Organizers: Yamal-Nenets Autonomous District Government YAMAL MEGA-PROJECTS F a c t s a n d f I g u r e s

YUZHNO-TAMBEYSKOYE FIELD

BOVANENKOVSKOYE sabetta FIELD

NOVOPORTOVSKOYE FIELD ZAPOLYARIYE- PURPE-SAMOTLOR PIPELINE NOVIY URENGOY GAS NOVIY URENGOY Obskaya station CHEMICAL COMPLEX Salekhard URENGOY

Nadym ZAPOLYARIYE-PURPE- Gubkinsky SAMOTLOR PIPELINE Transneft Noyabrsk

PARTNERS:

P L A N T Transneft GAZPROMMASH G P M S A R A T O V YUZHNO-TAMBEYSKOYE FIELD YAMAL MEGA-PROJECTS F a c t s a n d f I g u r e s

Yamal LNG Project involves the construction of liquefied (LNG) production plant using the resource base of Yuzhno-Tambeyskoye field located at north-east of . As for the beginning of 2015, there were drilled: Proved and possible reserves of the field based on PRMS standard, Field development projects provides as of the beginning of 2015 were as following: drilling of: production BCM MM of liquid 280 wells 26 wells 926 of gas 30 hydrocarbons on 19 clusters with capacity16,5 MMPA

20% Formation depth is LNG plant consisting of three process lines, 900-2 850 м with capacity 5,5 MMTPA LNG 20% superficial gaseous 60% 5 formations Projected field production level deep gas condensate exceeds: 37 formations The license for Yuzhno-Tambeyskoye BCM gas field development is valid until 2045. 27 annually Moscow: +7 499 505 15 05 www.yamaloilandgas.com London: +44 207 394 30 90 [email protected] BOVANENKOVSKOYE FIELD YAMAL MEGA-PROJECTS F a c t s a n d f I g u r e s The first Yamal project is focused on Senomanian-Aptian deposits' development of Bovanenkovskoye field. First stratup facility, which includes: Railway - gas treatment plant (GTP) 30 BCM gas per year «Obskaya-Bovanenkovo» Obskaya Karskaya - 60 wells station 572 км station (525 km to Bovanenkovo station) Projected gas production volume for Senomanian-Aptian deposits is defined as BCM gas following: the longest railway bridge in (reaching designed capacity is expected in 2019-2021) 115 annually the Arctic circle in the world 3,9 км Two-flow main gas pipelines are In long-term prospective, projected gas constructed to export Yamal gas production volume on the filed, considering BCM gas Neocomian-Jurassic gas-condensate deposits will increase up to: annually «Bovanenkovo-» 140 (planned completion of construction is 2016)

Totally, Planned number of production Manpower Bovanenkovo gas infrastructural and auxiliary facilities will increase 1800 persons will operate: 3 fields Manpower considering service companies [4 GTP, 12 BCS, 775 wells [ above 200 will be 3000 persons Moscow: +7 499 505 15 05 www.yamaloilandgas.com London: +44 207 394 30 90 [email protected] NOVOPORTOVSKOYE FIELD YAMAL MEGA-PROJECTS F a c t s a n d f I g u r e s

One of the biggest Yamal oil and gas condensate fields under development

Field reserves in C1 and С2 categories are exceeding:

MMT of oil 2nd phase oil pipeline and condensate construction: MMT oil 250 minimal transportation BCM gas volume 5,5 annually 320 annually After pipeline power increasing and oil loading Pressure oil pipeline thousand tons with capacity: terminal construction, Novy Port oil will be more than: per year exported by sea 100 км long 600 All year round New oil grade: Contains lower level of sulphur (near 0,1) than Russian Urals Novy Port start of field sea shipment START industrial Cape Kamenniy production 2016 Moscow: +7 499 505 15 05 www.yamaloilandgas.com London: +44 207 394 30 90 [email protected] ZAPOLYARIYE-PURPE- SAMOTLOR PIPELINE Transneft YAMAL MEGA-PROJECTS F a c t s a n d f I g u r e s

New types of pipe stools are specially designed for the project; oil heating and soil thermal stabilization are used (from 2011) 429 км stage (Yamal-NenePurpets Autonomous Dis trict ) Samotlor 1 (Khanty-Mansiysk Autonomous District - Ugra)

The most northern N Number of created Russian oil work places: pipeline: shortest route to connect Yamal and Krasnoyarsk Region northern fields 10 000 with Russian refineries and worlds markets oriented to S Eastern Siberia-Pacific Ocean 2 stage Zapolyariye 488 км Purpe Capacity: MMT oil and raw hydrocarbons Completion 45 per year term: 2016 Moscow: +7 499 505 15 05 www.yamaloilandgas.com London: +44 207 394 30 90 [email protected] NOVIY URENGOY GAS CHEMICAL YAMAL MEGA-PROJECTS COMPLEX F a c t s a n d f I g u r e s

The Project is developed on the basis of advanced foreign technologies and provides creation of single process chain including ethylene production from mixed raw hydrocarbons and further production of LDPE.

Project capacity of Chemical complex is thousand tons The complex will be: of polyethylene 420 per year THE BISSESt

Besides main products, it will produce: Y-grade NGLs and methane fractions IN RUSSIA

For production of gas is planned to be used from Completion term: of ETHYLENE AND URENGOY POLYETHYLENE GAS CONDENSATE FIELD 2016 Moscow: +7 499 505 15 05 www.yamaloilandgas.com London: +44 207 394 30 90 [email protected] We invite you to discuss these and other current and prospective Yamal projects

during the 5th international forum Yamal-Nenets Autonomous District Government

8-9 June, 2016, Salekhard, Russia

For sponsor participation opportunities, For programme and speaker participation, please contact: please contact: Darya Motornova Ekaterina Mamonova Business Development Director Conference Producer [email protected] [email protected] London: +44 207 394 30 97 London: +44 207 394 30 90 Moscow: +7 (499) 505 15 05 Moscow: +7 (499) 505 15 05

Moscow: +7 499 505 15 05 www.yamaloilandgas.com London: +44 207 394 30 90 [email protected]