58.00 12.50 49 Doddi Wall ent 0 12.300 LHS Mandya Maddur K M Mini Water Panchayat 24.40 4.00 16.39 50 Doddi Supply Tank 12.780 LHS Mandya Maddur K M MWS & Panchayat 23.00 2.00 8.70 51 Doddi Bore Well 14.230 LHS Mandya Maddur Doddarasi Panchayat 14.70 2.25 15.31 52 Hand Pump nakere 14.235 LHS Mandya Maddur Doddarasi Panchayat 60.00 21.00 35.00 53 Bus Stand nakere 15.030 LHS Mandya Maddur Chikkaras Panchayat 45.5 4.90 10.77 54 Bus Stand inakere 0

58 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in Sq.m

Tota % of % of Total Sl. Chaina Typeof Owner l Affecte Land Affected Str. Side District Taluk Village Struc No. ge Asset Type Lan d Land Getting Strcture Getting ture d Affected Affected

15.06 RHS Mandya Maddur Chikkaras Panchayat 12.00 2.25 18.75 55 Hand Pump inakere 15.230 LHS Mandya Maddur Chikkaras Panchayat 25.00 4.00 16.00 56 Basement inakere 15.245 LHS Mandya Maddur Chikkaras Panchayat 9.00 2.25 25.00 57 Hand Pump inakere 15.355 LHS Mandya Maddur Kenche Panchayat 18.00 1.50 8.33 58 Gowdana Hand Pump Doddi 15.373 RHS Mandya Maddur Kenche Panchayat 19.60 0.40 2.04 59 Gowdana Basement Doddi 15.397 LHS Mandya Maddur Kenche Panchayat 18.00 4.00 22.22 60 Gowdana Basement Doddi 15.710 RHS Mandya Maddur Hunnena Panchayat 1.90 0.04 2.11 61 Water Tap Doddi 15.820 RHS Mandya Maddur Hunnena Panchayat 37.60 6.00 15.96 62 Water Tank Doddi 15.835 LHS Mandya Maddur Honnena Mini Water Panchayat 25.50 9.00 35.29 63 Doddi Supply Tank 17.100 LHS Mandya Maddur Chatradah Communi 15.00 4.00 26.67 64 Temple osahalli ty 17.745 RHS Mandya Maddur Huligerep Panchayat 80.50 3.50 4.35 65 Bus Stand ura 18.070 RHS Mandya Maddur Huligerep Water Panchayat 13.00 3.00 23.08 66 ura Supply Valve 18.233 LHS Mandya Maddur Huligerep Panchayat 72.00 4.00 5.56 67 Water Tank ura 18.430 LHS Mandya Maddur Huligerep Panchayat 2.50 0.25 10.00 68 Bore Well ura 18.430 LHS Mandya Maddur Huligerep Mini Water Panchayat 15.00 4.00 26.67 69 ura Supply Tank 18.610 RHS Mandya Maddur Huligerep Water Panchayat 28.00 4.00 14.29 70 ura Supply Valve 18.660 RHS Mandya Maddur Huligerep Water Panchayat 36.00 4.00 11.11 71 ura Supply Valve 19.345 LHS Mandya Maddur Kuduragu Panchayat 10.50 2.25 21.43 72 Hand Pump ndi 19.350 LHS Mandya Maddur Kuduragu Communi 32.50 26.00 80.00 73 Aralikatte ndi ty 19.355 RHS Mandya Maddur Kuduragu Water Panchayat 20.00 2.00 10.00 74 ndi Supply Valve 20.880 RHS Mandya Maddur Goravana Water Panchayat 9.00 4.00 44.44 75 halli Supply Valve 21.700 RHS Mandya Maddur Goravana Water Panchayat 22.00 3.00 13.64 76 halli Supply Valve

59 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Table 4- 20: Community Asset Details of link 63B (Maddur - Huliyurdurga)

% of % of Sl. Chai Typeof Owner Total Affected Land Total Affected Str. Side District Taluk Village No. nage Asset Type Land Land Getting Structure Strcture Getting Affected Affected

0.20 RHS Mandya Maddur Huluganahal Railway Government 22.50 10.80 48.00 1 0 li Gate 1.14 LHS Mandya Maddur Hemmanaha Mini Panchayat 13.20 4.00 30.30 5 lli Water 2 Supply Tank 1.18 RHS Mandya Maddur Hemmanaha Community 132.48 19.32 14.58 3 Temple 5 lli 1.24 RHS Mandya Maddur Hemmanaha MWS & Panchayat 22.05 8.75 39.68 4 0 lli Bore Well 1.68 LHS Mandya Maddur Hemmanaha Water Panchayat 2.75 0.25 9.09 5 5 lli Tap 1.75 LHS Mandya Maddur Hemmanaha Compou Panchayat 80.40 3.60 4.48 6 0 lli nd Wall 1.75 LHS Mandya Maddur Hemmanaha Water Panchayat 3.85 0.25 6.49 7 5 lli Tap 1.83 LHS Mandya Maddur Hemmanaha Aralikatt Community 53.90 23.10 42.86 8 0 lli e 1.84 LHS Mandya Maddur Hemmanaha Water Panchayat 2.80 0.25 8.93 9 0 lli Tap 1.86 LHS Mandya Maddur Hemmanaha Water Panchayat 2.95 0.25 8.47 10 5 lli Tap 1.97 LHS Mandya Maddur Hemmanaha Water Panchayat 2.20 0.25 11.36 11 5 lli Tap 2.09 RHS Mandya Maddur Hemmanaha Water Panchayat 3.55 0.25 7.04 12 5 lli Tap 2.68 LHS Mandya Maddur Hemmanaha Bus Panchayat 59.15 24.50 41.42 13 0 lli Stand 2.78 LHS Mandya Maddur Hemmanaha Private 25.50 10.50 41.18 14 Samadhi 0 lli 3.29 RHS Mandya Maddur Yaraganahal MWS & Panchayat 14.10 9.00 63.83 15 0 li Bore Well 3.42 RHS Mandya Maddur Yaraganahal Community 70.50 18.00 25.53 16 Temple 5 li 3.44 RHS Mandya Maddur Yaraganahal Govern Government 17 0 li ment Land 3.58 RHS Mandya Maddur Yaraganahal Community 31.00 20.00 64.52 18 Temple 0 li 3.62 LHS Mandya Maddur Yaraganahal Water Panchayat 4.00 0.25 6.25 19 0 li Tap 3.65 LHS Mandya Maddur Yaraganahal Water Panchayat 3.70 0.25 6.76 20 0 li Tap 3.67 LHS Mandya Maddur Yaraganahal Open Government 330.00 180.00 54.55 21 li Plot 5.66 LHS Mandya Maddur Yaraganahal Community 15.40 4.00 25.97 22 Temple 0 li 5.67 LHS Mandya Maddur Thore Hand Panchayat 10.65 2.25 21.13 23 5 Settihalli Pump 5.80 RHS Mandya Maddur Thore Aralikatt Community 46.31 10.40 22.45 24 0 Settihalli e 6.04 LHS Mandya Maddur Thore Water Panchayat 3.60 0.25 6.94 25 5 Settihalli Tap

60 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

% of % of Sl. Chai Typeof Owner Total Affected Land Total Affected Str. Side District Taluk Village No. nage Asset Type Land Land Getting Structure Strcture Getting Affected Affected

6.07 LHS Mandya Maddur Thore Hand Panchayat 7.65 2.25 29.41 26 0 Settihalli Pump 6.09 RHS Mandya Maddur Thore Water Panchayat 26.25 7.00 26.67 27 5 Settihalli Pond 6.31 LHS Mandya Maddur Thore Water Panchayat 3.75 0.25 6.67 28 0 Settihalli Tap 6.38 LHS Mandya Maddur Thore Water Panchayat 4.60 0.25 5.43 29 5 Settihalli Tap 6.42 RHS Mandya Maddur Thore Shrine 10.00 1.00 10.00 30 Community 5 Settihalli 7.72 LHS Mandya Maddur Machahalli Hand Panchayat 11.70 2.25 19.23 31 0 Pump RHS Mandya Maddur Machahalli Water 3.85 0.25 6.49 32 7.78 Panchayat Tap 7.84 LHS Mandya Maddur Machahalli Bus Panchayat 44.55 19.80 44.44 33 0 Stand RHS Mandya Maddur Machahalli Govern 34 8.1 ment Government Land RHS Mandya Maddur Machahalli Water 4.85 0.25 5.15 35 8.12 Panchayat Tap 8.27 LHS Mandya Maddur Kesthur MWS & Panchayat 24.00 9.00 37.50 36 5 Bore Well 8.51 LHS Mandya Maddur Kesthur Sign Private 55.00 12.10 22.00 0 Board 37 Petrol Bunk 8.87 LHS Mandya Maddur Kesthur Water Panchayat 8.00 1.00 12.50 38 0 Pond 8.92 LHS Mandya Maddur Kesthur Water Panchayat 4.30 0.25 5.81 39 5 Tap 9.09 LHS Mandya Maddur Kesthur Hand Panchayat 12.15 2.25 18.52 40 0 Pump 9.15 LHS Mandya Maddur Kesthur Water Panchayat 4.50 0.25 5.56 41 5 Tap 9.22 RHS Mandya Maddur Kesthur Hand 11.25 2.25 20.00 42 Panchayat 5 Pump 9.24 LHS Mandya Maddur Kesthur Compou Government 124.11 12.60 10.15 43 5 nd Wall 9.30 LHS Mandya Maddur Kesthur High Government 356.00 84.00 23.60 44 5 School 9.34 LHS Mandya Maddur Kesthur Water Panchayat 3.00 0.25 8.33 45 0 Tap 9.51 LHS Mandya Maddur Kesthur Mini Panchayat 14.40 4.00 27.78 0 Water 46 Supply Tank 9.87 LHS Mandya Maddur Kesthur Water Panchayat 3.00 0.25 8.33 47 0 Tap 9.97 RHS Mandya Maddur Kesthur Water 3.15 0.25 7.94 48 Panchayat 5 Tap 10.0 RHS Mandya Maddur Kesthur Shrine 9.90 2.25 22.73 49 Community 6 RHS Mandya Maddur Kesthur Mini 11.20 4.00 35.71 10.2 Water 50 Panchayat 8 Supply Tank 10.9 LHS Mandya Maddur Dundanahall Aralikatt Community 33.48 20.52 61.29 51 40 i e

61 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

% of % of Sl. Chai Typeof Owner Total Affected Land Total Affected Str. Side District Taluk Village No. nage Asset Type Land Land Getting Structure Strcture Getting Affected Affected

10.9 LHS Mandya Maddur Dundanahall Mini Panchayat 13.20 4.00 30.30 70 i Water 52 Supply Tank 11.2 LHS Mandya Maddur Dundanahall MWS & Panchayat 23.50 6.25 26.60 53 35 i Bore Well RHS Mandya Maddur Dundanahall Mini 13.00 4.00 30.77 11.8 i Water 54 Panchayat 7 Supply Tank 11.8 RHS Mandya Maddur Dundanahall Water 1.75 0.25 14.29 55 Panchayat 75 i Tap 11.9 RHS Mandya Maddur Dundanahall Hand 12.60 2.25 17.86 56 Panchayat 2 i Pump 11.9 RHS Mandya Maddur Dundanahall Water 2.60 0.25 9.62 57 Panchayat 35 i Tap RHS Mandya Maddur Dundanahall Mini 18.00 4.00 22.22 12.1 i Water 58 Panchayat 2 Supply Tank 12.1 LHS Mandya Maddur Dundanahall Water Panchayat 20.15 4.65 23.08 59 35 i Pond 12.1 LHS Mandya Maddur Dundanahall Primaty Government 102.20 29.20 28.57 60 80 i School 12.2 RHS Mandya Maddur Dundanahall Water 3.50 0.25 7.14 61 Panchayat 45 i Tap 12.2 LHS Mandya Maddur Dundanahall Water Panchayat 3.50 0.25 7.14 62 70 i Tap 12.3 LHS Mandya Maddur Dundanahall Water Panchayat 4.00 0.25 6.25 63 00 i Tap 12.3 LHS Mandya Maddur Dundanahall Water Panchayat 2.50 0.25 10.00 64 85 i Tap 12.7 LHS Mandya Maddur Dundanahall Compou Government 735.00 105.00 14.29 65 80 i nd Wall RHS Mandya Maddur Dundanahall MWS & 18.75 6.25 33.33 13.0 66 i Bore Panchayat 3 Well RHS Mandya Maddur Mallanakup Mini 17.80 4.00 22.47 13.9 pe Water 67 Panchayat 4 Supply Tank 14.1 LHS Mandya Maddur Mallanakup Water Panchayat 3.00 0.25 8.33 68 20 pe Tap RHS Mandya Maddur Mallanakup Mini 14.00 4.00 28.57 14.2 pe Water 69 Panchayat 6 Supply Tank 14.2 LHS Mandya Maddur Mallanakup Bus Panchayat 46.48 20.80 44.76 70 70 pe Stand 14.3 LHS Mandya Maddur Mallanakup Water Panchayat 3.15 0.25 7.94 71 10 pe Tap 14.3 LHS Mandya Maddur Mallanakup Primaty Government 81.95 28.05 34.23 72 35 pe School 14.7 LHS Mandya Maddur Mallanayaka Panchayat 102.85 29.15 28.34 73 Fence 90 nahalli 14.8 RHS Mandya Maddur Mallanayaka Water 4.30 0.25 5.81 74 Panchayat 7 nahalli Tap 14.9 LHS Mandya Maddur Mallanayaka Bus Panchayat 33.64 17.40 51.72 75 80 nahalli Stand

62 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

% of % of Sl. Chai Typeof Owner Total Affected Land Total Affected Str. Side District Taluk Village No. nage Asset Type Land Land Getting Structure Strcture Getting Affected Affected

15.2 LHS Mandya Maddur Mallanayaka Mini Panchayat 10.60 2.25 21.23 40 nahalli Water 76 Supply Tank 15.5 LHS Mandya Maddur Mallanayaka Mini Panchayat 17.00 4.00 23.53 00 nahalli Water 77 Supply Tank 15.5 LHS Mandya Maddur Mallanayaka Aralikatt Community 43.40 26.60 61.29 78 90 nahalli e 15.6 RHS Mandya Maddur Mallanayaka Flag 8.55 2.25 26.32 79 Pvt. Trust 1 nahalli Pole RHS Mandya Maddur Mallanayaka Mini 12.00 4.00 33.33 15.6 nahalli Water 80 Pvt. Trust 4 Supply Tank 15.6 RHS Mandya Maddur Mallanayaka Water 20.48 4.80 23.44 81 Panchayat 45 nahalli Pond RHS Mandya Maddur Mallanayaka Mini 20.00 4.00 20.00 15.6 nahalli Water 82 Panchayat 85 Supply Tank 16.0 LHS Mandya Maddur Huluganahal Hand Panchayat 11.25 2.25 20.00 83 90 li Pump 16.6 LHS Mandya Maddur Huluganahal Bus Panchayat 46.20 19.80 42.86 84 55 li Stand 17.4 RHS Tumkur Kunigal Nidasale Compou 510.00 130.00 25.49 85 Government 3 nd Wall 17.4 RHS Tumkur Kunigal Nidasale Grazing 2760 1150.00 41.67 86 Government 7 Land 17.6 RHS Tumkur Kunigal Nidasale Aralikatt 22.75 15.75 69.23 87 Community 3 e 17.7 RHS Tumkur Kunigal Nidasale Aralikatt 29.40 17.64 60.00 88 Community 2 e 17.7 RHS Tumkur Kunigal Nidasale Water 24.12 7.20 29.85 89 Panchayat 95 Tank 17.8 LHS Tumkur Kunigal Nidasale Bus Panchayat 37.95 14.85 39.13 90 35 Stand 17.9 LHS Tumkur Kunigal Nidasale Government 43.40 12.25 28.23 91 Well 00 17.9 LHS Tumkur Kunigal Nidasale Water Panchayat 20.93 2.30 10.99 92 00 Tank 17.9 RHS Tumkur Kunigal Nidasale Water 11.44 2.60 22.73 93 Panchayat 3 Tank 17.9 RHS Tumkur Kunigal Nidasale Water 1.12 0.25 22.32 94 Panchayat 3 Tap 18.0 LHS Tumkur Kunigal Nidasale Water Panchayat 14.10 2.25 15.96 95 20 Tank RHS Tumkur Kunigal Nidasale Water 26.88 4.80 17.86 96 18.1 Panchayat Tank 18.1 RHS Tumkur Kunigal Nidasale Water 6.00 1.00 16.67 97 Panchayat 5 Tap RHS Tumkur Kunigal Nidasale MWS & 14.60 4.00 27.40 18.3 98 Bore Panchayat 6 Well 18.4 LHS Tumkur Kunigal Nidasale Bore Panchayat 4.25 0.25 5.88 99 70 Well 18.5 RHS Tumkur Kunigal Nidasale Water 12.40 2.00 16.13 100 Panchayat 1 Tank 101 18.6 LHS Tumkur Kunigal Honnamach Mini Panchayat 15.00 4.00 26.67

63 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

% of % of Sl. Chai Typeof Owner Total Affected Land Total Affected Str. Side District Taluk Village No. nage Asset Type Land Land Getting Structure Strcture Getting Affected Affected

20 anahalli Water Supply Tank 18.6 LHS Tumkur Kunigal Honnamach Water Panchayat 10.73 3.00 27.97 102 25 anahalli Tank 18.6 RHS Tumkur Kunigal Honnamach Aralikatt 26.40 23.04 87.27 103 Community 25 anahalli e 18.6 LHS Tumkur Kunigal Honnamach Hand Panchayat 10.95 2.25 20.55 104 28 anahalli Pump RHS Tumkur Kunigal Honnamach Mini 16.20 4.00 24.69 18.6 anahalli Water 105 Panchayat 5 Supply Tank 18.9 LHS Tumkur Kunigal Honnamach Mini Panchayat 14.00 4.00 28.57 60 anahalli Water 106 Supply Tank 18.9 RHS Tumkur Kunigal Honnamach Water 8.60 1.00 11.63 107 Private 75 anahalli Tank 19.0 RHS Tumkur Kunigal Honnamach Water 4.50 2.00 44.44 108 Panchayat 45 anahalli Tank RHS Tumkur Kunigal Honnamach Mini 12.00 4.00 33.33 19.0 anahalli Water 109 Panchayat 5 Supply Tank 19.0 LHS Tumkur Kunigal Honnamach Water Panchayat 13.30 4.00 30.08 110 80 anahalli Tank RHS Tumkur Kunigal Honnamach Hand 6.75 2.25 33.33 111 19.1 Panchayat anahalli Pump RHS Tumkur Kunigal Honnamach Mini 14.20 4.00 28.17 19.1 anahalli Water 112 Panchayat 5 Supply Tank RHS Tumkur Kunigal Honnamach MWS & 13.75 6.25 45.45 19.1 113 anahalli Bore Panchayat 8 Well 19.2 RHS Tumkur Kunigal Honnamach Flag 6.60 1.00 15.15 114 Pvt. Trust 3 anahalli Pole 19.2 LHS Tumkur Kunigal Honnamach Water Panchayat 24.45 4.00 16.36 115 40 anahalli Tank 19.2 RHS Tumkur Kunigal Honnamach Temple 39.00 39.00 100.00 116 Community 4 anahalli 19.4 LHS Tumkur Kunigal Honnamach Flag Private 8.00 1.00 12.50 117 00 anahalli Pole RHS Tumkur Kunigal Honnamach High 300 60.00 20.00 20.2 anahalli School 118 Pvt. Trust 4 Open Plot 20.8 RHS Tumkur Kunigal Honnamach Mantapa 57.75 5.25 9.09 119 Community 6 anahalli 21.1 LHS Tumkur Kunigal Honnamach Water Private 24.00 6.00 25.00 120 35 anahalli Tank 21.8 LHS Tumkur Kunigal Honnamach Temple Private 121 00 anahalli Land

64 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Table 4- 21: Community Asset Details of link 63C (Huliyurdurga - Kunigal) Area in Sq.m

% of Affecte Total Str. Sl. Chainag Typeof Owner d Side District Taluk Village Structur Getting No. e Asset Type Strctur e Affecte e d

1 1.041 LHS Tumkur Kunigal Huliyurdurga Bore Well Panchayat 2.91 0.30 10.31 1.045 LHS Tumkur Kunigal Huliyurdurga Pump Governmen 27.50 2.50 9.09 2 House t 3 1.150 RHS Tumkur Kunigal Huliyurdurga Aralikatte Community 27.20 16.00 58.82 1.270 LHS Tumkur Kunigal Huliyurdurga Water 22.20 6.00 27.03 4 Panchayat Tank 1.320 LHS Tumkur Kunigal Huliyurdurga Compoun Governmen 1547.00 13.00 0.84 d Wall & t 5 Stone Fencing 6 2.217 LHS Tumkur Kunigal Vajara Palya Bus Stand Panchayat 52.80 13.20 25.00 2.232 RHS Tumkur Kunigal Vajara Palya Mini Panchayat 16.88 6.25 37.04 Water 7 Supply Tank 8 2.232 LHS Tumkur Kunigal Vajara Palya Shrine Community 23.13 4.38 18.92 2.310 RHS Tumkur Kunigal Vajara Palya Hand Panchayat 12.00 4.00 33.33 9 Pump 10 2.430 RHS Tumkur Kunigal Aske Hoble Aralikatte Community 67.20 28.80 42.86 2.840 LHS Tumkur Kunigal Vajara Palya Hand 13.00 4.00 30.77 11 Panchayat Pump 2.913 LHS Tumkur Kunigal Rajendrapura Temple 25.80 19.35 75.00 12 Community Farm Gate 2.990 RHS Tumkur Kunigal Rajendrapura Panchayat 20.00 2.00 10.00 13 Bore Well Farm Gate 3.500 LHS Tumkur Kunigal D Hosahalli Mini 20.80 3.20 15.38 Water 14 Panchayat Supply Tank 15 3.504 LHS Tumkur Kunigal D Hosahalli Bore Well Panchayat 6.75 1.50 22.22 3.965 RHS Tumkur Kunigal D Hosahalli Mini Panchayat 25.20 3.30 13.10 Water 16 Supply Tank 4.070 LHS Tumkur Kunigal D Hosahalli Water 16.00 6.00 37.50 17 Panchayat Tank 4.072 LHS Tumkur Kunigal D Hosahalli Mini Panchayat 24.00 9.00 37.50 Water 18 Supply Tank 19 4.115 LHS Tumkur Kunigal D Hosahalli Flag Pole Community 10.50 2.25 21.43 4.120 LHS Tumkur Kunigal D Hosahalli Hand 18.80 3.20 17.02 20 Panchayat Pump 21 4.132 RHS Tumkur Kunigal D Hosahalli Bus Stand Panchayat 42.00 24.00 57.14 4.140 RHS Tumkur Kunigal D Hosahalli Water Private 22.50 3.75 16.67 22 Tank 4.242 LHS Tumkur Kunigal D Hosahalli Hand Panchayat 13.50 2.25 16.67 23 Pump 24 4.658 LHS Tumkur Kunigal Gollarahatti Bus Stand Panchayat 80.00 7.50 9.38 25 4.668 LHS Tumkur Kunigal Kembara Palya Temple Community 45.60 16.00 35.09 5.003 LHS Tumkur Kunigal Gollarahatti Hand Panchayat 12.45 2.25 18.07 26 Pump

65 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in Sq.m

% of Affecte Total Str. Sl. Chainag Typeof Owner d Side District Taluk Village Structur Getting No. e Asset Type Strctur e Affecte e d

27 5.037 RHS Tumkur Kunigal Gollarahatti Bus Stand Panchayat 30.60 13.50 44.12 28 5.755 LHS Tumkur Kunigal Beeragonahalli Bus Stand Panchayat 58.80 7.20 12.24 6.220 RHS Tumkur Kunigal Madappanahalli Hand Panchayat 12.00 2.25 18.75 29 Pump 6.630 RHS Tumkur Kunigal Madappanahalli Mini Panchayat 78.90 9.00 11.41 Water 30 Supply Tank 7.937 RHS Tumkur Kunigal Doddamavathur Water Panchayat 7.30 1.20 16.44 31 Tank 7.996 LHS Tumkur Kunigal Doddamavathur Water 21.60 6.00 27.78 32 Panchayat Tank 8.000 LHS Tumkur Kunigal Doddamavathur Mini Panchayat 11.10 9.00 81.08 Water 33 Supply Tank 8.217 RHS Tumkur Kunigal Doddamavathur Mini Panchayat 18.00 7.50 41.67 Water 34 Supply Tank 8.302 LHS Tumkur Kunigal Doddamavathur Hand 7.50 2.25 30.00 35 Panchayat Pump 8.402 RHS Tumkur Kunigal Doddamavathur Water Panchayat 20.00 4.80 24.00 36 Tank 8.406 RHS Tumkur Kunigal Doddamavathur Mini Panchayat 15.00 9.00 60.00 Water 37 Supply Tank 9.085 LHS Tumkur Kunigal Thippaiahana Panchayat 32.86 24.80 75.47 38 Bus Stand Palya 9.093 RHS Tumkur Kunigal Thippaiahana Panchayat 14.70 1.80 12.24 39 Bore Well Palya 9.098 RHS Tumkur Kunigal Thippaiahana Community 36.00 30.00 83.33 40 Aralikatte Palya 10.967 LHS Tumkur Kunigal Kempanahalli Water Panchayat 29.25 9.00 30.77 41 Tank 42 10.980 LHS Tumkur Kunigal Kempanahalli Temple Community 121.20 6.12 5.05 11.155 RHS Tumkur Kunigal Kempanahalli Hand Panchayat 12.00 0.75 6.25 43 Pump 44 11.160 LHS Tumkur Kunigal Kempanahalli Water Tap Panchayat 5.00 1.00 20.00 11.195 RHS Tumkur Kunigal Kempanahalli Compoun Governmen 104.40 18.85 18.06 45 d Wall t 11.200 LHS Tumkur Kunigal Kempanahalli Mini 18.60 6.90 37.10 Water 46 Panchayat Supply Tank 47 11.275 LHS Tumkur Kunigal Kempanahalli Aralikatte Community 38.15 21.35 55.96 11.292 LHS Tumkur Kunigal Kempanahalli Mini Panchayat 18.90 6.60 34.92 Water 48 Supply Tank 49 11.302 LHS Tumkur Kunigal Kempanahalli Temple Community 23.10 6.65 28.79 11.325 RHS Tumkur Kunigal Kempanahalli Water Panchayat 17.75 3.50 19.72 50 Tank 12.270 LHS Tumkur Kunigal Santhemavathur Mini Panchayat 20.10 6.90 34.33 51 Water

66 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in Sq.m

% of Affecte Total Str. Sl. Chainag Typeof Owner d Side District Taluk Village Structur Getting No. e Asset Type Strctur e Affecte e d

Supply Tank 52 12.31 RHS Tumkur Kunigal Santhemavathur Water Tap Panchayat 5.50 1.00 18.18 53 12.450 LHS Tumkur Kunigal Santhemavathur Flag Pole Community 7.00 1.00 14.29 54 12.510 RHS Tumkur Kunigal Santhemavathur Water Tap Panchayat 3.20 0.25 7.81 55 12.560 LHS Tumkur Kunigal Santhemavathur Water Tap Panchayat 1.56 0.04 2.56 12.560 LHS Tumkur Kunigal Santhemavathur Water 26.86 0.34 1.27 56 Panchayat Tank 57 12.595 RHS Tumkur Kunigal Santhemavathur Water Tap Panchayat 3.20 0.25 7.81 12.883 LHS Tumkur Kunigal Santhemavathur Water 28.70 6.30 21.95 58 Community Tank 59 12.900 RHS Tumkur Kunigal Santhemavathur Water Tap Panchayat 5.30 0.25 4.72 12.940 RHS Tumkur Kunigal Santhemavathur Water Panchayat 17.60 4.00 22.73 60 Tank 12.985 RHS Tumkur Kunigal Santhemavathur Mini Panchayat 17.60 4.00 22.73 Water 61 Supply Tank 12.987 LHS Tumkur Kunigal Santhemavathur Compoun Governmen 126.00 6.00 4.76 62 d Wall t 13.010 LHS Tumkur Kunigal Santhemavathur Water Community 37.80 0.70 1.85 63 Tank 13.915 RHS Tumkur Kunigal Santhemavathur Mini Panchayat 10.00 4.00 40.00 Water 64 Supply Tank 65 13.920 RHS Tumkur Kunigal Santhemavathur Bore Well Panchayat 7.50 2.25 30.00 14.030 LHS Tumkur Tumkur Vajara Palya Water 37.10 7.00 18.87 66 Private Tank 67 14.340 RHS Tumkur Kunigal Vajara Palya Aralikatte Community 40.00 5.00 12.50 68 14.342 LHS Tumkur Kunigal Vajara Palya Temple Community 42.00 18.00 42.86 14.355 RHS Tumkur Kunigal Vajara Palya Hand 13.50 2.25 16.67 69 Panchayat Pump 14.360 RHS Tumkur Kunigal Vajara Palya Mini Panchayat 25.50 9.00 35.29 Water 70 Supply Tank 15.045 RHS Tumkur Kunigal T Hosahalli Water 24.00 4.50 18.75 71 Panchayat Tank 15.050 RHS Tumkur Kunigal T Hosahalli Water Panchayat 3.50 0.75 21.43 72 Pipe 15.060 RHS Tumkur Kunigal T Hosahalli Mini 18.00 9.00 50.00 Water 73 Panchayat Supply Tank 74 15.070 RHS Tumkur Kunigal T Hosahalli Bore Well Panchayat 3.65 0.75 20.55 15.080 RHS Tumkur Kunigal T Hosahalli Mini Panchayat 16.00 4.00 25.00 Water 75 Supply Tank 15.190 LHS Tumkur Kunigal T Hosahalli Water 24.50 5.25 21.43 76 Panchayat Tank 15.255 LHS Tumkur Kunigal T Hosahalli Mini 21.00 9.00 42.86 77 Panchayat Water

67 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in Sq.m

% of Affecte Total Str. Sl. Chainag Typeof Owner d Side District Taluk Village Structur Getting No. e Asset Type Strctur e Affecte e d

Supply Tank 15.260 LHS Tumkur Kunigal T Hosahalli Water 22.50 9.00 40.00 78 Panchayat Tank 79 15.360 RHS Tumkur Kunigal Nanda Gokula Aralikatte Community 40.00 6.00 15.00 15.530 LHS Tumkur Kunigal Nanda Gokula Mini Panchayat 27.60 5.40 19.57 Water 80 Supply Tank 15.560 RHS Tumkur Kunigal Mini Panchayat Water 81 Supply Tank 15.625 RHS Tumkur Kunigal Nanda Gokula Hand Panchayat 2.85 0.25 8.77 82 Pump 17.310 LHS Tumkur Kunigal Giri Gowdana Community 21.60 9.00 41.67 83 Temple Palya 84 18.910 LHS Tumkur Kunigal Gavimata Temple Community 144.40 0.00 85 19.380 RHS Tumkur Kunigal Kothipura Bore Well Panchayat 3.75 0.25 6.67 86 19.450 RHS Tumkur Kunigal Gavimata Water Tap Panchayat 8.50 1.00 11.76 19.590 RHS Tumkur Kunigal Kothipura Mini Panchayat 27.60 3.90 14.13 Water 87 Supply Tank 19.832 RHS Tumkur Kunigal Kothipura Mini Panchayat 14.00 4.00 28.57 Water 88 Supply Tank 19.980 RHS Tumkur Kunigal Kothipura Mini Panchayat 24.00 9.00 37.50 Water 89 Supply Tank 20.030 RHS Tumkur Kunigal Kothipura Mini Panchayat 18.40 3.60 19.57 Water 90 Supply Tank 91 20.035 RHS Tumkur Kunigal Kothipura Bore Well Panchayat 4.00 0.25 6.25 20.075 RHS Tumkur Kunigal Kothipura Water Panchayat 32.90 2.80 8.51 92 Tank 93 20.095 LHS Tumkur Kunigal Kothipura Aralikatte Community 43.05 31.50 73.17

68 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Table 4- 22: Community Asset Details of link 63D (Kunigal - Tumkur) Area in Sq.m

% of Total Affecte Str. Typeof Owner Sl. No. Chainage Side District Taluk Village Structur d Getting Asset Type e Strcture Affecte d

1 0.001 LHS Tumkur Kunigal Kunigal Temple Public Trust 0.00 57.75 0.120 RHS Tumkur Kunigal Kunigal Church 23.70 0.30 1.27 2 Compoun Community d Wall 3 0.269 LHS Tumkur Kunigal Kunigal Aralikatte Community 26.46 11.34 42.86 4 0.274 LHS Tumkur Kunigal Kunigal Aralikatte Community 7.00 1.00 14.29 5 0.277 LHS Tumkur Kunigal Kunigal Aralikatte Community 18.90 8.10 42.86 0.280 LHS Tumkur Kunigal Kunigal Water Community 14.00 3.00 21.43 6 Tank & Tap 7 0.338 RHS Tumkur Kunigal Kunigal Flag Pole Community 4.50 1.00 22.22 8 0.416 LHS Tumkur Kunigal Kunigal Temple Community 66.00 4.40 6.67 9 0.501 RHS Tumkur Kunigal Kunigal Aralikatte Community 27.30 24.70 90.48 10 2.295 LHS Tumkur Kunigal Kothagere Aralikatte Community 22.50 9.00 40.00 11 2.305 LHS Tumkur Kunigal Kothagere Aralikatte Community 32.50 23.00 70.77 2.415 LHS Tumkur Kunigal Kothagere Revenue Governmen 116.16 34.24 29.48 12 Office t 2.435 LHS Tumkur Kunigal Kothagere Mini 23.63 6.25 26.46 Water 13 Panchayat Supply Tank 2.500 LHS Tumkur Kunigal Kothagere Hand 12.00 0.75 6.25 14 Panchayat Pump 2.997 RHS Tumkur Kunigal Kothagere Mini 14.70 7.84 53.33 Palya Water 15 Panchayat Supply Tank 3.012 LHS Tumkur Kunigal Kothagere Temple 46.94 22.37 47.65 16 Community Palya 3.085 RHS Tumkur Kunigal Kothagere Panchayat 35.10 16.20 46.15 17 Bus Stand Palya 3.135 LHS Tumkur Kunigal Kothagere Mini 23.40 9.00 38.46 Palya Water 18 Panchayat Supply Tank 3.206 LHS Tumkur Kunigal Kothagere Hand 4.50 0.25 5.56 19 Panchayat Palya Pump 3.263 LHS Tumkur Kunigal Kothagere Water Tap 1.10 0.10 9.09 20 Panchayat Palya 3.350 LHS Tumkur Kunigal Kothagere Water Tap 1.34 0.10 7.46 21 Panchayat Palya 3.398 LHS Tumkur Kunigal Kothagere Water Tap 0.54 0.02 3.70 22 Panchayat Palya 3.450 LHS Tumkur Kunigal Kothagere Water Tap 2.68 0.05 1.87 23 Panchayat Palya 3.980 LHS Tumkur Kunigal Kothagere Mini 28.22 9.18 32.53 Palya Water 24 Panchayat Supply Tank 4.193 RHS Tumkur Kunigal Chigani Palya Mini Panchayat 17.10 4.00 23.39 Water 25 Supply Tank

69 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in Sq.m

% of Total Affecte Str. Typeof Owner Sl. No. Chainage Side District Taluk Village Structur d Getting Asset Type e Strcture Affecte d

26 4.241 RHS Tumkur Kunigal Chigani Palya Water Tap Panchayat 0.84 0.03 3.57 4.259 RHS Tumkur Kunigal Chigani Palya Hand Panchayat 7.80 1.00 12.82 27 Pump 28 4.278 RHS Tumkur Kunigal Chigani Palya Water Tap Panchayat 1.72 0.02 1.16 29 4.280 LHS Tumkur Kunigal Chigani Palya Aralikatte Community 54.39 43.61 80.18 30 4.281 RHS Tumkur Kunigal Chigani Palya Bus Stand Panchayat 44.55 16.20 36.36 4.322 RHS Tumkur Kunigal Chigani Palya Mini 17.20 0.80 4.65 Water 31 Panchayat Supply Tank 32 4.329 RHS Tumkur Kunigal Chigani Palya Bore Well Panchayat 0.75 0.03 4.00 4.331 RHS Tumkur Kunigal Chigani Palya Water Panchayat 16.20 1.80 11.11 33 Tank 34 4.333 RHS Tumkur Kunigal Chigani Palya Water Tap Panchayat 1.48 0.02 1.35 4.690 LHS Tumkur Kunigal Chigani Palya Hand 9.45 1.00 10.58 35 Panchayat Pump 5.070 LHS Tumkur Kunigal Honnenahalli Hand 7.00 1.00 14.29 36 Panchayat Pump 37 5.097 LHS Tumkur Kunigal Honnenahalli Bus Stand Panchayat 45.10 1.65 3.66 5.397 LHS Tumkur Kunigal Honnenahalli Mini 12.10 4.00 33.06 Water 38 Panchayat Supply Tank 5.553 LHS Tumkur Kunigal Honnenahalli Hand 5.75 0.25 4.35 39 Panchayat Pump 40 5.565 LHS Tumkur Kunigal Honnenahalli Water Tap Panchayat 1.92 0.09 4.69 6.047 LHS Tumkur Kunigal Kurudihalli Water Governmen 35.33 13.50 38.22 41 Tank t 6.132 LHS Tumkur Kunigal Kurudihalli Arch 53.63 5.50 10.26 42 Community Palya 6.153 RHS Tumkur Kunigal Kurudahalli Bus Stand 38.50 6.50 16.88 43 Panchayat Palya 44 6.521 RHS Tumkur Kunigal Kurudihalli Water Tap Panchayat 2.31 0.06 2.60 6.609 RHS Tumkur Kunigal Kurudihalli Hand 9.00 2.25 25.00 45 Panchayat Pump 46 6.626 RHS Tumkur Kunigal Kurudihalli Bus Stand Panchayat 37.75 12.00 31.79 6.815 RHS Tumkur Kunigal Kurudihalli Water Panchayat 21.00 0.60 2.86 47 Tank 48 6.824 RHS Tumkur Kunigal Kurudihalli Bore Well Panchayat 6.35 0.10 1.57 6.826 RHS Tumkur Kunigal Kurudihalli Mini Panchayat 13.80 4.00 28.99 Water 49 Supply Tank 50 6.831 RHS Tumkur Kunigal Kurudihalli Water Tap Panchayat 1.24 0.06 4.84 51 7.060 RHS Tumkur Kunigal Kurudihalli Water Tap Panchayat 2.75 0.25 9.09 52 7.253 RHS Tumkur Kunigal Kurudihalli Water Tap Panchayat 9.00 2.25 25.00 8.263 LHS Tumkur Kunigal Baktharahalli Water 21.00 4.00 19.05 53 Panchayat Shed 54 8.267 LHS Tumkur Kunigal Baktharahalli Bore Well Panchayat 3.85 0.25 6.49 8.270 LHS Tumkur Kunigal Baktharahalli Mini 11.63 2.25 19.35 55 Water Panchayat Supply

70 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in Sq.m

% of Total Affecte Str. Typeof Owner Sl. No. Chainage Side District Taluk Village Structur d Getting Asset Type e Strcture Affecte d

Tank 8.790 RHS Tumkur Kunigal Halaganahalli Local Community 14.26 5.29 37.10 56 Slabs 57 8.795 RHS Tumkur Kunigal Halaganahalli Bus Stand Panchayat 56.00 5.60 10.00 9.177 RHS Tumkur Kunigal Halaganahalli Mini Panchayat 20.70 9.00 43.48 Water 58 Supply Tank 9.315 RHS Tumkur Kunigal Halaganahalli Water 21.90 0.60 2.74 59 Tank, Panchayat Plarform 9.473 LHS Kunigal Halagonahalli Mini 21.00 2.00 9.52 Tumkur Water 60 Panchayat Supply Tank 9.737 LHS Tumkur Kunigal Halagonahalli Mini 10.00 4.00 40.00 Water 61 Panchayat Supply Tank 62 9.773 LHS Tumkur Kunigal Halagonahalli Bore Well Panchayat 2.10 0.09 4.29 9.923 LHS Tumkur Kunigal Chikka Aralikatte 40.88 16.80 41.10 63 Community Malalawadi 9.930 LHS Tumkur Kunigal Chikka Temple 24.30 8.70 35.80 64 Community Malalawadi 9.950 LHS Tumkur Kunigal Chikka Washing 49.29 9.30 18.87 65 Community Malalawadi Platform 9.956 LHS Tumkur Kunigal Chikka Water Tap 11.70 2.25 19.23 66 Panchayat Malalawadi 10.010 LHS Tumkur Kunigal Chikka Hand 3.25 0.25 7.69 67 Panchayat Malalawadi Pump 10.080 RHS Tumkur Kunigal Chikka Pvt. Trust 31.00 1.00 3.23 68 Flag Pole Malalawadi 10.194 RHS Tumkur Kunigal Chikka Panchayat 3.10 0.25 8.06 69 Water Tap Malalawadi 10.238 LHS Tumkur Kunigal Chikka Bore Well 11.20 3.00 26.79 70 Panchayat Malalawadi 10.250 LHS Tumkur Kunigal Chikka Water 8.48 2.08 24.53 71 Malalawadi Tank & Panchayat Tap 10.258 LHS Tumkur Kunigal Chikka Hand 3.20 0.25 7.81 72 Panchayat Malalawadi Pump 10.400 LHS Tumkur Kunigal Chikka Water 9.00 4.00 44.44 73 Malalawadi Supply Panchayat Valve 10.430 LHS Tumkur Kunigal Chikka Water 9.00 4.00 44.44 74 Malalawadi Supply Panchayat Valve 10.443 LHS Tumkur Kunigal Chikka Washing 54.94 13.40 24.39 Malalawadi Platform, 75 Water Panchayat Tank & Water Tap 10.493 LHS Tumkur Kunigal Chikka Water 24.00 6.00 25.00 76 Panchayat Malalawadi Tank 10.497 LHS Tumkur Kunigal Chikka Water Tap 8.60 1.00 11.63 77 Panchayat Malalawadi 78 10.497 LHS Tumkur Kunigal Chikka Hand Panchayat 4.70 0.25 5.32

71 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in Sq.m

% of Total Affecte Str. Typeof Owner Sl. No. Chainage Side District Taluk Village Structur d Getting Asset Type e Strcture Affecte d

Malalawadi Pump 79 11.000 RHS Tumkur Kunigal Kallu Palya Bus Stand Panchayat 47.70 10.60 22.22 11.688 LHS Tumkur Kunigal Bannimarada Water 30.00 3.00 10.00 80 Panchayat Katte Tank 11.693 LHS Tumkur Tumkur Bannimarada Mini 13.40 4.00 29.85 Katte Water 81 Panchayat Supply Tank 11.695 LHS Tumkur Tumkur Bannimarada Bore Well 5.25 0.10 1.90 82 Panchayat Katte 11.978 LHS Tumkur Tumkur Bannimarada Bus Stand 45.50 16.25 35.71 83 Panchayat Katte 12.000 RHS Tumkur Tumkur Bannimarada Hand 9.00 1.00 11.11 84 Panchayat Katte Pump 12.002 RHS Tumkur Tumkur Bannimarada Mini Panchayat 24.00 9.00 37.50 Katte Water 85 Supply Tank 12.038 LHS Tumkur Tumkur Bannimarada Temple 60.59 22.41 36.99 86 Community Katte 12.302 LHS Tumkur Tumkur Bannimarada Hand 5.25 0.25 4.76 87 Panchayat Katte Pump 88 14.030 LHS Tumkur Tumkur Hebbur Temple Community 17.55 4.95 28.21 14.040 LHS Tumkur Tumkur Hebbur Hand 3.95 0.25 6.33 89 Panchayat Pump 14.070 RHS Tumkur Tumkur Hebbur Mini Panchayat 19.80 8.70 43.94 Water 90 Supply Tank 91 14.120 LHS Tumkur Tumkur Hebbur Bore Well Panchayat 8.80 0.50 5.68 92 14.140 RHS Tumkur Tumkur Hebbur Water Tap Panchayat 9.60 2.25 23.44 14.174 RHS Tumkur Tumkur Hebbur Mini Panchayat 20.40 8.10 39.71 Water 93 Supply Tank 14.210 RHS Tumkur Tumkur Hebbur Mini Panchayat 15.70 2.30 14.65 Water 94 Supply Tank 95 14.215 RHS Tumkur Tumkur Hebbur Bore Well Panchayat 8.50 0.20 2.35 14.253 RHS Tumkur Tumkur Hebbur Hand Panchayat 2.55 0.09 3.53 96 Pump 14.287 RHS Tumkur Tumkur Hebbur Mini Panchayat 22.05 4.95 22.45 Water 97 Supply Tank 14.370 RHS Tumkur Tumkur Hebbur Mini Panchayat 19.05 7.95 41.73 Water 98 Supply Tank 99 14.476 LHS Tumkur Tumkur Hebbur Water Tap Panchayat 4.50 0.05 1.11 14.937 RHS Tumkur Tumkur Hebbur Water Panchayat 25.65 4.35 16.96 100 Tank 101 15.282 RHS Tumkur Tumkur Hebbur Water Tap Panchayat 2.10 0.03 1.43 102 15.312 RHS Tumkur Tumkur Hebbur Hand Panchayat 10.95 0.30 2.74

72 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in Sq.m

% of Total Affecte Str. Typeof Owner Sl. No. Chainage Side District Taluk Village Structur d Getting Asset Type e Strcture Affecte d

Pump 16.292 LHS Tumkur Tumkur Hebbur Aralikatte 67.00 43.00 64.18 103 Community Amanikere 16.360 RHS Tumkur Tumkur Kudipalya Hand Panchayat 2.49 0.09 3.61 104 Pump 16.487 RHS Tumkur Tumkur Kudipalya Mini 21.75 9.00 41.38 Water 105 Panchayat Supply Tank 16.490 RHS Tumkur Tumkur Kudipalya Water Panchayat 23.25 4.80 20.65 106 Tank 107 16.660 LHS Tumkur Tumkur Kodipalya Shrine Community 5.80 5.20 89.66 108 16.660 LHS Tumkur Tumkur Kodipalya Shrine Panchayat 16.00 4.00 25.00 16.775 RHS Tumkur Tumkur Kudipalya Mini Panchayat 18.90 9.00 47.62 Water 109 Supply Tank 110 16.847 LHS Tumkur Tumkur Kodipalya Bus Stand Panchayat 40.00 15.00 37.50 17.330 RHS Tumkur Tumkur Doddaiah Panchayat 30.60 9.00 29.41 111 Well Kattan Palya 17.365 RHS Tumkur Tumkur Doddaiah Panchayat 56.88 29.25 51.43 112 Aralikatte Kattan Palya 17.518 RHS Tumkur Tumkur Doddaiah Hand Panchayat 11.25 2.25 20.00 113 Kattan Palya Pump 17.740 LHS Tumkur Tumkur Doddaiah Mini 14.70 1.80 12.24 Kattan Palya Water 114 Panchayat Supply Tank 17.743 LHS Tumkur Tumkur Doddaiah Bore Well 8.47 0.11 1.30 115 Panchayat Kattan Palya 116 18.987 LHS Tumkur Tumkur Balagere Bus Stand Panchayat 44.55 2.70 6.06 117 19.08 RHS Tumkur Tumkur Balagere Water Tap Panchayat 3.60 0.25 6.94 118 19.320 RHS Tumkur Tumkur Balagere Water Tap Panchayat 27.00 1.50 5.56 119 19.347 RHS Tumkur Tumkur Balagere Bore Well Panchayat 1.46 0.04 2.74 19.353 RHS Tumkur Tumkur Balagere Mini 16.00 3.00 18.75 Water 120 Panchayat Supply Tank 19.395 RHS Tumkur Tumkur Balagere Hand 7.70 1.10 14.29 121 Panchayat Pump 19.410 RHS Tumkur Tumkur Balagere Mini Panchayat 16.20 9.00 55.56 Water 122 Supply Tank 123 19.490 LHS Tumkur Tumkur Balagere Water Tap Panchayat 3.55 0.25 7.04 19.586 LHS Tumkur Tumkur Balagere Hand 10.20 2.25 22.06 124 Panchayat Pump 19.590 LHS Tumkur Tumkur Balagere Mini 21.00 6.00 28.57 Water 125 Panchayat Supply Tank 19.670 LHS Tumkur Tumkur Balagere Water 6.20 2.00 32.26 126 Supply Panchayat Valve

73 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in Sq.m

% of Total Affecte Str. Typeof Owner Sl. No. Chainage Side District Taluk Village Structur d Getting Asset Type e Strcture Affecte d

19.690 LHS Tumkur Tumkur Balagere Mini 13.00 4.00 30.77 Water 127 Panchayat Supply Tank 19.692 LHS Tumkur Tumkur Balagere Stone Governmen 256.50 66.50 25.93 128 Fencing t 19.800 LHS Tumkur Tumkur Balagere Water 17.40 2.10 12.07 129 Panchayat Tank 19.862 LHS Tumkur Tumkur Balagere Stone 142.50 18.75 13.16 130 Panchayat Fencing 19.920 LHS Tumkur Tumkur Balagere Mini 18.55 12.25 66.04 Water 131 Panchayat Supply Tank 132 20.000 RHS Tumkur Tumkur Balagere Well Community 21.75 9.00 41.38 20.375 LHS Tumkur Tumkur Balagere Mini 27.13 7.88 29.03 Water 133 Panchayat Supply Tank 20.438 RHS Tumkur Tumkur Balagere Hand Panchayat 4.35 0.25 5.75 134 Pump 20.450 LHS Tumkur Tumkur Balagere Water 19.75 2.50 12.66 135 Panchayat Tank 20.580 RHS Tumkur Tumkur Balagere Mini Panchayat 26.25 12.25 46.67 Water 136 Supply Tank 20.727 LHS Tumkur Tumkur Hanumantha Aralikatte 24.75 2.75 11.11 137 Community Nagar 20.730 RHS Tumkur Tumkur Hanumantha Panchayat 1.44 0.02 1.39 138 Water Tap Nagar 139 22.365 RHS Tumkur Tumkur Nagavalli Samadhi Community 585.00 90.00 15.38 22.767 RHS Tumkur Tumkur Nagavalli Stone Governmen 169.10 20.90 12.36 140 Fencing t Park 141 22.780 LHS Tumkur Tumkur Nagavalli Bus Stand Panchayat 50.53 5.27 10.43 142 22.805 LHS Tumkur Tumkur Nagavalli Flag Pole Community 7.00 3.00 42.86 22.890 RHS Tumkur Tumkur Nagavalli Compoun Governmen 1196.25 217.50 18.18 143 d Wall t 144 23.005 LHS Tumkur Tumkur Nagavalli Water Tap Panchayat 1.74 0.06 3.45 23.130 RHS Tumkur Tumkur Nagavalli Hand Panchayat 2.61 0.09 3.45 145 Pump 23.203 RHS Tumkur Tumkur Nagavalli Pump 21.45 7.05 32.87 146 Panchayat House 147 23.206 RHS Tumkur Tumkur Nagavalli Bore Well Panchayat 2.16 0.15 6.94 148 23.239 LHS Tumkur Tumkur Nagavalli Water Tap Panchayat 1.80 0.09 5.00 23.420 RHS Tumkur Tumkur Nagavalli Water 28.00 8.00 28.57 149 Panchayat Tank 24.192 LHS Tumkur Tumkur Ranganathpur Bus Stand 42.00 2.00 4.76 150 Panchayat a 25.483 RHS Tumkur Tumkur Banawara Water 19.40 2.00 10.31 151 Private Tank 26.585 RHS Tumkur Tumkur M G Palya Hand Panchayat 10.80 2.25 20.83 152 Pump 153 26.635 LHS Tumkur Tumkur M G Palya Bus Stand Panchayat 36.04 21.20 58.82

74 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in Sq.m

% of Total Affecte Str. Typeof Owner Sl. No. Chainage Side District Taluk Village Structur d Getting Asset Type e Strcture Affecte d

27.080 RHS Tumkur Tumkur M G Palya Water 23.50 0.50 2.13 154 Private Tank 27.473 LHS Tumkur Tumkur Akkatangiyara Water 21.60 0.40 1.85 155 Panchayat Kavalu Tank 27.740 LHS Tumkur Tumkur Honnudike Shrine 2.36 0.04 1.69 156 Private Hand Post 28.330 RHS Tumkur Tumkur Honnudike Mini Panchayat 19.60 4.00 20.41 Hand Post Water 157 Supply Tank 28.332 RHS Tumkur Tumkur Honnudike Bore Well 2.56 0.04 1.56 158 Panchayat Hand Post 28.786 LHS Tumkur Tumkur Honnudike Mini 24.90 9.00 36.14 Hand Post Water 159 Panchayat Supply Tank 28.938 LHS Tumkur Tumkur Honnudike Shrine 7.70 1.00 12.99 160 Private Hand Post 29.052 LHS Tumkur Tumkur Honnudike Water Tap 0.45 0.03 6.67 161 Panchayat Hand Post 29.120 RHS Tumkur Tumkur Honnudike Circle Governmen 78.75 56.25 71.43 162 Hand Post t 29.136 RHS Tumkur Tumkur Honnudike Public Trust 12.80 4.00 31.25 163 Flag Pole Hand Post 29.173 RHS Tumkur Tumkur Honnudike Basement 16.00 2.00 12.50 164 Private Hand Post 29.590 LHS Tumkur Tumkur Honnudike Mini 36.90 8.10 21.95 Hand Post Water 165 Panchayat Supply Tank 29.600 LHS Tumkur Tumkur Honnudike Mosque 133.50 30.50 22.85 166 Pvt. Trust Hand Post 29.650 LHS Tumkur Tumkur Honnudike Temple 21.25 6.25 29.41 167 Community Hand Post 29.790 RHS Tumkur Tumkur Honnudike Water 18.00 3.00 16.67 168 Private Hand Post Tank 29.837 LHS Tumkur Tumkur Honnudike Bus Stand 28.20 11.80 41.84 169 Panchayat Hand Post 170 30.650 LHS Tumkur Tumkur Gulur Bus Stand Panchayat 57.04 17.36 30.43 171 30.670 LHS Tumkur Tumkur Gulur Temple Panchayat 21.25 5.00 23.53 31.695 RHS Tumkur Tumkur Gulur Water 19.80 2.00 10.10 172 Private Tank 173 31.923 LHS Tumkur Tumkur Gulur Bore Well Panchayat 1.06 0.10 9.43 31.928 LHS Tumkur Tumkur Gulur Mini 10.00 2.00 20.00 Water 174 Panchayat Supply Tank 175 32.580 LHS Tumkur Tumkur Gulur Aralikatte Community 69.85 50.80 72.73 32.590 RHS Tumkur Tumkur Gulur Hand Panchayat 12.75 1.50 11.76 176 Pump 32.593 LHS Tumkur Tumkur Gulur Water 12.00 7.00 58.33 177 Panchayat Tank 32.596 LHS Tumkur Tumkur Gulur Mini 19.00 4.75 25.00 Water 178 Panchayat Supply Tank

75 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in Sq.m

% of Total Affecte Str. Typeof Owner Sl. No. Chainage Side District Taluk Village Structur d Getting Asset Type e Strcture Affecte d

179 32.627 RHS Tumkur Tumkur Gulur Water Tap Private 7.80 1.00 12.82 180 32.678 LHS Tumkur Tumkur Gulur Temple Panchayat 18.90 12.00 63.49 181 32.684 LHS Tumkur Tumkur Gulur Bus Stand Panchayat 48.00 12.00 25.00 32.710 RHS Tumkur Tumkur Gulur Governmen 0.00 16.00 182 Circle t 32.795 RHS Tumkur Tumkur Gulur Water Panchayat 21.83 0.37 1.69 183 Tank 32.955 RHS Tumkur Tumkur Gulur Water Panchayat 23.60 4.40 18.64 184 Tank 185 32.993 RHS Tumkur Tumkur Gulur Bore Well Panchayat 8.70 2.25 25.86 32.993 RHS Tumkur Tumkur Gulur Mini 12.00 1.50 12.50 Water 186 Panchayat Supply Tank 187 33.004 RHS Tumkur Tumkur Gulur Temple Community 47.50 40.00 84.21

Table 4- 23: Community Asset Details of link 63E (Tumkur - Koratagere) Area in

Sq.m

% of % of Tot Land Affec Str. Affec Total Sl. Chaina Distr Typeof Owner al Getti ted Getti Side Taluk Village ted Struct No. ge ict Asset Type La ng Strct ng Land ure nd Affec ure Affec ted ted

0.000 RHS Tum Tumku Sira Gate Aralikatt Commu 73.92 36.12 48.86 1 kur r e nity 0.000 LHS Tum Tumku Sira Gate Temple Commu 62.00 15.50 25.00 2 kur r nity 0.740 RHS Tum Tumku Antharasan Bore Govern 8.00 1.00 12.50 3 kur r ahalli Well ment 0.880 LHS Tum Tumku Antharasan Govern 266 2660. 100.0 Govern 4 kur r ahalli ment 0 00 0 ment Land 2.080 LHS Tum Tumku Antharasan Temple Commu 68.04 5.04 7.41 5 kur r ahalli nity 4.960 RHS Tum Tumku Arakere Commu 3.10 0.25 8.06 6 Hundi kur r nity 5.895 RHS Tum Tumku Amalapur Bus Panchay 47.78 14.70 30.77 7 kur r Stand at 5.900 RHS Tum Tumku Amalapur Aralikatt Commu 123.00 9.00 7.32 8 kur r e nity 5.915 RHS Tum Tumku Amalapur Hand Panchay 16.20 2.25 13.89 9 kur r Pump at 6.750 RHS Tum Tumku Hosahalli Temple Commu 73.14 11.66 15.94 10 kur r nity 6.980 RHS Tum Tumku Hosahalli Water Panchay 8.70 1.00 11.49 11 kur r Tap at 6.981 RHS Tum Tumku Hosahalli Water Panchay 20.80 1.00 4.81 12 kur r Pond at

76 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in

Sq.m

% of % of Tot Land Affec Str. Affec Total Sl. Chaina Distr Typeof Owner al Getti ted Getti Side Taluk Village ted Struct No. ge ict Asset Type La ng Strct ng Land ure nd Affec ure Affec ted ted

7.760 RHS Tum Tumku Lingapur MWS & 20.70 4.00 19.32 Panchay 13 kur r Bore at Well 7.890 RHS Tum Tumku Lingapur MWS & 34.65 13.50 38.96 Panchay 14 kur r Bore at Well 8.165 RHS Tum Tumku Gerahalli Hand Panchay 8.55 2.25 26.32 15 kur r Pump at 8.390 LHS Tum Tumku Lingapur Hand Panchay 12.00 2.25 18.75 16 kur r Pump at 10.000 RHS Tum Tumku Obalapur Bore Panchay 4.25 0.25 5.88 17 kur r Well at 12.590 RHS Tum Tumku Beladhara MWS & 15.40 4.00 25.97 Panchay 18 kur r Bore at Well 12.995 LHS Tum Tumku Beladhara Water Panchay 2.40 0.25 10.42 19 kur r Tap at 13.125 RHS Tum Tumku Beladhara Bore Panchay 5.90 1.00 16.95 20 kur r Well at 13.520 LHS Tum Tumku Beladhara Water Panchay 4.70 0.25 5.32 21 kur r Tap at 13.540 LHS Tum Tumku Beladhara Aralikatt Commu 108.16 6.24 5.77 22 kur r e nity 13.740 RHS Tum Tumku Beladhara Bus Panchay 40.80 15.84 38.82 23 kur r Stand at 14.650 RHS Tum Tumku Beladhara Bore Panchay 54.60 0.25 0.46 24 kur r Well at 14.870 LHS Tum Tumku Hanumanth Mallaga 48.80 8.00 16.39 Commu 25 kur r agiri mba nity Mantapa 15.045 LHS Tum Tumku Hanumanth Mini Panchay 18.80 4.00 21.28 kur r agiri Water at 26 Supply Tank 15.985 LHS Tum Korata Tharati Water Panchay 4.60 0.25 5.43 27 kur gere Tap at 16.040 LHS Tum Korata Tharati Mini Panchay 17.20 4.00 23.26 kur gere Water at 28 Supply Tank 16.700 LHS Tum Korata Tharati Commu 59.63 3.38 5.66 29 Temple kur gere nity 16.730 LHS Tum Korata Tharati Aralikatt Commu 29.23 10.50 35.93 30 kur gere e nity 16.734 LHS Tum Korata Tharati Commu 23.75 6.25 26.32 31 Temple kur gere nity 16.735 LHS Tum Korata Tharati Hand Panchay 11.25 2.25 20.00 32 kur gere Pump at 17.510 LHS Tum Korata Tharati Bore Panchay 2.95 0.25 8.47 33 kur gere Well at 17.700 RHS Tum Korata Agrahara Bore Panchay 4.00 0.25 6.25 34 kur gere Well at 18.420 LHS Tum Korata Agrahara Compou Panchay 427.00 77.00 18.03 35 kur gere nd Wall at 18.800 LHS Tum Korata Agrahara Water Panchay 26.24 4.80 18.29 36 kur gere Pond at 37 18.940 RHS Tum Korata Agrahara Hand Panchay 13.95 2.25 16.13

77 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in

Sq.m

% of % of Tot Land Affec Str. Affec Total Sl. Chaina Distr Typeof Owner al Getti ted Getti Side Taluk Village ted Struct No. ge ict Asset Type La ng Strct ng Land ure nd Affec ure Affec ted ted

kur gere Pump at 19.360 RHS Tum Korata Mantapa Commu 33.25 25.00 75.19 38 kur gere nity 19.620 RHS Tum Korata Agrahara Govern 152 3440. Govern 39 kur gere ment 0 00 ment Land 20.580 RHS Tum Korata Jampenahal Bus Panchay 37.00 13.50 36.49 40 kur gere li Stand at 20.620 RHS Tum Korata Jampenahal Mini 20.40 4.00 19.61 kur gere li Water Panchay 41 Supply at Tank 20.740 RHS Tum Korata Jampenahal Hand Panchay 7.80 2.25 28.85 42 kur gere li Pump at 20.835 LHS Tum Korata Jampenahal Bore Panchay 16.80 4.00 23.81 43 kur gere li Well at 21.020 RHS Tum Korata Jampenahal Mini Panchay 17.00 4.00 23.53 kur gere li Water at 44 Supply Tank 21.210 RHS Tum Korata Jampenahal Mini Panchay 17.00 4.00 23.53 kur gere li Water at 45 Supply Tank 21.265 LHS Tum Korata Jampenahal Hand Panchay 10.80 2.25 20.83 46 kur gere li Pump at 21.610 LHS Tum Korata Jampenahal MWS & Panchay 16.88 6.25 37.04 47 kur gere li Bore at Well 21.950 RHS Tum Korata Hanumanth Water Panchay 3.40 0.25 7.35 48 kur gere apur Tap at 22.310 RHS Tum Korata Hanumanth Water Panchay 3.90 0.25 6.41 49 kur gere apur Tap at 22.335 RHS Tum Korata Hanumanth Bore Panchay 4.25 0.25 5.88 50 kur gere apur Well at 23.030 RHS Tum Korata Koratagere Mini Panchay 17.00 4.00 23.53 kur gere Water at 51 Supply Tank 23.540 LHS Tum Korata Koratagere Water Panchay 2.50 0.25 10.00 52 kur gere Tap at 23.620 RHS Tum Korata Koratagere Post 116.25 7.75 6.67 kur gere Office Govern 53 Compou ment nd Wall 23.700 LHS Tum Korata Koratagere Bus Panchay 34.93 16.50 47.24 54 kur gere Stand at 23.707 LHS Tum Korata Koratagere Mini 14.70 4.00 27.21 kur gere Water Panchay 55 Supply at Tank 23.800 RHS Tum Korata Koratagere Aralikatt Commu 40.66 6.35 15.61 56 kur gere e nity 23.805 RHS Tum Korata Koratagere Bus Pvt. 34.01 17.48 51.40 57 kur gere Stand Trust 23.870 LHS Tum Korata Koratagere Water Panchay 3.40 0.25 7.35 58 kur gere Tap at

78 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in

Sq.m

% of % of Tot Land Affec Str. Affec Total Sl. Chaina Distr Typeof Owner al Getti ted Getti Side Taluk Village ted Struct No. ge ict Asset Type La ng Strct ng Land ure nd Affec ure Affec ted ted

23.945 RHS Tum Korata Koratagere Water Panchay 2.95 0.25 8.47 59 kur gere Tap at 23.970 RHS Tum Korata Koratagere Water Panchay 2.55 0.25 9.80 60 kur gere Tap at 24.050 LHS Tum Korata Koratagere Compou Govern 98.15 6.50 6.62 61 kur gere nd Wall ment 24.140 LHS Tum Korata Koratagere Primaty Govern 153.08 2.93 1.91 62 kur gere School ment

Table 4- 24: Community Asset Details of link 64F (Koratagere - Madhugiri) Area in

Sq.m

% of % of Tot Land Affec Str. Affec Total Sl. Chaina Typeof Owner al Getti ted Getti Side District Taluk Village ted Struct No. ge Asset Type La ng Strct ng Land ure nd Affec ure Affec ted ted

0.060 LHS Tumkur Korata Koratagere Bus Panchay 60.75 15.00 24.69 1 gere Stand at 0.079 RHS Tumkur Korata Koratagere Temple Public 41.76 10.44 25.00 2 gere Trust 0.368 RHS Tumkur Korata Koratagere Aralikat Commu 55.30 7.70 13.92 3 gere te nity 0.460 RHS Tumkur Korata Koratagere Commu 23.94 12.06 50.38 4 Shrine gere nity 0.525 RHS Tumkur Korata Koratagere Mini 57.42 6.38 11.11 gere Water Panchay 5 Supply at Tank 0.708 RHS Tumkur Korata Koratagere Aralikat Commu 64.74 5.46 8.43 6 gere te nity 2.305 LHS Tumkur Korata Kamenahalli Mini 37.60 14.40 38.30 gere Water Panchay 7 Supply at Tank 2.595 RHS Tumkur Korata Kamenahalli Mini 9.83 8.18 83.21 gere Water Panchay 8 Supply at Tank 2.915 LHS Tumkur Korata Kambadahal Hand Panchay 16.50 2.25 13.64 9 gere li Pump at 3.011 RHS Tumkur Korata Kambadahal Bus Panchay 37.92 12.48 32.91 10 gere li Stand at 3.020 LHS Tumkur Korata Kambadahal Primaty Panchay 220.80 28.80 13.04 11 gere li School at 3.335 LHS Tumkur Korata Kamenahalli Bus Panchay 40.85 13.33 32.63 12 gere Stand at 4.130 RHS Tumkur Korata Muggondan Mini 9.76 6.24 63.93 gere ahalli Water Panchay 13 Supply at Tank

79 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in

Sq.m

% of % of Tot Land Affec Str. Affec Total Sl. Chaina Typeof Owner al Getti ted Getti Side District Taluk Village ted Struct No. ge Asset Type La ng Strct ng Land ure nd Affec ure Affec ted ted

4.173 RHS Tumkur Korata Muggondan Bus Panchay 27.14 13.80 50.85 14 gere ahalli Stand at 4.192 RHS Tumkur Korata Muggondan Water Panchay 4.70 0.80 17.02 15 gere ahalli Tap at 4.238 RHS Tumkur Korata Muggondan Hand Panchay 15.00 3.00 20.00 16 gere ahalli Pump at 5.120 LHS Tumkur Korata Tumbadi Hand Panchay 9.00 2.25 25.00 17 gere Pump at 5.240 LHS Tumkur Korata Tumbadi Aralikat Panchay 78.10 19.20 24.58 18 gere te at 5.302 RHS Tumkur Korata Tumbadi Temple Panchay 34.56 8.64 25.00 19 gere at 5.451 RHS Tumkur Korata Tumbadi Bus Panchay 27.09 3.01 11.11 20 gere Stand at 5.550 LHS Tumkur Korata Tumbadi Aralikat Commu 11.75 7.50 63.83 21 gere te nity 5.635 RHS Tumkur Korata Tumbadi Shrine Panchay 39.06 0.00 22 gere at 5.700 LHS Tumkur Korata Tumbadi Aralikat Commu 82.60 59.00 71.43 23 gere te nity 6.250 LHS Tumkur Korata Tumbadi Temple Public 48.50 15.00 30.93 24 gere Trust 6.940 RHS Tumkur Korata Pammedeva Bus Panchay 47.43 12.75 26.88 25 gere rahalli Stand at 7.352 LHS Tumkur Korata Pammedeva Hand Panchay 13.80 2.25 16.30 26 gere rahalli Pump at 8.030 LHS Tumkur Korata Dasarahalli Aravati Commu 9.00 4.00 44.44 27 gere ke nity 8.045 LHS Tumkur Korata Dasarahalli Temple Commu 149.15 23.55 15.79 28 gere nity 8.058 LHS Tumkur Korata Dasarahalli Mini 14.20 4.00 28.17 gere Water Panchay 29 Supply at Tank 9.180 LHS Tumkur Korata Sevalal Mini 13.80 4.00 28.99 gere Tanda Water Panchay 30 Supply at Tank 11.271 LHS Tumkur Madhu Keregala Mantap Public 28.86 13.69 47.44 31 giri Palya a Trust 12.255 RHS Tumkur Madhu Keregala Public 8.30 2.70 32.53 32 Shrine giri Palya Trust 13.170 RHS Tumkur Madhu Keregala Water Panchay 5.50 1.00 18.18 33 giri Palya Tap at 13.202 RHS Tumkur Madhu Keregala Aralikat Commu 48.20 35.80 74.27 34 giri Palya te nity 13.218 RHS Tumkur Madhu Keregala Mini Panchay 27.90 12.10 43.37 giri Palya Water at 35 Supply Tank 13.218 RHS Tumkur Madhu Keregala Pancha Panchay 42.53 19.25 45.27 36 giri Palya yath at 13.286 RHS Tumkur Madhu Keregala Water Panchay 6.15 2.25 36.59 37 giri Palya Tap at 13.310 LHS Tumkur Madhu Keregala Water Panchay 3.45 0.25 7.25 38 giri Palya Tap at 39 13.400 LHS Tumkur Madhu Keregala Water Panchay 2.00 0.25 12.50

80 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in

Sq.m

% of % of Tot Land Affec Str. Affec Total Sl. Chaina Typeof Owner al Getti ted Getti Side District Taluk Village ted Struct No. ge Asset Type La ng Strct ng Land ure nd Affec ure Affec ted ted

giri Palya Tap at 14.250 LHS Tumkur Madhu Hari Hara Temple Commu 58.05 16.20 27.91 40 giri Roppa nity 15.332 RHS Tumkur Madhu Hari Hara Bore Govern 4.80 0.70 14.58 41 giri Roppa Well ment 15.565 LHS Tumkur Madhu Hari Hara Water 22.75 6.76 29.71 42 Private giri Roppa Tank 15.745 RHS Tumkur Madhu Cholenahalli Bore 374.13 100.3 26.83 giri Well & Govern 8 43 Open ment Space 15.830 LHS Tumkur Madhu Cholenahalli Water Panchay 16.70 4.00 23.95 44 giri Tank at 15.904 RHS Tumkur Madhu Cholenahalli Aralikat Commu 418.00 668.8 45 giri te nity 0 15.952 LHS Tumkur Madhu Cholenahalli Temple Commu 78.00 13.00 16.67 46 giri Steps nity 16.120 LHS Tumkur Madhu Cholenahalli Mosque Commu 31.27 15.90 50.85 47 giri nity 16.132 RHS Tumkur Madhu Cholenahalli Commu 24.48 6.12 25.00 48 Darga giri nity 16.245 LHS Tumkur Madhu Cholenahalli Temple Commu 159.36 32.64 20.48 49 giri nity 16.350 RHS Tumkur Madhu Madhugiri Commu 4.50 1.00 22.22 50 Arch giri nity 16.372 RHS Tumkur Madhu Madhugiri Water Panchay 3.50 0.25 7.14 51 giri pipe at 16.394 RHS Tumkur Madhu Madhugiri Hand Commu 11.31 9.10 80.45 52 giri Pump nity 16.403 LHS Tumkur Madhu Madhugiri Traffic Govern 80.70 161.4 53 giri Island ment 0 16.519 LHS Tumkur Madhu Madhugiri Commu Govern 39.20 7.35 18.75 giri nity ment 54 Hall Steps 16.655 LHS Tumkur Madhu Madhugiri Bus Commu 82.66 16.47 19.93 55 giri Stand nity 16.800 RHS Tumkur Madhu Madhugiri Circle Commu 105.00 30.00 28.57 56 giri nity 16.860 RHS Tumkur Madhu Madhugiri Bounda 426.41 202.4 47.47 giri ry & 0 Commu 57 Wall nity Open Space 16.880 LHS Tumkur Madhu Madhugiri Govt Govern 620.00 230.0 37.10 giri Office ment 0 58 Compo und Wall 16.900 RHS Tumkur Madhu Madhugiri Compo 682.68 159.7 23.40 Govern 59 giri und 8 ment Wall 16.919 RHS Tumkur Madhu Madhugiri Wall 374.85 186.1 49.66 Govern 60 giri Open 5 ment Space 17.070 LHS Tumkur Madhu Madhugiri Ambed Govern 239.76 64.80 27.03 61 giri kar ment

81 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in

Sq.m

% of % of Tot Land Affec Str. Affec Total Sl. Chaina Typeof Owner al Getti ted Getti Side District Taluk Village ted Struct No. ge Asset Type La ng Strct ng Land ure nd Affec ure Affec ted ted

Bhavan Wall Open Space 17.172 RHS Tumkur Madhu Madhugiri Public Govern 24.59 8.42 34.23 62 giri Toilet ment 17.545 RHS Tumkur Madhu Madhugiri Wall Public 252.70 165.3 65.41 63 giri Trust 0 17.585 RHS Tumkur Madhu Madhugiri Bore Public 2.45 0.25 10.20 64 giri Well Trust 17.594 LHS Madhug Madhu Madhugiri Water Panchay 2.95 0.25 8.47 65 iri giri Tap at 17.790 RHS Tumkur Madhu Madhugiri Wall Govern 226.92 139.0 61.29 66 giri ment 8 17.792 LHS Tumkur Madhu Madhugiri Compo Commu 62.72 21.28 33.93 67 giri und nity Wall

Table 4- 25: Community Asset Details of link 64G (Madhugiri - Pavagada) Area in

Sq.m

% of % of Land Affec Str. Affec Total Sl. Chain Si Distr Typeof Owner Total Getti ted Getti Taluk Village ted Struct No. age de ict Asset Type Land ng Strct ng Land ure Affec ure Affec ted ted

0.407 LH Tum Madhu Lingenahalli Water Panchay 4.70 1.00 21.28 1 S kur giri Tap at 0.413 LH Tum Madhu Lingenahalli Water Panchay 5.80 1.00 17.24 2 S kur giri Tap at 0.473 LH Tum Madhu Lingenahalli Water Panchay 9.30 0.25 2.69 3 S kur giri Tap at 0.483 LH Tum Madhu Lingenahalli Govt Govern 22.00 12.00 54.55 4 S kur giri Municip ment al Gate 0.510 LH Tum Madhu Lingenahalli Bore Panchay 8.10 1.00 12.35 5 S kur giri Well at 0.800 LH Tum Madhu Lingenahalli Bore Panchay 3.30 0.25 7.58 6 S kur giri Well at 0.880 LH Tum Madhu Lingenahalli Pump Panchay 22.80 12.00 52.63 7 S kur giri House at 1.070 LH Tum Madhu Lingenahalli Water Panchay 37.50 10.00 26.67 8 S kur giri Tank at 0.110 LH Tum Madhu Lingenahalli Water Panchay 6.00 1.00 16.67 9 S kur giri Tank at 1.263 LH Tum Madhu Lingenahalli Bore 9.00 1.00 11.11 S kur giri Well & Panchay 10 Water at Tank 11 1.460 LH Tum Madhu Lingenahalli Bore Panchay 7.70 1.00 12.99

82 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in

Sq.m

% of % of Land Affec Str. Affec Total Sl. Chain Si Distr Typeof Owner Total Getti ted Getti Taluk Village ted Struct No. age de ict Asset Type Land ng Strct ng Land ure Affec ure Affec ted ted

S kur giri Well at 1.620 LH Tum Madhu Basavanahalli Pump Panchay 147.00 27.50 18.71 12 S kur giri House at 1.990 LH Tum Madhu Basavanahalli Comoun 19.95 8.75 43.86 S kur giri d Wall Govern 13 & ment Lavator y 2.044 LH Tum Madhu Basavanahalli Water Panchay 23.56 3.10 13.16 14 S kur giri Tank at 2.110 LH Tum Madhu Basavanahalli Water Panchay 9.50 1.00 10.53 15 S kur giri Tank at 2.240 LH Tum Madhu Basavanahalli Water Panchay 14.00 2.00 14.29 16 S kur giri Tank at 2.300 LH Tum Madhu Basavanahalli Aralikat Commu 55.06 34.65 62.94 17 S kur giri te nity 2.400 LH Tum Madhu Basavanahalli Temple Commu 185.89 68.37 36.78 18 S kur giri nity 3.817 LH Tum Madhu Jadegondanahall Shrine Commu 10.65 2.25 21.13 19 S kur giri i nity 3.845 LH Tum Madhu Jadegondanahall Water Panchay 4.25 0.25 5.88 20 S kur giri i Tank at 4.006 LH Tum Madhu Jadegondanahall Aralikat Commu 62.70 3.80 6.06 21 S kur giri i te nity 4.080 LH Tum Madhu Jadegondanahall Aralikat Commu 70.20 5.40 7.69 22 S kur giri i te nity 4.100 LH Tum Madhu Jadegondanahall Water Panchay 22.80 7.60 33.33 23 S kur giri i Tank at 4.143 LH Tum Madhu Jadegondanahall Water Panchay 3.65 0.25 6.85 24 S kur giri i Tank at 4.470 LH Tum Madhu Jadegondanahall Water Private 19.58 3.24 16.55 25 S kur giri i Tank 4.270 LH Tum Madhu Jadegondanahall Water Panchay 2.90 0.25 8.62 26 S kur giri i Tap at 4.535 LH Tum Madhu Jadegondanahall Aralikat Commu 47.52 44.00 92.59 27 S kur giri i te nity 4.510 LH Tum Madhu Jadegondanahall Water 21.30 3.60 16.90 28 Private S kur giri i Tank 4.555 LH Tum Madhu Jadegondanahall Aralikat Commu 18.15 9.00 49.59 29 S kur giri i te nity 4.712 LH Tum Madhu Jadegondanahall Water Panchay 9.00 2.25 25.00 30 S kur giri i Tank at 5.520 LH Tum Madhu Chikkenahalli Aralikat Commu 113.10 3.90 3.45 31 S kur giri te nity 6.040 LH Tum Madhu Chikkenahalli Hand Panchay 12.00 2.25 18.75 32 S kur giri Pump at 7.960 LH Tum Madhu Giriyammana Water Panchay 1.50 0.25 16.67 33 S kur giri Palya Tap at 8.805 LH Tum Madhu Avaragallu Bus Panchay 20.21 16.45 81.40 34 S kur giri Stand at 8.810 LH Tum Madhu Avaragallu Primaty Panchay 66.55 49.50 74.38 35 S kur giri School at 8.807 LH Tum Madhu Avaragallu Aralikat Commu 149.25 45.75 30.65 36 S kur giri te nity 8.840 LH Tum Madhu Avaragallu Aralikat Commu 43.50 49.00 37 S kur giri te nity

83 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in

Sq.m

% of % of Land Affec Str. Affec Total Sl. Chain Si Distr Typeof Owner Total Getti ted Getti Taluk Village ted Struct No. age de ict Asset Type Land ng Strct ng Land ure Affec ure Affec ted ted

8.862 LH Tum Madhu Avaragallu Mini Panchay 9.18 2.89 S kur giri Water at 38 Supply Tank 8.870 LH Tum Madhu Avaragallu Hand Panchay 7.50 2.25 39 S kur giri Pump at 8.873 LH Tum Madhu Avaragallu Water Panchay 10.00 1.00 40 S kur giri Tank at 8.960 LH Tum Madhu Avaragallu Water Panchay 23.87 4.65 41 S kur giri Tank at 9.240 LH Tum Madhu Avaragallu Mini 29.26 14.74 S kur giri Water Panchay 42 Supply at Tank 11.020 LH Tum Madhu Hosakere Bus Panchay 43.50 16.50 43 S kur giri Stand at 11.443 LH Tum Madhu Hosakere Water Panchay 13.78 2.60 44 S kur giri Tank at 11.490 LH Tum Madhu Hosakere Water Panchay 6.00 1.56 45 S kur giri Tank at 11.500 LH Tum Madhu Hosakere Bus 38.50 13.20 46 Private S kur giri Stand 11.516 LH Tum Madhu Hosakere Bus Panchay 30.80 17.36 47 S kur giri Stand at 11.523 LH Tum Madhu Hosakere Public 54.00 64.80 48 Temple S kur giri Trust 11.660 LH Tum Madhu Hosakere Water 8.60 2.40 27.91 49 Private S kur giri Tank 11.920 LH Tum Madhu Hosakere Aralikat Commu 30.25 30.25 100.0 50 S kur giri te nity 0 12.012 LH Tum Madhu Hosakere Aralikat Panchay 24.60 16.00 65.04 51 S kur giri te at 12.040 LH Tum Madhu Hosakere Boundar Govern 264.00 15.00 5.68 52 S kur giri y Wall ment 12.270 LH Tum Madhu Hosakere Commu 14.00 5.60 40.00 53 Shrine S kur giri nity 12.870 LH Tum Madhu Hosakere Bus Panchay 57.36 5.04 8.79 54 S kur giri Stand at 13.235 LH Tum Madhu Thippagondanah Commu 90.35 6.95 7.69 55 Temple S kur giri alli nity 13.255 LH Tum Madhu Thippagondanah Aralikat Commu 26.02 4.09 15.70 56 S kur giri alli te nity 14.380 LH Tum Madhu Neelihalli Bus Panchay 41.31 14.79 35.80 57 S kur giri Stand at 14.390 LH Tum Madhu Neelihalli Ashram Panchay 26.40 6.60 25.00 58 S kur giri a at 16.520 LH Tum Madhu Chinnenahalli Water Panchay 3.10 0.25 8.06 59 S kur giri Tap at 16.530 LH Tum Madhu Chinnenahalli Water Panchay 3.10 0.25 8.06 60 S kur giri Tap at 19.050 LH Tum Madhu Midigeshi Water Panchay 21.15 3.90 18.44 61 S kur giri Tank at 19.055 LH Tum Madhu Midigeshi Water Panchay 2.45 0.25 10.20 62 S kur giri Tap at 19.655 LH Tum Madhu Midigeshi Mini 14.40 2.25 15.63 Panchay 63 S kur giri Water at Supply

84 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in

Sq.m

% of % of Land Affec Str. Affec Total Sl. Chain Si Distr Typeof Owner Total Getti ted Getti Taluk Village ted Struct No. age de ict Asset Type Land ng Strct ng Land ure Affec ure Affec ted ted

Tank 21.480 LH Tum Madhu Nallekamanahall Mini 7.50 2.25 30.00 S kur giri i Water Panchay 64 Supply at Tank 21.980 LH Tum Madhu Nallekamanahall Shrine Commu 6.72 3.52 52.38 65 S kur giri i nity 22.000 LH Tum Madhu Nallekamanahall Water Panchay 3.50 0.25 7.14 66 S kur giri i Tap at 22.020 LH Tum Madhu Nallekamanahall Ayurved Govern 220.48 33.92 15.38 67 S kur giri i ic ment Hospital 22.110 LH Tum Madhu Nallekamanahall Mini Panchay 8.85 2.25 25.42 S kur giri i Water at 68 Supply Tank 22.120 LH Tum Madhu Nallekamanahall Water Panchay 4.60 0.25 5.43 69 S kur giri i Tap at 23.290 LH Tum Madhu Bedathur Bus Panchay 66.88 9.92 14.83 70 S kur giri Stand at 24.580 LH Tum Madhu Bidarakere Public 18.70 4.00 21.39 71 Temple S kur giri Trust 26.040 LH Tum Madhu Kyathagondana Hand Panchay 20.70 2.25 10.87 72 S kur giri halli Pump at 27.375 LH Tum Madhu Chandrabhavi Aralikat Commu 43.47 16.33 37.57 73 S kur giri te nity 27.820 LH Tum Madhu Chandrabhavi Water Panchay 18.00 2.40 13.33 74 S kur giri Tank at 27.860 LH Tum Madhu Chandrabhavi Commu 12.50 5.67 45.38 75 Shrine S kur giri nity 44.440 LH Tum Pavaga Rajavanthi Commu 5.50 1.00 18.18 76 Shrine S kur da nity 44.480 LH Tum Pavaga Rajavanthi Hand Panchay 10.50 2.25 21.43 77 S kur da Pump at 44.485 LH Tum Pavaga Rajavanthi Water Panchay 40.20 13.80 34.33 78 S kur da Tank at 44.475 LH Tum Pavaga Rajavanthi Water Panchay 2.60 0.25 9.62 79 S kur da Tap at 45.540 LH Tum Pavaga Rajavanthi Commu 7.10 1.00 14.08 80 Shrine S kur da nity 45.750 LH Tum Pavaga Rajavanthi Bus Panchay 55.18 6.82 12.36 81 S kur da Stand at 46.265 LH Tum Pavaga Rajavanthi Hand Panchay 14.70 2.25 15.31 82 S kur da Pump at 47.220 LH Tum Pavaga Kanavinahalli Bus Panchay 57.00 8.00 14.04 83 S kur da Stand at 48.530 LH Tum Pavaga Kanavinahalli Water Panchay 34.00 5.20 15.29 84 S kur da Tank at 52.140 LH Tum Pavaga Pavagada Water Panchay 12.00 2.25 18.75 85 S kur da Tank at 45.000 LH Tum Pavaga Rajavanthi Govern Govern 7290. 0.00 0.00 0.00 86 S kur da ment ment 00 Land 0.795 R Tum Madhu Lingenahalli Aralikat Commu 72.60 48.40 66.67 87 HS kur giri te nity 1.070 R Tum Madhu Lingenahalli Water Panchay 35.00 5.00 14.29 88 HS kur giri Tank at

85 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in

Sq.m

% of % of Land Affec Str. Affec Total Sl. Chain Si Distr Typeof Owner Total Getti ted Getti Taluk Village ted Struct No. age de ict Asset Type Land ng Strct ng Land ure Affec ure Affec ted ted

2.044 R Tum Madhu Basavanahalli Bus Govern 26.84 15.40 57.38 89 HS kur giri Stand ment 3.870 R Tum Madhu Jadegondanahall Water Panchay 3.15 0.25 7.94 90 HS kur giri i Tap at 4.030 R Tum Madhu Jadegondanahall Water Panchay 2.80 0.25 8.93 91 HS kur giri i Tap at 4.065 R Tum Madhu Jadegondanahall Bus Panchay 35.10 2.70 7.69 92 HS kur giri i Stand at 7.863 R Tum Madhu Giriyammana Water Panchay 16.20 5.40 33.33 93 HS kur giri Palya Tank at 7.865 R Tum Madhu Giriyammana Bus Panchay 36.96 14.88 40.26 94 HS kur giri Palya Stand at 6.780 R Tum Madhu Chikkenahalli Hand Govern 17.25 2.25 13.04 95 HS kur giri Pump ment 8.600 R Tum Madhu Avaragallu Aralikat Commu 72.08 29.68 41.18 96 HS kur giri te nity 8.860 R Tum Madhu Avaragallu Water Panchay 3.75 0.25 6.67 97 HS kur giri Tap at 11.000 R Tum Madhu Hosakere Panchay 39.06 5.40 13.82 98 Pond HS kur giri at 11.040 R Tum Madhu Hosakere Commu 36.18 7.02 19.40 99 Temple HS kur giri nity 11.360 R Tum Madhu Hosakere Hand Panchay 10.20 2.25 22.06 100 HS kur giri Pump at 11.990 R Tum Madhu Hosakere Check Govern 11.20 4.00 35.71 101 HS kur giri Post ment 13.170 R Tum Madhu Thippagondanah Mini Panchay 24.30 4.50 18.52 HS kur giri alli Water at 102 Supply Tank 13.250 R Tum Madhu Thippagondanah Water Panchay 25.20 5.40 21.43 103 HS kur giri alli Tank at 15.790 R Tum Madhu VeeraChannann Bus Panchay 34.45 18.02 52.31 104 HS kur giri enahalli Stand at 16.500 R Tum Madhu Chinnenahalli Panchay 20.91 11.22 53.66 105 Temple HS kur giri at 16.570 R Tum Madhu Chinnenahalli Water Panchay 24.14 30.26 106 HS kur giri Tap at 16.595 R Tum Madhu Chinnenahalli Water Panchay 2.00 0.25 12.50 107 HS kur giri Tap at 16.670 R Tum Madhu Chinnenahalli Water Panchay 2.50 0.25 10.00 108 HS kur giri Tap at 17.580 R Tum Pavaga Chinnenahalli Mini Panchay 19.88 6.25 31.45 HS kur da Water at 109 Supply Tank 16.960 R Tum Madhu Chinnenahalli Mini Panchay 14.25 3.75 26.32 HS kur giri Water at 110 Supply Tank 19.440 R Tum Madhu Midigeshi Bus Panchay 42.05 15.08 35.86 111 HS kur giri Stand at 19.553 R Tum Madhu Midigeshi Panchay 29.44 4.80 16.30 112 Pond HS kur giri at 19.910 R Tum Madhu Midigeshi Hand Panchay 12.45 2.25 18.07 113 HS kur giri Pump at 114 22.068 R Tum Madhu Nallekamanahall Water Panchay 3.20 0.25 7.81

86 Karnataka State Highways Improvement Project –II Resettlement Implementation Plan WAP-1 (Malavalli - Pavagada)

Area in

Sq.m

% of % of Land Affec Str. Affec Total Sl. Chain Si Distr Typeof Owner Total Getti ted Getti Taluk Village ted Struct No. age de ict Asset Type Land ng Strct ng Land ure Affec ure Affec ted ted

HS kur giri i Tap at 22.070 R Tum Madhu Nallekamanahall Mini Panchay 10.95 2.25 20.55 HS kur giri i Water at 115 Supply Tank 23.055 R Tum Madhu Bedathur Mini Panchay 11.70 2.25 19.23 HS kur giri Water at 116 Supply Tank 20.000 R Tum Madhu Midigeshi Mini Panchay 10.88 7.13 65.52 HS kur giri Water at 117 Supply Tank 23.180 R Tum Madhu Bedathur Water Panchay 16.80 9.60 57.14 118 HS kur giri Tank at 24.460 R Tum Madhu Bidarakere Primaty Govern 276.00 164.0 59.42 119 HS kur giri School ment 0 24.589 R Tum Madhu Bidarakere Bus Panchay 46.48 15.12 32.53 120 HS kur giri Stand at 24.780 R Tum Madhu Bidarakere Public 37.46 2.15 5.73 121 Temple HS kur giri Trust 25.400 R Tum Madhu Bidarakere Commu 50.60 22.00 43.48 122 Temple HS kur giri nity 44.770 R Tum Pavaga Rajavanthi Check Govern 35.00 19.00 54.29 123 HS kur da Post ment 50.230 R Tum Pavaga Pavagada Bore Commu 560.00 210.0 37.50 HS kur da Well, nity 0 124 Compou nd Wall, Arch 50.230 R Tum Pavaga Pavagada Commu 89.60 64.40 71.88 125 Well HS kur da nity 51.520 R Tum Pavaga Pavagada Bus Panchay 36.23 5.78 15.94 126 HS kur da Stand at 50.160 R Tum Pavaga Pavagada Commu 81.13 105.0 127 Well HS kur da nity 7 51.910 R Tum Pavaga Pavagada Private Private 110.50 59.50 53.85 128 HS kur da Trust 51.920 R Tum Pavaga Pavagada Private Private 114.40 100.8 88.11 129 HS kur da Trust 0 18.760 R Tum Madhu Midigeshi Govern Govern 1610. 0.00 0.00 0.00 130 HS kur giri ment ment 00 Land