APPENDIX I (See paragraph-6) FORM 1

(I) Basic Information S. Item Details No 1. Name of the project/s “Sawapan Lok” Proposed EWS & LIG , Affordable Housing Project under “Mukhyta Mantri Jan Awas Yojana” promoted by M/s Richwell Enterprises Pvt. Ltd. 2. S. No. in the Schedule Category ‘B’ under item 8(a) of the schedule of Gazette Notification dated September 14th, 2006. 3. Proposed capacity/area/length/tonnage to be handled/command area/lease area/number of wells to be drilled. Details of Proposed Construction 1. Total Plot Area 7660.38 Sq. m 2. Permissible FAR area 18174.98 Sq. M {7660.38 x 2.25 = 17235.85 Sq. M (468.47 + 470.65)x1= 939.12 Sq. M} 3. Proposed FAR area 31072.37 Sq. M (3.93% of plot area) {include commercial} 4. Permissible ground coverage 50.00 % 5. Proposed ground coverage 3045.44 sq. m (39.75 % of plot area) 6. Total unit LIG = 462 (69.58 %) EWS = 202 (30.42 %) 7. Total Unit Area (Sq. Mt) Area Block A+B LIG A EWS Total Built up 23529.66 6185.24 29714.90 Super built up 28722.54 8356.74 37079.30 Carpet CMJAY 21538.44 5662.06 27200.50 RERA 22263.78 5811.54 28075.30 8. Permissible Landscape 766.03 Sq. M. (10.0 %) 9. Proposed Landscape 1656.00 Sq. M. (21.61 %) 10. Required scooter parking Commercial 595.96/50 = 11.91 x 1.25 = 14.88 (12 car + 7 scooter)

Scooter: LIG = 462 x 2 = 924 EWS = 202 Total = 1126

Total = 12 car + 1133 scooter 11. Provided scooter parking 78 car + 1141 scooter 4. New/Expansion/Modernization New Project 5. Existing Capacity / Area etc. - 6. Category of Project i.e. ‘A’ or ‘B’ B 7. Does it attract the general condition? No If yes, please specify 8. Does it attract the specific condition? No If yes, please specify 9. Location Jhotwara, , Plot/Survey/Khasra No. At Khasra No.- 26/1388, 28, 29 M/s Richwell Enterprises Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.

Authorized Signatory 1 Authorized Signatory Village Jhotwara Tehsil Jaipur State Rajasthan 10. Nearest railway station/airport along  Jotwara Railway Station is at a distance of about 3.20 km with distance in Kms. towards ESE.  Jaipur Railway Station is at a distance of about 6.60 km towards SE.  Jaipur Airport is at about 20 m towards SW. 11. Nearest Town, city, District Nearest headquarter is Jaipur about20.00 Km towards SW Headquarters along with distance in of project site. Kms. 12. Village Panchayats, Zila Parishad, UIT, Jaipur Municipal Corporation, Local body Address: (complete postal addresses with UIT, Jaipur telephone nos. to be given) Jaipur- 332015 13. Name of the applicant Mr. Vivek Sethia 14. Registered Address 15. Address for correspondence: Name Mr. Vivek Sethia Designation (Owner/ Partner/CEO) Director Address 801, Western Heights, S-21, Shyam Nagar,Jaipur Pin Code 302019 E-mail [email protected] Telephone No. 9799234333 Fax No. - 16. Details of Alternative Sites examined, No Alternative Site was examined. if any. Location of these sites should Geographical location of the proposed project is- be shown on a topo sheet. Latitude - 26° 57' 54.65"N Longitude - 75° 44' 26.34"E 17. Interlinked Projects No 18. Whether separate application of Not Applicable interlinked project has been submitted? 19. If yes, date of submission Not Applicable 20. If no, reason Not Applicable 21. Whether the proposal involves approval/clearance under: if yes, details of the same and their status to be given. 1.The Forest (Conservation) Act, 1980 No 2. The Wildlife (Protection) Act, No 1972? No 3. The C.R.Z Notification, 1991? 22. Whether there is any Government No Order/Policy relevant/relating to the site? 23. Forest land involved (hectares) No 24. Whether there is any litigation pending against the project and /or land in which the project is proposed to be set up? (a) Name of the court Not Applicable

M/s Richwell Enterprises Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.

Authorized Signatory 2 Authorized Signatory (b) Case No. Not Applicable (c) Orders/directions of the Court, Not Applicable if any and its relevance with the proposed project.

(II) Activity Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S.No. Information/ Checklist Yes Details thereof (with approximate quantities/rates, confirmation /No wherever possible) with source of information data 1.1 Permanent or temporary change in No Land use land use, land cover or topography The proposed site is in the developing area of Jaipur including increase in intensity of Tehsil which has maximum agriculture land. The area land use (with respect to local land is having mixed land use pattern comprising of use plan) residential and agricultural establishments. There will be minimal change in land use pattern of study area, and thus will not be inconsistent with the existing surroundings. Land cover Due to human activities, land cover is either directly affected from activity like construction of road- Yes building leading to deforestation or indirectly from water diversion leading to lowering of the water table. The proposed project will not involve any deforestation; only small work of site clearance will be done in which some shrubs and grasses will be removed. It will be balanced by planed landscaping on the site. Excavation of soil will be involved. The total expected quantity of earthwork involved is about 8,000 m³. The excavated soil will be balanced within site by back filling. Therefore the changes will be localized and insignificant. Topography The site is plane and will not involve any leveling activities. The proposed site does not involve any major natural drainage channel of locality therefore no No changes in drainage pattern are envisaged. 1.2 Clearance of existing land, No The proposed site is not having any structures. There vegetation and buildings? are some seasonal shrubs and grasses in the proposed project site. Clearing of vegetation during the construction stage is very minimal. List of observed vegetations is enclosed as Annexure XI. This shall be compensated by planting 25 trees in addition to shrubs. The proposed landscaping and plantation will have positive impact on the prevailing environment. Details of flora are enclosed as Annexure- XI. 1.3 Creation of new land uses? No The proposed site is located near Jaipur. The Jaipur Tehsil has mixed land use pattern of residential and agricultural use. The proposed use of site is for residential. Therefore, the proposed project will not create new land uses that significantly differ from M/s Richwell Enterprises Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.

Authorized Signatory 3 Authorized Signatory existing land use of locality as per the master plan. 1.4 Pre-construction investigations e.g. Yes The Soil investigation has been done. Report for same bore houses, soil testing? is enclosed as Annexure-XV 1.5 Construction works? Yes The Proposed EWS/ LIG Affordable Housing Project will involve construction of 664 flats. Area Statement

Area calculation (area in sq. m.) S. Floor Gross Balcony Chajja/ Corrido Stair Lift Built Up Far Comme No Built Up projecti r well well Area rcial on 1. Basement 5111.15 34.63 - - - - 5111.15 - - 2. Ground 3045.44 142.91 1006.13 257.14 64.66 32.3 1965.62 1259.09 595.96 3 3. First 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 4. Second 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 5. Third 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 6. Fourth 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 7. Fifth 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 8. Sixth 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 9. Seventh 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 10. Eighth 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 11. Ninth 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 12. Tenth 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 13. Eleventh 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 14. Twelfth 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 15. Thirteenth 2933.58 142.91 33.06 359.53 45.80 32.3 2739.06 2268.88 - 3 16. Mumty/ 193.36 - - - - - 193.36 - Stairs Total 46486.50 - - 4931.03 42877.90 30754.5 595.96 2

1.6 Demolition works? No Not Applicable 1.7 Temporary sites used for Yes They will be housed in temporary houses supported by construction works or housing of flush WCs during construction period only. construction workers? 1.8 Above ground buildings, structures Yes The maximum height of the project will be 43.25 m (up or earthworks including linear to Terrace Level) structures, cut and fill or Expected quantity of earth work involved is about 4,000 excavations m3. 1.9 Underground works including No No tunneling activity is involved. mining or tunneling? 1.10 Reclamation works? No No reclamation works involved

M/s Richwell Enterprises Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.

Authorized Signatory 4 Authorized Signatory 1.11 Dredging? No Not involved 1.12 Offshore structures? No Not applicable 1.13 Production and manufacturing No Not applicable processes? 1.14 Facilities for storage of goods or Yes Construction material will be stored at the site in materials? sheltered area. Cement will be separately stored under cover in bales. Sand will be stacked neatly under tarpaulin cover. Bricks and steel will be laid in open space. 1.15 Facilities for treatment or disposal Yes STP for treatment of sewage. STP treated effluent will of solid waste or liquid effluents? be used for gardening and flushing of toilets. All excess treated water will be given to Farmers nearby project site. All solid waste from different sections will be collected in separate bins. The non-organic waste shall be disposed off to authorized vendors. The organic waste will be converted into manure and used within premises for green belt development.

1.16 Facilities for long term housing of Yes Cabins for watchmen, gardeners etc and persons engaged operational workers? in essential services. 1.17 New road, rail or sea traffic during No Trucks for transport of construction material during construction or operation? construction phase and personal vehicles of residents during operational phase. 1.18 New road, rail, air waterborne or No Project is too small to require any change in existing other transport infrastructure infrastructure. including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not envisaged transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines No Not envisaged or pipelines? 1.21 Impoundment, damming, No No, Impoundment, damming, culverting, realignment or culverting, realignment or other other changes to the hydrology of watercourses is changes to the hydrology of proposed. watercourses or aquifers? 1.22 Stream crossings? No No, natural drain is crossing the plot. 1.23 Abstraction or transfers of water Yes Water will be will been abstracted from bore-well & from ground or surface waters? application for the same has already been submitted & receipt of the same is attached as Annexure IV. 1.24 Changes in water bodies or the No No effluent will be discharged outside and the proposed land surface affecting drainage or site does not involve any major natural drainage channel run-off? of locality therefore no such changes were envisaged. 1.25 Transport of personnel or materials Yes Construction material would require transport facility. for construction, operation or During construction phase material of construction will decommissioning? be transported to site. During operation stage cars and two wheelers of the residents. 1.26 Long-term dismantling or No Not envisaged decommissioning or restoration works? 1.27 Ongoing activity during No Not applicable

M/s Richwell Enterprises Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.

Authorized Signatory 5 Authorized Signatory decommissioning which could have an impact on the environment? 1.28 Influx of people to an area in either Yes During construction phase, there will be inward and temporarily or permanently? outward movement of local labour in the construction site. However during the post construction phase, there will be regular movement of residents, visitors and other related persons. The group housing will house about 5000 persons. 1.29 Introduction of alien species? No Only the plant/ tress of local species and suitable for the region will be planted. 1.30 Loss of native species or genetic No There are 25 grown trees on the proposed site, some diversity? shrubs and grasses will be removed. The same will be amply compensated by proposed plantation and landscaping. 1.31 Any other actions? No -

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply): S. Information/checklist confirmation Yes/ Details thereof (with approximate No. No quantities/rates, wherever possible) with source of information data 2.1 Land especially undeveloped or No The proposed site is in developing urban area agricultural land (ha) and the site has been converted for residential purpose by UIT and allocated to project proponent. 2.2 Water (expected source & competing Yes During construction phase water requirement users) unit: KLD will be 20.0 KLD which will be met from Tanker supplies. In post construction phase total water requirement will be about 355.30 KLD. ~203.30 KLD- Fresh water by obtaining NOC from CGWA supply. ~152.0 KLD- Recycled water from STP. 2.3 Minerals (MT) No - 2.4 Construction material – stone, Yes The construction will involve use of Stone, aggregates, and /soil (expected source- Stone Grit, Sand, bricks and timber. MT) The Stone and Stone grit is available from various queries operative around Jaipur City. 2.5 Forests and timber (source –MT) Yes Timber will be obtained from authorized local timber merchant. 2.6 Energy including electricity and fuels Yes The total power demand of the project will be (source, competing users) Unit: fuel 606.3 KW, which shall be met through power (MT), energy (MW) grid of JVVNL. The power will be received from JVVNL at 11 KV supply voltage, it will be stepped down to 0.433 KV through transformer of 500 kVA capacitiy each. 1 D.G. Set of 100 kVA capacity is proposed for common facilities to cater the essential load only. 2.7 Any other natural resources (use Yes Solar energy will be utilized for lighting of appropriate standard units) common areas.

M/s Richwell Enterprises Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.

Authorized Signatory 6 Authorized Signatory 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health. S. Information/checklist confirmation Yes/ Details thereof (with approximate No No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or materials, which No The proposed project will not use any hazardous are hazardous (as per MSIHC rules) material. Hazardous material in proposed to human health or the environment project will be generated only as used lubricating (flora, fauna, and water supplies) oil from DG Set which can cause health hazard. This used oil will be sold to authorized recyclers. 3.2 Changes in occurrence of disease or No The project is of a building construction. The affect disease vectors (e.g. insect or waste water as well as MSW is proposed to be water borne diseases) disposed of in appropriate manner therefore the project will not lead to change in occurrence of diseases or affect disease vectors. 3.3 Affect the welfare of people e.g. by Yes The urban cities including Jaipur are suffering changing living conditions? from shortage of adequate and hygienic living conditions. This has resulted in mushrooming of unauthorized Colonies which lacks basic amenities. The proposed project will provide all basic amenities and hygienic and comfortable living conditions. 3.4 Vulnerable groups of people who No There are a no. of schools, Colleges, hospitals could be affected by the project e.g. etc but it is a group housing project and will not hospital patients, children, the elderly affect vulnerable group of people. etc., 3.5 Any other causes No Not Applicable

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

S. Information/checklist confirmation Yes/ Details thereof (with approximate No. No quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or mine wastes No No spoil, overburden or mining waste will be generated. 4.2 Municipal waste (domestic and Yes According to the building construction commercial wastes) manual of MoEF&CC the rate of waste generation in residential building is 0.41 Kg/day/person. In the Residential Section of project, Out of total domestic waste 40 % will be wet garbage and rest (60 %) will be dry garbage. The solid waste so generated will be first segregated as plastic, glass, paper and other waste separately and disposed off as per MSW Rules, 2000 and amended Rules, 2008. Generation of Waste from Project (kg/day) = 0.41 X Estimated Population = 0.41 x 3984 = 1633.0 kg/day Dry waste @ 60% Total Waste Generated

M/s Richwell Enterprises Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.

Authorized Signatory 7 Authorized Signatory = 980.0 kg/day Wet Garbage @40% Total Waste Generated = 653.0 Kg/day Segregation will be practiced at the source level itself. Dry waste will be stored in the area marked for it, from where it will be sent for final disposal. 4.3 Hazardous wastes (as per Hazardous Yes Used lubricating oil from DG Sets will be waste Management Rules) generated during construction of the building. Waste oil will be properly stored and sold to authorized recyclers. 4.4 Other industrial process wastes No Not applicable as the proposed project is of construction and will not involve any industrial activity. 4.5 Surplus product No Not applicable , it is EWS/LIG Project 4.6 Sewage sludge or other sludge from Yes Dried sludge from STP will be used as effluent treatment manure for plants after treatment. 4.7 Construction or demolition wastes Yes Only construction wastes will be used for road construction. 4.8 Redundant machinery or equipment No All machinery after construction will be removed from site 4.9 Contaminated soils or other materials No No such material envisaged 4.10 Agricultural wastes No Not applicable 4.11 Other solid wastes No Not applicable

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No Information/checklist confirmation Yes/ Details thereof (with approximate No quantities/rates, wherever possible) with source of information data 5.1 Emissions from combustion of fossil Yes The only source of pollution will be 1 D.G. Set fuels from stationary or mobile of 100 kVA capacity. The emissions will be sources discharged through vent of proper height. D.G Set will conform emission limits as prescribed under E P Act- 1986 and having acoustic arrangement as per EP act- 1986. The D.G Sets will carry ‘Type approval Certificate’. 5.2 Emissions from production No Not Application processes 5.3 Emissions from materials handling Yes Dust during transportation and unloading of including storage or transport material. The measures to minimize the effects are given in Environmental Management Plan. 5.4 Emissions from construction Yes The measures to minimize the effects are given activities including plant and in Environmental Management Plan. equipment 5.5 Dust or odours from handling of Yes The measures to minimize the effects are given materials including construction in Environmental Management Plan. materials, sewage and waste 5.6 Emissions from incineration of No No such operations envisaged. waste 5.7 Emissions from burning of waste in No Waste would be collected and disposed through open air (e.g. slash materials, disposed through Govt. approved agency. M/s Richwell Enterprises Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.

Authorized Signatory 8 Authorized Signatory construction debris) 5.8 Emissions from any other sources No -

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

S. No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of equipment Yes but Noise generated by equipment will be nominal. e.g. engines, ventilation plant, negligible The measures to minimize the effects are given crushers in Environmental Management Plan. 6.2 From industrial or similar No It is a construction project. processes 6.3 From construction or Yes But insignificant to result in adverse effect on demolition environment. 6.4 From blasting or piling No Not involved 6.5 From construction or Yes During construction phase the noise will be operational traffic generated from movement of vehicles, earthwork, concrete mixer etc. 6.6 From lighting or cooling No Silent generators will be used. systems 6.7 From any other sources No Not Applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S. No. Information/checklist confirmation Yes/ Details thereof (with approximate No quantities/rates, wherever possible) with source of information data 7.1 From handling storage, use or Yes Used lubricating oil from D.G Sets will be spillage of hazardous materials properly stored and sold to authorized recyclers. 7.2 From discharge of sewage or other Yes The Sewage generated will be treated and effluents to water or the land handled properly to minimize the impact. (expected made and place of During construction phase septic tank would be discharge) provided and during operation phase STP would be provided. 7.3 By deposition of pollutants emitted No The only source of air pollution will be D.G. Set to air into the land or into water which would have vent of proper height. 7.4 From any other sources No Not Application 7.5 Is there a risk of long term build up No Not envisaged. of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S. Information/checklist confirmation Yes Details thereof (with approximate No. /No quantities/rates, wherever possible) with source of information data 8.1 From explosions, spillages, fires from No These operations are not involved. storage, handling, use or production of hazardous substances

M/s Richwell Enterprises Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.

Authorized Signatory 9 Authorized Signatory 8.2 From any other causes No Not Applicable 8.3 Could the project be affected by natural Yes There is no history of such disasters. Proper disasters causing environmental damage safety measures as per Disaster Management (e.g. floods, earthquakes, landsides, Plan will be adopted to face such incidents. cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

S. No. Information/checklist confirmation Yes/No Details thereof with approximate quantities/rates, wherever possible) with source of information data 9.1 Lead to development of supporting. No The area has well developed infrastructure cities, ancillary development or and provision of proper basic amenities. development stimulated by the project which could have impact on the environment e.g.: This is a small project and will not exert  Supporting infrastructure any significant negative impact. (Roads, power supply, waste or waste water treatment etc.)

 Housing development

 Extractive industries

 Supply industries

 Other 9.2 Lead to after-use of the site, which No This is a construction project. could haven impact on the environment 9.3 Set a precedent for later developments No The project will be developed strictly as per UIT bye laws. 9.4 Have cumulative effects due to No It is a construction project and will be used proximity to other existing or planned for non polluting activities with full civic projects with similar effects facilities like water supply, sewage treatment and ventilation etc.

(III) Environmental Sensitivity S. No. Areas Name/Identity Aerial distance (within 15 km.) Proposed Project Location Boundary 1 Areas protected under No No such areas exist. international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are important or Ramnagar PF 7.10 km towards East sensitive for ecological Mansagar Lake 11.20 km towards East reasons –Wetlands, PF near Jaisalya 8.50 km towards NE watercourses or other water bodies, coastal zone,

M/s Richwell Enterprises Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.

Authorized Signatory 10 Authorized Signatory biospheres, mountains, forests 3 Areas used by protected, No No such areas exist. important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, marine or No No such area exist underground waters 5 State, National boundaries No No boundary in 15 Km. area 6 Routes or facilities used by SH 2 C 2.50 Km towards S the public for access to Niwaru Road 0.80 m towards S recreation or other tourist, Benard Road 1.20 m towards NNE pilgrim areas NH-11 8.00 m towards SSW NH-8 8.50 m towards SW 7 Defense installations - - Densely populated or built- Village Nangal Jaisabohra 1.35 Km towards NW. 8 up area Nangal colony 0.25 Km towards NW Jai Narayan Puri 1.31 Km towards SW. Johtawara industrial area 1.50 Km towards SE Johtawara 1.00 Km towards S Jamna Puri 1.00 Km towards S Harmada 5.20 Km towards NE Bhakrota 11.00 Km towards SSW Jaipur 7.50 Km towards SSE Harnathpura 1.90 Km towards SW Gokulpura 3.50 Km towards SSW Maheshpura Rawan 11.90 Km towards SSW

9 Areas occupied by sensitive Health Care Facility/Hospitals Facilities man-made land uses Dispensary at Jhotwara 1.20 Km towards South (hospitals, schools, places of worship, community Hospital & Veterinary 1.00 Km towards South facilities) hospital at Jhotwara Worship & Community Facilities Temple, Post office & Police Temple at 0.20 Km Station Post Office at Jhotwara at 1.20 Km towards S Police station at Jhotwara Thana Road School and Educational Facilities Govt. Snr Sec. School, at Just in-front of the project site. Nangal Jaisabohra village Govt. Senior Sec School, Near site 1.20 Km towards Mahatama Gandhi Nagar, WSW. Jaipur, Rajasthan Govt. School, Kalwar Road, Near site 3.20 Km towards SE Chandri Chowk

M/s Richwell Enterprises Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.

Authorized Signatory 11 Authorized Signatory 10 Areas containing important, No No high quality scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism minerals) 11 Areas already subjected to None None pollution or environmental damage.(those where existing legal environmental standards are exceeded) 12 Areas susceptible to natural No Jaipur is located in semi-arid hazard which could cause the region and there is no history project to present of floods or land slide. Soil in environmental problems Jaipur is generally sandy and (earthquakes, subsidence, cohesion less; mildly alkaline landslides, erosion, flooding and saline soils with a or extreme or adverse calcareous base. The site is climatic conditions) located in the seismic zone- III, which is the zone of moderate seismic intensity, as per the seismic zoning map of given in BIS code IS: 1893(Part 1)-2002.As such there is no history of such disasters in the area till now. Map of India showing seismic zones of India is enclosed as Annexure- XIV

(b) “I hereby given undertaking that the data and information given in the application and enclosures are true to the best of my knowledge and belief and I am aware that if any part of the data and information submitted is found to be false or misleading at any stage, the project will be rejected and clearance give, if any to the project will be revoked at our risk and cost.

Date: Place: Vivek Sethia

(Authorized Signatory) M/s Richwell Enterprise Pvt. Ltd.

M/s Richwell Enterprises Pvt. Ltd. TEAM Institute of Science & Technology Pvt. Ltd.

Authorized Signatory 12 Authorized Signatory