KC PROOF

One Enterprise Square Two Enterprise Square 4,941 – 15,115 sq ft (459 – 1,404 sq m) 5,582 – 17,142 sq ft (518 – 1,592 sq m)

This is a Computer Generated Image, details may vary.

Enterprise Square, SkyPark, Setting the highest standard in sustainability New Build Offices. Planning Approved. Available FOR SALE or TO LET skyparkexeter.com KC PROOF

The new DCHG building SkyPark SkyPark is a partnership between St. Modwen, the UK’s leading regeneration specialist, and County Council. As the cornerstone of the Exeter and New Growth Point, SkyPark is the South West’s most significant business park development. It will combine environmentally sustainable office and industrial space with a hotel, local facilities and a combined heat and power plant providing district heating, all in a landscaped environment of more than 100 acres. SkyPark is a cutting edge business park development sitting in a prime location adjacent to Exeter International Airport and is accessed via the new Clyst Bypass which provides a direct link onto the A30 and to Junction 29 of the M5.

The images on this page are Computer Generated, details may vary.

Enterprise Square, SkyPark KC PROOF KC PROOF

Enterprise Square Buildings One and Two will comprise 2 highly energy efficient 3 storey office buildings. They will form the next phase of what will become a thriving working environment. Summary Specification

• BREEAM Excellent • Anti-static carpet tile finish • EPC A target • Showers and disabled • Suspended ceilings facilities • Low glare energy efficient • Climate control LED light fittings • Excellent parking provision • Metal encapsulated raised • Car charging points access floors

This is a Computer Generated Image, details may vary.

skyparkexeter.com 1 .4 9 1 L H W D 5 .3 9 1 L H W D

3 .3 9 1 L 7 H .2 W 9 S 1 L H W D

2 .1 9 1 L H W D

1 .1 9 1 L H DW

2 .1 9 1 L H W S

1 .9 8 1 L H W D

2 .9 8 1 L H W D 6 .9 8 1 L H W S

4 .7 8 1 L H W D

5 .7 8 1 L H W D

1 .8 8 1 L H W S

8 .6 8 1 L H W 6 S .4 8 1 L H W D

9 .4 8 1 L H W D

5 .5 8 1 L H W S

7 .2 8 1 L H W D 8 .2 8 1 L H W D 9 .3 8 1 L H 2 W .2 8 S 1 L H W D 0 OHT 26.20 .2 8 1 L H W D

0 .2 8 1 L H 0 W .0 S 8 1 L H 0 W .0 D 8 1 L H W D

2 .0 8 1 L H W S

9 6 .7 .8 25 7 T 1 OH L H W S

9 .6 7 1 L H W S

0 .6 7 1 L H W S

4 .5 7 1 L H W S

4 .5 7 1 L H W S

55 7. L1 H W D

64 7. L1 H W D

73 7. L1 H W D

92 7. L1 H W D

D m W H L 1 7 .6 4 5

90 L17. .5SWH

8 8.9 7 L1 H W 1 S BM 09 8. L1 H W S

18 8. L1 H W S

32 8. L1 H SW

48 8. L1 H SW

63 8. L1 H SW

G A B IO N BA S K E T S

78 8. L L1 L TES H A A W W G S E AD E IC H SLU 81 8. L1 H W D

86 8. L1 H W D

94 8. L1 H SW

01 9. L1 H DW 05 9. L1 H W S

4 .1 19 16 L 9. H L1 W H D DW

6 4 .2 .2 9 19 L1 6 L H .2 H W 9 W D L1 D H W D

6 .3 19 L 37 H 9. L1 DW H W 38 D 9. L1 H W 41 D 9. L1 4 H .4 W 9 D L1 H W D

IL IL D = = = 1 D 1 0 6. = 6 . 0 7 0 . 3 4 5 .3 1 M . M 0 19 9 L .5 H 9 W L1 D H W D 62 9. L1 H W D

67 9. L1 H DW

73 9. L1 H W D

79 9. L1 H W D

86 9. L1 H DW

90 9. L1 H W D

95 9. L1 H W D

03 0. L2 H W D

06 0. L2 H DW

15 0. L2 H W D 9 0.1 L2 7 H 0.1 W IL L2 D =16 H D .15 W =0. D 3M IL=1 D= 6.16 0.3M

25 0. L2 H W D

IL D= = 16 IL 0 .2 = .3 9 D 1 M = 6 6 0 .2 .3 .3 9 7 20 M 2 .2 L 5 0 H . M 0 2 6 5 5 L W 1 1 . M H D = . 6 5 W L 0 1 1 D I = . D= 0 IL = D

35 0. L2 H W D

4 7 .3 .4 0 20 L2 L H H W W D D

41 0. L2 H DW GRAVEL

G IN 48 D 0. IL L2 U H B W D

33 0. L2 H W D

51 GRASS 0. L2 H DW 0 90 E 11 29 3 N 9 FG 9 77 1 H 42 4 18 93 .2 .1 .4 72 37 7 5 0. 7 3 L2 H W D

5 .4 0 5 L2 .5 H 0 W L2 D H W D

2 .4 0 52 L2 0. H L2 W H D W D

48 0. L2 58 H 0. W L2 D H W D

5 .5 40 0 0. L2 L2 H H W W D D

50 63 0. 0. L2 L2 H H W W D D

45 0. L2 H 8 W .5 D 4 20 0.5 L L2 H H W W D D

64 0. L2 H DW

49 0. L2 H W D

67 0. L2 H W D

52 0. L2 H W D

69 0. L2 H W D

55 0. L2 H W D

72 0. L2 H W D

60 0. L2 H W D

79 0. L2 H W D

te ce 63 7 n 0. .6 o 2 0 C L L2 H H W W D D

73 0. L2 H B W R D DECIDUOUS W O 6 A KE .7 L 0 L N 68 L2 0. H L2 W H D W D

4 5 .6 .7 20 0 L L2 H H W W D D

Concrete

81 0. L2 2 H .7 W 0 D L2 H W D

67 0. L2 H W D

77 0. L2 H 85 W 0. D L2 H W D

DECIDUOUS

70 0. L2 H W D

89 0. L2 H W D 80 0. L2 H W D 73 0. L2 H W D

1 .9 9 0 7 L2 0. H L2 W H D W D

85 0. L2 H W D 79 0. DECIDUOUS L2 H 74 W 0. D L2 H W D

96 0. L2 H W D

80 0. L2 H W D DECIDUOUS 3 .8 20 HL W 72 D 0. L2 H W D DECIDUOUS

DECIDUOUS

95 0. L2 H W 7 D .7 0 0 .8 DECIDUOUS L2 0 H L2 W H D DW 2 .8 20 HL DW

87 0. L2 H W 78 D 0. L2 H W D

80 0. L2 H W D

79 0. L2 H W D

IL D = = 1 IL 0 6. 8 = .9 54 .7 D 1 3 20 = 6 L 1 .5 C H .0 2 W 0 onc D re te

70 0. L2 H W D

79 0. L2 H W D

0 .7 20 HL 6 .7 DW 20 HL DW

81 0. L2 H W D

5 .6 20 HL DW

IL = D= 1 6 0 . .9 6 2 3 83 0. L2 H W D

65 0. L2 H W D

82 0. L2 H W D 6 .6 20 HL DW

81 0. L2 H W D

81 0. L2 H W D 69 0. L2 H W D

76 0. L2 H W D 68 0. L2 H W D

8 .6 4 0 .6 L2 0 H L2 W H D DW

58 0. L2 H W D

46 0. L2 H W D

26 0. L2 H W D

23 0. L2 H W D

41 9. L1 H W D

35 9. L1 H W D

7 .2 19 2 HL 3 .1 W .3 9 D 19 L1 L H H W W D S

1 .1 19 HL DW

1 12 .9 9. 8 L1 L1 H H W W S D

2 .9 18 HL DW

4 .7 8 96 L1 8. H L1 W H D SW

5 .7 18 KC PROOF HL DW

1 .8 18 HL SW

6 8.4 L1 H 68 W . D 18 HL SW 9 .4 18 HL DW

5 .5 18 HL SW

27 8. L1 H W D 8 .2 18 HL DW

22 8. L1 H 39 W 8. D L1 0 H .2 SW 18 HL DW

OHT 26.20

00 20 8. 8. L1 L1 0 H H .0 W W 18 D S HL DW

2 .0 18 HL SW

5.79 OHT 2

6 .8 17 HL SW

9 .6 17 HL SW

0 .6 17 HL SW

4 .5 17 HL SW

4 .5 ASOC 17 HL SW

.55 17 HL Lay-by DW

.64 17 HL DW

.73 17 HL DW

2 7.9 m L1 H 4 DW

D W H L SWHL17.90 1 .5 7 .6 5

88 .9 17 HL 1 SW BM .09 18 HL SW

.18 18 HL SW

.32 18 HL SW

48 18. HL SW

63 18. HL SW

.81 18 .78 HL 18 DW HL SW .86 18 HL DW

.94 L18 WH EON Energy Centre S .01 19 HL DW

.05 19 HL SW

.16 19 HL DW .14 19 HL G W A D B ION 6 .2 19 B HL A W 6 S D 9.2 K L1 E H T W .24 S D 19 HL DW 6 9.3 L1 H 37 W 9. L S D 1 L E HL A T W W A D D G A 1 E CE .4 H I 19 LU L S WH 8 D .44 .3 19 19 L HL H W DW D

.59 19 HL DW 7 62 .5 9. 19 L1 L H WH DW D

3 9.7 L1 .67 WH 19 D HL DW

.79 19 HL DW

0 9.9 L1 WH D .86 19 HL DW

.95 19 HL DW

.06 20 HL DW .03 20 HL DW

5 0.1 .17 L2 20 WH HL D DW

.19 20 HL DW .25 20 HL DW

.27 20 HL DW

.36 20 HL DW .35 20 HL DW .34 20 HL DW

.47 20 HL DW .41 20 HL DW

.33 L20 Your Opportunity H DW

.48 20 HL DW

37 20. HL DW

.51 20 HL DW

45 20. HL 42 DW 20. HL DW

.55 20 HL 52 W 20. D HL DW .48 20 HL .40 DW 20 HL DW

8 0.5 55 L2 20. WH HL D DW

50 20. 5 L I .4 H I L 20 W L D L D D = WH = = 1 D = 1 0 6 0 6. .3 . .3 0 1 M 4 M 0 .54 63 20 20. HL HL DW DW .58 20 HL DW

49 20. HL DW

64 20. HL DW

52 20. HL DW

67 20. HL DW

.55 20 HL DW

.69 20 HL DW

60 20. HL DW

72 20. HL DW

63 20. HL DW 7 0.6 L2 H .79 DW 20 HL DW

4 .68 0.6 20 .73 L2 HL 20 H DW HL DW DW

.76 L20 75 WH 20. D HL DW

2 0.7 67 L2 20. H HL DW DW

81 20. HL DPD DW IL =1 0 D= 6.1 0.7 I 0. 5 L2 77 L= 3M H 0. D 1 DW L2 = 6. H 0. 16 DW 3M

.85 20 HL DW

3 0.7 L2 80 WH 20. D HL DW By joining us at SkyPark you will become 89 20. HL DW IL D = = 1 IL 0 6 D = .3 .2 .79 = 1 M 9 L20 0 6 H .3 .2 DW M 9

.74 L20 H 9 DW 0.7 L2 .91 WH 5 20 D 0.8 HL G L2 DW IN WH D D IL 2 U .5 B 6 M GR 1 5 0 AVE = .1 5 L L 0 6. M I = 1 5 D = .1 L 0 I = D 80 20. HL 72 DW 20. HL DW 96 20. HL DW 83 20. HL DW 77 20. HL DW 0 .8 0 20 9 HL E 0 W 2 1 D N 9 1 H 9 9 3 GRA 4 7 F SS 1 2 7 G 8 9 4 1 5 .1 3 .2 0.9 7 .4 7 L2 7 5 2 .82 WH 3 L20 D WH .78 D 20 HL DW

87 20. HL DW 80 20. HL DW

78 20. HL DW 79 20. HL DW

.79 20 HL DW 70 20. HL DW

.81 76 20 20. HL HL DW DW 0 0.7 HL2 DW part of a groundbreaking development which

83 20. 5 HL 0.6 DW HL2 DW

.65 .82 20 20 HL HL DW DW

66 20. .81 HL 20 DW HL DW

.81 20 HL DW

69 20. HL .76 DW 20 HL DW

68 20. HL DW

.68 20 HL DW

64 20. HL DW

DECI DUOUS .58 20 HL DW

e et nc Co

.46 L20 WH D B W R O seeks to embody sustainable principles at A K L EN L

26 20. HL DW

23 20. HL DW

Conc rete

DEC IDUOUS

DEC IDUOUS

DEC IDUOUS

DEC IDUOUS their broadest levels, whilst addressing social,

DECID UOUS

DEC IDUOUS economic and environmental objectives. Lay-by

IL D = IL = 1 0 6 D = . . = 1 9 5 1 6 3 4 .0 .5 0 2 C o n c re te

IL D = = 1 0 6 . .9 6 2 3 The vision for the site is to realise the full economic potential of Exeter as a major regional centre, providing a range of employment opportunities and highlighting

on ati bst Su the area as a self-sufficient, new urban community.

Location is also key: Entrance

E • Adjacent to Exeter Airport Phase 1 • Walking distance from Cranbrook Rail Halt

ion at Subst • 30 acres of landscaped environment Indicative masterplan DCHG Your New Office The offices will be set on either side of the street, which is a pedestrian zone running One Enterprise Square the full extent of the park from the gateway Pre Sale / Pre Let entrance off the Clyst Honiton Bypass. The street will be a vibrant landscaped area with water features and communal areas for employees to meet and relax. Two Enterprise Square

Under Construction Entrance

E

Enterprise Square, SkyPark KC PROOF KC PROOF

Typical Floor Plans – Building One Typical Floor Plans – Building Two

UP

Bins

Electrical intake FWC

1200 DisWC Riser

t Plant n i

o Shwr

P Tenants Riser

a e T MWC FWC Riser Tenants Riser Riser Tea Poin t

Landlord Riser

MWC Electrical Plant intake DisWC/ Shwr

Lift

UP Plan shows Ground Floor

Plan shows Ground Floor t n i o P

a Lift e DisWC T

MWC Balcony Shwr Riser r

e Riser r

e FWC s i Vent Ri s

R Riser

t FWC Tenants n Riser

Riser e V Landlord Riser Clnr MWC

Tea Poin t DisWC

Plan shows First Floor Plan shows First Floor

One Enterprise Square Sq Ft Sq M Parking Two Enterprise Square Sq Ft Sq M Parking

Ground Floor 4,941.2 459.0 Ground Floor 5,582.9 518.6

First Floor 5,083.3 472.2 First Floor 5780.6 537.0

Second Floor 5,090.8 472.9 Second Floor 5779.3 536.9

TOTAL 15,115.3 1,404.1 63 TOTAL 17,142.8 1,592.5 74

Measured in accordance with IPMS3. Measured in accordance with IPMS3.

skyparkexeter.com KC PROOF

SkyPark Sustainability At SkyPark, there is an integrated approach to sustainability – embracing every aspect of social, economic and urban design as integral elements of sus­tainable places, together with consideration of environ­mental sustainability in relation to renewable energy and energy efficiency to minimise the carbon footprint of the development. At SkyPark, you can expect more than just electric car charging points. SkyPark sustainability offers:

District Heating Reduced Occupational Costs Sustainable Transport SkyPark is of a size, scale and location to The office buildings will be 25% more energy SkyPark has a well served new sustainable consider integrated renewable technologies. efficient in their electrical consumption to meet travel network linking the East of Exeter Growth BREEAM Excellent Standards. Electrical bills Point to Exeter and the rest of the region. The E.ON Energy Centre provides combined will therefore be reduced. The East of Exeter Growth Area has a railway heat and power via a district heating system to station at Cranbrook (opened summer 2015) substantially reduce carbon production within The EPC rating will be A, which is likely to result with a service taking 10 mins into Exeter the site, providing carbon neutral heating. in reduced occupational costs in future years. city. There is a rapid transport bus link from Carbon neutral electricity via private wire is also Cranbrook to SkyPark and onto the centre of currently being discussed with E.ON. There are The combination of carbon neutral heating Exeter with a ½ hourly service currently moving more than just electric car charging points and and reduced electrical consumption on the to ¼ hourly as demand increases. a trim trail. 17,000 sq ft office will reduce carbon emissions from the building by 30 tonnes and 51.5 tonnes There is an extensive cycle link system at respectively. There will therefore be estimated SkyPark and comprehensive cycle facilities savings as measured by the Governments, within the specification for each building. Carbon Reduction Commitment Scheme of 81.5 tonnes of carbon. There are electric car charging points BREEAM Excellent within SkyPark. All buildings will be designed and constructed to achieve a BREEAM Excellent rating. There are enhanced opportunities for car Both the E.ON Energy Centre and the ASOC sharing via the collective Estate Management building have already achieved a BREEAM SkyPark. Excellent rating.

Enterprise Square, SkyPark KC PROOF KC PROOF

The SkyPark Approach

need higher res if possible Our approach to an overall carbon reduction is fourfold:

1. A reduction in the embodied energy during the construction process through careful selection of materials and on-site management.

2. A reduction in the buildings energy requirements through careful design to use passive technologies such as: orientation, solar gain, solar shading, increased insulation, natural ventilation, intelligent building control systems and the use of energy efficient fittings.

3. The use of renewable technologies

to reduce the CO2 impact of the residual energy needs. A scheme that is future-proofed to allow future integration into developing technologies.

4. An overarching approach through the whole site via the Estate Management including ecology, sustainable urban drainage and transport.

The E.ON Energy Centre

skyparkexeter.com Lydney Stroud

Key: Key: TIVERTON

Sat Nav Postcode: Chepstow Wotton-under-Edge 1 Exeter Science Park EX5 2DS Newport 2 Exeter Gateway ADDINGTON 30 Minutes 3 EDF P BRISTOL/LONDON Bristol 60 Minutes Clevedon 4 Met Office Bath 120 Minutes 5 Exeter Chiefs (Rugby)A396 M5 B3181 CRANBROOK Weston-super-Mare Radstock 6 Cranbrook Minehead SkyPark 6 HONITON/LONDON Woolacombe Burnham-on-Sea Wells Frome

Barnstaple Bridgwater A30 WATERLOO Salisbury Taunton EXETER CENTRAL 2 1 STivertonkyPark Yeovil EXETER INTERNATIONAL AIRPORT Chard Blandford 3 Forum 29 B3180 Honiton Ringwood EXETER 4 Wimborne ST DAVIDS EXETER

Exeter Bridport Launceston Dorchester Poole SIDMOUTH Weymouth A377 30 A3052 Liskeard 5 Newquay Bodmin Torquay A30

OKEHAMPTON

St Austell Truro TOPSHAM

31 A376 B3179 A38

EXMOUTH

PL

Y

M

O

OUTH

U

M

Location Contact InformationT

Y

H

PL SkyPark is adjacent to Exeter International Airport and is accessed via the Andrew Pearce Noel Stevens new Clyst Honiton Bypass which provides a direct link onto the A30 and to 01392 429302 01392 353093 Junction 29 of the M5. [email protected] [email protected] Close by is the new Cranbrook rail station offering links to Exeter city centre and London Waterloo. There is also a regular bus service serving the park from Exeter to Cranbrook

Local Amenities Important: These particulars are believed to be correct but their accuracy is not guaranteed and they do not form part of any contract. October 2016 SkyPark will incorporate on-site facilities including a hotel, pub, crèche and Designed and produced by www.kubiakcreative.com 151607 10/16 retail, as well as an on-site trim trail and central car park. Close by is the new Cranbrook development which has a good selection of new housing, schools and local amenities.