SARNIA INDUSTRIAL LINE REINFORCEMENT PIPELINE PROJECT DOW TO BLUEWATER: ENVIRONMENTAL REPORT

APPENDIX B: CONSULTATION

SARNIA INDUSTRIAL LINE REINFORCEMENT PIPELINE PROJECT DOW TO BLUEWATER: ENVIRONMENTAL REPORT

APPENDIX B1: PROJECT SUMMARY AND CONTACT LIST

Union Gas Limited – Sarnia Expansion Project Summary for Ministry of Energy

1. Introduction

This Summary Report has been prepared to provide the Ministry of Energy (“MOE”) with an overview of the Sarnia Expansion Project (“Project”), to support the preparation of a contact list of indigenous communities that may have an interest in the Project.

1.1 Project Overview

Union Gas Limited (“Union Gas”) is proposing to expand the capacity of the existing natural gas system in south Sarnia. The existing system expansion is being proposed to increase the available natural gas supply in the south Sarnia area for current and future customers. Due to the complexity of the existing infrastructure in the Sarnia area a proposed route has not yet been developed beyond the identification of a proposed start point and three potential end points.

The Project will consist of one or a combination of a pipeline replacement or new pipeline installation between the DOW Valve Site (Start Point) and the Churchill Road Station (End Point). Currently four potential pipeline routes have been identified (Figure 1 and 2) with the preferred route to be identified at a later date following additional design and planning processes. The proposed Project study area includes portions of the City of Sarnia, Aamjiwnaang First Nation, and the Township of St.Clair. A map indicating the Project study area is shown in Figure 1 and 2 (attached).

The following co-ordinates are the approximate proposed locations of the take off and end point for the new pipeline:

Proposed Locations Latitude Longitude Start Point 42.900854 -82.426075 DOW Valve Site End Point 2 42.932876 -82.427549 Churchill Road Station

2. Regulatory Requirements and Approvals

Ontario Energy Board (“OEB”) review and approval is required before this project can proceed. As part of that application, an Environmental Review (ER) will be conducted in accordance with the OEB Environmental Guidelines for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario 7th Edition (2016). The ER for this Project is anticipated to be completed and submitted to the OEB as early as December 2018, and the proposed project to be in service by November 2020. Other permits and authorizations for the project will be determined and may be necessary at the Federal, Provincial and Municipal levels. 3. Environmental Planning Process

The environmental planning process for the Project will be initiated in 2018 by Union Gas, with support provided throughout the process by consultant archaeologists, cultural heritage specialists, and environmental professionals. The following provides a general overview of the environmental planning process for the Project:

• Complete an Environmental Report (ER) o Describe the proposed work necessary for the Project; o Describe the procedures that will be followed during construction of the facilities; o Identify potential environmental impacts and recommend measures to minimize those impacts; and o Describe the public consultation opportunities. • Complete all necessary studies and assessments o An Archaeological Assessment will be conducted by a licensed archaeologist in accordance with the Ministry of Tourism, Culture and Sport (MTCS) guidelines to identify known or potential archaeological resources within the Project area and will develop an appropriate mitigation plan if required. o A heritage specialist will review the running line for potential cultural heritage landscapes and built heritage resources and will develop an appropriate mitigation plan if required. o A qualified biologist will review the running line for potential species at risk and determine if any species will be impacted by construction activities and will develop an appropriate mitigation plan if required. • Obtain all necessary environmental permits and approvals o Union Gas will work with all relevant governing agencies (i.e. Environment Canada (EC), Ministry of Natural Resources and Forestry (MNRF), St. Clair Region Conservation Authority (SCRCA), Fisheries and Oceans Canada (DFO), Aamjiwaang First Nation) to obtain any permits and/or approvals should it be necessary.

4. Consultation

Consultation is an important part of the environmental planning process and may include discussions with the relevant federal and provincial agencies, municipalities, interested and potentially affected landowners, and interest groups, as well as First Nations and Metis Nations as identified by the MOE.

Union Gas will contact with the City of Sarnia, EC, MNRF, DFO and SCRCA to discuss and review the project. Union Gas will also contact landowners along the proposed route.

5. Project Activities

The pipeline will be installed using Unions standard construction practices which include grading the site, digging the trench, installing the welded pipeline in the trench, testing the pipeline, and restoring the area to its original condition. 6. Summary and Conclusion

The purpose of this report is to provide MOE with preliminary information regarding the Project and acquire a list of Indigenous communities that may be interested in providing feedback during the project planning process. Field work and data collection will be undertaken to determine the potential effects of this Project during the construction, and operation phases. Mitigation measures to manage these potential effects will be identified and will include proposed monitoring and contingency plans which will be implemented to ensure effects are minimized.

!

!

!

! ! ! !

!

!

! !

!

! !

!

!

!

!

!

! !

! ! !

! !

!

!

!

!

!

!

! !

! !

!

! !

!

! !

!

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

! ! !

! !

! !

!

!

! !

!

! !

! ! !

! ! !

! ! ! ! ! ! !

!

! !

! !

! ! !

!

! ! ! !

!

!

!

!

!

!

!

!

!

!

!

! !

!

!

!

!

!

!

!

! !

! !

! ! !

!

! ! ! !

! ! ! ! !

! ! ! ! !

! ! !

! ! ! !

! ! !

! ! ! ! ! !

! ! ! ! ! !

! ! ! !

! ! ! !!

! ! ! ! !!

!

! ! !

! ! ! !

! ! ! ! ! ! ! !

! ! ! ! ! ! !

! ! !

!

!

!

!

!

!

! !

! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! ! !

!

! !

! ! ! !

382500 !! 385000 387500 390000 !

! ! h

h

t h

t Sherwood ! t

u

u

d

u ! ! Village o

o

o a !

S e h S ! o

t S

t

t v ! R u t O i

e

e ! r ! n o e

y

e t

e a D ! e r

r S r h t r

t i h ! o t 0 0 t p

c

S r

0 S S 0 ! e ! S e n

5 t 5

l u r i ! k l 7 e e v 7

n e i 5 5

c F ! r e Ca t M r r $ $

7 d 7

t o iff D

o s

! t 4 4 ! ! r

S t

s i Legend B ! a u

! n M ¯

i Confeder

R atio

! t n Street !

! is Site Location ! (

r

! Campbell S h treet !

!

! C

! 180

! )" Start Point ! n o !

! ti ! *# End Point Option

ta ! ! ! ! C ! r li St Andrew Street

! o ff *# p o Constructed Drain

! s rd

! n S End Option 3

t ! ! a r P ! ! ! !

r ee lan DFO Species At Risk (Fish)

! T t k ! R X o

! S ! a Thermal Regime, Warm

! d

! C

! County Of

! !

! Highway ! ! !

! !

!

Lambton !

! Major Road

! City Of

!

! !

Sarnia ! Minor Road

!

d

! ! !

a ! h

o

t ! Railway !

u

R !

o

! t !

! t

! ! S Existing Union Gas Transmission Line ! !

! o

! ! !

c ! ! d ! !

a

h S

t ! ! ! Existing Union Gas Distribution Line

USA u o !

o !

R !

! ! !

! S

! n Hydro Line

! t ! d e ! a

! i

! ! a

! e !

! r d

t o ! ! Unknown Pipeline

n

S ! I R !

l !

!

! a ! ! d 0 ! 0

d !

n Watercourse (Permanent) 0 ! i 0

!

!

0 V 0 a ! ! ! 5 5

! l !

5 5 ! e

7 7 Conservation Area Administrative Boundary

! 4 ! d 4

! ! ! o ! !

! !

! M ! Churchill Line Thermal Regime, Warm

!! ! ! ! Highway 40

! ! Waterbody

r ! !

! ! e er Ro ! ! !

! iv ad Lucasville v !

i R ! Wetland, Provincially Significant

! !

!

! !

End Option 2 ! ! !

R ! ! ! ! !

!

! ! !

!

r ! !

! ! ! ! ! !

i ! ! ! !

! ! ! ! ! ! Wooded Area *# ! a

!

! !

! !

! !

l ! ! ! ! ! ! ! ! ! ! End Option 1 ! ! ! !

C ! !

*# ! ! ! !

! ! !

. ! !

! !

! ! First Nation Reserve t !

! !

S ! !

!

! ! ! !

! Lot

! ! ! !

y ! ! !

! Canadia !

a ! n National S t . C l a i r R e g i o n ! ! !

w ! Municipal Boundary, Upper

! ! k ! !

r

! !

a ! C o n s e r v a t i o n ! !

! Municipal Boundary, Lower

e P ! ! ! ! ! !

! !

u

! r ! ! ! ! ! i ! ! ! ! ! !

! n A u t h o r i t y ! ! !

! ! ! ! a d ! l ! ! ! ! !

e ! ! ! ! ! ! ! ! !

a ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! ! v ! ! ! !

C ! ! !

l ! 0 1 2 !

l ! ! o

! ! !

! !

! !

t A

e r ! !

! ! !

s

! ! ! !

r ! !

! ! ! !

! !

S e

! ! ! !

! !

! o o km

! ! ! !

!

! !

! !

!

! !

! !

! d ! ! !

! ! ! w

o !

! ! i !

! ! !

! ! !

p ! !

!

!

! !

!

! !

! !

: !

S ! !

m ! !

y !

! 1:35,000 (At original document size of 11x17) !

! !

! !

!

B !

! r !

h

! !

!

!

! !

! ! 0 !

!

! s o ! !

!

2 ! ! !

!

!

! !

! !

! - ! ! ! ! ! ! !

! ! ! !

! ! ! ! a g ! ! 4 Notes ! ! 0

T

e - !

r 8 ! 1. Coordinate System: NAD 1983 UTM Zone 17N

1 ! g 0 2. Base features produced under license with the Ontario Ministry of Natural 2 c

! k :

e !

d e Resources and Forestry © Queen's Printer for Ontario, 2018. M ! r ! e

r

s C i

! d i v r

a

e u ! Sarnia 45

l R o

f !

l !

!

a 0 a C

i

T 8 ! 1 . d Forest

n t x 0 0

r ! m

S

0 ! 0

. !

a L a ! k e 5 5 a 0 f t

2 0 2 S a ! 5 5 2 O 21

D f

7 7 H u r o n _ ! ! 4 4

d L a m b t o n p !

O ! i n Point u C o u n t y

h ! y o Froomfield r ! t Edward s

i

g ! k

n !

c C ! 21-7-40 402 a

w Sarnia

B ! M ! _ Michigan o

a ! a

i !

r T n

r

s ! Wyoming

!

a h S !

_ C !

1 ! Lasalle Line

0 r ! ! e g i e ! F

_ ! k ! t

! ! n i Petrolia

_ ! ! 5

2

!

! k

2 40 !

1 e

!

6 ! e

! r 9

0 C

!

! 6 1 !

d ! Oil ! \ r s !

! ! Springs

p u Township a ! o !

M f l ! Of St.

l ! ! a

! ! ! n ! ! a

r ! T ! Clair e t

n ! ! I

\ ! !

d s

a

m ! ! ! Project Location 160961225 REVA e

o t

! s

!

y County of Prepared by PW on 2018-04-20 ! R

s

!

o Start Point

l

! !

!

! l

!

c ! !

! Lambton ! !

!

!

E !

! a ! ! \ !

! ! )" ! s ! ! ! ! ! b e ! ! ! ! r ! ! ! ! ! ! ! u ! ! ! m i g !

! Client/Project i

F K ! \

! g

! UNION GAS LIMITED n

i ! !

w ! a r ! SARNIA PIPELINE PROJECT d

!

\ !

5 !

2 ! !

2

! !

1 ! !

! ! ! !

6

! !! ! 9 ! ! !

! Figure No. 0

! ! ! 6

t

! ! 1

0 1 0

! ! ! !! ! e \ 8

0 ! 0

0 ! ! e 0 ! ! e 0 v ! 1

i ! ! r DRAFT 0 0 t !

! ! t 5 5 c !

! ! 7 7 a ! ! S

! Title !

\ 4 4

! !

9 0 ! !

h 0 0 ! Beckwi th S !

! ! tree 2

6 t !

! ! c 0

!!

1 0

! ! Background Data 0 ! ! o 2 !! !

\

! !

! d ! 2 !! DR! AFT St!ag Island 0

n f

! ! ! 0 0 !

- ! !

y 0 0

0

! !

2 ! (SC 45) ! 2 2 L 2

! ! 1

! !

d ! ! ! 382500 385000 387500 390000 c ! !

!

! \ !

\ !

Disclaimer: Stantec assumes no responsibility for data supplied in electronic format. The recipient accepts full resp! onsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provision of the data. ! !

!

! ! !

!

! !

! ! !

! !

! ! ! !

!

! ! !

! !

! !

!!

!! !

! ! !

!

! ! !

!

!

! !

!

!

!

!

!

!

! !

!

! !

!

!

!

! !

!

! ! ! ! !

! ! !

!

! !

!

! !

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

!

! ! 382500 385000 387500 390000

h

h

t h t Sherwood

t

u

u d u Village o

o

o a

S e h S o

t S

t

t v R u t O i

e e n r o e

y

e t e a D

e r

r S r h t r t io h t 0 0 t p c

S r 0 S S 0

e S e n 5 t 5 l u r i

k l 7 e e v 7 n e i 5 5 c F r e Ca t M r r $ $

7 d 7 t o iff D o s

t 4 4

r

S t

s i Legend B a u

n M ¯ i Confeder t R ation Street is ( Site Location r h Campbell Street C )" Start Point n o ti *# End Point Option ta r Cl St Andrew o iff *# Street p o Highway s rd n S End Option 3 a tr P r ee lan Major Road T t k R X o S a Minor Road d C County Of Railway Lambton City Of Watercourse (Permanent) Sarnia Waterbody

d

a

h

o t First Nation Reserve

u

R

o

t

t

S Municipal Boundary, Upper

o

c d

a th S Municipal Boundary, Lower USA u o o

R S t n Crown Land - Unpatented

d

e a

i re a d t o Crown Land - MNRF Non-Freehold Dispositions S n l I R a d

0 d 0 Crown Disposition Easement

n

0 i 0

0 V 0 a

5 l 5 5 e 5 Crown Disposition Leases 7 7

4 d 4 o Churchill Line M Crown Disposition Licence of Occupation Highway 40

r e iver Road v Lucasville i R R End Option 2 r i *# a l End Option 1 C *# . t S

y Can a adian National w k r a P e 0 1 2 r u i

n

a d l km e

a C v

o

t A r 1:35,000 (At original document size of 11x17)

S e

o l

d l

o

i e s r S Notes

m

o

r h

w 1. Coordinate System: NAD 1983 UTM Zone 17N

p s o

: 2. Base features produced under license with the Ontario Ministry of Natural a g y B

T

e Resources and Forestry © Queen's Printer for Ontario, 2018.

0 r 2 -

g 4

c 0 k - e 8 e

M

1 r

0 C r

i 2 d

: r u a d Sarnia 45 o l e lf s i

a a C v T i

. e Forest

n t R

0 0

r

S

0 0

a L a k e 5 5

f d 2 2

S x 5 5

O 21

m f 7 7 H u r o n . 4 4 d L a m b t o n p

O n

i

a Point

L C o u n t y

h y

_ Froomfield t Edward s n

i w

n

C 21-7-40 o 402 r

w Sarnia C M _ Michigan o a a i

r T n

r s Wyoming

a h S

_ C

2 Lasalle Line 0 re g i e F

_ k t n i Petrolia _ 5 2

2 40 1 6 9 0 6

1 Oil \ s Springs p Township a M l Of St. a n r Clair e t n I \

d s

a m Project Location 160961225 REVA e

o t s

y County of Prepared by PW on 2018-04-20

R s

o Start Point l

l c Lambton E

a

\ )" s

b e r u m

i g Client/Project i

F K \ g UNION GAS LIMITED n i w a r SARNIA PIPELINE PROJECT d \ 5 2 2 1 6

9 Figure No. 0 6

t 1 0 0

e \ 0 0 e

0 e 0 v 2 i r DRAFT 0 0 t

t 5 5 c 7 7 a S Title \ 4 4 9

h 0 Beckwith Stree

6 t

c 1 Crown Land

0 o \

d 2 DRAFT 0

n f -

y 0 2

L 2 1 d 382500 385000 387500 390000 c \

\ Disclaimer: Stantec assumes no responsibility for data supplied in electronic format. The recipient accepts full responsibility for verifying the accuracy and completeness of the data. The recipient releases Stantec, its officers, employees, consultants and agents, from any and all claims arising in any way from the content or provision of the data. Table B1.1: Agencies Contact List

First Last Provinc Postal Title Representing Address Town Phone Email Type Name Name e Code Karla Barboza Team Lead - Heritage (Acting) Ministry of Tourism, Culture and Sports 401 Bay Street Toronto ON M7A 0A7 416-314-7120 [email protected] Provincial James Hamilton Manager, Heritage Program Unit Ministry of Tourism, Culture and Sports 401 Bay Street Toronto ON M7A 0A7 416-212-7505 [email protected] Provincial Ministry of Energy, Northern Development Kaisha Bruetsch Senior Policy Advisor, Indigenous Affairs 900 Bay Street, 4th Floor Toronto ON M7A 1T7 416-327-9473 [email protected] Provincial and Mines Palin Director, Planning and Implementation 777 Bay Street, 4th Floor, Suite Dawn Ministry of Infrastructure Toronto ON M5G 2E5 416-325-7673 [email protected] Provincial Rokosh Branch 425 Manager, Environmental and Land Use Ministry of Agriculture and Food, Ministry of David Cooper 1 Stone Road West, 3rd Floor SE Guelph ON N1G 4Y2 519-826-3117 [email protected] Provincial Policy & Stewardship Rural Affairs Policy Advisor, Land Use Policy & Ministry of Agriculture and Food, Ministry of Michele Doncaster 1 Stone Road West, 3rd Floor SE Guelph ON N1G 4Y2 519-826-4369 [email protected] Provincial Stewardship Rural Affairs Rural Planner, Land Use Policy & Ministry of Agriculture and Food, Ministry of Drew Crinklaw 667 Exeter Road London ON N6E 1L3 519-873-4085 [email protected] Provincial Stewardship Rural Affairs Dallas Cundick Manager of Planning St. Clair Region Conservation Authority 205 Mill Pond Crescent Strathroy ON N7G 3P9 519-245-3710 x 223 [email protected] Provincial Sarah Hodgkiss Planning Ecologist St. Clair Region Conservation Authority 205 Mill Pond Crescent Strathroy ON N7G 3P9 519-245-3710 x 234 [email protected] Provincial Girish Sankar Director of Water Resources St. Clair Region Conservation Authority 205 Mill Pond Crescent Strathroy ON N7G 3P9 519-245-3710 x 247 [email protected] Provincial ceaa.ontarioregion- Ontario Region Canadian Environmental Assessment Agency 160 Elgin Street, 22nd Floor Ottawa ON K1A 0H3 416-952-1576 Federal [email protected] Central and Arctic Regional Headquarters Department of Fisheries and Oceans 520 Exmouth Street Sarnia ON N7T 8B1 519-383-1809 [email protected] Federal

Table B1.2: OPCC Members

First Last Title Representing Address Town Provin Postal Phone Email Type Name Name ce Code Zora Crnojacki Ontario Energy Board P.O Box 2319, 2300 Younge Toronto ON M4P 1E4 416-440-8104 [email protected] OPCC Street, 26th Floor Linda Pim Ministry of Agriculture, Food and Rural Affairs 1 Stone Road West, 3rd Floor SE Guelph ON N1G 4Y2 519-826-3380 [email protected] OPCC Laura Hatcher Team Lead, Heritage Ministry of Tourism, Culture & Sports 401 Bay Street Toronto ON M7A 0A7 416-314-3108 [email protected] OPCC Tony Difabio Ministry of Transportation 301 St. Paul Street, 2nd Floor St. ON L2R 7R4 905-704-2656 [email protected] OPCC Catharin es Kourosh Manouche Technical Standards and Safety Authority 345 Carlingview Drive Toronto ON M9W 416-734-3539 [email protected] OPCC hri 6N9 Sally Renwick Team Lead, Environmental Planning Ministry of Natural Resources and Forestry 300 Water Street Peterbor ON K9J 8M5 705-755-5195 [email protected] OPCC ough Scott Oliver Ministry of Municipal Affairs and Housing, 659 Exeter Road, 2nd Floor London ON N6E 1L3 519-873-4033 [email protected] OPCC Western Municipal Services Office Shannon McCabe Senior Advisor. Indigenous Energy Policy Ministry of Energy 77 Grenville Street, 6th Floor Toronto ON M7A 416-212-6704 [email protected] OPCC Unit 2C1 Crystal Lafrance Regional Contact-Southerwestern Ministry of Environment, Conservation and 659 Exeter Road, 2nd Floor London ON N6E 1L3 519-873-5055 [email protected] OPCC Parks Patrick Grace Infrastructure Ontario 1 Dundas Street West, Suite Toronto ON M5G 2L5 [email protected] OPCC 2000 Joseph Vecchiolla Ministry of Economic Development, Job 777 Bay Street, 4th Floor, Suite Toronto ON M5G 416-325-1561 [email protected] OPCC Creation and Trade 425 2E5

1 of 2

Table B.3: Elected Officials Contact List

First Name Last Name Title Representing Address Town Province Postal Code Phone Email Jeff Baranek Clerk St. Clair Township 1155 Emily Street Mooretown ON N0N 1M0 519-867-2021 [email protected] Carlie McClemens Deptury Clerk/Coordinator of Planning St. Clair Township 1155 Emily Street Mooretown ON N0N 1M0 519-867-2021 [email protected] Ben Puzanov Manager, Planning & Development Services Lambton County 789 Broadway Street Wyoming ON N0N 1T0 519-845-0801 ext. 5342 [email protected] Stephane Thiffeault General Manager, Solicitor / Clerk Lambton County 789 Broadway Street Wyoming ON N0N 1T0 519-845-0801 ext. 5402 [email protected]

Table B.4: Indigenous Contact List

Title First Name Last Name Indigenous community/Agency Address Town Prov PC Phone Email

Chief Christopher Plain Aamjiwnaang First Nation 978 Tashmoo Avenue Sarnia ON N7T 7H5 519-336-8410 x 236 [email protected]

Chief Daniel Miskokomon Walpole Island First Nation 117 Tahgahoning Road, R.R.3 Wallaceburg ON N8A 4K9 519-628-5700 [email protected]

Chief Jason Henry Chippewas of Kettle and Stony Point 6247 Indian Lane Lambton Shores ON N0N 1J2 519-786-2125 [email protected]

Chief Henry Myeengun Chippewas of the Thames First Nation 320 Chippewa Road, R.R.1 Muncey ON N0L 1Y0 519-289-5555 [email protected]

Chief Jessica Hill Oneida Nation of the Thames 2212 Elm Avenue Southwold ON N0L 2G0 519-652-3244 [email protected]

2 of 2

SARNIA INDUSTRIAL LINE REINFORCEMENT PIPELINE PROJECT DOW TO BLUEWATER: ENVIRONMENTAL REPORT

APPENDIX B2: NEWSPAPER NOTICES

sports Tuesday, May 14, 2019 The Observer A7

Hockey Hockey Soccer High School Harness Racing NHL Playoffs Memorial Cup MLS TRACK AND FIELD HIAWATHA HORSE EastErn ConfErEnCE W L otL Pts EastErn ConfErEnCE Following is the schedule for the LKSSAA championship fInaLs Guelph 0 0 0 0 W L t Pts gf ga at the Chatham-Kent Community Athletic Complex. PARK (BEst-of-7) WHL 0 0 0 0Philadelphia 7 3 2 23 23 12 (Legend: M – Midget; J – Junior; S – Senior; G – Girls; saturday’s rEsuLts (2) Boston BruIns Rouyn-Noranda 0 0 0 0 D.C. United 7 3 2 23 17 11 B – Boys) raCE 1 – PaCE $4,800; tImE 2:00 vs. (WC1) CaroLIna HurrICanEs Halifax Moosehead 0 0 0 0 Montreal 6 5 2 20 15 19 today’s EvEnts 5-Lyons Fullhouse (G. Rooney) 7.20 5.00 2.80 (Boston LEads sErIEs 2-0) round roBIn New York City FC 4 1 6 18 15 12 traCk 1-Novel Writer (A. Sorrie) 2.70 2.60 tuEsday’s gamE frIday’s gamE Atlanta 5 3 2 17 12 8 Open girls’, open boys’ 2,000-metre steeplechase, 9:45 2-Catch My Contrail (S. Wray) 3.60 Boston at Carolina, 8 p.m. WHL at Halifax, 7 p.m. Toronto FC 5 4 1 16 22 17 a.m. Exactor (5-1) $19.60; Triactor (5-1-2) $35.35 tHursday’s gamE saturday’s gamEs Columbus 5 7 1 16 12 18 Sprint hurdles (heats), 10:15 a.m. raCE 2 – PaCE $4,800; tImE 1:58.3 Boston at Carolina, 8 p.m. Rouyn-Noranda at Guelph, 3:30 p.m. Chicago 4 4 4 16 19 13 100 metres (heats), 10:45 a.m. 4-Lil Beau Duke (N. Steward) 3.00 2.20 2.60 saturday’s gamE sunday’s gamE New York 4 5 2 14 16 14 400 metres, 11:30 a.m. 2-Altruistic Fella (J. Mcdaid) 7.10 4.50 x-Carolina at Boston, 7:15 p.m. Halifax at Guelph, 7 p.m. Orlando City 3 5 3 12 13 17 Sprint hurdles (finals), 12:50 p.m. 3-Mach Art In Motion (G. Rooney) 2.30 monday, may 20 monday, may 20 Cincinnati 3 7 2 11 10 18 100 metres (finals), 1:20 p.m. Daily Double (5-4) $17.10 x-Boston at Carolina, 8 p.m. Rouyn-Noranda at WHL, 7 p.m. New England 3 8 2 11 14 31 1,500 metres, 1:50 p.m. Exactor (4-2) $57.60; Triactor (4-2-3) $31.05 WEdnEsday, may 22 tuEsday, may 21 WEstErn ConfErEnCE 4x100-metre relays, 3:15 p.m. raCE 3 – PaCE $5,000; tImE 1:59 x-Carolina at Boston, 8 p.m. Guelph at WHL, 7 p.m. W L t Pts gf ga fIELd 3-All Around Dragon (N. Steward) 9.80 6.00 4.40 gamE 1 WEdnEsday, may 22 Los Angeles FC 8 1 3 27 29 8 MG long jump, JG triple jump, SG high jump, MB shot 1-Ambers Shadow (S. Wray) 8.40 4.70 Boston 5, Carolina 2 Halifax at Rouyn-Noranda, 7 p.m. LA Galaxy 7 4 1 22 18 16 put, JB discus, SB javelin, 9:45 a.m. 6-Come On Barney (T. Borth) 3.30 gamE 2 tIE-BrEakEr Seattle 6 1 4 22 20 13 MG shot put, JG discus, SG javelin, MB long jump, JB Exactor (3-1) $101.50; Triactor (3-1-6) $189.10 Boston 6, Carolina 2 tHursday, may 23 Houston 6 2 1 19 17 10 triple jump, SB high jump, 11:30 a.m. raCE 4 – trot $3,800; tImE 2:00.2 x-TBD at TBD, 7 p.m. FC Dallas 5 4 2 17 16 14 MG high jump, JG long jump, SG triple jump, MB javelin, 5-Can Tab This (J. Tropea) 9.00 3.90 3.60 WEstErn ConfErEnCE sEmIfInaL Minnesota United 4 4 3 15 19 18 JB shot put, SB discus, 1:15 p.m. 3-Windmeredontuworry (A. Sorrie) 2.80 2.50 fInaLs frIday, may 24 4 6 1 13 15 20 Wednesday’s Events 4-Eagle Scout (D. Duford) 2.40 (BEst-of-7) TBD at TBD, 7 p.m. Vancouver 3 5 3 12 11 14 traCk Exactor (5-3) $31.70; Triactor (5-3-4) $31.85 (2) san JosE sHarks fInaL San Jose 3 6 2 11 14 22 200 metres (heats), 9:45 a.m. raCE 5 – PaCE $4,200; tImE 1:59.2 vs. (3) st. LouIs BLuEs sunday, may 26 Portland 3 6 1 10 13 21 800 metres, 10:40 a.m. 4-Seymour Little (G. Rooney) 11.50 5.10 2.90 (san JosE LEads sErIEs 1-0) TBD at TBD, 7 p.m. 2 4 4 10 19 19 400-metre hurdles, 11:30 a.m. 6-Sports Nation (A. Lilley) 4.70 3.70 monday’s rEsuLt x — if necessary Colorado 0 9 2 2 16 30 200 metres (finals), 1:15 p.m. 2-Bad Blake (G. Mcknight) 3.90 St. Louis at San Jose WEdnEsday’s gamEs 3,000 metres, 1:45 p.m. Exactor (4-6) $62.30; Triactor (4-6-2) $220.50 WEdnEsday’s gamE D.C. United at Toronto FC, 8 p.m. 4x400-metre relays, 3:15 p.m. raCE 6 – PaCE $4,800; tImE 1:55.4 San Jose at St. Louis, 8 p.m. Portland at Houston, 8:30 p.m. fIELd 6-Regal Luck (G. Rooney) 6.80 3.60 2.10 frIday’s gamE IIHF World Hockey Atlanta at Vancouver, 10 p.m. MG javelin, JG shot put, SG discus, MB high jump, JB 2-Mr Mach Jimmy (J. Mayhew) 3.60 2.30 San Jose at St. Louis, 8 p.m. Championship Orlando City at Seattle, 10:30 p.m. long jump, SB triple jump, 9:45 a.m. 3-Big Petes Style (T. Borth) 2.50 sunday’s gamE tHursday’s gamE MG triple jump, JG high jump, SG long jump, MB discus, Exactor (6-2) $15.30; Triactor (6-2-3) $45.85 x-St. Louis at San Jose, 3 p.m. grouP a FC Dallas at Los Angeles FC, 10 p.m. JB javelin, SB shot put, 11:30 a.m. teams W otW L otL P raCE 7 – PaCE $3,400; tImE 1:56.4 tuEsday, may 21 saturday’s gamEs MG discus, JG javelin, SG shot put, MB triple jump, JB 1-Amazing Quest (G. Rooney) 9.70 3.90 4.70 x-San Jose at St. Louis, 8 p.m. Finland 2 0 0 1 7 New England at Montreal, 1 p.m. high jump, SB long jump, 1:15 p.m. Germany 2 0 0 0 6 9-Big Is Better (T. Borth) 4.30 3.70 tHursday, may 23 Toronto FC at Real Salt Lake, 3 p.m. 6-Mybrothergeorge (J. Mayhew) 3.00 x-St. Louis at San Jose, 9 p.m. Canada 2 0 1 0 6 Chicago at San Jose, 3:30 p.m. United States 1 1 1 0 5 Exactor (1-9) $168.40; Triactor (1-9-6) $120.65 gamE 1 Seattle at Philadelphia, 7:30 p.m. SR. GIRLS SOCCER raCE 8 – PaCE $3,800; tImE 1:57 San Jose 6, St. Louis 3 Slovakia 1 0 2 0 3 Columbus at Minnesota United, 8 p.m. Denmark 0 1 1 0 3 monday’s rEsuLts 3-Keaton (G. Rooney) 5.10 3.60 2.30 D.C. United at Houston, 8:30 p.m. Pain Court 6 Lambton-Kent 0 2-Singhampton Kenny (T. Borth) 3.70 3.00 x — if necessary. France 0 0 1 1 1 Vancouver at Sporting Kansas City, 8:30 p.m. Britain 0 0 2 0 0 Northern 1 Ursuline 0 5-Bet On Art (S. Wray) 3.00 sunday’s gamEs McGregor at St. Patrick’s N Exactor (3-2) $18.90; Triactor (3-2-5) $52.95 grouP B Cincinnati at Orlando City, 3 p.m. teams W otW L otL P tHursday’s gamEs raCE 9 – PaCE $3,400; tImE 1:58.3 Los Angeles FC at FC Dallas, 3 p.m. Great Lakes vs. Northern, 2:30 p.m. Norm Perry Park 2-Dolly Dali (S. Wray) 17.30 6.20 4.30 NHL Leaders Russia 3 0 0 0 9 Atlanta at New York, 5 p.m. Switzerland 2 0 0 0 6 Tilbury at Lambton-Kent, 3:30 p.m. 7-Daenerys (A. Sorrie) 8.20 4.30 *Not including last night’s games Colorado at LA Galaxy, 8 p.m. Czech Republic 2 0 1 0 6 St. Patrick’s at Ursuline, 3:30 p.m. 1-Zarkana (T. Borth) 2.30 g a Pts Sweden 2 0 1 0 6 Lambton Central vs. Wallaceburg, 4 p.m. Perry Park Exactor (2-7) $347.70; Triactor (2-7-1) $412.40 Logan Couture, SJ 11 6 17 Latvia 1 0 1 0 3 may 8 rEsuLt raCE 10 – PaCE $3,400; tImE 1:56.3 Brad Marchand, Bos 5 10 15 Norway 0 0 3 0 0 MLS Leaders Ursuline 3 McGregor 1 4-I C Anastro (G. Rooney) 4.80 3.50 3.40 Brent Burns, SJ 5 10 15 Austria 0 0 2 0 0 may 2 rEsuLt 3-White Dancer (J. Mayhew) 3.10 2.30 Tomas Hertl, SJ 9 5 14 Player goals St. Patrick’s 5 Lambton Central 0 5-Onimpulse (T. Borth) 5.40 Italy 0 0 2 0 0 , LFC 12 Mikko Rantanen, Col 6 8 14 PrELImInary round Exactor (4-3) $11.60; Triactor (4-3-5) $87.30 Nathan MacKinnon, Col 6 7 13 Zlatan Ibrahimovic, LA 9 Total Purse: $41,400 monday’s rEsuLts Kei Kamara, COL 7SR. BOYS SOCCER Timo Meier, SJ 5 8 13 United States 3, Finland 2, OT Total Handle: $18,343 Erik Karlsson, SJ 0 13 13 Krisztian Nemeth, KC 6 monday’s rEsuLts Russia 3, Czech Republic 0 Wayne Rooney, DC 6 Jaden Schwartz, StL 8 4 12 Canada 6, Slovakia 5 Ursuline at Northern N Charlie Coyle, Bos 6 6 12 Diego Rossi, LFC 6Blenheim at Ridgetown N Sweden 9, Norway 1 Jozy Altidore, TOR 5 David Pastrnak, Bos 6 6 12 tuEsday’s gamEs McGregor at St. Patrick’s N Mark Stone, VGK 6 6 12 Mauro Manotas, HOU 5tHursday’s gamEs Denmark vs. Britain, 10:15 a.m. Nani, ORL 5 David Krejci, Bos 4 8 12 France vs. Germany, 2:15 p.m. Great Lakes vs. Northern, 4 p.m. Norm Perry Park Basketball Max Pacioretty, VGK 5 6 11 Nemanja Nikolic, CHI 5 Lambton Central vs. Wallaceburg, 4 p.m. Perry Park Latvia vs. Italy, 10:15 a.m. Alejandro Pozuelo, TOR 5 Artemi Panarin, Clb 5 6 11 Austria vs. Switzerland, 2:15 p.m. St. Patrick’s at Ursuline, 5 p.m. Sebastian Aho, Car 5 6 11 , MIN 5 NBA Playoffs WEdnEsday’s gamEs Albert Rusnak, RSL 5 Tyler Seguin, Dal 4 7 11 Britain vs. United States, 10:15 a.m. SR. GIRLS RUGBY EastErn ConfErEnCE Mats Zuccarello, Dal 4 7 11 Player assists fInaL Slovakia vs. Germany, 2:15 p.m. Nicolas Lodeiro, SEA 6 Alex Pietrangelo, StL 2 9 11 Norway vs. Switzerland, 10:15 a.m. monday’s rEsuLts (BEst-of-7) Torey Krug, Bos 1 10 11 Alejandro Pozuelo, TOR 6 CKSS 34 Blenheim 5 (1) mILWaukEE BuCks Italy vs. Russia, 2:15 p.m. Diego Valeri, POR 6 Jaccob Slavin, Car 0 11 11 tHursday’s gamEs Northern at St. Patrick’s N vs. (2) toronto raPtors Teuvo Teravainen, Car 7 3 10 Carlos Vela, LFC 6tHursday’s gamE (sErIEs tIEd 0-0) France vs. Canada, 10:15 a.m. Michael Barrios, DAL 5 Patrice Bergeron, Bos 6 4 10 Denmark vs. Finland, 2:15 p.m. Ursuline at Northern, 4 p.m. WEdnEsday’s gamE Alexander Radulov, Dal 5 5 10 Latif Blessing, LFC 5frIday’s gamE Toronto at Milwaukee, 8:30 p.m. Austria vs. Sweden, 10:15 a.m. , HOU 5 Matt Duchene, Clb 5 5 10 Latvia vs. Czech Republic, 2:15 p.m. St. Patrick’s at CKSS, 4 p.m. frIday’s gamE Jordan Staal, Car 4 6 10 Mark-Anthony Kaye, LFC 5 Toronto at Milwaukee, 8:30 p.m. frIday’s gamEs Maximiliano Urruti, MTL 5 Ryan O’Reilly, StL 3 7 10 Slovakia vs. France, 10:15 a.m. JR. GIRLS RUGBY sunday’s gamE Jamie Benn, Dal 2 8 10 Players shots Milwaukee at Toronto, 7 p.m. Britain vs. Finland, 2:15 p.m. Carlos Vela, LFC 64 Gustav Nyquist, SJ 1 9 10 Norway vs. Austria, 10:15 a.m. frIday’s gamEs tuEsday, may 21 Warren Foegele, Car 5 4 9 Zlatan Ibrahimovic, LA 50 At North Lambton Milwaukee at Toronto, 8:30 p.m. Italy vs. Czech Republic, 2:15 p.m. Diego Rossi, LFC 41 Alex Ovechkin, Wash 4 5 9 saturday’s gamEs Ursuline vs. St. Patrick’s, 3 p.m. tHursday, may 23 Jordan Eberle, NYI 4 5 9 Aleksandar Katai, CHI 35 Ursuline vs. North Lambton, 3:40 p.m. x-Toronto at Milwaukee, 8:30 p.m. United States vs. Denmark, 6:15 a.m. Josef Martinez, ATL 35 Marcus Johansson, Bos 3 6 9 Germany vs. Canada, 10:15 a.m. St. Patrick’s vs. North Lambton, 4:20 p.m. saturday, may 25 Seth Jones, Clb 3 6 9 Sebastian Blanco, POR 34 x-Milwaukee at Toronto, 8:30 p.m. Slovakia vs. Britain, 2:15 p.m. Dom Dwyer, ORL 33 John Klingberg, Dal 2 7 9 Russia vs. Latvia, 6:15 a.m. monday, may 27 Roope Hintz, Dal 5 3 8 Alexandru Mitrita, NYC 33BASEBALL x-Toronto at Milwaukee, 8:30 p.m. Norway vs. Italy, 10:15 a.m. Wayne Rooney, DC 33 Nicklas Backstrom, Wash 5 3 8 Switzerland vs. Sweden, 2:15 p.m. monday’s rEsuLts Joe Pavelski, SJ 4 4 8 Kei Kamara, COL 31Lambton Central vs. St. Patrick’s N WEstErn ConfErEnCE sunday’s gamEs Mauro Manotas, HOU 31 Colin Wilson, Col 4 4 8 United States vs. Germany, 10:15 a.m. Ursuline vs. CKSS N fInaL Gabriel Landeskog, Col 3 5 8 Finland vs. France, 2:15 p.m. Ridgetown at Wallaceburg N (BEst-of-7) Dustin Byfuglien, Wpg 2 6 8 Czech Republic vs. Austria, 10:15 a.m. today’s gamE (1) goLdEn statE WarrIors Cam Atkinson, Clb 2 6 8 Russia vs. Switzerland, 2:15 p.m. CPL St. Francois-Xavier vs. Great Lakes, 2:45 p.m. Blackwell vs. (3) PortLand traILBLazErs Paul Stastny, VGK 2 6 8 monday, may 20 Park (sErIEs tIEd 0-0) Evander Kane, SJ 2 6 8 Britain vs. France, 10:15 a.m. tHursday’s gamE WEdnEsday’s gamEs tuEsday’s gamE Tyson Barrie, Col 1 7 8 Denmark vs. Canada, 2:15 p.m. Hamilton at Winnipeg, 8 p.m. St. Patrick’s vs. Northern, 2:45 p.m. Blackwell Park Portland at Golden State, 9 p.m. Shea Theodore, VGK 1 7 8 Latvia vs. Sweden, 10:15 a.m. saturday’s gamEs Great Lakes at Lambton Central, 3:15 p.m. Greenwood tHursday’s gamE Kevin Labanc, SJ 4 3 7 Italy vs. Austria, 2:15 p.m. York at Victoria, 3:30 p.m. Park Portland at Golden State, 9 p.m. Justin Williams, Car 4 3 7 Edmonton at Calgary, 6 p.m.

EnbrNidOgeTIGaCEsIOFnc.–NDRotAFiceoTSfCITomEPmenLAceNment: SarniaIndustrial Line ReinforcementPipelineProject –DOW to Bluewater

Duetofacility expansions in theSarniaarea, resultinginanincreased demand fornatural gasand theneedfor additional capacity, Enbridge GasInc.(Enbridge Gas) is proposingtoconstruct anew natural gaspipeline between Enbridge Gas’ existing DowValve Site and EnbridgeGas’existingBluewater InterconnectTransmission Stationin theTownshipofSt. Clair. Theproposed pipeline will be 20-inchesindiameter, and approximately 1.2kminlength.

Please note: as of Jan. 1, 2019, UnionGas and Enbridge GasDistributionhaveamalgamated into one utilitywith thelegal nameEnbridgeGas Inc.

Enbridge Gasiscommittedtoconsultationand engagement with landowners, municipalities,government agencies, Indigenous communities andother interested parties.

An integral part of this projectisthe completion of an environmentalstudy of theconstructionand operation of the proposed pipeline andrelated facilities by an independent environmentalconsultant, StantecConsultingLtd (Stantec). An EnvironmentalReport, summarizing theresults of theenvironmentalstudy,will accompanyEnbridge Gas’ application to theOntario Energy Board (OEB), whosereviewand approvalisrequired beforethe proposedproject canproceed.The EnvironmentalReportisanticipated to be completedand submittedtothe OEBasearly as summer 2019. If approvedbythe OEB, construction of theproposedproject is planned to beginasearly as spring 2021,withanin- servicedateoffall2021.

If youhaveany questions or comments regardingthe environmentalstudy processor theproject,pleasecontact theundersigned or visitthe projectwebpage as notedbelow:

MichaelCandido ProjectManager Assessment and Permitting Stantec Consulting 1-70 SouthgateDrive Guelph ON,N1G 4P5 519-780-8139 [email protected]

Enbridge Gas Phone: 1-885-381-9138 Email: [email protected] Or visitour projectwebpage:uniongas.com/projects SARNIA INDUSTRIAL LINE REINFORCEMENT PIPELINE PROJECT DOW TO BLUEWATER: ENVIRONMENTAL REPORT

APPENDIX B3: LETTERS

Stantec Consulting Ltd. 1-70 Southgate Drive, Guelph ON N1G 4P5

May 14, 2019 File: 160961284

Attention: «Title» «First_Name» «Last_Name» «Representing» «Address» «City» «Province» «Postal_Code»

Dear, «First_Name» «Last_Name»

Reference: Enbridge Gas Inc. – Notice of Commencement: Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater

Due to facility expansions in the Sarnia area, resulting in an increased demand for natural gas and the need for additional capacity, Enbridge Gas Inc. (Enbridge Gas) is proposing to construct a new natural gas pipeline between Enbridge Gas’ existing Dow Valve Site and Enbridge Gas’ existing Bluewater Interconnect Transmission Station in the Township of St. Clair. The proposed pipeline will be 20-inches in diameter, and approximately 1.2 km in length. A map depicting the location of the project study area is enclosed.

Please note: as of Jan. 1, 2019, Union Gas and Enbridge Gas Distribution have amalgamated into one utility with the legal name Enbridge Gas Inc.

You are receiving this letter because your property is located near the proposed pipeline route.

As an integral part of this project, Enbridge Gas has hired Stantec Consulting Ltd. to undertake an environmental study of the construction and operation of the proposed pipeline and related facilities. The environmental study will fulfill the requirements of the Ontario Energy Boards’ (OEB) Environmental Guidelines for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario (2016). The environmental study process includes consultation and engagement with landowners, municipalities, agencies, Indigenous communities, and other interested parties through notices, mailouts, and meetings.

An Environmental Report, summarizing the results of the environmental study, will accompany Enbridge Gas’ application to the OEB, whose review and approval is required before the proposed project can proceed. The Environmental Report for the proposed project is anticipated to be completed and submitted to the OEB as early as summer of 2019. If approved by the OEB, construction of the proposed project is planned to begin as early as spring 2021 with an in-service date of fall 2021.

Please feel free to share this letter with your neighbours. If you are a landowner, it would also be appreciated if this letter could be shared with your tenants.

May 14, 2019 Attention Page 2 of 2

Reference: Enbridge Gas Inc. – Notice of Commencement: Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater

If you have any questions or comments regarding the environmental study process or the project, please contact the undersigned.

Additional project information is available at: uniongas.com/projects

Regards,

Stantec Consulting Ltd.

Michael Candido B.Sc.(Env.) Project Manager Assessment and Permitting Stantec Consulting Ltd 1-70 Southgate Drive Guelph, ON N1G 4P5 519-780-8139 [email protected]

Attachment: Map of Preferred Route c. Ryan Park, Enbridge Gas

Stantec Consulting Ltd. 1-70 Southgate Drive, Guelph ON N1G 4P5

May 14, 2019 File: 160961284

Attention: «Title» «First_Name» «Last_Name» «Representing» «Address» «Town» «Province» «Postal_Code»

Dear , «First_Name» «Last_Name»

Reference: Enbridge Gas Inc.– Notice of Commencement: Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater

Due to facility expansions in the Sarnia area, resulting in an increased demand for natural gas and the need for additional capacity, Enbridge Gas Inc. (Enbridge Gas) is proposing to construct a new natural gas pipeline between Enbridge Gas’ existing DOW Valve Site and Enbridge Gas’ existing Bluewater Interconnect Transmission Station in the Township of St. Clair. The proposed pipeline will be 20-inches in diameter, and approximately 1.2 km in length. A map depicting the location of the project study area is enclosed.

Please note: as of Jan. 1, 2019, Union Gas and Enbridge Gas Distribution have amalgamated into one utility with the legal name Enbridge Gas Inc.

As an integral part of this project, Enbridge Gas has hired Stantec Consulting Ltd. to undertake an environmental study of the construction and operation of the proposed pipeline and related facilities. The environmental study will fulfill the requirements of the Ontario Energy Boards’ (OEB) Environmental Guidelines for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario (2016). The environmental study process includes consultation and engagement with landowners, municipalities, agencies, Indigenous communities, and other interested parties through notices, mailouts, and meetings.

An Environmental Report, summarizing the results of the environmental study, will accompany Enbridge Gas’ application to the OEB, whose review and approval is required before the proposed project can proceed. The Environmental Report for the proposed project is anticipated to be completed and submitted to the OEB as early as summer of 2019. If approved by the OEB, construction of the proposed project is planned to begin as early as spring of 2021 with an in-service date of fall 2021.

Stantec is presently compiling an environmental and socio-economic inventory and as a stakeholder with authority or a potential interest in developments in the study area you are invited to provide comments regarding the proposed project. Specifically, Stantec is seeking information that may affect construction and operation of the proposed pipeline, including background environmental and socio-economic information, planning principles or guidelines which fall under your authority and other proposed developments to assess potential cumulative effects. Please feel free to contact us to discuss the most efficient way to obtain this information.

May 14, 2019 «Title» «First_Name» «Last_Name» Page 2 of 2

Reference: Enbridge Gas Inc.– Notice of Commencement: Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater

If you have questions or comments regarding the project or the environmental study process, please contact the undersigned.

Additional project information is available at: uniongas.com/projects

Regards,

Stantec Consulting Ltd.

Michael Candido B.Sc.(Env.) Project Manager Assessment and Permitting Stantec Consulting Ltd 1-70 Southgate Drive Guelph, ON N1G 4P5 519-780-8139 [email protected]

Attachment: Map of Preferred Route c. Ryan Park, Enbridge Gas

Stantec Consulting Ltd. 1-70 Southgate Drive, Guelph ON N1G 4P5

May 14, 2019 File: 160961284

Attention: «Title» «First_Name» «Last_Name» «Representing» «Address» «City» «Province» «Postal_Code»

Dear, «First_Name» «Last_Name»

Reference: Enbridge Gas Inc. – Notice of Commencement: Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater

Due to facility expansions in the Sarnia area, resulting in an increased demand for natural gas and the need for additional capacity, Enbridge Gas Inc. (Enbridge Gas) is proposing to construct a new natural gas pipeline between Enbridge Gas’ existing DOW Valve Site and Enbridge Gas’ existing Bluewater Interconnect Transmission Station in the Township of St. Clair. The proposed pipeline will be 20-inches in diameter, and approximately 1.2 km in length. A map depicting the location of the project study area is enclosed.

Please note: as of Jan. 1, 2019, Union Gas and Enbridge Gas Distribution have amalgamated into one utility with the legal name Enbridge Gas Inc.

You are receiving this letter because the proposed pipeline is located on your property.

As an integral part of this project, Enbridge Gas has hired Stantec Consulting Ltd. to undertake an environmental study of the construction and operation of the proposed pipeline and related facilities. The environmental study will fulfill the requirements of the Ontario Energy Boards’ (OEB) Environmental Guidelines for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario (2016). The environmental study process includes consultation and engagement with landowners, municipalities, agencies, Indigenous communities, and other interested parties through notices, mailouts, and meetings.

An Environmental Report, summarizing the results of the environmental study, will accompany Enbridge Gas’ application to the OEB, whose review and approval is required before the proposed project can proceed. The Environmental Report for the proposed project is anticipated to be completed and submitted to the OEB as early as summer of 2019. If approved by the OEB, construction of the proposed project is planned to begin as early as spring 2021 with an in-service date of fall 2021.

Please feel free to share this letter with your neighbours. If you are a landowner, it would also be appreciated if this letter could be shared with your tenants.

May 14, 2019 Attention Page 2 of 2

Reference: Enbridge Gas Inc. – Notice of Commencement: Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater

If you have any questions or comments regarding the environmental study process or the project, please contact the undersigned.

Additional project information is available at: uniongas.com/projects

Regards,

Stantec Consulting Ltd.

Michael Candido B.Sc.(Env.) Project Manager Assessment and Permitting Stantec Consulting Ltd 1-70 Southgate Drive Guelph, ON N1G 4P5 519-780-8139 [email protected]

Attachment: Map of Preferred Route c. Ryan Park, Enbridge Gas

May 14, 2019

«Indigenous_communityAgency» «Address» «Town» «Prov» «PC» «Email_»

Attention: «Title» «First_Name» «Last_Name», «Title»

Dear «Title» «First_Name» «Last_Name»,

Reference: Enbridge Gas Inc. – Notice of Commencement: Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater

Due to facility expansions in the Sarnia area, resulting in an increased demand for natural gas and the need for additional capacity, Enbridge Gas Inc. (Enbridge Gas) is proposing to construct a new natural gas pipeline between Enbridge Gas’ existing Dow Valve Site and the existing Enbridge Gas Bluewater Interconnect Transmission Station in the Township of St. Clair. The proposed pipeline will be 20-inches in diameter, and approximately 1.2 km in length. A map depicting the location of the project study area is enclosed.

As an integral part of this project, Enbridge Gas has hired Stantec Consulting Ltd. to undertake an environmental study of the construction and operation of the proposed pipeline and related facilities. The environmental study will fulfill the requirements of the Ontario Energy Board’s (OEB) Environmental Guidelines for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario (2016). The environmental study process includes consultation and engagement with landowners, municipalities, agencies, Indigenous communities, and other interested parties through notices, mailouts, meetings, and meetings.

An Environmental Report, summarizing the results of the environmental study, will accompany Enbridge Gas’ application to the OEB. The Environmental Report for the proposed project is anticipated to be completed and submitted to the OEB as early as summer of 2019 as part of the overall project application. If approved by the OEB, construction of the proposed project is planned to begin as early as spring 2021 with an in- service date of fall 2021.

«Indigenous_communityAgency» is invited to provide comments on the proposed project. Specifically, Stantec is seeking information about any adverse impacts that the proposed project may have on constitutionally protected Indigenous or treaty rights and any measures for mitigating those adverse impacts. Stantec is also seeking background environmental and socio-economic information that may be useful in compiling an inventory.

April 18, 2019 Page 2 of 2

Additional project information is available at: uniongas.com/projects

Miigwech,

Ken McCorkle Ken McCorkle Manager, Indigenous Affairs Enbridge Gas 50 Keil Drive North Chatham, ON N7M 5M1 Phone: 519-436-4600 ext. 5002243 Email: [email protected]

Attachment: Map of Preferred Route c. Michael Candido, Stantec Consulting Ltd. «Title»

P.O. Box 2001, 50 Keil Drive North, Chatham, ON, N7M 5M1 www.uniongas.com Enbridge Gas

Stantec Consulting Ltd. 1-70 Southgate Drive, Guelph ON N1G 4P5

May 14, 2019 File: 160961284

Attention: «Title» «First_Name» «Last_Name» «Representing» «Address» «Town» «Province» «Postal_Code»

Dear , «First_Name» «Last_Name»

Reference: Enbridge Gas Inc. – Notice of Commencement: Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater

Due to facility expansions in the Sarnia area, resulting in an increased demand for natural gas and the need for additional capacity, Enbridge Gas Inc. (Enbridge Gas) is proposing to construct a new natural gas pipeline between Enbridge Gas’ existing Dow Valve Site and Enbridge Gas’ existing Bluewater Interconnect Transmission Station in the Township of St. Clair. The proposed pipeline will be 20-inches in diameter, and approximately 1.2 km in length. A map depicting the location of the project study area is enclosed.

Please note: as of Jan. 1, 2019, Union Gas and Enbridge Gas have amalgamated into one utility with the legal name Enbridge Gas Inc.

As an integral part of this project, Enbridge Gas has hired Stantec Consulting Ltd. to undertake an environmental study of the construction and operation of the proposed pipeline and related facilities. The environmental study will fulfill the requirements of the Ontario Energy Boards’ (OEB) Environmental Guidelines for the Location, Construction and Operation of Hydrocarbon Pipelines and Facilities in Ontario (2016). The environmental study process includes consultation and engagement with landowners, municipalities, agencies, Indigenous communities, and other interested parties through notices, mailouts, and meetings.

An Environmental Report, summarizing the results of the environmental study, will accompany Enbridge Gas’ application to the OEB, whose review and approval is required before the proposed project can proceed. The Environmental Report for the proposed project is anticipated to be completed and submitted to the OEB as early as summer of 2019. If approved by the OEB, construction of the proposed project is planned to begin as early as spring of 2021 with an in-service date of fall 2021.

Stantec is presently compiling an environmental and socio-economic inventory and as a stakeholder with authority or a potential interest in developments in the study area you are invited to provide comments regarding the proposed project. Specifically, Stantec is seeking information that may affect construction and operation of the proposed pipeline, including background environmental and socio-economic information, planning principles or guidelines which fall under your authority and other proposed developments to assess potential cumulative effects. Please feel free to contact us to discuss the most efficient way to obtain this information.

May 14, 2019 «Title» «First_Name» «Last_Name» Page 2 of 2

Reference: Enbridge Gas Inc. – Notice of Commencement: Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater

If you have questions or comments regarding the project or the environmental study process, please contact the undersigned.

Additional project information is available at: uniongas.com/projects

Regards,

Stantec Consulting Ltd.

Michael Candido B.Sc.(Env.) Project Manager Assessment and Permitting Stantec Consulting Ltd 1-70 Southgate Drive Guelph, ON N1G 4P5 519-780-8139 [email protected]

Attachment: Map of Preferred Route c. Ryan Park, Enbridge Gas

SARNIA INDUSTRIAL LINE REINFORCEMENT PIPELINE PROJECT DOW TO BLUEWATER: ENVIRONMENTAL REPORT

APPENDIX B4: PROJECT CORRESPONDENCE

Sarnia Industrial Line Reinforcement Pipeline Project - DOW to Bluewater Correspondence Tracking Government and Agencies

Comment Stakeholder Representative Stakeholder Group Method of Communication Date of Communication Summary of Comment Date of Response Summary of Response Number Name See Appendix All agencies on contact list Email May 14, 2019 Notice of Commencement N/A N/A B1 and B3

1 Canadian Environmental Assessment Agency Emily Webb/Anjala Email May 15, 2019 Review the requirements of the Canadian Environmental Assessment Act to determine if the project is subject to a federal N/A (CEAA) Puvananathan environmental assessment. N/A

2 Technical Standards and Safety Authority (TSSA) Kourosh Manouchehri Email May 16, 2019 Provided an application to be filled and submitted for review by TSSA. May 16, 2019 Stantec thanked TSSA for the application.

3 Hydro One Networks Inc. (HONI) Roman Dorfman Email May 21, 2019 The proposed pipeline into the Dow Valve Site is planned within HONI owned lands known as Sarnia South TS. HONIs future need May 21, 2019 Stantec thanked HONI for the information and noted an Enbridge Gas for a station on these lands may require Enbridge Gas tor emove the pipeline if necessary to accommodate HONIs future needs. representative will contact HONI regarding next steps. If Enbridge Gas wishes to submit a proposal to acquire an easement on these lands that may be terminated, please provide detailed drawings along with an Engineering and Review Fee.

4 Minstry of Energy, Northern Development and Raina Crasto Email May 22, 2019 Confirming that the Project Summary Report submitted for Sarnia Expansion Project is the same project with a name change, or if May 24, 2019 Stantec responded this is a portion of the Sarnia Expansion Project and at this Mines (ENDM) this is a portion of the Sarnia Project, or if the scope of the project has changed. point the project is moving forward in phases.

5 St. Clair Region Conservation Authority (SCRCA) Eva Barker Email May 24, 2019 Upon review of SCRCA best available in-house mapping, the SCRCA can confirm that the location of the proposed pipeline project N/A N/A will be located outside of the hazard and outside the area regulated by SCRCA. Further written permission will not be required prior to the commencement of the project. Noted to contact SCRCA that If this is incorrect, or the proposal changes, please do not hesitate to contact me,

6 Ministry of Environment, Conservation and Parks Craig Newton Email June 11, 2019 MECP notes that there are two known waste sites situated within 500 metres of the proposed pipeline route and provided some N/A N/A (MECP) locational information pertaining to these two waste sites. The proponent of this project should evaluate what impact, if any, these two waste sites will have both to the waste sites themselves, and the proposed pipeline. If so, what mitigation measures will be employed to eliminate this as a possibility.

1 of 1 From: Candido, Mike To: Candido, Mike Subject: RE: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater Date: Monday, August 12, 2019 9:46:09 AM

From: Ontario Region / Region d'Ontario (CEAA/ACEE) Sent: Wednesday, May 15, 2019 10:11 AM To: Hartwig, Emily Subject: RE: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater

Good Morning,

Please see the attached reply to your notice regarding the Sarnia Industrial Life Reinforcement Pipeline Project – DOW to Bluewater.

Thank you.

Emily Emily Webb Office Clerk, Ontario Region Canadian Environmental Assessment Agency / Government of Canada Employe de bureau, Bureau regional de l’Ontario Agence canadienne d’evaluation environmentale / Gouvernment du Canada [email protected] / Tel: 416-952-1576

From: Hartwig, Emily Sent: May 14, 2019 3:14 PM To: Ontario Region / Region d'Ontario (CEAA/ACEE) Cc: Candido, Mike Subject: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater

Sent on behalf of Michael Candido (Stantec Consulting Ltd.)

Good afternoon,

Please find attached a Notice of Commencement and map for the Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater.

Regards,

Emily Hartwig B.Sc., EPt. Environmental Consultant, Assessment and Permitting

Direct: 519 780-8186 Mobile: 226 979-4457 [email protected]

Stantec 1-70 Southgate Drive Guelph ON N1G 4P5

The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.

Attachment – Useful Legislation, Regulation, and Guidance Documents

For more information on the Canadian Environmental Assessment Act, 2012 (CEAA 2012), and the National Energy Board, please access the following links:

Overview of CEAA 2012 http://www.ceaa.gc.ca/default.asp?lang=En&n=16254939-1

Regulations Designating Physical Activities, and Prescribed Information for a Description of a Designated Project Regulations http://www.ceaa.gc.ca/default.asp?lang=En&n=9EC7CAD2-1

National Energy Board http://www.neb-one.gc.ca/clf-nsi/index.html

If it appears that CEAA 2012 may apply to the proposed project, but is not subject to section 1 of the Regulations, please note that the Responsible Authority for pipelines is the National Energy Board. Please contact the National Energy Board via their web based form: http://www.neb-one.gc.ca/cntcts/index- eng.html

• Discussion Paper on the Proposed Project List, May 2019: https://www.canada.ca/content/dam/themes/environment/conservation/environm ental-reviews/project-list-en.pdf

• Discussion Paper on Information Requirements and Time Management Regulatory Proposal, May 2019: https://www.canada.ca/content/dam/themes/environment/conservation/environm ental-reviews/timeline-en.pdf

Please note that the comment period on the above noted discussion papers is open until May 31, 2019. From: Candido, Mike To: Kourosh Manouchehri Subject: RE: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater Date: Thursday, May 16, 2019 4:04:00 PM Attachments: image006.jpg image007.png image008.png image009.png image010.png

Thanks Kourosh.

Mike

Michael Candido -CAN-CISEC Project Manager - Assessment and Permitting

Direct: 519 780-8139 Mobile: 519 829-8159 Fax: 519 836-2493 [email protected]

Stantec 1-70 Southgate Drive Guelph ON N1G 4P5

The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.

From: Kourosh Manouchehri Sent: Thursday, May 16, 2019 3:34 PM To: Erb, Jacqueline Cc: Candido, Mike Subject: RE: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater

Hi Jacqueline,

An application needs to be filled and submitted for the review of this project by TSSA as part of Ontario Pipeline Coordinating Committee. Please fill Application for Review of Pipeline Project and send it to the email address provided on the form.

If you have any question, please contact me.

Regards,

Kourosh Manouchehri, P.Eng., PMP | Engineer Fuels Safety 345 Carlingview Drive Toronto, Ontario M9W 6N9 Tel: +1-416-734-3539 | | Fax: +1-416-231-7525 | E-Mail: [email protected] www.tssa.org

From: Erb, Jacqueline Sent: May 14, 2019 15:12 To: Kourosh Manouchehri Cc: Candido, Mike Subject: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater

Sent on behalf of Michael Candido (Stantec Consulting Ltd.)

Good afternoon,

Please find attached a Notice of Commencement and map for the Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater.

Regards,

Jacqueline Erb Receptionist

Direct: 519-780-8100 Fax: 519-836-2493 [email protected]

Stantec 1-70 Southgate Drive Guelph ON N1G 4P5

The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.

Please consider the environment before printing this email.

This electronic message and any attached documents are intended only for the named recipients. This communication from the Technical Standards and Safety Authority may contain information that is privileged, confidential or otherwise protected from disclosure and it must not be disclosed, copied, forwarded or distributed without authorization. If you have received this message in error, please notify the sender immediately and delete the original message. From: Candido, Mike To: [email protected] Cc: [email protected]; [email protected] Subject: RE: SILR - Enbridge Gas Inc. Date: Tuesday, May 21, 2019 1:55:00 PM Attachments: image001.png image002.png

Hello Roman. Thanks for the information. I have passed along to Enbridge and someone will be in touch regarding the easement.

Mike

Michael Candido -CAN-CISEC Project Manager - Assessment and Permitting

Direct: 519 780-8139 Mobile: 519 829-8159 Fax: 519 836-2493 [email protected]

Stantec 1-70 Southgate Drive Guelph ON N1G 4P5

The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.

From: [email protected] Sent: Tuesday, May 21, 2019 1:43 PM To: Candido, Mike Cc: [email protected]; [email protected] Subject: SILR - Enbridge Gas Inc.

Michael, we received the attached recently and would like to advise you that the proposed pipeline into the Dow Valve Site is planned within Hydro One (HONI) owned lands known as Sarnia South TS

That being said, please refer to my email (attached) of May 21/14 to Ryan Langan (re: file Moore 636.1-4215) that describes HONIs future need for a station on these lands and that UGL (now EGI) would have to remove the pipeline if necessary to accommodate HONIs future needs.

If EGI wishes to submit a proposal to acquire an easement on these lands that may be terminated, please provide detailed drawings along with an Engineering and Review Fee ($2500+HST) payable to Hydro One Networks Inc. to my colleague Jim Oriotis (cc’d) for processing.

Thank you

Roman Dorfman Real Estate Services Supervisor, Facilities and Real Estate Services

Hydro One Networks Inc. 185 Clegg Road Markham, ON | L6G 1B7

Tel: 905.946.6243 Cell: 416.433.8777 Fax: 905.946.6242 Email: [email protected] www.HydroOne.com

This email and any attached files are privileged and may contain confidential information intended only for the person or persons named above. Any other distribution, reproduction, copying, disclosure, or other dissemination is strictly prohibited. If you have received this email in error, please notify the sender immediately by reply email and delete the transmission received by you. This statement applies to the initial email as well as any and all copies (replies and/or forwards) of the initial email From: Candido, Mike To: Crasto, Raina (ENDM) Subject: RE: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater Date: Friday, May 24, 2019 10:16:00 AM

Hello Raina. This is a portion of the Sarnia Expansion Project. At this point the project is moving forward in phases. Please let me know if you have an additional questions.

Mike

Michael Candido -CAN-CISEC Project Manager - Assessment and Permitting

Direct: 519 780-8139 Mobile: 519 829-8159 Fax: 519 836-2493 [email protected]

Stantec 1-70 Southgate Drive Guelph ON N1G 4P5

The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.

From: Crasto, Raina (ENDM) Sent: Wednesday, May 22, 2019 2:30 PM To: Candido, Mike Cc: Erb, Jacqueline Subject: FW: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater

Hi Michael,

We were provided the Notice of Commencement for the Dow to Bluewater project as indicated in the email below.

I was checking our records and I can’t seem to find a project with this name, but I did come across the Sarnia Expansion Project which seems to be located in the same area, with similar routing.

I’m wondering if this is the same project with a name change, or if this is a portion of the Sarnia Project, or if the scope of the project has changed.

Kindly let me know when you have a moment.

Thank you, Raina

Ministry of Energy, Northern Development and Mines Indigenous Energy Policy Tel: 416-326-4571 Email: [email protected] 77 Grenville Street, 6th Floor Toronto, ON M7A 2C1

From: Erb, Jacqueline Sent: Wednesday, May 15, 2019 9:15 AM To: McCabe, Shannon (ENDM) Cc: Candido, Mike Subject: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater

Sent on behalf of Michael Candido (Stantec Consulting Ltd.)

Good morning,

Please find attached a Notice of Commencement and map for the Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater.

Regards,

Jacqueline Erb Receptionist

Direct: 519-780-8100 Fax: 519-836-2493 [email protected]

Stantec 1-70 Southgate Drive Guelph ON N1G 4P5

The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.

Please consider the environment before printing this email.

From: Eva Baker To: Hartwig, Emily Cc: Candido, Mike; Dallas Cundick; Melissa Deisley Subject: FW: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater Date: Friday, May 24, 2019 1:59:36 PM Attachments: image001.jpg image002.jpg let_NoC_dc3_20190514.pdf

Good afternoon,

It is my understanding that Enbridge Gas Inc. wishes to construct a new 1.2 km natural gas pipeline between two existing stations, south of LaSalle Line as outlined on the attached report and site plan.

Upon review of Authority best available in-house mapping, the Authority can confirm that the location of the proposed pipeline project will be located outside of the hazard and outside the area regulated by the Authority. Further written permission of the Authority will not be required prior to the commencement of the project.

If my understanding is incorrect, or the proposal changes, please do not hesitate to contact me,

Thank you,

Eva

______Eva Baker Planning and Regulations Clerk St. Clair Region Conservation Authority 519-245-3710 ext. 235

From: Hartwig, Emily Sent: Tuesday, May 14, 2019 3:14 PM To: Dallas Cundick Cc: Candido, Mike Subject: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater

Sent on behalf of Michael Candido (Stantec Consulting Ltd.)

Good afternoon,

Please find attached a Notice of Commencement and map for the Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater.

Regards,

Emily Hartwig B.Sc., EPt. Environmental Consultant, Assessment and Permitting

Direct: 519 780-8186 Mobile: 226 979-4457 [email protected]

Stantec 1-70 Southgate Drive Guelph ON N1G 4P5

The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately. From: Newton, Craig (MECP) To: Erb, Jacqueline Cc: Lafrance, Crystal (MECP); Candido, Mike; Corda, Mary Jane (MECP) Subject: FW: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater Date: Tuesday, June 11, 2019 9:46:48 AM Attachments: image004.png image005.jpg image006.jpg let_NoC_cl_20190514.pdf D4 Land Use Near Landfills.pdf 20190611093937855.pdf

Good Morning Jacqueline:

This e-mail acknowledges this ministry’s receipt, with thanks, of yours dated May 14th, 2019 and accompanying attachment. It is this ministry’s understanding that Stantec is seeking information from MECP on any matters that may affect construction and operation of the proposed pipeline, including background environmental and socio-economic information, planning principles or guidelines which fall under MECP authority.

In that regard, MECP’s April 1994 Guideline D4 Land Use on or Near Landfills and Dumps notes that the Ministry considers the most significant contaminant discharges to be normally within 500 meters of the perimeter of a fill area. The Ministry recommends this distance be used as a study area for land use proposals. The proponent to evaluate the presence and impact of any adverse effects or risks to health and safety and that necessary remedial measures are taken when land use proposals are within this distance. This assessment shall be based on the nature and knowledge of the disposal site, and the nature of land use(s) proposed. Actual influence areas for the considerations listed in Section 4.1 and 4.2 of this guideline will vary with the individual landfill or dump. Where the actual influence area of a site has been determined to be less than the 500 meter study area set out in this section, the study area for land use proposals can be reduced to coincide with the actual influence area.

MECP notes that there are two known waste sites situated within 500 metres of the proposed pipeline route (refer to attachments). Namely, Waste Site A031801 and X-6081. I have provided some locational information pertaining to these two waste sites attached. The proponent of this project should evaluate what impact, if any, these two waste sites will have both to the waste sites themselves, and the proposed pipeline. For example, will the pipeline act as a conduit for the migration of methane and/or leachate from either or both of these wastes sites? If so, what mitigation measures will be employed to eliminate this as a possibility.

Thank you for providing this ministry the opportunity to comment on this proposed pipeline.

Yours truly,

Craig Newton Regional Environmental Planner / Regional EA Coordinator Ministry of the Environment, Conservation and Parks Southwestern Region 733 Exeter Road London, Ontario N6E 1L3

Telephone: (519) 873-5014 E-mail: [email protected]

From: Lafrance, Crystal (MECP) Sent: May-14-19 4:56 PM To: Newton, Craig (MECP) Subject: FW: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater

Hi Craig,

Please see below and attached

Crystal Lafrance Air, Pesticides and Environmental Planning Supervisor Ministry of the Environment, Conservation and Parks, Southwest Region 733 Exeter Road, London ON N6E 1L3 Tel: 519-873-5055 Fax: 519-873-5020 [email protected]

From: Erb, Jacqueline Sent: May-14-19 3:13 PM To: Lafrance, Crystal (MECP) Cc: Candido, Mike Subject: Enbridge Gas Inc. - Notice of Commencement: Sarnia Industrial Life Reinforcement Pipeline Project - DOW to Bluewater

Sent on behalf of Michael Candido (Stantec Consulting Ltd.)

Good afternoon,

Please find attached a Notice of Commencement and map for the Sarnia Industrial Line Reinforcement Pipeline Project – DOW to Bluewater.

Regards,

Jacqueline Erb Receptionist

Direct: 519-780-8100 Fax: 519-836-2493 [email protected]

Stantec 1-70 Southgate Drive Guelph ON N1G 4P5

The content of this email is the confidential property of Stantec and should not be copied, modified, retransmitted, or used for any purpose except with Stantec's written authorization. If you are not the intended recipient, please delete all copies and notify us immediately.

Please consider the environment before printing this email.