The World Bank Report No: ISR14346

Implementation Status & Results Increased Access to Modern Energy (P110075)

Operation Name: Increased Access to Modern Energy (P110075) Project Stage: Implementation Seq.No: 8 Status: ARCHIVED Archive Date: 17-May-2014 Country: Benin Approval FY: 2009

Public Disclosure Authorized Product Line:IBRD/IDA Region: AFRICA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Communaute Electrique du Benin (CEB), Project Coordination Unit hosted with the Ministere de l'Energie Key Dates Board Approval Date 23-Jun-2009 Original Closing Date 30-Jun-2015 Planned Mid Term Review Date 30-Jun-2013 Last Archived ISR Date 21-Oct-2013 Public Disclosure Copy Effectiveness Date 30-Apr-2010 Revised Closing Date 30-Jun-2016 Actual Mid Term Review Date 14-Oct-2015

Project Development Objectives Increased Access to Modern Energy (P110075) Project Development Objective (from Project Appraisal Document) The project's objectives are to improve reliability and efficiency of, and access to, modern energy services in Benin.

Has the Project Development Objective been changed since Board Approval of the Program?

Yes No Public Disclosure Authorized

Benin GEF Energy Efficiency Program (P115064) Global Environmental Objective (from Project Appraisal Document) The overall objective of this program is to enhance standards and labels for efficient light bulbs and air-conditioners in Benin, and to introduce efficient light bulbs to households through a bulk procurement scheme and awareness. Has the Global Environmental Objective been changed since Board Approval of the Program?

Yes No Public Disclosure Authorized Public Disclosure Copy

Page 1 of 5 Public Disclosure Authorized The World Bank Report No: ISR14346

Component(s)

Component Name Component Cost Component A1-a: Construction of 161 kV interconnections between Onigbolo- and Sakete - 14.33 Porto Novo Component A4: Rehabilitation and Reinforcement of the SBEE network. Acquisition of metering 25.87 equipment. Component A5: Improving Lighting and Appliance Efficiency 1.82 Component B1 a: Planning and Development of Modern Energy Services of rural areas. 0.50 Component B2: Modernizing Biomass Energy Services 1.30 Component C: Sustainable Energy Services 4.60

Public Disclosure Copy Component B3: Electrification of three priority localities 1.50 Component D: Project Preparation 5.00 NEW: Component A1-b: Supply and installation of protection and relaying equipment 1.40

Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Unsatisfactory Progress towards achievement of GEO Moderately Unsatisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Unsatisfactory Overall Risk Rating Moderate Moderate

Implementation Status Overview The disbursement is still improving slowly. Major transmission and distribution contracts payments are expected for Q4 2014. The disbursement rate forecast is 28 % for Q4 2014, and 50% in Q2 2015

Locations Country First Administrative Division Location Planned Actual Benin Not Entered Yoko

Benin Not Entered Tourou

Benin Not Entered Toui

Benin Not Entered Tekparou

Benin Not Entered Tchatchou

Public Disclosure Copy Benin Not Entered

Benin Not Entered Save

Page 2 of 5 The World Bank Report No: ISR14346

Country First Administrative Division Location Planned Actual Benin Not Entered Sakete

Benin Departement du Plateau Sakete

Benin Departement de l' Oueme Porto-Novo

Benin Departement du Borgou Parakou

Benin Departement de l' Oueme Departement de l' Oueme

Benin Not Entered Okpometa

Public Disclosure Copy Benin Not Entered Okounfo

Benin Not Entered Misserete

Benin Not Entered Kilibo

Benin Not Entered Ketou

Benin Not Entered Kayo

Benin Not Entered

Benin Not Entered Issale

Benin Not Entered Issaba

Benin Not Entered Idouya

Benin Not Entered Idigny

Benin Not Entered Gogoro

Benin Not Entered Gbede

Benin Not Entered Diho

Benin Not Entered Demon

Benin Not Entered Borone

Benin Departement du Borgou Departement du Borgou

Benin Not Entered Bakperou

Public Disclosure Copy Benin Not Entered Badekparou

Benin Not Entered Avrankou

Page 3 of 5 The World Bank Report No: ISR14346

Benin Departement du Collines Departement du Collines

Benin Departement de l' Oueme Onigbolo

Results

Data on Financial Performance (as of 23-Apr-2014)

Financial Agreement(s) Key Dates Project Ln/Cr/Tf Status Approval Date Signing Date Effectiveness Date Original Closing Date Revised Closing Date P110075 IDA-45870 Effective 23-Jun-2009 13-Jul-2009 30-Apr-2010 30-Jun-2015 30-Jun-2016 Public Disclosure Copy P110075 TF-94664 Effective 13-Jul-2009 13-Jul-2009 13-Jul-2009 30-Jun-2015 30-Jun-2015 P110075 TF-99823 Closed 09-Nov-2011 09-Nov-2011 09-Nov-2011 30-Sep-2012 31-Dec-2013

Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P110075 IDA-45870 Effective USD 70.00 54.38 15.62 9.28 48.34 17.00 P110075 TF-94664 Effective USD 1.82 1.82 0.00 1.10 0.72 60.00 P110075 TF-99823 Closed USD 2.00 2.00 0.00 1.81 0.19 91.00

Disbursement Graph Public Disclosure Copy

Page 4 of 5 The World Bank Report No: ISR14346

Key Decisions Regarding Implementation The Project was restructured in November 2013 and US$15.5 million were cancelled out of the US$70million.

Restructuring History Level two Approved on 12-Oct-2011, Level two Approved on 06-Nov-2013

Related Projects P115064-Benin GEF Energy Efficiency Program Public Disclosure Copy Public Disclosure Copy

Page 5 of 5