Five Year Housing Land Supply Statement 2020

Total Page:16

File Type:pdf, Size:1020Kb

Load more

Breckland Council Statement of Five-Year Housing Land Supply (1.11.2020) Published December 2020 SUMMARY Breckland Council can demonstrate a 5-year supply of housing land as set out below. The Council will review the 5-year land supply position in March 2021. Breckland Council’s 5 Year Housing Position Statement (October 2020) Housing Requirement A Local Plan annual target 612 B 5 Year Target 612*5 3,060 C Shortfall in delivery since 2011 866 D Requirement with shortfall (Sedgefield) 3,060 +866 3,926 E 5% Buffer 5% of 3,926 196 F Total Requirement (November 2020 – D+E 4,122 October 2025) G Annual Requirement F/5 824 Housing Supply G Major Sites with Planning Permission 4,380 H Minor sites with planning permission 886 I Local Plan allocations with undetermined planning 216 applications J Windfall 242 K Total Supply 5,724 L 5 Year Housing Supply (5% buffer) K/G 6.95 1. Introduction 1.1 This Five-Year Housing Land Supply Statement sets out Breckland District Council’s residential land supply position as at 31 October 2020. 1.2 The Council is required to make provision for land to be available to build a certain number of houses either through allocations in Local Plans or by approving applications on suitable sites. The scale and location of development is governed by national and local plan policy that essentially is to develop in sustainable locations and to meet objectively assessed local needs. In Breckland this means a predominantly urban orientated strategy. The National Planning Policy Framework (2019) 1.3 The National Planning Policy Framework (the Framework) is a material planning consideration in both plan and decision making and therefore it must be given due weight. 1.4 Strategic policies should include a trajectory of housing delivery illustrating the expected rate over the plan period, and all plans should consider whether it is appropriate to set out the anticipated rate of development for specific sites. Local planning authorities should identify and update a supply of specific deliverable sites sufficient to provide a minimum of five years’ worth of housing against their agreed housing requirement. 1.5 The requirement should also include an additional figure (a buffer) that is taken from later years in the plan period. This could be: • 5% to ensure choice and competition in the market for land; or • 10% where the local planning authority wishes to demonstrate a 5-year supply of deliverable sites through an annual position statement or recently adopted plan, to account for any fluctuations in the market during that year; or • 20% where there has been significant under delivery of housing over the previous three years, to improve the prospect of achieving the planned supply. 1.6 A five-year supply of deliverable housing sites, with the appropriate buffer, can be demonstrated where it has been established in a recently adopted plan, or in a subsequent annual position statement which: • has been produced through engagement with developers and others who have an impact on delivery, and been considered by the Secretary of State; and • incorporates the recommendation of the Secretary of State, where the position on specific sites could not be agreed during the engagement process. 1.7 If there is compelling evidence, the Framework supports the inclusion of a windfall allowance in the 5-year supply figures. 2. Background 2.1 In November 2019 Breckland Council adopted its Local Plan. Paragraph 74 of the NPPF states: A five year supply of deliverable housing sites, with the appropriate buffer, can be demonstrated where it has been established in a recently adopted plan, or in a subsequent annual position statement which: a) has been produced through engagement with developers and others who have an impact on delivery, and been considered by the Secretary of State; and b) incorporates the recommendation of the Secretary of State, where the position on specific sites could not be agreed during the engagement process Footnote 38 states: For the purposes of paragraphs 73b and 74 a plan adopted between 1 May and 31 October will be considered ‘recently adopted’ until 31 October of the following year; and a plan adopted between 1 November and 30 April will be considered recently adopted until 31 October in the same year. 2.2 The Council was therefore able to demonstrate that it could demonstrate a 5 Year of Housing Land by virtue of having a recently adopted Local Plan. This assumption ended on 31 October 2020. 2.3. The usual monitoring year for housing supply calculations is April to March. It is therefore important that this continues to be reflected in the Council’s Monitoring processes. 2.4 Therefore this report includes the following information1. • Completions for the Period 1 April 2019 – 31 March 2020 • Planning permissions as at 31 March 2020 • Completions 1 April 1 2020 – 31 October 2020 • Planning permissions as at 31 October 2020 2.5 The 5 Year Housing Land Supply position is set out for the period ending 31 October 2020. 1 Please note: Due to the restrictions imposed by Covid 19 lockdown restrictions it was not possible for onsite monitoring to be undertaken between April and August 2020. The total dwellings completed therefore covers the period April 2019 – October 2020. This Report makes some assumptions on the number of dwellings completed in the year ending March 31 2020 and the subsequent 7 months ending October 2020. This is set out in this Report 3. Housing Requirement 3.1 The first step in assessing a Council’s 5-year land supply is to establish the correct housing requirement against which to test the identified supply. 3.2 The national Planning Practice Guidance (PPG) sets out what the starting point for calculating a 5-year land supply is. It states2: Housing requirement figures identified in adopted strategic housing policies should be used for calculating the 5-year housing land supply figure where: • the plan was adopted in the last 5 years, or • the strategic housing policies have been reviewed within the last 5 years and found not to need updating. 3.3 This guidance provides a clear steer as to the most appropriate requirement figures that should be used to calculate the 5-year land supply position. In 2019, Breckland adopted its Local Plan with an annual housing requirement of 612 dwellings. 3.4 Over the next 5-year period the requirement is therefore 3,060 dwellings (612*5) Shortfall 3.5 Table 1 below sets out the total completions since 2011. After a slow start from 2011, recent years (up to 2019) have shown there to be an upward trend in completions post-recession. This was a positive indicator of the strength of housing delivery in Breckland going forward. 3.6 Between April 2019 and October 2020 753 dwellings were completed. This can be assessed against the required target of 969 dwellings for the period April 2019 – October 2020 (19 months)3 3.7 This represents a shortfall over the 19-month period of 216 dwellings (969 – 753) 3.8 For monitoring and consistency purposes, it is necessary to seek to apportion the completions by the standard monitoring year (April – March). Lockdown restrictions meant that on-site monitoring was not possible until after August 2020. Consequently, it is not known whether a completion occurred between April 2019 and March 2020 or between April and October 2020. What is known is that nationally there has been a very significant drop in completions since March 2020 due to the covid pandemic. Information from MCLG suggests that, in England the number of dwellings completed on site was 15,390 from April to June 2020. This is a 62% decrease compared to the last quarter and 64% below their level in the same quarter a year ago4. This reflects the decision of most of the biggest housebuilders to shut down operations on site as well as closing sales offices and showhomes in order to prevent the spread of the virus. A Report by Savills (Impact of Covid-19 on social 2 Paragraph: 005 Reference ID: 68-005-20190722 3 Based on 612 per annum. This equates to an average of 51 per month. 19 months = 969 4 MCLG Report: Housing supply: Indicators of new supply, (England Statistical Release January to June 2020 housing supply and residential construction (Savills June 2020)5 estimated that in 2020-21 completions will fall by 33% on the previous year. 3.9 Following the introduction of restrictive measures in March 2020, as a result of the covid pandemic, It is evident that there have been significant implications on the construction industry 3.10 Based on the anecdotal and statistical evidence above and for the purposes of this Report it is assumed that completions for 7-month period beginning (April 2020) were an average of 60% of those achieved in 2019/2020. This percentage is a reasonable level that balances the MCLG of 64% decrease in Q2 (April – June 2020) with the conclusions of the Savills Report. 3.11 The total of 753 completions recorded over the 19-month period means that there was an average of 40 completions per month. A simple extrapolation of this average would result in 476 completions in the year ending March 2020 and a further 277 in the 7 months to the end of October 2020. However, due to the impact of the pandemic it is clear that the level of completions has been below average since April 2019. For the purposes of this Report it is considered reasonable to apply an assumed 40% reduction to the 7-month period ending October 2020.
Recommended publications
  • Thetford Area Hereward Way P 2 Santon House Little Ouse River

    Thetford Area Hereward Way P 2 Santon House Little Ouse River

    Norfolk health, heritage and biodiversity walks Blood Hill 3 Tumulus Walks in and around the Thetford area Hereward Way P 2 Santon House Little Ouse River Norfolk County Council at your service Contents folk or W N N a o r f o l l k k C o u s n t y C o u n c y i it l – rs H ve e di alth io Introduction page 2 • Heritage • B Walk 1 Thetford Castle Hill page 6 Walk 2 Thetford Haling Path page 10 Walk 3 Thetford Abbeygate page 14 Walk 4 Thetford Spring Walk page 18 Walk 5 Thetford BTO Nunnery Lakes Walk page 22 Walks 6 and 7 Great Hockham Woods page 28 Walks 8, 9 and 10 Santon Downham page 32 Walks 11 and 12 Lynford Stag Walks page 38 Walk 13 Rishbeth Wood page 42 Walks locations page 46 Useful contacts page 47 Project information page 48 •Song thrush Photograph by John Harding 1 Introduction ontact with natural surroundings offers a restorative enhance and restore the County’s biological diversity. On these walks you C environment which enables you to relax, unwind and recharge your will be able to see many aspects of the rich and varied biodiversity Norfolk batteries, helping to enhance your mood and reduce your stress levels. has to offer. More details can be found at www.norfolkbiodiversity.org To discover more about the Brecks, visit the website www.brecks.org Regular exercise can help to prevent major conditions, such as coronary heart disease, type II diabetes, high blood pressure, strokes, obesity, osteoporosis, osteoarthritis, bowel cancer and back pain.
  • WAYLANDER EDITORIAL at a Glance: BOARD AGM Saturday 4Th April – Coffee Morning 10–12 the AGM Will Take Place at Thompson Noon

    WAYLANDER EDITORIAL at a Glance: BOARD AGM Saturday 4Th April – Coffee Morning 10–12 the AGM Will Take Place at Thompson Noon

    TThehe Griston Merton Caston WWaayylanlandderer Thompson Stow Bedon Breckles A magazine of local news for the Wayland Group of Parishes Gt. Hockham March 2020 WAYLAND GROUP DIRECTORY COUNTY COUNCILLORS Caston/Griston—Clare Bowes 07789 796937 Breckles/Gt Hockham/Merton/Stow Bedon/Thompson— Fabian Eagle 07450 679838 DISTRICT COUNCILLOR Caston/Griston/Breckles/Gt Hockham/Merton/Stow Bedon/Thompson— Phil Cowen 488393 PARISH COUNCILLORS Caston—Chairman: Jaki Porter 483899; Clerk: Jo Blackman 01842 829821 Gt Hockham—Chairman: David Childerhouse 498079; Clerk: David Childerhouse 498079 Griston—Chairman: David Barnett 880441; Clerk: Jean Williams 884082 Merton—Chairman: Martin Parker 883492 Clerk: Vicky Turner 07961 806849 Stow Bedon and Breckles—Chairman: Jonathon White 498515; Clerk: Julian Gibson 499980 —Chair: Jean Kaye 488254; Clerk: Kim Austin 07811 287071 Thompson WAYLAND GROUP MINISTER AND CHURCHWARDENS Interim Parish Minister : Adrian Bell Breckles—St. Margaret: Karen Allen 498408 Caston—Holy Cross: Bridget Hall 483751; Lois Gill 488157 Gt Hockham—Holy Trinity: Jamie Plummer Griston—St. Peter & St. Paul: Sylvia Wright 883608; Keith Mace 880153 Merton—St. Peter: Carole Haggett 483526 Stow Bedon—St. Botolph: Beryl Warren 483375 Thompson—St. Martin: Katharine Wolstenholme 483318 VILLAGE CORRESPONDENTS Breckles: Bella Sandcraft 798983 [email protected] Caston: Annabel Valentine 483440 [email protected] Gt Hockham: Christine Rogers 498492 [email protected] Griston: Jacqueline Bailey 889922 [email protected] Merton: Helen Riley 884555 [email protected] Stow Bedon: Gillian Machorton 483446 [email protected] Thompson: Bronwen Tyler 483741 [email protected] Copy deadline: All copy for the magazine must be passed to the Editorial Board through your Village Correspondent.
  • Electoral Review of Breckland Council Proposal for a Warding Pattern

    Electoral Review of Breckland Council Proposal for a Warding Pattern

    Electoral Review of Breckland Council Proposal for a warding pattern across Breckland Council to support a Council size of 50 Councillors September 2013 Breckland Council Page 1 05/09/13 Introduction The Council was pleased to receive notification from the Local Government Boundary Commission that the Council’s submission for a council size of 50 had been adopted. The Commission has now asked for submissions proposing Warding patterns that reflect this change. Any group or individual is able to put forward suggestions on Warding patterns for the district. The Local Government Boundary Commission for England will consider all submissions and propose a warding pattern for the district. The Council’s proposals follow the process undertaken by the Working Group of six councillors set up for the purpose of in-depth research into the issues relating to council size and warding. This is a cross- party group with members spread across the district. Guidance issued by the Local Government Boundary Commission suggests that three main rules are followed when a new pattern of wards are produced. They are: Delivering electoral equality for local voters – this means ensuring that each local councillor represents roughly the same number of people so that the value of your vote is the same regardless of where you live in the local authority. Reflecting the interests and identities of local communities – this means establishing electoral arrangements which, as far as possible, maintain local ties and where boundaries are easily identifiable. Promoting effective and convenient local government – this means ensuring that the new wards or electoral divisions can be represented effectively by their elected representative(s) and that the new electoral arrangements as a whole allow the local authority to conduct is business effectively.
  • Norfolk. [Kelly's

    Norfolk. [Kelly's

    71{) PUB NORFOLK. [KELLY'S PUBLICANS-continued. Dog & Duck, Samuel Stevens, :Pilot street, Lynn Crown, J<'rederick Alien, 177 King street; 40 & 41 Regent Dog & Partridge, John Carter, Guildhall street, Thetford street & 40 Market place, Yarmouth Dog & Partridge, Chas. W. Tillott, East Wretham, Thetford Crown, John Bacon, Hindringham, Walsingham R.S.O Dolphin inn, James Carey, 252 Heigham street, Norwich Crown, Chas. Wm. Barnard, Lireat Ellingham,Attleborough Dolphin, Thos. Harvey, Wiggenhall St. Mary Magdalen, Lynn Crown, Horace Beales, Old Buckenham, Attleborongh Dolphin inn, Arthur Oakes, Friars street, Lynn Crown inn, Robert Bennett, Great Hockham, Thetford Dolphin, Alfred Reeve, Church street, Diss Crown, Jn. Bircham, Newton, Horsham St. Faith's, Norwich Dolphin (The), Henry Sharpe, Old Market street, Thetford Crown, Alien Blades, Little Fransham, East Dereham Dove, John Ford, 43 Barrack street, Norwich Crown, George Brown, Dickleburgh, Scole Dove, William Mudd, Great Poringland, Norwich Crown, Thomas Brown, Banham, Attleborough Dove, Samuel Valiant, Wortwell, Harleston Crown, George Bunting, Church street, East Dereham Dray & Horses, J0hn Wix, Tottenhill, Lynn Crown, John Capes, Attleborough Drovers' Rest, Mrs. M. Nightingale, 32 Austin st. Lynn Crown, Frederick Carter, Northwold, Brandon Druid's Arms, Mrs. H. Ruth en, 150 Middlegate !lt. Yarmouth Crown (The), :1.\lrs. Adelaide Clarke, 29 Elm hill, Norwich Duke, George Woodrow, Hindringham, Walsingham R.S.O Crown inn, Edward John Cocks, Mumlford R.S.O Duke's tavern, Francis Kerridge, 12 Tombland, Norwich Crown, Octavius Oliver Colman, Burston, Diss Duke of Connaught, George Harding H1gh, 72 Prince of Crown, Philip Colman, Great Ryburgh, Fakenham Wales road, Norwich Crown, Thomas Cooper, Little Ellingham, Attleborough Duke of Connaught, Alex.
  • 81 Bus Time Schedule & Line Route

    81 Bus Time Schedule & Line Route

    81 bus time schedule & line map 81 Thetford - Wayland Acacdemy View In Website Mode The 81 bus line (Thetford - Wayland Acacdemy) has 2 routes. For regular weekdays, their operation hours are: (1) Thetford: 3:30 PM (2) Watton: 7:50 AM Use the Moovit App to ƒnd the closest 81 bus station near you and ƒnd out when is the next 81 bus arriving. Direction: Thetford 81 bus Time Schedule 17 stops Thetford Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 3:30 PM Wayland High School, Watton Tuesday 3:30 PM Thompson Road, Griston Wednesday Not Operational Longmeadow Close, Griston Thursday Not Operational Church, Griston Friday Not Operational Caston Road, Griston Civil Parish Saturday Not Operational Green, Caston Stow Road, Caston Civil Parish Mere Road, Stow Bedon 81 bus Info Brookside, Great Hockham Direction: Thetford Stops: 17 Post O∆ce, Great Hockham Trip Duration: 41 min Walnut Close, Hockham Civil Parish Line Summary: Wayland High School, Watton, Thompson Road, Griston, Longmeadow Close, Green, Great Hockham Griston, Church, Griston, Green, Caston, Mere Road, School Square, Hockham Civil Parish Stow Bedon, Brookside, Great Hockham, Post O∆ce, Great Hockham, Green, Great Hockham, Dog & Dog & Partridge, East Wretham Partridge, East Wretham, Village Sign, East Wretham, Camp, East Wretham, Brettenham Road, Thetford, Village Sign, East Wretham Churchill Road, Thetford, Deer's Leap, Thetford, Aldi, Thetford, Bus Interchange, Thetford Thetford Road, Wretham Civil Parish Camp, East Wretham Brettenham Road, Thetford Churchill Road,
  • The Doomsday Book Records That Watton (Or Originally Wadetuna) Featured a Church, Manor House and Anglo-Saxon Settlement

    The Doomsday Book Records That Watton (Or Originally Wadetuna) Featured a Church, Manor House and Anglo-Saxon Settlement

    Tourist Information for Your Stay at The Willow House History: The Doomsday Book records that Watton (or Originally Wadetuna) featured a church, manor house and Anglo-Saxon settlement. The hare (wat) and the barrel (tun) Although speculative it is believed that because of the areas commercial ties to the rabbit/hare (wat) production, and the importance of the its principal industry was the manufacture of woollen cloth in Elizabethan times, the raw material being brought in barrels (tun) the nineteenth century derivative of wat being the local dialect word for hare, and ton for barrel, reflects the town name. The motif can now be seen both on the Clock Tower and as the weather vane. The Location and The Willow House: The clock tower of Watton was built in 1679 by Christopher Hey, a wealthy mercer. The tower was built to hold a fire warning bell following the 'Great Fire of Watton' that destroyed more than sixty properties in 1674. This early warning bell, known as 'Ting-Tang' sits in an ornate cupola on top of the tower. The Willow House, dates back from around 1556 and is the only thatched and one of the oldest buildings in Watton. Built on the western edge of the town. When the great fire took hold, blowing to the east, The Willow House survived. This was in 1674. The town was later re-developed: around and to the west of The Willow House. Watton is situated fairly equal distant from the surrounding coastal area, so on a good run you can get from Watton to all points from Kings Lynn round to Great Yarmouth in about an hour, so you can imagine how many attractions there are, for all tastes to visit and see.
  • Puddledock Cottage, Woodlands and the Annexe Into Great Hockham, Proceeding Through the Village and out the Other Side to the Junction with the A1075 Watton Road

    Puddledock Cottage, Woodlands and the Annexe Into Great Hockham, Proceeding Through the Village and out the Other Side to the Junction with the A1075 Watton Road

    PUDDLEDOCK COTTAGE , WOODLANDS AND THE ANNEXE , GREAT HOCKHAM Puddledock Cottage, Woodlands and The Annexe into Great Hockham, proceeding through the village and out the other side to the junction with the A1075 Watton Road. Turn le ft towards (Sid’s Cottage), Puddledock Lane, Great Hockham, Thetford and continue for around half a mile and turn right at the brown sign for camping and caravanning. Follow the road round to the right, keeping right and then turn left into Puddledock Lane. Follow the track all the way to the end where the properties are located. Thetford, Norfolk IP24 1FJ A unique opportunity to acquire three properties and a AGENT’S NOTES: All three properties have their own LPG central heating systems and mains electricity. The mains water supply may be subject to 2,300 sq ft barn/workshop in a lovely position on the regularisation on sale. Above ground Calor Gas tanks. Foul drainage is currently directed to a pumping station located within the grounds edge of Thetford Forest with countryside views. The of the adjoining camp site. The oil storage tank beside the workshop will be removed. The red boundary lines on the plan below roughly properties comprise a four bedroom semi-detached reflect the boundary fences as they currently are although these can be varied depending on the requirements of a buyer, subject to the cottage, a four/five bedroom semi-detached cottage and seller’s agreement. a detached one bedroom bungalow, the whole standing in grounds totalling around 0.85 acre (subject to VIEWING measured survey). The whole or in parts offers potential Viewing is strictly by appointment with the selling agent’s Norwich office.
  • Waylander? Give  a Call on 0 to Find out More

    Waylander? Give  a Call on 0 to Find out More

    Griston TThehe Merton Caston Thompson WWaayylanlandderer Stow Bedon Breckles A magazine of local news for the Wayland Group of Parishes Gt. Hockham March 2021 WAYLAND GROUP DIRECTORY COUNTY COUNCILLORS Caston/Griston—Clare Bowes 07789 796937 Breckles/Gt Hockham/Merton/Stow Bedon/Thompson— Fabian Eagle 07450 679838 DISTRICT COUNCILLOR Caston/Griston/Breckles/Gt Hockham/Merton/Stow Bedon/Thompson— Phil Cowen 488393 PARISH COUNCILLORS Caston—Chairman: Jaki Porter 483899; Clerk: Jo Blackman 01842 829821 Gt Hockham—Chairman: David Childerhouse 498079; Clerk: David Childerhouse 498079 Griston—Clerk: Jean Williams 884082 Merton—Chairman: Louise Hyde 889419 Clerk: Vicky Turner 07961 806849 Stow Bedon and Breckles—Chairman: Jonathon White 498515; Clerk: Julian Gibson 499980 —Chair: Jean Kaye 488254; Clerk: Kim Austin 07811 287071 Thompson WAYLAND GROUP MINISTER AND CHURCHWARDENS Interim Parish Minister : Adrian Bell Breckles—St. Margaret: Karen Allen 498408 Caston—Holy Cross: Bridget Hall 483751; Lois Gill 488157 Gt Hockham—Holy Trinity: Jamie Plummer Griston—St. Peter & St. Paul: Sylvia Wright 883608; Keith Mace 880153 Merton—St. Peter: Carole Haggett 483526 Stow Bedon—St. Botolph: Beryl Warren 483375 Thompson—St. Martin: Katharine Wolstenholme 483318 VILLAGE CORRESPONDENTS Breckles: Bella Sandcraft 798983 [email protected] Caston: Annabel Valentine 483440 [email protected] Gt Hockham: Christine Rogers 498492 [email protected] Griston: Jacqueline Bailey 889922 [email protected] Merton: Helen Riley 884555 [email protected] Stow Bedon: Clare Rowling 488993 [email protected] Thompson: Bronwen Tyler 483741 [email protected] Copy deadline: All copy for the magazine must be passed to the Editorial Board through your Village Correspondent. Please check the deadline date each month and note that nothing will be accepted for publication after this.
  • Situation of Polling Station

    Situation of Polling Station

    BRECKLAND COUNCIL Polling Station List UKPGE Thursday 12 December 2019 Reference Address Districts 1 Great Hockham Village Hall, Edinburgh Hall, Harling Road, Great AL10,AL5 Hockham, Norfolk, IP24 1NT 2 Thompson Community Hall, School Road, Thompson, Norfolk, IP24 AL11 1PY 3 Wretham Village Hall, Church Road, East Wretham, Norfolk, IP24 AL12 1RL 4 Garnier Village Hall, Station Road, Eccles, Norfolk, NR16 2JG AL13,AL7 5 Merton Mobile Polling Station, Merton Village Hall, Merton, Norfolk, AL6 IP25 6QU 6 Shropham Village Hall, Rocklands Road, Shropham, Norfolk, NR17 AL9 1DU 7 Great Cressingham Village Hall, Watton Road, Great Cressingham, AS2,AS3,AS6 Norfolk, IP25 6NQ 8 Hilborough Mills Memorial Hall, Westgate Street, Hilborough, AS4 Norfolk, IP26 5BS 9 Cockley Cley (Room At The Twenty Church Wardens), Swaffham BE1 Road, Cockley Cley, Norfolk, PE37 8AN 10 Mundford Village Hall, St Leonards Street, Mundford, Norfolk, IP26 BE2,BE3,BE6,BE7,F 5DW O5 11 Foulden Village Hall, Vicarage Road, Foulden, Norfolk, IP26 5AB BE4 12 Gooderstone Church of England Primary Academy, The Street, BE5 Gooderstone, Norfolk, PE33 9BP 13 Oxborough Village Hall, Swaffham Road, Oxborough, Norfolk, PE33 BE8 9QB 14 Brettenham Manor (Training Room), Brettenham Road, Brettenham, FO1,FO3 Norfolk, IP24 2RP 15 Croxton Village Hall, The Street, Croxton, Norfolk, IP24 1LN FO2 16 West Tofts Camp - Building 2, Building 19, Landmark Support FO4 Services, West Tofts, Norfolk, IP26 5EP 17 Weeting Village Hall, Lynn Road, Saxon Place, Weeting, Suffolk, FO6 IP27 0GH 18 Blo Norton
  • Proposed Anaerobic Digestion Plant at West Farm, Vicarage Road, Great

    Proposed Anaerobic Digestion Plant at West Farm, Vicarage Road, Great

    Proposed Anaerobic Digestion Plant at West Farm, Vicarage Road, Great Hockham, Norfolk IP24 1PE For AT Renewables Planning Application Planning Overview November 2011 COPYRIGHT The contents of this document must not be copied or reproduced in whole or in part without the written consent of Active Technologies Document Status – Planning Submission Page 1 Land at West Farm, Vicarage Road, Great Hockham, Norfolk, IP24 1PE for Proposed Anaerobic digestion system Contents Introduction Page 3 Active Technology Page 3 West Farm Page 3 Proposal Page 4 The Renewable Agenda Page 4 Anaerobic Digestion systems Page 4 Economic Consideration Page 5 Policy Page 5 General Impact Issues Page 6 Environmental Issues Page 7 Community Consultation Page 10 Conclusion Page 11 Appendix A Page 12 Appendix B Page 13 Document Status – Planning Submission Page 2 Land at West Farm, Vicarage Road, Great Hockham, Norfolk, IP24 1PE for Proposed Anaerobic digestion system Introduction AT Renewables are commissioned by Mr A J & Mr M J Beard to progress for the development of an Anaerobic Digestion system, on land at West Farm, Vicarage Road, Great Hockham, Norfolk, IP24 1PE The scheme is currently estimated to include the installation of:- 1,200 m3 capacity underground Anaerobic Digester tanks and mixing tank Control/Pump room and ancillary equipment Combine hear and power engine, gas scrubber and connection to local electrical grid system for export. The scheme has been designed to minimise visual impact whilst complying with Mr Bread’s and AT Renewables requirements. The overall impact will be small, while the scheme itself if firmly in line with National, Regional and Local Government policy on renewable energy and sustainable technologies.
  • 81 Bus Time Schedule & Line Route

    81 Bus Time Schedule & Line Route

    81 bus time schedule & line map 81 Watton - Thetford View In Website Mode The 81 bus line (Watton - Thetford) has 3 routes. For regular weekdays, their operation hours are: (1) Great Hockham: 1:30 PM (2) Thetford: 9:30 AM - 11:45 AM (3) Watton: 10:20 AM - 12:45 PM Use the Moovit App to ƒnd the closest 81 bus station near you and ƒnd out when is the next 81 bus arriving. Direction: Great Hockham 81 bus Time Schedule 11 stops Great Hockham Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 1:30 PM Crown, Watton 33 High Street, Watton Civil Parish Tuesday 1:30 PM Thompson Road, Griston Wednesday 1:30 PM Longmeadow Close, Griston Thursday 1:30 PM Friday 1:30 PM Church, Griston Caston Road, Griston Civil Parish Saturday Not Operational Green, Caston Stow Road, Caston Civil Parish Thompson Road, Griston 81 bus Info Direction: Great Hockham Mere Road, Stow Bedon Stops: 11 Trip Duration: 20 min Brookside, Great Hockham Line Summary: Crown, Watton, Thompson Road, Griston, Longmeadow Close, Griston, Church, Turn, Great Hockham Griston, Green, Caston, Thompson Road, Griston, Mere Road, Stow Bedon, Brookside, Great Hockham, Green, Great Hockham Turn, Great Hockham, Green, Great Hockham, Post O∆ce, Great Hockham School Square, Hockham Civil Parish Post O∆ce, Great Hockham Walnut Close, Hockham Civil Parish Direction: Thetford 81 bus Time Schedule 23 stops Thetford Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 9:30 AM - 11:45 AM Crown, Watton 33 High Street, Watton Civil Parish Tuesday 9:30 AM - 11:45 AM Thompson
  • I L the Field Systems of Breckland M. R. POSTOATE

    I L the Field Systems of Breckland M. R. POSTOATE

    ii ~!t ! The Field Systems of Breckland By M. R. POSTOATE i~i :i I i!! / F I E L D patterns are among the more permanent and obvious features i:!i :i~ i! of the rural landscape. Since Parliamentary Enclosure overtook all but ill : a few scattered remnants of the former open-field cultivation these pat- terns have become more stereotyped and regional variations less apparent. ii: : To the agricultural historian, however, the distribution of regional variations in former field systems is of interest, raising, as it does, the question whether similar patterns are genetically linked by a common racial origin or whether these convergences are a response to a similar natural and economic environ- ment. ( The work of Meitzen and Bloch on the Continent was matched in this country by that of Gray, which provided the first comprehensive account of .!, the variations in English field systems? Gray's interpretations of the general patterns and terminology remain valid, but since his work appeared in 1915 several decades of detailed regional studies have provided a sounder basis for comparative work on the modus operandi of his regional types of field systems. It was inevitable that, in the light of later knowledge, many of his conclusions iiii~ and generalizations should lose their validity. Not the least important deve- T lopment has been the increasing recognition of the influence of environment on field patterns, in contrast to his wholly ethnic explanations. Breckland provides an opportunity to test Gray's theories of a general East i : Anglian system in a limited but distinctive region.