ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT DELIVERING PRODUCTIVITY THROUGH STRATEGIC CHOICE OF TEST ENVIRONMENT

Dr. Philip Lawson & Sulabh Dhingra 28 Jun 2018 – AVL Product Development in Motion ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Outline

• Motivations Why? • Brief history of Powertrain Testing at JLR

• Increasing Productivity through What? Shift & Expand

• Key enablers to deliver Shift & Expand How? strategies

Data • Emissions Test Use Case ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Background & Motivation

Jaguar Land Retail Sales Volumes by FY

Jaguar E-Pace Jaguar F-Pace

Land Rover Discovery Velar ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Background & Motivation

Since 2011: • Doubled internal Test activity • Tripled internal Chassis-Dyno Test activity • 15x increase in outsourced test activity

Testing Effectiveness Four Levers

Internal capacity increase largely due to Testfield Efficiency Projects

“Holistic Powertrain Development & Test Productivity Optimisation at Jaguar ” J. Houldcroft et. al. 5th International Symposium on Development Methodology, 2013

4 ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Background & Motivation – SAE 2016-01-0982

5 Testing Effort Background& Motivation ADVANCEMENTS TEST ENVIRONMENTIN POWERTRAIN

As-is State Portfolio Product Expanding Technologies New

New Testing Effort Reuse Reuse Data Efficiency Gains Shift Shift & Expand Effectiveness

Reduced Testing Efforts in Strategic Environment Testing Effectiveness Four Levers ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Shift and Expand Strategy

7 ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Key Enablers

Adoption of Shift & Expand test methodologies requires significant investment in… People

Test Field Effectiveness

Facility Process

8 ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Process Investment - Operational Readiness

“Customer” Relationship Management 9 ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Process Investment – Customer Relationship Management

AVL Tech Centre Coventry

AVL Graz

10 ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT People Investment – Importance of Training

Team Growth & Development

Team Size Ramp

Skill Ramp

Productive Facility

TCC in Training Cell in Graz Coventry

Project Timeline

11 Shift and Expand Use Case Study EMISSIONS TESTING ON A VEHICLE-IN-LOOP (VIL) TEST CELL

12 ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Chassis-Dyno to ViL Emission Test Comparison

Fuel Type: CARCAL EU6 E10 Gasoline Engine Type: 3.0 V6 Supercharged

Fuel Type: CARCAL EU6 Type: 3.0 V6 Turbocharged ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Preparation of Unit Under Test

14 ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Design of Experiment ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Test Plan Overview

Gasoline Diesel

101 104 102 103 CVS modal CVS modal

RCD Soak RCD Soak CD3 CVS RCD Soak RCD Soak CD3 CVS

RCD = Rapid Cool Down WLTC x3

NEDC x3 ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT

Diesel CO2 Comparison

NEDC WLTC 190 Rapid cool down

Soaked 185 Chassis Dyno 180

CO2 (g/km) CO2 175

170

165

102 103 102 103 Error bars represent 2σ modal modal ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT

Gasoline CO2 Comparison

NEDC WLTC 250 Rapid cool down

Soaked 240

Chassis Dyno 230

220 CO2 (g/km) CO2

210

200

101 104 101 104 Error bars represent 2σ modal modal ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Rapid Cool Down Issues T101 Gasoline

56 Gearbox Temperature - 54 NEDC 52 5050 48

46

44

42 4040 100 38 95 Gearbox TemperatureWLTC -

Temp (ºC) Temp 36 90 WLTC

Gbx_tTCMOil C] [deg 90 34 85

32 80 3030 75 28 70

26 65 24 6060 22 55 100 200 300 400 500 600 700 800 900 1000 1100 1200

200 400 600time [s] 800 1000 1200 50 Temp (ºC) Temp

Gbx_tTCMOil C] [deg Time (s) 45 Rapid cool down 40

35 - Oil temperature 3030 Soaked - Driveline 25 20

- Coolant 15 Chassis Dyno 200 400 600 800 1000 1200 1400 1600 1800 400 800 time [s] 1200 1600 Time (s) ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Rapid Cool Down Issues T101 Gasoline

Extended Correlation Activity

- Fluid in RCD Unit reaches threshold and RCD switches off

- Thermocouple data inside the vehicle is not checked ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Rapid Cool Down Issues T101 Gasoline

9090 Gearbox Temperature 85

80 12 hour soak 75 RCD + 2 hour RCD + 4 hour 70 RCD + 6 hour 65 RCD + 8 hour 6060 RCD + 12 hour 12 hour soak 55

50

45

Temp (ºC) Temp 40

Gbx_tTCMOil C] [deg 185 35 3030 180 25

20

15 175

10 5 (g/km) CO2 170 100 200200 300 400400 500 600600 700 800800 900 10001000 1100 Timetime [s] (s) 165 Tests ADVANCEMENTS IN POWERTRAIN TEST ENVIRONMENT Summary & Conclusions

People Process Shift & Expand

Level 4 Apprenticeship & Project process and Migration of Test Use Cases via Shift & Expand development of Technician common goal of operational delivers Efficiency benefits through increased population status effectiveness

Established Technical Training Customer relationship A significant amount of effort (People, Process Team management & Facility) is required to unlock the potential

Specialist training in the test Process oriented culture Successful demonstration of initial Use Cases field environment with “swim lane” processes has generated significant internal demand for developed in advance of additional applications Up-skilling existing population training and ramp-up

While Technology changes can be “bought in”, it is essential to develop People and Teams

22 THANK YOU Dr. Philip Lawson Senior Manager Emissions Testing W/1/26 Abbey Road, Whitley Coventry CV3 4LF, UK M +44(0)7469 405229 jaguarlandrover.com [email protected]

Sulabh Dhingra Lead Engineer Powertrain ViL/PiL Test & Methodology

M +44(0)7341 074325

[email protected]