NYC Health + Major Work Request for Qualifications

November 22, 2016 Agenda

• Project Motivation

• Organizational Chart

• Project Description and Overview

• RFQ Process and Details

2 Project Motivation: Climate Change/ 21st Century Threats

Projected floodplain for the 2020s and 2050s 100‐year Floodplain* 2013 2050s Change PFIRMs Projected (%)

Residents 400,000 808,900 102%

Jobs 290,800 555,700 91%

Buildings 71,500 118,000 65%

1‐4 Family 57,400 89,000 55% Floor Area 534M 855M 42% (Sq Ft.)

Over 171,000 buildings and 1.2 million New Yorkers projected to live in the floodplain by 2100.

FEMA 2013 Preliminary FIRMs 100‐year Floodplain Projected 2080s 100‐year Floodplain Projected 2020s 100‐year Floodplain Projected 2100 100‐year Floodplain Projected 2050s 100‐year Floodplain

3 Project Motivation- OneNYC: Our Resilient City

This plan builds on prior efforts laid out in SIRR while strengthening and expanding the City’s commitment to a multilayered approach to resiliency.

2007 & 2011 2013 2014

4 Project Motivation

• In October 2012, Coney Island Hospital (CIH) suffered extensive flood damage as a result of

• Sandy flooded the hospital’s basement and first floor, damaging the emergency department, imaging services, and Damage in Main Building several other public and administrative areas

• The hospital opened a 24/7 urgent care center and pharmacy two days after the storm, and re-opened most of the hospital by the end of January 2013

5 Project Organization Chart

FEMA NYC Health + Hospitals Consultant

NYCEDC

Program Manager

Construction Manager

Prequalified Trades

6 Project Background-Site

Borough: Address: 2601 Brooklyn, NY 11235 Block: 7239 Lot: 1

7 Coney Island Hospital – Existing Site Plan

1: Main Building 3 / 6: Shops / MER 5: Building 6 2: Hammett Pavilion 4: FDNY EMS 7: Tower Building

8 Project Overview

The FEMA grant advances the City’s comprehensive resiliency plan, ensuring critical protection at Coney Island Hospital.

The CIH Campus Project is currently envisioned to include the following:

- New Critical Services Structure (CSS)

- Parking under the CSS

- Demolition of Hammett Pavilion and Building 6

- Site improvements to existing campus

- Renovation of portions of the existing Main Building and Tower Building

- New permanent flood mitigation structure around the campus

9 Pre-Design Schematic Design

A Main Building B Tower Building C New CSS Tower Location D Existing Utility Plant C E EMS Building E D B

A

10 Statement of Qualification

11 Selection Criteria - SOQ

Experience: - Experience and expertise acting as a contractor in similar projects and services within the past five years; - Composition and experience including, without limitation, demonstrated excellence in the coordination and implementation of similar projects within the past five years. - Familiarity with public approvals, permitting and its experience working with NYCEDC and multiple City agencies. - The firm’s familiarity and experience working with FEMA or HUD CDBG-DR funded projects. - The firm’s involvement and expertise in cutting edge solutions for mitigation of adverse demolition impacts through careful coordination of activities and sequencing of work.

Track Record:

- Accidents and lost work days on construction projects over the last 3 years

Resources:

- Financial stability, equipment and staff available for the Services.

Compliance:

- M/WBE participation

- Involvement and expertise in adhering to effective “Infection Control Risk Assessment Standard”

(ICRA) and “Interim Life Safety Measures” (ILSM) plans.

12 Construction Contractors

. Site/Civil Work . Tile Work . Concrete Contractors . Low voltage electrician . Flooring . Abatement Contractors . Site Fencing . Windows . Demolition Contractors . Painting . General Contractors . Electricians . Carpentry . Plumbers . MEP Insulation . Elevator Contractor . Steel Work . Scaffolding/Sidewalk bridge . Roofing and Waterproofing . Mechanical – HVAC . Spray on Fire Proofing . Fire Protection

. Masonry

13 M/WBE Goals and Subcontractors Participation Plan

• M/WBE Participation Goal: 30% (as percentage of total contract value)

• Firms must be certified as M/WBE by the State in order to count toward goal

• Respondents must also submit a Narrative demonstrating how they will meet the M/WBE Participation Goal. The Narrative should: • Speak to respondent’s commitment to M/WBE participation, including any pertinent programming run by respondent • Outline specific tactics for ensuring M/WBE Participation Goal is met • Include any other info that demonstrates the likelihood that the M/WBE Participation Goal will be met or exceeded • % of proprietary prequalified list that is State-certified M/WBE– overall and for specific trades key to this project • List members of respondent team that are M/WBE

• Narrative will be rated and factor into selection

14 Meeting M/WBE Goals

• Identifying M/WBE Partners –Use Empire State Development Corp. (ESDC) directories to find M/WBEs in a specific field. . Link:https://ny.newnycontracts.com/FrontEnd/VendorSearchPublic.asp ?TN=ny&XID=4687 – Check out the Interested Subcontractor and Supplier List for this RFP – Network at this info session – NYCEDC can assist in identifying M/WBEs – Refer to good faith efforts section in draft contract for more ideas

• Make use of the Kick-Start Loan Program – Mobilization loans for M/W/DBE firms participating as either prime or subcontractor – Amounts up to $250,000 – May be used to buy long lead equipment, material, and/or labor costs

15 Opportunity M/WBE Contacts

New York City Economic Development Corporation 110 William Street , NY 10038

Bomi Kim Director, Opportunity M/W/DBE 212.312.3695

John Rooney Asst. Vice President, Opportunity M/W/DBE 212.312.4256

Claudia Flores Senior Program Manager, Opportunity M/W/DBE 212.312.3712

[email protected] www.nycedc.com

16 RFQ Details

. Questions/Clarifications: Ongoing; EDC will respond within 2 weeks

. Contact Email Address: [email protected]

. Deadlines: - Initial bid package SOQ deadline for submissions: 4:00 pm, December 22nd, 2016 - SOQs will be accepted on an ongoing basis; Respondents who do not submit by the date above will not be considered for the initial packages. - Initial RFP for Demo/Abatement out to Pre-qualified bidders Q1 2017 - EDC will issue ads for future work approximately 60 days prior to the issuance of a bid package release to announce new deadlines for SOQs - Note that firms only need to submit SOQs once - Four (4) hard copies of the SOQ and attachments as well as four (4) jump drives must be submitted to: NYCEDC, 110 William Street, 4th Floor, New York, NY 10038, Attention: Maryann Catalano, Senior Vice President, Contracts.

17 QUESTIONS?