Budget Summary of Fiscal Year 2077/78 BS (2020/21 AD) Including Fiscal Transfers

Total Page:16

File Type:pdf, Size:1020Kb

Budget Summary of Fiscal Year 2077/78 BS (2020/21 AD) Including Fiscal Transfers Unofficial Translation Budget Summary of Fiscal Year 2077/78 BS (2020/21 AD) Including Fiscal Transfers Ministry of Economic Affairs and Planning Province No. 1 Biratnagar, Nepal Table of Contents Part (A) Title Page No. Objectives of the Budget 1 Sectoral Priorities of the Budget 2 Budget structure 3 Sources of Expenditure 4 Estimation of Internal Revenue 5 Ministry/ Central Body/ Grant Titled Expenditure Estimation 6 Operating Expenditure Estimation 7 Number and the Budget of the programs under federal Supplementary, Special and Conditional Grants Operated by 8 Sectoral Ministries Expenditure Estimates (Sustainable Development Goals) 9 Expenditure Estimates as per Provincial First Periodic Planning Strategy 10 Gender Responsive Budget & Climate Friendly Budget 11 State Government's Special programs for Fiscal Year 2077/78 BS (Flagship Programs) 12 Part (B) Inter-Governmental Fiscal Transfers (Local Level) 13-20 Part (C) Recommendation Regarding Vehicle Tax Sharing by the Provincial Government to Local Level 21-28 Objectives of the Budget To protect the lives of the people from all kinds of diseases including Corona pandemic, to make the life of the citizens safe and reliable. Coordinating policy and resources to revitalize the Corona pandemic while minimizing its impact on the economy and other sectors. To make people realize the presence of the welfare state by increasing the health, education, employment and development friendly policy interdependence. To increase the effectiveness of infrastructure, economic and social sectors by making maximum use of available resources and means through adopting economical and effective expenditure system. To guarantee civil security and social justice through effectiveness, transparency, good governance and accountability of public service. 1 Sectoral Priorities of the Budget Expansion of reliable health care and development of Gender equality and inclusion, mitigation of natural health infrastructure to protect all citizens from all disasters and environmental protection; Citizen kinds of diseases and risks including Corona and friendly governance system increase access to health care Development of strong mutual partnership with the Development of an inter-sectoral coordination Government of Nepal and the local level to further mechanism to create employment for those returning embody the concept of cooperation, coordination and from foreign employment and for the availability of co-existence. employment due to the decline in internal employment due to COVID19 Increase contribution to enhance the public welfare role of the state by fulfilling the fundamental rights Emphasis on technical and skill based education to and entitlements of the citizens increase people's income, create employment and develop self-reliance and its interdependence with Contribution of the Federal Government to the agriculture, tourism and industry objective of building an uplifting, elevated, independent, prosperous and socialist oriented Development and expansion of clean drinking water economy and housing, roads, irrigation, transportation, urban infrastructure and information technology Cooperation and coordination with private sector, cooperatives and community sector to ensure expected results in resource mobilization and social issues 2 Budget Structure Inter-Governmental Fiscal Transfers Financial 7.06% Management 0.10% Budget in Rs Percent% Nature of the Expenditure ‘000’ Recurrent 16046698 39.23 Capital 21925004 53.61 Inter-Governmental Fiscal Transfers 2888245 7.06 Financial Management 40000 0.10 Recurrent 39.23% Total 40899947 100% Capital 53.61% 3 Sources of Expenditure Deficit Financing - Loan with Government of Nepal 12.22% Amount in Rs Percent % Source of Expenditure Internal Source ‘000’ 11.62% Internal Source Cash in Hand- Current 4750747 11.62 Fiscal Year Revenue Sharing 14.67% 10035400 24.54 Federal Grants 15113800 36.95 Revenue Sharing Cash in Hand of Current Fiscal 24.54% Year 6000000 14.67 Deficit Financing - Loan with Government of Nepal 5000000 12.22 40899947 100% Total Federal Grants 36.95% 4 Estimation of Internal Revenue Budget in Percent Details Penalties and Rs ‘000’ % confiscations Real Estate Registration Fee 1315122 27.68 0.64% Miscellaneous Vehicle tax received from distribution 1540425 32.42 Paid by Business revenue Entertain and advertisement tax 53500 1.13 19.79% 0.004% Rent and royalty 501000 10.55 Tourism and hiking fees 1500 0.03 Proceeds from the sale of goods and Real Estate services 111500 2.35 Registration Fee 27.68% Administrative service charges 257000 5.41 Paid by Business 940200 19.79 Penalties and confiscations 30300 0.64 Administrative service Miscellaneous revenue 200 0.004 charges Total 4750747 100% 5.41% Proceeds from the sale of goods and services 2.35% Tourism and hiking fees 0.03% Vehicle tax received from distribution Rent and royalty Entertain and 32.42% 10.55% advertisement tax 1.13% 5 Ministry/ Central Body/ Grant Titled Expenditure Estimation Budget in Rs Percent Ministry / Central Body / Grant Title '000' % Provincial Public Provincial Legislature 235036 0.57 Office of the Chief Service Commission Provincial Public Service Commission 55922 0.14 0.14% Attorney 0.05% Office of the Chief Office of the Chief Attorney 18578 0.05 Provincial Minister and Council of Office of the Chief Minister and Council 1.85 Legislature Ministers 1.85% 0.57% of Ministers 758076 Ministry of Economic Ministry of Economic Affairs and 1.46 थानीय Localतह 7 .Level06% 7.06% Planning 598184 Affairs and Planning Ministry of Industry , Tourism , Forest 8.54 Economic - 1.46% and Environment 3493889 Miscellaneous Ministry of Ministry of Land, Management, 9.37 10.76% Industry , Tourism , Forest Agriculture and Cooperatives 3831633 Economic - Internal and Environment 8.54% Loan Payment Ministry of Internal Affairs and Law 1274089 3.12 0.02% Ministry of Physical Infrastructure 43.85 Development 17932982 Provincial Planning Ministry of Social Development 5302075 12.96 Commission Provincial Planning Commission 42238 0.10 0.10% Ministry of Land Economic-Finance System 30000 0.07 Management , Agri Economic - Internal Loan Payment 10000 0.02 culture and Staff facility and retirement facility 30000 0.07 Economic- Finance Cooperatives 9.37% Economic - Miscellaneous 4399000 10.76 System 0.07% Local level 2888245 7.06 Total 40899947 100% Staff facility Ministry of Internal and retirement Affairs and Law facility 0.07% 3.12% Ministry of Physical Ministry of Social Infrastructure Development Development 12.96% 43.85% 6 Operating Expenditure Estimation Health Entertainment , rel igion , culture and Budget Percent% 6.01% Sector Transport tourism in Rs infrastructure 3.39% Education ‘000’ 19.84% 1.47% General public service 7585811 18.55 Financial transfer to local level 2888245 7.06 Social security Public peace and security 1274089 3.12 0.68% Economic sector 909508 2.22 General economic , trade and labor 242273 0.59 Other industries 114487 0.28 Agriculture , forestry , fisheries and hunting 3635449 8.89 Accommodation General public Environmental protection 1619497 3.96 and community service Accommodation and community facilities 9793070 23.94 facilities 18.55% 23.94% Transport infrastructure 8114068 19.84 Health 2457831 6.01 Entertainment , religion , culture and tourism 1385233 3.39 Education 602317 1.47 Financial transfer to Social security 278069 0.68 local level 7.06% Total 40899947 100% Environmental protection Public peace and 3.96% security 3.12% Agriculture, forestry, Economic sector fisheries and hunting 2.22% 8.89% Other industries General 0.28% economic , trade and labor 0.59% 7 Number and Budget of the programs under federal Supplementary, Special and Conditional Grants Operated by Sectoral Ministries Supplementary Grants Ministry Program Number Budget in Rs. Thousand Ministry of Industry, Tourism, Forests 1 35400 and Environment Ministry of Physical Infrastructure Development 8 807300 Total 9 842700 Special Grants Ministry Program Number Budget in Rs. Thousand Ministry of Land Management, Agriculture 3 230000 and Cooperatives Ministry of Social Development 5 305000 Total 8 535000 Conditional Grants Ministry Program Number Budget in Rs. Thousand Office of the Chief Minister and Council of Ministers 2 412700 Ministry of Industry, Tourism, Forests 5 179,300 and Environment Ministry of Land Management, Agriculture 3 439100 and Cooperatives Ministry of Physical Infrastructure Development 19 3211600 Ministry of Social Development 23 149500 Total 52 5737700 8 Expenditure Estimates (Sustainable Development Goals)1 Sustainable Development Goals Budget in Percent% Rs '000' 0-Not coded 10759763 17-Partnership for 1- End of poverty 405025 1.34 1 Sustainable 1- End of poverty 2-Zero starvation 3635449 12.06 Development 1.34% 3-Healthy life 2752275 9.13 16. Peaceful , 1.96% justifiable and strong 4-Quality education 602317 2.00 2-Zero starvation society 5- Gender equality 88104 0.29 12.06% 9.16% 6-Sustainable clean water and sanitation 15. Use of ground service 1756467 5.83 3-Healthy life surface resources 9.13% 8-Inclusive economic growth and decent 0.85% work 216720 0.72 9. Industry , innovation and infrastructure 6789238 22.53 13 climate change 4-Quality education 10-Inequality reduction 3336490 11.07 friendly 3.62% 2.00% 11-Sustainable cities and settlements 5679950 18.85 12-Sustainable consumption and production 179,300 0.59 13 climate change friendly 1092176 3.62 12-Sustainable 5- Gender equality consumption and 0.29% 15. Use of ground surface resources 254872 0.85 production
Recommended publications
  • "Disappearance" / Fear for Safety/Arbitrary Detention New Concern: Fear of Torture Or Ill-Treatment
    PUBLIC AI Index: ASA 31/146/2004 27 July 2004 Further Information on UA 24/04 (ASA 31/010/2004, 19 January 2004) and follow-up (ASA 31/080/2004, 24 March 2004) - "Disappearance" / Fear for Safety/Arbitrary detention New concern: Fear of torture or ill-treatment NEPAL Pushpa Lal Dhakal (m) aged 31, farmer New Names: Pushpa Neupane (m) aged 25 four other unnamed people Amnesty International is seriously concerned for the safety of Pushpa Lal Dhakal, Pushpa Neupane and four other people who were reportedly rearrested by security forces personnel on 25 July. They were detained immediately after being released from Jhapa District Court, Chandragadi, Bhadrapur municipality and are at risk of torture or ill-treatment. At around 4pm on 25 July, Jhapa District Court reportedly ordered the release of Pushpa Lal Dhakal, Pushpa Neupane and four other people. As soon as they left the court premises they were reportedly arrested by around 50 armed security forces personnel in civilian clothes. Witnesses then saw them being taken away in a van towards Charali Army barracks. According to information received, Pushpa Lal Dhakal was first arrested on 13 January and held at Charali Army barracks for 10 days, where he was reportedly beaten so badly that several of his ribs were broken. He was then transferred to Chandragadi prison, where he was held under the Terrorist and Disruptive Activities (Control and Punishment) Act (TADA). His family were allowed four visits to the Chandragadi prison. On 26 July, Pushpa Lal Dhakal's family were reportedly told by an officer at Charali Army barracks that he was being held there following his rearrest.
    [Show full text]
  • Nepal Human Rights Year Book 2021 (ENGLISH EDITION) (This Report Covers the Period - January to December 2020)
    Nepal Human Rights Year Book 2021 (ENGLISH EDITION) (This Report Covers the Period - January to December 2020) Editor-In-Chief Shree Ram Bajagain Editor Aarya Adhikari Editorial Team Govinda Prasad Tripathee Ramesh Prasad Timalsina Data Analyst Anuj KC Cover/Graphic Designer Gita Mali For Human Rights and Social Justice Informal Sector Service Centre (INSEC) Nagarjun Municipality-10, Syuchatar, Kathmandu POBox : 2726, Kathmandu, Nepal Tel: +977-1-5218770 Fax:+977-1-5218251 E-mail: [email protected] Website: www.insec.org.np; www.inseconline.org All materials published in this book may be used with due acknowledgement. First Edition 1000 Copies February 19, 2021 © Informal Sector Service Centre (INSEC) ISBN: 978-9937-9239-5-8 Printed at Dream Graphic Press Kathmandu Contents Acknowledgement Acronyms and Abbreviations Foreword CHAPTERS Chapter 1 Situation of Human Rights in 2020: Overall Assessment Accountability Towards Commitment 1 Review of the Social and Political Issues Raised in the Last 29 Years of Nepal Human Rights Year Book 25 Chapter 2 State and Human Rights Chapter 2.1 Judiciary 37 Chapter 2.2 Executive 47 Chapter 2.3 Legislature 57 Chapter 3 Study Report 3.1 Status of Implementation of the Labor Act at Tea Gardens of Province 1 69 3.2 Witchcraft, an Evil Practice: Continuation of Violence against Women 73 3.3 Natural Disasters in Sindhupalchok and Their Effects on Economic and Social Rights 78 3.4 Problems and Challenges of Sugarcane Farmers 82 3.5 Child Marriage and Violations of Child Rights in Karnali Province 88 36 Socio-economic
    [Show full text]
  • COVID19 Reporting of Naukunda RM, Rasuwa.Pdf
    स्थानिय तहको विवरण प्रदेश जिल्ला स्थानिय तहको नाम Bagmati Rasuwa Naukunda Rural Mun सूचना प्रविधि अधिकृत पद नाम सम्पर्क नं. वडा ठेगाना कैफियत सूचना प्रविधि अधिकृतसुमित कुमार संग्रौला 9823290882 ६ गोसाईकुण्ड गाउँपालिका जिम्मेवार पदाधिकारीहरू क्र.स. पद नाम सम्पर्क नं. वडा ठेगाना कैफियत 1 प्रमुख प्रशासकीय अधिकृतनवदीप राई 9807365365 १३ विराटनगर, मोरङ 2 सामजिक विकास/ स्वास्थ्यअण प्रसाद शाखा पौडेल प्रमुख 9818162060 ५ शुभ-कालिका गाउँपालिका, रसुवा 3 सूचना अधिकारी डबल बहादुर वि.के 9804669795 ५ धनगढी उपमहानगरपालिका, कालिका 4 अन्य नितेश कुमार यादव 9816810792 ६ पिपरा गाउँपालिका, महोत्तरी 5 6 n विपद व्यवस्थापनमा सहयोगी संस्थाहरू क्र.स. प्रकार नाम सम्पर्क नं. वडा ठेगाना कैफियत 1 2 3 4 5 6 7 8 9 n ारेाइन केको ववरण ID ारेाइन केको नाम वडा ठेगाना केन्द्रको सम्पर्क व्यक्तिसम्पर्क नं. भवनको प्रकार बनाउने निकाय वारेटाइन केको मता Geo Location (Lat, Long) Q1 गौतम बुद्ध मा.वि क्वारेन्टाइन स्थल ३ फाम्चेत नितेश कुमार यादव 9816810792 विध्यालय अन्य (वेड संया) 10 28.006129636870693,85.27118702477858 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11 Qn भारत लगायत विदेशबाट आएका व्यक्तिहरूको विवरण अधारभूत विवरण ारेाइन/अताल रफर वा घर पठाईएको ववरण विदेशबाट आएको हो भने मात्र कैिफयत ID नाम, थर लिङ्ग उमेर (वर्ष) वडा ठेगाना सम्पर्क नं.
    [Show full text]
  • NEPAL: Preparing the Secondary Towns Integrated Urban
    Technical Assistance Consultant’s Report Project Number: 36188 November 2008 NEPAL: Preparing the Secondary Towns Integrated Urban Environmental Improvement Project (Financed by the: Japan Special Fund and the Netherlands Trust Fund for the Water Financing Partnership Facility) Prepared by: Padeco Co. Ltd. in association with Metcon Consultants, Nepal Tokyo, Japan For Department of Urban Development and Building Construction This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. TA 7182-NEP PREPARING THE SECONDARY TOWNS INTEGRATED URBAN ENVIRONMENTAL IMPROVEMENT PROJECT Volume 1: MAIN REPORT in association with KNOWLEDGE SUMMARY 1 The Government and the Asian Development Bank agreed to prepare the Secondary Towns Integrated Urban Environmental Improvement Project (STIUEIP). They agreed that STIUEIP should support the goal of improved quality of life and higher economic growth in secondary towns of Nepal. The outcome of the project preparation work is a report in 19 volumes. 2 This first volume explains the rationale for the project and the selection of three towns for the project. The rationale for STIUEIP is the rapid growth of towns outside the Kathmandu valley, the service deficiencies in these towns, the deteriorating environment in them, especially the larger urban ones, the importance of urban centers to promote development in the regions of Nepal, and the Government’s commitments to devolution and inclusive development. 3 STIUEIP will support the objectives of the National Urban Policy: to develop regional economic centres, to create clean, safe and developed urban environments, and to improve urban management capacity.
    [Show full text]
  • Reflections & Learning
    Reflections & Learning 2015 1 NEPAL REFLECTIONS & LEARNING 2015 2 ActionAid Nepal DISCLAIMERS The materials and the geographical designations in this report do not imply the expression of any opinion whatsoever on the part of ActionAid Nepal concerning the legal status of the country, zones, districts, municipalities, VDCs or areas or concerning the delimitation of its boundaries. COPYRIGHTS ActionAid Nepal (AAN) reserves all rights of ownership (copyrights) of this document. Therefore, no part of this document can be reproduced, stored in a retrieval system or transmitted in any form or by any means, without written permission of AAN. However, readers are free to make use of it for non-commercial purposes in the course of development work. AAN asks, however, that proper acknowledgements be given whenever this document is so used, and that a copy of any document produced with the assistance of original materials quoted from this document be sent to AAN for inclusion in its Library or Documentation Centre. DESIGN & PRINT PROCESS TheSquare Design Communication Pvt. Ltd. [email protected] www.thesquare.com.np Printed in Nepal. Reflections & Learning 2015 3 REFLECTIONS & LEARNING 2015 VISION MISSION “A Nepal without poverty “To work with people and injustice in which living in poverty and every person enjoys his excluded people to or her right to a life of eradicate poverty dignity.” and injustice.” WE BELIEVE Poverty is a denial and violation of human rights stemming from a historical process of exclusion and injustice. It is a complex, dynamic OUR APPROACH and multifaceted phenomenon We adopt a human rights-based WE WORK WITH associated with social constructs, approach as our overarching such as gender, caste, ethnicity, Women, Dalits, highly framework to fight poverty, location, physical ability and class.
    [Show full text]
  • BIRATNAGAR, 18–20 March 2014 Prepared by ADB Consultant Team
    Technical Assistance Consultant’s Report Project Number: 44140 Date: March 2014 TA 7566-REG: Strengthening and Use of Country Safeguard Systems Subproject: Strengthening Involuntary Resettlement Safeguard Systems (Nepal) CAPACITY ENHANCEMENT TRAINING ON SOCIAL SAFEGUARDS SYSTEM BIRATNAGAR, 18–20 March 2014 Prepared by ADB Consultant Team This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. Training Report Capacity Enhancement Training On Social Safeguards System. 18-20 March 201 Biratnagar TA 7566 REG: Strengthening and Use of Country Safeguards System. NEP Subproject: Strengthening Involuntary Resettlement Safeguard Systems in Nepal niri CET Report Biratnagar 18-20-3-014 – Table of Contents 1 Background: ............................................................................................................................................... 4 1.1. Objectives of the training ................................................................................................................... 4 1.2. Training Schedule: .............................................................................................................................. 4 2. Commencement of the training ................................................................................................................ 4 2.1.Output of the day: .............................................................................................................................
    [Show full text]
  • Forests and Watershed Profile of Local Level (744) Structure of Nepal
    Forests and Watershed Profile of Local Level (744) Structure of Nepal Volumes: Volume I : Forest & Watershed Profile of Province 1 Volume II : Forest & Watershed Profile of Province 2 Volume III : Forest & Watershed Profile of Province 3 Volume IV : Forest & Watershed Profile of Province 4 Volume V : Forest & Watershed Profile of Province 5 Volume VI : Forest & Watershed Profile of Province 6 Volume VII : Forest & Watershed Profile of Province 7 Government of Nepal Ministry of Forests and Soil Conservation Department of Forest Research and Survey Kathmandu July 2017 © Department of Forest Research and Survey, 2017 Any reproduction of this publication in full or in part should mention the title and credit DFRS. Citation: DFRS, 2017. Forests and Watershed Profile of Local Level (744) Structure of Nepal. Department of Forest Research and Survey (DFRS). Kathmandu, Nepal Prepared by: Coordinator : Dr. Deepak Kumar Kharal, DG, DFRS Member : Dr. Prem Poudel, Under-secretary, DSCWM Member : Rabindra Maharjan, Under-secretary, DoF Member : Shiva Khanal, Under-secretary, DFRS Member : Raj Kumar Rimal, AFO, DoF Member Secretary : Amul Kumar Acharya, ARO, DFRS Published by: Department of Forest Research and Survey P. O. Box 3339, Babarmahal Kathmandu, Nepal Tel: 977-1-4233510 Fax: 977-1-4220159 Email: [email protected] Web: www.dfrs.gov.np Cover map: Front cover: Map of Forest Cover of Nepal FOREWORD Forest of Nepal has been a long standing key natural resource supporting nation's economy in many ways. Forests resources have significant contribution to ecosystem balance and livelihood of large portion of population in Nepal. Sustainable management of forest resources is essential to support overall development goals.
    [Show full text]
  • ANNUAL REPORT 2013/14 A.D.(2070/71 B.S.) 2 Sunrise Bank Limited Seventh Annual Report 2013/14 BOARD of DIRECTORS
    ;g\/fOh a}+s lnld6]8 SUNRISE BANK LIMITED RISING TO SERVE www.sunrisebank.com.np ANNUAL REPORT 2013/14 A.D.(2070/71 B.S.) 2 Sunrise Bank Limited Seventh Annual Report 2013/14 BOARD OF DIRECTORS MR. MOTILAL DUGAR Chairman DR. BHOGENDRA GURAGAIN ER. BACHH RAJ TATER MR. SHRAWAN KUMAR GOYAL MR. MALCHAND DUGAR Director Director Director Director DR. DEEPAK PRASAD MR. DEEPAK NEPAL MR. JYOTI KUMAR BEGANI MR. SHANKHAR PD. DAHAL BHATTARAI Public Director Public Director Professional Director Public Director MR. ISHWOR KUMAR PATHAK (Company Secretary) Seventh Annual Report 2013/14 Sunrise Bank Limited 3 FINANCIAL GLANCE OF THE YEAR 2013/14 DEPOSITS GROSS LOANS NET PROFIT 26,617M 20,978M 247M 14% 14% 21% NET INTEREST OTHER OPETATING STAFF & INCOME INCOME OPERATING COST 1,095M 309M 624M 11% 15% 14% LOAN LOSS PROVISION TAX TO PROVISION WRITE BACK GOVERNMENT 467M 94M 124M 27% 55% 16% NET INTEREST SPREAD NPA PERCENTAGE LIQUIDITY 4.55% 4.94% 33.31% 0.21% 1.20% 0.20% CAPITAL ADEQUACY EARNING PER SHARE CLOSING SHARE PRICE 11.49% 11.03 510 0.31% 4.43 278 NO OF EMPLOYEES NO OF BRANCHES/ATM NO OF ACCOUNTS 445 51/61* 2,50,000 5 2/4 16% (* Currently Bank has 53 brances & 64 ATMs) (M = million) 4 Sunrise Bank Limited Seventh Annual Report 2013/14 CHAIRMAN MESSAGE Dear Shareholders, With the increased market competition as well as I am privileged to welcome all our distinguished bargaining power of customers and compliance with shareholders, guest and stakeholders to the Seventh internal, national and international standards etc Annual General Meeting of Sunrise Bank Limited and it is evident that the bank will have to face several would like to present the Bank’s Annual Report for the challenges in the various aspects in the coming Financial Year 2013/14.
    [Show full text]
  • English Annual Report 18-19.Pdf
    ANNUAL REPORT 2018-19 TOGETHER WE RISE CONTENTS STRATEGIC REPORT An Overview (Vision, Mission, Objectives & Core Values) ................6 Bank’s Performance ..............................................................................................8 Financial Reviews ...................................................................................................9 Macroeconomic-Outlook ..................................................................................10 Customer Centric Business Model .............................................................. 13 CORPORATE GOVERNANCE REPORT OBJECTIVES Governance at A Glance ...................................................................................16 Board of Directors ............................................................................................... 18 The consolidated as well as standalone financial Profile of Directors ..............................................................................................20 statements, prepared in accordance with NFRS, remain the Chairman's Statement ...................................................................................... 23 The CEO’S Point of View ................................................................................. 25 primary source of communication with stakeholders. The Management Team .............................................................................................26 Department Heads .............................................................................................30
    [Show full text]
  • 12Th Annual Report 075/076
    12th Annual Report 075/076 ljifo–;"rL != afx|f}+ ;fwf/0f ;ef ;DaGwL ;"rgf ! @= ;fwf/0f;ef ;DaGwL ;fdfGo hfgsf/Lx? @ #= k|f]S;L kmf/d tyf k|j]zkq # $= ;+rfns ;ldltsf] cWoIfsf] k|ltj]bg % %= ;+rfns ;ldltaf6 k|:t't cf=j= @)&%÷&^ sf] k|ltj]bg & ^= sDkgL P]g @)^# sf] bkmf !)( cg';f/sf] cltl/Qm ljj/0f !@ &= lwtf]kq btf{ tyf lgisfzg lgodfjnL, @)&# sf] lgod @^ sf] pklgod @ ;Fu ;DalGwt cg';"rL !% adf]lhdsf] jflif{s ljj/0f !$ *= n]vfkl/Ifssf] k|ltj]bg !% (= ljQLo cj:yfsf] ljj/0f -jf;nft_ !& !)= gfkmf gf]S;fg ljj/0f !* !!= cGo lj:t[t cfDbfgLsf] ljj/0f !( !@= OlSj6Ldf ePsf] kl/jt{gsf] ljj/0f @) !#= gub k|jfx ljj/0f @@ !$= k|d'v n]vf gLltx? tyf n]vf ;DaGwL l6Kk0fLx? @$ !%= ljlQo ljj/0fsf cg';"rLx? $! !^= Basel III pb\3f]if0f / cGo ljj/0fx? ^$ !&= )=%Ü eGbf dfly z]o/ ePsf z]o/wgLx?sf] ;"rL *) !*= n]vfkl/If0f gePsf] ljQLo ljj/0f *! !(= n]vfkl/If0f gePsf] / n]vfkl/If0f kl5sf] t'ngfTds ljQLo ljj/0f *$ @)= ljQLo ;"rsf+sx? *^ @!= g]kfn /fi6« a+}ssf] :jLs[lt kq *& @@= k|aGwkq / lgodfjnL ;+zf]wgsf] tLg dxn] ljj/0f ** 12th Annual Report 075/076 12th Annual Report 075/076 s]Gb|Lo sfof{noM sdnkf]v/L, sf7df8f}+} sf] afx|f}+ jflif{s ;fwf/0f;ef ;DaGwL ;"rgf ldlt @)&^÷)(÷)# -tb\g';f/ !( l8;]Dj/, @)!(_ ut] a;]sf] ;+rfns ;ldltsf] #*& cf}+ a}7ssf] lg0f{ofg';f/ o; a}+ssf] afx|f}+ aflif{s ;fwf/0f;ef lgDg lnlvt ldlt, :yfg / ;dodf lgDg ljifox¿ pk/ 5nkmn tyf lg0f{o ug{ a:g] ePsf] x'“bf cfb/0fLo ;Dk"0f{ z]o/wgL dxfg'efjx¿sf] pkl:yltsf]nflu cg'/f]w ub{5' .
    [Show full text]
  • Bhojpur Airport
    BHOJPUR AIRPORT Brief Description Bhojpur Airport is situated at Bhojpur Municipality of Bhojpur District, Province No. 1. General Information Name BHOJPUR Location Indicator VNBJ IATA Code BHP Aerodrome Reference Code 1B Aerodrome Reference Point 270851 N/0870303 E Province/District 1(One)/Bhojpur Distance and Direction from City 5 Km South Elevation 1208 m./3962 ft. Contact Off: 977-29420118 Tower: 977-29420118 Fax: 977-29420118 AFS: VNBJYDYX E-mail: [email protected] Operation Hours 16th Feb to 15th Nov 0600LT-1215LT 16th Nov to 15th Feb 0630LT-1215LT Status Operational Year of Start of Operation October, 1978 Serviceability All Weather Land 67195.69 m2 Re-fueling Facility Not Available Service AFIS Type of Traffic Permitted Visual Flight Rules (VFR) Type of Aircraft DHC6, L410, Y12 Schedule Operating Airlines Nepal Airlines Schedule Connectivity Kathmandu, Biratnagar RFF Not Available Infrastructure Condition Airside Runway Type of Surface Bituminous Paved (Asphalt Concrete) Runway Dimension 540 m x 20 m Runway Designation 17/35 Parking Capacity Two DHC6 Types Size of Apron 1800 sq.m. Apron Type Asphalt Concrete / Concrete Passenger Facilities Hotels Yes (city area) Restaurants No Transportations Jeep Banks/ATMs No Internet Facility Wi-Fi Cable TV No Baggage Trolley No Airport Facilities Console One Man Position Tower Console with Associated Equipment and Accessories Communication, Navigation & Surveillance Systems Communication HF SSB, VHF Navigation None Security and Facilitations X-Ray No Metal Detector Hand Held CCTV Surveillance System No UHF Band Communication System No FIDS No Meteorological Services Tower Observation Electro-Mechanical Facilities Supply Condition Single Phase Supply Approach Light No PAPI/APAPI Light No Stand-by-supply Solar/Invertor Air Conditioner No Bhojpur Flight Movement Comparison 2017-2019 Aircraft Movement 372 444 500 436 400 300 Aircraft 2017 2018 2019 Pax Movement 6927 10000 5399 5991 5000 0 Pax 2017 2018 2019 Cargo Movement ( In KGs) 1000 713 265 239 0 Cargo 2017 2018 2019 Profile Edited on 12th Feb, 2020 .
    [Show full text]
  • The Saptakoshi High Dam Project and Its Bio-Physical Consequences in the Arun River Basin: a Geographical Perspective
    The Geographical Journal of Nepal Vol. 13: 167-184, 2020 Doi: http://doi.org/10.3126/gjn.v13i0.28157 Central Department of Geography, Tribhuvan University, Kathmandu, Nepal The Saptakoshi high dam project and its bio-physical consequences in the Arun river basin: A geographical perspective Dil Kumar Rai1 and Tika Ram Linkha2* 1Adaptation for Smallholders in Hilly Areas (ASHA) Project, Government of Nepal/IFAD 2 Dhankuta Multiple Campus, Dhankuta T.U., Nepal (*Corresponding Author: [email protected]) Received: 15 November 2019; Accepted: 05 January 2020; Published: March 2020 Abstract The big project called Saptakoshi high dam is a bilateral project of Indian and Nepalese government under the Koshi agreement. At present, high dam issue is being the great issue especially raising by the inhabitants of upstream in Koshi basin. Therefore, this research paper attempts to examine the bio-physical consequences due to high dam in the upstream of Arun river basin. Geographic Information System (GIS) and Remote Sensing (RS) technology have been used for the spatial analysis to prepare this paper. Spatial data have been taken from topographical map and Digital Elevation Model (DEM) and the attribute data have taken from Central Bureau of Statistics (CBS), Kathmandu. It revealed that approximately 11777 hectors arable plain land will be inundated in Arun river basin only by water with river deposits due to high dam if the high dam will be built at the proposed place and proposed dam height. The proposed place lies 1.6 km upstream from Barahakshetra temple of Sunsari district and the dam height will 269 meters.
    [Show full text]