More Than 75.Xlsx
Total Page:16
File Type:pdf, Size:1020Kb
Details of works Uploaded into ProjectShelf 2013-14 (Habitation coverage more than 75%) Expected Total Coverage Expected Sanction Estimated Expenditure Expected Status as Sl. No. District Block Name Panchayat Name Village Name Habitation Name Scheme Name Expenditure Year Cost (Central) _ Expenditure on 01-04- _(State)_(Rs) (Rs) _(Rs) 2013 Providing pumping machinery 2013- 1 BAGALKOT BADAMI HOSUR ANANTAGIRI ANANTAGIRI 4.00 0.00 4.00 4.00 >100 andborewell villagee village 2014 2013- 2 BAGALKOT BADAMI KATARAKI CHIKKANASABI CHIKKANASABI Borewell at chiknasabi village 0.64 0.00 0.64 0.64 >100 2014 2013- 3 BAGALKOT BADAMI KHANAPUR SK KULAGERI KULAGERI CROSS Borewell at kulageri cross 1.33 0.00 1.33 1.33 >100 2014 SUBBALAHUNAS SUBBALAHUNAS Providing pipe line and cistern at 2013- 4 BAGALKOT BADAMI LAYADAGUNDI 2.50 0.00 2.50 2.50 >100 HI HI sabalhunsi village 2014 providing pipe line to aladkatti 2013- 5 BAGALKOT BADAMI MUTTALAGERI ALADAKATTI ALADAKATTI 2.90 0.00 2.90 2.90 >100 village 2014 SINKING OF BW AT TIMMAPUR 2013- 6 BAGALKOT BAGALKOT BILKERUR TIMMAPUR TIMMAPUR 0.92 0.00 0.92 0.92 >100 VILLAGE 2014 WSS TP BANTANUR PANCHYAT 2013- 7 BAGALKOT MUDHOL BHANTANUR BHANTANUR BHANTANUR 1.00 0.00 1.00 1.00 >100 FLUSHING AND DEEPING 2014 WSS TO HEBBAL PANCHYAT 2013- 8 BAGALKOT MUDHOL HEBBAL HEBBAL HEBBAL 20.00 2.00 2.00 4.00 >100 FLUSHING AND DEEPING 2014 WSS TO HEBBAL RC CISTERN & PIPE 2013- 9 BAGALKOT MUDHOL HEBBAL HEBBAL HEBBAL 2.40 0.00 2.40 2.40 >100 LINE 2014 2013- 10 BAGALKOT BADAMI ADAGAL KENDUR KENDUR Borewell at kendur village 0.96 0.00 0.96 0.96 75-100 2014 2013- 11 BAGALKOT BADAMI ADAGAL KENDUR KENDUR providing pipe line to kendur village 2.50 0.00 2.50 2.50 75-100 2014 CHOLACHAGUDD 2013- 12 BAGALKOT BADAMI KHYAD KHYAD Borewell at kyad village 0.62 0.00 0.62 0.62 75-100 A 2014 2013- 13 BAGALKOT BADAMI HALADUR ALLUR SP ALLUR SP Providing pipeline at allur sp village 2.50 0.00 2.50 2.50 75-100 2014 2013- 14 BAGALKOT BADAMI HEBBALLI MALLAPUR MALLAPUR Borewell at mallapur sl village 1.05 0.00 1.05 1.05 75-100 2014 MALAGI 2013- 15 BAGALKOT BADAMI HULAGERI MALAGI Borewell at malgi mohanpur village 2.25 0.00 2.25 2.25 75-100 MOHANAPUR 2014 Providing pumping machinery and 2013- 16 BAGALKOT BADAMI JAMMANAKATTI LAKKASAKOPPA LAKKASAKOPPA 1.50 0.00 1.50 1.50 75-100 pipe lin lakoskoppa villagee village 2014 2013- 17 BAGALKOT BADAMI KAKANUR KAKANUR KAKANUR Borewell at kaknur village 0.71 0.00 0.71 0.71 75-100 2014 2013- 18 BAGALKOT BADAMI MAMATAGERI UGALAWAT UGALAWAT Borewell at ugalwat village 1.95 0.00 1.95 1.95 75-100 2014 KARADIGUDDA KARADIGUDDA providing pipe line to kardigudda sn 2013- 19 BAGALKOT BADAMI MUSTIGERI 1.50 0.00 1.50 1.50 75-100 SN SN village 2014 2013- 20 BAGALKOT BADAMI NEERABUDHIHAL NEERABUDIHAL NEERABUDIHAL Borewell at neerbudihal village 1.91 0.00 1.91 1.91 75-100 2014 2013- 21 BAGALKOT BADAMI NEERALAKERI HAWALAKHOD HAWALAKHOD Borewell at havalkod village 2.18 0.00 2.18 2.18 75-100 2014 Details of works Uploaded into ProjectShelf 2013-14 (Habitation coverage more than 75%) 1 of 68 Expected Total Coverage Expected Sanction Estimated Expenditure Expected Status as Sl. No. District Block Name Panchayat Name Village Name Habitation Name Scheme Name Expenditure Year Cost (Central) _ Expenditure on 01-04- _(State)_(Rs) (Rs) _(Rs) 2013 PROVIDING BW SOURCES AT 2013- 22 BAGALKOT BAGALKOT BHAGAVATI BHAGAVATI BHAGAVATI KIRASUR, TULSIGERI AND KAJJIDONI 5.00 0.00 5.00 5.00 75-100 2014 VILLAGE SINKING OF BW AT BILKERUR 2013- 23 BAGALKOT BAGALKOT BILKERUR BILKERUR BILKERUR 0.50 0.00 0.50 0.50 75-100 VILLAGE 2014 SINKING OF BW AT JADRAMKUNTI 2013- 24 BAGALKOT BAGALKOT KADALIMATTI JADRAMAKUNTI JADRAMAKUNTI 1.19 0.00 1.19 1.19 75-100 RC 2014 2013- 25 BAGALKOT BAGALKOT KADALIMATTI JADRAMAKUNTI JADRAMAKUNTI SINKING OF BW AT JADRAMKUNTI 0.66 0.00 0.66 0.66 75-100 2014 SINKING OF BW AT HONNAKATTI 2013- 26 BAGALKOT BAGALKOT MUGALOLLI HONNAKATTI HONNAKATTI 1.29 0.00 1.29 1.29 75-100 VILLAGE 2014 SINKING OF BOREWELL AT KESAMIR 2013- 27 BAGALKOT BAGALKOT MURNAL KESANUR KESANUR 0.62 0.00 0.62 0.62 75-100 VILLAGE 2014 DRILLING OF BORE WELL AT 2013- 28 BAGALKOT BILAGI KUNDARAGI KUNDARAGI KUNDARAGI 0.39 0.00 0.39 0.39 75-100 KUNDARGI VILLAGE 2014 2013- 29 BAGALKOT JAMAKHANDI KONNUR MAREGUDDI MAREGUDDI sinking of borewell @ mareguddi 0.78 0.00 0.78 0.78 75-100 2014 2013- 30 BAGALKOT JAMAKHANDI KULLALLI KULLALLI KULAHALLI Pumping machine @ Kullalli 0.49 0.00 0.49 0.49 75-100 2014 2013- 31 BAGALKOT JAMAKHANDI KUNCHANUR JAKANUR JAKANUR sinking borewell @ jaknur 0.72 0.00 0.72 0.72 75-100 2014 O&M FOR JAKANUR &OTHER 7 2013- 32 BAGALKOT JAMAKHANDI KUNCHANUR KUNCHANUR KUNCHANUR 22.63 22.63 0.00 22.63 75-100 VILLAGES 2014 2013- 33 BAGALKOT JAMAKHANDI KUNCHANUR KUNCHANUR KUNCHANUR sinking of borewell @ kunchnur 1.40 0.00 1.40 1.40 75-100 2014 WATER SUPPLY SCHEME TO 2013- 34 BAGALKOT MUDHOL DAVALESHWAR DAVALESHWAR DAVALESHWAR 2.00 0.00 2.00 2.00 75-100 DAVALESWAR VILLAGE 2014 MWSS to Kesarakoppa Parappa 2013- 35 BAGALKOT MUDHOL KESARAKOPPA KESARAKOPPA KESARAKOPPA 0.40 0.00 0.40 0.40 75-100 sattigeri tota cistern 2014 WSS TO KESARAKOPPA RC HAND 2013- 36 BAGALKOT MUDHOL KESARAKOPPA KESARAKOPPA KESARAKOPPA 10.00 1.00 1.00 2.00 75-100 PUMP 2014 WATER SUPPLY SCHEME TO 2013- 37 BAGALKOT MUDHOL KESARAKOPPA KESARAKOPPA KESARAKOPPA PARASAPPA SATTIGERI VASTI IN 0.40 0.00 0.40 0.40 75-100 2014 KESARAKOPPA VILLAGE WSS TO MACHKANUR NEAR 2013- 38 BAGALKOT MUDHOL MACHAKANUR MACHAKANUR MACHAKANUR 5.40 0.54 0.54 1.08 75-100 GUDDADA PLOT 2014 WATER SUPPLY SCHEME TO 2013- 39 BAGALKOT MUDHOL MADABHAVI MADABHAVI MADABHAVI BIRADEVAR TEMPLE IN MADABAVI 0.40 0.00 0.40 0.40 75-100 2014 VILLAGE Construction of Cistern at 2013- 40 BAGALKOT MUDHOL MADABHAVI MADABHAVI MADABHAVI 0.40 0.00 0.40 0.40 75-100 madabhavi village 2014 2013- 41 BAGALKOT MUDHOL MADABHAVI MADABHAVI MADABHAVI MWSS to Chandana tota madabhavi 1.50 0.00 1.50 1.50 75-100 2014 WATER SUPPLY SCHEME TO 2013- 42 BAGALKOT MUDHOL MALALI MALALI MALALI KAMTHAR THOTA IN MALALLI 0.45 0.00 0.45 0.45 75-100 2014 VILLAGE WSS TO MALALI VILLAGE SARAWAD 2013- 43 BAGALKOT MUDHOL MALALI MALALI MALALI 15.00 1.50 1.50 3.00 75-100 VASTI 2014 Details of works Uploaded into ProjectShelf 2013-14 (Habitation coverage more than 75%) 2 of 68 Expected Total Coverage Expected Sanction Estimated Expenditure Expected Status as Sl. No. District Block Name Panchayat Name Village Name Habitation Name Scheme Name Expenditure Year Cost (Central) _ Expenditure on 01-04- _(State)_(Rs) (Rs) _(Rs) 2013 MWSS Mantur Budni road side 2013- 44 BAGALKOT MUDHOL MANTUR MANTUR MANTUR 0.33 0.00 0.33 0.33 75-100 Borewell Flushing 2014 MWSS Akkimaradi village 2013- 45 BAGALKOT MUDHOL NAGARAL AKKIMARDI AKKIMARDI 1.00 0.00 1.00 1.00 75-100 PIpelineand Cistern 2014 MWSS to Saidapur Cistern and 2013- 46 BAGALKOT MUDHOL SAIDAPUR SAIDAPUR SAIDAPUR 1.86 0.00 1.86 1.86 75-100 Borewell 2014 WSS TO SHIROL SORGAVA ROAD 2013- 47 BAGALKOT MUDHOL SHIROL SHIROL SHIROL 21.70 2.17 2.17 4.34 75-100 SIDE 2014 WATER SUPPLY SCHEME TO 2013- 48 BAGALKOT MUDHOL BELAGALI BELAGALI BELAGALI JAMKHANDI VASTI IN BELLAGALI 0.50 0.00 0.50 0.50 75-100 2014 VILLAGE water supply to Belagli near navalgi 2013- 49 BAGALKOT MUDHOL BELAGALI BELAGALI BELAGALI 2.41 0.00 2.41 2.41 75-100 road in mudhol taluk 2014 WSS TO BELAGALI NEAR 2013- 50 BAGALKOT MUDHOL BELAGALI BELAGALI BELAGALI MALIGARAYA TEMPLE GUNDA 0.69 0.00 0.69 0.69 75-100 2014 BASAPPA VASTI WSS TO BELAGLI VILLAGE 2013- 51 BAGALKOT MUDHOL BELAGALI BELAGALI BELAGALI SIDDAPUR VASTI NEAR LAXMI 18.20 1.82 1.82 3.64 75-100 2014 TEMPLE 51 BAGALKOT Total 173.64 31.66 69.74 101.40 BANGALORE SOLADEVANAHAL 2013- 52 NELAMANGALA BANASAVADI BANASAVADI Revival of PWS at Banasavadi 2.00 0.00 2.00 2.00 >100 RURAL LI 2014 BANGALORE G.CHOWDAPANA 2013- 53 DEVANHALLI KONDENAHALLI KONDENAHALLI Drilling of Borewe @ Kondenahalli 2.25 0.00 2.25 2.25 75-100 RURAL HALLY 2014 BANGALORE G.CHOWDAPANA 2013- 54 DEVANHALLI NAGENAHALLY NAGENAHALLY Drilling of Borewe @ Nagenahalli 2.25 0.00 2.25 2.25 75-100 RURAL HALLY 2014 BANGALORE CHI CHI 2013- 55 DEVANHALLI NALLURU Pump, motor @ Chimachanahalli 3.00 0.00 3.00 3.00 75-100 RURAL MACHANAHALLY MACHANAHALLY 2014 BANGALORE Providing Pump & Motor At 2013- 56 DEVANHALLI NALLURU MALLEPURA MALLEPURA 3.00 0.00 3.00 3.00 75-100 RURAL Mallepura 2014 BANGALORE VISHWANATHAP Providing Pump & Motor At 2013- 57 DEVANHALLI BEERASANDRA BEERASANDRA 3.00 0.00 3.00 3.00 75-100 RURAL URA Beersandra (boodbande) 2014 BANGALORE 2013- 58 NELAMANGALA SHIVAGANGE SHIVAGANGE SHIVAGANGE Revival of PWS at Shivagange 2.50 0.00 2.50 2.50 75-100 RURAL 2014 BANGALORE 2013- 59 NELAMANGALA THYAMAGONDLU THYAMAGONDLU THYAMAGONDLU Revival of PWS at Thyamagondlu 3.00 0.00 3.00 3.00 75-100 RURAL 2014 BANGALORE 2013- 60 NELAMANGALA THYAMAGONDLU THYAMAGONDLU THYAMAGONDLU Revival of PWS at Thyamagondlu 2.00 0.00 2.00 2.00 75-100 RURAL 2014 BANGALORE 9 23.00 0.00 23.00 23.00 RURAL Total BANGLORE BANGALORE CHUNCHANAGUP SUBBARAYAPPAN 2013- 61 SHESHIGIRIPURA Drilling of Borewell 2.04 0.00 2.04 2.04 >100 URBAN SOUTH PE APALYA A 2014 BANGLORE 2013- 62 ANEKAL HULIMANGALA KOPPA KOPPA GATE Drilling of Borewell 1.83 0.00 1.83 1.83 75-100 URBAN 2014 BANGLORE 2013- 63 ANEKAL NERIGA GONIGATTAPURA GONIGATTAPURA Drilling of Borewell 1.48 0.00 1.48 1.48 75-100 URBAN 2014 Details of works Uploaded into ProjectShelf 2013-14 (Habitation coverage more than 75%) 3 of 68 Expected Total Coverage Expected Sanction Estimated Expenditure Expected Status as Sl.