BRIEF SUMMARY Subject: Proposed 1.5 MTPA Cement Grinding Unit At- Mania, Tehsil- Tangi Choudwar, district, of M/s Emami Cement Limited Limited. (ToR). M/s Emami Cement Limited has proposed to setup 1.5 MTPA Cement Grinding Unit At- Mania, Tehsil- Tangi Choudwar, ,Odisha. The proposed project sites Latitude & Longitude are 200 37’ 17.54”N & 860 0’ 52.40”E. No National Park/wild life sanctuary is involved in setting up plant within 10 km radius o f the project site. The site is about 6.57 km away from nearest town Tangi. Nearest railway station Bayree is 2.28 km away from the proposed project site. Nearest airport is about 44.6 km away from the proposed project site. Total proposed project area is 90 Acre. Total Project Cost is Rs. 401.00 Crore. A budget of Rs. 1244.6 Lakhs and Rs. 63.4 Lakhs are earmarked towards Captial cost and Recurring cost per annum respectively. A budget of Rs. 2005.00 lakhs has been envisaged for CSR activities. This proposed project is listed at S.N. 3 (b) Category ‘B’ under Cement Plants at the State level.

Following are the details of the proposed plant: Production capacities

Portland Pozzolana Cement (PPC), Portland Slag Cement (PSC) and Ordinary portland Cement (OPC)- 1.5 MTPA Clinker, Gypsum, BF Slag and Fly Ash are the major raw materials for the proposed project. Gaseous emission will be controlled by installing air pollution control equipments. Dust suppression will be done by water sprinkling to control fugitive emissions due to transportation activities. Water sprinkling will be done along the haul roads to control dust arising from vehicular movement.

Suitable type and capacities of bag filters will be envisaged for the deducting system at Raw material handling points.

Total water requirement for the proposed project is of 300 M3/Day. Total power requirement for the proposed project is 12000 KVA. Waste water from process will be treated in ETP and will used dust suppression and green belt. RWTP in form of Back Wash will be treated in settling pond and reused in dust suppression.

Domestic wastewater will be treated in septic tank and discharged to soak pit. Zero discharge norms will be maintained in the proposed plant. 1 Dust from APC devices and Ash generated from Hot Air Generator will be reused in process. Sludge from RWTP will be used for landscaping.

Green belt will be developed in 29.7 Acres of the total plant area. Ear muffs/ear plugs will be provided to workers working in high noise prone areas.

The proposed project will provide direct & indirect employment opportunities to the local people of the area. Further, the project will also improve the socio-economic conditions of the people living in the vicinity of the project.