Page 1 – Highways Capital Programme 2016/17

Agenda I tem:

Environment Insert Overview Item Committee No.

Date of Meeting 19 January 2016

Officer Andrew Martin – Head of Highways

Subject of Report Dorset Highways Capital Programme 2016/17

Executive Summary This report is intended to advise members of the proposed Local Transport Plan (LTP) capital programme for 2016/17.

Appendix 1 also shows the capital maintenance schemes proposed for construction between 1 st April 2016 – 31 st March 2017.

This is a provisional programme at this stage and may be subject to change, pending confirmation of the budget situation, and subject to feasibility / provisional designs.

Impact Assessment: Equalities Impact Assessment : An Equalities Impact Assessment (EqIA) was carried out as part of the , Please refer to the and Dorset Local Transport Plan 3 (LTP3). An Accessibility protocol for writing Strategy was also produced as a supporting strategy to the L reports. TP. The recommendation is not considered to have any negative or differential impact on the equalities of any person or group.

Use of Evidence : All proposed highways improvement s schemes are prioritised against the County Council’s key objectives for transport, as described in the Local Transport Plan. The methodology for prioritising schemes includes the use of evidence such as casualty data, feasibility studies and evidence of local support from Town and Parish Councils. Page 2 –Dorset Highways Capital Programme 2016/17

The Bridges and Structures and Carriageway Maintenance programmes are developed from evidence of asset condition which is determined using a variety of surveying techniques and monitoring equipment along with visual assessments and reported defects.

Budget : The capital progr amme i s funded from Government allocations, developer contributions, and other external grants..

We are still waiting for confirmation of 2016/17 IT block funding allocations which is expected in January / February.

Risk Assessment : It is the officer’s opinion that there are no high risks that need to be reported, having considered all possible risks in line with the Council’s approved risk management methodology. Current Risk: Low Residual Risk: Low

Recommendation That the Committee approves the 2016/17 LTP Capital Programme.

Reason for To support the County Council’s corporate aims and objectives Recommendation linked to economic growth and health, safeguarding and wellbeing.

Appendices Appendix 1 – Proposed capital maintenance programme.

Background Papers

Report Originator and Name: Mike Hansford Contact Tel: 01305 228168 Email: [email protected]

Page 3 –Dorset Highways Capital Programme 2016/17

1. Background

The Local Transport Plan (LTP) is a statutory document that sets out the County’s priorities in terms of the transport systems in the region. It sets out the strategy for maintenance, management and development.

The LTP documents how funding, largely provided through Government Grants will be used to deliver improved transport and support key objectives identified by Government and local authorities.

Section 41 of the Highways Act places a statutory duty on as he Highway Authority to maintain highways, maintainable at public expense.

Appendix 1 documents the Dorset Highways Capital Programme and provides Members with all of the proposed schemes that meet the LTP goals and support corporate aims and objectives, for the forthcoming financial year.

These schemes are proposed at this stage, and an update and progress on these schemes will be provided to Members through the Quarterly Asset management Report.

2. Prioritising Highway Improvement Schemes.

The Bournemouth, Poole and Dorset Local Transport Plan 3 (LTP3) came into effect from April 2011. LTP3 sets out our transport priorities for the 15 year period to 2026, providing the context for improvement schemes.

Five key goals now guide our approach to transport in Dorset and are reflected in the assessment process through which improvement scheme s are prioritised:

• Supporting economic growth • Tackling climate change • Equality of opportunity • Better safety, security and health • Improved quality of life

The authority is now required also, to demonstrate efficiencies and value for money in all transport investment.

Dorset Highway’s scheme identification process ensures that all potential schemes are assessed and prioritised against LTP3 goals. The illustration below shows the criteria against which, these schemes are prioritised.

Page 4 –Dorset Highways Capital Programme 2016/17

3. Highways Asset Maintenance

Dorset’s Highways Asset Management Plan (HAMP) documents the County Council’s approach to maintenance of Highway Assets. In some cases this documents knowledge gaps or things we need to do to improve how these assets are maintained.

The Volume 2 of this document breaks down each asset group and documents the County’s approach to maintaining each asset.

Scheme assessment of these assets is based on asset condition which is collected using a variety of methods and techniques, including visual inspections and machine surveys. For THE Purpose of prioritisation this data is combined with outputs such as recorded defects and enquiries/complaints, engineering judgement.

Additional weighting is also attributed to Dorset’s resilient network and part of a regional exercise to develop network resilience. This is intended to mitigate the risks posed by extreme weather events linked to climate change and keep strategic routes accessible, even during times of adverse weather.

Maintenance schemes continue to support the goals documented in the LTP3 and indeed the corporate objectives linked to promoting highway safety and maintaining health, safeguarding of motorists and the wider public and wellbeing.

These maintenance schemes also support the Highways Service’s strapline of Keeping Dorset Moving. Decisions linked to budget allocation to activities, whilst supporting all of these goals and objectives, also help reduce future maintenance costs.

A report submitted to the Cabinet set out investment requirements for both carriageways and Traffic Control.

The report highlighted a shortfall in the £14.7million required to maintain the current condition of the carriageway network. This is through the £11million formula funding grant from Central Government, which is also used to maintain other highway assets. There a bid for corporate capital funding was made for £3.65million.

Traffic Control identified through the HAMP; a number of units requiring urgent investment having exceeding their life and now at risk of now working or in some cases literally falling over. A further bid to the corporate centre for £1million was also submitted.

The provisional programme of capital maintenance schemes is documented in Appendix 1.

4 Local Transport Settlement

4.1 Integrated Transport Block Funding

The Local Transport Integrated Block funding for 2016/17 is £2,088,000 (to be confirmed)

As it was last financial year, this figure is reduced having been top sliced by the Government to provide funding for the Local Enterprise Partnership (LEP) to award to local schemes.

Where opportunities exist, schemes are walk, talk, build to reduce design costs and maximise this investment in the network.

Page 5 –Dorset Highways Capital Programme 2016/17

4.2 Highways Capital Block Funding

Following the Secretary of State for Transport announcement that £6 billion will be made available between 2015/16 and 2020/21 for local highways maintenance capital funding, we now have some certainty in future funding.

However £578million of this has now been incentivised and will require highway authorities to demonstrate that they are delivering value for money through embedment of asset management and seeking to implement efficiencies. This will be through a self assessment process to determine bandings that will influence the proportion authorities will get of the incentivised element of the funding.

The DfT have now called on authorities to submit their completed self assessment questionnaires by the 31 st January to determine the proportion of the incentivised elements they will receive for 2016/17.

The Highways Maintenance Capital Block Funding for 2016/17 is therefore anticipated to be £10,415,746 for structural maintenance, and £2,337,514 for bridges and structures, with the incentivised element of £771,989 for structural maintenance and £141,496 for bridges and structures. This is likely to be confirmed following submission of the incentive fund self assessment questionnaire at the end of January.

However following a dry run of this exercise in the summer which saw Dorset County Council identify itself as a band 2, mid performing authority, it is anticipated 100% of this element will be awarded for 2016/17.

The structural maintenance funding is reduced by £550,000 to fund Dorset’s contribution to the A338 Bournemouth Spur Road major maintenance scheme.

5 Highways Capital Programme 2016/17

5 .1 Highways Improvement Programme 2016/17

The following schemes have been identified and targeted for delivery in 2016/17. Some of these schemes have been deferred from the 2015/16 programme.

Highway Improvements - Safety Schemes

A35 Junction improvement, Axium Centre Barrack Road Safety Scheme 1 – Shell Garage Collision Site Barrack Road Safety Scheme 2 – Junction with Avenue Road (crossing point) A351 Wareham roundabout with North Causeway B3070 / A352 West Holme junction improvement West Stour Crossroads A30 East Stour Cross junction improvement

Highway Improvements – Construction only

B3069 Footway Improvements Langton Matravers Phase 2 B3162 Salway Ash – Safer routes to school West Street Wimborne – Signal scheme West Allington – Signal scheme Dorchester Road Weymouth – Signal scheme Weymouth Avenue / Maiden Castle Road cycle link Dorchester Dorchester West Station Access Ramp Page 6 –Dorset Highways Capital Programme 2016/17

B3069 Footway Improvements Langton Matravers Phase 2 B3162 Salway Ash – Safer routes to school (continued) Sea Road North cycleway Bridport

Highway Improvements – Design and construction

B3069/A351 School safe cycling route including Swanage to Studland cycle route Conifers Primary School, Radipole Lane, Weymouth Wareham bypass cycleway Grimstone to Dorchester cycleway Hoburne roundabout, Christchurch B3074 Blandford Road – Corfe Mullen Pedestrian Improvements Somerford Roundabout – Lyndhurst Road,Christchurch Le Neubourg Way / Station Road Gillingham Signal Crossing Adoption of The Walks Dorchester Howe Lane Crossing Marshwood buildout / footway at pinch point Adoption of The Walks, Dorchester Marshwood build out / footway at pinch point

Walk, talk, build schemes

Crane Street Cranborne Footway pedestrian buildout Blandford Road, Upton Footway Norden Park and Ride footway extension Sea Road North cycleway Bridport Dorchester Road Upton – refresh cycle lane markings in carriageway Fairmile Road Christchurch – Cycle markings Christchurch Bypass cycleway

Highway Improvements – Design only

A352 /B3071 Wool junction improvements Lyndhurst Road footway, Christchurch Randalls Hill Lytchett Minster new pedestrian crossing Purewell Cross Roundabout – (Cycle collisions) Dorchester SRTS GD3 scheme Footway widening Castle Street / Bridge Street cycleway Christchurch Round Burton cycle routes Wimborne Road East / West town centre cycle routes A35 Prime Transport Corridor – Total Route Management.(Measures to improve traffic flow and safety) Shaftesbury town centre cycle routes

Page 7 –Dorset Highways Capital Programme 2016/17

5.2 Highways Structural Maintenance Programme 2016/17

Assuming the authority maintains its band 2 status in the self assessment process, the structural maintenance programme consists of the following allocations.

Carriageway resurfacing 4,165,000.00 Surface Dressing 2,500,000.00 Premium surface dressing sites 500,000.00 Microasphalt resurfacing 250,000.00 Footway maintenance and resurfacing 500,000.00 Planned patching 1,000,000.00 Strategic Route Man 300,000.00 Grip cutting 175,000.00 Drainage 500,000.00 Skid sites - Investigation/retexturing 150,000.00

In addition to the above, a further bid of £3.65million corporate capital funding has been submitted through the Asset Management Group process. If successful, this will be used to increase maintenance to roads with high levels of poor skid resistance and those at the end of their life and are requiring replacement, and the replacement of strategic traffic signal installations.

Carriageway resurfacing • A30 Lotmoor Hill - Bridge at West Stour to Junc Head Lane West Stour • A3066 South to first Netherbury Junction Beaminster • A3066 Dibberford to Junc C102 Nr Tunnel • A348 Ringwood Road (Lake Farm Close to B3073) Longham • A350 Littleton to B3075 junc D33507 West End • A350 Junc B3075 to Junc C23 Sturminster Marshall Sturminster Marshall • A352 - Junc C12 Middlemarsh to junc C29 Dogbury Gate Middlemarsh • A354 Junc C6 to Thornicombe Thornicombe • A356 Frampton to Maiden Newton • A356 Rampisham Down to Lancombe Farm Rampisham • A356 West of Maiden Newton to Whitesheet Hill Maiden Newton • A357 Main Road • A357 Henstridge boundary to Stalbridge • A37 Warden Hill Frome St Quintin • B3091 Hosey Bridge to Shaftesbury Road Manston Manston • B3092 Milton on Stour to Wilts boundary Milton on Stour Page 8 –Dorset Highways Capital Programme 2016/17

• B3157 Abbotsbury Hill Abbotsbury • A354 New Road Portland • C14 Haywards Lane Child Okeford • C2 Three Legged Cross incl mini roundabouts Three Legged Cross • C50 Colehill Lane Colehill • C50 Wimborne Road Colehill

Skid site investigations • A3066 South of Beaminster to Melplash Beaminster • A3030 Woodbridge to Stock Gaylard Nr King Stag • Wool to West Lulworth West Lulworth • A350 Slip Road onto A35 Upton • A35 Barrack Road Christchurch • Peacemarsh Roundabout to Milton on Stour Milton on Stour • Parley Lane Chapel Gate Roundabout East Parley • A35 Somerford Roundabout and A337 Road Christchurch • Lower Waterstone West of Puddletown Puddletown • A352 East of nursery to new surface Owermoigne • East of Parley Cross West Parley • A350 Cann South of Shaftesbury Cann • Near Frankham Farm to County boundary near A37 Ryme Intrensica

Surface dressing • Junc B3164 Whetley Cross to Junc B3162 Drimpton Littlewindsor • Winyards Gap to Halstock Halstock • Tollerford to Wynford Eagle Wynford Eagle • Jct C107 at Quarr Cross to County boundary Hartmoor • Landshire Lane Gibbs Marsh • Holway Lane Evershot • Court Hill Nth Corscombe • Strawberry Lane Uphall • Strawberry Lane Rampisham • Kingcome Road • Toller Hill Toller Porcorum • Clift Lane - Kingcome to Mount Pleasant Mount Pleasant • Powerstock junc to bridge West Milton West Milton • From bridge West Milton to Mangerton Lane Bradpole West Milton Page 9 –Dorset Highways Capital Programme 2016/17

• Mount Pleasant to Junc B31653 Hackthorn Hill Hooke • From B3390 Crossways to A352 at Owermoigne Crossways • Rampisham Hill Hooke • Green Lane Hooke • Childhay to Kittwhistle Childhay • Childhay to Junc B3165 Childhay • Grange Lane - Junc B3164 to Blackdown Burstock • Conegar Hill Littlewindsor • Hooke to Junc C66 Hooke • D10803 • New Road Uploaders • Mount Pleasant to North Poorton North Poorton • Lime Hill Jack's Hill to jct Ridgeback ln South Poorton South Poorton • Lime Hill jct Hill Farm, south to jct c44, Powerstock • Lime Hill Ridgeback ln South Poorton to jct hill farm South Poorton • D11015 North Poorton • Linnet Lane Uphall • Broom Hill to Junc C29 Rampisham • D11504 Wraxhall • Oak Lane Benville • Pound Hill/Catsley Lane Corscombe • Lovelands Corscombe • Higher Halstock Leigh Higher Halstock Leigh • D11719 Corscombe • D11721 Weston • Lecher Lane South Perrott South Perrott • D11805 South Perrott • Village Road Chedington • A37 Junc to Cattistock, Cattistock • Chanmarle Lane - Chalminton to A37 Junc Frome St Quintin • Higher Kingcome to A356 Kingcome • Higher Kingcome to Mount Pleasant Kingcome • Higher Kingcome to Hooke Hooke • Toller to Higher Kingcome Kingcombe • Barrowlands to Mount Pleasant Powerstock Common • Toller High Street through to Barrowlands Toller Porcorum Page 10 –Dorset Highways Capital Programme 2016/17

• A35 Junc to Roman Road Bradford Peverill • Bradfor Peverill to Muckleford Bradford Peverill • From Normandy Way to Bradford Peverill Bradford Peverill • Road Dorchester to Muckleford Bradford Peverill • A35 (trunk) to Jct C33 Lower Bockhampton Lower Bockhampton • Ansty Cross to Hilton Hilton • Old Weymouth Road Moreton • Sixpenny Handley to County boundary at Minchington Down Sixpenny Handley • Broadwindsor - Whetley Cross Broadwindsor • Dottery Shaves X to jct Dodges Orchard Dottery • Dottery jct Dodges Orchard to Paddocks X Dottery • Dottery jct Paddocks X Boarden bridge Dottery • Dottery Boarden bridge to Broad Oak Road jct Dottery • A356 junc Winyards Gap - A3066 Mosterton • Higher Street jct C44 to Forsters Lane Bradpole • Higher Street jct Forsters Lne to Yellow Lne Loders • Upton Manor Road Uploders • Sea Hill Lane Chideock • Chapel Street Shipton Gorge/Rosamund Shipton Gorge • Church Street Puncknowle • Chalk Pitt Lane Litton Cheney

Premium surface dressing • B3157 Coast Road - From Crown roundabout to Freshwater • B3157 Coast Road - From Abbotsbury to Portesham • A352/285 - Eastbound from Warmwell r/a to Owermoigne • A352/288 - Westbound Owermoigne to Warmwell r/a • A352 Wool to Wareham • A35 Morden Park Corner to Bakers Arms roundabout • B3143 Piddle Valley • B3162 West Allington Bridport • C12 Cerne Abbas junc - Holcombe Bottom Junction • A351 Wareham RA to Corfe Castle

Page 11 –Dorset Highways Capital Programme 2016/17

5.3 Bridges and Structures

The bridges and structures capital programme for 2016/17 is as follows:

• Crawford Bridge, Str No.317 - C25 Masonry repairs, arch 9 • Julian's Bridge - Str No 375 - B3078 Historic bridge, masonry maintenance Pamphill • Rampisham Main Bridge - D11503 Invert and scour protection work Rampisham • Littlemoor Railway Subway - C905 Concrete repairs, painting and the addition of decorative wall surface • Backwater R/W - D20807 Rebuild masonry wall supporting the highway Puddletown • Blandford Bridge - C31 Historic bridge, maintenance • Coombe Street Culvert - A30 Options to overcome existing culvert damaged by utility equipment • Town Bridge_Weymouth - D91518 Electrical/Mechanical works • Gold Hill Wall Shaftesbury Masonry repairs Shaftesbury • R/W, Str No.2087 - C25 Retaining Wall coping and facing Tarrant Gunville • A350 Overbridge (East) - A350 Pier protection and coping repairs Lytchett Minster and Upton • Durweston Flood 1 Far West - A357 Replacement RC extensions, parapet, waterproofing works in conjunction with a Structural Maintenance scheme Durweston • Durweston Flood 2 West - A357 Possible parapet, waterproofing works in conjunction with a Structural Maintenance scheme Durweston • Durweston Flood 3 East - A357 Possible parapet, waterproofing works in conjunction with a Structural Maintenance scheme Durweston • Tarrant Rawston - C25 Waterproofing, masonry repairs and invert protection Tarrant Rawston Page 12 –Dorset Highways Capital Programme 2016/17

• Bramblecombe - D20673 Add scour protection to watercourse through invert with downstands either end • Samways Bridge - D12203 Repairs to timber parapets Frampton • Upton Brickworks Bridge - A35 Pier protection Lytchett Minster and Upton • Small Capital Works Various locations Various • Nottington Mill - C58 Rebuild damaged invert and abutments • Blandford Road - B3074 Masonry repairs to old railway bridge Corfe Mullen • Rowden Mill - D30201 Replacement culvert • Mohuns GreaT - C12 Historic bridge, scour protection and masonry repairs Dorchester • Wool 1 - RoW36 Replacement superstructure Wool • Leigh East Bridge - C45 Masonry repairs possible waterproofing Leigh • Whetham Mill - D10208 Replacement culvert Burstock • Beaulieu Wood - C20 Rebuild or repair substructure and waterproof Buckland Newton • Hurst Middle - B3390 Replacement parapets and masonry work Affpuddle and Turnerspuddle • Tuckton Bridge - B3059 Pier protection and scour protection, Scheme lead by Bournemouth Council • Barrowland Lane -D12501 Works to substructure, foundations & invert Toller Porcorum • Knapp Bridge - C88 Waterproofing, masonry works and scour protection work Wootton Fitzpaine • Culvers Lane - D30534 Spandrel/Headwall maintenance Gillingham • Wall - D33301 'Plastic' retaining wall to support highway • Castleton Road - D20208 Remedials to upstream elevation, flooding concerns Sherborne • Station Road Railway Bridge - D20261 Upstream end rebuild of stone voussoir, wingwalls & spandrel possibly with additional room for large vehicle movements Sherborne • Eastbury - C25 Problems with arch/parapet connection following a RTC - repaired? Possible saddle and rebuild d/s parapet Tarrant Gunville • Neubourg Way Dwarf Wall Failing low retaining wall Gillingham

Bridge Projects for Design Only 2016/17

• Waterloo Bridge - C350 Soffit masonry repairs Page 13 –Dorset Highways Capital Programme 2016/17

• General Work - Major Projects Various • Buddle Bridge_Lyme Regis - A3052 Historic bridge, replacement arch ribs • Lamb House Bridge - C14 Low bridge masonry construction maintenance works • Christchurch BP Mude - A35 Waterproofing and other works, in conjunction with a Structural Maintenance scheme • Causeway 6 - C137 Replacement culvert, Str No.661 Hurn • Bakers Arms Middle Culvert - A35 Remedial works to rolled steel culvert Lytchett Minster and Upton • Kings Mill R/W - C15 Replacement retaining wall Stalbridge • School Lane R/W - D52804 Retaining wall rebuild West Lulworth • Bakers Arms West Culvert - A35 Remedial works to rolled steel culvert Lytchett Minster and Upton • Bakers Arms East Culvert - A35 Remedial works to rolled steel culvert Lytchett Minster and Upton • Benville Bridge - C29 Historic bridge. Possible concrete saddle, waterpoofing & masonry work in conjunction a Structural Maintenance scheme Corscombe • Somerford Bridge - B3059 Possible waterproofing works in conjunction with a Structural Maintenance scheme • Benville Farm - C29 Possible concrete saddle, waterpoofing & masonry work in conjunction a Structural Maintenance scheme Corscombe • Bridge - A350 Possible concrete saddle and waterproofing works in conjunction with a Structural Maintenance scheme Iwerne Minster • Burton Bradstock Flood Relief - B3157 Possible waterproofing works in conjunction with a Structural Maintenance scheme Burton Bradstock • Northport Bridge - A351 Special Inspection to investigate issues including abutments, pier, bearings, expansion joints and drainage. Works likely to include repairs/replacement of structural elements Wareham Town • Sandford Lane Bridge - A351 Replacement expansion joints and waterproofing, should form part of a Structural Maintenance scheme Wareham Town • West End House North - B3159 Replacement culvert requires Flood Risk Management input Winterborne St Martin • West End House South - B3159 Replacement culvert requires Flood Risk Management input Winterborne St Martin • Hylands Farm Culvert - D20616 Replacement culvert/pipe Buckland Newton • Knighton Lane Ford - D20530 Replacement footbridge Beer Hackett Page 14 –Dorset Highways Capital Programme 2016/17

• Berwick - C9 Replacement pipe/culvert Swyre • West Shilvinghampton Dairy - D12016 Replacement culvert Portesham • Grimstone - PRoW Replace existing post-tensioned footbridge Stratton • Bere Marsh - PRoW Replace existing post-tensioned footbridge Child Okeford • Thornford Road - C11 Upgrade works to various elements Castleton • Hidden Bridge - C38 Either replacement culvert or add liner Rampisham • High Bench_East Stour - A30 Parapet upgrade and other structural works West Stour • Christchurch Rd Bridge - C156 PROVISIONAL, Subject to site survey Oct 2015 St. Leonards and St. Ives • Powerstock R/W - C44 Retaining wall maintenance Powerstock • Network Rail & Swanage Rail & Redundant Rail O/B Upgrade low bridge signing Various • St Martin Wall - B3075 Wall monitoring and strengthening works Wareham Town • St Edward The Martyr Wall Wall monitoring and strengthening works Wareham Town

Bridge Capital Projects 2016/17

• Railway Overbridge Parapet Protection Various Various • Beaminster Tunnel Slope stabilisation - Final year of ground management Beaminster • Hayward Main Replacement Bridge Deck Shillingstone • Dinah's Hollow Slope stabilisation • Melbury Church Slope Stabilisation Melbury Abbas • Charminster Bridge Replacement - minor finishing off works Charminster

Andrew Martin Head of Highways December 2015