2 Method Statement
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Road, Walters Ash, Buckinghamshire, High Wycombe, HP14 4UU
Main Road, Walters Ash, Buckinghamshire, High Wycombe, HP14 4UU www.bb-estateagents.co.uk A BEAUTIFULLY EXTENDED four-bedroom SEMI-DETACHED family home which has been RENOVATED to a HIGH SPECIFICATION THROUGHOUT, originally built in and around 1920. The property is located in the HIGHLY DESIRABLE VILLAGE of Walters Ash and is within CLOSE PROXIMITY to the local primary school. Main Road, Walters Ash, Buckinghamshire, High Wycombe, HP14 4UU Guide Price - £625,000 • HIGH SPECIFICATION • EXTENDED • SEMI-DETACHED FAMILY HOME • FOUR BEDROOMS • OPEN PLAN KITCHEN / DINER & SNUG • LIVING ROOM WITH OPEN FIREPLACE • MASTER BEDROOM WITH ENSUITE • PLAYROOM / DOWNSTAIRS OFFICE • FAMILY BATHROOM • PRIVATE SUNNY REAR GARDEN • DRIVEWAY WITH PARKING FOR 5+VEHICLES 78 High Street, Princes Risborough, Buckinghamshire, HP27 0AX 01844 343661 www.bb-estateagents.co.uk Walters Ash Walters Ash is located in the heart of the Chilterns, an Area of Outstanding Natural Beauty, and surrounded by Green Belt. Local amenities include a Post Office and shops, a garage and a highly regarded local primary school. Princes Risborough (3 1/2miles) and High Wycombe (4 miles) provide a wider array of shopping and leisure facilities, excellent secondary schools and main line stations providing links to London, Marylebone (40 and 35 minutes respectively) and the midlands. There is an excellent local bus service and M40 (junction 4) is within 6 miles. Description A beautifully extended four-bedroom semi-detached family home which has been renovated to a high specification throughout. The property is located in the highly desirable village of Walters Ash and is within close proximity to the local primary school, amenities as well as transport links. -
Download Ofsted 2017 Report
Ofsted Piccadilly Gate Store Street Manchester T 0300 123 4234 M1 2WD www.gov.uk/ofsted 10 November 2017 Ms Kerenza Gwynn Headteacher Naphill and Walters Ash School Kilnwood Walters Ash High Wycombe Buckinghamshire HP14 4UL Dear Ms Gwynn Short inspection of Naphill and Walters Ash School Following my visit to the school on 31 October 2017, I write on behalf of Her Majesty’s Chief Inspector of Education, Children’s Services and Skills to report the inspection findings. The visit was the first short inspection carried out since the school was judged to be good in February 2013. This school continues to be good. The leadership team has maintained the good quality of education in the school since the last inspection. You provide high-quality and effective leadership, which is creative and sometimes challenges the norm. For example, all staff contribute to the school’s development plan as a working document which is placed on the staff room wall so that every member of staff understands how well the school is doing and where extra work is needed. Staff value the fact that you listen to them and they feel part of what is clearly a very strong team. You skilfully use the talents of your senior leadership team to improve teaching, learning and assessment across the school to raise standards. All leaders articulate your shared vision very clearly and have accurate views about what the school does well and what could be even better. You give leaders clear objectives, high-quality professional development and time to do their jobs well. -
AUGUST Sept 2019.Pdf
MOBILE FISH AND CHip VA N SERVING: 07376395678 LACEY GREEN WALTERS ASH NAPHILL EVERY SATURDAY 3.30PM TILL 7.30PM ONLINE TRACKER AVAILABLE HOME DELIVERY AVAILABLE WHERE POSSIBLE 27 DIFFERENT STOPS FULL ROAD LIST ON FACEBOOK HAVING THE FAMILY OVER? FACEBOOK.COM/ WHY NOT PRE-ORDER LARGE ORDERS TO AVOID WAITING MOBILECHIPPY 2 www.naphillandwaltersash.org.uk Mandy Dearden Tel: 01494 563006 Email: [email protected] Open: Mon-Fri 9.30am-5pm Saturday 8.30am-1pm CLOSED Thursday 245 Main Road, Walter’s Ash, HP14 4TH National Inspection Council Electrical Installation Contractors Member No:041067 593817 Our team of electrical, plumbing and gas engineers For Free Estimate Please Call: are qualified to carry out all type of domestic & commercial works including the following 01494 700 389 / 07811 946 611 ELECTRICAL PLUMBING GAS • Extra Socket + Lighting Points • Hot & Cold Pipework • Landlords CP12 safety certificates • Full / Part Re-wiring • Repairs & Installations • New Boiler & Central Heating Installation • Consumer Unit Upgrades • G3 Approved Cylinder installers • Boiler servicing & repairs • Electrical Condition Report • 1st and Second fix Kitchen • Power Flushing / Magnacleanse • Garden / Security Lighting • Bathroom / WC installations • Cooker / Hob / Fire installation Servicing www.naphillandwaltersash.org.uk 3 HAVING PROBLEMS WITH YOUR WeSTFIELD NEWSPAPER DELIVERY? LEASING M.H. Freeman newsagent, reliable family-run business. Delivering to Naphill and Walter’s Ash for Personal or Business car & van leasing over six years and looking to include your choice of (A new car could be cheaper than you think.) newspapers and magazine in our round. Free advice and quotes available 01494 569392 Please ring 01494 526425 with your order [email protected] Est. -
The Henley College Coach Transport from Buckinghamshire for Academic Year 2016-17
THE HENLEY COLLEGE COACH TRANSPORT FROM BUCKINGHAMSHIRE FOR ACADEMIC YEAR 2016-17 Coaches run by Henley College Coaches run by Henley College B20 - HEYFORDIAN COACHES B22 - HEYFORDIAN COACHES Walters Ash, Kilnwood 07.05 Hazelmere,Amersham Rd/St Johns Rd bus stop 07.03 Naphill, Clappins Lane 07.07 Hazlemere Crossroads 07.05 Naphill, Village Hall 07.09 Hazelmere Cosy Corner 07.07 Coombe Hill (Bottom) bus stop 07.13 Widmer End – Brimmers Hill/Windmill Lane 07.09 Terriers Cross Roads 07.19 Cryers Hill Lane 07.11 Amersham Hill – Shubbery Road 07.21 Hughenden Avenue (Bottom) bus stop 07.15 Easton Street - Church 07.24 Downley, The Pastures (Church) 07.17 London Road / Bassetbury Lane 07.26 Plomer Hill/Southfield Road 07.19 London Road / Hatters Lane 07.30 West Wycombe Road/Beechwood Road 07.21 London Road / Cock Lane 07.32 Piddington, Dashwood Arms PH 07.25 Loudwater – London Road / Rayners Avenue 07.34 Studley Green, The Old Post Office bus stop 07.30 Loudwater – London Road A40/ Station Road 07.36 Stokenchurch, B482 Marlow/Slade Road 07.34 Loudwater – Station Road Bus Stop 07.37 Cadmore End School 07.39 Wooburn Green – Boundary Rd/Watery Lane 07.39 Bolter End, Fingest Lane (The Peacock PH) 07.41 Flackwell Heath –Green Dragon Lane/Blind Lane 07.45 Lane End, Village Hall 07.43 Bourne End – Blind Lane / Marlow Road 07.48 Marlow, Dean Street (Police Station) 07.50 Little Marlow – Kings Head PH 07.51 Henley College 08.15 Depart Stop 5 4.25 Henley College 08.15 Depart Stop 1 4.15 B21 - HEYFORDIAN COACHES 4.15 pm Application forms for the purchase of annual passes for these coaches are available OldAmersham A355 bottom of Gore Hill bus stop 07.05 from Henley College Student Services Chalfont St Giles A413 Citroen Garage/Vache Ln 07.10 Please check times at enrolment. -
1957 RGS High Wycombe School List: Grey Book
I9573 SCHOOL LISTS FOR THIRD TERM 1957 GOVERNING BODY Date of Appointihent R. P. CLARKE, Esq., C.B.E., M.A., B.C.L. (Chairman) ... 1931 G. H. BAKER, Esq., J.P. (Vice-Chairman) ........................... 1941 R. W. BARTLETT, Esq.................................................................... 1934 M acA. BEXON, Esq., C.B.E............................................................ 1952 THE RIGHT REVEREND THE BISHOP OF BUCKINGHAM ............................................................... 1946 §W/Cdr. G. H. CURRALL, M.B.E., M.M................................... 1957 §D. J. HANN, Esq.............................................................................. 1956 §Mrs. C. A. HOLLOWAY ................................................... 1955 §C. W. LANCE, Esq., J.P. 1946 M rs. W. R. MOSS, J.P...................................................................... 1955 P. C. RAFFETY, Esq., J.P. (Chairman 1947/56) ............... 1926 J. W. K. TAYLOR, Esq.................................................................... 1949 N. THEED, Esq.................................................................................. 1957 Miss M. TOWERTON ................................................................. 1952 §E. WEBB, Esq.................................................................................... 1957 * Bucks County Council Representative. § Wycombe Divisional Executive Representative, t Foundation Governors. Clerk to the Governors : D. E. COOKE, Esq., M.C., M.A. Bursar : M rs. U. M. FREEMAN, B.Sc. Secretary : M rs. J. -
Wycombe District Local Plan Settlement Hierarchy Study
Wycombe District Local Plan Settlement Hierarchy Study Final Report June 2016 1 CONTENTS 1. Background 3 2. National policy context 4 3. Methodology 5 4. The resulting hierarchy 9 5. List of settlements considered in the study 15 6. Settlement Audit Matrix 17 7. Map showing settlement hierarchy 20 Appendix A: Local policy context 22 Appendix B: Review of other studies 24 Appendix C: Summary of information sources 28 Appendix D: Glossary of Terms 31 Appendix E: Detailed settlement audits (separate document) 2 1. Background 1.1 Wycombe District Council is currently progressing work on preparing a new planning framework, including a new Local Plan for the District. This work comprises a range of studies to explore options for accommodating new development requirements. 1.2 As part of the Council’s technical work which has already taken place, particularly as part of the Local Plan Options Consultation in 2014, it has already become clear that the requirements for new development are likely to be considerably higher than previous targets. Consequently the Council is likely to be faced with significantly greater challenges in terms of finding options to meet these needs. 1.3 To put this into context, the Council’s Adopted Core Strategy was based on a housing target of 402.5 new homes per annum, a quantum which was capable of being delivered predominantly through brownfield development and the limited pool of greenfield reserve sites in the south of the District. The early indication of significantly higher growth levels in the District means, however, that for the first time in many years, there is the prospect of a significant level of greenfield development being required to be explored in the Local Plan, to help meet the District’s development requirements. -
High Wycombe
High Wycombe - Princes Risborough - Aylesbury 300/X30 MONDAY TO FRIDAY From: 4 September 2016 Service number: 300 300 300 300 300 300 300 300 X30 X30 300 300 300 Notes : sch Nsch sch Nsch sch Nsch sch Nsch sch Nsch sch High Wycombe Bus Station, Gate D 0605 0620 0635 0638 0650 0654 0712 0715 0718 0721 0728 0735 0750 Hughenden Valley, Coombe Lane 0613 0628 0644 0647 0700 0703 0722 0724 | | 0740 0744 0759 Naphill, Village Hall 0616 0631 0647 0650 0703 0706 0726 0727 | | 0744 0747 0803 Walters Ash, Parkwood 0620 0635 0651 0654 0708 0711 0732 0732 | | 0750 0752 0809 Lacey Green, The Whip 0623 0638 0654 0657 0713 0714 0737 0735 | | 0753 0755 0812 West Wycombe, Pedestal ||||||||0725 0728 | | | Saunderton, The Golden Cross ||||||||0730 0733 | | | Princes Risborough, Market Square 0631 0648 0704 0706 0724 0725 0748 0746 0744 0744 0804 0805 0823 Great Kimble, Church 0636 0654 0710 0712 0731 0731 0755 0753 0751 0750 0811 0812 0830 Butlers Cross, The Russell Arms ||||0736 0736 |||||| | Stoke Mandeville, The Bull 0642 0700 0717 0718 0741 0741 0801 0759 0757 0756 0817 0818 0837 Stoke Mandeville Hospital, Main Gate 0645 0704 0722 0722 0746 0745 0806 0803 0802 0800 0822 0822 0842 Aylesbury Bus Station 0654 0716 0735 0731 0804 0757 0824 0815 0820 0812 0845 0834 0904 MONDAY TO FRIDAY Service number: 300 300 300 X30 300 300 300 X30 300 300 300 X30 300 Notes : Nsch sch Nsch High Wycombe Bus Station, Gate D 0755 0815 0818 0835 0855 0910 0925 0940 0955 1010 1025 1040 1055 Hughenden Valley, Coombe Lane 0804 0826 0827 | 0904 0919 0934 | 1004 1019 1034 | 1104 -
Weekly List of Planning Applications
Weekly List of Planning Applications Planning & Sustainability 02 May 2019 1 17/2019 Link to Public Access NOTE: To be able to comment on an application you will need to register. Wycombe District Council WEEKLY LIST OF PLANNING APPLICATIONS RECEIVED 29.04.19 19/05552/FUL Received on 18.04.19 Target Date for Determination: 13.06.2019 Other Auth. Ref: MR FERGUSON Location : Haycroft Spurlands End Road Great Kingshill Buckinghamshire HP15 6JA Description : Householder application for construction of roof extensions/alterations, single storey rear/side extension and associated external alterations Applicant : Mr & Mrs D Phillips Haycroft Spurlands End Road Great Kingshill Buckinghamshire HP15 6JA Agent : St. Johns Projects LTD Feathers Kiln Road Prestwood Bucks HP16 9DG Parish : Hughenden Parish Council Ward : Greater Hughenden Officer : Heather Smith Level : Delegated Decision 19/05720/FUL Received on 18.04.19 Target Date for Determination: 13.06.2019 Other Auth. Ref: Location : 50 Melbourne Road High Wycombe Buckinghamshire HP13 7HD Description : Householder application for construction of decking and timber fencing to rear (retrospective) Applicant : Miss Lesley Owusu 50 Melbourne Road High Wycombe Buckinghamshire HP13 7HD Agent : Parish : High Wycombe Town Unparished Ward : Micklefield Officer : Ian Beck Level : Delegated Decision 2 19/05762/FUL Received on 23.04.19 Target Date for Determination: 18.06.2019 Other Auth. Ref: Location : 55 Hughenden Avenue High Wycombe Buckinghamshire HP13 5SL Description : Change of use from residential (C3) to 7-bed HMO (SuiGeneris) (Retrospective) Applicant : Mr Andrew McMullan 9A Sandelwood End Beaconsfield HP9 2NW Agent : Parish : High Wycombe Town Unparished Ward : Disraeli Officer : Stephanie Penney Level : Delegated Decision 19/05865/FUL Received on 24.04.19 Target Date for Determination: 19.06.2019 Other Auth. -
2015 - 2016 Annual Network Update Plans Definition of Terms
2015 - 2016 Annual Network Update Plans Definition of Terms Site Status Definition: Site Built: Site is built but may or may not be taking call traffic. To open the Annual Network Update Plans for each operator please click on the relevant tab at the bottom left hand corner of this spreadsheet. Three - Annual Network Update Plans Spreadsheet 2015 - 2016 Operator Definitions: Three - a site operated by Three only Three & EE- a consolidated site operated jointly by Three and EE Limited Please note that consolidated sites are shown on both Three and EE's 2015 - 2016 Annual Network Update Plans. EE Limited (T-Mobile & ex Orange) and Three, through their joint venture company, Mobile Broadband Network Ltd (MBNL) has consolidated their 3G networks. This has resulted in the joint use of existing base station site infrastructure & hardware which results in one set of equipment on site and is enabling the reduction of duplicate sites. For Enquiries relating to the Annual Network Update Plans for Three please contact : William Comery, Community Affairs Manager - [email protected] or Mark Shaw, Health & Safety & Community Affairs Manager - [email protected] Authority National Parks Operator Operator Reference Easting Northing Site Name Site Address Post Code Status Wycombe Three and EE 26413 486300 188200 PUMP FARM - 2505 153697 O2 2505, Pump Farm, Marlow, Bucks SL7 3RB Site Built Wycombe Three and EE 26365 484932 191036 WYCOMBE BADMINTON CENTRE Wycombe Badminton Centre, Crest Road, High HP11 1UA Site Built 187914 Wycombe, Buckinghamshire Wycombe Three and EE 23206 482890 198890 HIGH WYCOMBE PWQH NORTH MD High Wycombe Pwqh North MD, Naphill, High HP14 4TZ Site Built 221524 Wycombe, Bucks Wycombe Three and EE 23196 487701 191111 CHEPPING WYCOMBE (THS) 7341 CHEPPING WYCOMBE, Abbey Barn Lane, HP10 9QQ Site Built Flackwell Heath, High Wycombe, Bucks. -
Weekly List of Planning Applications
Weekly List of Planning Applications Planning & Sustainability 11 April 2019 1 14/2019 Link to Public Access NOTE: To be able to comment on an application you will need to register. Wycombe District Council WEEKLY LIST OF PLANNING APPLICATIONS RECEIVED 10.04.19 Wycombe District Council 19/05275/FUL Received on 01.04.19 Target Date for Determination: 27.05.2019 Other Auth. Ref: Location : 25 Orchard Close Hughenden Valley Buckinghamshire HP14 4PR Description : Householder application for construction of an open front porch, insertion of a dormer window to the front roof elevation and bay window with roof Applicant : Mr Martin Sweeney 25 Orchard Close Hughenden Valley Buckinghamshire HP14 4PR Agent : Parish : Hughenden Parish Council Ward : Greater Hughenden Officer : Valerie Bailey Level : Delegated Decision 19/05526/FUL Received on 29.03.19 Target Date for Determination: 24.05.2019 Other Auth. Ref: MR SIMON ROGERS Location : Terriers Lodge Amersham Road High Wycombe Buckinghamshire HP13 5AJ Description : Construction of 3 bed detached dwellinghouse with associated landscaping, parking with access from Amersham Road Applicant : Mr Adrian White 67 Verney Avenue High Wycombe HP13 5AJ Agent : Eddy Fiss Design 38 Adelaide Strand Road Sandymount Dublin D04 F6F9 Parish : High Wycombe Town Unparished Ward : Terriers And Amersham Hill Officer : Stephanie Penney Level : Delegated Decision 2 19/05527/LBC Received on 29.03.19 Target Date for Determination: 24.05.2019 Other Auth. Ref: Terriers Lodge New Cottage Location : Terriers Lodge Amersham Road -
Ragdolls Stocking Lane Naphill Hp14 4Ne
RAGDOLLS STOCKING LANE NAPHILL HP14 4NE This lovely four bedroom semi-detached property, with a separate self-contained annex, is situated in Stocking Lane, Naphill set within the Chiltern countryside offering open views over the surrounding countryside to both the front and rear. Entrance hall | Sitting room | Dining room | Kitchen/Breakfast room | Utility Room | Downstairs WC | Three double bedrooms, 1 with en-suite | Study / bedroom 4 | Family bathroom | Driveway parking for at least 5 vehicles | Rear garden with patio area | Self-contained one bedroom annex ____________________________________________________________________ Situated in a quiet country lane overlooking rolling fields, Ragdolls has been extended and improved by the current owners to provide flexible family accommodation over three floors. The accommodation on the ground floor consists of a sitting room with feature working fire place, dining room and kitchen/breakfast room. The kitchen comprises a range of maple base and wall mounted units with black granite work surfaces. It also benefits from an island unit incorporating an eating area and French doors leading to the patio area in the rear garden. Additionally there is an utility room and WC on the ground floor. Stairs leading from the hallway take you to the first floor where there are two double bedrooms and a smaller third room currently used as a study. There is a contemporary styled family bathroom with bath and shower over. A spiral staircase takes you to the second floor bedroom currently used as an arts and craft room. This room benefits from an adjoining bathroom with shower and a Juliette balcony overlooking the rear garden and countryside beyond. -
Dunsmore, Wendover and Halton | CFA10 | Dunsmore, Wendover and Halton
LONDON-WEST MIDLANDS ENVIRONMENTAL STATEMENT ENVIRONMENTAL MIDLANDS LONDON-WEST | Vol 2 Vol LONDON- | Community Forum Area report Area Forum Community WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area report CFA10 | Dunsmore, Wendover and Halton | CFA10 | Dunsmore, Wendover and Halton and Halton Wendover Dunsmore, November 2013 VOL VOL VOL ES 3.2.1.10 2 2 2 London- WEST MIDLANDS ENVIRONMENTAL STATEMENT Volume 2 | Community Forum Area report CFA10 | Dunsmore, Wendover and Halton November 2013 ES 3.2.1.10 High Speed Two (HS2) Limited has been tasked by the Department for Transport (DfT) with managing the delivery of a new national high speed rail network. It is a non-departmental public body wholly owned by the DfT. A report prepared for High Speed Two (HS2) Limited: High Speed Two (HS2) Limited, Eland House, Bressenden Place, London SW1E 5DU Details of how to obtain further copies are available from HS2 Ltd. Telephone: 020 7944 4908 General email enquiries: [email protected] Website: www.hs2.org.uk High Speed Two (HS2) Limited has actively considered the needs of blind and partially sighted people in accessing this document. The text will be made available in full on the HS2 website. The text may be freely downloaded and translated by individuals or organisations for conversion into other accessible formats. If you have other needs in this regard please contact High Speed Two (HS2) Limited. Printed in Great Britain on paper containing at least 75% recycled fibre. CFA Report – Dunsmore, Wendover and Halton/No 10