Revised Builder's Guide to Frost Protected Shallow Foundations

Total Page:16

File Type:pdf, Size:1020Kb

Load more

RevisedRevised Builder’sBuilder’s GuideGuide toto FrostFrost ProtectedProtected ShallowShallow FoundationsFoundations September 2004 U.S. Department of Housing and Urban Development Office of Policy Development and Research Disclaimer Neither the NAHB Research Center, Inc., nor any person acting in its behalf, makes any warranty, express or implied, with respect to the use of any information, apparatus, method, or process disclosed in this publication or that such use may not infringe privately owned rights, or assumes any liabilities with respect to the use of, or for damages resulting from the use of, any information, apparatus, method, or process disclosed in this publication, or is responsible for statements made or opinions expressed by individual authors. Acknowledgements This guide is intended to simplify the design and construction of frost protected shallow foundations (FPSFs) and promote their widespread use. The underlying data was obtained from National Association of Home Builders (NAHB) members who provided demonstration sites for evaluation of the performance of FPSFs. Richard Morris, of the NAHB, initiated and facilitated the technology transfer into the United States and its acceptance into U.S. model building codes. The U.S. Department of Housing and Urban Development (HUD) has provided continuing support in the effort to advance the use of FPSFs. We acknowledge the American Society of Civil Engineers’ (ASCE) for permission to publish values that are contained in Tables 4 and A1 in SEI/ASCE 32-01, Design and Construction of Frost-Protected Shallow Foundations, 2001, authored and published by the ASCE. This guide represents the efforts of numerous contributors over a period of more than ten years. NAHB Research Center staff members, Jay Jones, P.E., Marie Del Bianco, G. Robert Fuller, P.E. and Edith Crane amended and edited this version. NAHB Research Center, Inc. Upper Marlboro, MD CONTENTS INTRODUCTION ................................................................................ 1 Background ....................................................................................................................... 1 DESIGN PROCEDURE...................................................................... 4 Applications/Limitations..................................................................................................... 4 Insulation Selection ........................................................................................................... 4 Simplified FPSF Design Method – Heated Buildings ........................................................ 6 Detailed FPSF Design Method – Heated Buildings ........................................................ 10 Design Steps – Detailed FPSF Design Method for Heated Buildings .................................................... 12 Detailed FPSF Design Method – Unheated Buildings .................................................... 17 Design Steps – Detailed FPSF Design Method for Unheated Buildings ................................................ 18 CONSTRUCTION METHODS AND DETAILS ................................. 20 General ........................................................................................................................... 20 Brick veneer ............................................................................................................................................ 20 Cold bridges, prevention ......................................................................................................................... 21 Drainage ................................................................................................................................................. 21 Energy efficiency .................................................................................................................................... 22 Excavation .............................................................................................................................................. 22 Foundation height ................................................................................................................................... 22 Freeze protection during construction .................................................................................................... 22 Heated slabs ........................................................................................................................................... 22 Landscaping and horizontal insulation ................................................................................................... 22 Insulation protection ............................................................................................................................... 22 Monolithic Slab ................................................................................................................ 23 Independent Slab and Stem Wall.................................................................................... 23 Unventilated Crawlspace ................................................................................................ 25 Unheated Areas in Otherwise Heated Buildings ............................................................. 25 APPENDIX I ..................................................................................... 27 Sources for Polystyrene Foam Insulation Protective Coatings APPENDIX II .................................................................................... 28 Common Questions and Answers about FPSFs APPENDIX III ................................................................................... 31 Building Material R-Values APPENDIX IV................................................................................... 32 Insulation Requirements for Energy Conservation REFERENCES................................................................................. 34 A Builder’s Guide to Frost Protected Shallow Foundations LIST OF TABLES AND FIGURES LIST OF TABLES Table 1. Building Classification Based on Indoor Air Temperature (T) ................................................. 4 Table 2. Design Values for FPSF Insulation Materials ......................................................................... 5 Table 3. Minimum Insulation Requirements for FPSFs in Heated Buildings – Simplified Method ....... 7 Table 4. Minimum Thermal Resistance of Vertical Wall Insulation (Rv) ............................................. 15 Table 5. Foundation Depths ............................................................................................................... 15 Table 6. Minimum Thermal Resistance of Horizontal Insulation along Walls (Rhw) ............................ 16 Table 7. Minimum Thermal Resistance of Horizontal Insulation at Corners (Rhc) .............................. 16 Table 8. Minimum Values for Design of FPSFs in Unheated Buildings.............................................. 19 Table 9. Nominal Thermal Resistance of Common Materials ............................................................ 31 Table 10. Insulation Requirements for FPSFs vs. Insulation Requirements for Energy Conservation in Heated Buildings ............................................................................................................... 33 LIST OF FIGURES Figure 1. Sections of Foundation Types ................................................................................................ 1 Figure 2. Frost Penetration into the Ground Under Various Conditions ................................................ 2 Figure 3. Frost Protected Shallow Foundation Heat Flow Diagram for a Heated Building .................... 3 Figure 4. Air-Freezing Index Map (Estimated 100 Year Return Period) ................................................ 6 Figure 5. FPSF Simplified Design Parameters – Heated Buildings ...................................................... 8 Figure 6. FPSF Detailed Design Parameters – Heated Buildings ....................................................... 11 Figure 7. FPSF Detailed Design Parameters – Unheated Buildings ................................................... 17 Figure 8. Brick Veneer Application ....................................................................................................... 20 Figure 9. Typical Illustrations of Cold Bridges ..................................................................................... 21 Figure 10. Typical FPSF Monolithic Slab ............................................................................................... 23 Figure 11. Independent Block Stem Wall .............................................................................................. 24 Figure 12. Typical Permanent Wood FPSF ...........................................................................................24 Figure 13. Typical Unventilated Crawlspace .......................................................................................... 25 Figure 14. Typical Detail for Unheated Area .......................................................................................... 26 Figure 15. Typical Detail at Garage (FPSF Adjacent to Conventional) .................................................. 26 A Builder’s Guide to Frost Protected Shallow Foundations INTRODUCTION Background A frost protected shallow foundation (FPSF) is a practical alternative to a deeper, more-costly foundation in cold regions with seasonal ground freezing and the potential for frost heave. The International Residential Code®
Recommended publications
  • SECTION 3 Erosion Control Measures

    SECTION 3 Erosion Control Measures

    SECTION 3 Erosion Control Measures 1. SEEDING When • Bare soil is exposed to erosive forces from wind and or water. Why • A cost effective way to prevent erosion by protecting the soil from raindrop impact, flowing water and wind. • Vegetation binds soil particles together with a dense root system, increasing infiltration thereby reducing runoff volume and velocity. Where • On all disturbed areas except where non-vegetative stabilization measures are being used or where seeding would interfere with agricultural activity. Scheduling • During the recommended temporary and permanent seeding dates outlined below. • Dormant seeding is acceptable. How 1. Site Assessment. Determine site physical characteristics including available sunlight, slope, adjacent topography, local climate, proximity to sensitive areas or natural plant communities, and soil characteristics such as natural drainage class, texture, fertility and pH. 2. Seed Selection. Use seed with acceptable purity and germination tests that are viable for the planned seeding date. Seed that has become wet, moldy or otherwise damaged is unacceptable. Select seed depending on, location and intended purpose. A mixture of native species for permanent cover may provide some advantages because they have coevolved with native wildlife and other plants and typically play an important function in the ecosystem. They are also adapted to the local climate and soil if properly selected for site conditions; can dramatically reduce fertilizer, lime and maintenance requirements; and provide a deeper root structure. When re- vegetating natural areas, introduced species may spread into adjacent natural areas, native species should be used. Noxious or aquatic nuisance species shall not be used (see list below). If seeding is a temporary soil erosion control measure select annual, non-aggressive species such as annual rye, wheat, or oats.
  • Promoting Geosynthetics Use on Federal Lands Highway Projects

    Promoting Geosynthetics Use on Federal Lands Highway Projects

    Promoting Geosynthetics Use on Federal Lands Highway Projects Publication No. FHWA-CFL/TD-06-009 December 2006 Central Federal Lands Highway Division 12300 West Dakota Avenue Lakewood, CO 80228 FOREWORD The Federal Lands Highway (FLH) of the Federal Highway Administration (FHWA) promotes development and deployment of applied research and technology applicable to solving transportation related issues on Federal Lands. The FLH provides technology delivery, innovative solutions, recommended best practices, and related information and knowledge sharing to Federal agencies, Tribal governments, and other offices within the FHWA. The objective of this study was to provide guidance and recommendations on the potential of systematically including geosynthetics in highway construction projects by the FLH and their client agencies. The study included a literature search of existing· design guidelines and published work on a range of applications that use geosynthetics. These included mechanically stabilized earth walls, reinforced soil slopes, base reinforcement, pavements, and various road applications. A survey of personnel from the FLH and its client agencies was performed to determine the current level of geosynthetic use in their practice. Based on the literature review and survey results, recommendations for possible wider use of geosynthetics in the FLH projects are made and prioritized. These include updates to current geosynthetic specifications, the offering of training programs, development of analysis tools that focus on applications of interest to the FLH, and further studies to promote the improvement of nascent or existin esign methods. Notice This document is disseminated under the sponsorship of the U.S. Department of Transportation (DOT) in the interest of information exchange. The U.S.
  • Freezing in Naples Underground

    Freezing in Naples Underground

    THE ARTIFICIAL GROUND FREEZING TECHNIQUE APPLICATION FOR THE NAPLES UNDERGROUND Giuseppe Colombo a Construction Supervisor of Naples underground, MM c Technicalb Director MM S.p.A., via del Vecchio Polit Abstract e Technicald DirectorStudio Icotekne, di progettazione Vico II S. Nicola Lunardi, all piazza S. Marco 1, The extension of the Naples Technical underground Director between Rocksoil Pia S.p.A., piazza S. Marc Direzionale by using bored tunnelling methods through the Neapo Cassania to unusually high heads of water for projects of th , Pietro Lunardi natural water table. Given the extreme difficulty of injecting the mater problem of waterproofing it during construction was by employing artificial ground freezing (office (AGF) district) metho on Line 1 includes 5 stations. T The main characteristics of this ground treatment a d with the main problems and solutions adopted during , Vittorio Manassero aspects of this experience which constitutes one of Italy, of the application of AGF technology. b , Bruno Cavagna e c S.p.A., Naples, Giovanna e a Dogana 9,ecnico Naples 8, Milan ion azi Sta o led To is type due to the presence of the Milan zza Dante and the o 1, Milan ial surrounding thelitan excavation, yellow tuff, the were subject he stations, driven partly St taz Stazione M zio solved for four of the stations un n Università ic e ds. ip Sta io zione Du e omo re presented in the text along the major the project examples, and theat leastsignificant in S t G ta a z r io iibb n a e Centro lldd i - 1 - 1.
  • Report 2008/05 Pacific Earthquake Engineering Research Center College of Engineering University of California, Berkeley August 2008

    Report 2008/05 Pacific Earthquake Engineering Research Center College of Engineering University of California, Berkeley August 2008

    PACIFIC EARTHQUAKE ENGINEERING RESEARCH CENTER Performance-Based Earthquake Engineering Design Evaluation Procedure for Bridge Foundations Undergoing Liquefaction-Induced Lateral Ground Displacement Christian A. Ledezma and Jonathan D. Bray University of California, Berkeley PEER 2008/05 AUGUST 2008 Performance-Based Earthquake Engineering Design Evaluation Procedure for Bridge Foundations Undergoing Liquefaction-Induced Lateral Ground Displacement Christian A. Ledezma and Jonathan D. Bray, Ph.D., P.E. Department of Civil and Environmental Engineering University of California, Berkeley PEER Report 2008/05 Pacific Earthquake Engineering Research Center College of Engineering University of California, Berkeley August 2008 ABSTRACT Liquefaction-induced lateral ground displacement has caused significant damage to pile foundations during past earthquakes. Ground displacements due to liquefaction can impose large forces on the overlying structure and large bending moments in the laterally displaced piles. Pile foundations, however, can be designed to withstand the displacement and forces induced by lateral ground displacement. Piles may actually “pin” the upper layer of soil that would normally spread atop the liquefied layer below it into the stronger soils below the liquefiable soil layer. This phenomenon is known as the “pile-pinning” effect. Piles have been designed as “pins” across liquefiable layers in a number of projects, and this design methodology was standardized in the U.S. bridge design guidance document MCEER/ATC-49-1. A number of simplifying assumptions were made in developing this design procedure, and several of these assumptions warrant re-evaluation. In this report, some of the key assumptions involved in evaluating the pile-pinning effect are critiqued, and a simplified probabilistic design framework is proposed for evaluating the effects of liquefaction-induced displacement on pile foundations of bridge structures.
  • JBT Lecture Paper

    JBT Lecture Paper

    JACKED BOX TUNNELLING Using the Ropkins System TM , a non-intrusive tunnelling technique for constructing new underbridges beneath existing traffic arteries DR DOUGLAS ALLENBY, Chief Tunnelling Engineer, Edmund Nuttall Limited JOHN W T ROPKINS, Managing Director, John Ropkins Limited Lecture presented at the Institution of Mechanical Engineers Held at 1 Birdcage Walk, London On Wednesday 17 October 2007 © Institution of Mechanical Engineers 2007 This publication is copyright under the Berne Convention and the International Copyright Convention. All rights reserved. Apart from any fair dealing for the purpose of private study, research, criticism or review, as permitted under the Copyright, Designs and Patent Act, 1988, no part of this publication may be reproduced, stored in a retrieval system or transmitted in any form or by any means without the prior permission of the copyright owners. Reprographic reproduction is permitted only in accordance with the terms of licenses issued by the Copyright Licensing Agency, 90 Tottenham Court Road, London W1P 9HE. Unlicensed multiple copying of the contents of the publication without permission is illegal. Jacked Box Tunnelling using the Ropkins System TM , a non-intrusive tunnelling technique for constructing new underbridges beneath existing traffic arteries Dr Douglas Allenby BSc(Hons) PhD CEng FICE FIMechE FGS, Chief Tunnelling Engineer, Edmund Nuttall Limited John W T Ropkins BSc CEng MICE, Managing Director, John Ropkins Limited The Ropkins System TM is a non-intrusive tunnelling technique that enables engineers to construct underbridges beneath existing traffic arteries in a manner that avoids the cost and inconvenience of traffic disruption associated with traditional construction techniques. The paper outlines a tunnelling system designed to install large open ended rectangular reinforced concrete box structures at shallow depth beneath existing railway and highway infrastructure.
  • Soils and Foundations: 2012 IBC

    Soils and Foundations: 2012 IBC

    Soils and Foundations January 2016 State of Connecticut Department of Administrative Services Division of Construction Services Office of Education and Data Management Soils and Foundations: 2012 IBC Presented by Douglas M. Schanne, Training Program Supervisor, OEDM for the Office of Education and Data Management Spring 2016 Career Development Series Soils and Foundations • Seminar will review the International Building Code requirements for soils and foundations: – Geotechnical investigations, foundation and soils – excavation, grading and fill, – load bearing values of soils, – dampproofing and waterproofing – design and construction of foundations • Shallow Foundations • Deep Foundations Office of Education and Data Management - January 2016 Career Development 2016 OEDM Career Development 1 Soils and Foundations January 2016 Chapter 18 ‐Soils and Foundations International Building Code 2012 • 1801 General • 1802 Definitions • 1803 Geotechnical Investigations • 1804 Excavation, Grading, and Fill • 1805 Dampproofing & Waterproofing • 1806 Presumptive Load‐Bearing Values of Soils • 1807 Walls, Posts, Poles • 1808 Foundations • 1809 Shallow Foundations • 1810 Deep Foundations 2016 OEDM Career Development 2 Soils and Foundations January 2016 Section 1801 General • Scope – The provisions of IBC Chapter 18 Soils and Foundations applies to building and foundation systems Section 1801 General • Design – Allowable bearing pressure, allowable stresses and design formulas provided shall be used with the allowable stress design load combinations
  • Settlement of Shallow Foundations Near Reinforced Slopes

    Settlement of Shallow Foundations Near Reinforced Slopes

    Settlement of Shallow Foundations near Reinforced Slopes Mehdi Raftari Department of Civil Engineering, Khorramabad Branch, Islamic Azad University, Khorramabad, Iran [email protected] Prof. Dr. Khairul Anuar Kassim Department of Geotechnics & Transportation, Faculty of Civil Engineering, UTM, Johor, Malaysia [email protected] Dr. Ahmad Safuan A.Rashid Department of Geotechnics & Transportation, Faculty of Civil Engineering, UTM, Johor, Malaysia [email protected] Hossein Moayedi Faculty of Engineering, Kermanshah University of Technology Kermanshah, Iran [email protected] ABSTRACT Nowadays, there are many situations that foundations are built near the slopes. To design such foundations large settlement towards the slope are expected. To reduce the settlement as well as increasing the bearing ratio, using the geosynthetic reinforcement is common. In some cases the slope is reinforced and this reinforcement could have a significant impact on decrease of shallow foundation settlement on it. In this paper we selected five different slopes from the Lorestan province located in Iran and reinforced it with the appropriate reinforcement. To analyze the models using the Finite Element Method (FEM), the Plaxis 8.2 was used. Firstly, the settlements of shallow foundation on both reinforced and unreinforced slope were compared. Then other important parameters such as number of layers, vertical spacing between layers, and distance from foundation to slope crest during the design of reinforced structures were tested. As a result, the nearer placement of the footing to crest of the slope increases the settlement, however using the reinforcement could significantly decreases the mentioned settlement. KEYWORDS: Geosynthetic; Reinforced slope; Plaxis; Finite Element analysis INTRODUCTION Increase in the bearing capacity of shallow foundations on slopes is being always one of the concerns for designers to design appropriate structures such as building’s foundations, roads, and railways[1].
  • Frost-Protected Shallow Foundations Found Near the Building

    Frost-Protected Shallow Foundations Found Near the Building

    energysmartdetails d ig less, insulate more Because most rigid insulation is either 24 in. from greenbuildingadvisor.com by martin holladay wide or 48 in. wide, it makes sense to design a Although not code-required, continuous horizontal insulation under frost-protected shallow foundation to be 24 in. the slab can be used to reduce heat deep at the perimeter, with 16 in. below grade loss through the floor. and 8 in. above grade. 1 Frost-protected Metal flashing with ⁄4-in. drip leg Protective covering applied to above-grade rigid foam Around the perimeter of the slab, shallow foundations vertical rigid foam insulates the foundation. he footings of most foundations are placed below the frost insulating your foundation walls enough to achieve the necessary Horizontal wing insulation builder’s tip depth. In colder areas of the United States, this can mean R-value for a shallow foundation. extends out from the bottom excavating and pouring concrete 4 ft. or more below grade. Let’s say you’re building a frost-protected shallow foundation in edge of the foundation, at Monolithic-slab t least 12 in. below grade, foundations require If you include enough rigid-foam insulation around a foundation, a Minnesota town with an air-freezing index of 2500. According to to retain heat in the soil a perimeter trench. however, you can keep the soil under the house warm enough to code requirements for frost-protected shallow foundations found near the building. It can be If vertical insulation sloped slightly away from the permit shallow excavations, which can be 12 in.
  • Types of Foundations

    Types of Foundations

    Lecture Note COSC 421 1 (M.E. Haque) TYPES OF FOUNDATIONS Foundation Systems Shallow Foundation Deep Foundation Pile Foundation Pier (Caisson) Foundation Isolated spread Wall footings Combined Cantilever or footings footings strap footings Raft or Mat foundation Lecture Note COSC 421 2 (M.E. Haque) Shallow Foundations – are usually located no more than 6 ft below the lowest finished floor. A shallow foundation system generally used when (1) the soil close the ground surface has sufficient bearing capacity, and (2) underlying weaker strata do not result in undue settlement. The shallow foundations are commonly used most economical foundation systems. Footings are structural elements, which transfer loads to the soil from columns, walls or lateral loads from earth retaining structures. In order to transfer these loads properly to the soil, footings must be design to • Prevent excessive settlement • Minimize differential settlement, and • Provide adequate safety against overturning and sliding. Types of Footings Column Footing Isolated spread footings under individual columns. These can be square, rectangular, or circular. Lecture Note COSC 421 3 (M.E. Haque) Wall Footing Wall footing is a continuous slab strip along the length of wall. Lecture Note COSC 421 4 (M.E. Haque) Columns Footing Combined Footing Property line Combined footings support two or more columns. These can be rectangular or trapezoidal plan. Lecture Note COSC 421 5 (M.E. Haque) Property line Cantilever or strap footings: These are similar to combined footings, except that the footings under columns are built independently, and are joined by strap beam. Lecture Note COSC 421 6 (M.E. Haque) Columns Footing Mat or Raft Raft or Mat foundation: This is a large continuous footing supporting all the columns of the structure.
  • Combined Ground Freezing Application for the Excavation of Connection Tunnels for Centrum Nauki Kopernik Station - Warsaw Underground Line II

    Combined Ground Freezing Application for the Excavation of Connection Tunnels for Centrum Nauki Kopernik Station - Warsaw Underground Line II

    Combined ground freezing application for the excavation of connection tunnels for Centrum Nauki Kopernik Station - Warsaw Underground Line II Achille Balossi Restelli, Elena Rovetto Studio ingegneria Balossi Restelli e Associati Andrea Pettinaroli Studio Andrea Pettinaroli s.r.l. ABSTRACT The Station “C13” of Warsaw Underground Line II, with tunnel crown 10m below the water table, required the excavation of three connection tunnels, underpassing a six-lane in service road tunnel, working from two lateral shafts. After the collapse occurred while digging the first tunnel, the use of artificial ground freezing was chosen to ensure the excavation under safe conditions. A complex freezing pipe geometry and excavation sequencing was necessary because of the interferences of the overlying road tunnel diaphragm wall foundations, shaft internal structures and previous grouting activities. A combined freezing method was used: nitrogen for freezing the tunnel arches, brine for freezing the intermediate wall and for maintenance stages. Sandy and silty sandy layers were frozen around the crowns and sides. No treatment was necessary for the inverts, lying in clay. A monitoring system of ground temperatures and structure movements allowed for successful completion of work in 8 months. INTRODUCTION The C13 Station of the Warsaw Underground-Line II is located on the West bank of the Vistula River. It consists of two shafts and three connecting tunnels, passing under the Wislostrada (WS) Road tunnel. According to the initial geotechnical investigation, tunnels should have been excavated in high- plasticity clay, but during the first borings non cohesive soil was encountered. Additional investigations were performed on both shafts and a more detailed stratigraphy was reconstructed (Lombardi et al.
  • Chapter 18 Soils and Foundations

    Chapter 18 Soils and Foundations

    18_OregonStruct_2014.fm Page 401 Wednesday, May 14, 2014 9:28 AM CHAPTER 18 SOILS AND FOUNDATIONS SECTION 1801 state to practice as such. Such an evaluation and report GENERAL may require the services of persons especially qualified in 1801.1 Scope. The provisions of this chapter shall apply to fields of engineering seismology, earthquake geology or building and foundation systems. geotechnical engineering. 1801.2 Design basis. Allowable bearing pressures, allowable 1803.2.1 Tsunami inundation zone. Some new “essen- stresses and design formulas provided in this chapter shall be tial facilities” and some new “special occupancy struc- used with the allowable stress design load combinations tures” as defined in ORS 455.447 shall not be constructed specified in Section 1605.3. The quality and design of materi- in tsunami inundation zones established by the Depart- als used structurally in excavations and foundations shall ment of Geology and Mineral Industries (DOGAMI), comply with the requirements specified in Chapters 16, 19, unless specifically exempted by ORS 455.446 or given an 21, 22 and 23 of this code. Excavations and fills shall also exception by the DOGAMI governing board. See OAR comply with Chapter 33. Chapter 632, Division 5, adopted by DOGAMI for spe- cific provisions. Some other new “essential facilities,” other “special occupancy structures” and all new “hazard- SECTION 1802 ous facilities” and “major structures” defined in ORS DEFINITIONS 455.447 that are constructed in a tsunami inundation zone 1802.1 Definitions. The following words and terms are are mandated to seek advice from DOGAMI, but are not defined in Chapter 2: necessarily prohibited from tsunami inundation zones.
  • Selection of Shaft Sinking Method for Underground Mining in Khalashpir Coal Field, Khalashpir, Rangpur, Bangladesh

    Selection of Shaft Sinking Method for Underground Mining in Khalashpir Coal Field, Khalashpir, Rangpur, Bangladesh

    IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) ISSN: 2278-1684 Volume 3, Issue 5 (Sep-Oct. 2012), PP 15-20 www.iosrjournals.org Selection of Shaft Sinking Method for Underground Mining in Khalashpir Coal Field, Khalashpir, Rangpur, Bangladesh Atikul Haque Farazi1, Chowdhury Quamruzzaman2, Nasim Ferdous3, Md. Abdul Mumin4, Fansab Mustahid5, A.K.M Fayazul Kabir6 1,2,3,4, 5, 6 (Department of Geology, University of Dhaka, Bangladesh) Abstract : Khalashpir coal field is the 3rd largest coal field in Bangladesh, where coal occurs at depths of 257m to 483m below the surface. Considering the Geological, Geo-environment and other related geo- engineering information, underground mining have been selected there to extract the deposit. In this paper, our concern is about shaft sinking method for underground mining. Depths of the coal seams reveal the necessity of a vertical shaft underground which again needs deep excavation. The problem arises with the excavation because of nearly 138m thick Dupitila Sandstone Formation just 6m below the surface in the area. It is loose, water bearing, containing dominantly porous and permeable sandstone and experiences massive water flow. So, the major concern is that any excavation through this will readily collapse and suffer massive water inrush. This will totally disturb the whole mining work progression and cause economic loss as well. By analyzing the ground condition of the Khalashpir cola field, artificial ground freezing has been identified most appropriate as shaft sinking method to control the ground water and to stabilize the loose soil during excavation. Lawfulness of the method and reason of neglecting other two common shaft sinking methods has been pointed out in this paper.