079 Blackdog

Total Page:16

File Type:pdf, Size:1020Kb

079 Blackdog 079 Blackdog Response ID Respondent 1063, 1699 Burness Paull LLP on behalf of Colin and Esther Tawse 1539 Stewart Milne Group 1580 SEPA 1813 N Lamb on behalf of Mrs C Lamb 1809 Scottish Water 1. Issues Settlement Objectives: Support was offered for further development land to be allocated in the settlement (1813). Existing Sites and Development Bids While two submissions supported the retention of M1 site (1063, 1699), another respondent expressed concern about its deliverability, with a number of alternative locations in Potterton suggested instead (1539). One respondent submitted a new bid for site NB1813 to be allocated for housing, in order to provide greater clarity that the site could be brought forward for development. No information was provided on the desired number of houses (1813). Two respondents provided factual information on waste water treatment capacity, flood risk and wider environmental issues, in relation to the development bids (1580, 1809). 2. Actions Settlement Objectives While support for further development land to be allocated is noted, subsequent to the approval of the Aberdeen City and Shire Strategic Development Plan, there is no need for further allocations in Aberdeenshire, unless a local need can be identified. There is no clear local need for further in Blackdog, and none has been identified by the respondent. Existing Sites and Development Bids The technical matters raised by respondents are noted. These issues will be taken into account through the development management process when planning applications are submitted. No further action is required in response to these detailed comments at this stage. Support for the M1 allocation is welcomed. While the concerns about deliverability are noted, the 2014 Draft Housing Land Audit identifies the M1 site as ‘effective’ and therefore capable of contributing toward the housing land. In addition, the 2014 Draft Action Programme shows that the site is progressing, with a masterplan already approved and a planning application for the early release of 48 houses submitted in 2014. The new bid for housing development on NB1813 is noted. This site does not require to be allocated as it is located within the settlement boundary and a planning application could be brought forward under policy SG LSD 4: Infill Development. Policy LSD4 provides sufficient clarity on the sites development potential. In addition, given that the respondent has provided no information on the nature of the development proposed, it is most appropriate to deal with the future use of the site as an application. There is no strategic or local need for further housing in the settlement and therefore no justification for new allocations. Page 1 of 3 3. Committee Recommendations 1. The existing M1 allocation should be retained within the LDP. 2. As no additional needs have been identified within the settlement, there is no reason to allocate additional development land at this stage. Page 2 of 3 4. Committee Decisions 1. Formartine Area Committee agreed the above recommendations at their meeting on 17 June 2014. The committee also agreed an additional recommendation: 3. Further consideration should be given to the possibility of over-washing agreed master plans onto settlement maps. 2. Infrastructure Services Committee noted the recommendation of the Area Committee and agreed them at their meeting of the 3 July 2014. Page 3 of 3 .
Recommended publications
  • August 2019 Newsletter
    August 2019 Newsletter Firstly, thanks very much to you all for your interest and joining Grampian Cycle Partnership! We have been overwhelmed by the many really kind and supportive comments we have received to date. We are absolutely committed to working positively for cycling across the north east. GCP truly believe we can encourage more people to take up cycling or cycle more by working constructively together with the army of committed and enthusiastic people already doing some fantastic pieces of work across the City, Shire and Moray. Over the last few months, GCP has been meeting with partners and other stakeholders on several projects as well as being involved in ongoing cycling issues for the region. We are taking this time to review what’s going on and tell you what we have been up to. We genuinely think it’s an exciting time for cycling in the area and GCP’s partners have been at the forefront. Please find below some information on what we’ve been involved with so far. Westhill to Aberdeen cycle path An initial open meeting was held with cyclists who use this path to discuss the issues and set up a working project group to document these issues and work with the councils to develop the improvements to this important corridor. This cycle path continues to be among the busiest routes in the whole of the north east. Stonehaven to Aberdeen cycle path At our last meeting we committed to form a similar group for the links to and from the City from the south.
    [Show full text]
  • Housing Land Audit 2014
    Housing Land Audit 2014 Aberdeen City Council Aberdeenshire Council Housing Land Audit 2014 A joint publication by Aberdeen City Council and Aberdeenshire Council 1. Introduction 1.1 Purpose of Audit 1 1.2 Preparation of Audit 1 1.3 Housing Market Areas 3 1.4 Land Supply Denitions 4 2. Background to Housing Land Audit 2014 2.1 2014 Draft Housing Land Audit Consultation 5 2.2 Inclusion of Local Development Plan Sites 5 3. Established Housing Land Supply 3.1 Established Housing Land Supply 6 3.2 Greeneld / Browneld Land 7 4. Constrained Housing Land Supply 4.1 Constrained Housing Land Supply 8 4.2 Analysis of Constraints 9 4.3 Constrained Sites and Completions 10 5. Effective Housing Land Supply 5.1 Five Year Effective Supply 12 5.2 Post Five Year Effective Supply 13 5.3 Small Sites 14 5.4 Trends in the Effective Supply 15 6. Housing Requirement and Effective Supply 6.1 Housing Requirement and Effective Supply 17 7. Agreement on Effective Supply 7.1 Agreement on Effective Supply 18 8. Cairngorms National Park Sites 8.1 Cairngorms National Park Sites 19 Appendix 1 Glossary of Terms Denitions used in Housing Land Audit Tables Appendix 2 Detailed Statement of Established, Constrained and Effective Land Supply 2014 for Aberdeen City and Aberdeenshire Tables: - Aberdeen City - Aberdeenshire part of Aberdeen Housing Market Area - Aberdeenshire Rural Housing Market Area Appendix 3 Actual and Anticipated Housing Completions: - Housing Market Areas - Strategic Growth Areas - Aberdeenshire Settlements Appendix 4 Constrained Sites Appendix 5 Long Term Constrained Sites Published August 2014 Aberdeen City Council Aberdeenshire Council Enterprise, Planning & Infrastructure Infrastructure Services Business Hub 4 Woodhill House Ground Floor North Westburn Road Marischal College Aberdeen Broad Street AB16 5GB Aberdeen AB10 1AB 1.
    [Show full text]
  • 291 Bus Time Schedule & Line Route
    291 bus time schedule & line map 291 Aberdeen Union Square - Methlick View In Website Mode The 291 bus line (Aberdeen Union Square - Methlick) has 4 routes. For regular weekdays, their operation hours are: (1) Aberdeen: 6:18 AM - 7:53 PM (2) Fyvie: 11:56 PM (3) Methlick: 6:24 AM (4) Methlick: 5:10 AM - 10:50 PM Use the Moovit App to ƒnd the closest 291 bus station near you and ƒnd out when is the next 291 bus arriving. Direction: Aberdeen 291 bus Time Schedule 50 stops Aberdeen Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 6:18 AM - 7:53 PM War Memorial, Methlick Tuesday 6:18 AM - 7:53 PM Cottonhillock, Methlick Wednesday 6:18 AM - 7:53 PM Cemetery, Methlick Thursday 6:18 AM - 7:53 PM Chapelpark, Methlick Friday 6:18 AM - 7:53 PM Braikley Park, Tarves Saturday 7:23 AM - 7:53 PM School, Tarves Duthie Road, Scotland The Square, Tarves 291 bus Info The Square, Scotland Direction: Aberdeen Stops: 50 Manse Walk, Tarves Trip Duration: 66 min Line Summary: War Memorial, Methlick, East Newseat Of Tolquhon, Pitmedden Cottonhillock, Methlick, Cemetery, Methlick, Chapelpark, Methlick, Braikley Park, Tarves, School, Tarves, The Square, Tarves, Manse Walk, Tarves, East Bonnyton Road, Pitmedden Newseat Of Tolquhon, Pitmedden, Bonnyton Road, Pitmedden, Laurel Terrace, Pitmedden, Church, Laurel Terrace, Pitmedden Pitmedden, Bothwell Terrace, Pitmedden, Post O∆ce, Laurel Cottages, Pitmedden Udny Station, Cherry Row, Udny Station, School, Udny Station, Middle Ardo Smithy, Foveran, Hall, Church, Pitmedden Belhelvie, Park Terrace, Belhelvie,
    [Show full text]
  • Support Directory for Families, Authority Staff and Partner Agencies
    1 From mountain to sea Aberdeenshirep Support Directory for Families, Authority Staff and Partner Agencies December 2017 2 | Contents 1 BENEFITS 3 2 CHILDCARE AND RESPITE 23 3 COMMUNITY ACTION 43 4 COMPLAINTS 50 5 EDUCATION AND LEARNING 63 6 Careers 81 7 FINANCIAL HELP 83 8 GENERAL SUPPORT 103 9 HEALTH 180 10 HOLIDAYS 194 11 HOUSING 202 12 LEGAL ASSISTANCE AND ADVICE 218 13 NATIONAL AND LOCAL SUPPORT GROUPS (SPECIFIC CONDITIONS) 223 14 SOCIAL AND LEISURE OPPORTUNITIES 405 15 SOCIAL WORK 453 16 TRANSPORT 458 SEARCH INSTRUCTIONS 1. Right click on the document and select the word ‘Find’ (using a left click) 2. A dialogue box will appear at the top right hand side of the page 3. Enter the search word to the dialogue box and press the return key 4. The first reference will be highlighted for you to select 5. If the first reference is not required, return to the dialogue box and click below it on ‘Next’ to move through the document, or ‘previous’ to return 1 BENEFITS 1.1 Advice for Scotland (Citizens Advice Bureau) Information on benefits and tax credits for different groups of people including: Unemployed, sick or disabled people; help with council tax and housing costs; national insurance; payment of benefits; problems with benefits. http://www.adviceguide.org.uk 1.2 Attendance Allowance Eligibility You can get Attendance Allowance if you’re 65 or over and the following apply: you have a physical disability (including sensory disability, e.g. blindness), a mental disability (including learning difficulties), or both your disability is severe enough for you to need help caring for yourself or someone to supervise you, for your own or someone else’s safety Use the benefits adviser online to check your eligibility.
    [Show full text]
  • Centrepoint Retail Park Aberdeen Ab25 3Sq
    NEW LETTING TO CENTREPOINT RETAIL PARK ABERDEEN AB25 3SQ PRIME RETAIL PARK TO THE WEST OF ABERDEEN CITY CENTRE LEASE EXTENSION WITH MECCA 94,376 SQ FT | 8768 SQ M / 600 PARKING SPACES / OPEN PLANNING CONSENT NORTH ELLON A90 G T N 20 MINUTE DRIVE TIME STATS O R CLIFTON RD T NEWMACHAR H E R N R O A D 20 MIN BALMEDIE 20 DRIVE TIME 20 MINUTE DRIVE TIME KITTYBREWSTER P O FOR 250,000 PEOPLE BLACKDOG W RETAIL PARK BLACKBURN DYCE IS T E INVERNESS BACK HILTON RD R R ABERDEEN A C INTERNATIONAL E AIRPORT BEDFORD RD ASHGROVE RD A96 ERSKINE ST ABERDEEN ELMBANK TERRACE POWIS TERRACE A96 58.3% BELMONT RD WESTHILL KINGSWELLS LESLIE TERRACE OF TOTAL HOUSEHOLDS ABERDEEN ARE ABC1 HARBOUR CULTS BIELDSIDE SAINSBURY’S PETERCULTER BERRYDEN ROAD COVE CALSAYSEAT RD POWIS PLACE 42% GEORGE STREET LESLIE TERRACE OF POPULATION AGED AWPR ELM PLACE BETWEEN 20 AND 44 Aberdeen Western YEARS OLD Peripheral Route RAILWAY NETWORK - LINKS TO BERRYDEN ROAD NORTHERN AND CHESNUT ROW SOUTHERN CITIES PORTLETHEN SOUTH A90 BERRYDEN 500,000 LOCATION: RETAIL PARK ABERDEEN’S APPROXIMATE Centrepoint Retail Park is located approximately CATCHMENT POPULATION 1 mile North West of Aberdeen city centre. UNDER OFFER BERRYDEN UNIT 3 RETAIL PARK AVAILABLE 285 6500 SQ FT CAR SPACES CENTREPOINT RETAIL PARK 600 CAR SPACES SAINSBURY’S 276 CAR SPACES SAINSBURY’S [85,000 SQ FT / 7897 SQ M] CENTREPOINT RETAIL PARK [94,376 SQ FT / 8768 SQ M] Mecca Bingo Poundland BERRYDEN RETAIL PARK [73,141 SQ FT / 6795 SQ M] Next Argos Mothercare Currys Contact the joint letting agents to discuss asset management opportunities at Centrepoint.
    [Show full text]
  • 75694 Sav Hill of Kier.Indd
    HILL OF KEIR Belhelvie, Aberdeenshire, AB23 8YS Residential development opportunity with planning consent for seven detached homes Hill of Keir Belhelvie, Aberdeenshire, AB23 8YS 2 SUMMARY • Semi-rural setting with views over the North Sea • Available for sale or will consider a joint venture LOCATION The site is in a semi-rural setting to the north of the village of Belhelvie, adjacent to a cluster of houses but otherwise surrounded by countryside and with views over the North Sea. The city of Aberdeen lies approximately 8 miles to the south and the seaside town of Balmedie lies approximately 1.2 miles to the east providing a range of amenities and facilities including a hotel, primary school, golf course and local shops. Trump International Golf Course lies approximately 4 miles to the north. Hill of Keir is accessed off McKays Road, which connects the site to the B977 and onwards to the A90. The site is on the Tarves to Aberdeen bus route with a bus-stop on its corner. The surrounding area will benefit from the Aberdeen Western Peripheral Route (AWPR) which is expected to open late 2018 and will improve access to the south of the city and beyond. Access to the AWPR is approximately 2 miles away at the Balmedie Junction. The industrial estate and supermarkets of Bridge of Don are approximately 5 miles south and construction of a shopping complex, hotel and cinema has been approved at the Blackdog Junction, approximately 5 miles to the south-east. Hill of Keir Belhelvie, Aberdeenshire, AB23 8YS 3 DESCRIPTION The site currently comprises a granite Victorian, five/six Mains water and gas are available and have been included Plots 1-4.
    [Show full text]
  • 22 MAIN STREET, TURRIFF, AB53 4AD 12Th May 2021 IN210458/HP665622 Terms and Conditions
    Single Survey survey report on: Property address 22 MAIN STREET TURRIFF AB53 4AD Customer MR A CARDER & MRS L CARDER Customer address 22 MAIN STREET TURRIFF AB53 4AD Prepared by DM Hall LLP Date of inspection 12th May 2021 22 MAIN STREET, TURRIFF, AB53 4AD 12th May 2021 IN210458/HP665622 Terms and Conditions PART 1 - GENERAL 1.1 THE SURVEYORS The Seller has engaged the Surveyors to provide the Single Survey Report and a generic Mortgage Valuation Report for Lending Purposes. The Seller has also engaged the Surveyors to provide an Energy Report in the format prescribed by the accredited Energy Company. The Surveyors are authorised to provide a transcript or retype of the generic Mortgage Valuation Report on to Lender specific pro-forma. Transcript reports are commonly requested by Brokers and Lenders. The transcript report will be in the format required by the Lender but will contain the same information, inspection date and valuation figure as the generic Mortgage Valuation Report and the Single Survey. The Surveyors will decline any transcript request which requires the provision of information additional to the information in the Report and the generic Mortgage Valuation Report until the Seller has conditionally accepted an offer to purchase made in writing. Once the Seller has conditionally accepted an offer to purchase made in writing, the Purchaser's lender or conveyancer may request that the Surveyors provide general comment on standard appropriate supplementary documentation. In the event of a significant amount of documentation being provided to the Surveyors, an additional fee may be incurred by the Purchaser.
    [Show full text]
  • List of Consultees and Issues.Xlsx
    Name / Organisation Issue Mr Ian Adams Climate change Policy C1 Using resources in buildings Mr Ian Adams Shaping Formartine Newburgh Mr Iain Adams Natural Heritage and Landscape Policy E2 Landscape Mr Ian Adams Shaping Formartine Newburgh Mr Michael Adams Natural Heritage and Landscape Policy E2 Landscape Ms Melissa Adams Shaping Marr Banchory Ms Faye‐Marie Adams Shaping Garioch Blackburn Mr Iain Adams Shaping Marr Banchory Michael Adams Natural Heritage and Landscape Policy E2 Landscape Ms Melissa Adams Natural Heritage and Landscape Policy E2 Landscape Mr Michael Adams Shaping Marr Banchory Mr John Agnew Shaping Kincardine and Mearns Stonehaven Mr John Agnew Shaping Kincardine and Mearns Stonehaven Ms Ruth Allan Shaping Banff and Buchan Cairnbulg and Inverallochy Ruth Allan Shaping Banff and Buchan Cairnbulg and Inverallochy Mrs Susannah Almeida Shaping Banff and Buchan Banff Ms Linda Alves Shaping Buchan Hatton Mrs Michelle Anderson Shaping Kincardine and Mearns Luthermuir Mr Murdoch Anderson Shaping Kincardine and Mearns Luthermuir Mrs Janette Anderson Shaping Kincardine and Mearns Luthermuir Miss Hazel Anderson Shaping Kincardine and Mearns Luthermuir J Angus Shaping Banff and Buchan Cairnbulg and Inverallochy Mrs Eeva‐Kaisa Arter Shaping Kincardine and Mearns Mill of Uras Mrs Eeva‐Kaisa Arter Shaping Kincardine and Mearns Mill of Uras Mr Robert Bain Shaping Garioch Kemnay K Baird Shaping Banff and Buchan Cairnbulg and Inverallochy Rachel Banks Shaping Formartine Balmedie Mrs Valerie Banks Shaping Formartine Balmedie Valerie Banks
    [Show full text]
  • FR025 Land at Cairntack (West), Belhelvie
    4. Site Details Name of the site Land at Cairntack (West), Belhelvie (Please use the LDP name if the site is already allocated) Site address Land at Cairntack (West), Belhelvie OS grid reference (if NJ 947 171 available) Site area/size 3.78 hectares Current land use Currently used for agricultural purposes Brownfield/greenfield Greenfield Please include an Ordnance Survey map (1:1250 or 1:2500 base for larger sites, e.g. over 2ha) showing the location and extent of the site, points of access, means of drainage etc. Location Plan attached along with Indicative Layout Plan. 5. Ownership/Market Interest Ownership Scotia Homes Ltd has an option to acquire the site from (Please list the owners in the landowner listed in question 3 above. question 3 above) Is the site under option to a Yes to Scotia Homes. developer? Is the site being marketed? No. As the site is controlled by the developer. If allocated in the replacement LDP, and granted planning permission, Scotia Homes would commence development and market the units at that time. 6. Legal Issues Are there any legal provisions in the title No deeds that may prevent or restrict development? If yes, please give details (e.g. way leave for utility providers, restriction on use of land, right of way etc.) N/A Are there any other legal factors that might No prevent or restrict development? (e.g. ransom strips/issues with accessing If yes, please give details the site etc.) N/A 3 7. Planning History Have you had any No formal/informal pre-application If yes, please give details: discussions with the Planning Service and what was the The site was promoted for development as part of response? the preparation of the current LDP – see details below.
    [Show full text]
  • The STATE of the EAST GRAMPIAN COAST
    The STATe OF THE eAST GRAMPIAN COAST AUTHOR: EMILY HASTINGS ProjEcT OffIcer, EGcP DEcEMBER 2009 The STATe OF THE eAST GRAMPIAN COAST AUTHOR: EMILY HASTINGS ProjEcT OffIcer, EGcP DEcEMBER 2009 Reproduced by The Macaulay Land Use Research Institute ISBN: 0-7084-0675-0 for further information on this report please contact: Emily Hastings The Macaulay Land Use Research Institute craigiebuckler Aberdeen AB15 8QH [email protected] +44(0)1224 395150 Report should be cited as: Hastings, E. (2010) The State of the East Grampian coast. Aberdeen: Macaulay Land Use Research Institute. Available from: egcp.org.uk/publications copyright Statement This report, or any part of it, should not be reproduced without the permission of The Macaulay Land Use Research Institute. The views expressed by the author (s) of this report should not be taken as the views and policies of The Macaulay Land Use Research Institute. © MLURI 2010 THE MACAULAY LAND USE RESEARCH INSTITUTE The STATe OF THE eAST GRAMPIAN COAST CONTeNTS A Summary Of Findings i 1 introducTIoN 1 2 coastal management 9 3 Society 15 4 EcoNomy 33 5 envIronment 45 6 discussioN and coNcLuSIons 97 7 rEfErences 99 AppendIx 1 – Stakeholder Questionnaire 106 AppendIx 2 – Action plan 109 The STATe OF THE eAST GRAMPIAN COAST A Summary of Findings This summary condenses the findings of the State of the East Grampian coast report into a quick, user friendly tool for gauging the state or condition of the aspects and issues included in the main report. The categories good, satisfactory or work required are used as well as a trend where sufficient data is available.
    [Show full text]
  • Aberdeenshire Weekly List 13 July 2015
    Aberdeenshire Weekly List 13 July 2015 The applications on the attached list have been Registered last week within the Formartine Area of Aberdeenshire Council and can be viewed online at https://upa.aberdeenshire.gov.uk/online-applications/. Community Councils wishing to be consulted on an application should contact the local planning office within 7 working days. Any comments from community councils should be submitted within 14 days, unless an extension of time for comments has been agreed with the planning officer. Any person wishing to make comment on an application should do so in writing to the undersigned by the date specified in the list. You can also make comment online or to the email address below. Please note the date for comment will extend if neighbour notification or advertisement is required. Comments must be submitted within the required timescale and any comments made will be available for public inspection and will be published on the internet. Local Planning Office: 45 Bridge Street, Ellon, AB41 9AA Telephone: 01358-726429 Email: [email protected] Robert Gray Head of Planning and Building Standards Ref Number Site Address /Applicant Name Proposal Case Officer (if applicable) Location Grid Reference APP/2015/2128 Site Address: Sunnyhill, Turriff, Full Planning Permission for Change of Aoife Murphy Aberdeenshire Use from Agricultural Shed to Class 6 Date Validated (Storage) 2 July 2015 Applicant: Mr J Kinsella c/o James G Ironside Ltd, Dunvegan, Victoria Terrace, E.372585 N.850595 Turriff, AB53 4DZ
    [Show full text]
  • Settlements in the Ellon to Blackdog
    ABERDEENSHIRE LOCAL DEVELOPMENT PLAN FINALISED RESPONSE TO PROPOSED PLAN CONSULTATION FORMARTINE – ELLON TO BLACKDOG STRATEGIC GROWTH AREA Issue 56 Spatial Strategy – Ellon to Blackdog Section 4, The Spatial Strategy (p6 - 7) Reporter: Section 6, The Proposals Maps (p21) Schedule 1 Table 4, (p27) Schedule 2 Table 4, (p31) Development plan Schedule 3 (p34 - 41) reference: Schedule 4 (p42) Volume 3F Supplementary Guidance, Settlement Statements Formartine Body or person(s) submitting a representation raising the issue (including reference number): 561 Belhelvie Community Council 924, 925, 926, Knight Frank LLP on behalf of Kirkwood Homes Ltd 1416, 1417, 1422, 1428, 1448 Bancon Developments 1483, 1486, 1511 Halliday Fraser Munro on behalf of Harper and Cochrane 1637, 1944 Archial Planning on behalf of Stewart Milne Homes 1794 Paull & Williamsons LLP on behalf of Scotia Homes Ltd 1816, 1817, 1821 Knight Frank LLP on behalf of Colin and Esther Tawse 1896, 1897 Ryden LLP on behalf of Mr & Mrs Buchan 2674 PPCA Ltd on behalf of Tor Ecosse Ltd Provision of the development plan to Distribution of development within the Ellon which the issue relates: to Blackdog strategic growth corridor. Planning Authority’s summary of the representation(s): Overall approach and phasing Respondents 924, 925, 926, 927 and 1794 support the proposed spatial strategy, which focuses the majority of development in the early phase of the plan to Ellon. 1794 further comments that this will support the school roll at the academy and help produce a solution to traffic congestion in the town centre. 1422 also supports this approach, but questions whether the target of around 150 homes per annum is deliverable.
    [Show full text]