More Than 75.Xlsx

Total Page:16

File Type:pdf, Size:1020Kb

More Than 75.Xlsx Details of works Uploaded into ProjectShelf 2013-14 (Habitation coverage more than 75%) Expected Total Coverage Expected Sanction Estimated Expenditure Expected Status as Sl. No. District Block Name Panchayat Name Village Name Habitation Name Scheme Name Expenditure Year Cost (Central) _ Expenditure on 01-04- _(State)_(Rs) (Rs) _(Rs) 2013 Providing pumping machinery 2013- 1 BAGALKOT BADAMI HOSUR ANANTAGIRI ANANTAGIRI 4.00 0.00 4.00 4.00 >100 andborewell villagee village 2014 2013- 2 BAGALKOT BADAMI KATARAKI CHIKKANASABI CHIKKANASABI Borewell at chiknasabi village 0.64 0.00 0.64 0.64 >100 2014 2013- 3 BAGALKOT BADAMI KHANAPUR SK KULAGERI KULAGERI CROSS Borewell at kulageri cross 1.33 0.00 1.33 1.33 >100 2014 SUBBALAHUNAS SUBBALAHUNAS Providing pipe line and cistern at 2013- 4 BAGALKOT BADAMI LAYADAGUNDI 2.50 0.00 2.50 2.50 >100 HI HI sabalhunsi village 2014 providing pipe line to aladkatti 2013- 5 BAGALKOT BADAMI MUTTALAGERI ALADAKATTI ALADAKATTI 2.90 0.00 2.90 2.90 >100 village 2014 SINKING OF BW AT TIMMAPUR 2013- 6 BAGALKOT BAGALKOT BILKERUR TIMMAPUR TIMMAPUR 0.92 0.00 0.92 0.92 >100 VILLAGE 2014 WSS TP BANTANUR PANCHYAT 2013- 7 BAGALKOT MUDHOL BHANTANUR BHANTANUR BHANTANUR 1.00 0.00 1.00 1.00 >100 FLUSHING AND DEEPING 2014 WSS TO HEBBAL PANCHYAT 2013- 8 BAGALKOT MUDHOL HEBBAL HEBBAL HEBBAL 20.00 2.00 2.00 4.00 >100 FLUSHING AND DEEPING 2014 WSS TO HEBBAL RC CISTERN & PIPE 2013- 9 BAGALKOT MUDHOL HEBBAL HEBBAL HEBBAL 2.40 0.00 2.40 2.40 >100 LINE 2014 2013- 10 BAGALKOT BADAMI ADAGAL KENDUR KENDUR Borewell at kendur village 0.96 0.00 0.96 0.96 75-100 2014 2013- 11 BAGALKOT BADAMI ADAGAL KENDUR KENDUR providing pipe line to kendur village 2.50 0.00 2.50 2.50 75-100 2014 CHOLACHAGUDD 2013- 12 BAGALKOT BADAMI KHYAD KHYAD Borewell at kyad village 0.62 0.00 0.62 0.62 75-100 A 2014 2013- 13 BAGALKOT BADAMI HALADUR ALLUR SP ALLUR SP Providing pipeline at allur sp village 2.50 0.00 2.50 2.50 75-100 2014 2013- 14 BAGALKOT BADAMI HEBBALLI MALLAPUR MALLAPUR Borewell at mallapur sl village 1.05 0.00 1.05 1.05 75-100 2014 MALAGI 2013- 15 BAGALKOT BADAMI HULAGERI MALAGI Borewell at malgi mohanpur village 2.25 0.00 2.25 2.25 75-100 MOHANAPUR 2014 Providing pumping machinery and 2013- 16 BAGALKOT BADAMI JAMMANAKATTI LAKKASAKOPPA LAKKASAKOPPA 1.50 0.00 1.50 1.50 75-100 pipe lin lakoskoppa villagee village 2014 2013- 17 BAGALKOT BADAMI KAKANUR KAKANUR KAKANUR Borewell at kaknur village 0.71 0.00 0.71 0.71 75-100 2014 2013- 18 BAGALKOT BADAMI MAMATAGERI UGALAWAT UGALAWAT Borewell at ugalwat village 1.95 0.00 1.95 1.95 75-100 2014 KARADIGUDDA KARADIGUDDA providing pipe line to kardigudda sn 2013- 19 BAGALKOT BADAMI MUSTIGERI 1.50 0.00 1.50 1.50 75-100 SN SN village 2014 2013- 20 BAGALKOT BADAMI NEERABUDHIHAL NEERABUDIHAL NEERABUDIHAL Borewell at neerbudihal village 1.91 0.00 1.91 1.91 75-100 2014 2013- 21 BAGALKOT BADAMI NEERALAKERI HAWALAKHOD HAWALAKHOD Borewell at havalkod village 2.18 0.00 2.18 2.18 75-100 2014 Details of works Uploaded into ProjectShelf 2013-14 (Habitation coverage more than 75%) 1 of 68 Expected Total Coverage Expected Sanction Estimated Expenditure Expected Status as Sl. No. District Block Name Panchayat Name Village Name Habitation Name Scheme Name Expenditure Year Cost (Central) _ Expenditure on 01-04- _(State)_(Rs) (Rs) _(Rs) 2013 PROVIDING BW SOURCES AT 2013- 22 BAGALKOT BAGALKOT BHAGAVATI BHAGAVATI BHAGAVATI KIRASUR, TULSIGERI AND KAJJIDONI 5.00 0.00 5.00 5.00 75-100 2014 VILLAGE SINKING OF BW AT BILKERUR 2013- 23 BAGALKOT BAGALKOT BILKERUR BILKERUR BILKERUR 0.50 0.00 0.50 0.50 75-100 VILLAGE 2014 SINKING OF BW AT JADRAMKUNTI 2013- 24 BAGALKOT BAGALKOT KADALIMATTI JADRAMAKUNTI JADRAMAKUNTI 1.19 0.00 1.19 1.19 75-100 RC 2014 2013- 25 BAGALKOT BAGALKOT KADALIMATTI JADRAMAKUNTI JADRAMAKUNTI SINKING OF BW AT JADRAMKUNTI 0.66 0.00 0.66 0.66 75-100 2014 SINKING OF BW AT HONNAKATTI 2013- 26 BAGALKOT BAGALKOT MUGALOLLI HONNAKATTI HONNAKATTI 1.29 0.00 1.29 1.29 75-100 VILLAGE 2014 SINKING OF BOREWELL AT KESAMIR 2013- 27 BAGALKOT BAGALKOT MURNAL KESANUR KESANUR 0.62 0.00 0.62 0.62 75-100 VILLAGE 2014 DRILLING OF BORE WELL AT 2013- 28 BAGALKOT BILAGI KUNDARAGI KUNDARAGI KUNDARAGI 0.39 0.00 0.39 0.39 75-100 KUNDARGI VILLAGE 2014 2013- 29 BAGALKOT JAMAKHANDI KONNUR MAREGUDDI MAREGUDDI sinking of borewell @ mareguddi 0.78 0.00 0.78 0.78 75-100 2014 2013- 30 BAGALKOT JAMAKHANDI KULLALLI KULLALLI KULAHALLI Pumping machine @ Kullalli 0.49 0.00 0.49 0.49 75-100 2014 2013- 31 BAGALKOT JAMAKHANDI KUNCHANUR JAKANUR JAKANUR sinking borewell @ jaknur 0.72 0.00 0.72 0.72 75-100 2014 O&M FOR JAKANUR &OTHER 7 2013- 32 BAGALKOT JAMAKHANDI KUNCHANUR KUNCHANUR KUNCHANUR 22.63 22.63 0.00 22.63 75-100 VILLAGES 2014 2013- 33 BAGALKOT JAMAKHANDI KUNCHANUR KUNCHANUR KUNCHANUR sinking of borewell @ kunchnur 1.40 0.00 1.40 1.40 75-100 2014 WATER SUPPLY SCHEME TO 2013- 34 BAGALKOT MUDHOL DAVALESHWAR DAVALESHWAR DAVALESHWAR 2.00 0.00 2.00 2.00 75-100 DAVALESWAR VILLAGE 2014 MWSS to Kesarakoppa Parappa 2013- 35 BAGALKOT MUDHOL KESARAKOPPA KESARAKOPPA KESARAKOPPA 0.40 0.00 0.40 0.40 75-100 sattigeri tota cistern 2014 WSS TO KESARAKOPPA RC HAND 2013- 36 BAGALKOT MUDHOL KESARAKOPPA KESARAKOPPA KESARAKOPPA 10.00 1.00 1.00 2.00 75-100 PUMP 2014 WATER SUPPLY SCHEME TO 2013- 37 BAGALKOT MUDHOL KESARAKOPPA KESARAKOPPA KESARAKOPPA PARASAPPA SATTIGERI VASTI IN 0.40 0.00 0.40 0.40 75-100 2014 KESARAKOPPA VILLAGE WSS TO MACHKANUR NEAR 2013- 38 BAGALKOT MUDHOL MACHAKANUR MACHAKANUR MACHAKANUR 5.40 0.54 0.54 1.08 75-100 GUDDADA PLOT 2014 WATER SUPPLY SCHEME TO 2013- 39 BAGALKOT MUDHOL MADABHAVI MADABHAVI MADABHAVI BIRADEVAR TEMPLE IN MADABAVI 0.40 0.00 0.40 0.40 75-100 2014 VILLAGE Construction of Cistern at 2013- 40 BAGALKOT MUDHOL MADABHAVI MADABHAVI MADABHAVI 0.40 0.00 0.40 0.40 75-100 madabhavi village 2014 2013- 41 BAGALKOT MUDHOL MADABHAVI MADABHAVI MADABHAVI MWSS to Chandana tota madabhavi 1.50 0.00 1.50 1.50 75-100 2014 WATER SUPPLY SCHEME TO 2013- 42 BAGALKOT MUDHOL MALALI MALALI MALALI KAMTHAR THOTA IN MALALLI 0.45 0.00 0.45 0.45 75-100 2014 VILLAGE WSS TO MALALI VILLAGE SARAWAD 2013- 43 BAGALKOT MUDHOL MALALI MALALI MALALI 15.00 1.50 1.50 3.00 75-100 VASTI 2014 Details of works Uploaded into ProjectShelf 2013-14 (Habitation coverage more than 75%) 2 of 68 Expected Total Coverage Expected Sanction Estimated Expenditure Expected Status as Sl. No. District Block Name Panchayat Name Village Name Habitation Name Scheme Name Expenditure Year Cost (Central) _ Expenditure on 01-04- _(State)_(Rs) (Rs) _(Rs) 2013 MWSS Mantur Budni road side 2013- 44 BAGALKOT MUDHOL MANTUR MANTUR MANTUR 0.33 0.00 0.33 0.33 75-100 Borewell Flushing 2014 MWSS Akkimaradi village 2013- 45 BAGALKOT MUDHOL NAGARAL AKKIMARDI AKKIMARDI 1.00 0.00 1.00 1.00 75-100 PIpelineand Cistern 2014 MWSS to Saidapur Cistern and 2013- 46 BAGALKOT MUDHOL SAIDAPUR SAIDAPUR SAIDAPUR 1.86 0.00 1.86 1.86 75-100 Borewell 2014 WSS TO SHIROL SORGAVA ROAD 2013- 47 BAGALKOT MUDHOL SHIROL SHIROL SHIROL 21.70 2.17 2.17 4.34 75-100 SIDE 2014 WATER SUPPLY SCHEME TO 2013- 48 BAGALKOT MUDHOL BELAGALI BELAGALI BELAGALI JAMKHANDI VASTI IN BELLAGALI 0.50 0.00 0.50 0.50 75-100 2014 VILLAGE water supply to Belagli near navalgi 2013- 49 BAGALKOT MUDHOL BELAGALI BELAGALI BELAGALI 2.41 0.00 2.41 2.41 75-100 road in mudhol taluk 2014 WSS TO BELAGALI NEAR 2013- 50 BAGALKOT MUDHOL BELAGALI BELAGALI BELAGALI MALIGARAYA TEMPLE GUNDA 0.69 0.00 0.69 0.69 75-100 2014 BASAPPA VASTI WSS TO BELAGLI VILLAGE 2013- 51 BAGALKOT MUDHOL BELAGALI BELAGALI BELAGALI SIDDAPUR VASTI NEAR LAXMI 18.20 1.82 1.82 3.64 75-100 2014 TEMPLE 51 BAGALKOT Total 173.64 31.66 69.74 101.40 BANGALORE SOLADEVANAHAL 2013- 52 NELAMANGALA BANASAVADI BANASAVADI Revival of PWS at Banasavadi 2.00 0.00 2.00 2.00 >100 RURAL LI 2014 BANGALORE G.CHOWDAPANA 2013- 53 DEVANHALLI KONDENAHALLI KONDENAHALLI Drilling of Borewe @ Kondenahalli 2.25 0.00 2.25 2.25 75-100 RURAL HALLY 2014 BANGALORE G.CHOWDAPANA 2013- 54 DEVANHALLI NAGENAHALLY NAGENAHALLY Drilling of Borewe @ Nagenahalli 2.25 0.00 2.25 2.25 75-100 RURAL HALLY 2014 BANGALORE CHI CHI 2013- 55 DEVANHALLI NALLURU Pump, motor @ Chimachanahalli 3.00 0.00 3.00 3.00 75-100 RURAL MACHANAHALLY MACHANAHALLY 2014 BANGALORE Providing Pump & Motor At 2013- 56 DEVANHALLI NALLURU MALLEPURA MALLEPURA 3.00 0.00 3.00 3.00 75-100 RURAL Mallepura 2014 BANGALORE VISHWANATHAP Providing Pump & Motor At 2013- 57 DEVANHALLI BEERASANDRA BEERASANDRA 3.00 0.00 3.00 3.00 75-100 RURAL URA Beersandra (boodbande) 2014 BANGALORE 2013- 58 NELAMANGALA SHIVAGANGE SHIVAGANGE SHIVAGANGE Revival of PWS at Shivagange 2.50 0.00 2.50 2.50 75-100 RURAL 2014 BANGALORE 2013- 59 NELAMANGALA THYAMAGONDLU THYAMAGONDLU THYAMAGONDLU Revival of PWS at Thyamagondlu 3.00 0.00 3.00 3.00 75-100 RURAL 2014 BANGALORE 2013- 60 NELAMANGALA THYAMAGONDLU THYAMAGONDLU THYAMAGONDLU Revival of PWS at Thyamagondlu 2.00 0.00 2.00 2.00 75-100 RURAL 2014 BANGALORE 9 23.00 0.00 23.00 23.00 RURAL Total BANGLORE BANGALORE CHUNCHANAGUP SUBBARAYAPPAN 2013- 61 SHESHIGIRIPURA Drilling of Borewell 2.04 0.00 2.04 2.04 >100 URBAN SOUTH PE APALYA A 2014 BANGLORE 2013- 62 ANEKAL HULIMANGALA KOPPA KOPPA GATE Drilling of Borewell 1.83 0.00 1.83 1.83 75-100 URBAN 2014 BANGLORE 2013- 63 ANEKAL NERIGA GONIGATTAPURA GONIGATTAPURA Drilling of Borewell 1.48 0.00 1.48 1.48 75-100 URBAN 2014 Details of works Uploaded into ProjectShelf 2013-14 (Habitation coverage more than 75%) 3 of 68 Expected Total Coverage Expected Sanction Estimated Expenditure Expected Status as Sl.
Recommended publications
  • LOK SABHA UNSTARRED QUESTION NO. 731 to BE ANSWERED on 23Rd JULY, 2018
    LOK SABHA UNSTARRED QUESTION NO. 731 TO BE ANSWERED ON 23rd JULY, 2018 Survey for Petrol Pumps 731. SHRI BHAGWANTH KHUBA: पेट्रोलियम एवं प्राकृ तिक गैस मंत्री Will the Minister of PETROLEUM AND NATURAL GAS be pleased to state: (a) whether the Government have conducted proposes to conduct any survey to open new petrol pumps and new LPG distributorships/dealerships in Hyderabad and Karnataka and if so, the details thereof; and (b) the name of the places where new petrol pump and LPG dealership have been opened / proposed to be opened open after the said survey? ANSWER पेट्रोलियम एवं प्राकृ तिक गैस मंत्री (श्री धमेन्द्र प्रधान) MINISTER OF PETROLEUM AND NATURAL GAS (SHRI DHARMENDRA PRADHAN) (a) Expansion of Retail Outlets (ROs) and LPG distributorships network by Oil Marketing Companies (OMCs) in the country is a continuous process. ROs and LPG distributorships are set up by OMCs at identified locations based on field survey and feasibility studies. Locations found to be having sufficient potential as well as economically viable are rostered in the Marketing Plans for setting up ROs and LPG distributorships. (b) OMCs have commissioned 342 ROs (IOCL:143, BPCL:89 & HPCL:110) in Karnataka and Hyderabad during the last three years and current year. State/District/Location-wise number of ROs where Letter of Intents have been issued by OMCs in the State of Karnataka and Hyderabad as on 01.07.2018 is given in Annexure-I. Details of locations advertised by OMCs for LPG distributorship in the state of Karnataka is given in Annexure-II.
    [Show full text]
  • Table of Content Page No's 1-5 6 6 7 8 9 10-12 13-50 51-52 53-82 83-93
    Table of Content Executive summary Page No’s i. Introduction 1-5 ii. Background 6 iii. Vision 6 iv. Objective 7 V. Strategy /approach 8 VI. Rationale/ Justification Statement 9 Chapter-I: General Information of the District 1.1 District Profile 10-12 1.2 Demography 13-50 1.3 Biomass and Livestock 51-52 1.4 Agro-Ecology, Climate, Hydrology and Topography 53-82 1.5 Soil Profile 83-93 1.6 Soil Erosion and Runoff Status 94 1.7 Land Use Pattern 95-139 Chapter II: District Water Profile: 2.1 Area Wise, Crop Wise irrigation Status 140-150 2.2 Production and Productivity of Major Crops 151-158 2.3 Irrigation based classification: gross irrigated area, net irrigated area, area under protective 159-160 irrigation, un irrigated or totally rain fed area Chapter III: Water Availability: 3.1: Status of Water Availability 161-163 3.2: Status of Ground Water Availability 164-169 3.3: Status of Command Area 170-194 3.4: Existing Type of Irrigation 195-198 Chapter IV: Water Requirement /Demand 4.1: Domestic Water Demand 199-200 4.2: Crop Water Demand 201-210 4.3: Livestock Water Demand 211-212 4.4: Industrial Water Demand 213-215 4.5: Water Demand for Power Generation 216 4.6: Total Water Demand of the District for Various sectors 217-218 4.7: Water Budget 219-220 Chapter V: Strategic Action Plan for Irrigation in District under PMKSY 221-338 List of Tables Table 1.1: District Profile Table 1.2: Demography Table 1.3: Biomass and Live stocks Table 1.4: Agro-Ecology, Climate, Hydrology and Topography Table 1.5: Soil Profile Table 1.7: Land Use Pattern Table
    [Show full text]
  • Pre-Feasibility Report
    1 Pre-Feasibility Report 1. Executive Summary: The Department of Mines and Geology (DMG) – Koppal, granted the Building Stone Quarry Lease, over an extent of 5.00 Acres (2.023 Ha) in Sy. No. 04 of Hussainpur Village, Koppal Taluk, Koppal District. Subsequently Quarry Lease executed under QL No. 306/11-12 by the Department of Mines and Geology – Koppal, for the term of 5 years lease period with effect from 28-05-2011. In accordance with the amended Karnataka Minor Mineral Concession Rules 1994, the Department of Mines and Geology – Koppal, directed the lessee to obtain the necessary approvals including Environmental Clearance for continuation of Quarry Operations. In accordance with the statuary obligation this project needs Environmental Clearance from the Department of Environment & Ecology, GoK to execute the lease renewal. Accordingly Project Proponent has submitted 1) Form- I, 2) Pre-Feasibility Report, 3) Quarry Plan approved by Department of Mines and Geology, Koppal 4) Land documents, 5) Lease Deed, 6) Statutory Clearances, 7) Survey of India Toposheet duly marking the lease area and 8) Google Imagery duly marking the project site, to the State Environment Impact Assessment Authority of Karnataka constituted by MoEF, GoI for grant of Environment Clearance as per the Notification. 2 Introduction of the project/ Background information i) Identification of project and project proponent. In case of mining project, a copy of mining lease/ letter of intent should be given: Identification of project: Project proponent: Hussainpur Building Stone Quarry, M/s Shree Sheshadri Steels and Metalics Pvt. Ltd. Extent:5.00 Acres(2.023 Ha) D.No.45, Ward No.
    [Show full text]
  • Belgaum District Lists
    Group "C" Societies having less than Rs.10 crores of working capital / turnover, Belgaum District lists. Sl No Society Name Mobile Number Email ID District Taluk Society Address 1 Abbihal Vyavasaya Seva - - Belgaum ATHANI - Sahakari Sangh Ltd., Abbihal 2 Abhinandan Mainariti Vividha - - Belgaum ATHANI - Uddeshagala S.S.Ltd., Kagawad 3 Abhinav Urban Co-Op Credit - - Belgaum ATHANI - Society Radderahatti 4 Acharya Kuntu Sagara Vividha - - Belgaum ATHANI - Uddeshagala S.S.Ltd., Ainapur 5 Adarsha Co-Op Credit Society - - Belgaum ATHANI - Ltd., Athani 6 Addahalli Vyavasaya Seva - - Belgaum ATHANI - Sahakari Sangh Ltd., Addahalli 7 Adishakti Co-Op Credit Society - - Belgaum ATHANI - Ltd., Athani 8 Adishati Renukadevi Vividha - - Belgaum ATHANI - Uddeshagala S.S.Ltd., Athani 9 Aigali Vividha Uddeshagala - - Belgaum ATHANI - S.S.Ltd., Aigali 10 Ainapur B.C. Tenenat Farming - - Belgaum ATHANI - Co-Op Society Ltd., Athani 11 Ainapur Cattele Breeding Co- - - Belgaum ATHANI - Op Society Ltd., Ainapur 12 Ainapur Co-Op Credit Society - - Belgaum ATHANI - Ltd., Ainapur 13 Ainapur Halu Utpadakari - - Belgaum ATHANI - S.S.Ltd., Ainapur 14 Ainapur K.R.E.S. Navakarar - - Belgaum ATHANI - Pattin Sahakar Sangh Ainapur 15 Ainapur Vividha Uddeshagal - - Belgaum ATHANI - Sahakar Sangha Ltd., Ainapur 16 Ajayachetan Vividha - - Belgaum ATHANI - Uddeshagala S.S.Ltd., Athani 17 Akkamahadevi Vividha - - Belgaum ATHANI - Uddeshagala S.S.Ltd., Halalli 18 Akkamahadevi WOMEN Co-Op - - Belgaum ATHANI - Credit Society Ltd., Athani 19 Akkamamhadevi Mahila Pattin - - Belgaum
    [Show full text]
  • KARNATAKA 33 AFZALPUR Afzalpur C.D
    KARNATAKA 33 AFZALPUR Afzalpur C.D. Block lies in the western part of Gulbarga kms. in Gulbarga south of Ghangapur railway station on the district.It is a part of Afzalpur taluka. The Block is located Chennai-Mumbai railway route. It is highly venerated by the at a distance of 46 kms. from district H.Q. (Gulbarga). Hindus of both Karnatakaand Maharashtra States. The There are 93 villages in the block with the total Pop. of sacred temple of Shri Narasimha Saraswathi Datta Maharaj 160,702 persons. Area of the C.D Block is 1301.73 sq. kms. is situated here. Pilgrims visit Ghangapurthroughout the It is bounded by taluk Aland on north, district Bijapur and year to worship at the temple and also to take holy bath at taluk Jevargi on south, taluk Gulbarga on east, district the confluence of the river Amerja and Bhima. There are Bijapur on west, and it has common boundary with the two large Dharmashalas for the use of pilgrims. It is state of Maharashtra on north. estimated that on an average 500 pilgrims visit this place Communications: daily to worship the Dattatraya Paduka. Around the Roadways : S.H-22: Direction- Akalkot to Gulbarga, Nearest month of February, a big jatra is held at this place at which Villages- Mannur, Karajagi, Ramnagar, Bhankalga, Shirwad, one lakh pilgrims congregate.Government road transport Gour (K), Gour (B), Afzalpur (Rural), Matoli, Mallabad, buses are run from Ghangapur railway station to this place Atnoor, Shivajinagar, Ingalgi (B), Chowdapur, Gobbur (B), every day. For the pilgrims, this place is known as Gobbur (K), Hawanur, Chinmmgera.
    [Show full text]
  • (MALLA B PHC) Government 2 Yadgir AGNI SC
    ಕ ೋ풿蓍 ಲಕಾಕರಣ ಕ ೋᲂ飍ರಗಳು (COVID VACCINATION CENTRES) Sl No District CVC Name Category 1 Yadgir AEWOOR SC (MALLA B PHC) Government 2 Yadgir AGNI SC (YALAGI PHC) Government 3 Yadgir ALAHALA SC (GUTTIBASAV PHC) Government 4 Yadgir ALDALA SC (PET AMMAPUR PHC) Government 5 Yadgir Allipur PHC Government 6 Yadgir Allipur PHC (Covax) Government 7 Yadgir ANABI SC (SHIRWAL PHC) Government 8 Yadgir Arkera B Government 9 Yadgir Azalapur PHC Government 10 Yadgir Azalapur PHC (Covax) Government 11 Yadgir AZALAPURA SC (AZALAPURA PHC) Government 12 Yadgir BAICHABALA SC (KEMBHAVI PHC) Government 13 Yadgir BAILKUNTI SC (KODEKAL PHC) Government 14 Yadgir BALASHETTIHALA SC (SHRINIVAS) Government 15 Yadgir Balichakra PHC Government 16 Yadgir BANGODDI SC (KAKKERA PHC) Government 17 Yadgir Bendebembali PHC Government 18 Yadgir BILVAR SC (BENDEBEMB PHC) Government 19 Yadgir BOMMAGUDDA SC (RAJAN KOLLUR ) Government 20 Yadgir Chamnal PHC Government 21 Yadgir Chatnalli PHC Government 22 Yadgir Chatnalli PHC (Covax) Government 23 Yadgir CHC Gurumitkal Government 24 Yadgir CHC Hunasagi Government 25 Yadgir Devargonal Phc Government 26 Yadgir DEVATKAL (KALLADEVAN PHC) Government 27 Yadgir DIGGI SC (GOGI PHC) Government 28 Yadgir Dornahalli CHC Government 29 Yadgir Dornahalli CHC (Covax) Government 30 Yadgir Gajarkote PHC Government 31 Yadgir GGH Shahapur Government 32 Yadgir GGH Shahapur (Covax) Government 33 Yadgir GGH Shorapur Government 34 Yadgir GGH Shorapur (Covax) Government 35 Yadgir Gogi PHC Government 36 Yadgir Govt AYUSH Hospital Yadgir Government 37 Yadgir
    [Show full text]
  • HŒ臬 A„簧綟糜恥sµ, Vw笑n® 22.12.2019 Š U拳 W
    ||Om Shri Manjunathaya Namah || Shri Kshethra Dhamasthala Rural Development Project B.C. Trust ® Head Office Dharmasthala HŒ¯å A„®ãtÁS®¢Sµ, vw¯ºN® 22.12.2019 Š®0u®± w®lµu® îµ±°ªæX¯Š®N®/ N®Zµ°‹ š®œ¯‡®±N®/w®S®u®± š®œ¯‡®±N® œ®±uµÛ‡®± wµ°Š® wµ°î®±N¯r‡®± ªRq® y®‹°£µ‡®± y®ªq¯ºý® D Nµ¡®w®ºruµ. Cu®Š®ªå 50 î®±q®±Ù 50 Oʺq® œµX®±Ï AºN® y®lµu®î®Š®w®±Ý (¬šµ¶g¬w®ªå r¢›Š®±î®ºqµ N®Zµ°‹/w®S®u®± š®œ¯‡®±N® œ®±uµÛSµ N®xÇ®Õ ïu¯ãœ®Áqµ y®u®ï î®±q®±Ù ®±š®±é 01.12.2019 NµÊ Aw®æ‡®±î¯S®±î®ºqµ 25 î®Ç®Á ï±°Š®u®ºqµ î®±q®±Ù îµ±ªæX¯Š®N® œ®±uµÛSµ N®xÇ®Õ Hš¬.Hš¬.HŒ¬.› /z.‡®±±.› ïu¯ãœ®Áqµ‡µ²ºvSµ 3 î®Ç®Áu® Nµ©š®u® Aw®±„Â®î® î®±q®±Ù ®±š®±é 01.12.2019 NµÊ Aw®æ‡®±î¯S®±î®ºqµ 30 î®Ç®Á ï±°Š®u®ºqµ ) î®±±ºvw® œ®ºq®u® š®ºu®ý®Áw®NµÊ B‡µ±Ê ¯l®Œ¯S®±î®¼u®±. š®ºu®ý®Áw®u® š®Ú¡® î®±q®±Ù vw¯ºN®î®w®±Ý y®äqµã°N®î¯T Hš¬.Hº.Hš¬ î®±²©N® ¯Ÿr x°l®Œ¯S®±î®¼u®±. œ¯cŠ¯u® HŒ¯å A„®ãtÁS®¢Sµ A†Ãw®ºu®wµS®¡®±. Written test Sl No Name Address Taluk District mark Exam Centre out off 100 11 th ward near police station 1 A Ashwini Hospete Bellary 33 Bellary kampli 2 Abbana Durugappa Nanyapura HB hally Bellary 53 Bellary 'Sri Devi Krupa ' B.S.N.L 2nd 3 Abha Shrutee stage, Near RTO, Satyamangala, Hassan Hassan 42 Hassan Hassan.
    [Show full text]
  • Quarterly Progress Report January-March 2020
    KARNATAKA NEERAVARI NIGAM LTD Karnataka Integrated and Sustainable Water Resources Management Investment Program ADB LOAN 3836-IND Quarterly Progress Report January-March 2020 Project Management Unit, KISWRMIP Project Support Consultant SMEC International Pty. Ltd. Australia in association with SMEC (India) Pvt. Ltd. 3 June 2020 Revised 20 June 2020 DOCUMENTS/REPORT CONTROL FORM Report Name Quarterly Progress Report January-March 2020 (draft) Karnataka Integrated and Sustainable Water Resources Management Project Name: Investment Program Project Number: 5061164 Report for: Karnataka Neeravari Nigam Ltd (KNNL) REVISION HISTORY Revision Date Prepared by Reviewed by Approved by # Dr. Srinivas Mudrakartha Dr Srinivas Dr Srinivas 1 3 June 2020 Mudrakartha/ Mudrakartha/ Balaji Maddikera Gaurav Srivastava Gaurav Srivastava Deepak GN and Team Dr. Srinivas Mudrakartha Dr Srinivas Dr Srinivas Mudrakartha/ Mudrakartha/ 2 20 June 2020 Balaji Maddikera Gaurav Srivastava Gaurav Srivastava Deepak GN and Team ISSUE REGISTER Distribution List Date Issued Number of Copies KNNL 20 June 2020 10 SMEC Staff 20 June 2020 2 Associate (Gaurav Srivastava) 20 June 2020 1 Office Library (Shimoga) 20 June 2020 1 SMEC Project File 20 June 2020 2 SMEC COMPANY DETAILS Dr Janardhan Sundaram, Executive Director 1st Floor, Novus Tower, West Wing, Plot Number -18, Sector – 18, Gurgaon – 122016, Haryana Tel: +91 124 4501100 Fax: +91 124 4376018 Email: [email protected]; Website: www.smec.com CONTENTS 1.0 INTRODUCTION ...........................................................................................................................
    [Show full text]
  • Name of the Village
    POPULATION PROFILE OF KALBURUGI Dist AS PER 2011 CENSUS Total SC ST Sl No Name of the Village % % Population Population Population 1 Gulbarga 2566326 648782 25.28 65259 2.54 2 Gulbarga 1730775 489697 28.29 50074 2.89 3 Gulbarga 835551 159085 19.04 15185 1.82 4 Aland 342207 85516 24.99 6843 2.00 5 Aland 299836 79777 26.61 6508 2.17 6 Aland 42371 5739 13.54 335 0.79 7 Jamga Khandala 1215 756 62.22 30 2.47 8 Tadola 2568 716 27.88 1 0.04 9 Alanga 2571 281 10.93 7 0.27 10 Sirur (G) 1378 240 17.42 63 4.57 11 Gadlegaon 686 250 36.44 0 0.00 12 Khajuri 6744 912 13.52 9 0.13 13 Jawalga (J) 1707 542 31.75 57 3.34 14 Tugaon 837 222 26.52 27 3.23 15 Annur 1248 295 23.64 69 5.53 16 Hodlur 2697 361 13.39 4 0.15 17 Subhashnagar 1057 1055 99.81 1 0.09 18 Nandgur 500 152 30.40 0 0.00 19 Kotanhipperga 1699 178 10.48 0 0.00 20 Jamga Ruderwadi 1766 502 28.43 0 0.00 21 Rudrawadi 3004 699 23.27 57 1.90 22 Bableshwar 884 228 25.79 65 7.35 23 Bangerga 2334 662 28.36 55 2.36 24 Khandala 1434 528 36.82 141 9.83 25 Nirgudi 3109 307 9.87 87 2.80 26 Matki 4206 732 17.40 291 6.92 27 Teerth 1636 315 19.25 12 0.73 28 Salegaon 2342 506 21.61 135 5.76 29 Chitali 1511 237 15.68 336 22.24 30 Kinnisultan 3322 745 22.43 1 0.03 31 Kanmas 1254 348 27.75 3 0.24 32 Bharked 865 97 11.21 39 4.51 33 Sangunda 1097 279 25.43 4 0.36 34 Belamogi 5127 1613 31.46 189 3.69 35 Karhari 1584 567 35.80 0 0.00 36 Salgera (V.K.) 5182 1734 33.46 137 2.64 37 Lengthi 1956 457 23.36 354 18.10 38 Ladmugli 2636 575 21.81 2 0.08 39 Kalkutga 691 184 26.63 56 8.10 40 Kudmud 1610 806 50.06 0 0.00 41 Ambalga
    [Show full text]
  • The Krishna Temple Complex, Hampi: an Exploration of Its Identity As a Medieval Temple in the Contemporary Context
    THE KRISHNA TEMPLE COMPLEX, HAMPI: AN EXPLORATION OF ITS IDENTITY AS A MEDIEVAL TEMPLE IN THE CONTEMPORARY CONTEXT A Thesis Presented to the Faculty of the Graduate School of Cornell University In Partial Fulfillment of the Requirements for the Degree of Master of Arts by Ashima Krishna January, 2009 © 2009 Ashima Krishna ABSTRACT Hindu temples in India have been in abundance for centuries. However, many have lost their use over time. They lie vacant and unused on vast tracts of land across the Indian subcontinent, in a time when financial resources for the provision of amenities to serve the local community are hard to come by. In the case of Hampi, this strain is felt not only by the community inhabiting the area, but the tourism sector as well. Hampi’s immense significance as a unique Medieval-city in the Indian subcontinent has increased tourist influx into the region, and added pressure on authorities to provide for amenities and facilities that can sustain the tourism industry. The site comprises near-intact Medieval structures, ruins in stone and archaeologically sensitive open land, making provision of tourist facilities extremely difficult. This raises the possibility of reusing one of the abundant temple structures to cater to some of these needs, akin to the Virupaksha Temple Complex and the Hampi Bazaar. But can it be done? There is a significant absence of research on possibilities of reusing a Hindu Temple. A major reason for this gap in scholarship has been due to the nature of the religion of Hinduism and its adherents. Communal and political forces over time have consistently viewed all Hindu temples as cultural patrimony of the people, despite legal ownership resting with the Government of India.
    [Show full text]
  • Review of Research
    Review of ReseaRch LEADERSHIP ROLE OF WOMENS IN QUIT INDIA MOVEMENT RELATED TUMKUR DISTRICT 1 2 Chandrashekar K. S. and Prof. L. P. Raju 1 issN: 2249-894X Reseach Scholar , Dept of Studies and Research in impact factoR : 5.7631(Uif) Histroy and Archaeology , Tumkur University Tumkur. 2 UGc appRoved JoURNal No. 48514 Dean & Professor , Dept of Studies and Research in volUme - 8 | issUe - 8 | may - 2019 Histroy and Archaeology , Tumkur University , Tumkur. ABSTRACT: Quit India Movement was carried briskly throughout India by using the powerful slogan “Do or Die” in this sigficant role women’s are involving themselves in the freedom movement. Against the british government the women actively participated in more and more numbers in the movement like non-cooperation movement.Quit india movement and civil dis Obedience movement in tumkur.The women freedom fighters actively took port in 1942 J c Bhaghirathamma from tumkur was participated.As a leader in Quit indiamovement and one of the leader Sunandamma she participated shivapura flag movement and Quit india movement and she was arrested by british police.Another womenvolunter of freedom movement of tumkur district. J C Bhagirthammaand is father karisiddappa and siddananjammalabour leader also take part in the quit indiamovement in 1941 and 1942 there by they plunged into freedom movement. One more yashodharamma Dasappa from tumkur she influenced by her father K.H Ramaiah , freedom fighter for his patriotism and service mind and she also participated in quit india movement related to vidurashawatha tragedy in 1938 in this way tumkur district women’s play a important role in quit india movement specialy in tumkur district.
    [Show full text]
  • 1995-96 and 1996- Postel Life Insurance Scheme 2988. SHRI
    Written Answers 1 .DECEMBER 12. 1996 04 Written Answers (c) if not, the reasons therefor? (b) No, Sir. THE MINISTER OF STATE IN THE MINISTRY OF (c) and (d). Do not arise. RAILWAYS (SHRI SATPAL MAHARAJ) (a) No, Sir. [Translation] (b) Does not arise. (c) Due to operational and resource constraints. Microwave Towers [Translation] 2987 SHRI THAWAR CHAND GEHLOT Will the Minister of COMMUNICATIONS be pleased to state : Construction ofBridge over River Ganga (a) the number of Microwave Towers targated to be set-up in the country during the year 1995-96 and 1996- 2990. SHRI RAMENDRA KUMAR : Will the Minister 97 for providing telephone facilities, State-wise; of RAILWAYS be pleased to state (b) the details of progress achieved upto October, (a) whether there is any proposal to construct a 1906 against above target State-wise; and bridge over river Ganges with a view to link Khagaria and Munger towns; and (c) whether the Government are facing financial crisis in achieving the said target? (b) if so, the details thereof alongwith the time by which construction work is likely to be started and THE MINISTER OF COMMUNICATIONS (SHRI BENI completed? PRASAD VERMA) : (a) to (c). The information is being collected and will be laid on the Table of the House. THE MINISTER OF STATE IN THE MINISTRY OF RAILWAYS (SHRI SATPAL MAHARAJ) : (a) No, Sir. [E nglish] (b) Does not arise. Postel Life Insurance Scheme Railway Tracks between Virar and Dahanu 2988. SHRI VIJAY KUMAR KHANDELWAL : Will the Minister of COMMUNICATIONS be pleased to state: 2991. SHRI SURESH PRABHU
    [Show full text]