Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, District,

FORM 1 FOR ENVIRONMENTAL CLEARANCE OF

BUILDING STONE QUARRY OF

M/s CEEYEN STONE CRUSHER

EXTENT: 4.7325 Ha.

SITUATED IN SURVEY No: 40/1K, PARAPPA VILLAGE VELLARIKKUND TALUK, KERALA STATE

PREPARED BY ULTRA-TECH

BANGALORE HEAD KERALA REGIONAL OFFICE REGIONAL OFFICE OFFICE # 20, 1st Cross, 1st Main, #206, 224-225, Door No.27/2957 A1, First MLA Lay out ,R T Nagar Jai Commercial Complex, Floor, Vaniampilly, K P Vallon BANGALORE Eastern, Express Highway Road, Kadavanthra- 682020 Karnataka – 560 032. Opp. Cadbury, Khopat, ERNAKULAM THANE WEST – 400601 Kerala

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 16

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

FORM – 1

I. Basic Information

Sl. Item Details No. 1 Name of the project/s Granite Building Stone Quarry of M/s. CEEYEN STONE CRUSHER 2 Sr. No. in the schedule 1(a) 3 Proposed Lease area: 4.7325 Ha capacity/area/length/tonnage to be Proposed production capacity: 1,90,625 TPA handled/command area/lease Life of quarry: 10 years area/number of wells to be drilled Total production during the plan period: 6,91,250 Tonnes 4 New/Expansion/Modernization New Project 5 Existing Capacity/Area etc. Proposed Capacity : 1,90,625 TPA 6 Category of Project i.e. ‘A’ or ‘B’ “B” 7 Does it attract the general condition? No If yes, please specify. 8 Does it attract the specific condition? No If yes, please specify. 9 Location Parappa Plot/Survey/Khasra No. 40/1K Village Parappa Tehsil Vellarikund District Kasaragod State Kerala

10 Nearest Railway station/Airport along Particulars Name Distance, with distance in kms Direction (From lease) Railway 20 kms (aerial station distance)

Airport Mangalore 75 kms (aerial distance)

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 17

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

11 Nearest Town, City, District Particulars Name Distance, Headquarters along with distance in direction kms (wrt lease) Nearest town Parappa 1.8 Km District Head Kasaragod Aerial distance of quarter 31 Km

12 Village Panchayat, Zilla Parishad, Particulars Name Municipal Corporation, Local body Village Parappa (Complete postal address with Taluk Vellarikund telephone no. to be given).

13 Name of the applicant Mr. C Narayanan 14 Registered address Mr. C. Narayanan, Managing Partner M/s. CEEYEN STONE CRUSHER Mundathadam,Parappa P.O, Vellarikund Taluk, Kasaragod District, Kerala- 671 533 Kerala, Mob:+91 9447000730 Email:[email protected] 15 Address for correspondence Same as above Name Mr. C. Narayanan Designation(Owner/Partner/ CEO) Managing Partner Address Mr. C. Narayanan, Managing Partner M/s. CEEYEN STONE CRUSHER Mundathadam,Parappa P.O, Vellarikund Taluk, Kasaragod District, Kerala- 671 533 Kerala, Mob:+91 9447000730 Email: [email protected] Pin Code 671 533 e-mail Email ID: [email protected] Telephone no. Mob:+91 9447000730 Fax no. Nil 16 Details of alternative sites examined, Nil as the mining is a site specific activity if any. Location of these sites should be shown on a topo sheet 17 Interlinked projects NO

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 18

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

18 Weather separate application of Not Applicable. interlinked project has been submitted?

19 If yes, date of submission Not Applicable.

20 If no, reason Not Applicable.

21 Whether the proposal involves approval/ Not applicable clearance under: (a) The Forest (Conservation) Act, 1980 (b) The Wildlife (Protection) Act, 1972 (c) The C.R.Z Notification, 1991 22 Whether there is any Government Not Applicable order/ policy relevant /relating to the site 23 Forest land involved (hectares) Nil

Whether there is any litigation 24 pending against the project and/or land in which the project is propose to be set up (a) Name of the Court Nil (b) Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project.

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 19

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 20

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

II. Activity

Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.)

Sl. Information/Checklist confirmation Yes/ No Details thereof (with No approximate quantities /rates, wherever possible) with source of information data 1.1 Permanent or temporary change in Yes Land use: - As per revenue record the land land use, land cover or topography is private. including increase in intensity of land Due to the quarrying activity there will be use (with respect to local land use change in the general ground profile in the plan) form of Pit, which will have localized impact and create physical change in the existing land use. 1.2 Clearance of existing land, vegetation No The area is already broken up as the quarry and buildings? is already under operation, 1.3 Creation of new land uses? Yes The mined out area will be restored by following the mine closure guidelines. 1.4 Pre-construction investigations e.g. No Not required as the quarry was already under bore houses, soil testing? operation. 1.5 Construction works? No Nil, Required infrastructure already exists. 1.6 Demolition works? No No demolition works will be carried out. Temporary sites used for construction No Nil. 1.7 works or housing of construction workers? 1.8 Above ground buildings, structures or Yes Existing infrastructure is sufficient to operate earthworks including linear structures, the present existing quarry. cut and fill or excavations. 1.9 Underground works including mining No Not Applicable or tunneling? 1.10 Reclamation works? Yes During the plan period of quarrying it is proposed plantation on 7.5m (buffer zone) Safety zone by using top soil and native plants.It is also proposed plantation on waste dump. At the Conceptual stage, this mine will pit will be used for various activities such as water pond, back filling and etc 1.11 Dredging? No Not Applicable

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 21

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

Sl. Information/Checklist confirmation Yes/ No Details thereof (with No approximate quantities /rates, wherever possible) with source of information data 1.12 Offshore structures? No None 1.13 Production and manufacturing Yes Maximum Production is 1,90,625 MT. The processes? mining will be done by open cast mechanized method of mining. The bench height and width will be 5.0 m & 5.0 m respectively at ultimate stage by maintaining 65 degree(Since Granite is hard rock) . Drilling and Blasting operation are involved. To minimize the impacts of drilling & blasting, latest technology will be implemented. Excavated material shall be transported to the client. The ultimate depth of the working mine is 70 m above MSL. 1.14 Facilities for storage of goods or Yes ROM produced from the quarry operation materials? will be transported to his own crusher unit situated vicinityof the lease, where size reduction will be done and final product will be sold the buyers. The lessee is having the understanding with the buyer that the waste generated at this quarry will be given to the road construction companies, where this material is required for them. Balance waste will be dumped in to the temporary waste dump yard which is situated within the lease. 1.15 Facilities for treatment or disposal of No Mainly the waste generated is the recovery solid waste or liquid effluents? loss due to the incidental to quarrying and the intercalated and overburden material. The material generated at this quarry will be used as a road metal / building material. The waste generated at this quarry will Dumped/back filled systematically in to the old worked out pit which is located North of the lease area, this operation is also part of Reclamation of old works out pit. 1.16 Facilities for long term housing of No All the operational workers are mainly from operational workers? the local and nearby villages. 1.17 New road, rail or sea traffic during No As existing facilities will suffice., no

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 22

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

Sl. Information/Checklist confirmation Yes/ No Details thereof (with No approximate quantities /rates, wherever possible) with source of information data construction or operation? additional facilities are required 1.18 New road, rail, air waterborne or No Not Applicable. other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of existing No Not Envisaged. transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted transmission lines or No None. pipelines? 1.21 Impoundment, damming, culverting, No realignment or other changes to the Nil. hydrology of watercourses or aquifers? 1.22 Stream crossings? No Nil. 1.23 Abstraction or transfers of water from Yes Water for the quarry is extracted from the ground or surface waters? open well at the site 1.24 Changes in water bodies or the land No The drainage pattern in this area is dendritic surface affecting drainage or run-off? in nature. 1.25 Transport of personnel or materials Yes The transportation system is mainly surface for construction, operation or transport by 10 tonnes capacity tipper trucks. decommissioning? 1.26 Long-term dismantling or Yes Long term measures will be taken as per Post decommissioning or restoration Mine Closure Plan. works? 1.27 Ongoing activity during No Service buildings will be retained. More so decommissioning which could have the lessee will use the same infrastructure for an impact on the environment? other purpose after the closure of quarry. 1.28 Influx of people to an area in either No Quarry provides direct employment to about temporarily or permanently? 40 people and generates indirect employment for few hundred people. Most of the directly employed people are skilled. 1.29 Introduction of alien species? No Nil. 1.30 Loss of native species or genetic No Not Envisaged. diversity? 1.31 Any other actions? No None.

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 23

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Sl. No Information/Checklist Yes/ No Details thereof (with confirmation approximate quantities /rates, wherever possible) with source of information data 2.1 Land especially undeveloped or Yes The area of the project is an outcrop of agricultural land (Ha) Charnockite (commercially known as Granite) rock, hence not feasible for agriculture purpose except rubber plantation. 2.2 Water (expected source & Yes Water will be used for domestic purposes, competing users) unit: KLD green belt development and dust suppression. The main source of water is from the open well within the quarry lease area. Domestic consumption : 1.80 kLD Dust suppression : 5.00 kLD Plantation : 2.20 kLD Total : 9.0 kLD 2.3 Minerals (MT) No Not Applicable 2.4 Construction material – stone, No Nil, all the required infrastructure already aggregates, sand / soil (expected exists. source – MT) 2.5 Forests and timber (source – MT) No Nil 2.6 Energy including Electricity and Yes For quarry operation no power is required fuels (source, competing users) Unit: as the HEMMs are operated by HSD. For fuel (MT),Energy (MW) office buildings electricity is met through KSEB. Diesel Driven Compressors will be used for drilling purpose. 2.7 Any other natural resources (use No Nil appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

Sl. Information/Checklist Yes/ No Details thereof (with No confirmation approximate quantities /rates, wherever possible) with source of information data

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 24

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

3.1 Use of substances or materials, Yes Explosives will be procured, stored, which are hazardous (as per MSIHC transported, handled and used in accordance rules) to human health or the with Indian Explosive Act 1884, MSIHC environment (flora, fauna, and water Rules 1989, Mines Act, 1952 and supplies) regulations there under. 3.2 Changes in occurrence of disease or No Not Applicable. affect disease vectors (e.g. insect or water borne diseases) 3.3 Affect the welfare of people e.g. by Yes Due to this project, no welfare people are changing living conditions? affected, but it will support for improving the local socio-economic conditions of the people in the surrounding region by providing direct employment and indirect employment opportunities like workshop, canteen, drivers and etc. 3.4 Vulnerable groups of people who No The existing quarry operation will not harm could be affected by the project e.g. any of the vulnerable groups hospital patients, children, the elderly etc., 3.5 Any other causes No Not envisaged from the project.

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Details thereof (with Sl. Information/Checklist Yes/ approximate quantities /rates, wherever No confirmation No possible) with source of information data 4.1 Spoil, overburden or mine Yes Mainly the waste generated is the recovery loss wastes due to the incidental to quarrying and the intercalated and overburden material. During plan period the waste generated during mining will be dumped systematically in to the temporary waste dump yard with the lease are. It is proposed retention wall/rubble wall and trench wall and at the bottom/toe of the waste dump to check run off of waste material /silt into the adjoining areas. And during conceptual stage this waste will used for back filling purpose. More or less entire area is exposed by charnockite (granite) only at places, topsoil is visualized which is sparsely distributed. The amount of topsoil occurs with the thickness varying from 0.0

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 25

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

to 1.0 m., however during the course of quarrying of this area, the topsoil so occurs incidental to quarrying will be removed separately and stocked separately in transit stock yard and will be used for plantation purpose as and when they required. The total quantity of top soil generated is 20,700MT only. 4.2 Municipal waste (domestic and Yes The workers in the quarry may generate around or commercial wastes) 8kg/day Municipal Solid Waste. Out of this 5.6 kg/day may be biodegradable and 2.4 kg/day may be non-biodegradable. The biodegradable waste will be treated by composting and the recyclable waste will be sold to recyclers 4.3 Hazardous wastes (as per Yes Used oil from maintenance of DG sets will be Hazardous Waste Management handled as per Hazardous Waste (Management Rules) Handling & Transboundary Movement) Rules, 2008. 4.4 Other industrial process wastes No Nil 4.5 Surplus product No None 4.6 Sewage sludge or other sludge No As the sewage is treated by septic tank followed from effluent treatment by soak pit, there will not be any sewage sludge 4.7 Construction or demolition No Nil wastes 4.8 Redundant machinery or No Machinery with sufficient shelf life will be equipment utilized for other projects and others will be phased out and or sold to reprocessing agency. 4.9 Contaminated soils or other No Not Envisaged materials 4.10 Agricultural wastes No Nil 4.11 Other solid wastes No Nil

5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

Sl. Information/Checklist Yes/ No Details thereof (with No confirmation approximate quantities /rates, wherever possible) with source of information data 5.1 Emissions from combustion of Yes Operation of HEMMs and DG set using HSD fossil fuels from stationary or do emit due to combustion which is not mobile sources significant. 5.2 Emissions from production Yes Quarry operations like drilling and blasting,

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 26

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

processes. transportation etc will generate emissions. Monitoring has been carried out in the project site for air quality & noise and the report is enclosed. 5.3 Emissions from materials Yes Air pollutants are generated from handling including storage or transportation. There will be fugitive emissions transport generated during material handling, transportation, loading and unloading etc. Regular water sprinkling on haul road will suppress the dust particles and prevent them from getting air-borne. 5.4 Emissions from construction No Not Envisaged. activities including plant and equipment 5.5 Dust or odor from handling of Yes Fugitive Dust will be generated during materials including construction Excavation, Transportation & Loading materials, sewage and waste operations. This will be taken care of by water Sprinkling at regular intervals on the haul roads, quarry benches, and internal roads. Transporting the raw material and finished goods will be in closed vehicles. No odor is generated from handling the materials including construction materials, sewage and waste. 5.6 Emissions from incineration of No Not applicable as no waste is being incinerated waste 5.7 Emissions from burning of No Not Applicable as no waste is being burned waste in open air (e.g. slash materials, construction debris) 5.8 Emissions from any other No Not Applicable. sources

6. Generation of Noise and Vibration, and Emissions of Light and Heat:

Details thereof (with approximate quantities Sl. Information/Checklist Yes/ No /rates, wherever possible) with source of No confirmation information data 6.1 From operation of equipment e.g. Yes The noise generating equipments in the lease engines, ventilation plant, crushers area are as under:- S. No. List of equipments 1. Excavator Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 27

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

Details thereof (with approximate quantities Sl. Information/Checklist Yes/ No /rates, wherever possible) with source of No confirmation information data 2. Drilling Machine 3. Trucks/Tippers

Mitigation Measures:-  Effective maintenance of machineries and vehicles at regular and frequent intervals.  Plantation of green belt around the haul roads and lease periphery.  PPE’s will be provided. 6.2 From industrial or similar No Not Applicable. processes 6.3 From construction or demolition No Not Applicable as no construction or demolition work is carried out 6.4 From blasting or piling Yes Drilling and blasting do generate noise and vibration, but, the blasting carried out at this quarry and also required precautions will be taken to maintain the noise levels to maintain within the acceptable norms. 6.5 From construction or operational Yes Noise do generate due to movement of loaded traffic and unloaded trucks and or tippers. There will not be traffic congestion to the local public. 6.6 From lighting or cooling systems No None. 6.7 From any other sources No None.

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

Details thereof (with approximate quantities Sl. Information/Checklist Yes/ No /rates, wherever possible) with source of No confirmation information data 7.1 From handling, storage, use or No Hazardous materials like spent oil, old batteries spillage of hazardous materials are being disposed off as per the existing Rules & Guidelines of Hazardous Waste (Management Handling & Transboundary Movement) Rules, 2008 and for disposal through authorized agents. 7.2 From discharge of sewage or Yes About 1.64 kLD domestic effluent will be

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 28

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

Details thereof (with approximate quantities Sl. Information/Checklist Yes/ No /rates, wherever possible) with source of No confirmation information data other effluents to water or the generated and the same will be treated though land (expected mode and place septic and soak pit. of discharge) 7.3 By deposition of pollutants No Dust will be generated, which is suppressed by emitted to air into the land or regular water sprinkling on haul roads, quarry into water benches & etc., 7.4 From any other sources No Nil. 7.5 Is there a risk of long term build No Not envisaged. up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

Details thereof (with approximate Information/Checklist Sl. No Yes/ No quantities /rates, wherever possible) with confirmation source of information data 8.1 From explosions, spillages, fires No Operation is strictly as per the DGMS etc from storage, handling, use or guidelines for its safety. Safety of the mine production of hazardous workers is taken care as per the Mines Act substances 1952 and the rules and regulations made under this act. Storage & using explosives as per the guideline by DGMS and Indian Explosive Act 1884, MSIHC Rules 1989, 8.2 From any other causes No Nil. 8.3 Could the project be affected by No Not envisaged. natural disasters causing environmental damage (e.g. floods, earthquakes, landslides, cloudburst etc)?

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 29

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

Details thereof (with approximate Sl. No Information/Checklist confirmation Yes/ No quantities /rates, wherever possible) with source of information data 9.1 Lead to development of supporting. Yes The project will generate direct / indirect facilities, ancillary development or employment to the local people. Hence, development stimulated by the project the activity has also contributed to the which could have impact on the improvement of income status of the local environment e.g: people. The quarry project will also  Supporting infrastructure (roads, improve by means of many ancillary / power supply, waste or waste supporting facilities / infrastructure water treatment, etc.) eventually leading to the overall  Housing development development of the area and the life style  Extractive industries will improve.  Supply industries  Other 9.2 Lead to after-use of the site, which Yes A portion of the pit will be used as water could have an impact on the reservoir cum recharging pit, the environment remaining portion (old pit) will be backfilled and green belt will be developed as per the Post Mine Closure Plan 9.3 Set a precedent for later developments No No. 9.4 Have cumulative effects due to Yes Similar types of projects are being proximity to other existing or planned operated in the vicinity of the project projects with similar effects which will lead to cumulative improvement of the region.

III. Environmental Sensitivity

Sl. Areas Yes/ No Details thereof (with No approximate quantities /rates, wherever possible) with source of information data 1 Areas protected under international No None within 15 km conventions, national or local legislation for radius their ecological, landscape, cultural or other related value 2 Areas which are important or sensitive for Chandragiri river at an ecological reasons - Wetlands, watercourses Yes aerial distance of 5.9 Km or other water bodies, coastal zone, Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 30

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

Sl. Areas Yes/ No Details thereof (with No approximate quantities /rates, wherever possible) with source of information data biospheres, mountains, forests 3 Areas used by protected, important or sensitive species of flora or fauna for No None within 15 km radius breeding, nesting, foraging, resting, over

wintering, migration 4 Inland, coastal, marine or underground No None within 15 km waters radius

5 State, National boundaries Yes Kerala - Karnataka State Boundary at an aerial distance of 14.5 Km

6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim No None within 15 km radius areas 7 Defense installations No None within 15 km radius

8 Densely populated or built-up area Yes 9 Areas occupied by sensitive man-made land Hospitals uses (hospitals, schools, places of worship, Yes 1. Mankayam Govt. community facilities) Hospital, Vellarikkund-4 Km 2. Dr.Madhusudhanan’s

Hospital- 10 Km 3. KKM Hospital- 10Km 4. PH Centre 5. Chittarikkal Elavumkal Hospital- 13 Km Schools 1. Govt HSS, Parappa2.2 Km 2. SVMG LP School- 2.2 Km 3. Govt. LP School,Kanakappally Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 31

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

Sl. Areas Yes/ No Details thereof (with No approximate quantities /rates, wherever possible) with source of information data - 2.2 Km 4. St. Annes English Medium School- 5.1 Km 5. St. Judes H.S.S – 5.5 Km 6. Govt. High school, Attenganam-5.9 Km 7. GWLPS, Adottukaya- 6.1 Km 8. Dr. Ambedkar Govt.HSS- 6.6 Km 9. Varakkad HSS- 9.7 Km Colleges 1. St.Pius college Rajapuram- 4.3 Km

2. E.K Nayanar Memorial Govt. College- 9.1 Km

3. Peoples Co-operative arts&science college- 10 Km

4. Nehru arts & science College- 12 Km

5. Applied Science College- 13.4 Km

6. Dr. Ambedkar college of Education- 14 Km

Temples 1. Thaliyil Temple- 2 Km 2. Balal sree Bhagavathy

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 32

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

Sl. Areas Yes/ No Details thereof (with No approximate quantities /rates, wherever possible) with source of information data Kshethram- 3.3 Km 3. Kunnumvayal Temple- 4.6 Km 4. Neroth Bhagavathy Temple- 5 Km 5. Mahavishnu Temple- 5.36 Km 6. Sree Ayyappa Temple- 6.5 Km 7. Sree Mahavishnu temple- 7.8 Km 8. Sree Dharmasastha Temple- 9 Km Mosque 1. Parappa Town Juma masjid- 2 Km 2. Kallar Juma Masjid- 5.4 Km 3. Kottady Juma Masjid- 5.8 km 4. Siraju lslam Juma Masjid- 7.9 Km 5. Juma Masjid- 10 .4Km 6. Kannoth Mosque- 10.7 Km 7. Badariya Juma Masjid- 11.3 Km Church 1. St. Marys Church, Parappa- 1.8 KM

2. St. Antonies Church Balal—3.8 Km

3. Holyt Family Church- 4.1 Km

4. St. Sebastian Church- 4.2 Km

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 33

Environment Clearance Application for M/s Ceeyen Stone Crusher at Parappa Village, Vellarikkund Taluk, Kasaragod District, Kerala

Sl. Areas Yes/ No Details thereof (with No approximate quantities /rates, wherever possible) with source of information data 5. Little Flower fornce church- 5.1 Km

6. St. Xaviers Church- 5.9 Km

10 Areas containing important, high quality or None within 15 km scarce resources (ground water resources, radius surface resources, forestry, agriculture, No fisheries, tourism, minerals) 11 Areas already subjected to pollution or Yes Quarrying for building environmental damage. (those where existing stone is being conducted legal environmental standards are exceeded) since many years. 12 Areas susceptible to natural hazard which No No, lease area is not could cause the project to present susceptible to natural environmental problems (earthquakes, hazard, as there is no subsidence, landslides, erosion, flooding or history of such incidents. extreme or adverse climatic conditions)

Prepared by ULTRA-TECH Environmental Consultancy & Laboratory, Ernakulam. Page 34