SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

CHAPTER 1

EXECUTIVE SUMMARY

1.1 Project and public purpose

The proposed project area is intended for the doubling of railway line from Trivandrum to Nemom. The urgent need for this project arises from the increased congestion inside trains and loss in transit time due to crossing from a train travelling in opposite direction. The presence of a double track is a prerequisite for introducing block signalling that can considerable speed up trains and reduce transit time. The existing track capacity utilization of this line is over 100 percent and the every existing single line is saturated, leading to congestion and slow movements of trains. The successful implementation of this project will ensure smooth movements of trains without many disruptions. In addition to that, the better operational efficiency of railway system will reduce the journey time and hence this will be an advantage for every passenger.

1.2 Location

The proposed project is intended to for the doubling of Railway line from to Nemom. The 14.9407 Hectares of land that is considered to be acquired for this project belongs to four villages in Thiruvananthapuram district, namely Thycaud, Thirumala, Nemom and Pallichal.

1.3. Size and attributes of land acquisition

An extent of 14.9407 Hectares of land collectively from the villages of Thycaud, Thirumala, Nemom and Pallichalis required for the implementation the project. The land identified for the project for doubling of Railway line from Thiruvananthapuram to Nemomis spread over 796 survey numbers.

1.4 Alternatives considered

The proposed project aims at the doubling of Railway line from Thiruvananthapuram to Nemom and construction of terminal. Since the project is for doubling of railway line, only lands adjacent to the existing line can be acquired. Hence, no alternative land has been considered for the proposed project.

Centre for Management Development, Thiruvananthapuram 1

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

1.5 Social impacts

Land under 796 survey number spread over 14.9407 hectares of land from Thycaud, Thirumala, Nemom and Pallichal villages need to be acquired for the project. The major social impact will be the displacement of families residing in the area. Around 171 houses partially and 244 houses completely are affected by the proposed acquisition. In addition to that some commercial institutions, government organisations etc. are also present. Loss of land for these commercial establishments and institutions can be considered as a negative impact as the people who are employed in the institutions, will face a loss in livelihood. The proposed area includes land owned by the CSIR-NIIST, SBI, SIDCO, Government Women & Children’s Hospital, Thycaud.

1.6 Mitigation measures

To mitigate the social impact of the proposed land acquisition, R&R package should be provided to the families as per the Policies issued by Revenue (B) Department, Government of vide G.O.(MS)No.485/2015/RD dated 23/09/2015 and G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCT in LAR&R Act 2013.

 The authorities should take necessary actions to ensure that the existing water bodies such as canals, streams etc. in the vicinity of the project area will not be affected during and after each stage of the implementation of the project.  Reconstruction of livelihood of people is an important factor in this project. It is a very difficult task to the people to recreate their commercial enterprises in a new area. So, the assistance should be provided to them in order to successfully recreate their livelihood.  The families who are losing the courtyard of their house demanded the reconstruction of proper boundary wall.  Safety of the people during the construction phase of the project and healthy disposal of wastages which may arise out of construction should be ensured.

Centre for Management Development, Thiruvananthapuram 2

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

 Retaining the natural drainage system is very important as majority of the land near the project area will face severe water logging problems during rainy seasons.  Maintaining roads, pathways, bridges present on the proposed land should be given priorities as the people residing on the boundary of the proposed land will face difficulties for free passage.

Centre for Management Development, Thiruvananthapuram 3

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

CHAPTER 2

DETAILED PROJECT DESCRIPTION

2.1 Background of the Project including Developer’s Background and Governance/Management structure

This project is for the doubling of Railway line from Thiruvananthapuram to Nemom in Thiruvananthapuram district and Construction of Terminal.Theproject intends to improve the commute between the two sates through developing a well structured railway network. The project requires a total area of 14.9407 hectares of land spread over Pallichal, Nemom, Thycaud and Thirumala Villages of Thiruvananthapuram District. The District Collector Thiruvananthapuram as per letter no. K 13-183091/19 dated 24/04/2019 invited proposals to conduct Social Impact Assessment prior to the Land Acquisition for the project. The Centre for Management was entrusted with the work by the Government of KeralavideGO(P)No.44/2019/RD dated 30/07/2019 (Kerala Gazette No. 1766 – Vol. 8 dated 05/08/2019) to conduct the Social Impact Assessment.

2.2 Rationale for Project, including how the project fits the public purpose criteria listed in the Act.

The proposed project area is intended for the doubling of railway line from Trivandrum to Nemom. The urgent need for this project arises from the increased congestion inside trains and loss in transit time due to crossing from a train travelling in opposite direction. The presence of a double track is a prerequisite for introducing block signalling that can considerable speed up trains and reduce transit time. The existing track capacity utilization of this line is over 100 percent and the every existing single line is saturated, leading to congestion and slow movements of trains. The successful implementation of this project will ensure smooth movements of trains without many disruptions. In addition to that, the better operational efficiency of railway system will reduce the journey time and hence this will be an advantage for every passenger.

Centre for Management Development, Thiruvananthapuram 4

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

As per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013 Section 2(vi), the project can be considered as a public purpose.

2.3 Details of Project size, location, capacity outputs, production targets, costs and risks

The affected area belongs to four different villages in Thiruvananthapuram district namely, Thycaud, Thirumala, Nemom and Pallichal villages. The project completion requires 14.9407 Hectares of land from various survey numbers to be acquired. This project aims for the doubling of Railway line from Thiruvananthapuram to Nemom and Constructon of Terminal. By implementing this project, the operational efficiency of Railway transport systems will be improved to a greatextent.

Fig. 2.1: Photographs of Project Area

Centre for Management Development, Thiruvananthapuram 5

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

2.4 Examination of alternatives

The proposed project aims at the doubling of Railway line from Thiruvananthapuram to Nemom and construction of terminal. Since the project is for doubling of railway line, only lands adjacent to the existing line can be acquired. Hence, no alternative land has been considered for the proposed project.

2.5 Phases of the Project Construction

In accordance with the proposed project, the railway line passing through the four villages will be doubled along with the construction of the Nemom Terminal.

2.6 Core design Features, size and Type of Facilities

The proposed project aims at the doubling of Railway line from Thiruvananthapuram to Nemom and construction of terminal.

2.7 Need for Ancillary Infrastructural Facilities

In addition to the doubling of railway line and construction of the terminal, there is a need for the widening and or reconstruction of various bridges present in the route. With the development of the terminal road facilities also need to be developed for the well connectivity of the terminal and the national highway which runs within 1 km from the proposed site for the terminal.

Centre for Management Development, Thiruvananthapuram 6

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

2.8 Workforce Requirements (temporary and permanent)

The work force for the project is not yet assessed. Efficient workforce need be employed with modern machineries and equipment at appropriate stages of the project implementation.

2.9 Details of Social Impact Assessment/Environment Impact Assessment if Already Conducted and any Technical Facility Reports

No Social Impact Assessment/Environment Impact Assessment has been conducted previously in association with the proposed project.

2.10 Applicable legislations and policies

The land acquisition for the proposed project is governed by the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013.

Centre for Management Development, Thiruvananthapuram 7

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

CHAPTER 3

TEAM COMPOSITION, APPROACH, METHODOLOGY AND SCHEDULE OF THE SOCIAL IMPACT ASSESSMENT

3.1 List of all Team Members with Qualifications

The details of the team members involved in the SIA are given in Annexure III.

3.2 Description and Rationale for the Methodology and Tools Used to collect Information for the Social Impact Assessment

An inclusive and participatory approach through involvement of multiple stakeholders such as elected representatives and project affected people including vulnerable sections such as Scheduled Castes, Scheduled Tribes, women, and those among below poverty line, at appropriate stages of the project.

3.3 Sampling Methodology Used

Qualitative information was gathered along with the field survey through public consultation/Focus Group Discussions (FGDs) with all relevant stakeholders. The public consultation encompassed the project components as well as its socio- economic impacts. The SIA team had preliminary discussions with the key officials of the district administration and gathered information regarding the status of the government procedures, the project area and intensity of the acquisition. The team also made a preliminary site visit with the officials for physical inspection and information dissemination purposes. The existing conditions of land, status of infrastructure/structures, land use pattern and the facilities available to people residing in the project area were analysed.

The quantitative information regarding the families affected by the project was collected through household surveys, in the form of structured questionnaires. The survey was conducted in all the households of the persons affected by the project. The results of the survey provided information pertaining to the demography, socio-economic status and livelihood status of the target community, and formed the basis for development of Social Impact Management Plan.

Centre for Management Development, Thiruvananthapuram 8

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

3.4 Overview of Information/Data Sources Used

The primary data was collected directly from the representatives all affected families through face to face interview. Structured questionnaires were used for collecting the details of the affected people. The results of the survey provided information pertaining to the demography, socio-economic status and livelihood status of the target community.

The secondary data was collected from the Requiring Body and the Revenue department. The SIA team had preliminary discussions with the key officials of the district administration and gathered information regarding the status of the government procedures, the project area and intensity of the acquisition.

3.5 Schedule of Consultations with Key Stakeholders

Date Details of Consultation Collection of documents form Land Acquisition 07-09-2019 office 07-09-2019 Meeting with the officials of Requiring Body 31-01-2020 (Thycaud Village) 01-02-2020 (Pallichal Village) Public Hearings 03-02-2020 (Nemom Village) 04-02-2020 (Thirumala Village)

3.6 Public Hearing

In accordance with the Section 5 of Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013, a Public Hearing was conducted to collect the views and opinions of the people affected by the project. Prior intimation was given to all the stakeholders regarding the date and venue of the public hearing through advertisements in leading newspapers, individual letters and/or over telephone.

Centre for Management Development, Thiruvananthapuram 9

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 10

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 11

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

CHAPTER 4

LAND ASSESSMENT

4.1 Description of Land with the help of Maps, Information from Land Inventories and Primary Sources

The land to be acquired for the project is spread over Pallichal, Nemom, Thycaud and Thirumala Villages of Thiruvananthapuram District. The sketch of the land for the proposed project is shown in annexure no. VI

4.2 Entire area of impact under the influence of the project

A total extend of 14.9407 hectares of land spread over Pallichal, Nemon, Thycaud and Thirumala Villages needs to be acquired for the project.

4.3 Total Land Requirement for the Project

For the implementation of the proposed project an extend of 1.6016 Hectares of land from Thycaud Village, 1.8048 Hectares of land from Thirumala Village, 4.5154 Hectares of land from Nemom Village and 7.0189 Hectares of land from Pallichal Village is required.

4.4 Present Use of any Public, Utilized land in the Vicinity of the Project Area

The proposed area includes land owned by the CSIR-NIIST, SBI, SIDCO, Government Women & Children’s Hospital, Thycaud.

4.5 Land (if any) Already Purchased, Alienated, Leased or Acquired, and the intended Use for Each Plot of Land required for the project

No land has been already acquired for the proposed project.

4.6 Quantity and Location of Land Proposed to be acquired for the Project

A total extend of 14.9407 hectares of land spread over Pallichal, Nemom, Thycaud and Thirumala Villages needs to be acquired for the project.

Centre for Management Development, Thiruvananthapuram 12

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

4.7 Nature, Present use and classification of Land and if Agricultural Land, Irrigation Coverage and Cropping Patterns

The land identified for the project include nilam, purayidom, and purambokke.

4.8 Size of Holding, Ownership Pattern, Land Distributions and Number of Residential Houses

Around 171 houses partially and 244 houses completely are affected by the proposed acquisition. The details of the affected families is given in annexure no. VII.

4.9 Land prices and recent changes in ownership, transfer and use of lands over the last 3 years

As per the information received from the respondents, no land transactions were done in the proposed area for the last 3 years.

Centre for Management Development, Thiruvananthapuram 13

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

CHAPTER 5

ESTIMATION AND ENUMERATION OF AFFECTED FAMILIES AND ASSETS

5.1 Estimation of families

Around 171 houses partially and 244 houses completely are affected by the proposed acquisition.The details of families which lose their land and or place of stay is given in annexure no. VII. In addition to that, the individuals who are running shops in the project area will lose their business which will then affect them with loss of income. The people who are working in these shops will also get affected by losing their livelihood.

5.2 Family of Scheduled Tribes and other Traditional Forest Dwellers who have lost any of their Forest Rights

Not Applicable

5.3 Families which depend on Common Property Resources which will be affected due to Land Acquisition for their Livelihood

Not applicable.

5.4 Families which have been assigned Land by the State Government for the Central Government Under any of its Schemes and such Land is Under Acquisition

Not applicable.

5.5 Families which have been Residing on any land in the Urban Areas for proceeding three years of more prior to the acquisition of land

Not applicable

5.6 Families which have depended on the Land Being Acquired as a Primary Source of Livelihood for three years prior to the acquisition

Some of the residents in the proposed area depend on their neighbourhood for livelihood. Petty shops, coolie workers, tailors etc. are identified who earn money

Centre for Management Development, Thiruvananthapuram 14

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

from their respective fields by depending on the business from the locale, which is non-consistent in nature.

5.6.1 Families which are indirectly impacted by the project (not affected directly by the acquisition of own lands)

During the implementation stage of the project, the families and shops close to the project area are prone to be affected with different types of pollutions. Most of the residents who resides near to the boundary of the proposed sketch expressed their concerns over the pathways that will get acquired as part of the land acquisition of the project. They also raised concerns for the natural drainage system.

5.6.2 Inventory of productive assets and significant lands

Any type of agriculture or cultivations are almost absent in the project area.

Centre for Management Development, Thiruvananthapuram 15

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

CHAPTER 6

SOCIO-ECONOMIC AND CULTURAL PROFILE

6.1 Demographic Details of the Population in the Project Area

a) Age Group of Affected Individuals

Table 6.1.1. Age Group of Affected Individuals

Age in Years No. of Individual 0-18 162 19-30 151 31-45 180 46-59 162 60 and Above 158 N/A 329 Total 1142

b) Gender of Affected Individuals

Table 6.1.2. Gender of Affected Individuals

Gender Number of Individuals Male 573 Female 569 Total 1142

c) Literacy of the Affected Individuals Table 6.1.3 Literacyof the Affected Individuals

Sl. Education Frequency No. 1 Toddler 17 2 Lower Primary 46 3 Upper Primary & High School 168 4 SSLC 266 5 Plus Two 142 6 Diploma 15 7 Graduation 223 8 Post-Graduation 48 9 PhD 04 10 N/A 213 Total 1142

Centre for Management Development, Thiruvananthapuram 16

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

d) Family Pattern

Affected families include nuclear and joint family structure.

6.2 Land Use and Livelihood

Agriculture or cultivation of any kind is almost absent in the project are, hence there is no impact on agricultural resources. However, the loss of commercial buildings will affect both the owners of the property, the people who run business here and the people who employed here.

6.3 Local Economic Activities

The area is mainly used for residentialpurposes. In addition to that a very few commercial structures are also present in the land. So, theloss of commercial buildings will affect both the owners of the property, the people who run business here and the people who employed here.

6.4 Factors that Contribute to Local Livelihood

The buildings that used for the commercial activities was a major source of income especially for the people who run business and their employees. So, the loss of these structures by the acquisition will make a negative impact to this local livelihood.

6.5 Kinship Patterns and Social and Cultural Organization

Majority of the properties are hereditary property and very less are purchased properties. Most of the families follow nuclear family system. However there are considerable numbers of joint families living in the area.

6.6 Administrative Organization

The proposed area includes land owned by the CSIR-NIIST, SBI, SIDCO, Government Women & Children’s Hospital, Thycaud.

6.7 Political Organization

Properties of any political organizations are not included in the area of the proposed acquisition.

Centre for Management Development, Thiruvananthapuram 17

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

6.8 Community Based Civil Society Organization

No such organizations are affected by the proposed the project.

6.9 Regional Dynamics &Historical Change Process

No major negative impact could be found regarding the regional dynamics and historical change processes.

6.10 Quality of the Living Environment

The Quality of the Living Environment is fair in the project area with decent livelihood options and transportation facilities with access to amenities such as Schools, Hospitals, Civil Organisations, etc.

Centre for Management Development, Thiruvananthapuram 18

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

CHAPTER 7

SOCIAL IMPACT MANAGEMENT

7.1 Approach to Mitigation

The CMD team made use of a combination of two research approaches i.e., quantitative and qualitative, for the identification of various social impact and the mitigation measures. Adoption of a combination of both qualitative and quantitative methodology was indented to obtain a more comprehensive data and more holistic result without excluding any important area of assessment.

7.2 Measures to avoid, mitigate and compensate impact

The proposed project will need an area of 14.9407 hectares of land from Thycaud, Thirumala, Nemom and Pallichal Villages. The land is mainly used for residential purposes. Mitigation measures can be framed as per the details given below:

 Compensation for the land owners as per the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act 2013.  Resettlement and Rehabilitation procedure as per the Policy issued by Revenue(B) Department, Government of Kerala vide G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLAR&R Act 2013.  The authorities should take necessary actions to ensure that the existing water bodies such as canals, streams etc. in the vicinity of the project area will not be affected during and after each stage of the implementation of the project.  Reconstruction of livelihood of people is an important factor in this project. It is a very difficult task to the people to recreate their commercial enterprises in a new area. So, the assistance should be provided to them in order to successfully recreate their livelihood.  The families who are losing the courtyard of their house demanded the reconstruction of proper boundary wall.

Centre for Management Development, Thiruvananthapuram 19

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

 Safety of the people during the construction phase of the project and healthy disposal of wastages which may arise out of construction should be ensured.  Retaining the natural drainage system is very important as majority of the land near the project area will face severe water logging problems during rainy seasons.  Maintaining roads, pathways, bridges present on the proposed land should be given priorities as the people residing on the boundary of the proposed land will face difficulties for free passage.

7.3 Measures that are included in terms of Rehabilitation and Resettlement and Compensation as outlined in the Act

The Rehabilitation and Resettlement package as per the Policy issued by Revenue(B) Department, Government of Kerala vide G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCTLAR&R Act 2013 shall be provided to the affected people.

7.4 Measures that the Requiring Body has stated it will introduce in the project proposal

The requiring body has stated that sufficient fund has been reserved as compensation.

7.5 Alterations to project design and additional measures that may be required to address the extend and intensity of impacts across various groups as identified during SIA

The alignment for the proposed project was prepared by minimising the negative impacts. No alterations to the project design is suggested.

Centre for Management Development, Thiruvananthapuram 20

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

7.6 Detailed Mitigation Plan including detailed activities to be carried out for each mitigation strategy, timelines for each mitigation strategy

To mitigate the social impact of the proposed land acquisition, R&R package should be provided to the families as per the Policies issued by Revenue (B) Department, Government of Kerala vide G.O. (MS)No.485/2015/RD dated 23/09/2015 and G.O.(Ms)No.448/2017/RD dated 29/12/2017 for the rehabilitation and resettlement package for land acquisition in the state in lieu of RFCT in LAR&R Act 2013.

 The authorities should take necessary actions to ensure that the existing water bodies such as canals, streams etc. in the vicinity of the project area will not be affected during and after each stage of the implementation of the project.  Reconstruction of livelihood of people is an important factor in this project. It is a very difficult task to the people to recreate their commercial enterprises in a new area. So, the assistance should be provided to them in order to successfully recreate their livelihood.  The families who are losing the courtyard of their house demanded the reconstruction of proper boundary wall.  Safety of the people during the construction phase of the project and healthy disposal of wastages which may arise out of construction should be ensured.  Retaining the natural drainage system is very important as majority of the land near the project area will face severe water logging problems during rainy seasons.  Maintaining roads, pathways, bridges present on the proposed land should be given priorities as the people residing on the boundary of the proposed land will face difficulties for free passage.

7.7 The Social Impact Management Plan indicating which measures the Requiring Body has committed to undertake and those that have been proposed, but not committed to be undertaken by the Requiring Body

The requiring body has stated that sufficient fund has been reserved as compensation.

Centre for Management Development, Thiruvananthapuram 21

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

CHAPTER 8

SOCIAL IMPACT MANAGEMENT PLAN INSTITUTIONAL FRAMEWORK

8.1 Description of institutional structures and key person responsible for each mitigation measures

The Government of Kerala had appointed Special Tehsildar LA Railway to perform one or more functions of the collector under in the Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation Act (RFCTLARR), 2013 within their area of jurisdiction.

Also vide G. O. (P) M. No. 590/2015/RD dated 11 November 2015, Government of Kerala, in line with the sub-section (1) of section 43 of the Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation Act (RFCTLARR) 2013 and sub-rule (1) of rule 21 of Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement (Kerala) Rules, 2015, the Deputy Collector (Land Acquisition) in each district has been appointed as the Administrator for Rehabilitation and Resettlement, for performing the functions under the said act and Rules in respect of involuntary displacement of persons due to requisition of land. The Administrator shall be responsible for the formulation, execution and monitoring of the Rehabilitation and Resettlement scheme in respect of land acquisition.

Vide G. O. (P) M. No. 589/2015/RD dated 11 November 2015, in exercise of the powers conferred by sub-section (1) of section 44 of the Right to Fair Compensation and Transparency in Land Acquisition, Resettlement and Rehabilitation Act (RFCTLARR), 2013, the commissioner for Rehabilitation and Resettlement supervising the formulation of Rehabilitation and Resettlement scheme or plans, proper implementation of the same and post implementation of social audit.

Centre for Management Development, Thiruvananthapuram 22

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

8.2 Specify the Role of Non-GovernmentalOrganisation, if any

Not applicable

8.3 Indicate Capacities Required and Capacity Building Plan, Including Technical Assistance, if any

Not applicable

8.4 Timelines for Each Activity

Proper timeline for each activity should be framed in accordance with the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement Act, 2013.

Centre for Management Development, Thiruvananthapuram 23

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

CHAPTER 9

SOCIAL IMPACT MANAGEMENT PLAN BUDGET AND FINANCING OF MITIGATION PLAN

9.1 Costs of all resettlement and rehabilitation costs

The requiring body stated that necessary budget provision exists for meeting the cost of acquisition.

9.2 Annual budget and plan of action

Not Applicable

9.3 Funding sources with break up

Not Applicable

Centre for Management Development, Thiruvananthapuram 24

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

CHAPTER 10

SOCIAL IMPACT MANAGEMENT PLAN MONITORING AND EVALUATION

10.1 Key monitoring and evaluative indicators

Monitoring is a long-term process, which should begin from the starting of the project and should continue throughout the life of the project. Its purpose is to establish benchmarks so that the nature and magnitude of anticipated social impacts can be continually assessed. Monitoring involves the continuous or periodic review to determine the effectiveness of recommended mitigation measures. The types of parameters that can be monitored may include mitigation measures or design features, or actual impacts. All the mitigation measures stated in Chapter 7 should be considered as the indicators for evaluation.

10.2 Reporting mechanisms and monitoring roles

Rehabilitation and Resettlement procedures as stated in the Right to Fair Compensation and Transparency in Land Acquisition, Rehabilitation and Resettlement act, 2013 will be applicable.

10.3 Plan for independent evaluation

Not applicable.

Centre for Management Development, Thiruvananthapuram 25

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

CHAPTER 11

ANALYSIS OF COSTS AND BENEFITS AND RECOMMENDATION ON ACQUISITION

11.1 Final conclusions on:Assessment of public purpose, less displacing alternatives, minimum requirements of land, the nature and intensity of social impacts, and viable mitigation measures and the extent to which mitigation measures will address will address costs

The proposed project aims at the doubling of Railway line from Thiruvananthapuram to Nemom and construction of terminal. The better facilities of rail transportation system will facilitate the easy commute of passengers as well as goods. An extent of 14.9407 Hectares of land collectively from the villages of Thycaud, Thirumala, Nemom and Pallichalis required for the implementation of the project. The land identified for the project for doubling of Railway line from Thiruvananthapuram to Nemom is spread over 796 survey numbers.Around 171 houses partially and 244 houses completely are affected by the proposed acquisition. The land proposed to be acquired for the project is bare minimum.

The impacts shall be mitigated by providing suitable Resettlement/ Rehabilitation/Compensation measures as per RFCTLARR Act2013.

The alignment of the proposed project was designed with an effort to reduce the number of people who will be affected with the land acquisition. Through the proper measures as per RFCTLARR Act 2013 the negative impacts of land acquisition can be mitigated.

11.2 The above analysis will use the equity principle as a framework of analysis for presenting a final recommendation on whether the acquisition should go through or not.

Comparing/weighing the positive against the negative impacts, it can be observed that even though the recreation of livelihood and rehabilitation to those families who lose their place of stay need to be provided with proper mitigation measures, the implementation of the project will improve the rail infrastructure of the state.

Centre for Management Development, Thiruvananthapuram 26

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

The families that are affected would require adequate and fair compensation. So, the authorities should make proper action plan to reconstruct the livelihood opportunities for the people who solely relied on the project area for income. It is observed that many of the negative impacts highlighted can be minimized or reduced with effective and relevant mitigation measures and strategies mentioned. So the study recommends acquisition of the land providing proper compensation to the affected people.

Centre for Management Development, Thiruvananthapuram 27

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

ANNEXURES

i. Details of the land covered in the SIA study

ii. List of key informants contacted and interacted

iii. SIA Team members

iv. Various Government Orders concerning Social Impact Assessment

v. Questionnaires used for survey

vi. Alignment sketches of the proposed project

vii. Details of Affected People

viii. Concers Raised and Corresponding Reply During Public Hearing

ix. Attendance Sheets of Public Hearing

x. Notice and Newspaper Notification Regarding Public Hearing

Centre for Management Development, Thiruvananthapuram 28

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

ANNEXURE-I

Details of the Land Covered in the SIA Study

Centre for Management Development, Thiruvananthapuram 29

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 30

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 31

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 32

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

ANNEXURE-II

List of Key Informants Contacted and Interacted

1. Deputy Collector, L.A, Thiruvananthapuram

2. Special Thasildhar, L.A. Railway, Nemom

3. Asst. Executive Engineer, Southern Railway, Thiruvananthapuram

4. Revenue Inspectors, Special Tehsildar’s Office, L A Railway Nemom

5. Surveyors, Special Tehsildar’s Office, L A Railway Nemom

Centre for Management Development, Thiruvananthapuram 33

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

ANNEXURE-III

SIA Team Members

Sl. No. Name Designation Qualification

1. Dr. G. Suresh Project Director Ph. D.

2. Shri. Riyas K. Basheer Project Coordinator MBA, B.Tech.

3. Dr. S. Remadevi Domain Expert Ph. D.

4.. Shri. Suradh K. Surendran Field Coordinator M. Tech.

5. Shri. Albin M. Field Investigator MBA

6. Shri. Josukutty Kurian Field Investigator MSW

Centre for Management Development, Thiruvananthapuram 34

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

ANNEXURE-IV Various Government Orders Concerning Social Impact Assessment on Land Acquisition

Centre for Management Development, Thiruvananthapuram 35

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 36

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 37

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 38

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 39

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 40

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 41

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 42

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 43

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 44

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 45

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 46

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 47

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 48

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 49

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 50

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 51

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 52

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

ANNEXURE- V Questionnaires used for survey

Centre for Management Development, Thiruvananthapuram 53

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 54

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 55

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 56

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 57

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 58

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 59

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

ANNEXURE- VI Alignment sketches of the proposed project

Centre for Management Development, Thiruvananthapuram 60

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 61

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 62

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Centre for Management Development, Thiruvananthapuram 63

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

ANNEXURE- VII

Details of Affected People

Centre for Management Development, Thiruvananthapuram 64

SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

THYCAUD VILLAGE

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

Compound wall Govt. Women & Child will be lost. 1 97 2 part Purambokke 0.2797 0471-2323442 Govt. Property Hospital, Thyacud Need fair compensation 2 96 1 Purambokke 0.0023 Govt. road House will be lost. No other place to Residential 3 96 177 part Purayidom 0.0024 K. Ayyappan 9633419220 Hindu APL Hereditary live. Building Need fair compensation. House & land will Residential be lost. 4 96 179 Purayidom 0.0017 K. Ganeshan 9497009061 Hindu APL Hereditary Building Need fair compensation. House & land will K. Radha Krishnan, 6380830272 Residential be lost. 5 96 21, 184 Purayidom 0.0035 Hindu Hereditary K. Rajagopal 9380830272 Building Need fair compensation. Part of house will Residential be lost. 6 96 22 part Purayidom 0.0261 Ganapathi 9446778049 Hindu APL Hereditary Building& Need fair Agriculture compensation. Livelihood will be affected. Running business Residential with the help of two 7 96 23 Purayidom 0.0029 GomathiAmma Hindu Hereditary Building other. No other income. Need fair compensation. House will be lost. No other place to Senthilkumar, Direct Residential 8 96 138 part Purayidom 0.0075 8592001190 Hindu BPL live. Pradeepkumar Purchase Building Need fair compensation.

House is lost partially. 9 96 170 Purayidom 0.0069 Kalakumari Need fair compensation.

65 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

Livelihood will be affected. Direct Residential No other place to 10 96 41 Purayidom 0.0023 Madaswami Pillai 9388115127 Hindu BPL Purchase Building live. Need fair compensation.

11 96 42 Purambokke 0.0016 Govt.

Supports 9074943399(Balaji) development. 12 96 44 part Purayidom 0.0034 Balaji Hindu APL Hereditary Business 9074943399(Salaji) Need fair compensation.

Supports 9074943399(Balaji) development. 13 96 163 part Purayidom 0.0032 Salaji Hindu APL Hereditary Business 9074943399(Salaji) Need fair compensation.

Residential Need fair 14 96 43 Purayidom 0.0103 Saralabhai 9895378020 Hindu APL Hereditary Building compensation.

15 96 50 Purambokke 0.0011 Govt. No other place to live. House was constructed by Direct Residential taking loan. 16 96 56 part Purayidom 0.0037 Jayasree 9895049747 Hindu APL Purchase Building Project should be implemented at the earliest. Need fair compensation. House & land will be lost. 8 lakh rupees was used to rebuild the Direct Residential 17 96 57 Purayidom 0.0057 S. DileepKumar 9895700170 Hindu APL house. Purchase Building No other place to live. Need fair compensation.

66 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

House & land will Direct Residential be lost. 18 96 58 Purayidom 0.0071 Vanisree 9567056578 Hindu APL Purchase Building Need fair compensation. 19 96 59 Purambokke 0.0018 Govt. House is Padmavathi completely 61, 20 96 Purayidom 0.0067 R. Vighnesh Hindu affected. 183 part R. Rajeev Need fair compensation. Land only is lost. 21 96 60 Purayidom 0.0055 Chandramohan Hindu Need fair compensation. 22 96 85 Purambokke 0.0009 Govt. road Land only is lost. 23 96 80 part Purayidom 0.0082 K. Mahadevan Hindu Need fair compensation. Land only is lost. 24 96 81 Purayidom 0.0078 Vijay R. Need fair compensation. Land only is lost. 25 96 82 Purayidom 0.0023 Vijay R. Need fair compensation. Need fair 26 96 84 part Purayidom 0.0087 Venugopal 9447016230 Hindu Hereditary compensation. 09446184128(Janaki) Need fair 27 96 171 Purayidom 0.0046 BhageerathiAmmal Hindu Hereditary 09486652003(Hareesh) compensation. Need fair 28 96 83 Purayidom 0.0057 Geetha 8281024716 Hindu Hereditary compensation. 29 96 88 Purambokke 0.0014 Govt. Road Land only is lost. 30 96 90 part Purayidom 0.0011 KumariVanaja Hindu Need fair compensation. 1 house and 3 shops Appukkuttan Nair, are lost completely. 31 96 89 Purayidom 0.0192 Vasanthakumari Need fair compensation. 32 96 112 Purambokke 0.0015 Govt. Land only is lost. 33 96 113 part Purayidom 0.0063 RukminiSubramanyam Hindu Need fair compensation.

67 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

Gireeshkumar, Satheeshkumar, Land only is lost. Kamalakshiyamma, 34 96 114 part Purayidom 0.0029 Hindu Need fair Shantamma, compensation. Radhamma, Sureshkumar Land only is lost. Savithriyamma, 35 96 153 part Purayidom 0.0038 Hindu Need fair Sureshkumar compensation. Gireeshkumar Land only is lost. 36 96 151 Purayidom 0.0045 Hindu Need fair compensation.

Satheeshkumar Land only is lost. 37 96 152 part Purayidom 0.0063 Hindu Need fair compensation.

Land only is lost. 38 96 115 Purayidom 0.0051 IndirabhaiAmma Hindu Need fair compensation.

Land only is lost. 39 96 116 part Purayidom 0.0136 Harilal Hindu Need fair compensation. Land only is lost. 40 96 167 Purayidom 0.0072 Chandramohan Hindu Need fair compensation. 41 96 126 part Purambokke 0.0013 Govt. Road Building is lost completely. 42 96 164 part Purayidom 0.0081 Ramakumari Hindu Need fair compensation. Land only is lost. 43 96 127 Purayidom 0.0157 P. Radha Hindu Need fair compensation. Building is lost completely. 44 96 125 part Purayidom 0.0091 Sreelekshmi M. R. Hindu Need fair compensation. 45 96 128 Purambokke 0.0072 Govt. Road

68 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

Land only is lost. 46 132 47 Purayidom 0.0021 Saralabhai Hindu Need fair compensation. House & land will be lost. Direct Residential Income will get 47 139 112 part Purayidom 0.0255 Mary Baison 0471 2324711 Christian Purchase Building affected. Need fair compensation. Don’t have any other place to live. Provide Direct Residential 48 139 113 part Purayidom 0.0309 ArumukhaPandi 9447450935 Hindu APL compensation at the Purchase Building earliest. Need fair compensation. 49 139 116 part Purambokke 0.0062 Govt. Road Land only is lost. 50 133 13 part Purayidom 0.0211 K. R. Venkidachalam Hindu Need fair compensation. Whole land will be acquired. Raveendran Nair. 12, 86, 87 9995606053 Direct Residential Doesn’t own other 51 133 Purayidom 0.0156 Sumathiyamma, Hindu APL part 9633677411 Purchase Building land. Vijayasree Need fair compensation. Need fair 52 133 5 part Purayidom 0.0024 Udayavarma Raja 9847074400 Hindu compensation. Doesn’t own other Direct Residential land. 53 133 11 Purayidom 0.0165 Sreejith 9946104586 Hindu APL Purchase Building Need fair compensation. Land only is lost. 54 133 9 part Purayidom 0.0021 Pradeep Kumar Hindu Need fair compensation. Hose & land will be Direct Residential lost. 55 133 10 Purayidom 0.0091 Priyathara 9497014490 Hindu BPL Purchase Building Need fair compensation.

House will be lost. Raghuveeran, Direct Residential 56 133 45 part Purayidom 0.0157 9847720980 Hindu APL Need fair R. Vasanthan Purchase Building compensation.

69 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

57 133 46 part Purambokke 0.0021 Govt. Road Vacant plot. Trees will be lost. 58 133 50 Purayidom 0.0131 R. Sadashivan Nair 9995927261 Hindu Need fair compensation. Land only is lost. Vijayakumar, Appukkuttan 59 133 49 part Purayidom 0.0003 Hindu Need fair Pillai compensation. Land only is lost. 60 133 52 part Purayidom 0.0006 Kumari Hindu Need fair compensation. Land only is lost. 61 133 51 Purayidom 0.0233 JanardhanaPai Hindu Need fair compensation. 62 133 58 part Purambokke 0.0301 Govt. Road Land only is lost. 63 133 66 part Purayidom 0.0002 Sreelatha 9388064475 Hindu Need fair compensation. Land only is lost. Residential 64 133 81 part Purayidom 0.0034 ParameshwaranThambi 9388064475 Hindu APL Hereditary Need fair Building compensation. Land only is lost. 9388064475(Sreelatha) 65 133 82 Purayidom 0.0036 MahithagopiKalyan Hindu Need fair 9447248289(Manikandan) compensation.

Land only is lost. 9388064475(Sreelatha) 66 133 83 Purayidom 0.0029 MahithagopiKalyan Hindu Need fair 9447248289(Manikandan) compensation. Land only is lost. Residential 67 133 67 part Purayidom 0.0208 ParameshwaranThambi 9388064475 Hindu APL Hereditary Need fair Building compensation.

Land only is lost. 68 133 68 part Purayidom 0.0037 Sreekandan Nair Hindu Need fair compensation.

Land only is lost. 69 133 69 part Purayidom 0.0296 Lalithamma Hindu Need fair compensation. Land only is lost. Direct Residential 70 138 37 part Purayidom 0.0088 PrathapanThambi 8281860818 Hindu APL Need fair Purchase Building compensation.

70 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

Land only is lost. Direct Residential 71 138 38 Purayidom 0.0043 RamalekshmiAmmal 8129395737 Hindu BPL Need fair Purchase Building compensation.

Land only is lost. 72 138 39 part Purayidom 0.0059 Sreekandan Nair 9497689840 Hindu APL Hereditary Business Need fair compensation.

Courtyard will be lost. Renovation of Residential 73 138 40 part Purayidom 0.0034 Chandrashekharan Nair 9387638485 Hindu APL Hereditary house will be Building necessary. Need fair compensation. House will be lost. Residential 74 138 41 part Purayidom 0.0026 Rajashekharan Nair 9633082945 Hindu APL Hereditary Need fair Building compensation. Land only is lost. Sadasivan Nair, 75 138 42 part Purayidom 0.0017 9895412734 Hindu Need fair Parameshwaran compensation. 76 138 44 part Purambokke 0.0005 Road Road Livelihood will be lost. Direct No other source of 77 138 58 part Purayidom 0.0024 Prabhakaran Nair 9633660222 Hindu APL Business Purchase income. Need fair compensation. House will be lost. Residential 78 138 60 part Purayidom 0.0006 Radhamma 9447571833 Hindu BPL Hereditary Need fair Building compensation. House will be lost. SumathikkuttyAmma, 9895978085 Residential 79 138 61 Purayidom 0.0031 Hindu BPL Hereditary Need fair Premakumari (Sumathikuttyyamma) Building compensation. 80 142 part Purambokke 0.0241 Killi river Killi River Land only is lost. Direct 81 157 80 part Purayidom 0.0118 Geethakumari 9747656477 Hindu BPL Need fair Purchase compensation. Residential House will be lost. Direct 82 157 81 Purayidom 0.0201 Chandrika 9496358508 Hindu APL Building & Need rehabilitation. Purchase Agriculture Need fair

71 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

compensation.

Land only is lost. 83 157 82 Purayidom 0.0156 Surendran Hindu Need fair compensation. 84 163 1 part Purambokke 0.0105 Road Road Have two shops given for rent at Rs. 3500/- per month. Income will be lost. Livelihood of two Direct 85 163 83 Purayidom 0.0043 Anitha 9946062543 Hindu APL Business individuals who Purchase used to rent the shops will also will be lost. Need fair compensation. Used as godown. Vijayakumar, Direct 86 163 81 part Purayidom 0.0145 9447070123 Hindu APL Business Need fair Sureshkumar Purchase compensation. House will be lost completely. 87 163 84 part Purayidom 0.0042 Harikumar Hindu Need fair compensation. House will be lost completely. 88 163 85 part Purayidom 0.0035 Sasikumar 9003160074 Hindu Need fair compensation. House will be lost completely. 89 163 136 part Purayidom 0.0013 Sankaranarayana Pillai 9969471404 Hindu Need fair compensation. Two storied house. Part of house will Direct Residential 90 163 86 part Purayidom 0.0013 Sivasubramanyam 9497760537 Hindu APL be lost. Purchase Building Need fair compensation. Bedroom and kitchen will be lost. Hose will be Direct Residential 91 163 87 part Purayidom 0.0013 Ananthakrishnan 9496249155 Hindu APL uninhabitable. Purchase Building Need fair compensation.

72 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

House will be lost. Giri, Direct Residential 92 163 88 part Purayidom 0.0021 9447551604 Hindu APL Need fair Satheeshkumar Purchase Building compensation. Direct Residential Need fair 93 163 93 part Purayidom 0.0016 Vijayamohan 9895910123 Hindu APL Purchase Building compensation. House will be uninhabitable after acquisition. 9847400769 Residential Wants to build 94 163 94 part Purayidom 0.0017 Sandhya Hindu BPL Hereditary 9562551913 Building house on the left over land. Need fair compensation. Land only is lost. 95 163 95 part Purayidom 0.0001 Sureshkumar Hindu Need fair compensation. Need fair 96 163 144 part Purayidom 0.0011 Daniel Christian compensation. Land only is lost. 97 163 105part Purayidom 0.0006 Alakammal Hindu Need fair compensation. Don’t know whether house will Residential 98 163 123 part Purayidom 0.0003 Manoj 9746724269( Maheswari) Hindu APL Hereditary get affected or not. Building Need fair compensation. Land only will be Sivam, Direct affected. 99 163 124 part Purayidom 0.0021 7356374514 Hindu BPL Land Pushpam Purchase Need fair compensation. 100 163 128 part Purambokke 0.0004 Road Road

Hose will be lost Anilkumar, Residential partially. 101 163 130 part Purayidom 0.0026 9895553457 Hindu APL Hereditary Ajikumar Building Need fair compensation.

Need fair 102 163 131 part Purayidom 0.0021 Prasannakumar 9446371180 Hindu compensation.

Hose will be Direct Residential partially lost. 103 163 134 part Purayidom 0.0048 Vasantha 8129166824 Hindu BPL Purchase Building Need fair compensation.

73 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

Rajesh G., Land only is lost. 104 163 135 part Purayidom 0.0163 Abhishek R. Nair, Hindu Need fair Abhinav R. Nair compensation.

105 164 110 part Purambokke 0.0013 Govt. Road

123, 131 Need fair 106 164 Nilam 0.0123 Karthyayani 9447163404 Hindu BPL Hereditary Land part compensation.

More than half portion of the hos will be lost. Shop will be lost. Livelihood gets 107 164 51 part Nilam 0.0092 Selvan 9633909308 Hindu BPL Hereditary Business affected. Left over land should be allowed for constructions. Need fair compensation. Shed will be lost 53, 116 completely. 108 164 Purayidom 0.0035 Durgadas Hindu part Need fair compensation. House will be lost partially. 109 164 52 part Purayidom 0.0025 Jayachandran Hindu Need fair compensation.

110 164 92 part Purambokke 0.0011 Road Road

Land only is lost. 111 164 108 part Purayidom 0.0173 Rajan 9846698000 (Mohannkumar) Hindu Need fair compensation. 112 165 28 part Purambokke 0.0064 Road Road Shop will be lost completely. Sreejith, Direct Livelihood will be 113 165 35 part Purayidom 0.0019 9746768420 Hindu APL Business Sajith Purchase lost. Need fair compensation. 114 165 36 part Purayidom 0.0048 Vijayakumari 9446458392 c APL Direct Residential Land only is lost.

74 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

Purchase Building Need fair compensation. Compound wall Residential will be lost. 115 165 37 part Purayidom 0.0025 Naseema 9446700030 Muslim APL Hereditary Building Need fair compensation. 116 165 79 part Purambokke 0.0005 Road Road

Consider excluding house form 70, 149 S. Vinodkumar, Residential 117 165 Purayidom 0.0075 9847240777 Hindu APL Hereditary acquisition. part Sunilkumar Building Need fair compensation. Compound wall will be lost. Residential Drainage system 118 165 69 part Purayidom 0.0051 Prasanth 9895826156 Hindu APL Hereditary Building may get affected. Need fair compensation. Land only is lost. Direct 119 165 68 part Purayidom 0.0044 Anilkumar 984724077 Hindu APL Agriculture Need fair Purchase compensation. Compound wall will be affected. 120 165 140 part Nilam 0.0034 Sayedali P. 9447240493 Muslim APL Hereditary Land Need fair compensation. Compound wall Direct Residential will be lost. 121 165 81 part Nilam 0.0071 Peerumuhammad 9447240493 Muslim APL Purchase Building Need fair compensation. 122 165 80 part Purambokke 0.0711 Govt. Govt. purambokke

123 165 110 part Purambokke 0.0009 Road Road Compound wall Residential will be lost. 124 165 112 part Purayidom 0.0021 Jayasree 9447038291 Hindu APL Hereditary Building Need fair compensation. 125 165 129 part Purambokke 0.0268 Road Road Compound wall will be lost. 126 171 2 part Purayidom 0.0049 Sheela 9846698000 Hindu APL Hereditary Land Need fair compensation.

75 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

Land only is lost. 127 171 3 part Purayidom 0.0049 Chellappan Hindu Need fair compensation. House will be lost partially. 128 171 4 part Purayidom 0.0038 Lekshmiammal Hindu BPL Need fair compensation. Land only is lost. 129 171 5 part Purayidom 0.0087 Kabeer S. Panicker Need fair compensation. 130 171 6 part Purambokke 0.0005 Road Road Land only is lost. 131 170 6 part Purayidom 0.0132 Greeshma Need fair compensation. Land only is lost. 132 170 7 part Purayidom 0.0123 SoumyaSanal Need fair compensation. Land only is lost. 133 170 8 part Purayidom 0.0004 Murukan Hindu Need fair compensation. Land only is lost. 134 170 11 part Purayidom 0.0286 Lekshmi Hindu Need fair compensation. Land only is lost. 135 170 12 part Purayidom 0.0141 Subash Hindu Need fair compensation. House will be lost partially. 136 170 14 Purayidom 0.0019 Kochuramanpanki Hindu Need fair compensation. House will be lost completely. 137 170 15 part Purayidom 0.0127 Santha Need fair compensation. Land only is lost. 138 170 16 part Purayidom 0.0364 Omanayamma Need fair compensation. 139 170 19 part Purambokke 0.0049 Road Road Land only is lost. 140 170 20 part Purayidom 0.0161 Girijakumari Need fair compensation. Land only is lost. 141 170 118 part Purayidom 0.0135 Rasheedabeevi Muslim Need fair compensation.

76 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

Land only is lost. 142 170 22 part Purayidom 0.0197 Parvathi Hindu Need fair compensation. Land only is lost. 143 170 119 part Purayidom 0.0208 Lekshmi Hindu Need fair compensation.

Land only is lost. 144 170 25 part Purayidom 0.0024 Abdulwaheed Muslim Need fair compensation.

145 170 28 part Purambokke 0.0018 Road Road

Land only is lost. 146 170 24 Purayidom 0.0105 Naseema Muslim Need fair compensation.

House is lost completely. 147 170 23 Purayidom 0.0042 ValsalakumariThankachi Need fair compensation. 148 170 30 part Purambokke 0.0033 Road Road House is lost partially. 149 170 29 part Purayidom 0.0293 HabeebaBeevi Muslim Need fair compensation. House is lost Abdulrasheed, partially. 150 170 31 part Purayidom 0.0138 Muslim Noorjahan Need fair compensation. Abdul Latheef, Need fair 151 170 128 part Purayidom 0.0122 Muslim Salma Beevi compensation. Hose is lost partially. 152 170 41 part Purayidom 0.0235 Aboobecker Muslim Need fair compensation. House is lost completely. 153 170 52 part Purayidom 0.0145 Nabeesathubeevi Muslim Need fair compensation. Workshop will be acquired 154 170 55 Purayidom 0.0096 MaajidaBeevi Muslim completely. Need fair

77 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Extend (in APL/ Type of Usage of Block No. Survey No. Type Owner Contact Number Religion No Hectare) BPL Ownership land Remarks

compensation. House is lost partially. 155 170 54 Purayidom 0.0028 Nabeesathubeevi Muslim Need fair compensation. House and shop is lost completely. 156 170 53 Purayidom 0.0114 Sameera Muslim Need fair compensation. 157 170 51 part Purambokke 0.0061 Road Road House is lost partially. 158 170 50 part Purayidom 0.0037 Kamalakshi Hindu Need fair compensation. House is lost completely. 159 170 49 Purayidom 0.0136 Kamalakshi Hindu Need fair compensation. Sulochana, House is lost Abhilash, partially. 160 170 45 part Purayidom 0.0009 Hindu Asha, Need fair Anand compensation. House and shop is lost partially. 161 170 47 part Purayidom 0.0055 Basheer Muslim Need fair compensation. Shop will be acquired 162 170 48 Purayidom 0.0005 Salim Muslim completely. Need fair compensation. 163 170 116 part Purambokke 0.0225 Govt. State PWD Rod 1.6016

78 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

THIRUMALA VILLAGE

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land House will be affected. 1 206 61 Purayidom 0.0028 Shajahan Muslim Need fair compensation. House will be lost completely. Residential 2 206 62 Purayidom 0.0038 Hafsath Muslim APL Direct Purchase Shop adjoining the plot 9567738420 Purpose next to road will be lost. Need fair compensation. Shop will be affected. 3 206 67 Purayidom 0.0054 Susheelakumari Hindu Need fair compensation.

4 206 66 Purayidom 0.0049 Rahim, Pathway Muslim Need fair compensation.

Residential House will be affected. 5 206 63 Purayidom 0.0087 Abdulkarim 7736364146 Muslim BPL Direct Purchase Purpose Need fair compensation.

House given for rent. Residential House will be lost 6 206 68 Purayidom 0.0102 Sudheer 9037515316 Muslim APL Hereditary Purpose completely. Need fair compensation.

Residential House will be affected. 7 206 69 Purayidom 0.0043 Malakmuhammed 8589966105 Muslim BPL Direct Purchase Purpose Need fair compensation.

House is partially Ahammadkannu, 8 206 60 Purayidom 0.0071 Muslim affected. Pathumma Need fair compensation. Shop is completely 9 206 56 Purayidom 0.0044 Niharabeegam Muslim affected. Need fair compensation. House is completely 10 206 226 Purayidom 0.0011 Bismi M. A. Muslim affected. Need fair compensation. Ameerjan, Beegam Residential House will be lost. 11 206 57 Purayidom 0.0203 8907943200 Muslim APL Direct Purchase Jasmine, Sayyed Purpose Need fair compensation.

79 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land House is partially 12 206 64 Purayidom 0.0085 Abdulrasheed Muslim affected. Need fair compensation. Umaibabeevi, 8589966105 Residential 13 206 70 Purayidom 0.0101 Muslim BPL Hereditary Need fair compensation. Sudheer 9037515316 Purpose Two storeyed house. Top floor given for rent. Residential 14 206 65 Purayidom 0.0176 Rahim 9947935035 Muslim APL Direct Purchase House will be lost Purpose completely. Need fair compensation.

House will lost Residential 15 206 58 Purayidom 0.0101 Najeeb 9495122281 Muslim APL Hereditary (constructed 5 years ago). Purpose Need fair compensation.

House will be lost Residential 16 206 220 Purayidom 0.0081 Hameed 9947922243 Muslim APL Hereditary completely. Purpose Need fair compensation. Residential House will be affected. 17 206 221 Purayidom 0.0021 Sulaikha, Fathima 9495122281 Muslim BPL Hereditary Purpose Need fair compensation. Corner of house and Pathummal, Residential pathway to house will be 18 206 59 Purayidom 0.0015 7946633977 Muslim APL Hereditary Rahumabeevi Purpose lost. Need fair compensation. House is partially Abdulrasheed, 19 206 73 Purayidom 0.0123 Muslim affected. Basheer Need fair compensation. House is partially Fathima, Mansoora, 20 206 72 Purayidom 0.0107 Muslim affected. Sofiya, Haseena Need fair compensation. 21 206 71 Vazhi 0.0078 Pathway Pathway House will be lost Residential 22 206 74 Purayidom 0.0052 Saidali, Sanooja 9633420074 Muslim BPL Hereditary completely. Purpose Need fair compensation. Peerumuhammad, Residential House will be lost. 23 206 75 Purayidom 0.0145 8547921680 Muslim BPL Hereditary Sulaikha Purpose Need fair compensation.

Residential House will be lost. 24 206 83 Purayidom 0.0022 Fasila 8129193072 Muslim BPL Direct Purchase Purpose Need fair compensation.

80 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land House will be lost Residential 25 206 84 Purayidom 0.0128 Krishnan 9895292942 Hindu BPL Hereditary completely. Purpose Need fair compensation. 26 206 85 Vazhi 0.0014 Pathway Pathway House will be lost Residential 27 206 86 Purayidom 0.0124 Rohini 8139875574 Hindu BPL Direct Purchase completely. Purpose Need fair compensation. House will be lost Residential 28 206 87 Purayidom 0.0051 Gopi 9567115422 Hindu BPL Direct Purchase completely. Purpose Need fair compensation. House is partially 29 206 88 Purayidom 0.0001 Babu Hindu affected. Need fair compensation.

House is partially V. Mariyappan, R. 30 206 161 Purayidom 0.0068 Hindu affected. Vadivu Need fair compensation.

House will be lost Jayasudha, Vinod, Residential 31 206 162 Purayidom 0.0112 8129736244 Hindu BPL Direct Purchase completely. Ramya Purpose Need fair compensation.

House given for rent. Hose will be lost 32 206 163 Purayidom 0.0019 Vijayamma 8129770329 Hindu BPL completely. Need fair compensation.

Ayyappan, House is partially 33 206 172 Purayidom 0.0021 SundareshaShastriya Hindu affected. r, Pathway Need fair compensation.

81 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land

House will be lost completely. Residential Shop is given for rent 34 206 174 Purayidom 0.0121 Jasmin 9846358474 Muslim BPL Direct Purchase Purpose which also will be lost on acquisition. Need fair compensation.

Bheemakannu, House is partially 35 206 175 Purayidom 0.0073 Abdulsamad, Muslim affected. Rubeeniya Need fair compensation.

Portion of land only is 8075595006 Residential 36 206 173 Purayidom 0.0029 Susheelabhai Hindu APL Direct Purchase lost. 9497621950 Purpose Need fair compensation.

House will be lost Veluchettiyaar, Residential 37 206 176 Purayidom 0.0054 7736491814 Hindu BPL Direct Purchase completely. Rajeshwari Purpose Need fair compensation.

Residential 38 206 177 Purayidom 0.0046 Shanti 9495556290 Hindu BPL Direct Purchase Need fair compensation. Purpose

House is partially 39 206 179 Purayidom 0.0003 Najeeb, Simi Muslim affected. Need fair compensation.

40 206 180 Vazhi 0.0001 Pathway Pathway

House given for rent. 9447017849 House will be lost 41 206 181 Purayidom 0.0064 Ashok Kumar Hindu 8891894288 completely. Need fair compensation. House given for rent. Residential 42 206 182 Purayidom 0.0071 Jayalatha 9446266566 Christian APL Direct Purchase House will be lost Purpose completely.

82 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land Need fair compensation. House is partially 43 206 183 Purayidom 0.0007 Sasi Hindu affected. Need fair compensation. 44 206 185 Vazhi 0.0002 Pathway Pathway

Portion of land and Residential 45 206 224 Purayidom 0.0006 Ansar, Sumayya 9746597210 Muslim APL Direct Purchase bathroom will be lost. Purpose Need fair compensation.

House is partially 46 206 186 Purayidom 0.0017 Shajjad Muslim affected. Need fair compensation. House is partially 47 206 187 Purayidom 0.0002 Abduljaleel Muslim affected. Need fair compensation. House is partially 48 206 189 Purayidom 0.0005 C. Padmakumari Hindu affected. Need fair compensation.

49 206 198 Vazhi 0.0002 Pathway Pathway

House is partially 50 206 209 Purayidom 0.0021 Ambika Hindu affected. Need fair compensation.

Half portion of house Residential 51 206 210 Purayidom 0.0006 Rajalekshmi 9562658214 Hindu BPL Hereditary will be lost. Purpose Need fair compensation.

52 206 211 Purayidom 0.0036 Residential House will be affected. 53 206 212 Purayidom 0.0126 Sraswathi 9495688783 Hindu APL Direct Purchase Purpose Need fair compensation. 54 206 204 Purayidom 0.0003 55 206 213 Vazhi 0.0004 Pathway Pathway Residential 56 206 214 Purayidom 0.0152 Shakunthala 9746292827 Hindu BPL Hereditary Need fair compensation. Purpose 57 209 149 Vazhi 0.0008 Pathway Pathway

83 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land

House is partially 58 209 150 Purayidom 0.0001 Mustafa Muslim affected. Need fair compensation.

House is partially 59 209 153 Purayidom 0.0012 Rahumakannu Muslim affected. Need fair compensation.

House is partially Shahulhameed, 60 209 154 Purayidom 0.0077 Muslim affected. Khadeeja Need fair compensation. House is partially 61 209 155 Purayidom 0.0021 Sheeja Hindu affected. Need fair compensation. Residential 62 209 156 Purayidom 0.0081 Nasarudheen 8921117857 Muslim BPL Hereditary Need fair compensation. Purpose 63 209 157 Vazhi 0.0013 Pathway Pathway Land only is affected. 64 209 158 Purayidom 0.0137 Jaya Hindu Need fair compensation. House is partially 65 209 159 Purayidom 0.0001 Haseena Muslim affected. Need fair compensation.

66 209 161 Canal 0.0008 Canal Canal

67 209 169 Nilam 0.0181 Ravi, Ambili Hindu Need fair compensation.

68 209 171 Purayidom 0.0002 A. M. Gopalan Hindu Need fair compensation.

69 209 180 Purambokke 0.1172 Purambokke Purambokke

House is partially Hari, Sivam, 70 209 198 Purayidom 0.0502 Hindu affected. Subramanyam Need fair compensation. 71 210 2 Purayidom 0.0018 Road Road

72 210 250 Purayidom 0.0173 Ragini Hindu Need fair compensation.

84 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land

Land only is affected. 73 210 247 Purayidom 0.0171 Mridula Hindu Need fair compensation.

Building is partially 74 210 274 Purayidom 0.0097 Abdulkalam Muslim affected. Need fair compensation. Land only is lost. 75 210 243 Purayidom 0.0023 Iliyaskunju Muslim Need fair compensation. 76 211 192 Vazhi 0.0018 Pathway Pathway Vijayakumar, Land only is lost. 77 211 114 Nilam 0.0387 Vijayakumari, Hindu Need fair compensation. Binitha House is partially 78 211 113 Nilam 0.0001 Arshad Muslim affected. Need fair compensation. House is partially Kerala Mudaliyar 79 211 115 Purayidom 0.0319 affected. Samudayam Need fair compensation. House is partially 80 211 145 Purayidom 0.0001 Krishnan, Gomathi Hindu affected. Need fair compensation. House is partially 81 211 147 Purayidom 0.0015 Manoharan, Pathway Hindu affected. Need fair compensation.

House is completely 82 211 148 Purayidom 0.0071 Krishnan, Gomathi Hindu affected. Need fair compensation.

House is partially 83 211 146 Purayidom 0.0001 Unni Hindu affected. Need fair compensation. House is completely 84 211 149 Purayidom 0.0061 Manoharan, Meena Hindu affected. Need fair compensation.

85 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land

House is partially 85 211 150 Purayidom 0.0044 Lalitha Hindu affected. Need fair compensation.

House is partially Lekshmanan, 86 211 152 Purayidom 0.0088 Hindu affected. Selvan, Appu Need fair compensation.

House is partially 87 211 196 Purayidom 0.0217 Selvan Hindu affected. Need fair compensation.

Lekshmanan, House is partially Selvan, Kala, Baby, 88 211 153 Purayidom 0.0041 Hindu affected. Kumar, Need fair compensation. PachanNadar

House is partially 89 211 154 Purayidom 0.0095 Kumar, Sindhu Hindu affected. Need fair compensation.

155: Pathway.

90 211 155 Purayidom 0.0007

Pushkaran, Vanaja Hindu 157: House is completely 91 211 157 Purayidom 0.0076 affected. Need fair compensation. House is partially 92 211 158 Purayidom 0.0061 Krijo Hindu affected. Need fair compensation. House is partially 93 211 161 Purayidom 0.0173 Pushpalatha Hindu affected. Need fair compensation.

86 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land 94 195 1 tdmUv 0.0047 Road Road House is partially 95 195 18 Purayidom 0.0083 Sasidharan, Thresya Hindu affected. Need fair compensation. House is partially Sheejamol, 96 195 19 Purayidom 0.0145 Hindu affected. Gireeshkumar Need fair compensation. 97 195 20 Vazhi 0.0008 Pathway Pathway House is partially 98 195 22 Purayidom 0.0036 Shivanandan Hindu affected. Need fair compensation. House is partially 99 195 21 Purayidom 0.0024 Harikumar Hindu affected. Need fair compensation. House is partially 100 195 23 Purayidom 0.0253 Omana, Thankappan Hindu affected. Need fair compensation. House is partially 101 195 24 Purayidom 0.0082 Rajam Hindu affected. Need fair compensation. House is partially 102 195 25 Purayidom 0.0165 Udayakumar Hindu affected. Need fair compensation. House is partially 103 195 28 Purayidom 0.0072 Santosh, Divya Hindu affected. Need fair compensation. House is partially 104 195 29 Purayidom 0.0106 Ratheesh Hindu affected. Need fair compensation. House is partially Shaji, Manju, 105 195 30 Purayidom 0.0016 Hindu affected. Ratheesh, Pathway Need fair compensation. House is partially 106 195 31 Purayidom 0.0011 SadasivanNadar Hindu affected. Need fair compensation. House is partially 107 195 32 Purayidom 0.0226 Linta Christian affected. Need fair compensation. House is completely 108 195 33 Purayidom 0.0111 Vijayamma Hindu affected. Need fair compensation.

87 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land House is partially 109 195 34 Purayidom 0.0202 Anikuttan Hindu affected. Need fair compensation. House is partially 110 195 39 Purayidom 0.0097 Soman Hindu affected. Need fair compensation. House is partially 111 195 42 Purayidom 0.0115 Shakunthala Hindu affected. Need fair compensation. House is partially 112 195 40 Purayidom 0.0215 Vishwanathan Hindu affected. Need fair compensation. House is partially 113 194 81 Purayidom 0.0191 Jayan, Sivada Hindu affected. Need fair compensation. House is partially 114 194 82 Purayidom 0.0107 Rameshkumar Hindu affected. Need fair compensation. Rashmi, House is partially 115 194 83 Purayidom 0.0169 Sundarakumar, Hindu affected. Girijadevi Need fair compensation. House is completely 116 194 88 Purayidom 0.0078 Beenaraj Hindu affected. Need fair compensation. House is partially 117 194 87 Purayidom 0.0137 RanjuSatheesan Hindu affected. Need fair compensation. House is partially 118 194 89 Purayidom 0.0062 RajendranSunitha Hindu affected. Need fair compensation. House is partially 119 194 92 Purayidom 0.0067 Soumya Hindu affected. Need fair compensation. House is partially 120 194 94 Purayidom 0.0072 Chitrasen Hindu affected. Need fair compensation. 121 194 95 Vazhi 0.0014 Pathway Pathway House is partially Shivendran, Hindu & 122 193 50 Purayidom 0.0778 affected. GladisLekha Christian Need fair compensation. House is partially 123 193 51 Purayidom 0.0085 Lisi George Christian affected. Need fair compensation.

88 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land House is partially 124 193 52 Purayidom 0.0179 Rukmini Hindu affected. Need fair compensation. House is partially 125 193 87 Purayidom 0.1269 Sister Thresyamma Christian affected. Need fair compensation.

126 182 112 Naalath Vazhi 0.0021 Pathway Pathway House is partially 127 182 163 Purayidom 0.0269 Girija Devi Hindu affected. Need fair compensation. House is partially 128 182 158 Purayidom 0.0004 Johnson Christian affected. Need fair compensation. House is completely 129 182 159 Purayidom 0.0059 Sureshbabu Hindu affected. Need fair compensation.

House is partially 130 182 171 Purayidom 0.0287 Suma Hindu affected. Need fair compensation.

House is partially 131 182 160 Purayidom 0.0059 Sadashivan Hindu affected. Need fair compensation.

House is partially 132 182 161 Purayidom 0.0315 Manoharan Hindu affected. Need fair compensation.

House is partially 133 182 162 Purayidom 0.0402 Appukuttan Hindu affected. Need fair compensation. 134 180 50 Vazhi 0.0007 Pathway Pathway House is partially 135 180 97 Purayidom 0.0063 Ramlabeevi, Ambili Hindu affected. Need fair compensation.

89 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land

136 179 36 Govt. Canal 0.0029 Govt.canal Govt. canal House is partially 137 179 37 Purayidom 0.0099 Mary Christian affected. Need fair compensation. House is partially 138 179 38 Purayidom 0.0241 Madhavan Hindu affected. Need fair compensation. House is partially 139 179 39 Purayidom 0.0177 Asokan Hindu affected. Need fair compensation. 140 179 40 Vazhi 0.0039 Pathway Pathway House is partially 141 179 60 Purayidom 0.0336 Geetha Jose Christian affected. Need fair compensation. House is partially 142 179 41 Purayidom 0.0176 Baby Christian affected. Need fair compensation. House is partially 143 179 58 Purayidom 0.0182 Jalaja Hindu affected. Need fair compensation. Lekha Pradeep, Land only is lost. 144 179 63 Purayidom 0.0002 Hindu Pradeep Raj Need fair compensation. House is partially 145 179 43 Purayidom 0.0253 K. V. Kumar Hindu affected. Need fair compensation. House is completely 146 179 42 Purayidom 0.0231 Pushkaran Nair Hindu affected. Need fair compensation. 147 179 44 Vazhi 0.0061 Pathway Pathway House is partially Muraleedharan Nair, 148 179 47 Purayidom 0.0007 Hindu affected. Rama Need fair compensation. House is partially 149 179 50 Purayidom 0.0207 Mohanan Hindu affected. Need fair compensation. House is partially 150 179 49 Purayidom 0.0025 SanojJayasree Hindu affected. Need fair compensation. House is partially 151 179 53 Purayidom 0.0147 Gopakumar Hindu affected. Need fair compensation.

90 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (In APL/ Type of Usage of Survey No. Type Owner Contact Number Religion remarks No. No. Hectares) BPL Ownership land House is completely 152 179 51 Purayidom 0.0029 Premkumar Hindu affected. Need fair compensation. House is completely 153 179 52 Purayidom 0.0087 Manjusha Hindu affected. Need fair compensation. House is partially 154 179 54 Purayidom 0.0119 Aswathi Pradeep Hindu affected. Need fair compensation. 155 177 1 Vazhi 0.0083 Pathway Pathway House is partially 156 177 59 Purayidom 0.0003 Mani Hindu affected. Need fair compensation. House is partially 157 177 60 Purayidom 0.0338 Vinukumar, Anju Hindu affected. Need fair compensation. House is partially 158 177 61 Purayidom 0.0144 Pachan Hindu affected. Need fair compensation.

House is partially 159 177 62 Purayidom 0.0018 Vaijayanti, Raju Hindu affected. Need fair compensation.

160 177 63 Vazhi 0.0046 Pathway Pathway

House is partially 161 177 64 Purayidom 0.0191 Johny Christian affected. Need fair compensation. House is partially 162 177 65 Purayidom 0.0011 Mohanan Hindu affected. Need fair compensation. House is partially 163 177 66 Purayidom 0.0129 Sajithlal Hindu affected. Need fair compensation. House is partially 164 177 68 Purayidom 0.0007 AppuNadar Hindu affected. Need fair compensation.

165 177 77 Purayidom 0.0323 Karamana River

1.8048

91 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

NEMOM VILLAGE

Owner Survey Sl. Block Extend (In Contact APL/ Type of No. Type Religion Usage of land No. No. Hectres) Number BPL Ownership Remarks

585/10 1 26 Purayidom 0.0109 Sajimon Hindu Need fair compensation. part Radhakrishnan Nair, Unnikrishnan, 585/3 PadmakumariAmma, 2 26 Purayidom 0.2306 Hindu Need fair compensation. part Asokan, Sathyavathi, Lathika, Thomas, Mohanan 585/4 3 26 Purambokke 0.0196 Purambokke Road Purambokke Road part 585/14 4 26 Purayidom 0.0016 Dr. ShabnamSayyed Muslim Need fair compensation. part 585/15 Ajithkumar, 5 26 Purayidom 0.0081 Hindu Need fair compensation. part Shailajakumari 585/18 House will be lost completely. 6 26 Purayidom 0.0121 Baby Hindu Need fair compensation. 585/17 Dr. ShakeerAnsad, Dr. 7 26 Purayidom 0.0231 Muslim Need fair compensation. part ShabnamSayyed 585/16 Dr. ShakeerAnsad, Dr. 8 26 Purayidom 0.0131 Muslim Need fair compensation. part ShabnamSayyed 585/19 Dr. ShakeerAnsad, Dr. 9 26 Purayidom 0.0041 Muslim Need fair compensation. part ShabnamSayyed 585/6 Sisil, Freida, 10 26 Purayidom 0.1101 Christian Need fair compensation. part Thankarajan

579/1 House will be lost partially. 11 26 Purayidom 0.0141 Anandakumar, Sajitha Hindu part Need fair compensation.

579/20 12 26 Purayidom 0.0023 part Sasikumar, House will be lost partially. Hindu 579/19 Vijayakumari Need fair compensation. 13 26 Purayidom 0.0275 part 1 house is partially and 1 house 579/21 14 26 Purayidom 0.0223 Unni, Surendran Hindu completely will be lost. part Need fair compensation.

92 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Owner Survey Sl. Block Extend (In Contact APL/ Type of No. Type Religion Usage of land No. No. Hectres) Number BPL Ownership Remarks

579/39 House will be lost completely. 15 26 Purayidom 0.0201 AppukuttanNadar Hindu part Need fair compensation.

579/38 House will be lost completely. 16 26 Purayidom 0.0112 RathnakaranNadar Hindu Need fair compensation. 579/32 17 26 Purayidom 0.0104 House will be lost completely. AppukuttanNadar Hindu 579/31 Need fair compensation. 18 26 Purayidom 0.0031

579/2 Land only is lost. 19 26 Purayidom 0.0012 Vasanthakumari Hindu part Need fair compensation. 579/40 Udayakumar, Bindu, House will be lost partially. 20 26 Purayidom 0.0221 Hindu part Chandran, Syamala Need fair compensation. 579/3 House will be lost partially. 21 26 Purayidom 0.1604 Bindu, Vijayakumar Hindu part Need fair compensation. 579/22 House will be lost partially. 22 26 Purayidom 0.0002 John Wilson Christian part Need fair compensation. 579/4 House will be lost completely. 23 26 Purayidom 0.0518 AntoJayaraj Christian part Need fair compensation. 579/5 House will be lost completely. 24 26 Purayidom 0.0336 Selvaneshan Christian part Need fair compensation. 579/10 House will be lost partially. 25 26 Purayidom 0.0394 Vishwambharan Nair Hindu part Need fair compensation. 1 house lost partially and 1 house lost 579/11 Lasar, Thomas, 26 26 Purayidom 0.0203 Christian completely. part Sahadevan Need fair compensation. 579/17 27 26 0.0101 part House will be lost partially. Purayidom Shameem, Noorjahan Muslim 579/34 Need fair compensation. 28 26 0.0031 part 579/18 House will be lost completely. 29 26 Purayidom 0.0637 Vikraman Nair Hindu Need fair compensation. 580/1 30 26 Purambokke 0.0119 Purambokke Road Purambokke Road

580/2 MadhusoodhananTham House will be lost completely. 31 26 Purayidom 0.0223 Hindu part bi Need fair compensation. 580/21 House will be lost completely. 32 26 Purayidom 0.0239 V. Surendran Hindu Need fair compensation. 580/22 33 26 Purayidom 0.0329 Sujakumari Hindu Need fair compensation. part

93 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Owner Survey Sl. Block Extend (In Contact APL/ Type of No. Type Religion Usage of land No. No. Hectres) Number BPL Ownership Remarks

Owned by NSS Karayogam. 580/3 34 26 Purayidom 0.0271 N.S.S. Karayogam Acquired completely.

Need fair compensation.

580/4 House will be lost completely. 35 26 Purayidom 0.0199 Sarojam, Sundaran Hindu Need fair compensation. 580/5 House will be lost completely. 36 26 Purayidom 0.0649 Mohandas Hindu part Need fair compensation. 580/6 Sundaribhai, Mable House will be lost completely. 37 26 Purayidom 0.0974 Christian Das Need fair compensation. 580/7 A. Najumudheen, 38 26 Purayidom 0.0204 Muslim Need fair compensation. part Jasmine 580/23 House will be lost completely. 39 26 Purayidom 0.0104 Shobha Hindu Need fair compensation. 580/24 House will be lost completely. 40 26 Purayidom 0.0066 Deepa K. Hindu Need fair compensation. 580/29 House will be lost completely. 41 26 Purayidom 0.0204 Shameena Muslim part Need fair compensation. 580/11 Shameena, Shafeeq, House will be lost partially. 42 26 Purayidom 0.0001 Muslim part Shareefabeevi Need fair compensation. 580/12 Land only is lost. 43 26 Purayidom 0.0367 Shamsudheen Muslim Need fair compensation. 580/13 Maideen, Pathumma, House will be lost partially. 44 26 Purayidom 0.0089 Muslim part Beemakannu, Sumayya Need fair compensation. 580/14 Land only is lost. 45 26 Purayidom 0.0004 Sureshkumar, Ajitha Hindu part Need fair compensation. 580/18 46 26 Purayidom 0.0153 part House will be lost completely. Nasarudheen Muslim 580/19 Need fair compensation. 47 26 Purayidom 0.0135

580/16 Land and shed is lost. 48 26 Purayidom 0.0023 Shameena, Sainaba Muslim part Need fair compensation. 580/17 House will be lost completely. 49 26 Purayidom 0.0181 NabeesathBeevi Muslim part Need fair compensation. Nujmudheen, 580/20 House will be lost completely. 50 26 Purayidom 0.0189 SakirHusssain, Muslim Need fair compensation. Muhammedkoya

94 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Owner Survey Sl. Block Extend (In Contact APL/ Type of No. Type Religion Usage of land No. No. Hectres) Number BPL Ownership Remarks

580/30 House will be lost completely. 51 26 Purayidom 0.0089 Tahirabeevi Muslim Need fair compensation.

581/4 Puarambokk 52 26 0.0006 Purambokke Purambokke Road part e 581/10 Land only is lost. 53 26 Purayidom 0.0002 Smitha Hindu Part Need fair compensation. 581/12 Land only is lost. 54 26 Purayidom 0.0151 Rajappan Nair Hindu part Need fair compensation. 581/31 Land only is lost. 55 26 Purayidom 0.0083 Lalithakumari Hindu part Need fair compensation. 581/42 House will be lost completely. 56 26 Purayidom 0.0102 Sreekala Hindu part Need fair compensation. Office of SIDCO is functioning in the compound which gets affected completely on acquisition. 591/1 Industrial Estate,Dr. Need fair compensation. 57 26 Purayidom 0.2213 part Rajalekshmi SBI Industrial Estate Branch functioning in a rented building (for rent) will get affected completely. Part of compound wall and laboratory will 591/3 CSIR NIIST, 58 26 Purayidom 0.0471 be lost. part Pappanamcode Need fair compensation. 591/4 59 Purayidom 0.0335 Road Road part 532/1 60 26 Purambokke 0.1232 Purambokke Purambokke Road part 531/10 Shop is lost completely. 61 26 Purayidom 0.0077 Sreekumaran Nair Hindu Need fair compensation. 531/1 Shop is lost completely. 62 26 Purayidom 0.0038 Ranjithkumar Hindu Need fair compensation. 531/11 House will be lost completely. 63 26 Purayidom 0.0209 Preetha K. Nair Hindu Need fair compensation. 531/2 House will be lost completely. 64 26 Purayidom 0.0201 Vimala Hindu Need fair compensation.

95 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Owner Survey Sl. Block Extend (In Contact APL/ Type of No. Type Religion Usage of land No. No. Hectres) Number BPL Ownership Remarks

KsheerodpadhakaSaha 531/3 karanaSankham, House will be lost completely. 65 26 Purayidom 0.0447 VenkittaRamayyan, Need fair compensation. Krishnamoorthi 531/4 House will be lost completely. 66 26 Purayidom 0.0953 MadhavaVaryar(Late) Hindu part Need fair compensation. Parvathi Pillai, 7902284334 534/10 Syamala, Manju, House will be lost completely. 67 26 Purayidom 0.0346 9656251756 Hindu BPL Heriditary Residential Purpose part Sasikumar, Janaki 9746084604 Need fair compensation. Pillai(Late) 534/11 Land only is lost. 68 26 Purayidom 0.0117 Janakipillai(Late) Hindu Need fair compensation. Vikraman Nair, 534/9 Major portion of house will be lost. 69 26 Purayidom 0.0421 Vasanthakumari, 9387782228 Hindu BPL Heriditary Residential Purpose part Ned fair compensation. Sunilkumar 534/12 House will be lost completely. 70 26 Purayidom 0.0206 Venugopal Hindu part Need fair compensation. House and land will be affected 534/36 Padmakumar, 71 26 Purayidom 0.0172 9895418372 Hindu APL Heriditary Residential Purpose completely. part Vidhya(Late) Need fair compensation. House, tailoring shop and shed will be lost 534/15 72 26 Purayidom 0.0127 Sathyapalan Hindu completely. part Need fair compensation. 534/37 MaHeriditaryshkumar, House will be lost partially. 73 26 Purayidom 0.0055 9895418372 Hindu APL Direct Purchase Residential Purpose part Sharanya, Mayadevi Need fair compensation. 534/20 74 26 Purambokke 0.0068 Purambokke Purambokke Road part 534/16 75 26 Purambokke 0.0003 Purambokke Purambokke Road part 534/39 Krishnan Nair, 8086923216 Land only is lost. 76 26 Purayidom 0.0002 Muslim BPL Direct Purchase Residential Purpose part FayisaBeegam 9496163135 Need fair compensation. 526/21-2: Half portion of house will be Sanalkumar, Kumari, lost on acquisition. FasiyaBeegam, 9633042617 526/21 Hindu & Need fair compensation. 77 26 Purayidom 0.0132 Gopakumar, 8086923216 BPL Direct Purchase Residential Purpose part Muslim Chembakam 9496163135 526/21-1: House will be lost completely. (Chandrika) Need fair compensation. 1 house partially and 1 house completely 526/23 Maniyan(Late), Mujeeb 9995562841 78 26 Purayidom 0.0063 Hindu BPL Direct Purchase Residential Purpose will be affected. part Rahman, Saifunisa 8547581843 Need fair compensation. Maniyan(Late), 9809786280 526/3 Hereditary & House will be lost completely. 79 26 Purayidom 0.0141 Beenakumari, 8078229183 Hindu BPL Residential Purpose part Direct Purchase Need fair compensation. Vijayakumar (Vijaya

96 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Owner Survey Sl. Block Extend (In Contact APL/ Type of No. Type Religion Usage of land No. No. Hectres) Number BPL Ownership Remarks

Kumar)

526/5 Ajithakumari, 8943778782 House will be lost completely. 80 26 Purayidom 0.0172 Hindu BPL Direct Purchase Residential Purpose part Geethakumari 6282074780 Need fair compensation. Salim, Rubeenabeevi, 526/6 8136812548 Hindu & House will be lost completely. 81 26 Nilam 0.0271 Sudhadevi, BPL part 7356458751 Muslim Need fair compensation. Sreelekshmi, Rama

Salim, Rubeenabeevi, 525/1 8136812548 Hindu & House will be lost completely. 82 26 Nilam 0.0194 Sudhadevi, Midhilaj, BPL Direct Purchase part 7356458751 Muslim Need fair compensation. Subina, RamabhaiAmma 525/2 83 26 Purambokke 0.0302 Purambokke Purambokke Canal part 525/3 Land only is lost. 84 26 Nilam 0.0029 Mohanan Nair Hindu part Need fair compensation. 525/9 Land only is lost. 85 26 Nilam 0.0182 Madhusoodhanan Nair Hindu part Need fair compensation. 525/10 Sudheesh Krishnan, Land only is lost. 86 26 Purayidom 0.0188 Hindu part Smitha V. K. Need fair compensation.

525/8 Land only is lost. 87 26 Nilam 0.0007 Subramanyan Hindu part Need fair compensation.

525/11 Premakumari, Land only is lost. 88 26 Nilam 0.0061 Hindu part Sugathakumari Need fair compensation. 525/12 Land only is lost. 89 26 Purayidom 0.0051 Renjiv M. R. Hindu Need fair compensation. 525/13 Hindu & Land only is lost. 90 26 Purayidom 0.0271 Fasaludeen, Sathyadas part Muslim Need fair compensation. 756/8 91 26 Purambokke 0.0041 Purambokke Purambokke Road part 756/9 Land only is lost. 92 26 Nilam 0.0411 Raveendran Nair Hindu part Need fair compensation. 756/10 Vipinkumar, Land only is lost. 93 26 Nilam 0.0426 Hindu part Jayachandran Need fair compensation. Vijayakumar, 756/16 Prathapachandran Nair, Land only is lost. 94 26 Nilam 0.0143 Hindu Part Omanayamma, Kumari Need fair compensation. Padma Sheela. 756/22 Premakumari, Land only is lost. 95 26 Nilam 0.0458 Hindu part Sugathakumari Need fair compensation.

97 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Owner Survey Sl. Block Extend (In Contact APL/ Type of No. Type Religion Usage of land No. No. Hectres) Number BPL Ownership Remarks

757/3 Land only is lost. 96 26 Nilam 0.0003 Gopalakrishnan Nair Hindu part Need fair compensation. 757/4 Land only is lost. 97 26 Nilam 0.0421 Madhavan Nair Hindu part Need fair compensation. 757/5 9633940776 Land only is lost. 98 26 Nilam 0.0359 Raveendran, Ajitha Hindu APL Direct Purchase part 9633940776 Need fair compensation. 757/6 Half portion of house will be lost. 99 26 Nilam 0.0193 Gopakumar 9946349932 Hindu BPL Direct Purchase Residential Purpose part Need fair compensation. 757/10 Thankappan, 9020939595 Major portion of house will be affected. 100 26 Nilam 0.0252 Hindu BPL&APL Direct Purchase Residential Purpose part Thankamani 9061280003 Need fair compensation. 757/11 House will be lost partially. 101 26 Nilam 0.0095 Gopalan, Radha Hindu part Need fair compensation. 757/21 House will be lost completely. 102 26 0.0204 Vasantha 8281638779 Hindu BPL Direct Purchase Residential Purpose നിലം Need fair compensation. 757/16 Meeran Sahib, Sathyan, 9496773811 Hindu&Musli Land only is lost. 103 26 0.0217 APL Land part നിലം Padmakumari 9605413311 m Need fair compensation. 757/17 Land only is lost. 104 26 0.0382 Sharafudheen Muslim part നിലം Need fair compensation. 758/4 House will be lost completely. 105 26 0.0294 Shahidabeevi, Junaida 9048033471 Muslim BPL Direct Purchase part നിലം Need fair compensation. 758/5 Land only is lost. 106 26 0.0653 Vijayalekshmi Hindu part നിലം Need fair compensation. 758/8 Anoop Kumar, Vinod Land only is lost. 107 26 0.0291 Hindu part നിലം Kumar Need fair compensation. 758/9 Land only is lost. 108 26 0.0042 Krishnakumaran Nair Hindu part നിലം Need fair compensation. 758/10 Land only is lost. 109 26 0.0293 Sreekumaran Nair Hindu part നിലം Need fair compensation. 758/11 Land only is lost. 110 26 0.0223 G. R. Mithra Hindu part നിലം Need fair compensation. 758/12 Land only is lost. 111 26 0.0187 Radhadevi Hindu part നിലം Need fair compensation. 758/14 Land only is lost. 112 26 0.0134 Prasannakumari Hindu part നിലം Need fair compensation. 758/15 Manojkumar, Land only is lost. 113 26 0.0022 Hindu part നിലം Vinodkumar Need fair compensation. 760/2 Land only is lost. 114 26 0.0244 Krishnakumaran Nair Hindu part നിലം Need fair compensation. 760/3 ChitraParameshwaran, Land only is lost. 115 26 0.0142 Hindu part നിലം Omana Need fair compensation. 760/5 Prasannakumari, Suja, Land only is lost. 116 26 0.0263 Hindu part നിലം Simi Need fair compensation.

98 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Owner Survey Sl. Block Extend (In Contact APL/ Type of No. Type Religion Usage of land No. No. Hectres) Number BPL Ownership Remarks

760/6 Land only is lost. 117 26 0.0103 Shyamkumar Hindu part നിലം Need fair compensation. 760/7 Land only is lost. 118 26 0.0308 Krishnakumaran Nair Hindu part നിലം Need fair compensation. 761/18 Land only is lost. 119 26 Purayidom 0.0171 Simi Hindu part Need fair compensation. 761/19 House will be lost partially. 120 26 Purayidom 0.0023 Naseer 9495904050 Muslim BPL Direct Purchase Residential Purpose part Need fair compensation.

761/30 House is lost completely. 121 26 Purayidom 0.0079 Nimisha Hindu part Need fair compensation.

761/8 Land only is lost. 122 26 Purayidom 0.0004 Sheeja, Lathikadevi Hindu part Need fair compensation.

761/22 Land only is lost. 123 26 Purayidom 0.0487 Lathikadevi, Sheeja Hindu part Need fair compensation.

761/14 House will be lost completely. 124 26 Purayidom 0.0292 Jayachandran Nair 9446702476 Hindu APL Direct Purchase Residential Purpose part Need fair compensation. 761/13 Land only is lost. 125 26 Purayidom 0.0205 Sreeja Krishnan Hindu part Need fair compensation.

761/12 Land will be lost completely. 126 26 Purayidom 0.0361 Shivankutty Nair 7736406255 Hindu BPL Direct Purchase Land part Need fair compensation.

NaseemaBeevi, 761/15 House will be lost completely. 127 26 Purayidom 0.0133 Peerumuhammad, 9400292684 Muslim BPL Direct Purchase Residential Purpose part Need fair compensation. Shajikumar

761/16 House will be lost completely. 128 26 Purayidom 0.0137 Preethi 9947577298 Hindu BPL Direct Purchase Residential Purpose Need fair compensation. Ashalatha, 9895477904 762/15 Half portion of house will be lost. 129 26 Purayidom 0.0208 Vrindamohan, Ambadi 9037908216 Hindu APL Direct Purchase Residential Purpose part Need fair compensation. Mohan 762/16 House is lost completely. 130 26 Purayidom 0.0313 Thankamoni 9809702286 Hindu part Need fair compensation.

99 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Owner Survey Sl. Block Extend (In Contact APL/ Type of No. Type Religion Usage of land No. No. Hectres) Number BPL Ownership Remarks

762/17 Anvarudheen, 2 houses is lost completely. 131 26 Purayidom 0.0084 Muslim part Rasheeda Need fair compensation. 762/14 Saimon, Sujarani, 132 26 Purayidom 0.0573 part Bijukumar, Raniraji House will be lost completely. 9288171004 Christian APL Heriditary Residential Purpose 762/21 Need fair compensation. 133 26 Purayidom 0.0331 Sujarani, Rajirani part

717/1 134 26 Purambokke 0.0194 Purambokke Purambokke Road part

716/7 Jayachandran Nair, 8129294887 House will be lost completely. 135 26 Purayidom 0.0166 Hindu APL Direct Purchase Residential Purpose part Lathika 8129294770 Need fair compensation. 716/10 136 26 Purambokke 0.0211 Purambokke Purambokke Road part

716/28 House is lost partially. 137 26 Purayidom 0.0108 Vineetha K. S. Hindu part Need fair compensation.

House given for rent (Six years). 716/29 138 26 Purayidom 0.0061 Jayalekshmi 9895356096 Hindu Front portion of house will be lost. part Need fair compensation.

716/26 Compound wall will be affected. 139 26 Purayidom 0.0017 Sudhakumari 9447090603 Hindu part Need fair compensation. 716/25 Madhosoodhanan Nair, 1 m. sq. of land is lost. 140 26 Purayidom 0.0001 Hindu part Vijayachandran Nair Need fair compensation.

916/1 2 shops will be lost completely. 141 26 Purayidom 0.0295 Udayakumar, Leela 965656037 Hindu BPL Direct Purchase Residential Purpose Need fair compensation.

0471 - 916/6 Land only is lost. 142 26 Purayidom 0.0326 Pradeepkumar, Chitra 2392626 Need fair compensation. 9895356096

100 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Owner Survey Sl. Block Extend (In Contact APL/ Type of No. Type Religion Usage of land No. No. Hectres) Number BPL Ownership Remarks

916/7 143 26 Purayidom 0.0025 Thankammapillai Hindu Land only is lost. Need fair compensation.

2 houses lost completely. 916/8 144 26 Purayidom 0.0291 Radhamma, Sindhu Hindu Need fair compensation.

916/9 House will be lost completely. 145 26 Purayidom 0.0401 Jayasree 9746056968 Hindu APL Hereditary Residential Purpose Need fair compensation.

916/10 House will be lost completely. 146 26 Purayidom 0.0262 Sindhu Hindu Need fair compensation.

916/11 Land will be affected. 147 26 Purayidom 0.0567 Indira, Gopakumar 9447361037 Hindu APL Direct Purchase Land part Need fair compensation.

916/12 Sreekandan Nair, 9633362500 House will be lost completely. 148 26 Purayidom 0.0249 Hindu APL Direct Purchase Residential Purpose Sreeja 9995621016 Need fair compensation.

House given for rent (five years). 916/2 149 26 Purayidom 0.0215 Kavitha 9995716519 Hindu House will be lost completely.

Need fair compensation.

House will be lost completely. 916/13 Hereditary&Direc 150 26 Purayidom 0.0194 Sandhya G. Nair 9656287971 Hindu APL Residential Purpose Acquire remaining land. part t Purchase Need fair compensation. House will be lost completely. 916/3 K. Mohanakumaran 6282122654 Hereditary&Direc 151 26 Purayidom 0.0037 Hindu APL Residential Purpose Acquire remaining land. Nair, Sasidharan Nair 9496349616 t Purchase Need fair compensation. 916/4 152 26 Purayidom 0.0328 Geethakumari, Rohini 9400860978 Hindu BPL Hereditary Need fair compensation.

916/14 Hereditary&Direc House will be lost completely. 153 26 Purayidom 0.0227 Sandhya G. Nair Hindu t Purchase Need fair compensation. 916/5 Elippikkal Devi Will be affected completely. 154 26 Purayidom 0.0366 9495012013 Temple-Ravendran Need fair compensation. 155 26 715/33 Purayidom 0.0004 Meera S. S. Hindu Land only is lost.

101 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Owner Survey Sl. Block Extend (In Contact APL/ Type of No. Type Religion Usage of land No. No. Hectres) Number BPL Ownership Remarks

part Need fair compensation 715/8 156 26 Purayidom 0.0061 Purambokke Purambokke Road part 715/32 Land only is lost. 157 26 Purayidom 0.0023 Kamalakumariyamma Hindu part Need fair compensation 715/31 Sreedevi, Ushakumari, 9446077197 Land only is lost. 158 26 Purayidom 0.0737 Hindu APL Hereditary part Kamalakumari 8086259601 Need fair compensation 945/3 Jagathammapillai, Land only will get acquired. 159 26 Purayidom 0.0493 9400094314 Hindu APL Hereditary Kamalakumari Need fair compensation. 945/4 Padmavathiyamma, Land only will get acquired. 160 26 Nilam 0.0022 Hindu part Indulekha Need fair compensation. 945/8 161 26 Nilam 0.0278 part Land only will get acquired. Presanna Kumari Hindu 945/5 Need fair compensation. 162 26 Nilam 0.0711 part

946/1 Land only will get acquired. 163 26 Purayidom 0.0012 Govinda Pillai Hindu part Need fair compensation.

946/2 164 26 0.0076 Canal Canal part 946/4 Land only will get acquired. 165 26 Purayidom 0.0335 Shibila Hindu part Need fair compensation. 946/3 Land only will get acquired. 166 26 Purayidom 0.0125 RudrayaniAmma Hindu Need fair compensation. Rameshkumar, 946/14 House is lost completely. 167 26 Purayidom 0.1658 Gireeshkumar, Hindu part Need fair compensation. RudrayaniAmma 946/16 House is lost completely. 168 26 Purayidom 0.0608 Sreekumaran Nair Hindu part Need fair compensation. 946/15 House is lost partially. 169 26 Purayidom 0.0058 Sreedharan Nair Hindu part Need fair compensation. 946/17 170 26 0.0034 Pathway Pathway part 951/1 House is lost completely. 171 26 Purayidom 0.0323 Sumina, Muthulekshmi Hindu Need fair compensation. 951/2 9447128754 House will be affected completely. 172 26 Purayidom 0.0435 Vishwanathan, Indira Hindu APL Direct Purchase Residential Purpose 8547072263 Need fair compensation. 4.5154

102 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

PALLICHAL VILLAGE

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks

1 4 131/1 Purambokke 0.0053 Govt. Road

2 4 131/21 Part 0.0172 Land near to house is lost. Purayidom Praveen R. Hindu Need fair compensation 3 4 131/6 Part 0.0103

A private temple present in the plot will be acquired. Anil Kumar, Ashok 9446455303 Residential 4 4 131/10 Part Purayidom 0.0318 Hindu APL Hereditary Half portion of the house is Kumar 9446959303 Purpose lost. Need fair compensation.

1 M.Sq. from Corner of the Vikraman, Thara, 5 4 131/11 Part Purayidom 0.0001 9645251350 Hindu APL Hereditary Land plot is lost. Dileep Kumar T. S.

6 4 131/19 Part Purambokke 0.0026 Govt. Railway Property Land only is affected. 7 4 133/5 Part Purayidom 0.0001 K. V. Kala Hindu Need fair compensation. 8 4 133/11 Part Purambokke 0.0226 Govt. Road

9 4 134/1 Part Purambokke 0.0077 Govt. Road House is lost partially. 10 4 134/2 Part Purayidom 0.0521 S. R. Shaija Hindu Need fair compensation.

Half portion of house is Sasidharan Nair, Residential lost. 11 4 134/23 Part Purayidom 0.0143 9446777028 Hindu APL Direct Purchase Sreekala Purpose Acquire remaining land. Need fair compensation.

Land only is lost. 12 4 135/5 Purayidom 0.0287 Sudha Devi 9495627629 Hindu APL Hereditary Land Need fair compensation.

103 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks Corner portion of land is Jeevan Sukumar, 13 4 135/33 Part Purayidom 0.0024 9496813085 Hindu BPL Direct Purchase lost. Indhuja Vijay Need fair compensation. Parameshwaran Nair, House is lost completely. Residential 14 4 135/32 Part Purayidom 0.0243 Draupathi Amma, 9633758727 Hindu BPL Direct Purchase Acquire remaining land. Purpose Dhanalekshmi Need fair compensation. 9946066700 Land is lost. 15 4 135/11 Part Purayidom 0.0094 Sreeja, Jisha Hindu Land 9387776565 Need fair compensation. Murukan, Nisha, Vijayalekshmi, APL & Residential 2 houses lost completely. 16 4 135/12 Part Purayidom 0.0332 9447738382 Hindu Hereditary Unnikrishnan Nair, BPL Purpose Need fair compensation. Padmaja Eshwayriyamma Janakiyamma, Janakiyamma Vijayamma, Land only is affected. 17 4 135/14 Purayidom 0.0141 Hindu Padmanabha Pillai Need fair compensation. Janardhanan Nair, Bagavathi Amma Bhargavi Amma 18 4 135/13 Part 0.0079 Half portion of house is Residential Purayidom Rajendran Nair 8129134842 Hindu BPL Direct Purchase lost. Purpose 19 4 135/37 0.0123 Need fair compensation. Sunilkumar, Geethakumari, 7558976190 Residential House is completely lost. 20 4 135/20 Part Purayidom 0.0437 Hindu BPL Direct Purchase Sureshkumar, (Suresh kumar) Purpose Need fair compensation. Sreedevi House lost partially. 21 4 135/17 Part Purayidom 0.0125 Yashodara Hindu Need fair compensation.

Land only is acquired. 22 4 141/36 Part Purayidom 0.0038 Irshad M.N. Muslim Need fair compensation.

Land only is acquired. 23 4 141/37 Part Purayidom 0.0001 M. N. Shijad Need fair compensation. House lost completely. 24 4 141/31 Part Purayidom 0.0121 Vijayakumaran Hindu Need fair compensation. Vijayakumaran, House given for rent. Rajesh, Sudhakumari, Source of income will be 25 4 141/3 Part Purayidom 0.0711 9961313657 Hindu K. R. Ramesh, lost. Preetaha P. J. Need fair compensation. Land only is acquired. 26 4 141/4 Part Purayidom 0.0243 Ayyappadas, Sandhya Hindu Need fair compensation.

104 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks Pradeep, Suresh House lost completely. 27 4 125/4 Part Nilam 0.0614 Hindu Kumar, Sreedevi Need fair compensation. Sukumaran Nair, Land only is acquired. 28 4 125/6 Part Nilam 0.0682 Hindu Syamalakuttiyamma Need fair compensation. Half portion of house will Residential be lost. 29 4 124/2 Part Nilam 0.0069 Anilkumar, Raju 7356943263 Hindu APL Direct Purchase Purpose Acquire remaining land. Need fair compensation. House lost completely. 30 4 124/3 Part Nilam 0.0084 Rasheedabeevi Muslim Need fair compensation. Land only is acquired. 31 4 124/9 Part Nilam 0.0138 Sathibhai Amma Hindu Need fair compensation. House will be lost Vasanthakumari, V Residential 32 4 124/8 Part Nilam 0.0265 9567600436 Hindu BPL Direct Purchase completely. Sreekumaran Nair Purpose Need fair compensation. House will be lost Residential 33 4 124/7 Nilam 0.0028 Anithabeevi 9746720014 Muslim BPL Direct Purchase completely. Purpose Need fair compensation. Land only is affected. 34 4 124/11 Part Nilam 0.0055 Padmanabha Pillai Hindu Need fair compensation. Land only is affected. 35 4 124/26 Nilam 0.0026 Sukumaran Nair Hindu Need fair compensation. Krishnapillai Land only is affected. 36 4 122/18 Part Purayidom 0.0215 Hindu Velappan Nair Need fair compensation. Krishnapillai Madhavanpillai, Land only is affected. 37 4 122/3 Part Purayidom 0.0176 Hindu Bhargavipillai Need fair compensation. Saraswathi Amma 38 4 149/1 Part Purambokke 0.0081 Govt. Govt. Road Land only is affected. 39 4 149/4 Part Purayidom 0.0761 Seethalekshmiyamma Hindu Need fair compensation. House is lost completely. 40 4 149/14Part Purayidom 0.0193 Vasanthakumari Hindu Fair compensation. Sumathikuttiyamma, Purushothaman Nair, Sakthidharan Nair, Land only is affected. 41 4 149/3 Part Purayidom 0.0876 Hindu Chanrakumari, Need fair compensation. Prashobhanakumar, ThanakaKumari Devakiyamma, Harshavardhanakumar Land only is affected. 42 4 149/5 Part Purayidom 0.0823 Hindu V. R., Asokan, Need fair compensation. Beenapriya, C.

105 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks Ramachandran Nair, Praveen, Rajeshwari Devi Sarasamma, House will be lost Sreekmariyamma, Residential 43 4 149/7 Purayidom 0.0475 9544840738 Muslim APL Direct Purchase completely. Sreemathiyamma, Purpose Need fair compensation. Salim K. S. Sabu, 2 houses will be lost Residential 44 4 149/20 Part Purayidom 0.1006 Chitralekha, 8138885124 Hindu APL Hereditary completely. Purpose Binikumar, Anilkumar Need fair compensation. 2 houses will be lost Vineethkumar V. L., 45 4 149/24 Purayidom 0.0288 Hindu completely. V. J. Jini, Vinodkmar Need fair compensation. Gopakumar, Land only is affected. 46 4 149/6 Part Purayidom 0.0058 9633618025 Hindu BPL Hereditary Bindukumar Need fair compensation. House lost completely. 47 4 149/12 Purayidom 0.0031 Chinnan Thankappan 8086171519 Hindu Need fair compensation. House will be lost Residential 48 4 149/11 Part Purayidom 0.0077 Yamunadevi 8289951701 Hindu APL Direct Purchase completely. Purpose Need fair compensation.

House was constructed ten years ago under EMS Residential house construction scheme. 49 4 149/15 Part Purayidom 0.0147 Sulfikar, Aneesa 8606933738 Muslim APL Direct Purchase Purpose One storeyed - Half portion will be lost. Need fair compensation.

House will be lost Residential 50 4 149/16 Purayidom 0.0351 Naseer, Sulfikar 9895952567 Muslim BPL Direct Purchase completely. Purpose Need fair compensation. One storeyed house lost completely. Only 2 cents. Bheema, Fathima, Residential 51 4 149/17 Purayidom 0.0424 9633537971 Muslim APL Direct Purchase No other land. Nabeesath Purpose Need Fair compensation.

149/17-1-1 Fathima –Front

106 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks portion of house will be lost. Need fair compensation. 149/8-4: House was constructed 4 months ago. One storeyed house- lost completely on acquisition. Need fair compensation.

9995213007 149/8-/: House lost Renuka Satheesh, M. (Vasantha), completely. G. Preetha, 9746354658 Residential 52 4 149/8 Purayidom 0.0542 Hindu APL Direct Purchase One storeyed building Vijayamma, Vasantha, (Renuka), Purpose Need Rathika Raji 9633541573 Fair compensation. (Preetha)

149/8-1-1: One storeyed house .House lost completely. Need Fair compensation. 53 4 149/9 Purayidom 0.0421 Sulfikar 8606933738 Muslim APL Direct Purchase Need Fair compensation. 9446555091, 54 4 148/15 Part Purayidom 0.0004 K. V. Kumari Latha Hindu APL Hereditary Need Fair compensation. 9847217288 55 4 148/9 Part Purambokke 0.0155 Govt. Canal

56 4 162/1 Part Purambokke 0.0641 Govt. Canal Land only is acquired. 9746944888, 57 4 162/2 Part Nilam 0.0001 Baiju Kumar M. A. Christian APL Hereditary Need 9447699501 fair compensation. Land only is acquired. 58 4 162/6 Part Nilam 0.0003 Naseer Need fair compensation. 59 4 162/7 Part 0.0075 Land only is acquired. Nilam Shivarajendran Hindu Need 60 4 162/8 Part 0.0149 fair compensation. Land only is acquired. 61 4 162/9 Part Nilam 0.0276 Shivankutty Hindu Need fair compensation. Land only is acquired. 62 4 162/11 Part Nilam 0.0383 Biju Hindu Need fair compensation.

107 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks Land only is acquired. Krishnapillai 63 4 162/12 Part Nilam 0.0141 Hindu Need Nanukuttan Nair fair compensation. 64 4 162/21 Part 0.0056 Land only is acquired. Nilam Lathakumari Hindu Need 65 4 162/13 Part 0.0054 fair compensation. Land only is acquired. Kunjamma 66 4 162/14 Part Nilam 0.0174 Hindu Need Thankamoni fair compensation. Land only is acquired. Shivankutty, 67 4 162/17 Part Nilam 0.0205 Hindu Need Chandralekha Kumari fair compensation. 68 4 162/18 Part 0.0237 Land only is acquired. Nilam Vijayakumar Hindu Need 69 4 161/3 Part 0.0576 fair compensation.

Land only is acquired. Sureshkumar, 70 4 161/7 Part Nilam 0.0506 Need Ashapriyadarshini fair compensation. Land only is acquired. 71 4 161/8 Part Nilam 0.0292 Mohankumar, Deepa Need fair compensation. Parameshwaran, Land only is acquired. 72 4 161/12 Part Nilam 0.0249 Sayedmakhdoom, Need Nankuttan Nair fair compensation.

House is lost partially. 73 4 161/13 Part Nilam 0.0217 Parameshwaran Need fair compensation.

Land only is acquired. 74 4 161/14 Part Nilam 0.0007 Parameshwaran Need fair compensation. Land only is acquired. Shivadasan, M. P. 75 4 161/18 Part Nilam 0.0227 Need Kumariprasanna fair compensation. 76 4 160/15 Part Purambokke 0.0011 Govt. Canal Land only is acquired. 77 4 160/3 Nilam 0.0217 Anithakumari Need fair compensation.

108 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks Sulochanakmari, Land only is acquired. 78 4 160/4 Part Nilam 0.0053 Rajeshkumar S. S., Need Santhoshkumar fair compensation. Land only is acquired. 79 4 160/18 Part Nilam 0.0068 Anithakumari Need fair compensation. Land only is acquired. 80 4 160/6 Nilam 0.0086 Anithakumari Need fair compensation. Land only is acquired. 81 4 160/5 Part Nilam 0.0148 Anithakumari Need fair compensation. Land only is acquired. 82 4 160/9 Nilam 0.0022 Anithakumari Need fair compensation. 2 houses lost completely. 83 4 150/26 Part Purayidom 0.0081 Jessy Syamala Need fair compensation. Anilkumar, 150/27: Half portion of 84 4 150/27Part Purayidom 0.0206 Pushpalatha house will be lost. Residential 9746119462 APL Hereditary 150/29: Land only is Anilkumar, Purpose 85 4 150/29 Purayidom 0.0271 Pushpalatha, affected. Bhaskaran, Joyce Need fair compensation. Only basement for construction is present. Sureshkumar, Shari S. 86 4 150/94 Purayidom 0.0159 9496773677 Hindu Hereditary Plot Will be lost completely on S. acquisition. Need fair compensation. 150/95-1: House will be lost completely. Residential 87 4 150/95 Purayidom 0.0421 Gopakumar 9995264074 Christian BPL Hereditary Church present on the Purpose house needs to be replaced. Need fair compensation.

House is lost partially. 88 4 150/96 Purayidom 0.0211 Raghu Need fair compensation.

House will be lost Residential 89 4 150/97 Purayidom 0.0187 Sreedharan 9895600147 Christian APL Direct Purchase completely. Purpose Need fair compensation.

7293584453 Residential House will be lost 90 4 150/31 Purayidom 0.0244 Kanakamma Hindu BPL Direct Purchase 7012648273 Purpose completely.

109 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks Need fair compensation.

House is lost partially. 91 4 150/30 Part Purayidom 0.0183 K. Govindan Need fair compensation. N. Sajikumar, Land only is acquired. 92 4 150/28 Part Purayidom 0.0001 Sreejamol Need fair compensation. Ajitha L., Rajan, House will be lost 93 4 150/34 Part Purayidom 0.0162 Vidhya A. V., Vipin completely. A. V. Need fair compensation. House will be lost partially. 94 4 150/22 Part Purayidom 0.0052 Rajmohan, Baby Need fair compensation. House given for rent. 0471-2393967 Residential On acquisition house will 95 4 150/91 Purayidom 0.0159 Saritha Hindu APL Hereditary 9188079654 Purpose be lost completely. Need fair compensation. House will be lost Residential 96 4 150/92 Purayidom 0.0373 Sasi, Shailaja 9496773677 Hindu APL Direct Purchase completely. Purpose Need fair compensation. Padmanabhapillai Land only is acquired. 97 4 150/93 Purayidom 0.0029 Madhavan Nair Need fair compensation. Land only is acquired. 98 4 150/37Part Purayidom 0.0291 Gopi, K. R. Vijimol Need fair compensation. Anilkumar, House is lost completely. 99 4 150/41 Purayidom 0.0183 Pushpalatha Need fair compensation. Anilkumar, Land only is acquired. 100 4 150/12 Purayidom 0.0216 Pushpalatha Need fair compensation. Ebanezer, Baby House will be lost Residential 101 4 150/42 Part Purayidom 0.0341 Kamalam, Kanna 9746119462 Hindu APL Hereditary completely. Purpose Ponnamma Need fair compensation. Land only is acquired. 102 4 150/56 Part Purayidom 0.0901 T. S. Premjithlal Need fair compensation. House will be lost 103 4 150/73 Part Purayidom 0.0203 Kumari completely. Need fair compensation. House will be lost 104 4 150/72 Part Purayidom 0.0213 Rafeek Rahim completely. Need fair compensation. Land only is acquired. 105 4 150/71 Part Purayidom 0.0001 Mohan Geetha 9744840750 Hindu BPL Direct Purchase Need fair compensation. 106 4 150/68 Part Purayidom 0.0091 Pathway Pathway Residential Two houses on the plot. 107 4 150/67 Part Purayidom 0.0309 Mohanakumaran Nair 9846032619 Hindu APL Hereditary Purpose Need fair compensation.

110 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks

108 4 150/15 Part Purayidom 0.0373 House is lost completely. 109 4 150/90 Purayidom 0.0262 Rathnamma Need fair compensation. 9539132570- House given for rent for Mahim Kannu past 4 years. 8547714386 Residential 110 4 150/89 Purayidom 0.0217 Maheenkannu Muslim BPL Hereditary On acquisition house will (Rejitha) Purpose be lost completely. /9445262916 Need fair compensation. (Mahim Kannu) 111 4 150/88 Part Purayidom 0.0099 Vasudevan Nadar Pathway

House will be lost Residential 112 4 150/87 Purayidom 0.0185 Muhammad Naushad 963368162 Muslim BPL Direct Purchase completely. Purpose Need fair compensation.

House will be lost Residential 113 4 150/86 Purayidom 0.0214 Appu Nadar 9895810439-Manoj Hindu BPL Direct Purchase completely. Purpose Need fair compensation.

House will be lost Residential 114 4 150/47 Purayidom 0.0191 Rameshan, Subha 9400044401 Hindu BPL Hereditary completely. Purpose Need fair compensation.

Front portion of land only Jamaludheen, Aisha 115 4 150/84 Part Purayidom 0.0034 9847487295 Muslim APL Direct Purchase will be affected. Beevi Need fair compensation.

Two houses are present. Veranda of one house (constructed 5 years ago) 9072889471 Residential 116 4 150/85 Part Purayidom 0.0039 Shivan, Shakunthala Hindu APL Direct Purchase will be lost on acquisition. 8129647481 Purpose Half portion of house (constructed 30 y7ears ago) will be affected. House given for rent. Residential House will be lost 117 4 150/6 Purayidom 0.0162 N. V. Bhasura 9633545610 Hindu Direct Purchase Purpose completely. Need fair compensation.

111 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks

House will be lost Residential 118 4 150/7 Purayidom 0.0131 Rathnamma 9995792536 Hindu APL Direct Purchase completely. Purpose Need fair compensation.

119 4 150/8 Purayidom 0.0071 9495481527, Residential House is lost partially. Komalakumar, Shaija Hindu APL Direct Purchase 9496361527 Purpose Need fair compensation. 120 4 150/33 Purayidom 0.0042 Land only is acquired. 121 4 152/1 Purayidom 0.1243 Pradeepkumar S. Hindu Need fair compensation. Rahul, Gokul, 3 houses will be lost Residential 122 4 152/4 Part Purayidom 0.0522 Sureshkumar, Reshma 9142586791 Hindu APL Hereditary completely on acquisition. Purpose J. S., Surendran Need fair compensation Hema, Ajitharani, Leena V. L., 3 houses will be lost Hereditary & Residential 123 4 152/7 Part Purayidom 0.1347 Venugopal, 8129392917 Hindu APL completely on acquisition. Direct Purchase Purpose Rajendran, Sanal Need fair compensation Kumari, Mohanan

Land only is acquired. 124 4 152/32 Purayidom 0.0198 Sunandakumari 9048149519 Hindu Land Need fair compensation.

Mohanan, Deepa S. Land and house is lost Residential 125 4 152/36 Purayidom 0.0484 Mohan, Divya S. 9048149519 Hindu APL Hereditary completely. Purpose Mohan Need fair compensation. M. G. Vijayan, S. Land only is acquired. 126 4 152/26 Part Purayidom 0.0665 Hindu Reena Need fair compensation. Land only is acquired. 127 4 152/27 Purayidom 0.0965 Raman Madhavan Hindu Need fair compensation. Land only is acquired. 128 4 152/39 Part Purayidom 0.0083 M. G. Vijayan Hindu Need fair compensation. M. G. Vijayan, M. S. Land only is acquired. 129 4 152/40 Part Purayidom 0.0337 Hindu Sakunthala Kumari Need fair compensation. Land only is acquired. 130 4 152/37 Part Purayidom 0.0001 M. G. Vijayan Hindu Need fair compensation. M. G. Vijayan, M. S. Land only is acquired. 131 4 152/38 Part Purayidom 0.0561 Hindu Sakunthala Kumari Need fair compensation. 132 4 153/37 Part Nilam 0.0129 Subaida Beevi Land only is affected. Muslim APL Direct Purchase Subaida Beevi, Need fair compensation. 133 4 153/38 Part Nilam 0.0001 Sulfikar Beegam

112 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks Land only is affected. 134 4 153/8 Purayidom 0.0024 Raman Sivadasan Hindu Need fair compensation. Purayidom 4 153/27 Need fair compensation. Purayidom 4 153/28 Need fair compensation. Land only is affected. 135 4 153/29 Purayidom 0.0261 Ponnamma Srasamma Hindu Need fair compensation. Ponnamma Lalitha, Land only is affected. 136 4 153/30 Purayidom 0.0024 Hindu Raman Reghunathan Need fair compensation. Land only is affected. 137 4 153/31 Purayidom 0.0038 Raman Reghunathan Hindu Need fair compensation. 138 4 159/1 Part Purambokke 0.0399 Govt. Canal Sreekandan Nair, House is lost completely. 139 4 159/22 Purayidom 0.0075 9567056624 Hindu Savithriyamma Need fair compensation. 2 houses will be lost Sadhique, Bushra, Residential 140 4 159/3 Nilam 0.0285 9656932730 Muslim APL Direct Purchase completely. Laila Purpose Need fair compensation. Thankammapillai, 2 houses will be lost Residential 141 4 159/8 Nilam 0.0321 Sasi, Valsala, 8129351196 Hindu BPL Direct Purchase completely. Purpose Vikraman Nair Need fair compensation. Land only is affected. 142 4 159/9 Nilam 0.0412 Akbar Badusha S. Need fair compensation. Latha Kumari, Vanaja Residential House will be affected. 143 4 159/10 Nilam 0.0446 8129069353 Hindu APL Direct Purchase Kumari Purpose Need fair compensation. Residential House will be affected. 144 4 159/11 Nilam 0.0038 Jagadamma 7909115730 Hindu BPL Direct Purchase Purpose Need fair compensation. 2 houses will be lost Babu, Susheela, 145 4 159/19 Part Nilam 0.0673 completely. Naseema, Shantha Need fair compensation. 146 4 159/18 Nilam 0.0169 Jayan, Vasantha 2 houses will be lost Residential 7909115730 Hindu BPL Direct Purchase completely. Purpose 147 4 159/17 Nilam 0.0078 Vasantha Need fair compensation. Raman Sivasankaran, Raman Krishnan, Parameshwaran Pillai Land only is acquired. 148 4 159/16 Nilam 0.0002 Hindu Kesava Pillai, Need fair compensation. Padmanabha Pillai Kesava Pillai Land only is acquired. 149 4 159/20 Part Purayidom 0.2205 Sasi, Mini 9746521228 Need fair compensation.

113 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks

150 4 154/16 Part Purambokke 0.0475 Govt. Pond Land only is acquired. 151 4 154/17 Part Purayidom 0.0041 Shivankutty Nadar Need fair compensation. House will be lost Hajamoinudheen, Residential 152 4 158/23 Purayidom 0.0101 Muslim APL Direct Purchase completely. Sabitha Beevi Purpose Need fair compensation. Sadique Ali, Sudheer, Shalima Beevi, 9526124245 Sulthan kannu, Residential House will be affected. 153 4 158/10 Part Purayidom 0.2483 8138883080 Muslim BPL Direct Purchase Pathumma, Nisha, Purpose Need fair compensation. 9895517307 Shajitha, Shamjitha Beegam, Jayaprakash Land only is acquired. 154 4 158/26 Part Purayidom 0.0018 Suharban Muslim APL Direct Purchase Need fair compensation. Dasthakeer, Residential House is lost partially. 155 4 158/27 Part Purayidom 0.0059 Muslim APL Direct Purchase Sajilabeevi Purpose Need fair compensation. Devaki, Ansari, Al Land only is acquired. 156 4 158/13 Part Purayidom 0.0408 Muslim APL Direct Purchase Ashra, Sajilabeevi Need fair compensation. Land only is acquired. 157 4 158/3 Part Purayidom 0.0022 M. P. Kumariprasanna Hindu APL Direct Purchase Need fair compensation. Arunkumar, Sathi, 7025998466 Residential House will be affected. 158 4 158/5 Part Purayidom 0.0363 Jalaludheen, 9605682004 Hindu & Muslim APL Direct Purchase Purpose Need fair compensation. Salahudheen 9947083382 Residential House will be lost partially. 159 4 158/17 Part Purayidom 0.0086 Rajan 8330894723 Hindu APL Direct Purchase Purpose Need fair compensation. Jalaludheen, Nasar, Residential House is lost completely. 160 4 158/6 Part Purayidom 0.0093 Muslim APL Direct Purchase Ashraf, Navas Purpose Need fair compensation. 2 houses completely and 1 Sabeena, Salahudheen, Residential 161 4 158/7 Purayidom 0.0131 9847091423 Muslim BPL Hereditary house partially is lost. Abithabeevi Purpose Need fair compensation. Noorudheen, Residential House is lost completely. 162 4 158/8 Purayidom 0.0172 9845744858 Muslim APL Direct Purchase Suhrabeevi Purpose Need fair compensation. Sakeer Hussain, 8089265223 Residential House is lost completely. 163 4 158/9 Purayidom 0.0249 Muslim APL Direct Purchase Shemi 7356249052 Purpose Need fair compensation. 164 4 155/1 Part Purambokke 0.0108 Govt. Govt. canal

165 4 156/3 Part Purambokke 0.0524 Purambokke canal Purambokke canal

166 4 156/1 Part Purambokke 0.0545 Govt. Govt. canal

114 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks

Land only is acquired. 167 4 170/39 Purayidom 0.0331 Fasaludheeen Need fair compensation.

Residential House is lost completely. 168 4 170/40 Purayidom 0.0258 Ajan 9446392905 Christian APL Hereditary Purpose Need fair compensation. 2 houses lost completely. 169 4 170/25 Purayidom 0.0205 Ajikumaran, Praseetha Hindu Need fair compensation. Building I lost completely. 170 4 170/34 Purayidom 0.0172 Vishwanathapillai Hindu Need fair compensation. Maheen kannu, 5 shops lost completely. 171 4 170/35 Purayidom 0.0187 Binukumar, T. S. Hindu Need fair compensation. Rajalekshmi Library building is lost Chandrasekharan Nair 172 4 170/12 Purayidom 0.0014 Hindu completely. Satheesh Chandran Need fair compensation. House is lost partially. 173 4 170/30 Part Purayidom 0.0104 Amritha Nair Hindu Need fair compensation. 9497930398 Residential 2 houses lost completely. 174 4 170/10 Part Purayidom 0.1342 Mahin kannu Muslim APL Hereditary 9447495515 Purpose Need fair compensation.

Land only is acquired. 175 4 170/6 Part Purayidom 0.0365 Binukala Hindu Need fair compensation.

P. Usha, Krishnakumar, 1 house and 1 shop is lost. 176 4 170/9 Part Purayidom 0.1545 9495549486 Hindu Rajkumar, Mithunraj, Need fair compensation. Girija 177 5 37/2 Part Purayidom 0.0451 Govt. Govt. Road

178 5 36/1 Part Purayidom 0.0077 Govt. Govt. Road House is lost completely. 179 5 35/13 Purayidom 0.0084 Chellayyan Nadar Hindu Need fair compensation. Land only is acquired. 180 5 35/33 Purayidom 0.0049 Sukumara Panicker Hindu Need fair compensation. Residential House is lost completely. 181 5 35/14 Purayidom 0.0633 Chitradas 9895965626 Hindu APL Hereditary Purpose Need fair compensation.

115 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks

182 5 35/15 Purayidom 0.0061

Manoharan, Residential House is lost completely. 183 5 35/48 Purayidom 0.0158 8137883910 Hindu APL Direct Purchase Geethakumari Purpose Need fair compensation.

184 5 35/39 Purayidom 0.0193 Land only is acquired. Bindhu Hindu Need fair compensation. 185 5 35/17 Part Purayidom 0.0221

Manoharan, Land only is acquired. 186 5 35/47 Purayidom 0.0241 Hindu Geethakumari Need fair compensation. 1 house and 2 shops are 187 5 35/54 Purayidom 0.0255 Mohankumar, Rekha Hindu lost completely. Need fair compensation. Bhadrakumar, Sujith Roy, Yashoda, 2 shops lost completely. 188 5 35/18 Part Purayidom 0.0196 Muhammed Naseer, Hindu & Muslim Need fair compensation. Geethakumari, Rekha, Mohanakumar Parameshwaran House will be lost partially. 189 5 35/7 Part Purayidom 0.0051 Hindu Velayudhan Need fair compensation. Raghavapanicker Land only is affected. 190 5 35/28 Part Purayidom 0.0255 Sasidharan, 9496395815 Hindu BPL Hereditary Need fair compensation. Mohanakumari

Raghavapanicker Land only is affected. 191 5 35/8 Part Purayidom 0.0204 Hindu Sasidharan Need fair compensation.

House is lost completely. 192 5 35/12 Purayidom 0.0147 Saleenabeevi Muslim Need fair compensation. Rathneshkumar, House is lost completely. 193 5 35/11 Part Purayidom 0.0067 Hindu Dhanya Need fair compensation. Rathneshkumar, Land only is affected. 194 5 35/44 Purayidom 0.0096 Hindu Dhanya Need fair compensation.

116 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks

Dakshayani Land only is affected. 195 5 35/37 Purayidom 0.0012 Hindu Pankajakshi Need fair compensation.

Rathneshkumar, Land only gets affected. 196 5 35/43 Part Purayidom 0.0061 9745428559 Hindu APL Hereditary Land Dhanya Need fair compensation.

House will be affected. Remaining land also Residential 197 5 35/50 Part Purayidom 0.0195 Vinodkumar, Seema 9497622856 Hindu APL Direct Purchase should be considered for Purpose acquisition. Need fair compensation.

Manikandan, Sreekanth, M. H. House is lost completely. 198 5 35/40 Part Purayidom 0.0365 Hindu Saritha, Pankajakshi Need fair compensation. Ambika Rathneshkumar, Land only is affected. 199 5 35/46 Part Purayidom 0.0003 Hindu Dhanya Need fair compensation. Land only is affected. 200 5 35/9 Part Purayidom 0.0001 Premkumar, Amritha Hindu Need fair compensation. Land only is affected. 201 5 39/1 Part Purayidom 0.0002 Appu Bhadrakumar Hindu Need fair compensation. Land only is affected. 202 5 39/2 Part Purayidom 0.0098 Vijayalekshmi Hindu Need fair compensation.

Sasidharan, Rahul P. Residential 2 houses will be affected. 203 5 39/4 Part Purayidom 0.0396 8129657747 Hindu APL Direct Purchase R. Purpose Need fair compensation.

117 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks

Prakash, Prameela, House is lost completely. 204 5 39/5 Purayidom 0.0271 Hindu Prasanth Need fair compensation.

Mohanakumar, Land only is acquired. 205 5 39/26 Part Purayidom 0.0125 Hindu Prameela Need fair compensation. Land only is acquired. 206 5 39/7 Part Purayidom 0.0335 Haseena Muslim Need fair compensation. K. Jayakumar, K. House is lost partially. 207 5 39/12 Part Purayidom 0.0772 Santoshkumar, Hindu Need fair compensation. Sugathan House will be affected. Remaining land also Residential 208 5 39/6 Part Purayidom 0.0284 Sreedhara Panicker 8943747115 Hindu APL Direct Purchase should be considered for Purpose acquisition. Need fair compensation. Land only is acquired. 209 5 39/21 Part Purayidom 0.0156 Mumtaz Beegam Muslim Need fair compensation. House is lost completely. 210 5 39/11 Part Purayidom 0.0361 Lalkumari, Sujathan Hindu Need fair compensation.

Suresh L. Kumar, House is lost completely. 211 5 40/15 Part Purayidom 0.0881 9495390698 Hindu APL Hereditary Rajesh K. Need fair compensation.

212 5 40/34 Part Purayidom 0.0118 Land only is acquired. Ajithkumar, Simi Hindu Need fair compensation. 213 5 40/23 Part Purayidom 0.0155 House is lost completely. 214 5 40/24 Purayidom 0.0103 Nanadakumar Hindu Need fair compensation. 215 5 40/36 Purayidom 0.0079 House is lost completely. Surendran, Laila Hindu Need fair compensation. 216 5 40/35 Purayidom 0.0059 House is lost completely. 217 5 40/25 Part Purayidom 0.0024 Surendran Hindu Need fair compensation. 218 5 40/26 Part Purayidom 0.0052 Pathway Pathway

118 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks Sreehari, Prathibha, Residential House is lost completely. 219 5 40/29 Part Purayidom 0.0421 7907443044 Hindu APL Direct Purchase Dinesh, Rajesh K. Purpose Need fair compensation. House and compound wall Residential 220 5 40/11 Part Purayidom 0.0129 Jameela 9562091218 Muslim APL Direct Purchase gets affected. Purpose Need fair compensation. House and compound wall Residential 221 5 40/12 Part Purayidom 0.0143 Satheesh Chandran 9400681978 Hindu APL Direct Purchase gets affected. Purpose Need fair compensation. Gokuldas, Santhosh Residential 2 houses will be affected. 222 5 49/19 Part Purayidom 0.0063 9142774741 Hindu APL Direct Purchase Kumar, Bindhu Purpose Need fair compensation. Vijayamma, 9495904323 Residential House is lost partially. 223 5 49/20 Part Purayidom 0.0028 Anilkumar, Shari, Hindu APL Direct Purchase 9400964002 Purpose Need fair compensation. Venu, Ramani Vijayan, Prameela, Sivankutty, Prasanna, Residential 2 houses get affected. 224 5 49/23 Purayidom 0.0446 9544546885 Hindu BPL Direct Purchase Vijayan, Sivankutty, Purpose Need fair compensation. Kamalasanan House is lost partially. 225 5 49/43Part Purayidom 0.0049 Venu, Ramani Hindu Need fair compensation. Land only is acquired. 226 5 49/42 Part Purayidom 0.0015 Anilkumar, Shari Hindu Need fair compensation.

Land only is acquired. 227 5 49/46 Purayidom 0.0108 Sumaja Hindu Need fair compensation.

Anilkumar, Shari, House is lost completely. 228 5 49/21 Part Purayidom 0.0383 Hindu Santoshkumar Need fair compensation. Raveendran, Temple and land will get 229 5 49/22 Purayidom 0.0162 Kamalasanan, Hindu affected. Sreedharan Need fair compensation. Madhava Panicker, Ranjith, Parvathi House is lost completely. 230 5 49/8 Part Purayidom 0.1111 Hindu Rajan, M. V. Satheesh Need fair compensation. Chandran Land only is acquired. 231 5 49/14 Part Purayidom 0.0301 S. V. Sanalkumari Hindu Need fair compensation. Rafeeka Beevi, Sayedali, Sarasamma, Residential 4 houses get affected. 232 5 49/13 Part Purayidom 0.0711 7356936307 Hindu APL Direct Purchase Shanthakumari, Purpose Need fair compensation. Chandran, Santosh

119 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks

Sajeev, Suji, Shibose, House is lost partially. 233 5 49/31 Part Purayidom 0.0141 Hindu Rajeev Need fair compensation.

Land only is acquired. 234 5 49/30 Purayidom 0.0395 Rajeev, Manuja 9446175161 Hindu BPL Hereditary Need fair compensation.

Land only is acquired. 235 5 49/5 Purayidom 0.0091 Ramya 8136805580 Hindu APL Direct Purchase Need fair compensation.

Land only is acquired. 236 5 49/9 Part Purayidom 0.0155 Ambikadevi Hindu Need fair compensation.

2 houses get affected Residential 237 5 49/10 Part Purayidom 0.0164 Shaji, Shibu 9447193782 Hindu APL Hereditary completely. Purpose Need fair compensation.

Land only is acquired. 238 5 49/34 Part Purayidom 0.0025 Prabhakaran Nadar Hindu Need fair compensation.

239 5 49/41 Purayidom 0.0101 Hereditary & Residential Land only gets affected. Shaji P. B., Nisha 9633511211 Hindu APL Direct Purchase Purpose Need fair compensation. 240 5 49/39 Part Purayidom 0.0049

241 5 49/40 Part Purayidom 0.0159 Jalaja, Shaji P. B., 9656857646 Residential House is lost completely. Hindu APL Direct Purchase Nisha 9495731389 Purpose Need fair compensation. 242 5 49/38 Part Purayidom 0.0005

House is lost partially. 243 5 49/12 Part Purayidom 0.0225 Sathikumar Hindu Need fair compensation.

120 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks

244 5 49/4 Part Purayidom 0.0131 Pathway Pathway

Prasad T. K., Sasikala, Aneesh Kumar 9137410341 Morais, Sainamol Residential 2 houses lost partially. 245 5 49/3 Part Purayidom 0.0227 9037413041 Hindu APL Direct Purchase Agustine, Surendra Purpose Need fair compensation. 9495728913 Babu, Anilkumar S., Anjana V. S. More than half portion of house will be lost. Residential 246 5 49/15 Part Purayidom 0.0092 Ramya, Usha 8089263883 Hindu APL Direct Purchase Acquire the remaining Purpose land. Need fair compensation. 247 5 50/1 Part Purambokke 0.0055 Govt. Canal Mohanakumar, Land only is acquired. 248 5 50/12 Part Nilam 0.0271 Hindu Lalitha, Sheela Need fair compensation.

Land only is acquired. 249 5 50/13 Part Nilam 0.0312 Sureshkumar Hindu Need fair compensation.

Mohanakumar, Land only is acquired. 250 5 50/29 Part Purayidom 0.0003 Hindu Lalitha, Sheela Need fair compensation.

Land only is acquired. 251 5 50/7 Purayidom 0.0042 Kalyani, Kamalabhai Hindu Need fair compensation. 252 5 50/20 Part Purambokke 0.0016 Govt. Railway Property

253 5 50/10 Part Purayidom 0.0041 Compound wall gets 0471 2392400 Sreelatha Devi Hindu APL Hereditary Commercial affected. 9447586015 254 5 50/3,31 Part Nilam 0.0093 Need fair compensation. Land only is acquired. 255 5 50/5 Part Purayidom 0.0022 Ananthakrishnan Nair Hindu Need fair compensation. Land only is acquired. 256 5 50/6 Part Purayidom 0.0027 V. Shivakumar Hindu Need fair compensation. 257 5 48/1 Part Purambokke 0.0006 Govt. Govt. Canal

121 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks

Land only is acquired. 258 5 48/23 Part Purayidom 0.0026 V. Shivakumar Hindu Need fair compensation.

Land only is acquired. 259 5 48/12 Part Purayidom 0.0001 Rajendran Hindu Need fair compensation. 260 5 51/1 Part Purambokke 0.0032 Govt. Govt. Canal

Sureshkumar, Priya, House is lost partially. 261 5 51/20 Part Purayidom 0.0231 Hindu R. Rajesh Need fair compensation.

Rajendran, Land only is acquired. 262 5 51/2 Part Purayidom 0.0271 Hindu Sathikumari Need fair compensation.

Land only is acquired. 263 5 63/20 Part Purayidom 0.0481 Sreelatha Devi Hindu Need fair compensation.

Kesavapillai, Land only is acquired. 264 5 71/1 Part Purayidom 0.1077 Hindu krishnapillai Need fair compensation.

Ponnamma Land only is acquired. 265 5 71/13 Nilam 0.0183 Hindu Rajammapillai Need fair compensation.

Sindhukumari, Land only is acquired. 266 5 69/10 Part Nilam 0.0241 Hindu Reshma A. S. Need fair compensation.

267 5 69/12 Part Nilam 0.0067 Land only is acquired. Abhilash V. G. Hindu Need fair compensation. 268 69/17 Part Nilam 0.0003

122 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks

S. Syamaladevi, S. Land only is acquired. 269 5 69/13 Nilam 0.0115 Padmajadevi, S. Hindu Need fair compensation. Sudhadevi Madhavan Nair, Land only is acquired. 270 5 68/10 Part Purayidom 0.0049 Ravikumar, Hindu Need fair compensation. Jayakumar 271 5 68/9 Part Purambokke 0.0462 Govt. Govt. Road House is lost partially. 272 5 68/8 Part Purayidom 0.0067 Manu M. Nair Hindu Need fair compensation. House is lost completely. 273 5 68/7 Part Purayidom 0.0041 Ranjith, Indirabhai Hindu Need fair compensation. 8129613932 Residential House is lost partially. 274 5 68/5 Part Purayidom 0.0146 Rajendran, Sajeev 9562693932 Hindu APL Direct Purchase Purpose Need fair compensation. 8086893736 2 houses lost completely. 275 5 78/19 Part Purayidom 0.0523 Sreekumariyamma Hindu Need fair compensation. Residential House is lost completely. 276 5 78/1 Nilam 0.0186 Sreekumar 9539312029 Hindu BPL Direct Purchase Purpose Need fair compensation.

Major portion of house will Sreekandan Nair, Residential 277 5 78/23 Nilam 0.0108 8281275474 Hindu APL Direct Purchase be lost. Shailja Devi Purpose Need fair compensation.

Residential House is lost partially. 278 5 78/12 Part Purayidom 0.0128 Sreekumari 9961055317 Hindu BPL Hereditary Purpose Need fair compensation. House is lost partially. 279 5 78/24 Part Purayidom 0.0086 Sindhukumari Hindu Need fair compensation. 1 house partially and 1 Residential house completely will be 280 5 78/13 Part Purayidom 0.0108 Valsalakumari 8547919224 Hindu BPL Hereditary Purpose lost. Need fair compensation.

281 5 78/14 Part Purayidom 0.0116 House is lost partially. Jayakumar Hindu Need fair compensation. 282 5 79/11 Purayidom 0.0041

283 5 79/39 Purayidom 0.0024 Land only is acquired. Subash Chandru Hindu Need fair compensation. 284 5 79/38 Part Purayidom 0.0221 Land only is acquired. 285 5 79/5 Part Purayidom 0.0006 Kunjan Velukutty Hindu Need fair compensation. Bindukumari, 9387456662 Residential 2 houses lost completely. 286 5 79/16 Purayidom 0.0096 Hindu APL Direct Purchase Murukan 9947960209 Purpose Need fair compensation.

123 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Sl. Block Extend (in APL/ Type of Survey No. Type Owner Contact No. Religion Usage of Land No. No. Hectare) BPL Ownership Remarks T. N. Prasanth Kumar, Ramya S., Land only gets affected. 287 5 79/17 Purayidom 0.0271 9605094770 Hindu Land Bindukumari, Need fair Compensation. Murukan T. N. Prasanth Kumar, Land only is acquired. 288 5 79/24 Part Purayidom 0.0098 Hindu Ramya S. Need fair compensation. Geetha, Vanajakshi Land only is acquired. 289 5 94/1 Part Purayidom 0.0017 Hindu Amma Need fair compensation. Land only is acquired. 290 5 94/17 Part Purayidom 0.0005 Sukumaranashari 9633811636 Hindu Direct Purchase Need fair compensation. Velayudhan Pillai Land only is acquired. 291 5 94/25 Purayidom 0.0005 Hindu Krishnachandran Need fair compensation. Sukumaran Ashari, Mohanan, 2 houses will get affected Thankamani, Residential 292 5 94/22 Part Purayidom 0.0927 9567079876 Hindu BPL Direct Purchase completely. Sathikumari, Rajan, Purpose Need fair compensation. Sheela, Shobhana, Babu Land only is acquired. 293 5 94/7Part Purayidom 0.0064 Narayani Sarojam Hindu Need fair compensation. 294 5 94/33 Part Purambokke 0.0001 Road Road

7.0463

124 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

------Blank Page------

125 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

ANNEXURE-VIII

Concerns Raised and Corresponding Reply during Public Hearing

Thirumala Village {Ia {]Xn-I-cn¨ BfpsS D¶-bn¨ Bi-¦- \¼À t]cv IÄ/tNmZy-§Ä DtZym-K-Ø-cpsS adp-]Sn  ]²Xn¡mbn Øew  sdbnÂth Bh-iy- Gsä-Sp-¡p-¶-Xn ¯n\p th­n Nne- bmsXmcp hn-[- X- t¸mÄ kÀÆokv tdm Sʧfp-an-Ã. kÀÆokv Uv \nÀ½n-t¡­n h tdmUvv hcp-¶-Xm-bn«v t¶-¡mw. AXp-h-gn-bp tI«p. AXn-eqsS k©- Å BÄ¡m-cpsS k cn¡p-¶-Xn Fs´- ©mcw \nb-{´n-¡n-Ã. ¦nepw XS-Ê-apt­m? _mep kp{_-Ò-  1 Wy³ ]t£ GsX-¦nepw Hcp kmlN-cy-¯n AXv A]-I-S-I-chpw, kpc-£n-X-hpasöp tXm¶nbm sdbn th AXv XSbpw kpc- £-bv¡mWv {][a ]cn- K-W-\.

 \jvS ]cn-lmcw \nbaw A\p-im-kn- F´nsâ ASn-Øm-\- ¡p¶ coXn-bn-em-bn- ¯n-em-bn-cn¡pw IW- cn¡pw \jvS ]cn- ¡m-¡p-I. lmcw Xocp-am-\n-¡p-I. 2 {]nb  Øetasä-Sp-¡-ensâ  GI-tZiw Hcp sImÃw \S-]-Sn-IÄ Ft¸m-gmWv hsc FSp-¡m³ ]qÀ¯n-bm-hp-I. km[y-X-bp-­v.-FÃmw ap³Iq«n Adn-bn-¡p-¶- Xm-bn-cn¡pw  Fsâ hkvXp-hn  F{X amÀ¡p sNbvXp, Ipd¨p `qan \jvS-s¸-Sp- F{X _m¡n-bp­v ¶p-­v. AXp-t]mse F¶p t\m¡n-bn«v Xs¶, hfsc Ipd¨p AXp-sIm­v bmsXmcp `qan an¨-ambpw hcp-¶p- Xc-¯n-ep-apÅ ]p\-cp- 3 iin ­v. C¯-c-¯n ]-tbmKhpw km[y-a-à an¨ambn hcp-¶, F¦n \n§Ä¡v ]n¶oSv D]-tbmK iq\y- At]-£-sIm-Sp-¡m-hp- ambn hcp¶ `qan IqsS sdbnÂth Gsä-Sp- ¶-Xm-Wv. ¡ptam?  Øe-ta-s{d-Sp-¡-en\v  FÃm \S-]-Sn-Ifpw F{X Imem-h[n hfsc Imcy-£-a-ambn 4 IntjmÀ FSp¡pw? apt¶m«p t]mIp-¶p-  tPmen km[yX Fs´- s­-¦n Hcp sImÃ- ¯n-\Iw Xs¶ Gsä-

126 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ BfpsS D¶-bn¨ Bi-¦- \¼À t]cv IÄ/tNmZy-§Ä DtZym-K-Ø-cpsS adp-]Sn ¦nepw {]Xo-£n- Sp-¡Â D­m-Ipw. ¡mtam?  tPmen km[y-Xsb kw_-Ôn¨v CXp-hsc Hcp kÀ¡p-e-dp-Ifpw ]pd-s¸-Sp-hn-¨n-«nÃ.  skâv tacokv kvIqÄ,  \ne-hnse ]me-§Ä Xaew kvIqÄ, ]pXp¡n ]ÅnIÄ, A¼-e-§Ä ]WnbpIbpw, hep- XpS§n \nc-h[n P\- Xm¡pIbpw,hoXn hmk tI{µ§Ä Iq«pIbpw sN¿pw. DÄs¸-Sp¶ Øe-am-Wv.  sehÂt{Im-knwKv  ap³]v sdbnÂth DÅ `mK-§-fn Hcp Øew Gsä-Sp-¯- k_v th hcpw, ASn- 5 tKm]n t¸mÄ CSXp hi¯v bn IqSn h­n- tdmUn-Ãm-¯-Xp-sIm­v IÄ¡v t]mIm-\pÅ AhnsS Hcp ]mew k_v th. h¶nÃ, Ct¸mÄ Gsä-  ]pXnb ]me-§- Sp-¡p-t¼mÄ AhnsS sfm¶pw CXp-hsc ]mew hcp-tam? ASn-¸m- ]²-Xn-bn-en-Ã. X-tbm, ta¸m-etam A§s\ Fs´-¦nepw?

 c­p skân  sdbnÂth Gsä-Sp¯p XmsgbpÅ Øe-am- Ignªp Øew sW-¦n AXpw IqsS _m¡n-bp-s­-¦n Gsä-Sp-¡p-sa¶p hoSp hbv¡m³ A\p- ]dªp. AXn IqSp- a-Xn¡v At]-£n-¡mw. X Øeaps­-¦n  kpc-£sb _m[n- hoSp hbv¡m³ A\p- ¡p¶ {]iv\-§Ä aXn sImSp-¡ptam? H¶p-an-sÃ-¦n A\p- aXn e`n¡pw.  cq]-tc-Jbpw `qan Gsä-Sp-¡epw A´n-a- 6 KoX tPmkv L-«-¯n-embn Ignªm A\p-aXn sImSp-¡p-¶-Xn XS- Ê-§-sfm-¶p-an-Ã.  sI«nS \nÀ½mW N«- §Ä¡-\p-k-cn¨v ¹m³ X¿m-dm¡n At]-£n- ¡p-I. CXn\v sdbnÂth-bp-ambn _Ô-anÃ. kÀ¡mÀ ]cn-[n-bnÂs]« Imcy- am-Wv.

7  Øew/ km¼-¯nIw  Ct¸mÄ Adn-bm³ thWtam F¶p tNmZn- ]änÃ. Bhiyw

127 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ BfpsS D¶-bn¨ Bi-¦- \¼À t]cv IÄ/tNmZy-§Ä DtZym-K-Ø-cpsS adp-]Sn ¨n-cp¶p. kÀ¡mcns\ Adn- A§s\bmsW-¦n bn¡pw. kÀ¡mÀ Xe- Øew GXp `mK-¯m- ¯n Xocp-am-\n¡pw. bn-cn¡pw?  Fhn-sS-bmtWm Øew e`y-am-bn-«p- ÅXv AX-\p-k-cn-¨m-bn- cn-¡pw \S-]-Sn-IÄ.  hoSp apgp-h-\m-bn«v  _m¡n Øe-ap-s­- t]mIm³ km[y-X-bp- ¦n XoÀ¨bmbpw ­v. sXm«-Sp¯v hoSp hoSp hbv¡mw.\K-c-k- hbv¡m³ kuIcyw `-bn-e-t]-£n-¨m 8 kc-kzXn Xcptam? A\p-aXn e`n¡pw  sdbnÂthbv¡v thsd ]²-Xn-sbm-¶p-an-sÃ- ¦n t\m H_vP-£³ Xcpw.  16.4 skâvv- Af¶v  amÀ¡v sNbvXn-cn-¡p- amÀ¡v sNbvXn-«p-­v. 4 ¶Xv A´n-a-am-bn- skâ _m¡n-bp­v. cn¡pw C\n amä-§Ä 9 ta ]dª Afhv H¶pw hcn-Ã. Ipd-bmt\m, IqSmt\m Ipd-bmt\m km[y-X- bpt­m?  sdbnÂth Øew  `qansb kw_-Ôn¨ Gsä-Sp-¡p-t¼mÄ, C\n B[m-cw, Icw AS-¨ Fs´Ãmw tcJ-IÄ cko-Xv, Ah-Imiw kaÀ¸n-¡-Ww? sXfn-bn-¡p-¶ tcJ- 10 IÄ FÃmw th­n-h- cpw. Iq«m-[m-c-sam-s¡- bm-sW-¦nÂ, ap³ B[mcw Nne kml-N- cy§fn th­n-hcpw .  dokÀtÆ \S-¡p-¶-  hntÃ-Pv Hm^o-kp-ambn Xn\p apt¶ BWv _Ô-s¸-Sp-Ibpw hkvXp hm§n-¨-Xv. A- ]pXnb kÀtÆ \¼-À Xn-epÅ kÀtÆ A\p-k-cn¨v Ic-a-S- \¼cpw dokÀtÆ bv¡p-Ibpw sN¿p- 11 km[nIv Aen \¼cpw hyXy-kvX-am- ¶ps­-¦n Hcp Wv. Icw AS-bv¡p-¶Xv {]iv\-hp-anÃ. ]pXnb kÀtÆ \¼-dn- emWv . {]am-W-¯n-se- s´-¦nepw amäw sN¿tWm? Fs´- ¦nepw {]iv\-apt­m? 12  än.-kn. DÅ hoSp-I-  än.-kn.thWw, tcJ-IÄ sfbpw än.-kn.CÃm¯ Ds­-¦n am{X-ta

128 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ BfpsS D¶-bn¨ Bi-¦- \¼À t]cv IÄ/tNmZy-§Ä DtZym-K-Ø-cpsS adp-]Sn hoSp-I-sfbpw F§s\ AX-\p-k-cn¨v \jvS _m[n¡pw? hne \nÝ- ]cnlmcw sImSp-¡m³ bn-¡p-¶-Xnsâ ASn- ]äq. DS-a-Øm-h-Imiw Øm\w? sXfn-bn-¡p¶ kÀ«n-  tImÀ¸-td-j-\n Icw ^n-¡äv thWw. AS-bv¡p¶ ckoXv  aXn. am{Xw aXntbm AtXm DS-a-Øm-h-Imiw sXfn- bn-¡m³ asä-s´-¦nepw Bh-iy-apt­m?  4-5 skâv \jvS-s¸-Sp-  ]me-¯n-\-Sp-¯m-sW- sa¶v ]d-ªp. a²y ¦n A[nIw `pan `mK¯p \n¶p 30 aoäÀ FSp-t¡­n hcpw. FSp-¯n-«p-­v. ]pXp-Xm-bns«mcp ]mew  IqSn ]Wn-bp-I-bm-Wv. F\n¡v hoSpw AXp-sIm­v \ne- Øehpw sam¯-ambpw hnse ]me-¯n \jvS-s¸-Sp-¶p. \n¶pw \nÝnX  21 aoäÀ hsc FSp- AIew thWw. ]mew ¯m aXn-sb¶v CÃm-¯n-S¯v FSp-¡p- 13 chn IrjvW³ apXnÀ¶ sdbnÂth ¶-Xn-t\-¡mÄ IqSp- DtZym-K-ØÀ ho«n X ]mew DÅn-S¯v h¶-t¸mÄ ]dªp. FSp-t¡­n hcpw.  A§s\-sb-¦n A[nIam-sb-Sp-¡p¶ 9 aoäÀ F´n-\mWv?  30 aoäÀ \ne-hn-epÅ {Sm¡n \n¶pw hfsc hen-sbmcpGcybmWv.

 hne kw_-Ôn-¨pÅ  3 Intem aoä-dn-\p-Ån hnh-c-§Ä. \S¶ B[m-c-§-fpsS icm-icn IW-¡-\p-k- 14 cn-¨mWv hne \nÝ-bn- ¡p-¶Xv. Ct¸m-gpÅ amÀ¡äv hne A\p-k- cn¨v In«pw.  ]pXnb hoSmWv. hne  hoSnsâ ]g¡w A\p- 15 \Po_v F§s\ Bbn-cn¡pw? k-cn¨v ]n.-U-_vfyq. Un. Bbncn¡pw hne \nÝ-bn-¡p-¶-Xv.  an¡ hoSp-IÄ¡pw än.-  C§-s\-bpÅ tIkp- kn. CÃ. XmXvI-enI än.- IÄ kÀ¡m-cn\p 16 emkÀ kn. sh¨mWv FÃm {]tXyI dnt¸mÀ«p Imcy§fpw sN¿p-¶-Xv. sImSp¡pw. At¸mÄ Id-âv, shÅw FÃmw AXns\-¡p-dn¨v ]cm- D­v. CX-t¸mÄ F§- aÀin-¡pw.

129 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ BfpsS D¶-bn¨ Bi-¦- \¼À t]cv IÄ/tNmZy-§Ä DtZym-K-Ø-cpsS adp-]Sn s\-bmWv?  kz´w Øe¯p  sdbnÂth Gsä-Sp-¡p- \n¶mWv hgn C«n-cn-¡p- ¶ps­-¦nÂ, ]Icw ¶-Xv. AXn-t¸mÄ t]mIm-\m-bn«v sdbnÂth¡v th­n Hm^vskäv D­mIpw. 3 Ipän ASn-¨n-cn-¡p-I- aoäÀ FSp-¡p-¶p­v, bmWv. R§Ä¡v AÃmsX t]mIm³ XS- thsd hgn CÃ. 17 efnX Ê-§-fn-Ã. tdmUv D­m- hn-Ã.  sdbnÂth Bh-iy- §Ä¡v th­n kÀÆokv tdmUv t]msebp­m-Ipw. AXv \n§Ä¡v D]- tbm-Kn-¡mw.  {]am-W-¯n aq¶v  ssIhiw IqSp-X skâv D­v. dokÀtÆ Øew Ds­¶v h¶-t¸mÄ AXv 2 ImWn¨v.Xmeq¡v 18 cXojv Hm^o-kn At]£ skâv Bbn Ipd-ªp. sImSp-¡mw. AXn\v Fs´-¦nepw sN¿m-\pt­m?  hoSnsâ ap³ his¯  sdbnÂth-bpsS Hm^v Øew FSp-¡p-¶p. skäv hgn D­mIpw. 3 hgn \jvS-s¸-Spw. ap³ aoäÀ Øe-ap-­mIpw hi¯p IqSn C\n AXv \n§Ä¡v D]- 19 A_vZpÄ djoZv t]mIm³ ]äptam? tbm-Kn-¡mw. AÃmsX thsd hgn D­m-InÃ. AXv thW-sa-¦n kz´-ambn \nÀ½n¡Ww.  CSXp hi¯p Øew  C-SXp hi¯p `qan FSp-¡p-a-t¼mÄ, heXp Gsä-Sp-¡p-t¼mÄ hi¯p IÃv sdbnÂth HmhÀ Ct«¡p¶p? {_nUvPv hcp¶ `mK- §-fn sdbnÂth 20 tKm] IqamÀ {_oUvPv ]p\À \nÀ½n- t¡-­-Xp-­v. AXn\m Ccp-h-ihpw FSp-t¡­n hcp-¶p.

 hoSpw ISbpw FÃmw  \ymb-amb hne Xs¶ \jvS-s¸-Spw. tcmKn- In«pw. hne CXp-hsc 21 jmlp laoZv bmWv. aäp amÀ¤-§-fn- \nÝ-bn-¨n-«n-Ã. Ã. Hcp skâv `qan-tb- bpÅq. Ch c­pw \jvS-s¸«m \K-c-¯n-

130 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ BfpsS D¶-bn¨ Bi-¦- \¼À t]cv IÄ/tNmZy-§Ä DtZym-K-Ø-cpsS adp-]Sn \p-Ån Xs¶ thsd Øew In«ptam?  tdmUv kuI-cy-apÅ  `qan-bpsS kz`m-h-a-\p- Øe-¯n-sâbpw CÃm- k-cn¨mbn-cn¡pw hne 22 sshimJv ¯-Xn-sâbpw hne \nÝ-bn-¡p-¶-Xv. Hcpt]mse Bbn-cn- ¡ptam?  hfscIpd-¨p `mKw  CÃ. _m¡n `mKw 23 tKm] IpamÀ am{Xta \jvS-s¸-Sp-¶p- kwc-£n-¡m³ ]äpw. Åq. AXv Hgn-hm-¡m³ km[n-¡ptam?  8 skâv `qanbpw, hoSn  \n§Ä¡Xv At]-£- sâ ap¡m `mKhpw I-fn-eqsS Adn-bn¡mw. 24 A¼nfn \jvS-s¸Spw _m¡n sdbnÂthbv¡v Fs´- F´p sN¿pw? ¦nepw sN¿m³ ]äp-sa- ¦n AXv \S-¸m-¡pw.  Øew/Øm]\w  {]tXyIw hne-bm-bn- 25 {]tXyIw hne-bmtWm cn¡pw `qan-¡pw, sI«n- AtXm Xpey hne- S-¯n\pw, Øm]-\-¯n- bmtWm? \pw.  Hmtcm Øe¯pw Hm  Øew Gsä-Sp-¡p-¶- tcm coXn-bn Øew Xv, `qan-bpsS {]Ir- FSp-t¯-¡p¶p? Xhpw, Øe-¯nsâ khn-ti-j-X-Ifpw, 26 I«nwMv / ^nÃnwKv F¶-Xn-s\sbms¡ A\p-k-cn-¨n-cn¡pw.

27 aWn  ]pXp-Xmbn ASn-¸mX  ]pXp-Xm-bn«v hcp-¶n-Ã. hcp-¶pt­m? DÅXv \ne-\nÀ¯pw.  Ip©mep½qSv  hoXn , s]m¡w Iq«n 28 ]mewþASn¸mX ]pXp¡n ]Wnbpw. hcptam?

Nemom Village {Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv  Cu `qan-bn Ct¸mÄ  ]pXp-Xmbn hoSv ]Wnbp-¶-Xn\v A\p-aXn Bh-i-y-s¸-«p-sIm­v 1. iin-Ip-amÀ AsÃ-¦n CXn-t\mSp tNÀ¶p InS-¡p¶ `qan- AXnsâ ¹m³ hc¨v AXnsâ bn hoSv ]Wnbm³ At]£ IqsS Xncp-h-\-´-

131 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv A\p-aXn Xcp-¶-Xn\v ]pcw ko\n-bÀ Unhn-j-W Fs´-¦nepw XSÊw C©n-\o-bÀ, ktX¬ Dt­m? sdbnÂth F¶ hnem-k-  `qan Gsä-Sp¯v Ign- ¯n kaÀ¸n-¨m aXn-bm- ªm ]»nIv tdmUv Ipw. Ah-cXv ]cn-tim-[n¨v \S- CXnsâ IqsS Dt­m ]Sn kzo-I-cn¡pw. CÃtbm?  \ne-hn kuI-cyw Ds­-¦n AXv \ne-\nÀ¯pw. ]pXp- Xmbn tdmUv Cu ]²-Xn-bpsS IqsS e`-y-am-¡p-¶n-Ã.  `qan Gsä-Sp¯ tijw  an¨w hcp¶ `qan Ct¸m-gs¯ an¨w hcp-¶Xv Ac NÀ¨-bn hcp-¶n-Ã. 50 aoäÀ skâm-Wv. AXv \n§Ä CSth-f-I-fn t]mÌn-«n-«p-­v. Gsä-Sp-¡ptam? AXn-\n-S-bn-epÅ `qan-bmWv  Ft¸m-gmWv At]£ Ct¸mÄ Gsä-Sp-¡p-¶-Xv. sImSp-t¡-­Xv? AXn\p tijw an¨w hcp¶ At]£ hntÃPv Hm^o- `qan Gsä-Sp-¡m-\mbn 2. kwKoX kn sImSp-¯m \n§Ä¡v At]£ sImSp-¡m- aXntbm? hp-¶-Xm-Wv. \n§Ä At]£ sImSp-¯m Gsä-Sp-¡m-\pÅ km[-yX ]cn-K-Wn-¡p-¶-Xm-Wv.  `qan Gsä-Sp-¯-Xn\p tij- amWv At]£ sImSp-t¡-­- Xv, sdbnÂth-bv¡mWv At]£ kaÀ¸n-t¡-­-Xv.  R§-fpsS hoSnsâ  ]pXp-Xmbn hgnbpw SmÀ sN¿m- sk]vänIv Sm¦v Gsä-Sp- \pÅ kwhn-[m-\hpw km[m-c- ¡-s¸-Sp¶ Øe-¯m-Wv. W-bmbn Cu ]²-Xn-bpsS AXv ]pd-tIm-t«¡p amän- IqsS \S-¸n-em-hn-Ã. \ne-hn- bm R§-fpsS IpSn- epÅ hgn \ne-\nÀ¯pw. shÅ t{kmXÊv \jvS- ]pXp-Xmbn Øew Gsä-Sp¯v s¸-Sp-Ibpw sN¿pw. hgn \nÀ½n-¡n-Ã. ]ns¶ aIsâ aq¶p  ag-shÅw t]mIm-\mbn Hcp skâv `qan ]qÀW-ambpw sskUv s{Ubn\pw I«n-§nsâ \jvS-s¸-Sp-Ibpw sN¿pw. apI-fn Im¨v hm«À AsXmcp henb {]iv\- s{Ubn\pw ]Wnbpw AXp 3. Bim eX am-Wv. Ct¸mÄ DÅ IqSn ]cn-K-Wn-¨p-sIm-­mWv hgnbn \n¶v as®- Øew Gsä-Sp-¡p-¶-Xv. Sp¯v amäp-¶-Xp-sIm­v  ]pXp-Xmbn SmÀ sN¿p-¶Xv R§Ä¡v Spho-eÀ Ct¸mÄ R§-fpsS ]²-Xn- sIm­p-t]m-Im³ Xs¶ bn DÄs¡m-Ån-¨n-«n-Ã. _p²n-ap-«m-Wv. \S-¸m-X- \n§Ä D¶-bn-¡p¶ Bh-i-y- bmbn am{Xta D]-tbm-Kn- §Ä dnt¸mÀ«n tcJ-s¸-Sp- ¡m³ km[n-¡p-¶p-Åq. ¯p-¶-Xm-Wv. Øe-ta-sä-Sp¯v Ign- ªm hgn SmÀ sNbvXv Xcptam?  sP.kn.-_n. D]-tbm-Kn¨v

132 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv as®-Sp¯Xn\p ]Icw HmS sI«n ag shÅw t]mIm-\pÅ kwhn- [m\w sNbvXm D]-Im- c-{]-Z-am-bn-cn-¡pw.  R§Ä¡v hgn SmÀ sNbvXp In«p-tam, AXv R§-fpsS Hcp Bh-i-y- ambn ]cn-K-Wn-¡m³ km[n-¡ntÃ?  sdbnÂth hnI-k\w  Xncp-h-\-´-]pcw apX I\-ym- A\-´-ambn \o­p-t]m- Ip-amcn hsc-bmWv ]mX Cc-«n- Ip¶ Hcp Ah-Ø-bmWv ¸n-¡p-¶-Xv. CXn Xncp-h-\-´- Ct¸mÄ DÅ-Xv. AXp- ]pcw apX s\¿m-än³Ic sIm­v Gsä-Sp-¡p¶ hsc CSXp `mK¯v IqsS- `qan {Ib-hn-{Ibw bmWv ]pXn-b-Xmbn {Sm¡v hcp- sN¿mt\m aäv Bh-i-y- ¶-Xv. s\¿m-än³Ic Ign- §Ä¡v D]-tbm-Kn- ªm heXp hi-t¯bv¡v ¡mt\m Ign-bm¯ Ah- amdp¶ ]mX ]md-Èm-e-þ- Ø-bm-Wv. F{Xbpw Ipgn¯pd `mK¯v ho­pw 4. AP-b-Ip-amÀ s]s«¶v \S-]-Sn-IÄ CSXp hi-t¯¡v amdp-¶p. ]qÀ¯o-I-cn¨v B {]iv\- Ipgn¯pd Ign-ªm I\-ym- §Ä ]cn-l-cn-¡Ww. Ip-amcn hsc heXp hi¯p Xncp-h-\-´-]p-c¯v \n¶v IqsS-bmWv ]mX \nÀ½n-¡m³ I\-ym-Ip-am-cn-bn-te¡v e£-y-an-«n-cn-¡p-¶-Xv. Xncp-h-\- t]mIp-t¼mÄ tdmUnsâ ´-]pcw apX t\aw hsc- Ccp `mK¯pw ]mX Cc- bpÅ `mK¯v he-Xp-h-i- «n-¸n-¡p-¶pt­m? GXv ¯pÅ hkvXp-¡Ä¡v {Ib-hn- `mK-amWv hnI-k-\- {Ibw \S-¯mt\m hoSv ¯n\p th­n Gsä-Sp- hbv¡mt\m bmsXmcp XS- ¡p-¶-Xv. Êhpw CÃ.  2006- ]pc-bn-S-ambn  `qan-bpsS Xcw GXm-sW¶p hm§nb hkvXp 2019- Xocp-am-\n-¡p-¶Xv hntÃPv Ic-a-S-¨-t¸m-gmWv \new Hm^okv aptJ-\-bm-Wv. {]k¶ sdbnÂth-bp-ambn CXn\v 5. BsW¶p a\-Ên-em-b-Xv. Ipamcn sdbnÂth Gsä-Sp-¡p- bmsXmcp _Ô-hp-an-Ã. t¼mÄ CXv ]pc-bn-S-am-bn- «m-tWm, \ne-am-bn-«mtWm Gsä-Sp-¡p-¶-Xv.  Cu Asse³saâv A´n-  Xncp-h-\-´-]pcw apX t\aw a-amtWm hsc-bpÅ `mKs¯ Asse³saâv A´n-a-am-bn-«p- t]cv shfns¸- ­v. Xncp-h-\-´-]pcw apX 6. Sp-¯n-bn-«nà t\aw hsc-bpÅ sdbnÂth U»nw-Kn\pw t\aw sdbnÂth bmÀUn-\p-apÅ ¹m\mWv AwKo-I-cn-¨-Xv. t\aw apX s\¿m-än³Ic hsc-bpÅ

133 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv Asse³saâv A´n-a-am-¡m- \pÅ {]hÀ¯\w \S¡pt¶- bp-Åq.  Rm³ Xma-kn-¡p¶ hoSv  ]p\-c-[n-hmkw Bh-i-y-ap-Å-h- sdbnÂth Gsä-Sp-¡p- cpsS hnh-c-§Ä AS-§nb ¶p-­v. \ap¡v F´v dnt¸mÀ«v If-IvSÀ¡v kaÀ¸n- ]c-a-in-h³ 7. ]p\-c-[n-hmk ]mt¡- ¡p-¶p­v. \n§-fpsS A`n- \mbÀ PmWv DÅ-Xv. {]mbw IqSn ]cn-K-Wn-¨v kÀ¡mÀ Xe-¯n ]p\-c-[n- hm-k-s¯-¡p-dn¨v Xocp-am-\n- ¡p-¶-Xv.  sdbnÂth-bpsS  sdbnÂth sebn³ tdmUv Asse³saân hfsc t]mse amän Øm]n-¡m³ Ign- ]pcm-X-\-amb Ccp-¸n- bm-¯-Xn-\m t£{Xw ¡Â tZho-t£{Xw Asse³saân \n¶v Hgn-hm- DÄs¸-Sp-¶p-­v. 1973- ¡m³ km[-y-a-Ã. `qan¡v \ym- sdbnÂth `qan Gsä-Sp- b-amb \jvS-]-cn-lmcw \ÂIp- ¯-t¸mÄ amän Øm]n¨ ¶-Xm-bn-cn-¡pw. t£{Xs¯ C\n amän  sdbnÂthbv¡p th­n-bpÅ cho-{µ³ Øm]n-¡m³ `qan-bn-Ã. `qan am{X-amWv Gsä-Sp-¡m³ 8. \mbÀ amän Øm]n-¡m³ `qan Xocp-am-\n-¨n-«pÅXv. Gsä-Sp- \ÂIp-Itbm t£{Xw ¡p¶ `qan¡v \jvS-]-cn-lmcw \ne-\nÀ¯p-Itbm sN¿- \ÂIpI am{X-amWv Cu ]²- W-sa¶v At]-£n-¡p- Xn-bn DÄs¸-«n-«p-Å-Xv. ¶p. ]Icw Øew Gsä-Sp¯v  t£{Xw amän Øm]n- \ÂI Cu ]²-Xn-bn ¡m³ Bh-i-y-amb DÄs¸-Sn-Ã. Øew IqSn Gsä-Sp¯p \ÂIm³ sdbnÂth¡v km[n-¡ptam?  Fsâ hkvXp-hnsâ \Sp-  \ne-hn-epÅ sI«n-S-\n-baw `m-K-¯mbn IÃv C«n-«p- A\p-k-cn¨v sN¿mw. ­v. AXn \n¶v F{X sdbnÂth-bpsS ]cn-[n-bn aoäÀ AI-e-¯n-emWv hcp-¶-X-Ã. hoSv ]Wn-bm³ km[n-  sdbnÂth sebn-\n-epÅ GXp ¡p-I. 9. hnPb IpamÀ ]Wnbpw sdbnÂth Gsä-Sp-  Fsâ hkvXp-hnte¡v ¡pw. shÅw sI«n-In-S-¡p-¶p- sdbnÂth sse\n s­-¦n FUvPn HmS ]Wn- \n¶v Hcp HmS h¶p Ib- bp¶-XmWv. _m¡n Imc-y- dp-¶p-­v. AXp sIm­v §Ä Øew t\cn«v I­m as®m-en¨p t]mIp-¶p. am{Xta ]d-bm³ km[n-¡p-I- HmS amän Øm]n-¡ptam? bp-Åq.  ]gb hoSv s]mfn¨v  Øe-ta-sä-Sp-¡p-¶-Xn\v Nne ]p\À\nÀan-¡m³ Dt±-in- \S-]-Sn-{I-a-§Ä D­v. AXn\v 10. apl-½Zv Aen ¡p¶ Ah-k-c-¯n-emWv ka-b-sa-Sp-¡pw. GI-tZiw Hcp AXn \n¶v Ipd¨p hÀjw th­n hcpw. Øew Gsä-Sp-¡p-¶p­v

134 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv F¶-dn-ª-Xv. Cu ]²Xn F{X Imew sIm­v ]qÀ¯o-I-cn- ¡pw.  sdbnÂth-bpsS  FÃm kpc£m am\-Z-WvU- \nÀ½mW {]hÀ¯-\- §fpw ]men-¨mWv sdbnÂth- §Ä ImcWw henb bpsS \nÀ½mW {]hÀ¯-\- IpgnIÄ cq]-s¸-Sp-¶p- §Ä \S-¯p-I. ac-§Ä¡v ­v. a®n-Snªv \jvS-]-cn-lmcw In«pw. ]mcn- t]mIm¯ coXn-bn ØnXnI {]iv\-§Ä IqsS \nÀ½mWw \S-¯-Ww. ]cn-K-Wn-¡pw. 11. {]nb³ sdbnÂth-bpsS \nÀ½mWw ImcWw \nc- h[n ]mcn-Øn-XnI {]iv\-§Ä IqSn cq]-s¸- Sp-¶p-­v. \qdp-I-W-¡n\v ac-§Ä \jvS-s¸-Sp-¶p. AXpw IqsS ]cn-K-Wn-¡- Ww.  F{Xbpw s]s«¶v \S-  \S-]Sn {Iaw ]qÀ¯n-bm¡n ]Sn Bbm \¶m-bn-cp- F{Xbpw s]s«¶v Xs¶ `qan Gsä-Sp¡pw. 12. Cµnc ¶p. 80 hb-Êmb A½- bp-­v. ]pXn-sbmcp Øew hm§n amtd-­- Xp-­v.  sdbnÂth-bpsS \S-]Sn  XoÀ¨-bm-bpw. 13. Pb³ {Ia-§Ä ]qÀ¯n-bm- bm amdn-¯m-a-kn-¡m³ kmh-Imiw In«p-tam.  hoSp-IÄ s]mfn-t¡-­Xv  ]mXn am{Xta \jvS-s¸-Sp- kz´w Nne-hn-em-tWm, ¶pÅq F¶p-s­-¦nepw apgp- AtXm sdbnÂth h³ \jvS-]-cn-lm-c-¯n\v Ah- sN¿p-tam, ]mXn s]mfn- Im-i-s¸-Smw. ]mXn am{Xw shfns¸-Sp-¯n- t¡­ hoSp-IÄ s]mfn- s]mfn¨v _m¡n D]-tbm-Kn-¡m- 14. bn-«nà ¡p-t¼mÄ Ah-ti-jn- \m-sW-¦n \n§Ä¡p-Xs¶ ¡p¶ `mKw D]-tbm-Kn- s]mfn-¡mw. ]qÀW-ambpw ¡m³ ]äp¶ coXn-bn- s]mfn-t¡-­p¶ sI«n-S-am-sW- emtWm s]mfn-¡p-¶-Xv. ¦n sdbnÂth asämcp GP³kn-sb-s¡m­v \S-¸n-em- ¡pw.  `qan Gsä-Sp-¯-Xn\p  sdbnÂth AXnÀ¯n-bpsS 30 tijw `qcn-`mKw aoädn\p-Ån hoSv ]Wn-bm³ t]À¡pw Ipd¨p `qan sdbnÂth-bpsS A\p-aXn 15. iymw IpamÀ am{X-ta-bp-Åq. an¨-apÅ thWw. AÃmsX A\p-a-Xn- `qan-bn hoSv ]Wn- bpsS Bh-i-y-an-Ã. bm³, sNss¶  F³.-H.-kn.-bp-ambn _Ô-s¸«v sdbnÂth Hm^o-kn Hcp sk£³ Xs¶ \ne-hn-ep- \n¶v A\p-aXn e`n-

135 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv t¡­ Ah-Ø-bm-Wv ­v. CXp-ambn _Ô-s¸« Ct¸mÄ DÅXv. CXp hnj-b-§Ä Ah-cp-ambn NÀ¨- kw_-Ôn¨v Cu I½n- sN-¿m-hp-¶-Xm-Wv. än¡v Fs´-¦nepw \nÀt±iw sImSp-¡m³ km[n-¡ptam  hfsc \nkm-c-ambn Cu {]iv\s¯ ImW-cp-Xv. Cu I½n-än-bpsS {][m\ \nÀt±-i-ambn AXpÄs¸- Sp-¯-W-sa¶v A`-yÀ°n- ¡p-¶p.  ]pXnb At{]m¨v  ]pXp-Xmbn tdmUv A\p-h-Zn-¡n- tdmUn\p km[-y-X- Ã. \ne-hn-epÅ tdmUv \ne- 16. B\µv bpt­m \nÀ¯n Aä-Ip-ä-]-Wn-IÄ sN¿pw.

 hoSnsâ apIÄ `mKw  Bh-i-y-amWv \nÀ½n-¡p-¶-Xn\pw  CsXÃmw kmaq-ly BLmX sdbnÂth-bpsS A\p- ]T\ dnt¸mÀ«n DÄs¸-Sp- aXn Bh-i-y-amtWm ¯pw. t]cv shfns¸-  hmS-Ibv¡p sImSp-¡p¶ 17. Sp-¯n-bn-«nà hoSm-Wv, AXn\v X¡- Xmb \jvS-]-cn-lmcw thWw. ]ns¶ s{Sbn³ sIm­p-­m-Ip¶ i_vZaen-\o-I-c-Whpw ]cn-K-Wn-¡-s¸-S-Ww.  an¨ `qan Gsä-Sp-¡m³  `qan-bpsS Imcyw t\ct¯ ]d- Fs´-¦nepw hgn-bp- ª-Xm-Wv. tPmen km[-y-X-sb- 18. cho-{µ³ t­m, Ip«n-IÄ¡v tPmen ¸än Ct¸mÄ kÀ¡p-eÀ H¶pw sImSp-¡m³ Fs´- CÃ. ¦nepw \nÀt±-i-¯n\v km[-y-X-bpt­m  hoSv Hgnªp t]mIp-¶-  AXns\ kw_-Ôn¨v kÀ¡mÀ 19. kpµcw hÀ¡v _Z kwhn-[m-\- Xe-¯n Xocp-am-\-ap-­m-Ipw. ¯n\v Ime-Xm-akw D­m-hptam  \jvS-]-cn-lmc ]mt¡-Pn-  \ne-hn-epÅ \nb-a-a-\p-k-cn- s\-¸än Fs´-¦nepw ¨pÅ \jvS-]-cn-lm-c-¯n\p cRvPohv cma- [mc-W-bmtbm th­n ChnsS \n¶v dnt¸mÀ«v 20. Ir-jvW³  \ne-hn-epÅ ]mX-bn sN-¿pw. \ym-b-amb \jvS-]-cn- \n¶v F{X Zqc-¯n-emWv lmcw Dd-¸p-h-cp-¯pw. `qan Gsä-Sp-¡p-¶-Xv. 21. t]cv shfns¸-  hkvXp-hn\pw sI«n-S-  hoSn-sâXv ]n.-U-»yq.Un. BWv

136 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv Sp-¯n-bn-«nà ¯n\pw aqe-y-\nÀWbw \nÀW-bn-¡p-¶-Xv. Øe-¯n- \S-¯p-¶Xv F§-s\-bm- tâXv \ne-hn-epÅ am\-Z-WvU-a- Wv. \p-k-cn¨v sN¿pw. kpIp-am-c³  Ft¸m-gmWv Hgnªp  Gsä-Sp-¡Â \S-]-Sn-IÄ¡v 22. \mbÀ t]m-tI­n hcp-¶Xv GI-tZiw Hcp hÀjw ka-b- ap­v  sdbnÂth hnI-k-\-¯n-  Hcp hÀj-¯n-\p-Ån Gsä-Sp- \mbn Øe-ta-sä-Sp¡pw ¡pw. F¶p ]d-bm³ XpS- Ipªn-ae §nbn«v 49 hÀj-w 23. t__n Ignªp. F\n¡v \à Hcp hoSv hbv¡-W-sa-¶v B{Klw D-­v. \n§Ä Øew Gsä-Sp-¡ptam CÃtbm  sdbnÂth-bpsS  t\m«n-^n-t¡-j³ hcp-¶Xp I¬kv{S-£³ Xocp-¶- apX A\p-a-Xn-¡p-th-­n Xn\p ap¼v _m¡n-bp-Å- At]-£n¨p XpS-§m-hp-¶-Xm- t]cv shfns¸- 24. hÀ¡pÅ A\p-aXn Wv. Sp-¯n-bn-«nà sImSp-¡-Ww. kam-[m-\- ]-c-amb AhØ \ne- \nÀt¯­ _m[-yX sdbn-th-bv¡p-­v.

Pallichal Village

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv  Xncp-h-\-´-]pcw  kÀtÆ \¼À {]Imcw \n§- sdbnÂth sse³ Cc-«n- fpsS hoSpw Øehpw Gsä-Sp- inh³Ip«n ¡p¶ `qan-bpsS ]cn-[n-bn 1. ¸n-¡p-¶-Xnsâ `mK-ambn \mbÀ Gsä-Sp-¡p¶ `qan-bn hcp-¶-X-Ã. Fsâ hoSpw Øehpw DÄs¸-«n-«pt­m?  ]pXnb sdbnÂ]mfw  ]pXnb sdbnÂ]mfw hcp-¶Xp hcp-¶-Xn Ccp-h- hgn Bfp-I-fpsS bm{Xm kuI- i¯pw Xma-kn-¡p¶ c-y-§Ä kpJ-{]-Z-am-¡p-¶-Xn-\p- Bfp-IÄ¡v F§-s\- th­n tdmUv ta¸m-e-¯n- bmWv bm{Xm kuI-cyw te¡v c­v At{]m¨v tdmUv D­m-Ip-I. \nÀ½n-¡p-¶p-­v. AXn IqSn 2. sdPn hnP-b³ ]mf-¯nsâ Ccp hi¯pw Xma-kn-¡p-¶-hÀ¡v bm{X sN¿m\pw \n§Ä ]dª {]iv\-§Ä¡v Hcp ]cn-lm-c-am- hp-Ibpw sN¿pw. F¶m {]mcw-` -L-«-¯n Bfp-IÄ¡v bm{X sN¿p-¶-Xn\v \S-¸m-X-bm-

137 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv bpÅ ta¸mew am{Xta D­m-Ip-I-bp-Åq. AXv \n§Ä¡v D]-tbm-K-s¸-Sp- ¯mw.  kÀtÆ sN¿p-¶-hÀ  XoÀ¨-bmbpw \n§-fpsS AtimIv 3. Fsâ Øew Af-¡m³ Øew Af-¡pw. AXnsâ IpamÀ hcptam {]mcw` L«w XpS-§n-bn-t«-bp- Åq.  sdbnÂ]mfw \nÀ½n-¡p-  sdbnÂ]mfw \nÀ½n-¡m³ ¶-Xn\v BsI 30 aoäÀ Bh-i-y-ap-Å-Xnepw A[nIw aXn-bm-Ipw. ]ns¶ Øew FSp-¡p-¶Xv ]nävsse- 50 \pw, Asse³saân\pw Bh-i- 4. \mbÀ F´n-\mWv aoäÀ Gsä-Sp-¡p-¶-Xv. y-ambn hcp¶Xp sIm­m-Wv.  \ne-hn Af¶ 50 aoä-  \ne-hn-epÅ ]²Xn A\p-k- dn-s\-¡mÄ Øew Gsä- cn¨v 50 aoä-dmWv BsI Gsä- Sp-¡ptam Sp-¡p-¶-Xv.  Ct¸m-gpÅ A{Xbpw  sdbnÂth FSp-¯v Ignªv Øew Gsä-Sp-¡p-¶-Xn\v _m¡n hcp¶ Øe¯v \jvS-]-cn-lmcw e`n-¡p- \n§Ä¡v aäp \nÀ½mW tam.Ct¸m-gpÅ Øe- {]hÀ¯-\-§Ä sN¿m-hp-¶- 5. jmPn ¯n\v Npäp-a-Xn \nÀ½n- Xm-Wv. \nÀ½mW ¡mtam. {]hÀ¯\w \S-¯m³ t]mIp¶ Øe-¯nsâ IrX-y- am-sbmcp ¹m³ kaÀ¸n-¨m AXn\v A\p-aXn \ÂIp-¶-Xm- bn-cn-¡pw.  Gsä-Sp-¡p¶ Øe-  Øew Gsä-Sp¸v \nbaw A\p- ¯n\v \ym-b-amb hne k-cn¨v Gsä-Sp-¡p¶ Øe-hm- In«Ww. AXp am{X-aà kn-IÄ¡v \ym-bamb \jvS-]-cn- Gsä-Sp-¡m³ t]mIp¶ lmcw In«pI Xs¶ sN¿pw. 6. P\mÀ±-\³ Øe¯v 50 Hmfw IpSpw- AXn-s\-¡p-dn¨v \n§Ä¡v _-§Ä ]«n-I-Pm-Xn-¡m- bmsXmcp Bi-¦bpw th­. cmWv AXn-\m AhÀ¡v Int«­ {]tX-y I B\p-Iq-e-y-§Ä e`-y- amIptam  sI«n-S-§Ä¡v AXnsâ  ]g¡w IW-¡n-se-Sp-¡n-Ã. 7. \mbÀ ]g¡w IW-¡m-¡n- CXnsâ hni-Z-amb Imc-y-§Ä bmtWm hne \nÝ-bn- Adn-bm-hp-¶Xv ]n.-U-»-yq.Un ¡p-¶-Xv. hIp-¸n-\m-Wv.  sdbnÂth Øew Gsä-  IpSpw-_-¯nse HcmÄ¡v Sp-¡p-t¼mÄ IpSpw-_- tPmen e`n-¡p-¶-Xn-\pÅ ¯nse HcmÄ¡v tPmen kÀ¡p-etdm A{]q-htem \ne- 8. d^o¡ sImSp-¡ptam hn-en-Ã. aps¼m-cn-¡Â sdbnÂth a{´n-bpsS {]J-ym- ]\w D­m-bn-cp-¶p. ]s£ CXp-h-sc- BÀ¡pw tPmen

138 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv \ÂIn-bn-cp-¶n-Ã.  Øew Gsä-Sp-¡p-sa¶v  `qan Gsä-Sp-¡p¶ \S-]-Sn-{I-a- Iptd \mfmbn ]d-bp-¶p. §Ä A\p-k-cn¨v `qan Gsä-Sp- CXp-hsc Øew Gsä-Sp- ¡p-¶-Xn\v C\nbpw Hcp ¯n-Ã. Gsä-Sp-¡p¶ hÀjw th­n-h-cpw. 9. iin-[-c³ Øe-¯n-sâ \jvS-]-cn- lmcw e`n-¨mte thsd Øehpw hm§p-hmt\m hoSv \nÀ½n-¡p-hmt\m km[n-¡p-I-bp-Åq.  Øe-¯n\v IrX-y-amb  \n§-fpsS Øe-¯n\v IrX-y-am- \jvS-]-cn-lmcw e`n- bn-«pÅ \jvS-]-cn-lmcw e`n- ¡ptam ¡pw. AXn-s\-¡p-dn¨v \n§Ä¡v bmsXmcp Bi- 10. jmPn ¦bpw th­. ImcWw `qan Gsä-Sp-¡Â \nbaw A\p-k- cn¨v Hmtcm-cp-¯À¡pw AÀln- ¡p¶ hne sImSp- ¡Wsa¶mWv \njvIÀjn-¡p- ¶-Xv.  sdbnÂth \nÀ½m-W-  Hmtcm ac-¯n-sâbpw khn-ti- ¯nsâ `mK-ambn Fsâ j-X-IÄ A\pkcn-¨mWv hne Øe-¯p-Iq-Sn-bmWv \nÝ-bn-¡p-¶-Xv. `qan Gsä-Sp- tdmUv \nÀ½n-¡p-hm³ ¡Â \nb-a-¯nsâ FÃm LS- Xocp-am-\n-¨n-cn-¡p-¶-Xv. \-Ifpw ]qÀ¯n-bm-¡n-b-Xn\p 11. AP³ At¸mÄ ]d-¼n tij-am-bn-cn¡pw `qan Gsä-Sp- \n¡p¶ ac-§Ä ¡p-¶-Xv. sh«n amtä­n hcpw. AXnsâ hne-sb-¡p-dn¨v hy-à-ambn Adn-b-W-sa- ¶p-­v.  ]pd-t¼m¡v `qan-bn  \n§-fpsS hoSn\v Icw AS- Xma-kn-¡p¶ 3 bv¡p-¶-Xp sIm­v hoSn\v IpSpw_§-fp-­v. IrX-y-amb \jvS-]-cn-lmcw e`n- R§Ä 50 hÀj-ambn ¡pw. F¶m Øe-¯n\v Xma-kn¨p t]mcp-¶p. Icw AS-bv¡m-¯-Xp-sIm­v 12. ip`m-in-h³ Øew Gsä-Sp¯p Ign- IrX-y-amb \jvS-]-cn-lmcw e`n- ªm R§Ä¡v ¡n-Ã. thsd Øe-an-Ã. At¸mÄ R§Ä¡v th­n Fs´-¦nepw sN¿m³ km[n-¡ptam  sdbnÂ]mfw hnI-kn-¸n-  sdbnÂth `qan Gsä-Sp-¯p -I- ¡p-¶-Xnsâ `mK-ambn gn-ªm kpc£m am\-Z-WvU- 13. {]ho¬ tdmUv s]mfn¨p amäp-¶- §Ä Dd-¸p-h-cp-¯n-b-Xn\p Xn\p ap¼p-Xs¶ thsd tijw am{X-amWv ]²Xn \S-¸n- tdmUv \nÀ½n¨p \ÂI- em-¡p-¶-Xv. Ww.

139 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv  Hmtcm Øe-¯n-sâbpw P\- §-fp-sSbpw hml-\-§-fp- sSbpw Xnc¡v A\p-k-cn¨v tdmUn-sâbpw ]me-¯n-sâbpw hoXn Iq«n \nÀ½n-¡pw. AXnsâ ASn-Øm-\-¯n-em-bn- cn¡pw ]²-Xn-IÄ cq]o-I-cn-¡p- ¶-Xv. tdmUv \nÀ½n-¨-Xn\p tijta s]mfn¨p amä {]{Inb Bcw-`n-¡p-I-bp-Åq. ImcWw sdbnÂ]mfw \nÀ½m- W-¯n\v Bh-i-y-amb km[-\- §Ä F¯n-¡p-¶-Xn\v tdmUv Bh-i-y-am-Wv.  `qan Gsä-Sp-¡-en \ym-  ]p\-c-[n-hmkw Bh-iyw hcp- b-amb \jvS-]-cn-lm- ¶-hÀ¡v Ah-cpsS IW-s¡- c¯n\pw kpXm-c-y- Sp¯v If-IvSÀ¡v \ÂIpw. Xbv¡pw ]p\-c-[n- If-IvSÀ Xe-¯n NÀ¨ 14. Nn{X-Zmkv hmk¯n\pw sNbvXv F´p-sN-¿-W-sa¶v ]p\xØm]-\-¯n-\p-apÅ Xocp-am\w ssIs¡m-Åpw. Ah-Imi \nba {]Imcw F´mWv sNbvXp sImSp- ¡p-¶-Xv.  _m¡n-h-cp¶ Øe¯v  _m¡n-h-cp¶ Øe¯nsâ 15. kptcjv \nÀ½mW A\p-aXn Afhv IrX-y-ambn In«n-bm In«ptam AXnsâ \S-]-Sn- {Iaw t\m¡n- bn«v A\p-aXn \ÂIpw.  ]mh-s¸« Bfp-I-fpsS  \n§Ä ]d-ªXp t]mse D]-Po-h\ amÀ¤w CÃm- Irjn Øe-¯n\v IrX-y-am-bn- XmIp-t¼mÄ AXn\p «pÅ hne \ÂIpw. AXns\ th­n F´v ]cn-lmc Ipdn¨v HmÀ¯v bmsXmcp Bi- amÀK-amWv ssIs¡m-Åp- ¦bpw th­. Gsä-Sp-¡p¶ ¶-Xv. ]ns¶ IrX-y-ambn Øe¯v F´v sN¿-W-sa¶v 16. A\n IpamÀ ]ptcm-KXn D­m-I-W-sa- Xocp-am-\n-¡p-¶Xv kÀ¡m-cm- ¶mWv R§Ä Bh-i-y- Wv. AXp-sIm­v \n§Ä s¸-Sp-¶-Xv. F´p ]d-ªmepw AXv R§Ä kÀ¡m-cns\ Adn-bn- ¡pw.

 sdbnÂth \nÀ½m-W-  hoSpw Øehpw \jvS-s¸-Sp-¶- ¯n\v Bh-i-y-ambn hsc Hcn-¡epw ]cn-K-Wn-¡m-Xn- hcp¶ `qan Gsä-Sp-¡Â cn-¡n-Ã. \n§-fpsS ho-Sn\pw 17. aWn-I-WvT³ sshIp-¶-Xp-sIm­v Øe-¯n\pw thsd thsd R§Ä¡v asämcp hoSv hne \nÝ-bn-¡p-¶-Xm-Wv. \nÀ½m-W-¯n-\mbn ]ns¶ {]tX-yI B\p-Iq-e-y- bmsXm¶pw sN¿m³ §Ä e`n-¡p-¶-hÀ¡v AXv km[n-¡p-¶n-Ã. e`n-¡p-¶-Xn\p th­n Ah-

140 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv F{Xbpw s]s«¶v `qan cpsS IW-s¡-Sp¯v kÀ¡m- Gsä-Sp-¡-Ww. R§- cn\v \ÂIpw. kÀ¡mÀ Xocp- fpsS Øe-¯n\v hn]-W- am-\n¨v \n§-fpsS Bh-i-y- \-hne e`-y-am-¡-Ww. §sf ]cn-K-Wn-¡pw. AsÃ-¦n R§Ä Zcn{ZÀ Bbn amdpw. A§s\ Hcp AhØ hcm-Xn-cn-¡m³ R§sf klm-bn-¡-Ww.  Øew Gsä-Sp-¡p-sa¶v  Øew Gsä-Sp-¡pI Xs¶ ]dªp XpS-§n-bn«v sN¿pw. AXn\v Ipd¨v Ime- hÀj-§-fm-bn. CXp- Xm-akw t\cn-Spw. ImcWw hsc AXn-s\mcp ]cn- Hmtcm Ime-b-f-hnepw Hmtcm 18. aWn-I-WvT³ lmcw Bbn-«n-Ã. AXn- `mKw Gsä-Sp-¡p-Ibpw sN¿p- s\-¡p-dn¨v hni-Z-ambn ¶p-­v. F´m-bmepw Hcp Adn-b-W-sa-¶p-­v. hÀj-¯n-\p-Ån FÃm Imc-y- §fpw ]qÀ¯o-I-cn¨v Øew Gsä-Sp-¡pw.  sdbn¸mfw hcp¶  sdbn¸mfw hcp¶ `mK¯v `mK¯v t£{X-§Ä t£{X-§Ä DÄs¸-Sp-¶p-s­- 19. KoX DÄs¸-Sp-¶p-s­-¦n ¦n AXnt\ amän Øm]n- AXv Hgn-hm-¡ptam? t¡­n hcpw. ImcWw sdbnÂ]mfw amän sIm­p t]mIm³ km[n-¡n-Ã.  sdbnÂth-bpsS  30aoäÀ ]cn-[n-bn DÅ- AXnÀ¯n-bn hoSv hÀt¡ sdbnÂth-bpsS A\p- hbv¡m³ km[n-¡ptam aXn Bh-i-y-ap-Åq.  30 aoäÀ ]cn-[n-bn DÅ  30aoäÀ ]cn-[n-bn hcp¶ Øe-¯n \nÀ½m-W- Øe-¯n\v {]tX-yI A\p-aXn 20. amln ¯n\v sdbnÂth-bpsS thWw. kÀ¡mÀ \b-am-Wn-Xv. A\p-aXn hm§p-¶-Xn AXn-s\mcp amäw hcp-¯m³ \n¶pw Hgn-hm-¡-Ww. km[n-¡n-Ã. ]ns¶ \n§-fpsS Bh-iyw kÀ¡m-cns\ Adn- bn¡mw F¶p-Å-XmWv sN¿m- \p-Å-Xv.  sdbnÂth-bpsS \nÀ½m-  \ne-hn-ep-­m-bn-cp¶ InW- W-¯n\p th­n Øew dnsâ \jvS-]-cn-lmcw XoÀ¨- Gsä-Sp-¡p-t¼mÄ InWÀ bmbpw \ÂIpw. \n§Ä \jvS-am-b-hÀ¡v GsX- shÅ-¯nsâ Bh-i-y-¯n\v 21. \hmkv ¦nepw Xc-¯n shÅw IpSn-shÅw \ÂIp¶ A[n-Ir- e`n-¡p-¶-Xn-\pÅ kwhn- X-tcmSv At]£ \ÂIm-hp-¶- [m-\-§Ä D­m-Iptam Xm-Wv. sdbnÂth-bpsS A[n- Im-cn-IÄ¡v CXn-te-¡mbn H¶pw sN¿m³ Ign-bnà  ]pd-t¼m¡v Øe¯v  ]pd-t¼m¡v Øe¯v Xma-kn- 22. AP-b-Ip-amÀ Xma-kn-¡p¶ tImf\n ¡p¶ tImf\n \nhm-kn-IÄ¡v \nhm-kn-IÄ D­v. Ah-cpsS Øe-¯n\v \jvS-]-

141 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv AhÀ¡v aXn-bmb \jvS- cn-lmcw In«n-Ã. ]s£, AhÀ ]-cn-lm-c-§-sfm¶pw e`n- \nÀ½n¨ hoSn\v \jvS-]-cn- ¡n-Ã. AXn-\mbn lmcw e`n-¡pw. Chsc amän- Ahsc amän Xma-kn-¸n- ]mÀ¸n-¡p-¶-Xn\p th­n ¡m-\pÅ kwhn-[m\w kÀ¡m-cnsâ ]²-Xn-I-fn D­m-I-W-sa-¶mWv DÄs¸-Sp-¯pw. AXp am{X-aà R§-fpsS Bh-i-yw. A§-s\-bp-Å-h-cpsS t]cv  sXmgn \jvS-s¸-«-hÀ¡v In«n-bm kÀ¡mcns\ Adn-bn- IrX-yamb \jvS-]-cn- ¡p-Ibpw AhÀ¡v th­n- lmcw \ÂI-Ww. bpÅ ]²Xn-IÄ \S-¸n-em- ¡pw.  D]-Po-h-\-amÀKw \jvS-am-b- hÀ¡v XoÀ¨-bmbpw \jvS-]-cn- lmcw e`n-¡pw.

 BZ-y-L-«-¯n Fsâ  Adn-bn¸v \n§Ä¡v In«n-bm Øe-¯nsâ Ipd¨p Gsä-Sp-¡pw. ]ns¶ Adn-bn¸v `mKw FSp-¡p-I-bp-Åq. In«nb Øew hn¡mt\m ]s£ c­m-as¯ ]²- hm§mt\m ]än-Ã. _m¡n- Xn-bn IqSn ho­pw bpÅ Øew \n§Ä¡v D]- t]cv shfns¸- 23. Øe-sa-Sp-¡psa¶v ]d- tbm-Kn-¡mw. \ne-hn hcm¯ Sp-¯n-bn-«nà bp-¶p-­v. AXp-sIm­v Imc-y-§Ä¡v Xocp-am-\-§Ä B Øes¯ Fs´- FSp-¡m\pw ]d-bm\pw km[n- ¦nepw sN¿m³ ]äptam ¡n-Ã. kÀ¡mÀ hnI-k-\- ¯n\v Øew Bh-i-y-ap-s­¶v Adn-bn-¡p-t¼m-gmWv R§Ä Øew Gsä-Sp-¡p-¶-Xv.  skâÀ t^mÀ amt\-  \n§Ä D¶-bn¨ tNmZyw \Ã- Pvsaâv sUh-e- Xm-Wv. ChnsS R§Ä h¶n- ¸vsaânsâ kmaq-ly «p-ÅXv \n§-fpsS {]iv\-§Ä BLmX ]T-\s¯ hni- a\-Ên-em-¡m\pw AXn-s\-¡p- I-e\w sN¿p-¶-Xn\v ]T- dn¨v kÀ¡m-cns\ Adn-bn-¡m- \-¯n-eqsS Is­-¯nb \p-am-Wv. AXn\v kÀ¡mÀ Xe- 24 lcn-Ip-amÀ {]iv\-§-sf-¡p-dn¨pw ¯n ]cn-lmcw D­m-Ipw. NÀ¨ sN¿p-¶-Xn-\mWv \n§Ä D¶-bn-¡p¶ A`n-{]m- FÃm-hcpw IqSn-t¨À¶- b-§Ä tiJ-cn-¡p-¶p-­v. Xv. AXn-\m kn.-Fw.- AXv IrX-y-ambn kÀ¡m-cns\ Un¡v P\-{]-Xn-\n-[n-I- Adn-bn-¡p-Ibpw sN¿pw. sfbpw £Wn-¡m-am-bn-cp- ¶p.  P\-{]-Xn-\n-[n-Isf tbmK-  \n§sf Hgn-hm-¡n-s¡m-­Ã ¯n ]s¦-Sp-¸n-¡m-am- ]ptcm-KXn sIm­p-h-cp-¶-Xv. t]cv shfns¸- bn-cp-¶p. \jvS-]-cn-lmcw \n§Ä¡v AÀl-n¡p¶ Imc-y- 25 Sp-¯n-bn-«nà F¶v amän \n§Ä \ym- §Ä sNbvXp-sIm-­m-bn-cn- b-amb ]cn-lmcw F¶m- ¡pw. CXp t]mes¯ Bi- ¡-Ww. ImcWw b§fpw A`n-{]m-b-§fpw CsXmcp Zpc-´-¯n kÀ¡m-cnsâ {i²-bnÂs¸-Sp-

142 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv D­mb \jvS-a-Ã. adn¨v ¯p-Ibpw sN¿pw. kÀ¡m-cnsâ ]²-Xn-I- fpsS ^e-am-bm-Wv. CXn- t\mSv \n§-fpsS A`n- {]mbw F´m-Wv.  `qan Ft¸mÄ Gsä-Sp-  `qan Gsä-Sp-¡en\pw AXnsâ ¡p¶p F¶-Xn-s\-¡p- hne \nÝ-bn-¡en\pw Hcp dn¨v \n§Ä hy-à-am- hÀj¡me-b-fhv th­n hcpw. sbmcp adp-]Sn ]d-b-Ww. AXn\p th­n-bmWv Hmtcm \jvS-]-cn-lmcw \ÂIp- hn`m-K-¯n-ep-apÅ DtZ-ym-K- ¶-Xn-epÅ IrX-y-amb Øcpw Øew Af-¡m\pw 26. hn\oXv IpamÀ hne-sb-¡p-dn¨pw ]d-b- Irjn, hoSv F¶n-h-bpsS IW- Ww. s¡-Sp-¡m\pw hcp-¶-Xv. Cu IW-¡p-IÄ In«n-bm am{Xta kÀ¡m-cn\v IrX-y-amb \jvS-]- cn-lmcw IW-¡m-¡m³ km[n- ¡p-I-bp-Åq. CXnÂIqSn \n§Ä¡v \ym-b-amb \jvS-]- cn-lmcw e`n-¡p-Ibpw sN¿pw.  am\-knI tcmKn-Ifpw  XoÀ¨-bmbpw D­v AwK-ssh-I-eyw DÅ- hcpw HmÀa iàn CÃm- t]cv shfns¸- ¯-h-cp-amb Bfp-I-fp-ap- 27. Sp-¯n-bn-«nà ­v. C§-s\-bp-Å-hsc kwc-£n-¡p-¶-Xn\pw ]p\-c-[n-h-kn-¸n-¡p-¶-Xn- \-amb Fs´-¦nepw ]²- Xn-IÄ Dt­m  sdbnÂth \nÀ½m-W-  kpc-£-bpsS `mK-ambn Ipgn- ¯nsâ `mK-ambn ho- bpsS `mK¯v kwc-£W Snsâ ASp-¯m-bn«v then \nÀ½n¨p Xcmw 28. hn\oXv IpamÀ henb Ipgn-IÄ \nÀ½n- ¨n-«p-­v. A]-IS km[-y X \ne-\n¡p-¶-Xp- sIm­v AXn-s\mcp ]cn- lmcw D­m-Iptam  Xmakw amdp-¶-Xn\p  ]pXnb \nb-a-a-\p-k-cn¨v th­n \n§Ä \n§Ä amdp-¶-Xn\p th­n- R§Ä¡v \nÝ-nX bpÅ IrX-y-amb kabw Xcpw. 29. hn\oXv IpamÀ kab ]cn[n Xcptam \n§sf s]s«¶v amdn  ]p\-c-[n-hmk \b-s¯- t]mIm³ ]d-bn-Ã. ¡p-dn¨v hy-à-am-¡pI

Thycaud Village {Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv 1. Fw.-tKm-]m-e-  A¼-e-¯nsâ hnI-k\w  sdbnÂth sse³ Cc«n-

143 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv Ir-jvW³ GXm­v ]qÀW-am-bn-cn- ¸n¡m³ th­n am{X-amWv \mbÀ ¡p¶ Ah-Ø-bn-em-Wv Ct¸mÄ Øew Gsä-Sp-¡m- CXv amäm³ ]d-bp-¶-Xv. \pÅ \S-]Sn. A¼-e-¯nsâ CXv ap¶n I­p- Øew ]qÀW-am-bn«v Gsä-Sp- sIm­v Hcp IrX-y-amb ¡m³ \n§Ä¡v Hcp \nth- FÌntaäv X¿m-dm¡n Z\w kaÀ¸n-¡mw. AXn\v Ign- sdbnÂthbv¡p \ÂIn- bp-sa-¶p-s­-¦n sdbnÂth bn-cp-¶p. Bb-Xn-\m B Øehpw Gsä-Sp-¡mw. t£{Xw s]mfn¨v ]p\- Øm-]n-¡p-¶-Xn\pw ]p\- {]-XnjvT \S-¯p-¶-Xn\pw Øew Gsä-Sp-¡p-¶-Xn- \p-apÅ Nnehv ]qÀW- ambpw sdbnÂth \ÂtI-­-Xm-Wv.  Fsâ ho«n hmS-I-¡m-  hoSv ]IpXn t]mIp¶ Ah- cm-Wv. AhÀ¡v Øew Ø-bm-sW-¦n AXns\ apgp- Gsä-Sp-¡p-¶-Xn-s\-¸än h-\mbn aqe-y-\nÀWbw \S¯n Hcp hnh-chpw e`n-¨n-«n-Ã. \jvS-]-cn-lmcw A\p-h-Zn-¡p-¶-  Ct¸mÄ Adn-bm³ Ign- Xm-Wv. Ct¸mÄ sdbnÂth ªXv hoSnsâ ]IpXn sse\n\p th­n-bpÅ Øe- t]mIp-sa-¶m-Wv. A§- amWv Gsä-Sp-¡p-¶-Xv. _m¡n s\-sb-¦n D]-tbm-Kn- ]n¶oSv Xocp-am-\n¨v Gsä-Sp-¡p- ¡m³ Ign-bm¯ adp- ¶-XmWv. hiw DÄs¸sS Øew  aäp Imc-y§sfÃmw hntÃPv 2. alm-Kncn Gsä-Sp-¡ptam Hm^o-kn Xs¶ XoÀ¸m-t¡-

 hntÃPv Hm^o-kn ­-Xm-Wv. sN¶m FÃm hnh- chpw e`n-¡p-sa¶v ]d- ªn-cp¶p F¦nepw AXn\v km[n-¨n-«n-Ã. FÃm hnh-chpw e`n- ¡p¶ Hcp IrX-y-amb kwhn-[m\w Dd-¸p-h-cp- ¯-W-sa¶v Adn-bn-¡p- ¶p.  hoSv Dĸ-sS-bpÅ  Øew Gsä-Sp-¡p-¶-Xnsâ A©v skâv Øe¯p ]qÀW-amb Afhv Hcp kÀtÆ \n¶v Im skâv FSp- \S-¯n-b-Xn\p tijw Adn-bn- ¯n-cn-¡p-¶-Xm-bmWv ¡p-¶-Xm-bn-cn-¡pw. {]tbm-P-\- 3. Ae³ ImWp-¶-Xv. AXv Dd-¸m- an-Ãm¯ Øew hcp-I-bm-sW- ¡m-tam. _m¡n Hcp ¦n Hcp \nth-Z-\-¯n sktâm H¶c sktâm DÄs¸-Sp¯n At]-£n-¡p-I- h¶m AXp sIm­v bm-sW-¦n klmbn-¡m³ {]tbm-P-\-an-Ã. ]äp-sa-¦n klm-bn-¡pw. t]cv shfns¸-  hoSnsâ {][m\ `mKw  sdbnÂth sse\n\p th­n- 4. Sp-¯n-bn-«nà t]mIp-Ibpw F¶m bpÅ Øew Gsä-Sp-¡Â Aev]w Øew _m¡n am{X-amWv Ct¸mÄ sNbvXp-

144 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv \n¡p-Ibpw sN¿p¶ sIm-­n-cn-¡p-¶-Xv. apgp-h³ Ah-Ø-bm-Wn-t¸mÄ. Øehpw Gsä-Sp-¡m³ th­n- AXv apgp-h-\mbn Gsä- bpÅ Hcp \nth-Z\w D¶X Sp¯v \jvS-]-cn-lmcw A[n-Im-cn-IÄ¡v \ÂIn AhÀ A\p-h-Zn-¨n-Iq-sS. A\p-aXn Xcn-I-bm-sW-¦n AXn-\pÅ \S-]Sn kzo-I-cn-¡p- ¶-Xm-Wv.  sdbnÂth sse\nsâ  Ct¸mÄ FSp¯ Imc-y-¯n Ct¸mÄ Asse³saânsâ Xocp-am\w FSp¯ Xocp-am\w A´n-a-am-Wv. A´n-a-am-tWm, AXn  hen-b-ime `mKs¯ C\n amä-ap-­m-Iptam sdbnÂth- sse³ Hcp I«n-  hen-b-ime `mK¯v §nsâ AI-¯m-Wv. AhnsS Hs¡ Hcp sdbnÂth Hcp Ncnhv t]mse \nÀ½n- sse³ CSm³ Bh-i-y-ap- ¡m³ th­nbpw, \ne-hn- Å-Xn-t\-¡mÄ Gsd epÅ hgn, s{Ubn-t\-Pv, kzo- Øew Gsä-Sp-¯n-«p-­v. thPv ss]¸v sse³, hm«À A{Xbpw Bh-i-y- ss]¸v sse³ XpS-§n-bh apt­m? \ne-\nÀ¯m³ IqSn-bmWv  A{Xbpw Øew Gsä-Sp-¡p-¶- ap¼v I­ ]{X-hmÀ¯ Xv. {]Imcw hfsc henb \jvSw kw`-hn-¡p¶  tPmen \ÂIp-¶Xp kw_- _me-Ir-jvW- Ôn¨v sk³{S an\n-kv{Sn- 5. Iq«-¯n HcmÄ¡v ]nÅ sdbnÂth tPmen bpsS {]kvXm-h\ am{X-amWv \ÂIp-sa¶v Adn-ªp. h¶-Xv. CXns\¸än CXv icn-bmtWm sdbnÂth t_mÀUn \n¶pw Hcp D¯-chpw e`n-¨n-«n-Ã.  hen-b-im-e-bn-epÅ ta¸mew Dt]-£n-¨n«v  {Sm¡nsâ Asse³saân kam-´-c-ambn ]pXn- amä-ap-s­-¦n ta¸mew sbmcp ]mew ]Wn-bp-¶- amän-¸-Wn-tb­n hcpw. ]s£ Xnsâ Af-sh-Sp-¡p-¶Xv Ct¸mÄ Øew Gsä-Sp-¡pI {i²-bnÂs¸-«p. AXp- am{Xta sNbvXn-«p-Åq. Å-XmtWm  Ct¸mÄ \ne-hn-epÅ tdmUpw  ssX¡mSv kv{XoI-fp- aäpw amäp-I-bn-Ã. sSbpw Ip«n-I-fp-sSbpw Bip-]-{Xnbv¡p kao]w Hcp tdmUp-­v. AXv s]mfn-¨p-amän ]Wn- bptam  aqe-y-\nÀWbw F´nsâ  Øe-s¯ \jvS-s¸-Sp¶ ^e- ASn-Øm-\-¯n-em-bn-c-n hÀ¤-§Ä¡pw hne-bn-Spw. \ne- ¡pw. Øes¯ ^e- hn-epÅ am\-ZWvUwA\p-k- t]cv shfns¸- hÀ¤§Ä¡pw hne-bn- cn¨v Npäp-h-«-¯pÅ, hne sa¨- 6. Sp-¯n-bn-«nà Sptam s¸« B[mcw ASn-Øm-\-am- ¡n-sb-Sp¯v AXnsâ Cc«n IW-¡m¡n ]en-ibpw aäpw DÄs¸-Sp¯n Hcp XpI \nÀW- bn-¡pw. AXv hn]Wn hne-

145 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv tbmSv ASp-¯n-cn-¡pw.  \ne-hn-epÅ ho«n Hcp  \ne-hn-epÅ hoSv GXp Xc-¯n- lmÄ Hgn¨v FÃmw emWv ]pXp-¡n-]-Wn-bm³ Dt±- Xs¶ \jvS-s¸-Spw. in-¡p-¶Xv F¶ ¹m³ F¶m _m¡n-bpÅ sdbnÂthbv¡v kaÀ¸n-¡p-I. Øe¯v _m¡n-bp-Å- AXv kpc-£n-X-amtWm Xnsâ IqsS apI-fn-tem«v AÃtbm F¶v t\m¡n A\p- 7. a\ojv sI«p-hmt\m ]pXp¡n hmZw Xcp-hmt\ ]Wn-bp-hmt\m th­n sdbnÂthbv¡v km[n-¡p-I-bp- ho­pw s]Àan-j³ Åq. tXtS-­-Xp-t­m.  sdbnÂth sse\n \n¶pw 30 aoäÀ AIew ]men¨p thWw sI«n-S-§Ä ]Wn-bp- hm³  F\n¡v Ht¶-Im  s]mXp-hmb Hcp \S-]Sn Bb- skâv Øe-ap-­v. ]«-b- Xn-\m Ct¸mÄ AXn-t·Â ¯n A{Xbpw ImWp- H¶pw ]d-bm³ km[n-¡p-¶n-Ã. t]cv shfns¸- ¶n-Ã. sdbnÂth-bp- Ic-a-S-bv¡p¶ cko-Xv, ssI 8. Sp-¯n-bn-«nà ambn tPmbnâv shcn-^n- hi kÀ«n-^n-¡äv F¶n-h- t¡-j³ \S¯n. sbÃmw \n§-fpsS ssIbn F¶n«pw AXn-\pÅ Ds­-¦n AXv ]cn-tim-[n¨v ]«bw e`n-¨n-«nà AXn-\pÅ aqeyw \ÂIp-¶-Xm- bn-cn-¡pw.  221/11 kÀtÆ \¼-cn  B {]kvXpX Øe¯v F{X- {Sm¡n\p th­n F{X bmWv FSp-¡p-¶Xv F¶-dn- aoä-dmWv Gsä-Sp-¡p-¶-Xv. bm³ t]mÌv Øm]n-¨n-«p-­v. F\n¡v c­p skâv GI-tZiw A¼Xp aoäÀ BIm- `qan-bm-Wp-Å-Xv. Hcp \mWv km[-y-X. AXv Hmtcm aq¶v ASn amdn Gsä-Sp- Øe¯pw hnX-ymkw BIm- ¯m \ne-hnepÅ hoSv \mWv km[-y-X. B \ne-\n¡pw. AXn- t]mÌnsâ Øm\w a\-Ên-em- t]cv shfns¸- \pÅ kwhn-[m\w ¡n-bm F{X Øew Gsä- 9. Sp-¯n-bn-«nà sNbvXp Xc-Ww. Sp¯p F¶-dn-bm³ km[n-¡pw. sdbnÂth {Sm¡n \n¶pw Hcp \nÝnX Afhv Ignªv am{Xta hoSv \nÀ½n-¡m³ ]mSp-Åq. AsÃ-¦n s{Sbn³ A]-IS km[-yX IqSp-X-em-Wv. Fs´-¦nepw {]tX-yI kml-N- cyw hcp-I-bm-sW-¦n AXn-\- \p-k-cn¨v amäw hcp-¯m³ km[n¡pw.  hoSnsâ ]pd-Inse hgn  ]pXp-Xmbn Øew Af¶v FSp- ap¼v hn«p-sIm-Sp-¯n-cp- ¡m³ km[-y-X-bn-Ã. ap¼v t]cv shfns¸- 10. ¶p. Ct¸mÄ apgp-h³ hgnbv¡v hn«p-sIm-Sp¯ Øe- Sp-¯n-bn-«nà Øehpw Gsä-Sp-¡p-¶- ¯n\v Icw AS-bv¡p-¶p-s­- Xn-t\m-sSm¸w AXp IqSn ¦n AXn\v aqeyw IW-¡m- DÄs¸-Sp-¯ptam ¡pw. hgn CXn DÄs¸-«n-«p-

146 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv CÃtbm s­-¦n Gsä-Sp-¡p-¶-Xm-bn-cn- ¡pw.  c­c aoäÀ apX-emWv  {Sm¡v hcp-¶Xv CSXp hi-¯m- Fsâ Npäp-a-Xn-en Wv. AXp sIm­v Ccp hi-§- \n¶pw t]mIp-¶-Xv. fnepw Øew FSp-¡p-¶-Xp- {Sm¡n \n¶v 16 aoäÀ sIm­v D]-Im-c-an-Ã. hm«À AI-se-bmWv Npäp-a- AtXm-dn-än-bpsS Hcp s{Ubn- XnÂ. B `mK-¯pÅ t\Pv B `mK-¯p-­v. B hoSp-I-fpsS ]pd-Ip-hiw Asse³saân\v Fs´-¦nepw Cu coXn-bn-epÅ Øe- amäw h¶m am{Xta CXv ta-sä-Sp-¸n \jvS-am-Ipw. Xocp-am-\n-¡m-\m-hq. AXv sI.- LS-\-bn CXv \ne- U-»-yq.-F. Xocp-am-\n-¡-Ww. \nÀ¯n-s¡m­v Hcp Ncn-hnsâ Imcyw Xocp-am-\n-¡- amäw hcp-¯m³ km[n- W-sa-¦n BZ-y-]-Sn-bmbn 11. Icow ¡ptam. {Sm¡nsâ Ccp a®p- ]-cn-tim-[n-t¡-­-Xp-­v. hi-§-fn \n¶pw Øew Gsä-Sp-¯m kuI-c-y-am-bn-cp-¶p. {Sm¡v _me³kv sN¿m³ Ncnhv \nÀ½n- ¡p-¶-Xn\p ]Icw Hcp tdmtUm atäm \nÀ½n- ¨mepw D]-Im-c-am-Wv. Ahn-sS-bpÅ s{Ubn- t\Pv \ne-\nÀ¯p-I-bm- sW-¦n Gsä-Sp-¡p¶ Øe-¯nsâ Afhv Ipd- ¨p-Iq-sS.  ]ß-]pcw Øe¯v Hcp  B `mKw I«nw-Km-Wv. Bb-Xn- Hmt«m-dn£ t]mepw \m ]qÀW-ambpw SmÀ hcm³ ]äm¯ coXn-bn- sNbvX tdmUn\v km[-yX Ipd- 12. KoX emWv tdmUv. ]me-amWv hm-Wv. Ct¸mÄ D]-tbm-Kn-¡p-¶- Xv. AhnsS Smdnw-tKmSp IqSn Hcp tdmUv hcptam  Øew Ft¸mÄ Gsä-Sp-  Gsä-Sp-¡Â \S-]-Sn-IÄ¡v t]cv shfns¸- 13. ¡pw, CXnsâ ]Wn GI-tZiw Hcp hÀjw ka-b- Sp-¯n-bn-«nà Ft¸mÄ ]qÀ¯o-I- ap­v cn¡pw  sNmÆ-c-]p-c¯v Xma-kn-  CXn-\mbn {]tX-yI kÀtÆ ¡p-¶hÀ¡v Hcp skâv, hcp-¶p-­v. AXn \n¶v Adn- H¶c skâv BWv bm³ ]äpw. Øew. F{X skâv  hoSv thW-sa-¶p-Å-hÀ¡v 14. kptcjv Gsä-Sp¡pw F¶v {]tX-yI enÌv X¿m-dm-¡p- AhÀ¡v hy-àX CÃ. Ibpw AXn-\-\p-k-cn¨v \S-]- AXv F§s\ Adn-bm³ Snbpw D­m-Ipw. Gsä-Sp-¡- Ign-bpw. en\p tijw _m¡n hcp¶  ]qÀW-ambpw hoSv \jvS- Øe¯v hoSv ]Wn-b-W-sa-¶p-

147 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv s¸Spw F¶p-Å-hÀ¡v ÅhÀ¡v sdbnÂthbv¡v hoSv e`n¡pw F¶v ]{X \nth-Z\w \ÂImw. hmÀ¯ I­n-cp-¶p. CXnsâ \S-]Sn {Ia-§Ä F§-s\-bmWv  hoSnsâ ap¡m  an¨-ambn hcp¶ Øe-s¯-¡p- `mKhpw \jvS-s¸-Spw. dn¨v ap¼v hy-à-am-¡n-b-Xm-Wv. _m¡n H¶c aoäÀ hcp- Ahbv¡v th­n hy-àn-KX ¶p­v, AXv apgp-h-\mbn At]£ \ÂtI­n hcpw. Gsä-Sp-¡m-tam, Øew Ah-sbÃmw ]n¶oSv Gsä-Sp- Gsä-Sp-¡Â F¶v ¡m³ {ian-¡p-¶-Xm-Wv. ]qÀ¯nbm-¡pw. AXv  hoSpw IqsS tNÀ¯mWv \jvS- 15. Pb-Ir-jvW³ Adn-ªmte Xma-k-ku- ]-cn-lmcw \ÂIp-¶-Xv. I-c-y-¯nsâ Imcyw Xocp- am-\n-¡m³ km[n-¡p-I- bp-Åq.  Øe-¯n\p am{X-amtWm \jvS-]-cn-lm-cw. AtXm hoSpw IqSn tNÀ¯m tWm?  ho«n \n¶pw apI-fn-  \nc-¸mb Øe¯v I«nwKv FSp- epÅ Øe¯v Hcp ¡p-¶-Xn\pw ^nÃnwKv apX-em-b- amÀ¡nwKv hcp-¶p-­v. h-sbÃmw IW-¡m-¡n hoSv Ignªv aq¶v Asse³saâv A´n-a-am-¡n. hoSn\v A¸p-d-amWv Ct¸mÄ \n§Ä¡v In«nb ASp¯ amÀ¡nw-Kv. \nÀt±-i-amWv A´n-aw. BZy Asse³saân  ]pXn-b-Xmbn hoSv hbv¡m³ hoSnsâ aXnep am{Xta [\-k-lm-b-ambn Ipd-ªXv \jvS-s¸-Sp-am-bn-cp-¶p- A©v e£w cq]-bmWv A\p- Åq. Dbcw IqSnb h-Zn-¡p-¶-Xv. CXv If-IvSdpw Øe¯pw \nc-¸mb _Ô-s¸« A[n-Im-c-bn-I-fp- 16. {]Xm-]³ Øe¯pw hn-X-yØ amWv Xocp-am-\n-¡p-¶-Xv. CXv Asse³saâm-Wv F¶v \jvS-]-cn-lm-c-¯n\v ]pd-ta-bm- ]n¶oSv asämcp \nÀ Wv. t±iw e`n-¨p. CXn GXmWv icn.  hoSpw Øehpw \jvS- s¸-Sp-¶-hÀ¡v ]pXnb Xma-k- ku-I-cyw A\p- h-Zn-¡ptam. \jvS-]-cn- lm-c-¯n CXpw DÄs¸- Sptam

 hm«À ss]¸v sse³  Cu Asse³saâv A´n-a-am- 17. {]Im-i³ tNÀ¯mWv amÀ¡v Wv. sNbvXn-«p-Å-Xv. CXv A´n-a-amtWm

148 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

{Ia {]Xn-I-cn¨ D¶-bn¨ Bi-¦-IÄ {]Xn-I-c-W-§Ä \¼À Bfp-sS t]cv  sabn³ tdmUn h¶  ]d-ªn-cn-¡p¶ Øe-¯nsâ t]mÌpw ]d-¼nse Imcyw \nth-Z-\-ambn Hm^o- t]mÌpw X½n hnX-ym kn dnt¸mÀ«v sN¿p-I. AXv kw D­v. CXv Ignªv ]Tn-¨-Xn\p tijw D¯cw 18. {ioe£van c­p aoäÀ _m¡n D­m- \ÂImw. _m¡n hcp¶ Ipw. C§s\ _m¡n Øe-¯nsâ Imc-y-¯n hcp¶ Øew ]n¶oSv Ct¸mÄ H¶pw sN¿m³ ]än-Ã. Gsä-Sp-¡m-sa¶v ]d- AXn\p th­n \nth-Z\w ªm km[m-c-W-¡mÀ \ÂI-Ww. F´p sN¿pw.  hne Ipd¨v hnä  kÀ¡m-cnsâ {]tX-yI 19. Pb-i-¦À Øe¯v F§-s\-bmWv am\ZvWvUw A\p-k-cn-¨mWv sdbnÂth hne \nÝ-bn- hne \nÝ-bn-¡p-¶-Xv. ¡p-¶-Xv.  Hmtcm hkvXp-hnepw  Hmtcm hy-àn-I-fp-sSbpw F{X-am{Xw Øew Gsä- Øew {]tX-yIw Af¶p Xn«- {]k-¶- 20. Sp-¡p-sa¶v Adn-bm³ s¸-Sp-¯m³ DtZ-ym-K-ØÀ hcp- Ip-amÀ GXv Hm^o-kn-s\-bmWv ¶-Xm-bn-cn-¡pw. AXv ASp¯ kao-]n-t¡-­-Xv. L«-am-Wv. B Imcyw \n§sf Adn-bn-¡p-¶-Xm-bn-cn-¡pw.  sdbnÂth-bpsS t\m¬  CSXp hi-¯p-Iq-Sn-bmWv H_vsP-£³ kÀ«n-^n- {Sm¡v hcp-¶-Xv. c­v hi¯p ¡äv e`n¨ tij-amWv \n¶v Øew Gsä-Sp-¡p-¶Xp _me-Ir- sI«nSw ]Wn-X-Xv. \qdp sIm­v bmsXmcp D]-tbm-K-hp- 21. jvW³ aoäÀ BWv Ct¸mÄ an-Ã. t\m¬ H_vsP-£³ Gsä-Sp-¡p-¶-Xv. CXv kÀ«n-^n-¡äpambn CXn\v c­p hi¯p \n¶pw bmsXmcp _Ô-hp-an-Ã. Gsä-Sp-¯p-IqsS.

 Fsâ `mK-¯pÅ  AXv Hm^o-kn h¶v kwkm- Asse³saân sImSpw- cn-¡-Ww. h-fhv Bbn-«mWv Gsä-Sp-  aqe-y-\nÀWbw XpS-§n-bn-«n-Ã. ¡p-¶-Xv. CXv t\sc FSp-¡p-I-bm-sW-¦n  \n§Ä¡v ]pXnb Xma-k -ku- D]-Im-c-s¸-Spw. I-cyw Hcp-¡m-\pÅ kabw A\p-h-Zn-¡p-¶-Xm-bn-cn-¡pw. 22. tim`  \jvS-]-cn-lm-c-ambn F{X XpI e`n¡pw F¶-dn- ªm D]-Im-c-{]-Z-am-bn- cn-¡pw.  \jvS-]-cn-lmcw e`n¨ tijw hoSv Hgnªp sImSp-¯m t]mtc?

149 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

ANNEXURE-IX

Attendance Sheets of Public Hearing

Nemom Village

150 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

151 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

152 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

153 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

154 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

155 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

156 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

157 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

158 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

159 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

160 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

161 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

162 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

163 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

164 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

165 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

166 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

167 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

168 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

169 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

170 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

171 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

172 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

173 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

174 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

175 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

176 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

177 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

178 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

179 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

180 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

181 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

182 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

183 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

184 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

185 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

186 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Pallichal

187 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

188 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

189 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

190 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

191 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

192 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

193 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

194 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

195 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

196 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

197 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

198 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

199 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

200 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

201 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

202 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

203 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

204 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

205 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

206 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

207 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

208 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

209 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

210 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

211 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

212 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

213 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

214 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

215 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

216 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

217 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

218 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

219 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

220 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

221 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

222 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

223 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

224 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

225 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

226 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

227 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

228 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

229 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

230 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

231 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

232 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

233 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

234 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

235 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

236 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

237 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

238 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

239 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

240 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

241 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

242 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

243 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

244 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

245 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

246 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

247 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

248 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

249 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

250 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

251 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

252 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

253 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

254 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

255 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

256 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Thirumala

257 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

258 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

259 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

260 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

261 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

262 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

263 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

264 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

265 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

266 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

267 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

268 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

269 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

270 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

271 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

272 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

273 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

274 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

275 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

276 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

277 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

278 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

279 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

280 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

281 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

282 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Thycaud

283 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

284 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

285 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

286 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

287 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

288 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

289 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

290 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

291 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

292 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

293 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

294 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

295 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

296 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

297 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

298 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

299 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

300 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

301 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

302 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

303 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

304 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

305 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

306 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

307 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

308 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

ANNEXURE-X

Notice and Newspaper Notification Regarding Public Hearing

Janmabhoomi Dated 16/01/2020

309 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Metro Vartha Dated 16/01/2020

310 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Janmabhoomi Dated 17/01/2020

Metro Vartha Dated 17/01/2020

311 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Notice

312 SIA of Land Acquisition for the Doubling of Trivandrum-Nemom Railway Line and Construction of Terminal

Newspaper Report Regarding the Project

313

CENTRE FOR MANAGEMENT DEVELOPMENT (An Autonomous Institution Sponsored by the Government of Kerala) THYCAUD, THIRUVANANTHAPURAM KERALA – 695014